Anda di halaman 1dari 6

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

No.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.

URAIAN

ASPHALT MIXING PLANT


ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100-150 HP
COMPRESSOR 4000-6500 L\M
CONCRETE MIXER 0.3-0.6 M3
CRANE 10-15 TON
DUMP TRUCK 3-4 M3
FLAT BED TRUCK
EXCAVATOR 80-140 HP
FLAT BED TRUCK 3-4 M3
GENERATOR SET
MOTOR GRADER >100 HP
TRACK LOADER 75-100 HP
WHEEL LOADER 1.0-1.6 M3
THREE WHEEL ROLLER 6-8 T
TANDEM ROLLER 6-8 T.
TIRE ROLLER 8-10 T.
VIBRATORY ROLLER 5-8 T.
CONCRETE VIBRATOR
STONE CRUSHER
WATER PUMP
WATER TANKER 3000-4500 L.
PEDESTRIAN ROLLER
TAMPER
JACK HAMMER
FULVI MIXER
CONCRETE PUMP
TRAILER 20 TON
PILE DRIVER + HAMMER
CRANE ON TRACK 35 TON
WELDING SET
BORE PILE MACHINE
ASPHALT LIQUID MIXER
TRAILLER 15 TON
ROCK DRILL BREAKER
COLD MILLING
VIBRATORY ROLLER 1 T.

File : 301665943.xls

KODE

E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38

HP

125.0
47.0
25.0
105.0
35.0
10.0
200.0
120.0
145.0
105.0
145.0
170.0
125.0
95.0
85.0
60.0
60.0
60.0
60.0
4.0
60.0
8.0
115.0
5.0
5.0
8.0
75.0
60.0
175.0
25.0
125.0
40.0
150.0
5.0
150.0
3.0
125
7.0

KAPASITAS

50.0 T/Jam
6.0 Ton
1,000.0 Liter
5,000.0
5,000.00
0.3 M3
25.0 Ton
4.0 Ton
8.0 Ton
0.9 M3
5.0 M3
125.0 KVA
1.5 M3
1.5 M3
8.0 Ton
8.0 Ton
95.0 Ton
90.0 Ton
60.0 T/Jam
2.0
2.00
4,000.0 Liter
1.00 Ton
0.60 Ton
0.75 M3
20.00 Ton
2.50 Ton
35.0 Ton
250.0 Amp
2,000.0 Meter
1,000.0 Liter
15.0 Ton

1.00 Ton

HARGA
ALAT

1,710,625,000
636,093,750
143,750,000
783,437,500
143,750,000
43,125,000
765,516,600
120,176,000
204,843,750
682,812,500
179,687,500
341,406,250
664,843,750
220,000,000
571,406,250
428,770,000
348,593,750
343,750,000
424,062,500
8,265,625
1,423,250,703
14,375,000
115,000,000
12,500,000
16,171,875
10,781,250
46,000,000
112,500,000
166,250,000
70,000,000
350,000,000
17,500,000
2,250,000,000
15,000,000
115,000,000
27,721,250
474,750,000
48,000,000

JAM KERJA
BIAYA
SEWA

KET.

ALAT/JAM
(di luar PPN)

1,217,541.46
146,607.43
60,409.82
222,398.67
57,956.96
32,470.08
257,166.67
72,040.74
108,425.20
199,511.80
122,796.29
154,376.44
208,702.98
105,083.86
171,762.14
132,283.32
116,682.82
135,157.44
141,569.60
18,449.81
353,388.66
23,488.61
91,905.53
17,921.42
18,921.74
18,765.68
56,329.28
44,491.65
106,357.97
24,557.93
117,414.81
20,905.11
468,871.96
5,456.63
88,589.90
42,075.84
211,426.55
30,201.45

File : 301665943.xls

Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru

ANALIS E
E155
E157
E154
E001
E301
E06
E07
E212
E221
E10
E11
E12
E010
E14
E052
E080
E081
E084
E082
E089
E031
E341
E182
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36

asphalt mixing plants


asphalt finisher
asphalt sprayer
bulldozer
air compressor
concrete mixer
crane
truck
dump truck
excavator
flat bed truck
generator set

E37

rock drill breaker

motor grader
track loader
whell loader
three whell roller
tandem roller
pneumatic tire roller
vibratory roller
concrete vibrator
stone crusher
water pump
water tanker
pedestrian roller
plate temper
jack hammer
fulvi mixer
concrete pump
trailer
pile diver hammer
crane on truck
velding set
bore pile
asphalt liquid mixer
trailler
cold milling (winget)

URAIAN ANALISA ALAT


No.

URAIAN

KODE

KOEF.

SATUAN

Tabel-tabel di ba
KET.
Merupakan acua
HARGA

A.
1.
2.
3.
4.

5.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

Alat Yang Dipakai :

ALAT

a.
b.
c.
a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

Pw
Cp
A
W
B
A'
W'
B'

TRAILLER 15 TON
150.0
15.0
10.0
1,500.0
115,000,000
10.0
1,500.0
115,000,000

E35
HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

UE'
###
E35
###
###
Alat Baru
Alat Baru
Alat Baru
###

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam


C.

11,500,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.19171

( B' - C ) x D
W'

13,228.23

Rupiah

153.33

Rupiah

13,381.57

Rupiah

0.002 x B'
W'
=

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

39,375.00

Rupiah

2.

Pelumas

26,250.00

Rupiah

3.

Perawatan dan =
perbaikan
Operator
Pembantu Operator

9,583.33

Rupiah

L
M

14,285.71
19,285.71

Rupiah
Rupiah

108,779.76

Rupiah

122,161.33

Rupiah

4.
5.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

Biaya Operasi per Jam

(12,5 % - 17,5 %) x B
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

File : 301665943.xls

i
U1
U2
Mb
Ms
Mp

14.00 % / Tahun
14,285.71
Rp./Jam
6,428.57
Rp./Jam
2,400.00
Liter
2,100.00
Liter
17,500.00
Liter

###
###
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

###
###
###
###
###
###
###

###

URAIAN ANALISA ALAT


No.

URAIAN

KODE

KOEF.

SATUAN

Tabel-tabel di ba
KET.
Merupakan acua
HARGA

A.
1.
2.
3.
4.

5.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

Alat Yang Dipakai :

ALAT

a.
b.
c.
a.
b.
c.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat (*)

Pw
Cp
A
W
B
A'
W'
B'

COLD MILLING (WINGET)


125.0
HP
10.0
Tahun
1,500.0
Jam
474,750,000
Rupiah
5.0
Tahun
1,500.0
Jam
474,750,000
Rupiah

E36
UE'
#
E35
###
###
Alat Baru
Alat Baru
Alat Baru
###

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

47,475,000

i x (1 + i)^A'
(1 + i)^A' - 1

0.29128

( B' - C ) x D
W'

82,972.12

Rupiah

633.00

Rupiah

83,605.12

Rupiah

0.002 x B'
W'

Biaya Pasti per Jam


C.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

32,812.50

Rupiah

2.

Pelumas

21,875.00

Rupiah

3.

Perawatan dan =
perbaikan
Operator
Pembantu Operator

39,562.50

Rupiah

L
M

14,285.71
19,285.71

Rupiah
Rupiah

127,821.43

Rupiah

211,426.55

Rupiah

4.
5.

###
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#
#

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp
(12,5 % - 17,5 %) x B'
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

Biaya Operasi per Jam

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

14.00 % / Tahun
14,285.71
Rp./Jam
6,428.57
Rp./Jam
2,400.00
Liter
2,100.00
Liter
17,500.00
Liter

###
###
###
###
###
###
###
###

URAIAN ANALISA ALAT


###
###
No.

URAIAN

KODE

KOEF.

SATUAN

KET.

> 15th ?

Kon

A.
1.
2.
3.
4.

5.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:

Alat Yang Dipakai :

File : 301665943.xls

Nila

a.
b.
c.
a.

Umur Ekonomis
Jam Kerja Dalam 1 Tahun
Harga Alat
Umur Ekonomis

Pw
Cp
A
W
B
A'

ROCK DRILL BREAKER


3.0
HP
10.0
Tahun
1,500.0
Jam
27,721,250
Rupiah
5.0
Tahun

E37
#
E38
###
###
Alat Baru

b. Jam Kerja Dalam 1 Tahun


c. Harga Alat (*)
B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

W'
B'

1,500.0
27,721,250

Jam
Rupiah

2,772,125

Rupiah

i x (1 + i)^A'
(1 + i)^A' - 1

0.29128

( B' - C ) x D
W'

4,844.85

Rupiah

36.96

Rupiah

Alat Baru
Alat Baru

###
###
###
###
###
###
###
###
> 15th ?

Kon

b. Asuransi, dll =

Biaya Pasti per Jam


C.

0.002 x B'
W'
=

(E+F)

Dep

4,881.81

Rupiah

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms

787.50

Rupiah

2.

Pelumas

525.00

Rupiah

3.

Perawatan dan =
perbaikan
Operator
Pembantu Operator

2,310.10

Rupiah

L
M

14,285.71
19,285.71

Rupiah
Rupiah

37,194.03

Rupiah

42,075.84

Rupiah

4.
5.

= (0.01-0.02 Ltr/HP/Jam) x Pw x Mp

Biaya Operasi per Jam


D.

(12,5 % - 17,5 %) x B
W'
= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2
=

(H+I+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

Nila

#
E39
###
###
###
###
###
###
###
###
###
###
###
###
###
> 15th ?

Kon

Nila

Dep

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

File : 301665943.xls

i
U1
U2
Mb
Ms
Mp

14.00 % / Tahun
14,285.71
Rp./Jam
6,428.57
Rp./Jam
2,400.00
Liter
2,100.00
Liter
17,500.00
Liter

#
E40
###
###
###
###
###
###
###

Anda mungkin juga menyukai