Di Buat Oleh :
KONSULTAN PERENCANA
CV. QOLBU PERSADA CONSULTANT
UPAH /
NO. NAMA PERSONIL HARI KETERANGAN
( Rp. )
Di Buat Oleh :
KONSULTAN PERENCANA
CV. QOLBU PERSADA CONSULTANT
Kkhusus
HARGA SATUAN
NO NAMA SATUAN BAHAN SATUAN KODE JAUH KETERANGAN
Rp.
BAHAN LOKAL
1 Batu belah 10 - 15 / 15 - 20 Cm M3 M. 020 254.000
2 Pasir beton / pasir pasang M3 M. 041 196.000
3 Batu Pecah Mesin 1-2 cm M3 M. 025 A 318.000
KAYU 0
1 Kayu Lokal papan 2/20, 3/30, 3/30 X 4 M' M3 3.164.100
2 Kayu Lokal Usuk 5/7, 4/6 X 4 M' / Perancah M3 2.260.100
3 Kayu Begisting M3 M. 180 1.356.000
PORTLAND CEMENT ( PC )
1 Semen 40 Kg ( Gresik ) Zak M. 080 A 57.400
2 Paku reng / papan Kg - 19.400
3 Bendrat / Kawat beton Kg M. 168 22.100
BESI & ALUMINIUM
1 Besi beton Kg M. 167 12.000
2 Batu Tempel motif bata 20/40 M2 148.200
CAT KAYU & CAT TEMBOK.
1 Ter / Minyak Bekisting Ltr M. 182 29.500
SANITAIR
1 Pipa GI Q 2" Medium B panjang 6 m Ljr - 617.925
2 Pipa PVC SNI AW. Q 1/2" pj = 4 m Ljr - 62.000
3 Molen bh/hr 395.400
4 Excavator Unit/hr 542.578
5 Rambu Pengaman bh 650.000
6 Prasasti 80x60 cm bh 1.000.000
7 Peil Scale (Bak Ukur Ketinggian Air) bh 900.000
Di Buat Oleh :
KONSULTAN PERENCANA
CV. QOLBU PERSADA CONSULTANT
6 DARI 7
Analisa EI-3,1 (1) C
A. TENAGA
B. BAHAN
C. PERALATAN