UPAH /
NO. NAMA PERSONIL HARI KETERANGAN
( Rp. )
3 Tukang 90,000 90
4 Pekerja 80,000 80
9 1 M2 Membongkar genteng
- Pekerja 0.0400 Oh Rp. 80,000 =
- Mandor 0.0200 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
11 1 M2 Membongkar reng/kaso-kaso
- Pekerja 0.0500 Oh Rp. 80,000 =
- Tukang kayu 0.2000 Oh Rp. 90,000 =
- Kepala tukang 0.0050 Oh Rp. 95,000 =
- Mandor 0.0100 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
3 1 m2 Membersihkan lapangan dan perataan
Tenaga
- Pekerja 0.1000 Oh Rp. 80,000 =
- Mandor 0.0500 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
Tenaga
- Pekerja 1.5000 Oh Rp. 80,000 =
- Tukang batu 0.7500 Oh Rp. 90,000 =
- Kepala Tukang 0.0750 Oh Rp. 95,000 =
- Mandor 0.0750 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Alat
- Molen 0.1670 sewa/hrRp. 11,200 =
Jumlah ( 3 )
Jumlah A ( 1+2+3) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
5 Membuat 1 m3 beton mutu f'c = 19,38 Mpa (K 225), Slump (12 + 2 ) cm, w/c = 0,58
Bahan
- Semen PC 40 kg/zak 371.0000 kg Rp. 1,625 =
- Pasir beton 0.4986 M3 Rp. 275,000 =
- Batu pecah mesin 1-2 cm / 2-3 cm 0.7756 M3 Rp. 350,000 =
- Air 215.000 ltr Rp. 100 =
- Sewa molen 0.250 hari Rp. 300,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.6500 Oh Rp. 80,000 =
- Tukang Batu 0.2750 Oh Rp. 90,000 =
- Kepala Tukang 0.0280 Oh Rp. 95,000 =
- Mandor 0.0830 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
6 1Kg Pembesian dengan besi beton polos / besi beton ulir
Bahan
- Besi beton 1.0500 Kg Rp. 7,800 =
- Kawat beton 0.0150 Kg Rp. 20,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0070 Oh Rp. 80,000 =
- Tukang Besi 0.0070 Oh Rp. 90,000 =
- Kepala Tukang 0.0007 Oh Rp. 95,000 =
- Mandor 0.0003 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
8 1 M2 Pasang Bekisting Untuk Sloof
Bahan
- Kayu bekisting 0.0450 M3 Rp. 1,000,000 =
- Paku 0.3000 Kg Rp. 20,000 =
- Minyak bekisting 0.1000 Lt Rp. 30,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.5200 Oh Rp. 80,000 =
- Tukang Kayu 0.2600 Oh Rp. 90,000 =
- Kepala Tukang 0.0260 Oh Rp. 95,000 =
- Mandor 0.0260 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
9 1 M2 Pasang Bekisting Untuk Kolom
Bahan
- Kayu bekisting 0.0400 M3 Rp. 1,000,000 =
- Paku 0.4000 Kg Rp. 20,000 =
- Minyak bekisting 0.2000 Ltr Rp. 30,000 =
- Kayu Lokal Balok 0.0150 M3 Rp. 2,100,000 =
- Plywood tebal 9mm 0.3500 lbr Rp. 115,000 =
- Dolken Kayu Q8 - 10 /400cm 2.0000 btg Rp. 15,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.6600 Oh Rp. 80,000 =
- Tukang Kayu 0.3300 Oh Rp. 90,000 =
- Kepala Tukang 0.0330 Oh Rp. 95,000 =
- Mandor 0.0330 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
11 1 M2 Pasang Bekisting Untuk Plat Lantai
Bahan
- Kayu bekisting 0.0400 M3 Rp. 1,000,000 =
- Paku 0.4000 Kg Rp. 20,000 =
- Minyak bekisting 0.2000 Ltr Rp. 30,000 =
- Kayu Lokal Balok 0.0150 M3 Rp. 2,100,000 =
- Plywood tebal 9mm 0.3500 lbr Rp. 115,000 =
- Dolken Kayu Q8 - 10 /400cm 6.0000 btg Rp. 15,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.6600 Oh Rp. 80,000 =
- Tukang Kayu 0.3300 Oh Rp. 90,000 =
- Kepala Tukang 0.0330 Oh Rp. 95,000 =
- Mandor 0.0330 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
14 1 M2 Membongkar bekisting
- Pekerja 4.0000 Oh Rp. 80,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
16 1 M3 Sloof Beton K.225 uk. 12x20 cm, tul 4 Q 12mm, begel Q 6-20 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 168.7350 kg Rp. 11,007 =
Bekisting untuk sloof 5.0500 m2 Rp. 140,310 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
19 1 M3 Kolom Beton K.225 uk. 30x30 cm, tul 12 Q 16mm, begel Q 8-15 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 169.2100 kg Rp. 11,007 =
Bekisting untuk kolom 6.1800 m2 Rp. 276,198 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
28 1 M3 Plat Beton K.225, tebal 8 cm, tul Q 8 mm - 25 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 49.1556 kg Rp. 11,007 =
Bekisting untuk pondasi 5.2700 m2 Rp. 343,698 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
1 1 M2 Pasang atap genteng tipe Press
Bahan
- Genteng Press 25.0000 Bh Rp. 1,800 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.1500 Oh Rp. 80,000 =
- Tukang Kayu 0.0750 Oh Rp. 90,000 =
- Kepala Tukang 0.0080 Oh Rp. 95,000 =
- Mandor 0.0080 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
5 1 M' Pasang bubung genteng type Press
Bahan
- Genteng bubung Press 5.0000 Bh Rp. 15,000 =
- Semen PC 40 kg/zak 8.0000 kg Rp. 1,625 =
- Pasir pasang 0.0320 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.4000 Oh Rp. 80,000 =
- Tukang Kayu 0.2000 Oh Rp. 90,000 =
- Kepala Tukang 0.0200 Oh Rp. 95,000 =
- Mandor 0.0020 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
3 Memasang 1 buah wastafel Ex INA
Bahan
- Wastafel "INA" 1.2000 Bh Rp. 200,000 =
- Perlengkapan (12% harga wastafel) 0.1200 hrg Rp. 200,000 =
- Semen PC 40 kg/zak 6.0000 kg Rp. 1,625 =
- Pasir pasang 0.0100 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.2000 Oh Rp. 80,000 =
- Tukang batu 1.4500 Oh Rp. 90,000 =
- Kepala tukang 0.1500 Oh Rp. 95,000 =
- Mandor 0.0600 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
4 1 M' Pas. Pipa PVC Q 3/4
Bahan
- Pipa PVC Q 3/4" 0.3000 Ljr Rp. 45,000 =
- Perlengkapan 35 % Rp. 13,500 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0360 Oh Rp. 80,000 =
- Tukang batu 0.0600 Oh Rp. 90,000 =
- Kepala tukang 0.0060 Oh Rp. 95,000 =
- Mandor 0.0020 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
7 1 Bh Pas Kran Q 3/4" Merk Ex San Ei
Bahan
- Kran air San Ei Q 3/4 1.0000 bh Rp. 35,000 =
- Seal tape 0.0250 bh Rp. 6,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0100 Oh Rp. 80,000 =
- Tukang batu 0.4000 Oh Rp. 90,000 =
- Kepala tukang 0.0400 Oh Rp. 95,000 =
- Mandor 0.0050 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
17 1 M' Pasang pipa penyalur limbah jenis pipa tanah, diameter 20 cm
Bahan
- Pipa Air Limbah SNI 1.6000 m' Rp. 300,000 =
- Semen 40 kg 35.0000 kg Rp. 1,625 =
- Pasir Pasang 0.0140 m3 Rp. 275,000 =
- Pasir Urug 0.0140 m3 Rp. 200,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0800 Oh Rp. 80,000 =
- Tukang pipa 0.0400 Oh Rp. 90,000 =
- kepala Tukang 0.0040 Oh Rp. 95,000 =
- Mandor 0.0040 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), Slump (12 + 2 ) cm, w/c = 0,87
Bahan
- Semen PC 40 kg/zak 247.0000 kg Rp. 1,625 =
- Pasir beton 0.6207 M3 Rp. 275,000 =
- Batu pecah mesin 1-2 cm / 2-3 cm 0.7400 M3 Rp. 350,000 =
- Air 215.000 ltr Rp. 100 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.6500 Oh Rp. 80,000 =
- Tukang Batu 0.2750 Oh Rp. 90,000 =
- Kepala Tukang 0.0280 Oh Rp. 95,000 =
- Mandor 0.0830 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1PC : 2 PP
Bahan :
- Bata Merah 70 Bh Rp. 600 =
- Semen PC 40 kg/zak 9.68 Kg Rp. 1,625 =
- Pasir Pasang 0.045 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga Kerja :
- Pekerja 0.32 Oh Rp. 80,000 =
- Tukang Batu 0.1 Oh Rp. 90,000 =
- Kepala Tukang 0.01 Oh Rp. 95,000 =
- Mandor 0.015 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
Rp. 9,000.00
Rp. 8,000.00
Rp. 950.00
Rp. 625.00
Rp. 18,575.00
Rp. 61,735.00
Rp. 7,716.88
Rp. 69,451.00
Rp. 3,200.00
Rp. 2,500.00
Rp. 5,700.00
Rp. 712.50
Rp. 6,412.00
Rp. 4,000.00
Rp. 18,000.00
Rp. 475.00
Rp. 1,250.00
Rp. 23,725.00
Rp. 2,965.63
Rp. 26,690.00
Rp. 8,000.00
Rp. 6,250.00
Rp. 14,250.00
Rp. 1,781.25
Rp. 16,031.00
Rp. 60,000.00
Rp. 3,125.00
Rp. 63,125.00
Rp. 7,890.63
Rp. 71,015.00
Rp. 23,600.00
Rp. 120,000.00
Rp. 120,000.00
Rp. 20,000.00
Rp. 3,125.00
Rp. 23,125.00
Rp. 143,125.00
Rp. 17,890.63
Rp. 161,015.00
Rp. 40,000.00
Rp. 6,250.00
Rp. 46,250.00
Rp. 5,781.25
Rp. 52,031.00
Rp. 264,000.00
Rp. 264,000.00
Rp. 24,000.00
Rp. 1,250.00
Rp. 25,250.00
Rp. 289,250.00
Rp. 36,156.25
Rp. 325,406.00
Rp. 300,000.00
Rp. 328,250.00
Rp. 133,375.00
Rp. 761,625.00
Rp. 120,000.00
Rp. 67,500.00
Rp. 7,125.00
Rp. 9,375.00
Rp. 204,000.00
Rp. 1,870.40
1,870.40
Rp. 967,495.40
Rp. 120,936.93
Rp. 1,088,432.00
Rp. 602,875.00
Rp. 137,115.00
Rp. 271,460.00
Rp. 21,500.00
Rp. 75,000.00
Rp. 1,107,950.00
Rp. 132,000.00
Rp. 24,750.00
Rp. 2,660.00
Rp. 10,375.00
Rp. 169,785.00
Rp. 1,277,735.00
Rp. 159,716.88
Rp. 1,437,451.00
Rp. 8,190.00
Rp. 300.00
Rp. 8,490.00
Rp. 560.00
Rp. 630.00
Rp. 66.50
Rp. 37.50
Rp. 1,294.00
Rp. 9,784.00
Rp. 1,223.00
Rp. 11,007.00
Rp. 45,000.00
Rp. 6,000.00
Rp. 3,000.00
Rp. 54,000.00
Rp. 41,600.00
Rp. 23,400.00
Rp. 2,470.00
Rp. 3,250.00
Rp. 70,720.00
Rp. 124,720.00
Rp. 15,590.00
Rp. 140,310.00
Rp. 40,000.00
Rp. 8,000.00
Rp. 6,000.00
Rp. 31,500.00
Rp. 40,250.00
Rp. 30,000.00
Rp. 155,750.00
Rp. 52,800.00
Rp. 29,700.00
Rp. 3,135.00
Rp. 4,125.00
Rp. 89,760.00
Rp. 245,510.00
Rp. 30,688.75
Rp. 276,198.00
Rp. 40,000.00
Rp. 8,000.00
Rp. 6,000.00
Rp. 31,500.00
Rp. 40,250.00
Rp. 90,000.00
Rp. 215,750.00
Rp. 52,800.00
Rp. 29,700.00
Rp. 3,135.00
Rp. 4,125.00
Rp. 89,760.00
Rp. 305,510.00
Rp. 38,188.75
Rp. 343,698.00
Rp. 320,000.00
Rp. 320,000.00
Rp. 40,000.00
Rp. 360,000.00
Rp. 1,437,451.00
Rp. 1,857,266.15
Rp. 708,565.50
Rp. 360,000.00
Rp. 4,363,282.00
Rp. 1,437,451.00
Rp. 1,862,494.47
Rp. 1,706,903.64
Rp. 360,000.00
Rp. 5,366,849.00
Rp. 1,437,451.00
Rp. 541,055.69
Rp. 1,811,288.46
Rp. 360,000.00
Rp. 4,149,795.00
Rp. 45,000.00
Rp. 45,000.00
Rp. 12,000.00
Rp. 6,750.00
Rp. 760.00
Rp. 1,000.00
Rp. 20,510.00
Rp. 65,510.00
Rp. 8,188.75
Rp. 73,698.00
Rp. 75,000.00
Rp. 13,000.00
Rp. 8,800.00
Rp. 96,800.00
Rp. 32,000.00
Rp. 18,000.00
Rp. 1,900.00
Rp. 250.00
Rp. 52,150.00
Rp. 148,950.00
Rp. 18,618.75
Rp. 167,568.00
Rp. 240,000.00
Rp. 24,000.00
Rp. 9,750.00
Rp. 2,750.00
Rp. 276,500.00
Rp. 96,000.00
Rp. 130,500.00
Rp. 14,250.00
Rp. 7,500.00
Rp. 248,250.00
Rp. 524,750.00
Rp. 65,593.75
Rp. 590,343.00
Rp. 13,500.00
Rp. 4,725.00
Rp. 18,225.00
Rp. 2,880.00
Rp. 5,400.00
Rp. 570.00
Rp. 250.00
Rp. 9,100.00
Rp. 27,325.00
Rp. 3,415.63
Rp. 30,740.00
Rp. 35,000.00
Rp. 150.00
Rp. 35,150.00
Rp. 800.00
Rp. 36,000.00
Rp. 3,800.00
Rp. 625.00
Rp. 41,225.00
Rp. 76,375.00
Rp. 9,546.88
Rp. 85,921.00
Rp. 480,000.00
Rp. 56,875.00
Rp. 3,850.00
Rp. 2,800.00
Rp. 543,525.00
Rp. 6,400.00
Rp. 3,600.00
Rp. 380.00
Rp. 500.00
Rp. 10,880.00
Rp. 554,405.00
Rp. 69,300.63
Rp. 623,705.00
Rp. 401,375.00
Rp. 170,692.50
Rp. 259,000.00
Rp. 21,500.00
Rp. 852,567.50
Rp. 132,000.00
Rp. 24,750.00
Rp. 2,660.00
Rp. 10,375.00
Rp. 169,785.00
Rp. 1,022,352.50
Rp. 127,794.06
Rp. 1,150,146.00
esi 1PC : 2 PP
Rp. 42,000.00
Rp. 15,730.00
Rp. 12,375.00
Rp. 70,105.00
Rp. 25,600.00
Rp. 9,000.00
Rp. 950.00
Rp. 1,875.00
Rp. 37,425.00
Rp. 107,530.00
Rp. 13,441.25
Rp. 120,971.00
Rp. 8,424.00
Rp. 7,150.00
Rp. 15,574.00
Rp. 16,000.00
Rp. 13,500.00
Rp. 1,425.00
Rp. 1,250.00
Rp. 32,175.00
Rp. 47,749.00
Rp. 5,968.63
Rp. 53,717.00
Rp. 5,281.25
Rp. 5,281.25
Rp. 12,000.00
Rp. 9,000.00
Rp. 950.00
Rp. 1,000.00
Rp. 22,950.00
Rp. 28,231.25
Rp. 3,528.91
Rp. 31,760.00
Rp. -
Rp. 15,000.00
Rp. 15,000.00
Rp. 56,000.00
Rp. 31,500.00
Rp. 3,325.00
Rp. 4,375.00
Rp. 95,200.00
Rp. 110,200.00
Rp. 13,775.00
Rp. 123,975.00
Rp. 1,000.00
Rp. 3,000.00
Rp. 7,800.00
Rp. 11,800.00
Rp. 1,600.00
Rp. 5,670.00
Rp. 598.50
Rp. 375.00
Rp. 8,243.50
Rp. 20,043.50
Rp. 2,505.44
Rp. 22,548.00
RENCANA ANGGARAN DAN BIA
TAHUN ANGGARAN 20
Nama Program :
Nama Kegiatan :
Nama Pekerjaan :
Lokasi Kegiatan :
Sumber Dana :
Volume Kegiatan :
NO URAIAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouplank
2 Membersihkan lapangan dan perataan
Jumlah
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 meter
2 Urugan tanah kembali
3 Urugan tanah kembali dari luar
4 Pemadatan Tanah (per 20 cm)
5 Urugan Pasir Bawah Pondasi
Jumlah
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali, 1Pc : 3 Ps
Jumlah
VII. PEKERJAAN BETON
1 Sloof Beton K.225 uk. 15x20 cm
2 Balok Beton K.225 uk. 15x20 cm
2 Kolom Beton K.225 uk. 25x25 cm
Jumlah
VIII. PEKERJAAN PENUTUP ATAP
1 Pasang atap genteng tipe Press
5 Pasang bubung genteng type Press
Jumlah
X. PEKERJAAN SANITASI
3 Pasang wastafel
4 Pas. Pipa PVC Q 3/4
7 Pas Kran Q 3/4" Merk onda
17 Pasang pipa penyalur limbah jenis pipa tanah, diameter 20 cm
18 Bak Kontrol Pipa Pengumpul uk. Q 40 cm x 1 m
Jumlah
XIII. PEKERJAAN LANTAI DAN DINDING
1 Lantai Beton mutu f'c = 7,4 Mpa (K 100), Slump (12 + 2 ) cm, w/c = 0,87
2 Plat Beton K.225, tebal 8 cm, tul Q 8 mm - 25 cm
3 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1 bata
4 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 cm
5 Memasang 1 m2 acian
6 1 M2 Pasang dinding Kayu
Jumlah
XIV. PEKERJAAN PENGECATAN
1 Pengecatan tembok baru
RAN DAN BIAYA ( RAB )
NGGARAN 2017
NORMAL
HARGA JUMLAH
KODE/
SATUAN VOLUME SATUAN HARGA
ANALISA
( Rp. ) ( Rp. )