HARGA SATUAN UPAH

PEMBANGUNAN SARANA PERMUKIMAN


TAHUN ANGGARAN 2020

UPAH /
NO. NAMA PERSONIL HARI KETERANGAN
( Rp. )

1 Mandor lapangan 125,000 115

2 Kepala tukang 95,000 95

3 Tukang 90,000 90

4 Pekerja 80,000 80

Lumajang, Januari 2018


I. PEKERJAAN PERSIAPAN DAN BONGKARAN

1 1 m' Pengukuran dan pemasangan bouplank


Bahan
- Kayu Meranti Usuk 5/7, 4/6 X 4 M' 0.0120 M3 Rp. 2,000,000 =
- Paku Reng / Papan 0.0200 Kg Rp. 13,000 =
- Kayu Meranti papan 2/20, 3/30, 3/30 X 4 M' 0.0070 M3 Rp. 2,700,000 =
Jumlah ( 1 ) =
Tenaga
- Tukang kayu 0.1000 Oh Rp. 90,000 =
- Pekerja 0.1000 Oh Rp. 80,000 =
- Kepala tukang 0.0100 Oh Rp. 95,000 =
- Mandor 0.0050 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =

9 1 M2 Membongkar genteng
- Pekerja 0.0400 Oh Rp. 80,000 =
- Mandor 0.0200 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
11 1 M2 Membongkar reng/kaso-kaso
- Pekerja 0.0500 Oh Rp. 80,000 =
- Tukang kayu 0.2000 Oh Rp. 90,000 =
- Kepala tukang 0.0050 Oh Rp. 95,000 =
- Mandor 0.0100 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
3 1 m2 Membersihkan lapangan dan perataan
Tenaga
- Pekerja 0.1000 Oh Rp. 80,000 =
- Mandor 0.0500 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =

II. PEKERJAAN TANAH

1 1 m3 Galian tanah biasa sedalam 1 meter


Tenaga
- Pekerja 0.7500 Oh Rp. 80,000 =
- Mandor 0.0250 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
9 1 m3 Urugan tanah kembali (1/3 dari jumlah galian)
a tanah biasa galian sedalam 1 meter 0.3333 Rp. 71,015 =
10 1 m3 Urugan Tanah Kembali dari luar
Bahan
- Tanah Urug 1.2000 M3 Rp. 100,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.2500 Oh Rp. 80,000 =
- Mandor 0.0250 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
11 1 m3 Pemadatan Tanah (per 20 cm)
Tenaga
- Pekerja 0.5000 Oh Rp. 80,000 =
- Mandor 0.0500 Oh Rp. 125,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
13 1 m3 Urugan pasir
Bahan
- Pasir urug 1.2000 M3 Rp. 220,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.3000 Oh Rp. 80,000 =
- Mandor 0.0100 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
1 1 m3 Pasang pondasi batu kali, 1Pc : 3 Ps
Bahan
- Batu belah 15/20 cm 1.2000 M3 Rp. 250,000 =
- Semen PC 40 kg/zak 202.0000 Kg Rp. 1,625 =
- Pasir pasang 0.4850 M3 Rp. 275,000 =
Jumlah ( 1 ) =

Tenaga
- Pekerja 1.5000 Oh Rp. 80,000 =
- Tukang batu 0.7500 Oh Rp. 90,000 =
- Kepala Tukang 0.0750 Oh Rp. 95,000 =
- Mandor 0.0750 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Alat
- Molen 0.1670 sewa/hrRp. 11,200 =
Jumlah ( 3 )
Jumlah A ( 1+2+3) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
5 Membuat 1 m3 beton mutu f'c = 19,38 Mpa (K 225), Slump (12 + 2 ) cm, w/c = 0,58
Bahan
- Semen PC 40 kg/zak 371.0000 kg Rp. 1,625 =
- Pasir beton 0.4986 M3 Rp. 275,000 =
- Batu pecah mesin 1-2 cm / 2-3 cm 0.7756 M3 Rp. 350,000 =
- Air 215.000 ltr Rp. 100 =
- Sewa molen 0.250 hari Rp. 300,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.6500 Oh Rp. 80,000 =
- Tukang Batu 0.2750 Oh Rp. 90,000 =
- Kepala Tukang 0.0280 Oh Rp. 95,000 =
- Mandor 0.0830 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
6 1Kg Pembesian dengan besi beton polos / besi beton ulir
Bahan
- Besi beton 1.0500 Kg Rp. 7,800 =
- Kawat beton 0.0150 Kg Rp. 20,000 =
Jumlah ( 1 ) =

Tenaga
- Pekerja 0.0070 Oh Rp. 80,000 =
- Tukang Besi 0.0070 Oh Rp. 90,000 =
- Kepala Tukang 0.0007 Oh Rp. 95,000 =
- Mandor 0.0003 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
8 1 M2 Pasang Bekisting Untuk Sloof
Bahan
- Kayu bekisting 0.0450 M3 Rp. 1,000,000 =
- Paku 0.3000 Kg Rp. 20,000 =
- Minyak bekisting 0.1000 Lt Rp. 30,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.5200 Oh Rp. 80,000 =
- Tukang Kayu 0.2600 Oh Rp. 90,000 =
- Kepala Tukang 0.0260 Oh Rp. 95,000 =
- Mandor 0.0260 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
9 1 M2 Pasang Bekisting Untuk Kolom
Bahan
- Kayu bekisting 0.0400 M3 Rp. 1,000,000 =
- Paku 0.4000 Kg Rp. 20,000 =
- Minyak bekisting 0.2000 Ltr Rp. 30,000 =
- Kayu Lokal Balok 0.0150 M3 Rp. 2,100,000 =
- Plywood tebal 9mm 0.3500 lbr Rp. 115,000 =
- Dolken Kayu Q8 - 10 /400cm 2.0000 btg Rp. 15,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.6600 Oh Rp. 80,000 =
- Tukang Kayu 0.3300 Oh Rp. 90,000 =
- Kepala Tukang 0.0330 Oh Rp. 95,000 =
- Mandor 0.0330 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
11 1 M2 Pasang Bekisting Untuk Plat Lantai
Bahan
- Kayu bekisting 0.0400 M3 Rp. 1,000,000 =
- Paku 0.4000 Kg Rp. 20,000 =
- Minyak bekisting 0.2000 Ltr Rp. 30,000 =
- Kayu Lokal Balok 0.0150 M3 Rp. 2,100,000 =
- Plywood tebal 9mm 0.3500 lbr Rp. 115,000 =
- Dolken Kayu Q8 - 10 /400cm 6.0000 btg Rp. 15,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.6600 Oh Rp. 80,000 =
- Tukang Kayu 0.3300 Oh Rp. 90,000 =
- Kepala Tukang 0.0330 Oh Rp. 95,000 =
- Mandor 0.0330 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =

14 1 M2 Membongkar bekisting
- Pekerja 4.0000 Oh Rp. 80,000 =
Jumlah A =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
16 1 M3 Sloof Beton K.225 uk. 12x20 cm, tul 4 Q 12mm, begel Q 6-20 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 168.7350 kg Rp. 11,007 =
Bekisting untuk sloof 5.0500 m2 Rp. 140,310 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
19 1 M3 Kolom Beton K.225 uk. 30x30 cm, tul 12 Q 16mm, begel Q 8-15 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 169.2100 kg Rp. 11,007 =
Bekisting untuk kolom 6.1800 m2 Rp. 276,198 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
28 1 M3 Plat Beton K.225, tebal 8 cm, tul Q 8 mm - 25 cm
Beton Mutu K.225 1.0000 m3 Rp. 1,437,451 =
Besi Beton 49.1556 kg Rp. 11,007 =
Bekisting untuk pondasi 5.2700 m2 Rp. 343,698 =
Membongkar Bekisting 1.0000 m3 Rp. 360,000 =
Jumlah ( 1 ) =
1 1 M2 Pasang atap genteng tipe Press
Bahan
- Genteng Press 25.0000 Bh Rp. 1,800 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.1500 Oh Rp. 80,000 =
- Tukang Kayu 0.0750 Oh Rp. 90,000 =
- Kepala Tukang 0.0080 Oh Rp. 95,000 =
- Mandor 0.0080 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
5 1 M' Pasang bubung genteng type Press
Bahan
- Genteng bubung Press 5.0000 Bh Rp. 15,000 =
- Semen PC 40 kg/zak 8.0000 kg Rp. 1,625 =
- Pasir pasang 0.0320 M3 Rp. 275,000 =
Jumlah ( 1 ) =

Tenaga
- Pekerja 0.4000 Oh Rp. 80,000 =
- Tukang Kayu 0.2000 Oh Rp. 90,000 =
- Kepala Tukang 0.0200 Oh Rp. 95,000 =
- Mandor 0.0020 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
3 Memasang 1 buah wastafel Ex INA
Bahan
- Wastafel "INA" 1.2000 Bh Rp. 200,000 =
- Perlengkapan (12% harga wastafel) 0.1200 hrg Rp. 200,000 =
- Semen PC 40 kg/zak 6.0000 kg Rp. 1,625 =
- Pasir pasang 0.0100 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.2000 Oh Rp. 80,000 =
- Tukang batu 1.4500 Oh Rp. 90,000 =
- Kepala tukang 0.1500 Oh Rp. 95,000 =
- Mandor 0.0600 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
4 1 M' Pas. Pipa PVC Q 3/4
Bahan
- Pipa PVC Q 3/4" 0.3000 Ljr Rp. 45,000 =
- Perlengkapan 35 % Rp. 13,500 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0360 Oh Rp. 80,000 =
- Tukang batu 0.0600 Oh Rp. 90,000 =
- Kepala tukang 0.0060 Oh Rp. 95,000 =
- Mandor 0.0020 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
7 1 Bh Pas Kran Q 3/4" Merk Ex San Ei
Bahan
- Kran air San Ei Q 3/4 1.0000 bh Rp. 35,000 =
- Seal tape 0.0250 bh Rp. 6,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0100 Oh Rp. 80,000 =
- Tukang batu 0.4000 Oh Rp. 90,000 =
- Kepala tukang 0.0400 Oh Rp. 95,000 =
- Mandor 0.0050 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
17 1 M' Pasang pipa penyalur limbah jenis pipa tanah, diameter 20 cm
Bahan
- Pipa Air Limbah SNI 1.6000 m' Rp. 300,000 =
- Semen 40 kg 35.0000 kg Rp. 1,625 =
- Pasir Pasang 0.0140 m3 Rp. 275,000 =
- Pasir Urug 0.0140 m3 Rp. 200,000 =
Jumlah ( 1 ) =

Tenaga
- Pekerja 0.0800 Oh Rp. 80,000 =
- Tukang pipa 0.0400 Oh Rp. 90,000 =
- kepala Tukang 0.0040 Oh Rp. 95,000 =
- Mandor 0.0040 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa (K 100), Slump (12 + 2 ) cm, w/c = 0,87
Bahan
- Semen PC 40 kg/zak 247.0000 kg Rp. 1,625 =
- Pasir beton 0.6207 M3 Rp. 275,000 =
- Batu pecah mesin 1-2 cm / 2-3 cm 0.7400 M3 Rp. 350,000 =
- Air 215.000 ltr Rp. 100 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 1.6500 Oh Rp. 80,000 =
- Tukang Batu 0.2750 Oh Rp. 90,000 =
- Kepala Tukang 0.0280 Oh Rp. 95,000 =
- Mandor 0.0830 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =

Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1/2 bata, campuran spesi 1PC : 2 PP
Bahan :
- Bata Merah 70 Bh Rp. 600 =
- Semen PC 40 kg/zak 9.68 Kg Rp. 1,625 =
- Pasir Pasang 0.045 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga Kerja :
- Pekerja 0.32 Oh Rp. 80,000 =
- Tukang Batu 0.1 Oh Rp. 90,000 =
- Kepala Tukang 0.01 Oh Rp. 95,000 =
- Mandor 0.015 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =

Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 cm


Bahan :
- Semen PC 40 kg/zak 5.184 Kg Rp. 1,625 =
- Pasir Pasang 0.026 M3 Rp. 275,000 =
Jumlah ( 1 ) =
Tenaga Kerja :
- Pekerja 0.2 Oh Rp. 80,000 =
- Tukang Batu 0.15 Oh Rp. 90,000 =
- Kepala Tukang 0.015 Oh Rp. 95,000 =
- Mandor 0.01 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
Memasang 1 m2 acian
Bahan :
- PC 3.250 Kg Rp. 1,625 =
Jumlah ( 1 ) =
Tenaga Kerja :
- Pekerja 0.150 Oh Rp. 80,000.00 =
- Tukang Batu 0.100 Oh Rp. 90,000.00 =
- Kepala Tukang 0.010 Oh Rp. 95,000.00 =
- Mandor 0.008 Oh Rp. 125,000.00 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
16 1 M2 Pasang dinding Kayu
Bahan
- Kayu 1.1000 M3 Rp. 0=
- Lem 0.5000 kg Rp. 30,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.7000 Oh Rp. 80,000 =
- Tukang Batu 0.3500 Oh Rp. 90,000 =
- Kepala tukang 0.0350 Oh Rp. 95,000 =
- Mandor 0.0350 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
5 1 M2 pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar,
2 lapis cat penutup )
Bahan
- Plamir 0.1000 Kg Rp. 10,000 =
- Cat dasar 0.1000 Kg Rp. 30,000 =
- Cat penutup 2 kali 0.2600 Kg Rp. 30,000 =
Jumlah ( 1 ) =
Tenaga
- Pekerja 0.0200 Oh Rp. 80,000 =
- Tukang cat 0.0630 Oh Rp. 90,000 =
- Kepala tukang 0.0063 Oh Rp. 95,000 =
- Mandor 0.0030 Oh Rp. 125,000 =
Jumlah ( 2 ) =
Jumlah A ( 1+2 ) =
Jumlah B ( Overhead & Profit 12.5% ) =
Jumlah ( A ) + ( B ) =
Rp. 24,000.00
Rp. 260.00
Rp. 18,900.00
Rp. 43,160.00

Rp. 9,000.00
Rp. 8,000.00
Rp. 950.00
Rp. 625.00
Rp. 18,575.00
Rp. 61,735.00
Rp. 7,716.88
Rp. 69,451.00

Rp. 3,200.00
Rp. 2,500.00
Rp. 5,700.00
Rp. 712.50
Rp. 6,412.00

Rp. 4,000.00
Rp. 18,000.00
Rp. 475.00
Rp. 1,250.00
Rp. 23,725.00
Rp. 2,965.63
Rp. 26,690.00

Rp. 8,000.00
Rp. 6,250.00
Rp. 14,250.00
Rp. 1,781.25
Rp. 16,031.00
Rp. 60,000.00
Rp. 3,125.00
Rp. 63,125.00
Rp. 7,890.63
Rp. 71,015.00

Rp. 23,600.00

Rp. 120,000.00
Rp. 120,000.00

Rp. 20,000.00
Rp. 3,125.00
Rp. 23,125.00
Rp. 143,125.00
Rp. 17,890.63
Rp. 161,015.00

Rp. 40,000.00
Rp. 6,250.00
Rp. 46,250.00
Rp. 5,781.25
Rp. 52,031.00

Rp. 264,000.00
Rp. 264,000.00

Rp. 24,000.00
Rp. 1,250.00
Rp. 25,250.00
Rp. 289,250.00
Rp. 36,156.25
Rp. 325,406.00

Rp. 300,000.00
Rp. 328,250.00
Rp. 133,375.00
Rp. 761,625.00

Rp. 120,000.00
Rp. 67,500.00
Rp. 7,125.00
Rp. 9,375.00
Rp. 204,000.00

Rp. 1,870.40
1,870.40
Rp. 967,495.40
Rp. 120,936.93
Rp. 1,088,432.00

Rp. 602,875.00
Rp. 137,115.00
Rp. 271,460.00
Rp. 21,500.00
Rp. 75,000.00
Rp. 1,107,950.00

Rp. 132,000.00
Rp. 24,750.00
Rp. 2,660.00
Rp. 10,375.00
Rp. 169,785.00
Rp. 1,277,735.00
Rp. 159,716.88
Rp. 1,437,451.00

Rp. 8,190.00
Rp. 300.00
Rp. 8,490.00

Rp. 560.00
Rp. 630.00
Rp. 66.50
Rp. 37.50
Rp. 1,294.00
Rp. 9,784.00
Rp. 1,223.00
Rp. 11,007.00

Rp. 45,000.00
Rp. 6,000.00
Rp. 3,000.00
Rp. 54,000.00

Rp. 41,600.00
Rp. 23,400.00
Rp. 2,470.00
Rp. 3,250.00
Rp. 70,720.00
Rp. 124,720.00
Rp. 15,590.00
Rp. 140,310.00

Rp. 40,000.00
Rp. 8,000.00
Rp. 6,000.00
Rp. 31,500.00
Rp. 40,250.00
Rp. 30,000.00
Rp. 155,750.00

Rp. 52,800.00
Rp. 29,700.00
Rp. 3,135.00
Rp. 4,125.00
Rp. 89,760.00
Rp. 245,510.00
Rp. 30,688.75
Rp. 276,198.00

Rp. 40,000.00
Rp. 8,000.00
Rp. 6,000.00
Rp. 31,500.00
Rp. 40,250.00
Rp. 90,000.00
Rp. 215,750.00

Rp. 52,800.00
Rp. 29,700.00
Rp. 3,135.00
Rp. 4,125.00
Rp. 89,760.00
Rp. 305,510.00
Rp. 38,188.75
Rp. 343,698.00

Rp. 320,000.00
Rp. 320,000.00
Rp. 40,000.00
Rp. 360,000.00

Rp. 1,437,451.00
Rp. 1,857,266.15
Rp. 708,565.50
Rp. 360,000.00
Rp. 4,363,282.00

Rp. 1,437,451.00
Rp. 1,862,494.47
Rp. 1,706,903.64
Rp. 360,000.00
Rp. 5,366,849.00

Rp. 1,437,451.00
Rp. 541,055.69
Rp. 1,811,288.46
Rp. 360,000.00
Rp. 4,149,795.00

Rp. 45,000.00
Rp. 45,000.00

Rp. 12,000.00
Rp. 6,750.00
Rp. 760.00
Rp. 1,000.00
Rp. 20,510.00
Rp. 65,510.00
Rp. 8,188.75
Rp. 73,698.00

Rp. 75,000.00
Rp. 13,000.00
Rp. 8,800.00
Rp. 96,800.00

Rp. 32,000.00
Rp. 18,000.00
Rp. 1,900.00
Rp. 250.00
Rp. 52,150.00
Rp. 148,950.00
Rp. 18,618.75
Rp. 167,568.00

Rp. 240,000.00
Rp. 24,000.00
Rp. 9,750.00
Rp. 2,750.00
Rp. 276,500.00

Rp. 96,000.00
Rp. 130,500.00
Rp. 14,250.00
Rp. 7,500.00
Rp. 248,250.00
Rp. 524,750.00
Rp. 65,593.75
Rp. 590,343.00

Rp. 13,500.00
Rp. 4,725.00
Rp. 18,225.00

Rp. 2,880.00
Rp. 5,400.00
Rp. 570.00
Rp. 250.00
Rp. 9,100.00
Rp. 27,325.00
Rp. 3,415.63
Rp. 30,740.00

Rp. 35,000.00
Rp. 150.00
Rp. 35,150.00

Rp. 800.00
Rp. 36,000.00
Rp. 3,800.00
Rp. 625.00
Rp. 41,225.00
Rp. 76,375.00
Rp. 9,546.88
Rp. 85,921.00

Rp. 480,000.00
Rp. 56,875.00
Rp. 3,850.00
Rp. 2,800.00
Rp. 543,525.00

Rp. 6,400.00
Rp. 3,600.00
Rp. 380.00
Rp. 500.00
Rp. 10,880.00
Rp. 554,405.00
Rp. 69,300.63
Rp. 623,705.00

Rp. 401,375.00
Rp. 170,692.50
Rp. 259,000.00
Rp. 21,500.00
Rp. 852,567.50

Rp. 132,000.00
Rp. 24,750.00
Rp. 2,660.00
Rp. 10,375.00
Rp. 169,785.00
Rp. 1,022,352.50
Rp. 127,794.06
Rp. 1,150,146.00

esi 1PC : 2 PP
Rp. 42,000.00
Rp. 15,730.00
Rp. 12,375.00
Rp. 70,105.00

Rp. 25,600.00
Rp. 9,000.00
Rp. 950.00
Rp. 1,875.00
Rp. 37,425.00
Rp. 107,530.00
Rp. 13,441.25
Rp. 120,971.00

Rp. 8,424.00
Rp. 7,150.00
Rp. 15,574.00

Rp. 16,000.00
Rp. 13,500.00
Rp. 1,425.00
Rp. 1,250.00
Rp. 32,175.00
Rp. 47,749.00
Rp. 5,968.63
Rp. 53,717.00

Rp. 5,281.25
Rp. 5,281.25

Rp. 12,000.00
Rp. 9,000.00
Rp. 950.00
Rp. 1,000.00
Rp. 22,950.00
Rp. 28,231.25
Rp. 3,528.91
Rp. 31,760.00

Rp. -
Rp. 15,000.00
Rp. 15,000.00

Rp. 56,000.00
Rp. 31,500.00
Rp. 3,325.00
Rp. 4,375.00
Rp. 95,200.00
Rp. 110,200.00
Rp. 13,775.00
Rp. 123,975.00

Rp. 1,000.00
Rp. 3,000.00
Rp. 7,800.00
Rp. 11,800.00

Rp. 1,600.00
Rp. 5,670.00
Rp. 598.50
Rp. 375.00
Rp. 8,243.50
Rp. 20,043.50
Rp. 2,505.44
Rp. 22,548.00
RENCANA ANGGARAN DAN BIA
TAHUN ANGGARAN 20
Nama Program :
Nama Kegiatan :
Nama Pekerjaan :
Lokasi Kegiatan :
Sumber Dana :
Volume Kegiatan :

NO URAIAN PEKERJAAN

I. PEKERJAAN PERSIAPAN DAN BONGKARAN


9 Membongkar genteng
11 Membongkar reng/kaso-kaso
12 Membongkar kuda-kuda/gording
13 Membongkar rangka plafon
14 Membongkar bekisting
Jumlah

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouplank
2 Membersihkan lapangan dan perataan
Jumlah
II. PEKERJAAN TANAH
1 Galian tanah biasa sedalam 1 meter
2 Urugan tanah kembali
3 Urugan tanah kembali dari luar
4 Pemadatan Tanah (per 20 cm)
5 Urugan Pasir Bawah Pondasi
Jumlah
III. PEKERJAAN PONDASI
1 Pasang pondasi batu kali, 1Pc : 3 Ps
Jumlah
VII. PEKERJAAN BETON
1 Sloof Beton K.225 uk. 15x20 cm
2 Balok Beton K.225 uk. 15x20 cm
2 Kolom Beton K.225 uk. 25x25 cm
Jumlah
VIII. PEKERJAAN PENUTUP ATAP
1 Pasang atap genteng tipe Press
5 Pasang bubung genteng type Press
Jumlah
X. PEKERJAAN SANITASI
3 Pasang wastafel
4 Pas. Pipa PVC Q 3/4
7 Pas Kran Q 3/4" Merk onda
17 Pasang pipa penyalur limbah jenis pipa tanah, diameter 20 cm
18 Bak Kontrol Pipa Pengumpul uk. Q 40 cm x 1 m
Jumlah
XIII. PEKERJAAN LANTAI DAN DINDING
1 Lantai Beton mutu f'c = 7,4 Mpa (K 100), Slump (12 + 2 ) cm, w/c = 0,87
2 Plat Beton K.225, tebal 8 cm, tul Q 8 mm - 25 cm
3 Memasang 1 m2 dinding bata merah ukuran (5x11x22) cm tebal 1 bata
4 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 cm
5 Memasang 1 m2 acian
6 1 M2 Pasang dinding Kayu
Jumlah
XIV. PEKERJAAN PENGECATAN
1 Pengecatan tembok baru
RAN DAN BIAYA ( RAB )
NGGARAN 2017

NORMAL
HARGA JUMLAH
KODE/
SATUAN VOLUME SATUAN HARGA
ANALISA
( Rp. ) ( Rp. )

SNI I.9 M2 42.00 6,412.00 269,304.00


SNI I.11 M2 42.00 26,690.00 1,120,980.00
SNI I.12 M3 859,500.00 -
SNI I.13 M2 30,318.00 -
SNI I.14 M2 292,500.00 -
1,390,284.00

SNI I.1 M' 32.00 69,451.00 2,222,432.00


SNI I.3 M2 64.00 16,031.00 1,025,984.00
3,248,416.00

SNI II.1 M3 4.73 71,015.00 335,545.88


SNI II.9 M3 0.70 23,600.00 16,520.00
SNI II.10 M3 6.40 161,015.00 1,030,496.00
SNI II.11 M3 6.40 52,031.00 332,998.40
SNI II.11 M3 3.20 325,406.00 1,041,299.20
2,756,859.48

SNI III.1 M3 3.60 1,088,432.00 3,918,355.20


3,918,355.20

SNI VII.16 M3 1.20 4,363,282.00 5,235,938.40


SNI VII.16 M3 1.20 4,363,282.00 5,235,938.40
SNI VII.19 M3 1.70 5,366,849.00 9,123,643.30
19,595,520.10

SNI VIII.1 M2 76.50 73,698.00 5,637,897.00


SNI VIII.5 M' 8.00 167,568.00 1,340,544.00
6,978,441.00

SNI X.3 Bh 1.00 590,343.00 590,343.00


SNI X.4 M' 10.00 30,740.00 307,400.00
SNI X.7 Bh 1.00 85,921.00 85,921.00
SNI X.17 M' 6.00 623,705.00 3,742,230.00
SNI X.18 Bh 1.00 205,000.00 205,000.00
4,930,894.00

SNI VII.1 M3 3.20 1,150,146.00 3,680,467.20


SNI VII.28 M3 0.32 4,149,795.00 1,327,934.40
M2 56.32 120,971.00 6,813,086.72
M2 28.00 53,717.00 1,504,076.00
M2 34.40 31,760.00 1,092,544.00
M2 27.00 123,975.00 3,347,325.00
17,765,433.32

SNI.XIV.5 M2 82.32 22,548.00 1,856,151.36


RENCANA ANGGARAN BIAYA CAFFE
"OMAH WAREG"
MUNDER YOSOWILANGUN
I. PEKERJAAN BONGKARAN 5,674,000.00
II. PEKERJAAN PERSIAPAN 3,248,416.00
III. PEKERJAAN TANAH 2,756,859.48
IV. PEKERJAAN PONDASI 3,918,355.20
V. PEKERJAAN BETON 19,595,520.10
VI. PEKERJAAN PENUTUP ATAP 9,978,441.00
VII. PEKERJAAN SANITASI 4,930,894.00
VIII. PEKERJAAN LANTAI DAN DINDING 17,765,433.320
IX. PEKERJAAN PENGECATAN 1,856,151.36
Jumlah 69,724,070.46