NAMA KEGIATAN : PENYEDIAAN AIR MINUM & SANITASI BERBASIS MASYARAKAT (PAMSIMAS)
PEKERJAAN : PEMBANGUNAN SARANA AIR BERSIH MASYARAKAT
SUB PEKERJAAN : PEMBANGUNAN SANITASI SEKOLAH
KELURAHAN / DESA : KARIANGO
KECAMATAN : LEMBANG
KABUPATEN : PINRANG
Pinrang, Okto
Disetujui Oleh : Diketahui Oleh : Disetujui Oleh : Dibuat Oleh :
Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM SATLAK PAMSIMAS
Biaya (Rp)
APBN
13=5x7
85,000.00
85,000.00
267,500.00
100,000.00
64,000.00
36,000.00
83,750.00
50,000.00
33,750.00
284,000.00
284,000.00
21,000.00
21,000.00
76,000.00
16,000.00
16,000.00
Biaya (Rp)
APBN
13=5x7
60,000.00
60,000.00
712,000.00
208,000.00
144,000.00
64,000.00
504,000.00
186,000.00
265,000.00
53,000.00
Biaya (Rp)
APBN
13=5x7
223,000.00
73,000.00
47,000.00
26,000.00
150,000.00
129,000.00
21,000.00
797,000.00
108,000.00
64,000.00
6,000.00
19,000.00
19,000.00
689,000.00
97,000.00
5,000.00
1,000.00
41,000.00
292,000.00
7,000.00
73,000.00
10,000.00
23,000.00
58,000.00
82,000.00
386,000.00
90,000.00
Biaya (Rp)
APBN
13=5x7
42,000.00
5,000.00
24,000.00
19,000.00
Biaya (Rp)
APBN
13=5x7
296,000.00
53,000.00
8,000.00
1,000.00
24,000.00
127,000.00
7,000.00
53,000.00
7,000.00
16,000.00
2,799,000.00
804,000.00
596,000.00
208,000.00
1,995,000.00
1,545,000.00
365,000.00
85,000.00
145,000.00
40,000.00
34,000.00
6,000.00
105,000.00
65,000.00
12,000.00
28,000.00
Biaya (Rp)
APBN
13=5x7
1,350,000.00
1,039,000.00
565,000.00
474,000.00
311,000.00
250,000.00
61,000.00
Biaya (Rp)
APBN
13=5x7
266,350.00
180,600.00
47,600.00
133,000.00
85,750.00
85,750.00
776,000.00
256,000.00
57,000.00
199,000.00
520,000.00
10,000.00
510,000.00
620,000.00
261,000.00
123,000.00
138,000.00
359,000.00
338,000.00
21,000.00
450,000.00
192,000.00
123,000.00
69,000.00
258,000.00
254,000.00
4,000.00
Biaya (Rp)
APBN
13=5x7
40,400.00
27,000.00
18,000.00
9,000.00
13,400.00
12,600.00
800.00
Biaya (Rp)
APBN
13=5x7
448,600.00
250,000.00
118,000.00
132,000.00
198,600.00
194,600.00
4,000.00
780,920.00
265,000.00
170,000.00
95,000.00
515,920.00
500,000.00
13,920.00
2,000.00
269,900.00
26,100.00
9,000.00
17,100.00
243,800.00
238,800.00
5,000.00
30,900.00
5,400.00
400.00
5,000.00
25,500.00
Biaya (Rp)
APBN
13=5x7
24,000.00
1,500.00
810,920.00
265,000.00
170,000.00
95,000.00
545,920.00
530,000.00
13,920.00
2,000.00
Biaya (Rp)
APBN
13=5x7
50,000.00
484,200.00
20,000.00
7,000.00
13,000.00
464,200.00
420,000.00
44,200.00
214,000.00
61,000.00
34,000.00
2,000.00
18,000.00
7,000.00
153,000.00
4,000.00
1,000.00
48,000.00
3,000.00
27,000.00
4,000.00
8,000.00
23,000.00
24,000.00
11,000.00
14,181,000.00
2,709,000.00
Biaya (Rp)
APBN
13=5x7
147,000.00
9,722,000.00
521,000.00
1,082,000.00
7,626,840.00
7,627,000.00
4,677,100.00
4,677,000.00
14,181,000.00
26,484,940.00
26,485,000.00
SATLAK PAMSIMAS
REKAPIT
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4 5
I PEKERJAAN SARANA AIR MINUM
1 PENANGKAP MATA AIR
- BAHAN 8,988,000 - -
- UPAH 3,449,000 - -
- LANGSIRAN 5,150,000
2 PEK. RESERVOIR
- BAHAN 17,526,000 -
- UPAH 5,690,000 - -
- LANGSIRAN 7,550,000 - -
3 PENGADAAN PIPA
- BAHAN 126,665,000 - - 35,000,000
4 PEMASANGAN PIPA
- BAHAN - - -
- UPAH 56,000,000 - 56,000,000
5 PEK. JEMBATAN - - -
- BAHAN 3,833,000 - -
- UPAH 5,240,000 - -
- LANGSIRAN 777,000
I KESEHATAN MASYARAKAT
I KESEHATAN SEKOLAH
III PEMBERDAYAAN
A. PELATIHAN
1 Pelatihan Teknis 455,000 455,000 -
Pelatihan Administrasi Keuangan dan
2 452,000 452,000 -
Pembukuan
3 Pelatihan PHBS Masyarakat 705,000 705,000 -
4 Pelatihan CLTS Masyarakat 389,000 389,000 -
Pelatihan Badan Pengelola SAB, Sanitasi
5 633,000 633,000 -
& Kesehatan
B. Operasional
A. Alat Tulis Kantor ( ATK ) 588,000 588,000 -
Pembuatan/Cetak Kelengkapan
B 3,750,000 3,750,000 -
Administrasi
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4 5
C Transportasi 2,800,000 2,800,000 -
#REF!
Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes
inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 12=5x7
3 Unit 52,761,000 - -
8,988,000 26,964,000 - - -
3,449,000 10,347,000 - - -
5,150,000 15,450,000
17,587,000
2 Paket 61,532,000 - -
17,526,000 35,052,000 - - -
5,690,000 11,380,000 - - -
7,550,000 15,100,000 - - -
30,766,000
1 Paket 126,665,000 -
91,665,000 126,665,000 - - 35,000,000
1 Paket 9,850,000 - - -
3,833,000 3,833,000 - - -
5,240,000 5,240,000 - - -
777,000 777,000
3 Paket 2,562,000 - - -
674,000 2,022,000 - - -
180,000 540,000 - - -
-
Sub Total 1) 311,500,000 - 56,000,000 35,000,000
Total
Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes
inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 12=5x7
3,559,000 3,559,000 - -
669,000 669,000
2,634,000 2,634,000 - -
1 Paket 455,000 455,000 - -
7,138,000 7,138,000 - -
1 Paket 588,000 588,000 - -
Jumlah Harga
APBD
13=6x7
52,761,000
26,964,000
10,347,000
15,450,000
61,532,000
35,052,000
11,380,000
15,100,000
91,665,000
-
-
-
9,850,000
3,833,000
5,240,000
777,000
2,130,000
2,562,000
2,022,000
540,000
-
220,500,000
24,500,000
245,000,000
Jumlah Harga
APBD
13=6x7
-
-
-
-
-
-
-
Jumlah Harga
APBD
13=6x7
-
-
220,500,000
220,500,000
Kariango, Oktober 2016
Satlak Pamsimas
( Parman )
Provinsi : Sulawesi Selatan
Kabupaten : Pinrang
Kecamatan : Lembang
Desa/lembang : Kariango
1 2
1. Pekerjaan Persiapan 4
1.1. Pembersihan Lahan
Pekerja 0.10 0.40
2. Pemasangan Bowplank 2.25
2.1. Tenaga Kerja
Pekerja 0.100 0.23
Tukang kayu 0.100 0.23
2.2. Bahan
Kayu klas II uk. 5/7 0.012 0.03
Paku biasa 2" - 5" 0.020 0.05
Kayu papan Kelas III 0.007 0.02
3. Galian Tanah 1.080
3.1. Tenaga Kerja
Pekerja 0.75 0.81
4. Pondasi batu kali, 1 Pc : 4 Ps 2.268
4.1. Tenaga Kerja
Pekerja 1.50 3.40
Tukang batu 0.60 1.36
4.2. Bahan
Batu belah 10/15 cm 1.10 2.49
Semen Portland 163.00 369.68
Pasir pasang 0.52 1.18
4. Urugan Tanah Kembali 0.360
4.1. Tenaga Kerja
Pekerja 0.25 0.09
5. Urugan Pasir 0.113
5.1. Tenaga Kerja
Pekerja 0.30 0.03
5.2. Bahan
Pasir urug 1.20 0.14
6. Pek. Sloof, Dinding, Lantai Beton & Penutup Plat Beton Bertulang
Fasilitator Teknik
RENCANA ANGGARAN BIAYA
Nomor RAB
Pekerjaan Kegiatan
Sub pekerjaan/Kegiatan
Ukuran/Dimensi
Volume Biaya
Harga Satuan
Kontribusi Masyarakat Satuan
Total APBD APBN Total
inCash inKind
2=3+4+5 3 4 5 6 7 8 9=2x8
34,000
8,953,249
11,025
0.06 0.06 Hok 85,000 5,206
0.06 0.06 Hok 95,000 5,819
105,000
0.04 0.04 m 3
2,500,000 98,438
0.26 0.26 Kg 17,000 4,463
0.18 0.18 Liter 12,000 2,100
50,840
0.51 0.51 Hok 85,000 43,478
0.08 0.08 Hok 95,000 7,363
138,388
71.92 71.92 Kg 1,160 83,427
0.16 0.16 M 3
97,200 15,669
0.24 0.24 M3 162,500 39,293
434,709
2.42 2.42 Hok 85,000 205,279
2.42 2.42 Hok 95,000 229,430
370,408
36.23 36.23 Kg 10,000 362,257
0.52 0.52 Kg 15,750 8,151
813,285
6.14 6.14 Hok 85,000 521,730
3.07 3.07 Hok 95,000 291,555
2,787,210
0.28 0.28 m 3
3,500,000 976,500
3.72 3.72 Kg 17,000 63,240
1.86 1.86 Liter 12,000 22,320
0.19 0.19 m3 3,500,000 651,000
3.26 3.26 Lbr 120,000 390,600
21.70 21.70 Batang 31,500 683,550
305,040
3.07 3.07 Hok 85,000 260,865
0.47 0.47 Hok 95,000 44,175
830,330
431.52 431.52 Kg 1,160 500,563
0.97 0.97 M3 97,200 94,012
1.45 1.45 M3 162,500 235,755
152,059
0.84 0.84 Hok 85,000 71,805
0.84 0.84 Hok 95,000 80,253
1,295,667
126.72 126.72 Kg 10,000 1,267,156
1.81 1.81 Kg 15,750 28,511
127,896
0.97 0.97 Hok 85,000 82,046
0.48 0.48 Hok 95,000 45,849
390,049
0.06 0.06 m3 2,500,000 146,250
0.59 0.59 Kg 17,000 9,945
0.29 0.29 Liter 12,000 3,510
0.02 0.02 m3 3,500,000 76,781
0.51 0.51 Lbr 120,000 61,425
2.93 2.93 Batang 31,500 92,138
66,482
0.67 0.67 Hok 85,000 56,854
0.10 0.10 Hok 95,000 9,628
182,018
94.05 94.05 Kg 1,160 109,095
0.21 0.21 M3 97,200 20,883
0.32 0.32 M3 162,500 52,040
49,568
0.28 0.28 Hok 85,000 23,407
0.28 0.28 Hok 95,000 26,161
422,362
41.31 41.31 Kg 10,000 413,068
0.59 0.59 Kg 15,750 9,294
35,867
0.36 0.36 Hok 85,000 30,673
0.05 0.05 Hok 95,000 5,194
97,631
50.74 50.74 Kg 1,160 58,857
0.11 0.11 M3 97,200 11,054
0.17 0.17 M3 162,500 27,720
30,188
0.17 0.17 Hok 85,000 14,256
0.17 0.17 Hok 95,000 15,933
257,228
25.16 25.16 Kg 10,000 251,568
0.36 0.36 Kg 15,750 5,660
600,075
445,200
3.36 3.36 Hok 85,000 285,600
1.68 1.68 Hok 95,000 159,600
154,875
114.51 114.51 Kg 1,160 132,830
0.23 0.23 M³ 97,200 22,045
331,759
290,440
2.19 2.19 Hok 85,000 186,320
1.10 1.10 Hok 95,000 104,120
41,319
35.62 35.62 Kg 1,160 41,319
217,025
64,554
0.17 0.17 Hok 85,000 14,280
0.53 0.53 Hok 95,000 50,274
152,471
0.84 0.84 Kg 2,950 2,478
0.84 0.84 Kg 25,000 21,000
2.18 2.18 Kg 59,063 128,993
Ls 700,000
5,150,000
39.0 zak 50,000 1,950,000
3.0 m3 800,000 2,400,000
2.0 m3 400,000 800,000
Kariango,...........................
Koordinator KKM
: 04
: Sarana Air Minum
: Reservoir Kariango
1.5 X 1.5 X 1.5
Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inCash inKind
- - 172,100
- - - 34,000 34,000.00
- 175,140
40,500
- - - 19,125 19,125.00
- - - 21,375 21,375.00
134,640
- - - 94,500 94,500.00
- - - 765 765.00
- - - 39,375 39,375.00
- - 68,850 0.48 2.250
- - - 68,850 68850
- - 1,336,133
418,446
- - - 289,170 289,170.00
- - - 129,276 129,276.00
917,687
- - - 374,220 374,220.00
- - - 428,833 428,833.44
- - - 114,634 114,633.79
- - 7,650
- 7,650 7650
- - 13,871
2,869
- - - 2,869 2868.75
11,003
- - - 11,003 11002.5
- 37,712,600
11,025
- - - 5,206 5,206.25
- - - 5,819 5,818.75
105,000
- - - 98,438 98,437.50
- - - 4,463 4,462.50
- - - 2,100 2,100.00
50,840
- - - 43,478 43,477.50
- - - 7,363 7,362.50
138,388
- - - 83,427 83,427.20
- - - 15,669 15,668.64
- - - 39,293 39,292.50
434,709
- - - 205,279 205,279.24
- - - 229,430 229,429.74
370,408
- - - 362,257 362,257.48
- - - 8,151 8,150.79
813,285
- - - 521,730 521,730.00
- - - 291,555 291,555.00
2,787,210
- - - 976,500 976,500.00
- - - 63,240 63,240.00
- - - 22,320 22,320.00
- - - 651,000 651,000.00
- - - 390,600 390,600.00
- - - 683,550 683,550.00
305,040
- - - 260,865 260,865.00
- - - 44,175 44,175.00
830,330
- - - 500,563 500,563.20
- - - 94,012 94,011.84
- - - 235,755 235,755.00
152,059
- - - 71,805 71,805.49
- - - 80,253 80,253.20
1,295,667
- - - 1,267,156 1,267,155.79
- - - 28,511 28,511.01
127,896
- - - 82,046 82,046.25
- - - 45,849 45,849.38
390,049
- - - 146,250 146,250.00
- - - 9,945 9,945.00
- - - 3,510 3,510.00
- - - 76,781 76,781.25
- - - 61,425 61,425.00
- - - 92,138 92,137.50
66,482
- - - 56,854 56,853.84
- - - 9,628 9,627.66
182,018
- - - 109,095 109,094.52
- - - 20,883 20,883.30
- - - 52,040 52,040.02
49,568
- - - 23,407 23,407.18
- - - 26,161 26,160.97
422,362
- - - 413,068 413,067.94
- - - 9,294 9,294.03
35,867
- - - 30,673 30,672.68
- - - 5,194 5,194.13
97,631
- - - 58,857 58,856.54
- - - 11,054 11,053.97
- - - 27,720 27,720.23
30,188
- - - 14,256 14,255.50
- - - 15,933 15,932.62
257,228
- - - 251,568 251,567.69
- - - 5,660 5,660.27
- - 600,075
445,200
- - - 285,600 285,600.00
- - - 159,600 159,600.00
154,875
- - - 132,830 132,830.21
- - - 22,045 22,044.96
- - 331,759
290,440
- - - 186,320 186,320.00
- - - 104,120 104,120.00
41,319
- - - 41,319 41,319.20
- - 217,025
64,554
- - - 14,280 14,280.00
- - - 50,274 50,274.00
152,471
- - - 2,478 2,478.00
- - - 21,000 21,000.00
- - - 128,993 128,992.50
- - 700,000
5,150,000
- - - 1,950,000
- - - 2,400,000
- - - 800,000
bahan
8,988,285 upah
Rp 8,988,000
3,449,467 26964000
Rp 3,449,000
5,150,000
Rp 5,150,000
Rp 17,587,000
Rp 17,587,000 52761000
Kariango,...........................................................2016
Dibuat Oleh :
kykelas 2
0.03
1.08
1.18
0.14
0.16
0.97
0.21
0.11
0.23
3.00
0.027
Total selisih 94,500.00
Rp 26,964,000 26,964,000.00 -
Rp 10,347,000 10,347,000.00 -
0.12
420,000.00
17,000 2,500,000 150,000 1,160
0.05 0.02
2.49 369.68
0.26 0.04
71.92
3.72 0.28
431.52
0.59 0.06
94.05
50.74
114.51
35.62
0.14
1.18
0.18
0.16 0.24
1.86
0.97 1.45
0.29
0.21 0.32
0.11 0.17
0.23
12 1.35 9 6.6
1,166,400.00 110,100.00 108,000.00 1,072,500.00
10,000 15,750 3,500,000 120,000
126.72 1.81
0.51
41.31 0.59
25.16 0.36
229.404890736 3.2772127248 0.186 3.766875
2,294,048.91 51,616.10 651,000.00 452,025.00
1.05
3,675,000.00
31,500 3,500,000 2,950 25,000
2.93 0.02
0.84
75 0.3 3 3
2,362,500.00 1,050,000.00 8,850.00 75,000.00
59,063 95,000 85,000
0.23 0.40
0.23
1.36 0.81
3.40
0.09
0.03
0.06
0.06
0.08 0.51
2.42 2.42
3.07 6.14
0.47 3.07
0.84
0.84
0.48 0.97
0.10 0.67
0.28 0.28
0.05 0.36
0.17 0.17
1.68 3.36
1.10 2.19
2.18
0.53 0.17
6 39 78
354,350.00 3,705,000.00 6,642,000.00
78 / Jpb
Disetujui Oleh :
Kabupaten Pinrang Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM
Kabupaten Pinrang Kabupaten Pinrang
A ANGGARAN BIAYA
Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8
33,374
- - 15,000
- - 1,224
- - 17,150
479,184
- - 45,518
- - 9,098
- - 25,448
- - 240,000
- - 16,320
- - 5,760
- - 90,000
- - 47,040
3,320,000
- - 1,800,000
- - 1,520,000
7,631,742
- 3,832,558
82 / Jpb
Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8
3,833,000
189,975
- - 8,500
- - 17,000
- - 475
- - 140,250
- - 23,750
83 / Jpb
Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8
56,850
- - 25,500
- - 31,350
1,839,600
- - 642,600
- - 1,197,000
3,153,600
- - 1,101,600
- - 2,052,000
5,240,025
5,240,000
39,240
74,880
62,640
600,000
- 776,760
- 777,000
- 9,850,000
- 9,850,000
( Parman )
Provinsi : Sulawesi Selatan
Kabupaten : Pinrang
Kecamatan : Lembang
Desa/lembang : Kariango
1 2
6. Pek. Sloof, Dinding, Lantai Beton & Penutup Plat Beton Bertulang
Fasilitator Teknik
RENCANA ANGGARAN BIAYA
Nomor RAB
Pekerjaan Kegiatan
Sub pekerjaan/Kegiatan
Ukuran/Dimensi
Volume Biaya
Harga
Kontribusi Masyarakat Satuan Satuan
Total APBD APBN Total
inCash inKind
2=3+4+5 3 4 5 6 7 8 9=2x8
53,125
18,837,921
15,120
0.08 0.08 Hok 85,000 7,140
0.08 0.08 Hok 95,000 7,980
144,000
0.05 0.05 m 3
2,500,000 135,000
0.36 0.36 Kg 17,000 6,120
0.24 0.24 Liter 12,000 2,880
72,160
0.73 0.73 Hok 85,000 61,710
0.11 0.11 Hok 95,000 10,450
196,422
102.08 102.08 Kg 1,160 118,413
0.23 0.23 M 3
97,200 22,239
0.34 0.34 M3 162,500 55,770
609,560
3.39 3.39 Hok 85,000 287,848
3.39 3.39 Hok 95,000 321,712
519,396
50.80 50.80 Kg 10,000 507,967
0.73 0.73 Kg 15,750 11,429
1,539,120
11.62 11.62 Hok 85,000 987,360
5.81 5.81 Hok 95,000 551,760
5,274,720
0.53 0.53 m 3
3,500,000 1,848,000
7.04 7.04 Kg 17,000 119,680
3.52 3.52 Liter 12,000 42,240
0.35 0.35 m3 3,500,000 1,232,000
6.16 6.16 Lbr 120,000 739,200
41.07 41.07 Batang 31,500 1,293,600
577,280
5.81 5.81 Hok 85,000 493,680
0.88 0.88 Hok 95,000 83,600
1,571,377
816.64 816.64 Kg 1,160 947,302
1.83 1.83 M3 97,200 177,915
2.75 2.75 M3 162,500 446,160
427,330
2.37 2.37 Hok 85,000 201,795
2.37 2.37 Hok 95,000 225,535
3,641,205
356.11 356.11 Kg 10,000 3,561,080
5.09 5.09 Kg 15,750 80,124
318,318
2.40 2.40 Hok 85,000 204,204
1.20 1.20 Hok 95,000 114,114
970,788
0.15 0.15 m3 2,500,000 364,000
1.46 1.46 Kg 17,000 24,752
0.73 0.73 Liter 12,000 8,736
0.05 0.05 m3 3,500,000 191,100
1.27 1.27 Lbr 120,000 152,880
7.28 7.28 Batang 31,500 229,320
132,840
1.34 1.34 Hok 85,000 113,603
0.20 0.20 Hok 95,000 19,238
363,699
187.92 187.92 Kg 1,160 217,987
0.43 0.43 M3 97,200 41,728
0.64 0.64 M3 162,500 103,984
134,169
0.75 0.75 Hok 85,000 63,358
0.75 0.75 Hok 95,000 70,812
1,143,235
111.81 111.81 Kg 10,000 1,118,079
1.60 1.60 Kg 15,750 25,157
78,720
0.79 0.79 Hok 85,000 67,320
0.12 0.12 Hok 95,000 11,400
214,279
111.36 111.36 Kg 1,160 129,178
0.25 0.25 M3 97,200 24,261
0.37 0.37 M3 162,500 60,840
93,919
0.52 0.52 Hok 85,000 44,350
0.52 0.52 Hok 95,000 49,568
800,265
78.27 78.27 Kg 10,000 782,655
1.12 1.12 Kg 15,750 17,610
600,075
445,200
3.36 3.36 Hok 85,000 285,600
1.68 1.68 Hok 95,000 159,600
154,875
114.51 114.51 Kg 1,160 132,830
0.23 0.23 M³ 97,200 22,045
331,759
290,440
2.19 2.19 Hok 85,000 186,320
1.10 1.10 Hok 95,000 104,120
41,319
35.62 35.62 Kg 1,160 41,319
217,025
64,554
0.17 0.17 Hok 85,000 14,280
0.53 0.53 Hok 95,000 50,274
152,471
0.84 0.84 Kg 2,950 2,478
0.84 0.84 Kg 25,000 21,000
2.18 2.18 Kg 59,063 128,993
Ls 700,000
7,550,000
39.0 zak 50,000 1,950,000
5.0 m3 800,000 4,000,000
4.0 m3 400,000 1,600,000
Kariango,...........................
Koordinator KKM
: 04
: Sarana Air Minum
: Reservoir Kariango
2 X2X2
Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inCash inKind
- - 172,100
- - - 53,125 53,125.00
- 311,360
72,000
- - - 34,000 34,000.00
- - - 38,000 38,000.00
239,360
- - - 168,000 168,000.00
- - - 1,360 1,360.00
- - - 70,000 70,000.00
- - 122,400 0.48 4.000 1.92
- - - 122,400 122400
- - 1,979,457
619,920
- - - 428,400 428,400.00
- - - 191,520 191,520.00
1,359,537
- - - 554,400 554,400.00
- - - 635,309 635,308.80
- - - 169,828 169,827.84
- - 13,600
- 13,600 13600
- - 49,320
10,200
- - - 10,200 10200
39,120
- - - 39,120 39120
- 37,712,600
15,120
- - - 7,140 7,140.00
- - - 7,980 7,980.00
144,000
- - - 135,000 135,000.00
- - - 6,120 6,120.00
- - - 2,880 2,880.00
72,160
- - - 61,710 61,710.00
- - - 10,450 10,450.00
196,422
- - - 118,413 118,412.80
- - - 22,239 22,239.36
- - - 55,770 55,770.00
609,560
- - - 287,848 287,847.74
- - - 321,712 321,712.17
519,396
- - - 507,967 507,966.59
- - - 11,429 11,429.25
1,539,120
- - - 987,360 987,360.00
- - - 551,760 551,760.00
5,274,720
- - - 1,848,000 1,848,000.00
- - - 119,680 119,680.00
- - - 42,240 42,240.00
- - - 1,232,000 1,232,000.00
- - - 739,200 739,200.00
- - - 1,293,600 1,293,600.00
577,280
- - - 493,680 493,680.00
- - - 83,600 83,600.00
1,571,377
- - - 947,302 947,302.40
- - - 177,915 177,914.88
- - - 446,160 446,160.00
427,330
- - - 201,795 201,794.56
- - - 225,535 225,535.10
3,641,205
- - - 3,561,080 3,561,080.47
- - - 80,124 80,124.31
318,318
- - - 204,204 204,204.00
- - - 114,114 114,114.00
970,788
- - - 364,000 364,000.00
- - - 24,752 24,752.00
- - - 8,736 8,736.00
- - - 191,100 191,100.00
- - - 152,880 152,880.00
- - - 229,320 229,320.00
132,840
- - - 113,603 113,602.50
- - - 19,238 19,237.50
363,699
- - - 217,987 217,987.20
- - - 41,728 41,727.96
- - - 103,984 103,983.75
134,169
- - - 63,358 63,357.79
- - - 70,812 70,811.65
1,143,235
- - - 1,118,079 1,118,078.64
- - - 25,157 25,156.77
78,720
- - - 67,320 67,320.00
- - - 11,400 11,400.00
214,279
- - - 129,178 129,177.60
- - - 24,261 24,261.12
- - - 60,840 60,840.00
93,919
- - - 44,350 44,350.45
- - - 49,568 49,568.15
800,265
- - - 782,655 782,655.05
- - - 17,610 17,609.74
- - 600,075 1.75
445,200 0.48
- - - 285,600 285,600.00 0.23
- - - 159,600 159,600.00 1.83
154,875 0.43
- - - 132,830 132,830.21 0.25
- - - 22,045 22,044.96 0.23
- - 331,759 5.19
290,440
- - - 186,320 186,320.00
- - - 104,120 104,120.00
41,319
- - - 41,319 41,319.20
- - 217,025
64,554
- - - 14,280 14,280.00
- - - 50,274 50,274.00
152,471
- - - 2,478 2,478.00
- - - 21,000 21,000.00
- - - 128,993 128,992.50
- - 700,000
7,550,000
- - - 1,950,000
- - - 4,000,000
- - - 1,600,000
17,526,067
Rp 17,526,000
5,689,975 Rp 17,526,000
Rp 5,690,000
7,550,000
Rp 7,550,000
Rp 30,766,000
Rp 30,766,000
Rp 61,532,000
Kariango,...........................................................2016
Dibuat Oleh :
7.04 0.53
1.46 0.15
0.05 8.94 0.76
17,525,755.00
Rp 245.00
17,526,000.00
Rp -
0.10 16.00 1.51
111.36 0.25
114.51 0.23
35.62
0.34
50.80 0.73
3.52
2.75 356.11 5.09
0.73
0.64
111.81 1.60
0.37
78.27 1.12
4.49 4.10 596.98 8.53
selisih
- 35,052,000.00
Rp - Rp 11,380,000
0.11 15.00 98.00 0.70
0.81
382,200.00 1,800,000.00 3,087,000.00 2,464,000.00
2,846,200.00
0.41
1,423,100.00
2,950 25,000 59,063 95,000
0.40
2.02
0.08
0.11
3.39
5.81
0.88
2.37
1.20
0.20
0.75
0.12
0.52
1.68
1.10
0.53
25.00
2,950.00 25,000.00 118,125.00
3,000.00 118,000.00 2,375,000.00
Rp 5,690,000
kebutuhan
bahan 35,052,000.00
upah 11,380,000.00
2.00 2.00 4.00 50.00
pekerjaa
0.63
0.40
1.44
5.04
0.16
0.12
0.08
0.73
3.39
11.62
5.81
2.37
2.40
1.34
0.75
0.79
0.52
3.36
2.19
0.17
42.67
3,627,167.04
39.00
3,315,000.00
5,690,000.00
Rp -
78.00
6,630,000.00
39.00
3,315,000.00
RENCANA ANGGARAN BIAYA
Volume
URAIAN Kontribusi Masyarakat Satuan
Total APBD
inCash inKind
1 2=3+4+5 3 4 6 7
1. ALAT
1.1 Gerobak Dorong 2 - - 2 bh
1.2 Sekop Besar 3 - - 3 bh
1.3 Sekop Kecil 3 - - 3 bh
1.4 Tenro' 3 - - 3 bh
1.5 Sendok Semen 4 - - 4 bh
1.6 Ember Cor 5 - - 5 bh
1.7 Gergaji Besi 2 - - 2 set
1.8 Meteran 3 Metet 2 - - 2 bh
To
Dibulatk
Dibuat Oleh :
Koordinator KKM Satlak Pamsimas
( Rudi) ( Parman )
RENCANA ANGGARAN BIAYA
APBN
25,000
18,000
9,000
15,000
125,000
385,000
65,000
15,000
12,000
5,000
674,000
85,000
95,000
180,000
854,000
Oktober 2016
DATA PENGUKURAN
Lokasi Program : Kariango / LEMBANG Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
Dusun : Buttu Batu
Volume
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 5
A. BAHAN
1. Pipa PVC
a. Pipa PVC Ø 2" 147 147 - - -
b. Pipa PVC Ø 1 1/2" 533 533 - - 333
Langsiran 680 678 - - 331
2. Pipa GIP Medium A FULL
a. Pipa GIP Ø 2" 2 2 - -
b. Pipa GIP Ø 1 1/2" 153 153 - -
Langsiran 155 155 - -
3. Accecories
a. PVC
b. Galvanis
bend Ø 45 1 1/2" 8 8 - -
Waiter moor Ø1 1/ 2" 4 4
Double Nipple Ø 1 1/ 2" 4 4
Flange Ø 1 1/2" 12 12
Karet Flange 14 14
Socket Ø 1 1/2 (sambungan Lurus) 31 31 - -
Gate Valve Ø 1 1/2" Broonze 2 2 - -
Gate Valve Ø 2" Broonze 2 2 - - -
Waiter moor Ø 2" 4 4
4 Lainnya
Lem Pipa 12 12 - - 1
Seal tape 151 151 - - -
Kunci Pipa GIP Ø 2" No.24 2 2 - - -
5 bh 17,500.00 87,500 - -
5 bh 30,500.00 152,500 - -
2 bh 10,000.00 30,000 - -
6 bh 120,000.00 720,000 - -
6 bh 120,000.00 720,000 - -
1 bh 42,000.00 42,000 - -
2 bh 30,000.00 60,000 - -
1 bh 27,500.00 27,500 - -
3 bh 195,000.00 585,000 - -
- bh - - -
Volume Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBD Total
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8
2,424,500 - -
4 bh 21,500.00 86,000 - -
8 bh 21,500.00 172,000 - -
4 bh 40,000.00 160,000
4 bh 15,000.00 60,000
12 bh 45,000.00 540,000
14 bh 50,000.00 700,000
31 bh 15,000.00 465,000 - -
2 bh 200,000.00 400,000 - -
2 bh 275,000.00 550,000 - -
4 bh 57,500.00 230,000 - -
3,363,000 - -
11 bh 45,000.00 540,000 - -
151 bh 2,500.00 377,500 - -
2 bh 300,000.00 600,000 - -
Sub Total b 1,517,500 - -
Jumlah Bahan (a + b) 126,665,000 - -
dibulatkan 126,665,000 - -
Dibuat Oleh :
Koordinator KKM Satlak Pamsimas
( Rudi) ( Parman )
mbang / Kariango
Pengadaan Pipa dan Accessories
Gip-Medium A, PVC-SNI S 12,5
Biaya (Rp)
APBDes APBD
12 13=6x8
- 17,640,000
31,635,000 19,000,000
3,310,000 3,470,000
680,000
42,075,000
1,550,000
34,945,000 84,415,000
- 87,500
- 152,500
10,000 20,000
- 720,000
- 720,000
- 42,000
- 60,000
- 27,500
- 585,000
- -
Biaya (Rp)
APBDes APBD
12 13=6x8
10,000 2,414,500
86,000
172,000
160,000
60,000
540,000
700,000
465,000
400,000
- 550,000
- 230,000
- 3,363,000
45,000 495,000
- 377,500
- 600,000
45,000 1,472,500
35,000,000 91,665,000
35,000,000 91,665,000
Satlak Pamsimas
( Parman )
DATA PENGUKURAN
Lokasi Program : Kariango / LEMBANG Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
Dusun : Buttu Batu
1 PMA I P0 1,060.00
2 P00-P01 P01 1,055.00 5.00 25 20.00 0 0.00 0 0.00 0.00
3 P01-P02 P02 1,059.00 -4.00 25 (16.00) 0 0.00 0 0.00 0.00
4 P02 - P03 P03 1,052.00 7.00 25 28.00 0 0.00 0 0.00 0.00
5 P03 - P04 P04 1,047.00 5.00 25 20.00 0 0.00 0 0.00 0.00
6 P04 - P05 P05 1,040.00 7.00 25 28.00 0 0.00 0 0.00 0.00
7 P05 - P06 P06 1,037.00 3.00 25 12.00 0 0.00 0 0.00 0.00
8 P06 - P07 P07 1,033.00 4.00 25 16.00 0 0.00 0 0.00 0.00
9 P07 - P08 P08 1,029.00 4.00 25 16.00 0 0.00 0 0.00 0.00
2,130 1650
#REF!
rolis Desa Kariango
Tondo Bunga
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
`````````````` V = 4*Q/1000(3.14*(D/1000)^2)
1,060.00
280 377 0.26 0.29 130 16.41 45.20 0.15 0.04 1,059.96 4.96 0.18
281 378 0.26 0.29 131 17.15 45.20 0.14 0.04 1,059.92 0.92 0.18
282 380 0.26 0.29 132 15.27 45.20 0.14 0.04 1,059.88 7.88 0.18
283 381 0.26 0.29 133 16.34 45.20 0.14 0.04 1,059.84 12.84 0.18
284 382 0.27 0.29 134 15.22 45.20 0.14 0.04 1,059.80 19.80 0.18
285 384 0.27 0.29 135 18.09 45.20 0.14 0.04 1,059.76 22.76 0.18
286 385 0.27 0.29 136 17.03 45.20 0.14 0.04 1,059.73 26.73 0.18
287 386 0.27 0.30 137 17.00 45.20 0.14 0.04 1,059.69 30.69 0.18
1,029.00
288 388 0.27 0.30 138 18.01 45.20 0.14 0.04 1,028.96 2.96 0.18
289 389 0.27 0.30 139 15.11 45.20 0.14 0.04 1,028.92 9.92 0.19
290 390 0.27 0.30 140 13.09 45.20 0.14 0.04 1,028.89 23.89 0.19
291 392 0.27 0.30 141 15.07 45.20 0.13 0.04 1,028.85 16.85 0.19
292 393 0.27 0.30 142 13.25 45.20 0.13 0.04 1,028.81 29.81 0.19
293 394 0.27 0.30 143 11.88 45.20 0.13 0.04 1,028.78 51.78 0.19
977.00
294 396 0.27 0.30 144 11.13 45.20 0.13 0.04 976.96 29.96 0.19
295 397 0.28 0.30 145 11.85 45.20 0.13 0.04 976.93 51.93 0.19
925.00
296 398 0.28 0.30 146 12.98 45.20 0.13 0.04 924.96 13.96 0.19
297 400 0.28 0.31 147 17.79 45.20 0.13 0.07 924.89 19.89 0.19
905.00
1650 2221 1.54 1.70 130 35.76 45.20 3.87 1.06 903.94 1.94 1.06
1650 2221 1.54 1.70 130 44.80 45.20 3.87 1.06 902.87 -0.13 1.06
1650 2221 1.54 1.70 130 44.80 45.20 3.87 1.06 901.81 -0.19 1.06
1650 2221 1.54 1.70 130 35.76 45.20 3.87 1.06 900.74 1.74 1.06
1650 2221 1.54 1.70 130 26.07 45.20 3.87 1.06 899.68 14.68 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 898.62 21.62 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 897.55 28.55 1.06
1650 2221 1.54 1.70 130 32.20 45.20 3.87 1.06 896.49 32.49 1.06
1650 2221 1.54 1.70 130 30.05 45.20 3.87 1.06 895.42 38.42 1.06
857.00
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 855.94 6.94 1.06
1650 2221 1.54 1.70 130 28.54 45.20 3.87 1.06 854.87 14.87 1.06
1650 2221 1.54 1.70 130 27.93 45.20 3.87 1.06 853.81 23.81 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 851.68 37.68 1.06
1650 2221 1.54 1.70 130 25.70 45.20 3.87 1.06 850.62 51.62 1.06
1650 2221 1.54 1.70 130 33.71 45.20 3.87 1.06 849.55 54.55 1.06
1650 2221 1.54 1.70 130 31.02 45.20 3.87 1.06 848.49 59.49 1.06
1650 2221 1.54 1.70 131 40.76 45.20 3.82 1.34 847.14 60.14 1.06
787.00
1650 2221 1.54 1.70 130 37.12 57.00 1.25 0.69 786.31 4.31 0.67
1646 2215 1.54 1.69 130 31.55 57.00 1.25 0.69 785.63 14.63 0.66
1642 2210 1.53 1.69 130 32.85 57.00 1.24 0.68 784.94 22.94 0.66
1630 2194 1.52 1.68 130 38.68 57.00 1.22 0.67 784.27 26.27 0.66
1622 2183 1.52 1.67 130 38.61 57.00 1.21 0.67 783.60 29.60 0.65
1610 2167 1.50 1.66 130 35.43 57.00 1.20 0.66 782.95 34.95 0.65
1602 2156 1.50 1.65 130 51.08 57.00 1.19 0.65 782.29 33.29 0.65
1594 2145 1.49 1.64 130 40.69 57.00 1.17 0.65 781.65 35.65 0.64
1586 2135 1.48 1.63 130 34.13 57.00 1.16 0.64 781.01 42.01 0.64
1574 2118 1.47 1.62 130 50.73 57.00 1.15 0.63 780.38 42.38 0.63
1562 2102 1.46 1.61 130 33.93 57.00 1.13 0.62 779.76 48.76 0.63
1554 2091 1.45 1.60 130 30.32 57.00 1.12 0.62 779.14 60.14 0.63
1542 2075 1.44 1.59 130 33.77 57.00 1.10 0.61 778.53 66.53 0.62
1534 2065 1.43 1.58 130 33.70 57.00 1.09 0.60 777.93 72.93 0.62
1518 2043 1.42 1.56 130 34.65 57.00 1.07 0.59 777.34 78.34 0.61
1510 2032 1.41 1.55 130 31.82 57.00 1.06 0.58 776.76 86.76 0.61
1498 2016 1.40 1.54 130 30.44 57.00 1.05 0.58 776.18 97.18 0.60
1490 2005 1.39 1.53 130 29.59 57.00 1.04 0.36 775.81 104.81 0.60
1478 1989 1.38 1.52 130 31.02 45.20 3.16 1.60 774.22 112.22 0.95
1466 1973 1.37 1.51 130 31.20 45.20 3.11 1.64 772.58 119.58 0.94
1458 1962 1.36 1.50 130 30.13 45.20 3.08 1.69 770.88 128.88 0.93
1446 1946 1.35 1.49 130 35.01 45.20 3.03 1.60 769.28 132.28 0.93
1430 1925 1.34 1.47 130 30.95 45.20 2.97 1.40 767.88 138.88 0.92
1422 1914 1.33 1.46 130 29.59 45.20 2.94 1.55 766.33 148.33 0.91
1410 1898 1.32 1.45 130 40.18 45.20 2.89 1.88 764.45 149.45 0.90
1402 1887 1.31 1.44 130 41.21 45.20 2.86 1.42 763.03 150.03 0.90
1390 1871 1.30 1.43 130 29.34 45.20 2.82 1.49 761.54 159.54 0.89
1378 1855 1.29 1.42 130 29.24 45.20 2.77 1.46 760.08 169.08 0.88
1362 1833 1.27 1.40 130 31.81 45.20 2.71 1.40 758.68 174.68 0.87
1350 1817 1.26 1.39 130 34.40 45.20 2.67 1.47 757.21 178.21 0.87
1342 1806 1.25 1.38 130 34.32 45.20 2.64 1.45 755.76 181.76 0.86
1330 1790 1.24 1.37 130 37.83 45.20 2.60 1.40 754.36 183.36 0.85
1318 1774 1.23 1.36 130 36.52 45.20 2.55 1.18 753.18 185.18 0.84
1302 1752 1.22 1.34 130 30.55 45.20 2.50 1.15 752.02 191.02 0.83
1286 1731 1.20 1.32 130 31.39 45.20 2.44 0.94 751.08 195.08 0.82
1260 1696 1.18 1.30 130 32.01 45.20 2.35 1.24 749.84 199.84 0.81
1252 1685 1.17 1.29 130 33.76 45.20 2.32 1.07 748.77 202.77 0.80
1252 1685 1.17 1.29 130 30.80 45.20 2.32 1.20 747.57 208.57 0.80
1252 1685 1.17 1.29 130 35.82 45.20 2.32 1.07 746.50 210.50 0.80
1252 1685 1.17 1.29 130 45.30 45.20 2.32 1.12 745.37 210.37 0.80
1252 1685 1.17 1.29 130 30.76 45.20 2.32 1.02 744.35 215.35 0.80
1252 1685 1.17 1.29 130 28.45 45.20 2.32 1.05 743.30 223.30 0.80
1252 1685 1.17 1.29 130 33.76 45.20 2.32 1.07 742.23 226.23 0.80
40 54 0.04 0.04 130 7.54 45.20 0.00 0.00 770.88 3.88 0.03
1 PMA I P0 1,174.00
2 P00-P01 P01 1,173.00 1.00 47 2.13 0 0.00 0 0.00 0.00
3 P01-P02 P02 1,158.00 15.00 50 30.00 0 0.00 0 0.00 0.00
4 P02 - P03 P03 1,162.00 -4.00 48 (8.33) 0 0.00 0 0.00 0.00
5 P03 - P04 P04 1,159.00 3.00 48 6.25 0 0.00 0 0.00 0.00
6 P04 - P05 P05 1,158.00 1.00 25 4.00 0 0.00 0 0.00 0.00
7 P05 - P06 P06 1,152.00 6.00 50 12.00 0 0.00 0 0.00 0.00
8 P06 - P07 P07 1,144.00 8.00 50 16.00 0 0.00 0 0.00 0.00
9 P07 - P08 P08 1,136.00 8.00 50 16.00 0 0.00 0 0.00 0.00
10 P08- P09 P09 1,133.00 3.00 50 6.00 0 0.00 0 0.00 0.00
11 P09- P10 P10 1,130.00 3.00 50 6.00 0 0.00 0 0.00 0.00
12 P10 - P11 P11 1,120.00 10.00 50 20.00 0 0.00 0 0.00 0.00
13 P11 - P12 P12 1,125.00 -5.00 50 (10.00) 0 0.00 0 0.00 0.00
14 P12 - P13 P13 1,124.00 1.00 50 2.00 0 0.00 0 0.00 0.00
15 P13 - P14 P14 1,118.00 6.00 50 12.00 0 0.00 0 0.00 0.00
16 P14 - P15 P15 1,109.00 9.00 50 18.00 0 0.00 0 0.00 0.00
17 P15 - P16 P16 1,101.00 8.00 50 16.00 0 0.00 0 0.00 0.00
18 P16 - P17 P17 1,093.00 8.00 50 16.00 0 0.00 0 0.00 0.00
19 P17-- P18 P18 1,086.00 7.00 50 14.00 0 0.00 0 0.00 0.00
20 Bak Umum P19 1,050.00 36.00 50 72.00 0 0.00 0 0.00 0.00
918
Perhitungan Hydrolis De
Kriteria Desain : Dusun Buttu B
Kebut. Air = 0 lt / org / hari
Pertumbuhan Pddk = 2 % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.50 ````````````````````````
Minor Loss = 10 %
1,174.00
308 415 0.29 0.32 110 28.72 45.20 0.24 0.12 1,173.88 0.88 0.20
308 415 0.29 0.32 110 16.68 45.20 0.24 0.13 1,173.75 15.75 0.20
308 415 0.29 0.32 110 21.70 45.20 0.24 0.12 1,173.62 11.62 0.20
308 415 0.29 0.32 110 23.02 45.20 0.24 0.12 1,173.50 14.50 0.20
308 415 0.29 0.32 110 25.23 45.20 0.24 0.06 1,173.43 15.43 0.20
308 415 0.29 0.32 110 20.14 45.20 0.24 0.13 1,173.30 21.30 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,173.17 29.17 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,173.04 37.04 0.20
308 415 0.29 0.32 110 23.21 45.20 0.24 0.13 1,172.91 39.91 0.20
308 415 0.29 0.32 110 23.21 45.20 0.24 0.13 1,172.78 42.78 0.20
308 415 0.29 0.32 110 18.13 45.20 0.24 0.13 1,172.65 52.65 0.20
308 415 0.29 0.32 110 20.90 45.20 0.24 0.13 1,172.52 47.52 0.20
308 415 0.29 0.32 110 29.08 45.20 0.24 0.13 1,172.39 48.39 0.20
308 415 0.29 0.32 110 20.14 45.20 0.24 0.13 1,172.26 54.26 0.20
308 415 0.29 0.32 110 18.53 45.20 0.24 0.13 1,172.13 63.13 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,172.00 71.00 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,171.87 78.87 0.20
308 415 0.29 0.32 110 19.51 45.20 0.24 0.13 1,171.74 85.74 0.20
308 415 0.29 0.32 110 13.94 45.20 0.24 0.13 1,171.61 121.61 0.20
1,050.00
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,049.89 3.89 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,049.78 6.78 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,049.67 9.67 0.20
308 415 0.29 0.32 120 23.32 45.20 0.20 0.04 1,049.62 10.62 0.20
308 415 0.29 0.32 120 19.06 45.20 0.20 0.07 1,049.56 14.56 0.20
308 415 0.29 0.32 120 18.09 45.20 0.20 0.06 1,049.49 19.49 0.20
308 415 0.29 0.32 120 24.60 45.20 0.20 0.06 1,049.44 20.44 0.20
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,049.33 24.33 0.20
308 415 0.29 0.32 120 28.02 45.20 0.20 0.11 1,049.22 25.22 0.20
308 415 0.29 0.32 120 22.34 45.20 0.20 0.14 1,049.07 29.07 0.20
308 415 0.29 0.32 120 19.01 45.20 0.20 0.08 1,048.99 33.99 0.20
308 415 0.29 0.32 120 20.81 45.20 0.20 0.05 1,048.94 35.94 0.20
308 415 0.29 0.32 120 26.60 45.20 0.20 0.08 1,048.86 36.86 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,048.75 39.75 0.20
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,048.64 43.64 0.20
308 415 0.29 0.32 120 18.36 45.20 0.20 0.11 1,048.52 35.52 0.20
308 415 0.29 0.32 120 24.41 45.20 0.20 0.11 1,048.41 37.41 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,048.30 34.30 0.20
308 415 0.29 0.32 120 24.41 45.20 0.20 0.11 1,048.19 36.19 0.20
304 409 0.28 0.31 120 22.35 45.20 0.20 0.11 1,048.08 39.08 0.19
300 404 0.28 0.31 120 24.16 45.20 0.19 0.11 1,047.98 40.98 0.19
288 388 0.27 0.30 120 21.89 45.20 0.18 0.10 1,047.88 43.88 0.18
280 377 0.26 0.29 120 21.66 45.20 0.17 0.09 1,047.79 46.79 0.18
268 361 0.25 0.28 120 23.15 45.20 0.16 0.09 1,047.70 48.70 0.17
GIV
Jumlah
diameter Panjang
Pipa Total
pipa (Meter)
(batang)
81.40 270.00 45.00 45.00 0
57.00 0.00 0.00 0
45.20 918.00 153.00 153.00 153 91800%
36.20
45.20
PVC 331.00
Jumlah
diameter Panjang
Pipa Total
pipa (Meter)
(batang)
81.40 300.00 50.00 50.00 0
57.00 0.00 0.00 0
45.20 1067.00 177.83 178.00 178 8.89
36.20
45.20
diameter pipa
81.4
57
45.2
918
0.00
Daftar Kebutuhan Accessories Tiap Item Pekerjaan
Desa Kariango Kabupaten Pinrang
Jembt.
Nama Bahan POMPA BAK Jalur Pipa Jumlah
Pipa
Pipa PVC
a. Pipa PVC Ø 2" - - - 147 147
b. Pipa PVC Ø 1 1/2" - - - 533 533
680
Pipa GIP
c. Pipa GI Ø 1 1/2" - - 153 153
d. Pipa GI Ø 2" - - 2 - 2
a. PVC
Knee 90° Ø 1 1/2" - - - 5 5
Knee 45° Ø 1 1/2" - - - 21 21
Dop/Cap Ø 1 1/2" - - - 3 3
Double nipple Ø 1 1/2" - - - 1 1
Stop Kran 1 1/2" - - - 6 6
Air Valve Ø 1 1/2 " - - - 6 6
tee Ø 1 1/2 " - - - 1 1
b. Galvanis
bend Ø 45 1 1/2" - - 8 - 8
Waiter moor Ø1 1/ 2" - - 6 - 6
Double Nipple Ø 1 1/ 2" - - 2 - 2
Flange Ø 1 1/2" - 12 - - 12
Karet Flange - 14 - - 14
Socket Ø 1 1/2 - - - 31 31
Gate Valve Ø 1 1/2" Broonze - - - 2 2
Lainnya
Air Valve Ø 1 1/2 " - - - 5 5
Dop Ø 1 1/2 " - - 4 - 4
Lem Pipa - - - 12 12
Seal tape - - 77 - 77
Kunci Pipa GIP Ø 2" No.24 - - 2 - 2
Kebutuhan Accessories Tiap Item Pekerjaan
Desa Kariango Kabupaten Pinrang
Satuan
btg
btg
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
RENCANA ANGGARAN BIAYA
Biaya (Rp)
Kontribusi Masyarakat (APBD /
inKind APBN) *
10=4x7 11=5x7
- 170,000
170,000
225,200
34,000
- 120,000
- 1,200
- 70,000
- 204,000
204,000
- 1,845,206
- 275,400
- 664,848
- 297,000
- 506,131
- 101,827
- 20,890
20,890
- 89,057
14,729
- 74,328
13,833,928
1,802,000
104,500
572,000
462,000
- 2,000,000
- 90,000
- 17,600
- 6,160,000
- 99,000
- 1,559,040
- 441,288
526,500
- 944,806
340,000
304,000
- 265,037
- 35,770
- 520,400
255,000
190,000
- 75,400
511,391
117,810
19,950
212,419
42,457
118,755
- 212,320
38,080
63,840
- 44,160
- 66,240
350,000
668,863
176,256
61,560
-
317,520
86,443
27,084
500,000
8,694,450
35,000
30,000
1,958,410
6,671,040
-
28,790,510
- 28,791,000
Kariango, Oktober 2016
Dibuat Oleh :
( Parman )
Provinsi / Kabupaten /Kecamatan / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango
Dibuat Oleh :
Ketua Satlak
( Parman )
RENCANA ANGGARAN BIAYA
4826.00
PVC Ø 1 1/2 " 290 289.5 m 95,000 27,502,500 - 27,502,500
918
GIV Ø 1 1/2" 165 165.2 m 170,000 28,090,800 - 28,090,800
Jumlah Total 56,876,072 - 56,876,072
Dibuatkan 56,876,000 - 56,876,000
Biaya (Rp)
(APBD /
APBN) *
11=5x7
-
-
-
-
-
-
-
-
-
-
Dibuat Oleh :
PAMSIMAS
3 Biaya penyusutan pertahun 15,575,000 Rupiah 4 Golongan IV (> 30 M3) 2,600 Rupiah/M3
4 Biaya penyusutan perbulan 1,297,917 Rupiah
G Biaya Operasional 1% 0.5% M Iuran HU/KU
1 Honor tenaga perbulan (direncanakan) 1,000,000 Rupiah 1 Banyak Pemakaian air 10 M3/bulan
2 Kualitas air & promkes (direncanakan) 115,000 Rupiah 2 Iuran KK perbulan 13,000 Rp/KK/bulan
3 Pengembangan perbulan (direncanakan) 400,000 Rupiah
MINIMAL TARGET PENGGUNA
Penyusutan 6%, biaya investasi dicapai dalam periode : 0 KK untuk Iuran HU/KU/Sosial - p/bulan
20 tahun 171 Unit SR & Iuran Sekolah 3,072,500 p/bulan
2,812,917 TARGET AWAL UNTUK O & M 3,072,500 p/bulan
70 65 65
Panjang
Transmisi GIP 2" PVC 2" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
0
batang
Transmisi GIP 2" PVC 2" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
0
Panjang
Transmisi GIP 2" PVC 2" PVC 1½" GI 1½" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
PVC 1¼" GIP 1" PVC 1"
0 0 0
No Uraian Satuan
Tahun
5th 10th 15th KODE
Perencanaan
ANALISA PERHITUNGAN
KETERANGAN
CARA HITUNG
(21)=(18) + (20)
juklak
(23)=(21)*(22)/100
(24)=(21)+ 23)
juklak
(26)=(24)* (25)
(27)=(26)x3600/1000
(28)=(27)*24
juklak (minimum)
(30)=(24)*(27)
faktor keamanan
(32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
(30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
Tabel 5 - 2.
EKSI KEBUTUHAN AIR BERSIH
Kariango/ Kecamatan Lembang
Dusun Tondo Bunga
ANALISA PERHITUNGAN
KETERANGAN
CARA HITUNG
rata2 kenaikan 2% pertahun
juklak 100% pelayanan
juklak / survei
(5)= ((4)*(3))/100
juklak
(7)= (5) / (6)
juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
juklak
(14)=(12)/(13)
juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)
(21)=(18) + (20)
juklak
(23)=(21)*(22)/100
(24)=(21)+ 23)
juklak
(26)=(24)* (25)
(27)=(26)x3600/1000
(28)=(27)*24
juklak (minimum)
(30)=(24)*(27)
faktor keamanan
(32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
(30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
HARGA BAHAN/ALAT, UPAH
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 85,000.00 8,500.00
JUMLAH 8,500.00
JUMLAH 8,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 85,000.00 8,500.00
4. Tukang Kayu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 18,000.00
B. BAHAN
1. Kayu Klas II uk. 5/7 M3 0.012 5,000,000.00 60,000.00
2. Paku biasa 2" - 5" Kg 0.020 17,000.00 340.00
3. Kayu papan Kelas III M3 0.007 3,700,000.00 25,900.00
JUMLAH 86,240.00
JUMLAH A + B 104,240.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.750 85,000.00 63,750.00
JUMLAH A 63,750.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.900 85,000.00 76,500.00
JUMLAH A 76,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
JUMLAH A 25,500.00
B. BAHAN
1. Tanah urug M3 1.200 62,500.00 75,000.00
JUMLAH 75,000.00
JUMLAH A + B 100,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 85,000.00 42,500.00
2 Tukang Gali Hari/Orang 0.050 95,000.00 4,750.00
JUMLAH A 47,250.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
JUMLAH A 25,500.00
B. BAHAN
1. Pasir urug M3 1.200 81,500.00 97,800.00
JUMLAH 97,800.00
JUMLAH A + B 123,300.00
6.9 1 m3 Pasang batu kosong (aanstamping) Pekerjaan Pondasi
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 85,000.00 66,300.00
2. Tukang Batu Hari/Orang 0.390 95,000.00 37,050.00
JUMLAH 103,350.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.200 150,000.00 180,000.00
2 Pasir urug M3 0.432 81,500.00 35,208.00
JUMLAH 215,208.00
JUMLAH A + B 318,558.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 35,000.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,180.00 13,570.00
3. Pasir pasang M3 0.043 105,000.00 4,515.00
JUMLAH 67,085.00
JUMLAH A + B 102,085.00
6.5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 85,000.00 127,500.00
2. Tukang Batu Hari/Orang 0.600 95,000.00 57,000.00
JUMLAH 184,500.00
B. BAHAN
1. Batu belah 10/15 cm M3 1.100 150,000.00 165,000.00
2. Semen Portland Kg 163.000 1,180.00 192,340.00
3. Pasir pasang M3 0.520 105,000.00 54,600.00
JUMLAH 411,940.00
JUMLAH A + B 596,440.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 85,000.00 140,250.00
2. Tukang Batu Hari/Orang 0.250 95,000.00 23,750.00
JUMLAH 164,000.00
B. BAHAN
1. Semen Portland Kg 218.000 1,180.00 257,240.00
2. Pasir beton M3 0.520 105,000.00 54,600.00
3. Cipping beton M3 0.870 240,700.00 209,409.00
JUMLAH 521,249.00
JUMLAH A + B 685,249.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 85,000.00 140,250.00
2. Tukang Batu Hari/Orang 0.250 95,000.00 23,750.00
JUMLAH 164,000.00
B. BAHAN
1. Semen Portland Kg 232.000 1,180.00 273,760.00
2. Pasir beton M3 0.520 105,000.00 54,600.00
3. Koral beton (2 -3 ) M3 0.780 240,700.00 187,746.00
JUMLAH 516,106.00
JUMLAH A + B 680,106.00
6.17 1 Kg Pembesian dengan besi polos atau besi ulir Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.007 85,000.00 595.00
2. Tukang Besi Hari/Orang 0.007 95,000.00 665.00
JUMLAH 1,260.00
B. BAHAN
1. Besi beton ( polos/ulir ) Kg 1.050 10,000.00 10,500.00
2. Kawat beton Kg 0.015 15,750.00 236.25
JUMLAH 10,736.25
JUMLAH A + B 11,996.25
6.20 1 m2 Pasang bekisting untuk pondasi Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 85,000.00 44,200.00
2. Tukang Kayu Hari/Orang 0.260 95,000.00 24,700.00
JUMLAH 68,900.00
B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.300 17,000.00 5,100.00
3. Minyak bekisting Ltr 0.100 12,000.00 1,200.00
JUMLAH 154,300.00
JUMLAH A + B 223,200.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 85,000.00 44,200.00
2. Tukang Kayu Hari/Orang 0.260 95,000.00 24,700.00
JUMLAH 68,900.00
B. BAHAN
1. Kayu Kls III M3 0.045 3,700,000.00 166,500.00
2. Paku biasa 2" - 5' Kg 0.300 17,000.00 5,100.00
3. Minyak bekisting Ltr 0.100 12,000.00 1,200.00
JUMLAH 172,800.00
JUMLAH A + B 241,700.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00
B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.015 5,000,000.00 75,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 M Btg 0.667 31,500.00 21,000.00
JUMLAH 295,200.00
JUMLAH A + B 382,650.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00
B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.018 5,000,000.00 90,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 M Btg 0.667 31,500.00 21,000.00
JUMLAH 310,200.00
JUMLAH A + B 397,650.00
6.24 1 m2 Pasang bekisting untuk lantai Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Batu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00
B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.015 5,000,000.00 75,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 m Btg 2.000 31,500.00 63,000.00
JUMLAH 337,200.00
JUMLAH A + B 424,650.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00
B. BAHAN
1. Kayu Kls III M3 0.030 3,700,000.00 111,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.020 5,000,000.00 100,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 m Btg 2.333 31,500.00 73,500.00
JUMLAH 335,700.00
JUMLAH A + B 423,150.00
6.2 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela kayu kls II Pekerjaan Kayu
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 85,000.00 510,000.00
2. Tukang Kayu Hari/Orang 18.000 95,000.00 1,710,000.00
JUMLAH 2,220,000.00
B. BAHAN
1. Balok Kayu Kls II M3 1.200 5,000,000.00 6,000,000.00
2. Paku 10 cm Kg 1.250 17,000.00 21,250.00
3. Lem kayu Kg 1.000 30,000.00 30,000.00
JUMLAH 6,051,250.00
JUMLAH A + B 8,271,250.00
6.5 Membuat dan memasang 1 m² daun pintu panel Pekerjaan Kayu
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 85,000.00 85,000.00
2. Tukang Kayu Hari/Orang 3.000 95,000.00 285,000.00
JUMLAH 370,000.00
B. BAHAN
1. Papan Kayu Kls II M3 0.040 5,500,000.00 220,000.00
2. Lem kayu Kg 0.500 30,000.00 15,000.00
JUMLAH 235,000.00
JUMLAH A + B 605,000.00
17 1 M² pasang kaca polos tebal 5 mm Pekerjaan Kunci, Alat Gantung dan Kaca
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 85,000.00 12,750.00
2. Tukang Kayu Hari/Orang 0.150 95,000.00 14,250.00
JUMLAH 27,000.00
B. BAHAN
1. Kaca polos 5 mm M² 1.100 315,000.00 346,500.00
JUMLAH 346,500.00
JUMLAH A + B 373,500.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 85,000.00 27,200.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 36,700.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 18.950 1,180.00 22,361.00
3. Pasir pasang M3 0.038 105,000.00 3,990.00
JUMLAH 75,351.00
JUMLAH A + B 112,051.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 85,000.00 27,200.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 36,700.00
B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,180.00 13,570.00
3. Pasir pasang M3 0.043 105,000.00 4,515.00
JUMLAH 67,085.00
JUMLAH A + B 103,785.00
6.13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm Pekerjaan Plesteran
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 85,000.00 34,000.00
2. Tukang Batu Hari/Orang 0.200 95,000.00 19,000.00
JUMLAH 53,000.00
B. BAHAN
1. Semen Portland Kg 13.632 1,180.00 16,085.76
2. Pasir pasang M3 0.027 105,000.00 2,835.00
JUMLAH 18,920.76
JUMLAH A + B 71,920.76
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 85,000.00 34,000.00
2. Tukang Batu Hari/Orang 0.200 95,000.00 19,000.00
JUMLAH 53,000.00
B. BAHAN
1. Semen Portland Kg 8.320 1,180.00 9,817.60
2. Pasir pasang M3 0.032 105,000.00 3,360.00
JUMLAH 13,177.60
JUMLAH A + B 66,177.60
A. TENAGA KERJA
Pekerja Hari/Orang 0.200 85,000.00 17,000.00
Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 26,500.00
B. BAHAN
Semen Portland Kg 3.250 1,180.00 3,835.00
JUMLAH 3,835.00
JUMLAH A + B 30,335.00
6.14 Pekerjaan
1 m2 pengecatan tembok baru (1 x Plamir, 1 x cat dasar, 2 x cat penutup ) Pengecatan dan Finishing
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 85,000.00 1,700.00
2. Tukang Cat Hari/Orang 0.063 95,000.00 5,985.00
JUMLAH 7,685.00
B. BAHAN
Plamir Kg 0.100 2,950.00 295.00
1. Cat dasar Kg 0.100 25,000.00 2,500.00
2. Cat penutup 2 kali Kg 0.260 236,250.00 61,425.00
JUMLAH 64,220.00
JUMLAH A + B 71,905.00
6.8 Pekerjaan Pengecatan dan Finishing
1 m2 pengecatan bidang kayu baru (1x plamur , 1 x cat dasar, 2 x cat penutup)
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 85,000.00 5,950.00
2. Tukang Cat Hari/Orang 0.009 95,000.00 855.00
JUMLAH 6,805.00
B. BAHAN
1. Cat meni Kg 0.200 21,137.00 4,227.40
2. Plamur Kg 0.150 2,950.00 442.50
3. Cat dasar Kg 0.170 25,000.00 4,250.00
4. Cat penutup 2 kali Kg 0.260 57,750.00 15,015.00
JUMLAH 23,934.90
JUMLAH A + B 30,739.90
A. TENAGA KERJA
1. Pekerja Hari/Orang 1.050 85,000.00 89,250.00
2. Tukang Las Hari/Orang 1.050 95,000.00 99,750.00
JUMLAH 189,000.00
B. BAHAN
1. Besi plat Kg 32.800 10,000.00 328,000.00
2. Besi siku 30.30.3 Kg 15.000 10,000.00 150,000.00
JUMLAH 478,000.00
JUMLAH A + B 667,000.00
A. TENAGA KERJA
1. Tukang Las Hari/Orang 1.200 95,000.00 114,000.00
2. Pekerja Hari/Orang 1.200 85,000.00 102,000.00
JUMLAH 216,000.00
B. BAHAN
1. Pipa gip 1" M' 4.000 30,833.33 123,333.33
JUMLAH 123,333.33
JUMLAH A + B 339,333.33
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00
B. BAHAN
1. Pipa PVC M' 1.200 3,583.33 4,300.00
JUMLAH 4,300.00
JUMLAH A + B 13,060.00
6.26 Memasang 1 m' Pipa PVC tipe SNI diameter 3/4"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00
B. BAHAN
1. Pipa PVC M' 1.200 4,916.67 5,900.00
JUMLAH 5,900.00
JUMLAH A + B 14,660.00
6.27 Memasang 1 m' Pipa PVC tipe SNI diameter 1"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00
B. BAHAN
1. Pipa PVC M' 1.200 72,675.00 87,210.00
JUMLAH 87,210.00
JUMLAH A + B 95,970.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 85,000.00 4,590.00
2. Tukang Pipa Hari/Orang 0.090 95,000.00 8,550.00
JUMLAH 13,140.00
B. BAHAN
1. Pipa PVC M' 1.200 116,000.00 139,200.00
JUMLAH 139,200.00
JUMLAH A + B 152,340.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 85,000.00 6,885.00
2. Tukang Pipa Hari/Orang 0.135 95,000.00 12,825.00
JUMLAH 19,710.00
B. BAHAN
1. Pipa PVC M' 1.200 30,000.00 36,000.00
JUMLAH 36,000.00
JUMLAH A + B 55,710.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 85,000.00 6,885.00
2. Tukang Pipa Hari/Orang 0.135 95,000.00 12,825.00
JUMLAH 19,710.00
B. BAHAN
1. Pipa PVC M' 1.200 59,166.67 71,000.00
JUMLAH 71,000.00
JUMLAH A + B 90,710.00
6.35 Memasang 1 buah kran diameter 3/4" atau 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 85,000.00 850.00
2. Tukang Pipa Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 10,350.00
B. BAHAN
1. Kran air Buah 1.000 35,000.00 35,000.00
2. Seal tape Buah 0.025 2,500.00 62.50
JUMLAH 35,062.50
JUMLAH A + B 45,412.50
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 85,000.00 4,590.00
2. Tukang Pipa Hari/Orang 0.090 95,000.00 8,550.00
JUMLAH 13,140.00
B. BAHAN
1. Pipa galvanis M' 1.200 30,833 37,000.00
JUMLAH 37,000.00
JUMLAH A + B 50,140.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Batu Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00
B. BAHAN
1. Pipa galvanis M' 1.200 265,833 319,000.00
JUMLAH 319,000.00
JUMLAH A + B 344,380.00
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 9,180.00
B. BAHAN
1. Pipa galvanis M' 1.200 275,000 330,000.00
JUMLAH 330,000.00
JUMLAH A + B 339,180.00
6.22 Memasang 1 m' Pipa galvanis diameter 3"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Pipa Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00
B. BAHAN
1. Pipa galvanis M' 1.200 104,167 125,000.00
JUMLAH 125,000.00
JUMLAH A + B 150,380.00
6.22 Memasang 1 m' Pipa galvanis diameter 4"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Pipa Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00
B. BAHAN
1. Pipa galvanis M' 1.200 137,500 165,000.00
JUMLAH 165,000.00
JUMLAH A + B 190,380.00
RENCANA SELURUH KEGIATAN PELAKSANAAN RKM
Dengan pembobotan sesuai kegiatan, volume terhadap total dana RKM
( dalam excel dalam bentuk kurva S )
NO URAIAN PEKERJAAN VOLUME BIAYA Bobot (%)
A. KEGIATAN PELATIHAN
1 Pelatihan Teknik 1 Paket 455,000 0.18%
2 Pelatihan. Administrasi keuangan dan pembukuan 1 Paket 452,000 0.18%
3 Pelatihan PHBS Masyarakat 1 Paket 705,000 0.28%
4 Pelatihan CLTS Masyarakat 1 Paket 389,000 0.16%
6 Operasional KKM 1 Paket 7,138,000 2.86%
B. KEGIATAN SARANA AIR BERSIH
1 PEK. RESERVOIR 1 Unit 52,761,000 21.10%
2 PENYELIDIKAN GEOHIDROLOGI/GEOLISTRIK 1 Paket Err:509 Err:509
3 PEK. PENGEBORAN SUMUR DALAM 1 Paket 61,532,000 24.61%
4 PENGADAAN PIPA 1 Paket 126,665,000 50.67%
5 PEMASANGAN PIPA 1 Paket 56,000,000 22.40%
6 PENGADAAN POMPA 1 Paket Err:509 Err:509
7 PENGADAAN LISTRIK PLN 1 Paket Err:509 Err:509
8 ALAT SAB 1 Paket 2,130,000 4.07%
C. KEGIATAN SANITASI dan PHBS
MASYARAKAT
a Promkes tentang pentingnya BAB di jamban 1 Paket 33,000 0.01%
b Promkes tentang Cara Cuci Tangan yang benar 1 Paket 33,000 0.01%
c Verifikasi SBS 1 Paket 32,000 0.01%
d Monitoring Progres Akses Jamban & CTPS 1 Paket 66,000 0.03%
e Pemeriksaan Kualitas Air Sebelum dan Sesudah Program 2 Paket Err:509 Err:509
RUH KEGIATAN PELAKSANAAN RKM
WAKTU PELAKSANAAN
November
November
November
November
November - Desember
November - Desember
Oktober
November - Desember
November - Desember
November - Desember
Desember
November - Desember
November
November - Desember
November - Desember
November - Desember
November - Desember
November - Desember
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBERDAYAAN
Harga Satuan
No Uraian Vol. Unit Satuan Jumlah Biaya (Rp)
(Rp)
1 Monitoring Progres Akses Jamban dan CTPS 3 Paket 78,000 234,000
2 Verifikasi SBS/ODF 3 Paket 78,000 234,000
3 Promkes "Stop BAB Sembarangan" 3 Paket 47,000 141,000
4 Promkes Melalui Media Kesehatan Tentang SBS dan CTPS 1 Paket 3,900,000 3,900,000
5 Promkes Cuci Tangan Pakai Sabun (CTPS) 3 Paket 47,000 141,000
6 Demo Cuci Tangan Pakai Sabun (CTPS) 3 Paket 165,000 495,000
7 Uji Kualitas Air 2 Paket 677,000 1,354,000
TOTAL 6,499,000
Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6
1 BAHAN
A. PEKERJAAN PENDAHULUAN
- Pengukuran & Pemasangan Bowplank
1.1 Kayu balok klas II uk. 5/7 2.50 0.012 0.03
1.2 Paku biasa 2" - 5 " 2.50 0.020 0.05
1.3 Kayu papan kls II uk.2/20 2.50 0.007 0.018
D. PEKERJAAN BETON
- SLOEF 15/20 CM
* Beton
1.1 Semen portland 0.12 232.000 27.84
1.2 Pasir Beton 0.12 0.520 0.06
1.3 Kerikil beton 0.12 0.780 0.09
* Pembesian
1.1 Besi beton Polos 14.21 1.050 14.92
1.2 Kawat beton 14.21 0.015 0.21
* Bekisting
1.1 Kayu terentang 0.16 0.040 0.01
1.2 Paku biasa 2" - 5" 0.16 0.400 0.06
1.3 Minyak Bekisting 0.16 0.200 0.03
1.4 Kayu balok klas II uk. 5/7 0.16 0.018 0.0029
1.5 Playwood tebal 9 mm 0.16 0.350 0.06
1.6 Bambu 0.16 2.000 0.32
- DINDING BETON
* Beton
1.1 Semen portland 0.80 232.000 185.60
1.2 Pasir Beton 0.80 0.520 0.42
1.3 Kerikil beton 0.80 0.780 0.62
* Pembesian
1.1 Besi beton Polos 71.04 1.050 74.59
1.2 Kawat beton 71.04 0.015 1.07
* Bekisting
1.1 Kayu terentang 8.00 0.040 0.32
1.2 Paku biasa 2" - 5' 8.00 0.400 3.20
1.3 Minyak bekisting 8.00 0.200 1.60
1.4 Balok kayu borneo 8.00 0.015 0.12
1.5 Playwood tebal 9 mm 8.00 0.350 2.80
1.6 Bambu 8.00 2.000 16.00
E. PEKERJAAN FINISHING
- Plesteran sisi luar
1.1 Semen Portland 4.000 8.680 34.72
1.2 Pasir pasang 4.000 0.028 0.11
- Acian sisi dalam
1.1 Semen Portland 4 5.927 23.71
- Pengecatan sissi luar
1.1 Cat penutup 2 kali 4.000 0.180 0.72
2 UPAH
A. PEKERJAAN PENDAHULUAN
- Membersihkan Lapangan dan Peralatan
3.1 Pekerja 2.50 0.100 0.25
- Pemasangan Bowplank
3.1 Pekerja 2.50 0.100 0.25
3.2 Tukang 2.50 0.100 0.25
B. PEKERJAAN TANAH
- Galian Tanah
3.1 Pekerja 11.25 0.625 7.03
- Urugan Pasir
3.1 Pekerja 1.20 0.300 0.36
- Urugan Tanah
3.1 Pekerja 2.81 0.192 0.54
D. PEKERJAAN BETON
- SLOEF 15/20 CM
* Beton
3.1 Pekerja 0.12 1.650 0.20
3.2 Tukang 0.12 0.250 0.03
* Pembesian
3.1 Pekerja 14.21 0.007 0.10
3.2 Tukang 14.21 0.007 0.10
* Bekisting
3.1 Pekerja 0.16 0.320 0.05
3.2 Tukang 0.16 0.330 0.05
- DINDING BETON
* Beton
3.1 Pekerja 0.80 1.650 1.32
3.2 Tukang 0.80 0.250 0.20
* Pembesian
3.1 Pekerja 71.04 0.007 0.50
3.2 Tukang 71.04 0.007 0.50
* Bekisting
3.1 Pekerja 8.00 0.300 2.40
3.2 Tukang 8.00 0.330 2.64
F. PEKERJAAN FINISHING
- Plesteran sisi luar
3.1 Pekerja 4.00 0.25 1.00
3.2 Tukang 4.00 0.2 0.80
- Acian sisi dalam
3.1 Pekerja 4 0.085 0.34
3.2 Tukang 4 0.05 0.20
- Pengecetan
3.1 Pekerja 4.000 0.028 0.11
3.2 Tukang 4.000 0.042 0.17
B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi
- Upah
Pekerja 0.080 0.750 0.06 0.00
2 Pek. Pasir Urug. Bawah Pondasi
- Bahan
Pasir 0.02 1.2 0.02 0.00
- Upah
Pekerja 0.020 0.300 0.01 0.00
C. PEKERJAAN PASANGAN BATU
1 Pas. Pondasi Batu Gunung
- Bahan
Batu belah 10/15 cm 0.150 1.200 0.18 0.00
Semen Portland 0.150 163.000 24.45 0.00
Pasir pasang 0.150 0.520 0.08 0.00
- Upah
Pekerja 0.150 1.500 0.23 0.00
Tukang 0.150 0.750 0.11 0.00
- DINDING BETON
* Dinding Beton
- Bahan
1.1 Semen portland 0.280 232.000 64.96
1.2 Pasir Beton 0.280 0.520 0.15
1.3 Kerikil beton 0.280 0.780 0.22
- Upah
Pekerja 0.280 1.650 0.46
Tukang 0.280 0.250 0.07
* Pembesian
- Bahan
1.1 Besi beton Polos 49.728 1.050 52.21
1.2 Kawat beton 49.728 0.015 0.75
- Upah
Pekerja 49.728 0.007 0.35
Tukang 49.728 0.007 0.35
* Bekisting
- Bahan
1.1 Kayu Kls III 2.800 0.040 0.11
1.2 Paku biasa 2" - 5' 2.800 0.400 1.12
1.3 Minyak bekisting 2.800 0.200 0.56
1.4 Balok Kayu Kls II 2.800 0.015 0.04
1.5 Plywood tebal 4 mm 2.800 0.350 0.98
1.6 Bambu P = 12 M 2.800 2.000 5.60
- Upah
Pekerja 2.800 0.300 0.84
Tukang 2.800 0.330 0.92
F. PEKERJAAN FINISHING
- Pekerjaan Plesteran
1.1 Semen Portland 2.80 8.680 24.30
1.2 Pasir pasang 2.80 0.028 0.08
- Upah
Pekerja 2.800 0.250 0.70
Tukang 2.800 0.200 0.56
- Pengecatan sisi luar
1.1 Cat penutup 2 kali 2.800 0.180 0.50
- Upah
3.1 Pekerja 2.800 0.028 0.08
3.2 Tukang 2.800 0.042 0.12
Bahan
Upah i
Biaya Langsiran Semen (upah ii)
Biaya Langsiran Pasir (upah iii)
Biaya Langsiran Kerikil (upah iv)
-
-
0.06 Hok 85,000 5,100 - - 5,100
- -
- -
0.02 M3 97,200 2,333 - 2,333
- - -
0.01 Hok 85,000 510 - - 510
- - -
- - -
- - -
0.18 M3 125,000 22,500 - - 22,500
24.45 kg 1,160 28,362 - - 28,362 0.49
0.08 M3 97,200 7,582 - 7,582
- -
0.23 Hok 85,000 19,125 - - 19,125
0.11 Hok 95,000 10,688 - - 10,688
- - -
- - -
260,860 - - -
64.96 Kg 1,160 75,354 - - 75,354 1.30
0.15 M3 97,200 14,152 - - 14,152
0.22 M3 162,500 35,490 - - 35,490
- -
0.46 HOK 85,000 39,270 - 39,270
0.07 HOK 95,000 6,650 - 6,650
- - -
- - -
52.21 Kg 10,000 522,144 - - 522,144
0.75 Kg 10,000 7,459 - - 7,459
- -
0.35 HOK 85,000 29,588 - 29,588
0.35 HOK 95,000 33,069 - 33,069
- - -
-
0.11 M3 2,500,000 280,000 - - 280,000
1.12 Kg 17,000 19,040 - - 19,040
0.56 Ltr 10,000 5,600 - - 5,600
0.04 M3 2,500,000 105,000 - - 105,000
0.98 Lbr 56,000 54,880 - - 54,880
5.60 Btg 31,500 176,400 - - 176,400
- -
0.84 HOK 85,000 71,400 - 71,400
0.92 HOK 95,000 87,780 - 87,780
- -
-
24.30 Kg 1,160 28,193 - - 28,193 0.49
0.08 M3 97,200 7,620 - - 7,620
- -
0.70 HOK 85,000 59,500 - 59,500
0.56 HOK 95,000 53,200 - 53,200
0.00 -
0.50 M2 23,000 11,592 - - 11,592
- -
0.08 Hok 85,000 6,664 - - 6,664
0.12 Hok 95,000 11,172 - - 11,172
1,403,701
433,716
7.24 Zak 42,000 303,974 303,974 7.24
0.92 M3 1,000,000 916,400 916,400
0.94 M3 300,000 280,800 280,800
(upah i -iv) 1,934,890
Total Upah 3,632,137
3,632,000
Total Bahan 4,593,788
4,594,000
Jumlah Total) 8,226,000 - - 13,113,258 13,113,258
Dibulatkan 8,226,000 - 13,113,000
Kariango, 2016
Dibuat Oleh :
Koordinator LKM Satlak HID
350,000,000
IN KIND 56,000,000 BHAN LOKAL + UPAH
IN CASH 14,000,000 BPT
APDES 35,000,000 PIPA + HOK
APBN 245,000,000 PABRIKASI
0.120
16.000 14.208
0.160
0.800
4.000 8.000
4.000
### 5,375,023
0.150
0.280
PMA APBN
BAK
71,400.000
13,113,258
DAFTAR PERBANDINGAN HARGA BAHAN PABRIKASI
8 Besi kg - - 10,000
B. Alat
Ket.
Ket.
FIBERGLASS 1 M³
FIBERGLASS 2 M³
Ket.
HARGA BAHAN/ALAT, UPAH
B. Alat
berat 20 kg
fiberglass 1 m3
fiberglass 2 m3
PROGRES FISIK P
Kabupaten / Kota : SIDENRENG RAPPANG
Desa / Kelurahan : BILA RIASE
Masyaraka
Jumlah Total Nilai RKM Dana APBN /
No Jenis Pekerjaan
(unit) (Rp.) HIBAH (Rp.) InCash (Rp.)
1 2 3 4=5+6+7+8 5 7
A. KEGIATAN PELATIHAN
1 Pelatihan Teknis 1 Paket 455,000 455,000 -
2 Pelatihan. Administrasi keuangan dan pembukuan 1 Paket 452,000 452,000 -
3 Pelatihan PHBS Masyarakat 1 Paket 705,000 705,000 -
4 Pelatihan CLTS Masyarakat 1 Paket 389,000 389,000 -
6 Operasional LKM 1 Paket 7,138,000 7,138,000 -
Jumlah A 9,139,000 9,139,000 -
B. KEGIATAN SARANA AIR BERSIH
1 PENANGKAP MATA AIR 1 Unit 52,761,000 52,761,000 -
2 Err:509 1 Paket Err:509 Err:509 -
3 PEK. RESERVOIR 1 Paket 61,532,000 61,532,000 -
4 PENGADAAN PIPA 1 Paket 126,665,000 126,665,000 -
5 PEMASANGAN PIPA 1 Paket 56,000,000 - -
6 Err:509 1 Paket Err:509 Err:509
7 Err:509 1 Paket Err:509 Err:509
8 ALAT SAB 1 Paket 2,130,000 2,130,000 -
Jumlah B 311,500,000 Err:509 -
C. KEGIATAN SANITASI dan PHBS
1. PHBS Masyarakat
0
a Monitoring Progres Akses Jamban dan CTPS 1 Paket 33,000 33,000
b Verifikasi SBS/ODF 1 Paket 33,000 33,000
c Verifikasi SBS 1 Paket 32,000 32,000
d monitoring Progres Akses jamban & CTPS 1 Paket 66,000 66,000
e Pemeriksaan Kualitas Air Sebelum dan Sesudah Program 2 Paket Err:509 Err:509
- Err:509 Err:509 0 0 0 0 0 0 -
56,000,000 Err:509 Err:509 0.00% ### ### ### ### 8100.00% ###
Mengetahui
Koordinator Kabupaten
Nilai (Rp)
20
15,590,000
2,250,000
16,065,000
33,905,000
-
###
PROGRAM : PAMSIMAS III
PEKERJAAN : PEMBANGUNAN SARANA AIR MINUM
JUMLAH
NO URAIAN KEGIATAN HARGA BOBOT (%) NOVEMBER
(RP) 1 2
1 SARANA AIR BERSIH 311,500,000 95.70
1.351
PENANGKAP MATA AIR 52,761,000 16.21
0.336
PELATIHAN KESEHATAN 1,094,000 0.34
5 KEGIATAN PENDUKUNG
0.199
ADMINISTRASI/OPERASIONAL LKM 7,138,000 2.19
ADMINISTRASI/OPERASIONAL LKM 7,138,000 2.19
Err:509
Err:509 Err:509
0.654
RENCANA
0.139
KABUPATEN : PINRANG
Desa / KEC : MASOLO
90.00
2.363
80.00
0.00
70.00
60.00
50.00
0.547 0.547
40.00
30.00
20.00
10.00
0.00
0.00
Disetujui Oleh,
Koordinator Kabupaten
Dibuat Oleh :
Satlak Pamsimas
( Ansar )
DAFTAR HARGA UPAH DAN BAHAN 2016
buah Rp 650
m3 Rp 105,000
m3 Rp 150,000
m3 Rp 162,500
m3 Rp 62,500
m3 Rp 78,750
m3 Rp 320,000
m3 Rp 281,000
m3 Rp 240,700
m3 Rp 210,000
liter Rp 10,000
liter Rp 15,000
liter Rp 10,000
liter Rp 29,000
liter Rp 9,300
liter Rp 6,950
m3 Rp 81,500
m3 Rp 97,200
m3 Rp 97,200
m3 Rp 50,000
m3 Rp 105,500
kg Rp 15,000
zak Rp 59,400
zak Rp 48,000
kg Rp 15,000
m Rp 63,000
m3 Rp 78,750
m3 Rp 10,000,000
m3 Rp 6,500,000
m3 Rp 12,500,000
m3 Rp 3,500,000
m3 Rp 2,500,000
batang Rp 31,500
m3 Rp 10,000,000
m3 Rp 12,500,000
m3 Rp 6,500,000
Rp 3,500,000
m3 Rp 2,500,000
Rp -
Lembar Rp 21,000
Lembar Rp 31,500
Lembar Rp 47,250
Lembar Rp 63,000
Lembar Rp 152,985
Lembar Rp 210,000
Jergen Rp 399,000
kaleng Rp 131,250
Lembar Rp 178,500
batang Rp 18,900
Rp 78,750
Lembar Rp 85,995
Lembar Rp 93,713
Roll Rp 385,875
Roll Rp 468,563
Roll Rp 551,250
Lembar Rp 355,005
Lembar Rp 166,950
Lembar Rp 29,400
Lembar Rp 50,820
Lembar Rp 60,900
Batang Rp 92,400
Batang Rp 108,570
Batang Rp 101,850
Batang Rp 101,640
Batang Rp 90,090
Batang Rp 93,555
Batang Rp 137,500
Batang Rp 100,485
Batang Rp 47,250
Batang Rp 283,500
Batang Rp 215,250
Batang Rp 147,000
Batang Rp 127,500
Batang Rp 61,950
lbr Rp 577,500
lbr Rp 4,462,500
lbr Rp 341,250
lbr Rp 1,890,000
lbr Rp 1,365,000
lbr Rp 787,500
Lembar Rp 997,500
Lembar Rp 388,500
Batang Rp 36,750
Batang Rp 21,000
batang Rp 283,500
batang Rp 206,850
batang Rp 141,750
batang Rp 103,950 Rp 8,663
batang Rp 78,750
Batang Rp 57,750
Batang Rp 325,185
Batang Rp 303,135
Batang Rp 184,800
Batang Rp 138,600
Batang Rp 97,020
Batang Rp 86,625
Batang Rp 83,685
Batang Rp 66,675
Batang Rp 57,330
batang Rp 46,725
Batang Rp 36,330
Batang Rp 25,830
batang Rp 299,250
batang Rp 367,500
batang Rp 299,250
batang Rp 210,000
batang Rp 147,000
batang Rp 70,350
batang Rp 63,000
batang Rp 57,750
batang Rp 32,550
batang Rp 25,200
batang Rp 89,250
batang Rp 141,750
batang Rp 99,750
Batang Rp 73,500
Batang Rp 47,250
Lembar Rp 23,625
Lembar Rp 23,625
Lembar Rp 48,300
Lembar Rp 87,150
Lembar Rp 28,350
Lembar Rp 28,350
m Rp 28,875
m Rp 16,800
m Rp 31,500
m Rp 15,750
kg Rp 12,075
kg Rp 105,000
Rp 57,750
kg Rp 57,750
m Rp 16,800
kg Rp 19,425
kg Rp 15,750
buah Rp 99,750
buah Rp 68,250
Rool Rp 472,500
Lembar Rp 42,000
dos Rp 36,750
m Rp 498,750
buah Rp 1,050,000
m Rp 1,155,000
buah Rp 262,500
m Rp 525,000
m Rp 577,500
m Rp 1,050,000
m Rp 945,000
Batang Rp 318,780
Batang Rp 2,030,490
Batang Rp 314,580
Batang Rp 1,569,225
Batang Rp 742,035
Batang Rp 245,175
batang Rp 84,000
batang Rp 94,500
batang Rp 262,500
batang Rp 131,250
batang Rp 173,250
batang Rp 199,500
Batang Rp 578,813
Batang Rp 78,750
Batang Rp 452,025
Batang Rp 297,675
Batang Rp 159,863
Batang Rp 226,013
Batang Rp 63,000
batang Rp 4,410,000
batang Rp 2,206,313
batang Rp 1,648,238
batang Rp 1,000,519
batang Rp 175,628
batang Rp 721,586
batang Rp 410,461
Batang Rp 127,339
batang Rp 242,964
batang Rp 338,605
Batang Rp 192,255
lembar Rp 17,535
lembar Rp 20,108
Lembar Rp 78,750
Lembar Rp 97,650
lembar Rp 72,765
Lembar Rp 17,850
lembar Rp 58,170
buah Rp 15,750
zak Rp 78,750
m Rp 78,750
Roll Rp 535,500
m Rp 15,750
Rp 46,570
m Rp 21,000
Rp 78,750
Lembar Rp 47,250
Lembar Rp 73,500
Kaki Rp 7,560
Kaki Rp 8,925
Kaki Rp 49,875
Kaki Rp 78,750
Lembar Rp 69,300
Lembar Rp 30,188
Kaki Rp 43,785
Kaki Rp 34,230
Kaki Rp 29,085
Lembar Rp 26,250
Lembar Rp 91,875
Lembar Rp 63,000
Lembar Rp 46,570
Lembar Rp 46,570
Lembar Rp 46,570
Lembar Rp 34,650
m Rp 57,750
m Rp 52,500
m Rp 52,500
buah Rp 3,625
buah Rp 2,120
buah Rp 42,000
buah Rp 65,625
buah Rp 39,375
buah Rp 21,656
buah Rp 39,375
buah Rp 9,188
buah Rp 10,149
buah Rp 14,875
buah Rp 6,825
buah Rp 6,090
buah Rp 6,300
buah Rp 6,500
buah Rp 3,806
buah Rp 3,281
buah Rp 2,406
buah Rp 2,226
buah Rp 2,310
buah Rp 150,000
buah Rp 160,000
buah Rp 26,250
buah Rp 5,949
buah Rp 5,681
buah Rp 3,045
buah Rp 2,310
buah Rp 2,310
m2 Rp 99,750
m2 Rp 246,750
buah Rp 17,850
buah Rp 10,500
Lembar Rp 40,215
Lembar Rp 35,070
Lembar Rp 97,650
Lembar Rp 16,380
Kaki Rp 7,350
Lembar Rp 30,450
Lembar Rp 72,765
Lembar Rp 58,170
Lembar Rp 45,045
Lembar Rp 45,045
Lembar Rp 31,080
Lembar Rp 35,490
Lembar Rp 32,970
Lembar Rp 22,890
Lembar Rp 38,640
Lembar Rp 27,930
m Rp 17,850
m Rp 17,325
m2 Rp 52,500
m2 Rp 82,583
m2 Rp 105,000
m2 Rp 84,000
m2 Rp 105,000
m2 Rp 84,000
m2 Rp 75,600
buah Rp 189,000
buah Rp 157,600
buah Rp 126,000
buah Rp 94,500
buah Rp 63,000
buah Rp 47,250
buah Rp 31,500
batang Rp 375,000
batang Rp 200,000
batang Rp 140,000
batang Rp 90,000
batang Rp 60,000
Batang Rp 35,000
Batang Rp 40,000
batang Rp 40,000
batang Rp 145,000
batang Rp 700,000
Batang Rp 358,600
Batang Rp 25,000
Batang Rp 150,000
Batang Rp 18,000
Batang Rp 100,000 Rp 25,000
Batang Rp 80,000
batang Rp 1,937,250
batang Rp 1,227,870
batang Rp 578,340
batang Rp 21,000
batang Rp 384,615
batang Rp 198,030
batang Rp 14,280
batang Rp 35,490
batang Rp 52,080
buah Rp 299,250
Set Rp 1,890,000
buah Rp 945,000
buah Rp 367,500
buah Rp 682,500
buah Rp 525,000
buah Rp 787,500
Set Rp 1,365,000
buah Rp 577,500
buah Rp 682,500
buah Rp 189,000
buah Rp 1,260,000
buah Rp 157,500
buah Rp 52,500
buah Rp 189,000
buah Rp 19,110
buah Rp 63,000
buah Rp 10,500
buah Rp 84,000
buah Rp 1,050,000
buah Rp 262,500
buah Rp 609,000
Unit Rp 546,000
buah Rp 31,500
buah Rp 47,250
buah Rp 15,750
buah Rp 367,500
buah Rp 15,750
buah Rp 2,625,000
buah Rp 1,455,300
buah Rp 1,391,250
buah Rp 157,500
buah Rp 472,500
buah Rp 52,500
buah Rp 47,250
buah Rp 84,000
buah Rp 157,500
kg Rp 23,100
kg Rp 23,100
liter Rp 141,750
liter Rp 236,250
kg Rp 63,000
liter Rp 152,250
liter Rp 236,250
kg Rp 63,000
kg Rp 9,669
kg Rp 48,300
kg Rp 57,750
kg Rp 57,110
kg Rp 36,750
kg Rp 41,895
kg Rp 28,350
kg Rp 50,400
kg Rp 49,560
kg Rp 60,900
kg Rp 57,750
kg Rp 63,000
kg Rp 50,400
kg Rp 52,500
liter Rp 42,000
liter Rp 36,750
liter Rp 161,175
liter Rp 177,345
liter Rp 266,175
liter Rp 44,100
liter Rp 156,450
kg Rp 107,310
kg Rp 74,445
kg Rp 129,465
kg Rp 264,180
kg Rp 99,750
liter Rp 47,250
kg Rp 63,000
liter Rp 120,750
liter Rp 57,750
buah Rp 47,250
buah Rp 36,750
buah Rp 26,250
buah Rp 23,100
liter Rp 71,400
liter Rp 19,031
liter Rp 73,500
kg Rp 95,183
kg Rp 21,137
kg Rp 21,137
kg Rp 55,860
kg Rp 18,209
kg Rp 2,625
kg Rp 52,500
kg Rp 21,000
kg Rp 31,500
liter Rp 28,875
kg Rp 31,500
liter Rp 14,700
liter Rp 42,000
liter Rp 57,750
liter Rp 52,500
buah Rp 31,500
buah Rp 36,750
Mata Rp 21,000
m Rp 315,000
m2 Rp 126,000
m2 Rp 115,500
m2 Rp 115,000
m2 Rp 105,000
m2 Rp 73,500
m2 Rp 315,000
m2 Rp 107,100
m2 Rp 115,500
m2 Rp 105,000
m2 Rp 73,500
m2 Rp 131,500
m2 Rp 152,250
m2 Rp 141,750
m2 Rp 68,250
buah Rp 10,500
m Rp 16,800
m Rp 13,650
m Rp 14,700
m Rp 11,550
m Rp 18,375
m Rp 12,600
m Rp 12,600
m Rp 9,450
m Rp 9,975
m Rp 7,350
Roll Rp 294,000
Roll Rp 189,000
buah Rp 36,750
buah Rp 18,900
buah Rp 262,500
buah Rp 10,500
buah Rp 5,250
buah Rp 10,500
buah Rp 10,500
buah Rp 13,650
Set Rp 246,750
Set Rp 99,750
Set Rp 131,250
Set Rp 84,000
buah Rp 131,250
m Rp 183,750
m Rp 3,150
buah Rp 28,875
buah Rp 26,250
buah Rp 52,500
buah Rp 47,250
buah Rp 38,850
buah Rp 36,750
buah Rp 32,550
buah Rp 36,750
buah Rp 15,750
buah Rp 8,400
buah Rp 57,750
buah Rp 52,500
buah Rp 78,750
buah Rp 68,250
buah Rp 26,250
buah Rp 21,000
buah Rp 682,500
buah Rp 367,500
buah Rp 133,350
buah Rp 69,825
buah Rp 69,825
buah Rp 95,025
buah Rp 31,500
Batang Rp 8,925
Batang Rp 29,190
Batang Rp 18,585
Batang Rp 22,785
batang Rp 84,000
buah Rp 13,650
buah Rp 17,850
buah Rp 15,750
buah Rp 13,125
buah Rp 17,850
buah Rp 28,350
buah Rp 6,930
buah Rp 8,400
buah Rp 52,500
buah Rp 39,375
buah Rp 42,000
buah Rp 63,000
buah Rp 28,875
buah Rp 23,100
buah Rp 18,900
buah Rp 15,750
buah Rp 78,750
buah Rp 147,000
buah Rp 43,313
buah Rp 36,750
liter Rp 36,750
buah Rp 9,450
buah Rp 10,500
buah Rp 26,250
liter Rp 11,813
liter Rp 5,933
buah Rp 21,000
buah Rp 8,085
Rol Rp 5,775
buah Rp 29,400
buah Rp 23,100
dos Rp 115,500
dos Rp 127,050
buah Rp 2,888
buah Rp 2,310
Rp 15,750
buah Rp 10,500
buah Rp 10,500
buah Rp 5,250
buah Rp 21,000
buah Rp 68,250
buah Rp 209,402
buah Rp 168,000
buah Rp 131,250
buah Rp 5,250
dos Rp 147,000
Pasang Rp 367,500
Pasang Rp 189,000
Pasang Rp 472,500
Pasang Rp 157,500
Pasang Rp 399,000
Pasang Rp 472,500
buah Rp 10,500
buah Rp 15,750
buah Rp 26,250
buah Rp 47,250
buah Rp 36,750
buah Rp 8,400
buah Rp 54,632
buah Rp 21,000
buah Rp 73,500
buah Rp 17,850
buah Rp 157,500
Set Rp 126,000
kg Rp 32,603
kg Rp 36,527
dos Rp 30,188
kg Rp 15,750
kg Rp 21,000
kg Rp 31,395
kg Rp 31,500
kg Rp 15,750
kg Rp 31,500
kg Rp 26,250
buah Rp 34,650
buah Rp 26,250
buah Rp 36,750
buah Rp 52,500
buah Rp 1,050
Set Rp 21,000
Set Rp 5,250
buah Rp 3,150
m Rp 8,400
Set Rp 15,750
buah Rp 21,000
buah Rp 1,365,000
Lembar Rp 84,000
Perhari Rp 90,000
Perhari Rp 90,000
hari Rp 90,000
Perhari Rp 103,400
Perhari Rp 103,400
perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 110,250
Perhari Rp 105,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
DAFTAR PERBANDINGAN HARGA BAHAN/ALAT, UPAH
A. Bahan
I Material lainnya
B. Upah
Ket.
Ket.
HARGA BAHAN/ALAT, UPAH
I Material lainnya
B. Upah
Upah Angkut/ Total
Harga Satuan
No. Nama barang/Jasa Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
1 Pekerja Hok 90,000 - 90,000
Panjang 4 m
Panjang 4 m
Panjang 4 m
Panjang 4 m
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
1 2=3+4+5 3 4
A. PEKERJAAN PENDAHULUAN
1 Membersihkan Lapangan dan Peralatan 25.00
- Upah
Pekerja 0.100 2.50 2.50 0.00 2.50
2 Pengukuran & Pemasangan Bowplank 16.00
- Bahan
Kayu balok klas II uk. 5/7 0.012 0.19 0.19 0.00 0.19
Paku biasa 2" - 5 " 0.020 0.32 0.32 0.00 0.00
Kayu papan kls III uk.2/20 0.007 0.11 0.11 0.00 0.11
- Upah
Pekerja 0.100 1.60 1.60 0.00 1.60
Tukang 0.100 1.60 1.60 0.00 1.60
B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi 16.90
- Upah
Pekerja 0.900 15.21 15.21 0.00 15.21
2 Pek. Urug. Kembali Galian Tanah Pondasi 5.63
- Upah
Pekerja 0.250 1.41 1.41 0.00 1.41
3 Pek. Urugan Tanah di Bawah Lantai 3.07
- Bahan
Tanah Urug 1.200 3.69 3.69 0.00 3.69
- Upah
Pekerja 0.300 0.92 0.92 0.00 0.92
4 Urugan Pasir di Bawah Aanstampang 0.68
- Bahan
Pasir Urug 1.200 0.81 0.81 0.00 0.81
- Upah
Pekerja 0.300 0.20 0.20 0.00 0.20
5 Urugan Pasir di Lantai 1.02
- Bahan
Pasir Urug 1.200 1.23 1.23 0.00 1.23
- Upah
Pekerja 0.300 0.31 0.31 0.00 0.31
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
C. PEKERJAAN PASANGAN BATU
1 Pas. Batu Kosong 1.35
- Bahan
Batu belah 10/15 cm 1.200 1.62 1.62 0.00 1.62
Pasir Urug 0.432 0.58 0.58 0.00 0.58
- Upah
Pekerja 0.780 1.05 1.05 0.00 1.05
Tukang 0.390 0.53 0.53 0.00 0.53
2 Pas. Batu Bata Gardu Listrik 30.48
- Bahan
Bata merah 5 x 11 x 22 cm 70.000 2133.60 2133.60 0.00 0.00
Semen Portland 11.500 350.52 350.52 0.00 0.00
Pasir pasang 0.043 1.31 1.31 0.00 1.31
- Upah
Pekerja 0.300 9.14 9.14 0.00 0.00
Tukang 0.100 3.05 3.05 0.00 0.00
3 Pas. Batu Bata Box Valve 40 x 60 x60 0.72
- Bahan
Bata merah 5 x 11 x 22 cm 70.000 50.40 50.40 0.00 0.00
Semen Portland 11.500 8.28 8.28 0.00 0.00
Pasir pasang 0.043 0.03 0.03 0.00 0.03
- Upah
Pekerja 0.300 0.22 0.22 0.00 0.22
Tukang 0.100 0.07 0.07 0.00 0.07
D. PEKERJAAN BETON
1 Pondasi Poer Plat & Kolom Pondasi Poor
* Beton Pondasi 2.48
- Bahan
Semen portland 232.000 575.36 575.36 0.00 0.00
Pasir Beton 0.520 1.29 1.29 0.00 0.00
Kerikil beton 0.780 1.93 1.93 0.00 1.93
- Upah
Pekerja 1.650 4.09 4.09 0.00 0.00
Tukang 0.250 0.62 0.62 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
* Pembesian Pondasi 561.59
- Bahan
Besi beton Polos 1.050 589.67 589.67 0.00 0.00
Kawat beton 0.015 8.42 8.42 0.00 0.00
- Upah
Pekerja 0.007 3.93 3.93 0.00 0.00
Tukang 0.007 3.93 3.93 0.00 0.00
* Bekisting Pondasi 8.80
- Bahan
Kayu Kls III 0.040 0.35 0.35 0.00 0.00
Paku biasa 2" - 5' 0.300 2.64 2.64 0.00 0.00
Minyak bekisting 0.100 0.88 0.88 0.00 0.00
- Upah
Pekerja 0.520 4.58 4.58 0.00 4.58
Tukang 0.260 2.29 2.29 0.00 2.29
2 Beton Sloof ( 20 x 40 )
* Beton Sloof 0.90
- Bahan
Semen portland 232.000 207.87 207.87 0.00 0.00
Pasir Beton 0.520 0.47 0.47 0.00 0.00
Kerikil beton 0.780 0.70 0.70 0.00 0.00
- Upah
Pekerja 1.650 1.48 1.48 0.00 0.00
Tukang 0.250 0.22 0.22 0.00 0.00
* Pembesian Sloof 196.47
- Bahan
Besi beton Polos 1.050 206.30 206.30 0.00 0.00
Kawat beton 0.015 2.95 2.95 0.00 0.00
- Upah
Pekerja 0.007 1.38 1.38 0.00 0.00
Tukang 0.007 1.38 1.38 0.00 0.00
* Bekisting Sloof 4.48
- Bahan
Kayu Kls III 0.045 0.20 0.20 0.00 0.20
Paku biasa 2" - 5' 0.300 1.34 1.34 0.00 0.00
Minyak bekisting 0.100 0.45 0.45 0.00 0.00
- Upah
Pekerja 0.520 2.33 2.33 0.00 0.00
Tukang 0.260 1.16 1.16 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
3 Kolom ( 40 x 40 )
* Beton Kolom 4.48
- Bahan
Semen portland 232.000 1039.36 1039.36 0.00 0.00
Pasir Beton 0.520 2.33 2.33 0.00 0.00
Kerikil beton 0.780 3.49 3.49 0.00 0.00
- Upah
Pekerja 1.650 7.39 7.39 0.00 0.00
Tukang 0.250 1.12 1.12 0.00 0.00
* Pembesian Kolom 542.08
- Bahan
Besi beton Polos 1.050 569.19 569.19 0.00 0.00
Kawat beton 0.015 8.13 8.13 0.00 0.00
- Upah
Pekerja 0.007 3.79 3.79 0.00 3.79
Tukang 0.007 3.79 3.79 0.00 3.79
* Bekisting Kolom 22.40
- Bahan
Kayu Kls III 0.040 0.90 0.90 0.00 0.00
Paku biasa 2" - 5' 0.400 8.96 8.96 0.00 0.00
Minyak bekisting 0.200 4.48 4.48 0.00 0.00
Balok Kayu Kls II 0.015 0.34 0.34 0.00 0.00
Plywood tebal 9 mm 0.350 7.84 7.84 0.00 0.00
Bambu P = 12 M 0.667 14.93 14.93 0.00 14.93
- Upah
Pekerja 0.660 14.78 14.78 0.00 14.78
Tukang 0.330 7.39 7.39 0.00 7.39
4 Balok 20 x 40 (Lantai 2 dan 3)
* Beton Balok 1.79
- Bahan
Semen portland 232.000 415.74 415.74 0.00 0.00
Pasir Beton 0.520 0.93 0.93 0.00 0.00
Kerikil beton 0.780 1.40 1.40 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 1.650 2.96 2.96 0.00 0.00
Tukang 0.250 0.45 0.45 0.00 0.00
* Pembesian Balok 399.49
- Bahan
Besi beton Polos 1.050 419.47 419.47 0.00 0.00
Kawat beton 0.015 5.99 5.99 0.00 0.00
- Upah
Pekerja 0.007 2.80 2.80 0.00 0.00
Tukang 0.007 2.80 2.80 0.00 2.80
* Bekisting Balok 8.96
- Bahan
Kayu Kls III 0.040 0.36 0.36 0.00 0.36
Paku biasa 2" - 5' 0.400 3.58 3.58 0.00 0.00
Minyak bekisting 0.200 1.79 1.79 0.00 0.00
Balok Kayu Kls II 0.018 0.16 0.16 0.00 0.00
Plywood tebal 9 mm 0.350 3.14 3.14 0.00 0.00
Bambu P = 12 M 0.667 5.97 5.97 0.00 5.97
- Upah
Pekerja 0.660 5.91 5.91 0.00 0.00
Tukang 0.330 2.96 2.96 0.00 0.00
5 Plat lantai 2 dan lantai 3 ( t 20 Cm) dan Plat Penutup Bak ( t = 15 cm )
* Beton Plat Lantai dan Penutup 6.81
- Bahan
Semen portland 232.000 1578.99 1578.99 0.00 0.00
Pasir Beton 0.520 3.54 3.54 0.00 0.00
Kerikil beton 0.780 5.31 5.31 0.00 0.00
- Upah
Pekerja 1.650 11.23 11.23 0.00 0.00
Tukang 0.250 1.70 1.70 0.00 0.00
* Pembesian Plat Lantai dan Penutup 874.76
- Bahan
Besi beton Polos 1.050 918.50 918.50 0.00 0.00
Kawat beton 0.015 13.12 13.12 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 0.007 6.12 6.12 0.00 0.00
Tukang 0.007 6.12 6.12 0.00 0.00
* Bekisting Plat Lantai dan Penutup 18.38
- Bahan
Kayu Kls III 0.040 0.74 0.74 0.00 0.00
Paku biasa 2" - 5' 0.400 7.35 7.35 0.00 0.00
Minyak bekisting 0.200 3.68 3.68 0.00 0.00
Balok Kayu Kls II 0.015 0.28 0.28 0.00 0.00
Plywood tebal 9 mm 0.350 6.43 6.43 0.00 0.00
Bambu P = 12 m 2.000 36.76 36.76 0.00 36.76
- Upah
Pekerja 0.660 12.13 12.13 0.00 12.13
Tukang 0.330 6.07 6.07 0.00 6.07
6 Dinding beton bak penampung ( t 20 )
* Beton dinding bak penampung 5.44
- Bahan
Semen portland 232.000 1262.08 1262.08 0.00 0.00
Pasir Beton 0.520 2.83 2.83 0.00 0.00
Kerikil beton 0.780 4.24 4.24 0.00 0.00
- Upah
Pekerja 1.650 8.98 8.98 0.00 0.00
Tukang 0.250 1.36 1.36 0.00 1.36
* Pembesian dinding bak penampung 740.11
- Bahan
Besi beton Polos 1.050 777.12 777.12 0.00 0.00
Kawat beton 0.015 11.10 11.10 0.00 0.00
- Upah
Pekerja 0.007 5.18 5.18 0.00 0.00
Tukang 0.007 5.18 5.18 0.00 0.00
* Bekisting dinding bak penampung 13.60
- Bahan
Kayu Kls III 0.030 0.41 0.41 0.00 0.41
Paku biasa 2" - 5' 0.400 5.44 5.44 0.00 0.00
Minyak bekisting 0.200 2.72 2.72 0.00 0.00
Balok Kayu Kls II 0.020 0.27 0.27 0.00 0.00
Plywood tebal 9 mm 0.350 4.76 4.76 0.00 0.00
Bambu P = 12 m 2.333 31.73 31.73 0.00 31.73
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 0.660 8.98 8.98 0.00 8.98
Tukang 0.330 4.49 4.49 0.00 4.49
E. PEKERJAAN KUSEN DAN JENDELA
1 Pek. 1 M3 Kusen pintu dan kusen jendela 0.03
- Bahan
Balok Kayu Kls II 1.200 0.04 0.04 0.00 0.00
Paku 10 cm 1.250 0.04 0.04 0.00 0.00
Lem kayu 1.000 0.03 0.03 0.00 0.00
- Upah
Pekerja 6.000 0.21 0.21 0.00 0.00
Tukang 18.000 0.62 0.62 0.00 0.00
2 Pek. 1 M2 daun pintu dan daun jendela 1.57
- Bahan
Papan Kayu Kls II 0.040 0.06 0.06 0.00 0.00
Lem kayu 0.500 0.78 0.78 0.00 0.00
- Upah
Pekerja 1.000 1.57 1.57 0.00 0.00
Tukang 3.000 4.71 4.71 0.00 0.00
3 Pek. 1 M2 pasang kaca polos 5 mm 0.46
- Bahan
Kaca polos 5 mm 1.100 0.50 0.50 0.00 0.00
- Upah
Pekerja 0.150 0.07 0.07 0.00 0.07
Tukang 0.150 0.07 0.07 0.00 0.07
E. PEKERJAAN FINISHING
1 Plesteran Gardu Listrik 1 : 4 ( t 20 ) 60.96
- Bahan
Semen Portland 8.320 507.19 507.19 0.00 0.00
Pasir pasang 0.032 1.95 1.95 0.00 0.00
- Upah
Pekerja 0.400 24.38 24.38 0.00 0.00
Tukang 0.200 12.19 12.19 0.00 0.00
2 Plesteran Box Valve 1 : 2 ( t 20 ) 1.44
- Bahan
Semen Portland 13.632 19.63 19.63 0.00 0.00
Pasir pasang 0.027 0.04 0.04 0.00 0.00
- Upah
Pekerja 0.400 0.58 0.58 0.00 0.58
Tukang 0.200 0.29 0.29 0.00 0.29
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
3 Acian 24.00
- Bahan
Semen Portland 3.250 78.00 78.00 0.00 0.00
- Upah
Pekerja 0.200 4.80 4.80 0.00 4.80
Tukang 0.100 2.40 2.40 0.00 2.40
4 Pekerjaan Man Hole 80 x 80 0.64
- Bahan
Besi plat 32.800 20.99 20.99 0.00 0.00
Besi siku 30.30.3 15.000 9.60 9.60 0.00 0.00
- Upah
Pekerja 1.050 0.67 0.67 0.00 0.00
Tukang 1.050 0.67 0.67 0.00 0.00
5 Penutup Box Valve 60 x 60 0.36
- Bahan
Besi plat 32.800 11.81 11.81 0.00 0.00
Besi siku 30.30.3 15.000 5.40 5.40 0.00 0.00
- Upah
Pekerja 1.050 0.38 0.38 0.00 0.00
Tukang 1.050 0.38 0.38 0.00 0.00
6 Pengecatan ( 2 x cat penutup ) 151.84
- Bahan
Plamir 0.100 15.18 15.18 0.00 0.00
Cat dasar 0.100 15.18 15.18 0.00 0.00
Cat penutup 2 kali 0.260 39.48 39.48 0.00 0.00
- Upah
Pekerja 0.020 3.04 3.04 0.00 0.00
Tukang 0.063 9.57 9.57 0.00 0.00
7 Pengecatan Kusen 4.35
- Bahan
Cat meni 0.200 0.87 0.87 0.00 0.00
Plamur 0.150 0.65 0.65 0.00 0.00
Cat dasar 0.170 0.74 0.74 0.00 0.00
Cat penutup 2 kali 0.260 1.13 1.13 0.00 0.00
- Upah
Pekerja 0.070 0.30 0.30 0.00 0.30
Tukang 0.009 0.04 0.04 0.00 0.04
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
8 Pipa Vent Gip Ø 2" 1.00
- Upah
Pekerja 0.108 0.11 0.11 0.00 0.11
Tukang 0.180 0.18 0.18 0.00 0.18
9 Tangga Monyet 8.00
- Upah
Pekerja 1.200 9.60 9.60 0.00 0.00
Tukang 1.200 9.60 9.60 0.00 0.00
10 Stop Kran Ø 3'' Err:509
- Upah
Pekerja 0.010 Err:509 Err:509 0.00 Err:509
Tukang 0.100 Err:509 Err:509 0.00 Err:509
11 Sambungan Knee Ø 3'' Err:509
- Upah
Pekerja 0.010 Err:509 Err:509 0.00 Err:509
Tukang 0.100 Err:509 Err:509 0.00 Err:509
176.00 14,080,000.00
102.00 8,670,000.00
Dibuat Oleh :
Koordinator KKM Satlak Pamsimas
1 2 3 4 5 6 7= 6x4 8 9
1 BAHAN LOKAL
Balok 5/7 Kayu Kls II 50 btg 90,000 4,500,000 4,500,000
Bambu 84 bh 31,500 2,646,000 1,746,000
Batu Belah 1.00 Ret 600,000 600,000 -
Pasir Urug 9.00 Ret 326,000 2,934,000 -
Pasir Beton 5 Ret 420,000 2,100,000 1,300,000
Pasir Pasang 6 Ret 420,000 2,520,000 2,520,000
Kayu Balok Kls I 0.10 M3 6,500,000 650,000 300,000
Kayu Papan Kls I 0.05 M3 6,500,000 344,110 344,110
Kayu Papan Kls II, 2/20 20 lbr 68,000 1,360,000 1,360,000
Bata Merah 5 x 11 x 12 cm 2,184 Bh 700 1,528,800 1,528,800
Kerikil beton / Cipping 5 ret 962,800 4,814,000 3,654,000
JUMLAH (1) 23,996,910 17,252,910
2 BAHAN INDUSTRI
Besi Beton Ǿ 16 SNI 53 btg 141,750 7,512,750 7,512,750
Besi Beton Ǿ 14 SNI 20 btg 103,950 2,079,000 2,079,000
Besi Beton Ǿ 12 SNI 146 btg 78,750 11,497,500 11,497,500
Besi Beton Ǿ 10 SNI 52 btg 57,750 3,003,000 3,003,000
Besi Plat 3 mm 1 M2 524,800 524,800 524,800
Besi Siku 40 x 40 x 4 mm 2 M1 60,000 120,000 120,000
Cat Besi / Kayu @ 2 Kg 5 Klg 57,750 288,750 288,750
Cat Tembok @ 4 Kg 4 Klg 236,250 945,000 945,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Cat Pelapis Anti Bocor @ 4 Kg (No Drop) 3 Klg 71,400 214,200 214,200
Ember Cor 5 Buah 10,000 50,000 50,000
Gergaji Besi 1 Set 70,000 70,000 70,000
Gerobak Dorong 2 Buah 500,000 1,000,000 1,000,000
Kaca bening tebal 5 mm 3 M2 315,000 945,000 945,000
Kawat Beton 30 Kg 15,750 472,500 472,500
Minyak Bekisting 5 Kg 12,000 60,000 60,000
Linggis 2 Buah #REF! #REF! #REF!
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Meteran 1 Buah 30,000 30,000 30,000
Paku Biasa 30 Kg 17,000 510,000 510,000
Playwood 9 mm 22 Lbr 120,000 2,640,000 2,640,000
Sekop Besar 2 Bh 75,000 150,000 150,000
Sekop Kecil 3 Bh 85,000 255,000 255,000
Semen Skim Coat / A Plus @ 20 kg 16 Zak 59,000 944,000 944,000
Portland Composite Cemen (PCC) 144 Zak 59,000 8,496,000 8,496,000
Sendok Semen 2 Bh 25,000 50,000 50,000
Tenro' #REF! Bh 100,000 #REF! #REF!
Tali Plastik Err:509 m 2,500 Err:509 Err:509
JUMLAH (2) #REF! #REF!
4 PENGEBORAN
SUMUR DALAM
PENGADAAN BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90.00 M' 137,500 12,375,000 -
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000 -
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000 -
Pengadaan Gravel Pack 3.00 M3 240,700 722,100 543,650
UPAH DAN BIAYA KONSTRUKSI
Mobilisasi dan demobilisasi meliputi pemindahan alat dan
1.00 Rig 1,000,000 1,000,000 1,000,000
alat bantu lainnya
dari workshop ke site pengeboran dan sebaliknya
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 500,000 500,000 500,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Persiapan lokasi sebelum pemboran dan pemulihannya
1.00 Lokasi 1,000,000 1,000,000 1,000,000
setelah pek. selesai
Mut pit lahan, Material untuk landasan rig / jalan
Pemboran pada segala formasi Ø 2" 90.00 M' 75,000 6,750,000 6,750,000
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M' 200,000 18,000,000 18,000,000
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000 500,000
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M' 190,000 17,100,000 17,100,000
Pemasangan Pipa blank Pipa SNI Ø 6" 65.00 M' 50,000 3,250,000 3,250,000
Pemasangan Pipa screen dan bottom plug PVC AW Ø 6" 25.00 M' 75,000 1,875,000 1,875,000
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000 150,000
Water jetting Development 1.00 Lokasi 500,000 500,000 500,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Air jetting Development 1.00 Lokasi 500,000 500,000 500,000
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 1,000,000 1,000,000 1,000,000
Pemasangan, pembongkaran dan pemindahan instalasi
1.00 Lokasi 500,000 500,000 500,000
pompa uji
Pemompaan uji meliputi :
a. Uji debit tetap (Long periode test) 48.00 Jam 15,000 720,000 720,000
b. Uji pemulihan (Recovery) 12.00 Jam 15,000 180,000 180,000
JUMLAH (4) 67,407,100 54,068,650
5 PENGADAAN PIPA
BAHAN
Pipa PVC
a. Pipa PVC Ø 2" 147 btg 120,000 17,640,000 17,640,000
b. Pipa PVC Ø 1 1/2" 200 btg 95,000 50,635,000 50,635,000
c. Pipa PVC Ø 1 1/2" 11 btg Err:509 Err:509 Err:509
Pipa GIP Medium A FULL
a. Pipa GIP Ø 2" 2 btg 340,000 680,000 680,000
b. Pipa GIP Ø 1 1/2" 153 btg 275,000 42,075,000 42,075,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Accecories
a. PVC
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Knee 90° Ø 1 1/2" 5 bh 17,500 87,500 87,500
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Air Valve Ø 1 1/2 " 6 bh 120,000 720,000 720,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
b. Galvanis - - - 2,424,500 2,424,500
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Gate Valve Ø 2" Broonze Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Double Nipple Ø 2" 4 bh 21,500 86,000 86,000
bend Ø 45 1 1/2" 8 bh 21,500 172,000 172,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Seal tape 151 bh 2,500 377,500 377,500
Kunci Pipa GIP Ø 2" No.24 2 bh 300,000 600,000 600,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH (5) Err:509 Err:509
Dibulatkan Err:509 Err:509
6 PENGADAAN
POMPA Bahan
Submersible Deep Well Pump 1 Unit 19,438,650 19,438,650 19,438,650
Type : SP - 5A
Debit : 1,5 lt/dtk
Head Max : 70 M
Power : 2.640 Watt
Rated Voltage : 1 x 220 V / 50 Hz
- Water level control
Pump Housing : Stainless Stell
Impeller : Stainless Stell
Motor : Stainless Stell
Pump Outlet : dia. 1 1/2"
Pump Diameter : 4"
Stabilizert : 5 KVA 1 Unit 5,000,000 5,000,000 5,000,000
Control Panel STD 1x220/50Hz 1 Unit 4,500,000 4,500,000 4,500,000
Drop Cable Power 1 Ls 3,500,000 3,500,000 3,500,000
Drop Cable Sensor 1 Ls 2,000,000 2,000,000 2,000,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
Biaya Pemasangan Pompa dan accessories 1 Lot 5,000,000 5,000,000 5,000,000
Transportasi dan akomodasi 1 Lot 2,000,000 2,000,000 2,000,000
JUMLAH (6) 41,438,650 41,438,650
Dibulatkan 41,439,000 41,438,650
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes
1 2 3 4 5 6 7= 6x4 8 9
7 PENGADAAN DAN
PEMASANGAN PLNBAHAN
Sertifikat Layak Operasi (SLO) 1 Ls 150,000 150,000 150,000
Pembelian Kabel & Accessories 1 Ls 938,000 938,000 938,000
UPAH
Biaya Pasang Baru 2,200 Watt 937 2,062,000 2,062,000
Biaya Gambar 1 Ls 350,000 350,000 350,000
Pekerjaan Instalasi 1 Ls 500,000 500,000 500,000
JUMLAH (7) 4,000,000 4,000,000
8 UPAH / JASA
Tukang 147 Hok 120,000 17,642,520 4,000,000
Pekerja 428 Hok 90,000 38,489,850 10,080,000
JUMLAH (8) 56,132,370 14,080,000
Err:509 Err:509
TOTAL Err:509 Err:509
Err:509 Err:509
Dibuat Oleh,
BP-SPAMS Koordinator LKM
#REF! #REF!
I RENCANA PENGADAAN
Nama KKM : " MANDIRI "
Jenis Pekerjaan : Pembangunan Sarana Air Minum
Partisipasi -
- - BR Masyarakat
900,000 - BR
600,000 - BR
2,934,000 - BR
800,000 - BR
- - BR
350,000 - BR
- - BR
- - BR
- - BR
1,160,000 - BR
6,744,000 -
Survey -
- - BR
- - BR Perbandingan Harga
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- -
- - JS Penunjukan
Langsung
- -
Survey -
Perbandingan Harga
12,375,000 BR
285,000 BR
500,000 BR
178,450 BR
- JS
- JS
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- JS
- JS
- JS
- JS
- JS
- 13,338,450
Survey -
Perbandingan Harga
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - -
Survey -
Perbandingan Harga
BR
BR
BR
BR
BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
BR
- -
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
Penunjukan -
Langsung
- - BR
- - BR
- - JS
BR
- - JS
- -
Partisipasi -
8,496,800 - JS Masyarakat
28,409,850 - JS
36,906,650 -
43,650,650 13,338,450
43,650,700 13,338,500
12,349,300 (13,338,500)
Desa Masolo, ………............Oktober 2016
FM - WSS
#REF!
RENCANA ANGG
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupa
Nomor RAB : 02
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Kontribusi Masyarak
Total
inCash
1 2=3+4+5 3
1 PENGADAAN BAHAN
a. Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90 90
b. Pengadaan bottom plug Ø 6" 1.00 1.00
c. Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 1.00
d. Pengadaan Gravel Pack 3.00 0.74
Biaya (Rp)
APBD
13=6x8
-
-
-
543,650
543,650
544,000
1,000,000
500,000
1,000,000
6,750,000
18,000,000
17,100,000
500,000
3,250,000
1,875,000
150,000
500,000
500,000
1,000,000
500,000
720,000
180,000
53,525,000
53,525,000
54,069,000
Satlak Pamsimas
Biaya (Rp)
APBD
( Ansar )
DIAMETER PIPA GALIAN URUGAN TANAH UUGAN PASIR
Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg
Trans
Dis 3 0.180 720 129.60 0.135 720 97.20 0.038 720
2 0.120 390 46.80 0.090 390 35.10 0.038 390
1½ 0.120 396 47.52 0.090 396 35.64 0.038 396
27.00
14.63 0.060 0.045 0.000
14.85
56.48
DATA PENGUKURAN
Lokasi Program : DESA MASOLO Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
R 56.00
B 44.00
JUMLAH 80 29
D 42.00
JUMLAH 65 37
B 44.00
J 41.00
JUMLAH 242 87
M 40.00
JUMLAH 60 33
N 39.00
JUMLAH 50 12
O 38.00
JUMLAH 45 8
P 39.00
JUMLAH 80 29
Q 38.00
JUMLAH 50 25
R 37.00
JUMLAH 110 29
56.00
56.00
56.00
56.00
55.97
55.96
55.95
55.95
55.95
55.95
55.94
11.00 0.04
12.00 0.04
13.00 0.03
14.00 0.02
15.00 0.01
17.00 0.01
13.00 0.02
14.00 0.01
15.00 0.03
15.99 0.02
12.99 0.07
Sisa Kcptan
Tekan V
(m) (m/dtk)
13.48 0.06
13.97 0.05
14.97 0.03
15.97 0.02
16.97 0.01
15.96 0.07
16.95 0.06
17.95 0.04
16.95 0.03
17.95 0.03
18.94 0.02
18.94 0.01
16.95 0.05
17.95 0.02
17.95 0.01
16.94 0.04
Sisa Kcptan
Tekan V
(m) (m/dtk)
18.94 0.03
19.93 0.04
RENCANA ANGGARA
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinr
Nomor RAB : 04
Pekerjaan Kegiatan : Sarana Air Minum
Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 5
1. BAHAN
1 Urugan Pasir 56.48 1.200 67.77 - 67.77
2. UPAH
A. PEKERJAAN TANAH
1 Galian Tanah
1.1 Pekerja 145.80 0.90 131.22 - 131.22
2 Urugan Kembali
2.1 Pekerja 167.94 0.25 41.99 - 41.99
B. PEMASANGAN PIPA
1 Pipa PVC Ø 3"
1.1 Pekerja 720.00 0.081 58.32 - 58.32
2 Pipa PVC Ø 2" Rp -
2.1 Pekerja 390.00 0.054 21.06 - 21.06
3 Pipa PVC Ø 1½"
3.1 Pekerja 396.00 0.036 14.26 - 14.26
4 Pipa GIP Ø 3"
4.1 Pekerja Err:509 0.108 Err:509 - Err:509
5 Pipa GIP Ø 2"
5.1 Pekerja Err:509 0.108 Err:509 - Err:509
6 Pipa GIP Ø 1 1/2"
6.1 Pekerja 918.000 0.054 49.57 - 49.57
Volume Harga
me Koefisien Kontribusi Masyarakat Satuan Satuan Kontrib
Total APBDes APBD Total
inCash inKind (Rp) inCash
2=3+4+5 3 4 5 6 7 8 9=2x8 10=3*8
Volume
URAIAN Kontribusi Masyarakat
Total
inCash inKind
1 2=3+4+5 3 4
1. BAHAN
1.1 Submersible Deep Well Pump 1.00 - -
Type : SP - 5A
Debit : 1,5 lt/dtk
Head Max : 70 M
Pump Outlet : dia. 1 1/2"
Pump Diameter : 4"
Pump Housing : Stainless Stell
Impeller : Stainless Stell
Motor : Stainless Stell
Power : 2.640 Watt
Rated Voltage : 1 x 220 V / 50 Hz
1.2 Control Panel STD 1x220/50Hz 1.00 - -
Proteksi :
- Under & Overload Protection
- Under & Overload Voltage Protection
- Start/stop Indikator
- Water level control
1.3 Stabilizert : 5 KVA 1.00 - -
1.4 Drop Cable Power 1.00 - -
1.5 Drop Cable Sensor 1.00 - -
2. UPAH
1.6 Biaya Pemasangan Pompa dan accessories 1.00
1.7 Transportasi dan akomodasi 1.00
Biaya (Rp)
APBD
13=6x8
19,438,650
4,500,000
5,000,000
3,500,000
2,000,000
34,438,650
34,438,700
5,000,000
2,000,000
7,000,000
7,000,000
41,438,700
Satlak Pamsimas
( Ansar )
RENCANA ANGGARAN BIAYA
Volume
URAIAN Kontribusi Masyarakat Satuan
Total APBD
inCash inKind
1 2=3+4+5 3 4 6 7
1. BAHAN
1.1 Sertifikat Layak Operasi (SLO) 1 - - 1 Ls
1.2 Pembelian Kabel & Accessories 1 - - 1 Ls
Sub Total 1)
Dibula
2 UPAH
2.1 Biaya Pasang Baru 2,200 2,200 Watt
2.2 Biaya Gambar 1 1 Ls
2.2 Pekerjaan Instalasi 1 1 Ls
Sub To
Dibula
Jumlah (To
1,088,000 - 1,088,000
Dibulatkan 1,088,000 - - 1,088,000
Dibuat Oleh :
Koordinator KKM Satlak Pamsimas
Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6
1 BAHAN
A. PEMAS. PIPA PVC AW
1.1 Pipa PVC Ø 1/2" 20.00 1.200 24.000 -
1.2 Clam Sadle Ø 2"x1/2" 1.00 1.000 1.000 -
1.3 knee Ø 1/2" 6.00 1.000 6.000 -
1.4 Tee Ø 1/2" 1.00 1.000 1.000 -
1.5 Double Nipple Ø 1/2" 1.00 1.000 1.000 -
1.6 Socked Ø 1/2' 2.00 1.000 2.000 -
1.7 Meteran Air 1.00 1.000 1.000 -
1.8 Stop Kran Ø 1/2 1.00 1.000 1.000 -
1.9 Seal Tape 1.00 1.000 1.000 -
B. PEMAS. KRAN 1/2"
1.10 Kran Air 2.00 1.000 2.000 -
1.11 Seal Tape 1.00 1.000 1.000 -
C. PEKERJAAN RABAT BETON
* Beton
1.12 Semen portland 0.30 232.000 69.37
1.13 Pasir Beton 0.30 0.520 0.16 -
1.14 Kerikil beton 0.30 0.780 0.23
* Bekisting
1.15 Kayu terentang 0.15 0.040 0.01
1.16 Paku biasa 2" - 5' 0.15 0.400 0.06 -
1.17 Minyak Bekisting 0.15 0.200 0.03 -
Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6
2 UPAH
A. PEMAS. PIPA PVC AW
2.1 Pekerja 5.16 0.180 0.929 0.93
2.2 Tukang 5.16 0.056 0.289 0.29
B. PEMAS. KRAN 1/2"
2.3 Pekerja 1.00 0.320 0.320 0.32
2.4 Tukang 1.00 0.100 0.100 0.10
C. PEKERJAAN RABAT BETON
2.5 Pekerja 1.00 1.650 1.650 1.65
2.6 Tukang 1.00 0.250 0.250 0.25
Dibuat Oleh :
Koordinator KKM Satlak Pamsimas
1 2 3 4 5 6 7 8=7x5 10 12
SARANA AIR MINUM
1 Lingk.2 Pengeboran
Talumae Sumur Dalam BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90.00 M' 137,500 12,375,000 - -
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000 - -
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000 - -
Pengadaan Gravel Pack 3.00 M3 240,700 722,100 543,650 -
UPAH DAN BIAYA KONSTRUKSI - -
Mobilisasi dan demobilisasi meliputi pemindahan alat dan alat bantu lainnya 1.00 Rig 1,000,000 1,000,000 1,000,000 -
dari workshop ke site pengeboran dan sebaliknya -
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 500,000 500,000 500,000 -
Persiapan lokasi sebelum pemboran dan pemulihannya setelah pek. selesai 1.00 Lokasi 1,000,000 1,000,000 1,000,000 -
Mut pit lahan, Material untuk landasan rig / jalan -
Pemboran pada segala formasi Ø 2" 90.00 M' 75,000 6,750,000 6,750,000 -
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M' 200,000 18,000,000 18,000,000 -
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000 500,000 -
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M' 190,000 17,100,000 17,100,000 -
Pemasangan Pipa blank Pipa SNI Ø 6" 65.00 M' 50,000 3,250,000 3,250,000 -
Pemasangan Pipa screen dan bottom plug PVC AW Ø 6" 25.00 M' 75,000 1,875,000 1,875,000 -
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000 150,000 -
Water jetting Development 1.00 Lokasi 500,000 500,000 500,000 -
Air jetting Development 1.00 Lokasi 500,000 500,000 500,000 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 1,000,000 1,000,000 1,000,000 -
Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Lokasi 500,000 500,000 500,000 -
Pemompaan uji meliputi : -
a. Uji debit tetap (Long periode test) 48.00 Jam 15,000 720,000 720,000 -
b. Uji pemulihan (Recovery) 12.00 Jam 15,000 180,000 180,000 -
JUMLAH (1) 67,407,100 54,068,650 -
2 Lingk.2 Penyelidikan Penyelidikan Geohidrologi / Geolistrik 1.00 Lokasi Err:509 Err:509 Err:509 -
Talumae Geohidrologi/
Geolistrik
JUMLAH (2) Err:509 Err:509 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
3 Lingk.2 Pek. Bak
Talumae Reservoir BAHAN
1 Kayu balok klas II uk. 5/7 79 btg 60,000 4,737,600 3,873,600 864,000
2 Bambu 87 Btg 31,500 2,740,500 565,500 2,175,000
3 Bata Merah 5 x 11 x 22 cm 2,184 Buah 700 1,528,800 1,528,800 -
4 Batu Belah 10/15 cm 2 M3 150,000 243,360 - 243,360
5 Besi Beton Ǿ 16 SNI 53 Btg 141,750 7,512,750 7,512,750 -
6 Besi Beton Ǿ 14 SNI 20 Btg 103,950 2,079,000 2,079,000 -
7 Besi Beton Ǿ 12 SNI 146 Btg 78,750 11,497,500 11,497,500 -
8 Besi Beton Ǿ 10 SNI 52 Btg 57,750 3,003,000 3,003,000 -
9 Besi Plat 3 mm 1 lbr 524,800 262,400 262,400 -
10 Besi Siku 40.40.4 mm 2 Btg 60,000 120,000 120,000 -
11 Cat Dasar 1 x 4 klng 35,000 142,445 142,445 -
12 Daun Pintu Kayu Papan Kls I 2 lbr 200,000 398,125 398,125 -
13 Kaca Bening 5 mm 3 m2 315,000 1,039,500 1,039,500 -
14 Kawat Beton 50 Kg 15,750 783,055 783,055 -
15 Paku biasa 30 Kg 17,000 504,614 504,614
16 Papan 2/25, Kayu Kls II 3 lbr 60,000 195,514 195,514
17 Kerikil beton 4 ret 1,160,000 4,631,880 4,070,904 560,976
18 bekisting Kayu Kls III 238 lbr 39,000 9,300,702 5,952,702 3,348,000
19 Minyak bekisting 14 Ltr 12,000 167,952 167,952
20 Pasir Beton 3 ret 440,000 1,198,736 1,198,736
21 Pasir Pasang 1 ret 420,000 420,000 279,132 140,868
22 Pasir Urug 1 ret 360,000 508,020 - 508,020
23 Plywood tebal 9 mm 22 lbr 120,000 2,660,280 2,547,278 113,002
24 Portland Composite Cemen (PCC) 121 zak 57,000 6,889,049 6,889,049 -
25 Semen Skim Coat / A Plus @ 20 kg 16 zak 59,000 934,338 934,338 -
UPAH
1 Tukang 106 HOK 110,000 11,660,000 8,785,000 2,875,000
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
2 Pekerja 176 HOK 90,000 15,840,000 10,237,000 5,603,000
JUMLAH (3) 90,999,120 74,567,894 16,431,226
DI BULATKAN 90,999,000 74,568,000 16,431,000
4 Lingk.1,2,3 Pengadaan Pipa 85,571,000 69,157,000 16,415,000
Manisa & Accessories BAHAN (5,428,120) (5,410,894) (16,226)
Talumae Pipa PVC
Kp. Baru a. Pipa PVC Ø 2" 147 btg 120,000 17,640,000 17,640,000 -
b. Pipa PVC Ø 1 1/2" 200 btg 95,000 19,000,000 19,000,000 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Accecories
a. PVC
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Knee 90° Ø 1 1/2" 5 bh 17,500 87,500 87,500 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Air Valve Ø 1 1/2 " 6 bh 120,000 720,000 720,000 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
b. Galvanis
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Gate Valve Ø 2" Broonze Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
bend Ø 45 1 1/2" 8 bh 21,500 172,000 172,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
151 2,500 377,500 377,500
Kunci Pipa GIP Ø 2" No.24 2 klng 300,000 600,000 600,000
Err:509 Err:509 bh Err:509 Err:509 Err:509
Err:509 Err:509 bh Err:509 Err:509 Err:509
Err:509 Err:509 ls Err:509 Err:509 Err:509
JUMLAH (4) Err:509 Err:509 -
DI BULATKAN Err:509 Err:509 -
5 Lingk.1,2,3 Pemasangan Pipa BAHAN
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
Manisa Pasir urug 68 m³ 81,500 5,522,772 - 5,522,772
Talumae UPAH -
Kp. Baru Pekerja 270 HOK 90,000 24,340,500 - 24,340,500
29,863,272 - 29,863,272
DI BULATKAN 29,863,000 - 29,863,000
6 Lingk.2 Pengadaan
Talumae Pompa BAHAN
Submersible Deep Well Pump 1.00 Unit 19,438,650 19,438,650 19,438,650 -
Type : SP - 5A - - - - -
Debit : 1,5 lt/dtk - - - - -
Head Max : 70 M - - - - -
Power : 2.640 Watt - - - - -
Rated Voltage : 1 x 220 V / 50 Hz - - - - -
- Water level control - - - - -
Pump Housing : Stainless Stell - - - - -
Impeller : Stainless Stell - - - - -
Motor : Stainless Stell - - - - -
Pump Outlet : dia. 1 1/2" - - - - -
Pump Diameter : 4" - - - - -
Stabilizert : 5 KVA 1.00 Unit 5,000,000 5,000,000 5,000,000 -
Control Panel STD 1x220/50Hz 1.00 Unit 4,500,000 4,500,000 4,500,000 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind
1 2 3 4 5 6 7 8=7x5 10 12
Drop Cable Power 1.00 Ls 3,500,000 3,500,000 3,500,000 -
Drop Cable Sensor 1.00 Ls 2,000,000 2,000,000 2,000,000 -
1 2 3 4 5 6 7 8=7x5 10 12
JUMLAH (8) #REF! #REF! -
9 Lingk.2 SCTPS Pipa PVC Ø 1/2" 24.00 btng 4,000 96,000 96,000
Talumae Clam Sadle Ø 2"x1/2" 1.00 bh 25,000 25,000 25,000
knee Ø 1/2" 6.00 bh 3,000 18,000 18,000
Tee Ø 1/2" 1.00 bh 3,500 3,500 3,500
Double Nipple Ø 1/2" 1.00 bh 3,000 3,000 3,000
Socked Ø 1/2' 2.00 bh 3,000 6,000 6,000
Meteran Air 1.00 bh 35,000 35,000 35,000
Stop Kran Ø 1/2 1.00 bh 15,000 15,000 15,000
Seal Tape 2.00 bh 5,000 5,000 5,000
Kran Air 2.00 bh 13,000 26,000 26,000
Semen portland 1.36 zak 57,000 77,692 77,692
Pasir Beton 0.16 M3 100,000 15,600 15,600
Kerikil beton 0.23 M3 275,000 64,350 64,350
In-Cash Lainnya
13 14
12,375,000.00 BR
285,000.00 BR
500,000.00 BR
178,450.00 BR
-
- JS
-
- JS
- JS
-
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
SUMBER DANA
In-Cash Lainnya
13 14
- JS
- JS
-
- JS
- JS
13,338,450
- JS
-
SUMBER DANA
In-Cash Lainnya
13 14
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
-
- JS
SUMBER DANA
In-Cash Lainnya
13 14
- JS
-
- BR
- BR
-
BR
BR
- BR
-
-
- BR
- BR
- BR
- BR
SUMBER DANA
In-Cash Lainnya
13 14
-
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
-
-
-
-
SUMBER DANA
In-Cash Lainnya
13 14
- BR
- JS
-
- BR
-
-
-
-
-
-
-
-
-
-
-
- BR
- BR
SUMBER DANA
In-Cash Lainnya
13 14
- BR
- BR
- BR
- BR
- BR
- BR
- JS
-
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
SUMBER DANA
In-Cash Lainnya
13 14
-
11,500,000
Desa / Kelurahan : Manisa
Kecamatan : Baranti
Kota / Kab : Sidrap
Propinsi : Sulawesi Selatan
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan
1 Pengeboran
Sumur Dalam BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC SNI Ø 6" 90.00 M1 125,000 11,250,000
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000
Pengadaan Gravel Pack 3.00 M3 290,000 870,000
UPAH DAN BIAYA KONSTRUKSI -
Mobilisasi dan demobilisasi meliputi pemindahan alat dan alat bantu lainnya 1.00 Rig 1,000,000 1,000,000
dari workshop ke site pengeboran dan sebaliknya
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 268,000 268,000
Persiapan lokasi sebelum pemboran dan pemulihannya setelah pek. selesai 1.00 Lokasi 800,000 800,000
Mut pit lahan, Material untuk landasan rig / jalan
Pemboran pada segala formasi Ø 2" 90.00 M1 50,000 4,500,000
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M1 150,000 13,500,000
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M1 185,000 16,650,000
Pemasangan Pipa blank Pipa SNI Ø 6" 50.00 M1 35,000 1,750,000
Pemasangan Pipa screen dan bottom plug PVC SNI Ø 6" 40.00 M1 37,000 1,480,000
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000
Water jetting Development 1.00 Lokasi 500,000 500,000
Air jetting Development 1.00 Lokasi 500,000 500,000
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 575,000 575,000
Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Lokasi 500,000 500,000
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan
Jumlah 24,993,913
Bahan Pabrikasi
Besi Beton Ǿ 16 SNI 53 Btg 149,000 7,897,000 Survey
Besi Beton Ǿ 14 SNI 20 Btg 114,000 2,280,000 Perbandingan Harga
Besi Beton Ǿ 12 SNI 146 Btg 83,000 12,118,000
Besi Beton Ǿ 10 SNI 52 Btg 58,000 3,016,000
Besi Plat 3 mm 1 lbr 524,800 262,400
Besi Siku 40.40.4 mm 2 Btg 60,000 120,000
Cat Dasar 1 x 4 klng 35,000 142,445
Kaca Bening 5 mm 3 m2 105,000 346,500
Kawat Beton 45 Kg 20,000 909,344
Paku biasa 29 Kg 17,000 495,366
Minyak bekisting 14 Ltr 12,000 164,688
Plywood tebal 9 mm 22 lbr 105,000 2,277,765
Portland Composite Cemen (PCC) 114 zak 57,000 6,515,074
Semen Skim Coat / A Plus @ 20 kg 16 zak 60,000 944,415
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan
Jumlah 37,488,997
UPAH
1 Tukang 106 HOK 85,000 9,010,000
2 Pekerja 176 HOK 80,000 14,080,000
Jumlah 23,090,000
JUMLAH (3) 85,572,910
4 Pengadaan Pipa 85,571,000
& Accessories BAHAN (1,910) Survey
Pipa PVC Perbandingan Harga
a. Pipa PVC Ø 3" 55 btg 235,000 12,925,000
b. Pipa PVC Ø 2" 220 btg 115,000 25,300,000
b. Pipa PVC Ø 1 1/2" 11 btg 92,500 1,017,500
Pipa GIP
a. Pipa GI Ø 3" 3 btg 650,000 1,950,000
b. Pipa GI Ø 2" 8 btg 375,000 3,000,000
c. Pipa GI Ø 1" 3 btg 245,000 735,000
Accecories
a. PVC
Bend 90° Ø 3" 2 bh 92,000 184,000
Bend 90° Ø 2" 3 bh 89,000 267,000
Bend 45° Ø 3" - bh 119,000 -
Bend 45° Ø 2" - bh 83,500 -
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan
b. Galvanis
Knee Ø 3" 2 bh 92,000 184,000
Knee Ø 2" 5 bh 32,000 160,000
Reduser Ø 2" x Ø 1 1/2" 1 bh 75,000 75,000
Waiter moor Ø 3" 1 bh 155,000 155,000
Waiter moor Ø 2" 3 bh 56,000 168,000
Double Nipple Ø 3" 2 bh 50,000 100,000
Double Nipple Ø 2" 4 bh 35,000 140,000
Check Valve Ø 2" 1 bh 350,000 350,000
Stop Kran Ø 3" Broonze 1 bh 850,000 850,000
Stop Kran Ø 2" Broonze 2 bh 450,000 900,000
- - -
Lem Pipa 29 klng 45,000 1,305,000
Seal tape 39 bh 2,500 97,500
Kunci Pipa GIP Ø 1/2 - Ø 3" 2 bh 350,000 700,000
Transportasi 1 ls 900,000 900,000
JUMLAH (4) 52,277,500
5 Pemasangan Pipa BAHAN
Pasir urug 74 m³ 85,000 6,310,767 Kontribusi masyarakat
UPAH
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan
Daftar Besi
Panjang Panjang
D Berat / m D Berat / m
Sengkang Sengkang
mm Kg m mm Kg m
I. VOLUME BESI
C. Beugel D 10 Jarak 20 Cm
Jumlah Beugel =
Panjang Beugel =
Jumlah Poor =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =
B. Beugel D 10 Jarak 20 Cm
Jumlah Beugel =
Panjang Beugel =
Jumlah Sloof =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =
Jumlah Berat Besi D 16 dan D 10
B. Beugel D 10 Jarak 20 Cm
Jumlah Beugel =
Panjang Beugel =
Jumlah Kolom =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =
B. Beugel D 10 Jarak 20 Cm
Jumlah Beugel =
Panjang Beugel =
Jumlah Balok =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =
Plat lantai 2 dan lantai 3 (20 Cm) dan Plat Penutup Bak
E A. Perhit. Besi D 12 Plat
15 cm
Lantai 2
P 4.2 Panjang Horizon =
L 3.4 Panjang Vertikal =
Panjang =
T 0.2 Jumlah tulangan ganda =
Jumlah plat =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 (A) =
Lantai 3
P 3.4
L 3.4 Panjang Horizon =
Panjang Vertikal =
T 0.2 Panjang =
Jumlah tulangan ganda =
Jumlah plat =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 (A) =
B. Plat Penutup
T 0.3
Jumlah 4
Volume poor plat (A) = 1.2 M3
- Kolom poor
P 0.4
L 0.4
T 2
Jumlah 4
Volume Kolom poor (B) = 1.28 M3
B Sloof 20 x 40
- Sloof dan Balok
P 2.8
L 0.2
T 0.4
Jumlah = 4
Volume Sloof & Balok (20 x 40) = 0.896 M3
C Kolom 40 x 40
- Kolom
P 0.4
L 0.4
T 7
Jumlah 4
Volume Kolom (40 x 40) = 4.48 M3
T 0.4
Jumlah / Lantai = 4
Jumlah Lantai = 2
Volume Sloof & Balok (20 x 40) = 1.792 M3
E Plat lantai 2 dan lantai 3 (20 Cm) dan Plat Penutup Bak 15 cm
- Plat Lantai 2
P 4.2
L 3.4
T 0.2
Jumlah Lantai = 1
Volume Plat Lantai 2 = 2.856 M3
- Plat Lantai 3
P 3.4
L 3.4
T 0.2
Jumlah Lantai = 1
Volume Plat Lantai 3 t 20 ( A ) = 2.312 M3
Volume Plat Lantai 2 dan Lantai 3 t 20 ( A ) = 5.168 M3
- Plat Penutup
P 3.4
L 3.4
T 0.15
Luas Plat penutup = 11.56 M2
Man Hole
P 0.8
L 0.8
Luas Man Hole = 0.64 M2
Total luas Plat Penutup = 10.92
Volume Plat Penutup t 15 (B) = 1.638 M3
T 2
Jumlah Dinding = 4
Volume Dinding t 20 = 5.44 M3
- Kolom Poor
P 0.4
T 2
Jumlah Sisi = 4 BH
Luas = 3.2 M2
Jumlah Poor = 4 BH
Jumlah Luas Kolom Poor (B) = 12.8 M2
B Sloof 20 x 40
- Sloof
P 2.8
T 0.4
Jumlah Sisi = 2 BH
Jumlah Sloof = 4
Luas Sloof = 8.96 M2
C Kolom 40 x 40
- Kolom
P 0.4
T 7
Jumlah Sisi = 4 BH
Luas = 11.2 M2
Jumlah Kolom = 4 BH
Luas Kolom = 44.8 M2
- Plat Lantai 3
P 3.4
L 3.4
Jumlah Lantai = 1
Volume Plat Lantai 3 t 20 ( A ) = 11.56 M2
Volume Plat Lantai 2 dan Lantai 3 t 20 ( A ) = 25.84 M2
- Plat Penutup
P 3.4
L 3.4
Luas Plat penutup = 11.56
Man Hole
P 0.8
L 0.8
Luas Man Hole = 0.64
Jumlah Sisi = 4
Volume Luas Dinding t 20 = 27.2 M2
- Lt 1
L = 3.6
T = 0.4 2.9 0.4 = 3.7
- Kolom LT 2
L = 0.4
T = 2.9
- Balok Lantai 3
L = 4.2
T = 0.4
Daun Jendela
L = 0.07 dan 0.46
T = 1 dan 0.07
x2 x2
0.14 0.0644
Luas daun Jendela (b) = 0.2044 M2
Luas (a + b) = 1.5694 M2
Dikali 2 Luar dalam = 2
Daun Jendela
L = 0.07 dan 0.46
T = 1 dan 0.07
x2 x2
0.14 0.0644
Luas daun pintu = 0.2044
Kait Jumlah
3.1 0.3 0.4 0.2 4 4 16 M
3.1 0.3 0.3 0.2 3.9 4 15.6 M
31.6 M
4 Bh
126.4 M 126.4
1.58 Kg
199.712 Kg
= 542.083 Kg
= 399.494 Kg
= 874.759 Kg
uk dinding beton
Kait Jumlah Banyak
2 0.1 2.1 13 27.3 M
3.4 0.1 3.5 22 77 M
104.3 M
2
4
834.4 M
0.887 Kg
740.113 Kg
643.2 246.4
3314.52 1.05 1.05
3480.24 675.36 258.72
11.8 11.8
57.2339 21.9254
53 20
53 20
0 0
D 16 D 14
0.05 dan 0.6 dan 0.1 dan 0.1
1 dan 0.05 dan 1 dan 0.6
x1 x1 x2 x2
0.05 M2 0.03 M2 0.2 M2 0.12 M2
0.1
0.7
0.05
x1
0.0035 M3
D 12 D 10
Jarak Antar Tulangan 10 cm
103.2
84.48
254.56
179.52
386.2
308
292
834.4
1820.6 621.76
1.05 1.05
1911.63 652.848
11.8 11.8
162 55.3261
146 52
146 52
0 0 0
D 12 D 10
TABEL PENENTUAN BIAYA OPERASI, PEMELIHARAAN DAN
KELURAHAN MANISA KEC. BARANTI
Sis
NO KOMPONEN BIAYA SATUAN FORMULASI SESUAI NO. URUT
Gravitasi
1 2 3 4 5
1A Penduduk
2B Jumlah Penduduk Awal Po jiwa -
3C Jumlah KK awal KK -
4D Pertumbuhan Penduduk % / th -
5E Tahun Proyeksi tahun -
6F Jumlah Penduduk Proyeksi Pn 15th jiwa 6 = B*(1+D/100)^E -
7G Jumlah KK Proyeksi KK 7 = F/4 -
9I Sistem Pelayanan
10 J Sambungan Rumah unit -
11 K Hidran umum / Kran umum unit -
12 L Sumur Gali unit -
13 M Kebutuhan air
14 O Kebutuhan Air Domestik l/org/hr -
15 P Kebocoran % -
16 Q Air Domestik + Kebocoran l/org/hr 16 = (P/100*O)+O -
19 T Penyusutan
20 U Biaya Investasi Rp -
21 V Penyusutan %/th -
22 W Biaya Penyusutan Rp/th 22 = V/100 x U -
23 X Biaya Penyusutan Rp/bl 23 = W/12,00 -
24 Y Biaya Operasi
25 Z Honor Tenaga Rp/bl -
26 AA Kualitas Air & Promkes Rp/th -
27 BB Kualitas Air & Promkes Rp/bl 27 = AA/12 -
28 CC Pengembangan Jaringan/KU Rp/th -
29 DD Pengembangan Jaringan/KU Rp/bl 29 = CC/12 -
30 EE Beban tetap Daya Listrik Rp/bl -
31 FF Beban Pemakaian Listrik Rp/bl -
32 GG Bahan bakar solar / bensin Rp/bl -
33 HH Pelumas Rp/bl -
34 II Biaya Pemeliharaan -
35 JJ Rp/th 35 = II/100*U -
36 KK Rp/bl 36 = JJ/12 -
Non
Sistem Perpipaan
Perpipaan Keterangan
Pemompaan Pengolahan Sumur Gali
6 7 8 9
#REF! - -
#REF! - - 1 KK = 4 Jiwa
1.85 - - rata2 pertumbuhan
15 - - tahun rencana
#REF! - -
#REF! - -
8 - - asumsi
- - - rencana RKM
- - - rencana RKM
- - - 1 SGL = 10 KK
70 - kriteria
20 - asumsi
84 -
#REF! -
#REF! -
1 - - asumsi (%)
Err:509 - -
Err:509 - -
Err:509 - -
Err:509 - - KK (Pn)
5,100 -
2,550 -
1,700 -
850 -
Err:509
BLM INCASH TOTAL INKIND
Biaya Operasional - -
Satlak
Kegiatan Konstruksi Err:509 - Err:509 Err:509
Air Minum
Pelatihan Satlak dan Err:509 Err:509
Masyarakat
Sub Total Err:509 - Err:509 Err:509
Err:509
Err:509
Err:509
Err:509
3,559,000
Err:509
Err:509
Err:509
Err:509