1 Pekerjaan Persiapan 85,000.00
1.1 Pembersihan Lahan 1.000 1.000 LS 85,000.00 85,000.00

2 Pemasangan Bouplank 5.000 M' 20,362.50 267,500.00


2.1 Tenaga Kerja 100,000.00 - -
Pekerja 0.750 0.750 O/H 85,000.00 64,000.00
Tukang Kayu 0.375 0.375 O/H 95,000.00 36,000.00
2.2 Bahan 83,750.00 - -
Papan Bouwplank/terentang 0.020 0.020 M3 2,500,000.00 50,000.00
Balok Kayu Kls III 0.014 0.014 M3 2,500,000.00 33,750.00

3 Galian Tanah Keras 5.348 M3 26,562.50 284,000.00


3.1 Tenaga Kerja
Pekerja 3.342 3.342 O/H 85,000.00 284,000.00

4 Urugan Tanah Kembali 1.259 M3 8,160.00 21,000.00


4.1 Tenaga Kerja
Pekerja 0.242 0.242 O/H 85,000.00 21,000.00
-
5 Pek. Urugan Pasir 0.617 M3 96,750.00 76,000.00
5.1 Tenaga Kerja - 16,000.00 - -
Pekerja 0.185 0.185 O/H 85,000.00 16,000.00
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
5.2 Bahan - 60,000.00 - -
Pasir urug 0.740 0.740 M3 81,500.00 60,000.00
-
6 Pas. Pondasi Batu Kali 1 PC : 3 Pasir 1.130 M3 453,660.00 712,000.00
6.1 Tenaga Kerja - 208,000.00 - -
Pekerja 1.695 1.695 O/H 85,000.00 144,000.00
Tukang Batu 0.678 0.678 O/H 95,000.00 64,000.00
6.2 Bahan - 504,000.00 - -
Batu belah 10/15 cm 1.243 1.243 M 3
150,000.00 186,000.00
Semen Portland 228.250 228.250 Kg 1,160.00 265,000.00
Pasir pasang 0.548 0.548 M3 97,200.00 53,000.00
-
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
7 Pasangan Batu Kosong 0.715 M 3
212,625.00 223,000.00
7.1 Tenaga Kerja - 73,000.00 - -
Pekerja 0.558 0.558 O/H 85,000.00 47,000.00
Tukang Batu 0.279 0.279 O/H 95,000.00 26,000.00
7.2 Bahan - 150,000.00 - -
Batu belah 10/15 cm 0.858 0.858 M 3
150,000.00 129,000.00
Pasir urug 0.215 0.215 M3 97,200.00 21,000.00
-
8 Pek. Kolom Beton 0.194 M3 3,246,048.00 797,000.00
8.1 Tenaga Kerja - 108,000.00
Pekerja 0.758 0.758 O/H 85,000.00 64,000.00
Tukang Batu 0.068 0.068 O/H 95,000.00 6,000.00
Tukang Kayu 0.202 0.202 O/H 95,000.00 19,000.00
Tukang Besi 0.204 0.204 O/H 95,000.00 19,000.00
8.2 Bahan - 689,000.00
Kayu terentang 0.039 0.039 M3 2,500,000.00 97,000.00
Paku biasa 2" - 5" 0.292 0.292 Kg 17,000.00 5,000.00
Minyak bekisting 0.117 0.117 Ltr 12,000.00 1,000.00
Besi beton polos -
- Dia 6 mm 1.629 1.629 batang 25,000.00 41,000.00
- Dia 10 mm 4.500 4.500 batang 65,000.00 292,000.00
Kawat beton 0.437 0.437 Kg 15,750.00 7,000.00
Semen Portland 62.791 62.791 Kg 1,160.00 73,000.00
Pasir beton 0.101 0.101 M3 97,200.00 10,000.00
Koral beton 0.152 0.152 M3 150,000.00 23,000.00
Kayu Borneo balok 0.029 0.029 M3 2,000,000.00 58,000.00
Plywood 9 mm 0.680 0.680 Lmbr 120,000.00 82,000.00
-
9 Sloef Beton Bertulang 0.140 M3 2,066,789.00 386,000.00
9.1 Tenaga Kerja - 90,000.00
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
Pekerja 0.491 0.491 O/H 85,000.00 42,000.00
Tukang Batu 0.049 0.049 O/H 95,000.00 5,000.00
Tukang Kayu 0.253 0.253 O/H 95,000.00 24,000.00
Tukang Besi 0.197 0.197 O/H 95,000.00 19,000.00
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
9.2 Bahan - 296,000.00
Kayu terentang 0.021 0.021 M 3
2,500,000.00 53,000.00
Paku biasa 2" - 5" 0.449 0.449 Kg 17,000.00 8,000.00
Minyak bekisting 0.112 0.112 Ltr 12,000.00 1,000.00
Besi beton polos - -
- Dia 6 mm 0.956 0.956 batang 25,000.00 24,000.00
- Dia 10 mm 1.950 1.950 batang 65,000.00 127,000.00
Kawat beton 0.421 0.421 Kg 15,750.00 7,000.00
Semen Portland 45.349 45.349 Kg 1,160.00 53,000.00
Pasir beton 0.073 0.073 M3 97,200.00 7,000.00
Koral beton 0.110 0.110 M3 150,000.00 16,000.00
-
10 Pasangan Batu Bata, 1/2 Bata 1 : 3 21.905 M2 77,732.60 2,799,000.00
10.1 Tenaga Kerja - 804,000.00
Pekerja 7.010 7.010 7.010 O/H 85,000.00 596,000.00
Tukang Batu 2.191 2.191 O/H 95,000.00 208,000.00
10.2 Bahan - 1,995,000.00
Bata merah 5 x 11 x 22 cm 1,545.000 1,545.000 Bh 1,000.00 1,545,000.00
Semen portland 314.775 314.775 Kg 1,160.00 365,000.00
Pasir pasang 0.876 0.876 M3 97,200.00 85,000.00
-
11 Beton Rabat 1PC : 2Psr : 3Krk 0.240 M3 565,410.00 145,000.00
11.1 Tenaga Kerja - 40,000.00 - -
Pekerja 0.396 0.396 0.396 O/H 85,000.00 34,000.00
Tukang Batu 0.060 0.060 O/H 95,000.00 6,000.00
11.2 Bahan - 105,000.00 - -
Semen Portland 55.680 55.680 Kg 1,160.00 65,000.00
Pasir beton 0.125 0.125 M3 97,200.00 12,000.00
Koral beton 0.187 0.187 M3 150,000.00 28,000.00
-
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
-
12 Plesteran 1 PC : 2 Ps Tebal 15 mm & Acian 33.250 M2 24,055.40 1,350,000.00
12.1 Tenaga Kerja - 1,039,000.00
Pekerja 6.650 6.650 6.650 O/H 85,000.00 565,000.00
Tukang Batu 4.988 4.988 O/H 95,000.00 474,000.00
12.2 Bahan - 311,000.00 - -
Semen Portland 215.460 215.460 Kg 1,160.00 250,000.00
Pasir pasang 0.632 0.632 M3 97,200.00 61,000.00
-
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
13 Pemasangan Jendela Kaca Kayu Kamper 0.700 M2 226,500.00 266,350.00
13.1 Tenaga Kerja - 180,600.00 - -
Pekerja 0.560 0.560 0.560 O/H 85,000.00 47,600.00
Tukang Kayu 1.400 1.400 O/H 95,000.00 133,000.00
13.2 Bahan - 85,750.00 - -
Kayu kamper, balok 0.025 0.025 M3 3,500,000.00 85,750.00
-
14 Pengecatan Dinding 33.250 M2 16,032.50 776,000.00
14.1 Tenaga Kerja - 256,000.00 - -
Pekerja 0.665 0.665 0.665 O/H 85,000.00 57,000.00
Tukang Cat 2.095 2.095 O/H 95,000.00 199,000.00
14.2 Bahan - 520,000.00 - -
Plamur 3.325 3.325 Kg 2,950.00 10,000.00
Cat penutup 2 kali 8.645 8.645 Kg 59,000.00 510,000.00
-
15 Pek. Pasang Kaso + reng atap kayu kamper 12.075 M2 32,000.00 620,000.00
15.1 Tenaga Kerja - 261,000.00 - -
Pekerja 1.449 1.449 1.449 O/H 85,000.00 123,000.00
Tukang Kayu 1.449 1.449 O/H 95,000.00 138,000.00
15.2 Bahan - 359,000.00 - -
Kayu kamper, balok 0.097 0.097 M3 3,500,000.00 338,000.00
Paku biasa 2" - 5" 1.208 1.208 Kg 17,000.00 21,000.00
-
16 Pek. Pasang Atap Seng gelombang 12.075 M2 29,610.00 450,000.00
16.1 Tenaga Kerja - 192,000.00 - -
Pekerja 1.449 1.449 1.449 O/H 85,000.00 123,000.00
Tukang Kayu 0.725 0.725 O/H 95,000.00 69,000.00
16.2 Bahan - 258,000.00 - -
Seng Gelombang 50.715 50.715 lbr 5,000.00 254,000.00
Paku seng 0.242 0.242 Kg 17,000.00 4,000.00
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
-
17 Pek. Pasang Nok Seng 1.400 M2 19,770.00 40,400.00
17.1 Tenaga Kerja - 27,000.00 - -
Pekerja 0.210 0.210 0.210 O/H 85,000.00 18,000.00
Tukang Kayu 0.098 0.098 O/H 95,000.00 9,000.00
17.2 Bahan - 13,400.00 - -
Seng Polos 2.520 2.520 Kaki 5,000.00 12,600.00
Paku seng 0.056 0.056 Kg 17,000.00 800.00
-
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
18 Pek. Listplank 1 x ( 2 x 20 cm ) kayu kamper 13.900 M' 19,710.00 448,600.00
18.1 Tenaga Kerja - 250,000.00 - -
Pekerja 1.390 1.390 1.390 O/H 85,000.00 118,000.00
Tukang Kayu 1.390 1.390 O/H 95,000.00 132,000.00
18.2 Bahan - 198,600.00 - -
Kayu Kamper, papan 0.056 0.056 Lbr 3,500,000.00 194,600.00
Paku Biasa 2" - 5" 0.209 0.209 Kg 17,000.00 4,000.00
-
19 Pek. Pemasangan Pintu Fiber 2.000 Bh 245,330.00 780,920.00
19.1 Tenaga Kerja - 265,000.00 - -
Pekerja 2.000 2.000 2.000 O/H 85,000.00 170,000.00
Tukang Batu 1.000 1.000 O/H 95,000.00 95,000.00
19.2 Bahan - 515,920.00 - -
Pintu Fiber 2.000 2.000 Bh 250,000.00 500,000.00
Semen Portland 12.000 12.000 Kg 1,160.00 13,920.00
Pasir Pasang 0.020 0.020 M3 97,200.00 2,000.00
-
20 Pemasangan Pipa PVC SNI Ø 1/2" 12.000 M' 4,390.00 269,900.00
20.1 Tenaga Kerja - 26,100.00 - -
Pekerja 0.108 0.108 0.108 O/H 85,000.00 9,000.00
Tukang Kayu 0.180 0.180 O/H 95,000.00 17,100.00
20.2 Bahan - 243,800.00 - -
Pipa PVC Ø 1/2" 12.000 12.000 m' 19,900.00 238,800.00
Perlengkapan 35% dr harga pipa 0.072 0.072 Ls 65,000.00 5,000.00
-
21 Pemasangan Kran Air SNI Ø 1/2" 2.000 Bh 14,168.80 30,900.00
21.1 Tenaga Kerja - 5,400.00 - -
Pekerja 0.005 0.005 0.005 O/H 85,000.00 400.00
Tukang Kayu 0.050 0.050 O/H 95,000.00 5,000.00
21.2 Bahan - 25,500.00 - -
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
Kran Air Ø 1/2" 2.000 2.000 Bh 12,000.00 24,000.00
Seal Type 0.500 0.500 Ls 3,000.00 1,500.00
-
22 Pemasangan Closed Jongkok Porselin 2.000 Bh 255,330.00 810,920.00
22.1 Tenaga Kerja - 265,000.00 - -
Pekerja 2.000 2.000 2.000 O/H 85,000.00 170,000.00
Tukang Kayu 1.000 1.000 O/H 95,000.00 95,000.00
22.2 Bahan - 545,920.00 - -
Closed Porselin 2.000 2.000 Bh 265,000.00 530,000.00
Semen Portland 12.000 12.000 Kg 1,160.00 13,920.00
Pasir Urug 0.020 0.020 M3 97,200.00 2,000.00
-
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
23 Pipa Ventilasi Ø 1" 1.000 Ls 50,000.00 50,000.00
-
24 Pek. Pemasangan Pipa PVC Ø 3" (Air Kotor) 4.000 M' 42,456.30 484,200.00
24.1 Tenaga Kerja - 20,000.00 - -
Pekerja 0.081 0.081 0.081 O/H 85,000.00 7,000.00
Tukang Pipa 0.135 0.135 O/H 95,000.00 13,000.00
24.2 Bahan + Acc - 464,200.00 - -
Pipa PVC Ø 3" 4.000 4.000 m 105,000.00 420,000.00
Perlengkapan 35 % harga pipa 0.680 0.680 Ls 65,000.00 44,200.00
-
25 Pek. Plat Penutup Septic Tank 0.072 M3 2,600,190.00 214,000.00
25.1 Tenaga Kerja - 61,000.00 - -
Pekerja 0.403 0.403 O/H 85,000.00 34,000.00
Tukang Batu 0.025 0.025 O/H 95,000.00 2,000.00
Tukang Kayu 0.190 0.190 O/H 95,000.00 18,000.00
Tukang Besi 0.076 0.076 O/H 95,000.00 7,000.00
25.2 Bahan - 153,000.00 - -
Paku biasa 2" - 5" 0.230 0.230 Kg 17,000.00 4,000.00
Minyak bekisting 0.115 0.115 Ltr 12,000.00 1,000.00
Besi beton polos - -
- Dia 10 mm 0.734 0.734 batang 65,000.00 48,000.00
Kawat beton 0.162 0.162 Kg 15,750.00 3,000.00
Semen Portland 23.256 23.256 Kg 1,160.00 27,000.00
Pasir beton 0.037 0.037 M3 97,200.00 4,000.00
Koral beton 0.056 0.056 M3 150,000.00 8,000.00
Kayu Borneo balok 0.012 0.012 M3 2,000,000.00 23,000.00
Plywood 9 mm 0.202 0.202 Lmbr 120,000.00 24,000.00
Bambu 0.360 0.360 Btg 31,600.00 11,000.00
26 Langsiran 14,181,000.00 -
Pasir 3.387 3.387 M3 800,000.00 2,709,000.00
Volume Biaya (Rp)
Harga Satuan
No URAIAN Kontribusi Masyarakat Satuan Kontribusi Masyarakat
Total APBN Rp Total
inCash inKind inCash inKind
1 2 3=3+4+5 4 5 6 7 8 9=2x7 10=3x7 11=4x7
Besi 9.769 9.769 Batang 15,000.00 147,000.00
Semen 24.304 24.304 Zak 400,000.00 9,722,000.00
Batu Belah 2.605 2.605 M3 200,000.00 521,000.00
Batu Bata 1,545.000 1,545.000 Buah 700.00 1,082,000.00

Total Bahan 7,626,840.00


Dibulatkan 7,627,000.00
Total Upah 4,677,100.00
Dibulatkan 4,677,000.00
Total langsiran 14,181,000.00
Jumlah 26,484,940.00
Dibulatkan 26,485,000.00 -

Pinrang, Okto
Disetujui Oleh : Diketahui Oleh : Disetujui Oleh : Dibuat Oleh :
Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM SATLAK PAMSIMAS

( Harman, ST, MT ) Maghfira Asdiana, ST Rudi Parman


NA ANGGARAN BIAYA (RAB)

Biaya (Rp)
APBN

13=5x7
85,000.00
85,000.00

267,500.00
100,000.00
64,000.00
36,000.00
83,750.00
50,000.00
33,750.00

284,000.00

284,000.00

21,000.00

21,000.00

76,000.00
16,000.00
16,000.00
Biaya (Rp)
APBN

13=5x7
60,000.00
60,000.00

712,000.00
208,000.00
144,000.00
64,000.00
504,000.00
186,000.00
265,000.00
53,000.00
Biaya (Rp)
APBN

13=5x7
223,000.00
73,000.00
47,000.00
26,000.00
150,000.00
129,000.00
21,000.00

797,000.00
108,000.00
64,000.00
6,000.00
19,000.00
19,000.00
689,000.00
97,000.00
5,000.00
1,000.00

41,000.00
292,000.00
7,000.00
73,000.00
10,000.00
23,000.00
58,000.00
82,000.00

386,000.00
90,000.00
Biaya (Rp)
APBN

13=5x7
42,000.00
5,000.00
24,000.00
19,000.00
Biaya (Rp)
APBN

13=5x7
296,000.00
53,000.00
8,000.00
1,000.00

24,000.00
127,000.00
7,000.00
53,000.00
7,000.00
16,000.00

2,799,000.00
804,000.00
596,000.00
208,000.00
1,995,000.00
1,545,000.00
365,000.00
85,000.00

145,000.00
40,000.00
34,000.00
6,000.00
105,000.00
65,000.00
12,000.00
28,000.00
Biaya (Rp)
APBN

13=5x7

1,350,000.00
1,039,000.00
565,000.00
474,000.00
311,000.00
250,000.00
61,000.00
Biaya (Rp)
APBN

13=5x7
266,350.00
180,600.00
47,600.00
133,000.00
85,750.00
85,750.00

776,000.00
256,000.00
57,000.00
199,000.00
520,000.00
10,000.00
510,000.00

620,000.00
261,000.00
123,000.00
138,000.00
359,000.00
338,000.00
21,000.00

450,000.00
192,000.00
123,000.00
69,000.00
258,000.00
254,000.00
4,000.00
Biaya (Rp)
APBN

13=5x7

40,400.00
27,000.00
18,000.00
9,000.00
13,400.00
12,600.00
800.00
Biaya (Rp)
APBN

13=5x7
448,600.00
250,000.00
118,000.00
132,000.00
198,600.00
194,600.00
4,000.00

780,920.00
265,000.00
170,000.00
95,000.00
515,920.00
500,000.00
13,920.00
2,000.00

269,900.00
26,100.00
9,000.00
17,100.00
243,800.00
238,800.00
5,000.00

30,900.00
5,400.00
400.00
5,000.00
25,500.00
Biaya (Rp)
APBN

13=5x7
24,000.00
1,500.00

810,920.00
265,000.00
170,000.00
95,000.00
545,920.00
530,000.00
13,920.00
2,000.00
Biaya (Rp)
APBN

13=5x7
50,000.00

484,200.00
20,000.00
7,000.00
13,000.00
464,200.00
420,000.00
44,200.00

214,000.00
61,000.00
34,000.00
2,000.00
18,000.00
7,000.00
153,000.00
4,000.00
1,000.00

48,000.00
3,000.00
27,000.00
4,000.00
8,000.00
23,000.00
24,000.00
11,000.00
14,181,000.00
2,709,000.00
Biaya (Rp)
APBN

13=5x7
147,000.00
9,722,000.00
521,000.00
1,082,000.00

7,626,840.00
7,627,000.00
4,677,100.00
4,677,000.00
14,181,000.00
26,484,940.00
26,485,000.00

Pinrang, Oktober 2016

SATLAK PAMSIMAS
REKAPIT

Provinsi / Kabupaten /Kecamatan / Desa: Sulaw

Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4 5
I PEKERJAAN SARANA AIR MINUM
1 PENANGKAP MATA AIR
- BAHAN 8,988,000 - -
- UPAH 3,449,000 - -
- LANGSIRAN 5,150,000

2 PEK. RESERVOIR
- BAHAN 17,526,000 -
- UPAH 5,690,000 - -
- LANGSIRAN 7,550,000 - -

3 PENGADAAN PIPA
- BAHAN 126,665,000 - - 35,000,000

4 PEMASANGAN PIPA
- BAHAN - - -
- UPAH 56,000,000 - 56,000,000

5 PEK. JEMBATAN - - -
- BAHAN 3,833,000 - -
- UPAH 5,240,000 - -
- LANGSIRAN 777,000

6 ALAT SAB 2,130,000 - -

7 PEK. Sarana Cuci Tangan


- BAHAN 674,000 - -
- UPAH 180,000 - -
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4 5

I KESEHATAN MASYARAKAT

Monitoring Progres Akses Jamban dan


A 33,000 33,000 - -
CTPS

B Verifikasi SBS/ODF 33,000 33,000 - -

C Promkes "Stop BAB Sembarangan" 39,000 39,000

D Promkes Melalui media kesehatan SBS 2,500,000 2,500,000 - -

Promkes Cuci Tangan Pakai Sabun


E 39,000 39,000
(CTPS)

F Demo Cuci Tangan Pakai Sabun (CTPS) 80,000 80,000

G Uji Kualitas Air ( Laboratrium ) 677,000 677,000 - -

I KESEHATAN SEKOLAH

1 Promkes "Stop BAB Sembarangan" 39,000 39,000

Promkes Melalui Media Kesehatan


2 500,000 500,000
Tentang PHBS (Poster)
Promkes Cuci Tangan Pakai Sabun
3 39,000 39,000
(CTPS)

4 Demo Cuci Tangan Pakai Sabun (CTPS) 80,000 80,000

5 Monitoring Higiene dan sanitasi sekolah 5,500 5,500

III PEMBERDAYAAN
A. PELATIHAN
1 Pelatihan Teknis 455,000 455,000 -
Pelatihan Administrasi Keuangan dan
2 452,000 452,000 -
Pembukuan
3 Pelatihan PHBS Masyarakat 705,000 705,000 -
4 Pelatihan CLTS Masyarakat 389,000 389,000 -
Pelatihan Badan Pengelola SAB, Sanitasi
5 633,000 633,000 -
& Kesehatan
B. Operasional
A. Alat Tulis Kantor ( ATK ) 588,000 588,000 -
Pembuatan/Cetak Kelengkapan
B 3,750,000 3,750,000 -
Administrasi
Harga
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5+6 3 4 5
C Transportasi 2,800,000 2,800,000 -

#REF!

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT (Maghfira Asdiana


NIP. 19730305 200212 1 012
REKAPITULASI

amatan / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango

Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes
inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 12=5x7

3 Unit 52,761,000 - -
8,988,000 26,964,000 - - -
3,449,000 10,347,000 - - -
5,150,000 15,450,000
17,587,000
2 Paket 61,532,000 - -
17,526,000 35,052,000 - - -
5,690,000 11,380,000 - - -
7,550,000 15,100,000 - - -
30,766,000
1 Paket 126,665,000 -
91,665,000 126,665,000 - - 35,000,000

1 Paket 56,000,000 56,000,000 -


- - - - -
- 56,000,000 - 56,000,000 -

1 Paket 9,850,000 - - -
3,833,000 3,833,000 - - -
5,240,000 5,240,000 - - -
777,000 777,000

2,130,000 1 Paket 2,130,000 - - -

3 Paket 2,562,000 - - -
674,000 2,022,000 - - -
180,000 540,000 - - -
-
Sub Total 1) 311,500,000 - 56,000,000 35,000,000

Pajak PPH 10%

Total
Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes
inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 12=5x7

3,559,000 3,559,000 - -

1 Paket 33,000 33,000 - -

1 Paket 33,000 33,000 - -

2 Paket 78,000 78,000 - -

1 Paket 2,500,000 2,500,000 - -

2 Paket 78,000 78,000 - -

2 Paket 160,000 160,000 - -

1 Paket 677,000 677,000 - -

669,000 669,000

1 Paket 39,000 39,000 - -

1 Paket 500,000 500,000 - -

1 Paket 39,000 39,000 - -

1 Paket 80,000 80,000 - -

2 Paket 11,000 11,000 - -

Sub Total 2) 4,228,000 4,228,000 - -

2,634,000 2,634,000 - -
1 Paket 455,000 455,000 - -

1 Paket 452,000 452,000 - -

1 Paket 705,000 705,000 - -


1 Paket 389,000 389,000 - -

1 Paket 633,000 633,000 - -

7,138,000 7,138,000 - -
1 Paket 588,000 588,000 - -

1 Paket 3,750,000 3,750,000 - -


Jumlah Harga
Jumlah Satuan Kontribusi Masyarakat
APBD Total APBDes
inCash inKind
6 7 8 9=2x7 10=3x7 11=4x7 12=5x7
1 Paket 2,800,000 2,800,000 - -
Sub Total 3) 9,772,000 9,772,000 - -
Jumlah Total) 325,500,000 14,000,000 56,000,000 35,000,000
Di Bulatkan 325,500,000 14,000,000 56,000,000 35,000,000
Kariango, Oktober 2016

Diperiksa Oleh : Dibuat Oleh :


FM - WSS Koordinator KKM Satlak Pamsimas

(Maghfira Asdiana , ST MT) ( Rudi) ( Parman )


/ Kariango

Jumlah Harga

APBD

13=6x7

52,761,000
26,964,000
10,347,000
15,450,000

61,532,000
35,052,000
11,380,000
15,100,000

91,665,000

-
-
-

9,850,000
3,833,000
5,240,000
777,000

2,130,000

2,562,000
2,022,000
540,000
-
220,500,000

24,500,000

245,000,000
Jumlah Harga

APBD

13=6x7

-
-

-
-

-
-

-
Jumlah Harga

APBD

13=6x7
-
-
220,500,000
220,500,000
Kariango, Oktober 2016

Satlak Pamsimas

( Parman )
Provinsi : Sulawesi Selatan
Kabupaten : Pinrang
Kecamatan : Lembang
Desa/lembang : Kariango

NO URAIAN Koefisien volume Total

1 2

1. Pekerjaan Persiapan 4
1.1. Pembersihan Lahan
Pekerja 0.10 0.40
2. Pemasangan Bowplank 2.25
2.1. Tenaga Kerja
Pekerja 0.100 0.23
Tukang kayu 0.100 0.23
2.2. Bahan
Kayu klas II uk. 5/7 0.012 0.03
Paku biasa 2" - 5" 0.020 0.05
Kayu papan Kelas III 0.007 0.02
3. Galian Tanah 1.080
3.1. Tenaga Kerja
Pekerja 0.75 0.81
4. Pondasi batu kali, 1 Pc : 4 Ps 2.268
4.1. Tenaga Kerja
Pekerja 1.50 3.40
Tukang batu 0.60 1.36
4.2. Bahan
Batu belah 10/15 cm 1.10 2.49
Semen Portland 163.00 369.68
Pasir pasang 0.52 1.18
4. Urugan Tanah Kembali 0.360
4.1. Tenaga Kerja
Pekerja 0.25 0.09
5. Urugan Pasir 0.113
5.1. Tenaga Kerja
Pekerja 0.30 0.03
5.2. Bahan
Pasir urug 1.20 0.14

6. Pek. Sloof, Dinding, Lantai Beton & Penutup Plat Beton Bertulang

6.1 Pek. Sloof


6.1.1 Pek. Bekistng Sloof 0.875
6.1.1. A Tenaga Kerja
Pekerja 0.07 0.06
Tukang Batu 0.07 0.06
6.1.1.B Bahan
Kayu Kelas III 0.045 0.04
Paku biasa 2" - 5" 0.30 0.26
Minyak Bekisting 0.20 0.18

6.1.2 Pek. Sloof 0.31


6.1.2. A Tenaga Kerja
Pekerja 1.65 0.51
Tukang Batu 0.25 0.08
6.1.2. B Bahan
Semen Portland 232.00 71.92
Pasir Pasang 0.52 0.16
Kerikil 0.78 0.24

6.1.3 Pek. Pembesian Sloof 34.50


6.1.3. A Tenaga Kerja
Pekerja 0.07 2.42
Tukang Besi 0.07 2.42
6.1.3. B Bahan
Besi beton ( polos/ulir ) 1.05 36.23
Kawat beton 0.015 0.52

6.2 Pek. Dinding Beton


6.2.1 Pek. Bekistng Dinding Beton 9.300
6.2.1. A Tenaga Kerja
Pekerja 0.66 6.14
Tukang Batu 0.33 3.07
6.2.1.B Bahan
Kayu kelas III 0.03 0.28
Paku biasa 2" - 5" 0.40 3.72
Minyak Bekisting 0.20 1.86
Balok kayu kelas II 0.02 0.19
Plywood tebal 9 mm 0.35 3.26
Bambu P =12 m 2.33 21.70

6.2.2 Pek. Dinding Beton 1.86


6.2.2. A Tenaga Kerja
Pekerja 1.65 3.07
Tukang Batu 0.25 0.47
6.2.2. B Bahan
Semen Portland 232.00 431.52
Pasir 0.52 0.97
Kerikil 0.78 1.45

6.2.3 Pek. Pembesian Dinding Beton 120.68


6.2.3. A Tenaga Kerja
Pekerja 0.0070 0.84
Tukang Batu 0.0070 0.84
6.2.3. B Bahan
Besi beton ( polos/ulir ) 1.050 126.72
Kawat beton 0.015 1.81

6.3 Pek. Plat Penutup Beton


6.3.1 Pek. Bekistng Plat Penutup Beton 1.463
6.3.1. A Tenaga Kerja
Pekerja 0.66 0.97
Tukang Batu 0.33 0.48
6.3.1.B Bahan
Kayu kelas III 0.040 0.06
Paku biasa 2" - 5" 0.400 0.59
Minyak Bekisting 0.200 0.29
Balok kayu kelas II 0.015 0.02
Plywood tebal 9 mm 0.350 0.51
Bambu P =12 m 2.000 2.93

6.3.2 Pek. Penutup Plat Beton 0.41


6.3.2. A Tenaga Kerja
Pekerja 1.65 0.67
Tukang Batu 0.25 0.10
6.3.2. B Bahan
Semen Portland 232.00 94.05
Pasir 0.53 0.21
Kerikil 0.79 0.32

6.3.3 Pek. Pembesian Plat Beton 39.34


6.3.3. A Tenaga Kerja
Pekerja 0.007 0.28
Tukang Batu 0.007 0.28
6.3.3. B Bahan
Besi beton ( polos/ulir ) 1.050 41.31
Kawat beton 0.015 0.59

6.4 Pek. Lantai Beton


6.4.1 Pek. Lantai Beton
6.4.1. A Tenaga Kerja 0.219
Pekerja 1.65 0.36
Tukang Batu 0.25 0.05
6.4.2. B Bahan
Semen Portland 232.00 50.74
Pasir 0.52 0.11
Kerikil 0.78 0.17

6.4.2 Pek. Pembesian Lantai Beton 23.96


6.4.2. A Tenaga Kerja
Pekerja 0.007 0.17
Tukang Batu 0.007 0.17
6.4.2. B Bahan
Besi beton ( polos/ulir ) 1.050 25.16
Kawat beton 0.015 0.36

7. 1 m2 Plesteran Dinding Luar 1 Pc : 2 Ps, tebal 20 mm 8.40


7.1. Tenaga Kerja
Pekerja 0.400 3.36
Tukang batu 0.200 1.68
7.2. Bahan
Semen portland 13.632 114.51
Pasir Pasang 0.027 0.23
8. Acian Dinding dan Lantai Bagian Dalam 10.96
8.1. Tenaga Kerja
Pekerja 0.200 2.19
Tukang batu 0.100 1.10
8.2. Bahan
Semen portland 3.250 35.62
1 m2 pengecatan tembok baru bag.luar( 1 lapis cat dasar, 2 lapis cat
10
penutup ) 8.40
10.1. Tenaga Kerja
Pekerja 0.02 0.17
Tukang cat 0.06 0.53
10.2. Bahan
Plamir 0.10 0.84
Cat dasar 0.10 0.84
cat penutup 2 kali 0.26 2.18
11 Pekerjaan Box Valve & Man Hole 1.00
Langsiran
Biaya Langsiran Semen
Biaya Langsiran Pasir
Biaya Langsiran Batu Gunung
Diketahui Oleh :

Fasilitator Teknik
RENCANA ANGGARAN BIAYA

Nomor RAB
Pekerjaan Kegiatan
Sub pekerjaan/Kegiatan
Ukuran/Dimensi

Volume Biaya
Harga Satuan
Kontribusi Masyarakat Satuan
Total APBD APBN Total
inCash inKind

2=3+4+5 3 4 5 6 7 8 9=2x8

34,000

0.40 0.40 Hok 85,000 34,000


175,140
40,500
0.23 0.23 Hok 85,000 19,125
0.23 0.23 Hok 95,000 21,375
134,640
0.03 0.03 M³ 3,500,000 94,500
0.05 0.05 Kg 17,000 765
0.02 0.02 M³ 2,500,000 39,375
68,850

0.81 0.81 Hok 85,000 68,850


1,336,133
418,446
3.40 3.40 Hok 85,000 289,170
1.36 1.36 Hok 95,000 129,276
917,687
2.49 2.49 M³ 150,000 374,220
369.68 369.68 Kg 1,160 428,833
1.18 1.18 M³ 97,200 114,634
7,650
0.09 0.09 Hok 85,000 7,650
13,871
2,869
0.03 0.03 Hok 85,000 2,869
11,003
0.14 0.14 M³ 81,500 11,003

8,953,249

11,025
0.06 0.06 Hok 85,000 5,206
0.06 0.06 Hok 95,000 5,819
105,000
0.04 0.04 m 3
2,500,000 98,438
0.26 0.26 Kg 17,000 4,463
0.18 0.18 Liter 12,000 2,100

50,840
0.51 0.51 Hok 85,000 43,478
0.08 0.08 Hok 95,000 7,363
138,388
71.92 71.92 Kg 1,160 83,427
0.16 0.16 M 3
97,200 15,669
0.24 0.24 M3 162,500 39,293

434,709
2.42 2.42 Hok 85,000 205,279
2.42 2.42 Hok 95,000 229,430
370,408
36.23 36.23 Kg 10,000 362,257
0.52 0.52 Kg 15,750 8,151
813,285
6.14 6.14 Hok 85,000 521,730
3.07 3.07 Hok 95,000 291,555
2,787,210
0.28 0.28 m 3
3,500,000 976,500
3.72 3.72 Kg 17,000 63,240
1.86 1.86 Liter 12,000 22,320
0.19 0.19 m3 3,500,000 651,000
3.26 3.26 Lbr 120,000 390,600
21.70 21.70 Batang 31,500 683,550

305,040
3.07 3.07 Hok 85,000 260,865
0.47 0.47 Hok 95,000 44,175
830,330
431.52 431.52 Kg 1,160 500,563
0.97 0.97 M3 97,200 94,012
1.45 1.45 M3 162,500 235,755

152,059
0.84 0.84 Hok 85,000 71,805
0.84 0.84 Hok 95,000 80,253
1,295,667
126.72 126.72 Kg 10,000 1,267,156
1.81 1.81 Kg 15,750 28,511

127,896
0.97 0.97 Hok 85,000 82,046
0.48 0.48 Hok 95,000 45,849
390,049
0.06 0.06 m3 2,500,000 146,250
0.59 0.59 Kg 17,000 9,945
0.29 0.29 Liter 12,000 3,510
0.02 0.02 m3 3,500,000 76,781
0.51 0.51 Lbr 120,000 61,425
2.93 2.93 Batang 31,500 92,138

66,482
0.67 0.67 Hok 85,000 56,854
0.10 0.10 Hok 95,000 9,628
182,018
94.05 94.05 Kg 1,160 109,095
0.21 0.21 M3 97,200 20,883
0.32 0.32 M3 162,500 52,040

49,568
0.28 0.28 Hok 85,000 23,407
0.28 0.28 Hok 95,000 26,161
422,362
41.31 41.31 Kg 10,000 413,068
0.59 0.59 Kg 15,750 9,294

35,867
0.36 0.36 Hok 85,000 30,673
0.05 0.05 Hok 95,000 5,194
97,631
50.74 50.74 Kg 1,160 58,857
0.11 0.11 M3 97,200 11,054
0.17 0.17 M3 162,500 27,720

30,188
0.17 0.17 Hok 85,000 14,256
0.17 0.17 Hok 95,000 15,933
257,228
25.16 25.16 Kg 10,000 251,568
0.36 0.36 Kg 15,750 5,660

600,075
445,200
3.36 3.36 Hok 85,000 285,600
1.68 1.68 Hok 95,000 159,600
154,875
114.51 114.51 Kg 1,160 132,830
0.23 0.23 M³ 97,200 22,045
331,759
290,440
2.19 2.19 Hok 85,000 186,320
1.10 1.10 Hok 95,000 104,120
41,319
35.62 35.62 Kg 1,160 41,319

217,025
64,554
0.17 0.17 Hok 85,000 14,280
0.53 0.53 Hok 95,000 50,274
152,471
0.84 0.84 Kg 2,950 2,478
0.84 0.84 Kg 25,000 21,000
2.18 2.18 Kg 59,063 128,993
Ls 700,000
5,150,000
39.0 zak 50,000 1,950,000
3.0 m3 800,000 2,400,000
2.0 m3 400,000 800,000

Sub Total Bahan 8,988,285


Dibulatkan Rp 8,988,000
Sub Total Upah 3,449,467
Dibulatkan Rp 3,449,000
Sub Total Langsiran 5,150,000
Dibulatkan Rp 5,150,000
Jumlah Total Rp 17,587,000
Dibulatkan Rp 17,587,000

Kariango,...........................

Disetujui Oleh : Dibuat

Koordinator KKM
: 04
: Sarana Air Minum
: Reservoir Kariango
1.5 X 1.5 X 1.5

Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inCash inKind

10=3x8 11=4x8 12 13=6x8

- - 172,100

- - - 34,000 34,000.00
- 175,140
40,500
- - - 19,125 19,125.00
- - - 21,375 21,375.00
134,640
- - - 94,500 94,500.00
- - - 765 765.00
- - - 39,375 39,375.00
- - 68,850 0.48 2.250

- - - 68,850 68850
- - 1,336,133
418,446
- - - 289,170 289,170.00
- - - 129,276 129,276.00
917,687
- - - 374,220 374,220.00
- - - 428,833 428,833.44
- - - 114,634 114,633.79
- - 7,650
- 7,650 7650
- - 13,871
2,869
- - - 2,869 2868.75
11,003
- - - 11,003 11002.5

- 37,712,600

11,025
- - - 5,206 5,206.25
- - - 5,819 5,818.75
105,000
- - - 98,438 98,437.50
- - - 4,463 4,462.50
- - - 2,100 2,100.00

50,840
- - - 43,478 43,477.50
- - - 7,363 7,362.50
138,388
- - - 83,427 83,427.20
- - - 15,669 15,668.64
- - - 39,293 39,292.50

434,709
- - - 205,279 205,279.24
- - - 229,430 229,429.74
370,408
- - - 362,257 362,257.48
- - - 8,151 8,150.79
813,285
- - - 521,730 521,730.00
- - - 291,555 291,555.00
2,787,210
- - - 976,500 976,500.00
- - - 63,240 63,240.00
- - - 22,320 22,320.00
- - - 651,000 651,000.00
- - - 390,600 390,600.00
- - - 683,550 683,550.00

305,040
- - - 260,865 260,865.00
- - - 44,175 44,175.00
830,330
- - - 500,563 500,563.20
- - - 94,012 94,011.84
- - - 235,755 235,755.00

152,059
- - - 71,805 71,805.49
- - - 80,253 80,253.20
1,295,667
- - - 1,267,156 1,267,155.79
- - - 28,511 28,511.01

127,896
- - - 82,046 82,046.25
- - - 45,849 45,849.38
390,049
- - - 146,250 146,250.00
- - - 9,945 9,945.00
- - - 3,510 3,510.00
- - - 76,781 76,781.25
- - - 61,425 61,425.00
- - - 92,138 92,137.50

66,482
- - - 56,854 56,853.84
- - - 9,628 9,627.66
182,018
- - - 109,095 109,094.52
- - - 20,883 20,883.30
- - - 52,040 52,040.02

49,568
- - - 23,407 23,407.18
- - - 26,161 26,160.97
422,362
- - - 413,068 413,067.94
- - - 9,294 9,294.03

35,867
- - - 30,673 30,672.68
- - - 5,194 5,194.13
97,631
- - - 58,857 58,856.54
- - - 11,054 11,053.97
- - - 27,720 27,720.23

30,188
- - - 14,256 14,255.50
- - - 15,933 15,932.62
257,228
- - - 251,568 251,567.69
- - - 5,660 5,660.27

- - 600,075
445,200
- - - 285,600 285,600.00
- - - 159,600 159,600.00
154,875
- - - 132,830 132,830.21
- - - 22,045 22,044.96
- - 331,759
290,440
- - - 186,320 186,320.00
- - - 104,120 104,120.00
41,319
- - - 41,319 41,319.20

- - 217,025
64,554
- - - 14,280 14,280.00
- - - 50,274 50,274.00
152,471
- - - 2,478 2,478.00
- - - 21,000 21,000.00
- - - 128,993 128,992.50
- - 700,000
5,150,000
- - - 1,950,000
- - - 2,400,000
- - - 800,000
bahan
8,988,285 upah
Rp 8,988,000
3,449,467 26964000
Rp 3,449,000
5,150,000
Rp 5,150,000
Rp 17,587,000
Rp 17,587,000 52761000

Kariango,...........................................................2016

Dibuat Oleh :

Ketua Satlak Pamsimas


3,500,000

kykelas 2

0.03

1.08
1.18
0.14
0.16
0.97
0.21
0.11
0.23
3.00

0.027
Total selisih 94,500.00
Rp 26,964,000 26,964,000.00 -
Rp 10,347,000 10,347,000.00 -
0.12
420,000.00
17,000 2,500,000 150,000 1,160

paku ky kls 3 bt blah semen

0.05 0.02

2.49 369.68
0.26 0.04

71.92
3.72 0.28

431.52

0.59 0.06

94.05
50.74
114.51
35.62

4.6125 0.392625 2.4948 1168.0382


78,412.50 981,562.50 374,220.00 1,354,924.31

15 1.5 7.5 3510


255,000.00 3,750,000.00 1,125,000.00 4,071,600.00
97,200 81,500 12,000 162,500

pasir psg psr urug mnyk bek krkil

0.14

1.18
0.18

0.16 0.24
1.86

0.97 1.45

0.29

0.21 0.32
0.11 0.17
0.23

2.86313275 0.135 2.3275 2.18343225


278,296.50 11,002.50 27,930.00 354,807.74

12 1.35 9 6.6
1,166,400.00 110,100.00 108,000.00 1,072,500.00
10,000 15,750 3,500,000 120,000

besi btn kwt bton blok kls2 plyw 9mm


36.23 0.52
0.19 3.26

126.72 1.81

0.51
41.31 0.59

25.16 0.36
229.404890736 3.2772127248 0.186 3.766875
2,294,048.91 51,616.10 651,000.00 452,025.00

690.00 9.0000 0.75 11.400


6,900,000.00 141,700.00 2,625,000.00 1,368,000.00

1.05
3,675,000.00
31,500 3,500,000 2,950 25,000

bmbu blok kls2 plamir cat dasar


21.70

2.93 0.02
0.84

24.625 0.0219375 0.840 0.84


775,687.50 76,781.25 2,478.00 21,000.00

75 0.3 3 3
2,362,500.00 1,050,000.00 8,850.00 75,000.00
59,063 95,000 85,000

cat pntup tukang pekerja

0.23 0.40

0.23

1.36 0.81
3.40

0.09

0.03
0.06
0.06

0.08 0.51

2.42 2.42

3.07 6.14
0.47 3.07

0.84
0.84

0.48 0.97
0.10 0.67

0.28 0.28

0.05 0.36

0.17 0.17
1.68 3.36
1.10 2.19

2.18

0.53 0.17

2.184 12.9053045644 26.1583845644


128,992.50 1,226,003.93 2,223,462.69

6 39 78
354,350.00 3,705,000.00 6,642,000.00
78 / Jpb

RENCANA ANGGARAN BIAYA

Provinsi/Kabupaten-Kota/Kecamatan/Desa: Sulawesi Selatan/Pinrang/Lembang/Kariango


Nomor RAB : 06 Sub pekerjaan/Kegiatan :
Pekerjaan Kegiatan : Sarana Air Minum

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBD APBN Total
inCash inKind (Rp) inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3*8
1. BAHAN
A. PEKERJAAN PENDAHULUAN
- Pemasangan Bowplank 33,374
1.1 Kayu klas III uk. 5/7 0.01 - - - 0.01 M3 2,500,000 15,000 -
1.2 Paku Biasa 0.07 - - - 0.07 Kg 17,000 1,224 -
1.3 Kayu Papan 2/25 0.01 - - - 0.01 M3 2,500,000 17,150 -
B. PEKERJAAN BETON
- Pekerjaan Trust Block Beton
* Beton 479,184
1.1 Semen Portland 39.24 - - - 39.24 Kg 1,160 45,518 -
1.2 Pasir beton 0.09 - - - 0.09 M 3
97,200 9,098 -
1.3 Kerikil 0.16 - - - 0.16 M3 162,500 25,448 -
* Bekisting
1.1 Kayu terentang 0.10 - - - 0.10 M3 2,500,000 240,000 -
1.2 Paku biasa 2" - 5' 0.96 - - - 0.96 Kg 17,000 16,320 -
1.3 Minyak bekisting 0.48 - - - 0.48 Ltr 12,000 5,760 -
1.4 Balok kayu borneo 0.04 - - - 0.04 M3 2,500,000 90,000 -
1.5 Plywood tebal 4 mm 0.84 - - - 0.84 Lmbr 56,000 47,040 -
- Pekerjaan Pemasangan Kabel Sleng Ø32 3,320,000
1.1 Kabel Sleng Ø22 120.00 120.00 m1 15,000 1,800,000 -
1.2 Kuku Macan Ø22 80.00 80.00 bh 19,000 1,520,000 -
7,631,742
Sub Total 1) 3,832,558 -
79 / Jpb

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBD APBN Total
inCash inKind (Rp) inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3*8
3,833,000
2. UPAH
A. PEKERJAAN PENDAHULUAN
- Membersihkan Lapangan dan Peralatan 189,975
2.1 Pekerja 0.10 - - - 0.10 Hok 85,000 8,500 -
- Pemasangan Bowplank
2.1 Pekerja 0.20 - - - 0.20 Hok 85,000 17,000 -
2.2 Tukang 0.01 - - - 0.01 Hok 95,000 475 -
* Beton
2.1 Pekerja 1.65 - - - 1.65 Hok 85,000 140,250 -
2.2 Tukang 0.25 - - - 0.25 Hok 95,000 23,750 -
80 / Jpb

Volume Harga Biaya (Rp)


URAIAN Kontribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
Total APBD APBN Total
inCash inKind (Rp) inCash
1 2=3+4+5 3 4 5 6 7 8 9=2x8 10=3*8
* Bekisting 56,850
2.1 Pekerja 0.30 - - - 0.30 Hok 85,000 25,500 -
2.2 Tukang 0.33 - - - 0.33 Hok 95,000 31,350 -
- Pekerjaan Pemasangan Pipa 1,839,600
2.1 Pekerja 7.56 - - - 7.56 Hok 85,000 642,600 -
2.2 Tukang 12.60 - - - 12.60 Hok 95,000 1,197,000 -
- Pekerjaan Pemasangan Kabel Sleng Ø32 3,153,600
2.1 Pekerja 12.96 - - 12.96 Hok 85,000 1,101,600 -
2.2 Tukang 21.60 - - - 21.60 Hok 95,000 2,052,000 -
Sub Total 2 5,240,025
Di Bulatkan 5,240,000
3.langsiran
Biaya Langsiran Semen 0.78 zak 50,000 39,240
Biaya Langsiran Pasir 0.09 m3 800,000 74,800
Biaya Langsiran Kerikil 0.16 m3 400,000 62,600
Biaya Langsiran Kabel Sleng 120.00 m1 5,000 600,000
Sub Total 3 776,640 -
Di Bulatkan 777,000 -
Jumlah Total(1+2+3) 9,850,000 -
Dibulatkan 9,850,000 -

Disetujui Oleh :
Kabupaten Pinrang Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM
Kabupaten Pinrang Kabupaten Pinrang

( Harman, ST, MT ) ( Harman, ST, MT ) (Maghfira Asdiana , ST MT) ( Rudi)


NIP. 19561202 198303 1 010 NIP. 19730305 200212 1 012
81 / Jpb

A ANGGARAN BIAYA

Desa: Sulawesi Selatan/Pinrang/Lembang/Kariango


Pek. Jembatan Pipa M-B

Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8

33,374
- - 15,000
- - 1,224
- - 17,150

479,184
- - 45,518
- - 9,098
- - 25,448

- - 240,000
- - 16,320
- - 5,760
- - 90,000
- - 47,040
3,320,000
- - 1,800,000
- - 1,520,000
7,631,742
- 3,832,558
82 / Jpb

Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8
3,833,000

189,975
- - 8,500

- - 17,000
- - 475

- - 140,250
- - 23,750
83 / Jpb

Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inKind
11=4x8 12=5*8 13=6x8
56,850
- - 25,500
- - 31,350
1,839,600
- - 642,600
- - 1,197,000
3,153,600
- - 1,101,600
- - 2,052,000
5,240,025
5,240,000

39,240
74,880
62,640
600,000
- 776,760
- 777,000
- 9,850,000
- 9,850,000

Kariango, Oktober 2016


Dibuat Oleh :
Ketua Satlak

( Parman )
Provinsi : Sulawesi Selatan
Kabupaten : Pinrang
Kecamatan : Lembang
Desa/lembang : Kariango

NO URAIAN Koefisien volume Total

1 2

1. Pekerjaan Persiapan 6.25


1.1. Pembersihan Lahan
Pekerja 0.10 0.63
2. Pemasangan Bowplank 4
2.1. Tenaga Kerja
Pekerja 0.100 0.40
Tukang kayu 0.100 0.40
2.2. Bahan
Kayu klas II uk. 5/7 0.012 0.05
Paku biasa 2" - 5" 0.020 0.08
Kayu papan Kelas III 0.007 0.03
3. Galian Tanah 1.920
3.1. Tenaga Kerja
Pekerja 0.75 1.44
4. Pondasi batu kali, 1 Pc : 4 Ps 3.360
4.1. Tenaga Kerja
Pekerja 1.50 5.04
Tukang batu 0.60 2.02
4.2. Bahan
Batu belah 10/15 cm 1.10 3.70
Semen Portland 163.00 547.68
Pasir pasang 0.52 1.75
4. Urugan Tanah Kembali 0.640
4.1. Tenaga Kerja
Pekerja 0.25 0.16
5. Urugan Pasir 0.400
5.1. Tenaga Kerja
Pekerja 0.30 0.12
5.2. Bahan
Pasir urug 1.20 0.48

6. Pek. Sloof, Dinding, Lantai Beton & Penutup Plat Beton Bertulang

6.1 Pek. Sloof


6.1.1 Pek. Bekistng Sloof 1.200
6.1.1. A Tenaga Kerja
Pekerja 0.07 0.08
Tukang Batu 0.07 0.08
6.1.1.B Bahan
Kayu Kelas III 0.045 0.05
Paku biasa 2" - 5" 0.30 0.36
Minyak Bekisting 0.20 0.24

6.1.2 Pek. Sloof 0.44


6.1.2. A Tenaga Kerja
Pekerja 1.65 0.73
Tukang Batu 0.25 0.11
6.1.2. B Bahan
Semen Portland 232.00 102.08
Pasir 0.52 0.23
Kerikil 0.78 0.34

6.1.3 Pek. Pembesian Sloof 48.38


6.1.3. A Tenaga Kerja
Pekerja 0.07 3.39
Tukang Besi 0.07 3.39
6.1.3. B Bahan
Besi beton ( polos/ulir ) 1.05 50.80
Kawat beton 0.015 0.73

6.2 Pek. Dinding Beton


6.2.1 Pek. Bekistng Dinding Beton 17.600
6.2.1. A Tenaga Kerja
Pekerja 0.66 11.62
Tukang Batu 0.33 5.81
6.2.1.B Bahan
Kayu kelas III 0.03 0.53
Paku biasa 2" - 5" 0.40 7.04
Minyak Bekisting 0.20 3.52
Balok kayu kelas II 0.02 0.35
Plywood tebal 9 mm 0.35 6.16
Bambu P =12 m 2.33 41.07

6.2.2 Pek. Dinding Beton 3.52


6.2.2. A Tenaga Kerja
Pekerja 1.65 5.81
Tukang Batu 0.25 0.88
6.2.2. B Bahan
Semen Portland 232.00 816.64
Pasir 0.52 1.83
Kerikil 0.78 2.75

6.2.3 Pek. Pembesian Dinding Beton 339.15


6.2.3. A Tenaga Kerja
Pekerja 0.0070 2.37
Tukang Batu 0.0070 2.37
6.2.3. B Bahan
Besi beton ( polos/ulir ) 1.050 356.11
Kawat beton 0.015 5.09

6.3 Pek. Plat Penutup Beton


6.3.1 Pek. Bekistng Plat Penutup Beton 3.640
6.3.1. A Tenaga Kerja
Pekerja 0.66 2.40
Tukang Batu 0.33 1.20
6.3.1.B Bahan
Kayu kelas III 0.040 0.15
Paku biasa 2" - 5" 0.400 1.46
Minyak Bekisting 0.200 0.73
Balok kayu kelas II 0.015 0.05
Plywood tebal 9 mm 0.350 1.27
Bambu P =12 m 2.000 7.28

6.3.2 Pek. Penutup Plat Beton 0.81


6.3.2. A Tenaga Kerja
Pekerja 1.65 1.34
Tukang Batu 0.25 0.20
6.3.2. B Bahan
Semen Portland 232.00 187.92
Pasir 0.53 0.43
Kerikil 0.79 0.64

6.3.3 Pek. Pembesian Plat Beton 106.48


6.3.3. A Tenaga Kerja
Pekerja 0.007 0.75
Tukang Batu 0.007 0.75
6.3.3. B Bahan
Besi beton ( polos/ulir ) 1.050 111.81
Kawat beton 0.015 1.60

6.4 Pek. Lantai Beton


6.4.1 Pek. Lantai Beton
6.4.1. A Tenaga Kerja 0.480
Pekerja 1.65 0.79
Tukang Batu 0.25 0.12
6.4.2. B Bahan
Semen Portland 232.00 111.36
Pasir 0.52 0.25
Kerikil 0.78 0.37

6.4.2 Pek. Pembesian Lantai Beton 74.54


6.4.2. A Tenaga Kerja
Pekerja 0.007 0.52
Tukang Batu 0.007 0.52
6.4.2. B Bahan
Besi beton ( polos/ulir ) 1.050 78.27
Kawat beton 0.015 1.12

7. 1 m2 Plesteran Dinding Luar 1 Pc : 2 Ps, tebal 20 mm 8.40


7.1. Tenaga Kerja
Pekerja 0.400 3.36
Tukang batu 0.200 1.68
7.2. Bahan
Semen portland 13.632 114.51
Pasir Pasang 0.027 0.23
8. Acian Dinding dan Lantai Bagian Dalam 10.96
8.1. Tenaga Kerja
Pekerja 0.200 2.19
Tukang batu 0.100 1.10
8.2. Bahan
Semen portland 3.250 35.62
1 m2 pengecatan tembok baru bag.luar( 1 lapis cat dasar, 2 lapis cat
10
penutup ) 8.40
10.1. Tenaga Kerja
Pekerja 0.02 0.17
Tukang cat 0.06 0.53
10.2. Bahan
Plamir 0.10 0.84
Cat dasar 0.10 0.84
cat penutup 2 kali 0.26 2.18
11 Pekerjaan Box Valve & Man Hole 1.00

Biaya Langsiran Semen


Biaya Langsiran Pasir
Biaya Langsiran Batu Gunung
Diketahui Oleh :

Fasilitator Teknik
RENCANA ANGGARAN BIAYA

Nomor RAB
Pekerjaan Kegiatan
Sub pekerjaan/Kegiatan
Ukuran/Dimensi

Volume Biaya
Harga
Kontribusi Masyarakat Satuan Satuan
Total APBD APBN Total
inCash inKind

2=3+4+5 3 4 5 6 7 8 9=2x8

53,125

0.63 0.63 Hok 85,000 53,125


311,360
72,000
0.40 0.40 Hok 85,000 34,000
0.40 0.40 Hok 95,000 38,000
239,360
0.05 0.05 M³ 3,500,000 168,000
0.08 0.08 Kg 17,000 1,360
0.03 0.03 M³ 2,500,000 70,000
122,400

1.44 1.44 Hok 85,000 122,400


1,979,457
619,920
5.04 5.04 Hok 85,000 428,400
2.02 2.02 Hok 95,000 191,520
1,359,537
3.70 3.70 M³ 150,000 554,400
547.68 547.68 Kg 1,160 635,309
1.75 1.75 M³ 97,200 169,828
13,600
0.16 0.16 Hok 85,000 13,600
49,320
10,200
0.12 0.12 Hok 85,000 10,200
39,120
0.48 0.48 M³ 81,500 39,120

18,837,921

15,120
0.08 0.08 Hok 85,000 7,140
0.08 0.08 Hok 95,000 7,980
144,000
0.05 0.05 m 3
2,500,000 135,000
0.36 0.36 Kg 17,000 6,120
0.24 0.24 Liter 12,000 2,880

72,160
0.73 0.73 Hok 85,000 61,710
0.11 0.11 Hok 95,000 10,450
196,422
102.08 102.08 Kg 1,160 118,413
0.23 0.23 M 3
97,200 22,239
0.34 0.34 M3 162,500 55,770

609,560
3.39 3.39 Hok 85,000 287,848
3.39 3.39 Hok 95,000 321,712
519,396
50.80 50.80 Kg 10,000 507,967
0.73 0.73 Kg 15,750 11,429
1,539,120
11.62 11.62 Hok 85,000 987,360
5.81 5.81 Hok 95,000 551,760
5,274,720
0.53 0.53 m 3
3,500,000 1,848,000
7.04 7.04 Kg 17,000 119,680
3.52 3.52 Liter 12,000 42,240
0.35 0.35 m3 3,500,000 1,232,000
6.16 6.16 Lbr 120,000 739,200
41.07 41.07 Batang 31,500 1,293,600

577,280
5.81 5.81 Hok 85,000 493,680
0.88 0.88 Hok 95,000 83,600
1,571,377
816.64 816.64 Kg 1,160 947,302
1.83 1.83 M3 97,200 177,915
2.75 2.75 M3 162,500 446,160

427,330
2.37 2.37 Hok 85,000 201,795
2.37 2.37 Hok 95,000 225,535
3,641,205
356.11 356.11 Kg 10,000 3,561,080
5.09 5.09 Kg 15,750 80,124

318,318
2.40 2.40 Hok 85,000 204,204
1.20 1.20 Hok 95,000 114,114
970,788
0.15 0.15 m3 2,500,000 364,000
1.46 1.46 Kg 17,000 24,752
0.73 0.73 Liter 12,000 8,736
0.05 0.05 m3 3,500,000 191,100
1.27 1.27 Lbr 120,000 152,880
7.28 7.28 Batang 31,500 229,320

132,840
1.34 1.34 Hok 85,000 113,603
0.20 0.20 Hok 95,000 19,238
363,699
187.92 187.92 Kg 1,160 217,987
0.43 0.43 M3 97,200 41,728
0.64 0.64 M3 162,500 103,984

134,169
0.75 0.75 Hok 85,000 63,358
0.75 0.75 Hok 95,000 70,812
1,143,235
111.81 111.81 Kg 10,000 1,118,079
1.60 1.60 Kg 15,750 25,157

78,720
0.79 0.79 Hok 85,000 67,320
0.12 0.12 Hok 95,000 11,400
214,279
111.36 111.36 Kg 1,160 129,178
0.25 0.25 M3 97,200 24,261
0.37 0.37 M3 162,500 60,840

93,919
0.52 0.52 Hok 85,000 44,350
0.52 0.52 Hok 95,000 49,568
800,265
78.27 78.27 Kg 10,000 782,655
1.12 1.12 Kg 15,750 17,610

600,075
445,200
3.36 3.36 Hok 85,000 285,600
1.68 1.68 Hok 95,000 159,600
154,875
114.51 114.51 Kg 1,160 132,830
0.23 0.23 M³ 97,200 22,045
331,759
290,440
2.19 2.19 Hok 85,000 186,320
1.10 1.10 Hok 95,000 104,120
41,319
35.62 35.62 Kg 1,160 41,319

217,025
64,554
0.17 0.17 Hok 85,000 14,280
0.53 0.53 Hok 95,000 50,274
152,471
0.84 0.84 Kg 2,950 2,478
0.84 0.84 Kg 25,000 21,000
2.18 2.18 Kg 59,063 128,993
Ls 700,000
7,550,000
39.0 zak 50,000 1,950,000
5.0 m3 800,000 4,000,000
4.0 m3 400,000 1,600,000

Sub Total Bahan 17,526,067


Dibulatkan Rp 17,526,000
Sub Total Upah 5,689,975
Dibulatkan Rp 5,690,000
Sub Total Langsiran 7,550,000
Dibulatkan Rp 7,550,000
Jumlah Total Rp 30,766,000
Dibulatkan Rp 30,766,000

Kariango,...........................

Disetujui Oleh : Dibuat

Koordinator KKM
: 04
: Sarana Air Minum
: Reservoir Kariango
2 X2X2

Biaya (Rp)
Kontribusi Masyarakat
APBD APBN
inCash inKind

10=3x8 11=4x8 12 13=6x8

- - 172,100

- - - 53,125 53,125.00
- 311,360
72,000
- - - 34,000 34,000.00
- - - 38,000 38,000.00
239,360
- - - 168,000 168,000.00
- - - 1,360 1,360.00
- - - 70,000 70,000.00
- - 122,400 0.48 4.000 1.92

- - - 122,400 122400
- - 1,979,457
619,920
- - - 428,400 428,400.00
- - - 191,520 191,520.00
1,359,537
- - - 554,400 554,400.00
- - - 635,309 635,308.80
- - - 169,828 169,827.84
- - 13,600
- 13,600 13600
- - 49,320
10,200
- - - 10,200 10200
39,120
- - - 39,120 39120

- 37,712,600

15,120
- - - 7,140 7,140.00
- - - 7,980 7,980.00
144,000
- - - 135,000 135,000.00
- - - 6,120 6,120.00
- - - 2,880 2,880.00

72,160
- - - 61,710 61,710.00
- - - 10,450 10,450.00
196,422
- - - 118,413 118,412.80
- - - 22,239 22,239.36
- - - 55,770 55,770.00

609,560
- - - 287,848 287,847.74
- - - 321,712 321,712.17
519,396
- - - 507,967 507,966.59
- - - 11,429 11,429.25
1,539,120
- - - 987,360 987,360.00
- - - 551,760 551,760.00
5,274,720
- - - 1,848,000 1,848,000.00
- - - 119,680 119,680.00
- - - 42,240 42,240.00
- - - 1,232,000 1,232,000.00
- - - 739,200 739,200.00
- - - 1,293,600 1,293,600.00

577,280
- - - 493,680 493,680.00
- - - 83,600 83,600.00
1,571,377
- - - 947,302 947,302.40
- - - 177,915 177,914.88
- - - 446,160 446,160.00

427,330
- - - 201,795 201,794.56
- - - 225,535 225,535.10
3,641,205
- - - 3,561,080 3,561,080.47
- - - 80,124 80,124.31

318,318
- - - 204,204 204,204.00
- - - 114,114 114,114.00
970,788
- - - 364,000 364,000.00
- - - 24,752 24,752.00
- - - 8,736 8,736.00
- - - 191,100 191,100.00
- - - 152,880 152,880.00
- - - 229,320 229,320.00

132,840
- - - 113,603 113,602.50
- - - 19,238 19,237.50
363,699
- - - 217,987 217,987.20
- - - 41,728 41,727.96
- - - 103,984 103,983.75

134,169
- - - 63,358 63,357.79
- - - 70,812 70,811.65
1,143,235
- - - 1,118,079 1,118,078.64
- - - 25,157 25,156.77

78,720
- - - 67,320 67,320.00
- - - 11,400 11,400.00
214,279
- - - 129,178 129,177.60
- - - 24,261 24,261.12
- - - 60,840 60,840.00

93,919
- - - 44,350 44,350.45
- - - 49,568 49,568.15
800,265
- - - 782,655 782,655.05
- - - 17,610 17,609.74

- - 600,075 1.75
445,200 0.48
- - - 285,600 285,600.00 0.23
- - - 159,600 159,600.00 1.83
154,875 0.43
- - - 132,830 132,830.21 0.25
- - - 22,045 22,044.96 0.23
- - 331,759 5.19
290,440
- - - 186,320 186,320.00
- - - 104,120 104,120.00
41,319
- - - 41,319 41,319.20

- - 217,025
64,554
- - - 14,280 14,280.00
- - - 50,274 50,274.00
152,471
- - - 2,478 2,478.00
- - - 21,000 21,000.00
- - - 128,993 128,992.50
- - 700,000
7,550,000
- - - 1,950,000
- - - 4,000,000
- - - 1,600,000

17,526,067
Rp 17,526,000
5,689,975 Rp 17,526,000
Rp 5,690,000
7,550,000
Rp 7,550,000
Rp 30,766,000
Rp 30,766,000
Rp 61,532,000
Kariango,...........................................................2016

Dibuat Oleh :

Ketua Satlak Pamsimas


15,100,000
3,500,000 17,000 2,500,000

kykelas 2 paku ky kls 3

0.05 0.08 0.03


0.36 0.05

7.04 0.53
1.46 0.15
0.05 8.94 0.76

168,000.00 151,912.00 1,889,000.00


0.05 8.00 0.76
16,298,067.39
Rp 1,227,932.61

168,000.00 136,000.00 1,889,000.00

17,525,755.00
Rp 245.00
17,526,000.00
Rp -
0.10 16.00 1.51

336,000.00 272,000.00 3,778,000.00

X1 0.05 8.00 0.76


168,000.00 136,000.00 1,889,000.00
150,000 1,160 97,200 81,500

bt blah semen pasir psg psr urug

3.70 547.68 1.75 0.48


102.08 0.23
816.64 1.83
187.92 0.43

111.36 0.25
114.51 0.23
35.62

3.70 1,915.81 4.71 0.48

554,400.00 2,222,338.21 458,016.12 39,120.00


8.00 2,373.00 5.00 1.00

1,200,000.00 2,752,680.00 486,000.00 81,500.00


2,753,000.00
16.00 4,746.00 10.00 2.00

2,400,000.00 5,505,300.00 972,000.00 163,000.00

8.00 2,373.00 5.00 1.00


1,200,000.00 2,752,650.00 486,000.00 81,500.00
12,000 162,500 10,000 15,750

mnyk bek krkil besi btn kwt bton


0.24

0.34

50.80 0.73

3.52
2.75 356.11 5.09

0.73
0.64

111.81 1.60

0.37

78.27 1.12
4.49 4.10 596.98 8.53

53,856.00 666,753.75 5,969,780.75 134,320.07


4.50 4.00 597.00 8.00

54,000.00 650,000.00 5,970,000.00 126,000.00


9.00 8.00 1,194.00 16.00

108,000.00 1,300,000.00 11,940,000.00 252,000.00

4.50 4.00 597.00 8.00


54,000.00 650,000.00 5,970,000.00 126,000.00
3,500,000 120,000 31,500 3,500,000

blok kls2 plyw 9mm bmbu blok ky kls2


6.16 41.07 0.35
0.05 1.27 7.28
0.05 7.43 48.35 0.35

191,100.00 892,080.00 1,522,920.00 1,232,000.00


0.05 7.50 49.00 0.35

191,000.00 900,000.00 1,543,500.00 1,232,000.00


1,423,000.00 0.41

selisih
- 35,052,000.00
Rp - Rp 11,380,000
0.11 15.00 98.00 0.70
0.81
382,200.00 1,800,000.00 3,087,000.00 2,464,000.00
2,846,200.00

0.05 7.50 49.00 0.35


191,100.00 900,000.00 1,543,500.00 1,232,000.00

0.41
1,423,100.00
2,950 25,000 59,063 95,000

plamir cat dasar cat pntup TukANG

0.40

2.02
0.08

0.11

3.39
5.81

0.88

2.37

1.20
0.20

0.75

0.12

0.52
1.68

0.84 0.84 2.18

1.10

0.53

0.84 0.84 2.18 21.15

2,478.00 21,000.00 128,992.50 2,009,682.57


1.00 1.00 2.00

25.00
2,950.00 25,000.00 118,125.00
3,000.00 118,000.00 2,375,000.00

Rp 5,690,000

kebutuhan
bahan 35,052,000.00
upah 11,380,000.00
2.00 2.00 4.00 50.00

5,900.00 50,000.00 236,600.00 4,750,000.00

1.00 1.00 2.00 25.00


2,950.00 25,000.00 118,300.00 2,375,000.00
85,000

pekerjaa

0.63

0.40

1.44
5.04
0.16

0.12

0.08

0.73

3.39
11.62

5.81

2.37

2.40
1.34

0.75

0.79

0.52
3.36

2.19

0.17

42.67

3,627,167.04

39.00

3,315,000.00

5,690,000.00
Rp -
78.00

6,630,000.00

39.00
3,315,000.00
RENCANA ANGGARAN BIAYA

Provinsi / Kabupaten /Kecamatan / Desa: Sulawesi Selatan / Pinrang / Le


Nomor RAB : 07
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Kontribusi Masyarakat Satuan
Total APBD
inCash inKind
1 2=3+4+5 3 4 6 7
1. ALAT
1.1 Gerobak Dorong 2 - - 2 bh
1.2 Sekop Besar 3 - - 3 bh
1.3 Sekop Kecil 3 - - 3 bh
1.4 Tenro' 3 - - 3 bh
1.5 Sendok Semen 4 - - 4 bh
1.6 Ember Cor 5 - - 5 bh
1.7 Gergaji Besi 2 - - 2 set
1.8 Meteran 3 Metet 2 - - 2 bh

To
Dibulatk

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS Koordinato
Kab, Pinrang

Harman, ST., MT (Maghfira Asdiana , ST MT) ( Rud


NIP. 19730305 200212 1 012
NCANA ANGGARAN BIAYA

matan / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango


Sub pekerjaan/Kegiatan : Perlengkapan SAB

Harga Biaya (Rp)


Satuan Kontribusi Masyarakat
Total APBN
(Rp) inCash inKind
8 9=2x8 10=3*8 11=4x8 13=6x8

500,000 1,000,000 - - 1,000,000


75,000 225,000 - - 225,000
85,000 255,000 - - 255,000
100,000 300,000 - - 300,000
25,000 100,000 - - 100,000
10,000 50,000 - - 50,000
70,000 140,000 - - 140,000
30,000 60,000 60,000

Total 2,130,000 - - 2,130,000


Dibulatkan 2,130,000 - - 2,130,000

Kariango, Oktober 2016

Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( Rudi) ( Parman )
RENCANA ANGGARAN BIAYA

Provinsi : Sulawesi Selatan


Kabupaten : Pinrang Nomor RAB : 06
Kecamatan : Lembang Pekerjaan Kegiatan : Sarana Air Minum
Desa/lembang : Ulu Saddang Sub pekerjaan/Kegiatan : Westafel/Sarana Cuci Tangan
Unit :1
VOLUME HARGA BIAYA (RP)
NO URAIAN KONTRIBUSI MASYARAKAT SAT SATUAN KONTRIBUSI MASYARAKAT
TOTAL APBD TOTAL
IN CASH IN KIND ( Rp ) IN CASH IN KIND
I. BAHAN
Pipa PVC type AW dia 1" panjang 4 m 1.00 1.00 btg 25,000 25,000
Pipa PVC type AW dia 3/4" panjang 4 m 1.00 1.00 btg 18,000 18,000
Knee 3/4" 3.00 3.00 bh 3,000 9,000
Knee 1" 3.00 3.00 bh 5,000 15,000
Kran Westafel 1.00 1.00 bh 125,000 125,000
Westhafel 1.00 1.00 bh 385,000 385,000
Accecories Westafel 1.00 1.00 pcs 65,000 65,000
Shock draft dalam lengkungan 1.00 1.00 bh 15,000 15,000
Lem Pipa 1.00 1.00 bh 12,000 12,000
Isolasi Pipa 1.00 1.00 bh 5,000 5,000
Total I 674,000 - -
II. U PAH
Pekerja 1.00 1.00 HOK 85,000 85,000
Tukang 1.00 1.00 HOK 95,000 95,000
Total III 180,000 -
Total 854,000 - -

Ulu Saddang, Oktober 2016


Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :
Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM Ketua Satlak
( Harman, ST, MT ) ( Maghfira Asdiana, ST ) ( Gusrianto ) ( Syarifuddin )
NIP. 19730305 200212 1 012
na Air Minum
afel/Sarana Cuci Tangan

APBN

25,000
18,000
9,000
15,000
125,000
385,000
65,000
15,000
12,000
5,000
674,000

85,000
95,000
180,000
854,000

Oktober 2016
DATA PENGUKURAN
Lokasi Program : Kariango / LEMBANG Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
Dusun : Buttu Batu

Jarak Jumlah Rumah Jumlah Jiwa


No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
1 PMA I P0 - - - 1061 Kapasitas Sumber =
2 P00-P01 P01 40 - - - 1060 1,39 ltr/dtk
3 P01-P02 P02 38 - - - 1056
4 P02 - P03 P03 47 - - - 1055
5 P03 - P04 P04 36 - - - 1052
6 P04 - P05 P05 48 - - - 1049
7 P05 - P06 P06 37 - - - 1047
8 P06 - P07 P07 43 - - - 1045
9 P07 - P08 P08 48 - - - 1039
10 P08- P09 P09 49 - - - 1036
11 P09- P10 P10 48 - - - 1032
12 P10 - P11 P11 48 - - - 1028
13 P11 - P12 P12 50 - - - 1026
14 P12 - P13 P13 50 - - - 1020
15 P13 - P14 P14 37 - - - 1000
16 P14 - P15 P15 22 - - - 995
17 P15 - P16 P16 39 - - - 990
18 P16 - P17 P17 50 - - - 985
50 980

19 PMA II P18 - - - 905


20 P18 - P19 P19 63 - - - 902
21 P19 - P20 P20 47 - - - 903
22 P20 - P21 P21 52 - - - 900
23 P21 - P22 P22 52 - - - 899
24 P22 - P23 P23 59 - - - 885
25 P23 - P24 P24 47 - - - 877 8
26 P24 - P25 P25 53 - - - 869 5
27 P25 - P26 P26 48 - - - 864 7
28 P26 - P27 P27 51 - - - 857 8
29 P27 - P28 P28 58 - - - 849 9
30 P28 - P29 P29 56 - - - 840 10
31 P29 - P30 P30 57 - - - 830 8
32 P30 - P31 P31 55 - - - 822 8
33 P31 - P32 P32 51 - - - 814 15
34 P32 - P33 P33 50 - - - 799 4

142 / data ukur


Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
35 P33 - P34 P34 53 - - - 795 6
36 P34 - P35 P35 46 - - - 789 2
37 Bak Umum P35 - - - 787 Bak Umum
38 P35 - P36 P36 50 1 - 4 785 2
39 P36 - P37 P37 54 1 - 4 784 1
40 P37- P38 P38 54 2 1 12 782 2
41 P38 - P39 P39 54 1 1 8 780 2
42 P39 - P40 P40 54 2 1 12 775 5
43 P40- P41 P41 48 1 1 8 774 1
44 P41- P42 P42 54 1 1 8 768 6
45 P42- P43 P43 54 1 1 8 766 2
46 P43- P44 P44 54 1 2 12 765 1
47 P44- P45 P45 54 1 2 12 764 1
48 P45- P46 P46 54 1 1 8 759 5
49 P46- P47 P47 54 1 2 12 755 4
50 P47- P48 P48 50 1 1 8 749 6
51 P48- P49 P49 54 2 2 16 747 2
52 P49- P50 P50 54 1 1 8 749 -2
53 P50- P51 P51 54 1 2 12 746 3
54 P51- P52 P52 54 1 1 8 740 6
55 P52- P53 P53 54 1 2 12 743 -3
56 P53- P54 P54 54 2 1 12 745 -2
57 P54- P55 P55 54 1 1 8 740 5
58 P55- P56 P56 54 1 2 12 735 5

143 / data ukur


1 10/27/2016 9:41 1061 m 15 15 15 m 0:00:38 1.4 km/h 63° true
2 10/27/2016 9:41 1060 m 7 77m 0:00:57 0.4 km/h 3° true
3 10/27/2016 9:42 1059 m 10 10 10 m 0:03:06 0.2 km/h 84° true
4 10/27/2016 9:45 1061 m 8 88m 0:00:25 1.1 km/h 17° true
5 10/27/2016 9:46 1060 m 40 20 20 m 0:00:28 3 km/h 74° true
6 10/27/2016 9:46 1061 m 4 44m 0:01:46 0.1 km/h 117° true
7 10/27/2016 9:48 1059 m 4 44m 0:02:28 0.1 km/h 149° true
8 10/27/2016 9:51 1059 m 5 55m 0:00:20 0.9 km/h 134° true
9 10/27/2016 9:51 1059 m 7 77m 0:00:16 2 km/h 83° true
10 10/27/2016 9:51 1057 m 1 11m 0:00:05 0.8 km/h 127° true
11 10/27/2016 9:51 1056 m 16 16 16 m 0:00:18 3 km/h 126° true
12 10/27/2016 9:52 1056 m 1 11m 0:00:01 3 km/h 106° true
13 10/27/2016 9:52 1056 m 38 13 13 m 0:00:14 3 km/h 97° true
14 10/27/2016 9:52 1056 m 9 99m 0:00:20 2 km/h 79° true
15 10/27/2016 9:52 1056 m 8 88m 0:00:14 2 km/h 90° true
16 10/27/2016 9:52 1055 m 5 55m 0:00:14 1.3 km/h 105° true
17 10/27/2016 9:53 1055 m 8 88m 0:00:14 2 km/h 140° true
18 10/27/2016 9:53 1053 m 4 44m 0:00:16 0.9 km/h 169° true
19 10/27/2016 9:53 1053 m 4 44m 0:00:20 0.7 km/h 174° true
20 10/27/2016 9:53 1052 m 2 22m 0:01:29 0.1 km/h 215° true
21 10/27/2016 9:55 1052 m 7 77m 0:00:36 0.7 km/h 282° true
22 10/27/2016 9:56 1055 m 47 99m 0:00:26 1.2 km/h 233° true
23 10/27/2016 9:56 1057 m 66m 0:00:11 2 km/h 192° true
24 10/27/2016 9:56 1059 m 66m 0:00:44 0.5 km/h 148° true
25 10/27/2016 9:57 1059 m 10 10 m 0:00:12 3 km/h 199° true
26 10/27/2016 9:57 1058 m 14 14 m 0:00:12 4 km/h 134° true
36

27 10/27/2016 9:57 1059 m 7 77m 0:00:05 5 km/h 127° true


28 10/27/2016 9:57 1058 m 4 44m 0:00:03 5 km/h 157° true
29 10/27/2016 9:57 1058 m 6 66m 0:00:05 4 km/h 170° true
30 10/27/2016 9:58 1058 m 9 99m 0:00:08 4 km/h 145° true
31 10/27/2016 9:58 1058 m 7 77m 0:00:11 2 km/h 146° true
32 10/27/2016 9:58 1057 m 7 77m 0:00:14 2 km/h 205° true
33 10/27/2016 9:58 1057 m 8 88m 0:00:08 4 km/h 175° true
34 10/27/2016 9:58 1056 m 48 77m 0:00:05 5 km/h 123° true
35 10/27/2016 9:58 1056 m 9 99m 0:00:13 2 km/h 208° true
36 10/27/2016 9:59 1057 m 1 11m 0:00:01 4 km/h 209° true
37 10/27/2016 9:59 1057 m 15 15 15 m 0:00:16 3 km/h 181° true
38 10/27/2016 9:59 1060 m 6 66m 0:00:06 4 km/h 151° true
39 10/27/2016 9:59 1060 m 6 66m 0:00:03 7 km/h 158° true
40 10/27/2016 9:59 1060 m 37 20 20 m 0:00:16 5 km/h 115° true
41 10/27/2016 9:59 1059 m 8 88m 0:00:19 1.5 km/h 153° true
42 10/27/2016 10:00 1057 m 3 33m 0:00:02 5 km/h 157° true

144 / data ukur


6 10/27/2016 9:46 1061 m 4 44m 0:01:46 0.1 km/h 117° true
7 10/27/2016 9:48 1059 m 4 44m 0:02:28 0.1 km/h 149° true
8 10/27/2016 9:51 1059 m 5 55m 0:00:20 0.9 km/h 134° true
43 10/27/2016 10:00 1056 m 9 99m 0:00:08 4 km/h 94° true
44 10/27/2016 10:00 1056 m 19 19 19 m 0:00:13 5 km/h 100° true
45 10/27/2016 10:00 1056 m 4 44m 0:00:02 7 km/h 90° true
46 10/27/2016 10:00 1056 m 43 24 24 m 0:00:19 4 km/h 108° true
47 10/27/2016 10:00 1054 m 21 21 21 m 0:00:17 4 km/h 144° true
48 10/27/2016 10:01 1054 m 5 55m 0:00:29 0.6 km/h 1° true
49 10/27/2016 10:01 1051 m 10 10 10 m 0:00:24 1.5 km/h 351° true
50 10/27/2016 10:01 1047 m 8 88m 0:00:25 1.1 km/h 345° true
51 10/27/2016 10:02 1045 m 3 33m 0:00:24 0.4 km/h 301° true
52 10/27/2016 10:02 1045 m 1 11m 0:00:16 0.2 km/h 135° true
53 10/27/2016 10:03 1046 m 48 55m 0:00:21 0.9 km/h 108° true
54 10/27/2016 10:03 1046 m 6 66m 0:00:25 0.9 km/h 7° true
55 10/27/2016 10:03 1043 m 10 10 10 m 0:00:33 1.1 km/h 341° true
56 10/27/2016 10:04 1042 m 7 77m 0:00:23 1.1 km/h 1° true
57 10/27/2016 10:04 1039 m 13 13 13 m 0:00:14 3 km/h 62° true
58 10/27/2016 10:04 1036 m 13 13 13 m 0:00:18 3 km/h 67° true
59 10/27/2016 10:05 1033 m 49 66m 0:00:12 2 km/h 102° true
60 10/27/2016 10:05 1030 m 12 12 12 m 0:00:12 4 km/h 117° true
61 10/27/2016 10:05 1027 m 2 22m 0:00:02 4 km/h 107° true
62 10/27/2016 10:05 1027 m 12 12 12 m 0:00:13 3 km/h 123° true
63 10/27/2016 10:05 1024 m 7 77m 0:00:20 1.2 km/h 162° true
64 10/27/2016 10:06 1022 m 4 44m 0:00:14 1.1 km/h 134° true
65 10/27/2016 10:06 1019 m 11 11 11 m 0:00:18 2 km/h 144° true
66 10/27/2016 10:06 1015 m 48 10 10 m 0:00:15 2 km/h 113° true

145 / data ukur


RENCANA

Provinsi / Kabupaten /Kecamatan / Desa


Nomor RAB : 03
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 5
A. BAHAN
1. Pipa PVC
a. Pipa PVC Ø 2" 147 147 - - -
b. Pipa PVC Ø 1 1/2" 533 533 - - 333
Langsiran 680 678 - - 331
2. Pipa GIP Medium A FULL
a. Pipa GIP Ø 2" 2 2 - -
b. Pipa GIP Ø 1 1/2" 153 153 - -
Langsiran 155 155 - -

3. Accecories
a. PVC

Knee 90° Ø 1 1/2" 5 5 - -

Knee 45° Ø 1 1/2" 5 5 - -


Dop/Cap Ø 1 1/2" 3 3 - - 1
Stop Kran 1 1/2" 6 6 - -
Air Valve Ø 1 1/2 " 6 6 - -
tee 2 -1 1/2 - 2 " 1 1 - -
tee Ø 1 1/2 " 2 2
Reducer Ø 2- 1 1/2" 1 1 -
Stop Kran 2" 3 3 - -
- - -
Volume
URAIAN Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 5

b. Galvanis

Double Nipple Ø 2" 4 4 - -

bend Ø 45 1 1/2" 8 8 - -
Waiter moor Ø1 1/ 2" 4 4
Double Nipple Ø 1 1/ 2" 4 4
Flange Ø 1 1/2" 12 12
Karet Flange 14 14
Socket Ø 1 1/2 (sambungan Lurus) 31 31 - -
Gate Valve Ø 1 1/2" Broonze 2 2 - -
Gate Valve Ø 2" Broonze 2 2 - - -
Waiter moor Ø 2" 4 4
4 Lainnya
Lem Pipa 12 12 - - 1
Seal tape 151 151 - - -
Kunci Pipa GIP Ø 2" No.24 2 2 - - -

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT (Maghfira Asdiana , ST MT)


NIP. 19730305 200212 1 012
RENCANA ANGGARAN BIAYA

insi / Kabupaten /Kecamatan / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango


Sub pekerjaan/Kegiatan : Pengadaan Pipa dan Accesso
Spesifikasi : Gip-Medium A, PVC-SNI S 12

Volume Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
APBD Total
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8

147 btg 120,000.00 17,640,000 - -


200 btg 95,000.00 50,635,000 - -
347 btg 10,000.00 6,780,000 - -

2 btg 340,000.00 680,000 - -


153 btg 275,000.00 42,075,000 - -
155 btg 10,000.00 1,550,000 - -
Sub Total a 119,360,000 - -

5 bh 17,500.00 87,500 - -

5 bh 30,500.00 152,500 - -
2 bh 10,000.00 30,000 - -
6 bh 120,000.00 720,000 - -
6 bh 120,000.00 720,000 - -
1 bh 42,000.00 42,000 - -
2 bh 30,000.00 60,000 - -
1 bh 27,500.00 27,500 - -
3 bh 195,000.00 585,000 - -
- bh - - -
Volume Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBD Total
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8

2,424,500 - -

4 bh 21,500.00 86,000 - -

8 bh 21,500.00 172,000 - -
4 bh 40,000.00 160,000
4 bh 15,000.00 60,000
12 bh 45,000.00 540,000
14 bh 50,000.00 700,000
31 bh 15,000.00 465,000 - -
2 bh 200,000.00 400,000 - -
2 bh 275,000.00 550,000 - -
4 bh 57,500.00 230,000 - -
3,363,000 - -
11 bh 45,000.00 540,000 - -
151 bh 2,500.00 377,500 - -
2 bh 300,000.00 600,000 - -
Sub Total b 1,517,500 - -
Jumlah Bahan (a + b) 126,665,000 - -
dibulatkan 126,665,000 - -

Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( Rudi) ( Parman )
mbang / Kariango
Pengadaan Pipa dan Accessories
Gip-Medium A, PVC-SNI S 12,5

Biaya (Rp)

APBDes APBD

12 13=6x8

- 17,640,000
31,635,000 19,000,000
3,310,000 3,470,000

680,000
42,075,000
1,550,000
34,945,000 84,415,000

- 87,500

- 152,500
10,000 20,000
- 720,000
- 720,000
- 42,000
- 60,000
- 27,500
- 585,000
- -
Biaya (Rp)

APBDes APBD

12 13=6x8

10,000 2,414,500

86,000

172,000
160,000
60,000
540,000
700,000
465,000
400,000
- 550,000
- 230,000
- 3,363,000
45,000 495,000
- 377,500
- 600,000
45,000 1,472,500
35,000,000 91,665,000
35,000,000 91,665,000

Kariango, Oktober 2016

Satlak Pamsimas

( Parman )
DATA PENGUKURAN
Lokasi Program : Kariango / LEMBANG Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
Dusun : Buttu Batu

Jarak Jumlah Rumah Jumlah Jiwa


No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
1 PMA I P0 - - - 1061 Kapasitas Sumber =
2 P00-P01 P01 72 - - - 1059 1,39 ltr/dtk
3 P01-P02 P02 57 - - - 1056
4 P02 - P03 P03 54 - - - 1058
5 P03 - P04 P04 52 - - - 1059
6 P04 - P05 P05 46 - - - 1056
7 P05 - P06 P06 80 - - - 1037
8 P06 - P07 P07 80 - - - 1033
9 P07 - P08 P08 80 - - - 1029
10 P08- P09 P09 80 - - - 1026
11 P09- P10 P10 80 - - - 1019
12 P10 - P11 P11 80 - - - 1005
13 P11 - P12 P12 80 - - - 1012
14 P12 - P13 P13 80 - - - 999
15 P13 - P14 P14 80 - - - 977
16 P14 - P15 P15 80 - - - 947
17 P15 - P16 P16 80 - - - 925
18 P16 - P17 P17 80 - - - 911
19 PMA II P18 - - - 905
20 P18 - P19 P19 63 - - - 902
21 P19 - P20 P20 47 - - - 903
22 P20 - P21 P21 52 - - - 902
23 P21 - P22 P22 52 - - - 899
24 P22 - P23 P23 59 - - - 885
25 P23 - P24 P24 47 - - - 877
26 P24 - P25 P25 53 - - - 869
27 P25 - P26 P26 48 - - - 864
28 P26 - P27 P27 51 - - - 857
29 P27 - P28 P28 58 - - - 849
30 P28 - P29 P29 56 - - - 840
31 P29 - P30 P30 57 - - - 830
32 P30 - P31 P31 55 - - - 822
33 P31 - P32 P32 51 - - - 814
34 P32 - P33 P33 50 - - - 799
35 P33 - P34 P34 53 - - - 795
36 P34 - P35 P35 46 - - - 789

152 / data ukur


Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
37 Bak Umum P35 - - - 787 Bak Umum
38 P35 - P36 P36 50 1 - 4 785 2
39 P36 - P37 P37 54 1 - 4 784 1
40 P37- P38 P38 54 2 1 12 782 2
41 P38 - P39 P39 54 1 1 8 780 2
42 P39 - P40 P40 54 2 1 12 775 5
43 P40- P41 P41 48 1 1 8 774 1
44 P41- P42 P42 54 1 1 8 768 6
45 P42- P43 P43 54 1 1 8 766 2
46 P43- P44 P44 54 1 2 12 765 1
47 P44- P45 P45 54 1 2 12 764 1
48 P45- P46 P46 54 1 1 8 759 5
49 P46- P47 P47 54 1 2 12 755 4
50 P47- P48 P48 50 1 1 8 749 6
51 P48- P49 P49 54 2 2 16 747 2
52 P49- P50 P50 54 1 1 8 749 -2
53 P50- P51 P51 54 1 2 12 746 3
54 P51- P52 P52 54 1 1 8 740 6
55 P52- P53 P53 54 1 2 12 743 -3
56 P53- P54 P54 54 2 1 12 745 -2
57 P54- P55 P55 54 1 1 8 740 5
58 P55- P56 P56 54 1 2 12 735 5
59 P56- P57 P57 54 2 2 16 730 5
60 P57- P58 P58 54 1 1 8 726 4
61 P58- P59 P59 54 2 1 12 729 -3
62 P59- P60 P60 54 1 1 8 732 -3
63 P60- P61 P61 54 1 2 12 728 4
64 P61- P62 P62 48 2 1 12 727 1
65 P62- P63 P63 55 1 3 16 729 -2
66 P63- P64 P64 52 - 3 12 725 4
67 P64- P65 P65 48 1 1 8 723 2
68 P65- P66 P66 50 2 1 12 720 3
69 P66- P67 P67 50 1 2 12 718 2
70 P67- P68 P68 54 2 2 16 719 -1
71 P68- P69 P69 51 2 2 16 715 4
72 P69- P70 P70 54 2 4 26 712 3
73 P70- P71 P71 46 1 1 8 715 -3
74 P71- P72 P72 40 1 2 12 710 DOP
JUMLAH 4077 410
74 P40 - PA PA 54 10 - 40 767
JUMLAH 4,131 57 55 450

153 / data ukur


1 10/27/2016 9:39 1061 21 0:02:33 0.5 km/h
2 10/27/2016 9:41 1060 13 0:04:03 0.2 km/h
3 10/27/2016 9:45 1061 8 0:00:25 1.1 km/h
4 10/27/2016 9:46 1060 25 0:04:42 0.3 km/h
5 10/27/2016 9:51 1059 5 0:00:20 0.9 km/h
6 10/27/2016 9:51 1059 8 0:00:21 1.4 km/h
7 10/27/2016 9:51 1056 16 0:00:19 3 km/h
8 10/27/2016 9:52 1056 35 0:01:02 2 km/h
9 10/27/2016 9:53 1055 8 0:00:14 2 km/h
10 10/27/2016 9:53 1053 8 0:00:36 0.8 km/h
11 10/27/2016 9:53 1052 8 0:02:05 0.2 km/h
12 10/27/2016 9:56 1055 9 0:00:26 1.2 km/h
13 10/27/2016 9:56 1057 6 0:00:11 2 km/h
14 10/27/2016 9:56 1059 15 0:00:56 0.9 km/h
15 10/27/2016 9:57 1058 14 0:00:12 4 km/h
16 10/27/2016 9:57 1059 11 0:00:08 5 km/h
17 10/27/2016 9:57 1058 15 0:00:13 4 km/h
18 10/27/2016 9:58 1058 12 0:00:25 2 km/h
19 10/27/2016 9:58 1057 8 0:00:08 4 km/h
20 10/27/2016 9:58 1056 7 0:00:05 5 km/h
21 10/27/2016 9:58 1056 10 0:00:14 3 km/h
22 10/27/2016 9:59 1057 15 0:00:16 3 km/h
23 10/27/2016 9:59 1060 6 0:00:06 4 km/h
24 10/27/2016 9:59 1060 6 0:00:03 7 km/h
25 10/27/2016 9:59 1060 20 0:00:16 5 km/h
26 10/27/2016 9:59 1059 8 0:00:19 1.5 km/h
27 10/27/2016 10:00 1057 3 0:00:02 5 km/h
28 10/27/2016 10:00 1056 9 0:00:08 4 km/h
29 10/27/2016 10:00 1056 19 0:00:13 5 km/h
30 10/27/2016 10:00 1056 4 0:00:02 7 km/h
31 10/27/2016 10:00 1056 24 0:00:19 4 km/h
32 10/27/2016 10:00 1054 21 0:00:17 4 km/h
33 10/27/2016 10:01 1054 5 0:00:29 0.6 km/h
34 10/27/2016 10:01 1051 10 0:00:24 1.5 km/h
35 10/27/2016 10:01 1047 8 0:00:25 1.1 km/h
36 10/27/2016 10:02 1045 3 0:00:24 0.4 km/h
37 10/27/2016 10:02 1045 1 0:00:16 0.2 km/h
38 10/27/2016 10:03 1046 5 0:00:21 0.9 km/h
39 10/27/2016 10:03 1046 6 0:00:25 0.9 km/h

154 / data ukur


1 10/27/2016 9:39 1061 21 0:02:33 0.5 km/h
2 10/27/2016 9:41 1060 13 0:04:03 0.2 km/h
3 10/27/2016 9:45 1061 8 0:00:25 1.1 km/h
40 10/27/2016 10:03 1043 10 0:00:33 1.1 km/h
41 10/27/2016 10:04 1042 7 0:00:23 1.1 km/h
42 10/27/2016 10:04 1039 13 0:00:14 3 km/h
43 10/27/2016 10:04 1036 13 0:00:18 3 km/h
44 10/27/2016 10:05 1033 6 0:00:12 2 km/h
45 10/27/2016 10:05 1030 12 0:00:12 4 km/h
46 10/27/2016 10:05 1027 2 0:00:02 4 km/h
47 10/27/2016 10:05 1027 12 0:00:13 3 km/h
48 10/27/2016 10:05 1024 7 0:00:20 1.2 km/h
49 10/27/2016 10:06 1022 4 0:00:14 1.1 km/h
50 10/27/2016 10:06 1019 11 0:00:18 2 km/h
51 10/27/2016 10:06 1015 10 0:00:15 2 km/h
52 10/27/2016 10:07 1012 13 0:00:52 0.9 km/h
53 10/27/2016 10:07 1009 6 0:00:14 2 km/h
54 10/27/2016 10:08 1008 4 0:00:21 0.8 km/h
55 10/27/2016 10:08 1005 2 0:00:04 2 km/h
56 10/27/2016 10:08 1006 6 0:00:12 2 km/h
57 10/27/2016 10:08 1003 5 0:00:17 1.2 km/h
58 10/27/2016 10:09 999 3 0:00:15 0.8 km/h
59 10/27/2016 10:09 996 8 0:00:17 2 km/h
60 10/27/2016 10:09 993 1 0:00:02 1.3 km/h
61 10/27/2016 10:09 992 10 0:00:16 2 km/h
62 10/27/2016 10:09 989 9 0:00:12 3 km/h
63 10/27/2016 10:10 987 3 0:00:23 0.5 km/h
64 10/27/2016 10:10 986 3 0:00:42 0.3 km/h
65 10/27/2016 10:11 983 6 0:00:23 0.9 km/h
66 10/27/2016 10:11 980 6 0:00:20 1.0 km/h
67 10/27/2016 10:11 977 5 0:00:15 1.3 km/h
68 10/27/2016 10:12 975 3 0:00:19 0.7 km/h
69 10/27/2016 10:12 975 0 0:01:06 0.0 km/h
70 10/27/2016 10:13 971 4 0:00:17 0.9 km/h
71 10/27/2016 10:13 968 11 0:00:15 3 km/h
72 10/27/2016 10:14 965 8 0:00:15 2 km/h
73 10/27/2016 10:14 962 9 0:00:13 3 km/h
74 10/27/2016 10:14 960 5 0:00:13 1.3 km/h
75 10/27/2016 10:14 957 12 0:00:17 3 km/h
76 10/27/2016 10:15 953 8 0:00:15 2 km/h
77 10/27/2016 10:15 950 8 0:00:11 3 km/h
78 10/27/2016 10:15 947 8 0:00:17 2 km/h
79 10/27/2016 10:15 945 3 0:00:23 0.5 km/h
80 10/27/2016 10:16 942 12 0:00:27 2 km/h
81 10/27/2016 10:16 939 3 0:00:16 0.7 km/h
155 / data ukur
1 10/27/2016 9:39 1061 21 0:02:33 0.5 km/h
2 10/27/2016 9:41 1060 13 0:04:03 0.2 km/h
3 10/27/2016 9:45 1061 8 0:00:25 1.1 km/h
82 10/27/2016 10:16 938 8 0:00:12 2 km/h
83 10/27/2016 10:17 934 4 0:00:16 1.0 km/h

156 / data ukur


40° true
52° true
17° true
90° true
134° true
88° true
125° true
92° true
140° true
171° true
269° true
233° true
192° true
179° true
134° true
138° true
155° true
176° true
175° true
123° true
208° true
181° true
151° true
158° true
115° true
153° true
157° true
94° true
100° true
90° true
108° true
144° true
1° true
351° true
345° true
301° true
135° true
108° true
7° true

157 / data ukur


40° true
52° true
17° true
341° true
1° true
62° true
67° true
102° true
117° true
107° true
123° true
162° true
134° true
144° true
113° true
55° true
84° true
110° true
70° true
114° true
86° true
103° true
106° true
116° true
95° true
82° true
75° true
33° true
12° true
37° true
102° true
97° true
45° true
1° true
354° true
22° true
87° true
133° true
139° true
103° true
136° true
118° true
96° true
126° true
346° true
158 / data ukur
40° true
52° true
17° true
3° true
3° true

159 / data ukur


DATA PENGUKURAN
Lokasi Program : Kariango / LEMBANG Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin
Dusun : Tondo Bunga

Jarak Jumlah Rumah Jumlah Jiwa


No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
1 PMA I P0 - - - 1060 Kapasitas Sumber =
2 P00-P01 P01 25 - - - 1055 1,39 ltr/dtk
3 P01-P02 P02 25 - - - 1059
4 P02 - P03 P03 25 - - - 1052
5 P03 - P04 P04 25 - - - 1047
6 P04 - P05 P05 25 - - - 1040
7 P05 - P06 P06 25 - - - 1037
8 P06 - P07 P07 25 - - - 1033
9 P07 - P08 P08 25 - - - 1029
10 P08- P09 P09 25 - - - 1026
11 P09- P10 P10 25 - - - 1019
12 P10 - P11 P11 25 - - - 1005
13 P11 - P12 P12 25 - - - 1012
14 P12 - P13 P13 25 - - - 999
15 P13 - P14 P14 25 - - - 977
16 P14 - P15 P15 25 - - - 947
17 P15 - P16 P16 25 - - - 925
18 P16 - P17 P17 25 - - - 911
19 PMA II P18 50 - - - 905
20 P18 - P19 P19 25 - - - 902
21 P19 - P20 P20 25 - - - 903
22 P20 - P21 P21 25 - - - 902
23 P21 - P22 P22 25 - - - 899
24 P22 - P23 P23 25 - - - 885
25 P23 - P24 P24 25 - - - 877
26 P24 - P25 P25 25 - - - 869
27 P25 - P26 P26 25 - - - 864
28 P26 - P27 P27 25 - - - 857
29 P27 - P28 P28 25 - - - 849
30 P28 - P29 P29 25 - - - 840
31 P29 - P30 P30 25 - - - 830
32 P30 - P31 P31 25 - - - 822
33 P31 - P32 P32 25 - - - 814
34 P32 - P33 P33 25 - - - 799
35 P33 - P34 P34 25 - - - 795
36 P34 - P35 P35 25 - - - 789

160 / data ukur


Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
37 Bak Umum P36 32 - - - 787 Bak Umum
38 P36 - P37 P37 50 1 - 4 782 5
39 P37 - P38 P38 50 1 - 4 771 11
40 P38 - P39 P39 50 2 1 12 762 9
41 P39 - P40 P40 50 1 1 8 758 4
42 P40 - P41 P41 50 2 1 12 754 4
43 P41 - P42 P42 50 1 1 8 748 6
44 P42 - P43 P43 50 1 1 8 749 -1
45 P43 - P44 P44 50 1 1 8 746 3
46 P44 - P45 P45 50 1 2 12 739 7
47 P45 - P46 P46 50 1 2 12 738 1
48 P46 - P47 P47 50 1 1 8 731 7
49 P47 - P48 P48 50 1 2 12 719 12
50 P49 - P50 P49 50 1 1 8 712 7
51 P50 - P51 P50 50 2 2 16 705 7
52 P50 - P51 P51 50 1 1 8 699 6
53 P51 - P52 P52 50 1 2 12 690 9
54 P52 - P53 P53 50 1 1 8 679 11
55 P53 - P54 P54 32 1 2 12 671 8
56 P54 - P55 P55 46 2 1 12 662 9
57 P55 - P56 P56 48 1 1 8 653 9
58 P56 - P57 P57 50 1 2 12 642 11
59 P57 - P58 P58 48 2 2 16 637 5
60 P58 - P59 P59 43 1 1 8 629 8
61 P59 - P60 P60 48 2 1 12 618 11
62 P60 - P61 P61 59 1 1 8 615 3
63 P61 - P62 P62 45 1 2 12 613 2
64 P62 - P63 P63 48 2 1 12 602 11
65 P63 - P64 P64 48 1 3 16 591 11
66 P64 - P65 P65 47 - 3 12 584 7
67 P65 - P66 P66 50 1 1 8 579 5
68 P66 - P67 P67 50 2 1 12 574 5
69 P67 - P68 P68 49 1 2 12 571 3
70 P68 - P69 P69 42 2 2 16 568 3
71 P69 - P70 P70 42 2 2 16 561 7
72 P70 - P71 P71 35 2 4 26 556 5
73 P70 - P72 P72 48 1 1 8 550 6
74 P72 - P73 P73 42 - - - 546 4
75 P73 - P74 P74 47 - - - 539 7
76 P74 - P75 P75 42 - - - 536 3
77 P75 - P76 P76 44 - - - 535 1
78 P76 - P77 P77 40 - - - 529 6
161 / data ukur
Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) (Orang)
Kiri Kanan
79 P77 - P78 P78 41 - - - 520 16
80 P78 - P79 P79 42 1 2 12 516 DOP
JUMLAH 2958 410
74 P40 - PA PA 54 10 - 40 749
JUMLAH 3,012 57 55 450

162 / data ukur


1 10/27/2016 9:41 1061 m 15 0:00:38 1.4 km/h 63° true
2 10/27/2016 9:41 1060 m 38 0:04:56 0.5 km/h 57° true
3 10/27/2016 9:46 1061 m 4 0:01:46 0.1 km/h 117° true
4 10/27/2016 9:48 1059 m 14 0:03:04 0.3 km/h 115° true
5 10/27/2016 9:51 1057 m 1 0:00:05 0.8 km/h 127° true
6 10/27/2016 9:51 1056 m 44 0:01:07 2 km/h 102° true
7 10/27/2016 9:52 1055 m 12 0:00:28 2 km/h 126° true
8 10/27/2016 9:53 1053 m 8 0:00:36 0.8 km/h 171° true
9 10/27/2016 9:53 1052 m 4 0:00:46 0.3 km/h 200° true
10 10/27/2016 9:54 1051 m 2 0:00:43 0.2 km/h 8° true
11 10/27/2016 9:55 1052 m 7 0:00:36 0.7 km/h 282° true
12 10/27/2016 9:56 1055 m 9 0:00:26 1.2 km/h 233° true
13 10/27/2016 9:56 1057 m 6 0:00:11 2 km/h 192° true
14 10/27/2016 9:56 1059 m 15 0:00:56 0.9 km/h 179° true
15 10/27/2016 9:57 1058 m 14 0:00:12 4 km/h 134° true
16 10/27/2016 9:57 1059 m 16 0:00:13 5 km/h 150° true
17 10/27/2016 9:58 1058 m 16 0:00:19 3 km/h 145° true
18 10/27/2016 9:58 1057 m 15 0:00:22 2 km/h 189° true
19 10/27/2016 9:58 1056 m 12 0:00:18 2 km/h 172° true
20 10/27/2016 9:59 1057 m 16 0:00:17 3 km/h 183° true
21 10/27/2016 9:59 1060 m 31 0:00:25 4 km/h 130° true
22 10/27/2016 9:59 1059 m 8 0:00:19 1.5 km/h 153° true
23 10/27/2016 10:00 1057 m 3 0:00:02 5 km/h 157° true
24 10/27/2016 10:00 1056 m 55 0:00:42 5 km/h 102° true
25 10/27/2016 10:00 1054 m 17 0:00:46 1.3 km/h 133° true
26 10/27/2016 10:01 1051 m 10 0:00:24 1.5 km/h 351° true
27 10/27/2016 10:01 1047 m 8 0:00:25 1.1 km/h 345° true
28 10/27/2016 10:02 1045 m 2 0:00:40 0.1 km/h 291° true
29 10/27/2016 10:03 1046 m 7 0:00:46 0.6 km/h 51° true
30 10/27/2016 10:03 1043 m 10 0:00:33 1.1 km/h 341° true
31 10/27/2016 10:04 1042 m 7 0:00:23 1.1 km/h 1° true
32 10/27/2016 10:04 1039 m 13 0:00:14 3 km/h 62° true
33 10/27/2016 10:04 1036 m 13 0:00:18 3 km/h 67° true
34 10/27/2016 10:05 1033 m 6 0:00:12 2 km/h 102° true
35 10/27/2016 10:05 1030 m 12 0:00:12 4 km/h 117° true
36 10/27/2016 10:05 1027 m 14 0:00:15 3 km/h 120° true

163 / data ukur


37 10/27/2016 10:05 1024 m 7 0:00:20 1.2 km/h 162° true
18 38 10/27/2016 10:06 1022 m 4 0:00:14 1.1 km/h 134° true
39 10/27/2016 10:06 1019 m 11 0:00:18 2 km/h 144° true
40 10/27/2016 10:06 1015 m 10 0:00:15 2 km/h 113° true
41 10/27/2016 10:07 1012 m 13 0:00:52 0.9 km/h 55° true
42 10/27/2016 10:07 1009 m 6 0:00:14 2 km/h 84° true
43 10/27/2016 10:08 1008 m 4 0:00:21 0.8 km/h 110° true
44 10/27/2016 10:08 1005 m 2 0:00:04 2 km/h 70° true
45 10/27/2016 10:08 1006 m 6 0:00:12 2 km/h 114° true
46 10/27/2016 10:08 1003 m 5 0:00:17 1.2 km/h 86° true
47 10/27/2016 10:09 999 m 3 0:00:15 0.8 km/h 103° true
48 10/27/2016 10:09 996 m 8 0:00:17 2 km/h 106° true
49 10/27/2016 10:09 993 m 1 0:00:02 1.3 km/h 116° true
50 10/27/2016 10:09 992 m 10 0:00:16 2 km/h 95° true
51 10/27/2016 10:09 989 m 9 0:00:12 3 km/h 82° true
52 10/27/2016 10:10 987 m 3 0:00:23 0.5 km/h 75° true
53 10/27/2016 10:10 986 m 3 0:00:42 0.3 km/h 33° true
54 10/27/2016 10:11 983 m 6 0:00:23 0.9 km/h 12° true
55 10/27/2016 10:11 980 m 6 0:00:20 1.0 km/h 37° true
56 10/27/2016 10:11 977 m 5 0:00:15 1.3 km/h 102° true
57 10/27/2016 10:12 975 m 3 0:00:19 0.7 km/h 97° true
58 10/27/2016 10:12 975 m 0 0:01:06 0.0 km/h 45° true
59 10/27/2016 10:13 971 m 4 0:00:17 0.9 km/h 1° true
60 10/27/2016 10:13 968 m 11 0:00:15 3 km/h 354° true
61 10/27/2016 10:14 965 m 8 0:00:15 2 km/h 22° true
62 10/27/2016 10:14 962 m 9 0:00:13 3 km/h 87° true
63 10/27/2016 10:14 960 m 5 0:00:13 1.3 km/h 133° true
64 10/27/2016 10:14 957 m 12 0:00:17 3 km/h 139° true
65 10/27/2016 10:15 953 m 8 0:00:15 2 km/h 103° true
66 10/27/2016 10:15 950 m 8 0:00:11 3 km/h 136° true
67 10/27/2016 10:15 947 m 8 0:00:17 2 km/h 118° true
68 10/27/2016 10:15 945 m 3 0:00:23 0.5 km/h 96° true
69 10/27/2016 10:16 942 m 12 0:00:27 2 km/h 126° true
70 10/27/2016 10:16 939 m 3 0:00:16 0.7 km/h 346° true
71 10/27/2016 10:16 938 m 8 0:00:12 2 km/h 3° true
72 10/27/2016 10:17 934 m 4 0:00:16 1.0 km/h 3° true
73 10/27/2016 10:17 931 m 10 0:00:25 1.4 km/h 94° true

164 / data ukur


74 10/27/2016 10:17 928 m 4 0:00:16 0.8 km/h 131° true
75 10/27/2016 10:17 925 m 9 0:00:20 2 km/h 148° true
76 10/27/2016 10:18 922 m 4 0:00:10 1.4 km/h 109° true
77 10/27/2016 10:18 920 m 2 0:00:03 2 km/h 127° true
78 10/27/2016 10:18 919 m 7 0:00:16 2 km/h 136° true
79 10/27/2016 10:18 916 m 25 0:00:43 2 km/h 156° true
80 10/27/2016 10:19 911 m 2 0:00:17 0.5 km/h 34° true

165 / data ukur


S3 29.561 E119 38.042
S3 29.557 E119 38.049
S3 29.546 E119 38.066
S3 29.547 E119 38.068
S3 29.550 E119 38.075
S3 29.551 E119 38.076
S3 29.555 E119 38.099
S3 29.559 E119 38.104
S3 29.564 E119 38.105
S3 29.566 E119 38.104
S3 29.565 E119 38.104
S3 29.564 E119 38.101
S3 29.567 E119 38.097
S3 29.570 E119 38.096
S3 29.578 E119 38.097
S3 29.583 E119 38.102
S3 29.590 E119 38.106
S3 29.597 E119 38.111
S3 29.605 E119 38.110
S3 29.611 E119 38.111
S3 29.620 E119 38.110
S3 29.631 E119 38.123
S3 29.635 E119 38.125
S3 29.636 E119 38.126
S3 29.642 E119 38.155
S3 29.648 E119 38.161
S3 29.643 E119 38.161
S3 29.639 E119 38.159
S3 29.638 E119 38.159
S3 29.636 E119 38.162
S3 29.631 E119 38.160
S3 29.627 E119 38.160
S3 29.624 E119 38.166
S3 29.621 E119 38.173
S3 29.622 E119 38.176
S3 29.625 E119 38.182

166 / data ukur


S3 29.629 E119 38.188
S3 29.632 E119 38.189
S3 29.634 E119 38.191
S3 29.638 E119 38.195
S3 29.641 E119 38.199
S3 29.636 E119 38.205
S3 29.636 E119 38.209
S3 29.637 E119 38.211
S3 29.636 E119 38.212
S3 29.638 E119 38.215
S3 29.638 E119 38.218
S3 29.638 E119 38.220
S3 29.639 E119 38.224
S3 29.639 E119 38.224
S3 29.640 E119 38.230
S3 29.639 E119 38.234
S3 29.639 E119 38.236
S3 29.637 E119 38.237
S3 29.634 E119 38.237
S3 29.632 E119 38.239
S3 29.632 E119 38.242
S3 29.633 E119 38.244
S3 29.633 E119 38.244
S3 29.630 E119 38.244
S3 29.624 E119 38.244
S3 29.620 E119 38.245
S3 29.620 E119 38.250
S3 29.622 E119 38.252
S3 29.627 E119 38.256
S3 29.628 E119 38.261
S3 29.631 E119 38.264
S3 29.633 E119 38.268
S3 29.633 E119 38.269
S3 29.637 E119 38.275
S3 29.635 E119 38.274
S3 29.631 E119 38.274
S3 29.629 E119 38.275

167 / data ukur


S3 29.629 E119 38.280
S3 29.631 E119 38.281
S3 29.635 E119 38.284
S3 29.635 E119 38.286
S3 29.636 E119 38.287
S3 29.639 E119 38.289
S3 29.651 E119 38.295

168 / data ukur


Perhitungan Hydrolis Desa K
Dusun Tondo Bunga
Kriteria Desain :

Kebut. Air = 60 lt / org / hari


Pertumbuhan Pddk = 2 % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.1 ````````````````````````
Minor Loss = 10 %

DATA BEBAN NODE


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt)

1 PMA I P0 1,060.00
2 P00-P01 P01 1,055.00 5.00 25 20.00 0 0.00 0 0.00 0.00
3 P01-P02 P02 1,059.00 -4.00 25 (16.00) 0 0.00 0 0.00 0.00
4 P02 - P03 P03 1,052.00 7.00 25 28.00 0 0.00 0 0.00 0.00
5 P03 - P04 P04 1,047.00 5.00 25 20.00 0 0.00 0 0.00 0.00
6 P04 - P05 P05 1,040.00 7.00 25 28.00 0 0.00 0 0.00 0.00
7 P05 - P06 P06 1,037.00 3.00 25 12.00 0 0.00 0 0.00 0.00
8 P06 - P07 P07 1,033.00 4.00 25 16.00 0 0.00 0 0.00 0.00
9 P07 - P08 P08 1,029.00 4.00 25 16.00 0 0.00 0 0.00 0.00

10 P08- P09 P09 1,026.00 3.00 25 12.00 0 0.00 0 0.00 0.00


11 P09- P10 P10 1,019.00 7.00 25 28.00 0 0.00 0 0.00 0.00
12 P10 - P11 P11 1,005.00 14.00 25 56.00 0 0.00 0 0.00 0.00
13 P11 - P12 P12 1,012.00 -7.00 25 (28.00) 0 0.00 0 0.00 0.00
14 P12 - P13 P13 999.00 13.00 25 52.00 0 0.00 0 0.00 0.00
15 P13 - P14 P14 977.00 22.00 25 88.00 0 0.00 0 0.00 0.00
16 P14 - P15 P15 947.00 30.00 25 120.00 0 0.00 0 0.00 0.00
17 P15 - P16 P16 925.00 22.00 25 88.00 0 0.00 0 0.00 0.00

18 P16 - P17 P17 911.00 14.00 25 56.00 0 0.00 0 0.00 0.00


PMA II P18 905.00 6.00 50 12.00 0 0.00 0 0.00 0.00
475

19 PMA II P18 905.00


20 P18 - P19 P19 902.00 3.00 25 12.00 0 0.00 0 0.00 0.00
21 P19 - P20 P20 903.00 -1.00 25 (4.00) 0 0.00 0 0.00 0.00
22 P20 - P21 P21 902.00 1.00 25 4.00 0 0.00 0 0.00 0.00
23 P21 - P22 P22 899.00 3.00 25 12.00 0 0.00 0 0.00 0.00
24 P22 - P23 P23 885.00 14.00 25 56.00 0 0.00 0 0.00 0.00
25 P23 - P24 P24 877.00 8.00 25 32.00 0 0.00 0 0.00 0.00
26 P24 - P25 P25 869.00 8.00 25 32.00 0 0.00 0 0.00 0.00
27 P25 - P26 P26 864.00 5.00 25 20.00 0 0.00 0 0.00 0.00
28 P26 - P27 P27 857.00 7.00 25 28.00 0 0.00 0 0.00 0.00

29 P27 - P28 P28 849.00 8.00 25 32.00 0 0.00 0 0.00 0.00


30 P28 - P29 P29 840.00 9.00 25 36.00 0 0.00 0 0.00 0.00
31 P29 - P30 P30 830.00 10.00 25 40.00 0 0.00 0 0.00 0.00
33 P31 - P32 P32 814.00 8.00 25 32.00 0 0.00 0 0.00 0.00
34 P32 - P33 P33 799.00 15.00 25 60.00 0 0.00 0 0.00 0.00
35 P33 - P34 P34 795.00 4.00 25 16.00 0 0.00 0 0.00 0.00
36 P34 - P35 P35 789.00 6.00 25 24.00 0 0.00 0 0.00 0.00
37 Bak Umum P36 787.00 2.00 32 6.25 0 0.00 0 0.00 0.00
457

Kriteria Desain : 1200


Kebut. Air = 60 lt / org / hari
Pertumbuhan Pddk = 2 % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.5 ````````````````````````
Minor Loss = 10 %

DATA BEBAN NODE


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt)

Bak Umum 787.00


36 P36 - P37 P37 782.00 5.00 50 10.00 4 0.00 5 0.00 0.00
37 P37 - P38 P38 771.00 11.00 50 22.00 4 0.00 5 0.00 0.00
38 P38 - P39 P39 762.00 9.00 50 18.00 12 0.01 16 0.01 0.01
39 P39 - P40 P40 758.00 4.00 50 8.00 8 0.01 11 0.01 0.01
40 P40 - P41 P41 754.00 4.00 50 8.00 12 0.01 16 0.01 0.01
41 P41 - P42 P42 748.00 6.00 50 12.00 8 0.01 11 0.01 0.01
42 P42 - P43 P43 749.00 -1.00 50 (2.00) 8 0.01 11 0.01 0.01
43 P43 - P44 P44 746.00 3.00 50 6.00 8 0.01 11 0.01 0.01
44 P44 - P45 P45 739.00 7.00 50 14.00 12 0.01 16 0.01 0.01
45 P45 - P46 P46 738.00 1.00 50 2.00 12 0.01 16 0.01 0.01
46 P46 - P47 P47 731.00 7.00 50 14.00 8 0.01 11 0.01 0.01
47 P47 - P48 P48 719.00 12.00 50 24.00 12 0.01 16 0.01 0.01
48 P49 - P50 P49 712.00 7.00 50 14.00 8 0.01 11 0.01 0.01
49 P50 - P51 P50 705.00 7.00 50 14.00 16 0.01 22 0.01 0.02
50 P50 - P51 P51 699.00 6.00 50 12.00 8 0.01 11 0.01 0.01
51 P51 - P52 P52 690.00 9.00 50 18.00 12 0.01 16 0.01 0.01
52 P52 - P53 P53 679.00 11.00 50 22.00 8 0.01 11 0.01 0.01
53 P53 - P54 P54 671.00 8.00 32 25.00 12 0.01 16 0.01 0.01
54 P54 - P55 P55 662.00 9.00 46 19.57 12 0.01 16 0.01 0.01
55 P55 - P56 P56 653.00 9.00 48 18.75 8 0.01 11 0.01 0.01
56 P56 - P57 P57 642.00 11.00 50 22.00 12 0.01 16 0.01 0.01
57 P57 - P58 P58 637.00 5.00 48 10.42 16 0.01 22 0.01 0.02
58 P58 - P59 P59 629.00 8.00 43 18.60 8 0.01 11 0.01 0.01
59 P59 - P60 P60 618.00 11.00 48 22.92 12 0.01 16 0.01 0.01
60 P60 - P61 P61 615.00 3.00 59 5.08 8 0.01 11 0.01 0.01
61 P61 - P62 P62 613.00 2.00 45 4.44 12 0.01 16 0.01 0.01
62 P62 - P63 P63 602.00 11.00 48 22.92 12 0.01 16 0.01 0.01
63 P63 - P64 P64 591.00 11.00 48 22.92 16 0.01 22 0.01 0.02
64 P64 - P65 P65 584.00 7.00 47 14.89 12 0.01 16 0.01 0.01
65 P65 - P66 P66 579.00 5.00 50 10.00 8 0.01 11 0.01 0.01
66 P66 - P67 P67 574.00 5.00 50 10.00 12 0.01 16 0.01 0.01
67 P67 - P68 P68 571.00 3.00 49 6.12 12 0.01 16 0.01 0.01
68 P68 - P69 P69 568.00 3.00 42 7.14 16 0.01 22 0.01 0.02
69 P69 - P70 P70 561.00 7.00 42 16.67 16 0.01 22 0.01 0.02
70 P70 - P71 P71 556.00 5.00 35 14.29 26 0.02 35 0.02 0.03
71 P70 - P72 P72 550.00 6.00 48 12.50 8 0.01 11 0.01 0.01
72 P72 - P73 P73 546.00 4.00 42 9.52 0 0.00 0 0.00 0.00
73 P73 - P74 P74 539.00 7.00 47 14.89 0 0.00 0 0.00 0.00
74 P74 - P75 P75 536.00 3.00 42 7.14 0 0.00 0 0.00 0.00
75 P75 - P76 P76 535.00 1.00 44 2.27 0 0.00 0 0.00 0.00
76 P76 - P77 P77 529.00 6.00 40 15.00 0 0.00 0 0.00 0.00
77 P77 - P78 P78 520.00 9.00 41 21.95 0 0.00 0 0.00 0.00
78 P78 - P79 P79 516.00 4.00 42 9.52 12 0.01 16 0.01 0.01
1144 1610
P42
16 P40 - PA PA 767.00 -13.00 54 (24.07) 40 0.03 54 0.04 0.04

2,130 1650
#REF!
rolis Desa Kariango
Tondo Bunga
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
`````````````` V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

1,060.00
280 377 0.26 0.29 130 16.41 45.20 0.15 0.04 1,059.96 4.96 0.18
281 378 0.26 0.29 131 17.15 45.20 0.14 0.04 1,059.92 0.92 0.18
282 380 0.26 0.29 132 15.27 45.20 0.14 0.04 1,059.88 7.88 0.18
283 381 0.26 0.29 133 16.34 45.20 0.14 0.04 1,059.84 12.84 0.18
284 382 0.27 0.29 134 15.22 45.20 0.14 0.04 1,059.80 19.80 0.18
285 384 0.27 0.29 135 18.09 45.20 0.14 0.04 1,059.76 22.76 0.18
286 385 0.27 0.29 136 17.03 45.20 0.14 0.04 1,059.73 26.73 0.18
287 386 0.27 0.30 137 17.00 45.20 0.14 0.04 1,059.69 30.69 0.18
1,029.00
288 388 0.27 0.30 138 18.01 45.20 0.14 0.04 1,028.96 2.96 0.18
289 389 0.27 0.30 139 15.11 45.20 0.14 0.04 1,028.92 9.92 0.19
290 390 0.27 0.30 140 13.09 45.20 0.14 0.04 1,028.89 23.89 0.19
291 392 0.27 0.30 141 15.07 45.20 0.13 0.04 1,028.85 16.85 0.19
292 393 0.27 0.30 142 13.25 45.20 0.13 0.04 1,028.81 29.81 0.19
293 394 0.27 0.30 143 11.88 45.20 0.13 0.04 1,028.78 51.78 0.19
977.00
294 396 0.27 0.30 144 11.13 45.20 0.13 0.04 976.96 29.96 0.19
295 397 0.28 0.30 145 11.85 45.20 0.13 0.04 976.93 51.93 0.19
925.00
296 398 0.28 0.30 146 12.98 45.20 0.13 0.04 924.96 13.96 0.19
297 400 0.28 0.31 147 17.79 45.20 0.13 0.07 924.89 19.89 0.19

905.00
1650 2221 1.54 1.70 130 35.76 45.20 3.87 1.06 903.94 1.94 1.06
1650 2221 1.54 1.70 130 44.80 45.20 3.87 1.06 902.87 -0.13 1.06
1650 2221 1.54 1.70 130 44.80 45.20 3.87 1.06 901.81 -0.19 1.06
1650 2221 1.54 1.70 130 35.76 45.20 3.87 1.06 900.74 1.74 1.06
1650 2221 1.54 1.70 130 26.07 45.20 3.87 1.06 899.68 14.68 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 898.62 21.62 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 897.55 28.55 1.06
1650 2221 1.54 1.70 130 32.20 45.20 3.87 1.06 896.49 32.49 1.06
1650 2221 1.54 1.70 130 30.05 45.20 3.87 1.06 895.42 38.42 1.06
857.00
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 855.94 6.94 1.06
1650 2221 1.54 1.70 130 28.54 45.20 3.87 1.06 854.87 14.87 1.06
1650 2221 1.54 1.70 130 27.93 45.20 3.87 1.06 853.81 23.81 1.06
1650 2221 1.54 1.70 130 29.24 45.20 3.87 1.06 851.68 37.68 1.06
1650 2221 1.54 1.70 130 25.70 45.20 3.87 1.06 850.62 51.62 1.06
1650 2221 1.54 1.70 130 33.71 45.20 3.87 1.06 849.55 54.55 1.06
1650 2221 1.54 1.70 130 31.02 45.20 3.87 1.06 848.49 59.49 1.06
1650 2221 1.54 1.70 131 40.76 45.20 3.82 1.34 847.14 60.14 1.06

Formula Hazen William :


S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
`````````````` V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

787.00
1650 2221 1.54 1.70 130 37.12 57.00 1.25 0.69 786.31 4.31 0.67
1646 2215 1.54 1.69 130 31.55 57.00 1.25 0.69 785.63 14.63 0.66
1642 2210 1.53 1.69 130 32.85 57.00 1.24 0.68 784.94 22.94 0.66
1630 2194 1.52 1.68 130 38.68 57.00 1.22 0.67 784.27 26.27 0.66
1622 2183 1.52 1.67 130 38.61 57.00 1.21 0.67 783.60 29.60 0.65
1610 2167 1.50 1.66 130 35.43 57.00 1.20 0.66 782.95 34.95 0.65
1602 2156 1.50 1.65 130 51.08 57.00 1.19 0.65 782.29 33.29 0.65
1594 2145 1.49 1.64 130 40.69 57.00 1.17 0.65 781.65 35.65 0.64
1586 2135 1.48 1.63 130 34.13 57.00 1.16 0.64 781.01 42.01 0.64
1574 2118 1.47 1.62 130 50.73 57.00 1.15 0.63 780.38 42.38 0.63
1562 2102 1.46 1.61 130 33.93 57.00 1.13 0.62 779.76 48.76 0.63
1554 2091 1.45 1.60 130 30.32 57.00 1.12 0.62 779.14 60.14 0.63
1542 2075 1.44 1.59 130 33.77 57.00 1.10 0.61 778.53 66.53 0.62
1534 2065 1.43 1.58 130 33.70 57.00 1.09 0.60 777.93 72.93 0.62
1518 2043 1.42 1.56 130 34.65 57.00 1.07 0.59 777.34 78.34 0.61
1510 2032 1.41 1.55 130 31.82 57.00 1.06 0.58 776.76 86.76 0.61
1498 2016 1.40 1.54 130 30.44 57.00 1.05 0.58 776.18 97.18 0.60
1490 2005 1.39 1.53 130 29.59 57.00 1.04 0.36 775.81 104.81 0.60
1478 1989 1.38 1.52 130 31.02 45.20 3.16 1.60 774.22 112.22 0.95
1466 1973 1.37 1.51 130 31.20 45.20 3.11 1.64 772.58 119.58 0.94
1458 1962 1.36 1.50 130 30.13 45.20 3.08 1.69 770.88 128.88 0.93
1446 1946 1.35 1.49 130 35.01 45.20 3.03 1.60 769.28 132.28 0.93
1430 1925 1.34 1.47 130 30.95 45.20 2.97 1.40 767.88 138.88 0.92
1422 1914 1.33 1.46 130 29.59 45.20 2.94 1.55 766.33 148.33 0.91
1410 1898 1.32 1.45 130 40.18 45.20 2.89 1.88 764.45 149.45 0.90
1402 1887 1.31 1.44 130 41.21 45.20 2.86 1.42 763.03 150.03 0.90
1390 1871 1.30 1.43 130 29.34 45.20 2.82 1.49 761.54 159.54 0.89
1378 1855 1.29 1.42 130 29.24 45.20 2.77 1.46 760.08 169.08 0.88
1362 1833 1.27 1.40 130 31.81 45.20 2.71 1.40 758.68 174.68 0.87
1350 1817 1.26 1.39 130 34.40 45.20 2.67 1.47 757.21 178.21 0.87
1342 1806 1.25 1.38 130 34.32 45.20 2.64 1.45 755.76 181.76 0.86
1330 1790 1.24 1.37 130 37.83 45.20 2.60 1.40 754.36 183.36 0.85
1318 1774 1.23 1.36 130 36.52 45.20 2.55 1.18 753.18 185.18 0.84
1302 1752 1.22 1.34 130 30.55 45.20 2.50 1.15 752.02 191.02 0.83
1286 1731 1.20 1.32 130 31.39 45.20 2.44 0.94 751.08 195.08 0.82
1260 1696 1.18 1.30 130 32.01 45.20 2.35 1.24 749.84 199.84 0.81
1252 1685 1.17 1.29 130 33.76 45.20 2.32 1.07 748.77 202.77 0.80
1252 1685 1.17 1.29 130 30.80 45.20 2.32 1.20 747.57 208.57 0.80
1252 1685 1.17 1.29 130 35.82 45.20 2.32 1.07 746.50 210.50 0.80
1252 1685 1.17 1.29 130 45.30 45.20 2.32 1.12 745.37 210.37 0.80
1252 1685 1.17 1.29 130 30.76 45.20 2.32 1.02 744.35 215.35 0.80
1252 1685 1.17 1.29 130 28.45 45.20 2.32 1.05 743.30 223.30 0.80
1252 1685 1.17 1.29 130 33.76 45.20 2.32 1.07 742.23 226.23 0.80

40 54 0.04 0.04 130 7.54 45.20 0.00 0.00 770.88 3.88 0.03

diameter Panjang Jumlah Pipa


Total
pipa (Meter) (batang)
81.40 0.00 0.00 0.00 0 0.00
pvc 57.00 0.00 0 pvc 2 57.00 882.00 147.00 147.00 0 7.35
pvc 475.00 457.00 1198 45.20 2130.00 355.00 355 17.75
2130.00 36.20
diameter pipa
81.4
57
45.2
355
91 546
Perhitungan Hydrolis Desa K
Dusun Buttu Batu
Kriteria Desain :

Kebut. Air = 60 lt / org / hari


Pertumbuhan Pddk = 2 % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.1 ````````````````````````
Minor Loss = 10 %

DATA BEBAN NODE


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt)

1 PMA I P0 1,174.00
2 P00-P01 P01 1,173.00 1.00 47 2.13 0 0.00 0 0.00 0.00
3 P01-P02 P02 1,158.00 15.00 50 30.00 0 0.00 0 0.00 0.00
4 P02 - P03 P03 1,162.00 -4.00 48 (8.33) 0 0.00 0 0.00 0.00
5 P03 - P04 P04 1,159.00 3.00 48 6.25 0 0.00 0 0.00 0.00
6 P04 - P05 P05 1,158.00 1.00 25 4.00 0 0.00 0 0.00 0.00
7 P05 - P06 P06 1,152.00 6.00 50 12.00 0 0.00 0 0.00 0.00
8 P06 - P07 P07 1,144.00 8.00 50 16.00 0 0.00 0 0.00 0.00
9 P07 - P08 P08 1,136.00 8.00 50 16.00 0 0.00 0 0.00 0.00
10 P08- P09 P09 1,133.00 3.00 50 6.00 0 0.00 0 0.00 0.00
11 P09- P10 P10 1,130.00 3.00 50 6.00 0 0.00 0 0.00 0.00
12 P10 - P11 P11 1,120.00 10.00 50 20.00 0 0.00 0 0.00 0.00
13 P11 - P12 P12 1,125.00 -5.00 50 (10.00) 0 0.00 0 0.00 0.00
14 P12 - P13 P13 1,124.00 1.00 50 2.00 0 0.00 0 0.00 0.00
15 P13 - P14 P14 1,118.00 6.00 50 12.00 0 0.00 0 0.00 0.00
16 P14 - P15 P15 1,109.00 9.00 50 18.00 0 0.00 0 0.00 0.00
17 P15 - P16 P16 1,101.00 8.00 50 16.00 0 0.00 0 0.00 0.00
18 P16 - P17 P17 1,093.00 8.00 50 16.00 0 0.00 0 0.00 0.00
19 P17-- P18 P18 1,086.00 7.00 50 14.00 0 0.00 0 0.00 0.00
20 Bak Umum P19 1,050.00 36.00 50 72.00 0 0.00 0 0.00 0.00
918

Perhitungan Hydrolis De
Kriteria Desain : Dusun Buttu B
Kebut. Air = 0 lt / org / hari
Pertumbuhan Pddk = 2 % / thn
Periode Desain = 15 thn
Faktor Jam Puncak, jp = 1.50 ````````````````````````
Minor Loss = 10 %

DATA BEBAN NODE


No Jalur Node Elevasi 1.5 Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt)

20 Bak Umum P19 1,050.00 100


21 P19 - P20 P20 1,046.00 4.00 50 8.00 0 0.00 0 0.00 0.00
22 P20 - P21 P21 1,043.00 3.00 50 6.00 0 0.00 0 0.00 0.00
23 P21 - P22 P22 1,040.00 3.00 50 6.00 0 0.00 0 0.00 0.00
24 P22- P23 P23 1,039.00 1.00 20 5.00 0 0.00 0 0.00 0.00
25 P23 - P24 P24 1,035.00 4.00 30 13.33 0 0.00 0 0.00 0.00
26 P24 - P25 P25 1,030.00 5.00 29 17.24 0 0.00 0 0.00 0.00
27 P25 - P26 P26 1,029.00 1.00 26 3.85 0 0.00 0 0.00 0.00
28 P26 - P27 P27 1,025.00 4.00 50 8.00 0 0.00 0 0.00 0.00
29 P27 - P28 P28 1,024.00 1.00 49 2.04 0 0.00 0 0.00 0.00
30 P28 - P29 P29 1,020.00 4.00 65 6.15 0 0.00 0 0.00 0.00
31 P29 - P30 P30 1,015.00 5.00 37 13.51 0 0.00 0 0.00 0.00
32 P30 - P31 P31 1,013.00 2.00 23 8.70 0 0.00 0 0.00 0.00
33 P31 - P32 P32 1,012.00 1.00 38 2.63 0 0.00 0 0.00 0.00
34 P32 - P33 P33 1,009.00 3.00 50 6.00 0 0.00 0 0.00 0.00
35 P33 - P34 P34 1,005.00 4.00 50 8.00 0 0.00 0 0.00 0.00
36 P34 - P35 P35 1,013.00 -8.00 50 (16.00) 0 0.00 0 0.00 0.00
36 P35 - P36 P36 1,011.00 2.00 50 4.00 0 0.00 0 0.00 0.00
37 P36 - P37 P37 1,014.00 -3.00 50 (6.00) 0 0.00 0 0.00 0.00
38 P37 - P38 P38 1,012.00 2.00 50 4.00 4 0.00 5 0.00 0.00
39 P38 - P39 P39 1,009.00 3.00 50 6.00 4 0.00 5 0.00 0.00
40 P39 - P40 P40 1,007.00 2.00 50 4.00 12 0.01 16 0.01 0.01
41 P40 - P41 P41 1,004.00 3.00 50 6.00 8 0.01 11 0.01 0.01
42 P41 - P42 P42 1,001.00 3.00 50 6.00 12 0.01 16 0.01 0.01
43 P42 - P43 P43 999.00 2.00 50 4.00 8 0.01 11 0.01 0.01
1067 48
#REF!
rolis Desa Kariango
n Buttu Batu
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
`````````````` V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

1,174.00
308 415 0.29 0.32 110 28.72 45.20 0.24 0.12 1,173.88 0.88 0.20
308 415 0.29 0.32 110 16.68 45.20 0.24 0.13 1,173.75 15.75 0.20
308 415 0.29 0.32 110 21.70 45.20 0.24 0.12 1,173.62 11.62 0.20
308 415 0.29 0.32 110 23.02 45.20 0.24 0.12 1,173.50 14.50 0.20
308 415 0.29 0.32 110 25.23 45.20 0.24 0.06 1,173.43 15.43 0.20
308 415 0.29 0.32 110 20.14 45.20 0.24 0.13 1,173.30 21.30 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,173.17 29.17 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,173.04 37.04 0.20
308 415 0.29 0.32 110 23.21 45.20 0.24 0.13 1,172.91 39.91 0.20
308 415 0.29 0.32 110 23.21 45.20 0.24 0.13 1,172.78 42.78 0.20
308 415 0.29 0.32 110 18.13 45.20 0.24 0.13 1,172.65 52.65 0.20
308 415 0.29 0.32 110 20.90 45.20 0.24 0.13 1,172.52 47.52 0.20
308 415 0.29 0.32 110 29.08 45.20 0.24 0.13 1,172.39 48.39 0.20
308 415 0.29 0.32 110 20.14 45.20 0.24 0.13 1,172.26 54.26 0.20
308 415 0.29 0.32 110 18.53 45.20 0.24 0.13 1,172.13 63.13 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,172.00 71.00 0.20
308 415 0.29 0.32 110 18.98 45.20 0.24 0.13 1,171.87 78.87 0.20
308 415 0.29 0.32 110 19.51 45.20 0.24 0.13 1,171.74 85.74 0.20
308 415 0.29 0.32 110 13.94 45.20 0.24 0.13 1,171.61 121.61 0.20

Hydrolis Desa Kariango


un Buttu Batu
Formula Hazen William :
S (slope) = ( ^H/L)*100
D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
`````````````` V = 4*Q/1000(3.14*(D/1000)^2)

BEBAN PIPA PERHITUNGAN HEAD LOSS


Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

1,050.00
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,049.89 3.89 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,049.78 6.78 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,049.67 9.67 0.20
308 415 0.29 0.32 120 23.32 45.20 0.20 0.04 1,049.62 10.62 0.20
308 415 0.29 0.32 120 19.06 45.20 0.20 0.07 1,049.56 14.56 0.20
308 415 0.29 0.32 120 18.09 45.20 0.20 0.06 1,049.49 19.49 0.20
308 415 0.29 0.32 120 24.60 45.20 0.20 0.06 1,049.44 20.44 0.20
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,049.33 24.33 0.20
308 415 0.29 0.32 120 28.02 45.20 0.20 0.11 1,049.22 25.22 0.20
308 415 0.29 0.32 120 22.34 45.20 0.20 0.14 1,049.07 29.07 0.20
308 415 0.29 0.32 120 19.01 45.20 0.20 0.08 1,048.99 33.99 0.20
308 415 0.29 0.32 120 20.81 45.20 0.20 0.05 1,048.94 35.94 0.20
308 415 0.29 0.32 120 26.60 45.20 0.20 0.08 1,048.86 36.86 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,048.75 39.75 0.20
308 415 0.29 0.32 120 21.17 45.20 0.20 0.11 1,048.64 43.64 0.20
308 415 0.29 0.32 120 18.36 45.20 0.20 0.11 1,048.52 35.52 0.20
308 415 0.29 0.32 120 24.41 45.20 0.20 0.11 1,048.41 37.41 0.20
308 415 0.29 0.32 120 22.46 45.20 0.20 0.11 1,048.30 34.30 0.20
308 415 0.29 0.32 120 24.41 45.20 0.20 0.11 1,048.19 36.19 0.20
304 409 0.28 0.31 120 22.35 45.20 0.20 0.11 1,048.08 39.08 0.19
300 404 0.28 0.31 120 24.16 45.20 0.19 0.11 1,047.98 40.98 0.19
288 388 0.27 0.30 120 21.89 45.20 0.18 0.10 1,047.88 43.88 0.18
280 377 0.26 0.29 120 21.66 45.20 0.17 0.09 1,047.79 46.79 0.18
268 361 0.25 0.28 120 23.15 45.20 0.16 0.09 1,047.70 48.70 0.17

GIV
Jumlah
diameter Panjang
Pipa Total
pipa (Meter)
(batang)
81.40 270.00 45.00 45.00 0
57.00 0.00 0.00 0
45.20 918.00 153.00 153.00 153 91800%
36.20
45.20
PVC 331.00
Jumlah
diameter Panjang
Pipa Total
pipa (Meter)
(batang)
81.40 300.00 50.00 50.00 0
57.00 0.00 0.00 0
45.20 1067.00 177.83 178.00 178 8.89
36.20
45.20
diameter pipa
81.4
57
45.2
918
0.00
Daftar Kebutuhan Accessories Tiap Item Pekerjaan
Desa Kariango Kabupaten Pinrang

Jembt.
Nama Bahan POMPA BAK Jalur Pipa Jumlah
Pipa
Pipa PVC
a. Pipa PVC Ø 2" - - - 147 147
b. Pipa PVC Ø 1 1/2" - - - 533 533
680
Pipa GIP
c. Pipa GI Ø 1 1/2" - - 153 153
d. Pipa GI Ø 2" - - 2 - 2
a. PVC
Knee 90° Ø 1 1/2" - - - 5 5
Knee 45° Ø 1 1/2" - - - 21 21
Dop/Cap Ø 1 1/2" - - - 3 3
Double nipple Ø 1 1/2" - - - 1 1
Stop Kran 1 1/2" - - - 6 6
Air Valve Ø 1 1/2 " - - - 6 6
tee Ø 1 1/2 " - - - 1 1
b. Galvanis
bend Ø 45 1 1/2" - - 8 - 8
Waiter moor Ø1 1/ 2" - - 6 - 6
Double Nipple Ø 1 1/ 2" - - 2 - 2
Flange Ø 1 1/2" - 12 - - 12
Karet Flange - 14 - - 14
Socket Ø 1 1/2 - - - 31 31
Gate Valve Ø 1 1/2" Broonze - - - 2 2
Lainnya
Air Valve Ø 1 1/2 " - - - 5 5
Dop Ø 1 1/2 " - - 4 - 4
Lem Pipa - - - 12 12
Seal tape - - 77 - 77
Kunci Pipa GIP Ø 2" No.24 - - 2 - 2
Kebutuhan Accessories Tiap Item Pekerjaan
Desa Kariango Kabupaten Pinrang

Satuan

btg
btg

btg
btg

bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
bh
bh

bh
bh
bh
bh
bh
RENCANA ANGGARAN BIAYA

Provinsi : Sulawesi Selatan Nomor RAB


Kabupaten : Pinrang Pekerjaan Kegiatan
Kecamatan : Lembang Sub pekerjaan/Kegiatan
Desa/lembang : Kariango Ukuran/Dimensi

Volume Harga Biaya (Rp)


Total Kontribusi Masyarakat (APBD / Satuan + Kontribusi Masyarakat
NO URAIAN Satuan
Koefisien Langsiran 5 % Total
inCash inKind APBN) * Rp inCash

1 2 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7

1. Pekerjaan Persiapan 2.000 170,000 -


1.1. Pembersihan Lahan
Pekerja 2.00 2.000 2.00 Ls 85,000 170,000 -
2. Pemasangan Bowplank 4.000 225,200 -
2.1. Tenaga Kerja
Pekerja 0.400 0.100 0.400 Hok 85,000 34,000 -
Tukang kayu 0.400 0.100 0.400 Hok 95,000 - -
2.2. Bahan
Kayu klas IV uk. 5/7 0.048 0.012 0.048 M³ 2,500,000 120,000 -
Paku biasa 2" - 5" 0.080 0.020 0.080 Kg 15,000 1,200 -
Kayu papan 3/20 0.028 0.007 0.028 M³ 2,500,000 70,000 -
3. Galian Tanah 3.840 204,000 -
3.1. Tenaga Kerja
Pekerja 2.400 0.625 2.40 Hok 85,000 204,000 -
4. Pondasi batu kali, 1 Pc : 3 Ps 2.160 1,845,206 -
4.1. Tenaga Kerja
Pekerja 3.240 1.500 3.24 Hok 85,000 275,400 -
Tukang batu 6.998 0.600 7.00 Hok 95,000 664,848 -
4.2. Bahan
Batu belah 10/15 cm 2.376 1.100 2.38 M³ 125,000 297,000 -
Semen Portland 436.320 202.000 436.32 Kg 1,160 506,131 -
Pasir pasang 1.048 0.485 1.05 M³ 97,200 101,827 -
4. Urugan Tanah Kembali 1.280 20,890 -
4.1. Tenaga Kerja
Pekerja 0.246 0.192 0.25 Hok 85,000 20,890 -
5. Urugan Pasir 0.760 89,057 -
5.1. Tenaga Kerja
Pekerja 0.173 0.300 0.23 Hok 85,000 14,729 -
5.2. Bahan
Pasir urug 0.91 1.200 0.91 M³ 81,500 74,328 -
6. Pek. Dinding Beton & Penutup Plat Beton Bertulang 4.000 13,833,928 -
6.1. Tenaga Kerja
Pekerja 5.300 21.20 Hok 85,000 1,802,000 -
Tukang Batu 0.275 1.10 Hok 95,000 104,500 -
Kepala Tukang 1.300 5.20 Hok 110,000 572,000 -
Tukang Besi 1.050 4.20 Hok 110,000 462,000 -
6.2. Bahan
Kayu Terentang KLAS IV 0.200 0.80 M3 2,500,000 2,000,000 -
Paku biasa 2" - 5" 1.500 6.00 Kg 15,000 90,000 -
Minyak Bekisting 0.400 1.60 Ltr 11,000 17,600 -
Besi Beton Polos 110.000 440.00 Kg 14,000 6,160,000 -
Kawat beton 2.250 9.00 Kg 11,000 99,000 -
Semen portland 336.000 1,344.00 Kg 1,160 1,559,040 -
Pasir Beton 0.540 4.54 M3 97,200 441,288 -
Kerikil beton 0.810 3.24 M3 162,500 526,500
7. 1 m2 Plesteran Dinding Luar 1 Pc : 2 Ps, tebal 20 mm 16.00 944,806 -
7.1. Tenaga Kerja
Pekerja 0.250 4.00 Hok 85,000 340,000 -
Tukang batu 0.200 3.20 Hok 95,000 304,000 -
7.2. Bahan
Semen portland 14.280 228.48 Kg 1,160 265,037 -
Pasir Pasang 0.023 0.37 M³ 97,200 35,770 -
8. Acian Dinding dan Lantai Bagian Dalam 20.000 520,400 -
8.1. Tenaga Kerja
Pekerja 0.150 3.00 Hok 85,000 255,000 -
Tukang batu 0.100 2.00 Hok 95,000 190,000 -
8.2. Bahan
Semen portland 3.250 65.00 Kg 1,160 75,400 -
9 Lantai Kerja beton tumbuk 1 : 3 : 5 0.840 511,391 -
9.1. Tenaga Kerja
Pekerja 1.650 1.39 Hok 85,000 117,810 -
Tukang Batu 0.250 0.21 Hok 95,000 19,950 -
9.2. Bahan
Semen portland 218.000 183.12 Kg 1,160 212,419 -
Pasir Beton 0.520 0.44 M³ 97,200 42,457 -
Kerikil sungai 0.870 0.73 M³ 162,500 118,755 -
1 m2 pengecatan tembok baru bag.luar( 1 lapis cat dasar, 2 lapis cat
10
penutup )
16.00 212,320 -
10.1. Tenaga Kerja
Pekerja 0.028 0.45 Hok 85,000 38,080 -
Tukang cat 0.042 0.67 Hok 95,000 63,840 -
10.2. Bahan -
Cat dasar 0.120 1.92 Kg 23,000 44,160 -
cat penutup 2 kali 0.180 2.88 Kg 23,000 66,240 -
13 Pekerjaan Box Valve & Man Hole 1.00 Ls 350,000 350,000
14 Pas. Batu 1/2 Bata 1:4 6.48 668,863
14.1. Tenaga Kerja
Pekerja 2.07 0.320 2.07 HOK 85,000 176,256
Tukang Batu 0.65 0.100 0.65 HOK 95,000 61,560
14.2. Bahan -
Bata merah 5 x 11 x 22 cm 453.60 70.000 453.60 Buah 700 317,520
Semen Portland 74.52 11.500 74.52 Kg 1,160 86,443
Pasir pasang 0.28 0.043 0.28 M3 97,200 27,084
15 Tangga Monyet Pipa GIP Ø ¾" 1.00 Ls 500,000 500,000
16 Pekerjaan Pemasangan Pipa GIP Dan Acsesoris 6.000 65,266,435
12.2. Acsesoris
Cat Meni Besi 2.000 2.000 2.000 Kg 17,500 35,000
Cat Besi 2.000 2.000 2.000 Kg 15,000 30,000
Biaya Langsiran Semen 46.629 zak 42,000 1,958,410
Biaya Langsiran Pasir 6.671 m3 1,000,000 6,671,040
Total Bahan 13,765,673.888
13,766,000.00
Total Upah 14,520,312.00
14,520,000.00
Jumlah Total 28,286,312
Dibulatkan 28,286,000 -

Kepala Satker Pamsimas Diketahui Oleh : Disetujui Oleh : Dibuat Oleh :


Kabupaten Pinrang Fasilitator Teknik Koordinator KKM
Ketua Satlak Pams

( Harman, ST, MT ) (Maghfira Asdiana , ST MT) ( Rudi) ( Parman )


: 04
: Sarana Air Minum
: Reservoir Kariango
2x 2 x 2 = 8 M3

Biaya (Rp)
Kontribusi Masyarakat (APBD /
inKind APBN) *

10=4x7 11=5x7

- 170,000

170,000
225,200

34,000

- 120,000
- 1,200
- 70,000
- 204,000

204,000
- 1,845,206

- 275,400
- 664,848
- 297,000
- 506,131
- 101,827
- 20,890

20,890
- 89,057

14,729

- 74,328
13,833,928

1,802,000
104,500
572,000
462,000

- 2,000,000
- 90,000
- 17,600
- 6,160,000
- 99,000
- 1,559,040
- 441,288
526,500
- 944,806

340,000
304,000

- 265,037
- 35,770
- 520,400

255,000
190,000

- 75,400
511,391

117,810
19,950

212,419
42,457
118,755

- 212,320

38,080
63,840

- 44,160
- 66,240
350,000
668,863

176,256
61,560
-
317,520
86,443
27,084
500,000
8,694,450

35,000
30,000
1,958,410
6,671,040
-

28,790,510
- 28,791,000
Kariango, Oktober 2016
Dibuat Oleh :

Ketua Satlak Pamsimas

( Parman )
Provinsi / Kabupaten /Kecamatan / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango

Disetujui Oleh : Dibuat Oleh :

Kepala Satker Pamsimas Fasilitator Teknik Koordinator KKM


Kabupaten Pinrang

( Harman, ST, MT ) (Maghfira Asdiana , ST MT) ( Rudi)


NIP. 19730305 200212 1 012
an / Desa: Sulawesi Selatan / Pinrang / Lembang / Kariango

Kariango, Oktober 2016

Dibuat Oleh :

Ketua Satlak

( Parman )
RENCANA ANGGARAN BIAYA

Provinsi : Sulawesi Selatan


Kabupaten : Pinrang Pekerjaan Kegiatan : Sarana Air Minum
Kecamatan : Lembang Sub pekerjaan/Kegiatan : Pemasangan Pipa
Desa : Kariango Ukuran/Dimensi : SNI S - 12,5

Volume Harga Biaya (Rp)


NO URAIAN Kontribusi Masyarakat (APBD / Satuan Satuan Kontribusi Masyarakat
Total Total
inCash inKind APBN) * Rp inCash inKind
1 2 2=3+4+5 3 4 5 6 7 8=2x7 9=3x7 10=4x7

1. Galian Tanah 60.56 308,858 - 308,858


1.1. Tenaga Kerja
Pekerja 3.63 3.6 Hok 85,000 308,858 - 308,858
2. Urugan Tanah Kembali 45.83 973,914 - 973,914
2.1. Tenaga Kerja
Pekerja 11.46 11 Hok 85,000 973,914 - 973,914
3. Urugan Pasir 0.00 - - -
3.1. Tenaga Kerja
Pekerja 0.00 - Hok 85,000 - - -
3.2. Bahan
Pasir urug 0.00 - M³ 377,000 - - -
4 Pemasangan Pipa 55,593,300 - 55,593,300

4826.00
PVC Ø 1 1/2 " 290 289.5 m 95,000 27,502,500 - 27,502,500
918
GIV Ø 1 1/2" 165 165.2 m 170,000 28,090,800 - 28,090,800
Jumlah Total 56,876,072 - 56,876,072
Dibuatkan 56,876,000 - 56,876,000

Kariango, Oktober 2016

Diketahui Oleh : 290 Disetujui Oleh : Dibuat Oleh :

Fasilitator Teknik Koordinator KKM Ketua Satlak

( Maghfira Asdiana, ST ) ( Gusrianto ) ( Syarifuddin )


RENCANA ANGGARAN BIAYA

: Sarana Air Minum


: Pemasangan Pipa

Biaya (Rp)
(APBD /
APBN) *
11=5x7

-
-

-
-

-
-

-
-
-
-

Kariango, Oktober 2016

Dibuat Oleh :
PAMSIMAS

TABEL PERHITUNGAN O & M BERDASARKAN PEMANFAAT AWAL (KU/HU) & SR


Desa Kariango Kecamatan Lembang Kabupaten Pinrang Propensi Sulawesi Selatan

KOMPONEN BIAYA JUMLAH KOMPONEN BIAYA JUMLAH


A. Penduduk 4.4 H. Biaya Pemeliharaan (direncanakan)
1 Jumlah penduduk awal (Po) 1,190 Jiwa 1 Persentase pertahun 1% Persen
2 Jumlah KK awal 272 KK 2 Biaya Pemeliharaan pertahu 3,115,000 Rupiah
3 Pertumbuhan penduduk 2.0% Persen 3 Biaya Pemeliharaan perbula 259,583 Rupiah
4 Tahun proyeksi 15 Tahun
5 Penduduk proyeksi (Pn) 1,602 Jiwa I. Total Biaya Pengelolaan 3,072,500 Rupiah/Bulan
6 Jumlah KK proyeksi 366 KK
7 Pemanfaat air minum yg direncanakan 758 Jiwa J. Harga Air 1,802 Rupiah/M3
Tarif Harga Air Dibulatkan 1,800 Rupiah/M3
B. Biaya investasi SPAM (RKM) 311,500,000 Rupiah
L. Iuran Rata-rata 16,213.72 Rupiah/KK/Bulan
C. Waktu Operasional 24 Jam/hari
D. Sistem Pelayanan (RKM) M. Iuran Tetap (Riil)
1 Sambungan Rumah (SR) 190 Unit 1 Pemakaian air rata-rata 9 M3/bulan
2 Hidran Umum (HU) - Unit 2 Harga air perkubik 1,802 Rupiah/M3
3 Kran Umum (KU) - Unit 3 Harga air per kubik dibulatk 1,900 Rupiah/M3
4 Sambungan Sosial - Unit 4 Iuran tetap bulanan 17,100 Rupiah/KK/Bulan
5 Sambungan Sekolah - Unit
E. Kebutuhan air K. Iuran Menurut Klasifikasi
1 Keb. air domestik SR 60 Lt/org/hari 1 Harga air Rata-rata 1,900 Rupiah/M3
2 Keb. air domestik KU/HU 70 Lt/org/hari 2 Mampu (SR) 1,800 Rupiah/M3
3 Persentase kebocoran 25% Persen 3 Tidak Mampu (HU/KU) 1,300 Rupiah/M3
4 Air SR, KU/HU & kebocoran 163 Lt/org/hari
5 Pemakaian air rata-rata 71,400 Lt/hari IURAN YANG DITERAPKAN
6 Pemakaian air rata-rata 71 M3/hari L. Iuran Progresif (SR)
F. Penyusutan 1 Golongan I (<10 M3) 1,800 Rupiah/M3
1 Biaya investasi (dg inkind) 311,500,000 Rupiah 2 Golongan II (10 < 20 M3) 2,100 Rupiah/M3
2 Persentase penyusutan (5 - 10) % 5.0% Persen 3 Golongan III (20 < 30 M3) 2,300 Rupiah/M3

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


PAMSIMAS

3 Biaya penyusutan pertahun 15,575,000 Rupiah 4 Golongan IV (> 30 M3) 2,600 Rupiah/M3
4 Biaya penyusutan perbulan 1,297,917 Rupiah
G Biaya Operasional 1% 0.5% M Iuran HU/KU
1 Honor tenaga perbulan (direncanakan) 1,000,000 Rupiah 1 Banyak Pemakaian air 10 M3/bulan
2 Kualitas air & promkes (direncanakan) 115,000 Rupiah 2 Iuran KK perbulan 13,000 Rp/KK/bulan
3 Pengembangan perbulan (direncanakan) 400,000 Rupiah
MINIMAL TARGET PENGGUNA
Penyusutan 6%, biaya investasi dicapai dalam periode : 0 KK untuk Iuran HU/KU/Sosial - p/bulan
20 tahun 171 Unit SR & Iuran Sekolah 3,072,500 p/bulan
2,812,917 TARGET AWAL UNTUK O & M 3,072,500 p/bulan

Perhitungan Rencana SR untuk Kebutuhan Biaya Operasional Pemeliharaaan 25


DIAMETER PIPA GALIAN URUGAN TANAH URUGAN PASIR
Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg Volume
tr
tr 1 0.163 0 0.000 0.150 0.000 0.000 0.082 0.000 0.000
tr 1½ 0.178 533 94.661 0.138 533.000 73.288 0.071 533.000 37.955
tr 2 0.180 147 26.460 0.125 147.000 18.375 0.061 147.000 8.899
3 0.188 0 0.000 0.141 0 0.00 0.038 0 0.00
TOTAL 60.560 TOTAL 45.831 TOTAL 0.000

70 65 65
Panjang

Transmisi GIP 2" PVC 2" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
0

batang

Transmisi GIP 2" PVC 2" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
0

Panjang

Transmisi GIP 2" PVC 2" PVC 1½" GI 1½" PVC 1¼" PVC 1" Distribusi GIP 1½" PVC 1½" GIP 1¼"
0 0 0 0 0 0 0
PVC 1¼" GIP 1" PVC 1"
0 0 0

PVC 1¼" GIP 1" PVC 1"


0 0 0

PVC 1¼" GIP 1" PVC 1" PVC 3/4"


0 0 0 0
Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH
Desa Kariango/ Kecamatan Lembang
Dusun Buntu Batu

Tahun Proyeksi Ke n ANALISA PERHITUN

No Uraian Satuan
Tahun
5th 10th 15th KODE
Perencanaan

1 Jumlah penduduk jiwa 450 497 549 606 1


Pelayanan penduduk % 100 100 100 100 2
jiwa 450 497 549 606 3
2 Pelayanan SR % 100 100 100 100 4
jiwa 450 497 549 606 5
jiwa/sb 4 4 4 4 6
Jmlh. Sb 113 124 137 151 7
Pemakaian Air Lt/org/hr 60 60 60 60 8
Lt/sb/hr 240 240 240 240 9
Lt/det 0.31 0.35 0.38 0.42 10
3 Pelayanan KU / HU % - - - - 11
jiwa - - - - 12
jiwa/HU 100 100 100 100 13
Jmlh. HU - - - - 14
Pemakaian Air Lt/org/hr 70 70 70 70 15
Lt/HU/hr 7,000 7,000 7,000 7,000 16
Lt/det - - - - 17
4 Total Domestik Lt/det 0.31 0.35 0.38 0.42 18
5 Total Non Domestik % 0 0 0 0 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.31 0.35 0.38 0.42 21
7 Kehilangan Air % 20 20 20 20 22
Lt/det 0.06 0.07 0.08 0.08 23
8 Kebutuhan Air
- Rata-rata Lt/det 0.38 0.41 0.46 0.50 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25
Lt/det 0.41 0.46 0.50 0.56 26
M3/hari 1.49 1.64 1.81 2.00 27
M3/hari 35.64 39.35 43.44 47.97 28
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29
Lt/det 0.56 0.62 0.69 0.76 30
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31
Lt/det 1.24 1.37 1.51 1.67 32

10 Volume Resevoir M3 7.13 7.87 8.69 10 33


Tabel 5 - 2.
PROYEKSI KEBUTUHAN AIR BERSIH
Desa Kariango/ Kecamatan Lembang
Dusun Tondo Bunga

Tahun Proyeksi Ke n ANALISA PERHITUN


No Uraian Satuan Tahun
5th 10th 15th KODE
Perencanaan
1 Jumlah penduduk jiwa 308 497 549 606 1
Pelayanan penduduk % 100 100 100 100 2
jiwa 308 497 549 606 3
2 Pelayanan SR % 100 100 100 100 4
jiwa 308 497 549 606 5
jiwa/sb 4 4 4 4 6
Jmlh. Sb 77 124 137 151 7
Pemakaian Air Lt/org/hr 60 60 60 60 8
Lt/sb/hr 240 240 240 240 9
Lt/det 0.21 0.35 0.38 0.42 10
3 Pelayanan KU / HU % - - - - 11
jiwa - - - - 12
jiwa/HU 100 100 100 100 13
Jmlh. HU - - - - 14
Pemakaian Air Lt/org/hr 70 70 70 70 15
Lt/HU/hr 7,000 7,000 7,000 7,000 16
Lt/det - - - - 17
4 Total Domestik Lt/det 0.21 0.35 0.38 0.42 18
5 Total Non Domestik % 0 0 0 0 19
Lt/det - - - - 20
6 Total Kebutuhan Air Lt/det 0.21 0.35 0.38 0.42 21
7 Kehilangan Air % 20 20 20 20 22
Lt/det 0.04 0.07 0.08 0.08 23
8 Kebutuhan Air
- Rata-rata Lt/det 0.26 0.41 0.46 0.50 24
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25
Lt/det 0.28 0.46 0.50 0.56 26
M3/hari 1.02 1.64 1.81 2.00 27
M3/hari 24.39 39.35 43.44 47.97 28
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29
Lt/det 0.39 0.62 0.69 0.76 30
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31
Lt/det 0.85 1.37 1.51 1.67 32
10 Volume Resevoir M3 4.88 7.87 8.69 10 33
Tabel 5 - 2.
EKSI KEBUTUHAN AIR BERSIH
Kariango/ Kecamatan Lembang
Dusun Buntu Batu

ANALISA PERHITUNGAN

KETERANGAN
CARA HITUNG

rata2 kenaikan 2% pertahun


juklak 100% pelayanan
Anggaran APBN
juklak / survei
(5)= ((4)*(3))/100 ###
juklak
(7)= (5) / (6) ###
juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
juklak
(14)=(12)/(13)
juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)

(21)=(18) + (20)
juklak
(23)=(21)*(22)/100

(24)=(21)+ 23)
juklak
(26)=(24)* (25)
(27)=(26)x3600/1000
(28)=(27)*24
juklak (minimum)
(30)=(24)*(27)
faktor keamanan
(32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
(30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
Tabel 5 - 2.
EKSI KEBUTUHAN AIR BERSIH
Kariango/ Kecamatan Lembang
Dusun Tondo Bunga

ANALISA PERHITUNGAN
KETERANGAN
CARA HITUNG
rata2 kenaikan 2% pertahun
juklak 100% pelayanan

juklak / survei
(5)= ((4)*(3))/100
juklak
(7)= (5) / (6)
juklak
(9)= (8) x (6)
(10)=(5)x(8)/86400
(11)= 100 - (4)
(12)=(11)/100*(3)
juklak
(14)=(12)/(13)
juklak
(16)=(13)*(15)
(17)=(12)*(15)/86400
(18)=(10)+(17)

(21)=(18) + (20)
juklak
(23)=(21)*(22)/100

(24)=(21)+ 23)
juklak
(26)=(24)* (25)
(27)=(26)x3600/1000
(28)=(27)*24
juklak (minimum)
(30)=(24)*(27)
faktor keamanan
(32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
(30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
HARGA BAHAN/ALAT, UPAH

LKM : Tondo Bunga


Desa/Kelurahan : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang
Propinsi : Sulawesi Selatan

Upah Angkut/ Total Harga


Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Satuan
(Rp). (Rp). (Rp).
A. Bahan
I Pipa dan Assesories
PIPA PVC Standar SNI, Pj 6 meter
1 PVC dia. 6" (160 mm), S 12,5 RRJ atau SCJ batang 767,500.00 - 767,500.00
2 PVC dia. 4" (110 mm), S 12,5 RRJ atau SCJ batang 355,000.00 - 355,000.00
3 PVC dia. 3" (90 mm), S 12,5 RRJ atau SCJ batang 240,000.00 - 240,000.00
4 PVC Ø 2 1/2" (75 mm), S 12,5 RRJ atau SCJ batang 180,000.00 - 180,000.00
5 PVC dia. 2" (63 mm), S 12,5 RRJ atau SCJ batang 120,000.00 - 120,000.00
6 PVC dia. 1 1/2" (50 mm), S 12,5 SCJ batang 95,000.00 - 95,000.00
7 PVC dia. 1 1/4" (40 mm), S 12,5 SCJ batang 58,500.00 - 58,500.00
8 PVC dia. 1" (32 mm), S 12,5 SCJ batang 45,000.00 - 45,000.00
9 PVC dia. 3/4" (25 mm), S 12,5 SCJ batang 29,500.00 - 29,500.00
10 PVC dia. 1/2" (20 mm), S 12,5 SCJ batang 21,500.00 - 21,500.00
Assesories Pipa PVC
Knee 90°
11 Ukuran dia. 4" buah 89,500.00 - 89,500.00
12 Ukuran dia. 3" buah 80,000.00 - 80,000.00
13 Ukuran dia. 2½" buah 29,500.00 - 29,500.00
14 Ukuran dia. 2 buah 25,000.00 - 25,000.00
15 Ukuran dia. 1½" buah 17,500.00 17,500.00
16 Ukuran dia. 1 buah 4,000.00 - 4,000.00
Knee 45°
17 Ukuran dia. 4" buah 89,500.00 - 89,500.00
18 Ukuran dia. 3" buah 35,000.00 - 35,000.00
18 Ukuran dia. 2½" buah 29,500.00 - 29,500.00
19 Ukuran dia. 2 buah 30,500.00 - 30,500.00
19 Ukuran dia. 1½" buah 17,500.00 - 17,500.00
Socket Drat Dalam
20 Ukuran dia. 4" buah 40,000 - 40,000.00
21 Ukuran dia. 3" buah 35,000 - 35,000.00
Upah Angkut/ Total Harga
Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Satuan
(Rp). (Rp). (Rp).
22 Ukuran dia. 2½" buah 25,000 - 25,000.00
23 Ukuran dia. 2" buah 17,500 - 17,500.00
25 Ukuran dia. 1½" buah 12,500 12,500.00
Socket Drat Luar
26 Ukuran dia. 4" buah 40,000 40,000.00
27 Ukuran dia. 3" buah 35,000 35,000.00
28 Ukuran dia. 2½" buah 25,000 25,000.00
29 Ukuran dia. 2" buah 17,500 17,500.00
30 Ukuran dia. 1½" buah 12,500 12,500.00
Tee
31 Ukuran dia. 3 x 3 x 3" buah 140,000 - 140,000.00
32 Ukuran dia. 2 x 2 x 2" buah 60,000 - 60,000.00
33 Ukuran dia. 1½ x 1½ x 1½ " buah 30,000 - 30,000.00
Ball Valve
34 Ball Valve dia. 2 buah 62,000 - 62,000.00
35 Ball Valve dia. 1½" buah 57,500 - 57,500.00
Reducer 62,000.00
36 dia. 3" x 2 1/2" buah - - -
37 dia. 3" x 2" buah 60,000 - 60,000.00
38 dia. 3" x 1½" buah 65,000 - 65,000.00
39 dia. 2" x 1½" buah 27,500 - 27,500.00
End Cap / Dop
40 Ukuran dia. 3" buah - - -
41 Ukuran dia. 2 1/2" buah - - -
42 Ukuran dia. 2 buah 15,000 - 15,000.00
43 Ukuran dia. 1½" buah 10,000 - 10,000.00
44 Sealtape buah 2,500 - 2,500.00
45 Lem Pipa @ 1/2 kg Klg 45,000 - 45,000.00

PIPA Besi Standar Medium A SNI,


46 SNI dia. 4" , Pj 6 meter batang 825,000.00 - 825,000.00
47 SNI dia. 3" , Pj 6 meter batang 625,000.00 - 625,000.00
48 SNI dia. 2 1/2" , Pj 6 meter batang 507,500.00 - 507,500.00
49 SNI dia. 2" , Pj 6 meter batang 340,000.00 - 340,000.00
50 SNI dia. 1 1/2" , Pj 6 meter batang 275,000.00 - 275,000.00
Upah Angkut/ Total Harga
Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Satuan
(Rp). (Rp). (Rp).
51 SNI dia. 1 1/4" , Pj 6 meter batang - - -
51 SNI dia. 1" , Pj 6 meter batang 185,000.00 - 185,000.00
52 SNI dia. 3/4" , Pj 6 meter batang 150,000.00 - 150,000.00
53 SNI dia. 1/2" , Pj 6 meter batang 105,000.00 - 105,000.00
Assesories Pipa GIP
Knee 90°
54 Ukuran dia. 4" buah 140,000.00 - 140,000.00
55 Ukuran dia. 3" buah 80,000.00 - 80,000.00
56 Ukuran dia. 2½" buah 52,500.00 - 52,500.00
57 Ukuran dia. 2 buah 30,000.00 - 30,000.00
58 Ukuran dia. 1½" buah 18,500.00 - 18,500.00
59 Ukuran dia. 1 buah 9,000.00 - 9,000.00
Knee 45°
60 Ukuran dia. 4" buah 162,500.00 - 162,500.00
61 Ukuran dia. 3" buah 102,000.00 - 102,000.00
62 Ukuran dia. 2 1/2" buah 63,750.00 - 63,750.00
63 Ukuran dia. 2 buah 30,500.00 - 30,500.00
64 Ukuran dia. 1½" buah 21,500.00 - 21,500.00
65 Ukuran dia. 1 buah 10,500.00 - 10,500.00
Double Nipple
66 Ukuran dia. 3" buah 55,250.00 - 55,250.00
67 Ukuran dia. 2 buah 21,500.00 - 21,500.00
68 Ukuran dia. 1½" buah 15,000.00 - 15,000.00
Socket Drat Luar
69 Ukuran dia. 3" buah 36,500.00 - 36,500.00
70 Ukuran dia. 2 buah 40,000.00 - 40,000.00
71 Ukuran dia. 1 1/2" buah 15,000.00 - 15,000.00
Tee
69 Ukuran dia. 2 x 2 x 2" buah 36,500.00 - 36,500.00
70 Ukuran dia. 2 x 2 x 1½" buah 40,000.00 - 40,000.00
Reducer
71 Ukuran dia. 3" x 2 " buah 65,000.00 - 65,000.00
72 Ukuran dia. 2 x 1½" buah 22,500.00 - 22,500.00
Flange
73 Ukuran dia. 3" buah 67,500.00 - 67,500.00
74 Ukuran dia. 2½" buah 60,000.00 - 60,000.00
75 Ukuran dia. 2 buah 52,000.00 - 52,000.00
Upah Angkut/ Total Harga
Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Satuan
(Rp). (Rp). (Rp).
76 Ukuran dia. 1½" buah 45,000.00 - 45,000.00
Water Mur
77 Ukuran dia. 3" buah 160,000.00 160,000.00
78 Ukuran dia. 2½" buah 105,000.00 - 105,000.00
79 Ukuran dia. 2 buah 57,500.00 - 57,500.00
80 Ukuran dia. 1½" buah 40,000.00 - 40,000.00
Gate Valve Onda Brass
81 Ukuran dia. 4" buah 900,000.00 - 900,000.00
82 Ukuran dia. 3" buah 825,000.00 - 825,000.00
83 Ukuran dia. 2½" buah 605,000.00 - 605,000.00
84 Ukuran dia. 2 buah 275,000.00 - 275,000.00
85 Ukuran dia. 1½" buah 200,000.00 - 200,000.00
86 Ukuran dia. 1 buah 97,500.00 - 97,500.00
Check Valve
87 Ukuran dia. 3" buah 685,000.00 - 685,000.00
88 Ukuran dia. 2" buah 315,000.00 - 315,000.00
Accesorries Lainnya
89 Mur Baut no.12 buah 2,500.00 - 2,500.00
90 Karet Pelapis Flange buah 50,000.00 - 50,000.00
91 Kunci Pipa dia. 1/2" - 3" No. 36 buah 450,000.00 - 450,000.00
92 Kunci Pipa dia. 1/2" - 3" buah 350,000.00 - 350,000.00
93 Ukuran dia. 1 buah 97,500 - 97,500.00
Accesorries Lainnya
89 Water Meter dia.3 buah 2,000,000.00 2,000,000.00
90 Water Meter dia.2 buah 1,600,000.00 1,600,000.00
91 Kunci Pipa dia. 1/2" - 2" buah 300,000.00 - 300,000.00
92 Kunci Pipa dia. 1/2" - 3" No. 36 buah 450,000.00 - 450,000.00
93 Sney Pipa Ø 3" buah 1,000,000.00 - 1,000,000.00
94 Sney Pipa Ø 2 buah 700,000.00 - 700,000.00
Catatan: Harga Satuan sampai dengan lokasi
RGA BAHAN/ALAT, UPAH

Spesifikasi Teknik Ket.

Tekanan Nominal pipa minimal 1,00 Mpa


atau 10 bar (SNI 06-0084- 2002) dengan
tebal dinding nominal S12,5.

Sistim Penyambungan dengan gelang karet


(RRJ = Rubber Ring Joint) dan dapat
dengan lem (SCJ = Solven Cement Joint).

Assesories Pipa harus dari bahan dengan


kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .

Assesories Pipa harus dari bahan dengan


kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .

Assesories Pipa harus dari bahan dengan


kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .
Spesifikasi Teknik Ket.
Assesories Pipa harus dari bahan dengan
kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .

SNI Klas Medium A, semua pipa dan alat


penyambung harus dapat menerima
tekanan kerja minimum sebesar 10.0 kg/cm 2
atau 10 bar dan maximum 50 kg/cm2 atau
50 bar.
Spesifikasi Teknik Ket.

Semua material bantu seperti fitting, elbow


90, reducer, tee, sock drat, coupling dan
lainnya harus dari bahan dengan kualitas
yang sama dengan pipa yang digunakan.
Spesifikasi Teknik Ket.

Assesories Pipa harus dari bahan dengan


kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .

Assesories Pipa harus dari bahan dengan


kualitas yang sama dengan pipa yang
digunakan (SNI 06-0135- 1987) .
DAFTAR PERBANDINGAN HARGA BAHAN/ALAT, UPAH

KKM : Tondo Bunga


Desa : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang
Propinsi : Sulawesi Selatan

Harga Satuan (Rp.)


CV. RAJA TIRTA
No. Nama barang/alat Satuan BAHANA UD. JAYA ABADI
JAYA
SUPRALON LANGGENG WAVIN
A. Bahan
I Pipa dan Assesories
PIPA PVC Standar SNI, Pj 6 meter
1 PVC dia. 6" (160 mm), S 12,5 RRJ atau SCJ batang 1,082,700 690,000 767,500.00
2 PVC dia. 4" (110 mm), S 12,5 RRJ atau SCJ batang 506,100 350,000 355,000.00
3 PVC dia. 3" (90 mm), S 12,5 RRJ atau SCJ batang 345,900 220,000 240,000.00
4 PVC Ø 2 1/2" (75 mm), S 12,5 RRJ atau SCJ batang 239,400 160,000 180,000.00
5 PVC dia. 2" (63 mm), S 12,5 RRJ atau SCJ batang 167,500 110,000 120,000.00
6 PVC dia. 1 1/2" (50 mm), S 12,5 SCJ batang 114,200 80,000 95,000.00
7 PVC dia. 1 1/4" (40 mm), S 12,5 SCJ batang 74,200 55,000 58,500.00
8 PVC dia. 1" (32 mm), S 12,5 SCJ batang 48,500 35,000 45,000.00
9 PVC dia. 3/4" (25 mm), S 12,5 SCJ batang 30,700 25,000 29,500.00
10 PVC dia. 1/2" (20 mm), S 12,5 SCJ batang 20,500 17,500 21,500.00
Assesories Pipa PVC
Knee 90° -
11 Ukuran dia. 4" buah 143,000 - 89,500.00
12 Ukuran dia. 3" buah 78,650 80,000 80,000.00
13 Ukuran dia. 2½" buah 50,050 29,500.00
14 Ukuran dia. 2 buah 21,450 40,000 25,000.00
15 Ukuran dia. 1½" buah 14,300 35,000 17,500.00
16 Ukuran dia. 1 buah 7,150 10,000 4,000.00
Knee 45°
17 Ukuran dia. 4" buah 114,400 - 162,500.00
18 Ukuran dia. 3" buah 57,200 - 102,000.00
19 Ukuran dia. 2½" buah 35,750 - 63,750.00
20 Ukuran dia. 2 buah 20,750 - 30,500.00
Socket Drat Dalam -
21 Ukuran dia. 4" buah - - 95,000.00
22 Ukuran dia. 3" buah - 80,000 42,000.00
23 Ukuran dia. 2½" buah - - 32,500.00
24 Ukuran dia. 2 buah 18,800 40,000 27,500.00
Harga Satuan (Rp.)
CV. RAJA TIRTA
No. Nama barang/alat Satuan BAHANA UD. JAYA ABADI
JAYA
SUPRALON LANGGENG WAVIN
25 Ukuran dia. 1½ - 30,000 20,000.00
Socket Drat Luar
26 Ukuran dia. 4" buah 81,850 - 89,500.00
27 Ukuran dia. 3" buah 42,590 80,000 55,250.00
28 Ukuran dia. 2½ buah 34,350 - 33,000.00
29 Ukuran dia. 2 buah 11,100 40,000 21,500.00
30 Ukuran dia. 1½ buah - 30,000 15,000.00
Tee
31 Ukuran dia. 3 x 3 x 3" buah 94,150 100,000 153,000.00
32 Ukuran dia. 2 x 2 x 2" buah 37,800 60,000 60,000.00
33 Ukuran dia. 1½ x 1½ x 1½ " buah - 40,000 30,000.00
Ball Valve
34 Ball Valve dia. 2 buah 62,000.00
35 Ball Valve dia. 1½" buah 57,500.00
Reducer -
36 dia. 3" x 2 1/2" buah 42,900 - -
37 dia. 3" x 2" buah 53,650 100,000 60,000.00
38 dia. 3" x 1½" buah 28,600 - 65,000.00
39 dia. 2" x 1½" buah 21,450 45,000 27,500.00
End Cap / Dop
40 Ukuran dia. 3" buah 71,500 75,000 -
41 Ukuran dia. 2 1/2" buah 64,350 - -
42 Ukuran dia. 2 buah 42,900 40,000 15,000.00
43 Ukuran dia. 1½" buah 35,750 30,000 10,000.00
44 Stop Kran dia 2 buah 195,000.00
45 Stop Kran dia 1 1/2 buah 85,000.00
45 Sealtape buah 300 2,000 2,500.00
46 Lem Pipa @ 1/2 kg Klg 58,500 37,500 45,000.00
Harga Satuan (Rp.)
CV. RAJA TIRTA
No. Nama barang/alat Satuan BAHANA UD. JAYA ABADI
JAYA
SUPRALON LANGGENG WAVIN
PIPA Besi Standar Medium A SNI,
47 SNI dia. 4" , Pj 6 meter batang 1,309,000 1,350,000 825,000.00
48 SNI dia. 3" , Pj 6 meter batang 1,083,100 875,000 625,000.00
49 SNI dia. 2 1/2" , Pj 6 meter batang 591,200 700,000 507,500.00
50 SNI dia. 2" , Pj 6 meter batang 467,300 520,000 340,000.00
51 SNI dia. 1 1/2" , Pj 6 meter batang 381,800 385,000 275,000.00
52 SNI dia. 1 1/4" , Pj 6 meter batang 323,700 335,000 -
52 SNI dia. 1" , Pj 6 meter batang 257,600 260,000 185,000.00
53 SNI dia. 3/4" , Pj 6 meter batang 197,900 170,000 150,000.00
54 SNI dia. 1/2" , Pj 6 meter batang 154,300 130,000 105,000.00
Assesories Pipa GIP
Knee 90°
55 Ukuran dia. 4" buah 169,180 150,000 140,000.00
56 Ukuran dia. 3" buah 93,390 93,500 80,000.00
57 Ukuran dia. 2½" buah 61,270 55,000 52,500.00
58 Ukuran dia. 2 buah 32,110 27,500 30,000.00
59 Ukuran dia. 1½" buah 20,460 17,500 18,500.00
60 Ukuran dia. 1 buah 11,220 9,000 9,000.00
Knee 45°
61 Ukuran dia. 4" buah 191,300 175,000 162,500.00
62 Ukuran dia. 3" buah 111,835 100,000 102,000.00
63 Ukuran dia. 2½" buah 73,575 - 63,750.00
64 Ukuran dia. 2 buah 35,315 32,500 30,500.00
65 Ukuran dia. 1½" buah 23,545 22,500 21,500.00
66 Ukuran dia. 1 buah 11,770 - 10,500.00
Double Nipple
67 Ukuran dia. 3" buah 64,240 60,000 55,250.00
68 Ukuran dia. 2 buah 43,780 20,000 21,500.00
69 Ukuran dia. 1½" buah 15,180 15,000 15,000.00
Tee
70 Ukuran dia. 2 x 2 x 2" buah 40,865 35,000 36,500.00
71 Ukuran dia. 1½ x 1½ x 1½" buah 48,705 25,000 40,000.00
Reducer
72 Ukuran dia. 3" x 2 " buah 72,925 67,500 65,000.00
73 Ukuran dia. 2 x 1½" buah 24,305 22,500 22,500.00
Flange
74 Ukuran dia. 3" buah 95,000 60,000 67,500.00
Harga Satuan (Rp.)
CV. RAJA TIRTA
No. Nama barang/alat Satuan BAHANA UD. JAYA ABADI
JAYA
SUPRALON LANGGENG WAVIN
75 Ukuran dia. 2½" buah 85,000 60,500 60,000.00
76 Ukuran dia. 2 buah 70,000 50,000 52,000.00
77 Ukuran dia. 1½" buah 60,000 - 45,000.00
Water Mur
78 Ukuran dia. 3" buah - 160,000 160,000.00
79 Ukuran dia. 2½" buah - 110,000 105,000.00
80 Ukuran dia. 2 buah 65,895 57,500 57,500.00
81 Ukuran dia. 1 1/2" buah 45,840 40,000 40,000.00
Gate Valve Onda Brass
82 Ukuran dia. 4" buah 2,167,750 - 900,000.00
83 Ukuran dia. 3" buah 1,150,250 750,000 825,000.00
84 Ukuran dia. 2½" buah 839,750 550,000 605,000.00
85 Ukuran dia. 2 buah 395,750 250,000 275,000.00
86 Ukuran dia. 1½" buah 277,250 175,000 200,000.00
87 Ukuran dia. 1 buah 143,250 - 97,500.00
Check Valve
88 Ukuran dia. 3" buah 1,456,750 - 685,000.00
89 Ukuran dia. 2" buah 525,500 - 315,000.00
Accesorries Lainnya
90 Mur Baut no.12 buah - - 2,500.00
91 Karet Pelapis Flange buah - - 50,000.00
92 Kunci Pipa dia. 3" No. 36 buah - - 450,000.00
93 Kunci Pipa dia. 2" buah - - 350,000.00
Accesorries Lainnya
89 Sney Pipa dia. 3" buah - - 1,000,000.00
90 Sney Pipa dia. 2" buah - 700,000.00
91 Water Meter dia.3 buah 2,000,000.00
92 Water Meter dia.2 buah - 1,600,000
Catatan: Harga Satuan sampai dengan lokasi
NGAN HARGA BAHAN/ALAT, UPAH

Spesifikasi Teknik Ket.

Tekanan Nominal pipa minimal


1,00 Mpa atau 10 bar (SNI 06-
0084- 2002) dengan tebal dinding
nominal S12,5.

Sistim Penyambungan dengan


gelang karet (RRJ = Rubber Ring
Joint) dan dapat dengan lem (SCJ
= Solven Cement Joint).

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .
Spesifikasi Teknik Ket.

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .
Spesifikasi Teknik Ket.

SNI Klas Medium A, semua pipa


dan alat penyambung harus
dapat menerima tekanan kerja
minimum sebesar 10.0 kg/cm2
atau 10 bar dan maximum 50
kg/cm2 atau 50 bar.

Semua material bantu seperti


fitting, elbow 90, reducer, tee,
sock drat, coupling dan lainnya
harus dari bahan dengan kualitas
yang sama dengan pipa yang
digunakan.

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
Spesifikasi Teknik Ket.

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .

Assesories Pipa harus dari bahan


dengan kualitas yang sama
dengan pipa yang digunakan (SNI
06-0135- 1987) .
ANALISA SNI 2008
DAFTAR ANALISA
PROGRAM : PAMSIMAS
PEKERJAAN : SARANA AIR MINUM DAN SANITASI
LOKASI : PINRANG
TAHUN ANGGARAN : 2016

6.8 1 m2 Membersihkan lapangan dan peralatan Pekerjaan Persiapan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 85,000.00 8,500.00
JUMLAH 8,500.00
JUMLAH 8,500.00

6.4 1 m' Pengukuran dan pemasangan bouwplank Pekerjaan Persiapan


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.100 85,000.00 8,500.00
4. Tukang Kayu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 18,000.00

B. BAHAN
1. Kayu Klas II uk. 5/7 M3 0.012 5,000,000.00 60,000.00
2. Paku biasa 2" - 5" Kg 0.020 17,000.00 340.00
3. Kayu papan Kelas III M3 0.007 3,700,000.00 25,900.00
JUMLAH 86,240.00
JUMLAH A + B 104,240.00

6.1 1 m3 Galian tanah biasa sedalam 1 meter Pekerjaan Tanah


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KOEFISIEN
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.750 85,000.00 63,750.00
JUMLAH A 63,750.00

6.2 1 m3 Galian tanah biasa sedalam 2 meter Pekerjaan Tanah


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.900 85,000.00 76,500.00
JUMLAH A 76,500.00

6.9 1 m3 Urugan kembali (1/3 Volume Galian) Pekerjaan Tanah


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )
A. TENAGA KERJA
1. Pekerja Hari/Orang 0.250 85,000.00 21,250.00
JUMLAH A 21,250.00
6.15 1 m3 Urugan tanah Pekerjaan Tanah
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
JUMLAH A 25,500.00

B. BAHAN
1. Tanah urug M3 1.200 62,500.00 75,000.00
JUMLAH 75,000.00
JUMLAH A + B 100,500.00

6.10 1 m3 Pemadatan tanah


SATUAN HARGA SATUAN BIAYA SATUAN
NO. URAIAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.500 85,000.00 42,500.00
2 Tukang Gali Hari/Orang 0.050 95,000.00 4,750.00
JUMLAH A 47,250.00

6.11 1 m3 Urugan pasir Pekerjaan Tanah


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
JUMLAH A 25,500.00

B. BAHAN
1. Pasir urug M3 1.200 81,500.00 97,800.00
JUMLAH 97,800.00
JUMLAH A + B 123,300.00
6.9 1 m3 Pasang batu kosong (aanstamping) Pekerjaan Pondasi
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.780 85,000.00 66,300.00
2. Tukang Batu Hari/Orang 0.390 95,000.00 37,050.00
JUMLAH 103,350.00

B. BAHAN
1. Batu belah 10/15 cm M3 1.200 150,000.00 180,000.00
2 Pasir urug M3 0.432 81,500.00 35,208.00
JUMLAH 215,208.00
JUMLAH A + B 318,558.00

6.11 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps Pekerjaan Dinding


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.300 85,000.00 25,500.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 35,000.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,180.00 13,570.00
3. Pasir pasang M3 0.043 105,000.00 4,515.00
JUMLAH 67,085.00
JUMLAH A + B 102,085.00
6.5 1 m3 Pasang pondasi batu kali, 1 Pc : 4 Ps
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.500 85,000.00 127,500.00
2. Tukang Batu Hari/Orang 0.600 95,000.00 57,000.00
JUMLAH 184,500.00

B. BAHAN
1. Batu belah 10/15 cm M3 1.100 150,000.00 165,000.00
2. Semen Portland Kg 163.000 1,180.00 192,340.00
3. Pasir pasang M3 0.520 105,000.00 54,600.00
JUMLAH 411,940.00
JUMLAH A + B 596,440.00

6.1 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 85,000.00 140,250.00
2. Tukang Batu Hari/Orang 0.250 95,000.00 23,750.00
JUMLAH 164,000.00

B. BAHAN
1. Semen Portland Kg 218.000 1,180.00 257,240.00
2. Pasir beton M3 0.520 105,000.00 54,600.00
3. Cipping beton M3 0.870 240,700.00 209,409.00
JUMLAH 521,249.00
JUMLAH A + B 685,249.00

6.5 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr Pekerjaan Beton


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.650 85,000.00 140,250.00
2. Tukang Batu Hari/Orang 0.250 95,000.00 23,750.00
JUMLAH 164,000.00

B. BAHAN
1. Semen Portland Kg 232.000 1,180.00 273,760.00
2. Pasir beton M3 0.520 105,000.00 54,600.00
3. Koral beton (2 -3 ) M3 0.780 240,700.00 187,746.00
JUMLAH 516,106.00
JUMLAH A + B 680,106.00

6.17 1 Kg Pembesian dengan besi polos atau besi ulir Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.007 85,000.00 595.00
2. Tukang Besi Hari/Orang 0.007 95,000.00 665.00
JUMLAH 1,260.00
B. BAHAN
1. Besi beton ( polos/ulir ) Kg 1.050 10,000.00 10,500.00
2. Kawat beton Kg 0.015 15,750.00 236.25
JUMLAH 10,736.25
JUMLAH A + B 11,996.25
6.20 1 m2 Pasang bekisting untuk pondasi Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 85,000.00 44,200.00
2. Tukang Kayu Hari/Orang 0.260 95,000.00 24,700.00
JUMLAH 68,900.00

B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.300 17,000.00 5,100.00
3. Minyak bekisting Ltr 0.100 12,000.00 1,200.00
JUMLAH 154,300.00
JUMLAH A + B 223,200.00

6.21 1 m2 Pasang bekisting untuk sloof Pekerjaan Beton


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.520 85,000.00 44,200.00
2. Tukang Kayu Hari/Orang 0.260 95,000.00 24,700.00
JUMLAH 68,900.00

B. BAHAN
1. Kayu Kls III M3 0.045 3,700,000.00 166,500.00
2. Paku biasa 2" - 5' Kg 0.300 17,000.00 5,100.00
3. Minyak bekisting Ltr 0.100 12,000.00 1,200.00
JUMLAH 172,800.00
JUMLAH A + B 241,700.00

6.22 1 m2 Pasang bekisting untuk kolom Pekerjaan Beton


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00

B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.015 5,000,000.00 75,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 M Btg 0.667 31,500.00 21,000.00
JUMLAH 295,200.00
JUMLAH A + B 382,650.00

6.23 1 m2 Pasang bekisting untuk balok Pekerjaan Beton


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00

B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.018 5,000,000.00 90,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 M Btg 0.667 31,500.00 21,000.00
JUMLAH 310,200.00
JUMLAH A + B 397,650.00
6.24 1 m2 Pasang bekisting untuk lantai Pekerjaan Beton
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Batu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00

B. BAHAN
1. Kayu Kls III M3 0.040 3,700,000.00 148,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.015 5,000,000.00 75,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 m Btg 2.000 31,500.00 63,000.00
JUMLAH 337,200.00
JUMLAH A + B 424,650.00

6.25 1 m2 Pasang bekisting untuk dinding Pekerjaan Beton


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.660 85,000.00 56,100.00
2. Tukang Kayu Hari/Orang 0.330 95,000.00 31,350.00
JUMLAH 87,450.00

B. BAHAN
1. Kayu Kls III M3 0.030 3,700,000.00 111,000.00
2. Paku biasa 2" - 5' Kg 0.400 17,000.00 6,800.00
3. Minyak bekisting Ltr 0.200 12,000.00 2,400.00
4. Balok Kayu Kls II M3 0.020 5,000,000.00 100,000.00
5. Plywood tebal 9 mm Lmbr 0.350 120,000.00 42,000.00
6. Bambu P = 12 m Btg 2.333 31,500.00 73,500.00
JUMLAH 335,700.00
JUMLAH A + B 423,150.00

6.2 Membuat dan memasang 1 m³ kusen pintu dan kusen jendela kayu kls II Pekerjaan Kayu
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 6.000 85,000.00 510,000.00
2. Tukang Kayu Hari/Orang 18.000 95,000.00 1,710,000.00
JUMLAH 2,220,000.00

B. BAHAN
1. Balok Kayu Kls II M3 1.200 5,000,000.00 6,000,000.00
2. Paku 10 cm Kg 1.250 17,000.00 21,250.00
3. Lem kayu Kg 1.000 30,000.00 30,000.00
JUMLAH 6,051,250.00
JUMLAH A + B 8,271,250.00
6.5 Membuat dan memasang 1 m² daun pintu panel Pekerjaan Kayu
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.000 85,000.00 85,000.00
2. Tukang Kayu Hari/Orang 3.000 95,000.00 285,000.00
JUMLAH 370,000.00

B. BAHAN
1. Papan Kayu Kls II M3 0.040 5,500,000.00 220,000.00
2. Lem kayu Kg 0.500 30,000.00 15,000.00
JUMLAH 235,000.00
JUMLAH A + B 605,000.00

17 1 M² pasang kaca polos tebal 5 mm Pekerjaan Kunci, Alat Gantung dan Kaca
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.150 85,000.00 12,750.00
2. Tukang Kayu Hari/Orang 0.150 95,000.00 14,250.00
JUMLAH 27,000.00

B. BAHAN
1. Kaca polos 5 mm M² 1.100 315,000.00 346,500.00
JUMLAH 346,500.00
JUMLAH A + B 373,500.00

6.9 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 85,000.00 27,200.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 36,700.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 18.950 1,180.00 22,361.00
3. Pasir pasang M3 0.038 105,000.00 3,990.00
JUMLAH 75,351.00
JUMLAH A + B 112,051.00

6.11 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.320 85,000.00 27,200.00
2. Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 36,700.00

B. BAHAN
1. Bata merah 5 x 11 x 22 cm Bh 70.000 700.00 49,000.00
2. Semen Portland Kg 11.500 1,180.00 13,570.00
3. Pasir pasang M3 0.043 105,000.00 4,515.00
JUMLAH 67,085.00
JUMLAH A + B 103,785.00
6.13 1 m2 Plesteran 1 Pc : 2 Ps, tebal 20 mm Pekerjaan Plesteran
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 85,000.00 34,000.00
2. Tukang Batu Hari/Orang 0.200 95,000.00 19,000.00
JUMLAH 53,000.00

B. BAHAN
1. Semen Portland Kg 13.632 1,180.00 16,085.76
2. Pasir pasang M3 0.027 105,000.00 2,835.00
JUMLAH 18,920.76
JUMLAH A + B 71,920.76

6.15 1 m2 Plesteran 1 Pc : 4 Ps, tebal 20 mm Pekerjaan Plesteran


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.400 85,000.00 34,000.00
2. Tukang Batu Hari/Orang 0.200 95,000.00 19,000.00
JUMLAH 53,000.00

B. BAHAN
1. Semen Portland Kg 8.320 1,180.00 9,817.60
2. Pasir pasang M3 0.032 105,000.00 3,360.00
JUMLAH 13,177.60
JUMLAH A + B 66,177.60

6.27 1 m2 Acian Dinding Pekerjaan Plesteran


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
Pekerja Hari/Orang 0.200 85,000.00 17,000.00
Tukang Batu Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 26,500.00

B. BAHAN
Semen Portland Kg 3.250 1,180.00 3,835.00
JUMLAH 3,835.00
JUMLAH A + B 30,335.00

6.14 Pekerjaan
1 m2 pengecatan tembok baru (1 x Plamir, 1 x cat dasar, 2 x cat penutup ) Pengecatan dan Finishing
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.020 85,000.00 1,700.00
2. Tukang Cat Hari/Orang 0.063 95,000.00 5,985.00
JUMLAH 7,685.00

B. BAHAN
Plamir Kg 0.100 2,950.00 295.00
1. Cat dasar Kg 0.100 25,000.00 2,500.00
2. Cat penutup 2 kali Kg 0.260 236,250.00 61,425.00
JUMLAH 64,220.00
JUMLAH A + B 71,905.00
6.8 Pekerjaan Pengecatan dan Finishing
1 m2 pengecatan bidang kayu baru (1x plamur , 1 x cat dasar, 2 x cat penutup)
NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.070 85,000.00 5,950.00
2. Tukang Cat Hari/Orang 0.009 95,000.00 855.00
JUMLAH 6,805.00

B. BAHAN
1. Cat meni Kg 0.200 21,137.00 4,227.40
2. Plamur Kg 0.150 2,950.00 442.50
3. Cat dasar Kg 0.170 25,000.00 4,250.00
4. Cat penutup 2 kali Kg 0.260 57,750.00 15,015.00
JUMLAH 23,934.90
JUMLAH A + B 30,739.90

6.12 1 m2 pintu besi plat baja Pekerjaan Besi & Alumunium


NO. HARGA SATUAN BIAYA SATUAN
URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 1.050 85,000.00 89,250.00
2. Tukang Las Hari/Orang 1.050 95,000.00 99,750.00
JUMLAH 189,000.00

B. BAHAN
1. Besi plat Kg 32.800 10,000.00 328,000.00
2. Besi siku 30.30.3 Kg 15.000 10,000.00 150,000.00
JUMLAH 478,000.00
JUMLAH A + B 667,000.00

6.12 1 m2 pasang tangga monyet


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Tukang Las Hari/Orang 1.200 95,000.00 114,000.00
2. Pekerja Hari/Orang 1.200 85,000.00 102,000.00
JUMLAH 216,000.00

B. BAHAN
1. Pipa gip 1" M' 4.000 30,833.33 123,333.33
JUMLAH 123,333.33
JUMLAH A + B 339,333.33

6.25 Memasang 1 m' Pipa PVC tipe SNI diameter 1/2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00

B. BAHAN
1. Pipa PVC M' 1.200 3,583.33 4,300.00
JUMLAH 4,300.00
JUMLAH A + B 13,060.00
6.26 Memasang 1 m' Pipa PVC tipe SNI diameter 3/4"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00

B. BAHAN
1. Pipa PVC M' 1.200 4,916.67 5,900.00
JUMLAH 5,900.00
JUMLAH A + B 14,660.00
6.27 Memasang 1 m' Pipa PVC tipe SNI diameter 1"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.036 85,000.00 3,060.00
2. Tukang Pipa Hari/Orang 0.060 95,000.00 5,700.00
JUMLAH 8,760.00

B. BAHAN
1. Pipa PVC M' 1.200 72,675.00 87,210.00
JUMLAH 87,210.00
JUMLAH A + B 95,970.00

6.29 Memasang 1 m' Pipa PVC tipe AW diameter 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 85,000.00 4,590.00
2. Tukang Pipa Hari/Orang 0.090 95,000.00 8,550.00
JUMLAH 13,140.00

B. BAHAN
1. Pipa PVC M' 1.200 116,000.00 139,200.00
JUMLAH 139,200.00
JUMLAH A + B 152,340.00

6.31 Memasang 1 m' Pipa PVC tipe SNI diameter 3"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 85,000.00 6,885.00
2. Tukang Pipa Hari/Orang 0.135 95,000.00 12,825.00
JUMLAH 19,710.00

B. BAHAN
1. Pipa PVC M' 1.200 30,000.00 36,000.00
JUMLAH 36,000.00
JUMLAH A + B 55,710.00

6.32 Memasang 1 m' Pipa PVC tipe SNI diameter 4"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.081 85,000.00 6,885.00
2. Tukang Pipa Hari/Orang 0.135 95,000.00 12,825.00
JUMLAH 19,710.00

B. BAHAN
1. Pipa PVC M' 1.200 59,166.67 71,000.00
JUMLAH 71,000.00
JUMLAH A + B 90,710.00
6.35 Memasang 1 buah kran diameter 3/4" atau 1/2"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.010 85,000.00 850.00
2. Tukang Pipa Hari/Orang 0.100 95,000.00 9,500.00
JUMLAH 10,350.00

B. BAHAN
1. Kran air Buah 1.000 35,000.00 35,000.00
2. Seal tape Buah 0.025 2,500.00 62.50
JUMLAH 35,062.50
JUMLAH A + B 45,412.50

6.22 Memasang 1 m' Pipa galvanis diameter 3/4" atau 1"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.054 85,000.00 4,590.00
2. Tukang Pipa Hari/Orang 0.090 95,000.00 8,550.00
JUMLAH 13,140.00

B. BAHAN
1. Pipa galvanis M' 1.200 30,833 37,000.00
JUMLAH 37,000.00
JUMLAH A + B 50,140.00

6.22 Memasang 1 m' Pipa galvanis diameter 1 1/ 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Batu Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00

B. BAHAN
1. Pipa galvanis M' 1.200 265,833 319,000.00
JUMLAH 319,000.00
JUMLAH A + B 344,380.00

6.22 Memasang 1 m' Pipa galvanis diameter 2"


HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Batu Hari/Orang 0.180 - -
JUMLAH 9,180.00

B. BAHAN
1. Pipa galvanis M' 1.200 275,000 330,000.00
JUMLAH 330,000.00
JUMLAH A + B 339,180.00
6.22 Memasang 1 m' Pipa galvanis diameter 3"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Pipa Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00

B. BAHAN
1. Pipa galvanis M' 1.200 104,167 125,000.00
JUMLAH 125,000.00
JUMLAH A + B 150,380.00
6.22 Memasang 1 m' Pipa galvanis diameter 4"
HARGA SATUAN BIAYA SATUAN
NO. URAIAN SATUAN KUANTITAS
( Rp ) ( Rp )

A. TENAGA KERJA
1. Pekerja Hari/Orang 0.108 85,000.00 9,180.00
2. Tukang Pipa Hari/Orang 0.180 90,000.00 16,200.00
JUMLAH 25,380.00

B. BAHAN
1. Pipa galvanis M' 1.200 137,500 165,000.00
JUMLAH 165,000.00
JUMLAH A + B 190,380.00
RENCANA SELURUH KEGIATAN PELAKSANAAN RKM
Dengan pembobotan sesuai kegiatan, volume terhadap total dana RKM
( dalam excel dalam bentuk kurva S )
NO URAIAN PEKERJAAN VOLUME BIAYA Bobot (%)

A. KEGIATAN PELATIHAN
1 Pelatihan Teknik 1 Paket 455,000 0.18%
2 Pelatihan. Administrasi keuangan dan pembukuan 1 Paket 452,000 0.18%
3 Pelatihan PHBS Masyarakat 1 Paket 705,000 0.28%
4 Pelatihan CLTS Masyarakat 1 Paket 389,000 0.16%
6 Operasional KKM 1 Paket 7,138,000 2.86%
B. KEGIATAN SARANA AIR BERSIH
1 PEK. RESERVOIR 1 Unit 52,761,000 21.10%
2 PENYELIDIKAN GEOHIDROLOGI/GEOLISTRIK 1 Paket Err:509 Err:509
3 PEK. PENGEBORAN SUMUR DALAM 1 Paket 61,532,000 24.61%
4 PENGADAAN PIPA 1 Paket 126,665,000 50.67%
5 PEMASANGAN PIPA 1 Paket 56,000,000 22.40%
6 PENGADAAN POMPA 1 Paket Err:509 Err:509
7 PENGADAAN LISTRIK PLN 1 Paket Err:509 Err:509
8 ALAT SAB 1 Paket 2,130,000 4.07%
C. KEGIATAN SANITASI dan PHBS
MASYARAKAT
a Promkes tentang pentingnya BAB di jamban 1 Paket 33,000 0.01%
b Promkes tentang Cara Cuci Tangan yang benar 1 Paket 33,000 0.01%
c Verifikasi SBS 1 Paket 32,000 0.01%
d Monitoring Progres Akses Jamban & CTPS 1 Paket 66,000 0.03%
e Pemeriksaan Kualitas Air Sebelum dan Sesudah Program 2 Paket Err:509 Err:509
RUH KEGIATAN PELAKSANAAN RKM

WAKTU PELAKSANAAN

November
November
November
November
November - Desember

November - Desember
Oktober
November - Desember
November - Desember
November - Desember
Desember
November - Desember
November

November - Desember
November - Desember
November - Desember
November - Desember
November - Desember
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBERDAYAAN

Propinsi : Sulawesi Selatan Nomor RAB : 00


Kabupaten : Pinrang Program : PAMSIMAS III
Kecamatan : Lembang Kegiatan : Rekapitulasi RAB Pemberdayaan
Desa : Kariango

Unit Harga Satuan


No Uraian Vol. Jumlah Biaya (Rp)
Satuan (Rp)
A. Pelatihan
1 Pelatihan Teknis 1 Paket 901,000 901,000
2 Pelatihan Administrasi Keuangan dan Pembukuan 1 Paket 882,000 882,000
3 Pelatihan PHBS Masyarakat 1 Paket 767,000 767,000
4 Pelatihan CLTS Masyarakat 1 Paket 651,000 651,000
5 Pelatihan Badan Pengelola SAB, Sanitasi & Kesehatan 1 Paket 955,000 955,000
B. Operasional
1 ATK 1 Paket 2,075,000 2,075,000
2 Administrasi 1 Paket 4,325,000 4,325,000
3 Transportasi 1 Paket 7,600,000 7,600,000
TOTAL 18,156,000

Kariango, Oktober 2016

Disetujui Oleh: Dibuat Oleh:


CF Bidang Pemberdayaan, KKM TONDO BUNGA
Desa Kariango
RAHMAT D ABD, ST / ISMAIL H, SE / HUSNI A, SE RUDI
Koordinator
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PHBS DAN SANITASI SEKOLAH

Propinsi : Sulawesi Selatan Nomor RAB : 00


Kabupaten : Pinrang Program : PAMSIMAS III
Kecamatan : Lembang Kegiatan : Rekapitulasi RAB Kesehatan
Desa : Kariango Sekolah

Harga Satuan Jumlah Biaya


No Uraian Vol. Unit Satuan
(Rp) (Rp)
1 Promkes "Stop BAB Sembarangan" 2 Paket 94,000 188,000
2 Promkes Melalui Media Kesehatan Tentang PHBS (Poster) 2 Paket 1,020,000 2,040,000
3 Promkes Cuci Tangan Pakai Sabun (CTPS) 2 Paket 108,000 216,000
4 Demo Cuci Tangan Pakai Sabun (CTPS) 2 Paket 150,000 300,000
5 Monitoring Higiene dan sanitasi sekolah 2 Paket 13,000 26,000
TOTAL 2,770,000

Kariango, Oktober 2016

Disetujui Oleh: Dibuat Oleh:


CF Bidang Pemberdayaan, KKM TONDO BUNGA
Desa Kariango

RAHMAT D ABD, ST / ISMAIL H, SE / HUSNI A, SE RUDI


Koordinator
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN PHBS DAN SANITASI MASYARAKAT

Propinsi : Sulawesi Selatan Nomor RAB : 00


Kabupaten : Pinrang Program : PAMSIMAS III
Kecamatan : Lembang Kegiatan : Rekapitulasi RAB Kesehatan
Desa : Kariango Masyarakat

Harga Satuan
No Uraian Vol. Unit Satuan Jumlah Biaya (Rp)
(Rp)
1 Monitoring Progres Akses Jamban dan CTPS 3 Paket 78,000 234,000
2 Verifikasi SBS/ODF 3 Paket 78,000 234,000
3 Promkes "Stop BAB Sembarangan" 3 Paket 47,000 141,000
4 Promkes Melalui Media Kesehatan Tentang SBS dan CTPS 1 Paket 3,900,000 3,900,000
5 Promkes Cuci Tangan Pakai Sabun (CTPS) 3 Paket 47,000 141,000
6 Demo Cuci Tangan Pakai Sabun (CTPS) 3 Paket 165,000 495,000
7 Uji Kualitas Air 2 Paket 677,000 1,354,000
TOTAL 6,499,000

Kariango, Oktober 2016

Disetujui Oleh: Dibuat Oleh:


CF Bidang Pemberdayaan, KKM TONDO BUNGA
Desa Kariango

RAHMAT D ABD, ST / ISMAIL H, SE / HUSNI A, SE RUDI


Koordinator
RENCANA ANGGARAN BIAYA
Provinsi/Kabupaten-Kota/Kecamatan/Desa: Sulawesi Selatan/Pinrang
Nomor RAB : 03
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6
1 BAHAN
A. PEKERJAAN PENDAHULUAN
- Pengukuran & Pemasangan Bowplank
1.1 Kayu balok klas II uk. 5/7 2.50 0.012 0.03
1.2 Paku biasa 2" - 5 " 2.50 0.020 0.05
1.3 Kayu papan kls II uk.2/20 2.50 0.007 0.018
D. PEKERJAAN BETON
- SLOEF 15/20 CM
* Beton
1.1 Semen portland 0.12 232.000 27.84
1.2 Pasir Beton 0.12 0.520 0.06
1.3 Kerikil beton 0.12 0.780 0.09
* Pembesian
1.1 Besi beton Polos 14.21 1.050 14.92
1.2 Kawat beton 14.21 0.015 0.21
* Bekisting
1.1 Kayu terentang 0.16 0.040 0.01
1.2 Paku biasa 2" - 5" 0.16 0.400 0.06
1.3 Minyak Bekisting 0.16 0.200 0.03
1.4 Kayu balok klas II uk. 5/7 0.16 0.018 0.0029
1.5 Playwood tebal 9 mm 0.16 0.350 0.06
1.6 Bambu 0.16 2.000 0.32
- DINDING BETON
* Beton
1.1 Semen portland 0.80 232.000 185.60
1.2 Pasir Beton 0.80 0.520 0.42
1.3 Kerikil beton 0.80 0.780 0.62
* Pembesian
1.1 Besi beton Polos 71.04 1.050 74.59
1.2 Kawat beton 71.04 0.015 1.07
* Bekisting
1.1 Kayu terentang 8.00 0.040 0.32
1.2 Paku biasa 2" - 5' 8.00 0.400 3.20
1.3 Minyak bekisting 8.00 0.200 1.60
1.4 Balok kayu borneo 8.00 0.015 0.12
1.5 Playwood tebal 9 mm 8.00 0.350 2.80
1.6 Bambu 8.00 2.000 16.00
E. PEKERJAAN FINISHING
- Plesteran sisi luar
1.1 Semen Portland 4.000 8.680 34.72
1.2 Pasir pasang 4.000 0.028 0.11
- Acian sisi dalam
1.1 Semen Portland 4 5.927 23.71
- Pengecatan sissi luar
1.1 Cat penutup 2 kali 4.000 0.180 0.72
2 UPAH
A. PEKERJAAN PENDAHULUAN
- Membersihkan Lapangan dan Peralatan
3.1 Pekerja 2.50 0.100 0.25
- Pemasangan Bowplank
3.1 Pekerja 2.50 0.100 0.25
3.2 Tukang 2.50 0.100 0.25
B. PEKERJAAN TANAH
- Galian Tanah
3.1 Pekerja 11.25 0.625 7.03
- Urugan Pasir
3.1 Pekerja 1.20 0.300 0.36
- Urugan Tanah
3.1 Pekerja 2.81 0.192 0.54
D. PEKERJAAN BETON
- SLOEF 15/20 CM
* Beton
3.1 Pekerja 0.12 1.650 0.20
3.2 Tukang 0.12 0.250 0.03
* Pembesian
3.1 Pekerja 14.21 0.007 0.10
3.2 Tukang 14.21 0.007 0.10
* Bekisting
3.1 Pekerja 0.16 0.320 0.05
3.2 Tukang 0.16 0.330 0.05
- DINDING BETON
* Beton
3.1 Pekerja 0.80 1.650 1.32
3.2 Tukang 0.80 0.250 0.20
* Pembesian
3.1 Pekerja 71.04 0.007 0.50
3.2 Tukang 71.04 0.007 0.50
* Bekisting
3.1 Pekerja 8.00 0.300 2.40
3.2 Tukang 8.00 0.330 2.64
F. PEKERJAAN FINISHING
- Plesteran sisi luar
3.1 Pekerja 4.00 0.25 1.00
3.2 Tukang 4.00 0.2 0.80
- Acian sisi dalam
3.1 Pekerja 4 0.085 0.34
3.2 Tukang 4 0.05 0.20
- Pengecetan
3.1 Pekerja 4.000 0.028 0.11
3.2 Tukang 4.000 0.042 0.17

B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi
- Upah
Pekerja 0.080 0.750 0.06 0.00
2 Pek. Pasir Urug. Bawah Pondasi
- Bahan
Pasir 0.02 1.2 0.02 0.00
- Upah
Pekerja 0.020 0.300 0.01 0.00
C. PEKERJAAN PASANGAN BATU
1 Pas. Pondasi Batu Gunung
- Bahan
Batu belah 10/15 cm 0.150 1.200 0.18 0.00
Semen Portland 0.150 163.000 24.45 0.00
Pasir pasang 0.150 0.520 0.08 0.00
- Upah
Pekerja 0.150 1.500 0.23 0.00
Tukang 0.150 0.750 0.11 0.00
- DINDING BETON
* Dinding Beton
- Bahan
1.1 Semen portland 0.280 232.000 64.96
1.2 Pasir Beton 0.280 0.520 0.15
1.3 Kerikil beton 0.280 0.780 0.22
- Upah
Pekerja 0.280 1.650 0.46
Tukang 0.280 0.250 0.07
* Pembesian
- Bahan
1.1 Besi beton Polos 49.728 1.050 52.21
1.2 Kawat beton 49.728 0.015 0.75
- Upah
Pekerja 49.728 0.007 0.35
Tukang 49.728 0.007 0.35
* Bekisting
- Bahan
1.1 Kayu Kls III 2.800 0.040 0.11
1.2 Paku biasa 2" - 5' 2.800 0.400 1.12
1.3 Minyak bekisting 2.800 0.200 0.56
1.4 Balok Kayu Kls II 2.800 0.015 0.04
1.5 Plywood tebal 4 mm 2.800 0.350 0.98
1.6 Bambu P = 12 M 2.800 2.000 5.60
- Upah
Pekerja 2.800 0.300 0.84
Tukang 2.800 0.330 0.92
F. PEKERJAAN FINISHING
- Pekerjaan Plesteran
1.1 Semen Portland 2.80 8.680 24.30
1.2 Pasir pasang 2.80 0.028 0.08
- Upah
Pekerja 2.800 0.250 0.70
Tukang 2.800 0.200 0.56
- Pengecatan sisi luar
1.1 Cat penutup 2 kali 2.800 0.180 0.50
- Upah
3.1 Pekerja 2.800 0.028 0.08
3.2 Tukang 2.800 0.042 0.12
Bahan
Upah i
Biaya Langsiran Semen (upah ii)
Biaya Langsiran Pasir (upah iii)
Biaya Langsiran Kerikil (upah iv)

Disetujui Oleh : Diperiksa Oleh :


Ketua DPMU Fasilitator Masyarakat HID

( Drs. AKHMAD YASIN, M.A.P. ) ( RUSYDIN MAS'UDY, ST)


NIP. 19561202 198303 1 010
NGGARAN BIAYA
a: Sulawesi Selatan/Pinrang/Lembang/Kariango
Sub pekerjaan/Kegiatan : Penangkap Mata Air
Ukuran/Dimensi : 350,0

me Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
7 8 9 10=4x9 11=5x9 12=6x9 13=7x9

0.03 M3 2,500,000 75,000 - - 75,000


0.05 Kg 17,000 850 - - 850
0.02 M3 2,500,000 43,750 - - 43,750
-
-
-
27.84 Kg 1,160 32,294 - - 32,294 0.56
0.06 M3 97,200 6,065 - - 6,065
0.09 M3 162,500 15,210 - - 15,210
- -
14.92 Kg 10,000 149,184 - - 149,184
0.21 Kg 10,000 2,131 - - 2,131
- -
0.01 M3 2,500,000 16,000 - - 16,000
0.06 Kg 17,000 1,088 - - 1,088
0.03 Ltr 10,000 320 - - 320
0.00 M3 2,500,000 7,200 - - 7,200
0.06 Lbr 60,000 3,360 - - 3,360
0.32 Btg 31,500 10,080 - - 10,080
- -
- -
185.60 Kg 1,160 215,296 - - 215,296 3.71
0.42 M3 97,200 40,435 - - 40,435
0.62 M3 162,500 101,400 - - 101,400
0.00 - -
74.59 Kg 7,000 522,144 - - 522,144
1.07 Kg 10,000 10,656 - - 10,656
- -
0.32 M3 2,500,000 800,000 - - 800,000
3.20 Kg 17,000 54,400 - - 54,400
1.60 Ltr 10,000 16,000 - - 16,000
0.12 M3 2,500,000 300,000 - - 300,000
2.80 Lbr 60,000 168,000 - - 168,000
16.00 Btg 31,500 504,000 - - 504,000
- - -
- - -
34.72 Kg 1,160 40,275 - - 40,275 0.69
0.11 M3 97,200 10,886 - - 10,886
0.00 - -
23.71 Kg 1,160 27,501 - - 27,501
0.00 -
0.72 M2 23,000 16,560 - - 16,560
- -
3,190,087 3,190,087
- -
-
-
0.25 Hok 85,000 21,250 - - 21,250
- -
0.25 Hok 85,000 21,250 - - 21,250
0.25 Hok 95,000 23,750 - - 23,750
-
-
7.03 Hok 85,000 597,656 - - 597,656
- -
0.36 Hok 85,000 30,600 - - 30,600
- - -
0.54 Hok 85,000 45,900 - - 45,900
- -
- -
- -
0.20 Hok 85,000 16,830 - - 16,830
0.03 Hok 95,000 2,850 - - 2,850
0.00 -
0.10 Hok 85,000 8,454 - - 8,454
0.10 Hok 95,000 9,448 - - 9,448
0.00 - -
0.05 Hok 85,000 4,352 - - 4,352
0.05 Hok 95,000 5,016 - - 5,016
0.00

1.32 Hok 85,000 112,200 - - 112,200


0.20 Hok 95,000 19,000 - - 19,000
- - -
0.50 Hok 85,000 42,269 - - 42,269
0.50 Hok 95,000 47,242 - - 47,242
-
2.40 Hok 85,000 204,000 - - 204,000
2.64 Hok 95,000 250,800 - - 250,800
- -
-
1.00 Hok 85,000 85,000 - - 85,000
0.80 Hok 95,000 76,000 - - 76,000
-
0.34 Hok 85,000 28,900 - - 28,900
0.20 Hok 95,000 19,000 - - 19,000
- -
0.11 Hok 85,000 9,520 - - 9,520
0.17 Hok 95,000 15,960 - - 15,960
Sub Total 2) 1,697,247 - - 1,697,247

-
-
0.06 Hok 85,000 5,100 - - 5,100
- -
- -
0.02 M3 97,200 2,333 - 2,333
- - -
0.01 Hok 85,000 510 - - 510
- - -
- - -
- - -
0.18 M3 125,000 22,500 - - 22,500
24.45 kg 1,160 28,362 - - 28,362 0.49
0.08 M3 97,200 7,582 - 7,582
- -
0.23 Hok 85,000 19,125 - - 19,125
0.11 Hok 95,000 10,688 - - 10,688
- - -
- - -
260,860 - - -
64.96 Kg 1,160 75,354 - - 75,354 1.30
0.15 M3 97,200 14,152 - - 14,152
0.22 M3 162,500 35,490 - - 35,490
- -
0.46 HOK 85,000 39,270 - 39,270
0.07 HOK 95,000 6,650 - 6,650
- - -
- - -
52.21 Kg 10,000 522,144 - - 522,144
0.75 Kg 10,000 7,459 - - 7,459
- -
0.35 HOK 85,000 29,588 - 29,588
0.35 HOK 95,000 33,069 - 33,069
- - -
-
0.11 M3 2,500,000 280,000 - - 280,000
1.12 Kg 17,000 19,040 - - 19,040
0.56 Ltr 10,000 5,600 - - 5,600
0.04 M3 2,500,000 105,000 - - 105,000
0.98 Lbr 56,000 54,880 - - 54,880
5.60 Btg 31,500 176,400 - - 176,400
- -
0.84 HOK 85,000 71,400 - 71,400
0.92 HOK 95,000 87,780 - 87,780
- -
-
24.30 Kg 1,160 28,193 - - 28,193 0.49
0.08 M3 97,200 7,620 - - 7,620
- -
0.70 HOK 85,000 59,500 - 59,500
0.56 HOK 95,000 53,200 - 53,200
0.00 -
0.50 M2 23,000 11,592 - - 11,592
- -
0.08 Hok 85,000 6,664 - - 6,664
0.12 Hok 95,000 11,172 - - 11,172
1,403,701
433,716
7.24 Zak 42,000 303,974 303,974 7.24
0.92 M3 1,000,000 916,400 916,400
0.94 M3 300,000 280,800 280,800
(upah i -iv) 1,934,890
Total Upah 3,632,137
3,632,000
Total Bahan 4,593,788
4,594,000
Jumlah Total) 8,226,000 - - 13,113,258 13,113,258
Dibulatkan 8,226,000 - 13,113,000

Kariango, 2016
Dibuat Oleh :
Koordinator LKM Satlak HID

( Drs. JUMHUR ) ( EMIL MIRDAF )


PMA

350,000,000
IN KIND 56,000,000 BHAN LOKAL + UPAH
IN CASH 14,000,000 BPT
APDES 35,000,000 PIPA + HOK
APBN 245,000,000 PABRIKASI

0.120

16.000 14.208

0.160

0.800

besi 12 = 0,888 kg/m


10.000 10.000 20.000 80 71

4.000 8.000

4.000
### 5,375,023
0.150

0.280

7.000 7.000 14.000 56 49.73

PMA APBN
BAK

71,400.000
13,113,258
DAFTAR PERBANDINGAN HARGA BAHAN PABRIKASI

KKM : Tondo Bunga


Desa/Kelurahan : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang

Harga Satuan (Rp.)


No. Nama barang/alat Satuan CV.
CV. BANGUNAN
SEJAHTERA CV. ROMANTIS
JAYA
BAGUNAN
A. Bahan

I Besi Beton Tulangan Polos (Full)

1 Tulangan Polos dia 4 btg 14,000 18,500 14,000

2 Tulangan Polos dia 6 btg 23,000 23,000 21,000

3 Tulangan Polos dia 8 btg 38,000 38,000 36,750

4 Tulangan Polos dia 10 btg 58,000 58,000 57,750

5 Tulangan Polos dia 12 btg 84,000 88,000 78,750

6 Tulangan Polos dia 14 btg 120,000 135,000 103,950

7 Tulangan Polos dia 16 btg - 175,000 141,750

8 Besi kg - - 10,000

II Semen Portland (PC)

1 Semen PCC, berat 50 kg Zak 57,000 58,000 59,000

2 Semen PCC, berat 40 kg Zak - 45,000 48,000

III Material lainnya

1 Besi Plat 3 mm ( 125 x 240 cm) Lbr - 700,000 997,500

2 Besi Siku 40.40.40 cm M1 125,000 125,000 138,600

3 Cat Atap kg - 125,000 23,100

4 Cat Besi / Kayu kg - 52,000 57,750

5 Cat Pelapis Anti Bocor kg 180,000 180,000 71,400

6 Cat Tembok kg 80,000 100,000 236,250


Harga Satuan (Rp.)
No. Nama barang/alat Satuan CV.
CV. BANGUNAN
SEJAHTERA CV. ROMANTIS
JAYA
BAGUNAN
7 Cat Dasar buah 25,000 17,000 25,000

8 Cat Meni buah - 22,000 21,137

9 Closet Jongkok Standard buah 185,000 180,000 299,250

10 Engsel Jendela buah 35,000 35,000 21,000

11 Engsel Pintu buah 50,000 55,000 17,850

12 Grendel Jendela M2 25,000 25,000 36,750

13 Grendel Pintu kg 25,000 25,000 25,000

14 Kaca Tebal 5 mm lembar 125,000 - 315,000

15 Kawat Beton buah 20,000 21,000 15,750

16 Kertas Gosok / Amplas set 5,000 5,000 5,000

17 Kran Air kg 35,000 38,000 35,000

18 Kunci Pintu 2x slaag kg 180,000 185,000 180,000

19 Minyak Bekisting kg - - 12,000

20 Paku 7 cm kg 15,000 18,000 17,000

21 Paku 5 cm kg 16,000 18,000 17,000

22 Paku 3 cm lembar 27,000 28,000 25,000

23 Plamur ( A Plus / skim coat ) lembar 55,000 65,000 59,000

24 Plywood tebal 9 mm lembar 160,000 - 120,000

25 Seng Gelombang Besar M' - - -

26 Seng Gelombang Kecil M' - - -

27 Seng Plat buah 20,000 20,000 20,000

28 Seng Plat buah 17,000 18,000 18,000

29 Tangki Reservoir Kapasitas buah 1,200,000 1,200,000

30 Tangki Reservoir Kapasitas buah - - -


Harga Satuan (Rp.)
No. Nama barang/alat Satuan CV.
CV. BANGUNAN
SEJAHTERA CV. ROMANTIS
JAYA
BAGUNAN
31 Tripleks 120 cm x 240 cm x 3 mm lembar - 65,000 60,000

32 Lem Kayu kg 38,000 38,000 30,000

B. Alat

1 Ember Cor bh 12,000 11,000 10,000

2 Gergaji besi set 72,000 71,000 70,000

3 Gerobak Dorong bh 553,000 52,500 500,000

4 Kuas Cat Besar bh 23,000 21,000 20,000

5 Kuas Cat Kecil bh 8,000 7,500 8,000

6 Kuas Roll bh 30,000 27,000 25,000

7 Kunci Pipa dia. 1/2" - 2" psg - - -

8 Kunci Pipa dia. 1/2" - 3" psg - - -

9 Linggis bh 58,000 56,000 55,000

10 Meteran 5 Meter bh 31,000 30,000 30,000

11 Meteran Roll 50 Meter bh 90,000 85,000 80,000

12 Rol Derek/catrol bh 63,000 62,000 60,000

13 Sekop Besar bh 97,000 72,000 75,000

14 Sekop Kecil bh 87,000 86,000 85,000

15 Sendok Semen bh 27,000 26,000 25,000

16 Sney Pipa dia. 1/2" - 2" set - - -

17 Sney Pipa dia. 2 1/2" - 3" set - - -

18 Tenro' bh 106,000 110,200 100,000

19 Tali Plastik Ø 14 mm m 22,000 21,000 20,000


Harga Satuan (Rp.)
No. Nama barang/alat Satuan CV.
CV. BANGUNAN
SEJAHTERA CV. ROMANTIS
JAYA
BAGUNAN
Catatan: Harga Satuan sampai dengan lokasi
ANDINGAN HARGA BAHAN PABRIKASI

Ket.
Ket.

FIBERGLASS 1 M³

FIBERGLASS 2 M³
Ket.
HARGA BAHAN/ALAT, UPAH

LKM : Tondo Bunga


Desa/Kelurahan : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang

Upah Angkut/ Total


Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
A. Bahan

I Besi Beton Tulangan Polos (Full)

1 Tulangan Polos dia 4 btg 14,000 - 14,000

2 Tulangan Polos dia 6 btg 21,000 - 21,000

3 Tulangan Polos dia 8 btg 36,750 - 36,750

4 Tulangan Polos dia 10 btg 57,750 - 57,750

5 Tulangan Polos dia 12 btg 78,750 - 78,750

6 Tulangan Polos dia 14 btg 103,950 - 103,950

7 Tulangan Polos dia 16 btg 141,750 - 141,750

8 Kawat Beton Kg 10,000 10,000

II Semen Portland (PC)

1 Semen PCC, berat 50 kg Zak 59,000 - 59,000

2 Semen PCC, berat 40 kg Zak 48,000 - 48,000

III Material lainnya

1 Besi Plat 5 mm ( 125 x 240 cm) Lbr 997,500 - 997,500

2 Besi Siku 40.40.40 cm btg 138,600 - 138,600

3 Cat Atap Kg 23,100 - 23,100

4 Cat Besi / Kayu Kg 57,750 - 57,750

5 Cat Pelapis Anti Bocor Kg 71,400 - 71,400

6 Cat Tembok Kg 236,250 - 236,250

7 Cat Dasar Kg 25,000 - 25,000


Upah Angkut/ Total
Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
8 Cat Meni Kg 21,137 - 21,137

9 Closet Jongkok Standard buah 299,250 - 299,250

10 Engsel Jendela buah 21,000 - 21,000

11 Engsel Pintu buah 17,850 - 17,850

12 Grendel Jendela buah 36,750 - 36,750

13 Grendel Pintu buah 25,000 - 25,000

14 Kaca Tebal 5 mm M2 315,000 - 315,000

15 Kawat Beton kg 15,750 - 15,750

16 Kertas Gosok / Amplas lembar 5,000 - 5,000

17 Kran Air buah 35,000 - 35,000

18 Kunci Pintu 2x slaag set 180,000 - 180,000

19 Minyak Bekisting kg 12,000 - 12,000

20 Paku 7 cm kg 17,000 - 17,000

21 Paku 5 cm kg 17,000 - 17,000

22 Paku 3 cm kg 25,000 - 25,000

23 Plamur ( A Plus / skim coat ) Zak 59,000 - 59,000

24 Plywood tebal 9 mm lembar 120,000 - 120,000

25 Seng Gelombang Besar lembar - - -

26 Seng Gelombang Kecil lembar - - -

27 Seng Plat M' 20,000 - 20,000

28 Seng Plat M' 18,000 - 18,000


Upah Angkut/ Total
Harga Satuan
No. Nama barang/alat Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
29 Tangki Reservoir Kapasitas buah 1,200,000 - 1,200,000

30 Tangki Reservoir Kapasitas buah - - -

31 Tripleks 120 cm x 240 cm x 3 mm lembar 60,000 - 60,000

32 Lem Kayu Kg 30,000 - 30,000

B. Alat

1 Ember Cor bh 10,000 - 10,000

2 Gergaji besi set 70,000 - 70,000

3 Gerobak Dorong bh 500,000 - 500,000

4 Kuas Cat Besar bh 20,000 - 20,000

5 Kuas Cat Kecil bh 8,000 - 8,000

6 Kuas Roll bh 25,000 - 25,000

7 Kunci Pipa dia. 1/2" - 2" psg - - -

8 Kunci Pipa dia. 1/2" - 3" psg - - -

9 Linggis bh 55,000 - 55,000

10 Meteran 5 Meter bh 30,000 - 30,000

11 Meteran Roll 50 Meter bh 80,000 - 80,000

12 Rol Derek/catrol bh 60,000 - 60,000

13 Sekop Besar bh 75,000 - 75,000

14 Sekop Kecil bh 85,000 - 85,000

15 Sendok Semen bh 25,000 - 25,000

16 Tenro' bh 100,000 - 100,000

17 Tali Plastik Ø 14 mm m 20,000 - 20,000

Catatan: Harga Satuan sampai dengan lokasi


ARGA BAHAN/ALAT, UPAH

Spesifikasi Teknik Ket.

SK SNI – 15-1991-03. Jenis baja


Mild Steel dengan Tegangan Leleh
(fy) minimal = 2400 kg/cm2 untuk
diameter tulangan < 12” dan fy =
3900 kg/cm2 untuk diameter
tulangan > 12”.

kelas I-PBI 1971, SNI 15-7064-2004

PCC (Portland Composite Cement)

(Avitex atau sejenisnya)

( Avian atau sejenisnya)

( No Drop / sejenisnya ; 5 ltr/klg)

( Metrolite / sejenisnya; 5 ltr/klg)


Spesifikasi Teknik Ket.

berat 20 kg

Bjls 20 KI, 105 x 120 cm2

Bjls 30 KI, 105 x 120 cm2

Bjls 30 lebar 60 cm (1 roll 50 m')

Bjls 30 lebar 90 cm (1 roll 50 m')


Spesifikasi Teknik Ket.

fiberglass 1 m3

fiberglass 2 m3
PROGRES FISIK P
Kabupaten / Kota : SIDENRENG RAPPANG
Desa / Kelurahan : BILA RIASE
Masyaraka
Jumlah Total Nilai RKM Dana APBN /
No Jenis Pekerjaan
(unit) (Rp.) HIBAH (Rp.) InCash (Rp.)

1 2 3 4=5+6+7+8 5 7

A. KEGIATAN PELATIHAN
1 Pelatihan Teknis 1 Paket 455,000 455,000 -
2 Pelatihan. Administrasi keuangan dan pembukuan 1 Paket 452,000 452,000 -
3 Pelatihan PHBS Masyarakat 1 Paket 705,000 705,000 -
4 Pelatihan CLTS Masyarakat 1 Paket 389,000 389,000 -
6 Operasional LKM 1 Paket 7,138,000 7,138,000 -
Jumlah A 9,139,000 9,139,000 -
B. KEGIATAN SARANA AIR BERSIH
1 PENANGKAP MATA AIR 1 Unit 52,761,000 52,761,000 -
2 Err:509 1 Paket Err:509 Err:509 -
3 PEK. RESERVOIR 1 Paket 61,532,000 61,532,000 -
4 PENGADAAN PIPA 1 Paket 126,665,000 126,665,000 -
5 PEMASANGAN PIPA 1 Paket 56,000,000 - -
6 Err:509 1 Paket Err:509 Err:509
7 Err:509 1 Paket Err:509 Err:509
8 ALAT SAB 1 Paket 2,130,000 2,130,000 -
Jumlah B 311,500,000 Err:509 -
C. KEGIATAN SANITASI dan PHBS
1. PHBS Masyarakat
0
a Monitoring Progres Akses Jamban dan CTPS 1 Paket 33,000 33,000
b Verifikasi SBS/ODF 1 Paket 33,000 33,000
c Verifikasi SBS 1 Paket 32,000 32,000
d monitoring Progres Akses jamban & CTPS 1 Paket 66,000 66,000
e Pemeriksaan Kualitas Air Sebelum dan Sesudah Program 2 Paket Err:509 Err:509

Jumlah C 4,228,000 Err:509 -


TOTAL RKM (A+B+C) 325,500,000 220,500,000 -

Bila Riase : 20 Pebruari 2016


Dibuat Oleh
FM - WSS

Layla Rukmanah, ST.


RES FISIK PROGRAM PAMSIMAS
Kecamatan : PITU RIASE
Tanggal Pelaporan : 20 Pebruari 2016
Masyarakat Realisasi Fisik (%) Jumlah Tenaga Kerja (HOK)
Progres
Bobot (%) Minggu S/d Minggu Kpl
InKind (Rp.) Ini Mandor Tukang Pekerja Laki-Laki Perempuan Jumlah
Lalu Minggu Ini Tukang

8 9=4/Tot RKM 10 11 12=11x9 13 14 15 16 17=(13+14+15+16)-18 18 19=17+18

0.14% 100% 0% 0.14%


0.14% 100% 0% 0.14%
0.22% 100% 0% 0.22%
0.12% 100% 0% 0.12%
2.19% 50% 0% 1.10%
- 2.81% 1.71%

- 16.21% 10% 10% 1.62% - 8 25 102 129 6 135


- Err:509 100% 100% Err:509
- 18.90% 25% 25% 4.73% - 10 - 50 60 - 60
- 38.91% 100% 100% 38.91%
56,000,000 17.20% 0% 0% 0.00% - - 60 357 342 75 417
Err:509 20% 20% Err:509
Err:509 0% 0% Err:509
- 0.65% 100% 100% 0.65%
56,000,000 Err:509 Err:509 0 18.0 85 509 531 81 612

0.01% 100% 100% 0.01%


0.01% 100% 100% 0.01%
0.01% 100% 100% 0.01%
0.02% 100% 100% 0.02%
Err:509 50% 50% Err:509

- Err:509 Err:509 0 0 0 0 0 0 -
56,000,000 Err:509 Err:509 0.00% ### ### ### ### 8100.00% ###

Mengetahui
Koordinator Kabupaten

( A. ABD. MALIK, ST. )


Jumlah Tenaga Kerja (HOK)

Nilai (Rp)

20

15,590,000

2,250,000

16,065,000

33,905,000

-
###
PROGRAM : PAMSIMAS III
PEKERJAAN : PEMBANGUNAN SARANA AIR MINUM

JUMLAH
NO URAIAN KEGIATAN HARGA BOBOT (%) NOVEMBER
(RP) 1 2
1 SARANA AIR BERSIH 311,500,000 95.70

1.351
PENANGKAP MATA AIR 52,761,000 16.21

Err:509 Err:509 Err:509

PEK. RESERVOIR 61,532,000 18.90

PENGADAAN PIPA 126,665,000 38.91

PEMASANGAN PIPA 56,000,000 17.20

Err:509 Err:509 Err:509

Err:509 Err:509 Err:509

ALAT SAB 2,130,000 0.65

3 PRILAKU HIDUP BERSIH DAN SEHAT (PHBS) 3,559,000 1.09

PROMOSI KESEHATAN DI MASYARAKAT 3,559,000 1.09

4 PEMBERDAYAAN MASYARAKAT 2,001,000 0.61 RENCAN


0.140
PELATIHAN TEKNIK 455,000 0.14

PELATIHAN ADMINISTRASI & KEUANGAN 452,000 0.14

0.336
PELATIHAN KESEHATAN 1,094,000 0.34

5 KEGIATAN PENDUKUNG

0.199
ADMINISTRASI/OPERASIONAL LKM 7,138,000 2.19
ADMINISTRASI/OPERASIONAL LKM 7,138,000 2.19

TOTAL 325,500,000 100

RENCANA 0.14 1.89

KOMULATIF RENCANA 0.14 2.03

REALISASI 0.00 0.00

KOMULATIF REALISASI 0.00 0.00

DEVIASI -0.14 -1.89

KOMULATIF DEVIASI -0.14 -2.03

Bila Riase : 20 Pebruari 2016


Dibuat Oleh :
FM - WSS

Layla Rukmanah, ST.


PROGRES SELURUH KEGIATAN PELAKSANAAN RKM

NOVEMBER DESEMBER JANUARI


3 4 5 6 7 8 9 10

1.351 1.351 1.351 1.351 1.351 1.351 1.351

Err:509

4.726 2.363 4.726 4.726

12.971 12.971 12.971

5.735 5.735 5.735

Err:509 Err:509 Err:509

Err:509 Err:509

0.654

RENCANA

0.139

0.199 0.199 0.199 0.199 0.199 0.199


12.97 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 7.28

15.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

0.00 0.00 0.16 0.17 0.26 0.20 2.52 16.76

0.00 0.00 0.16 0.33 0.59 0.79 3.31 20.07

-12.97 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 9.48

-15.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509


M

KABUPATEN : PINRANG
Desa / KEC : MASOLO

JANUARI FEBRUARI KETERANGAN


11 12 13 14 15 16

1.351 1.351 1.351 0.675 0.675


100.00

90.00

2.363

80.00

0.00
70.00

60.00

50.00

0.547 0.547
40.00

30.00

20.00

10.00

0.199 0.199 0.199 0.199 0.199 0.199

0.00
0.00

3.91 1.55 2.10 1.42 0.87 0.20

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

3.24 3.51 4.01 0.50 0.00 0.00

23.31 26.82 30.83 31.33 31.33 31.33

-0.67 1.96 1.91 -0.92 -0.87 -0.20

Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Disetujui Oleh,
Koordinator Kabupaten

( A. ABD. MALIK, ST. )


REKAPITULASI KEGIATAN DAN BIAYA RKM

Tabel Kegiatan dan biaya RKM


BIAYA
NO URAIAN PEKERJAAN JUMLAH BIAYA Bantuan Langsung Kostribusi
masyarakat Masyarakat

A. KEGIATAN PELATIHAN 2,001,000 2,001,000


1 Pelatihan Teknik 455,000 455,000
2 Pelatihan. Administrasi keuangan dan pembukuan 452,000 452,000
3 Pelatihan PHBS Masyarakat 705,000 705,000
4 Pelatihan CLTS Masyarakat 389,000 389,000

B. KEGIATAN SARANA AIR BERSIH Err:509 Err:509 56,000,000


1 PEK. RESERVOIR - 18 m3 52,761,000 52,761,000 -
2 PENYELIDIKAN GEOHIDROLOGI/GEOLISTRIK Err:509 Err:509
3 PEK. PENGEBORAN SUMUR DALAM 90m 61,532,000 61,532,000 -
4 PENGADAAN PIPA - -
5 PEMASANGAN PIPA 56,000,000 56,000,000
6 PENGADAAN POMPA Err:509 Err:509
7 PENGADAAN LISTRIK PLN Err:509 Err:509
8 ALAT SAB 2,130,000 2,130,000
III Peningkatan PHBS Sekolah dan Masyarakat 3,559,000 3,559,000
1 Penyuluhan PHBS Masyarakat 3,559,000 3,559,000
IV Operasional KKM - -
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : M

Disetujui Oleh : Dibuat Oleh :

Kepala Satker Pamsimas FM - WSS Koordinator KKM


Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST. ( H. Muh. Amin )


NIP. 19730305 200212 1 012
en-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo

Desa Masolo, ………............Oktober 2016

Dibuat Oleh :

Satlak Pamsimas

( Ansar )
DAFTAR HARGA UPAH DAN BAHAN 2016

A Bahan Dasar Alam


A-01 Aspal
A-0101 Aspal Curah
A-02 Bata
A-0201 Batu Merah Uk. 5x11x22 cm
A-03 Batu/Split
A-0301 Abu Batu
A-0302 Batu Kali/Gunung/Belah
A-0303 Kerikil
A-0304 Sirtu
A-0305 Sirtu Sungai
A-0306 Split 0,5-1 cm
A-0307 Split 1-2 cm
A-0308 Split 2-3 cm
A-0309 Split 3-5 cm
A-04 BBM
A-0401 Minyak Tanah
A-0402 Oli Hidrolis Drum
A-0403 Oli Mesin Drum Meditran
A-0404 Oli Mesin Drum Meditran Kaleng 2,5 Liter
A-0405 Premium Industri
A-0406 Premium/Bensin
A-05 Pasir/Tanah
A-0501 Pasir Urug
A-0502 Pasir Beton
A-0503 Pasir Pasangan
A-0504 Tanah Biasa
A-06 Semen
A-0601 Kapur Pasangan
A-0602 Semen Nat
A-0603 Semen PC Tonasa 50 kg
A-0604 Semen PC Bosowa 40 kg
A-0605 Semen Warna
B Bahan Kayu dan Bambu
B-01 Gelagar
B-0101 Gelagar Balok 5/20 Kumia
B-0102 Gelagar Balok 5/25 Kumia
B-02 Kayu
B-0201 Balok Kayu Kelas I Bayam
B-0202 Balok Kayu Kelas I Kumia
B-0203 Balok Kayu Kelas I Ulin
B-0204 Balok Kayu Kelas II
B-0205 Balok Kayu Kelas III
B-0206 Bambu
B-0207 Papan Kayu Kelas I Bayam
B-0208 Papan Kayu Kelas I Ulin
B-0209 Papan Kayu Kelas I Kumia
B-0210 Papan Kayu Kelas II
B-0211 Papan Kayu Kelas III
B-03 Lantai Kayu (Parket)
B-0301 Lantai Kayu (Parket)
B-04 Lis Kayu
B-0401 List Profil Kayu 2 x 3 Cm
B-0402 List Profil Kayu 3 x 3 Cm
B-0403 List Profil Kayu 4 x 4 Cm
B-0404 List Profil Kayu 5 x 5 Cm
B-05 Plywood/Tripleks
B-0501 Hard Board 122 x 244 Cm
B-0502 HPL
B-0503 Lem Untuk HPL (Fox)
B-0504 Lem Untuk HPL (Fox)
B-0513 Tripleks Melamin 122 x 244 x 1,2 Cm
C Bahan Logam/Besi/Aluminium
C-02 Aluminium Profil
C-0201 Aluminium Strip
C-0202 Aluminium Profil
C-03 Atap Bitumen
C-0301 Nok Bitumen Merah, Coklat, Hitam dan Hijau
C-0302 Nok Bitumen Terracota dan
C-0303 Lakband Bitumen Merah Ukuran 10 x
Florentino
1000 cm
C-0304 Lakband Bitumen Merah Ukuran 15 x
C-0305 Lakband Bitumen 1000
MerahcmUkuran 20 x
C-0306 Bitumen Transparant 1000 cm
C-0307 Bitumen Merah, Coklat, Hitam dan Hijau
C-04 Atap Metal
C-0401 Nok Perkasa
C-0402 Atap Metal Surya
C-0403 Atap Metal Perkasa Roof
C-05 Baja Struktur
C-0501 Truss Zincalume Profil C-7.5 x 3 cm t = 8 mm
C-0502 Truss Taso Profil C 75 - 80 = 6 m
C-0503 Truss Taso Profil C 75 - 75 = 6 m
C-0504 Truss Sipro Profil C = 6 m
C-0505 Truss Galvanis Profil C-7.5 x 3 cm t = 7,5 mm
C-0506 Truss Galvalum Profil C-7.5 x 3 cm t = 7,5 mm
C-0507 Truss Essar Profil C = 6 m
C-0508 Truss Apro Profil C = 6 m
C-06 Besi Beton (Rebar)
C-0601 Besi Beton Ulir SNI Dia 8 mm SNI 12 m
C-0602 Besi Beton Ulir SNI Dia 22 mm SNI 12 m
C-0603 Besi Beton Ulir SNI Dia 19 mm SNI 12 m
C-0604 Besi Beton Ulir SNI Dia 16 mm SNI 12 m
C-0605 Besi Beton Ulir SNI Dia 13 mm SNI 12 m
C-0606 Besi Beton Ulir SNI Dia 10 mm SNI 12 m
C-07 Besi Plat
C-0701 Plat Stainless 1x2x1 mm
C-0702 Plat Stainless 1x2x0,8
C-0703 Plat Stainless 1x2x0,5
C-0704 Plat Stainless 122x244x2 mm
C-0705 Plat Stainless 122x244x1,5
C-0706 Plat Stainless 122x244x1 mm
C-0708 Besi Plat 5 mm = 120 x 240 mm
C-0710 Besi Plat 2 mm = 120 x 240 mm
C-08 Besi Polos
C-0801 Besi Polos Diameter 8 mm SNI
C-0802 Besi Polos Diameter 6 mm SNI
C-0803 Besi Polos Diameter 22 mm SNI
C-0804 Besi Polos Diameter 19 mm SNI
C-0805 Besi Polos Diameter 16 mm SNI
C-0806 Besi Polos Diameter 14 mm SNI
C-0807 Besi Polos Diameter 12 mm SNI
C-0808 Besi Polos Diameter 10 mm SNI
C-09 Besi Siku "L"
C-0901 70.70.7
C-0902 60.60.6
C-0903 50.50.5
C-0904 40.40.4
C-0905 40.40.3
C-0906 30.30.3
C-10 Besi Streep
C-1001 Besi Strep 50.6 mm
C-1002 Besi Strep 40.6 mm
C-1003 Besi Strep 40.4 mm
C-1004 Besi Strep 35.4 mm
C-1005 Besi Strep 30.3 mm
C-1006 Besi Strep 30.2 mm
C-11 Besi/Aluminium Hollow
C-1101 Hollow Stainless 4x4
C-1102 Hollow Stainless 3x6
C-1103 Hollow Stainless 2x6
C-1104 Hollow Stainless 2x4
C-1105 Hollow Stainless 2x2
C-1106 Hollow Plafond Galvanize Uk. 6x6
C-1107 Hollow Plafond Galvanize Uk. 4x6
C-1108 Hollow Plafond Galvanize Uk. 4x4
C-1109 Hollow Plafond Galvanize Uk. 2x4
C-1110 Hollow Plafond Galvanize Uk. 2x2
C-1111 Hollow Baja Hitam Uk. 6 x 6 cm, tebal 0,3 mm = 6 m
C-1112 Hollow Baja Hitam Uk. 4 x 6 cm, tebal 0,3 mm = 6 m
C-1113 Hollow Baja Hitam Uk. 4 x 4 cm, tebal 0,3 mm = 6 m
C-1114 Hollow Baja Hitam Uk. 2 x 4 cm, tebal 0,3 mm = 6 m
C-1115 Hollow Baja Hitam Uk. 2 x 2 cm, tebal 0,3 mm = 6 m
C-12 Genteng Metal
C-1201 Nok Genteng Metal Multi Roof
C-1202 Nok Genteng Metal
C-1203 Genteng Metal Surya Roof
C-1204 Genteng Metal Multi Roof
C-1205 Genteng Metal Inti Roof
C-1206 Genteng Metal
C-13 Kawat
C-1301 Saringan Pasir/Ayakan
C-1302 Kawat Nyamuk Plastik
C-1303 Kawat Nyamuk Baja
C-1304 Kawat Nyamuk
C-1305 Kawat Licin 4 mm Rol
C-1306 Kawat Las Kw 1
C-1307 Kawat Galvanis 4 mm 50 kg
C-1308 Kawat Galvanis 3 mm 50 kg
C-1309 Kawat Duri Roll
C-1310 Kawat Bronjong
C-1311 Kawat Beton 8 Kg
C-14 Listplang
C-1401 Listplang tekstur kayu
C-1402 Listplang Papan Kalsiboard 20 cm Nusa Board
C-1403 Karet Pelapis Genteng 110 cm Panjang 40 m
C-15 Metal Stud
C-1501 Metal Stud Sakura
C-16 Pintu Aluminium
C-1601 Skrup Fixer
C-1602 Rolling Door Aluminium
C-1603 Pintu Lipat (folding door) Aluminium
C-1604 Pintu Aluminium + Kusen
C-1605 Pintu Aluminium
C-1606 Kusen Aluminium 4" Putih
C-1607 Kusen Aluminium 4" Cokelat
C-17 Pintu Besi
C-1701 Rolling Door Besi
C-1702 Pintu Lipat Besi
C-18 Pipa Besi
C-0336 Pipa Black Steel diameter 1" Tebal 2 mm SNI Panjang 6 m
C-1801 Pipa White Steel Dia 4" Tebal 2 mm SNI Panjang 6 m
C-1802 Pipa White Steel Dia 3/4" Tebal 2 mm SNI Panjang 6 m
C-1803 Pipa White Steel Dia 3" Tebal 2 mm SNI Panjang 6 m
C-1804 Pipa White Steel Dia 2" Tebal 2 mm SNI Panjang 6 m
C-1805 Pipa White Steel Dia 1/2" Tebal 2 mm SNI Panjang 6 m
C-1807 Pipa Polos Stainless Dia 5/8"
C-1808 Pipa Polos Stainless Dia 3/4"
C-1809 Pipa Polos Stainless Dia 2"
C-1810 Pipa Polos Stainless Dia 1"
C-1811 Pipa Polos Stainless Dia 1 1/4 "
C-1812 Pipa Polos Stainless Dia 1 1/2 "
C-1813 Pipa Galvanis medium B Diameter 4" Panjang 6 m
C-1814 Pipa Galvanis medium B Diameter 3/4" Panjang 6 m
C-1815 Pipa Galvanis medium B Diameter 3" Panjang 6 m
C-1816 Pipa Galvanis medium B Diameter 2" Panjang 6 m
C-1817 Pipa Galvanis medium B Diameter 1" Panjang 6 m
C-1818 Pipa Galvanis medium B Diameter 1 1/2" Panjang 6 m
C-1819 Pipa Galvanis medium B Diameter 1/2" Panjang 6 m
C-1820 Pipa Galvanis medium A Diameter 8" Panjang 6 m Super SNI
C-1821 Pipa Galvanis medium A Diameter 6" Panjang 6 m Super SNI
C-1822 Pipa Galvanis medium A Diameter 5" Panjang 6 m Super SNI
C-1823 Pipa Galvanis medium A Diameter 4" Panjang 6 m
C-1824 Pipa Galvanis medium A Diameter 3/4" Panjang 6 m
C-1825 Pipa Galvanis medium A Diameter 3" Panjang 6 m
C-1826 Pipa Galvanis medium A Diameter 2" Panjang 6 m
C-1827 Pipa Galvanis medium A Diameter 1/2" Panjang 6 m
C-1828 Pipa Galvanis medium A Diameter 1" Panjang 6 m
C-1829 Pipa Galvanis medium A Diameter 1 1/2" Panjang 6 m
C-1835 Pipa Black Steel diameter 1/2" Tebal 2 mm SNI Panjang 6 m
C-19 Plafond
C-1901 List Profil Gypsum 7x210 cm
C-1902 List Profil Gypsum 12x240 cm
C-1903 Gypsum 120x240x9 mm
C-1904 Gypsum 120x240x12 mm
C-1905 GRC 120X240X6 mm
C-1906 Eternit 100x100 cm
C-1906 GRC 120X240X4 mm
C-1908 Cotton Plaster
C-1909 Compound gypsum
C-20 Rangka Atap Baja Ringan
C-2001 Rangka Atap Baja Ringan 0,75
C-21 Seng
C-2101 Talang Seng 50 cm
C-2102 Talang Karet 90 cm
C-2103 Seng Plat BJLS 0,30 mm 90x180 Lembar
C-2104 Seng Plat BJLS 0,30 mm Lembar
C-2105 Seng Plat BJLS 0,28 mm Lembar
C-2106 Seng Plat 3" x 6" BJLS 28
C-2107 Seng Plastik (fiber) Lembar
C-2108 Seng Gelombang BWG 34" BJLS 0,20 mm Lembar
C-2109 Seng Gelombang BWG 33" BJLS 0,22 mm Lembar
C-2110 Seng Gelombang BWG 32" BJLS 0,22 mm Lembar
C-2111 Seng Gelombang BWG 28" BJLS 0,35 mm Lembar
C-2112 Seng Gelombang BJLS 30"
C-2113 Seng Gelombang 3"-5"
C-2114 Seng Aluminium Gelombang SWG 32" Lembar
0,38 mm
C-2115 Seng Aluminium Gelombang SWG 32" Lembar
0,31 mm
C-2116 Seng Aluminium Gelombang SWG 32" Lembar
0,27 mm
C-2117 Nok Spiro
C-2118 Fibre Glass (Jabes) 200x92
C-2119 Fibre Glass (Jabes) 180x92
C-2120 Asbes Gelombang besar 5 mm (250x102 cm)
C-2121 Asbes Gelombang besar 5 mm (200x102 cm)
C-2122 Asbes Gelombang besar 5 mm (180x102 cm)
C-2123 Aluminium Gelombang
C-22 Spandek
C-2201 Spandek Warna
C-2202 Spandek Polos
C-2203 Metal Deck / Spadeck Tebal 0,3 cm
D Bahan Keramik
D-01 Tegel PC
D-0101 PC Abu-Abu 30x30 cm
D-0102 PC Abu-Abu 20x20 cm
D-02 Keramik Lantai
D-0201 Keramik 60x60 cm (4 buah) SNI
D-0202 Keramik 60x60 cm Esenza
D-0203 Keramik 60x60 cm Cheta
D-0204 Keramik 50x50 cm (4 buah) Jupiter
D-0205 Keramik 50x50 cm Habitat
D-0206 Keramik 40x40 cm (6 buah) Arwana
D-0207 Keramik 40x40 cm Abu-Abu
D-0208 Keramik 40x40 cm Platinum
D-0209 Keramik 40x40 cm Putih
D-0210 Keramik 40x40 cm Warna
D-0211 Keramik 30x30 cm (12 buah) Kia
D-0212 Keramik 30x30 cm Abu-Abu
D-0213 Keramik 30x30 cm Warna
D-0214 Keramik 30x30 cm Putih
D-0215 Keramik 20x20 cm (25 buah) Arwana
D-0216 Keramik 20x20 cm Warna
D-0217 Keramik 20x20 cm Putih
D-0218 Granit 60x60 cm (4 buah) Coralli Polos
D-0219 Granit 60x60 cm Urat Kayu
D-03 Keramik Dinding
D-0301 Keramik 30x60 Cm Platinum
D-0302 Keramik 25x40 cm Warna
D-0303 Keramik 25x40 cm Pegasus
D-0304 Keramik 20X25 cm Warna
D-0305 Keramik 20x25 cm Arwana
D-0306 Keramik 20x20 cm Arwana
D-04 Batu Alam
D-0401 Batu Paras
D-0402 Batu Alam Andesit
D-05 Plint
D-0501 Plint Keramik 10x30 cm
D-0502 Plint Keramik 10x20 cm
E Bahan Komposit
E-01 Gypsum
E-0102 List Profil Gypsum 12 x 210 cm
E-0102 List Profil Gypsum 7 x 210 cm
E-0104 Board Gypsum 120 x 244 x 12 mm
E-02 Asbes
E-0201 Asbes Plat Harfek 200 X 100 X 0,3 Cm
E-0202 Asbes Glombang
E-0203 Asbes
E-04 Fiber Semen
E-0401 Papan Fiber Semen 120 x 244 x 6 mm
E-0402 Papan Fiber Semen 120 x 244 x 4 mm
E-0403 Fiber Semen Super 240 x 108 x 0,6 cm
E-0404 Fiber Semen Super 240 x 105 x 0,4 cm
E-0405 Fiber Semen Super 180 x 180 x 0,6 cm
E-0406 Fiber Semen Super 180 x 105 x 0,4 cm
E-0407 Fiber Semen Mini 240 x 105 x 0,4 cm
E-0408 Fiber Semen Mini 180 x 105 x 0,4 cm
E-0409 Fiber Semen Ekonomi 240 x 29 x 0,5 cm
E-0410 Fiber Semen Ekonomi 180 x 29 x 0,5 cm
E-05 Eternit
E-0501 Eternit 1 x 1
E-0502 Eternit 1 x 1
F Bahan Dasar Semen
F-02 Paving/Grass Block
F-0201 Paving Blok Standar
F-0202 Paving Blok K300
F-0203 Paving Blok 8 cm Warna K 400
F-0204 Paving Blok 8 cm abu-abu K 400
F-0205 Paving Blok 6 cm Warna K 200
F-0206 Paving Blok 6 cm abu-abu K 200
F-0207 Paving Blok K 250
F-05 Gorong-Gorong
F-0501 Gorong-Gorong 60"
F-0502 Gorong-Gorong 50"
F-0503 Gorong-Gorong 40"
F-0504 Gorong-Gorong 30"
F-0505 Gorong-Gorong 20"
F-06 Cincin
F-0601 Cincin 80"
F-0602 Cincin 60"
G Bahan PVC
G-01 Pipa PVC
G-0101 Pipa PVC Tipe D 8" Panjang 4 m
G-0102 Pipa PVC Tipe D 6" Panjang 4 m
G-0103 Pipa PVC Tipe D 5" Panjang 4 m
G-0104 Pipa PVC Tipe D 4" Panjang 4 m
G-0105 Pipa PVC Tipe D 3" Panjang 4 m
G-0106 Pipa PVC Tipe D 2" Panjang 4 m
G-0107 Pipa PVC Tipe D 2 1/2" Panjang 4 m
G-0108 Pipa PVC Tipe D 2 1/2" Panjang 4 m
G-0109 Pipa PVC Tipe D 12" Panjang 4 m
G-0110 Pipa PVC Tipe D 10" Panjang 4 m
G-0111 Pipa PVC Tipe D 1 1/ 4" Panjang 4 m
G-0112 Pipa PVC Tipe D 1 1/ 2" Panjang 4 m
G-0113 Pipa PVC Tipe AW 4" Panjang 4 m
G-0114 Pipa PVC Tipe AW 3/4 " Panjang 4 m
G-0115 Pipa PVC Tipe AW 3 " Panjang 4 m
G-0116 Pipa PVC Tipe AW 2 1/2 " Panjang 4 m
G-0121 Pipa PVC Diameter 8" s 12,5 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 6 m
G-0122 Pipa PVC Diameter 6" s 12,5 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 6 m
G-0123 Pipa PVC Diameter 4" s 12,5 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 6 m
G-0124 Pipa PVC Diameter 3/4" s 10 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 4 m
G-0125 Pipa PVC Diameter 3" s 12,5 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 6 m
G-0126 Pipa PVC Diameter 2" s 12,5 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 6 m
G-0127 Pipa PVC Diameter 1/2" s 10 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 4 m
G-0128 Pipa PVC Diameter 1" s 10 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 4 m
G-0129 Pipa PVC Diameter 1 1/4" s 10 Tekanan Wavin
Nominal 10 bar (1,0 mpa) 4 m
H Bahan Sanitary
H-01 Kloset
H-0101 Kloset Jongkok Porselen Toto
H-0102 Kloset Duduk Toto Toto
H-0103 Kloset Duduk Monoblok
H-02 Washtafel/Kitchen Zink
H-0201 Wasthafel
H-0202 Wastafel Kotak Efos
H-0203 Wastafel Bulat Toto Kecil
H-0204 Wastafel Bulat Efos
H-0205 Wastafel 1 Set Model Gantung
H-0206 Bak Cuci Piring 1 Lubang Prestile
H-0207 Bak Cuci Piring Stainless Steel 2 lubang
H-0208 Bak Cuci Piring Stainless Steel 1 lubang
H-03 Urinoir
H-0301 Urinoir
H-04 Aksesories Sanitary
H-0401 Tirai Plastik
H-0402 Tempat Sabun Tanam
H-0403 Tempat Sabun Gantung Stainless Steel
H-0404 Stop Kran
H-0405 Saringan Sedang Stainless Steel
H-0406 Saringan Plastik
H-0407 Saringan Besar Stainless Steel
H-0408 Pintu KM/WC Full Kaca
H-0409 Pintu KM/WC Aluminium Putih
H-0410 Pintu KM/WC Aluminium Hitam
H-0411 Mesin Pompa Air (Ext. Shimizu) Sumur
Dangkal
H-0412 Kran Stainless Kualitas Sedang
H-0413 Kran Stainless Kualitas Baik
H-0414 Kran Air Kualitas Standar
H-0415 Gantungan Aluminium
H-0416 Floor Drain Stainless steel
H-05 Bak Air
H-0501 Reservoir Fiber - 2 m3 2000 liter
H-0502 Reservoir Fiber - 1 m3 1000 liter
H-0503 Bak Reservoir kapasitas 600 liter
H-06 Shower
H-0601 Shower Tanam Biasa
H-0602 Shower Set 1 Kran
H-0603 Kran untuk closet
H-0604 Kran Shower Tunggal
H-0605 Kran Shower Ganda
H-0606 Kran Leher Angsa
I Bahan Cat
I-01 Cat Tembok
I-0101 Cat Tembok Kualitas Menengah Interior (Envitex,ctylac,metrolit e) 5 kg
I-0102 Cat Tembok Kualitas Menengah Exterior (Envitex,ctylac,metrolit e) 5 kg
I-0103 Cat Tembok Interior (Mowilex) Standar 2,5 Liter (0,9 kg/liter)
I-0104 Cat Tembok Interior (Mowilex) Kualitas
High
I-0105 Cat Tembok Interior (Aries) 5 kg
I-0106 Cat Tembok Exterior (Mowilex) Standar 2,5 Liter (0,9 kg/Liter)
I-0107 Cat Tembok Exterior (Mowilex) Kualitas
High
I-0108 Cat Tembok Exterior (Aries) 5 kg
I-02 Cat Kayu dan Besi
I-0201 Cat Residu 10 Kg/Kaleng
I-0202 Cat Kayu dan Besi Seiv
I-0203 Cat Kayu dan Besi Nippe 2000
I-0204 Cat Kayu dan Besi Mowilex
I-0205 Cat Kayu dan Besi Lippo
I-0206 Cat Kayu dan Besi Glotex
I-0207 Cat Kayu dan Besi Garuda
I-0208 Cat Kayu dan Besi Ftalit
I-0209 Cat Kayu dan Besi Dulux
I-0210 Cat Kayu dan Besi Brillo
I-0211 Cat Kayu dan Besi Avian
I-0213 Cat Kayu dan Besi Al-tex
I-0214 Cat Dasar (Kayu)
I-0215 Cat Dasar (Besi)
I-03 Cat Aluminium
I-0301 Cat Avian Aluminium Paint Chrome Finish
I-0302 Cat Avian Aluminium Paint Chrome 0,9 Liter
I-04 Cat Genteng
I-0401 Cat Genteng Mowilex Roof Paint 2,5 Liter (0,9 kg/liter)
I-0402 Cat Genteng Dulux Roof Paint warna 2,5 Liter (0,9 kg/liter)
Standar
I-0403 Cat Genteng Dulux Roof Paint warna Baru 2,5 Liter (0,9 kg/liter)
I-0404 Cat Genteng Matex
I-0405 Cat Genteng Jotaroof 2,5 Liter (0,9 kg/liter)
I-0406 Cat Genteng Djarum 4 Kilogram
I-0407 Cat Genteng Belmas 4 Kilogram
I-0408 Cat Genteng Avitex 4 Kilogram
I-0409 Cat Genteng Avicryl 2800 5 Kilogram
I-0410 Cat Atap Yoko
I-05 Cat Melamin
I-0501 Cat Melamine Impra Melamine Lack ML- 1 Liter
131
I-0502 Cat Melamin
I-06 Cat Precoat
I-0601 Cat Precoat Varnish Batu Alam Solvent 2,5 Liter (0,9 kg/liter)
Based
I-0602 Cat Precoat Varnish Batu Alam Solvent 1 Liter
Based
I-07 Cat Semprot
I-0701 Cat Semprot RJ HI-Temp 400 CC
I-0702 Cat Semprot RJ Chrome 227 Gram
I-0703 Cat Semprot RJ Acrylic Epoxy Spray 400 CC
I-0704 Cat Semprot RJ Acrylic Epoxy Spray 300 CC
I-10 Wateroofing
I-1001 Wateroofing No Drop 2,5 Liter (0,9 kg/liter)
I-1002 Water Proof Biasa
I-1003 Compound Gypsum
I-1004 Bubuk + Air Plarut Water Proofing Ex
Aqugart
I-11 Cat Meni
I-1101 Meni Kayu
I-1102 Meni Besi
I-1103 Cat Minyak Emco
I-1104 Cat Meni Glatik 3,5 kg
I-12 Dempul
I-1201 Plamor Tembok (scim Coat) 20 kg
I-1202 Plamor Tembok
I-1203 Plamor Kayu
I-1204 Dempul
I-13 Pengencer Cat
I-1301 Tinner Avian 1 Liter
I-1302 Pengencer Cat Kayu/Besi
I-1303 Pengencer Cat / Tinner
I-14 Penghilang Cat (Paint Remover)
I-1401 Penghilang Cat
I-15 Politur
I-1501 Politur Jadi
I-1502 Politur
J Bahan Kaca dan Cermin
J-01 Kaca
J-0101 Seal Kecil
J-0102 Seal Besar
J-0103 Rangka Nako lengkap Terali
J-0104 Profil Kaca
J-0105 Kaca Rayban 5 mm
J-0106 Kaca Rayban 3 mm
J-0107 Kaca Polos 5 mm
J-0108 Kaca Polos 3 mm
J-0109 Kaca Polos 2 mm
J-0110 Kaca Buram 5 mm
J-0111 Kaca Buram 3 mm
J-0112 Kaca Bening 5 mm
J-0113 Kaca Bening 3 mm
J-0114 Kaca Bening 2 mm
J-02 Cermin
J-0201 Kaca Cermin 5mm (P)
j-0202 Kaca Cermin 5mm (H)
J-0203 CerminUkuran 86
J-0204 Cermin Ukuran 51
K Bahan Elektrik
K-02 Fitting Lampu
K-0201 Fitting Broco
K-03 Kabel
K-0301 Kabel NYY 3x2,5
K-0302 Kabel NYY 3x1,5
K-0303 Kabel NYY 2x2,5
K-0304 Kabel NYY 2x1,5
K-0305 Kabel NYM 4x2,5
K-0306 Kabel NYM 4x1,5
K-0307 Kabel NYM 3x2,5
K-0308 Kabel NYM 3x1,5
K-0309 Kabel NYM 2x2,5
K-0310 Kabel NYM 2x1,5 Visicom
K-04 Kabel Roll
K-0401 Kabel NYA 2,5 mm
K-0402 Kabel NYA 1,5 mm
K-06 Lampu

K-0601 Lampu TL 40 Watt/220 Volt


k-0602 Lampu Taman Mercury (Lampu Jalan SON) Philips
K-0605 Lampu Pijar 60 Watt Philips
K-0606 Lampu Pijar 5 Watt
K-0607 Lampu Pijar 40 Watt Philips
K-0608 Lampu Pijar 25 Watt Philips
K-0609 Lampu Pijar 100 Watt Philips
K-0610 Lampu Neon 2 x 40 W Aluminium (Tanam) Philips
K-0611 Lampu Neon 2 x 20 W Aluminium (Tanam) Philips
K-0612 Lampu Neon 1 x 40 W Kap Biasa
K-0613 Lampu Neon 1 x 20 W Kap Biasa
K-0614 Lampu HPL 250 Watt/220 Volt
K-0615 Lampu Hias Selang
K-0616 Lampu Hias Lombok
K-0617 Lampu Hemat Energi 8 watt
K-0618 Lampu Hemat Energi 5 watt
K-0619 Lampu Hemat Energi 28 Watt
K-0620 Lampu Hemat Energi 23 Watt
K-0621 Lampu Hemat Energi 18 Watt
K-0622 Lampu Hemat Energi 14 watt
K-0623 Lampu Hemat Energi 11 Watt
K-0624 Lampu Gantung Broco Lux
K-0625 Lampu Gantung Broco 1211
K-0626 Lampu Gantung
K-0627 Dwon Light 4"
K-0628 Dwon Light 3,5"
K-1603 Lampu SL 42 Watt
K-1604 Lampu SL 32 Watt
K-07 MCB/Mini Circuit Breakers
K-0701 MCB Waka Moto
K-0702 MCB Internasional
K-0703 MCB 6 A
K-0704 MCB 30 A
K-0705 MCB 2 Group 2 A
K-0706 MCB 2 Group 10 A
K-0707 Lokal 2 Group Biasa ins
K-0708 Lokal 2 Group Autmat Wakamoto
K-0709 Box MCB
K-08 Pengaman Kabel
K-0801 Pipa Union 5/8" - 4 m Maspion
K-0802 Pipa Union 2" - 4 m
K-0803 Pipa Union 1" - 4 m
K-0804 Pipa Union 1 1/2" - 4 m
K-0805 Pipa Maspion 5/8"
K-09 Saklar dan Stop Kontak
K-0901 Stop Kontak Tunggal
K-0902 Stop Kontak Double
K-0903 Saklar Phase Double kualitas sedang
k-0904 Saklar Phase Double kualitas sedang
K-0905 Sakelar Phase Tunggal Kualitas Baik
K-0906 Sakelar Phase double Kualitas Baik
K-10 Solasi Listrik

K-1001 Isolasi Listrik


K-11 Cup Down Light
K-1101 Diameter 4 inchi (kualitas baik)
K-1102 Diameter 3 inchi (kualitas Sedang)
K-1103 Diameter 3 inchi (kualitas baik)
K-1104 Diameter 5 inchi (kualitas baik)
K-12 Terminal
K-1201 Terminal 5 Lubang
K-1202 Terminal 4 Lubang
K-1203 Terminal 3 Lubang
K-1204 Terminal 2 Lubang
L Bahan Karet dan Lem/Perekat
L-04 Lem Besi/Baja
L-0401 Lem Besi Tube
L-05 Lem Fiberglass
L-0501 Lem Fiberglass Kaleng
L-06 Lem Kaet talang
L-0601 Lem Kaet Talang Kaleng
L-07 Lem Kayu/Karet
L-0701 Lem Kayu/Karet Botol
L-09 Lem Kertas
L-0901 Lem Kertas
L-10 Lem Pipa/PVC
L-1001 Lem Pipa Tube
L-11 Lem Serbaguna
L-1101 Lem Serba Guna Tube
L-12 Sealent
L-1201 Sealent Botol
M Bahan Kimia/Cairan
M-02 Pelumas
M-0201 Solar Industri
M-0202 Solar
N Bahan Aksesories
N-01 Alat ukur/meteran
N-0101 Meteran Tangan 3 Meter
N-0102 Meteran Tangan 5 Meter
N-02 Benang
N-0201 Benang Ukur
N-04 Gembok
N-0401 Gembok
N-08 Katrol
N-0801 Katrol
N-09 Kawat las
N-0901 Kawat Las Nikko 2,6 5 kg
N-0902 Kawat Las
N-10 Klem Selang
N-1001 Klem Selang
N-1002 Klem
N-11 Kuas
N-1101 Kuas 4"
N-1102 Kuas 3"
N-1103 Kuas 2"
N-1104 Kuas 1"
N-12 Kunci/Lock
N-1201 Kunci Tanam Antik
N-1202 Kunci tanam 2 x Slag (Ext. Union)
N-1203 Kunci tanam 2 x Slag (Ext. SES)
N-1204 Kunci tanam 2 x Slag (Ext. Bennotti)
N-1205 Kunci Silinder
N-1206 Kunci Lemari
N-1207 Kunci Lemari
N-1208 Handel Pintu Stainless
N-1209 Handel Pintu Bossini
N-1210 Handel Pintu Arcel Stainless
N-1211 Handel Pintu + Kunci Belgreen Panjang
N-1212 Handel Pintu + Kunci Allessa
N-1214 Handel Pintu + Kunci Marerik Minimalis
N-1215 Hak Angin - Kecil (Pasangan)
N-1216 Hak Angin - Besar (Pasangan)
N-1217 Grendel Ukuran 6"
N-1218 Grendel Ukuran 12"
N-1219 Grendel Tanam Kotak
N-1220 Grendel 3"
N-1221 Expaynolet
N-1222 Engsel Pintu
N-1223 Engsel Kupu-Kupu
N-1224 Engsel Jendela
N-1225 Door Stop
N-1226 1 Set Kunci Pintu Kw 2
N-13 Paku
N-1301 Paku Skrup 4 inc
N-1302 Paku Skrup 31/2 inci
N-1303 Paku Sirap
N-1304 Paku Seng (Payung) RRT
N-1305 Paku Sekrup
N-1306 Paku Payung Berulir 75 mm
N-1307 Paku Payung
N-1308 Paku Biasa
N-1309 Paku Beton
N-1310 Paku Asbes
N-14 Palu
N-1401 Palu Eksiko
N-1402 Palu Biasa
N-15 Pelampung Air
N-1501 Pelampung Air
N-1502 Level Control Swictc/Radar Pelampung Air
N-18 Sambungan Selang
N-1801` Sambungan Selang
N-19 Sarung Tangan/Gloves
N-1901 Sarung Tangan Karet
N-1902 Sarung tangan Kain
N-21 Seal Tape
N-2101 Seal tape
N-22 Selang
N-2201 Selang
N-23 Siku Rak/Self Bracket
N-2301 Siku Rak
N-25 Spray/Semprotan Air
N-2501 Semprotan Air
N-27 Tangki Air/Toran
N-2701 Tangki Air 1000 liter
N-28 Amplas
N-2801 Amplas/Kertas Gosok
P Upah Kerja
P-01 Pekerja
P-0101 Penjaga Malam
P-0102 Penjaga Gudang
P-0103 Pekerja
P-02 Tukang/Operator/Mekanik
P-0201 Tukang Pipa
P-0202 Tukang listrik
P-0203 Tukang Kayu
P-0204 Tukang Cat
P-0205 Tukang Besi
P-0206 Tukang Batu
P-0213 Mekanik
P-03 Mandor/Kepala Tukang
P-0301 Mandor
P-0302 Kepala Tukang Pipa
P-0303 Kepala Tukang Listrik
P-0304 Kepala Tukang kayu
P-0305 Kepala Tukang cat
P-0306 Kepala Tukang Besi
P-0307 Kepala Tukang Batu
kg Rp 14,750

buah Rp 650

m3 Rp 105,000
m3 Rp 150,000
m3 Rp 162,500
m3 Rp 62,500
m3 Rp 78,750
m3 Rp 320,000
m3 Rp 281,000
m3 Rp 240,700
m3 Rp 210,000

liter Rp 10,000
liter Rp 15,000
liter Rp 10,000
liter Rp 29,000
liter Rp 9,300
liter Rp 6,950

m3 Rp 81,500
m3 Rp 97,200
m3 Rp 97,200
m3 Rp 50,000

m3 Rp 105,500
kg Rp 15,000
zak Rp 59,400
zak Rp 48,000
kg Rp 15,000

m Rp 63,000
m3 Rp 78,750

m3 Rp 10,000,000
m3 Rp 6,500,000
m3 Rp 12,500,000
m3 Rp 3,500,000
m3 Rp 2,500,000
batang Rp 31,500
m3 Rp 10,000,000
m3 Rp 12,500,000
m3 Rp 6,500,000
Rp 3,500,000
m3 Rp 2,500,000

Rp -

Lembar Rp 21,000
Lembar Rp 31,500
Lembar Rp 47,250
Lembar Rp 63,000

Lembar Rp 152,985
Lembar Rp 210,000
Jergen Rp 399,000
kaleng Rp 131,250
Lembar Rp 178,500

batang Rp 18,900
Rp 78,750

Lembar Rp 85,995
Lembar Rp 93,713
Roll Rp 385,875
Roll Rp 468,563
Roll Rp 551,250
Lembar Rp 355,005
Lembar Rp 166,950

Lembar Rp 29,400
Lembar Rp 50,820
Lembar Rp 60,900

Batang Rp 92,400
Batang Rp 108,570
Batang Rp 101,850
Batang Rp 101,640
Batang Rp 90,090
Batang Rp 93,555
Batang Rp 137,500
Batang Rp 100,485
Batang Rp 47,250
Batang Rp 283,500
Batang Rp 215,250
Batang Rp 147,000
Batang Rp 127,500
Batang Rp 61,950

lbr Rp 577,500
lbr Rp 4,462,500
lbr Rp 341,250
lbr Rp 1,890,000
lbr Rp 1,365,000
lbr Rp 787,500
Lembar Rp 997,500
Lembar Rp 388,500

Batang Rp 36,750
Batang Rp 21,000
batang Rp 283,500
batang Rp 206,850
batang Rp 141,750
batang Rp 103,950 Rp 8,663
batang Rp 78,750
Batang Rp 57,750

Batang Rp 325,185
Batang Rp 303,135
Batang Rp 184,800
Batang Rp 138,600
Batang Rp 97,020
Batang Rp 86,625

Batang Rp 83,685
Batang Rp 66,675
Batang Rp 57,330
batang Rp 46,725
Batang Rp 36,330
Batang Rp 25,830

batang Rp 299,250
batang Rp 367,500
batang Rp 299,250
batang Rp 210,000
batang Rp 147,000
batang Rp 70,350
batang Rp 63,000
batang Rp 57,750
batang Rp 32,550
batang Rp 25,200
batang Rp 89,250
batang Rp 141,750
batang Rp 99,750
Batang Rp 73,500
Batang Rp 47,250

Lembar Rp 23,625
Lembar Rp 23,625
Lembar Rp 48,300
Lembar Rp 87,150
Lembar Rp 28,350
Lembar Rp 28,350

m Rp 28,875
m Rp 16,800
m Rp 31,500
m Rp 15,750
kg Rp 12,075
kg Rp 105,000
Rp 57,750
kg Rp 57,750
m Rp 16,800
kg Rp 19,425
kg Rp 15,750

buah Rp 99,750
buah Rp 68,250
Rool Rp 472,500

Lembar Rp 42,000

dos Rp 36,750
m Rp 498,750
buah Rp 1,050,000
m Rp 1,155,000
buah Rp 262,500
m Rp 525,000
m Rp 577,500

m Rp 1,050,000
m Rp 945,000
Batang Rp 318,780
Batang Rp 2,030,490
Batang Rp 314,580
Batang Rp 1,569,225
Batang Rp 742,035
Batang Rp 245,175
batang Rp 84,000
batang Rp 94,500
batang Rp 262,500
batang Rp 131,250
batang Rp 173,250
batang Rp 199,500
Batang Rp 578,813
Batang Rp 78,750
Batang Rp 452,025
Batang Rp 297,675
Batang Rp 159,863
Batang Rp 226,013
Batang Rp 63,000
batang Rp 4,410,000
batang Rp 2,206,313
batang Rp 1,648,238
batang Rp 1,000,519
batang Rp 175,628
batang Rp 721,586
batang Rp 410,461
Batang Rp 127,339
batang Rp 242,964
batang Rp 338,605
Batang Rp 192,255

lembar Rp 17,535
lembar Rp 20,108
Lembar Rp 78,750
Lembar Rp 97,650
lembar Rp 72,765
Lembar Rp 17,850
lembar Rp 58,170
buah Rp 15,750
zak Rp 78,750

m Rp 78,750

Roll Rp 535,500
m Rp 15,750
Rp 46,570
m Rp 21,000
Rp 78,750
Lembar Rp 47,250
Lembar Rp 73,500
Kaki Rp 7,560
Kaki Rp 8,925
Kaki Rp 49,875
Kaki Rp 78,750
Lembar Rp 69,300
Lembar Rp 30,188
Kaki Rp 43,785

Kaki Rp 34,230

Kaki Rp 29,085

Lembar Rp 26,250
Lembar Rp 91,875
Lembar Rp 63,000
Lembar Rp 46,570
Lembar Rp 46,570
Lembar Rp 46,570
Lembar Rp 34,650

m Rp 57,750
m Rp 52,500
m Rp 52,500

buah Rp 3,625
buah Rp 2,120

buah Rp 42,000
buah Rp 65,625
buah Rp 39,375
buah Rp 21,656
buah Rp 39,375
buah Rp 9,188
buah Rp 10,149
buah Rp 14,875
buah Rp 6,825
buah Rp 6,090
buah Rp 6,300
buah Rp 6,500
buah Rp 3,806
buah Rp 3,281
buah Rp 2,406
buah Rp 2,226
buah Rp 2,310
buah Rp 150,000
buah Rp 160,000

buah Rp 26,250
buah Rp 5,949
buah Rp 5,681
buah Rp 3,045
buah Rp 2,310
buah Rp 2,310

m2 Rp 99,750
m2 Rp 246,750

buah Rp 17,850
buah Rp 10,500

Lembar Rp 40,215
Lembar Rp 35,070
Lembar Rp 97,650

Lembar Rp 16,380
Kaki Rp 7,350
Lembar Rp 30,450

Lembar Rp 72,765
Lembar Rp 58,170
Lembar Rp 45,045
Lembar Rp 45,045
Lembar Rp 31,080
Lembar Rp 35,490
Lembar Rp 32,970
Lembar Rp 22,890
Lembar Rp 38,640
Lembar Rp 27,930

m Rp 17,850
m Rp 17,325
m2 Rp 52,500
m2 Rp 82,583
m2 Rp 105,000
m2 Rp 84,000
m2 Rp 105,000
m2 Rp 84,000
m2 Rp 75,600

buah Rp 189,000
buah Rp 157,600
buah Rp 126,000
buah Rp 94,500
buah Rp 63,000

buah Rp 47,250
buah Rp 31,500

batang Rp 375,000
batang Rp 200,000
batang Rp 140,000
batang Rp 90,000
batang Rp 60,000
Batang Rp 35,000
Batang Rp 40,000
batang Rp 40,000
batang Rp 145,000
batang Rp 700,000
Batang Rp 358,600
Batang Rp 25,000
Batang Rp 150,000
Batang Rp 18,000
Batang Rp 100,000 Rp 25,000
Batang Rp 80,000
batang Rp 1,937,250

batang Rp 1,227,870

batang Rp 578,340

batang Rp 21,000

batang Rp 384,615
batang Rp 198,030

batang Rp 14,280

batang Rp 35,490

batang Rp 52,080

buah Rp 299,250
Set Rp 1,890,000
buah Rp 945,000

buah Rp 367,500
buah Rp 682,500
buah Rp 525,000
buah Rp 787,500
Set Rp 1,365,000
buah Rp 577,500
buah Rp 682,500
buah Rp 189,000

buah Rp 1,260,000

buah Rp 157,500
buah Rp 52,500
buah Rp 189,000
buah Rp 19,110
buah Rp 63,000
buah Rp 10,500
buah Rp 84,000
buah Rp 1,050,000
buah Rp 262,500
buah Rp 609,000
Unit Rp 546,000

buah Rp 31,500
buah Rp 47,250
buah Rp 15,750
buah Rp 367,500
buah Rp 15,750

buah Rp 2,625,000
buah Rp 1,455,300
buah Rp 1,391,250

buah Rp 157,500
buah Rp 472,500
buah Rp 52,500
buah Rp 47,250
buah Rp 84,000
buah Rp 157,500

kg Rp 23,100
kg Rp 23,100
liter Rp 141,750
liter Rp 236,250

kg Rp 63,000
liter Rp 152,250
liter Rp 236,250

kg Rp 63,000

kg Rp 9,669
kg Rp 48,300
kg Rp 57,750
kg Rp 57,110
kg Rp 36,750
kg Rp 41,895
kg Rp 28,350
kg Rp 50,400
kg Rp 49,560
kg Rp 60,900
kg Rp 57,750
kg Rp 63,000
kg Rp 50,400
kg Rp 52,500

liter Rp 42,000
liter Rp 36,750

liter Rp 161,175
liter Rp 177,345

liter Rp 266,175
liter Rp 44,100
liter Rp 156,450
kg Rp 107,310
kg Rp 74,445
kg Rp 129,465
kg Rp 264,180
kg Rp 99,750

liter Rp 47,250

kg Rp 63,000

liter Rp 120,750

liter Rp 57,750

buah Rp 47,250
buah Rp 36,750
buah Rp 26,250
buah Rp 23,100

liter Rp 71,400
liter Rp 19,031
liter Rp 73,500
kg Rp 95,183

kg Rp 21,137
kg Rp 21,137
kg Rp 55,860
kg Rp 18,209

kg Rp 2,625
kg Rp 52,500
kg Rp 21,000
kg Rp 31,500

liter Rp 28,875
kg Rp 31,500
liter Rp 14,700

liter Rp 42,000

liter Rp 57,750
liter Rp 52,500
buah Rp 31,500
buah Rp 36,750
Mata Rp 21,000
m Rp 315,000
m2 Rp 126,000
m2 Rp 115,500
m2 Rp 115,000
m2 Rp 105,000
m2 Rp 73,500
m2 Rp 315,000
m2 Rp 107,100
m2 Rp 115,500
m2 Rp 105,000
m2 Rp 73,500

m2 Rp 131,500
m2 Rp 152,250
m2 Rp 141,750
m2 Rp 68,250

buah Rp 10,500

m Rp 16,800
m Rp 13,650
m Rp 14,700
m Rp 11,550
m Rp 18,375
m Rp 12,600
m Rp 12,600
m Rp 9,450
m Rp 9,975
m Rp 7,350

Roll Rp 294,000
Roll Rp 189,000

buah Rp 36,750
buah Rp 18,900
buah Rp 262,500
buah Rp 10,500
buah Rp 5,250
buah Rp 10,500
buah Rp 10,500
buah Rp 13,650
Set Rp 246,750
Set Rp 99,750
Set Rp 131,250
Set Rp 84,000
buah Rp 131,250
m Rp 183,750
m Rp 3,150
buah Rp 28,875
buah Rp 26,250
buah Rp 52,500
buah Rp 47,250
buah Rp 38,850
buah Rp 36,750
buah Rp 32,550
buah Rp 36,750
buah Rp 15,750
buah Rp 8,400
buah Rp 57,750
buah Rp 52,500
buah Rp 78,750
buah Rp 68,250

buah Rp 26,250
buah Rp 21,000
buah Rp 682,500
buah Rp 367,500
buah Rp 133,350
buah Rp 69,825
buah Rp 69,825
buah Rp 95,025
buah Rp 31,500

Batang Rp 8,925
Batang Rp 29,190
Batang Rp 18,585
Batang Rp 22,785
batang Rp 84,000

buah Rp 13,650
buah Rp 17,850
buah Rp 15,750
buah Rp 13,125
buah Rp 17,850
buah Rp 28,350
buah Rp 6,930
buah Rp 8,400

buah Rp 52,500
buah Rp 39,375
buah Rp 42,000
buah Rp 63,000

buah Rp 28,875
buah Rp 23,100
buah Rp 18,900
buah Rp 15,750

buah Rp 78,750

buah Rp 147,000

buah Rp 43,313

buah Rp 36,750

liter Rp 36,750

buah Rp 9,450

buah Rp 10,500

buah Rp 26,250

liter Rp 11,813
liter Rp 5,933

buah Rp 21,000
buah Rp 8,085

Rol Rp 5,775

buah Rp 29,400

buah Rp 23,100
dos Rp 115,500
dos Rp 127,050

buah Rp 2,888
buah Rp 2,310

Rp 15,750
buah Rp 10,500
buah Rp 10,500
buah Rp 5,250

buah Rp 21,000
buah Rp 68,250
buah Rp 209,402
buah Rp 168,000
buah Rp 131,250
buah Rp 5,250
dos Rp 147,000
Pasang Rp 367,500
Pasang Rp 189,000
Pasang Rp 472,500
Pasang Rp 157,500
Pasang Rp 399,000
Pasang Rp 472,500
buah Rp 10,500
buah Rp 15,750
buah Rp 26,250
buah Rp 47,250
buah Rp 36,750
buah Rp 8,400
buah Rp 54,632
buah Rp 21,000
buah Rp 73,500
buah Rp 17,850
buah Rp 157,500
Set Rp 126,000

kg Rp 32,603
kg Rp 36,527
dos Rp 30,188
kg Rp 15,750
kg Rp 21,000
kg Rp 31,395
kg Rp 31,500
kg Rp 15,750
kg Rp 31,500
kg Rp 26,250

buah Rp 34,650
buah Rp 26,250

buah Rp 36,750
buah Rp 52,500

buah Rp 1,050

Set Rp 21,000
Set Rp 5,250

buah Rp 3,150

m Rp 8,400

Set Rp 15,750

buah Rp 21,000

buah Rp 1,365,000

Lembar Rp 84,000

Perhari Rp 90,000
Perhari Rp 90,000
hari Rp 90,000

Perhari Rp 103,400
Perhari Rp 103,400
perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 103,400
Perhari Rp 110,250

Perhari Rp 105,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
Perhari Rp 120,000
DAFTAR PERBANDINGAN HARGA BAHAN/ALAT, UPAH

LKM : Tondo Bunga


Desa/Kelurahan : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang
Propinsi : Sulawesi Selatan

Harga Satuan (Rp.)


No. Nama barang/Jasa Satuan UD. SUMBER CV. ABADI
UD MASOLO
SEJAHTERAH SEJAHTERAH

A. Bahan

I Material lainnya

1 Bambu btg 25,000 - 31,500

2 Batu Bata, ukuran standar buah 600 - 700

3 Batu Bata, ukuran tebal buah 650 - 750

4 Batu Belah 15 - 20 cm (Batu Kali) Ret/M³ 560,000 - 600,000

5 Kayu 5/12, Balok Kelas I btg/M³ 220,000 270,000 250,000

6 Kayu 5/7, Balok Kelas II btg/M³ 85,000 134,000 90,000

7 Kayu 3/25, Papan Kelas I lembar/M³ 200,000 217,000 210,000

8 Kayu 2/20, Papan Kelas II lembar/M³ 60,000 140,000 68,000

9 Kayu Balok Kelas I M³ 6,500,000 6,500,000 6,500,000

10 Kayu Balok Kelas II M³ 4,500,000 5,000,000 5,000,000

11 Kayu Balok Kelas III M³ 2,900,000 3,000,000 3,700,000

12 Kayu Papan Kelas I M³ 6,500,000 6,000,000 6,500,000

13 Kayu Papan Kelas II M³ 5,500,000 6,000,000 5,500,000

14 Kayu Papan Kelas III M³ 3,100,000 3,500,000 3,700,000

15 Pasir Beton ret 440,000 - 420,000

16 Pasir Pasang ret 420,000 - 420,000

17 Pasir Urug ret 400,000 - 326,000

18 Split/Cipping/Batu Pecah ret 1,160,000 - 962,800

19 Tanah urug ret 180,000 - 250,000


Harga Satuan (Rp.)
No. Nama barang/Jasa Satuan UD. SUMBER CV. ABADI
UD MASOLO
SEJAHTERAH SEJAHTERAH

B. Upah

1 Pekerja Org / Hari 80,000 80,000 80,000

2 Tukang Org / Hari 90,000 90,000 90,000

Catatan: Harga Satuan sampai dengan lokasi


NGAN HARGA BAHAN/ALAT, UPAH

Ket.
Ket.
HARGA BAHAN/ALAT, UPAH

KKM : Tondo Bunga


Desa/Kelurahan : Kariango
Kecamatan : Lembang
Kabupaten : Pinrang
Propinsi : Sulawesi Selatan

Upah Angkut/ Total


Harga Satuan
No. Nama barang/Jasa Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
A. Bahan

I Material lainnya

1 Bambu btg 31,500 - 31,500

2 Batu Bata, ukuran standar buah 700 - 700

3 Batu Bata, ukuran tebal buah 750 - 750

4 Batu Belah 15 - 20 cm (Batu Kali) ret 600,000 - 600,000

5 Kayu 5/12, Balok Kelas I batang 250,000 - 250,000

6 Kayu 5/7, Balok Kelas II batang 90,000 - 90,000

7 Kayu 3/25, Papan Kelas I lembar 210,000 - 210,000

8 Kayu 2/20, Papan Kelas II lembar 68,000 - 68,000

9 Kayu Balok Kelas I m3 6,500,000 - 6,500,000

10 Kayu Balok Kelas II m3 5,000,000 - 5,000,000

11 Kayu Balok Kelas III m3 3,700,000 - 3,700,000

12 Kayu Papan Kelas I m3 6,500,000 - 6,500,000

13 Kayu Papan Kelas II m3 5,500,000 - 5,500,000

14 Kayu Papan Kelas III m3 3,700,000 - 3,700,000

15 Pasir Beton ret 420,000 - 420,000

16 Pasir Pasang ret 420,000 - 420,000

17 Pasir Urug ret 326,000 - 326,000

18 Split/Cipping/Batu Pecah ret 962,800 - 962,800

19 Tanah urug ret 250,000 - 250,000

B. Upah
Upah Angkut/ Total
Harga Satuan
No. Nama barang/Jasa Satuan Biaya Transport Harga Satuan
(Rp). (Rp). (Rp).
1 Pekerja Hok 90,000 - 90,000

2 Tukang Hok 120,000 - 110,000

Catatan: Harga Satuan sampai dengan lokasi


A BAHAN/ALAT, UPAH

Spesifikasi Teknik Ket.

Tanah Liat, Ukuran normal 6 x 12 cm

Batu Kali ukuran 15 - 20 cm

Panjang 4 m

Panjang 4 m

Panjang 4 m

Panjang 4 m

Butir-butir pasir harus tajam, keras dan


tidak dapat dihancurkan dengan tangan,
kadar lumpur tidak boleh lebih dari 5%
Spesifikasi Teknik Ket.
RENCANA ANGGARAN B

Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinrang


Nomor RAB : 01
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
1 2=3+4+5 3 4
A. PEKERJAAN PENDAHULUAN
1 Membersihkan Lapangan dan Peralatan 25.00
- Upah
Pekerja 0.100 2.50 2.50 0.00 2.50
2 Pengukuran & Pemasangan Bowplank 16.00
- Bahan
Kayu balok klas II uk. 5/7 0.012 0.19 0.19 0.00 0.19
Paku biasa 2" - 5 " 0.020 0.32 0.32 0.00 0.00
Kayu papan kls III uk.2/20 0.007 0.11 0.11 0.00 0.11
- Upah
Pekerja 0.100 1.60 1.60 0.00 1.60
Tukang 0.100 1.60 1.60 0.00 1.60
B. PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi 16.90
- Upah
Pekerja 0.900 15.21 15.21 0.00 15.21
2 Pek. Urug. Kembali Galian Tanah Pondasi 5.63
- Upah
Pekerja 0.250 1.41 1.41 0.00 1.41
3 Pek. Urugan Tanah di Bawah Lantai 3.07
- Bahan
Tanah Urug 1.200 3.69 3.69 0.00 3.69
- Upah
Pekerja 0.300 0.92 0.92 0.00 0.92
4 Urugan Pasir di Bawah Aanstampang 0.68
- Bahan
Pasir Urug 1.200 0.81 0.81 0.00 0.81
- Upah
Pekerja 0.300 0.20 0.20 0.00 0.20
5 Urugan Pasir di Lantai 1.02
- Bahan
Pasir Urug 1.200 1.23 1.23 0.00 1.23
- Upah
Pekerja 0.300 0.31 0.31 0.00 0.31
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
C. PEKERJAAN PASANGAN BATU
1 Pas. Batu Kosong 1.35
- Bahan
Batu belah 10/15 cm 1.200 1.62 1.62 0.00 1.62
Pasir Urug 0.432 0.58 0.58 0.00 0.58
- Upah
Pekerja 0.780 1.05 1.05 0.00 1.05
Tukang 0.390 0.53 0.53 0.00 0.53
2 Pas. Batu Bata Gardu Listrik 30.48
- Bahan
Bata merah 5 x 11 x 22 cm 70.000 2133.60 2133.60 0.00 0.00
Semen Portland 11.500 350.52 350.52 0.00 0.00
Pasir pasang 0.043 1.31 1.31 0.00 1.31
- Upah
Pekerja 0.300 9.14 9.14 0.00 0.00
Tukang 0.100 3.05 3.05 0.00 0.00
3 Pas. Batu Bata Box Valve 40 x 60 x60 0.72
- Bahan
Bata merah 5 x 11 x 22 cm 70.000 50.40 50.40 0.00 0.00
Semen Portland 11.500 8.28 8.28 0.00 0.00
Pasir pasang 0.043 0.03 0.03 0.00 0.03
- Upah
Pekerja 0.300 0.22 0.22 0.00 0.22
Tukang 0.100 0.07 0.07 0.00 0.07
D. PEKERJAAN BETON
1 Pondasi Poer Plat & Kolom Pondasi Poor
* Beton Pondasi 2.48
- Bahan
Semen portland 232.000 575.36 575.36 0.00 0.00
Pasir Beton 0.520 1.29 1.29 0.00 0.00
Kerikil beton 0.780 1.93 1.93 0.00 1.93
- Upah
Pekerja 1.650 4.09 4.09 0.00 0.00
Tukang 0.250 0.62 0.62 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
* Pembesian Pondasi 561.59
- Bahan
Besi beton Polos 1.050 589.67 589.67 0.00 0.00
Kawat beton 0.015 8.42 8.42 0.00 0.00
- Upah
Pekerja 0.007 3.93 3.93 0.00 0.00
Tukang 0.007 3.93 3.93 0.00 0.00
* Bekisting Pondasi 8.80
- Bahan
Kayu Kls III 0.040 0.35 0.35 0.00 0.00
Paku biasa 2" - 5' 0.300 2.64 2.64 0.00 0.00
Minyak bekisting 0.100 0.88 0.88 0.00 0.00
- Upah
Pekerja 0.520 4.58 4.58 0.00 4.58
Tukang 0.260 2.29 2.29 0.00 2.29
2 Beton Sloof ( 20 x 40 )
* Beton Sloof 0.90
- Bahan
Semen portland 232.000 207.87 207.87 0.00 0.00
Pasir Beton 0.520 0.47 0.47 0.00 0.00
Kerikil beton 0.780 0.70 0.70 0.00 0.00
- Upah
Pekerja 1.650 1.48 1.48 0.00 0.00
Tukang 0.250 0.22 0.22 0.00 0.00
* Pembesian Sloof 196.47
- Bahan
Besi beton Polos 1.050 206.30 206.30 0.00 0.00
Kawat beton 0.015 2.95 2.95 0.00 0.00
- Upah
Pekerja 0.007 1.38 1.38 0.00 0.00
Tukang 0.007 1.38 1.38 0.00 0.00
* Bekisting Sloof 4.48
- Bahan
Kayu Kls III 0.045 0.20 0.20 0.00 0.20
Paku biasa 2" - 5' 0.300 1.34 1.34 0.00 0.00
Minyak bekisting 0.100 0.45 0.45 0.00 0.00
- Upah
Pekerja 0.520 2.33 2.33 0.00 0.00
Tukang 0.260 1.16 1.16 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
3 Kolom ( 40 x 40 )
* Beton Kolom 4.48
- Bahan
Semen portland 232.000 1039.36 1039.36 0.00 0.00
Pasir Beton 0.520 2.33 2.33 0.00 0.00
Kerikil beton 0.780 3.49 3.49 0.00 0.00
- Upah
Pekerja 1.650 7.39 7.39 0.00 0.00
Tukang 0.250 1.12 1.12 0.00 0.00
* Pembesian Kolom 542.08
- Bahan
Besi beton Polos 1.050 569.19 569.19 0.00 0.00
Kawat beton 0.015 8.13 8.13 0.00 0.00
- Upah
Pekerja 0.007 3.79 3.79 0.00 3.79
Tukang 0.007 3.79 3.79 0.00 3.79
* Bekisting Kolom 22.40
- Bahan
Kayu Kls III 0.040 0.90 0.90 0.00 0.00
Paku biasa 2" - 5' 0.400 8.96 8.96 0.00 0.00
Minyak bekisting 0.200 4.48 4.48 0.00 0.00
Balok Kayu Kls II 0.015 0.34 0.34 0.00 0.00
Plywood tebal 9 mm 0.350 7.84 7.84 0.00 0.00
Bambu P = 12 M 0.667 14.93 14.93 0.00 14.93
- Upah
Pekerja 0.660 14.78 14.78 0.00 14.78
Tukang 0.330 7.39 7.39 0.00 7.39
4 Balok 20 x 40 (Lantai 2 dan 3)
* Beton Balok 1.79
- Bahan
Semen portland 232.000 415.74 415.74 0.00 0.00
Pasir Beton 0.520 0.93 0.93 0.00 0.00
Kerikil beton 0.780 1.40 1.40 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 1.650 2.96 2.96 0.00 0.00
Tukang 0.250 0.45 0.45 0.00 0.00
* Pembesian Balok 399.49
- Bahan
Besi beton Polos 1.050 419.47 419.47 0.00 0.00
Kawat beton 0.015 5.99 5.99 0.00 0.00
- Upah
Pekerja 0.007 2.80 2.80 0.00 0.00
Tukang 0.007 2.80 2.80 0.00 2.80
* Bekisting Balok 8.96
- Bahan
Kayu Kls III 0.040 0.36 0.36 0.00 0.36
Paku biasa 2" - 5' 0.400 3.58 3.58 0.00 0.00
Minyak bekisting 0.200 1.79 1.79 0.00 0.00
Balok Kayu Kls II 0.018 0.16 0.16 0.00 0.00
Plywood tebal 9 mm 0.350 3.14 3.14 0.00 0.00
Bambu P = 12 M 0.667 5.97 5.97 0.00 5.97
- Upah
Pekerja 0.660 5.91 5.91 0.00 0.00
Tukang 0.330 2.96 2.96 0.00 0.00
5 Plat lantai 2 dan lantai 3 ( t 20 Cm) dan Plat Penutup Bak ( t = 15 cm )
* Beton Plat Lantai dan Penutup 6.81
- Bahan
Semen portland 232.000 1578.99 1578.99 0.00 0.00
Pasir Beton 0.520 3.54 3.54 0.00 0.00
Kerikil beton 0.780 5.31 5.31 0.00 0.00
- Upah
Pekerja 1.650 11.23 11.23 0.00 0.00
Tukang 0.250 1.70 1.70 0.00 0.00
* Pembesian Plat Lantai dan Penutup 874.76
- Bahan
Besi beton Polos 1.050 918.50 918.50 0.00 0.00
Kawat beton 0.015 13.12 13.12 0.00 0.00
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 0.007 6.12 6.12 0.00 0.00
Tukang 0.007 6.12 6.12 0.00 0.00
* Bekisting Plat Lantai dan Penutup 18.38
- Bahan
Kayu Kls III 0.040 0.74 0.74 0.00 0.00
Paku biasa 2" - 5' 0.400 7.35 7.35 0.00 0.00
Minyak bekisting 0.200 3.68 3.68 0.00 0.00
Balok Kayu Kls II 0.015 0.28 0.28 0.00 0.00
Plywood tebal 9 mm 0.350 6.43 6.43 0.00 0.00
Bambu P = 12 m 2.000 36.76 36.76 0.00 36.76
- Upah
Pekerja 0.660 12.13 12.13 0.00 12.13
Tukang 0.330 6.07 6.07 0.00 6.07
6 Dinding beton bak penampung ( t 20 )
* Beton dinding bak penampung 5.44
- Bahan
Semen portland 232.000 1262.08 1262.08 0.00 0.00
Pasir Beton 0.520 2.83 2.83 0.00 0.00
Kerikil beton 0.780 4.24 4.24 0.00 0.00
- Upah
Pekerja 1.650 8.98 8.98 0.00 0.00
Tukang 0.250 1.36 1.36 0.00 1.36
* Pembesian dinding bak penampung 740.11
- Bahan
Besi beton Polos 1.050 777.12 777.12 0.00 0.00
Kawat beton 0.015 11.10 11.10 0.00 0.00
- Upah
Pekerja 0.007 5.18 5.18 0.00 0.00
Tukang 0.007 5.18 5.18 0.00 0.00
* Bekisting dinding bak penampung 13.60
- Bahan
Kayu Kls III 0.030 0.41 0.41 0.00 0.41
Paku biasa 2" - 5' 0.400 5.44 5.44 0.00 0.00
Minyak bekisting 0.200 2.72 2.72 0.00 0.00
Balok Kayu Kls II 0.020 0.27 0.27 0.00 0.00
Plywood tebal 9 mm 0.350 4.76 4.76 0.00 0.00
Bambu P = 12 m 2.333 31.73 31.73 0.00 31.73
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
- Upah
Pekerja 0.660 8.98 8.98 0.00 8.98
Tukang 0.330 4.49 4.49 0.00 4.49
E. PEKERJAAN KUSEN DAN JENDELA
1 Pek. 1 M3 Kusen pintu dan kusen jendela 0.03
- Bahan
Balok Kayu Kls II 1.200 0.04 0.04 0.00 0.00
Paku 10 cm 1.250 0.04 0.04 0.00 0.00
Lem kayu 1.000 0.03 0.03 0.00 0.00
- Upah
Pekerja 6.000 0.21 0.21 0.00 0.00
Tukang 18.000 0.62 0.62 0.00 0.00
2 Pek. 1 M2 daun pintu dan daun jendela 1.57
- Bahan
Papan Kayu Kls II 0.040 0.06 0.06 0.00 0.00
Lem kayu 0.500 0.78 0.78 0.00 0.00
- Upah
Pekerja 1.000 1.57 1.57 0.00 0.00
Tukang 3.000 4.71 4.71 0.00 0.00
3 Pek. 1 M2 pasang kaca polos 5 mm 0.46
- Bahan
Kaca polos 5 mm 1.100 0.50 0.50 0.00 0.00
- Upah
Pekerja 0.150 0.07 0.07 0.00 0.07
Tukang 0.150 0.07 0.07 0.00 0.07
E. PEKERJAAN FINISHING
1 Plesteran Gardu Listrik 1 : 4 ( t 20 ) 60.96
- Bahan
Semen Portland 8.320 507.19 507.19 0.00 0.00
Pasir pasang 0.032 1.95 1.95 0.00 0.00
- Upah
Pekerja 0.400 24.38 24.38 0.00 0.00
Tukang 0.200 12.19 12.19 0.00 0.00
2 Plesteran Box Valve 1 : 2 ( t 20 ) 1.44
- Bahan
Semen Portland 13.632 19.63 19.63 0.00 0.00
Pasir pasang 0.027 0.04 0.04 0.00 0.00
- Upah
Pekerja 0.400 0.58 0.58 0.00 0.58
Tukang 0.200 0.29 0.29 0.00 0.29
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
3 Acian 24.00
- Bahan
Semen Portland 3.250 78.00 78.00 0.00 0.00
- Upah
Pekerja 0.200 4.80 4.80 0.00 4.80
Tukang 0.100 2.40 2.40 0.00 2.40
4 Pekerjaan Man Hole 80 x 80 0.64
- Bahan
Besi plat 32.800 20.99 20.99 0.00 0.00
Besi siku 30.30.3 15.000 9.60 9.60 0.00 0.00
- Upah
Pekerja 1.050 0.67 0.67 0.00 0.00
Tukang 1.050 0.67 0.67 0.00 0.00
5 Penutup Box Valve 60 x 60 0.36
- Bahan
Besi plat 32.800 11.81 11.81 0.00 0.00
Besi siku 30.30.3 15.000 5.40 5.40 0.00 0.00
- Upah
Pekerja 1.050 0.38 0.38 0.00 0.00
Tukang 1.050 0.38 0.38 0.00 0.00
6 Pengecatan ( 2 x cat penutup ) 151.84
- Bahan
Plamir 0.100 15.18 15.18 0.00 0.00
Cat dasar 0.100 15.18 15.18 0.00 0.00
Cat penutup 2 kali 0.260 39.48 39.48 0.00 0.00
- Upah
Pekerja 0.020 3.04 3.04 0.00 0.00
Tukang 0.063 9.57 9.57 0.00 0.00
7 Pengecatan Kusen 4.35
- Bahan
Cat meni 0.200 0.87 0.87 0.00 0.00
Plamur 0.150 0.65 0.65 0.00 0.00
Cat dasar 0.170 0.74 0.74 0.00 0.00
Cat penutup 2 kali 0.260 1.13 1.13 0.00 0.00
- Upah
Pekerja 0.070 0.30 0.30 0.00 0.30
Tukang 0.009 0.04 0.04 0.00 0.04
Volume
URAIAN Koef. Volume Kontribusi Masyarakat
Total
inCash inKind
8 Pipa Vent Gip Ø 2" 1.00
- Upah
Pekerja 0.108 0.11 0.11 0.00 0.11
Tukang 0.180 0.18 0.18 0.00 0.18
9 Tangga Monyet 8.00
- Upah
Pekerja 1.200 9.60 9.60 0.00 0.00
Tukang 1.200 9.60 9.60 0.00 0.00
10 Stop Kran Ø 3'' Err:509
- Upah
Pekerja 0.010 Err:509 Err:509 0.00 Err:509
Tukang 0.100 Err:509 Err:509 0.00 Err:509
11 Sambungan Knee Ø 3'' Err:509
- Upah
Pekerja 0.010 Err:509 Err:509 0.00 Err:509
Tukang 0.100 Err:509 Err:509 0.00 Err:509

176.00 14,080,000.00
102.00 8,670,000.00

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST.


NIP. 19730305 200212 1 012
ANA ANGGARAN BIAYA

ota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo


Sub pekerjaan/Kegiatan : Reservoir
Ukuran/Dimensi : 3 x 3 x 2 m

me Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
6 7 8 9=2x8 10=3x8 11=4x8 13=6x8
1,924,840 - 1,919,400 5,440
225,000 - 225,000 -
225,000 - 225,000 -
0.00 Hok 90,000 225,000 - 225,000 -
1,699,840 - 1,694,400 5,440
1,379,840 - 1,374,400 5,440
0.00 M3 5,000,000 960,000 - 960,000 -
0.32 Kg 17,000 5,440 - - 5,440
0.00 M3 3,700,000 414,400 - 414,400 -
320,000 - 320,000 -
0.00 Hok 90,000 144,000 - 144,000 -
0.00 Hok 110,000 176,000 - 176,000 -
2,021,154 - 2,021,154 -
1,368,900 - 1,368,900 -
1,368,900 - 1,368,900 -
0.00 Hok 90,000 1,368,900 - 1,368,900 -
126,750 - 126,750 -
126,750 - 126,750 -
0.00 Hok 90,000 126,750 - 126,750 -
313,344 - 313,344 -
230,400 - 230,400 -
0.00 M3 62,500 230,400 - 230,400 -
82,944 - 82,944 -
0.00 Hok 90,000 82,944 - 82,944 -
84,365 - 84,365 -
66,113 - 66,113 -
0.00 M3 81,500 66,113 - 66,113 -
18,252 - 18,252 -
0.00 Hok 90,000 18,252 - 18,252 -
127,795 - 127,795 -
100,147 - 100,147 -
0.00 M3 81,500 100,147 - 100,147 -
27,648 - 27,648 -
0.00 Hok 90,000 27,648 - 27,648 -
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
3,722,524 - 612,100 3,110,424
443,872 - 443,872 -
290,961 - 290,961 -
0.00 M3 150,000 243,360 - 243,360 -
0.00 M3 81,500 47,601 - 47,601 -
152,911 - 152,911 -
0.00 Hok 90,000 94,910 - 94,910 -
0.00 Hok 110,000 58,001 - 58,001 -
3,202,991 - 137,617 3,065,374
2,044,751 - 137,617 1,907,134
2133.60 Bh 700 1,493,520 - - 1,493,520
350.52 Kg 1,180 413,614 - - 413,614
0.00 M3 105,000 137,617 - 137,617 -
1,158,240 - - 1,158,240
9.14 Hok 90,000 822,960 - - 822,960
3.05 Hok 110,000 335,280 - - 335,280
75,661 - 30,611 45,050
48,301 - 3,251 45,050
50.40 Bh 700 35,280 - - 35,280
8.28 Kg 1,180 9,770 - - 9,770
0.00 M3 105,000 3,251 - 3,251 -
27,360 - 27,360 -
0.00 Hok 90,000 19,440 - 19,440 -
0.00 Hok 110,000 7,920 - 7,920 -
84,728,838 - 13,947,123 70,781,714
10,553,423 - 1,129,130 9,424,293
1,716,423 - 465,610 1,250,813
1,279,943 - 465,610 814,333
575.36 Kg 1,180 678,925 - - 678,925
1.29 M3 105,000 135,408 - - 135,408
0.00 M3 240,700 465,610 - 465,610 -
436,480 - - 436,480
4.09 Hok 90,000 368,280 - - 368,280
0.62 Hok 110,000 68,200 - - 68,200
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
6,815,640 - - 6,815,640
6,029,409 - - 6,029,409
589.67 Kg 10,000 5,896,733 - - 5,896,733
8.42 Kg 15,750 132,676 - - 132,676
786,231 - - 786,231
3.93 Hok 90,000 353,804 - - 353,804
3.93 Hok 110,000 432,427 - - 432,427
2,021,360 - 663,520 1,357,840
1,357,840 - - 1,357,840
0.35 M3 3,700,000 1,302,400 - - 1,302,400
2.64 Kg 17,000 44,880 - - 44,880
0.88 Ltr 12,000 10,560 - - 10,560
663,520 - 663,520 -
0.00 Hok 90,000 411,840 - 411,840 -
0.00 Hok 110,000 251,680 - 251,680 -
4,116,516 - 745,920 3,370,596
620,127 - - 620,127
462,431 - - 462,431
207.87 Kg 1,180 245,289 - - 245,289
0.47 M3 105,000 48,922 - - 48,922
0.70 M3 240,700 168,220 - - 168,220
157,696 - - 157,696
1.48 Hok 90,000 133,056 - - 133,056
0.22 Hok 110,000 24,640 - - 24,640
2,384,453 - - 2,384,453
2,109,390 - - 2,109,390
206.30 Kg 10,000 2,062,973 - - 2,062,973
2.95 Kg 15,750 46,417 - - 46,417
275,063 - - 275,063
1.38 Hok 90,000 123,778 - - 123,778
1.38 Hok 110,000 151,285 - - 151,285
1,111,936 - 745,920 366,016
774,144 - 745,920 28,224
0.00 M3 3,700,000 745,920 - 745,920 -
1.34 Kg 17,000 22,848 - - 22,848
0.45 Ltr 12,000 5,376 - - 5,376
337,792 - - 337,792
2.33 Hok 90,000 209,664 - - 209,664
1.16 Hok 110,000 128,128 - - 128,128
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
18,435,652 - 3,372,996 15,062,656
3,100,635 - - 3,100,635
2,312,155 - - 2,312,155
1039.36 Kg 1,180 1,226,445 - - 1,226,445
2.33 M3 105,000 244,608 - - 244,608
3.49 M3 240,700 841,102 - - 841,102
788,480 - - 788,480
7.39 Hok 90,000 665,280 - - 665,280
1.12 Hok 110,000 123,200 - - 123,200
6,578,857 - 758,916 5,819,941
5,819,941 - - 5,819,941
569.19 Kg 10,000 5,691,874 - - 5,691,874
8.13 Kg 15,750 128,067 - - 128,067
758,916 - 758,916 -
0.00 Hok 90,000 341,512 - 341,512 -
0.00 Hok 110,000 417,404 - 417,404 -
8,756,160 - 2,614,080 6,142,080
6,612,480 - 470,400 6,142,080
0.90 M3 3,700,000 3,315,200 - - 3,315,200
8.96 Kg 17,000 152,320 - - 152,320
4.48 Ltr 12,000 53,760 - - 53,760
0.34 0 5,000,000 1,680,000 - - 1,680,000
7.84 Hok 120,000 940,800 - - 940,800
0.00 Hok 31,500 470,400 - 470,400 -
2,143,680 - 2,143,680 -
0.00 Hok 90,000 1,330,560 - 1,330,560 -
0.00 Hok 110,000 813,120 - 813,120 -
9,725,482 - 1,821,851 7,903,631
1,240,254 - - 1,240,254
924,862 - - 924,862
415.74 Kg 1,180 490,578 - - 490,578
0.93 M3 105,000 97,843 - - 97,843
1.40 M3 240,700 336,441 - - 336,441
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
315,392 - - 315,392
2.96 Hok 90,000 266,112 - - 266,112
0.45 Hok 110,000 49,280 - - 49,280
4,848,364 - 307,611 4,540,753
4,289,072 - - 4,289,072
419.47 Kg 10,000 4,194,691 - - 4,194,691
5.99 Kg 15,750 94,381 - - 94,381
559,292 - 307,611 251,681
2.80 Hok 90,000 251,681 - - 251,681
0.00 Hok 110,000 307,611 - 307,611 -
3,636,864 - 1,514,240 2,122,624
2,779,392 - 1,514,240 1,265,152
0.00 M3 3,700,000 1,326,080 - 1,326,080 -
3.58 Kg 17,000 60,928 - - 60,928
1.79 Ltr 12,000 21,504 - - 21,504
0.16 0 5,000,000 806,400 - - 806,400
3.14 Hok 120,000 376,320 - - 376,320
0.00 Hok 31,500 188,160 - 188,160 -
857,472 - - 857,472
5.91 Hok 90,000 532,224 - - 532,224
2.96 Hok 110,000 325,248 - - 325,248
23,283,474 - 2,916,906 20,366,568
4,710,473 - - 4,710,473
3,512,617 - - 3,512,617
1578.99 Kg 1,180 1,863,211 - - 1,863,211
3.54 M3 105,000 371,608 - - 371,608
5.31 M3 240,700 1,277,799 - - 1,277,799
1,197,856 - - 1,197,856
11.23 Hok 90,000 1,010,691 - - 1,010,691
1.70 Hok 110,000 187,165 - - 187,165
10,616,299 - - 10,616,299
9,391,636 - - 9,391,636
918.50 Kg 10,000 9,184,974 - - 9,184,974
13.12 Kg 15,750 206,662 - - 206,662
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
1,224,663 - - 1,224,663
6.12 Hok 90,000 551,098 - - 551,098
6.12 Hok 110,000 673,565 - - 673,565
7,956,702 - 2,916,906 5,039,796
6,197,736 - 1,157,940 5,039,796
0.74 M3 3,700,000 2,720,240 - - 2,720,240
7.35 Kg 17,000 124,984 - - 124,984
3.68 Ltr 12,000 44,112 - - 44,112
0.28 0 5,000,000 1,378,500 - - 1,378,500
6.43 Hok 120,000 771,960 - - 771,960
0.00 Hok 31,500 1,157,940 - 1,157,940 -
1,758,966 - 1,758,966 -
0.00 Hok 90,000 1,091,772 - 1,091,772 -
0.00 Hok 110,000 667,194 - 667,194 -
18,614,291 - 3,960,320 14,653,971
3,765,057 - 149,600 3,615,457
2,807,617 - - 2,807,617
1262.08 Kg 1,180 1,489,254 - - 1,489,254
2.83 M3 105,000 297,024 - - 297,024
4.24 M3 240,700 1,021,338 - - 1,021,338
957,440 - 149,600 807,840
8.98 Hok 90,000 807,840 - - 807,840
0.00 Hok 110,000 149,600 - 149,600 -
8,982,194 - - 8,982,194
7,946,036 - - 7,946,036
777.12 Kg 10,000 7,771,184 - - 7,771,184
11.10 Kg 15,750 174,852 - - 174,852
1,036,158 - - 1,036,158
5.18 Hok 90,000 466,271 - - 466,271
5.18 Hok 110,000 569,887 - - 569,887
5,867,040 - 3,810,720 2,056,320
4,565,520 - 2,509,200 2,056,320
0.00 M3 3,700,000 1,509,600 - 1,509,600 -
5.44 Kg 17,000 92,480 - - 92,480
2.72 Ltr 12,000 32,640 - - 32,640
0.27 0 5,000,000 1,360,000 - - 1,360,000
4.76 Hok 120,000 571,200 - - 571,200
0.00 Hok 31,500 999,600 - 999,600 -
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
1,301,520 - 1,301,520 -
0.00 Hok 90,000 807,840 - 807,840 -
0.00 Hok 110,000 493,680 - 493,680 -
1,406,227 - 12,359 1,393,868
285,772 - - 285,772
209,071 - - 209,071
0.04 M3 5,000,000 207,300 - - 207,300
0.04 Kg 17,000 734 - - 734
0.03 Kg 30,000 1,037 - - 1,037
76,701 - - 76,701
0.21 Hok 85,000 17,621 - - 17,621
0.62 Hok 95,000 59,081 - - 59,081
949,487 - - 949,487
368,809 - - 368,809
0.06 M3 5,500,000 345,268 - - 345,268
0.78 Kg 30,000 23,541 - - 23,541
580,678 - - 580,678
1.57 Hok 85,000 133,399 - - 133,399
4.71 Hok 95,000 447,279 - - 447,279
170,968 - 12,359 158,609
158,609 - - 158,609
0.50 M² 315,000 158,609 - - 158,609
12,359 - 12,359 -
0.00 Hok 85,000 5,836 - 5,836 -
0.00 Hok 95,000 6,523 - 6,523 -
Err:509 - Err:509 Err:509
4,338,986 - - 4,338,986
803,306 - - 803,306
507.19 Kg 1,180 598,481 - - 598,481
1.95 M3 105,000 204,826 - - 204,826
3,535,680 - - 3,535,680
24.38 Hok 90,000 2,194,560 - - 2,194,560
12.19 Hok 110,000 1,341,120 - - 1,341,120
110,766 - 83,520 27,246
27,246 - - 27,246
19.63 Kg 1,180 23,163 - - 23,163
0.04 M3 105,000 4,082 - - 4,082
83,520 - 83,520 -
0.00 Hok 90,000 51,840 - 51,840 -
0.00 Hok 110,000 31,680 - 31,680 -
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
788,040 - 696,000 92,040
92,040 - - 92,040
78.00 Kg 1,180 92,040 - - 92,040
696,000 - 696,000 -
0.00 Hok 90,000 432,000 - 432,000 -
0.00 Hok 110,000 264,000 - 264,000 -
440,320 - - 440,320
305,920 - - 305,920
20.99 Kg 10,000 209,920 - - 209,920
9.60 Kg 10,000 96,000 - - 96,000
134,400 - - 134,400
0.67 Hok 90,000 60,480 - - 60,480
0.67 Hok 110,000 73,920 - - 73,920
247,680 - - 247,680
172,080 - - 172,080
11.81 Kg 10,000 118,080 - - 118,080
5.40 Kg 10,000 54,000 - - 54,000
75,600 - - 75,600
0.38 Hok 90,000 34,020 - - 34,020
0.38 Hok 110,000 41,580 - - 41,580
11,076,728 - - 11,076,728
9,751,165 - - 9,751,165
15.18 Kg 2,950 44,793 - - 44,793
15.18 Kg 25,000 379,600 - - 379,600
39.48 Kg 236,250 9,326,772 - - 9,326,772
1,325,563 - - 1,325,563
3.04 Hok 90,000 273,312 - - 273,312
9.57 Hok 110,000 1,052,251 - - 1,052,251
133,666 - 29,590 104,076
104,076 - - 104,076
0.87 Kg 21,137 18,382 - - 18,382
0.65 Kg 2,950 1,924 - - 1,924
0.74 Kg 25,000 18,480 - - 18,480
1.13 Kg 57,750 65,290 - - 65,290
29,590 - 29,590 -
0.00 Hok 85,000 25,872 - 25,872 -
0.00 Hok 95,000 3,718 - 3,718 -
me Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBN Total APBN
(Rp) inCash inKind
25,380 - 25,380 -
25,380 - 25,380 -
0.00 Hok 85,000 9,180 - 9,180 -
0.00 Hok 90,000 16,200 - 16,200 -
1,680,000 - - 1,680,000
1,680,000 - - 1,680,000
9.60 Hok 85,000 816,000 - - 816,000
9.60 Hok 90,000 864,000 - - 864,000
Err:509 - Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Hok 85,000 Err:509 - Err:509 Err:509
Err:509 Hok 90,000 Err:509 - Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 - Err:509 Err:509
Err:509 Hok 85,000 Err:509 - Err:509 Err:509
Err:509 Hok 90,000 Err:509 - Err:509 Err:509

UPAH Err:509 - Err:509 Err:509


Dibulatkan Err:509 - Err:509 Err:509
BAHAN 85,325,055 - 9,066,199 76,258,856
Dibulatkan 85,325,000 - 9,066,000 76,259,000
Total) Err:509 - Err:509 Err:509
85,571,000
Desa Masolo, ………............Oktober 2016

Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( H. Muh. Amin ) ( Ansar )


VERIFIKASI RENCANA PENGADAAN
Desa / Kelurahan :: Masolo
Kecamatan : Patampanua Jenis Pekerj
Kota / Kab : Pinrang
Propinsi : Sulawesi Selatan

No. SUMBER DAN


Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9

1 BAHAN LOKAL
Balok 5/7 Kayu Kls II 50 btg 90,000 4,500,000 4,500,000
Bambu 84 bh 31,500 2,646,000 1,746,000
Batu Belah 1.00 Ret 600,000 600,000 -
Pasir Urug 9.00 Ret 326,000 2,934,000 -
Pasir Beton 5 Ret 420,000 2,100,000 1,300,000
Pasir Pasang 6 Ret 420,000 2,520,000 2,520,000
Kayu Balok Kls I 0.10 M3 6,500,000 650,000 300,000
Kayu Papan Kls I 0.05 M3 6,500,000 344,110 344,110
Kayu Papan Kls II, 2/20 20 lbr 68,000 1,360,000 1,360,000
Bata Merah 5 x 11 x 12 cm 2,184 Bh 700 1,528,800 1,528,800
Kerikil beton / Cipping 5 ret 962,800 4,814,000 3,654,000
JUMLAH (1) 23,996,910 17,252,910

2 BAHAN INDUSTRI
Besi Beton Ǿ 16 SNI 53 btg 141,750 7,512,750 7,512,750
Besi Beton Ǿ 14 SNI 20 btg 103,950 2,079,000 2,079,000
Besi Beton Ǿ 12 SNI 146 btg 78,750 11,497,500 11,497,500
Besi Beton Ǿ 10 SNI 52 btg 57,750 3,003,000 3,003,000
Besi Plat 3 mm 1 M2 524,800 524,800 524,800
Besi Siku 40 x 40 x 4 mm 2 M1 60,000 120,000 120,000
Cat Besi / Kayu @ 2 Kg 5 Klg 57,750 288,750 288,750
Cat Tembok @ 4 Kg 4 Klg 236,250 945,000 945,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Cat Pelapis Anti Bocor @ 4 Kg (No Drop) 3 Klg 71,400 214,200 214,200
Ember Cor 5 Buah 10,000 50,000 50,000
Gergaji Besi 1 Set 70,000 70,000 70,000
Gerobak Dorong 2 Buah 500,000 1,000,000 1,000,000
Kaca bening tebal 5 mm 3 M2 315,000 945,000 945,000
Kawat Beton 30 Kg 15,750 472,500 472,500
Minyak Bekisting 5 Kg 12,000 60,000 60,000
Linggis 2 Buah #REF! #REF! #REF!
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Meteran 1 Buah 30,000 30,000 30,000
Paku Biasa 30 Kg 17,000 510,000 510,000
Playwood 9 mm 22 Lbr 120,000 2,640,000 2,640,000
Sekop Besar 2 Bh 75,000 150,000 150,000
Sekop Kecil 3 Bh 85,000 255,000 255,000
Semen Skim Coat / A Plus @ 20 kg 16 Zak 59,000 944,000 944,000
Portland Composite Cemen (PCC) 144 Zak 59,000 8,496,000 8,496,000
Sendok Semen 2 Bh 25,000 50,000 50,000
Tenro' #REF! Bh 100,000 #REF! #REF!
Tali Plastik Err:509 m 2,500 Err:509 Err:509
JUMLAH (2) #REF! #REF!

3 PENYELIDIKAN 1 Lokasi Err:509 Err:509 Err:509


GEOHIDROLOGI /
GEOLISTRIK
JUMLAH (3) Err:509 Err:509

4 PENGEBORAN
SUMUR DALAM
PENGADAAN BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90.00 M' 137,500 12,375,000 -
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000 -
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000 -
Pengadaan Gravel Pack 3.00 M3 240,700 722,100 543,650
UPAH DAN BIAYA KONSTRUKSI
Mobilisasi dan demobilisasi meliputi pemindahan alat dan
1.00 Rig 1,000,000 1,000,000 1,000,000
alat bantu lainnya
dari workshop ke site pengeboran dan sebaliknya
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 500,000 500,000 500,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Persiapan lokasi sebelum pemboran dan pemulihannya
1.00 Lokasi 1,000,000 1,000,000 1,000,000
setelah pek. selesai
Mut pit lahan, Material untuk landasan rig / jalan
Pemboran pada segala formasi Ø 2" 90.00 M' 75,000 6,750,000 6,750,000
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M' 200,000 18,000,000 18,000,000
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000 500,000
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M' 190,000 17,100,000 17,100,000
Pemasangan Pipa blank Pipa SNI Ø 6" 65.00 M' 50,000 3,250,000 3,250,000
Pemasangan Pipa screen dan bottom plug PVC AW Ø 6" 25.00 M' 75,000 1,875,000 1,875,000
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000 150,000
Water jetting Development 1.00 Lokasi 500,000 500,000 500,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Air jetting Development 1.00 Lokasi 500,000 500,000 500,000
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 1,000,000 1,000,000 1,000,000
Pemasangan, pembongkaran dan pemindahan instalasi
1.00 Lokasi 500,000 500,000 500,000
pompa uji
Pemompaan uji meliputi :
a. Uji debit tetap (Long periode test) 48.00 Jam 15,000 720,000 720,000
b. Uji pemulihan (Recovery) 12.00 Jam 15,000 180,000 180,000
JUMLAH (4) 67,407,100 54,068,650
5 PENGADAAN PIPA
BAHAN
Pipa PVC
a. Pipa PVC Ø 2" 147 btg 120,000 17,640,000 17,640,000
b. Pipa PVC Ø 1 1/2" 200 btg 95,000 50,635,000 50,635,000
c. Pipa PVC Ø 1 1/2" 11 btg Err:509 Err:509 Err:509
Pipa GIP Medium A FULL
a. Pipa GIP Ø 2" 2 btg 340,000 680,000 680,000
b. Pipa GIP Ø 1 1/2" 153 btg 275,000 42,075,000 42,075,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Accecories
a. PVC
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Knee 90° Ø 1 1/2" 5 bh 17,500 87,500 87,500
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Air Valve Ø 1 1/2 " 6 bh 120,000 720,000 720,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
b. Galvanis - - - 2,424,500 2,424,500
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Gate Valve Ø 2" Broonze Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Double Nipple Ø 2" 4 bh 21,500 86,000 86,000
bend Ø 45 1 1/2" 8 bh 21,500 172,000 172,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Seal tape 151 bh 2,500 377,500 377,500
Kunci Pipa GIP Ø 2" No.24 2 bh 300,000 600,000 600,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
JUMLAH (5) Err:509 Err:509
Dibulatkan Err:509 Err:509
6 PENGADAAN
POMPA Bahan
Submersible Deep Well Pump 1 Unit 19,438,650 19,438,650 19,438,650
Type : SP - 5A
Debit : 1,5 lt/dtk
Head Max : 70 M
Power : 2.640 Watt
Rated Voltage : 1 x 220 V / 50 Hz
- Water level control
Pump Housing : Stainless Stell
Impeller : Stainless Stell
Motor : Stainless Stell
Pump Outlet : dia. 1 1/2"
Pump Diameter : 4"
Stabilizert : 5 KVA 1 Unit 5,000,000 5,000,000 5,000,000
Control Panel STD 1x220/50Hz 1 Unit 4,500,000 4,500,000 4,500,000
Drop Cable Power 1 Ls 3,500,000 3,500,000 3,500,000
Drop Cable Sensor 1 Ls 2,000,000 2,000,000 2,000,000
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
Biaya Pemasangan Pompa dan accessories 1 Lot 5,000,000 5,000,000 5,000,000
Transportasi dan akomodasi 1 Lot 2,000,000 2,000,000 2,000,000
JUMLAH (6) 41,438,650 41,438,650
Dibulatkan 41,439,000 41,438,650
No. SUMBER DAN
Harga
Uru Paket Pekerjaan Uraian Kegiatan (Bahan/Jasa) Volume Sat. Jumlah Biaya
Satuan
t
APBD APBDes

1 2 3 4 5 6 7= 6x4 8 9
7 PENGADAAN DAN
PEMASANGAN PLNBAHAN
Sertifikat Layak Operasi (SLO) 1 Ls 150,000 150,000 150,000
Pembelian Kabel & Accessories 1 Ls 938,000 938,000 938,000
UPAH
Biaya Pasang Baru 2,200 Watt 937 2,062,000 2,062,000
Biaya Gambar 1 Ls 350,000 350,000 350,000
Pekerjaan Instalasi 1 Ls 500,000 500,000 500,000
JUMLAH (7) 4,000,000 4,000,000

8 UPAH / JASA
Tukang 147 Hok 120,000 17,642,520 4,000,000
Pekerja 428 Hok 90,000 38,489,850 10,080,000
JUMLAH (8) 56,132,370 14,080,000
Err:509 Err:509
TOTAL Err:509 Err:509
Err:509 Err:509

Dibuat Oleh,
BP-SPAMS Koordinator LKM

#REF! #REF!
I RENCANA PENGADAAN
Nama KKM : " MANDIRI "
Jenis Pekerjaan : Pembangunan Sarana Air Minum

SUMBER DANA Waktu


Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14

Partisipasi -
- - BR Masyarakat
900,000 - BR
600,000 - BR
2,934,000 - BR
800,000 - BR
- - BR
350,000 - BR
- - BR
- - BR
- - BR
1,160,000 - BR
6,744,000 -

Survey -
- - BR
- - BR Perbandingan Harga
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- -

- - JS Penunjukan
Langsung

- -

Survey -
Perbandingan Harga

12,375,000 BR
285,000 BR
500,000 BR
178,450 BR

- JS

- JS
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- JS

- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- JS
- JS
- JS

- JS
- JS
- 13,338,450
Survey -
Perbandingan Harga

- - BR
- - BR

- - BR
- - BR
- - BR

- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - BR
- - -

Survey -
Perbandingan Harga
BR

BR
BR
BR
BR
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14

BR
- -
SUMBER DANA Waktu
Metoda
Pelaksanaa
Pengadaan
Lainn n
In-Kind In-Cash
ya
10 11 12 13 14
Penunjukan -
Langsung
- - BR
- - BR

- - JS
BR
- - JS
- -

Partisipasi -
8,496,800 - JS Masyarakat
28,409,850 - JS
36,906,650 -
43,650,650 13,338,450
43,650,700 13,338,500
12,349,300 (13,338,500)
Desa Masolo, ………............Oktober 2016

FM - WSS

#REF!
RENCANA ANGG
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupa
Nomor RAB : 02
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Kontribusi Masyarak
Total
inCash
1 2=3+4+5 3
1 PENGADAAN BAHAN
a. Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90 90
b. Pengadaan bottom plug Ø 6" 1.00 1.00
c. Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 1.00
d. Pengadaan Gravel Pack 3.00 0.74

2 UPAH DAN BIAYA KONSTRUKSI


a. Mobilisasi dan demobilisasi meliputi pemindahan alat dan alat bantu lainnya 1.00
dari workshop ke site pengeboran dan sebaliknya
b. Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00
c. Persiapan lokasi sebelum pemboran dan pemulihannya setelah pek. selesai 1.00
Mut pit lahan, Material untuk landasan rig / jalan
d. Pemboran pada segala formasi Ø 2" 90.00
e. Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00
f. Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00
g. Pembersihan lubang dengan sirkulasi lumpur 1.00
h. Pemasangan Pipa blank Pipa SNI Ø 6" 65.00
i. Pemasangan Pipa screen dan bottom plug PVC AW Ø 6" 25.00
j. Pekerjaan pengisian Gravel pack 3.00
k. Water jetting Development 1.00
l. Air jetting Development 1.00
m. Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00
n. Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00
Pemompaan uji meliputi :
a. Uji debit tetap (Long periode test) 48.00
b. Uji pemulihan (Recovery) 12.00 -

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang
Volume
URAIAN Kontribusi Masyarak
Total
inCash

Harman, ST., MT Layla Rukmanah, ST.


NIP. 19730305 200212 1 012
RENCANA ANGGARAN BIAYA
paten-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo
Sub pekerjaan/Kegiatan : Pengeboran Sumur Dalam
Ukuran/Dimensi : 90

Volume Harga Biaya (Rp)


ntribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
APBD Total
inKind (Rp) inCash inKind
4 6 7 8 9=2x8 10=3*8 11=4x8

- M' 137,500 12,375,000 12,375,000 -


- Bh 285,000 285,000 285,000 -
Bh 500,000 500,000 500,000 -
2.26 M 3
240,700 722,100 178,450 -
Sub Total 1) 13,882,100 13,338,450 -
dibulatkan 13,882,000 13,338,000 -

1.00 Rig 1,000,000 1,000,000 - -

1.00 Lokasi 500,000 500,000 - -


1.00 Lokasi 1,000,000 1,000,000 - -

90.00 M' 75,000 6,750,000 - -


90.00 M' 200,000 18,000,000 - -
90.00 M' 190,000 17,100,000
1.00 Lokasi 500,000 500,000 - -
65.00 M' 50,000 3,250,000 - -
25.00 M' 75,000 1,875,000 - -
3.00 M3 50,000 150,000 - -
1.00 Lokasi 500,000 500,000 - -
1.00 Lokasi 500,000 500,000 - -
1.00 M 3
1,000,000 1,000,000 - -
1.00 Lokasi 500,000 500,000 - -

48.00 Jam 15,000 720,000 - -


12.00 Jam 15,000 180,000 - -
Sub Total 2) 53,525,000 - -
Dibulatkan 53,525,000 - -
Jumlah Total) 67,407,000 13,338,000 -

Desa Masolo, ………............Oktobe


sa Oleh : Dibuat Oleh :
- WSS Koordinator KKM Satlak Pamsimas
Volume Harga Biaya (Rp)
ntribusi Masyarakat Satuan Satuan Kontribusi Masyarakat
APBD Total
inKind (Rp) inCash inKind

manah, ST. ( H. Muh. Amin ) ( Ansar )


olo
Pengeboran Sumur Dalam
m

Biaya (Rp)

APBD

13=6x8

-
-
-
543,650
543,650
544,000

1,000,000

500,000
1,000,000

6,750,000
18,000,000
17,100,000
500,000
3,250,000
1,875,000
150,000
500,000
500,000
1,000,000
500,000

720,000
180,000
53,525,000
53,525,000
54,069,000

Desa Masolo, ………............Oktober 2016

Satlak Pamsimas
Biaya (Rp)

APBD

( Ansar )
DIAMETER PIPA GALIAN URUGAN TANAH UUGAN PASIR
Ø Luas Pjg Volume Luas Pjg Volume Luas Pjg

Trans
Dis 3 0.180 720 129.60 0.135 720 97.20 0.038 720
2 0.120 390 46.80 0.090 390 35.10 0.038 390
1½ 0.120 396 47.52 0.090 396 35.64 0.038 396

TOTAL 223.92 TOTAL 167.94 TOTAL


UUGAN PASIR
Volume

27.00
14.63 0.060 0.045 0.000
14.85

56.48
DATA PENGUKURAN
Lokasi Program : DESA MASOLO Waktu Mulai : 11. 15 WITA
Hari/Tanggal : .................................. Waktu Selesai : 11. 47 WITA
Cuaca : CERAH Nama Alat : GPS Garmin

Jarak Jumlah Rumah Jumlah Jiwa


No Patok Node Elevasi Ket
Langsung (M) Kiri Kanan (Orang)
RE 56.00
1 RE - A 3 3 - 12
A 45.00
2 A-B 15 4 - 17
B 44.00
3 B-C 45 4 - 17
C 43.00
4 C-D 50 5 - 21
D 42.00
5 D-E 36 4 - 17
E 41.00
6 E-F 50 4 - 17
F 39.00
B 44.00
7 B-1 50 4 - 17
1 43.00
8 1-2 30 3 - 12
2 42.00
D 42.00
9 D-3 30 4 - 17
3 41.00
10 3-4 35 5 - 21
4 40.00
B 44.00
B-G 60 7 - 29
G 43.00
G-H 73 8 - 33
H 42.50
H-I 100 10 - 42
I 42.00
I-J 100 4 - 17
J 41.00
J-K 100 6 - 25
K 40.00
Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) Kiri Kanan (Orang)
K-L 86 7 - 29
L 39.00
J 41.00
J-M 29 2 - 8
M 40.00
M-N 50 7 - 29
N 39.00
N-O 50 2 - 8
O 38.00
O-P 35 2 - 8
P 39.00
P-Q 22 2 - 8
Q 38.00
Q-R 20 2 - 8
Jarak Jumlah Rumah Jumlah Jiwa
No Patok Node Elevasi Ket
Langsung (M) Kiri Kanan (Orang)
R 37.00
R-S 36 4 - 17
S 37.00
M 40.00
4 M-4 60 5 3 33 39.00
N 39.00
5 N-5 50 1 2 12 38.00
O 38.00
6 O-6 45 2 8 38.00
P 39.00
7 P-7 80 5 2 29 39.00
Q 38.00
8 Q-8 50 4 2 25 37.00
R 37.00
9 R-9 110 5 2 29 36.00

JUMLAH 1,500 125 11 565


Kriteria Desain :

but. Air = 70 lt / org / hari


ertumbuhan Pddk = 2 % / thn
eriode Desain = 15 thn
aktor Jam Puncak, jp = 2
nor Loss = 10 %

DATA BEBAN NODE


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk
Pipa h ^h L S yg dilayani
(+ m) (m) (m) (%) (jiwa)

R 56.00

1 RE - A A 45.00 11.00 3.00 366.67 12

2 A-B B 44.00 1.00 15.00 6.67 17

3 B-C C 43.00 1.00 45.00 2.22 17

4 C-D D 42.00 1.00 50.00 2.00 21

5 D-E E 41.00 1.00 36.00 2.78 17

6 E-F F 39.00 2.00 50.00 4.00 17

JUMLAH 199 100

B 44.00

5 B-1 1 43.00 1.00 50.00 2.00 17

6 1-2 2 42.00 1.00 30.00 3.33 12

JUMLAH 80 29

D 42.00

9 D-3 3 41.00 1.00 30.00 3.33 17

10 3-4 4 40.00 1.00 35.00 2.86 21

JUMLAH 65 37

B 44.00

9 B-G G 43.00 1.00 60.00 1.67 29


DATA BEBAN NODE
No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk
Pipa h ^h L S yg dilayani
(+ m) (m) (m) (%) (jiwa)

10 G-H H 42.50 0.50 73.00 0.68 33

10 H-I I 42.00 0.50 100.00 0.50 42

11 I-J J 41.00 1.00 100.00 1.00 17

11 J-K K 40.00 1.00 100.00 1.00 25

12 K-L L 39.00 1.00 86.00 1.16 29

JUMLAH 519 174

J 41.00

13 J-M M 40.00 1.00 29.00 3.45 8

14 M-N N 39.00 1.00 50.00 2.00 29

15 N-O O 38.00 1.00 50.00 2.00 8

16 O-P P 39.00 -1.00 35.00 (2.86) 8

17 P-Q Q 38.00 1.00 22.00 4.55 8

18 Q-R R 37.00 1.00 20.00 5.00 8

19 R-S S 37.00 0.00 36.00 0.00 17

JUMLAH 242 87

M 40.00

9 M-4 4 39.00 1.00 60.00 1.67 33

JUMLAH 60 33

N 39.00

9 N-5 5 38.00 1.00 50.00 2.00 12

JUMLAH 50 12

O 38.00

9 O-6 6 38.00 0.00 45.00 0.00 8

JUMLAH 45 8

P 39.00

9 P-7 7 39.00 0.00 80.00 0.00 29


DATA BEBAN NODE
No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk
Pipa h ^h L S yg dilayani
(+ m) (m) (m) (%) (jiwa)

JUMLAH 80 29

Q 38.00

9 Q-8 8 37.00 1.00 50.00 2.00 25

JUMLAH 50 25

R 37.00

9 R-9 3 36.00 1.00 110.00 0.91 29

JUMLAH 110 29

TOTAL 1,500 565


Perhitungan Hydrolis Desa Masolo

Formula Hazen William


S (slope)
D (diam) teoritis
Hloss / 100 m
V

N NODE BEBAN PIPA


Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow
Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn
(lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt)

0.01 17 0.01 0.03 100 134 0.11

0.01 22 0.02 0.04 87 117 0.10

0.01 22 0.02 0.04 71 95 0.08

0.02 28 0.02 0.05 54 73 0.06

0.01 22 0.02 0.04 33 45 0.04

0.01 22 0.02 0.04 17 22 0.02

0.08 134 0.11 0.22

0.01 22 0.02 0.04 29 39 0.03

0.01 17 0.01 0.03 12 17 0.01

0.02 39 0.03 0.06

0.01 22 0.02 0.04 37 50 0.04

0.02 28 0.02 0.05 21 28 0.02

0.03 50 0.04 0.08

0.02 39 0.03 0.06 174 235 0.19


N NODE BEBAN PIPA
Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow
Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn
(lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt)

0.03 45 0.04 0.07 145 196 0.16

0.03 56 0.05 0.09 112 151 0.12

0.01 22 0.02 0.04 71 95 0.08

0.02 34 0.03 0.05 54 73 0.06

0.02 39 0.03 0.06 29 39 0.03

0.14 235 0.19 0.38

0.01 11 0.01 0.02 87 117 0.10

0.02 39 0.03 0.06 79 106 0.09

0.01 11 0.01 0.02 50 67 0.05

0.01 11 0.01 0.02 42 56 0.05

0.01 11 0.01 0.02 33 45 0.04

0.01 11 0.01 0.02 25 34 0.03

0.01 22 0.02 0.04 17 22 0.02

0.07 117 0.10 0.19

0.03 45 0.04 0.07 33 45 0.04

0.03 45 0.04 0.07

0.01 17 0.01 0.03 12 17 0.01

0.01 17 0.01 0.03

0.01 11 0.01 0.02 8 11 0.01

0.01 11 0.01 0.02

0.02 39 0.03 0.06 29 39 0.03


N NODE BEBAN PIPA
Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow
Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn
(lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt)

0.02 39 0.03 0.06

0.02 34 0.03 0.05 25 34 0.03

0.02 34 0.03 0.05

0.02 39 0.03 0.06 29 39 0.03

0.02 39 0.03 0.06

0.46 760 0.62 1.23


asolo

Formula Hazen William :


S (slope) = ( ^H/L)*100
D (diam) teoritis ((3.59*Q*10^6)/(S^0.54*C))^0.38
=
Hloss / 100 m ((3.59*Q*10^6)/(D^2.63*C))^1.85
=
V 4*Q/1000(3.14*(D/1000)^2)
=

PERHITUNGAN HEAD LOSS


Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL
Jam Puncak C D teoritis D desain per 100 m (+10% minor)
(lt/dt) (mm) (mm) (m) (m) (m)

56.00

0.22 120 8.37 83.00 0.01 0.0002 56.00

0.19 120 18.11 83.00 0.00 0.001 56.00

0.15 120 20.94 83.00 0.00 0.001 56.00

0.12 120 19.32 83.00 0.00 0.0009 56.00

0.07 120 15.02 83.00 0.00 0.0003 56.00

0.04 120 10.71 83.00 0.00 0.0001 56.00

56.00

0.06 120 15.27 58.20 0.00 0.0017 56.00

0.03 120 9.97 58.20 0.00 0.0002 56.00

56.00

0.08 120 15.13 58.20 0.00 0.002 56.00

0.05 120 12.49 58.20 0.00 0.001 55.99

56.00

0.38 120 31.32 83.00 0.01 0.010 55.99


PERHITUNGAN HEAD LOSS
Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL
Jam Puncak C D teoritis D desain per 100 m (+10% minor)
(lt/dt) (mm) (mm) (m) (m) (m)

0.32 120 35.08 83.00 0.01 0.008 55.98

0.24 120 33.90 83.00 0.01 0.007 55.97

0.15 120 24.67 83.00 0.00 0.003 55.97

0.12 120 22.28 83.00 0.00 0.002 55.97

0.06 120 17.07 83.00 0.00 0.001 55.97

55.97

0.19 120 20.73 58.20 0.02 0.007 55.96

0.17 120 22.32 58.20 0.02 0.010 55.95

0.11 120 18.74 58.20 0.01 0.004 55.95

0.09 120 16.26 58.20 0.01 0.002 55.95

0.07 120 13.58 58.20 0.00 0.001 55.95

0.05 120 11.94 58.20 0.00 0.000 55.94

0.04 121 #DIV/0! 58.20 0.00 0.000 55.94

55.96

0.07 120 16.68 45.20 0.01 0.009 55.95

55.95

0.03 120 11.07 45.20 0.00 0.001 55.95

55.95

0.02 120 #DIV/0! 45.20 0.00 0.001 55.95

55.95

0.06 120 #DIV/0! 45.20 0.01 0.009 55.94


PERHITUNGAN HEAD LOSS
Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL
Jam Puncak C D teoritis D desain per 100 m (+10% minor)
(lt/dt) (mm) (mm) (m) (m) (m)

55.95

0.05 120 14.40 45.20 0.01 0.004 55.94

55.94

0.06 120 17.96 45.20 0.01 0.012 55.93


Sisa Kcptan
Tekan V
(m) (m/dtk)

11.00 0.04

12.00 0.04

13.00 0.03

14.00 0.02

15.00 0.01

17.00 0.01

13.00 0.02

14.00 0.01

15.00 0.03

15.99 0.02

12.99 0.07
Sisa Kcptan
Tekan V
(m) (m/dtk)

13.48 0.06

13.97 0.05

14.97 0.03

15.97 0.02

16.97 0.01

15.96 0.07

16.95 0.06

17.95 0.04

16.95 0.03

17.95 0.03

18.94 0.02

18.94 0.01

16.95 0.05

17.95 0.02

17.95 0.01

16.94 0.04
Sisa Kcptan
Tekan V
(m) (m/dtk)

18.94 0.03

19.93 0.04
RENCANA ANGGARA
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinr
Nomor RAB : 04
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total APBDes
inCash inKind
1 2=3+4+5 3 4 5
1. BAHAN
1 Urugan Pasir 56.48 1.200 67.77 - 67.77

2. UPAH
A. PEKERJAAN TANAH
1 Galian Tanah
1.1 Pekerja 145.80 0.90 131.22 - 131.22
2 Urugan Kembali
2.1 Pekerja 167.94 0.25 41.99 - 41.99
B. PEMASANGAN PIPA
1 Pipa PVC Ø 3"
1.1 Pekerja 720.00 0.081 58.32 - 58.32
2 Pipa PVC Ø 2" Rp -
2.1 Pekerja 390.00 0.054 21.06 - 21.06
3 Pipa PVC Ø 1½"
3.1 Pekerja 396.00 0.036 14.26 - 14.26
4 Pipa GIP Ø 3"
4.1 Pekerja Err:509 0.108 Err:509 - Err:509
5 Pipa GIP Ø 2"
5.1 Pekerja Err:509 0.108 Err:509 - Err:509
6 Pipa GIP Ø 1 1/2"
6.1 Pekerja 918.000 0.054 49.57 - 49.57

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST.


NIP. 19730305 200212 1 012
RENCANA ANGGARAN BIAYA
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo
Sub pekerjaan/Kegiata
Air Minum

Volume Harga
me Koefisien Kontribusi Masyarakat Satuan Satuan Kontrib
Total APBDes APBD Total
inCash inKind (Rp) inCash
2=3+4+5 3 4 5 6 7 8 9=2x8 10=3*8

48 1.200 67.77 - 67.77 - M3 81,500.00 5,523,255

Sub Total 1) 5,523,255


Dibulatkan 5,523,000

45.80 0.90 131.22 - 131.22 - M3 90,000.00 11,810,075

7.94 0.25 41.99 - 41.99 - M3 90,000.00 3,778,650

0.00 0.081 58.32 - 58.32 - M' 90,000.00 5,248,800


Rp -
0.00 0.054 21.06 - 21.06 - M' 90,000.00 1,895,400

6.00 0.036 14.26 - 14.26 - M' 90,000.00 1,283,040

0.108 Err:509 - Err:509 - M' 90,000.00 Err:509

0.108 Err:509 - Err:509 - M' 90,000.00 Err:509

8.000 0.054 49.57 - 49.57 - M' 90,000.00 4,461,480

Sub Total 2 Err:509


Dibulatkan Err:509
Jumlah Total) Err:509

Diperiksa Oleh : Dibuat Oleh :


FM - WSS Koordinator KKM

Layla Rukmanah, ST. ( H. Muh. Amin )


RENCANA ANGGAR
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten P
Nomor RAB : 05
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Kontribusi Masyarakat
Total
inCash inKind
1 2=3+4+5 3 4
1. BAHAN
1.1 Submersible Deep Well Pump 1.00 - -
Type : SP - 5A
Debit : 1,5 lt/dtk
Head Max : 70 M
Pump Outlet : dia. 1 1/2"
Pump Diameter : 4"
Pump Housing : Stainless Stell
Impeller : Stainless Stell
Motor : Stainless Stell
Power : 2.640 Watt
Rated Voltage : 1 x 220 V / 50 Hz
1.2 Control Panel STD 1x220/50Hz 1.00 - -
Proteksi :
- Under & Overload Protection
- Under & Overload Voltage Protection
- Start/stop Indikator
- Water level control
1.3 Stabilizert : 5 KVA 1.00 - -
1.4 Drop Cable Power 1.00 - -
1.5 Drop Cable Sensor 1.00 - -

2. UPAH
1.6 Biaya Pemasangan Pompa dan accessories 1.00
1.7 Transportasi dan akomodasi 1.00

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST.


NIP. 19730305 200212 1 012
RENCANA ANGGARAN BIAYA
tan /Kabupaten-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo
Sub pekerjaan/Kegiatan : Pengadaan Pompa
Head : 90 M

Volume Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
APBD Total
(Rp) inCash inKind
6 7 8 9=2x8 10=3*8 11=4x8

1.00 Unit 19,438,650 19,438,650 - -

1.00 Unit 4,500,000 4,500,000 - -

1.00 Unit 5,000,000 5,000,000 - -


1.00 Ls 3,500,000 3,500,000 - -
1.00 Ls 2,000,000 2,000,000 - -
Sub Total 1) 34,438,650 - -
Dibulatkan 34,438,700 - -

1.00 Lot 5,000,000 5,000,000


1.00 Lot 2,000,000 2,000,000
Sub Total 2 7,000,000 - -
Dibulatkan 7,000,000 - -
Jumlah Total) 41,438,700 - -

Desa Masolo, ………............Oktober 20


Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( H. Muh. Amin ) ( Ansar )


bang /Desa : Masolo
Pengadaan Pompa

Biaya (Rp)

APBD

13=6x8

19,438,650

4,500,000

5,000,000
3,500,000
2,000,000
34,438,650
34,438,700

5,000,000
2,000,000
7,000,000
7,000,000
41,438,700

Desa Masolo, ………............Oktober 2016

Satlak Pamsimas

( Ansar )
RENCANA ANGGARAN BIAYA

Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinrang /Kecamatan : L


Nomor RAB : 06
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Kontribusi Masyarakat Satuan
Total APBD
inCash inKind
1 2=3+4+5 3 4 6 7
1. BAHAN
1.1 Sertifikat Layak Operasi (SLO) 1 - - 1 Ls
1.2 Pembelian Kabel & Accessories 1 - - 1 Ls

Sub Total 1)
Dibula
2 UPAH
2.1 Biaya Pasang Baru 2,200 2,200 Watt
2.2 Biaya Gambar 1 1 Ls
2.2 Pekerjaan Instalasi 1 1 Ls

Sub To
Dibula
Jumlah (To

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS Koordina
Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST. ( H. Muh


NIP. 19730305 200212 1 012
NCANA ANGGARAN BIAYA

ten-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo


Sub pekerjaan/Kegiatan : Listrik PLN

Harga Biaya (Rp)


Satuan Kontribusi Masyarakat
Total APBD
(Rp) inCash inKind
8 9=2x8 10=3*8 11=4x8 13=6x8

150,000.00 150,000 - - 150,000


938,000.00 938,000 - - 938,000

1,088,000 - 1,088,000
Dibulatkan 1,088,000 - - 1,088,000

937.273 2,062,000 - - 2,062,000


350,000 350,000 - - 350,000
500,000 500,000 - - 500,000

Sub Total 2 2,912,000 - - 2,912,000


Dibulatkan 2,912,000 - - 2,912,000
Jumlah (Total) 4,000,000 - - 4,000,000

Desa Masolo, ………............Oktober 2016

Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( H. Muh. Amin ) ( Ansar )


RENCANA ANGGARAN BIAYA
Provinsi : Sulawesi Selatan /Kabupaten-Kota : Kabupaten Pinrang /Kecama
Nomor RAB : 08
Pekerjaan Kegiatan : Sarana Air Minum

Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6
1 BAHAN
A. PEMAS. PIPA PVC AW
1.1 Pipa PVC Ø 1/2" 20.00 1.200 24.000 -
1.2 Clam Sadle Ø 2"x1/2" 1.00 1.000 1.000 -
1.3 knee Ø 1/2" 6.00 1.000 6.000 -
1.4 Tee Ø 1/2" 1.00 1.000 1.000 -
1.5 Double Nipple Ø 1/2" 1.00 1.000 1.000 -
1.6 Socked Ø 1/2' 2.00 1.000 2.000 -
1.7 Meteran Air 1.00 1.000 1.000 -
1.8 Stop Kran Ø 1/2 1.00 1.000 1.000 -
1.9 Seal Tape 1.00 1.000 1.000 -
B. PEMAS. KRAN 1/2"
1.10 Kran Air 2.00 1.000 2.000 -
1.11 Seal Tape 1.00 1.000 1.000 -
C. PEKERJAAN RABAT BETON
* Beton
1.12 Semen portland 0.30 232.000 69.37
1.13 Pasir Beton 0.30 0.520 0.16 -
1.14 Kerikil beton 0.30 0.780 0.23
* Bekisting
1.15 Kayu terentang 0.15 0.040 0.01
1.16 Paku biasa 2" - 5' 0.15 0.400 0.06 -
1.17 Minyak Bekisting 0.15 0.200 0.03 -
Volume
URAIAN Volume Koefisien Kontribusi Masyarakat
Total
inCash inKind
1 2 3 4=5+6+7 5 6

2 UPAH
A. PEMAS. PIPA PVC AW
2.1 Pekerja 5.16 0.180 0.929 0.93
2.2 Tukang 5.16 0.056 0.289 0.29
B. PEMAS. KRAN 1/2"
2.3 Pekerja 1.00 0.320 0.320 0.32
2.4 Tukang 1.00 0.100 0.100 0.10
C. PEKERJAAN RABAT BETON
2.5 Pekerja 1.00 1.650 1.650 1.65
2.6 Tukang 1.00 0.250 0.250 0.25

Disetujui Oleh : Diperiksa Oleh :


Kepala Satker Pamsimas FM - WSS
Kab, Pinrang

Harman, ST., MT Layla Rukmanah, ST.


NIP. 19730305 200212 1 012
NCANA ANGGARAN BIAYA
-Kota : Kabupaten Pinrang /Kecamatan : Lembang /Desa : Masolo
Sub pekerjaan/Kegiatan : SCT PS
Ukuran/Dimensi : - m

Volume Harga Biaya (Rp)


Satuan Satuan Kontribusi Masyarakat
APBD Total APBD
(Rp) inCash inKind
7 8 9 10=4x9 11=5x9 12=6x9 13=7x9

24.000 M' 4,000 96,000 - - 96,000


1.000 bh 25,000 25,000 - - 25,000
6.000 bh 3,000 18,000 - - 18,000
1.000 bh 3,500 3,500 - - 3,500
1.000 bh 3,000 3,000 - - 3,000
2.000 bh 3,000 6,000 - - 6,000
1.000 bh 35,000 35,000 - - 35,000
1.000 bh 15,000 15,000 - - 15,000
1.000 bh 2,500 2,500 - - 2,500

2.000 Bh 13,000 26,000 - - 26,000


1.000 bh 2,500 2,500 - - 2,500

69.37 Kg 1,120 77,692 - - 77,692


0.16 M3 100,000 15,600 - - 15,600
0.23 M3 275,000 64,350 - - 64,350

0.01 M3 4,000,000 24,000 - 24,000


0.06 Kg 25,000 1,500 - - 1,500
0.03 Ltr 30,000 900 - - 900

Sub Total 1) 416,542 - - 416,542


417,000 - - 417,000
Volume Harga Biaya (Rp)
Satuan Satuan Kontribusi Masyarakat
APBD Total APBD
(Rp) inCash inKind
7 8 9 10=4x9 11=5x9 12=6x9 13=7x9

- Hok 80,000 74,304 - 74,304 -


- Hok 85,000 24,562 - 24,562 -

- Hok 80,000 25,600 - 25,600 -


- Hok 85,000 8,500 - 8,500 -

- Hok 80,000 132,000 - 132,000 -


- Hok 85,000 21,250 - 21,250 -
Sub Total 2) 286,216 - 286,216 -
Dibulatkan 286,000 - 286,000 -
Jumlah (total) 703,000 - 286,000 -

Desa Masolo, ………............Oktober 2016

Dibuat Oleh :
Koordinator KKM Satlak Pamsimas

( H. Muh. Amin ) ( Ansar )


4 - Output

4.02 - Rencana Kerja Masyarakat (RKM) PAMSIMAS DISETUJUI


Desa / Kelurahan : Corawali
Kecamatan : Panca Lautang
Kota / Kab : Sidrap
Propinsi : Sulawesi Selatan

No. Urut SUMBER DANA


Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
SARANA AIR MINUM
1 Lingk.2 Pengeboran
Talumae Sumur Dalam BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC AW Ø 6" 90.00 M' 137,500 12,375,000 - -
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000 - -
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000 - -
Pengadaan Gravel Pack 3.00 M3 240,700 722,100 543,650 -
UPAH DAN BIAYA KONSTRUKSI - -
Mobilisasi dan demobilisasi meliputi pemindahan alat dan alat bantu lainnya 1.00 Rig 1,000,000 1,000,000 1,000,000 -
dari workshop ke site pengeboran dan sebaliknya -
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 500,000 500,000 500,000 -
Persiapan lokasi sebelum pemboran dan pemulihannya setelah pek. selesai 1.00 Lokasi 1,000,000 1,000,000 1,000,000 -
Mut pit lahan, Material untuk landasan rig / jalan -
Pemboran pada segala formasi Ø 2" 90.00 M' 75,000 6,750,000 6,750,000 -
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M' 200,000 18,000,000 18,000,000 -
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000 500,000 -
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M' 190,000 17,100,000 17,100,000 -
Pemasangan Pipa blank Pipa SNI Ø 6" 65.00 M' 50,000 3,250,000 3,250,000 -
Pemasangan Pipa screen dan bottom plug PVC AW Ø 6" 25.00 M' 75,000 1,875,000 1,875,000 -
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000 150,000 -
Water jetting Development 1.00 Lokasi 500,000 500,000 500,000 -
Air jetting Development 1.00 Lokasi 500,000 500,000 500,000 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 1,000,000 1,000,000 1,000,000 -
Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Lokasi 500,000 500,000 500,000 -
Pemompaan uji meliputi : -
a. Uji debit tetap (Long periode test) 48.00 Jam 15,000 720,000 720,000 -
b. Uji pemulihan (Recovery) 12.00 Jam 15,000 180,000 180,000 -
JUMLAH (1) 67,407,100 54,068,650 -
2 Lingk.2 Penyelidikan Penyelidikan Geohidrologi / Geolistrik 1.00 Lokasi Err:509 Err:509 Err:509 -
Talumae Geohidrologi/
Geolistrik
JUMLAH (2) Err:509 Err:509 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
3 Lingk.2 Pek. Bak
Talumae Reservoir BAHAN
1 Kayu balok klas II uk. 5/7 79 btg 60,000 4,737,600 3,873,600 864,000
2 Bambu 87 Btg 31,500 2,740,500 565,500 2,175,000
3 Bata Merah 5 x 11 x 22 cm 2,184 Buah 700 1,528,800 1,528,800 -
4 Batu Belah 10/15 cm 2 M3 150,000 243,360 - 243,360
5 Besi Beton Ǿ 16 SNI 53 Btg 141,750 7,512,750 7,512,750 -
6 Besi Beton Ǿ 14 SNI 20 Btg 103,950 2,079,000 2,079,000 -
7 Besi Beton Ǿ 12 SNI 146 Btg 78,750 11,497,500 11,497,500 -
8 Besi Beton Ǿ 10 SNI 52 Btg 57,750 3,003,000 3,003,000 -
9 Besi Plat 3 mm 1 lbr 524,800 262,400 262,400 -
10 Besi Siku 40.40.4 mm 2 Btg 60,000 120,000 120,000 -
11 Cat Dasar 1 x 4 klng 35,000 142,445 142,445 -
12 Daun Pintu Kayu Papan Kls I 2 lbr 200,000 398,125 398,125 -
13 Kaca Bening 5 mm 3 m2 315,000 1,039,500 1,039,500 -
14 Kawat Beton 50 Kg 15,750 783,055 783,055 -
15 Paku biasa 30 Kg 17,000 504,614 504,614
16 Papan 2/25, Kayu Kls II 3 lbr 60,000 195,514 195,514
17 Kerikil beton 4 ret 1,160,000 4,631,880 4,070,904 560,976
18 bekisting Kayu Kls III 238 lbr 39,000 9,300,702 5,952,702 3,348,000
19 Minyak bekisting 14 Ltr 12,000 167,952 167,952
20 Pasir Beton 3 ret 440,000 1,198,736 1,198,736
21 Pasir Pasang 1 ret 420,000 420,000 279,132 140,868
22 Pasir Urug 1 ret 360,000 508,020 - 508,020
23 Plywood tebal 9 mm 22 lbr 120,000 2,660,280 2,547,278 113,002
24 Portland Composite Cemen (PCC) 121 zak 57,000 6,889,049 6,889,049 -
25 Semen Skim Coat / A Plus @ 20 kg 16 zak 59,000 934,338 934,338 -
UPAH
1 Tukang 106 HOK 110,000 11,660,000 8,785,000 2,875,000
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
2 Pekerja 176 HOK 90,000 15,840,000 10,237,000 5,603,000
JUMLAH (3) 90,999,120 74,567,894 16,431,226
DI BULATKAN 90,999,000 74,568,000 16,431,000
4 Lingk.1,2,3 Pengadaan Pipa 85,571,000 69,157,000 16,415,000
Manisa & Accessories BAHAN (5,428,120) (5,410,894) (16,226)
Talumae Pipa PVC
Kp. Baru a. Pipa PVC Ø 2" 147 btg 120,000 17,640,000 17,640,000 -
b. Pipa PVC Ø 1 1/2" 200 btg 95,000 19,000,000 19,000,000 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -

Pipa GIP Medium A FULL


a. Pipa GIP Ø 2" 2 btg 340,000 680,000 680,000 -
b. Pipa GIP Ø 1 1/2" 153 btg 275,000 42,075,000 42,075,000 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -

Accecories
a. PVC
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Knee 90° Ø 1 1/2" 5 bh 17,500 87,500 87,500 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Air Valve Ø 1 1/2 " 6 bh 120,000 720,000 720,000 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -

b. Galvanis
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Gate Valve Ø 2" Broonze Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 -
bend Ø 45 1 1/2" 8 bh 21,500 172,000 172,000
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
151 2,500 377,500 377,500
Kunci Pipa GIP Ø 2" No.24 2 klng 300,000 600,000 600,000
Err:509 Err:509 bh Err:509 Err:509 Err:509
Err:509 Err:509 bh Err:509 Err:509 Err:509
Err:509 Err:509 ls Err:509 Err:509 Err:509
JUMLAH (4) Err:509 Err:509 -
DI BULATKAN Err:509 Err:509 -
5 Lingk.1,2,3 Pemasangan Pipa BAHAN
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
Manisa Pasir urug 68 m³ 81,500 5,522,772 - 5,522,772
Talumae UPAH -
Kp. Baru Pekerja 270 HOK 90,000 24,340,500 - 24,340,500
29,863,272 - 29,863,272
DI BULATKAN 29,863,000 - 29,863,000
6 Lingk.2 Pengadaan
Talumae Pompa BAHAN
Submersible Deep Well Pump 1.00 Unit 19,438,650 19,438,650 19,438,650 -
Type : SP - 5A - - - - -
Debit : 1,5 lt/dtk - - - - -
Head Max : 70 M - - - - -
Power : 2.640 Watt - - - - -
Rated Voltage : 1 x 220 V / 50 Hz - - - - -
- Water level control - - - - -
Pump Housing : Stainless Stell - - - - -
Impeller : Stainless Stell - - - - -
Motor : Stainless Stell - - - - -
Pump Outlet : dia. 1 1/2" - - - - -
Pump Diameter : 4" - - - - -
Stabilizert : 5 KVA 1.00 Unit 5,000,000 5,000,000 5,000,000 -
Control Panel STD 1x220/50Hz 1.00 Unit 4,500,000 4,500,000 4,500,000 -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
Drop Cable Power 1.00 Ls 3,500,000 3,500,000 3,500,000 -
Drop Cable Sensor 1.00 Ls 2,000,000 2,000,000 2,000,000 -

JUMLAH (6) 34,438,650 34,438,650 -


DI BULATKAN 34,439,000 34,439,000 -
7 Lingk.2 Pengadaan
Talumae Listrik PLN BAHAN
Sertifikat Layak Operasi (SLO) 1 Ls 150,000 150,000 150,000 -
Pembelian Kabel & Accessories 1 Ls 938,000 938,000 938,000 -
UPAH
Biaya Pasang Baru 2,200 Watt 937 2,062,000 2,062,000 -
Biaya Gambar 1 Ls 350,000 350,000 350,000 -
Pekerjaan Instalasi 1 Ls 500,000 500,000 500,000 -
JUMLAH (7) 4,000,000 4,000,000 -
8 lingk.1 Alat SAB
manisa ALAT
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! bh #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! -
No. Urut SUMBER DANA
Lokasi
dalam Kategori Kegiatan Komponen Kegiatan (Bahan/Jasa) Volume Satuan Harga Satuan Jumlah Biaya
Kegiatan
RKM
APBN In-Kind

1 2 3 4 5 6 7 8=7x5 10 12
JUMLAH (8) #REF! #REF! -
9 Lingk.2 SCTPS Pipa PVC Ø 1/2" 24.00 btng 4,000 96,000 96,000
Talumae Clam Sadle Ø 2"x1/2" 1.00 bh 25,000 25,000 25,000
knee Ø 1/2" 6.00 bh 3,000 18,000 18,000
Tee Ø 1/2" 1.00 bh 3,500 3,500 3,500
Double Nipple Ø 1/2" 1.00 bh 3,000 3,000 3,000
Socked Ø 1/2' 2.00 bh 3,000 6,000 6,000
Meteran Air 1.00 bh 35,000 35,000 35,000
Stop Kran Ø 1/2 1.00 bh 15,000 15,000 15,000
Seal Tape 2.00 bh 5,000 5,000 5,000
Kran Air 2.00 bh 13,000 26,000 26,000
Semen portland 1.36 zak 57,000 77,692 77,692
Pasir Beton 0.16 M3 100,000 15,600 15,600
Kerikil beton 0.23 M3 275,000 64,350 64,350

Kayu terentang 0.01 4,000,000 24,000 24,000


Paku biasa 2" - 5' 0.06 25,000 1,500 1,500
Minyak Bekisting 0.03 30,000 900 900
Pekerja 2.90 80,000 231,669 231,669
Tukang 0.64 85,000 54,312 54,312
JUMLAH 9 702,523 416,542 285,981
DI BULATKAN 703,000 417,000 286,000
TOTAL Err:509 #REF! 46,580,479
SUMBER DANA

In-Cash Lainnya

13 14

12,375,000.00 BR
285,000.00 BR
500,000.00 BR
178,450.00 BR
-
- JS
-
- JS
- JS
-
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
- JS
SUMBER DANA

In-Cash Lainnya

13 14
- JS
- JS
-
- JS
- JS
13,338,450
- JS

-
SUMBER DANA

In-Cash Lainnya

13 14

- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
-
- JS
SUMBER DANA

In-Cash Lainnya

13 14
- JS
-

- BR
- BR
-
BR
BR
- BR
-
-

- BR
- BR
- BR
- BR
SUMBER DANA

In-Cash Lainnya

13 14
-
- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR

- BR
- BR
- BR
-

-
-

-
SUMBER DANA

In-Cash Lainnya

13 14
- BR

- JS
-

- BR
-
-
-
-
-
-
-
-
-
-
-
- BR
- BR
SUMBER DANA

In-Cash Lainnya

13 14
- BR
- BR

- BR
- BR

- BR
- BR
- JS
-

- BR
- BR
- BR
- BR
- BR
- BR
- BR
- BR
SUMBER DANA

In-Cash Lainnya

13 14
-

11,500,000
Desa / Kelurahan : Manisa
Kecamatan : Baranti
Kota / Kab : Sidrap
Propinsi : Sulawesi Selatan

Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

1 Pengeboran
Sumur Dalam BAHAN
Pengadaan Pipa blank dan Pipa Screen PVC SNI Ø 6" 90.00 M1 125,000 11,250,000
Pengadaan bottom plug Ø 6" 1.00 Bh 285,000 285,000
Pengadaan dan pemasangan tutup sumur Ø 6" 1.00 Bh 500,000 500,000
Pengadaan Gravel Pack 3.00 M3 290,000 870,000
UPAH DAN BIAYA KONSTRUKSI -
Mobilisasi dan demobilisasi meliputi pemindahan alat dan alat bantu lainnya 1.00 Rig 1,000,000 1,000,000
dari workshop ke site pengeboran dan sebaliknya
Pemasangan / pembongkaran drilling rig dan alat bantunya 1.00 Lokasi 268,000 268,000
Persiapan lokasi sebelum pemboran dan pemulihannya setelah pek. selesai 1.00 Lokasi 800,000 800,000
Mut pit lahan, Material untuk landasan rig / jalan
Pemboran pada segala formasi Ø 2" 90.00 M1 50,000 4,500,000
Pelebaran lubang bor (reaming) dari Ø 2" menjadi Ø 6" 90.00 M1 150,000 13,500,000
Pembersihan lubang dengan sirkulasi lumpur 1.00 Lokasi 500,000 500,000
Pelebaran lubang bor (reaming) dari Ø 6" menjadi Ø10" 90.00 M1 185,000 16,650,000
Pemasangan Pipa blank Pipa SNI Ø 6" 50.00 M1 35,000 1,750,000
Pemasangan Pipa screen dan bottom plug PVC SNI Ø 6" 40.00 M1 37,000 1,480,000
Pekerjaan pengisian Gravel pack 3.00 M3 50,000 150,000
Water jetting Development 1.00 Lokasi 500,000 500,000
Air jetting Development 1.00 Lokasi 500,000 500,000
Pekerjaan sementing mortal dan pondasi ( Lantai beton ) 1.00 M3 575,000 575,000
Pemasangan, pembongkaran dan pemindahan instalasi pompa uji 1.00 Lokasi 500,000 500,000
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

Pemompaan uji meliputi :


a. Uji debit tetap (Long periode test) 48.00 Jam 15,000 720,000
b. Uji pemulihan (Recovery) 12.00 Jam 15,000 180,000
JUMLAH (1) 56,478,000
2 Penyelidikan Penyelidikan Geohidrologi / Geolistrik 1.00 Lokasi 2,500,000 2,500,000
Geohidrologi/
Geolistrik
JUMLAH (2) 2,500,000
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

3 Pek. Bak Reservoir


Bahan Lokal
Kayu balok klas II uk. 5/7 79 btg 60,000 4,737,600
Bambu 87 Btg 25,000 2,175,000 Kontribusi masyarakat
Bata Merah 5 x 11 x 22 cm 2,184 Buah 550 1,201,200
Batu Belah 10/15 cm 2 M3 140,000 227,136
Daun Pintu Kayu Papan Kls I 2 lbr 200,000 398,125
Papan 2/25, Kayu Kls II 3 lbr 60,000 195,514
Kerikil beton 4 ret 1,160,000 4,631,880
Bekisting Kayu Kls III 238 lbr 39,000 9,300,702
Pasir Beton 3 ret 440,000 1,198,736
Pasir Pasang 1 ret 420,000 420,000
Pasir Urug 1 ret 360,000 508,020

Jumlah 24,993,913
Bahan Pabrikasi
Besi Beton Ǿ 16 SNI 53 Btg 149,000 7,897,000 Survey
Besi Beton Ǿ 14 SNI 20 Btg 114,000 2,280,000 Perbandingan Harga
Besi Beton Ǿ 12 SNI 146 Btg 83,000 12,118,000
Besi Beton Ǿ 10 SNI 52 Btg 58,000 3,016,000
Besi Plat 3 mm 1 lbr 524,800 262,400
Besi Siku 40.40.4 mm 2 Btg 60,000 120,000
Cat Dasar 1 x 4 klng 35,000 142,445
Kaca Bening 5 mm 3 m2 105,000 346,500
Kawat Beton 45 Kg 20,000 909,344
Paku biasa 29 Kg 17,000 495,366
Minyak bekisting 14 Ltr 12,000 164,688
Plywood tebal 9 mm 22 lbr 105,000 2,277,765
Portland Composite Cemen (PCC) 114 zak 57,000 6,515,074
Semen Skim Coat / A Plus @ 20 kg 16 zak 60,000 944,415
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

Jumlah 37,488,997
UPAH
1 Tukang 106 HOK 85,000 9,010,000
2 Pekerja 176 HOK 80,000 14,080,000
Jumlah 23,090,000
JUMLAH (3) 85,572,910
4 Pengadaan Pipa 85,571,000
& Accessories BAHAN (1,910) Survey
Pipa PVC Perbandingan Harga
a. Pipa PVC Ø 3" 55 btg 235,000 12,925,000
b. Pipa PVC Ø 2" 220 btg 115,000 25,300,000
b. Pipa PVC Ø 1 1/2" 11 btg 92,500 1,017,500

Pipa GIP
a. Pipa GI Ø 3" 3 btg 650,000 1,950,000
b. Pipa GI Ø 2" 8 btg 375,000 3,000,000
c. Pipa GI Ø 1" 3 btg 245,000 735,000

Accecories
a. PVC
Bend 90° Ø 3" 2 bh 92,000 184,000
Bend 90° Ø 2" 3 bh 89,000 267,000
Bend 45° Ø 3" - bh 119,000 -
Bend 45° Ø 2" - bh 83,500 -
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

Tee Ø 3" 1 bh 15,000 15,000


Tee Ø 2 X 2 X 2" 1 bh 58,500 58,500
Reduser Ø 3" x Ø 2" 3 bh 15,000 45,000
Valve Socket (SDL) Ø 3" 6 bh 35,000 210,000
Valve Socket (SDL) Ø 2" 3 bh 15,000 45,000
Faucet Socket (SDD) Ø 2" 3 bh 15,000 45,000
Valve Socket (SDD) Ø 1 1/2" 14 bh 12,000 168,000
Valve Socket (SDL) Ø 1 1/2" 14 bh 12,000 168,000
Dop/Cap Ø 2" 4 bh 15,000 60,000

b. Galvanis
Knee Ø 3" 2 bh 92,000 184,000
Knee Ø 2" 5 bh 32,000 160,000
Reduser Ø 2" x Ø 1 1/2" 1 bh 75,000 75,000
Waiter moor Ø 3" 1 bh 155,000 155,000
Waiter moor Ø 2" 3 bh 56,000 168,000
Double Nipple Ø 3" 2 bh 50,000 100,000
Double Nipple Ø 2" 4 bh 35,000 140,000
Check Valve Ø 2" 1 bh 350,000 350,000
Stop Kran Ø 3" Broonze 1 bh 850,000 850,000
Stop Kran Ø 2" Broonze 2 bh 450,000 900,000
- - -
Lem Pipa 29 klng 45,000 1,305,000
Seal tape 39 bh 2,500 97,500
Kunci Pipa GIP Ø 1/2 - Ø 3" 2 bh 350,000 700,000
Transportasi 1 ls 900,000 900,000
JUMLAH (4) 52,277,500
5 Pemasangan Pipa BAHAN
Pasir urug 74 m³ 85,000 6,310,767 Kontribusi masyarakat
UPAH
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

Pekerja 270 HOK 85,000 22,988,250 Kontribusi masyarakat


29,299,017
6 Pengadaan
Pompa BAHAN Survey
Submersible Deep Well Pump 1.00 Unit 18,491,550 18,491,550 Perbandingan Harga
Type : SP - 5A - - -
Debit : 1,3 lt/dtk - 1,5 lt/dtk - - -
Head Max : 70 M - - -
Power : 2.640 Watt / 5 KVA - - -
Rated Voltage : 1 x 220 V / 50 Hz - - -
Material Pompa - - -
Pump Housing : Stainless Stell - - -
Impeller : Stainless Stell - - -
Motor : Stainless Stell - - -
Pump Outlet : dia. 1 1/2" - - -
Pump Diameter : 4" - - -
Stabilizert : 5 KVA 1.00 Unit 5,500,000 5,500,000
Control Panel 1.00 Rol 6,000,000 6,000,000
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

Drop Cable Power 1.00 Rol 2,000,000 2,000,000


Drop Cable Sensor 1.00 Unit 1,500,000 1,500,000
Biaya Running Test dan Training Operator
(Include Transportasi & Akomodasi) 1.00 ls 8,000,000 8,000,000

JUMLAH (6) 41,491,550


7 Pengadaan
Listrik PLN BAHAN Penunjukan
Sertifikat Layak Operasi (SLO) 1 Ls 150,000 150,000 Langsung
Pembelian Kabel & Accessories 1 Ls 232,000 232,000
UPAH
Biaya Pasang Baru 2,200 Watt 1,031 2,268,000
Biaya Gambar 1 Ls 350,000 350,000
Pekerjaan Instalasi 1 Ls 500,000 500,000
JUMLAH (7) 3,500,000
8 Alat SAB
ALAT
Gerobak Dorong 2.00 bh 450,000 900,000
Sekop Besar 2.00 bh 75,000 150,000
Sekop Kecil 3.00 bh 40,000 120,000
Tenro' 2.00 bh 50,000 100,000
Sendok Semen 2.00 bh 20,000 40,000
Ember Cor 5.00 bh 5,000 25,000
Gergaji Besi 1.00 bh 12,000 12,000
Meteran 5 Meter 1.00 set 15,000 15,000
Jumlah Biaya
No. Paket Pekerjaan Uraian / Material Volume Satuan Harga Satuan
(Rp) Metoda Pengadaan Waktu Pelaksanaan

JUMLAH (8) 1,362,000


9 SCTPS Pipa PVC Ø 1/2" 24.00 btng 4,000 96,000
Clam Sadle Ø 2"x1/2" 1.00 bh 25,000 25,000
knee Ø 1/2" 6.00 bh 3,000 18,000
Tee Ø 1/2" 1.00 bh 3,500 3,500
Double Nipple Ø 1/2" 1.00 bh 3,000 3,000
Socked Ø 1/2' 2.00 bh 3,000 6,000
Meteran Air 1.00 bh 35,000 35,000
Stop Kran Ø 1/2 1.00 bh 15,000 15,000
Seal Tape 2.00 bh 5,000 5,000
Kran Air 2.00 bh 13,000 26,000
Semen portland 1.36 zak 57,000 77,692
Pasir Beton 0.16 M3 100,000 15,600
Kerikil beton 0.23 M3 275,000 64,350

Kayu terentang 0.01 4,000,000 24,000


Paku biasa 2" - 5' 0.06 25,000 1,500
Minyak Bekisting 0.03 30,000 900
Pekerja 2.90 80,000 231,669 Kontribusi masyarakat
Tukang 0.64 85,000 54,312 Kontribusi masyarakat
JUMLAH 9 702,523
DI BULATKAN 703,000
TOTAL ###
Syarat Sengkang Besi Polos
Tinggi Bengkokan < 2.5 d
Panjang Sengkang < 4 d

Syarat Selimut Beton


Minimal = 0.1 Tinggi / Lebar Beton

Daftar Besi
Panjang Panjang
D Berat / m D Berat / m
Sengkang Sengkang
mm Kg m mm Kg m

4.5 0.125 0.2925 0


5 0.153 0.325 0
5.5 0.188 0.3575 0
6 0.22 0.39 0
6.5 0.259 0.4225 0
6.8 0.282 0.442 0
7 0.3 0.455 0
8 0.393 0.52 0
8.5 0.439 0.5525 0
9 0.499 0.585 0
10 0.62 0.65 0
12 0.887 0.78 0
13 1.04 0.845 0
14 1.209 0.91 0
15 1.377 0.975 0
16 1.58 1.04 0
18 1.994 1.17 0
19 2.23 1.235 0
20 2.465 1.3 0

I. VOLUME BESI

A Pondasi Poor Plat A. Perhit. Besi D 14 Alas Poor


P 1 M
L 1 M Panjang Horizon =
T Bawah 0.3 M Panjang Vertikal =
T Atas 3.1 M Panjang =
Jumlah Poor =
Panjang Total Besi D 14 =
Berat Besi D 14 / M =
Total Berat Besi D 14 =

B. Perhit. Besi D 16 Kolom Poor


Panjang setiap sudut =
Panjang tengah
Panjang =
Jumlah Poor =
Panjang Total Besi D 16 =
Berat Besi D 16 / M =
Total Berat Besi D 16 =

C. Beugel D 10 Jarak 20 Cm

Jumlah Beugel =
Panjang Beugel =
Jumlah Poor =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =

Jumlah Berat Besi D 16, D 14 & D 10

B Sloof 20 x 40 A. Perhit. Besi D 16 Sloof


P 3.6
L 0.2 Panjang Besi D 16 =
Jumlah Sloof =
T 0.4 Panjang Total Besi D 16 =
Berat Besi D 16 / M =
Total Berat Besi D 16 =

B. Beugel D 10 Jarak 20 Cm

Jumlah Beugel =
Panjang Beugel =
Jumlah Sloof =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =
Jumlah Berat Besi D 16 dan D 10

C Kolom 40 x 40 A. Perhit. Besi D 16 Kolom


P 0.4
L 0.4 Panjang Besi D 16 =
Jumlah Kolom =
T 7.4 Panjang Total Besi D 16 =
Berat Besi D 16 / M =
Total Berat Besi D 16 =

B. Beugel D 10 Jarak 20 Cm

Jumlah Beugel =
Panjang Beugel =
Jumlah Kolom =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =

Jumlah Berat Besi D 16 dan D 10

D Balok 20 x 40 Lantai 2 dan 3 A. Perhit. Besi D 16 Balok


P 3.6
L 0.2 Panjang Besi D 16 =
Jumlah Sloof =
T 0.4 Panjang Total Besi D 16 =
Berat Besi D 16 / M =
Total Berat Besi D 16 =

B. Beugel D 10 Jarak 20 Cm

Jumlah Beugel =
Panjang Beugel =
Jumlah Balok =
Panjang Total Besi D 10 =
Berat Besi D 10 / M =
Total Berat Besi D 10 =

Jumlah Berat Besi D 16 dan D 10

Plat lantai 2 dan lantai 3 (20 Cm) dan Plat Penutup Bak
E A. Perhit. Besi D 12 Plat
15 cm
Lantai 2
P 4.2 Panjang Horizon =
L 3.4 Panjang Vertikal =
Panjang =
T 0.2 Jumlah tulangan ganda =
Jumlah plat =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 (A) =
Lantai 3
P 3.4
L 3.4 Panjang Horizon =
Panjang Vertikal =
T 0.2 Panjang =
Jumlah tulangan ganda =
Jumlah plat =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 (A) =

B. Plat Penutup

Panjang Horizon Man Hole =


Panjang Horizon non MH =
Panjang Vertikal Man Hole =
Panjang Vertikal non MH =
Panjang =
Jumlah tulangan ganda =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 (B) =

Jumlah Berat Besi D 12 ( A + B )

F Dinding beton bak penampung (20)


P 3.4 A. Perhit. Besi D 12 untuk dinding beton
L 3.4
Panjang Vertikal =
T 2 Panjang Horizan =
Panjang =
Jumlah tulangan ganda =
Jumlah Dinding =
Panjang Total Besi D 12 =
Berat Besi D 12 / M =
Total Berat Besi D 12 =
II. VOLUME BETON
A Pondasi poor plat
- Poor Plat
P 1
L 1

T 0.3
Jumlah 4
Volume poor plat (A) = 1.2 M3

- Kolom poor
P 0.4
L 0.4

T 2
Jumlah 4
Volume Kolom poor (B) = 1.28 M3

Total Volume (A + B) = 2.48 M3

B Sloof 20 x 40
- Sloof dan Balok
P 2.8
L 0.2

T 0.4
Jumlah = 4
Volume Sloof & Balok (20 x 40) = 0.896 M3

C Kolom 40 x 40
- Kolom
P 0.4
L 0.4

T 7
Jumlah 4
Volume Kolom (40 x 40) = 4.48 M3

D Balok 20 x 40 (Lantai 2 dan 3)


- Balok
P 2.8
L 0.2

T 0.4
Jumlah / Lantai = 4
Jumlah Lantai = 2
Volume Sloof & Balok (20 x 40) = 1.792 M3

E Plat lantai 2 dan lantai 3 (20 Cm) dan Plat Penutup Bak 15 cm
- Plat Lantai 2
P 4.2
L 3.4

T 0.2
Jumlah Lantai = 1
Volume Plat Lantai 2 = 2.856 M3

- Plat Lantai 3
P 3.4
L 3.4

T 0.2
Jumlah Lantai = 1
Volume Plat Lantai 3 t 20 ( A ) = 2.312 M3
Volume Plat Lantai 2 dan Lantai 3 t 20 ( A ) = 5.168 M3

- Plat Penutup
P 3.4
L 3.4

T 0.15
Luas Plat penutup = 11.56 M2
Man Hole
P 0.8
L 0.8
Luas Man Hole = 0.64 M2
Total luas Plat Penutup = 10.92
Volume Plat Penutup t 15 (B) = 1.638 M3

Total Volume (A + B) = 6.806 M3

F Dinding beton bak penampung t 20


- Dinding
P 3.4
L 0.2

T 2
Jumlah Dinding = 4
Volume Dinding t 20 = 5.44 M3

III VOLUME BEKESTING BETON


A Pondasi Poor Plat
- Poor Plat
P 1
T 0.3
Jumlah Sisi = 4 BH
Luas = 1.2 M2
Jumlah Poor = 4 BH
Jumlah Luas Poor Plat (A) = 4.8 M2

- Kolom Poor
P 0.4
T 2
Jumlah Sisi = 4 BH
Luas = 3.2 M2
Jumlah Poor = 4 BH
Jumlah Luas Kolom Poor (B) = 12.8 M2

Total Luas (A + B) = 17.6 M2

B Sloof 20 x 40
- Sloof
P 2.8
T 0.4
Jumlah Sisi = 2 BH
Jumlah Sloof = 4
Luas Sloof = 8.96 M2
C Kolom 40 x 40
- Kolom
P 0.4
T 7
Jumlah Sisi = 4 BH
Luas = 11.2 M2
Jumlah Kolom = 4 BH
Luas Kolom = 44.8 M2

D Balok 20 x 40 (Lantai 2 dan 3)


- Balok
P 2.8
T 0.4
Jumlah Sisi = 2 BH
Jumlah Balok / Lantai = 4
Luas = 8.96 M2
Jumlah Lantai = 2 M2
Luas Kolom = 17.92 M2

E Plat lantai 2 dan lantai 3 ( t 20 Cm) dan Plat Penutup Bak ( t = 15 cm )


- Plat Lantai 2
P 4.2
L 3.4
Jumlah Lantai = 1
Volume Plat Lantai 2 = 14.28 M2

- Plat Lantai 3
P 3.4
L 3.4
Jumlah Lantai = 1
Volume Plat Lantai 3 t 20 ( A ) = 11.56 M2
Volume Plat Lantai 2 dan Lantai 3 t 20 ( A ) = 25.84 M2

- Plat Penutup
P 3.4
L 3.4
Luas Plat penutup = 11.56
Man Hole
P 0.8
L 0.8
Luas Man Hole = 0.64

Volume luas Plat Penutup = 10.92 M2

Total Volume Luas (A + B) = 36.76 M2


F Dinding beton bak penampung t 20
- Dinding
P 3.4
L 2

Jumlah Sisi = 4
Volume Luas Dinding t 20 = 27.2 M2

III VOLUME PENGECATAN TEMBOK

- Lt 1
L = 3.6
T = 0.4 2.9 0.4 = 3.7

Luas 1 Sisi = 13.32


Jumlah Sisi = 4
Luas 4 Sisi = 53.28

Luas Pintu dan Jendela = 2


Luas Luar = 51.28
Luas Luar dalam = 102.56 M2

- Kolom LT 2
L = 0.4
T = 2.9

Luas 1 Sisi / Kolom = 1.16


Jumlah Sisi / Kolom = 4
Luas 4 Sisi / Kolom = 4.64
Jumlah Kolom = 4
Luas KolomLantai 2 = 18.56 M2

- Balok Lantai 3
L = 4.2
T = 0.4

Luas 1 Sisi / Balok = 1.68


Jumlah Sisi / Balok = 1
Luas 4 Sisi / Balok = 1.68
Jumlah Balok = 4
Luas Balok Lantai 3 = 6.72 M2
- Dinding Bak Lt 3
L = 3
T = 2

Luas 1 Sisi / Dinding = 6.0


Jumlah Sisi / Dinding = 1.0
Luas 4 Sisi / Dinding = 6.0
Jumlah Dinding = 4.0
Luas Dinding Lantai 3 = 24 M2

Total Luas Pengecatan = 151.84 M2

IV VOLUME PENGECATAN KAYU


A Kusen Pintu dan Kusen Jendela
L = 0.05 dan 0.1 dan 1.55 dan
T = 1.83 dan 1.83 dan 0.05 dan
x4 x2 x1
0.366 M2 0.366 M2 0.0775 M2
Volume Luas (A) = 1.2095 M3

B Daun Pintu dan Daun Jendela


Daun Pintu
L = 0.7
T = 1.95
Luas daun pintu (a) = 1.365 M2

Daun Jendela
L = 0.07 dan 0.46
T = 1 dan 0.07
x2 x2
0.14 0.0644
Luas daun Jendela (b) = 0.2044 M2

Luas (a + b) = 1.5694 M2
Dikali 2 Luar dalam = 2

Volume Luas (B) = 3.1388 M2

Total Volume Luas (A + B) = 4.3483 M2


V VOLUME KUSEN PINTU, KUSEN JENDELA DAN DAUN PINTU
A Kusen Pintu dan Kusen Jendela
L = 0.05 dan 0.1 dan 0.05 dan
P = 0.1 dan 1.55 dan 0.1 dan
T = 1.83 dan 0.05 dan 1 dan
x2 x1 x1
0.0183 M3 0.00775 M3 0.005 M3
Volume = 0.03455 M3

B Daun Pintu dan Daun Jendela


Daun Pintu
L = 0.7
T = 1.95
Luas daun pintu = 1.365 M2

Daun Jendela
L = 0.07 dan 0.46
T = 1 dan 0.07
x2 x2
0.14 0.0644
Luas daun pintu = 0.2044

Total Luas = 1.5694 M2


D 16 D 14

Kait Jumlah Banyak


1 0.3 1 0.3 0.2 2.8 11 30.8 M
1 0.3 1 0.3 0.2 2.8 11 30.8 M
61.6 M
4
246.4 M 246.4
1.209 Kg
297.898 Kg

Kait Jumlah
3.1 0.3 0.4 0.2 4 4 16 M
3.1 0.3 0.3 0.2 3.9 4 15.6 M
31.6 M
4 Bh
126.4 M 126.4
1.58 Kg
199.712 Kg

Kait Jumlah Banyak


15
0.4 0.4 0.4 0.4 0.12 1.72 15 25.8 M
4 Bh
103.2 M
0.62 Kg
63.984 Kg

16, D 14 & D 10 = 561.594 Kg

Kait Jumlah Banyak


3.6 0.2 3.8 6 22.8 M
4 Bh
91.2 M 91.2
1.58 Kg
144.096 Kg

Kait Jumlah Banyak


16
0.4 0.2 0.4 0.2 0.12 1.32 16 21.12 M
4 Bh
84.48 M
0.62 Kg
52.3776 Kg
= 196.474 Kg

Kait Jumlah Banyak


7.4 0.2 7.6 8 60.8 M
4 Bh
243.2 M 243.2
1.58 Kg
384.256 Kg

Kait Jumlah Banyak


37
0.4 0.4 0.4 0.4 0.12 1.72 37 63.64 M
4 Bh
254.56 M
0.62 Kg
157.827 Kg

= 542.083 Kg

Kait Jumlah Banyak


3.6 0.2 3.8 6 22.8 M
8 Bh
182.4 M 182.4
1.58 Kg
288.192 Kg

Kait Jumlah Banyak


17
0.4 0.2 0.4 0.2 0.12 1.32 17 22.44 M
8 Bh
179.52 M
0.62 Kg
111.302 Kg

= 399.494 Kg

Kait Jumlah Banyak


4.2 0.1 4.3 27 116.1 M
3.4 0.1 3.5 22 77 M
193.1 M
2
1
386.2 M
0.887 Kg
342.559 Kg

Kait Jumlah Banyak


3.4 0.1 3.5 22 77 M
3.4 0.1 3.5 22 77 M
154 M
2
1
308 M
0.887 Kg
273.196 Kg

Kait Jumlah Banyak


2.6 0.1 2.7 5 13.5 M
3.4 0.1 3.5 17 59.5 M
2.6 0.1 2.7 5 13.5 M
3.4 0.1 3.5 17 59.5 M
146 M
2
292 M
0.887 Kg
259.004 Kg

= 874.759 Kg

uk dinding beton
Kait Jumlah Banyak
2 0.1 2.1 13 27.3 M
3.4 0.1 3.5 22 77 M
104.3 M
2
4
834.4 M
0.887 Kg
740.113 Kg
643.2 246.4
3314.52 1.05 1.05
3480.24 675.36 258.72
11.8 11.8
57.2339 21.9254

53 20
53 20
0 0
D 16 D 14
0.05 dan 0.6 dan 0.1 dan 0.1
1 dan 0.05 dan 1 dan 0.6
x1 x1 x2 x2
0.05 M2 0.03 M2 0.2 M2 0.12 M2
0.1
0.7
0.05
x1
0.0035 M3
D 12 D 10
Jarak Antar Tulangan 10 cm
103.2

84.48
254.56

179.52
386.2

308

292

834.4
1820.6 621.76
1.05 1.05
1911.63 652.848
11.8 11.8
162 55.3261

146 52
146 52
0 0 0
D 12 D 10
TABEL PENENTUAN BIAYA OPERASI, PEMELIHARAAN DAN
KELURAHAN MANISA KEC. BARANTI

Sis
NO KOMPONEN BIAYA SATUAN FORMULASI SESUAI NO. URUT
Gravitasi
1 2 3 4 5
1A Penduduk
2B Jumlah Penduduk Awal Po jiwa -
3C Jumlah KK awal KK -
4D Pertumbuhan Penduduk % / th -
5E Tahun Proyeksi tahun -
6F Jumlah Penduduk Proyeksi Pn 15th jiwa 6 = B*(1+D/100)^E -
7G Jumlah KK Proyeksi KK 7 = F/4 -

8H Waktu Operasi jam/hr -

9I Sistem Pelayanan
10 J Sambungan Rumah unit -
11 K Hidran umum / Kran umum unit -
12 L Sumur Gali unit -

13 M Kebutuhan air
14 O Kebutuhan Air Domestik l/org/hr -
15 P Kebocoran % -
16 Q Air Domestik + Kebocoran l/org/hr 16 = (P/100*O)+O -

17 R Pemakaian Air rata-rata l/hr 17 = F * O -


18 S Pemakaian Air rata-rata m3/hr 18 = R/1000 -

19 T Penyusutan
20 U Biaya Investasi Rp -
21 V Penyusutan %/th -
22 W Biaya Penyusutan Rp/th 22 = V/100 x U -
23 X Biaya Penyusutan Rp/bl 23 = W/12,00 -

24 Y Biaya Operasi
25 Z Honor Tenaga Rp/bl -
26 AA Kualitas Air & Promkes Rp/th -
27 BB Kualitas Air & Promkes Rp/bl 27 = AA/12 -
28 CC Pengembangan Jaringan/KU Rp/th -
29 DD Pengembangan Jaringan/KU Rp/bl 29 = CC/12 -
30 EE Beban tetap Daya Listrik Rp/bl -
31 FF Beban Pemakaian Listrik Rp/bl -
32 GG Bahan bakar solar / bensin Rp/bl -
33 HH Pelumas Rp/bl -

34 II Biaya Pemeliharaan -
35 JJ Rp/th 35 = II/100*U -
36 KK Rp/bl 36 = JJ/12 -

37 LL Total Biaya pengelolaan Rp/bl 37 = X+Z+BB+DD+EE+FF+GG+HH+KK -

38 MM Tarif / Iuran tetap Rata2 (opsi-1) Rp/KK/bl 38 = LL / G -

39 NN Tarif / Iuran tetap Rata2 (opsi-2)


40 OO Pemakaian Air rata2 m3/bln 40 = (70ltr/org/hr x 4 jw) x (30hr/1000) -
41 PP Harga Air Rp/m3 41 = MM / OO -
42 QQ Harga Air di bulatkan Rp/m3 -
43 RR iuran tetap bulanan Rp/KK/bl 43 = OO x QQ -

44 SS Tarif berdasarkan tkt. sosial (opsi-5)


45 TT Kaya : Menengah : Miskin (3:2:1) Rp/m3 45 = QQ x 3 -
46 UU Kaya (3/6) Rp/m3 46 = TT x (3/6) -
47 VV Menengah (2/6) Rp/m3 47 = TT x (2/6) -
48 WW Miskin (1/6) Rp/m3 48 = TT x (1/6) -

49 XX Tarif progresif samb. rumah (opsi-4)


50 YY Golongan I m3/bln < 10
51 ZZ Rp/KK/bl 51 = (2 x 10 m3/bln)*QQ -
52 AAA Golongan II m3/bln 10 < 20
53 BBB Rp/KK/bl 53 = ZZ + (3 x 10 m3/bln)*QQ -
54 CCC Golongan III m3/bln 20 < 30
55 DDD Rp/KK/bl 55 = BBB + (4 x 10 m3/bln)*QQ -
56 EEE Golongan IV m3/bln 30 < 40
57 FFF Rp/KK/bl 57 = DDD + (5 x 10 m3/bln)*QQ -
58 GGG Golongan V m3/bln 40 < 50
59 HHH Rp/KK/bl 59 = FFF + (6 x 10 m3/bln)*QQ -

60 III Tarif KU / HU (opsi-3)


61 JJJ Banyak Pemakaian m3/bln 61 = (45 x 5jw x 30hr)/1000 7
62 KKK Iuran KK perbulan Rp/m3 62 = QQ x JJJ -
PERASI, PEMELIHARAAN DAN TARIF/HARGA AIR
HAN MANISA KEC. BARANTI

Non
Sistem Perpipaan
Perpipaan Keterangan
Pemompaan Pengolahan Sumur Gali
6 7 8 9

#REF! - -
#REF! - - 1 KK = 4 Jiwa
1.85 - - rata2 pertumbuhan
15 - - tahun rencana
#REF! - -
#REF! - -

8 - - asumsi

- - - rencana RKM
- - - rencana RKM
- - - 1 SGL = 10 KK

70 - kriteria
20 - asumsi
84 -

#REF! -
#REF! -

Err:509 - - rencana RKM thn pertama


10 - - asumsi (%)
Err:509 - -
Err:509 - -

1,050,000 - - sesuai kebutuhan tenaga


- - - tahun pertama asumsi
- - - tahun pertama asumsi
- - - jika dikehendaki
- - - jika dikehendaki
- - - sesuai tagihan bulanan
400,000 - - sesuai tagihan bulanan
- - - harga ditempat
- - - harga ditempat

1 - - asumsi (%)
Err:509 - -
Err:509 - -

Err:509 - -

Err:509 - - KK (Pn)

8.40 - pemompaan 45ltr/org/hr


Err:509 -
1,700 - di bulatkan
14,280 -

5,100 -
2,550 -
1,700 -
850 -

<6 <6 gravitasi 10 m3/bln


20,400 - pompa/olahan 6 m3/bln
6 < 12 6 < 12
51,000 -
12 < 18 12 < 18
91,800 -
18 < 24 18 < 24
142,800 -
24 < 30 24 < 30
204,000 -

4.5 5 gravitasi 45 ltr/org/hr


7,650 - pompa/olahan 30 ltr/org/hr
VOLUME JUMLAH apbn apbd inkind
106.0000 11,660,000.0000 8,785,000.0000 Err:509 2,875,000.0000
Err:509 Err:509 Err:509 Err:509 Err:509

Err:509 Err:509 Err:509 Err:509 Err:509


47300000
5300000 9460000
10500000
31500000 22040000
in - cash
-
Err:509

Err:509
BLM INCASH TOTAL INKIND

Biaya Operasional - -
Satlak
Kegiatan Konstruksi Err:509 - Err:509 Err:509
Air Minum
Pelatihan Satlak dan Err:509 Err:509
Masyarakat
Sub Total Err:509 - Err:509 Err:509

Sanitasi Sekolah Err:509 Err:509 Err:509


Peningkatan PHBS
§  Masyarakat 3,559,000 3,559,000
§  Sekolah Err:509 Err:509

Pelatihan BPS dan Err:509 Err:509


Masyarakat
Sub Total Err:509 - Err:509 Err:509

TOTAL Err:509 - Err:509 Err:509


-

Err:509

Err:509

Err:509

Err:509

3,559,000
Err:509

Err:509

Err:509

Err:509

Anda mungkin juga menyukai