I BAHAN MATERIAL
~ Batu Gunung Belah 15/20 (lokal) m3 175,000
~ Pasir Pasang (jawa) m3 285,000
~ Pasir Cor m3 350,000
~ Batu Gunung Pecah 2/3 (lokal) m3 300,000
~ Portland Semen 40 Kg zak 54,000
~ Pedel m3 85,000
~ Air ltr 50
~ Kayu papan begisting 2/20 x 4 M' m³ 1,500,000
~ Kayu Untuk Perancah m³ 2,250,000
~ Multiplek 1,22 x 2,44 x 6 mm Lbr 80,000
~ Paku 5-12 cm kg 16,000
~ Besi beton polos kg 12,000
~ Buis Beton D-30cm bh 125,000
~ Buis Beton D-20cm bh 90,000
~ Meteran bh 100,000
~ Minyak Bekisting ltr 10,500
~ Kawat beton kg 20,000
~ Alat bantu Unit 5,000
~ Prasasti Nama Kegiatan Unit 500,000
~ 3 Whell Roller Jam 399,990.46
~ Dump Truck Jam 235,557.24
~ Mobilisasi & Demobilisasi Ls 2,500,000.00
~ Helm Pelindung Kepala Bh 25,000
~ Rompi bh 12,000
~ Sarung Tangan Set 3,000
~ Masker Dus 25,000
~ Chainsaw 7,5 hp Hari 1,000,000
II UPAH
~ Mandor Hari 150,000
~ Kepala Tukang Hari 140,000
~ Tukang Hari 125,000
~ Pekerja Hari 100,000
~ Juru Ukur Hari 150,000
~ Pembantu Juru Ukur Hari 100,000
ANALISA HARGA SATUAN PEKERJAAN DAN UPAH KERJA
KABUPATEN BANGKALAN TAHUN 2023 (PERMENPU N0.1 Tahun 2022)
1 Pengukuran / Uitzet 1 m¹
No. Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.012 100,000.00 1,200.00
Pembantu Juru Ukur OH 0.004 100,000.00 400.00
Juru Ukur OH 0.004 150,000.00 600.00
JUMLAH TENAGA KERJA 2,200.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Meteran OH 0.004 100,000.00 400.00
JUMLAH HARGA ALAT 400.00
D Jumlah (A+B+C) 2,600.00
E Overhead & Profit (Maksimal 15 %) 15% x D 390.00
F Harga Satuan Pekerjaan (D+E) 2,990.00
No. Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 0.750 100,000.00 75,000.00
Mandor OH 0.025 150,000.00 3,750.00
JUMLAH TENAGA KERJA 78,750.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 78,750.00
E Overhead & Profit (Maksimal 15 %) 15% x D 11,812.50
F Harga Satuan Pekerjaan (D+E) 90,562.50
8 Pengurugan 1 m³ dengan pedel putih dengan Pemadatan / Wales Analisa El-321a / Jakon 2021
No. Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja Jam 0.1675 14,285.71 2,392.86
Mandor Jam 0.0419 21,428.57 897.86
JUMLAH TENAGA KERJA 3,290.71
B BAHAN
Pedel putih M³ 1.200 85,000.00 102,000.00
JUMLAH HARGA BAHAN 102,000.00
C PERALATAN
3 Whell Roller Jam 0.0808 399,990.46 32,319.23
Dump Truck Jam 0.2142 235,557.24 50,456.36
JUMLAH HARGA ALAT 82,775.59
12 Membuat 1 m³ lantai kerja beton mutu f' = 7,4 MPa (K 100) A.4.1.1.1 / 2.2.2.1.b.(c)
No. Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang OH 0.275 125,000.00 34,375.00
Kepala Tukang OH 0.028 140,000.00 3,920.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 215,745.00
B BAHAN
Semen Portland Kg 247 1,350.00 333,450.00
Pasir Beton M³ 0.621 350,000.00 217,250.00
Kerikil 2/3 (lokal) M³ 0.740 300,000.00 222,000.00
Air Ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 783,450.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 999,195.00
E Overhead & Profit (Maksimal 15 %) 15% x D 149,879.25
F Harga Satuan Pekerjaan (D+E) 1,149,074.25
13 Membuat 1 m³ beton mutu f'c = 16,9 MPa (K 200), manual A.4.1.1.6 / 2.2.2.1.g.(c)
No. Uraian Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja OH 1.650 100,000.00 165,000.00
Tukang OH 0.275 125,000.00 34,375.00
Kepala Tukang OH 0.028 140,000.00 3,920.00
Mandor OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 215,745.00
B BAHAN
Semen Portland Kg 352 1,350.00 475,200.00
Pasir Beton M³ 0.522 350,000.00 182,750.00
Kerikil 2/3 (lokal) M³ 0.764 300,000.00 229,111.11
Air ltr 215 50.00 10,750.00
JUMLAH HARGA BAHAN 897,811.11
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,113,556.11
E Overhead & Profit (Maksimal 15 %) 15% x D 167,033.42
F Harga Satuan Pekerjaan (D+E) 1,280,589.53
16 Membuat 1 m³ plat beton bertulang tebal 10 cm beton mutu f' = 16,9 MPa (K 200)
A Pekerjaan Bekisting 2 X pakai M² 10.00 173,903.00 1,739,030.00
B Pekerjaan Pembesian Kg 82.67 #REF! #REF!
C Pekerjaan Beton K-200 M³ 1.00 #REF! #REF!
D Jumlah (A+B+C) JUMLAH TENAGA KERJA #REF!
Strousse Ø 20 cm
TULANGAN UTAMA
DIMENSI R H Diameter
Diameter m m mm
Ø 20 0.15 8
SENGKANG
Pondasi Plat 60 x 60 x 20
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
60 x 60 x 20 0.6 0.2 10
SENGKANG
Panjang sengkang Panjang Ø Jarak Sengkang
m m mm m
Sloof 15 x 20 cm
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
15 x 20 0.15 0.2 10
SENGKANG
Kolom Praktis 12 x 12
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
SENGKANG
TULANGAN UTAMA
DIMENSI B H Ø
B/H m m mm
20 x 30 0.2 0.3 10
SENGKANG
Kolom 20 x 20 cm
TULANGAN UTAMA
DIMENSI B H Ø
B/H m m mm
20 x 20 0.2 0.2 10
SENGKANG
Kolom 20 x 30 cm Pagar
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
20 x 30 0.2 0.3 10
SENGKANG
Balok Gantung 15 x 25
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
15 x 25 0.15 0.25 10
SENGKANG
TULANGAN UTAMA
DIMENSI B H Diameter
B/H m m mm
SENGKANG
Panjang sengkang Panjang Ø Jarak Sengkang
m m mm m
Plat tebal 10 cm
TULANGAN UTAMA
Memanjang
DIMENSI B H Diameter
B/H m m mm
10x100 0.1 1 10
Melintang / Berdiri
DIMENSI B H Diameter
B/H m m mm
10x100 0.1 1 10
BESI POLOS
ø 6 mm 0.22 Kg/m
ø 8 mm 0.40 Kg/m
ø 10 mm 0.62 Kg/m
ø 12 mm 0.89 Kg/m
ø 16 mm 1.58 Kg/m
ø 19 mm 2.23 Kg/m
ø 22 mm 2.98 Kg/m
ø 25 mm 3.85 Kg/m
31.847 5 63.694
212.314 22.000
8.333
Jumlah Sengkang Volume Besi
bh Kg
111.111 92.311
33.333 4 82.667
166.667 18.333
69.444 4 172.222
347.222 24.444
16.667 8 82.667
83.333 14.667
25.000 6 93.000
166.667 22.000
83.333 14.667
133.333 17.600
55.556 4 137.778
Jumlah Sengkang Volume Besi
bh Kg
277.778 22.000