PERSIAPAN
Rp 6,500.00
Rp 8,000.00
Rp 800.00
Rp 450.00
Rp 15,750.00
Rp 47,112.00
Rp 357.00
Rp 573.65
Rp 48,042.65
Rp 63,792.65
Rp 6,379.27
Rp 70,171.92
BALITBANG PU - A. 2.2.1.9.
Jumlah
Rp 6,500.00
Rp 4,500.00
Rp 11,000.00
Rp 11,000.00
Rp 1,100.00
Rp 12,100.00
ANALISA HARGA SATUAN PEKERJAAN
TANAH
1 m3 Mengurug Galian Tanah Biasa Sedalam 1 Meter SNI 2835:2008 - 6.9 (a)
No. Uraian Kode Sat. Koef. Harga Sat. Jumlah
A. Tenaga Kerja
1 Pekerja L.01 OH 0.250 Rp 65,000.00 Rp 16,250.00
2 Mandor L.04 OH 0.008 Rp 90,000.00 Rp 750.00
Jumlah Harga Tenaga Kerja = Rp 17,000.00
B. Jumlah (A) = Rp 17,000.00
C. Overhead & Profit 10 % X B. = Rp 1,700.00
D. Harga Satuan Pekerjaan (B+C) = Rp 18,700.00
Rp 97,500.00
Rp 80,000.00
Rp 80,000.00
Rp 90,000.00
Rp 347,500.00
Rp 330,900.00
Rp 128,700.00
Rp 154,275.00
Rp 613,875.00
Rp 961,375.00
Rp 96,137.50
Rp 1,057,512.50
ANALISA HARGA SATUAN PEKERJAAN
BETON
1 m3 Beton Mutu f’c = 7,4 MPa (K 100), Slump (12 ± 2) cm, W/C = 0,87
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 Rp 65,000.00
2 Tukang L.02 OH 0.275 Rp 80,000.00
3 Kepala Tukang L.03 OH 0.028 Rp 80,000.00
4 Mandor L.04 OH 0.083 Rp 90,000.00
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Portland Cement (PC) Kg 247.000 Rp 1,300.00
2 Pasir Beton Kg 869.000 Rp 174.82
3 Batu Split 1/2 Kg 999.000 Rp 144.44
4 Air Kerja Ltr 215.000 Rp 100.00
Jumlah Harga Bahan =
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (C+D) =
1 m3 Lantai Kerja Beton Mutu f’c = 7,4 MPa (K 100), Slump (3-6) cm, W/C= 0,87
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 1.200 Rp 65,000.00
2 Tukang Batu L.02 OH 0.200 Rp 80,000.00
3 Kepala Tukang L.03 OH 0.020 Rp 80,000.00
4 Mandor L.04 OH 0.060 Rp 90,000.00
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Portland Cement (PC) Gresik Kg 230.000 Rp 1,300.00
2 Agregat halus/pasir klas A ( Uk. butir 5 mKg 893.000 Rp 174.82
3 Batu Split 1/2 Kg 1,027.000 Rp 144.44
4 Air Kerja Ltr 200.000 Rp 100.00
Jumlah Harga Bahan =
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (C+D) =
1 m3 Beton Mutu f’c = 26,4 MPa (K 300), Slump (12 ± 2) cm, W/C = 0,52
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 Rp 65,000.00
2 Tukang Batu L.02 OH 0.275 Rp 80,000.00
3 Kepala Tukang L.03 OH 0.028 Rp 80,000.00
4 Mandor L.04 OH 0.083 Rp 90,000.00
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Portland Cement (PC) Kg 413.000 Rp 1,100.00
2 Pasir Beton Kg 681.000 Rp 174.82
3 Batu Split 1/2 Kg 1,021.000 Rp 144.44
4 Air Kerja Ltr 215.000 Rp 100.00
Jumlah Harga Bahan =
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (C+D) =
Rp 107,250.00
Rp 22,000.00
Rp 2,240.00
Rp 7,470.00
Rp 138,960.00
Rp 321,100.00
Rp 151,919.82
Rp 144,300.00
Rp 21,500.00
Rp 638,819.82
Rp 777,779.82
Rp 77,777.98
Rp 855,557.80
Rp 78,000.00
Rp 16,000.00
Rp 1,600.00
Rp 5,400.00
Rp 101,000.00
Rp 299,000.00
Rp 156,115.54
Rp 148,344.44
Rp 20,000.00
Rp 623,459.98
Rp 724,459.98
Rp 72,446.00
Rp 796,905.98
Rp 454,300.00
Rp 119,053.39
Rp 147,477.78
Rp 21,500.00
Rp 742,331.17
Rp 881,291.17
Rp 88,129.12
Rp 969,420.29
Rp 4,550.00
Rp 5,600.00
Rp 560.00
Rp 360.00
Rp 11,070.00
Rp 105,000.00
Rp 2,535.00
Rp 107,535.00
Rp 118,605.00
Rp 11,860.50
Rp 130,465.50
Rp 13,046.55
Rp 33,800.00
Rp 20,800.00
Rp 2,080.00
Rp 2,340.00
Rp 59,020.00
Rp 95,500.00
Rp 5,355.00
Rp 1,500.00
Rp 102,355.00
Rp 161,375.00
Rp 16,137.50
Rp 177,512.50
Rp 33,800.00
Rp 20,800.00
Rp 2,080.00
Rp 2,340.00
Rp 59,020.00
Rp 107,437.50
Rp 5,355.00
Rp 1,500.00
Rp 114,292.50
Rp 173,312.50
Rp 17,331.25
Rp 190,643.75
Rp 42,900.00
Rp 26,400.00
Rp 2,640.00
Rp 2,970.00
Rp 74,910.00
Rp 95,500.00
Rp 7,140.00
Rp 3,000.00
Rp 147,712.50
Rp 46,200.00
Rp 34,150.00
Rp 333,702.50
Rp 408,612.50
Rp 40,861.25
Rp 449,473.75
Rp 42,900.00
Rp 26,400.00
Rp 2,640.00
Rp 2,970.00
Rp 74,910.00
Rp 95,500.00
Rp 7,140.00
Rp 3,000.00
Rp 177,255.00
Rp 46,200.00
Rp 34,150.00
Rp 363,245.00
Rp 438,155.00
Rp 43,815.50
Rp 481,970.50
Rp 42,900.00
Rp 26,400.00
Rp 2,640.00
Rp 2,970.00
Rp 74,910.00
Rp 95,500.00
Rp 7,140.00
Rp 3,000.00
Rp 147,712.50
Rp 46,200.00
Rp 102,450.00
Rp 402,002.50
Rp 476,912.50
Rp 47,691.25
Rp 524,603.75
SNI 7394:2008 - 6.35
Jumlah
Rp 11,700.00
Rp 1,600.00
Rp 1,600.00
Rp 1,600.00
Rp 480.00
Rp 810.00
Rp 17,790.00
Rp 4,775.00
Rp 178.50
Rp 30,000.00
Rp 760.50
Rp 4,400.00
Rp 1,468.50
Rp 2,340.00
Rp 43,922.50
Rp 61,712.50
Rp 6,171.25
Rp 67,883.75
Rp 19,305.00
Rp 2,640.00
Rp 2,640.00
Rp 2,640.00
Rp 800.00
Rp 1,350.00
Rp 29,375.00
Rp 7,162.50
Rp 357.00
Rp 36,000.00
Rp 845.00
Rp 6,050.00
Rp 2,202.75
Rp 3,900.00
Rp 56,517.25
Rp 85,892.25
Rp 8,589.23
Rp 94,481.48
ANALISA HARGA SATUAN PEKERJAAN
PASANGAN
1m2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1⁄2 bata, campuran spesi 1 PC : 4 PP
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 65,000.000
2 Tukang L.02 OH 0.100 80,000.000
3 Kepala Tukang L.03 OH 0.010 80,000.000
4 Mandor L.04 OH 0.015 90,000.000
B. Bahan
1 Bata merah bh 70.000 800.000
2 Portland Cement Kg 11.500 1,100.000
3 Pasir Pasang m3 0.043 275,000.000
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (C+D) =
1 m2 Dinding terawang (Roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP SNI 6897:2008 - 6.2
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 Rp 65,000.00
2 Tukang L.02 OH 0.100 Rp 80,000.00
3 Kepala Tukang L.03 OH 0.010 Rp 80,000.00
4 Mandor L.04 OH 0.015 Rp 90,000.00
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Roster Ukuran (12 x 11 x 24) m3 30.000 Rp 17,000.00
2 Portland Cement Kg 11.000 Rp 1,175.00
3 Pasir Pasang m3 0.035 Rp 275,000.00
Jumlah Harga Bahan =
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (C+D) =
an spesi 1 PC : 4 PP
Jumlah
19,500.000
8,000.000
800.000
1,350.000
56,000.000
12,650.000
11,825.000
Rp 110,125.00
Rp 11,012.50
Rp 121,137.50
Rp 19,500.00
Rp 8,000.00
Rp 800.00
Rp 1,350.00
Rp 29,650.00
Rp 510,000.00
Rp 12,925.00
Rp 9,625.00
Rp 532,550.00
Rp 562,200.00
Rp 56,220.00
Rp 618,420.00
ANALISA HARGA SATUAN PEKERJAAN
PLESTERAN
1 m2 Plesteran 1 PC : 6 PP, Tebal 15 mm SNI 2837:2008 - 6.6
No. Uraian Kode Sat. Koef. Harga Sat.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 Rp 65,000.00
2 Tukang L.02 OH 0.150 Rp 80,000.00
3 Kepala Tukang L.03 OH 0.015 Rp 80,000.00
4 Mandor L.04 OH 0.015 Rp 90,000.00
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Portland Cement Kg 4.416 Rp 1,100.00
2 Pasir Pasang m3 0.027 Rp 275,000.00
Jumlah Harga Bahan =
C. Jumlah (A+B) =
D. Overhead & Profit 10 % X C. =
E. Harga Satuan Pekerjaan (D+E) =
Rp 19,500.00
Rp 12,000.00
Rp 1,200.00
Rp 1,350.00
Rp 34,050.00
Rp 4,857.60
Rp 7,425.00
Rp 12,282.60
Rp 46,332.60
Rp 4,633.26
Rp 50,965.86
Rp 5,200.00
Rp 32,000.00
Rp 3,200.00
Rp 360.00
Rp 40,760.00
Rp 550.00
Rp 3,575.00
Rp 4,125.00
Rp 44,885.00
Rp 4,488.50
Rp 49,373.50
Rp 13,000.00
Rp 8,000.00
Rp 800.00
Rp 900.00
Rp 22,700.00
Rp 3,575.00
Rp 3,575.00
Rp 26,275.00
Rp 2,627.50
Rp 28,902.50
ANALISA HARGA SATUAN PEKERJAAN
LANTAI
Rp 15,600.00
Rp 9,600.00
Rp 960.00
Rp 1,080.00
Rp 27,240.00
Rp 377,940.63
Rp 10,560.00
Rp 12,375.00
Rp 19,650.00
Rp 420,525.63
Rp 447,765.63
Rp 44,776.56
Rp 492,542.20
Rp 16,250.00
Rp 10,000.00
Rp 1,040.00
Rp 1,170.00
Rp 28,460.00
Rp 87,295.00
Rp 10,780.00
Rp 12,375.00
Rp 17,030.00
Rp 127,480.00
Rp 155,940.00
Rp 15,594.00
Rp 171,534.00
Rp 58,500.00
Rp 36,000.00
Rp 3,600.00
Rp 4,050.00
Rp 102,150.00
Rp 212,000.00
Rp 10,230.00
Rp 4,950.00
Rp 36,025.00
Rp 263,205.00
Rp 365,355.00
Rp 36,535.50
Rp 401,890.50
Rp 5,850.00
Rp 7,200.00
Rp 720.00
Rp 450.00
Rp 14,220.00
Rp 34,542.96
Rp 1,254.00
Rp 825.00
Rp 1,310.00
Rp 37,931.96
Rp 52,151.96
Rp 5,215.20
Rp 57,367.16
ANALISA HARGA SATUAN PEKERJAAN
CAT
1 m2 Pengecatan Tembok Dalam Baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.020
2 Tukang L.02 OH 0.063
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Plamur Kg 0.100
2 Cat Dasar Kg 0.100
3 Cat Tembok Dalam Kg 0.260
Jumlah Harga Bahan =
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
1 m2 Pengecatan Tembok Luar Baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.020
2 Tukang L.02 OH 0.063
3 Kepala Tukang L.03 OH 0.006
4 Mandor L.04 OH 0.003
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Plamur Kg 0.100
2 Cat Dasar Kg 0.100
3 Cat Tembok Luar Kg 0.260
Jumlah Harga Bahan =
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
JAAN
Rp 65,000.00 Rp 1,300.00
Rp 80,000.00 Rp 5,040.00
Rp 80,000.00 Rp 504.00
Rp 90,000.00 Rp 270.00
Jumlah Harga Tenaga Kerja = Rp 7,114.00
Rp 18,800.00 Rp 1,880.00
Rp 50,000.00 Rp 5,000.00
Rp 66,875.00 Rp 17,387.50
Jumlah Harga Bahan = Rp 24,267.50
= Rp 31,381.50
= Rp 3,138.15
= Rp 34,519.65
Rp 65,000.00 Rp 1,300.00
Rp 80,000.00 Rp 5,040.00
Rp 80,000.00 Rp 504.00
Rp 90,000.00 Rp 270.00
Jumlah Harga Tenaga Kerja = Rp 7,114.00
Rp 18,800.00 Rp 1,880.00
Rp 50,000.00 Rp 5,000.00
Rp 472,500.00 Rp 122,850.00
Jumlah Harga Bahan = Rp 129,730.00
= Rp 136,844.00
= Rp 13,684.40
= Rp 150,528.40
ANALISA HARGA SATUAN PEKERJAAN
PLUMBING
BALITBANG PU - A.5.1.1.25
Harga Sat. Jumlah
Rp 65,000.00 Rp 2,340.00
Rp 80,000.00 Rp 4,800.00
Rp 80,000.00 Rp 480.00
Rp 90,000.00 Rp 180.00
Jumlah Harga Tenaga Kerja = Rp 7,800.00
Rp 6,037.50 Rp 7,245.00
Rp 2,535.75 Rp 2,535.75
Jumlah Harga Bahan = Rp 9,780.75
= Rp 17,580.75
= Rp 1,758.08
= Rp 19,338.83
BALITBANG PU - A.5.1.1.26
Harga Sat. Jumlah
Rp 65,000.00 Rp 2,340.00
Rp 80,000.00 Rp 4,800.00
Rp 80,000.00 Rp 480.00
Rp 90,000.00 Rp 180.00
Jumlah Harga Tenaga Kerja = Rp 7,800.00
Rp 7,875.00 Rp 9,450.00
Rp 3,307.50 Rp 3,307.50
Jumlah Harga Bahan = Rp 12,757.50
= Rp 20,557.50
= Rp 2,055.75
= Rp 22,613.25
BALITBANG PU - A.5.1.1.32
Harga Sat. Jumlah
Rp 65,000.00 Rp 5,265.00
Rp 80,000.00 Rp 10,800.00
Rp 80,000.00 Rp 1,080.00
Rp 90,000.00 Rp 360.00
Jumlah Harga Tenaga Kerja = Rp 17,505.00
Rp 28,750.00 Rp 34,500.00
Rp 12,075.00 Rp 12,075.00
Jumlah Harga Bahan = Rp 46,575.00
= Rp 64,080.00
= Rp 6,408.00
= Rp 70,488.00
BALITBANG PU - A.5.1.1.31
Harga Sat. Jumlah
Rp 65,000.00 Rp 5,265.00
Rp 80,000.00 Rp 10,800.00
Rp 80,000.00 Rp 1,080.00
Rp 90,000.00 Rp 360.00
Jumlah Harga Tenaga Kerja = Rp 17,505.00
Rp 68,750.00 Rp 82,500.00
Rp 28,875.00 Rp 28,875.00
Jumlah Harga Bahan = Rp 111,375.00
= Rp 128,880.00
= Rp 12,888.00
= Rp 141,768.00
BALITBANG PU - A.5.1.1.25
Harga Sat. Jumlah
Rp 65,000.00 Rp 2,340.00
Rp 80,000.00 Rp 4,800.00
Rp 80,000.00 Rp 480.00
Rp 90,000.00 Rp 180.00
Jumlah Harga Tenaga Kerja = Rp 7,800.00
Rp 20,000.00 Rp 24,000.00
Rp 2,535.75 Rp 2,535.75
Jumlah Harga Bahan = Rp 26,535.75
= Rp 34,335.75
= Rp 3,433.58
= Rp 37,769.33
ANALISA HARGA SATUAN PEKERJAAN
SANITAIR
1 bh Closet Duduk
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000
2 Tukang L.02 OH 1.500
3 Kepala Tukang L.03 OH 0.150
4 Mandor L.04 OH 0.160
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Kloset Duduk bh 1.000
2 Portland Cement (PC) Tiga Roda Kg 6.000
3 Pasir pasang ( progo ) m3 0.010
Jumlah Harga Bahan =
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
1 bh Floor Drain
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.010
2 Tukang L.02 OH 0.100
3 Kepala Tukang L.03 OH 0.010
4 Mandor L.04 OH 0.005
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Floordrain biasa bh 1.000
Jumlah Harga Bahan =
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
BALITBANG PU - A.5.1.1 2.
Harga Sat. Jumlah
Rp 65,000.00 Rp 65,000.00
Rp 80,000.00 Rp 120,000.00
Rp 80,000.00 Rp 12,000.00
Rp 90,000.00 Rp 14,400.00
Jumlah Harga Tenaga Kerja = Rp 211,400.00
Rp 3,500,000.00 Rp 3,500,000.00
Rp 1,175.00 Rp 7,050.00
Rp 275,000.00 Rp 2,750.00
Jumlah Harga Bahan = Rp 3,509,800.00
= Rp 3,721,200.00
= Rp 372,120.00
= Rp 4,093,320.00
Rp 65,000.00 Rp 650.00
Rp 80,000.00 Rp 8,000.00
Rp 80,000.00 Rp 800.00
Rp 90,000.00 Rp 450.00
Jumlah Harga Tenaga Kerja = Rp 9,900.00
Rp 95,000.00 Rp 95,000.00
Jumlah Harga Bahan = Rp 95,000.00
= Rp 104,900.00
= Rp 10,490.00
= Rp 115,390.00
Rp 65,000.00 Rp 650.00
Rp 80,000.00 Rp 32,000.00
Rp 80,000.00 Rp 3,200.00
Rp 90,000.00 Rp 450.00
Jumlah Harga Tenaga Kerja = Rp 36,300.00
Rp 100,000.00 Rp 100,000.00
Rp 15,000.00 Rp 375.00
Jumlah Harga Bahan = Rp 100,375.00
= Rp 136,675.00
= Rp 13,667.50
= Rp 150,342.50
ANALISA HARGA SATUAN PEKERJAAN
PLAFON
BALITBANG PU - A.4.2.1.20
Harga Sat. Jumlah
Rp 65,000.00 Rp 16,250.00
Rp 80,000.00 Rp 20,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,170.00
Jumlah Harga Tenaga Kerja = Rp 39,420.00
Rp 7,500.00 Rp 7,875.00
Rp 7,875.00 Rp 7,875.00
Jumlah Harga Bahan = Rp 15,750.00
= Rp 55,170.00
= Rp 5,517.00
= Rp 60,687.00
Rp 65,000.00 Rp 6,500.00
Rp 80,000.00 Rp 4,000.00
Rp 80,000.00 Rp 400.00
Rp 90,000.00 Rp 450.00
Jumlah Harga Tenaga Kerja = Rp 11,350.00
Rp 68,000.00 Rp 24,752.00
Rp 31,500.00 Rp 3,465.00
Jumlah Harga Bahan = Rp 28,217.00
= Rp 39,567.00
= Rp 3,956.70
= Rp 43,523.70
Rp 65,000.00 Rp 3,900.00
Rp 80,000.00 Rp 4,800.00
Rp 80,000.00 Rp 480.00
Rp 90,000.00 Rp 270.00
Jumlah Harga Tenaga Kerja = Rp 9,450.00
Rp 13,900.00 Rp 14,595.00
Rp 31,500.00 Rp 4,725.00
Jumlah Harga Bahan = Rp 19,320.00
= Rp 28,770.00
= Rp 2,877.00
= Rp 31,647.00
ANALISA HARGA SATUAN PEKERJAAN
ME
TV Line
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.050
2 Tukang L.02 OH 0.025
3 Kepala Tukang L.03 OH 0.025
4 Mandor L.04 OH 0.013
Jumlah Harga Tenaga Kerja =
B. Bahan
1 TV line bh 1.000
2 Aksesories 15 % lot 1.000
Jumlah Harga Bahan =
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
JAAN
Rp 65,000.00 Rp 9,750.00
Rp 80,000.00 Rp 800.00
Rp 80,000.00 Rp 400.00
Rp 90,000.00 Rp 450.00
Jumlah Harga Tenaga Kerja = Rp 11,400.00
Rp 15,852.50 Rp 158,525.00
Rp 3,928.57 Rp 35,357.14
Rp 5,280.00 Rp 5,280.00
Rp 660.00 Rp 3,300.00
Rp 660.00 Rp 2,357.14
Rp 660.00 Rp 660.00
Rp 6,600.00 Rp 6,600.00
Rp 2,000.00 Rp 4,000.00
Rp 4,757.00 Rp 475.70
Jumlah Harga Bahan = Rp 199,162.14
= Rp 210,562.14
= Rp 21,056.21
= Rp 231,618.36
Rp 65,000.00 Rp 3,250.00
Rp 80,000.00 Rp 2,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,143.00
Jumlah Harga Tenaga Kerja = Rp 8,393.00
Rp 31,600.00 Rp 31,600.00
Rp 4,740.00 Rp 4,740.00
Jumlah Harga Bahan = Rp 36,340.00
= Rp 44,733.00
= Rp 4,473.30
= Rp 49,206.30
Harga Sat. Jumlah
Rp 65,000.00 Rp 3,250.00
Rp 80,000.00 Rp 2,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,143.00
Jumlah Harga Tenaga Kerja = Rp 8,393.00
Rp 222,050.00 Rp 222,050.00
Rp 4,740.00 Rp 4,740.00
Jumlah Harga Bahan = Rp 226,790.00
= Rp 235,183.00
= Rp 23,518.30
= Rp 258,701.30
Rp 65,000.00 Rp 3,250.00
Rp 80,000.00 Rp 2,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,143.00
Jumlah Harga Tenaga Kerja = Rp 8,393.00
Rp 23,100.00 Rp 23,100.00
Rp 3,465.00 Rp 3,465.00
Jumlah Harga Bahan = Rp 26,565.00
= Rp 34,958.00
= Rp 3,495.80
= Rp 38,453.80
Rp 65,000.00 Rp 3,250.00
Rp 80,000.00 Rp 2,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,143.00
Jumlah Harga Tenaga Kerja = Rp 8,393.00
Rp 37,800.00 Rp 37,800.00
Rp 5,670.00 Rp 5,670.00
Jumlah Harga Bahan = Rp 43,470.00
= Rp 51,863.00
= Rp 5,186.30
= Rp 57,049.30
Rp 65,000.00 Rp 3,250.00
Rp 80,000.00 Rp 2,000.00
Rp 80,000.00 Rp 2,000.00
Rp 90,000.00 Rp 1,143.00
Jumlah Harga Tenaga Kerja = Rp 8,393.00
Rp 30,000.00 Rp 30,000.00
Rp 5,670.00 Rp 5,670.00
Jumlah Harga Bahan = Rp 35,670.00
= Rp 44,063.00
= Rp 4,406.30
= Rp 48,469.30
ANALISA HARGA SATUAN PEKERJAAN
KAYU
1 m3 Membuat dan memasang kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 7.000
2 Tukang L.02 OH 21.000
3 Kepala Tukang L.03 OH 2.100
4 Mandor L.04 OH 0.350
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Balok Kayu m3 1.100
2 Paku Kg 1.250
3 Lem Kayu Kg 1.000
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
1 m3 Membuat dan memasang 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No. Uraian Kode Sat. Koef.
A. Tenaga Kerja
1 Pekerja L.01 OH 0.800
2 Tukang L.02 OH 2.400
3 Kepala Tukang L.03 OH 0.240
4 Mandor L.04 OH 0.040
Jumlah Harga Tenaga Kerja =
B. Bahan
1 Balok Kayu m3 1.100
2 Paku Kg 1.250
3 Lem Kayu Kg 1.000
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
KERJAAN
Rp 65,000.00 Rp 455,000.00
Rp 80,000.00 Rp 1,680,000.00
Rp 80,000.00 Rp 168,000.00
Rp 90,000.00 Rp 31,500.00
Jumlah Harga Tenaga Kerja = Rp 2,334,500.00
Rp 13,117,500.00 Rp 14,429,250.00
Rp 17,850.00 Rp 22,312.50
Rp 17,025.00 Rp 17,025.00
Jumlah Harga Bahan = Rp 14,468,587.50
= Rp 16,803,087.50
= Rp 1,680,308.75
= Rp 18,483,396.25
Rp 65,000.00 Rp 65,000.00
Rp 80,000.00 Rp 240,000.00
Rp 80,000.00 Rp 24,000.00
Rp 90,000.00 Rp 4,500.00
Jumlah Harga Tenaga Kerja = Rp 333,500.00
Rp 176,500.00 Rp 194,150.00
Rp 17,025.00 Rp 17,025.00
Jumlah Harga Bahan = Rp 211,175.00
= Rp 544,675.00
= Rp 54,467.50
= Rp 599,142.50
Rp 65,000.00 Rp 52,000.00
Rp 80,000.00 Rp 192,000.00
Rp 80,000.00 Rp 19,200.00
Rp 90,000.00 Rp 3,600.00
Jumlah Harga Tenaga Kerja = Rp 266,800.00
Rp 104,000.00 Rp 114,400.00
Rp 17,850.00 Rp 22,312.50
Rp 17,025.00 Rp 17,025.00
Jumlah Harga Bahan = Rp 153,737.50
= Rp 420,537.50
= Rp 42,053.75
= Rp 462,591.25
ANALISA HARGA SATUAN PEKERJAAN
ALUMINIUM
C. Jumlah (A+B)
D. Overhead & Profit 10 % X C.
E. Harga Satuan Pekerjaan (D+E)
KERJAAN
Rp 65,000.00 Rp 2,795.00
Rp 80,000.00 Rp 3,440.00
Rp 80,000.00 Rp 344.00
Rp 90,000.00 Rp 189.00
Jumlah Harga Tenaga Kerja = Rp 6,768.00
Rp 85,000.00 Rp 93,500.00
Rp 1,575.00 Rp 3,150.00
Rp 40,000.00 Rp 2,400.00
Jumlah Harga Bahan = Rp 99,050.00
= Rp 105,818.00
= Rp 10,581.80
= Rp 116,399.80
HARGA MATERIAL
KAYU JATI
1 Kayu Jati Balok Kelas I Perhutani m3 Rp 110,575,000.00 Rp 110,575,000.00
2 Kayu Jati Papan Kelas I Perhutani m3 Rp 114,087,500.00 Rp 114,087,500.00
3 Kayu jati balok 8/12 ( klas plitur ) m3 Rp 41,236,000.00 Rp 41,236,000.00
NO. URAIAN SAT. HARGA MATERIAL UPAH LANGSIR HARGA SATUAN
10 Bingkai reng & kaso kayu kelas I ukuran 2/3 m Rp 19,225.00 Rp 19,225.00
11 Papan kayu kelas I ukuran 2/15 m Rp 52,825.00 Rp 52,825.00
12 Papan kayu kelas I ukuran 2/20 m Rp 64,650.00 Rp 64,650.00
13 Papan kayu kelas I ukuran 2/25 m Rp 75,650.00 Rp 75,650.00
14 Papan kayu kelas I ukuran 2/30 m Rp 81,950.00 Rp 81,950.00
15 Papan kayu kelas I ukuran 3/18 m Rp 81,950.00 Rp 81,950.00
16 Papan kayu kelas I ukuran 3/20 m Rp 98,750.00 Rp 98,750.00
17 Papan kayu kelas I ukuran 3/25 m Rp 105,325.00 Rp 105,325.00
18 Papan kayu kelas I ukuran 3/30 m Rp 99,575.00 Rp 99,575.00
19 Lis Dan jalusi kayu kelas I ukuran 1/3 m Rp 8,785.00 Rp 8,785.00
20 Lis Dan jalusi kayu kelas I ukuran 1/5 m Rp 9,835.00 Rp 9,835.00
21 Lis Dan jalusi kayu kelas I ukuran 2/4 m Rp 119,250.00 Rp 119,250.00
KAYU GLUGU, DOLKEN DAN BEGISTING
1 Kayu glugu balok m3 Rp 2,387,500.00 Rp 2,387,500.00
2 Kayu glugu ukuran 5/7 m Rp 23,100.00 Rp 23,100.00
3 Kayu Meranti Papan m3 Rp 7,482,500.00 Rp 7,482,500.00
4 Kayu Meranti Balok m3 Rp 5,819,000.00 Rp 5,819,000.00
5 Papan cetakan / begesteng m Rp 15,250.00 Rp 15,250.00
6 Kayu dolken Ø 8 - 10/400 cm batang Rp 17,075.00 Rp 17,075.00
7 Kayu bakar m3 Rp 144,950.00 Rp 144,950.00
KAYU LAPIS
1 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,3 cm lbr Rp 59,125.00 Rp 59,125.00
2 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,4 cm lbr Rp 71,500.00 Rp 71,500.00
3 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,6 cm lbr Rp 87,750.00 Rp 87,750.00
4 Kayu lapis mutu I AA 3 lapis uk. 122x244x0,9 cm lbr Rp 132,000.00 Rp 132,000.00
5 Kayu lapis mutu I AA 3 lapis uk. 122x244x1,2 cm lbr Rp 173,250.00 Rp 173,250.00
6 Melamin wood 120 x 240 cm lbr Rp 109,750.00 Rp 109,750.00
7 Teak wood ( 90 x 240 ) lbr Rp 110,000.00 Rp 110,000.00
KLOSET
1 Kloset jongkok putih INA buah Rp 220,000.00 Rp 220,000.00
2 Kloset jongkok warna INA buah Rp 255,000.00 Rp 255,000.00
3 Kloset duduk putih dengan tangki "Toto" set Rp 7,780,000.00 Rp 7,780,000.00
4 Kloset duduk warna dengan tangki "Toto" set Rp 3,900,000.00 Rp 3,900,000.00
5 Kloset duduk putih dengan tangki "Amercan Standard/ex KIA" set Rp 7,300,000.00 Rp 7,300,000.00
6 Kloset duduk warna dengan tangki "Amercan Standard/ex KIA" set Rp 4,300,000.00 Rp 4,300,000.00
7 Kloset duduk putih dengan tangki "INA" set Rp 4,900,000.00 Rp 4,900,000.00
8 Kloset duduk warna dengan tangki "INA" set Rp 1,306,150.00 Rp 1,306,150.00
9 Kloset duduk putih "INA" buah Rp 1,900,000.00 Rp 1,900,000.00
WASTAFEL
1 Wastafel putih INA buah Rp 385,000.00 Rp 385,000.00
2 Wastafel putih (Amercan Standard/ex-KIA) buah Rp 730,900.00 Rp 730,900.00
3 Wastafel warna (Amercan Standard/ex-KIA) buah Rp 730,900.00 Rp 730,900.00
4 Wastafel ex. TOTO buah Rp 1,500,000.00 Rp 1,500,000.00
5 Bak cuci stainless steel buah Rp 3,000,000.00 Rp 3,000,000.00
6 Water drain + aksesories set Rp 272,750.00 Rp 272,750.00
7 Floordrain biasa buah Rp 95,000.00 Rp 95,000.00
8 Floordrain merk TOTO buah Rp 495.00 Rp 495.00
9 Kran 1/2 atau Kran 3/4 bh Rp 100,000.00 Rp 100,000.00
10 TBA bh Rp 15,000.00 Rp 15,000.00
Bahan Plastik
1 Pipa PVC putih dia. 1/2" Wavin Batang Rp 24,150.00 Rp 24,150.00
2 Pipa PVC putih dia. 3/4" Wavin Batang Rp 31,500.00 Rp 31,500.00
3 Pipa PVC putih dia. 1" Wavin Batang Rp 43,000.00 Rp 43,000.00
4 Pipa PVC putih dia. 2" Wavin Batang Rp 87,000.00 Rp 87,000.00
5 Pipa PVC putih medium dia. 3" Wavin Batang Rp 157,000.00 Rp 157,000.00
6 Pipa PVC putih tebal dia. 3" Wavin Batang Rp 115,000.00 Rp 115,000.00
7 Pipa PVC putih medium dia. 4" Wavin Batang Rp 275,000.00 Rp 275,000.00
ASBES
1 Asbes plat ( 100 x 100 x 0,3 ) lbr Rp 20,500.00 Rp 20,500.00
2 Asbes plat ( 100 x 100 x 0,4 ) lbr Rp 26,800.00 Rp 26,800.00
3 Asbes gelombang besar ( 180 x 110 x 0,5 ) lbr Rp 62,275.00 Rp 62,275.00
4 Asbes gelombang besar ( 210 x 108 x 0,6 ) lbr Rp 92,400.00 Rp 92,400.00
5 Asbes gelombang besar ( 250 x 108 x 0,6 ) lbr Rp 117,000.00 Rp 117,000.00
6 Asbes gelombang besar ( 180 x 100 x 0,6 ) lbr Rp 100,875.00 Rp 100,875.00
7 Asbes gelombang kecil ( 300 x 100 x 0,4 ) lbr Rp 122,925.00 Rp 122,925.00
8 Asbes gelombang kecil ( 210 x 100 x 0,4 ) lbr Rp 81,800.00 Rp 81,800.00
9 Asbes gelombang kecil ( 150 x 100 x 0,4 ) lbr Rp 80,000.00 Rp 80,000.00
10 Asbes gelombang kecil ( 240 x 100 x 0,4 ) lbr Rp 98,100.00 Rp 98,100.00
GENTENG
1 Genteng beton besar natural 1m 9 biji bh Rp 8,400.00 Rp 8,400.00
2 Genteng beton besar warna 1m 9 biji bh Rp 9,450.00 Rp 9,450.00
3 Genteng beton kecil natural 1m 11 biji bh Rp 7,350.00 Rp 7,350.00
4 Genteng beton kecil warna 1m 11 biji bh Rp 8,675.00 Rp 8,675.00
5 Genteng beton kecil natural 1m 20 biji bh Rp 6,300.00 Rp 6,300.00
6 Genteng beton kecil warna 1m 20 biji bh Rp 7,350.00 Rp 7,350.00
7 Genteng wuwung warna bh Rp 12,325.00 Rp 12,325.00
GENTENG & NOK
NO. URAIAN SAT. HARGA MATERIAL UPAH LANGSIR HARGA SATUAN
20 Ujung jurai
21 Unglazed bh Rp 57,750.00 Rp 57,750.00
22 Natural bh Rp 60,900.00 Rp 60,900.00
23 Tropical bh Rp 120,750.00 Rp 120,750.00
24 Ujung nok
25 Unglazed bh Rp 83,775.00 Rp 83,775.00
26 Natural bh Rp 59,850.00 Rp 59,850.00
27 Tropical bh Rp 124,900.00 Rp 124,900.00
28 Nok 3 arah
29 Unglazed bh bh Rp 76,650.00 Rp 76,650.00
30 Natural bh bh Rp 126,550.00 Rp 126,550.00
31 Tropical bh bh Rp 143,950.00 Rp 143,950.00
32 Nok 2 arah
33 Unglazed bh Rp 144,225.00 Rp 144,225.00
34 Natural bh Rp 126,550.00 Rp 126,550.00
35 Tropical bh Rp 158,050.00 Rp 158,050.00
36 Nok 4 arah
37 Unglazed bh Rp 362,250.00 Rp 362,250.00
38 Natural bh Rp 246,750.00 Rp 246,750.00
39 Tropical bh Rp 393,750.00 Rp 393,750.00
FIBER SEMEN GELOMBANG
1 Nusa 14 (Gelombang Kecil)
2 Gelombang Kecil lbr Rp 86,650.00 Rp 86,650.00
3 Gelombang Kecil lbr Rp 78,750.00 Rp 78,750.00
4 Gelombang Kecil lbr Rp 73,500.00 Rp 73,500.00
5 Gelombang Kecil lbr Rp 63,275.00 Rp 63,275.00
6 Gelombang Kecil lbr Rp 55,100.00 Rp 55,100.00
7 Gelombang Kecil lbr Rp 43,275.00 Rp 43,275.00
8 Nusa 110 (Gelombang Besar)
9 Gelombang Besar lbr Rp 90,900.00 Rp 90,900.00
10 Gelombang Besar lbr Rp 74,600.00 Rp 74,600.00
11 Gelombang Besar lbr Rp 73,050.00 Rp 73,050.00
12 Gelombang Besar lbr Rp 56,650.00 Rp 56,650.00
13 Gelombang Besar lbr Rp 90,125.00 Rp 90,125.00
SENG BJLS
1 Seng BJLS 0,20 gelombang P = 180 cm lbr Rp 46,750.00 Rp 46,750.00
2 Seng BJLS 0,20 gelombang P = 240 cm lbr Rp 55,600.00 Rp 55,600.00
3 Seng BJLS 0,20 gelombang P = 300 cm lbr Rp 70,850.00 Rp 70,850.00
4 Seng BJLS 0,28 lembaran 40 cm lebar lbr Rp 25,150.00 Rp 25,150.00
5 Seng BJLS 0,28 lembaran 50 cm lebar lbr Rp 33,600.00 Rp 33,600.00
6 Seng BJLS 0,20 lembaran 90 cm lebar lbr Rp 52,500.00 Rp 52,500.00
7 Seng BJLS 0,30 lembaran 40 cm lebar lbr Rp 47,250.00 Rp 47,250.00
8 Alumunium foil m² Rp 360,000.00 Rp 360,000.00
9 Seng BJLS 0.20 gelombang P = 240 cm lbr Rp 47,100.00 Rp 47,100.00
10 Galvalum Gelombang Tebal 4 mm m1 Rp 60,000.00 Rp 60,000.00
PELAPIS
1 Pelapis Anti Bocor " MASTERGUARD"
2 Masterguard MG 20kg/pal pal Rp 331,550.00 Rp 331,550.00
3 Masterguard MG 4kg/pail galon Rp 67,150.00 Rp 67,150.00
4 Masterguard FG 230 gram/kg kg Rp 51,450.00 Rp 51,450.00
5 Masterguard Waterproffing System dg FG 300 gram/m² m² Rp 60,900.00 Rp 60,900.00
PENUTUP PLAFOND / PARTISI
1 GRC lbr Rp 21,000.00 Rp 21,000.00
2 GRC lbr Rp 23,600.00 Rp 23,600.00
3 GRC lbr Rp 19,950.00 Rp 19,950.00
4 GRC lbr Rp 62,000.00 Rp 62,000.00
5 GRC lbr Rp 64,275.00 Rp 64,275.00
6 GRC lbr Rp 102,250.00 Rp 102,250.00
7 GRC lbr Rp 320,000.00 Rp 320,000.00
8 GRC lbr Rp 163,050.00 Rp 163,050.00
9 GRC lbr Rp 245,100.00 Rp 245,100.00
10 GRC lbr Rp 250,350.00 Rp 250,350.00
11 GRC lbr Rp 470,025.00 Rp 470,025.00
12 Paku GRC kg Rp 68,250.00 Rp 68,250.00
13 Paku GRC kg Rp 90,650.00 Rp 90,650.00
14 Fiber tape Nusabord rol Rp 133,750.00 Rp 133,750.00
15 Sekrup Nusaboard bh Rp 315.00 Rp 315.00
16 Sekrup Nusaboard dos Rp 142,000.00 Rp 142,000.00
17 Kompon Nusaboard Zak Rp 77,650.00 Rp 77,650.00
Kapur & Gips
1 Akustik Panel 30x30 lbr
2 Akustik Panel 30x60 lbr
3 Akustik Panel 60x120 lbr
4 Kapur pasang m3 Rp 89,100.00 Rp 89,100.00
5 Tepung Gypsum kg Rp 55,250.00 Rp 55,250.00
6 Alkasit Kg Rp 14,675.00 Rp 14,675.00
7 Gypsum Board Kenauf lbr Rp 68,000.00 Rp 68,000.00
8 Gypsum Board Star Brand lbr Rp 70,000.00 Rp 70,000.00
NO. URAIAN SAT. HARGA MATERIAL UPAH LANGSIR HARGA SATUAN
CAT
1 Batu kambang kg Rp 90,250.00 Rp 90,250.00
2 Cat Brom (Perak Indiana) 0,2 kg bh Rp 16,250.00 Rp 16,250.00
3 Cat Brom (Perak Indiana) 0,5 kg bh Rp 29,450.00 Rp 29,450.00
4 Cat Brom (Perak Indiana) 1 kg bh Rp 53,500.00 Rp 53,500.00
5 Cat genteng (envi roof) 1 kg bh Rp 48,250.00 Rp 48,250.00
6 Cat genteng (envi roof) 4 kg bh Rp 170,100.00 Rp 170,100.00
7 Cat genteng (envi roof) 20 kg bh Rp 773,750.00 Rp 773,750.00
8 Cat dasar kayu (Al-tex) 1 kg bh Rp 31,500.00 Rp 31,500.00
9 Cat dasar kayu (Al-tex) 5 kg bh Rp 147,050.00 Rp 147,050.00
10 Cat dasar besi (Al-tex) 1 kg bh Rp 31,500.00 Rp 31,500.00
11 Cat dasar besi (Al-tex) 5 kg bh Rp 147,600.00 Rp 147,600.00
12 Cat Dasar Tembok 5 kg bh Rp 250,000.00 Rp 250,000.00
13 Cat duco (ISAMU) 0,2 kg bh Rp 26,250.00 Rp 26,250.00
14 Cat duco (ISAMU) 1 kg bh Rp 93,550.00 Rp 93,550.00
15 Cat genteng air ICI weathershield (DULUX) 2,5 liter bh Rp 304,500.00 Rp 304,500.00
16 Cat genteng air ICI weathershield (DULUX) 20 liter bh Rp 2,152,500.00 Rp 2,152,500.00
17 Cat kayu se kualitas Emco biasa bh Rp 53,625.00 Rp 53,625.00
18 Cat kayu se kualitas Emco biasa bh Rp 181,000.00 Rp 181,000.00
19 Cat kayu se kualitas Emco biasa bh Rp 808,250.00 Rp 808,250.00
20 Cat meni besi sinkromat (kanzai) bh Rp 52,800.00 Rp 52,800.00
21 Cat rettar bh Rp 25,150.00 Rp 25,150.00
22 Cat Tembok Dalam bh Rp 55,000.00 Rp 55,000.00
23 Cat Tembok Dalam bh Rp 55,000.00 Rp 55,000.00
24 Cat Tembok Dalam bh Rp 989,250.00 Rp 989,250.00
25 Cat Tembok Luar bh Rp 120,000.00 Rp 120,000.00
26 Cat Tembok Luar bh Rp 1,348,500.00 Rp 1,348,500.00
27 Cat tembok sekualitas Decolith bh Rp 104,450.00 Rp 104,450.00
28 Cat Tembok sekualitas Catylac Biasa bh Rp 111,250.00 Rp 111,250.00
29 Cat Tembok sekualitas Catylac Biasa bh Rp 526,500.00 Rp 526,500.00
30 Cat Tembok sekualitas Catylac Eksterior bh Rp 95,050.00 Rp 95,050.00
NO. URAIAN SAT. HARGA MATERIAL UPAH LANGSIR HARGA SATUAN
1 Pekerja Oh Rp 65,000.00
2 Tenaga Gali Tanah / Pondasi Oh Rp 65,000.00
3 Tukang Oh Rp 80,000.00
4 Tukang Aluminium Oh Rp 80,000.00
5 Tukang Batu Oh Rp 80,000.00
6 Tukang Kayu Oh Rp 80,000.00
7 Tukang Cat Oh Rp 80,000.00
8 Tukang Besi Oh Rp 80,000.00
9 Tukang Politur Oh Rp 80,000.00
10 Tukang Las Konstruksi Oh Rp 80,000.00
11 Tukang Listrik Oh Rp 80,000.00
12 Tukang Pipa Ledeng Oh Rp 80,000.00
13 Tukang Baja Rngan Oh Rp 80,000.00
14 Kepala Tukang Oh Rp 80,000.00
15 Kepala Tukang Batu Oh Rp 85,000.00
16 Kepala Tukang Kayu Oh Rp 85,000.00
17 Kepala Tukang Cat Oh Rp 85,000.00
18 Kepala Tukang Besi Oh Rp 85,000.00
19 Kepala Tukang Politur Oh Rp 85,000.00
20 Kepala Tukang Listrik Oh Rp 85,000.00
21 Kepala Tukang Baja Ringan Oh Rp 85,000.00
22 Mandor Oh Rp 90,000.00
DAFTAR HARGA SATUAN UPAH
HARGA SAT.
Rp 65,000.00
Rp 65,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 80,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 85,000.00
Rp 90,000.00