DAFTAR ANALISA

Anl. L 11.A : 10 M2 Membongkar Loteng/ Lantai/Dinding dari Kayu


0.6000 org Tukang @ Rp 78,000.00 Rp 46,800.00
0.0600 org Kepala Tukang @ Rp 90,000.00 Rp 5,400.00
@ Jumlah Rp 52,200.00
Untuk 1 m1 Pas. Bouwplank = 1/10 x @ Rp 52,200.00 Rp 5,220.00
Dibulatkan Rp 5,220.00

Anl. SUPL. VII : 1 M2 PEMASANGAN PLAFOND TEBAL 4 mm


- Tenaga Kerja
0.5000 org Pekerja @ Rp 50,000.00 Rp 25,000.00
0.0250 org Mandor @ Rp 72,600.00 Rp 1,815.00
- Bahan
0.0094 M3 Kayu Meranti @ Rp 4,000,000.00
### Rp 37,600.00
0.4000 Lbr Multiplex 4 mm @ Rp 64,000.00
### Rp 25,600.00
0.0200 Kg Paku @ Rp 11,500.00
### Rp 230.00
Jumlah Rp 90,245.00
Dibulatkan Rp 90,250.00

Anl. L. 8 : 10 M2 Menurunkan Atap Seng


1.0000 org Pekerja @ Rp 50,000.00 Rp 50,000.00
0.5000 org Mandor @ Rp 72,600.00 Rp 36,300.00
Jumlah Rp 86,300.00
Dibulatkan Rp 86,300.00

Anl. H. 8 : 1 M2 PEMASANGAN ATAP SENG BJLS 0,2 '- 8 "


- Tenaga Kerja
0.1000 org Pekerja @ Rp 50,000.00 Rp 5,000.00
0.0050 org Mandor @ Rp 72,600.00 Rp 363.00
0.2000 Tukang @ Rp 78,000.00 Rp 15,600.00
0.0200 Kepala Tukang @ Rp 90,000.00 Rp 1,800.00
- Bahan
0.7000 M3 Seng BJLS 0,20 x 8 " @ Rp 72,500.00
### Rp 50,750.00
0.0300 Kg Paku Seng @ Rp 11,500.00
### Rp 345.00
Jumlah Rp 73,858.00
Dibulatkan Rp 73,860.00

Anl. H. 10 : 1 M2 PEMASANGAN BUMBUNGAN SENG BJLS 0,2 '- 8 "


- Tenaga Kerja
0.2500 org Pekerja @ Rp 50,000.00 Rp 12,500.00
0.2500 Tukang @ Rp 78,000.00 Rp 19,500.00
0.0250 Kepala Tukang @ Rp 90,000.00 Rp 2,250.00
- Bahan
6.0000 M3 Rabung Seng BJLS 0,20 x 8 " @ Rp 24,000.00
### Rp 144,000.00
0.4000 Kg Paku Seng @ Rp 11,500.00
### Rp 4,600.00
Jumlah Rp 182,850.00
0.1000 Untuk 1 M' Bumbungan '= 1/10 @ Rp 182,850.00 Rp 18,285.00
Dibulatkan Rp 18,285.00
Anl.F. 21 : 1 M2 PAPAN LISPLANK L '= 25 Cm
- Tenaga Kerja
0.2800 org Pekerja @ Rp 50,000.00 Rp 14,000.00
0.0140 org Mandor @ Rp 72,600.00 Rp 1,016.40
0.8000 Tukang @ Rp 78,000.00 Rp 62,400.00
0.0100 Kepala Tukang @ Rp 90,000.00 Rp 900.00
Upah Kerja diambil 3/4 @ Rp 78,316.40 Rp 58,737.30
Jumlah A Rp 58,737.00
- Bahan
1.0000 M3 Kayu Semantok @ Rp 106,500.00
### Rp 106,500.00
0.1000 Kg Paku @ Rp 11,500.00
### Rp 1,150.00
Jumlah B Rp 107,650.00
Total ( A + B ) Rp 166,387.00
Dibulatkan Rp 107,650.00
1
Anl. K. 23 : 10 M2 MENGECAT TEMBOK 3 KALI
- Tenaga Kerja
0.7500 org Pekerja @ Rp 50,000.00 Rp 37,500.00
1.0000 Tukang @ Rp 78,000.00 Rp 78,000.00
0.0250 Kepala Tukang @ Rp 90,000.00 Rp 2,250.00
0.2000 Mandor @ Rp 72,600.00 Rp 14,520.00
- Bahan
4.4350 M3 Cat Extana Avitex @ Rp 17,500.00
### Rp 77,612.50
0.5500 Kg Cat Dasar @ Rp 27,500.00
### Rp 15,125.00
Jumlah Rp 225,007.50
0.1000 Untuk 1 M2 Cat Tembok '= 1/10 @ Rp 225,007.50 Rp 22,500.75
Dibulatkan Rp 22,500.00

Anl. K. 9 + 23 + 30 : 10 M2 MENGECAT KAYU 3 KALI


- Tenaga Kerja
1.7500 org Pekerja @ Rp 50,000.00 Rp 87,500.00
1.1500 Tukang @ Rp 78,000.00 Rp 89,700.00
0.1150 Kepala Tukang @ Rp 90,000.00 Rp 10,350.00
0.0750 Mandor @ Rp 72,600.00 Rp 5,445.00
- Bahan
2.9800 M3 Cat Kuda Terbang @ Rp 47,500.00
### Rp 141,550.00
0.0520 Kg Thinner @ Rp 21,000.00
### Rp 1,092.00
0.8000 Kg Dempul @ Rp 15,000.00
### Rp 12,000.00
2.0000 Kg Kertas Amplas @ Rp 2,500.00
### Rp 5,000.00
Jumlah Rp 335,637.00
0.1000 Untuk 1 M2 Cat Tembok '= 1/10 @ Rp 335,637.00 Rp 33,563.70
Dibulatkan Rp 33,560.00

Anl. K. 9 + 23 : 10 M2 MENGECAT BESI 3 KALI


- Tenaga Kerja
1.6800 org Pekerja @ Rp 50,000.00 Rp 84,000.00
1.4000 Tukang @ Rp 78,000.00 Rp 109,200.00
0.1400 Kepala Tukang @ Rp 90,000.00 Rp 12,600.00
0.0840 Mandor @ Rp 72,600.00 Rp 6,098.40
- Bahan
2.9800 M3 Cat MENIE @ Rp 24,000.00
### Rp 71,520.00
0.0520 Kg Cat Minyak @ Rp 47,500.00
### Rp 2,470.00
0.8000 Kg Thinner @ Rp 21,000.00
### Rp 16,800.00

Jumlah Rp 302,688.40
0.1000 Untuk 1 M2 Cat Tembok '= 1/10 @ Rp 302,688.40 Rp 30,268.84
Dibulatkan Rp 30,270.00

ANL. TAKSIR 1 Bh = 3.63 M1 PEMBUATAN PAGAR DEPAN ( GALVANIS + BESI BETON )


Org Ongkos Tukang @ Rp 1,500,000.00 Rp 1,500,000.00
Mobilisasi @ Rp 30,000.00 Rp 30,000.00
5.7000 M1 Pipa galvanis Dia. 5 cm @ Rp 506,500.00 Rp 2,887,050.00
27.2000 M1 Besi Beton Dia. 10 mm @ Rp 12,000.00 Rp 326,400.00
1.0000 Kg Cat Pagar ( 3 Kali ) @ Rp 24,000.00 Rp 24,000.00
Jumlah Rp 4,767,450.00
Dibulatkan Rp 4,767,450.00

Anl. Supl. III.b : 1 M2 PASANGAN LANTAI KERAMIK 40 x 40 Cm


0.2500 org Tukang @ Rp 78,000.00 Rp 19,500.00
0.0250 org Kepala Tukang @ Rp 90,000.00 Rp 2,250.00
0.0250 org Mandor @ Rp 72,600.00 Rp 1,815.00
0.5000 org Pekerja @ Rp 50,000.00 Rp 25,000.00
0.025 Buah Perekat ( G.16 ) @ Rp 705,645.00 Rp 17,641.13
1.0000 M3 Keramik 40 x 40 Cm @ Rp 70,500.00 Rp 70,500.00
0.0200 Zak Semen Putih @ Rp 156,500.00 Rp 3,130.00
Jumlah Rp 139,836.13
Dibulatkan Rp 139,840.00

2
Anl.F. 21 : 1 M2 jendela kaca panil
- Tenaga Kerja
2.0000 org Pekerja @ Rp -
0.0140 org Mandor @ Rp - Rp -
0.8000 Tukang @ Rp 78,000.00 Rp 62,400.00
0.6000 Kepala Tukang @ Rp 90,000.00 Rp 54,000.00
Upah Kerja diambil 3/4 @ Rp 116,400.00 Rp 116,400.00
Jumlah A Rp 116,400.00
- Bahan

3
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : K U A TANAH PASIR

LOKASI : KAB ACEH UTARA

TAHUN ANGGARAN : 2009

No Uraian Pekerjaan Volume Satuan Analisa Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi 1.000 - Taksir 750,000.00 450,000.00


2 Pengukuran Pemasangan Bowplank 1.000 - Taksir 1,000,000.00 500,000.00

3 P3K 1.000 - Taksir 350,000.00 350,000.00

4 Administrasi dan Dokumentasi 1.000 - Taksir 2,500,000.00 1,200,000.00

Jumlah 2,500,000.00

II PEKERJAAN LANTAI

1 Urugan Pasir Bawah Lantai 3.983 Anl. A.18a 105,730.00 421,122.59

2 Lantai Kerja Beton Cor 1 : 3 : 5 3.983 Anl. G.44 880,530.00 3,507,150.99

3 Pasangan Keramik 40 X 40 Cm 79.660 139,840.00 11,139,654.40

Jumlah 15,067,927.98

IV PEKERJAAN KOZEN, PINTU & JENDELA

1 Pintu P1 Uk. 210 x 120 cm 1.000 Unit Taksir 1,000,000.00 1,000,000.00

2 Pintu Panel Uk. 210 x 80 cm 1.000 Unit Taksir 480,000.00 480,000.00

3 Jendela Kaca Reyben Uk. 120x1,20 cm 4.000 Unit Taksir 165,000.00 660,000.00

4 Ventilasi Uk 70 x 45 Cm 29.000 Unit Taksir 165,000.00 4,785,000.00

5 Engsel Pintu 4" ARCH 4.000 Bh Taksir 8,000.00 32,000.00

6 Engsel Jendela 3" ARCH 8.000 Bh Taksir 6,000.00 48,000.00

7 Kunci Pintu 2.000 Bh Taksir 8,750.00 17,500.00

Jumlah 7,022,500.00

V PEKERJAAN PLAFOND

1 Membongkar Plafond dan Rangka Plafond 122.126 M2 Anl. L 11.A 5,220.00 637,496.15

2 Pemasangan Plafond Multiplex 4 mm 122.126 M2 Anl. SUPL. VII #REF! #REF!

3 Residu Rangka Plafond 53.242 M2 Anl. K. 23 d 27,270.00 1,451,898.43

4 Lat Profil 80.980 M1 Taksir #REF! #REF!

Jumlah #REF!

VI PEKERJAAN PENGECATAN

Cat Dinding Tembok 421.02 Anl. K. 23 #REF! #REF!


Cat Pintu, Jendela, Ventilasi + Kozen 35.25 Anl. K.9+ 23+30 #REF! #REF!
Cat Lisplank Papan 27.00 Anl. K.9+ 23+30 #REF! #REF!
Cat Plafond 122.13 M2 Anl. K. 23 #REF! #REF!
Cat Atap 129.65 Anl. K. 9 + 23 30,270.00 3,924,505.50
Jumlah #REF!

VII PEKERJAAN LISTRIK

1 Lampu SL 18 Watt 11.000 Unit Taksir 75,000.00 825,000.00

2 Saklar Tunggal 5.000 Bh Taksir 18,000.00 90,000.00

3 Saklar Ganda 3.000 Bh Taksir 19,000.00 57,000.00

5 Stop Kontak 5.000 Bh Taksir 18,000.00 90,000.00


6 Box Sekering 6 MCB 1.000 Bh Taksir 65,000.00 65,000.00

7 Titik Api 8.000 Titik Taksir 60,000.00 480,000.00

Jumlah 1,607,000.00

REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)


I. PEKERJAAN PERSIAPAN Rp. 2,500,000.00
II PEKERJAAN LANTAI Rp. 15,067,927.98
IV PEKERJAAN KOZEN, PINTU & JENDELA Rp. 7,022,500.00
V PEKERJAAN PLAFOND Rp. #REF!
VI PEKERJAAN PENGECATAN Rp. #REF!
VII PEKERJAAN LISTRIK Rp. 1,607,000.00

Jumlah Rp. #REF!


Dibulatkan Rp. #REF!

Terbilang : Seratus Dua Belas Juta Delapan Ratus Delapan Puluh Dua Ribu Rupiah '.-

Lhokseumawe, Maret 2009


Direncanakan Oleh

YUSMIZA, ST
2.5.1 HARGA SATUAN PEKERJAAN TANAH
2.5.1.1 Penggalian 1 m3 Tanah Biasa Sedalam 1 m

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.750 90,000.00 67,500.00
MANDOR OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 70,250.00

B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 70,250.00


E Harga Satuan Pekerjaan 70,250.00

2.5.1.9 Pengurugan Kembali 1 m3 Galian Tanah

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.500 90,000.00 45,000.00
MANDOR OH 0.050 110,000.00 5,500.00
JUMLAH TENAGA KERJA 50,500.00

B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 50,500.00


E Harga Satuan Pekerjaan 50,500.00

2.5.1.7 Pengurugan 1 m3 Dengan Pasir Urug

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.330 90,000.00 29,700.00
MANDOR OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 30,800.00

B BAHAN
Pasir Urug M3 1.200 156,000.00 187,200.00
JUMLAH HARGA BAHAN 187,200.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 218,000.00


E Harga Satuan Pekerjaan 218,000.00
2.5.1.8 Pengurugan 1 m3 Dengan Tanah Timbunan Biasa

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.300 90,000.00 27,000.00
MANDOR OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 28,100.00

B BAHAN
Tanah Urug M3 1.200 62,400.00 74,880.00
JUMLAH HARGA BAHAN 74,880.00
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 102,980.00


E Harga Satuan Pekerjaan 102,980.00

3.2.1 HARGA SATUAN PEKERJAAN PONDASI

3.2.1.8 Pemasangan 1 m3 Pondasi Batu Kali Campuran 1 SP : 4 PP

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 1.500 90,000.00 135,000.00
TUKANG OH 0.750 110,000.00 82,500.00
KEPALA TUKANG OH 0.075 170,000.00 12,750.00
MANDOR OH 0.075 110,000.00 8,250.00
JUMLAH TENAGA KERJA 238,500.00

B BAHAN
Batu Kali M3 1.200 300,000.00 360,000.00
Semen Portland Kg 163.000 1,950.00 317,850.00
Pasir Pasang M3 0.520 216,000.00 112,320.00
JUMLAH HARGA BAHAN 790,170.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,028,670.00


E Harga Satuan Pekerjaan 1,028,670.00

3.2.1.9 Pemasangan 1 m3 Batu Kosong (Aanstamping)

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.780 90,000.00 70,200.00
TUKANG OH 0.390 110,000.00 42,900.00
KEPALA TUKANG OH 0.039 170,000.00 6,630.00
MANDOR OH 0.039 110,000.00 4,290.00
JUMLAH TENAGA KERJA 124,020.00

B BAHAN
Batu Kali M3 1.200 300,000.00 360,000.00
Pasir Urug M3 0.432 156,000.00 67,392.00
JUMLAH HARGA BAHAN 427,392.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 551,412.00


E Harga Satuan Pekerjaan 551,412.00
3.1.1 HARGA SATUAN PEKERJAAN BETON

3.1.1.1 Membuat 1m3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 1.650 90,000.00 148,500.00
TUKANG OH 0.275 110,000.00 30,250.00
KEPALA TUKANG OH 0.028 170,000.00 4,760.00
MANDOR OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 192,640.00

B BAHAN
Semen Portland Kg 247.000 1,950.00 481,650.00
Pasir Beton Kg 869.000 162.86 141,522.86
Kerikil Beton Kg 999.000 222.22 222,000.00
Air Ltr 200.000 100.00 20,000.00
JUMLAH HARGA BAHAN 865,172.86
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,057,812.86


E Harga Satuan Pekerjaan 1,057,812.86

3.1.1.5 Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 1.650 90,000.00 148,500.00
TUKANG OH 0.275 110,000.00 30,250.00
KEPALA TUKANG OH 0.028 170,000.00 4,760.00
MANDOR OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 192,640.00

B BAHAN
Semen Portland Kg 326.000 1,950.00 635,700.00
Pasir Beton Kg 760.000 162.86 123,771.43
Kerikil Beton Kg 1029.000 222.22 228,666.67
Air Ltr 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 1,009,638.10
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,202,278.10


E Harga Satuan Pekerjaan 1,202,278.10
3.2.1.13 Membuat 1m3 Beton Mutu f'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 1.650 90,000.00 148,500.00
TUKANG OH 0.275 110,000.00 30,250.00
KEPALA TUKANG OH 0.028 170,000.00 4,760.00
MANDOR OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 192,640.00

B BAHAN
Semen Portland Kg 326.000 1,950.00 635,700.00
Pasir Beton Kg 760.000 162.86 123,771.43
Kerikil Beton Kg 1029.000 222.22 228,666.67
Air Ltr 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 1,009,638.10
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,202,278.10


E Harga Satuan Pekerjaan 1,202,278.10

3.2.1.10 Membuat 1 m3 Pondasi Siklop, 60% Beton Campuran 1 : 2 : 3 dan 40 % Batu Kali

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 1.650 90,000.00 148,500.00
TUKANG OH 0.275 110,000.00 30,250.00
KEPALA TUKANG OH 0.028 170,000.00 4,760.00
MANDOR OH 0.083 110,000.00 9,130.00
JUMLAH TENAGA KERJA 192,640.00

B BAHAN
Semen Portland Kg 194.000 1,950.00 378,300.00
Pasir Beton Kg 0.312 228,000.00 71,136.00
Kerikil Beton M3 0.468 300,000.00 140,400.00
Batu Kali M3 0.480 300,000.00 144,000.00
JUMLAH HARGA BAHAN 733,836.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 926,476.00


E Harga Satuan Pekerjaan 926,476.00

3.1.1.17 (a Pembesian 10 kg Dengan Besi Polos Atau Ulir

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.070 90,000.00 6,300.00
TUKANG OH 0.070 110,000.00 7,700.00
KEPALA TUKANG OH 0.007 170,000.00 1,190.00
MANDOR OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 15,630.00

B BAHAN
Besi Beton Polos Kg 1.050 14,400.00 15,120.00
Kawat Beton Kg 0.150 25,200.00 3,780.00
JUMLAH HARGA BAHAN 18,900.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 34,530.00
E Harga Satuan Pekerjaan 34,530.00

3.2.1.19 Pemasangan 1m2 Bekisting Untuk Pondasi

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.520 90,000.00 46,800.00
TUKANG OH 0.260 110,000.00 28,600.00
KEPALA TUKANG OH 0.026 170,000.00 4,420.00
MANDOR OH 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 82,680.00

B BAHAN
Kayu Kelas III M3 0.040 6,240,000.00 249,600.00
Paku Kg 0.300 24,000.00 7,200.00
Minyak Bekisting Ltr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 257,150.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 339,830.00


E Harga Satuan Pekerjaan 339,830.00
F Asumsi 3 x Pakai 113,276.67

3.2.2.20 Pemasangan 1m2 Bekisting Untuk Sloof

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.520 90,000.00 46,800.00
TUKANG OH 0.260 110,000.00 28,600.00
KEPALA TUKANG OH 0.026 170,000.00 4,420.00
MANDOR OH 0.026 110,000.00 2,860.00
JUMLAH TENAGA KERJA 82,680.00

B BAHAN
Kayu Kelas III M3 0.045 6,240,000.00 280,800.00
Paku Kg 0.300 24,000.00 7,200.00
Minyak Bekisting Ltr 0.100 3,500.00 350.00
JUMLAH HARGA BAHAN 288,350.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 371,030.00


E Harga Satuan Pekerjaan 371,030.00
F Asumsi 3 x Pakai 123,676.67
3.1.1.22 Pemasangan 1m2 Bekisting Untuk Kolom

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.660 90,000.00 59,400.00
TUKANG OH 0.330 110,000.00 36,300.00
KEPALA TUKANG OH 0.033 170,000.00 5,610.00
MANDOR OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 104,940.00

B BAHAN
Kayu Kelas III M3 0.040 6,240,000.00 249,600.00
Paku Kg 0.400 24,000.00 9,600.00
Minyak Bekisting Ltr 0.200 3,500.00 700.00
Balok Kayu Kelas II M3 0.015 9,840,000.00 147,600.00
Plywood 9 mm Lbr 0.350 181,500.00 63,525.00
Dolken Kayu Galam, ø (8-
Batang 2.000 14,400.00 28,800.00
10) cm, Panjang 4 m
JUMLAH HARGA BAHAN 499,825.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 604,765.00


E Harga Satuan Pekerjaan 604,765.00
F Asumsi 3 x Pakai 201,588.33

3.1.1.23 Pemasangan 1m2 Bekisting Untuk Balok

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.660 90,000.00 59,400.00
TUKANG OH 0.330 110,000.00 36,300.00
KEPALA TUKANG OH 0.033 170,000.00 5,610.00
MANDOR OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 104,940.00

B BAHAN
Kayu Kelas III M3 0.040 6,240,000.00 249,600.00
Paku Kg 0.400 24,000.00 9,600.00
Minyak Bekisting Ltr 0.200 3,500.00 700.00
Balok Kayu Kelas II M3 0.018 9,840,000.00 177,120.00
Plywood 9 mm Lbr 0.350 181,500.00 63,525.00
Dolken Kayu Galam, ø (8-
14,400.00
10) cm, Panjang 4 m Batang 2.000 28,800.00
JUMLAH HARGA BAHAN 529,345.00
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 634,285.00


E Harga Satuan Pekerjaan 634,285.00
F Asumsi 3 x Pakai 211,428.33
3.1.1.24 Pemasangan 1m2 Bekisting Untuk Plat Lantai

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.660 90,000.00 59,400.00
TUKANG OH 0.330 110,000.00 36,300.00
KEPALA TUKANG OH 0.033 170,000.00 5,610.00
MANDOR OH 0.033 110,000.00 3,630.00
JUMLAH TENAGA KERJA 104,940.00

B BAHAN
Kayu Kelas III M3 0.040 6,240,000.00 249,600.00
Paku Kg 0.400 24,000.00 9,600.00
Minyak Bekisting Ltr 0.200 3,500.00 700.00
Balok Kayu Kelas II M3 0.015 9,840,000.00 147,600.00
Plywood 9 mm Lbr 0.350 181,500.00 63,525.00
Dolken Kayu Galam, ø (8-
Batang 2.000 14,400.00 28,800.00
10) cm, Panjang 4 m
JUMLAH HARGA BAHAN 499,825.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 604,765.00


E Harga Satuan Pekerjaan (D+E) 604,765.00

4.4.1 HARGA SATUAN PEKERJAAN PEKERJAAN PASANGAN DINDING


4.4.1.7 Pemasangan 1m2 Dinding Bata Merah Tebal 1/2 Batu Campuran 1PS : 2 PP

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.300 90,000.00 27,000.00
TUKANG OH 0.100 110,000.00 11,000.00
KEPALA TUKANG OH 0.010 170,000.00 1,700.00
MANDOR OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 41,350.00

B BAHAN
Batu Bata M3 70.000 800.00 56,000.00
Semen Portland Lg 18.950 1,950.00 36,952.50
Pasir Pasang M3 0.038 216,000.00 8,208.00
JUMLAH HARGA BAHAN 101,160.50
C PERALATAN

JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) 142,510.50


E Harga Satuan Pekerjaan 142,510.50
4.4.1.9 Pemasangan 1m2 Dinding Bata Merah Tebal 1/2 Batu Campuran 1PS : 4 PP

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.300 90,000.00 27,000.00
TUKANG OH 0.100 110,000.00 11,000.00
KEPALA TUKANG OH 0.010 170,000.00 1,700.00
MANDOR OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 41,350.00

B BAHAN
Batu Bata M3 70.000 800.00 56,000.00
Semen Portland Lg 11.500 1,950.00 22,425.00
Pasir Pasang M3 0.043 216,000.00 9,288.00
JUMLAH HARGA BAHAN 87,713.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,063.00


E Harga Satuan Pekerjaan 129,063.00

A.4.4.2 HARGA SATUAN PEKERJAAN PEKERJAAN PLASTERAN

4.4.2.2 Pemasangan 1m2 Plasteran 1SP : 2 PP Tebal 15 mm

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.300 90,000.00 27,000.00
TUKANG OH 0.150 110,000.00 16,500.00
KEPALA TUKANG OH 0.015 170,000.00 2,550.00
MANDOR OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 47,700.00

B BAHAN
Semen Portland Kg 10.000 1,950.00 19,500.00
Pasir Pasang M3 0.020 216,000.00 4,320.00
JUMLAH HARGA BAHAN 23,820.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 71,520.00


E Harga Satuan Pekerjaan 71,520.00

4.4.2.4 Pemasangan 1m2 Plasteran 1SP : 4 PP Tebal 15 mm

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.300 90,000.00 27,000.00
TUKANG OH 0.150 110,000.00 16,500.00
KEPALA TUKANG OH 0.015 170,000.00 2,550.00
MANDOR OH 0.015 110,000.00 1,650.00
JUMLAH TENAGA KERJA 47,700.00

B BAHAN
Semen Portland Kg 6.240 1,950.00 12,168.00
Pasir Pasang M3 0.024 216,000.00 5,184.00
JUMLAH HARGA BAHAN 17,352.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 65,052.00


E Harga Satuan Pekerjaan 65,052.00

4.4.2.27 Pemasangan 1 m2 Acian

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.200 90,000.00 18,000.00
TUKANG OH 0.100 110,000.00 11,000.00
KEPALA TUKANG OH 0.010 170,000.00 1,700.00
MANDOR OH 0.010 110,000.00 1,100.00
JUMLAH TENAGA KERJA 31,800.00

B BAHAN
Semen Portland Kg 3.250 1,950.00 6,337.50
JUMLAH HARGA BAHAN 6,337.50
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,137.50


E Harga Satuan Pekerjaan 38,137.50

4.2.1.6 Pemasangan 1 m2 Rangka Besi Hollow 40 x 40 mm

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.350 90,000.00 31,500.00
TUKANG OH 0.350 110,000.00 38,500.00
KEPALA TUKANG OH 0.035 170,000.00 5,950.00
MANDOR OH 0.018 110,000.00 1,980.00
JUMLAH TENAGA KERJA 77,930.00

B BAHAN
Besi Hollow 40x40 mm M1 10.500 29,683.33 311,675.00
Assesories (perkuatan,las.
dll), 100% dari rangka
Ls 1.000 3,500.00 3,500.00
Dempul Kg 0.650 26,400.00 17,160.00
JUMLAH HARGA BAHAN 332,335.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 410,265.00


E Harga Satuan Pekerjaan 410,265.00

4.2.1.7 Pemasangan 1 m2 Pintu Besi Hollow 40 x 40 mm

KOEFISIE HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN
N (RP) (RP)
A TENAGA
PEKERJA OH 0.350 90,000.00 31,500.00
TUKANG OH 0.350 110,000.00 38,500.00
KEPALA TUKANG OH 0.035 170,000.00 5,950.00
MANDOR OH 0.018 110,000.00 1,980.00
JUMLAH TENAGA KERJA 77,930.00

B BAHAN
Besi Hollow 40x40 mm M1 10.500 29,683.33 311,675.00
Roda Pintu Dia. 70 mm Bh 0.350 35,000.00 12,250.00
Besi Siku 50 x 50 x 5 mm M1 1.050 55,000.00 57,750.00
Dempul Kg 0.650 26,400.00 17,160.00
Assesories (perkuatan,las.
Ls 1.000 3,500.00 3,500.00
dll), 100% dari rangka
JUMLAH HARGA BAHAN 402,335.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 480,265.00


E Harga Satuan Pekerjaan 480,265.00
Lampiran : PEMBANGUNAN PAGAR BAGIAN BELAKANG SDN KEC. BANDA SAKTI

CALCULATION OF REINFORCEMENT & FORM WORKS

CONCRETE REINFORCEMENT FORM WORK


NO NAME OF STRUCTURE L H T Vol Dia. L Weight Unit Vol. Vol./m3 Vol./m3 Kubikasi Total Kg L H T Unit Vol. Vol./m3 Vol. Total REMARK
Besi
(m) (m) (m) (m3) (mm) (m) (kg/m) (kg) Ulir Polos (m) (m) (m) (m2) (m2) (m2)

A PONDASI TAPAK 80 x 80 x 20 cm
1 Beton Bertulang Pondasi Tapak 80x80x25 cm 0.80 0.80 0.25 0.16
- Tulangan Utama Bag. Atas 12.00 0.75 0.880 6.33 4.18
- Tulangan Utama Bag. Bawah 12.00 0.95 0.880 6.33 5.29 59.22 1.36 80.53

- Bekisting Sisi 1 0.80 0.25 2.00 0.40


- Bekisting Sisi 2 54.07 0.80 0.25 2.00 0.40 5.00 6.80

B SLOOF 15/20 cm
1 Beton Bertulang Sloof 15x25 cm 3.80 0.15 0.25 0.14
- Tulangan Utama Atas 12.00 3.80 0.880 2.00 6.69
- Tulangan Utama Bawah 12.00 3.80 0.880 2.00 6.69 93.87
- Sengkang Tumpuan 6.00 0.80 0.220 13.00 2.29
- Sengkang Lapangan 6.00 0.80 0.220 13.00 2.29 125.98 1.23 155.33
- Bekisting Sisi 1 3.80 0.25 2.00 1.90
- Bekisting Sisi 2 13.33 16.44

C KOLOM 20/20 cm
1 Beton Bertulang Kolom 20x20 cm 0.20 0.20 2.60 0.10
- Tulangan Utama 12.00 3.80 0.880 4.00 13.38 128.62
- Sengkang 8.00 0.80 0.390 18.00 5.62 182.62 2.24 409.79
- Bekisting Sisi 1 0.20 2.60 2.00 1.04
- Bekisting Sisi 2 0.20 2.60 2.00 1.04 20.00 44.88

D RENG BALOK 15/20 cm


1 Beton Bertulang Reng Balok 15x20 cm 3.80 0.20 0.15 0.11 144.35 1.94 280.40
- Tulangan Utama Atas 12.00 3.80 0.880 2.00 6.69
- Tulangan Utama Bawah 12.00 3.80 0.880 2.00 6.69
- Sengkang Tumpuan 6.00 0.70 0.220 10.00 1.54
- Sengkang Lapangan 6.00 0.70 0.220 10.00 1.54
- Kait 144.35
- Bekisting Sisi 1 3.80 0.15 2.00 1.14
- Bekisting Sisi 2 3.80 0.20 0.00 0.00 10.00 19.43
CALCULATION SHEET

PEKERJAAN : PEMBANGUNAN PAGAR BAGIAN BELAKANG SDN KEC. BANDA SAKTI


LOKASI : KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWE
TAHUN : 2015

Lebar Lebar
NO URAIAN PEKERJAAN Panjang Tinggi Unit Sub Volume Volume Satuan
Atas Bawah

I. PEKERJAAN PERSIAPAN
1 Pengukuran Dan Pemasangan Bowplank 1.000 Ls
2 Laporan dan dokumentasi 1.000 Ls
3 Pembersihan Lapangan 1.000 Ls
4 Papan Nama Proyek 1.000 Ls

II. PEKERJAAN TANAH DAN PASIR


PAGAR TYPE A

1 Pekerjaan Pemasangan Besi Hollow 40 x 40 mm 2.60 0.95 12.00 29.64 35.815 M2


3.00 0.95 1.00 2.85
3.50 0.95 1.00 3.33

2 Pekejaan pemasangan Pintu Pagar Besi Hollow 40 x 40 mm 4.10 1.60 1.00 6.56 6.560 M2

3 Relief Kepala Kolom 16.000 Unit

PAGAR TYPE B

1 Galian Tanah Pondasi Tapak Uk. 80 x 80 cm 0.80 0.80 1.00 17.00 10.88 10.880 M3

2 Galian Tanah Pondasi Menerus 3.80 0.80 0.75 15.00 34.20 36.180 M3
3.30 0.80 0.75 1.00 1.98
3 Mungurung Pasir Urug t= 5 cm Bawah Pondasi
Pondasi Tapak 0.80 0.80 0.05 17.00 0.54 2.956 M3
Pondasi Menerus 3.80 0.80 0.05 15.00 2.28
3.30 0.80 0.05 1.00 0.13

4 Pasangan Batu Kosong (Aanstamping) t = 10 3.80 0.80 0.10 15.00 4.56 5.912 M3
3.30 0.80 0.10 1.00 0.26
Pondasi Tapak 0.80 0.80 0.10 17.00 1.09

5 Urungan Kembali 23.360 M3

PEKERJAAN BETON/BETON BERTULANG


1 Pondasi Batu Kali 1 : 4 3.80 0.25 0.60 0.60 15.00 14.54 14.832 M3
3.30 0.25 0.60 0.60 1.00 0.30

2 Beton Bertulang Pondasi Tapak 80 x 80 x 25 cm 0.80 0.80 0.25 17.00 1.36 1.360 M3

3 Beton Bertulang Sloof Uk. 15 x 25 cm 3.80 0.10 0.20 15.00 1.14 1.233 M3
3.10 0.15 0.20 1.00 0.09

4 Beton Bertulang Kolom Uk. 20 x 20 cm 0.20 0.20 3.30 17.00 2.24 2.244 M3

5 Beton Bertulang Ring Balok 15 x 20 cm 3.80 0.15 0.20 15.00 1.71 1.943 M3
3.10 0.15 0.50 1.00 0.23

6 Acian Kolom dan Balok


Kolom 0.40 0.14 17.00 9.18 17.180 M2
Balok 0.40 0.10 16.00 8.00

PEKERJAAN PASANGAN BATA DAN PLASTERAN


1 Pasangan Bata 1 : 2 3.80 0.40 15.00 22.80 24.120 M2
3.30 0.40 1.00 1.32

2 Plasteran Bata 1 : 2 Sama Dengan Pasangan Bata 1:2 x 2 48.240 M2

3 Pasangan Bata 1 : 4 3.80 1.25 15.00 71.25 75.375 M2


3.30 1.25 1.00 4.13

4 Plasteran Bata 1 : 4 Sama Dengan Pasangan Bata 1:4 x 2 150.750 M2

PEKERJAAN PAGAR KAWAT DURI


1 Pemasangan Kawat Duri (ex. Diamond) 57.00 5.00 285.00 285.000 M1
2 Pemasangan Besi Siku 50 x 50 x 5 mm 1.00 17.00 17.00 17.000 M1

Estimator

…………….
DAFTAR HARGA UPAH DAN BAHAN
A . HARGA UPAH
SATUAN HARGA SATUAN
NO URAIAN KETERANGAN
Rp. Rp.
1 2 3 4 5
1 Pekerja Hari 90,000.00
2 Tukang Hari 110,000.00
3 Kepala Tukang Hari 170,000.00
4 Mandor Hari 110,000.00

B . HARGA BAHAN
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
Rp.

1 Air Liter 100.00


2 Assesories (perkuatan,las. dll), 100% dari rangka Ls 3,500.00
3 Batu Bata Buah 800.00
4 Batu Kali M3 300,000.00
5 Besi Beton Polos Kg 14,400.00
6 Besi Beton Ulir Kg 15,600.00
7 Besi Siku 50 x 50 x 5 mm M1 55,000.00
8 Besi Plat t = 5 mm M2 455,000.00
9 Besi Hollow 40x40 mm M1 29,683.33
10 Dolken Kayu Galam, ø (8-10) cm, Panjang 4 m Batang 14,400.00
11 Dempul Kg 26,400.00
12 Kayu Kelas I (Seumantok/Ulin/dll) M3 12,600,000.00
13 Kayu Kelas II M3 9,840,000.00
14 Kayu Kelas III M3 6,240,000.00
15 Kawat Duri M1 6,500.00
16 Kawat Beton Kg 25,200.00
17 Kerikil Beton M3 300,000.00
18 Kerikil Beton Kg 222.22 1 M3 = 1350 Kg
19 Pasir Beton M3 228,000.00
20 Pasir Beton Kg 162.86 1 M3 = 1400 Kg
21 Pasir Pasang M3 216,000.00
22 Pasir Pasang Kg 154.29 1 M3 = 1400 Kg
23 Pasir Urug M3 156,000.00
24 Pasir Urug Kg 111.43
25 Paku Kg 24,000.00
26 Plywood 12 mm Lembar 243,600.00
27 Plywood 9 mm Lembar 181,500.00 1,2 x 2,4 m
28 Plywood 4 mm Lembar 137,800.00
29 Semen Andalas @ 40 Kg Zak 78,000.00
30 Semen Portland Kg 1,950.00
31 Tanah Urug M3 62,400.00
32 Minyak bekisting Liter 3,500.00

Konsultan Perencana
CV. NEW VENTURA CONSULTANT

MUHAMMAD GADE, ST
Direktur
REKAPITULASI

Kegiatan : PEMBANGUNAN SARANA DAN PRASARANA UMUM


Pekerjaan : PEMBANGUNAN PAGAR BAGIAN BELAKANG SDN KEC. BANDA SAKTI
Lokasi : KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWE
Tahun Anggaran : 2015

NO. URAIAN JUMLAH TOTAL HARGA

Divisi I Design Development 2,800,000.00


Divisi II Sitework 11,300,233.00
Divisi III Pekerjaan Struktural 76,045,223.93
Divisi IV Pekerjaan Arsitektur 59,298,053.44
Divisi V Pekerjaan Mekanikal -
Divisi VI Pekerjaan Elektrikal -
Divisi VII Pekerjaan Eksteriol Bangunan -
Divisi VIII Miscellaneous Work -
REKAPITULASI JUMLAH TOTAL 149,443,510.36
DIBULATKAN 149,437,500.00
Err:511

Lhokseumawe, Maret 2015


CV. NEW VENTURA CONSULTANT

Diperiksa/ Disetujui Oleh: Dihitung Oleh:


Team Leader Estimator,

…………….. …………….

Disetujui Oleh :
Direktur CV.

MUHAMMAD GADE, ST
HARGA PERKIRAAN RENCANA
ENGINEERING'S ESTIMATE

Kegiatan : PEMBANGUNAN SARANA DAN PRASARANA UMUM


Pekerjaan : PEMBANGUNAN PAGAR BAGIAN BELAKANG SDN KEC. BANDA SAKTI
Lokasi : KECAMATAN BANDA SAKTI KOTA LHOKSEUMAWE
Tahun Anggaran : 2015

HARGA
NO. URAIAN VOLUME SAT. ANALISA JUMLAH
SATUAN (RP)

Divisi I Design Development


1.1 Dokumentasi Kontrak 1.00 Ls 1.1 1,200,000.00 1,200,000.00
1.2 Asuransi dan Jaminan
1.3 Shop Drawing dan As-built Drawing 1.00 Ls 1.3 750,000.00 750,000.00
1.4 Site Management
1.5 Papan Nama Proyek 1.00 Ls 1.5 250,000.00 250,000.00
1.6 Dokumentasi Proyek 1.00 Ls 1.6 600,000.00 600,000.00
Total Jumlah Harga Divisi I Rp 2,800,000.00
Divisi II Sitework
2.1 Setting-out
2.2 Fasilitas Sementara
2.2.1 Pekerjaan Persiapan
2.2.1.1 Pembuatan 1 m2 Pagar Sementara Dari Kayu
2.2.1.2 Pembuatan 1 m2 Pagar Sementara Dari Seng Gelombang
2.2.1.3 Pembuatan 1 m2 Pagar Sementara Dari Kawat Duri
2.3 Mobilisasidan Demobilisasi
2.4 Pembersihan Lahan dan Removoral
2.4.1 Pembongkaran dan Membuang Hasil Bongkaran Pagar lama 60.30 M1 2.4.1 115,000.00 6,934,500.00
2.5 Galian, Pemotongan, Timbunan dan Buangan
2.5.1 Pekerjaan Tanah
2.5.1.1 Penggalian Tanah Biasa Sedalam 1 m 36.18 M3 2.5.1.1 70,250.00 2,541,645.00
2.5.1.2 Penggalian Tanah Biasa Sedalam 2 m
2.5.1.3 Penggalian Tanah Biasa Sedalam 3 m
2.5.1.4 Penggalian Tanah Keras Sedalam 1 m
2.5.1.5 Penggalian Tanah Cadas Sedalam 1 m
2.5.1.6 Penggalian Tanah Lumpur Sedalam 1 m
2.5.1.7 Urugan Pasir Urug 2.956 M3 2.5.1.7 218,000.00 644,408.00
2.5.1.8 Timbunan Tanah Biasa
2.5.1.9 Urugan Kembali 23.36 M3 2.5.1.9 50,500.00 1,179,680.00

Total Jumlah Harga Divisi II Rp 11,300,233.00


Divisi III Pekerjaan Struktural
3.1 Pekerjaan Struktural Diatas Tanah
3.1.1 Pekerjaan Beton
3.1.1.1 Pembuatan 1 m3 Beton Mutu fc' 7,4 Mpa (K100)
3.1.1.2 Pembuatan 1 m3 Beton Mutu fc' 9,8 Mpa (K125)
3.1.1.3 Pembuatan 1 m3 Beton Mutu fc' 12,2 Mpa (K150)
3.1.1.4 Pembuatan 1 m3 Lantai Kerja Beton Mutu fc' 7,4 Mpa
3.1.1.5 Pembuatan 1 m3 Beton Mutu fc' 14,5 Mpa (K175) 5.42 M3 3.1.1.5 1,202,278.10 6,515,746.14
3.1.1.6 Pembuatan 1 m3 Beton Mutu fc' 16,9 Mpa (K200)
3.1.1.7 Pembuatan 1 m3 Beton Mutu fc' 19,3 Mpa (K225)
3.1.1.8 Pembuatan 1 m3 Beton Mutu fc' 21,7 Mpa (K250)
3.1.1.17 (a) Pembesian 10 Kg Dengan Besi Polos 845.52 M3 3.1.1.17 (a) 34,530.00 29,195,893.45
3.1.1.17 (b) Pembesian 10 Kg Dengan Besi Ulir
3.1.1.22 Pemasangan 1 m2 Bekisting Untuk Kolom 44.880 M2 3.1.1.22 201,588.33 9,047,284.40
3.1.1.23 Pemasangan 1 m2 Bekisting Untuk Balok 35.865 M2 3.1.1.23 211,428.33 7,582,877.18
3.1.1.24 Pemasangan 1 m2 Bekisting Untuk Lantai
3.1.1.25 Pemasangan 1 m2 Bekisting Untuk Dinding
3.1.1.26 Pemasangan 1 m2 Bekisting Untuk Tangga
3.1.1.27 Pemasangan 1 m2 Tangga Pengecoran Beton
3.2 Pekerjaan Struktural Dibawah Tanah
3.2.1 Pekerjaan Pondasi
3.2.1.1 Pemasangan Pondasi Batu Belah 1 PC : 3PP
3.2.1.2 Pemasangan Pondasi Batu Belah 1 PC : 4PP
3.2.1.3 Pemasangan Pondasi Batu Belah 1 PC : 5PP
3.2.1.4 Pemasangan Pondasi Batu Belah 1 PC : 6PP
3.2.1.5 Pemasangan Pondasi Batu Belah 1 PC : 8PP
3.2.1.6 Pemasangan Pondasi Batu Belah 1 KP : 1 SM : 2PP
3.2.1.7 Pemasangan Pondasi Batu Belah 1 PC : 3KP : 10 PP
3.2.1.8 Pemasangan Pondasi Batu Kali 1 PC : 4 PP 14.832 M3 3.2.1.8 1,028,670.00 15,257,233.44
3.2.1.9 Pemasangan Batu Kosong (aanstamping) 5.912 M3 3.2.1.9 551,412.00 3,259,947.74
3.2.1.10 Pemasangan Pondasi Siklop 60% Beton
3.2.1.11 Pemasangan Pondasi Sumuran Dia. 100 cm
3.2.1.12 Pembuatan 1 m3 Lantai Kerja Beton Mutu fc' 7,4 Mpa
3.2.1.13 Pembuatan 1 m3 Beton Mutu fc' 14,5 Mpa (K175) 1.360 m3 3.2.1.13 1,202,278.10 1,635,098.21
3.2.1.14 Pembuatan 1 m3 Beton Mutu fc' 16,9 Mpa (K200)
3.2.1.15 Pembuatan 1 m3 Beton Mutu fc' 19,3 Mpa (K225)
3.2.1.16 Pembuatan 1 m3 Beton Mutu fc' 21,7 Mpa (K250)
3.2.1.17 (a) Pembesian 10 Kg Dengan Besi Polos 80.53 Kg 3.2.1.17 (a) 34,530.00 2,780,862.04
3.2.1.17 (b) Pembesian 10 Kg Dengan Besi Ulir
3.2.1.18 Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh)
3.2.1.19 Pemasangan 1 m2 Bekisting Untuk Pondasi 6.80 M2 3.2.1.19 113,276.67 770,281.33
HARGA
NO. URAIAN VOLUME SAT. ANALISA JUMLAH
SATUAN (RP)

3.2.2 Pekerjaan Sloof


3.2.2.12 Pembuatan 1 m3 Lantai Kerja Beton Mutu fc' 7,4 Mpa
3.2.2.13 Pembuatan 1 m3 Beton Mutu fc' 14,5 Mpa (K175)
3.2.2.14 Pembuatan 1 m3 Beton Mutu fc' 16,9 Mpa (K200)
3.2.2.15 Pembuatan 1 m3 Beton Mutu fc' 19,3 Mpa (K225)
3.2.2.16 Pembuatan 1 m3 Beton Mutu fc' 21,7 Mpa (K250)
3.2.1.17 (a) Pembesian 10 Kg Dengan Besi Polos
3.2.1.17 (b) Pembesian 10 Kg Dengan Besi Ulir
3.2.2.20 Pemasangan 1 m2 Bekisting Untuk Sloof
3.2.3 Pekerjaan Kolom Pedestal
3.2.3.21 Pemasangan 1 m2 Bekisting Untuk Kolom (Pedestal)
3.2.2.12 Pembuatan 1 m3 Lantai Kerja Beton Mutu fc' 7,4 Mpa
3.2.2.13 Pembuatan 1 m3 Beton Mutu fc' 14,5 Mpa (K175)
3.2.2.14 Pembuatan 1 m3 Beton Mutu fc' 16,9 Mpa (K200)
3.2.2.15 Pembuatan 1 m3 Beton Mutu fc' 19,3 Mpa (K225)
3.2.2.16 Pembuatan 1 m3 Beton Mutu fc' 21,7 Mpa (K250)
3.2.1.17 (a) Pembesian 10 Kg Dengan Besi Polos
3.2.1.17 (b) Pembesian 10 Kg Dengan Besi Ulir

Total Jumlah Harga Divisi III Rp 76,045,223.93


Divisi IV Pekerjaan Arsitektur
4.1 Beton
4.1.1 Pekerjaan Beton
4.1.1.1 Pembuatan 1 m3 Beton Mutu fc' 7,4 Mpa (K100)
4.1.1.2 Pembuatan 1 m3 Beton Mutu fc' 9,8 Mpa (K125)
4.1.1.3 Pembuatan 1 m3 Beton Mutu fc' 12,2 Mpa (K150)
4.1.1.5 Pembuatan 1 m3 Beton Mutu fc' 14,5 Mpa (K175)
4.1.1.6 Pembuatan 1 m3 Beton Mutu fc' 16,9 Mpa (K200)
4.1.1.7 Pembuatan 1 m3 Beton Mutu fc' 19,3 Mpa (K225)
4.1.1.8 Pembuatan 1 m3 Beton Mutu fc' 21,7 Mpa (K250)
3.1.1.17 (a) Pembesian 10 Kg Dengan Besi Polos
3.1.1.17 (b) Pembesian 10 Kg Dengan Besi Ulir
3.1.1.22 Pemasangan 1 m2 Bekisting Untuk Kolom
3.1.1.23 Pemasangan 1 m2 Bekisting Untuk Balok
3.1.1.24 Pemasangan 1 m2 Bekisting Untuk Lantai
3.1.1.25 Pemasangan 1 m2 Bekisting Untuk Dinding
3.1.1.26 Pemasangan 1 m2 Bekisting Untuk Tangga
3.1.1.27 Pemasangan 1 m2 Tangga Pengecoran Beton
4.2 Pekerjaan Logam
4.2.1 Pekerjaan Besi dan Alumunium
4.2.1.1 Pemasangan 1 kg Besi Profil
4.2.1.2 Pemasangan 1 kg Rangka Kuda-kuda Baja IWF
4.2.1.3 Pengerjaan 100 Kg Pekerjaan Perakitan
4.2.1.4 Pemasangan Kawat Duri (ex. Diamond) 285.00 M1 4.2.1.4 6,500.00 1,852,500.00
4.2.1.5 Pemasangan Besi Siku 50 x 50 x 5 mm 17.00 M1 4.2.1.5 55,000.00 935,000.00
4.2.1.6 Pemasangan Besi Hollow 40x40 mm 35.82 M2 4.2.1.6 410,265.00 14,693,640.98
4.2.1.7 Pemasangan Pintu Besi Hollow 40x40 mm, Lengkap Siap 6.56 M2 4.2.1.7 480,265.00 3,150,538.40
Terpasang
4.3 Pekerjaan Kayu dan Plastik
4.4 Pekerjaan Pasangan
4.4.1.7 Pekerjaan Pasangan Batu Bata 1 : 2 24.12 M2 4.4.1.7 142,510.50 3,437,353.26
4.4.1.9 Pekerjaan Pasangan Batu Bata 1 : 4 75.375 M2 4.4.1.9 129,063.00 9,728,123.63
4.4.2.2 Pekerjaan Plasteran Bata 1 : 2 48.24 M2 4.4.2.2 71,520.00 3,450,124.80
4.4.2.4 Pekerjaan Plasteran Bata 1 : 4 150.75 M2 4.4.2.4 65,052.00 9,806,589.00
4.4.2.27 Pekerjaan Acian 216.17 M2 4.4.2.27 38,137.50 8,244,183.38
4.5 Perlindungan Suhu dan Kelembaban
4.6 Pekerjaan Bukaan (Jendela, Pintu, Kusen)
4.7 Finishing
4.7.1 Relief Kolom dan Kepala Kolom 16.00 Unit 4.7.1 250,000.00 4,000,000.00

Total Jumlah Harga Divisi IV Rp 59,298,053.44


Divisi V Pekerjaan Mekanikal
5.1 Plambing
5.2 Pemanasan, Vertikal dan Pengkondisian Udara
5.3 Pencegahan Kebakaran
Total Jumlah Harga Divisi V Rp -
Divisi VI Pekerjaan Elektrikal
6.1 Sistem Distribusi Jaringan Listrik
6.2 Sistem Pencahayaan
6.3 Sistem Komunikasi
6.4 Pencegahan Petir
Total Jumlah Harga Divisi VI Rp -
Divisi VII Pekerjaan Eksteriol Bangunan
7.1 Paving, Perparkiran, dan Pendestrian
7.2 Pagar dan Gerbang
7.3 Pertanaman dan Landscaping (Tanaman, Rumput, dan Tanah)
Total Jumlah Harga Divisi VII Rp -
HARGA
NO. URAIAN VOLUME SAT. ANALISA JUMLAH
SATUAN (RP)

Divisi VIII Miscellaneous Work


8.1 Peralatan
8.2 Konstruksi Khusus
8.3 Conveying Equipment
8.4 Pekerjaan Pemipaan Air Minum Diluar Bangunan Gedung
Total Jumlah Harga Divisi VIII Rp -

Lhokseumawe, Februari 2015


CV. KHATACHI KIRA KONSULTAN

Diperiksa/ Disetujui Oleh: Dihitung Oleh:


Team Leader Estimator,

…………….. …………….
REKAPITULASI

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA UMUM


PEKERJAAN : PEMBANGUNAN PAGAR KUBURAN DUSUN B GP. BLANG POROH
LOKASI : DESA BLANG POROH KECAMATAN MUARA DUA KOTA LHOKSEUMAWE
TAHUN ANGGARAN : 2015

No. URAIAN PEKERJAAN TOTAL BIAYA (Rp.)

I. PEKERJAAN PERSIAPAN 2,460,000.00

II. PEKERJAAN TANAH DAN PASIR #REF!

III. PEKERJAAN BETON/BETON BERTULANG #N/A

IV. PEKERJAAN PASANGAN BATA DAN PLASTERAN 19,534,185.00

V PEKERJAAN PAGAR BRC 48,130,000.00

Total #REF!

Dibulatkan #REF!

Err:511

DiSetujui Oleh Lhokseumawe, Februari 2015


Pejabat Pembuat Komitmen Konsultan Perencana
Dinas Pekerjaan Umum Kota Lhokseumawe CV. KHATACHI KIRA KONSULTAN

…………… AFDHAL
Nip …………… Direktur

Mengetahui/ Menyetujui : Mengetahui :


Kepala Dinas Pekerjaan Umum Kepala Bidang Prongram dan perencanaan
Kota Lhokseumawe Dinas Pekerjaaan Umum
Kota Lhokseumawe

…………… TUTI INDRIANI, ST. MM


Nip …………… Nip. 19680614 199703 2 2002
RENCANA ANGGARAN BIAYA (R A B)

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA UMUM


PEKERJAAN : PEMBANGUNAN PAGAR KUBURAN DUSUN B GP. BLANG POROH
LOKASI : DESA BLANG POROH KECAMATAN MUARA DUA KOTA LHOKSEUMAWE
TAHUN : 2015

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN ANALISA VOLUME
(Rp) (Rp)
I. PEKERJAAN PERSIAPAN
1 Pengukuran Dan Pemasangan Bowplank Taksir 1.000 Ls 700,000.00 700,000.00
2 Laporan dan dokumentasi Taksir 1.000 Ls 1,200,000.00 1,200,000.00
3 Pembersihan Lapangan Taksir 1.000 Ls 260,000.00 260,000.00
4 Papan Nama Proyek Taksir 1.000 Ls 300,000.00 300,000.00
Jumlah 2,460,000.00
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Pondasi Tapak 80 x 80 cm SNI 2835-2008 6.1 #REF! M3 70,250.00 #REF!
2 Galian Tanah Pondasi Menerus SNI 2835-2008 6.1 36.180 M3 70,250.00 2,541,645.00
3 Mungurung Pasir Urug t= 5 cm Bawah Pondasi SNI 2835-2008 6.11 #REF! M3 215,300.00 #REF!
4 Pasangan Batu Kosong (Aanstamping) t = 10 SNI 2836-2008 6.9 5.912 M3 #N/A #N/A
5 Urungan Kembali SNI 2835-2008 6.9 23.360 M3 23,410.00 546,857.60
Jumlah #REF!
III. PEKERJAAN BETON/BETON BERTULANG
1 Pondasi Batu Kali 1 : 4 SNI 2836-2008 6.2 14.832 M3 #N/A #N/A
2 Beton Bertulang Pondasi Tapak Uk. 80 x 80 x 20 cm SUPLEMEN 04 #REF! M3 2,950,510.00 #REF!
3 Beton Bertulang Sloof Uk. 15 x 25 cm SUPLEMEN 01 1.233 M3 5,172,060.00 6,377,149.98
4 Beton Bertulang Kolom Uk. 25 x 25 cm SUPLEMEN 02 2.244 M3 8,520,940.00 19,120,989.36
5 Beton Betulang Kolom 13 x 13 cm SUPLEMEN 03 1.943 M3 5,950,750.00 11,559,331.88
6 Beton Cor Bibir Dinding Bata t = 5 cm SNI 7394-2008 6.4 #REF! M3 982,150.00 #REF!
7 Relief Kolom dan Kepala Kolom Taksir #REF! Unit 250,000.00 #REF!
Jumlah #N/A
IV. PEKERJAAN PASANGAN BATA DAN PLASTERAN
1 Pasangan Bata 1 : 4 SNI 6897-2008 6.9 75.375 M3 129,060.00 9,727,897.50
2 Plasteran Bata 1 : 4 SNI 2837-2008 6.4 150.750 M3 65,050.00 9,806,287.50
Jumlah 19,534,185.00
V. PEKERJAAN PAGAR BRC
Pemasangan Pagar BRC FP 120 HD2. Dia. 6 mm, Uk.0.9 x 2.4 m +
1 Klam dan Baut Pengikat Dia. 14 mm Taksir 285.000 M2 165,000.00 47,025,000.00

2 Pemasangan Tiang Penghubung Pagar BRC TP 120. Dia 2" Taksir 17.000 M1 65,000.00 1,105,000.00
Jumlah 48,130,000.00
JUMLAH TOTAL #N/A
DIBULATKAN #N/A

Lhokseumawe, Februari 2015


Dihitung Oleh
Konsultan Perencana
CV. KHATACHI KIRA KONSULTAN

AFDHAL
Direktur
PERHITUNGAN PEMBESIAN BETON BERTULANG

UKURAN JARAK PANJANG JUMLAH DIAMETER PANJANG/ JUMLAH KG BESI JULAH KG


PEMBESIAN PENULANGAN KG. BESI BEKISTING
LEBAR TINGGI BEUHEL BEUHEL BATANG BESI M3 UNTUK 1 M3 BESI

POKOK 0.15 0.25 4 12 0.8879 26.6667 94.7098


SLOOF 15x25 140.3108 6.667
BEUHEL 0.1 0.2 0.15 0.65 8 0.3946 177.7778 45.6009955556

POKOK 0.25 0.25 6 12 0.8879 16.0000 85.2388


KOLOM 25x25 121.0180 4.000
BEUHEL 0.2 0.2 0.15 0.85 8 0.3946 106.6667 35.7792426667

POKOK 0.8 0.2 18 12 0.8879 6.2500 99.8892


PONDASI TAPAK 80x80x20 CM 130.3081 1.250
BEUHEL 0.75 0.15 0.15 1.85 8 0.3946 41.6667 30.4189333333

POKOK 0.13 0.15 4 10 0.6166 51.2821 126.4821


BALOK 13x15 157.5966 7.692
BEUHEL 0.08 0.1 0.15 0.41 6 0.2220 341.8803 31.1145846154

POKOK 0.25 0.35 8 12 0.8879 11.4286 81.1798


BALOK 25x35 112.7497 4.000
BEUHEL 0.2 0.3 0.15 1.05 8 0.3946 76.1905 31.56992

POKOK 0.15 0.40 8 10 0.6166 16.6667 82.2133


BALOK TANGGA 15x40 123.8681 6.667
BEUHEL 0.1 0.35 0.15 0.95 8 0.3946 111.1111 41.6547555556
UKURAN JARAK PANJANG JUMLAH DIAMETER PANJANG/ JUMLAH KG BESI JULAH KG
PEMBESIAN PENULANGAN KG. BESI BEKISTING
LEBAR TINGGI BEUHEL BEUHEL BATANG BESI M3 UNTUK 1 M3 BESI

POKOK 0.25 0.20 3 10 0.6166 20.0000 36.9960


ANAK TANGGA 25x20 76.4584 4.000
BEUHEL 0.2 0.15 0.15 0.75 8 0.3946 133.3333 39.4624

POKOK 1 0.15 0.15 8 12 0.8879 6.6667 45.3818


PLAT TANGGA T = 15 CM 90.7635 3.333
LAPANGAN 1 0.15 0.15 8 12 0.8879 6.6667 45.3818

POKOK 1 0.12 0.15 8 12 0.8879 8.3333 56.7272


PLAT BORDES T = 12CM 113.4544 4.167
LAPANGAN 1 0.12 0.15 8 12 0.8879 8.3333 56.7272

POKOK 1 0.15 0.15 8 12 0.8879 6.6667 45.3818


PLAT DACK T = 15 CM 90.7635 3.333
LAPANGAN 1 0.15 0.15 8 12 0.8879 6.6667 45.3818

POKOK 1 0.12 0.15 8 12 0.8879 8.3333 56.7272


PLAT DACK T = 12 CM 113.4544 4.167
LAPANGAN 1 0.12 0.15 8 12 0.8879 8.3333 56.7272

POKOK 1 0.10 0.15 8 12 0.8879 10.0000 68.0726


PLAT DACK T = 10 CM 136.1453 5.000
LAPANGAN 1 0.10 0.15 8 12 0.8879 10.0000 68.0726

POKOK 1 0.08 0.15 6 12 0.8879 12.5000 66.5928


PLAT DACK T = 8 CM 133.1856 6.250
LAPANGAN 1 0.08 0.15 6 12 0.8879 12.5000 66.5928
DAFTAR ANALISA

SNI 2835-2008 6.1 : 1 m³ Galian Tanah Biasa Sedalam 1 Meter


: Tenaga Kerja
0.750 OH Pekerja @ Rp. 90,000.00 Rp. 67,500.00
0.025 OH Mandor @ Rp. 110,000.00 Rp. 2,750.00
Jumlah Rp. 70,250.00
Dibulatkan Rp. 70,250.00

SNI 2835-2008 6.9 : 1 m3 Urugan Kembali Galian


0.250 OH Pekerja @ Rp. 90,000.00 Rp. 22,500.00
0.008 OH Mandor @ Rp. 110,000.00 Rp. 916.67
Jumlah Rp. 23,416.67
Dibulatkan Rp. 23,410.00

SNI 2835-2008 6.11 : 1 m³ Mengurug Pasir Urug


1.200 m3 Pasir Urug @ Rp. 156,000.00 Rp. 187,200.00
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.010 OH Mandor @ Rp. 110,000.00 Rp. 1,100.00
Jumlah Rp. 215,300.00
Dibulatkan Rp. 215,300.00

SNI 2835-2008 6.11a : 1 m³ Mengurug Tanah Urug


1.200 m3 Tanah Urug @ Rp. 62,400.00 Rp. 74,880.00
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.010 OH Mandor @ Rp. 110,000.00 Rp. 1,100.00
Jumlah Rp. 102,980.00
Dibulatkan Rp. 102,980.00

SNI 2836-2008 6.2 : 1 m³ Memasang Pondasi Batu Kali, Campuran 1 PC : 4 PP


: Bahan
1.200 m3 Batu Kali @ Rp. #N/A Rp. #N/A
163.000 kg Semen Portland @ Rp. 1,950.00 Rp. 317,850.00
0.520 m3 Pasir Pasang @ Rp. 216,000.00 Rp. 112,320.00
: Tenaga Kerja
1.500 OH Pekerja @ Rp. 90,000.00 Rp. 135,000.00
0.750 OH Tukang @ Rp. 110,000.00 Rp. 82,500.00
0.075 OH Kepala Tukang @ Rp. 170,000.00 Rp. 12,750.00
0.075 OH Mandor @ Rp. 110,000.00 Rp. 8,250.00
Jumlah Rp. #N/A
Dibulatkan Rp. #N/A

SNI 2836-2008 6.9 : 1 m³ Memasang Batu Kosong (anstamping)


: Bahan
1.200 m3 Batu Kali @ Rp. #N/A Rp. #N/A
0.432 m3 Pasir Urug @ Rp. 156,000.00 Rp. 67,392.00
: Tenaga Kerja
0.780 OH Pekerja @ Rp. 90,000.00 Rp. 70,200.00
0.390 OH Tukang @ Rp. 110,000.00 Rp. 42,900.00
0.039 OH Kepala Tukang @ Rp. 170,000.00 Rp. 6,630.00
0.039 OH Mandor @ Rp. 110,000.00 Rp. 4,290.00
Jumlah Rp. #N/A
Dibulatkan Rp. #N/A

SNI 6897-2008 6.7 : 1 m2 Memasang Dinding Bata Merah Ukuran (5 x 11 x 22) cm Tebal 1/2 Bata, Campuran Spesi 1 PC : 2 PP
: Bahan
70.000 Buah Batu Bata @ Rp. 800.00 Rp. 56,000.00
18.950 kg Semen Portland @ Rp. 1,950.00 Rp. 36,952.50
0.038 m3 Pasir Pasang @ Rp. 216,000.00 Rp. 8,208.00
: Tenaga Kerja
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.100 OH Tukang @ Rp. 110,000.00 Rp. 11,000.00
0.010 OH Kepala Tukang @ Rp. 170,000.00 Rp. 1,700.00
0.015 OH Mandor @ Rp. 110,000.00 Rp. 1,650.00
Jumlah Rp. 142,510.50
Dibulatkan Rp. 142,510.00
SNI 6897-2008 6.9 : 1 m2 Memasang Dinding Bata Merah Ukuran (5 x 11 x 22) cm Tebal 1/2 Bata, Campuran Spesi 1 PC : 4 PP
: Bahan
70.000 Buah Batu Bata @ Rp. 800.00 Rp. 56,000.00
11.500 kg Semen Portland @ Rp. 1,950.00 Rp. 22,425.00
0.043 m3 Pasir Pasang @ Rp. 216,000.00 Rp. 9,288.00
: Tenaga Kerja
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.100 OH Tukang @ Rp. 110,000.00 Rp. 11,000.00
0.010 OH Kepala Tukang @ Rp. 170,000.00 Rp. 1,700.00
0.015 OH Mandor @ Rp. 110,000.00 Rp. 1,650.00
Jumlah Rp. 129,063.00
Dibulatkan Rp. 129,060.00
SNI 2837-2008 6.2 : 1 m² Membuat Plesteran 1 PC : 2 PP, Tebal 15 mm
: Bahan
10.224 Kg Semen Portland @ Rp. 1,950.00 Rp. 19,936.80
0.020 M3 Pasir Pasang @ Rp. 216,000.00 Rp. 4,320.00
: Tenaga Kerja
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.150 OH Tukang @ Rp. 110,000.00 Rp. 16,500.00
0.015 OH Kepala Tukang @ Rp. 170,000.00 Rp. 2,550.00
0.015 OH Mandor @ Rp. 110,000.00 Rp. 1,650.00
Jumlah Rp. 71,956.80
Dibulatkan Rp. 71,950.00

SNI 2837-2008 6.4 : 1 m² Membuat Plesteran 1 PC : 4 PP, Tebal 15 mm


: Bahan
6.240 Kg Semen Portland @ Rp. 1,950.00 Rp. 12,168.00
0.024 M3 Pasir Pasang @ Rp. 216,000.00 Rp. 5,184.00
: Tenaga Kerja
0.300 OH Pekerja @ Rp. 90,000.00 Rp. 27,000.00
0.150 OH Tukang @ Rp. 110,000.00 Rp. 16,500.00
0.015 OH Kepala Tukang @ Rp. 170,000.00 Rp. 2,550.00
0.015 OH Mandor @ Rp. 110,000.00 Rp. 1,650.00
Jumlah Rp. 65,052.00
Dibulatkan Rp. 65,050.00

VIII. PEKERJAAN BETON UNUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN


SNI 7394-2008 6.4 : 1 m3 Membuat Beton Mutu F'C = 7,4 MPa (K 100), Slump (12 ± 2) cm, w/c = 0,87
: Bahan
230.000 kg Semen Portland @ Rp. 1,950.00 Rp. 448,500.00
893.000 kg Pasir Beton @ Rp. 162.86 Rp. 145,431.43
1027.000 kg Kerikil Beton @ Rp. 222.22 Rp. 228,222.22
200.000 Liter Air @ Rp. 100.00 Rp. 20,000.00
: Tenaga Kerja
1.200 OH Pekerja @ Rp. 90,000.00 Rp. 108,000.00
0.200 OH Tukang @ Rp. 110,000.00 Rp. 22,000.00
0.020 OH Kepala Tukang @ Rp. 170,000.00 Rp. 3,400.00
0.060 OH Mandor @ Rp. 110,000.00 Rp. 6,600.00
Jumlah Rp. 982,153.65
Dibulatkan Rp. 982,150.00

SNI 7394-2008 6.5 : 1 m3 Membuat Beton Mutu F'C = 14.5 MPa (K 175), Slump (12 ± 2) cm, w/c = 0,66
: Bahan
326.000 kg Semen Portland @ Rp. 1,950.00 Rp. 635,700.00
760.000 kg Pasir Beton @ Rp. 162.86 Rp. 123,771.43
1029.000 kg Kerikil Beton @ Rp. 222.22 Rp. 228,666.67
215.000 Liter Air @ Rp. 100.00 Rp. 21,500.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 110,000.00 Rp. 30,250.00
0.028 OH Kepala Tukang @ Rp. 170,000.00 Rp. 4,760.00
0.083 OH Mandor @ Rp. 110,000.00 Rp. 9,130.00
Jumlah Rp. 1,202,278.10
Dibulatkan Rp. 1,202,270.00
SNI 7394-2008 6.7 : 1 m3 Membuat Beton Mutu F'C = 19,3 MPa (K 225), Slump (12 ± 2) cm, w/c = 0,58
: Bahan
371.000 kg Semen Portland @ Rp. 1,950.00 Rp. 723,450.00
698.000 kg Pasir Beton @ Rp. 162.86 Rp. 113,674.29
1047.000 kg Kerikil Beton @ Rp. 222.22 Rp. 232,666.67
215.000 Liter Air @ Rp. 100.00 Rp. 21,500.00
: Tenaga Kerja
1.650 OH Pekerja @ Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang @ Rp. 110,000.00 Rp. 30,250.00
0.028 OH Kepala Tukang @ Rp. 170,000.00 Rp. 4,760.00
0.083 OH Mandor @ Rp. 110,000.00 Rp. 9,130.00
Jumlah Rp. 1,283,930.95
Dibulatkan Rp. 1,283,930.00
SNI 7394-2008 6.17a : 1 Kg Pembesian Dengan Besi Polos
: Bahan
1.050 Kg Besi Beton Polos @ Rp. 14,400.00 Rp. 15,120.00
0.015 Kg Kawat Beton @ Rp. 25,200.00 Rp. 378.00
: Tenaga Kerja
0.007 OH Pekerja @ Rp. 90,000.00 Rp. 630.00
0.007 OH Tukang @ Rp. 110,000.00 Rp. 770.00
0.0007 OH Kepala Tukang @ Rp. 170,000.00 Rp. 119.00
0.0004 OH Mandor @ Rp. 110,000.00 Rp. 44.00
Jumlah Rp. 17,061.00
Dibulatkan Rp. 17,060.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
SNI 7394-2008 6.20 : 1 m2 Memasang Bekisting Untuk Pondasi
: Bahan
0.040 m3 Kayu Kelas III @ Rp. 6,240,000.00 Rp. 249,600.00
0.300 Kg Paku @ Rp. 24,000.00 Rp. 7,200.00
0.100 Liter Minyak Bekisting @ Rp. 3,500.00 Rp. 350.00
: Tenaga Kerja
0.520 OH Pekerja @ Rp. 90,000.00 Rp. 46,800.00
0.260 OH Tukang @ Rp. 110,000.00 Rp. 28,600.00
0.026 OH Kepala Tukang @ Rp. 170,000.00 Rp. 4,420.00
0.026 OH Mandor @ Rp. 110,000.00 Rp. 2,860.00
Jumlah Rp. 339,830.00
Asumsi 3 x Pakai Jumlah Rp. 113,276.67
Dibulatkan Rp. 113,270.00

SNI 7394-2008 6.21 : 1 m2 Memasang Bekisting Untuk Sloof


: Bahan
0.045 m3 Kayu Kelas III @ Rp. 6,240,000.00 Rp. 280,800.00
0.300 Kg Paku @ Rp. 24,000.00 Rp. 7,200.00
0.100 Liter Minyak Bekisting @ Rp. 3,500.00 Rp. 350.00
: Tenaga Kerja
0.520 OH Pekerja @ Rp. 90,000.00 Rp. 46,800.00
0.260 OH Tukang @ Rp. 110,000.00 Rp. 28,600.00
0.026 OH Kepala Tukang @ Rp. 170,000.00 Rp. 4,420.00
0.026 OH Mandor @ Rp. 110,000.00 Rp. 2,860.00
Jumlah Rp. 371,030.00
Asumsi 3 x Pakai Jumlah Rp. 123,676.67
Dibulatkan Rp. 123,670.00

SNI 7394-2008 6.22 : 1 m2 Memasang Bekisting Untuk Kolom


: Bahan
0.040 m3 Kayu Kelas III @ Rp. 6,240,000.00 Rp. 249,600.00
0.400 Kg Paku @ Rp. 24,000.00 Rp. 9,600.00
0.200 Liter Minyak Bekisting @ Rp. 3,500.00 Rp. 700.00
0.015 m3 Balok Kayu Kelas II @ Rp. 9,840,000.00 Rp. 147,600.00
0.350 Lembar Plywood 9 mm @ Rp. 181,500.00 Rp. 63,525.00
2.000 Batang Dolken Kayu Galam, ø (8-10) cm, Panjang 4 m @ Rp. 14,400.00 Rp. 28,800.00
: Tenaga Kerja
0.660 OH Pekerja @ Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang @ Rp. 110,000.00 Rp. 36,300.00
0.033 OH Kepala Tukang @ Rp. 170,000.00 Rp. 5,610.00
0.033 OH Mandor @ Rp. 110,000.00 Rp. 3,630.00
Jumlah Rp. 604,765.00
Asumsi 3 x Pakai Jumlah Rp. 201,588.33
Dibulatkan Rp. 201,580.00

SNI 7394-2008 6.23 : 1 m2 Memasang Bekisting Untuk Balok


: Bahan
0.040 m3 Kayu Kelas III @ Rp. 6,240,000.00 Rp. 249,600.00
0.400 Kg Paku @ Rp. 24,000.00 Rp. 9,600.00
0.200 Liter Minyak Bekisting @ Rp. 3,500.00 Rp. 700.00
0.018 m3 Balok Kayu Kelas II @ Rp. 9,840,000.00 Rp. 177,120.00
0.350 Lembar Plywood 9 mm @ Rp. 181,500.00 Rp. 63,525.00
2.000 Batang Dolken Kayu Galam, ø (8-10) cm, Panjang 4 m @ Rp. 14,400.00 Rp. 28,800.00
: Tenaga Kerja
0.660 OH Pekerja @ Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang @ Rp. 110,000.00 Rp. 36,300.00
0.033 OH Kepala Tukang @ Rp. 170,000.00 Rp. 5,610.00
0.033 OH Mandor @ Rp. 110,000.00 Rp. 3,630.00
Jumlah Rp. 634,285.00
Asumsi 3 x Pakai Jumlah Rp. 211,428.33
Dibulatkan Rp. 211,420.00

SNI 7394-2008 6.24 : 1 m2 Memasang Bekisting Untuk Plat Lantai


: Bahan
0.040 m3 Kayu Kelas III @ Rp. 6,240,000.00 Rp. 249,600.00
0.400 Kg Paku @ Rp. 24,000.00 Rp. 9,600.00
0.200 Liter Minyak Bekisting @ Rp. 3,500.00 Rp. 700.00
0.015 m3 Balok Kayu Kelas II @ Rp. 9,840,000.00 Rp. 147,600.00
0.350 Lembar Plywood 9 mm @ Rp. 181,500.00 Rp. 63,525.00
6.000 Batang Dolken Kayu Galam, ø (8-10) cm, Panjang 4 m @ Rp. 14,400.00 Rp. 86,400.00
: Tenaga Kerja
0.660 OH Pekerja @ Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang @ Rp. 110,000.00 Rp. 36,300.00
0.033 OH Kepala Tukang @ Rp. 170,000.00 Rp. 5,610.00
0.033 OH Mandor @ Rp. 110,000.00 Rp. 3,630.00
Jumlah Rp. 662,365.00
Asumsi 3 x Pakai Jumlah Rp. 220,788.33
Dibulatkan Rp. 220,780.00

Pekerjaan Lain-lain : Untuk Membongkar Cetakan dan Menyiram Beton Diperlukan


Tenaga Kerja
1.000 OH Pekerja @ Rp. 90,000.00 Rp. 90,000.00
Jumlah Rp. 90,000.00
Dibulatkan Rp. 90,000.00

SUPLEMEN 01 1 m3 Sloof 15/25 cm


1.000 m3 SNI 7394-2008 6.7 @ Rp. 1,283,930.00 Rp. 1,283,930.00
125.979 Kg SNI 7394-2008 6.17a @ Rp. 17,060.00 Rp. 2,149,200.84
13.333 M2 SNI 7394-2008 6.21 @ Rp. 123,670.00 Rp. 1,648,933.33
1.000 OH Pekerjaan Lain-lain @ Rp. 90,000.00 Rp. 90,000.00
Jumlah Rp. 5,172,064.18
Dibulatkan Rp. 5,172,060.00

SUPLEMEN 02 1 m3 Kolom 25/25 cm


1.000 m3 SNI 7394-2008 6.7 @ Rp. 1,283,930.00 Rp. 1,283,930.00
182.615 Kg SNI 7394-2008 6.17a @ Rp. 17,060.00 Rp. 3,115,418.46
20.000 M2 SNI 7394-2008 6.22 @ Rp. 201,580.00 Rp. 4,031,600.00
1.000 OH Pekerjaan Lain-lain @ Rp. 90,000.00 Rp. 90,000.00
Jumlah Rp. 8,520,948.46
Dibulatkan Rp. 8,520,940.00

SUPLEMEN 03 : 1 m3 Kolom 15/15 cm


1.000 m3 SNI 7394-2008 6.7 @ Rp. 1,283,930.00 Rp. 1,283,930.00
144.351 Kg SNI 7394-2008 6.17a @ Rp. 17,060.00 Rp. 2,462,625.96
10.000 M2 SNI 7394-2008 6.23 @ Rp. 211,420.00 Rp. 2,114,200.00
1.000 OH Pekerjaan Lain-lain @ Rp. 90,000.00 Rp. 90,000.00
Jumlah Rp. 5,950,755.96
Dibulatkan Rp. 5,950,750.00

SUPLEMEN 04 : 1 m3 Pondasi Tapak 80 x 80 x 20 cm


1.000 m3 SNI 7394-2008 6.7 @ Rp. 1,283,930.00 Rp. 1,283,930.00
59.217 Kg SNI 7394-2008 6.17a @ Rp. 17,060.00 Rp. 1,010,236.33
5.000 M2 SNI 7394-2008 6.20 @ Rp. 113,270.00 Rp. 566,350.00
1.000 OH Pekerjaan Lain-lain @ Rp. 90,000.00 Rp. 90,000.00
Jumlah Rp. 2,950,516.33
Dibulatkan Rp. 2,950,510.00

Konsultan Perencana
CV. KHATACHI KIRA KONSULTAN

AFDHAL
Direktur