Program Pengembangan Kecamatan (PPK) Fase II

Regional Manajemen Unit 1 Prov. NAD

ANALISA HARGA SATUAN PEKERJAAN

Propinsi : Nanggroe ACEH Darussalam


Kabupaten : Edisi : Nope

A.1 1 M3 GALIAN TANAH BIASA


0.750 OH Pekerja @ Rp. 14,000.00 Rp.
0.025 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
A.17a Urugan Kembali diambil 1/2 A.1 Rp. 10,885.00 Rp.

A.1.a 10 M2 PEMBERSIHAN LAPANGAN


0.750 OH Pekerja @ Rp. 14,000.00 Rp.
0.025 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Untuk 1 M2 = 1/10 x Rp. 10,885.00 Rp.

A.2 1 M3 GALIAN TANAH KERAS


1.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.033 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.

A.4 1 M3 GALIAN TANAH LUMPUR


1.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.050 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.

A.18 1 M3 TIMBUNAN TANAH URUG


1.200 M3 Tanah Urug (Ganti Rugi) @ Rp. 15,000.00 Rp.
0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

A.18.a 1 M3 TIMBUNAN TANAH URUG


1.200 M3 Tanah Urug (Timbunan Pilihan) @ Rp. 25,000.00 Rp.
0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

A.18.b 1 M3 LAPISAN PASIR URUG


1.200 M3 Pasir Beton @ Rp. 45,500.00 Rp.
0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

A.18.c 1 M3 LAPISAN KORAL / KERKIL


1.200 M3 Kerikil @ Rp. 46,000.00 Rp.
0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

B.1 1 M2 MEMASANG LEMPENGAN RUMPUT


1.000 M2 Lempengan Rumput @ Rp. 3,000.00 Rp.
0.150 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
C.2 1 M3 MENGISI GALIAN PERMUKAAN JALAN ( TEBAL 0,20 M)
0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.015 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

C.6.a 1 M3 JALAN KERIKIL TEBAL 15 CM, LEBAR 4 M TERDIRI ATAS DUA LAPIS
LAPIS PERTAMA TEBAL 11 CM, BATU KALI. DAN LAPIS KE DUA 4 CM KERIKIL
0.200 M3 Kerkil Sungai @ Rp. 46,000.00 Rp.
0.500 M3 Batu Kali @ Rp. 60,000.00 Rp.
0.200 M3 Pasir Pasangan @ Rp. 45,500.00 Rp.
2.400 OH Pekerja @ Rp. 14,000.00 Rp.
0.120 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

E.13 1 M' MEMANJANG TIANG PADA TANAH LUNAK


1.200 M' Kayu Bakau/Keras @ Rp. 4,000.00 Rp.
0.040 M3 Tukang Kayu @ Rp. 17,500.00 Rp.
0.004 M3 Kepala Tukang @ Rp. 19,950.00 Rp.
0.180 OH Pekerja @ Rp. 14,000.00 Rp.
0.043 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.1 1 M3 PEKERJAAN BALOK GELAGAR / BALOK LANTAI JEMBATAN


15.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
1.500 OH Kepala Tukang @ Rp. 19,950.00 Rp.
5.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.250 OH Mandor @ Rp. 15,400.00 Rp.
1.100 M3 Kayu Gelagar @ Rp. 2,100,000.00 Rp.
J U M LA H Rp

F.3 1 M3 PEKERJAAN KAYU SANDARAN /LEANING JEMBATAN :


24.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
2.400 OH Kepala Tukang @ Rp. 19,950.00 Rp.
8.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.400 OH Mandor @ Rp. 15,400.00 Rp.
1.100 M3 Kayu Jembatan @ Rp. 2,100,000.00 Rp.
J U M LA H Rp

F.8 1 M2 CETAKAN BETON


0.500 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.050 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.200 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
0.040 Kg Paku @ Rp. 4,500.00 Rp.
0.040 M3 Kayu Stut @ Rp. 1,200,000.00 Rp.
1.000 M2 Plywood 4 Cm @ Rp. 41,500.00 Rp.
J U M LA H Rp

F.8.a 1 M2 PEMASANGAN BOUWPLANK


0.500 OH Tukang Kayu @ Rp. 17,500.00Rp.
0.050 OH Kepala Tukang @ Rp. 19,950.00Rp.
0.200 OH Buruh Terlatih @ Rp. 14,000.00Rp.
0.010 OH Mandor @ Rp. 15,400.00Rp.
0.040 M3 Kayu/Papan Bekisting @ Rp. 1,200,000.00Rp.
J U M LA H Rp.
Untuk 1M' Pemasangan Bouwplank 0,2 x Rp. 60,701.50 Rp.

F.9 1 M2 PEMASANGAN KAYU LANTAI JEMBATAN :


0.750 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.075 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.250 OH Buruh Terlatih @ Rp. 14,000.00 Rp.
0.013 OH Mandor @ Rp. 15,400.00 Rp.
0.069 M3 Kayu Jembatan @ Rp. 2,100,000.00 Rp.
10.000 Kg Baut Jembatan @ Rp. 2,000.00 Rp.
J U M LA H Rp
F.19 1 M2 KAYU GORDING :
0.100 OH Tukang @ Rp. 17,500.00 Rp.
0.010 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.070 OH Mandor @ Rp. 15,400.00 Rp.
0.009 M3 Kayu Semantok @ Rp. 2,100,000.00 Rp.
0.100 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp

F.21 1 M3 LISPLANK PAPAN


0.280 OH Pekerja @ Rp. 14,000.00 Rp.
0.014 OH Mandor @ Rp. 15,400.00 Rp.
0.800 OH Tukang @ Rp. 17,500.00 Rp.
0.080 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.020 M2 Kayu Papan Merbo @ Rp. 2,100,000.00 Rp.
0.100 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp

F.22 1 M3 KERANGKA ATAP KUDA-KUDA


1.100 M3 Kayu Rangka @ Rp. 2,100,000.00 Rp.
0.290 Kg Paku Biasa @ Rp. 4,500.00 Rp.
24.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
2.400 OH Kepala Tukang @ Rp. 19,950.00 Rp.
8.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.400 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.26 1 M3 KERANGKA KUSEN PINTU/JENDELA


1.000 M3 Kayu Kozen @ Rp. 2,100,000.00 Rp.
0.250 Kg Paku Biasa @ Rp. 4,500.00 Rp.
30.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
3.000 OH Kepala Tukang @ Rp. 19,950.00 Rp.
10.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.500 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.33 1 M2 PINTU/JENDELA PANIL


0.044 M3 Kayu Kozen @ Rp. 2,100,000.00 Rp.
0.250 KG Paku Biasa @ Rp. 4,500.00 Rp.
7.500 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.750 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.125 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.33.a 1 M2 PINTU PANIL LAPIS SENG


0.044 M3 Kayu Kosen @ Rp. 2,100,000.00 Rp.
1.000 M2 Seng Plat BJLS 0.20 @ Rp. 30,000.00 Rp.
0.200 Kg Paku Biasa @ Rp. 4,500.00 Rp.
7.500 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.750 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.125 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
F.33.b 1 M2 PEKERJAAN PINTU LAPIS SENG
4.500 OH Tukang @ Rp. 17,500.00 Rp.
0.450 OH Kepala Tukang @ Rp. 19,950.00 Rp.
1.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.043 OH Mandor @ Rp. 15,400.00 Rp.
0.028 M3 Kayu Rangka @ Rp. 1,200,000.00 Rp.
0.700 Lbr Seng Plat @ Rp. 30,000.00 Rp.
0.500 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp

F.34 1 M2 PINTU PINTU / JENDELA JALUSI


0.064 M3 Kayu Meuranti @ Rp. 2,100,000.00 Rp.
0.200 Kg Paku Biasa @ Rp. 4,500.00 Rp.
9.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.900 OH Kepala Tukang @ Rp. 19,950.00 Rp.
3.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.150 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.36 1 M2 PINTU / JENDELA KACA


0.035 M3 Kayu Kozen @ Rp. 2,100,000.00 Rp.
1.000 M2 Kaca Polos @ Rp. 45,000.00 Rp.
0.200 Kg Paku Biasa @ Rp. 4,500.00 Rp.
6.000 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.600 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.100 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.37 1 M2 DINDING PAPAN


0.020 M2 Papan Meuranti @ Rp. 2,100,000.00 Rp.
0.200 Kg Paku Biasa @ Rp. 4,500.00 Rp.
0.800 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.080 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.280 OH Pekerja @ Rp. 14,000.00 Rp.
0.014 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

F.01a 1 M2 PLAFOND MULTIPLEK 4 MM


0.015 M3 Kayu Rangka @ Rp. 2,100,000.00 Rp
1.000 M2 Multiplek 4 MM @ Rp. 41,500.00 Rp
0.250 Kg Paku @ Rp. 4,500.00 Rp
0.800 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.080 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.280 OH Pekerja @ Rp. 14,000.00 Rp
0.014 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

F.01b 1 M2 PLAFOND ASBES QUALITY 100 x 100 CM


0.015 M3 Kayu Rangka 5/7 CM @ Rp. 2,100,000.00 Rp
2.000 M' Kayu Lat 1/3 CM @ Rp. 2,100.00 Rp
1.000 M2 Asbes / Eterniet @ Rp. 5,355.00 Rp
0.250 Kg Paku @ Rp. 4,500.00 Rp
0.800 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.080 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.280 OH Pekerja @ Rp. 14,000.00 Rp
0.014 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp
G.2 1 M2 PASANGAN BATU KOSONG
1.200 M2 Batu Gunung/Kali @ Rp. 60,000.00 Rp.
1.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.075 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

G.5b 3 M3 PASANGAN BRONJONG ( KAWAT 4.00" MM )


2.200 OH Penganyam @ Rp. 17,500.00 Rp.
1.800 OH Pekerja Penganyam @ Rp. 12,250.00 Rp.
0.080 OH Mandor Penganyam @ Rp. 15,400.00 Rp.
4.500 OH Pekerja Pengisi @ Rp. 12,250.00 Rp.
0.075 OH Mandor Pengisi @ Rp. 15,400.00 Rp.
3.000 M3 Batu Kali @ Rp. 60,000.00 Rp.
45.000 Kg Kawat Galvano (bronjong) @ Rp. 9,500.00 Rp.
J U M LA H Rp
Untuk 1 M3 Diambil Upah 1/3 Rp. 725,562.00 Rp.

G.7 1 M2 PASANG ROSSTER (KERAWANG BETON ) 1 PC : 3 PS


16.000 Bh Roster Angin 25 x 25 @ Rp. 1,800.00 Rp.
0.101 Zak Semen PC @ Rp. 23,000.00 Rp.
0.010 M3 Pasir Beton @ Rp. 45,500.00 Rp.
0.100 OH Tukang @ Rp. 17,500.00 Rp.
0.010 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.025 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

G.14 1 M3 PEREKAT 1 : 2 PC
14.688 Zak Semen PC @ Rp. 23,000.00 Rp.
0.950 M2 Pasir Pasangan @ Rp. 45,500.00 Rp.
J U M LA H Rp

G.16 1 M3 PEREKAT 1 : 3 PC
11.250 Zak Semen PC @ Rp. 23,000.00 Rp.
1.080 M2 Pasir Pasangan @ Rp. 45,500.00 Rp.
J U M LA H Rp

G.32h 1 M3 PASANGAN BATU KALI 1 : 4


1.200 M3 Batu Gunung/Kali @ Rp. 60,000.00 Rp.
4.040 Zak Semen PC @ Rp. 23,000.00 Rp.
0.486 M3 Pasir Pasangan @ Rp. 45,500.00 Rp.
1.200 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.120 OH Kepala Tukang @ Rp. 19,950.00 Rp.
3.600 OH Pekerja @ Rp. 14,000.00 Rp.
0.180 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

G.32m 1 M3 PASANGAN BATU KALI 1 : 3


1.200 M3 Batu Gunung/Kali @ Rp. 60,000.00 Rp.
5.062 Zak Semen PC @ Rp. 23,000.00 Rp.
0.486 M3 Pasir Pasangan @ Rp. 45,500.00 Rp.
1.200 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.120 OH Kepala Tukang @ Rp. 19,950.00 Rp.
3.600 OH Pekerja @ Rp. 14,000.00 Rp.
0.180 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

G.33h 1 M3 PASANGAN BATU BATA 1 : 4


650.000 Bh Batu Bata @ Rp. 210.00 Rp.
2.024 Zak, Semen PC @ Rp. 23,000.00 Rp.
0.324 M3 Pasir Pasangan @ Rp. 45,500.00 Rp.
1.500 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.150 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.225 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
G.33m 1 M3 PASANGAN BATU BATA 1 : 2
650.000 Bh Batu Bata @ Rp. 210.00 Rp
3.150 Zak, Semen PC @ Rp. 23,000.00 Rp
0.380 M3 Pasir Pasangan @ Rp. 45,500.00 Rp
1.500 OH Tukang Batu @ Rp. 17,500.00 Rp
0.150 OH Kepala Tukang @ Rp. 19,950.00 Rp
2.000 OH Pekerja @ Rp. 14,000.00 Rp
0.225 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.41 1 M3 BETON COR 1 : 2 : 3


0.820 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.540 M3 Pasir Beton @ Rp. 45,500.00 Rp
8.500 Zak Semen PC @ Rp. 23,000.00 Rp
1.000 OH Tukang Batu @ Rp. 17,500.00 Rp
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp
6.000 OH Pekerja @ Rp. 14,000.00 Rp
0.300 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.43 1 M3 BETON COR 1 : 3 : 5


0.910 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.546 M3 Pasir Beton @ Rp. 45,500.00 Rp
5.690 Zak Semen PC @ Rp. 23,000.00 Rp
0.500 OH Tukang Batu @ Rp. 17,500.00 Rp
0.050 OH Kepala Tukang @ Rp. 19,950.00 Rp
6.000 OH Pekerja @ Rp. 14,000.00 Rp
0.300 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.43.a 1 M3 BETON CYCLOPE 1 : 3 : 5


0.700 M3 Batu Kali @ Rp. 60,000.00 Rp
0.650 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.400 M3 Pasir Beton @ Rp. 45,500.00 Rp
4.063 Zak Semen PC @ Rp. 23,000.00 Rp
1.000 OH Tukang Batu @ Rp. 17,500.00 Rp
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp
6.000 OH Pekerja @ Rp. 14,000.00 Rp
0.300 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.44 1 M3 BETON COR 1 : 3 : 5


1.000 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.500 M3 Pasir Beton @ Rp. 45,500.00 Rp
5.300 Zak Semen PC @ Rp. 23,000.00 Rp
6.000 OH Tukang Batu @ Rp. 17,500.00 Rp
0.300 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.500 OH Pekerja @ Rp. 14,000.00 Rp
0.050 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.44.a 1 M2 BETON LANTAI KERJA 1 : 3 : 5 = 7 CM + PLESTARAN 1 : 3, T = 6 MM


0.070 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.044 M3 Pasir Beton @ Rp. 45,500.00 Rp
0.455 Zak Semen PC @ Rp. 23,000.00 Rp
0.135 OH Tukang Batu @ Rp. 17,500.00 Rp
0.014 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.720 OH Pekerja @ Rp. 14,000.00 Rp
0.036 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.50h 1 M2 PLESTERAN 1 : 2 TEBAL 10 MM


0.008 M3 Pasir Pasangan @ Rp. 45,500.00 Rp
0.143 Zak Semen PC @ Rp. 23,000.00 Rp
0.150 OH Tukang Batu @ Rp. 17,500.00 Rp
0.015 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.400 OH Pekerja @ Rp. 14,000.00 Rp
0.020 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp
G.50k 1 M2 PLESTERAN 1 : 3 TEBAL 10 MM
0.013 M3 Pasir Pasangan @ Rp. 45,500.00 Rp
0.135 Zak Semen PC @ Rp. 23,000.00 Rp
0.150 OH Tukang Batu @ Rp. 17,500.00 Rp
0.015 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.400 OH Pekerja @ Rp. 14,000.00 Rp
0.020 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.50q 1 M2 PLESTERAN 1 : 4 TEBAL 10 MM


0.014 M3 Pasir Pasangan @ Rp. 45,500.00 Rp
0.087 Zak Semen PC @ Rp. 23,000.00 Rp
0.200 OH Tukang Batu @ Rp. 17,500.00 Rp
0.020 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.400 OH Pekerja @ Rp. 14,000.00 Rp
0.020 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.51d 1 M2 SIARAN DENGAN 1 : 2


0.009 M3 Pasir Pasangan @ Rp. 45,500.00 Rp
0.131 Zak Semen PC @ Rp. 23,000.00 Rp
0.120 OH Tukang Batu @ Rp. 17,500.00 Rp
0.012 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.360 OH Pekerja @ Rp. 14,000.00 Rp
0.018 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.53 100 M2 KAPUR DINDING / BETON :


0.100 Ton Kapur @ Rp. 525,000.00 Rp.
1.000 OH Tukang @ Rp. 17,500.00 Rp.
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp.
6.000 OH Pekerja @ Rp. 14,000.00 Rp.
J U M LA H Rp
Untuk 1 M2 Diambil Upah 1/100 @ Rp. 155,995.00 Rp.

G.60 1 M2 MEMASANG LANTAI DARI INTERBLOCK


66.000 Bh Inter Block @ Rp. 1,200.00 Rp.
0.100 M3 Pasir @ Rp. 45,500.00 Rp.
0.100 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.500 OH Pekerja @ Rp. 14,000.00 Rp.
J U M LA H Rp

G.67 1 M2 LANTAI BETON COR 1 : 3 : 5


0.070 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.044 M3 Pasir Beton @ Rp. 45,500.00 Rp
0.455 Zak Semen PC @ Rp. 23,000.00 Rp
0.135 OH Tukang Batu @ Rp. 17,500.00 Rp
0.014 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.720 OH Pekerja @ Rp. 14,000.00 Rp
0.036 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

G.67.a 1 M2 BETON COR 1 : 3 : 6, T = 10 CM


0.100 M3 Kerikil Beton @ Rp. 46,000.00 Rp
0.630 M3 Pasir Beton @ Rp. 45,500.00 Rp
0.640 Zak Semen PC @ Rp. 23,000.00 Rp
0.192 OH Tukang Batu @ Rp. 17,500.00 Rp
0.019 OH Kepala Tukang @ Rp. 19,950.00 Rp
1.028 OH Pekerja @ Rp. 14,000.00 Rp
0.051 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

H.06 1 M2 ATAP SENG GELOMBANG


0.600 Lbr Seng BJLS 30 x 8' @ Rp. 33,000.00 Rp
4.000 Bh Paku Seng @ Rp. 13,500.00 Rp
0.200 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.020 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.100 OH Pekerja @ Rp. 14,000.00 Rp
0.005 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp
H.08 1 M2 MEMASANG ATAP GENTENG
5.250 Lbr Seng BJLS 30 x 8' @ Rp. 3,000.00 Rp
4.000 On Skrup @ Rp. 1,350.00 Rp
0.200 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.020 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.100 OH Pekerja @ Rp. 14,000.00 Rp
0.005 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

H.10 10 M' BUBUNGAN ATAP SENG


6.000 Lbr Seng Plat BJLS 0,30 @ Rp. 19,750.00 Rp
0.050 Kg Paku Seng @ Rp. 13,500.00 Rp
0.250 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.025 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.250 OH Pekerja @ Rp. 14,000.00 Rp
J U M LA H Rp
1 M' Bumbungan Seng 0.100 x Rp. 127,548.75 Rp

H.15 1 M1 TALANG PATAHAN ATAP


0.350 Lbr Seng Plat BJLS 20 @ Rp. 19,750.00 Rp
6.000 Bh Paku Seng @ Rp. 13,500.00 Rp
0.600 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.060 OH Kepala Tukang @ Rp. 19,950.00 Rp
0.350 OH Pekerja @ Rp. 14,000.00 Rp
0.018 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp

H.17 10 M' TALANG ATAP SENG


3.000 Lbr Seng Plat BJLS 20 @ Rp. 19,750.00 Rp
0.150 Kg Paku Seng @ Rp. 13,500.00 Rp
5.000 OH Tukang Kayu @ Rp. 17,500.00 Rp
0.500 OH Kepala Tukang @ Rp. 19,950.00 Rp
3.000 OH Pekerja @ Rp. 14,000.00 Rp
0.150 OH Mandor @ Rp. 15,400.00 Rp
J U M LA H Rp
1 M' Bumbungan Seng 0.100 x Rp. 203,060.00 Rp

H.26 1 M2 PEMASANGAN ATAP ASBES GELOMBANG


1.100 m2 Asbes Gelombang @ Rp. 24,000.00 Rp.
4.000 Bh Sekrup Asbes @ Rp. 13,500.00 Rp.
0.400 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.040 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.200 OH Pekerja @ Rp. 14,000.00 Rp.
0.010 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

H.24 1M BUBUNGAN ATAP ASBES GELOMBANG


1.100 M' Rabung Asbes @ Rp. 8,100.00 Rp.
4.000 Bh Sekrup Asbes @ Rp. 13,500.00 Rp.
0.250 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.025 OH Kepala Tukang @ Rp. 19,950.00 Rp.
0.250 OH Pekerja @ Rp. 14,000.00 Rp.
0.013 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

L.4 1 M3 PEMBONGKARAN DINDING TEMBOK


1.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.050 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
Untuk 1 M2 Bongkar Dinding = 0,12 x @ Rp. 14,770.00 Rp.

L.6 10 M2 PENGUPASAN PLESTERAN LAMA


0.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.025 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
Untuk 1 M2 Bongkar Dinding = 0,1 x @ Rp. 7,385.00 Rp.
L.9 10 M2 PEMBONGKARAN ATAP/PLAFOND + RANGKA
0.250 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.025 OH Kepala Tukang @ Rp. 19,950.00 Rp.
1.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.050 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
Untuk 1 M2 Pembongkaran Atap = 0,1 x @ Rp. 19,643.75 Rp.

L.11 10 M2 PEMBONGKARAN LANTAI JEMBATAN


0.600 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.060 OH Kepala Tukang @ Rp. 19,950.00 Rp.
4.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.100 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp
Untuk 1 M2 Diambil Upah 1/10 @ Rp. 69,237.00 Rp.

L.12 1 M3 PEMASANGAN LANTAI JEMBATAN


6.000 Kg Tukang Kayu @ Rp. 17,500.00 Rp.
0.600 OH Kepala Tukang @ Rp. 19,950.00 Rp.
4.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.200 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

L.17 1 M2 PASANG KACA MATI BENING 3 MM


1.040 m2 Kaca Bening @ Rp. 45,000.00 Rp.
0.010 Kg Paku @ Rp. 4,500.00 Rp.
4.000 M' Lis. Kayu @ Rp. 2,100.00 Rp.
0.300 OH Tukang Kayu @ Rp. 17,500.00 Rp.
0.030 OH Tukang kepala @ Rp. 19,950.00 Rp.
0.100 OH Pekerja @ Rp. 14,000.00 Rp.
0.050 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp

K.16 10 M2 MENGECAT KAYU 2 KALI


2.250 OH Tukang Cat @ Rp. 17,500.00 Rp.
0.225 OH Tukang kepala @ Rp. 19,950.00 Rp.
1.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.075 OH Mandor @ Rp. 15,400.00 Rp.
2.840 Kg Cat Minyak @ Rp. 25,000.00 Rp.
0.052 Ltr Thinner @ Rp. 9,000.00 Rp.
0.800 Kg Dempul @ Rp. 20,000.00 Rp.
2.000 Lbr Kertas Pasir @ Rp. 1,500.00 Rp.
J U M LA H Rp
Untuk 1 M2 Diambil 1/10 Rp. 156,486.75 Rp

K.23 10 M2 MENGECAT TEMBOK 3 KALI


0.750 OH Tukang Cat @ Rp. 17,500.00 Rp.
0.075 OH Tukang kepala @ Rp. 19,950.00 Rp.
0.500 OH Pekerja @ Rp. 14,000.00 Rp.
0.025 OH Mandor @ Rp. 15,400.00 Rp.
3.146 Kg Cat Tembok @ Rp. 40,000.00 Rp.
0.100 Kg Cat Dasar @ Rp. 5,775.00 Rp.
2.000 Lbr Kertas Pasir @ Rp. 1,500.00 Rp.
J U M LA H Rp
Untuk 1 M2 Diambil 1/10 Rp. 151,423.75 Rp

K.35 1 M2 MENGECAT MENIE 1 KALI


0.100 Kg Cat Menie Rp. 7,000.00 Rp.
0.050 OH Pekerja Rp. 14,000.00 Rp.
0.003 OH Mandor Rp. 15,400.00 Rp.
J U M LA H Rp

K.1+K.23 1 M2 LABURAN RESIDU ( 1 KALI )


0.100 OH Pekerja @ Rp. 14,000.00 Rp.
0.005 OH Mandor @ Rp. 15,400.00 Rp.
0.350 Kg Residu @ Rp. 1,750.00 Rp.
J U M LA H Rp
K.510 1 M3 LAPISAN PONDASI BAWAH (SUB BASE)
0.040 OH Pekerja @ Rp. 14,000.00 Rp.
0.020 OH Operator Terlatif @ Rp. 21,000.00 Rp.
0.010 OH Sopir Terampil @ Rp. 14,700.00 Rp.
0.010 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
1.600 M3 Kerikil Sungai (Sub Base) @ Rp. 46,000.00 Rp.
0.050 Jam Vibrator Roller @ Rp. 22,500.00 Rp.
0.050 Jam Water Tank Truck @ Rp. 36,000.00 Rp.
0.050 Jam Motor Grader @ Rp. 88,000.00 Rp.
0.005 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp

K.510.a 1 M3 TIMBUNAN BATU TANAH


0.040 OH Pekerja @ Rp. 14,000.00 Rp.
0.020 OH Operator Terlatif @ Rp. 21,000.00 Rp.
0.010 OH Sopir Terampil @ Rp. 14,700.00 Rp.
0.010 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
1.400 M3 Batu Tanah (Timbunan Pilihan) @ Rp. 25,000.00 Rp.
0.050 Jam Vibrator Roller @ Rp. 22,500.00 Rp.
0.050 Jam Water Tank Truck @ Rp. 36,000.00 Rp.
0.050 Jam Motor Grader @ Rp. 88,000.00 Rp.
0.005 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp

K.520 1 M3 PONDASI ATAS BATU (BASE COURSE)


0.041 OH Pekerja @ Rp. 14,000.00 Rp.
0.053 OH Operator Terlatif @ Rp. 21,000.00 Rp.
0.011 OH Sopir Terampil @ Rp. 14,700.00 Rp.
0.011 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
1.500 M3 Batu Pecah 10 - 15 Cm @ Rp. 70,500.00 Rp.
0.055 Jam Vibrator Roller @ Rp. 22,500.00 Rp.
0.055 Jam Pneumatic Roller @ Rp. 60,000.00 Rp.
0.055 Jam Water Tank Truck @ Rp. 36,000.00 Rp.
0.055 Jam Motor Grader @ Rp. 88,000.00 Rp.
0.005 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp

K.618a 1 M2 LAPIS PENETRASI MACADAM (LAPEN) T = 6 CM


0.080 OH Pekerja @ Rp. 10,500.00 Rp.
0.012 OH Buruh Terlatih @ Rp. 14,000.00 Rp.
0.007 OH Operator Terlatif @ Rp. 21,000.00 Rp.
0.004 OH Sopir Terampil @ Rp. 14,700.00 Rp.
0.004 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
0.034 M3 Agregat Pokok (Spec) @ Rp. 70,500.00 Rp.
0.013 M3 Agregat Pengunci (Spec) @ Rp. 97,000.00 Rp.
0.012 M3 Agregat Penutup (Spec) @ Rp. 97,000.00 Rp.
6.500 Kg Aspal Bitmen @ Rp. 3,000.00 Rp.
0.365 Kg Minyak Aspal @ Rp. 1,250.00 Rp.
0.014 Jam Betuminous Sprayer @ Rp. 70,000.00 Rp.
0.018 Jam Mesin Gilas Roda Besi @ Rp. 60,000.00 Rp.
0.018 Jam Flat Bed Truck 3,5 Ton @ Rp. 57,000.00 Rp.
0.005 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp

K.618b 1 M2 LAPIS PENETRASI MACADAM (LAPEN) T = 5 CM


0.060 OH Pekerja @ Rp. 10,500.00 Rp.
0.009 OH Buruh Terlatih @ Rp. 14,000.00 Rp.
0.005 OH Operator Terlatif @ Rp. 21,000.00 Rp.
0.003 OH Sopir Terampil @ Rp. 14,700.00 Rp.
0.003 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
0.034 M3 Agregat Pokok (Spec) @ Rp. 70,500.00 Rp.
0.013 M3 Agregat Pengunci (Spec) @ Rp. 97,000.00 Rp.
0.012 M3 Agregat Penutup (Spec) @ Rp. 97,000.00 Rp.
6.500 Kg Aspal Bitmen @ Rp. 3,000.00 Rp.
0.365 Kg Minyak Aspal @ Rp. 1,250.00 Rp.
0.010 Jam Betuminous Sprayer @ Rp. 70,000.00 Rp.
0.013 Jam Mesin Gilas Roda Besi @ Rp. 60,000.00 Rp.
0.013 Jam Flat Bed Truck 3,5 Ton @ Rp. 57,000.00 Rp.
0.004 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp
L.15a 100 M2 ASPAL GORENG TEBAL 3 CM
18.000 OH Pekerja @ Rp. 10,500.00 Rp.
2.000 OH Tukang Masak Aspal @ Rp. 17,500.00 Rp.
1.000 OH Tukang Api @ Rp. 17,500.00 Rp.
1.000 OH Penjaga @ Rp. 14,000.00 Rp.
1.000 OH Mandor Lapangan @ Rp. 15,400.00 Rp.
4.000 M3 Kerikil Bersih 1 : 2 @ Rp. 55,500.00 Rp.
2.000 M3 Pasir @ Rp. 45,500.00 Rp.
400.000 Kg Aspal ….. @ Rp. 3,000.00 Rp.
250.000 Kg Aspal ….. @ Rp. - Rp.
2.000 M3 Kayu Bakar @ Rp. 175,000.00 Rp.
1.000 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp
Pemadatan = 1/750 x Anl. W.4 Rp. 4,354,500.00 Rp.
J U M LA H Rp
Tiap 1M2 Aspal Goreng Rp. 2,189,706.00 Rp

W.2 1 M2 PAKLAAG DARI BATU BELAH TEBAL 15 CM


0.375 OH Pekerja @ Rp. 14,000.00 Rp.
0.019 OH Mandor @ Rp. 15,400.00 Rp.
0.200 M3 Batu Belah @ Rp. 70,500.00 Rp.
0.000 Jam Biaya Menggilas 1/7500 x Anl. W.4 @ Rp. 4,354,500.00 Rp.
J U M LA H Rp

W.2a 1 M2 PAKLAAG DARI BATU BELAH TEBAL 12 CM


0.300 OH Pekerja @ Rp. 14,000.00 Rp.
0.015 OH Mandor @ Rp. 15,400.00 Rp.
0.160 M3 Batu Belah @ Rp. 70,500.00 Rp.
0.000 Jam Biaya Menggilas 1/7500 x Anl. W.4 @ Rp. 4,354,500.00 Rp.
J U M LA H Rp

W.3 100 M2 SLIJLAAG TEBAL 6 CM


7.500 OH Pekerja @ Rp. 14,000.00Rp.
0.375 OH Mandor @ Rp. 15,400.00Rp.
8.000 M3 Batu Belah 5 - 7 @ Rp. 90,000.00Rp.
2.000 M3 Pasir Pasangan @ Rp. 45,500.00Rp.
0.270 Jam Biaya Menggilas @ Rp. 4,354,500.00Rp.
J U M LA H Rp
Untuk 1 M2 Sijlaag Tebal 6 Cm 1/100 Rp. 922,355.60 Rp

W.3a 100 M2 SLIJLAAG TEBAL 12 CM


15.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.750 OH Mandor @ Rp. 15,400.00 Rp.
16.000 M3 Batu Belah 5 - 7 @ Rp. 90,000.00 Rp.
4.000 M3 Pasir Pasangan @ Rp. 45,500.00 Rp.
0.270 Jam Biaya Menggilas @ Rp. 4,354,500.00 Rp.
J U M LA H Rp
Untuk 1 M2 Sijlaag Tebal 6 Cm 1/100 Rp. 1,844,130.60 Rp

W.4 BIAYA MENGGILAS 1 BULAN / 1 MESIN


25.000 OH Masinis @ Rp. 21,000.00 Rp.
25.000 OH Kenek @ Rp. 14,700.00 Rp.
30.000 OH Penjaga @ Rp. 15,400.00 Rp.
150.000 OH Pekerja @ Rp. 14,000.00 Rp.
500.000 Ltr Solar @ Rp. 950.00 Rp.
15.000 Ltr Pelumas @ Rp. 15,000.00 Rp.
10.000 Kg Gemuk @ Rp. 20,000.00 Rp.
J U M LA H Rp
W.5b 100 M2 HITUNGAN LAPISAN ASPAL
10.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.500 OH Mandor @ Rp. 15,400.00 Rp.
250.000 Kg Aspal @ Rp. 3,000.00 Rp.
12.200 M3 Kerikil @ Rp. 55,500.00 Rp.
0.500 - Tempat Memasak Aspal @ Rp. 10,000.00 Rp.
0.091 M3 Kayu Bakar @ Rp. 175,000.00 Rp.
1.000 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
J U M LA H Rp
Tiap 1 M2 Aspal 1/100 x Rp. 1,645,725.00 Rp

W.5c 100 M2 HITUNGAN LAPISAN ASPAL


26.000 OH Pekerja @ Rp. 14,000.00 Rp.
1.300 OH Mandor @ Rp. 15,400.00 Rp.
650.000 Kg Aspal @ Rp. 3,000.00 Rp.
3.120 M3 Kerikil @ Rp. 55,500.00 Rp.
1.300 - Tempat Memasak Aspal @ Rp. 10,000.00 Rp.
0.237 M3 Kayu Bakar @ Rp. 175,000.00 Rp.
1.000 Set Alat-Alat Bantu** @ Rp. 50,000.00 Rp.
0.001 Biaya Menggilas 1/170 x Anl. W.4 @ Rp. 4,354,500.00 Rp.
J U M LA H Rp
Tiap 1 M2 Aspal 1/100 x Rp. 2,617,461.00 Rp

Supl. III 1 M2 PEMASANGAN TEGEL ABU-ABU 30 X 30 CM


0.500 HO Tukang Batu @ Rp. 17,500.00 Rp.
0.050 HO Kepala Tukang @ Rp. 19,950.00 Rp.
1.000 HO Pekerja @ Rp. 14,000.00 Rp.
0.025 HO Mandor @ Rp. 15,400.00 Rp.
11.110 Bh Tegel Abu-Abu 30 x 30 Cm @ Rp. 1,700.00 Rp.
0.200 Zak Semen @ Rp. 23,000.00 Rp.
0.025 M3 Perekat (Anl. G.14) @ Rp. 381,049.00 Rp.
J U M LA H Rp.

Supl. III.a 1 M2 PEMASANGAN KERAMIK 30 X 30 CM


0.500 HO Tukang Batu @ Rp. 17,500.00 Rp.
0.050 HO Kepala Tukang @ Rp. 19,950.00 Rp.
1.000 HO Pekerja @ Rp. 14,000.00 Rp.
0.025 HO Mandor @ Rp. 15,400.00 Rp.
11.110 Bh Keramik 30 x 30 Cm @ Rp. 3,960.00 Rp.
0.200 Zak Semen @ Rp. 23,000.00 Rp.
0.025 M3 Perekat (Anl. G.14) @ Rp. 381,049.00 Rp.
J U M LA H Rp.

Supl. IV 1 M2 PEMASANGAN PORSELEN 11 X 11 CM


0.500 HO Tukang Batu @ Rp. 17,500.00 Rp.
0.050 HO Kepala Tukang @ Rp. 19,950.00 Rp.
1.000 HO Pekerja @ Rp. 14,000.00 Rp.
0.025 HO Mandor @ Rp. 15,400.00 Rp.
83.000 Bh Porselen 11 x 11 @ Rp. 963.00 Rp.
0.010 M3 Perekat (Anl. G.14) @ Rp. 381,049.00 Rp.
J U M LA H Rp.

Supl. V 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Anl. G.41 1 M3 BETON COR 1 : 2 : 3
0.820 M3 Kerikil Beton @ Rp. 55,500.00 Rp.
0.540 M3 Pasir Beton @ Rp. 45,500.00 Rp.
8.500 Zak Semen PC @ Rp. 23,000.00 Rp.
1.000 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp.
6.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.300 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
B. PEKERJAAN BESI
a. Upah
9.000 OH Tukang Besi @ Rp. 17,500.00 Rp.
3.000 OH Kepala Tukang @ Rp. 19,950.00 Rp.
9.000 OH Pekerja @ Rp. 14,000.00 Rp.
J U M LA H Rp.
b. Bahan - Bahan Besi
110.000 M3 Besi Beton @ Rp. 5,500.00 Rp.
2.000 M3 Kawat Beton @ Rp. 5,000.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
C. CETAKAN BETON.
a. Bahan
10.000 M2 Papan Bekisting @ Rp. 16,000.00 Rp.
0.400 M3 Kayu Stut @ Rp. 1,200,000.00 Rp.
4.000 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp.
b. Upah
5.000 OH Tukang @ Rp. 17,500.00 Rp.
0.500 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.100 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.

D. LAIN - LAIN.
Upah Membongkar dan Menyiram Beton
4.000 OH Pekerja @ Rp. 14,000.00 Rp.

1 M3 REKAPITULAS BETON BERTULANG 1 : 3 : 4


A. Beton 1 : 2 : 3 Rp.
B. Pekerjaan Besi Rp.
C. Cetakan Beton Rp.
D. Bongkar Cetakan dan Menyiram Beton Rp.
J U M LA H Rp.

Supl. V.a 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
125.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.b 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
140.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.
Supl. V.c 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)
A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
160.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.d 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
170.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.e 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
200.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.f 1 M3 PEKERJAAN BETON BERTULANG 1 : 2 : 3 (K-175)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
240.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.g 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. 1 M3 BETON COR 1 : 1 1/ 2 : 2 1/2
a. Bahan
0.750 M3 Kerikil Beton @ Rp. 55,500.00 Rp.
0.440 M3 Pasir Beton @ Rp. 45,500.00 Rp.
10.115 Zak Semen PC @ Rp. 23,000.00 Rp.
J U M LA H Rp.
b. Upah
1.000 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp.
6.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.300 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
B. PEKERJAAN BESI
a. Upah
9.000 OH Tukang Besi @ Rp. 17,500.00 Rp.
3.000 OH Kepala Tukang @ Rp. 19,950.00 Rp.
9.000 OH Pekerja @ Rp. 14,000.00 Rp.
J U M LA H Rp.
b. Bahan - Bahan Besi
110.000 M3 Besi Beton @ Rp. 5,500.00 Rp.
2.000 M3 Kawat Beton @ Rp. 5,000.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
C. CETAKAN BETON.
a. Bahan
10.000 M2 Papan Bekisting @ Rp. 16,000.00 Rp.
0.400 M3 Kayu Stut @ Rp. 1,200,000.00 Rp.
4.000 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp.
b. Upah
5.000 OH Tukang @ Rp. 17,500.00 Rp.
0.500 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.100 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
D. LAIN - LAIN.
Upah Membongkar dan Menyiram Beton
4.000 OH Pekerja @ Rp. 14,000.00 Rp.

REKAPITULASI
A. Beton 1 : 2 : 3 Rp.
B. Pekerjaan Besi Rp.
C. Cetakan Beton Rp.
D. Bongkar Cetakan dan Menyiram Beton Rp.
J U M LA H Rp.

Supl. V.h 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
125.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.i 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
140.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.
Supl. V.j 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)
A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
155.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.k 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
165.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.l 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
175.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.m 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
185.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.n 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
210.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.
Supl. V.o 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)
A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
240.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.p 1 M3 PEKERJAAN BETON BERTULANG 1 : 1 1/2 : 2 1/2 (K-225)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
265.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.q 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. 1 M3 BETON COR 1 : 1,25 : 2,25
a. Bahan
0.600 M3 Split 1 - 2 Cm @ Rp. 97,000.00 Rp.
0.330 M3 Pasir Beton @ Rp. 45,500.00 Rp.
11.360 Zak Semen PC @ Rp. 23,000.00 Rp.
J U M LA H Rp.
b. Upah
1.000 OH Tukang Batu @ Rp. 17,500.00 Rp.
0.100 OH Kepala Tukang @ Rp. 19,950.00 Rp.
6.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.300 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
B. PEKERJAAN BESI
a. Upah
9.000 OH Tukang Besi @ Rp. 17,500.00 Rp.
3.000 OH Kepala Tukang @ Rp. 19,950.00 Rp.
9.000 OH Pekerja @ Rp. 14,000.00 Rp.
J U M LA H Rp.
b. Bahan - Bahan Besi
210.000 M3 Besi Beton @ Rp. 5,500.00 Rp.
2.000 M3 Kawat Beton @ Rp. 5,000.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
C. CETAKAN BETON.
a. Bahan
10.000 M2 Papan Bekisting @ Rp. 16,000.00 Rp.
0.400 M3 Kayu Stut @ Rp. 1,200,000.00 Rp.
4.000 Kg Paku @ Rp. 4,500.00 Rp.
J U M LA H Rp.
b. Upah
5.000 OH Tukang @ Rp. 17,500.00 Rp.
0.500 OH Kepala Tukang @ Rp. 19,950.00 Rp.
2.000 OH Pekerja @ Rp. 14,000.00 Rp.
0.100 OH Mandor @ Rp. 15,400.00 Rp.
J U M LA H Rp.
Jumlah ( a + b) Rp.
D. LAIN - LAIN.
Upah Membongkar dan Menyiram Beton
4.000 OH Pekerja @ Rp. 14,000.00 Rp.

REKAPITULASI
A. Beton 1 : 2 : 3 Rp.
B. Pekerjaan Besi Rp.
C. Cetakan Beton Rp.
D. Bongkar Cetakan dan Menyiram Beton Rp.
J U M LA H Rp.
Supl. V.r 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)
A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
225.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.s 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
240.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.t 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
260.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.u 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
270.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.v 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
300.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.

Supl. V.w 1 M3 PEKERJAAN BETON BERTULANG 1 : 1,25 : 2,25 (K-350)


A. Beton Bertulang 1 : 2 : 3 Rp.
B. Pekerjaan Besi
a. Upah Rp.
b. Bahan-Bahan Besi
340.000 Kg Besi Beton @ Rp. 5,500.00 Rp.
2.000 Kg Kawat Beton @ Rp. 5,000.00 Rp.
C. Cetakan Beton Rp.
D. Lain-Lain Rp.
J U M LA H Rp.
am Pengembangan Kecamatan (PPK) Fase II
Regional Manajemen Unit 1 Prov. NAD

LISA HARGA SATUAN PEKERJAAN

Edisi : Nopember 2003

10,500.00
385.00
10,885.00
5,442.50

10,500.00
385.00
10,885.00
1,088.50

14,000.00
508.20
14,508.20

21,000.00
770.00
21,770.00

18,000.00
4,200.00
154.00
22,354.00

30,000.00
4,200.00
154.00
34,354.00

54,600.00
4,200.00
154.00
58,954.00

55,200.00
4,200.00
154.00
59,554.00
3,000.00
2,100.00
154.00
5,254.00
4,200.00
231.00
4,431.00

9,200.00
30,000.00
9,100.00
33,600.00
1,848.00
35,448.00

4,800.00
700.00
79.80
2,520.00
662.20
3,182.20

262,500.00
29,925.00
70,000.00
3,850.00
2,310,000.00
2,676,275.00

420,000.00
47,880.00
112,000.00
6,160.00
2,310,000.00
2,896,040.00

8,750.00
997.50
2,800.00
154.00
180.00
48,000.00
41,500.00
102,381.50

8,750.00
997.50
2,800.00
154.00
48,000.00
60,701.50
12,140.30
13,125.00
1,496.25
3,500.00
192.50
145,530.00
20,000.00
183,843.75
1,750.00
199.50
7,000.00
1,078.00
18,900.00
450.00
29,377.50

3,920.00
215.60
14,000.00
1,596.00
42,000.00
450.00
62,181.60

2,310,000.00
1,305.00
420,000.00
47,880.00
112,000.00
6,160.00
2,897,345.00

2,100,000.00
1,125.00
525,000.00
59,850.00
140,000.00
7,700.00
2,833,675.00

92,400.00
1,125.00
131,250.00
14,962.50
35,000.00
1,925.00
276,662.50

92,400.00
30,000.00
900.00
131,250.00
14,962.50
35,000.00
1,925.00
306,437.50
78,750.00
8,977.50
21,000.00
660.00
33,600.00
21,000.00
2,250.00
166,237.50

134,400.00
900.00
157,500.00
17,955.00
42,000.00
2,310.00
355,065.00

73,500.00
45,000.00
900.00
105,000.00
11,970.00
28,000.00
1,540.00
265,910.00

42,000.00
900.00
14,000.00
1,596.00
3,920.00
215.60
62,631.60

31,500.00
41,500.00
1,125.00
14,000.00
1,596.00
3,920.00
215.60
93,856.60

31,500.00
4,200.00
5,355.00
1,125.00
14,000.00
1,596.00
3,920.00
215.60
61,911.60
72,000.00
21,000.00
1,155.00
94,155.00

38,500.00
22,050.00
1,232.00
55,125.00
1,155.00
180,000.00
427,500.00
725,562.00
241,854.00

28,800.00
2,323.00
441.35
1,750.00
199.50
7,000.00
385.00
40,898.85

337,824.00
43,225.00
381,049.00

258,750.00
49,140.00
307,890.00

72,000.00
92,920.00
22,113.00
21,000.00
2,394.00
50,400.00
2,772.00
263,599.00

72,000.00
116,426.00
22,113.00
21,000.00
2,394.00
50,400.00
2,772.00
287,105.00

136,500.00
46,552.00
14,742.00
26,250.00
2,992.50
28,000.00
3,465.00
258,501.50
136,500.00
72,450.00
17,290.00
26,250.00
2,992.50
28,000.00
3,465.00
286,947.50

37,720.00
24,570.00
195,500.00
17,500.00
1,995.00
84,000.00
4,620.00
365,905.00

41,860.00
24,843.00
130,870.00
8,750.00
997.50
84,000.00
4,620.00
295,940.50

42,000.00
29,900.00
18,200.00
93,449.00
17,500.00
1,995.00
84,000.00
4,620.00
291,664.00

46,000.00
22,750.00
121,900.00
105,000.00
5,985.00
7,000.00
770.00
309,405.00

3,220.00
2,002.00
10,465.00
2,362.50
279.30
10,080.00
554.40
28,963.20

382.20
3,289.00
2,625.00
299.25
5,600.00
308.00
12,503.45
591.50
3,105.00
2,625.00
299.25
5,600.00
308.00
12,528.75

632.45
2,001.00
3,500.00
399.00
5,600.00
308.00
12,440.45

386.75
3,018.75
2,100.00
239.40
5,040.00
277.20
11,062.10

52,500.00
17,500.00
1,995.00
84,000.00
155,995.00
1,559.95

79,200.00
4,550.00
1,750.00
7,000.00
92,500.00

3,220.00
2,002.00
10,465.00
2,362.50
269.33
10,080.00
554.40
28,953.23

4,600.00
28,665.00
14,720.00
3,360.00
379.05
14,392.00
785.40
66,901.45

19,800.00
54,000.00
3,500.00
399.00
1,400.00
77.00
79,176.00
15,750.00
5,400.00
3,500.00
399.00
1,400.00
77.00
26,526.00

118,500.00
675.00
4,375.00
498.75
3,500.00
127,548.75
12,754.88

6,912.50
81,000.00
10,500.00
1,197.00
4,900.00
269.50
104,779.00

59,250.00
2,025.00
87,500.00
9,975.00
42,000.00
2,310.00
203,060.00
20,306.00

26,400.00
54,000.00
7,000.00
798.00
2,800.00
154.00
91,152.00

8,910.00
54,000.00
4,375.00
498.75
3,500.00
192.50
71,476.25
14,000.00
770.00
14,770.00
1,772.40

7,000.00
385.00
7,385.00
738.50
4,375.00
498.75
14,000.00
770.00
19,643.75
1,964.38

10,500.00
1,197.00
56,000.00
1,540.00
69,237.00
6,923.70

105,000.00
11,970.00
56,000.00
3,080.00
176,050.00

46,800.00
45.00
8,400.00
5,250.00
598.50
1,400.00
770.00
63,263.50

39,375.00
4,488.75
21,000.00
1,155.00
71,000.00
468.00
16,000.00
3,000.00
156,486.75
15,648.68

13,125.00
1,496.25
7,000.00
385.00
125,840.00
577.50
3,000.00
151,423.75
15,142.38

700.00
700.00
38.50
1,438.50

1,400.00
77.00
612.50
2,089.50
560.00
420.00
147.00
154.00
73,600.00
1,125.00
1,800.00
4,400.00
250.00
82,456.00

560.00
420.00
147.00
154.00
35,000.00
1,125.00
1,800.00
4,400.00
250.00
43,856.00

574.00
1,113.00
161.70
169.40
105,750.00
1,237.50
3,300.00
1,980.00
4,840.00
250.00
119,375.60

840.00
168.00
147.00
58.80
61.60
2,397.00
1,261.00
1,164.00
19,500.00
456.25
980.00
1,050.00
997.50
250.00
29,331.15

630.00
126.00
105.00
44.10
46.20
2,397.00
1,261.00
1,164.00
19,500.00
456.25
700.00
780.00
741.00
200.00
28,150.55
189,000.00
35,000.00
17,500.00
14,000.00
15,400.00
222,000.00
91,000.00
1,200,000.00
-
350,000.00
50,000.00
2,183,900.00
5,806.00
2,189,706.00
21,897.06

5,250.00
292.60
14,100.00
580.60
20,223.20

4,200.00
231.00
11,280.00
580.60
16,291.60

105,000.00
5,775.00
720,000.00
91,000.00
580.60
922,355.60
9,223.56

210,000.00
11,550.00
1,440,000.00
182,000.00
580.60
1,844,130.60
18,441.31

525,000.00
367,500.00
462,000.00
2,100,000.00
475,000.00
225,000.00
200,000.00
4,354,500.00
140,000.00
7,700.00
750,000.00
677,100.00
5,000.00
15,925.00
50,000.00
1,645,725.00
16,457.25

364,000.00
20,020.00
1,950,000.00
173,160.00
13,000.00
41,475.00
50,000.00
5,806.00
2,617,461.00
26,174.61

8,750.00
997.50
14,000.00
385.00
18,887.00
4,600.00
9,526.23
57,145.73

8,750.00
997.50
14,000.00
385.00
43,995.60
4,600.00
9,526.23
82,254.33

8,750.00
997.50
14,000.00
385.00
79,929.00
3,810.49
107,871.99

45,510.00
24,570.00
195,500.00
17,500.00
1,995.00
84,000.00
4,620.00
373,695.00
157,500.00
59,850.00
126,000.00
343,350.00

605,000.00
10,000.00
615,000.00
958,350.00

160,000.00
480,000.00
18,000.00
658,000.00

87,500.00
9,975.00
28,000.00
1,540.00
127,015.00
785,015.00

56,000.00

373,695.00
958,350.00
785,015.00
56,000.00
2,173,060.00

373,695.00

343,350.00

687,500.00
10,000.00
785,015.00
56,000.00
2,255,560.00

373,695.00

343,350.00

770,000.00
10,000.00
785,015.00
56,000.00
2,338,060.00
373,695.00

343,350.00

880,000.00
10,000.00
785,015.00
56,000.00
2,448,060.00

373,695.00

343,350.00

935,000.00
10,000.00
785,015.00
56,000.00
2,503,060.00

373,695.00

343,350.00

1,100,000.00
10,000.00
785,015.00
56,000.00
2,668,060.00

373,695.00

343,350.00

1,320,000.00
10,000.00
785,015.00
56,000.00
2,888,060.00

41,625.00
20,020.00
232,645.00
294,290.00

17,500.00
1,995.00
84,000.00
4,620.00
108,115.00
402,405.00
157,500.00
59,850.00
126,000.00
343,350.00

605,000.00
10,000.00
615,000.00
958,350.00

160,000.00
480,000.00
18,000.00
658,000.00

87,500.00
9,975.00
28,000.00
1,540.00
127,015.00
785,015.00

56,000.00

402,405.00
958,350.00
785,015.00
56,000.00
2,201,770.00

402,405.00

343,350.00

687,500.00
10,000.00
785,015.00
56,000.00
2,284,270.00

402,405.00

343,350.00

770,000.00
10,000.00
785,015.00
56,000.00
2,366,770.00
402,405.00

343,350.00

852,500.00
10,000.00
785,015.00
56,000.00
2,449,270.00

402,405.00

343,350.00

907,500.00
10,000.00
785,015.00
56,000.00
2,504,270.00

402,405.00

343,350.00

962,500.00
10,000.00
785,015.00
56,000.00
2,559,270.00

402,405.00

343,350.00

1,017,500.00
10,000.00
785,015.00
56,000.00
2,614,270.00

402,405.00

343,350.00

1,155,000.00
10,000.00
785,015.00
56,000.00
2,751,770.00
402,405.00

343,350.00

1,320,000.00
10,000.00
785,015.00
56,000.00
2,916,770.00

402,405.00

343,350.00

1,457,500.00
10,000.00
785,015.00
56,000.00
3,054,270.00

58,200.00
15,015.00
261,280.00
334,495.00

17,500.00
1,995.00
84,000.00
4,620.00
108,115.00
442,610.00

157,500.00
59,850.00
126,000.00
343,350.00

1,155,000.00
10,000.00
1,165,000.00
1,508,350.00

160,000.00
480,000.00
18,000.00
658,000.00

87,500.00
9,975.00
28,000.00
1,540.00
127,015.00
785,015.00

56,000.00

442,610.00
1,508,350.00
785,015.00
56,000.00
2,791,975.00
442,610.00

343,350.00

1,237,500.00
10,000.00
785,015.00
56,000.00
2,874,475.00

442,610.00

343,350.00

1,320,000.00
10,000.00
785,015.00
56,000.00
2,956,975.00

442,610.00

343,350.00

1,430,000.00
10,000.00
785,015.00
56,000.00
3,066,975.00

442,610.00

343,350.00

1,485,000.00
10,000.00
785,015.00
56,000.00
3,121,975.00

442,610.00

343,350.00

1,650,000.00
10,000.00
785,015.00
56,000.00
3,286,975.00

442,610.00

343,350.00

1,870,000.00
10,000.00
785,015.00
56,000.00
3,506,975.00
ANALISA HARGA SATUAN
JAPAT / AWCAS
(MENGGUNAKAN ALAT)

PROPINSI : Nanggroe ACEH Darussalam KECAMATAN : DISIAPKAN OLEH :


KABUPATEN : - D E S A :

URAIAN : ANGGAPAN / ASUMSI :


1. Leveransir menuangkan agregat disepanajang 1. Menggunakan alat berat ( 4 m x 375 m/hari )
jalan dengan truk 2. Tanah dasar selebar 8 m sudah disiapkan (341)
3. Agregat pecah dikirim ke tempat pekerjaan oleh leveransir
2. Truk air dan gilasan digunakan untuk memadatkan 4. Grader menghampar agregat dalam 3 lintasan
kedalam tanah dasar. hasil kerja 4 m x 6 km/ 5 jam/hari
5. Agregat dipadatkan dengan mesin gilas roda karet dan disiram
air sampai tebal padat 10 cm.

TOTAL VOL. UPAH BIAYA


PEKERJA VOL HARI KODE
(Org.Hari) (Rp/Org/Hari) (Rp)

Buruh tak terlatih 4.000 1.000 L.101 4.000 - -


P
E Mandor 1.000 1.000 L.061 1.000 - -
K Operator Terlatih 2.000 1.000 L.081 2.000 - -
E
R Supir 1.000 1.000 L.091 1.000 - -
J
A

Jumlah Biaya untuk Pekerja PEKERJA (I)


HARGA B IAYA
MATERIAL JUMLAH SATUAN KODE TOTAL VOL.
(Rp/Unit) (Rp)

M Agregat tersaring M3 K016 200.000 - -


A #REF! Set M.170 0.200 - -
T
E
R
I
A
L

Jumlah Biaya untuk Material MATERIAL (II)


HARI HARGA B IAYA
PERALATAN JUMLAH KODE JAM KERJA
KERJA (Rp/Jam) (Rp)

P Grader 110 HP 1.000 1.000 E.010 5.000 - -


E Mesin gilas bergetar 1 ton 1.000 1.000 E.082 5.000 200,000.00 1,000,000.00
R
A Truk tangki air 68 HP 1.000 1.000 E.182 5.000 - -
L
A
T
A
N

Jumlah Biaya untuk Peralatan PERALATAN (III)


TOTAL (Rp)
VOLUME : 1,500.000 SATUAN : M2 HARGA SATUAN Rp. 666.67
KODE
K - 611

SUB TOTAL
(Rp)

-
SUB TOTAL
(Rp)

-
SUB TOTAL
(RP)

1,000,000.00
1,000,000.00
Per
DAFTAR HARGA SATUAN UPAH, BAHAN DAN PAJAK
TAHUN 2018

Kute Gunung Pak-Pak Jenis KegiatSal. Pembuangan Air Limbah


Kecamatan : Leuser Ukuran 120 Meter
Kabupaten : Aceh Tenggara

Harga Satuan PPh 22


No Jenis Bahan/Alat Satuan PPn (10%) PPh 21 (5%) Pajak Daerah
(Rp) (1,5%)

I. BAHAN

1 Pasir M3 220,000.00 3,240.00 4,000.00

2 Kerikil M3 210,000.00 3,090.00 4,000.00

3 Batu Kali M3 200,000.00 2,940.00 4,000.00

4 Tanah Timbunan M3 95,000.00 1,365.00 4,000.00

5 Semen 40 Kg Zak 66,900.00 6,690.00 903.15

6 Papan Bekisting 3/20 Lbr 60,000.00 6,000.00 810.00

7 Kayu 5/5 Btg 45,000.00 4,500.00 607.50

8 Besi Ø 12 Panjang 12m polos Btg 110,000.00 11,000.00 1,485.00

9 Besi Ø 6 Panjang 9m polos Btg 35,000.00 3,500.00 472.50

10 Kawat Beton Kg 20,000.00 2,000.00 270.00

11 Paku Kayu Kg 20,000.00 2,000.00 270.00

12 Batu Bata bh 800.00 80.00 10.80

13 Seng Multiroof Lbr 95,000.00 9,500.00 1,282.50

14 Bubung Genteng Metal Lbr 85,000.00 8,500.00 1,147.50

15 C-75 , 0.8 Btg 95,000.00 9,500.00 1,282.50

16 Baut (screw driver) bh 500.00 50.00 6.75

17 Dynabolt bh 8,500.00 850.00 114.75

18 Reng btg 65,000.00 6,500.00 877.50

19 Talang jurai m' 85,000.00 8,500.00 1,147.50

20 Bola lampu Hemat Energi 38 Wat 55,000.00 5,500.00 742.50

21 Box MCB 75,000.00 7,500.00 1,012.50

22 Saklar Tunggal 25,000.00 2,500.00 337.50

23 Kabel NYA 2 ,mm 285,000.00 28,500.00 3,847.50

24 Rolen 800.00 80.00 10.80

25 Cat Dasar 5 Kg 75,000.00 7,500.00 1,012.50

II. ALAT

1 Papan kegiatan unit 250,000


2 Prasasti unit 500,000

III. UPAH

1 Tukang HOK 120,000.00

2 Pekerja HOK 100,000.00

Terbilang : Sepuluh Juta Tujuh Ratus Delapan Puluh Lima Ribu Dua Ratus Tujuh Puluh Tiga Rupiah
Leuser

Pelak
AHAN DAN PAJAK

Harga Yang Pajak Yang


Ket. Volume
Dipakai Dibayar

227,240.00 13.00 94,120.00

217,090.00 14.00 99,260.00

206,940.00 3.00 20,820.00

100,365.00 90.00 482,850.00

74,493.15 199.00 1,511,036.85

66,810.00 Panjang 5 m 161.00 1,096,410.00

50,107.50 Panjang 5 m 69.00 352,417.50

122,485.00 Panjang 12 m 97.00 1,211,045.00

38,972.50 Panjang 9 m 229.00 909,702.50

22,270.00 25.00 56,750.00

22,270.00 65.00 147,550.00

890.80 2,695.00 244,706.00

105,782.50 201.00 2,167,282.50

94,647.50 32.00 308,720.00

105,782.50 163.00 1,757,547.50

556.75 9,975.00 566,081.25

9,464.75 420.00 405,195.00

72,377.50 236.00 1,741,090.00

94,647.50 33.00 318,367.50

61,242.50 10.00 62,425.00

83,512.50 1.00 8,512.50

27,837.50 10.00 28,375.00

317,347.50 2.00 64,695.00

890.80 100.00 9,080.00

83,512.50 2.00 17,025.00

TOTAL I 13,681,064.10

-
-

TOTAL II -

120,000.00

100,000.00

TOTAL III -

TOTAL I-IV 13,681,064


Puluh Tiga Rupiah
Leuser, 2018
Dibuat Oleh :
Pelaksana Kegiatan Desa

Ketua PK
BANTUAN KEUANGAN PEUMAKMUE GAMPO
KECAMATAN LAWE BULAN KABUPATEN ACEH T
PROVINSI ACEH
TAHUN ANGGARAN 2018

SEKRETARIAT UPK : JLN. LAWE KISAM NO. DESA KANDANG MBEL

LAPORAN AKHIR AS-BUILT DRAWIN

Nomor : 023/ SPBB/ P3MD/ LB - LKA/ X/ 2018


Tanggal : 28 Oktober 2013

KEGIATAN :
SARANA PRASARANA :
SALURAN PEMBUANGAN AIR L
(SPAL)
VOLUME RENCANA : 120 Meter
VOLUME REALISASI : 246 METER
NILAI DANA FISIK :
DANA BUMK :
OPERASIONAL BKPG :
JUMLAH DANA :

LAPORAN AKHIR LAWE KING

KEMENTERIAN DALAM NEGERI REPUBLIK INDON

DIREKTORAT JENDERAL PEMBERDAYAAN MASYARAKAT

SATUAN PROYEK PEMBINAAN PROGRAM NASIO

PEMBERDAYAAN MASYARAKAT MANDIRI PEDESAAN (

2013
MUE GAMPONG ( BKPG )
PATEN ACEH TENGGARA
CEH
N 2018

DESA KANDANG MBELANG MANDIRI

UILT DRAWING

LB - LKA/ X/ 2018
ber 2013

:
RANA :
GAN AIR LIMBAH
L)

47,500,000
19,000,000
3,500,000
70,000,000

WE KINGA

REPUBLIK INDONESIA

AN MASYARAKAT DAN DESA

PROGRAM NASIONAL

RI PEDESAAN ( PNPM - MP )
PNPM Mandiri - Perdesaan

PEMERIKSAAN DOKUMEN DESAIN DAN RAB


Lokasi : Gunung Pak-Pak Jenis Prasarana : Prasana Umum

Diperiksa oleh : Ahmad Syukur, ST/ Zalmahdi, A. Md Tipe Prasarana : Sal. Pembuangan Air Limbah

Jabatan : Fasilitator Teknik Kab. Ukuran : 120 Meter

Sudah Belum Perlu


Jenis Dokumen yang diperiksa memenuhi memenuhi diperiksa Jenis Dokumen
syarat syarat ulang
SURVEI GAMBAR DESAIN
1.1 Survei Antar Patok 5.1 Gambar Situasi
1.2 Sket Kondisi Tanah 5.2 Gambar Denah
1.3 Sketsa lokasi kegiatan 5.3 Tampang Memanjang
1.4 Survei Beda Tinggi, Sumber Air, Debit Air dan Pelayanan 5.4 Tampang Melintang
1.5 Survei Harga Bahan, Alat oleh TPK 5.5 Tampak Depan, Belakan
1.6 Survei Harga Bahan, Alat oleh FT 5.6 Gambar Denah Fondasi,
1.7 Kesepakatan harga upah dan harga bahan lokal 5.7 Gambar Potongan Mema
1.8 Catatan tentang dampak lingkungan 5.8 Gambar Detail
1.9 Catatan tentang pembebasan lahan 5.9 Kelengkapan dimensi/uk
TAKE-OFF SHEET 5.10 Kelengkapan spesifikasi
2.1 Pemilihan Jenis Konstruksi 5.11 Lokasi prasarana tepat
2.2 Perhitungan Konstruksi 5.12 Lokasi sarana pelengkap
2.3 Perhitungan Volume Pekerjaan RENCANA ANGGARAN BIAYA
2.4 Perhitungan Harga Satuan Pekerjaan 6.1 Rencana Anggaran Biay
2.5 Perhitungan Penggunaan Alat Berat 6.2 Rekapitulasi Rencana An
2.6 Perhitungan Harga satuan Sewa Alat Berat 6.3 Kewajaran Harga Bahan
2.7 Perhitungan Volume Alat manual 6.4 Kewajaran Penggunaan
2.8 Rekapitulasi Volume Bahan, Upah dan Alat 6.5 Kelengkapan spesifikasi
SPESIFIKASI BAHAN DAN ALAT 6.6 Kelengkapan dimensi/uk
3.1 Spesifikasi bahan 6.7 Swadaya
3.2 Spesifikasi alat berat ANTISIPASI MASALAH
SAFEGUARD 7.1 Ada potensi konflik deng
4.1 Pengisian Form Dampak Lingkungan 7.2 Cukup mudah untuk dila
4.2 Rencana penanganan Dampak Lingkungan 7.3 Catatan sumber bahan d
4.3 Pengisian rencana penggunaan Alat Berat 7.4 Catatan jalan akses untu
4.4 Pengesahan penggunaan Alat Berat 7.5 Perizinan/Koordinasi yan
4.5 Pengisian Form Ganti Rugi Lahan 7.6 Potensi manfaat subproy
4.6 Jumlah Penerima manfaat 7.7 Kekuatan struktur/konstr
4.7 Kesanggupan memelihara prasarana 7.8 Konfirmasi tentang pemb
4.8 Desain sesuai kebutuhan Masyarakat Adat
Form. 25

OKUMEN DESAIN DAN RAB Pemeriksaan


ke :
Tanggal diserahkan :

Tanggal diperiksa :

Sudah Belum Perlu


Jenis Dokumen yang diperiksa memenuhi memenuhi diperiksa
syarat syarat ulang
GAMBAR DESAIN
Gambar Situasi
Gambar Denah
Tampang Memanjang
Tampang Melintang
Tampak Depan, Belakang, Samping Kiri dan Kanan
Gambar Denah Fondasi, Atap, Lantai dan Plafond
Gambar Potongan Memanjang dan Potongan Melintang
Gambar Detail
Kelengkapan dimensi/ukuran pada gambar
Kelengkapan spesifikasi pada gambar
Lokasi prasarana tepat
Lokasi sarana pelengkap
RENCANA ANGGARAN BIAYA
Rencana Anggaran Biaya Detail
Rekapitulasi Rencana Anggaran Biaya
Kewajaran Harga Bahan, Upah dan Alat
Kewajaran Penggunaan Alat Berat
Kelengkapan spesifikasi bahan pada RAB
Kelengkapan dimensi/ukuran bahan pada RAB
Swadaya
ANTISIPASI MASALAH
Ada potensi konflik dengan . . . . . . . . . . .
Cukup mudah untuk dilaksanakan oleh masyarakat
Catatan sumber bahan dan ketersediaan bahan
Catatan jalan akses untuk mengedrop material & alat
Perizinan/Koordinasi yang diperlukan
Potensi manfaat subproyek
Kekuatan struktur/konstruksi
Konfirmasi tentang pembebasan lahan
Tgl,...................................................
Disetujui / Belum Disetujui

Ahmad Syukur, ST/ Zalmahdi, A. Md


FT-KAB
PNPM Mandiri - Perdesaan Form. 25 A

LEMBAR CATATAN PEMERIKSAAN


Lokasi : Gunung Pak-Pak
Dibuat oleh : 0 Pemeriksaan ke :
Jabatan : 0 Tanggal diserahkan :
Jenis Prasarana : Sal. Pembuangan Air Limbah Tanggal diperiksa :

Hal-hal yang harus diperhatikan/diperbaiki :


PETUNJUK PENGISIAN FORMULIR PEMERIKSAAN DESAIN DAN RAB
Fasilitator Teknis Kabupaten (FT-Kab) wajib memeriksa semua dokumen yang berkaitan dengan Pembuatan Desain dan RAB
untuk kegiatan pembangunan prasarana, untuk mencegah dokumen desain dan RAB yang belum lengkap dan atau yang belum
memenuhi kebutuhan dan standar teknis. Dengan dilakukan pemeriksaan ini, FT-Kab menjamin bahwa dokumen ini layak untuk
digunakan sebagai dokumen perencanaan detail lokasi PNPM.

FT-Kab memeriksa Dokumen Desain dan RAB serta mengisi blangko yang telah disediakan, kemudian mengatakan "disetujui"
atau "tidak disetujui" berdasarkan hasil penilaian. Jika dokumen desain dan RAB dinilai “Tidak Disetujui,” Fasilitator Teknis
harus melengkapi atau memperbaiki kekurangan dokumen dan atau hal-hal yang dinilai belum memenuhi syarat dalam dokumen
sebagaimana terdapat dalam ceklist dan lembar catatan pemeriksaan. Semua koreksi tersebut harus diperiksa kembali oleh FT-
Kab, kecuali beberapa jenis koreksi yang dapat dianggap sebagai “Layak dengan Syarat,” seperti:

- Melengkapi dimensi pada gambar


- Menandai spesifikasi pada gambar
- Menandai lokasi perlengkapan pada gambar situasi dan atau denah
Semua Ceklist Pemeriksaan Dokumen dan Lembar Catatan Pemeriksaan wajib didokumentasikan oleh FT-Kab dikantor Faskab
dan aslinya dijilid bersama dokumen SPPB sebagai lampiran.

Hal-hal yang harus diperiksa dan persyaratan penilaian "Terpenuhi" sebagaimana tabel dibawah ini :

ITEM YANG DIPERIKSA PERSYARATAN TERPENUHI


SURVEI
1.1 Survei Antar Patok Form survei jalan (Form.16) terisi lengkap dan jelas.

1.2 Sket Kondisi Tanah Kegiatan jalan : form sket kondisi tanah (Form.20) terisi lengkap dan jelas.
Kegiatan jembatan : sketsa potongan melintang sungai yang dilengkapi ukuran
lebar sungai , dalam sungai, tinggi muka air normal, tinggi muka air banjir,
kedalaman tanah keras dan jenis tanah.

Kegiatan bangunan gedung : sketsa potongan melintang dan memanjang yang


dilengkapi ukuran beda tinggi, data kedalaman tanah keras, jenis tanah dan
kedalaman air tanah.

Kegiatan tambatan perahu : sketsa potongan melintang dan memanjang yang


dilengkapi ukuran beda tinggi, data kedalaman tanah keras, jenis tanah dan
kedalaman air pasang, surut, normal.

Untuk kegiatan lain : minimal ada data-data teknis untuk membuat desain Fondasi
dan pekerjaan tanah.
1.3 Sketsa lokasi kegiatan
Sketsa berupa gambar denah yang dilengkapi keadaan sekitar lokasi kegiatan.
Sketsa dilengkapi dengan ukuran panjang, lebar, beda tinggi lokasi kegiatan
dengan jalan atau titik referensi yang ditetapkan dilapangan.
1.4 Survei Beda Tinggi, Sumber Air, Debit Air dan
Kegiatan SAB Perpipaan, Jaringan Irigasi, PLTMH : data sumber air, kontinuitas
Pelayanan
ketersediaan air, debit air, beda tinggi, trase jaringan, tingkat pelayanan, area
pelayanan terdata dengan lengkap.
1.5 Survei Harga Bahan, Alat oleh TPK
Minimal survei harga bahan dan alat dilakukan pada 3 (tiga) tempat/supplier yang
berbeda untuk setiap jenis bahan atau alat. Supaya dihindari melakukan survei
pada suppiler yang mempunyai keterkaitan dengan supplier lainnya (untuk
menghindari monopoli harga)

Pada blangko survei terdapat informasi; alamat lokasi survei, nama responden,
jenis bahan dan alat, ukuran bahan, kualitas bahan, kapasitas alat, harga bahan
atau alat, jarak dari lokasi survei ke Desa.

Form blanko survei yang digunakan adalah sesuai format yang tercantum pada
PTO Penjelasan IV halaman 16. Kemudian hasil survei direkap menggunakan
form 23 (Hasil Survei Harga Bahan/Alat)
1.6 Survei Harga Bahan, Alat oleh FT Minimal terdapat hasil survei harga pembanding dilakukan pada 3 (tiga) tempat
yang berbeda untuk setiap jenis bahan/alat. Blanko/form survei dan pengisiannya
sesuai dengan Survei Harga Bahan/Alat oleh TPK
1.7 Kesepakatan harga upah dan harga bahan lokal
Terdapat Berita Acara Musyawarah "kesepakatan harga upah dan harga bahan
yang akan diadakan secara lokal" antara TPK dengan masyarakat calon
pengumpul bahan dan pekerja serta dihadiri KPMD, TPU, Tomasy, Kades, BPD.
Berita Acara dilengkapi dengan Notulen dan Daftar hadir

Jika harga bahan lokal lebih mahal dari pada harga non lokal, supaya diadakan
review hasil Musyawarah dan peninjauan kembali harga yang ditawarkan
masyarakat.
1.8 Catatan tentang dampak lingkungan Terdapat catatan-catatan dampak negatif terhadap lingkungan yang akan terjadi
pada lokasi kegiatan yang akan direncanakan.
1.9 Catatan tentang pembebasan lahan Terdapat catatan-catatan hasil komfirmasi pembebasan lahan kepada masyarakat
yang lahannya akan dibebaskan untuk kegiatan.
TAKE-OFF SHEET
2.1 Pemilihan Jenis Konstruksi
Jenis konstruksi yang dipilih sudah sesuai dengan petunjuk pemilihan konstruksi
yang terdapat pada bahan bacaan Prasarana dan atau sesuai kaidah teknik yang
berlaku. Beberapa catatan penting dan penegasan untuk kegiatan-kegiatan
sebagai berikut :
Kegiatan jalan : konstruksi yang dipilih sudah mempertimbangkan topografi,
kondisi struktur tanah, tingkat pelayanan (roda dua atau roda empat serta volume
lalu lintas yang akan lewat), kemampuan masyarakat untuk melaksanakan dan
memelihara kegiatan. Bangunan pelengkap jalan seperti gorong-gorong, TPT dan
saluran pasangan batu dipastikan hanya direncanakan pada tempat-tempat yang
secara teknis dibutuhkan. Tidak diperkenankan merencanakan bangunan
pelengkap jalan seperti saluran pinggir jalan menggunakan pasangan batu dan
TPT tanpa ada alasan teknis.

Kegiatan jembatan : konstruksi yang dipilih sudah mempertimbangkan batasan-


batasan yang dianjurkan dalam petunjuk teknis, kemampuan masyarakat untuk
melaksanakan dan memelihara kegiatan, jalan akses untuk mengangkut material.

Kegiatan bangunan gedung : konstruksi yang dipilih sudah mempertimbangkan


kemampuan masyarakat untuk melaksanakan dan memelihara kegiatan,
memanfaatkan sebanyak mungkin material lokal, ketersediaan dan kemudahan
menyediakan material.
2.2 Perhitungan Konstruksi
Untuk bangunan-bangunan yang sudah ada standard konstruksinya dalam bahan
bacaan prasarana, perhitungan konstruksi tidak perlu dibuat. Sebagai gantinya
dalam take-off sheet perhitungan konstruksi dicantumkan rujukan konstruksi yang
diambil beserta tabelnya. Perhitungan
kekuatan konstruksi utama bangunan yang tidak ada pada bahan bacaan harus
dibuat sesuai kaidah perencanaan teknik yang berlaku nasional dan minimal
dalam take-off sheet terdapat perhitungan konstruksi sebagai berikut :

Kegiatan jalan : terdapat perhitungan konstruksi bangunan pelengkap seperti


besar dan jenis Gorong-gorong , perhitungan konstruksi TPT.
Kegiatan jembatan : terdapat perhitungan konstruksi bangunan bawah (Abutment,
Pilar, TPT). Tinjauan terhadap kemampuan mendukung beban vertikal, horizontal
dan guling. Untuk bangunan atas bisa mengambil kontruksi sesuai tabel standard
yang tersedia pada bahan bacaan prasarana. Untuk
bangunan jembatan yang diluar standard, perhitungan konstruksi bangunan atas
dan bangunan bawahnya wajib dibuat.

2.3 Perhitungan Volume Pekerjaan Semua volume pekerjaan sudah dibuat dan perhitungan sudah benar. Urutan
uraian pekerjaan dimulai dari kegiatan bangunan bawah sampai pekerjaan
finishing.
2.4 Perhitungan Harga Satuan Pekerjaan Semua perhitungan harga satuan pekerjaan sudah dibuat dan perhitungan sudah
benar. Analisis Harga Satuan Pekerjaan yang digunakan sudah sesuai dengan
spesifikasi bahan dan alat yang direncanakan.
2.5 Perhitungan Penggunaan Alat Berat Tersedia perhitungan penggunaan alat berat dalam format jam atau hari. Analisis
yang digunakan sudah berdasarkan kapasitas alat, tingkat kesulitan pekerjaan dan
volume pekerjaan.
2.6 Perhitungan Harga satuan Sewa Alat Berat
Tersedia harga satuan sewa alat berat. Harga sewa sudah termasuk komponen
bahan bakar, pelumas. Komponen HOK Operator Alat supaya dipisah.

2.7 Perhitungan Volume Alat manual


Alat-alat manual untuk membantu pekerjaan sudah memperhatikan tingkat
efisiensi dan metode kerja yang direncanakan
2.8 Rekapitulasi Volume Bahan, Upah dan Alat Volume Bahan, Upah dan Alat sudah direkap berdasarkan volume yang terdapat
pada "perhitungan harga satuan pekerjaan".
SPESIFIKASI BAHAN DAN ALAT
3.1 Spesifikasi bahan Lembaran spesifikasi bahan yang akan digunakan sudah dibuat dan dilengkapi
dengan data pabrikan yang memproduksinya.
3.2 Spesifikasi alat berat Lembaran spesifikasi alat yang akan digunakan sudah dibuat dan pabrikan
pembuat
SAFEGUARD
4.1 Pengisian Form Dampak Lingkungan Form 22 sudah berdasarkan catatan tentang dampak lingkungan dan solusi untuk
meminimalkan dampak lingkungan sudah diisi.
4.2 Rencana penanganan Dampak
Dalam Desain dan RAB sudah mengakomodir solusi untuk meminimalkan dampak
Lingkungan
lingkungan. Jika dampak lingkungan diprediksi akan terjadi setelah kegiatan
beroperasi, sudah ada rencana penanganan untuk diberikan nantinya diberikan
kepada TP3.
4.3 Pengisian rencana penggunaan Alat Rencana penggunaan alat berat sudah disosialisasikan dan disetujui masyarakat
Berat serta dituangkan kedalam form rencana penggunaan alat berat.
4.4 Pengesahan penggunaan Alat Berat FT-Kab sudah menyatakan persetujuan penggunaan alat berat yang dituangkan
kedalam form rencana penggunaan alat berat.
4.5 Pengisian Form Ganti Rugi Lahan Form ini bisa di copy dari Proposal Usulan yang sudah lolos Verifikasi TV.
4.6 Penerima manfaat Terdapat data pemanfaat langsung dan pemanfaat tidak langsung kegiatan.
Konstruksi kegiatan sudah di Desain sesuai dengan manfaat dan jumlah penerima
manfaat yang direncanakan.
4.7 Kesanggupan memelihara prasarana
Tersedianya Berita Acara Kesanggupan memelihara kegitan yang dilengkapi
rencana operasional dan pemeliharaan serta rencana pembiayaannya.

GAMBAR DESAIN
5.1 Gambar Situasi
Minimal terinformasikan perletakan bangunan utama dan bangunan pelengkap
yang direncanakan, keadaan sekitar bangunan, jalan akses menuju bangunan
tersebut.
5.2 Gambar Denah
Dalam gambar denah minimal terdapat informasi tata letak konstruksi utama, tata
letak ruangan, ukuran panjang, lebar dan peil ketinggian lantai.
5.3 Tampang Memanjang Gambar ini khusus untuk kegiatan jalan.Pada gambar terdapat informasi kondisi
existing jalan sebagaimana hasil survey dan rencana permukaan jalan,
penempatan bangunan pendukung. Gambar dilengkapi dengan STA.
5.4 Tampang Melintang Gambar ini khusus untuk kegiatan jalan. Gambar ini dapat berupa gambar tipikal,
setiap perubahan perlu dibuat gambar tampang melintang. Pada gambar minimal
terdapat informasi mengenai perkerasan, bahu jalan, saluran pinggir dan keadaan
kiri kanan jalan.
5.5 Tampak Depan, Belakang, Samping Kiri, Gambar ini untuk kegiatan selain jalan. Pada gambar terdapat informasi bentuk
Samping Kanan
bangunan yang dilihat dari posisi tertentu, ukuran panjang/lebar dan tinggi.
5.6 Gambar Denah Fondasi, Atap, Lantai dan Pada denah fondasi minimal terdapat informasi tata letak pondasi yang dilengkapi
Plafond ukuran serta type pondasi
Pada denah Atap minimal terdapat informasi tata letak konstruksi atap yang
dilengkapi ukuran, serta komponen konstruksi yang dilengkapi ukuran dan nama
komponen serta spesifikasi.
Pada denah lantai minimal terdapat informasi tata letak finishing lantai yang
dilengkapi ukuran panjang/lebar dan ketinggian serta informasi jenis dan
spesifikasi bahan yang digunakan.

Pada denah plafond minimal terdapat informasi tata letak komponen konstruksi
plafond, tata letak lampu yang dilengkapi dengan ukuran, jenis, spesifikasi bahan.
5.7 Gambar Potongan Memanjang dan Potongan
Gambar ini untuk kegiatan selain jalan. Pada gambar terdapat informasi bentuk
Melintang
bangunan jika dipotong. Informasi dalam potongan yang diutamakan adalah info
mengenai konstruksi bangunan. Gambar dilengkapi ukuran panjang/lebar, tinggi,
nana komponen, jenis, ukuran dan spesifikasi bahan.
5.8 Gambar Detail
Semua komponen konstruksi utama harus dibuat gambar detailnya. Penamaan
gambar detail sinkron dengan informasi yang terdapat pada gambar denah adan
atau gambar potongan. Gambar dilengkapi ukuran konstruksi dan komponen
konstruksi, jenis, ukuran dan spesifikasi bahan yang digunakan.
5.9 Kelengkapan dimensi/ukuran pada gambar
Pada setiap gambar sudah dilengkapi dimensi/ukuran bangunan, konstruksi dan
komponen konstruksi.
5.10 Kelengkapan spesifikasi pada gambar
Pada setiap gambar sudah dilengkapi spesifikasi dan jenis bahan yang digunakan
untuk konstruksi dan komponen konstruksi.
5.11 Lokasi prasarana tepat Selain penempatan prasarana sudah sesuai dengan Proposal Usulan yang sudah
diperiksa Tim Verifikasi, sudah dipertimbangkan secara teknis untuk
menempatkan prasarana/unit prasarana/komponen prasarana.
5.12 Lokasi sarana pelengkap
Penempatan sarana pelengkap pada gambar situasi dan atau gambar tampang
memanjang dan atau gambar denah jelas posisi dan dilengkapi dengan
keterangan jenis dan ukuran sarana pelengkap.

RENCANA ANGGARAN BIAYA


6.1 Rencana Anggaran Biaya Detail
Form RAB Prasarana (form.7e) terisi dengan lengkap. RAB detail dibuat untuk
setiap jenis kegiatan dan diurutkan mulai dari Kegiatan Utama. Total volume
bahan, upah dan alat sudah sesuai dengan Rekapitulasi Volume Bahan, Upah dan
Alat. Volume swadaya sudah sesuai dengan komitmen swadaya yang disepakati.
Kategori biaya sudah sesuai dengan petunjuk pengisian kategori biaya. Harga
satuan sudah sesuai dengan daftar harga yang sudah disepakati. Perkalian dan
perjumlahan sudah sesuai.
6.2 Rekapitulasi Rencana Anggaran Biaya Form Rekapitulasi Anggaran Biaya Prasarana (form.8b) terisi dengan lengkap.
Nomor RAB sudah diurutkan mulai nomor satu dan pengisian sudah sesuai
dengan perjumlahan pada RAB Detail. Perhitungan perjumlahan dan perkalian
sudah benar.
6.3 Kewajaran Harga Bahan, Upah dan Alat Harga bahan, upah dan alat yang dimasukan kedalam RAB sudah
diperbandingkan dengan hasil survei harga oleh FT dan hasil survei harga oleh
FT-Kab.
6.4 Kewajaran Penggunaan Alat Berat Penggunaan Alat Berat sudah mengacu kepada PTO Penjelasan IV halaman 18
tentang penggunaan dan mekanisme penggunaan Alat Berat.
6.5 Kelengkapan spesifikasi bahan pada RAB Uraian bahan pada form RAB Detail dilengkapi dengan spesifikasi bahan dan atau
nama pabrikan yang memproduksi.
6.6 Uraian bahan pada form RAB Detail dilengkapi dengan dimensi/ukuran sesuai
Kelengkapan dimensi/ukuran bahan pada RAB
standard yang berlaku.
6.7 Swadaya Swadaya masyarakat yang dicantumkan dalam RAB sudah sesuai dengan
komitmen swadaya yang dituangkan dalam form kesanggupan swadaya
masyarakat.
ANTISIPASI MASALAH
7.1 Ada potensi konflik dengan . . . . . . . . . . .
Potensi konflik sudah dibicarakan dengan para pihak dan antisipasi konflik sudah
dipersiapkan sebelum MAD Prioritas Usulan. Potensi konflik dipaparkan pada
forum MAD Prioritas Usulan dan forum memberikan masukan untuk
mengantisipasinya.
7.2 Cukup mudah untuk dilaksanakan oleh Pemilihan dan Desain konstruksi harus dibuat sesederhana mungkin dan sudah
masyarakat mempertimbangkan kemampuan masyarakat untuk melaksanakan kegiatan.
7.3 Catatan sumber bahan dan ketersediaan bahan Sumber bahan dan ketersediaan bahan sudah diidentifikasi dengan benar oleh
Fasilitator.
7.4 Catatan jalan akses untuk mengedrop material & Desain dan RAB sudah memperhitungkan/mempertimbangkan ketersediaan jalan
alat akses yang ada.
7.5 Perizinan/Koordinasi yang diperlukan Izin sudah ada dan koordinasi dengan pihak terkait sudah dilakukan sebelum MAD
Penetapan Usulan dilaksanakan.
7.6 Potensi manfaat subproyek Kegiatan sudah dipastikan akan bermanfaat bagi masyarakat.
7.7 Kekuatan struktur/konstruksi Tersedia informasi tentang kekuatan konstruksi. Informasi ini berguna untuk
pembatasan beban penggunaan.
7.8 Konfirmasi tentang pembebasan lahan
Catatan hasil komfirmasi pembebasan lahan kepada masyarakat yang lahannya
akan dibebaskan untuk kegiatan sudah ditindaklanjuti. Hasil tindaklanjut sudah
harus ada sebelum MAD Prioritas Usulan.
PNPM Mandiri - Perdesaan

PENANGANAN MASALAH DAMPAK NEGATIF TERHADAP LINGKUNGAN

Desa : Gunung Pak-Pak Jenis Kegiatan : Sal. Pembuangan Air


Kecamatan : Leuser Desain Oleh : 0

Kabupaten : Aceh Tenggara Tanggal : 22 Oktober 2013

Mohon diisi untuk dua jenis dampak negatif terhadap lingkungan yang paling besar potensi untuk merugikan masy
(Keterangan dilanjutkan ke lembar tambahan, bila perlu)

1. Dampak negatif yang berpotensi merugikan masyarakat dan mungkin akan timbul di lokasi ini :

- Terkena Lahan Tanah Milik Masyarakat

Yang telah direncanakan untuk mencegah masalah ini atau untuk mengurangi dampak negatif yang mun

Masyarakat yang Lahan nya terkena harus Menanda Tangai Surat persetujuan tidak adanya ganti rugi.

2. Dampak negatif yang berpotensi merugikan masyarakat dan mungkin akan timbul di lokasi ini :

Terganggu nya Akses dan Terputus nya Jalan desa Desa Akibat Galian Saluran

Yang telah direncanakan untuk mencegah masalah ini atau untuk mengurangi dampak negatif yang mun

Pada Pelaksanaan Kegiatan Material Bahan di Tumpukan dan Di atur dan Pada Perencanaan dibuat Plat B
Jemb Plat, Papan, Pipa aliran, untuk Peyeberangan di ruas Jalan yang Membelah Badan Jalan.
Mohon diisi untuk dua jenis dampak negatif terhadap lingkungan yang paling besar kemungkinan untuk timbul di
(Keterangan dilanjutkan ke lembar tambahan, bila perlu)

1. Dampak negatif yang kemungkinan besar akan timbul di lokasi ini :

Adanya Bau Aroma kurang Sedap akibat Genangan Air Limbah

Yang direncanakan untuk mengatasi masalah ini atau untuk mengurangi dampak negatif yang mungkin t

di imbau Kan Kepada Masyarakat agar tidak membuang Sampah dan Membuang Kotoran pada Saluran SP

Supaya membersih kan dan Membuang Endapan Pada Saluran SPAL.

2. Dampak negatif yang kemungkinan besar akan timbul di lokasi ini :


Terjadinya pencemaran dan Banjir di Pemukiman Warga

Yang telah direncanakan untuk mencegah masalah ini atau untuk mengurangi dampak negatif yang mun

Tinggi Elevasi Saluran SPAL harus terjadi beda Tinggi , Galian Bertambah Dalam dan Volume isi bertamab

di dimensi Saluran SPAL di pembuangan Akhir.


Form. 22

NGKUNGAN

embuangan Air Limbah

ktober 2013

merugikan masyarakat

di lokasi ini :

gatif yang mungkin timbul :

a ganti rugi.

gatif yang mungkin timbul

n dibuat Plat Beton

ntuk timbul di lokasi ini

ang mungkin timbul

pada Saluran SPAL dan


gatif yang mungkin timbul

me isi bertamabah pada


JADWAL PELAKSANA
KEGIATAN
Desa : Gunung Pak-Pak
Jenis Kegiatan : Sal. Pembuangan Air Limbah
Volume : 120 Meter
Kecamatan : Leuser
Kabupaten : Aceh Tenggara

Renc
Bobot Bulan Septemb
No Uraian Kegiatan Vol. Renc Satuan Biaya (Rp) (%)
Real 1 2

A. SAL. Pembuangan Air Limbah ( SPAL )


1 Pekerjaan Persiapan LS LS 1,590,000 3.55 Renc
Real
2 Pekerjaan Galian Tanah Biasa 19.20 M3 798,000 1.78 Renc
Real
3 Pekerjaan Coran Dinding Saluran Cyclope 43.2 M3 24,935,000 55.69 Renc
Real
4 Pekerjaan Coran Lantai Saluran 18.72 M3 11,478,000 25.64 Renc
Real
5 Pekerjaan Plesteran 95.04 M2 5,972,000 13.34 Renc
135,998,000 135,998,000 Real
Total 44,773,000 100
Rencana 0 0
Rencana Komulatif 0 0
Realiasai 0 0
Realisasi Kumulatif 0 0
Deviasi 0 0
L PELAKSANAAN
KEGIATAN

Tahun 2013
Bulan September Bulan Oktober Bulan November

3 4 1 2 3 4 1 2 3 4

0.43 1.05 -2.07

1.05 0.15 -0.58

6.00 19.00 19.00 12.00 3.04 0.50 3.85

5.50 8.50 3.50 3.00 2.12 -3.02


5.00 8.00 2.17 1.83

0 0 0 0 7 25 28 21 14 5
0 0 0 0 7 32 59 80 94 99
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0

0 0 0 0 -7 -32 -59 -80 -94 -99


Gunung Pak-Pak 29 Juli 2013
Dibuat oleh :
TP- BKPG Desa. Gunung Pak-Pak

0
Ketua
RENCANA PEMELIHARAAN PRASARANA

Desa : Gunung Pak-Pak


Kecamatan : Leuser
Kabupaten : Aceh Tenggara
Provinsi : Aceh
Jenis Kegiatan : Prasarana Umum
Nama Kegiatan : Sal. Pembuangan Air Limbah

Berdasarkan hasil musyawarah desa, masyarakat merencanakan Pemeliharaan Saluran Pembuangan Air

Limbah ( S PAL ) yang akan dibangun dengan dana ( P3MD ) yaitu dengan cara

Gotong Royong dengan memfungsikan Tim Pemeliharaan yang akan dibentuk pada Musyawarah desa

Serah Terima, jika terjadi kerusakan maka masyarakat akan dengan dana swadaya Masyarakat Sendiri

Mengetahui, Dibuat Oleh,


Kepala Desa Gunung Pak-Pak TP - BKPG Desa Gunung Pak-Pak

0 0

Atas nama masyarakat desa :


Nama : Alamat Tandatangan

1. ………………………. ……………………. ………………………...

2. ………………………. …………………….. ………………………...

3. ………………………. ……………………. ………………………...

4. ………………………. …………………….. ………………………...

5. ………………………. …………………….. ………………………...


PNPM - Mandiri Pedesaan Form. 30 . F

SURVEI KEADAAN SEBELUM KEGIATAN DIMULAI

Provinsi : Aceh
Kabupaten : Aceh Tenggara
Kecamatan : Leuser
Desa : Gunung Pak-Pak
Tanggal Survei : 22 Oktober 2013
Jenis Prasarana : Sal. Pembuangan Air Limbah
Nama responden : 0

Survei dilakukan pada setiap rumah tangga berdasarkan seleksi acak dan jumlah responden sedikitnya 10 %
dari jumlah penerima manfaat kegiatan yang terdapat dalam usulan.

1. Kondisi ( S PAL) saat ini : a.) Ada b.) Tidak Ada


Jika “Ada” :
No. Jenis Konstruksi Lebar (M’) Panjang (M’) Keterangan
1.
2.
3.
4.
Total

Apakah Tim Pemelihara sudah dibentuk ?

a.) Ya, Sebutkan jumlah anggotanya ? 5 Orang


b.)Tidak
2. Jumlah orang dalam satu rumah tangga ? 5 0rang

3. Kerusakan yang diakibatkan banjir pada 5 tahun terakhir ?

No. Jenis Kerusakan Nilai kerusakan yang di sebabkan oleh Banjir


1. Badan Jalan Tergerus Rusaknya Badan Jalan Akibat Aliaran Air
2.
3.
4.
5.
4. Apakah akibat drainase yang buruk menimbulkan kerusakan pada 5 tahun terakhir ? Jelaskan dan

jika mungkin perkirakan tingkat kerusakannya.

No. Jenis Kerusakan Nilai kerusakan yang di sebabkan oleh Banjir


1.
2.
3.
4.
5.

5. Jika anda menjual tanah/rumah tinggal saat ini, berapa harga jualnya ?
Form. 30 . F

AAN SEBELUM KEGIATAN DIMULAI

asarkan seleksi acak dan jumlah responden sedikitnya 10 %


pat dalam usulan.

nimbulkan kerusakan pada 5 tahun terakhir ? Jelaskan dan


AM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA ( P3MD )
KECAMATAN LAWE BULAN KABUPATEN ACEH TENGGARA
TAHUN ANGGARAN 2018

FHOTO NOL SEBELUM PELAKSANAAN

GUNUNG PAK-PAK
PEMB. SALURAN PEMBUANGAN AIR LIMBAH

0%
SEBELUM DIKERJAKAN

0%
SEBELUM DIKERJAKAN

0%
SEBELUM DIKERJAKAN
SEBELUM DIKERJAKAN
( P3MD )
N LAWE BULAN KABUPATEN ACEH TENGGARA
TAHUN ANGGARAN 2018

OTO NOL SEBELUM PELAKSANAAN

0%
SEBELUM DIKERJAKAN

0%
SEBELUM DIKERJAKAN

0%
SEBELUM DIKERJAKAN
SEBELUM DIKERJAKAN
PNPM Mandiri Perdesaan

Survey Harga Bahan / Alat

Kecamatan : Leuser Nama Toko :


Kabupaten : Aceh Tenggara Alamat :
Hari / Tanggal :
Nama dan Alamat Suplier
No. Jenis Bahan / Alat Satuan UD. Bintang Putri UD. Iska Agara UD. Nabawi
Lawe Rutung Lawe Rutung Lawe Rutung
I BAHAN
1 Batu Kali M3 100,000 100,000 100,000
2 Pasir Beton M3 170,000 170,000 170,000
3 Kerikil Beton M3 170,000 170,000 93,000
4 Timbunan Sirtu M3 100,000 92,000 100,000
5 Tanah Timbun M3 100,000 90,000 85,000
6 Batu Bata Bh 650 650 650
7 Papan Bekisting Lbr 53,000 53,000 53,000
8 Plywood 9 mm Lbr 125,000 127,000 125,000
9 Kayu 1,5 x 2" Btg 30,000 32,000 30,000
10 Kayu 2 x 2" Btg 40,000 40,000 40,000
11 Semen Padang @ 40 Kg Zak 60,000 60,000 60,000
12 Paku Kayu Kg 20,000 20,000 20,000
13 Besi Ø 12 mm Penuh Btg 80,000 80,000 80,000
14 Besi Ø 10 mm Penuh Btg 65,000 65,000 62,000
15 Besi Ø 8 mm Penuh Btg 45,000 45,000 45,000
16 Gorong - Gorong ø 40 Cm Bh 370,000 370,000 370,000
17 Gorong - Gorong ø 60 Cm Bh 550,000 550,000 560,000
18 Gorong - Gorong ø 80 Cm Bh 650,000 680,000 650,000
19 Pipa Fynnlon AW 6 Inchi Btg 395,000 395,000 395,000
20 Pipa Fynnlon AW 4 Inchi Btg 365,000 365,000 365,000
20 Pipa Fynnlon AW 3 Inchi Btg 305,000 310,000 305,000
21 Pipa Fynnlon AW 2 Inchi Btg 240,000 245,000 240,000
22 Pipa Fynnlon AW 0,5 Inchi Btg 80,000 85,000 80,000
23 Batang Bambu Btg 10,000 10,000 10,000
24 Kayu Sokong Btg 25,000 30,000 25,000
25 Terpal Plastik Glg - - -
26 Oli Ltr 8,000 10,000 8,000
27 Cat Minyak ABC Klg 42,000 45,000 42,000
II ALAT
1 Kereta Sorong (Artco) Bh 350,000 350,000 350,000
2 Cangkul Bh 70,000 70,000 70,000
3 Skop Bh 70,000 55,000 55,000
4 Pacul Bh 90,000 90,000 90,000
5 Meteran @ 5 Mtr Bh 30,000 30,000 30,000
6 Benang Nilon Bh 5,000 5,000 5,000
7 Ember Bh 10,000 10,000 10,000
8 Kuas 3" Bh 25,000 25,000 25,000
9 Mesin Molen Hr 350,000 350,000 350,000

Diketahui oleh : Dibuat oleh :


Ketua TP-BKPG Gunung Pak-Pak Sekretaris TP-BKPG
Form. 23

Harga yang
diambil

100,000
170,000
170,000
100,000
100,000
650
53,000
125,000
30,000
40,000
60,000
20,000
80,000
65,000
45,000
370,000
550,000
650,000
395,000
365,000
305,000
240,000
80,000
10,000
25,000
-
8,000
42,000

350,000
70,000
70,000
90,000
30,000
5,000
10,000
25,000
350,000
PNPM Mandiri Perdesaan

HARGA BAHAN DAN ALAT


Kecamatan : Leuser
Kabupaten : Aceh Tenggara
Harga Ongkos Angkut
No. Jenis Bahan / Alat Satuan
(Rp) (Rp)
I BAHAN
1 Batu Kali M3 200,000
2 Pasir Beton M3 220,000
3 Kerikil Beton M3 210,000
4 Timbunan Sirtu M3 95,000
5 Tanah Timbun M3 95,000
6 Batu Bata Bh 800
7 Papan Bekisting Lbr 60,000
8 Plywood 9 mm Lbr 125,000
9 Kayu 1,5 x 2" Btg 30,000
10 Kayu 2 x 2" Btg 40,000
11 Semen Padang @ 40 Kg Zak 6,690
12 Paku Kayu Kg 20,000
13 Besi Ø 12 mm Penuh Btg 110,000
14 Besi Ø 10 mm Penuh Btg 85,000
15 Besi Ø 8 mm Penuh Btg 75,000
16 Gorong - Gorong ø 40 Cm Bh 370,000
17 Gorong - Gorong ø 60 Cm Bh 550,000
18 Gorong - Gorong ø 80 Cm Bh 650,000
19 Pipa Fynnlon AW 6 Inchi Btg 395,000
20 Pipa Fynnlon AW 4 Inchi Btg 365,000
21 Pipa Fynnlon AW 3 Inchi Btg 305,000
22 Pipa Fynnlon AW 2 Inchi Btg 240,000
23 Pipa Fynnlon AW 0,5 Inchi Btg 80,000
24 Batang Bambu Btg 10,000
25 Kayu Sokong Btg 25,000
26 Terpal Plastik Glg -
27 Oli Ltr 8,000
28 Cat Minyak ABC Klg 42,000
II ALAT
1 Kereta Sorong (Artco) Bh 380,000
2 Cangkul Bh 70,000
3 Skop Bh 70,000
4 Pacul Bh 90,000
5 Meteran @ 5 Mtr Bh 30,000
6 Benang Nilon Bh 5,000
7 Ember Bh 10,000
8 Kuas 3" Bh 25,000
9 Mesin Molen Hr 350,000
10 Papan Proyek Unit 250,000
11 Prasasti Unit 600,000
III Upah
1 Tukang HOK 120,000
2 Pekerja HOK 100,000
3 Pekerja Lansir Bahan HOK 60,000

di ketahui oleh : Disurvey oleh :


Ketua TP-BKPG Gunung Pak-Pak Fasilitator Teknik Kec. Lawe

0 0
Form. 23

Total Harga ( Rp)

200,000
220,000
210,000
95,000
95,000
800
60,000
125,000
30,000
40,000
6,690
20,000
110,000
85,000
75,000
370,000
550,000
650,000
395,000
365,000
305,000
240,000
80,000
10,000
25,000
-
8,000
42,000

380,000
70,000
70,000
90,000
30,000
5,000
10,000
25,000
350,000
250,000
600,000

120,000
100,000
60,000

Disurvey oleh :
Fasilitator Teknik Kec. Lawe Bulan

0
PNPM Mandiri - Perdesaan

PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA ( P3MD )


KECAMATAN LAWE BULAN KABUPATEN ACEH TENGGARA
TAHUN ANGGARAN 2018

REKAPITULASI RENCANA ANGGARAN BIAYA (R-RAB)

Jenis Prasarana : Sal. Pembuangan Air Limbah


Provinsi : Aceh
Kabupaten : Aceh Tenggara
Jenis Kegiatan : Sal. Pembuangan Air Li Jenis Kegiatan : Jenis Kegiatan :
Ukuran / Dimensi : 1,0 x 0,7 Bobot Ukuran / Dimensi : Bobot Ukuran / Dimensi :
No. Uraian Bobot %
Jumlah : 120 Meter % Jumlah : % Jumlah :
No. RAB : 01 No. RAB : 02 No. RAB : 03
( P3MD ) Swadaya ( P3MD ) Swadaya ( P3MD ) Swadaya
I BAHAN
Ia 51,420,000 38.8
Ib 35,345,000 26.7
II PERALATAN
II a 840,000 0.6
II b 750,000 0.6
III UPAH
III a 44,143,000 33.3
III b
JUMLAH 132,498,000 100 -
Operasional BKPG 5%
JUMLAH TOTAL

Jumlah Biaya Upah Konstruksi

Jum Biaya Upah Pengmpln Bhn

Jumlah Biaya Upah 44,143,000 -

Formulir untuk Desa


Jumlah Upah
412 HOK HOK HOK

Diketahui oleh, Diperiksa oleh,


PjOK Kec.Lawe Bulan Fasilitator Kecamatan

(KHALIK) ( HASOLOAN H, SH / M. ASRI ST/ SISKA AY, ST )


NIP : 19630909 198410 1 001 NIK : 110000468 / 110000494

Formulir untuk Desa


Form.8.
b

LAN KABUPATEN ACEH TENGGARA


UN ANGGARAN 2018

CANA ANGGARAN BIAYA (R-RAB)

Kecamatan : Leuser
Desa : Gunung Pak-Pak

Jumlah Total Bobot %

( P3MD ) Swadaya

51,420,000 36.9
35,345,000 25.3

840,000 0.6
750,000 0.5

44,143,000 31.7
-
132,498,000 95

6,973,579 5.0

139,471,579 100

44,143,000

Formulir untuk Desa


412 HOK

Dibuat oleh,
TP-BKPG. Desa Gunung Pak-Pak

0
Ketua

Formulir untuk Desa


DINAS PEMBERDAYAAN MASYARAKAT DAN GAMPON
PROVINSI ACEH
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DAN
TAHUN ANGGARAN 2019

RENCANA ANGGARAN BIAYA (RAB)

Propinsi Aceh
Kabupaten : Aceh Tenggara
Kecamatan : Leuser
Desa Gunung Pak-Pak
Volume Harga
Kategori
NO. URAIAN Total Dari Dari Satuan Satuan
Swadaya Dana Biaya (Rp.)

A. PEKERJAAN PERSIAPAN a b c d e f

1 Pembersihan Lokasi 1.00 1.00 Ls Taksir

Sub

B. BAHAN

1 Batu Kali 17 17 M3 I.a 650,000.00

2 Kerikil Beton 37 37 M3 I.a 650,000.00

3 Pasir Beton 24 24 M3 I.a 680,000.00

4 Papan Bekisting 16 16 Lbr I.b 75,000.00

5 Kayu Bekisting ( 2" x 2" ) 8 8 Btg I.b 55,000.00

6 Semen PC. Padang @ 40 Kg 354 354 Zak I.b 95,000.00

7 Paku Kayu 3.0 3 Kg I.b 25,000.00

Sub

B. ALAT

1 Cangkul 4 4 Bh II.a 95,000

2 Sekop 4 4 Bh II.a 95,000

3 Ember Cor 6 6 Bh II.a 10,000

4 Benang Nilon 4 4 Glg II.a 5,000

5 Papan Proyek 1 1 Unit II.b 250,000

6 Prasasti 1 1 Unit II.b 500,000

Sub T

C. UPAH
1 Pekerja 262 262 HOK III-a 100,000

2 Tukang 150 150 HOK III-a 120,000

Sub To

Total Biaya BKPG ( 1 +


Sumber Dana
Total Biaya Sw

Diketahui oleh,
Pengulu Kute Gunung Pak - Pak
DAYAAN MASYARAKAT DAN GAMPONG
PROVINSI ACEH
N PEMBERDAYAAN MASYARAKAT DAN DESA ( P3MD )
AHUN ANGGARAN 2019

CANA ANGGARAN BIAYA (RAB)

No. RAB : 01
Program : ( P3MD )
Jenis Kegiatan : Sal. Pembuangan Air Limbah
Volume 120 Meter
Jumlah Jumlah
Swadaya Total
(Rp) (Rp.)

g h=(axf)

1,000,000.00

Sub Total 1) 1,000,000.00

11,050,000

24,050,000

16,320,000

1,200,000

440,000

33,630,000

75,000

Sub Total 2) 86,765,000

380,000

380,000

60,000

20,000

250,000

500,000

Sub Total 3) 1,590,000


26,191,000

17,952,000

Sub Total 4 ) 44,143,000

OP. TPK 2,500,000

Total Biaya BKPG ( 1 + 2 + 3 ) 135,998,000

Total Biaya Swadaya

Dibuat oleh,
Ketua TPK Kute Gunung Pak - Pak
DAFTAR RENCANA DAN KEGIATAN
PROGRAM NASIONAL PEMBERDAYAAN MASYARAKAT - MANDIRI PEDESAAN ( PNPM-MP)
KECAMATAN BUKIT TUSAM TAHUN 2011

Provinsi : ACEH
Kabupaten : Aceh Tenggara
Desa : KTL. Selian
Kegiatan : Saluran Pembuangan Air Limbah ( SPAL )
JULI AGUSTUS SEPTEMBER
NO URAIAN KEGIATAN
I II III IV I II III IV I

A. Saluran SPAL
Rencana
1 Pekerjaan Galian/ Kebersihan
Realisasi
Rencana
2 Pekerjaan Pemasangan Mall
Realisasi
Rencana
3 Pekerjaan Pengecoran SPAL
Realisasi
Rencana
4 Pekerjaan Penutup Atas Saluran
Realisasi
Rencana
5 Pekerjaan Plesteran
Realisasi
B. Pemb.Gorong-Gorong

Rencana
6 Pekerjaan Galian/ Kebersihan
Realisasi
Rencana
7 Pemasangan Gorong- Gorong
Realisasi
Rencana
8 Pekerjaan Pengecoran Kepala Gorong2
Realisasi
Rencana
9 Pekerjaan Plesteran
Realisasi
Rencana
10 Pekerjaan Finishing
Realisasi

KETERANGAN = = Rencana Tim Pengelola Kegiat


TPK
= = Realisasi

( Rusdi )
Ketua
MP)

SEPTEMBER

II III IV
Tim Pengelola Kegiatan
TPK

( Rusdi )
Ketua
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA
KECAMATAN LAWE BULAN - KABUPATEN ACEH TENGGARA
PROVINSI ACEH. TA 2013

Kabupaten : Aceh Tenggara


Kecamatan : Leuser Take Of Sheet
Desa : Gunung Pak-Pak

¤ Pek Galian Tanah V= 0.45 + 0.35 x 0.4 x 120 = 19.20


2

¤ SNI 03-2835-2002-6.8, 1M3 GALIAN TANAH BIASA


0.4 OH Pekerja x 19.20 = 7.68 HOK
Type I (Dusun Masjid)
¤ Pekerjaan Pengecoran dinding saluran Beton Cyclope 1 : 3 : 5
V= 0.9 x 0.2 x 2 x 120 = 43.2

¤ SNI.03.2826.2002, 1M3 PASANGAN COR BETON CYCLOPE 40% BATU KALI


Batu Kali 0.40 x 43.2 = 17.28 M3
Kerikil 0.49 x 43.2 = 21.17 M3
Pasir Beton 0.32 x 43.2 = 13.82 M3
Semen PC @ 40 Kg 5.05 x 43.2 = 218.16 Zak
Tukang Batu 0.85 x 43.2 = 36.72 HOK
Pekerja 2.00 x 43.2 = 86.40 HOK

¤ Pekerjaan Pengecoran Lantai saluran 1 : 3 : 5


V = 1.3 x 0.12 x 120 = 18.72

¤ SNI 03-3435-2002, 1M3 PONDASI BETON COR 1Pc : 3 Ps : 5Kr

Semen PC 5.40 x 18.72 = 101.09 Zak

Kerikil 0.87 x 18.72 = 16.29 M3

Pasir Beton 0.52 x 18.72 = 9.73 M3

Tukang Batu 0.25 x 18.72 = 4.68 HOK

Pekerja 1.65 x 18.72 = 30.89 HOK

¤ Pekerjaan Plesteran 1 : 4 V = 0.2 x 2 = 0.4 M2


= 0.90 x 2 = 1.8 M2
Jumlah = 2.2 M2
Luas = 95.04 M2
¤ SNI.03.2827.2002, PLESTERAN 1 : 4 TEBAL 10 MM
Pasir Pasangan 0.02 x 2.2 x 120 = 5.28 M3
Semen PC 0.13 x 2.2 x 120 = 34.32 Zak
Tukang Batu 0.05 x 2.2 x 120 = 13.2 HOK
Pekerja 0.10 x 2.2 x 120 = 26.4 HOK
( P3MD )
ABUPATEN ACEH TENGGARA
EH. TA 2013

Jenis Prasara Sal. Pembuangan Air Limbah


Lokasi Gunung Pak-Pak
Volume 120 Meter

M3 0.45

Galian 0.4

M3 0.35

M3 0.2 1.0 0.2

Cor 1:3:5

0.9

0.12

0.2 0.9 0.2


Program Nasional Pemberdayaan Masyarakat Mandiri - Perdesaan

ANALISA SATUAN PEKERJAAN


Form. IV. 19

Kabupaten : Aceh Tenggara Jenis Prasarana : SPAL


Kecamatan : Lawe Bulan HARGA SATUAN PEKERJAAN Lokasi : Gunung Pak-Pak
Desa : Gunung Pak-Pak Volume : 120 Meter
HARGA
NO. URAIAN SATUAN KOEFISIEN SATUAN JUMLAH HARGA (Rp.)
(Rp.)

1. 1 M3 Galian Tanah Biasa


(SNI. 03-2835-2002)
Upah :
Pekerja HOK 0.4 100,000 40,000

2. 1 M3 Beton Cor Cyclope


(SNI. 03-2836-2002)
Bahan :
Batu Kali M3 0.400 650,000 260,000
Kerikil M3 0.490 650,000 318,500
Pasir Beton M3 0.320 680,000 217,600
Semen 40 Kg Zak 5.050 95,000 479,750

Upah :
Tukang HOK 0.85 120,000 102,000
Pekerja HOK 2.00 100,000 200,000

1,577,850
3. 1 M3 Beton Tumbuk, 1 : 3 : 5
SNI. 03-3435-2002
Bahan :
Semen PC 40 Kg Zak 5.40 95,000 513,000
Kerikil M3 0.87 650,000 565,500
Pasir beton M3 0.52 680,000 353,600

Upah :
Tukang HOK 0.25 120,000 30,000
Pekerja HOK 1.65 100,000 165,000

1,627,100
4. 1 M2 Plesteran 1 : 3 Tebal 15 mm.
SNI. 03-2837-2002
Bahan :
Pasir pasang M3 0.02 680,000 13,600
Semen 40 Kg Zak 0.13 95,000 12,350

Upah :
Tukang HOK 0.05 120,000 6,000
Pekerja HOK 0.10 100,000 10,000

28,350
Tanggal Survey : Dibuat Oleh :
22 Oktober 2013

MUHAMMAD ASRI, ST
FT Kecamatan