KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
1 2.2 PASANGAN BATU DENGAN MORTAR
2 3.2 GALIAN TANAH BIASA MEKANIS
3 3.2 (1) GALIAN TANAH KEDALAMAN 0 S/D 1 M
4 3.2 (2) GALIAN TANAH KEDALAMAN 1 S/D 2 M
5 3.2 (3) GALIAN TANAH KEDALAMAN 2 S/D 4 M
6 3.2 (4) GALIAN TANAH KEDALAMAN 4 S/D 6 M
7 3.2 (5) GALIAN TANAH KERAS MEKANIS
8 3.2 (6) GALIAN BATU
9 3.2 (7) GALIAN KONGLUMERAT
10 3.2 (8) GALIAN PERKERASAN
11 3.2 (1a) KEPRASAN
12 3.3 (1) URUGAN BIASA Mekanik
13 3.3 (1a) URUGAN BIASA ( Manual )
14 3.3 ( 1b ) URUGAN BIASA ( Mendatangkan )
15 3.3 (2) URUGAN PILIHAN (SIRTU)
16 3.3 (3) URUGAN PASIR
17 3.4 PENYIAPAN BADAN JALAN
18 5.1 (1) LAPIS PONDASI AGREGAT KELAS A
19 5.1 (2) LAPIS PONDASI AGREGAT KELAS B
20 5.5 (1) LAPIS PONDASI BATU BELAH ( TELFORD )
21 5.5 (2) PASANGAN BATU TEPI
22 5.5 (3) LAPIS PONDASI BATU BELAH (ONDERLAAG)
23 5.5 (4) LAPIS PONDASI BATU PECAH (STEINSLAAG)
24 5.5 (5) LAPIS PONDASI BATU PECAH BERASPAL (STEINSLAAG BERASPAL)
25 5.7 (2) CTB (CEMENT TREATED BASE)
26 6.1 (1) LAPIS RESAP PENGIKAT (Prime Coat)
27 6.1 (2) LAPIS PEREKAT (Tack Coat)
28 6.2 (1) AGREGAT PENUTUP BURAS
29 6.3 (1) AGREGAT PENUTUP BURTU
30 6.4 (1) AGREGAT PENUTUP BURDA
31 6.4 (2) ASPAL UNTUK PEKERJAAN PELABURAN
32 6.5 (1) HRSS B 2 cm
33 6.6 (1) HRS ( LATASTON ) 3 CM 3 cm
34 6.7 (1) ATB (ASPHALT TREATED BASE) Tebal 3 Cm
35 6.7 (1a) ATB (ASPHALT TREATED BASE) Tebal 4 Cm
36 6.6 (1.a) HRS ( LATASTON ) 3 CM ( Manual ) 3 cm
37 6.7 (2) ATB ( LASTON ATAS )
38 6.8 (1) AC ( LASTON ) 4 CM 4 cm
39 6.8 (1.a) AC ( LASTON ) 4 CM ( Manual ) 4 cm
40 6.8 (2) AC ( LASTON ) 6 CM 6 cm
41 6.8 (2.a) AC ( LASTON ) 6 CM ( Manual ) 6 cm
KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
42 6.9 AC ( LASTON ) LEVELLING MANUAL
43 6.10 (1) LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,5 KG/M² 5 cm
44 6.10 (2) LAPEN MACADAM ( LAPEN LEVELLING), ASPAL 3 KG/M²
45 6.10 (3) LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,0 KG/M²
46 LAPEN MACADAM ( LAPEN LEVELING )
44 6.10 (4) LAPEN MACADAM ( LAPEN LEVELING )
45 LAPEN MACADAM ( LAPEN LEVELING 5 CM ) 5 cm
46 LAPEN MACADAM ( LAPEN LEVELING 3 CM ) 3 cm
45 7.1 (1) BETON K 500
46 7.1 (2) BETON K 400
47 7.1 (3) BETON K 350
48 7.1 (4) BETON K 300
49 7.1 (5) BETON K 275
50 7.1 (6) BETON K 250
51 7.1 (7a) BETON K 225
52 7.1 (7b) BETON K 225 DIBAWAH AIR
53 7.1 (8) BETON K 175
54 7.1 (9) BETON K 125
55 7.1 (10) BETON B 0
56 7.1 (11) BETON 1 : 3 : 5
57 7.1 (12) ACUAN BETON
58 7.1 (13) PERANCAH
59 7.1 (14) MENYIRAM DAN MEMBONGKAR BEKISTING
60 7.3 (1) BAJA TULANGAN POLOS
61 7.3 (2) BAJA TULANGAN ULIR
62 7.4 (1) PABRIKAN & PEMAS. STRUKTUR S/D PENGECATAN
63 7.4 (2) PABRIKAN & PEMAS.BANG. ATAS PLAT GIRDER BAJA
64 7.4 (3) PENGANGKUTAN RANGKA BAJA
65 7.4 (4) PEMASANGAN LENGKAP BANGUNAN ATAS RANGKA BAJA
66 7.4 (5) PERLETAKAN ELASTOMER
62 7.4 (6) PEMASANGAN BESI SHEAR CONEKTOR
63 7.10 PASANGAN BATU KALI / BELAH
64 7.10 (1) SIARAN
65 7.10 (2) PLESTERAN
66 7.11 (2) PASANGAN BATU KOSONG
67 7.11 (3) BRONJONG (GABION)
68 7.12 PASANGAN BATU BATA CAMP 1 : 3
69 7.13 BONGKARAN BETON BERTULANG
70 7.13 (1) BONGKARAN PASANGAN BATA
71 7.19 PENGECATAN TEMBOK BARU
72 7.20 PENGECATAN TEMBOK LAMA
73 7.21 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
73 7.22 PENGECATAN DENGAN CAT BESI
74 8.3 STABILITAS DENGAN TANAMAN
74 8.8 RAILING (SANDARAN) JEMBATAN
75 8.12 PASANG PAVING BLOK WARNA
76 8,12 (a) PAVING TEBAL 6 CM ( KASAR ) 6 cm
77 8,12 (b) PAVING TEBAL 8 CM ( KASAR ) 8 cm
78 8.13 PASANG BAWPLANK
KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
78 8.14 PASANG PIPA BETON TIDAK BERTULANG DIAMETER 20 CM
79 8.14 (1) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 30 CM
80 8.14 (2) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 40 CM
81 8.14 (3) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 50 CM
82 8.14 (4) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 60 CM
83 8.14 (5) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 80 CM
84 8.15 DEPLANK JEMBATAN
85 8.17 BENANGAN
HARGA SATUAN PEKERJAAN
MARGA DAN CIPTA KARYA
PATEN BONDOWOSO
N ANGGARAN 2016
HARGA SATUAN
(Rp)
5
936,400.00 / M3
16,800.00 / M3
44,800.00 / M3
59,400.00 / M3
66,000.00 / M3
81,100.00 / M3
68,500.00 / M3
137,000.00 / M3
102,700.00 / M3
143,100.00 / M3
44,800.00 / M3
139,400.00 / M3
43,200.00 / M3
177,000.00 / M3
175,100.00 / M3
152,400.00 / M3
5,500.00 / M2
379,000.00 / M3
427,600.00 / M3
77,600.00 / M2
11,900.00 / M'
40,100.00 / M2
44,600.00 / M2
62,000.00 / M2
687,600.00 / M3
15,400.00 / Liter
18,500.00 / Liter
6,300.00 / M2
10,100.00 / M2
13,800.00 / M2
23,200.00 / Liter
78,700.00 / M2
139,900.00 / M2
116,800.00 / M2
155,800.00 / M2
137,600.00 / M2
1,632,200.00 / Ton
159,100.00 / M2
156,500.00 / M2
254,200.00 / M2
251,100.00 / M2
HARGA SATUAN
(Rp)
5
1,819,600.00 / Ton
120,100.00 / M2
96,900.00 / M2
107,100.00 / M2
2,425,300.00 / M3
2,493,400.00 / M3
2,639,700.00 / M3
2,159,300.00 / M3
1,499,400.00 / M3
1,302,400.00 / M3
1,253,100.00 / M3
1,203,900.00 / M3
1,154,600.00 / M3
1,106,300.00 / M3
1,024,700.00 / M3
1,205,700.00 / M3
949,600.00 / M3
851,100.00 / M3
811,500.00 / M3
771,900.00 / M3
271,900.00 / M2
6,451,600.00 / M3
151,100.00 / M3
16,500.00 / KG
27,200.00 / KG
30,500.00 / KG
31,500.00 / KG
2,400.00 / KG
1,600.00 / KG
21,000.00 / DM3
17,100.00 / KG
946,400.00 / M3
46,100.00 / M2
56,000.00 / M2
300,400.00 / M3
614,900.00 / M3
961,600.00 / M3
409,000.00 / M3
259,700.00 / M3
51,600.00 / M2
32,600.00 / M2
37,100.00 / M2
53,900.00 / M2
70,900.00 / M2
175,800.00 / M1
125,300.00 / M2
137,400.00 / M2
125,300.00 / M2
100,000.00 / M'
HARGA SATUAN
(Rp)
5
42,800.00 / M'
60,000.00 / M'
19,800.00 / M'
19,800.00 / M'
19,800.00 / M'
146,300.00 / M'
998,500.00 / M3
9,700.00 / M'
DAFTAR REKAPITULASI
JUMLAH Rp.
PPN 10 % Rp.
JUMLAH TOTAL Rp.
DIBULATKAN Rp.
Terbilang : Seratus Tiga Puluh Satu Lima Ratus Tiga Puluh Tujuh Ribu Rupiah
DAFTAR REKAPITULASI
an Jalan
JUMLAH HARGA
#REF!
#REF!
#REF!
#REF!
#REF!
DAFTAR ANALISA PEKERJAAN
4 1 M2 PASANG PAVING STONE TYPE SEGI EMPAT T=6cm K-300 (SNI 2005)
Paving Segi Empat 1.000 M2
Pasir Urug t=10cm 0.121 M3
Pekerja 0.248 OH
Tukang Batu 0.200 OH
Kepala Tukang Batu 0.020 OH
Mandor 0.010 OH
Sewa stamper (minimal 5 jam). 0.083 Jam
45,000.00 33,750.00
65,000.00 1,625.00
Jumlah 35,375.00
45,000.00 11,250.00
65,000.00 520.00
Jumlah 11,770.00
77,530.00 93,036.00
45,000.00 13,500.00
65,000.00 650.00
Jumlah 107,186.00
12,500.00 31,250.00
123,720.00 3,711.60
1,000.00 1,000.00
45,000.00 9,000.00
55,000.00 8,250.00
60,000.00 900.00
65,000.00 520.00
Jumlah 54,631.60
2,500.00 8,350.00
77,530.00 77.53
45,000.00 9,000.00
55,000.00 5,500.00
60,000.00 600.00
65,000.00 65.00
Jumlah 23,592.53
2,230.00 486,140.00
123,720.00 64,334.40
174,380.00 151,710.60
45,000.00 74,250.00
55,000.00 13,750.00
60,000.00 1,500.00
65,000.00 5,200.00
Jumlah 796,885.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
Harga Satuan
77,530.00
123,720.00
1,777.61
12,500.00
2,500.00
64,800.00
2,230.00
174,380.00
50.00
115,000.00
42,160.00
2,389,500.00
2,340.00
6,800.00
45,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00
300,000.00
75,000.00
REKAPITULASI ANGGARAN BIAYA FISIK
____________________ ____________________
____________________
REKAPITULASI
JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp )
A. PEK. PERSIAPAN
B. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 13/04 Ds. JATI TAMBAN
C. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 12/04 Ds. JATI TAMBAN
D. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 11/04 Ds. JATI TAMBAN
E. PEK. JALAN PAVING Dsn. JERUGAN BARAT RT/RW : 10/03 Ds. JATI TAMBAN
F. PEK. JALAN PAVING Dsn. JERUGAN RT/RW : 10/03 Ds. JATI TAMBAN
G. PEK. JALAN PAVING Dsn. JERUGAN TIMUR RT/RW : 18/03 Ds. JATI TAMBAN
H. PEK. JALAN PAVING Dsn. KRAJAN RT/RW : 01/01 Ds. JATI TAMBAN
I. PEK. JALAN PAVING Dsn. KRAJAN RT/RW : 02/01 Ds. JATI TAMBAN
JUMLAH
DI BULATKAN
Terbilang :
____________________ ____________________
____________________
lan Pavingisasi
JUMLAH HARGA
( Rp )
Rp 6,500,000.00
0
0
0
0
0
0
0
0
Rp 6,500,000.00
____________________
LANJUTAN :