REKAPITULASI HARGA SATUAN PEKERJAAN

DINAS BINA MARGA DAN CIPTA KARYA


KABUPATEN BONDOWOSO
TAHUN ANGGARAN 2016

KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
1 2.2 PASANGAN BATU DENGAN MORTAR
2 3.2 GALIAN TANAH BIASA MEKANIS
3 3.2 (1) GALIAN TANAH KEDALAMAN 0 S/D 1 M
4 3.2 (2) GALIAN TANAH KEDALAMAN 1 S/D 2 M
5 3.2 (3) GALIAN TANAH KEDALAMAN 2 S/D 4 M
6 3.2 (4) GALIAN TANAH KEDALAMAN 4 S/D 6 M
7 3.2 (5) GALIAN TANAH KERAS MEKANIS
8 3.2 (6) GALIAN BATU
9 3.2 (7) GALIAN KONGLUMERAT
10 3.2 (8) GALIAN PERKERASAN
11 3.2 (1a) KEPRASAN
12 3.3 (1) URUGAN BIASA Mekanik
13 3.3 (1a) URUGAN BIASA ( Manual )
14 3.3 ( 1b ) URUGAN BIASA ( Mendatangkan )
15 3.3 (2) URUGAN PILIHAN (SIRTU)
16 3.3 (3) URUGAN PASIR
17 3.4 PENYIAPAN BADAN JALAN
18 5.1 (1) LAPIS PONDASI AGREGAT KELAS A
19 5.1 (2) LAPIS PONDASI AGREGAT KELAS B
20 5.5 (1) LAPIS PONDASI BATU BELAH ( TELFORD )
21 5.5 (2) PASANGAN BATU TEPI
22 5.5 (3) LAPIS PONDASI BATU BELAH (ONDERLAAG)
23 5.5 (4) LAPIS PONDASI BATU PECAH (STEINSLAAG)
24 5.5 (5) LAPIS PONDASI BATU PECAH BERASPAL (STEINSLAAG BERASPAL)
25 5.7 (2) CTB (CEMENT TREATED BASE)
26 6.1 (1) LAPIS RESAP PENGIKAT (Prime Coat)
27 6.1 (2) LAPIS PEREKAT (Tack Coat)
28 6.2 (1) AGREGAT PENUTUP BURAS
29 6.3 (1) AGREGAT PENUTUP BURTU
30 6.4 (1) AGREGAT PENUTUP BURDA
31 6.4 (2) ASPAL UNTUK PEKERJAAN PELABURAN
32 6.5 (1) HRSS B 2 cm
33 6.6 (1) HRS ( LATASTON ) 3 CM 3 cm
34 6.7 (1) ATB (ASPHALT TREATED BASE) Tebal 3 Cm
35 6.7 (1a) ATB (ASPHALT TREATED BASE) Tebal 4 Cm
36 6.6 (1.a) HRS ( LATASTON ) 3 CM ( Manual ) 3 cm
37 6.7 (2) ATB ( LASTON ATAS )
38 6.8 (1) AC ( LASTON ) 4 CM 4 cm
39 6.8 (1.a) AC ( LASTON ) 4 CM ( Manual ) 4 cm
40 6.8 (2) AC ( LASTON ) 6 CM 6 cm
41 6.8 (2.a) AC ( LASTON ) 6 CM ( Manual ) 6 cm
KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
42 6.9 AC ( LASTON ) LEVELLING MANUAL
43 6.10 (1) LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,5 KG/M² 5 cm
44 6.10 (2) LAPEN MACADAM ( LAPEN LEVELLING), ASPAL 3 KG/M²
45 6.10 (3) LAPIS PENETRASI MACADAM ( LAPEN ) ASPAL 4,0 KG/M²
46 LAPEN MACADAM ( LAPEN LEVELING )
44 6.10 (4) LAPEN MACADAM ( LAPEN LEVELING )
45 LAPEN MACADAM ( LAPEN LEVELING 5 CM ) 5 cm
46 LAPEN MACADAM ( LAPEN LEVELING 3 CM ) 3 cm
45 7.1 (1) BETON K 500
46 7.1 (2) BETON K 400
47 7.1 (3) BETON K 350
48 7.1 (4) BETON K 300
49 7.1 (5) BETON K 275
50 7.1 (6) BETON K 250
51 7.1 (7a) BETON K 225
52 7.1 (7b) BETON K 225 DIBAWAH AIR
53 7.1 (8) BETON K 175
54 7.1 (9) BETON K 125
55 7.1 (10) BETON B 0
56 7.1 (11) BETON 1 : 3 : 5
57 7.1 (12) ACUAN BETON
58 7.1 (13) PERANCAH
59 7.1 (14) MENYIRAM DAN MEMBONGKAR BEKISTING
60 7.3 (1) BAJA TULANGAN POLOS
61 7.3 (2) BAJA TULANGAN ULIR
62 7.4 (1) PABRIKAN & PEMAS. STRUKTUR S/D PENGECATAN
63 7.4 (2) PABRIKAN & PEMAS.BANG. ATAS PLAT GIRDER BAJA
64 7.4 (3) PENGANGKUTAN RANGKA BAJA
65 7.4 (4) PEMASANGAN LENGKAP BANGUNAN ATAS RANGKA BAJA
66 7.4 (5) PERLETAKAN ELASTOMER
62 7.4 (6) PEMASANGAN BESI SHEAR CONEKTOR
63 7.10 PASANGAN BATU KALI / BELAH
64 7.10 (1) SIARAN
65 7.10 (2) PLESTERAN
66 7.11 (2) PASANGAN BATU KOSONG
67 7.11 (3) BRONJONG (GABION)
68 7.12 PASANGAN BATU BATA CAMP 1 : 3
69 7.13 BONGKARAN BETON BERTULANG
70 7.13 (1) BONGKARAN PASANGAN BATA
71 7.19 PENGECATAN TEMBOK BARU
72 7.20 PENGECATAN TEMBOK LAMA
73 7.21 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
73 7.22 PENGECATAN DENGAN CAT BESI
74 8.3 STABILITAS DENGAN TANAMAN
74 8.8 RAILING (SANDARAN) JEMBATAN
75 8.12 PASANG PAVING BLOK WARNA
76 8,12 (a) PAVING TEBAL 6 CM ( KASAR ) 6 cm
77 8,12 (b) PAVING TEBAL 8 CM ( KASAR ) 8 cm
78 8.13 PASANG BAWPLANK
KODE
NO. URAIAN PEKERJAAN TEBAL
ANALISA
1 2 3 4
78 8.14 PASANG PIPA BETON TIDAK BERTULANG DIAMETER 20 CM
79 8.14 (1) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 30 CM
80 8.14 (2) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 40 CM
81 8.14 (3) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 50 CM
82 8.14 (4) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 60 CM
83 8.14 (5) PASANG PIPA BETON TIDAK BERTULANG DIAMETER 80 CM
84 8.15 DEPLANK JEMBATAN
85 8.17 BENANGAN
HARGA SATUAN PEKERJAAN
MARGA DAN CIPTA KARYA
PATEN BONDOWOSO
N ANGGARAN 2016

HARGA SATUAN
(Rp)
5
936,400.00 / M3
16,800.00 / M3
44,800.00 / M3
59,400.00 / M3
66,000.00 / M3
81,100.00 / M3
68,500.00 / M3
137,000.00 / M3
102,700.00 / M3
143,100.00 / M3
44,800.00 / M3
139,400.00 / M3
43,200.00 / M3
177,000.00 / M3
175,100.00 / M3
152,400.00 / M3
5,500.00 / M2
379,000.00 / M3
427,600.00 / M3
77,600.00 / M2
11,900.00 / M'
40,100.00 / M2
44,600.00 / M2
62,000.00 / M2
687,600.00 / M3
15,400.00 / Liter
18,500.00 / Liter
6,300.00 / M2
10,100.00 / M2
13,800.00 / M2
23,200.00 / Liter
78,700.00 / M2
139,900.00 / M2
116,800.00 / M2
155,800.00 / M2
137,600.00 / M2
1,632,200.00 / Ton
159,100.00 / M2
156,500.00 / M2
254,200.00 / M2
251,100.00 / M2
HARGA SATUAN
(Rp)
5
1,819,600.00 / Ton
120,100.00 / M2
96,900.00 / M2
107,100.00 / M2
2,425,300.00 / M3
2,493,400.00 / M3
2,639,700.00 / M3
2,159,300.00 / M3
1,499,400.00 / M3
1,302,400.00 / M3
1,253,100.00 / M3
1,203,900.00 / M3
1,154,600.00 / M3
1,106,300.00 / M3
1,024,700.00 / M3
1,205,700.00 / M3
949,600.00 / M3
851,100.00 / M3
811,500.00 / M3
771,900.00 / M3
271,900.00 / M2
6,451,600.00 / M3
151,100.00 / M3
16,500.00 / KG
27,200.00 / KG
30,500.00 / KG
31,500.00 / KG
2,400.00 / KG
1,600.00 / KG
21,000.00 / DM3
17,100.00 / KG
946,400.00 / M3
46,100.00 / M2
56,000.00 / M2
300,400.00 / M3
614,900.00 / M3
961,600.00 / M3
409,000.00 / M3
259,700.00 / M3
51,600.00 / M2
32,600.00 / M2
37,100.00 / M2
53,900.00 / M2
70,900.00 / M2
175,800.00 / M1
125,300.00 / M2
137,400.00 / M2
125,300.00 / M2
100,000.00 / M'
HARGA SATUAN
(Rp)
5
42,800.00 / M'
60,000.00 / M'
19,800.00 / M'
19,800.00 / M'
19,800.00 / M'
146,300.00 / M'
998,500.00 / M3
9,700.00 / M'
DAFTAR REKAPITULASI

Program : Anggaran Dana Desa ( ADD )


Kegiatan : Pembangunan Jalan
Pekerjaan : Pembangunan Jalan Paving
Lokasi : Dsn Sempolan RT/RW : 007/003
Desa Sumber Malang, Kec. Wringin, Kab. BONDOWOSO
Tahun Anggaran : 2016

NO. JENIS PEKERJAAN JUMLAH HARG

I. PEKERJAAN JALAN PAVING

1 Dsn. Sempolan Uk. 1,5 m' x 260 m' Rp

JUMLAH Rp.
PPN 10 % Rp.
JUMLAH TOTAL Rp.
DIBULATKAN Rp.

Terbilang : Seratus Tiga Puluh Satu Lima Ratus Tiga Puluh Tujuh Ribu Rupiah
DAFTAR REKAPITULASI

an Jalan

JUMLAH HARGA

#REF!

#REF!
#REF!
#REF!
#REF!
DAFTAR ANALISA PEKERJAAN

Program : (10415) Pengembangan Perumahan


Kegiatan : #REF!

Pekerjaan : Jalan Paving


Lokasi : #REF!
#REF!
Sumber Dana : DPA SKPD Dinas PU Cipta Karya Dan Tata Ruang Provinsi Jawa Timu
Tahun Anggaran : 2015

No. Uraian Pekerjaan Volume Koefisien


1 2 3

1 1 M3 GALIAN TANAH BIASA (SNI DT 91-0006-2007) 6.1


Pekerja 0.750 OH
Mandor 0.025 OH

2 1 M3 URUGAN TANAH KEMBALI (SNI DT 91-0006-2007) 6.9


Pekerja 0.250 OH
Mandor 0.008 OH

3 1 M3 URUGAN PASIR (SNI DT 91-0006-2007) 6.11


Pasir Urug 1.200 M3
Pekerja 0.300 OH
Mandor 0.010 OH

4 1 M2 PASANG PAVING STONE TYPE SEGI EMPAT T=6cm K-300 (SNI 2005)
Paving Segi Empat 1.000 M2
Pasir Urug t=10cm 0.121 M3
Pekerja 0.248 OH
Tukang Batu 0.200 OH
Kepala Tukang Batu 0.020 OH
Mandor 0.010 OH
Sewa stamper (minimal 5 jam). 0.083 Jam

5 1 M' PASANGAN KANSTIN / Skreb 10x20x40 (SNI 2005)


Kanstin 10x20x40 cm 2.500 Bj
Pasir Pasang 0.030 M3
Spesi Untuk Sambungan 1.000 Ls
Pekerja 0.200 OH
Tukang Batu 0.150 OH
Kepala Tukang Batu 0.015 OH
Mandor 0.008 OH

6 1 M' PASANGAN USKUP Uk. t=6cm


Uskup Paving Stone 3.340 Bj
Pasir Urug 0.001 M3
Pekerja 0.200 OH
Tukang Batu 0.100 OH
Kepala Tukang Batu 0.010 OH
Mandor 0.001 OH

7 1 M3 BETON RABAT 1 Pc : 3 Ps : 5 Kr (SNI 2008) 7.6.1


Semen Pc 218.000 Kg
Pasir Beton 0.520 M3
Krikil beton 2/3 0.870 M3
Pekerja 1.650 OH
Tukang batu 0.250 OH
Kep. Tukang batu 0.025 OH
Mandor 0.080 OH
DAFTAR ANALISA PEKERJAAN

as PU Cipta Karya Dan Tata Ruang Provinsi Jawa Timur

Harga Satuan Jumlah Harga


(Rp) (Rp)
4 5

45,000.00 33,750.00
65,000.00 1,625.00
Jumlah 35,375.00

45,000.00 11,250.00
65,000.00 520.00
Jumlah 11,770.00

77,530.00 93,036.00
45,000.00 13,500.00
65,000.00 650.00
Jumlah 107,186.00

E SEGI EMPAT T=6cm K-300 (SNI 2005)


81,770.00 81,770.00
77,530.00 9,381.13
45,000.00 11,160.00
55,000.00 11,000.00
60,000.00 1,200.00
65,000.00 650.00
60,000.00 4,980.00
Jumlah 120,141.13

12,500.00 31,250.00
123,720.00 3,711.60
1,000.00 1,000.00
45,000.00 9,000.00
55,000.00 8,250.00
60,000.00 900.00
65,000.00 520.00
Jumlah 54,631.60

2,500.00 8,350.00
77,530.00 77.53
45,000.00 9,000.00
55,000.00 5,500.00
60,000.00 600.00
65,000.00 65.00
Jumlah 23,592.53

2,230.00 486,140.00
123,720.00 64,334.40
174,380.00 151,710.60
45,000.00 74,250.00
55,000.00 13,750.00
60,000.00 1,500.00
65,000.00 5,200.00
Jumlah 796,885.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH

Program : (10415) Pengembangan Perumahan


Kegiatan : #REF!

Pekerjaan : Jalan Paving


Lokasi : #REF!
#REF!
Tahun Anggaran : #REF!

NO. Uraian Bahan Satuan Harga Satuan

A. HARGA SATUAN BAHAN BANGUNAN

1 Pasir Urug M3 Rp.


2 Pasir Pasang / beton M3 Rp.
3 Paving segi empat tebal 6 cm K-300 BJ Rp.
4 Kanstin uk.10x20x40 cm BJ Rp.
5 Uskup / Stoper BJ Rp.
6 Tanah Urug M3 Rp.
7 Semen PC Kg Rp.
8 Koral / batu pecah 2/3 M3 Rp.
9 Air Ltr Rp.
10 Grosok M3 Rp.
Batu Piring M2 Rp.
Aspal drm Rp.
Genteng Biasa
Bubung Biasa
Pipa PVC 1,5"

B HARGA SATUAN UPAH KERJA


1 Pekerja Org / Hr Rp.
2 Tukang Batu Org / Hr Rp.
3 Tukang Kayu Org / Hr Rp.
4 Tukang Besi Org / Hr Rp.
5 Kepala Tukang Org / Hr Rp.
6 Mandor Org / Hr Rp.
C HARGA SATUAN ALAT
1 Alat bantu pemadat / stamper (sewa/hr) Unit/Hari Rp.
2 Bodem Unit Rp.
HARGA SATUAN BAHAN DAN UPAH

Harga Satuan

77,530.00
123,720.00
1,777.61
12,500.00
2,500.00
64,800.00
2,230.00
174,380.00
50.00
115,000.00
42,160.00
2,389,500.00
2,340.00
6,800.00

45,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00
300,000.00
75,000.00
REKAPITULASI ANGGARAN BIAYA FISIK

PROPINSI : Jawa Timur NO. RAB :


KABUPATEN : Bondowoso PROGRAM : Dana Desa ( DD )
KECAMATAN : Wringin PEKERJAAN : Pembangunan Jalan Pavingisasi
DESA : Jati Tamban TAHUN : 2017

VOLUME SATUAN HARGA SATUAN JUMLAH TOTAL


URAIAN
TOTAL DI BULATKAN ( Rp ) ( Rp )
BIAYA PERSIAPAN
Pek. Persiapan / Pengukuran 1 1 Ls Rp 6,500,000.00 Rp 6,500,000.00
JUMLAH A. Rp 6,500,000.00
PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 13/04 Ds. JATI TAMBAN
Bahan
Pasir Pasang 31 31 m3 Rp 195,000.00 Rp 6,045,000.00
Pasir Urug 27 27 m3 Rp 88,000.00 Rp 2,376,000.00
Koral 13 13 m3 Rp 293,000.00 Rp 3,809,000.00
Semen PC @ 40 kg 245 245 Zak Rp 62,000.00 Rp 15,190,000.00
Ky. Bekisting 0.24 0.24 m3 Rp 3,900,000.00 Rp 917,600.00
Perancah m3
Paku 3 3 kg Rp 15,800.00 Rp 47,400.00
Paving Tbl. 6cm 268 268 m2 Rp 67,000.00 Rp 17,956,000.00
Gorong-gorong Ø 30 cm bh
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 9 9 bh Rp 15,000.00 Rp 135,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Selang 5 5 m' Rp 5,000.00 Rp 25,000.00
Benang 2 2 roll Rp 4,000.00 Rp 8,000.00
Upah
Tukang 93 93 HOK Rp 61,000.00 Rp 5,673,000.00
Pekerja 279 279 HOK Rp 50,000.00 Rp 13,950,000.00
JUMLAH Rp 66,247,000.00
PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 12/04 Ds. JATI TAMBAN
Bahan
Pasir Pasang 16 16 m3 Rp 195,000.00 Rp 3,120,000.00
Pasir Urug 32 32 m3 Rp 88,000.00 Rp 2,816,000.00
Semen PC @ 40 kg 150 150 Zak Rp 62,000.00 Rp 9,300,000.00
Ky. Bekisting 1.05 1.05 m3 Rp 3,900,000.00 Rp 4,108,550.00
Paku 12 12 kg Rp 15,800.00 Rp 189,600.00
Paving Tbl. 6cm 304 304 m2 Rp 67,000.00 Rp 20,368,000.00
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 9 9 bh Rp 15,000.00 Rp 135,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 72 72 HOK Rp 61,000.00 Rp 4,392,000.00
Pekerja 216 216 HOK Rp 50,000.00 Rp 10,800,000.00
JUMLAH Rp 55,348,150.00
LANJUTAN :

VOLUME SATUAN HARGA SATUAN JUMLAH TOTAL


URAIAN
TOTAL DI BULATKAN ( Rp ) ( Rp )
PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 11/04 Ds. JATI TAMBAN
Bahan
Pasir Pasang 19 19 m3 Rp 195,000.00 Rp 3,705,000.00
Pasir Urug 56 56 m3 Rp 88,000.00 Rp 4,928,000.00
Koral m3 Rp 293,000.00
Batu Belah 4 4 m3 Rp 143,000.00 Rp 572,000.00
Semen PC @ 40 kg 158 158 Zak Rp 62,000.00 Rp 9,796,000.00
Ky. Bekisting 1.23 1.23 m3 Rp 3,900,000.00 Rp 4,782,800.00
Paku 12 12 kg Rp 15,800.00 Rp 189,600.00
Paving Tbl. 6cm 542 542 m2 Rp 67,000.00 Rp 36,314,000.00
Gorong-gorong Ø 30 cm Bh
Gorong-gorong Ø 60 cm Bh
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 7 7 bh Rp 15,000.00 Rp 105,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Sekop 1 1 bh Rp 85,000.00 Rp 85,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 87 87 HOK Rp 61,000.00 Rp 5,307,000.00
Pekerja 261 261 HOK Rp 50,000.00 Rp 13,050,000.00
JUMLAH Rp 78,953,400.00
PEKERJAAN JALAN PAVING Dsn. JERUGAN BARAT RT/RW : 10/03 Ds. JATI TAMBAN
Bahan
Pasir Pasang 15 15 m3 Rp 195,000.00 Rp 2,925,000.00
Pasir Urug 71 71 m3 Rp 88,000.00 Rp 6,248,000.00
Koral Rp 293,000.00
Semen PC @ 40 kg 4 4 m3 Rp 293,000.00 Rp 1,172,000.00
Ky. Bekisting 117 117 Zak Rp 62,000.00 Rp 7,254,000.00
Paku 0.51 0.51 m3 Rp 3,900,000.00 Rp 1,990,000.00
Paving Tbl. 6cm 0.51 0.51 m3 Rp 3,900,000.00 Rp 1,983,000.00
Gorong-gorong Ø 30 cm 10 10 kg Rp 15,800.00 Rp 158,000.00
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 7 7 bh Rp 15,000.00 Rp 105,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Sekop 1 1 bh Rp 85,000.00 Rp 85,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 87 87 HOK Rp 61,000.00 Rp 5,307,000.00
Pekerja 261 261 HOK Rp 50,000.00 Rp 13,050,000.00
JUMLAH Rp 40,396,000.00
PEKERJAAN JALAN PAVING Dsn. JERUGAN RT/RW : 10/03 Ds. JATI TAMBAN
Bahan
Pasir Pasang 15 15 m3 Rp 195,000.00 Rp 2,925,000.00
Pasir Urug 71 71 m3 Rp 88,000.00 Rp 6,248,000.00
Semen PC @ 40 kg 4 4 m3 Rp 293,000.00 Rp 1,172,000.00
Ky. Bekisting 117 117 Zak Rp 62,000.00 Rp 7,254,000.00
Paku 0.51 0.51 m3 Rp 3,900,000.00 Rp 1,990,000.00
Paving Tbl. 6cm 0.51 0.51 m3 Rp 3,900,000.00 Rp 1,983,000.00
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 7 7 bh Rp 15,000.00 Rp 105,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Sekop 1 1 bh Rp 85,000.00 Rp 85,000.00
Selang 5 5 m' Rp 5,000.00 Rp 25,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 152 152 HOK Rp 61,000.00 Rp 9,272,000.00
Pekerja 456 456 HOK Rp 50,000.00 Rp 22,800,000.00
JUMLAH Rp 53,978,000.00
PEKERJAAN JALAN PAVING Dsn. JERUGAN TIMUR RT/RW : 18/03 Ds. JATI TAMBAN
Bahan
Pasir Pasang 19 19 m3 Rp 195,000.00 Rp 3,705,000.00
Pasir Urug 56 56 m3 Rp 88,000.00 Rp 4,928,000.00
Batu Belah 4 4 m3 Rp 143,000.00 Rp 572,000.00
Semen PC @ 40 kg 158 158 Zak Rp 62,000.00 Rp 9,796,000.00
Ky. Bekisting 1.23 1.23 m3 Rp 3,900,000.00 Rp 4,782,800.00
Paku 12 12 kg Rp 15,800.00 Rp 189,600.00
Paving Tbl. 6cm 542 542 m2 Rp 67,000.00 Rp 36,314,000.00
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 7 7 bh Rp 15,000.00 Rp 105,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Sekop 1 1 bh Rp 85,000.00 Rp 85,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 87 87 HOK Rp 61,000.00 Rp 5,307,000.00
Pekerja 261 261 HOK Rp 50,000.00 Rp 13,050,000.00
JUMLAH Rp 75,248,400.00
PEKERJAAN JALAN PAVING Dsn. KRAJAN RT/RW : 01/01 Ds. JATI TAMBAN
Bahan
Pasir Pasang 19 19 m3 Rp 195,000.00 Rp 3,705,000.00
Pasir Urug 56 56 m3 Rp 88,000.00 Rp 4,928,000.00
Koral m3 Rp 293,000.00
Semen PC @ 40 kg 158 158 Zak Rp 62,000.00 Rp 9,796,000.00
Ky. Bekisting 1.23 1.23 m3 Rp 3,900,000.00 Rp 4,782,800.00
Paku 12 12 kg Rp 15,800.00 Rp 189,600.00
Paving Tbl. 6cm 542 542 m2 Rp 67,000.00 Rp 36,314,000.00
Gorong-gorong Ø 60 cm Bh
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 7 7 bh Rp 15,000.00 Rp 105,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Sekop 1 1 bh Rp 85,000.00 Rp 85,000.00
Benang 1 1 roll Rp 4,000.00 Rp 4,000.00
Upah
Tukang 87 87 HOK Rp 61,000.00 Rp 5,307,000.00
Pekerja 261 261 HOK Rp 50,000.00 Rp 13,050,000.00
JUMLAH Rp 74,676,400.00
VOLUME SATUAN HARGA SATUAN JUMLAH TOTAL
URAIAN
TOTAL DI BULATKAN ( Rp ) ( Rp )
PEKERJAAN JALAN PAVING Dsn. KRAJAN RT/RW : 02/01 Ds. JATI TAMBAN
Bahan
Pasir Pasang 19 19 m3 Rp 195,000.00 Rp 3,705,000.00
Pasir Urug 56 56 m3 Rp 88,000.00 Rp 4,928,000.00
Koral m3 Rp 293,000.00
Semen PC @ 40 kg 158 158 Zak Rp 62,000.00 Rp 9,796,000.00
Ky. Bekisting 1.23 1.23 m3 Rp 3,900,000.00 Rp 4,782,800.00
Paku 12 12 kg Rp 15,800.00 Rp 189,600.00
Paving Tbl. 6cm 542 542 m2 Rp 67,000.00 Rp 36,314,000.00
Gorong-gorong Ø 60 cm Bh
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 5 5 bh Rp 15,000.00 Rp 75,000.00
Cangkul 1 1 bh Rp 70,000.00 Rp 70,000.00
Selang 10 10 m' Rp 5,000.00 Rp 50,000.00
Benang 3 3 roll Rp 4,000.00 Rp 12,000.00
Upah
Tukang 33 33 HOK Rp 61,000.00 Rp 2,013,000.00
Pekerja 99 99 HOK Rp 50,000.00 Rp 4,950,000.00
JUMLAH Rp 66,930,400.00
TOTAL BIAYA Rp 443,601,350.00
DI BULATKAN Rp 443,601,350.00

Mengetahui : Menyetujui : Bondowoso, 28 Februari 2017


Kepala Sekdes Direncanakan :
Desa Jati Tamban Desa Jati Tamban Ketua TPK
Desa Jati Tamban

____________________ ____________________ ____________________


REKAPITULASI ANGGARAN BIAYA

PROPINSI : Jawa Timur NO. RAB :


KABUPATEN : Bondowoso PROGRAM : Dana Desa ( DD )
KECAMATAN : Wringin PEKERJAAN : Pembangunan Jalan Pavingisasi
DESA : Jati Tamban TAHUN : 2017

HARGA SATUAN JUMLAH TOTAL


NO. URAIAN SAT VOLUME
( Rp ) ( Rp )
A. BIAYA PERSIAPAN
Pek. Persiapan / Pengukuran Ls 1 Rp 6,500,000.00 Rp 6,500,000.00
JUMLAH A. Rp 6,500,000.00
B. PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 13/04 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M3 Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M 3
Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Plesteran M 2
Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
C. PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 12/04 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M 3
Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M 3
Rp 293,000.00 Rp -
5 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
D. PEKERJAAN JALAN PAVING Dsn. JATI OMBO RT/RW : 11/04 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M 3
Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M 3
Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Plesteran M 2
Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
E. PEKERJAAN JALAN PAVING Dsn. JERUGAN BARAT RT/RW : 10/03 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M3 Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M 3
Rp 293,000.00 Rp -
5 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
F. PEKERJAAN JALAN PAVING Dsn. JERUGAN RT/RW : 10/03 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M 3
Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
LANJUTAN :

HARGA SATUAN JUMLAH TOTAL


NO. URAIAN SAT VOLUME
( Rp ) ( Rp )
G. PEKERJAAN JALAN PAVING Dsn. JERUGAN TIMUR RT/RW : 18/03 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M 3
Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Siaran M2
6 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
JUMLAH Rp -
H. PEKERJAAN JALAN PAVING Dsn. KRAJAN RT/RW : 01/01 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M 3
Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
I. PEKERJAAN JALAN PAVING Dsn. KRAJAN RT/RW : 02/01 Ds. JATI TAMBAN
1 Pek. Galian Tanah M3 Rp 195,000.00 Rp -
2 Pek. Urugan Tanah M3 Rp 88,000.00 Rp -
3 Pek. Beton 1:3:5 (kanstin) M3 Rp 890,000.00 Rp -
4 Pek. Pasangan Paving tbl 6cm M3 Rp 293,000.00 Rp -
5 Pek. Plesteran M2 Rp 3,900,000.00 Rp -
6 Gorong-gorong Ø 30 cm M' Rp 99,200.00 Rp -
JUMLAH Rp -
TOTAL BIAYA #REF!
DI BULATKAN #REF!

Mengetahui : Menyetujui : Bondowoso, 28 Februari 2017


Kepala Sekdes Direncanakan :
Desa Jati Tamban Desa Jati Tamban Ketua TPK
Desa Jati Tamban

____________________ ____________________
____________________
REKAPITULASI

PROPINSI : Jawa Timur NO. RAB :


KABUPATEN : Bondowoso PROGRAM : Dana Desa ( DD )
KECAMATAN : Wringin PEKERJAAN : Pembangunan Jalan Pavingisasi
DESA : Jati Tamban TAHUN : 2017

JUMLAH HARGA
NO. URAIAN PEKERJAAN
( Rp )

A. PEK. PERSIAPAN
B. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 13/04 Ds. JATI TAMBAN
C. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 12/04 Ds. JATI TAMBAN
D. PEK. JALAN PAVING Dsn. JATI OMBO RT/RW : 11/04 Ds. JATI TAMBAN
E. PEK. JALAN PAVING Dsn. JERUGAN BARAT RT/RW : 10/03 Ds. JATI TAMBAN
F. PEK. JALAN PAVING Dsn. JERUGAN RT/RW : 10/03 Ds. JATI TAMBAN
G. PEK. JALAN PAVING Dsn. JERUGAN TIMUR RT/RW : 18/03 Ds. JATI TAMBAN
H. PEK. JALAN PAVING Dsn. KRAJAN RT/RW : 01/01 Ds. JATI TAMBAN
I. PEK. JALAN PAVING Dsn. KRAJAN RT/RW : 02/01 Ds. JATI TAMBAN

JUMLAH

DI BULATKAN
Terbilang :

Mengetahui : Menyetujui : Bondowoso, 28 Februari 2017


Kepala Sekdes Direncanakan :
Desa Jati Tamban Desa Jati Tamban Ketua TPK
Desa Jati Tamban

____________________ ____________________
____________________
lan Pavingisasi

JUMLAH HARGA
( Rp )

Rp 6,500,000.00
0
0
0
0
0
0
0
0

Rp 6,500,000.00

Bondowoso, 28 Februari 2017


Direncanakan :
Ketua TPK
Desa Jati Tamban

____________________
LANJUTAN :

VOLUME SATUAN HARGA SATUAN JUMLAH TOTAL


URAIAN
TOTAL DI BULATKAN ( Rp ) ( Rp )
Kayu Perancah 0.06 0.06 m3 Rp 3,900,000.00 Rp 218,100.00
Paku 3 3 kg Rp 15,800.00 Rp 47,400.00
Batu Belah 24 24 m3 Rp 143,000.00 Rp 3,432,000.00
Baja Tulangan Polos 245 245 kg Rp 12,800.00 Rp 3,136,000.00
Kawat 4 4 kg Rp 19,750.00 Rp 79,000.00
Batu Pecah ( 3/5 - 5/7) 39.00 39.00 m3 Rp 187,000.00 Rp 7,293,000.00
Batu Pecah ( 10/15) 80 80 m3 Rp 143,000.00 Rp 11,440,000.00
Batu Pecah ( 2/3 ) 10 10 m3 Rp 247,000.00 Rp 2,470,000.00
Batu Pecah ( 1/2 ) 6 6 m3 Rp 273,000.00 Rp 1,638,000.00
Batu Pecah 0.5/1 4 4 m3 Rp 273,000.00 Rp 1,092,000.00
Aspal 15 15 Drm Rp 2,092,500.00 Rp 31,387,500.00
Solar 100 100 ltr Rp 5,250.00 Rp 525,000.00
Kayu Bakar 1 1 Ls Rp 150,000.00 Rp 150,000.00
Alat
Ayakan 5 5 bh Rp 45,000.00 Rp 225,000.00
Cangkul 2 2 bh Rp 70,000.00 Rp 140,000.00
Timba 8 8 bh Rp 15,000.00 Rp 120,000.00
Selang 8 8 m' Rp 5,000.00 Rp 40,000.00
Benang 4 4 Roll Rp 4,000.00 Rp 16,000.00
Sewa Alat Berat 10 10 Hari Rp 450,000.00 Rp 4,500,000.00
Upah
Tukang 20 20 HOK Rp 61,000.00 Rp 1,220,000.00
Pekerja 120 120 HOK Rp 50,000.00 Rp 6,000,000.00
Operator 10 10 HOK Rp 77,000.00 Rp 770,000.00
Pembantu Operator 10 10 HOK Rp 50,000.00 Rp 500,000.00
JUMLAH Rp 86,876,000.00
RT 5 RW 2 Desa Glingseran
Bahan
Pasir Pasang 23 23 m3 Rp 195,000.00 Rp 4,485,000.00
Pasir Urug 54 54 m3 Rp 88,000.00 Rp 4,752,000.00
Semen PC @ 40 kg 169 169 Zak Rp 62,000.00 Rp 10,478,000.00
Koral 35 35 m3 Rp 293,000.00 Rp 10,255,000.00
Ky. Bekisting 1.40 1.40 m3 Rp 3,900,000.00 Rp 5,460,000.00
Paku 17 17 kg Rp 15,800.00 Rp 268,600.00
Paving Tbl. 6cm 386 386 m2 Rp 67,000.00 Rp 25,874,400.00
Alat
Ayakan 1 1 bh Rp 45,000.00 Rp 45,000.00
Timba 10 10 bh Rp 15,000.00 Rp 150,000.00
Selang 5 5 m' Rp 5,000.00 Rp 25,000.00
Benang 4 4 roll Rp 4,000.00 Rp 16,000.00
Upah
Tukang 99 99 HOK Rp 61,000.00 Rp 6,039,000.00
Pekerja 286 286 HOK Rp 50,000.00 Rp 14,300,000.00
JUMLAH Rp 82,148,000.00
TOTAL BIAYA Rp 529,898,000.00
DI BULATKAN Rp 529,898,000.00

Bondowoso, 22 April 2016


Mengetahui : Menyetujui : Direncanakan :
Kepala Sekdes Ketua TPK
Desa Glingseran Desa Glingseran Desa Glingseran

____________________ ____________________ ____________________


Mengetahui : Menyetujui : Direncanakan :
Kepala Sekdes Ketua TPK
Desa Glingseran Desa Glingseran Desa Glingseran

____________________ ____________________ ____________________


LANUTAN :

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
G. Dusun Kokap RT 5
5 Pek. Plesteran 1 : 3 m2 13.16 Rp 46,400.00 Rp 610,624.00
6 Pasangan Batu Kali 1 : 4 m3 7.82 Rp 775,600.00 Rp 6,065,192.00
7 Pek. Siaran 1 : 2 m2 8.00 Rp 38,500.00 Rp 308,000.00
8 Pek. Baja Tulangan Polos dia 12 -15 kg 244.02 Rp 14,100.00 Rp 3,440,715.84
9 Pek. Plat Beton K250 m3 1.76 Rp 1,163,700.00 Rp 2,048,112.00
10 Pek. Pasangan Batu Tepi m' 400.00 Rp 9,300.00 Rp 3,720,000.00
11 Pek. PasanganTelford 10/15 m2 440.00 Rp 59,300.00 Rp 26,092,000.00
12 Pek. Lapis Penetrasi 5 cm m2 501.88 Rp 84,400.00 Rp 42,358,250.00
JUMLAH H. Rp 86,875,769.00
F. RT 5 RW 2 Desa Glingseran
1 Pek. Galian Tanah m3 13.41 Rp 36,800.00 Rp 493,488.00
2 Pek. Acuan Beton m2 29.80 Rp 229,600.00 Rp 6,842,080.00
3 Pek. Beton Kanstin 1 : 3 : 5 m3 26.82 Rp 890,300.00 Rp 23,877,846.00
4 Pek. Paving t : 6cm m2 453.60 Rp 94,000.00 Rp 42,638,400.00
5 Pek. Plesteran 1 : 3 m2 178.80 Rp 46,400.00 Rp 8,296,320.00
JUMLAH H. Rp 82,148,134.00
JUMLAH TOTAL ( A + B + C + D + E + F ) Rp 529,897,601.00
DIBULATKAN Rp 529,898,000.00

Bondowoso, 27 April 2016


Menyetujui : Menyetujui : Direncanakan :
Sekdes Sekdes Ketua TPK
Desa Glingseran Desa Glingseran Desa Glingseran

___________________ ____________________ ____________________

Anda mungkin juga menyukai