REKAPITULASI RENCANA ANGGARAN BIAYA (RA

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN : PEMBANGUNAN KANTIN BLUD RUMAH SAKIT KONAWE

LOKASI : BADAN LAYANAN UMUM DAERAH (BLUD) RUMAH SAKIT KONAWE

TAHUN ANGGARAN: 2018

NO URAIAN PEKERJAAN

a b

I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PONDASI
IV PEKERJAAN STRUKTUR BETON DAN RABAT
V PEKERJAAN PASANGAN & PLESTERAN DINDING
VI PEKERJAAN PLAFOND
VII PEKERJAAN KUSEN
VIII PEKERJAAN KUDA-KUDA DAN ATAP
IX PEKERJAAN LANTAI
X PEKERJAAN INSTALASI LISTRIK
XI PEKERJAAN SANITASI
XII PEKERJAAN BESI WIREMESH
XIII PEKERJAAN FINISHING
XIV PENGADAAN PERABOT KANTIN
A. REAL COST
B. PPN 10%
C. PERENCANAAN (2,5%)
C. PENGAWASAN (2%)
C. TOTAL COST (A+B)
D. DIBULATKAN

Terbilang : DUA RATUS JUTA TUJUH RATUS LIMA PULUH TIGA RIBU RUPIAH.

Unaaha, Novem
Mengetahui/Menyetujui : Dibuat Ole
PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN PER
(BLUD) RUMAH SAKIT KONAWE CV. ZENITH ENGINEERIN

ABD. MALIK, ST JABIRUDDIN


Nip. 19690416 199103 1 006 Direktur

Mengetahui/Menyetujui :
KEPALA BADAN LAYANAN UMUM DAERAH
(BLUD) RUMAH SAKIT KONAWE

Dr. H. M. AGUS S. LAHIDA, MMR


Nip. 19760826 199703 1 002
GARAN BIAYA (RAB)

UMAH SAKIT KONAWE

JUMLAH HARGA
(Rp)
c

Rp 2,166,000.00
Rp 3,325,164.17
Rp 8,412,725.30
Rp 33,024,675.56
Rp 19,550,905.96
Rp -
Rp 3,228,260.54
Rp 52,797,059.75
Rp 21,036,169.27
Rp 11,620,773.99
Rp 12,401,878.40
Rp 9,187,500.00
Rp 5,752,119.42
Rp -
Rp 182,503,232.35
Rp 18,250,323.23
Rp 4,562,580.81
Rp 3,650,064.65
Rp 208,966,201.04
Rp 208,966,000.00

H TIGA RIBU RUPIAH.

Unaaha, November 2018


Dibuat Oleh :
KONSULTAN PERENCANA
CV. ZENITH ENGINEERING CONSULTANT

JABIRUDDIN, S.T
Direktur
ESTIMATE ENGINEERING CONSULTAN
(EE)

KEGIATAN :
PENINGKATAN SARANA DAN PRASARANA APARAT

PEKERJAAN :
PEMBANGUNAN KANTIN BLUD RUMAH SAKIT KON

LOKASI :
BADAN LAYANAN UMUM DAERAH (BLUD) RUMAH SAKIT
TAHUN ANGGARAN 2018

KONSULTAN PERENCANA :
ONSULTAN
E)

:
SARANA APARATUR

N:
MAH SAKIT KONAWE

D) RUMAH SAKIT KONAWE


N 2018

NCANA :
RENCANA KERJA DAN SYARAT - SYA
TEKNIS (RKS

KEGIATAN :
PENINGKATAN SARANA DAN PRASARANA APARAT

PEKERJAAN :
PEMBANGUNAN KANTIN BLUD RUMAH SAKIT KON

LOKASI :
BADAN LAYANAN UMUM DAERAH (BLUD) RUMAH SAKIT
DANA ALOKASI UMUM
TAHUN ANGGARAN 2018

KONSULTAN PERENCANA :
ARAT - SYARAT
(RKS)

:
SARANA APARATUR

N:
MAH SAKIT KONAWE

D) RUMAH SAKIT KONAWE


UMUM
N 2018

NCANA :
REKAPITULASI RENCANA ANGGARAN BIAYA (RA

KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR

PEKERJAAN : PEMBANGUNAN KANTIN BLUD RUMAH SAKIT KONAWE

LOKASI : BADAN LAYANAN UMUM DAERAH (BLUD) RUMAH SAKIT KONAWE

TAHUN ANGGARAN: 2018

NO URAIAN PEKERJAAN

a b

I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PONDASI
IV PEKERJAAN STRUKTUR BETON DAN RABAT
V PEKERJAAN PASANGAN & PLESTERAN DINDING
VI PEKERJAAN PLAFOND
VII PEKERJAAN KUSEN
VIII PEKERJAAN KUDA-KUDA DAN ATAP
IX PEKERJAAN LANTAI
X PEKERJAAN INSTALASI LISTRIK
XI PEKERJAAN SANITASI
XII PEKERJAAN BESI WIREMESH
XIII PEKERJAAN FINISHING
XIV PENGADAAN PERABOT KANTIN
A. REAL COST
B. PPN 10%
C. TOTAL COST (A+B)
D. DIBULATKAN

Terbilang : DUA RATUS JUTA TUJUH RATUS LIMA PULUH TIGA RIBU RUPIAH.

Unaaha, Novem
Diperiksa Oleh : Dibuat Ole
KEPALA DINAS PEKERJAAN UMUM, PENATAAN RUANG, KONSULTAN PER
PERUMAHAN & KAWASAN PERMUKIMAN CV. ZENITH ENGINEERIN
KAB. KONAWE

Ir. MUH. SYAHRULLAH. S.,MT JABIRUDDIN


Nip. 19631009 200212 1 005 Direktur

Mengetahui/Menyetujui :
KEPALA BADAN LAYANAN UMUM DAERAH
(BLUD) RUMAH SAKIT KONAWE

Dr. H. M. AGUS S. LAHIDA, MMR


Nip. 19760826 199703 1 002
GARAN BIAYA (RAB)

UMAH SAKIT KONAWE

JUMLAH HARGA
(Rp)
c

Rp 2,166,000.00
Rp 3,325,164.17
Rp 8,412,725.30
Rp 33,024,675.56
Rp 19,550,905.96
Rp -
Rp 3,228,260.54
Rp 52,797,059.75
Rp 21,036,169.27
Rp 11,620,773.99
Rp 12,401,878.40
Rp 9,187,500.00
Rp 5,752,119.42
Rp -
Rp 182,503,232.35
Rp 18,250,323.23
Rp 200,753,555.58
Rp 200,753,000.00

H TIGA RIBU RUPIAH.

Unaaha, November 2018


Dibuat Oleh :
KONSULTAN PERENCANA
CV. ZENITH ENGINEERING CONSULTANT

JABIRUDDIN, S.T
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : PEMBANGUNAN KANTIN BLUD RUMAH SAKIT KONAWE
LOKASI : BADAN LAYANAN UMUM DAERAH (BLUD) RUMAH SAKIT KONAWE
TAHUN ANGGARAN: 2018

KODE
NO URAIAN PEKERJAAN VOLUME SAT.
ANALISA
a b c d e
I PEKERJAAN PERSIAPAN
1 Pembersihan awal (Lapangan dan peralatan) - Ls -
2 Pengukuran / Pemasangan Bouwplank 1.00 Ls -
3 Pembuatan Kantor Direksi Keet & Gudang Bahan/Material - Ls -
4 Papan Nama Proyek 1.00 Ls -
5 Administrasi dan Dokumentasi 1.00 Ls -
6 Air Kerja dan P3K 1.00 Ls -
JUMLAH - I
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi Batu Gunung/Kali 9.32 M3 A.2.3.1.1
2 Pek. Urug. Tanah Kembali Sisi Pondasi Batu Gunung/Kali 3.11 M3 A.2.3.1.9
3 Pek. Urug. Tanah Bawah Lantai Dalam Bangunan 18.90 M 3
A.2.3.1.15
4 Pek. Urug. Pasir Bawah Pondasi Batu Gunung/ Kali T=5 cm 0.89 M3 A.2.3.1.11
5 Pek. Urug. Pasir Bawah Lantai Dalam Bangunan T=5 cm 3.92 M3 A.2.3.1.11
JUMLAH - II
III PEKERJAAN PONDASI
1 Pek. Pasangan Pondasi Batu Kosong - M3 A.3.2.1.9
2 Pek. Pasangan Pondasi Batu Gunung/Kali 1 Pc : 5 Ps 9.53 M3 A.3.2.1.2
JUMLAH - III
IV PEKERJAAN STRUKTUR BETON DAN RABAT
1 Pekerjaan Sloof (Sf) Uk. 12x20 cm
1.1. Pek. Beton 1.15 M3 A.A.4.1.1.6
1.2. Pek. Pembesian 171.94 KG A.4.1.1.17
1.3. Bekisting 9.60 M2 A.4.1.1.21
2 Pek. Kolom Utama (Ku) Uk. 15x15 cm
2.1. Pek. Beton - M3 A.A.4.1.1.6
2.2. Pek. Pembesian - KG A.4.1.1.17
2.3. Pek. Bekisting - M2 A.4.1.1.22
3 Pek. Kolom Praktis (Kp) Uk. 11x11 cm
3.1. Pek. Beton 0.64 M3 A.A.4.1.1.6
3.2. Pek. Pembesian 190.54 KG A.4.1.1.17
3.3. Pek. Bekisting 5.85 M2 A.4.1.1.22
4 Pek. Balok (B1) Uk. 10x15 cm
4.1. Pek. Beton - M3 A.A.4.1.1.6
4.2. Pek. Pembesian - KG A.4.1.1.17
4.3. Pek. Bekisting - M2 A.4.1.1.23
5 Pek. Balok (B2) Uk. 10x15 cm
5.1. Pek. Beton - M3 A.A.4.1.1.6
5.2. Pek. Pembesian - KG A.4.1.1.17
5.3. Pek. Bekisting - M2 A.4.1.1.23
a b c d e

6 Pek. Balok (B3) Uk. 10x15 cm


6.1. Pek. Beton - M3 A.A.4.1.1.6
6.2. Pek. Pembesian - KG A.4.1.1.17
6.3. Pek. Bekisting - M2 A.4.1.1.23
7 Pek. Balok (B4) Uk. 10x15 cm
7.1. Pek. Beton - M3 A.A.4.1.1.6
7.2. Pek. Pembesian - KG A.4.1.1.17
7.3. Pek. Bekisting - M2 A.4.1.1.23
8 Pek. Plat Level T = 10 cm
8.1. Pek. Beton - M3 A.A.4.1.1.6
8.2. Pek. Pembesian - KG A.4.1.1.17
8.3. Pek. Bekisting - M2 A.4.1.1.24
9 Pek. Meja Plat Wastafell T = 10 cm
9.1. Pek. Beton 0.36 M3 A.A.4.1.1.6
9.2. Pek. Pembesian 11.41 KG A.4.1.1.17
9.3. Pek. Bekisting 0.75 M2 A.4.1.1.24
10 Pek. Rabat Beton K-100 8.24 M3 A.A.4.1.1.1
11 Pek. Rabat Beton K-100 Keliling Bangunan T = 5 cm 1.94 M3 A.A.4.1.1.1
12 Pek. Saluran Air Hujan 63.00 M' A.5.1.1.16a
JUMLAH - IV
V PEKERJAAN PASANGAN & PLESTERAN DINDING
1 Pek. Pas. Dinding Batu 1/2 Bata Camp. 1Pc : 3 Ps - M2 A.4.4.1.8
2 Pek. Pas. Dinding Batu 1/2 Bata Camp. 1Pc : 3 Ps KM/WC - M2 A.4.4.1.8
3 Pek. Pasangan Dinding Batu 1/2 Bata Camp. 1Pc : 5 Ps 79.98 M 2
A.4.4.1.10
4 Pek. Plesteran Dinding Camp. 1Pc : 3 Ps - M2 A.4.4.2.3
5 Pek. Plesteran Dinding Camp. 1Pc : 5 Ps 159.96 M2 A.4.4.2.5
6 Pek. Plesteran Beton Camp. 1Pc : 3 Ps - M 2
A.4.4.2.3
7 Pek. Plesteran Pondasi Camp. 1Pc : 3 Ps 18.40 M2 A.4.4.2.3
8 Pek. Acian Air Semen 18.40 M2 A.4.4.2.27
JUMLAH - V
VI PEKERJAAN PLAFOND
1 Pek. Pas. Rangka Plafond Hollow 40.40.3mm (Uk. 60x60 cm - M2 A.4.2.1.21
2 Pek. Pasangan Plafond Kalciboard 6mm - M 2
A.4.5.1.7
JUMLAH - VI
VII PEKERJAAN KUSEN
1 Pek. Kusen Ventilasi, Kayu Kls II - M3 A.4.6.1.2
2 Pek. Pintu Aluminium + Grendel utk KM/WC 2.00 Bh A.4.2.1.13c
JUMLAH - VII
VIII PEKERJAAN KUDA-KUDA DAN ATAP
1 Pek. Tiang Kuda-Kuda Besi Hollow 2 x 4/6 Cm 43.00 Btg A.4.5.2. F
2 Pek. Kuda-Kuda Besi Hollow 4/4 cm & 2/4 Cm 178.36 M 2
A.4.5.2. F
3 Pek. Penutup Atap Spandek 178.36 M2 A.4.5.2. C
4 Pek. Nok / Bubungan Atap Spandek - M2 A.4.5.2. D
5 Pek. Kalsiplank 30 x 40 cm t=8 mm rangkap - M1 A.4.5.2. E
JUMLAH - VIII
IX PEKERJAAN LANTAI
1 Pek. Lantai Dalam Ruangan Keramik (40 x 40) 126.00 M2 A.4.4.3.4
2 Pek. Lantai Teras Keramik (40 x 40) - M2 A.4.4.3.4
3 Pek. Plint Keramik (10x40) 24.00 M1 A.4.4.3.21
4 Pek. Lantai Meja Wastafel Keramik (40 x40) 0.40 M 2
A.4.4.3.4
5 Pek. Dinding Keramik (40 x 40) Ut. Meja Wastafel 0.60 M2 A.4.4.3.54a
6 Pek. Lantai Keramik (20x20) Ut. KM/WC 4.02 M2 A.4.4.3.6
7 Pek. Dinding Keramik (20x25) Ut. KM/WC (t = 150 Cm) 1.80 M 2
A.4.4.3.54a
8 Pek. Dinding Batu Tempel Hitam - M2 A.4.4.3.58
JUMLAH - IX
a b c d e
X PEKERJAAN INSTALASI LISTRIK
1 Pemasangan MCB + Box MCB 8.00 Bh
2 Pekerjaan Instalasi Titik Lampu 36.00 Ttk A.4.7.2.1
3 Pasangan Saklar Tunggal 4.00 Bh A.4.7.2.2
4 Pasangan Saklar Ganda 8.00 Bh A.4.7.2.3
5 Pasangan Stop Kontak 8.00 Bh A.4.7.2.4
6 Fiting Besi Keramik 36.00 Bh
7 Fitting Downlight panasonic 2 inchi - Bh
8 Lampu LED (5 watt) ex. Philips / setara 12.00 Bh
9 Lampu LED (13 watt) ex. Philips / setara 24.00 Bh
JUMLAH - X
XI PEKERJAAN SANITASI
1 Pas. Klosed Duduk 2.00 Bh A.5.1.1.1
2 Pas. Bak fiber 70 x 70 cm - M1 A.5.1.1.1
3 Pas. Wastafel 8.00 M1 A.5.1.1.5
4 Pekerjaan Pasangan Pipa Pembuangan Air Kotor dia. 3" 4.00 M1 A.5.1.1.31
5 Pekerjaan Pasangan Pipa Pembuangan Cair dia. 2" 8.00 M1 A.5.1.1.29
6 Pekerjaan Pasangan Pipa Pemasukan Air Bersih dia. 3/4" 32.00 M1 A.5.1.1.26
7 Pekerjaan Pasangan Kran Air 10.00 Bh A.5.1.1.19
8 Pekerjaan Pasangan Floor Drain 2.00 Bh A.5.1.1.14
9 Pekerjaan Septictank menggunakan cincin beton 2.00 Ls
JUMLAH - XI
XII PEKERJAAN BESI WIREMESH
1 Pek. Jaring kawat baja (wiremesh) M6 73.50 M²
2 Pek. Rangka Wiremesh Besi Siku L 5/5 73.50 M²
JUMLAH - XIII
XIII PEKERJAAN FINISHING
1 Pek. Pengecatan Dinding Interior (Dalam) 79.98 M2 A.4.7.1.10
2 Pek. Pengecatan Dinding Exterior (Luar) 79.98 M 2
A.4.7.1.10a
3 Pek. Pengecatan Beton 18.40 M2 A.4.7.1.10a
4 Pek. Pengecatan Besi 1.00 Ls
6 Pembersihan Akhir 1.00 Ls
JUMLAH - XII
XIV PENGADAAN PERABOT KANTIN
1 Meja Partisi/Kasir 6.00 Unit
2 Kursi Kasir + Pelayan 18.00 Unit
3 Meja Makan + Kursi (VIP) 1.00 Unit
4 Meja Makan 14.00 Unit
5 Kursi Meja Makan 56.00 Unit
JUMLAH - XIII

Unaaha, November 201


-
Dibuat Oleh :
KONSULTAN PERENCANA
CV. ZENITH ENGINEERING CONS

JABIRUDDIN, ST
Direktur
RAB )

Lembar 01

HARGA SAT JUMLAH HARGA


(RP) (RP)
f g

400,000.00 -
600,000.00 600,000.00
2,500,000.00 -
150,000.00 150,000.00
1,116,000.00 1,116,000.00
300,000.00 300,000.00
Rp 2,166,000.00

71,875.00 670,162.50
51,750.00 160,839.00
87,975.00 1,662,727.50
139,150.00 124,400.10
139,150.00 544,772.25
Rp 3,325,164.17

505,839.00 -
882,855.00 8,412,725.30
Rp 8,412,725.30
1,055,422.39 1,215,846.59
17,527.25 3,013,551.59
161,287.50 1,548,360.00

1,055,422.39 -
17,527.25 -
279,378.13 -

1,055,422.39 679,396.50
17,527.25 3,339,598.06
279,378.13 1,634,920.79

1,055,422.39 -
17,527.25 -
284,208.13 -

1,055,422.39 -
17,527.25 -
284,208.13 -
Lembar 02

f g

1,055,422.39 -
17,527.25 -
284,208.13 -

1,055,422.39 -
17,527.25 -
284,208.13 -

1,055,422.39 -
17,527.25 -
306,978.13 -

1,055,422.39 379,952.06
17,527.25 199,995.35
306,978.13 230,233.59
889,052.68 7,328,905.76
889,052.68 1,727,873.88
186,127.64 11,726,041.39
Rp 33,024,675.56

110,786.98 -
110,786.98 -
103,685.15 8,292,738.30
62,847.73 -
58,956.82 9,430,732.93
62,847.73 -
62,847.73 1,156,398.23
36,469.38 671,036.50
Rp 19,550,905.96

109,020.00 -
56,994.00 -
Rp -
6,843,075.00 -
1,614,130.27 3,228,260.54
Rp 3,228,260.54

204,662.22 8,800,475.46
162,837.93 29,043,773.69
83,835.00 14,952,810.60
266,340.00 -
128,225.00 -
Rp 52,797,059.75

150,287.75 18,936,256.50
150,287.75 -
25,835.33 620,047.80
150,287.75 60,115.10
293,658.25 176,194.95
177,853.25 714,970.07
293,658.25 528,584.85
323,049.38 -
Rp 21,036,169.27
Lembar 03

f g

115,000.00 920,000.00
232,061.50 8,354,213.99
23,460.00 93,840.00
29,210.00 233,680.00
29,210.00 233,680.00
14,260.00 513,360.00
14,260.00 -
26,000.00 312,000.00
40,000.00 960,000.00
Rp 11,620,773.99

1,500,000.00 3,000,000.00
392,667.00 -
675,567.50 5,404,540.00
36,800.00 147,200.00
26,289.00 210,312.00
15,465.20 494,886.40
104,995.00 1,049,950.00
47,495.00 94,990.00
1,000,000.00 2,000,000.00
Rp 12,401,878.40

65,000.00 4,777,500.00
60,000.00 4,410,000.00
Rp 9,187,500.00

28,622.12 2,289,197.16
30,117.12 2,408,767.26
30,117.12 554,155.01
250,000.00 250,000.00
250,000.00 250,000.00
Rp 5,752,119.42
- -
- -
- -
- -
- -
Rp -

November 2018

ibuat Oleh :
LTAN PERENCANA
GINEERING CONSULTANT

IRUDDIN, ST
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP) BIDANG
BERDASARKAN PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN R
NO. 28/PRT/M/2016

NO. KODE

a b

A A.2.3.1

1 A.2.3.1.1
2 A.2.3.1.9
3 A.2.3.1.10
4 A.2.3.1.11
5 A.2.3.1.15

B A.3.2.1

1 A.3.2.1.1
2 A.3.2.1.2
3 A.3.2.1.9

C A.4.1.1

1 A.A.4.1.1.1
2 A.A.4.1.1.3
3 A.A.4.1.1.4
3 A.A.4.1.1.5
4 A.A.4.1.1.6
5 A.A.4.1.1.7
6 A.4.1.1.17
7 A.4.1.1.17a
8 A.4.1.1.19
9 A.4.1.1.20
10 A.4.1.1.21
11 A.4.1.1.22
12 A.4.1.1.23
13 A.4.1.1.24
14 A.4.1.1.25
15 A.4.1.1.26
16 Err:509
17 Err:509
18 Err:509
19 Err:509
20 Err:509
21 Err:509
22 A.4.1.1.35
23 A.4.1.1.36
24 Err:509

D A.4.2.1

1 A.4.2.1.2
2 A.4.2.1.2a
3 A.4.2.1.11
4 A.4.2.1.13
5 A.4.2.1.13a
6 A.4.2.1.13b
7 A.4.2.1.13c
8 A.4.2.1.13d

E A.4.4.1

1 A.4.4.1.2
2 A.4.4.1.4
3 A.4.4.1.8
4 A.4.4.1.10
a b

F A.4.4.2

1 A.4.4.2.3
2 A.4.4.2.5
3 A.4.4.2.20
4 A.4.4.2.23
5 A.4.4.2.27

G A.4.4.3

1 A.4.4.3.4
2 A.4.4.3.5
3 A.4.4.3.6
4 A.4.4.3.13
5 A.4.4.3.28
6 A.4.4.3.28a
7 A.4.4.3.54
8 A.4.4.3.54a
9 A.4.4.3.58

H A.4.5.1

1 A.4.2.1.21
2 A.4.2.1.21a
3 A.4.5.1.5a
4 A.4.5.1.7
5 A.4.5.1.7a
6 A.4.5.1.9

I A.4.5.2

1 A.4.5.2.32
2 A.4.5.2.36
3 A.4.5.2. F

J A.4.6.1

1 A.4.6.1.2
2 A.4.6.1.5
3 A.4.6.1.8
4 A.4.6.1.6
5 A.4.6.1.10
6 A.4.6.1.21

K A.4.6.2

1 A.4.6.2.1
2 A.4.6.2.2
3 A.4.6.2.3
4 A.4.6.2.5
5 A.4.6.2.6
6 A.4.6.2.9
7 A.4.6.2.11
8 A.4.6.2.17
9 A.4.6.2.17a
10 A.4.6.2.18
11 A.4.6.2.18a
12 A.4.6.2.19
13 A.4.6.2.20

L A.4.7.1

1 A.4.7.1.4
2 A.4.7.1.10
3 A.4.7.1.10a
4 A.4.7.1.10b
5 A.4.7.1.10c

M A.4.7.2

1 A.4.7.2.1
2 A.4.7.2.2
3 A.4.7.2.3
4 A.4.7.2.4
5 A.4.7.2.5
6 A.4.7.2.6
a b

N A.5.1.1

1 A.5.1.1.1
2 A.5.1.1.2
3 A.5.1.1.4
4 A.5.1.1.5
5 A.5.1.1.5a
6 A.5.1.1.14
7 A.5.1.1.14a
8 A.5.1.1.15
9 A.5.1.1.19
10 A.5.1.1.26
11 A.5.1.1.27
12 A.5.1.1.29
13 A.5.1.1.31
14 A.5.1.1 32
15 A.5.1.1 32a
16 A.5.1.1.16a
17 Err:509
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP) BIDANG CIPTA KARYA
BERDASARKAN PERATURAN MENTERI PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
NO. 28/PRT/M/2016

JENIS PEKERJAAN

HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 M3 tanah biasa sedalam 1 m'


Penggalian 1 M3 tanah biasa sedalam 2 m'
Pemadatan tanah 1 m3 tanah (per 20 cm )
Pengurugan 1 M3 dengan pasir urug
Pengurugan 1 M3 Tanah Urug ( Tanah timbunan biasa )

HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 3 Ps


Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 4 Ps
Pemasangan 1 M3 pondasi batu kosong (anstamping)

HARGA SATUAN PEKERJAAN BETON

Membuat 1 M3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0.87
Membuat 1 M3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72
Membuat 1 M3 Lantai Kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 ± 6 ) cm, w/c = 0,
Membuat 1 M3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,66
Membuat 1 M3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61
Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58
Pembesian 1 kg dengan besi polos
Pembesian 1 kg dengan besi ulir
Membuat 10 kg jaring kawat baja (wiremesh)
Pemasangan 1 m2 bekisting untuk pondasi
Pemasangan 1 m2 bekisting untuk sloof
Pemasangan 1 m2 bekisting untuk kolom
Pemasangan 1 m2 bekisting untuk balok
Pemasangan 1 m2 bekisting untuk Lantai
Pemasangan 1 m2 bekisting untuk dinding
Pemasangan 1 m2 bekisting untuk tangga
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Membuat 1 M kolom praktis Beton bertulang (11 x 11) cm
Membuat 1 M balok latey Beton bertulang (10 x 15) cm
Err:509

HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

Pemasangan 1 Kg rangka kuda-kuda baja IWF/ CNP


Pemasangan 1 M2 Railling besi hollow
Pemasangan 1 m1 kusen pintu aluminium
Pemasangan 1 m1 Pintu Kaca Rangka aluminium
Pemasangan 1 m2 bingkai pintu aluminium
Pemasangan 1 m2 bingkai Jendela aluminium
Pemasangan 1 Bh Pintu Aluminium + Grendel utk KM/WC
Pemasangan 1 m2 Pintu Pagar Hollow

HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu camp. 1 SP : 3 PP


Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu camp. 1 SP : 5 PP
Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu camp. 1 SP : 3 PP
Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu camp. 1 SP : 5 PP
c

HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm


Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm
Pemasangan 1 m1 plesteran skoning camp. 1SP : 3PP
Pemasangan 1 m2 plesteran ciprat camp. 1SP : 2PP
Pekerjaan 1 M2 acian

HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 M2 lantai Keramik ukuran 40 x 40 cm Warna/Putih


Pemasangan 1 M2 lantai Keramik ukuran 30 x 30 cm Warna/Abu-abu
Pemasangan 1 m2 lantai Keramik ukuran 20 x 20 cm Warna/Abu-abu (Ut. KM/WC)
Pemasangan 1 m2 lantai granit ukuran 60 x 60 cm
Pemasangan 1 m' Plint granit ukuran 10 x 60 cm
Pemasangan 1 m2 Dinding Granit ukuran 30 x 60 cm
Pemasangan 1 M2 dinding keramik 20 x 20 cm
Pemasangan 1 M2 dinding keramik 20 x 25 cm
Pemasangan 1 m2 Dinding Batu tempel hitam

HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Pemasangan 1 m2 rangka besi hollow 40.40.2mm, modul 60 x 60 cm, plafond


Pemasangan 1 m2 rangka besi hollow 20.40.3mm, modul 60 x 60 cm, Partisi
Pemasangan 1 m2 Aluminium Composite Panel (120x240) mm, tebal 4 mm
Pemasangan 1 m2 langit-langit Kalciboard (120x240x6) mm, tebal 6 mm
Pemasangan 1 M2 Dinding partisi PVC Foarboard (20x5,9x4) mm, tebal 4 mm
Pemasangan 1 m1 List Langit-langit Kayu Profil uk. 4 x 5 cm

HARGA SATUAN PEKERJAAN PENUTUP ATAP

Pemasangan 1 M2 genteng Sakura Roof


Pemasangan 1 M' nok genteng Sakura Roof
Pemasangan 1 M2 Kuda - kuda baja ringan

HARGA SATUAN PEKERJAAN KAYU

Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II
Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu kelas II
Pembuatan dan pemasangan 1 M2 daun pintu double multipleks 6 mm, rangka papan kayu
Pembuatan dan pemasangan 1 M2 Bingkai pintu dan jendela kaca, kayu kelas II
Pemasangan 1 M2 jalusi kusen kayu kelas II
Pemasangan 1 M’ lisplank ukuran (3 x 20) cm, kayu kelas II

HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Pemasangan 1 buah kunci tanam antik


Pemasangan 1 buah kunci tanam biasa 2 x slag stainless
Pemasangan 1 buah kunci kamar mandi
Pemasangan 1 buah engsel pintu stainless
Pemasangan 1 buah engsel jendela stainless
Pemasangan 1 buah kait angin
Pemasangan 1 buah Grendel Stainless Pintu/Jendela
Pemasangan 1 M2 kaca Bening tebal 5 mm
Pemasangan 1 M2 kaca rayben tebal 5 mm
Pemasangan 1 M2 kaca Bening tebal 8 mm
Pemasangan 1 M2 kaca rayben tebal 8 mm
Pemasangan 1 M2 kaca tebal 12 mm
Pemasangan 1 M2 Kaca cermin 5 mm

HARGA SATUAN PEKERJAAN PENGECATAN

Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Inte
Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Ext
Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Pengecatan 1 m2 Waterproofing 2x cat penutup

HARGA SATUAN PEKERJAAN INSTALASI LISTRIK

Pemasangan 1 titik Lampu


Pemasangan 1 Buah Saklar Tunggal
Pemasangan 1 Buah Saklar Ganda
Pemasangan 1 Buah Stop Kontak
Pemasangan 1 Buah Lampu Baret 40 Watt
Pemasangan 1 Buah Fiting Besi Keramik
c

HARGA SATUAN PEKERJAAN SANITASI

Pemasangan 1 buah closet duduk / monoblock


Pemasangan 1 buah closet jongkok porslen
Pemasangan 1 buah urinoir
Pemasangan 1 buah wastafel
Pemasangan 1 buah Shower utk mandi ex. Onda / setara
Pemasangan 1 buah floor drain
Pemasangan 1 buah tempat sabun
Pemasangan 1 buah bak kontrol pasangan bata 30x30 cm, tinggi 35 cm
Pemasangan 1 buah kran diameter ½” atau 3/4”
Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”
Pemasangan 1 m’ pipa PVC tipe AW diameter 1”
Pemasangan 1 m’ pipa PVC tipe AW diameter 2”
Pemasangan 1 m’ pipa PVC tipe AW diameter 3”
Pemasangan 1 m’ pipa PVC tipe AW diameter 4”
Pemasangan 1 Unit Septictank dan Peresapan
Pemasangan 1 M1 Saluran Air hujan
Err:509
NG CIPTA KARYA
N RAKYAT

LEMBAR 1

HARGA

71,875.00
87,975.00
51,750.00
139,150.00
87,975.00

984,428.75
924,427.50
505,839.00

889,052.68
971,641.85
813,487.33
1,014,704.33
1,055,422.39
1,086,442.42
17,527.25
21,397.19
16,180.50
153,237.50
161,287.50
279,378.13
284,208.13
306,978.13
324,228.13
262,329.38
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
92,724.50
114,574.50
Err:509

36,041.00
541,727.19
135,297.50
2,071,265.00
67,102.50
63,307.50
1,614,130.27
586,322.81

230,175.38
213,831.00
110,786.98
103,685.15
LEMBAR 2

62,847.73
58,956.82
56,522.50
48,891.10
36,469.38

150,287.75
144,181.25
177,853.25
322,511.75
46,032.20
380,098.00
289,403.25
293,658.25
323,049.38

109,020.00
93,495.00
314,065.00
56,994.00
261,625.00
16,109.95

75,210.00
92,661.25
151,363.00

6,843,075.00
591,100.00
435,095.60
443,210.00
540,270.00
72,105.00

822,365.00
231,495.00
170,430.00
53,222.00
36,627.50
37,950.00
42,205.00
149,937.00
217,695.00
363,170.00
401,120.00
1,461,602.00
197,282.50

51,287.88
28,622.12
30,117.12
26,552.12
117,909.50

232,061.50
23,460.00
29,210.00
29,210.00
556,485.00
14,260.00
LEMBAR 3

2,265,500.00
489,842.50
2,466,692.50
675,567.50
1,036,633.00
47,495.00
64,745.00
429,812.50
104,995.00
15,465.20
18,492.00
26,289.00
36,800.00
38,192.65
6,381,405.03
186,127.64
Err:509
Standar Nasional Indonesia (SNI)
AHSP BIDANG CIPTA KARYA-2016

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 M3 tanah biasa sedalam 1 m'

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.750
Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Penggalian 1 M3 tanah biasa sedalam 2 m'

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.9000
Mandor L.04 OH 0.0450
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengurugan kembali 1 M3 galian tanah

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pengurugan kembali 1 m3 galian dihitung 1/3 kali dari koefisien pekerjaan galian
Pemadatan tanah 1 m3 tanah (per 20 cm )

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.500
Mandor OH 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengurugan 1 M3 dengan pasir urug

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengurugan 1 M3 Sirtu padat ( Tanah timbunan pilihan )

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.250
Mandor OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Sirtu M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengurugan 1 M3 Tanah Urug ( Tanah timbunan biasa )

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.250
Mandor OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
Tanah timbunan biasa M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
donesia (SNI)
A KARYA-2016

Lembar 01

A.2.3.1.1
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 60,000.00
100,000.00 2,500.00
UMLAH TENAGA KERJA 62,500.00

UMLAH HARGA BAHAN

UMLAH HARGA ALAT


62,500.00
9,375.00
71,875.00

A.2.3.1.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 72,000.00
100,000.00 4,500.00
UMLAH TENAGA KERJA 76,500.00

UMLAH HARGA BAHAN


UMLAH HARGA ALAT
76,500.00
11,475.00
87,975.00

A.2.3.1.9
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 40,000.00
100,000.00 5,000.00
UMLAH TENAGA KERJA 45,000.00

UMLAH HARGA BAHAN

UMLAH HARGA ALAT


45,000.00
6,750.00
51,750.00
ekerjaan galian
Lembar 02

A.2.3.1.10
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 40,000.00
100,000.00 5,000.00
UMLAH TENAGA KERJA 45,000.00

UMLAH HARGA BAHAN

UMLAH HARGA ALAT


45,000.00
6,750.00
51,750.00

A.2.3.1.11
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 24,000.00
100,000.00 1,000.00
UMLAH TENAGA KERJA 25,000.00

80,000.00 96,000.00
UMLAH HARGA BAHAN 96,000.00

UMLAH HARGA ALAT


121,000.00
18,150.00
139,150.00

A.2.3.1.14
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 2,500.00
UMLAH TENAGA KERJA 22,500.00
120,000.00 144,000.00
UMLAH HARGA BAHAN 144,000.00

UMLAH HARGA ALAT


166,500.00
24,975.00
191,475.00

A.2.3.1.15
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,000.00
100,000.00 2,500.00
UMLAH TENAGA KERJA 22,500.00

45,000.00 54,000.00
UMLAH HARGA BAHAN 54,000.00

UMLAH HARGA ALAT


76,500.00
11,475.00
87,975.00
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 3 Ps

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.5000
Tukang Batu OH 0.7500
Kepala Tukang OH 0.0750
Mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah / Batu Gunung M3 1.2000
Semen Porlant Kg 202.0000
Pasir pasang M3 0.4850
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 4 Ps

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.5000
Tukang Batu OH 0.7500
Kepala Tukang OH 0.0750
Mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah / Batu Gunung M3 1.2000
Semen Porlant Kg 163.0000
Pasir pasang M3 0.5200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M3 pondasi gunung campuran 1 Pc : 5 Ps

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.5000
Tukang Batu OH 0.7500
Kepala Tukang OH 0.0750
Mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah / Batu Gunung M3 1.2000
Semen Porlant Kg 136.0000
Pasir pasang M3 0.5440
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M3 pondasi batu kosong (anstamping)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.7800
Tukang Batu OH 0.3900
Kepala Tukang OH 0.0390
Mandor OH 0.0390
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah / Batu Gunung M3 1.2000
Pasir urug M3 0.4320
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M3 pondasi sumuran, diameter 100 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 2.4000
Tukang Batu OH 0.8000
Kepala Tukang OH 0.0800
Mandor OH 0.1190
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah / Batu Gunung M3 0.4500
Semen Porlant Kg 194.0000
Pasir Beton M3 0.3120
Kerikil (Maks 3 cm) M3 0.4680
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 03

A.3.2.1.1
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 120,000.00
90,000.00 67,500.00
100,000.00 7,500.00
100,000.00 7,500.00
UMLAH TENAGA KERJA 202,500.00

250,000.00 300,000.00
1,450.00 292,900.00
125,000.00 60,625.00
UMLAH HARGA BAHAN 653,525.00

UMLAH HARGA ALAT


856,025.00
128,403.75
984,428.75

A.3.2.1.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 120,000.00
90,000.00 67,500.00
100,000.00 7,500.00
100,000.00 7,500.00
UMLAH TENAGA KERJA 202,500.00

250,000.00 300,000.00
1,450.00 236,350.00
125,000.00 65,000.00
UMLAH HARGA BAHAN 601,350.00

UMLAH HARGA ALAT


803,850.00
120,577.50
924,427.50
A.3.2.1.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 120,000.00
90,000.00 67,500.00
100,000.00 7,500.00
100,000.00 7,500.00
UMLAH TENAGA KERJA 202,500.00

250,000.00 300,000.00
1,450.00 197,200.00
125,000.00 68,000.00
UMLAH HARGA BAHAN 565,200.00

UMLAH HARGA ALAT


767,700.00
115,155.00
882,855.00
Lembar 04

A.3.2.1.9
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 62,400.00
90,000.00 35,100.00
100,000.00 3,900.00
100,000.00 3,900.00
UMLAH TENAGA KERJA 105,300.00

250,000.00 300,000.00
80,000.00 34,560.00
UMLAH HARGA BAHAN 334,560.00

UMLAH HARGA ALAT


439,860.00
65,979.00
505,839.00

A.3.2.1.11
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 192,000.00
90,000.00 72,000.00
100,000.00 8,000.00
100,000.00 11,900.00
UMLAH TENAGA KERJA 283,900.00

250,000.00 112,500.00
1,450.00 281,300.00
125,000.00 39,000.00
200,000.00 93,600.00
UMLAH HARGA BAHAN 526,400.00

UMLAH HARGA ALAT


810,300.00
121,545.00
931,845.00
A.4.1.1 HARGA SATUAN PEKERJAAN BETON

Membuat 1 M3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0.87

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 247.000
Pasir beton m3 0.621
Kerikil (Maks 3 cm) m3 0.740
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Membuat 1 M3 beton mutu f' = 12,2 Mpa (K 150), slump (12 ±2) cm, w/c = 0,72

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 299.000
Pasir beton m3 0.571
Kerikil (Maks 3 cm) m3 0.753
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Membuat 1 M3 Lantai Kerja beton mutu f’c = 7,4 MPa (K 100), slump (3 ± 6 ) cm, w/c = 0

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.200
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 230.000
Pasir beton m3 0.638
Kerikil (Maks 3 cm) m3 0.761
Air ltr 200.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Membuat 1 M3 beton mutu f' = 14,5 Mpa (K 175), slump (12 ±2) cm, w/c = 0,66

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 326.000
Pasir beton m3 0.543
Kerikil (Maks 3 cm) m3 0.762
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Membuat 1 M3 beton mutu f' = 16,9 Mpa (K 200), slump (12 ±2) cm, w/c = 0,61

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 352.000
Pasir beton m3 0.522
Kerikil (Maks 3 cm) m3 0.764
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Membuat 1 M3 beton mutu f' = 19,3 Mpa (K 225), slump (12 ±2) cm, w/c = 0,58

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.650
Tukang Batu OH 0.275
Kepala Tukang OH 0.028
Mandor OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 371.000
Pasir beton m3 0.499
Kerikil (Maks 3 cm) m3 0.776
Air ltr 215.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bucking factor pasir = 20 %
Pembesian 1 kg dengan besi polos

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang Batu L.02 OH 0.070
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Polos Kg 10.500
Kawat beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pembesian 1 kg dengan besi ulir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang Batu L.02 OH 0.070
Kepala Tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Ulir Kg 10.500
Kawat beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Membuat 10 kg jaring kawat baja (wiremesh)


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.025
Tukang Batu L.02 OH 0.025
Kepala Tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat baja dilas Kg 10.200
Kawat beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 bekisting untuk pondasi

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.520
Tukang Batu L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.040
Paku 5 - 10 cm Kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 bekisting untuk sloof

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.520
Tukang Batu L.02 OH 0.260
Kepala Tukang L.03 OH 0.026
Mandor L.04 OH 0.026
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.045
Paku 5 - 10 cm Kg 0.300
Minyak bekisting Liter 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 bekisting untuk kolom


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.040
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kelas III ( 2 kali pakai ) M3 0.015
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 bekisting untuk balok

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kelas III ( 2 kali pakai ) M3 0.018
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 bekisting untuk Lantai

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III ( 2 kali pakai ) M3 0.040
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kelas III ( 2 kali pakai ) M3 0.015
Plywood 9 mm ( 2 kali pakai ) Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m 2x pakai Batang 6.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 bekisting untuk dinding

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.030
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kelas III M3 0.020
Plywood 9 mm Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m Batang 3.000
Penjaga jarak bekisting/spacer Buah 4.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 bekisting untuk tangga

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang Batu L.02 OH 0.330
Kepala Tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.030
Paku 5 - 10 cm Kg 0.400
Minyak bekisting Liter 0.150
Balok kelas III M3 0.015
Plywood 9 mm Lembar 0.350
Dolken Kayu (8-10) cm , panjang 4 m Batang 2.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 05

12 ± 2) cm, w/c = 0.87 A.A.4.1.1.1


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 132,000.00
90,000.00 24,750.00
100,000.00 2,800.00
100,000.00 8,300.00
UMLAH TENAGA KERJA 167,850.00

1,450.00 358,150.00
125,000.00 77,589.29
200,000.00 148,000.00
100.00 21,500.00
UMLAH HARGA BAHAN 605,239.29

UMLAH HARGA ALAT


773,089.29
115,963.39
889,052.68

12 ±2) cm, w/c = 0,72 A.A.4.1.1.3


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 132,000.00
90,000.00 24,750.00
100,000.00 2,800.00
100,000.00 8,300.00
UMLAH TENAGA KERJA 167,850.00

1,450.00 433,550.00
125,000.00 71,339.29
200,000.00 150,666.67
100.00 21,500.00
UMLAH HARGA BAHAN 677,055.95

UMLAH HARGA ALAT


844,905.95
126,735.89
971,641.85

00), slump (3 ± 6 ) cm, w/c = 0,87 A.A.4.1.1.4


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 96,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 6,000.00
UMLAH TENAGA KERJA 122,000.00

1,450.00 333,500.00
125,000.00 79,732.14
200,000.00 152,148.15
100.00 20,000.00
UMLAH HARGA BAHAN 585,380.29

UMLAH HARGA ALAT


707,380.29
106,107.04
813,487.33
Lembar 06

12 ±2) cm, w/c = 0,66 A.A.4.1.1.5


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 132,000.00
90,000.00 24,750.00
100,000.00 2,800.00
100,000.00 8,300.00
UMLAH TENAGA KERJA 167,850.00

1,450.00 472,700.00
125,000.00 67,857.14
200,000.00 152,444.44
100.00 21,500.00
UMLAH HARGA BAHAN 714,501.59

UMLAH HARGA ALAT


882,351.59
132,352.74
1,014,704.33

12 ±2) cm, w/c = 0,61 A.A.4.1.1.6


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 132,000.00
90,000.00 24,750.00
100,000.00 2,800.00
100,000.00 8,300.00
UMLAH TENAGA KERJA 167,850.00

1,450.00 510,400.00
125,000.00 65,267.86
200,000.00 152,740.74
100.00 21,500.00
UMLAH HARGA BAHAN 749,908.60

UMLAH HARGA ALAT


917,758.60
137,663.79
1,055,422.39
12 ±2) cm, w/c = 0,58 A.A.4.1.1.7
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 132,000.00
90,000.00 24,750.00
100,000.00 2,800.00
100,000.00 8,300.00
UMLAH TENAGA KERJA 167,850.00

1,450.00 537,950.00
125,000.00 62,321.43
200,000.00 155,111.11
100.00 21,500.00
UMLAH HARGA BAHAN 776,882.54

UMLAH HARGA ALAT


944,732.54
141,709.88
1,086,442.42

m3, Bucking factor pasir = 20 %


Lembar 07

A.4.1.1.17
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 5,600.00
90,000.00 6,300.00
100,000.00 700.00
100,000.00 400.00
UMLAH TENAGA KERJA 13,000.00

13,000.00 136,500.00
19,406.00 2,910.90
UMLAH HARGA BAHAN 139,410.90

UMLAH HARGA ALAT


152,410.90
22,861.64
175,272.54
17,527.25

A.4.1.1.17a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 5,600.00
90,000.00 6,300.00
100,000.00 700.00
100,000.00 400.00
UMLAH TENAGA KERJA 13,000.00

16,125.00 169,312.50
25,000.00 3,750.00
UMLAH HARGA BAHAN 173,062.50

UMLAH HARGA ALAT


186,062.50
27,909.38
213,971.88
21,397.19

A.4.1.1.19
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 2,000.00
90,000.00 2,250.00
100,000.00 2,500.00
100,000.00 100.00
UMLAH TENAGA KERJA 6,850.00

13,000.00 132,600.00
25,000.00 1,250.00
UMLAH HARGA BAHAN 133,850.00

UMLAH HARGA ALAT


140,700.00
21,105.00
161,805.00
16,180.50
Lembar 08

A.4.1.1.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 41,600.00
90,000.00 23,400.00
100,000.00 2,600.00
100,000.00 2,600.00
UMLAH TENAGA KERJA 70,200.00

1,400,000.00 56,000.00
18,000.00 5,400.00
16,500.00 1,650.00
UMLAH HARGA BAHAN 63,050.00

UMLAH HARGA ALAT


133,250.00
19,987.50
153,237.50

A.4.1.1.21
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 41,600.00
90,000.00 23,400.00
100,000.00 2,600.00
100,000.00 2,600.00
UMLAH TENAGA KERJA 70,200.00

1,400,000.00 63,000.00
18,000.00 5,400.00
16,500.00 1,650.00
UMLAH HARGA BAHAN 70,050.00

UMLAH HARGA ALAT


140,250.00
21,037.50
161,287.50

A.4.1.1.22
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 52,800.00
90,000.00 29,700.00
100,000.00 3,300.00
100,000.00 3,300.00
UMLAH TENAGA KERJA 89,100.00

1,400,000.00 56,000.00
18,000.00 7,200.00
16,500.00 3,300.00
1,400,000.00 21,000.00
155,250.00 54,337.50
6,000.00 12,000.00
UMLAH HARGA BAHAN 153,837.50

UMLAH HARGA ALAT


242,937.50
36,440.63
279,378.13
Lembar 09

A.4.1.1.23
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 52,800.00
90,000.00 29,700.00
100,000.00 3,300.00
100,000.00 3,300.00
UMLAH TENAGA KERJA 89,100.00

1,400,000.00 56,000.00
18,000.00 7,200.00
16,500.00 3,300.00
1,400,000.00 25,200.00
155,250.00 54,337.50
6,000.00 12,000.00
UMLAH HARGA BAHAN 158,037.50

UMLAH HARGA ALAT


247,137.50
37,070.63
284,208.13

A.4.1.1.24
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 52,800.00
90,000.00 29,700.00
100,000.00 3,300.00
100,000.00 3,300.00
UMLAH TENAGA KERJA 89,100.00

1,400,000.00 56,000.00
18,000.00 7,200.00
16,500.00 3,300.00
1,400,000.00 21,000.00
155,250.00 54,337.50
6,000.00 36,000.00
UMLAH HARGA BAHAN 177,837.50
UMLAH HARGA ALAT
266,937.50
40,040.63
306,978.13
Lembar 10

A.4.1.1.25
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 52,800.00
90,000.00 29,700.00
100,000.00 3,300.00
100,000.00 3,300.00
UMLAH TENAGA KERJA 89,100.00

1,400,000.00 42,000.00
18,000.00 7,200.00
16,500.00 3,300.00
1,400,000.00 28,000.00
155,250.00 54,337.50
6,000.00 18,000.00
10,000.00 40,000.00
UMLAH HARGA BAHAN 192,837.50

UMLAH HARGA ALAT


281,937.50
42,290.63
324,228.13

A.4.1.1.26
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 52,800.00
90,000.00 29,700.00
100,000.00 3,300.00
100,000.00 3,300.00
UMLAH TENAGA KERJA 89,100.00

1,400,000.00 42,000.00
18,000.00 7,200.00
16,500.00 2,475.00
1,400,000.00 21,000.00
155,250.00 54,337.50
6,000.00 12,000.00
UMLAH HARGA BAHAN 139,012.50
UMLAH HARGA ALAT
228,112.50
34,216.88
262,329.38
HARGA SATUAN BETON

Analisa 1 M3 Pek. Sloef Sf (Uk. 15x20 cm)


1.0000 M3 Beton K-200 @ Rp.
150.5707 Kg Pembesian Polos @ Rp.
6.6667 M2 Bekisting Sloof 2 x pakai @ Rp.

Analisa 1 M3 Pek. Kolom Ku (Uk. 30x30 cm)


1.0000 M3 Beton K-200 @ Rp.
185.0885 Kg Pembesian Polos @ Rp.
6.6667 M2 Bekisting Kolom 2 x pakai @ Rp.

Analisa 1 M3 Pek. Kolom Kp (Uk. 11x11 cm)


1.0000 M3 Beton K-200 @ Rp.
239.0934 Kg Pembesian Polos @ Rp.
9.0909 M2 Bekisting Kolom 2 x pakai @ Rp.

Analisa 1 M3 Pek. Balok Latey BL (Uk. 10x15 cm)


1.0000 M3 Beton K-200 @ Rp.
208.2423 Kg Pembesian Polos @ Rp.
10.0000 M2 Bekisting Balok 2 x pakai @ Rp.

Analisa 1 M3 Pek. Ringbalok Rb (Uk. 10x15 cm)


1.0000 M3 Beton K-200 @ Rp.
208.2423 Kg Pembesian Polos @ Rp.
10.0000 M2 Bekisting Sloef 2 x pakai @ Rp.

Analisa 1 M3 Pek. Plat Level PL (Tebal = 10 cm)


1.0000 M3 Beton K-200 @ Rp.
152.9258 Kg Pembesian Polos @ Rp.
11.6667 M2 Bekisting Lantai @ Rp.
LEMBAR 11

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 2,639,091.10
161,287.50 Rp 1,075,250.00
Total Rp 4,769,763.49

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 3,244,093.25
279,378.13 Rp 1,862,520.83
Total Rp 6,162,036.48

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 4,190,651.13
279,378.13 Rp 2,539,801.14
Total Rp 7,785,874.65

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 3,649,915.90
284,208.13 Rp 2,842,081.25
Total Rp 7,547,419.53

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 3,649,915.90
284,208.13 Rp 2,842,081.25
Total Rp 7,547,419.53

1,055,422.39 Rp 1,055,422.39
17,527.25 Rp 2,680,368.73
306,978.13 Rp 3,581,411.46
Total Rp 7,317,202.57
Pemasangan 1 M' Tiang Kuda-Kuda Hollow 4/6 Cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Tukang Las Konstruksi L.02 OH 0.300
Kepala Tukang L.03 OH 0.030
Mandor L.04 OH 0.015
JUMLAH TENAGA KER
B BAHAN
Besi hollow 4 x 6 cm M1 1.100
besi plat 5 mm Kg 1.275
Baut fisher Bh 4.000
Assesoris (perkuatan, las dll) Ls 1.000
cat meni besi Kg 0.0917
cat 2x penutup ex. Avian / setara Kg 0.1833
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 Rangka Kuda-Kuda Besi Hollow

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.350
Tukang Las Konstruksi L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KER
B BAHAN
Besi hollow 4 x 4 cm M1 1.100
Besi hollow 2 x 4 cm M1 1.150
besi plat 5 mm Kg -
Assesoris (perkuatan, las dll) Ls 1.000
cat meni besi Kg 0.0917
cat 2x penutup ex. Avian / setara Kg 0.1833
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 24,000.00
90,000.00 27,000.00
100,000.00 3,000.00
100,000.00 1,500.00
JUMLAH TENAGA KERJA 55,500.00

30,000.00 33,000.00
36,041.00 45,952.28
3,000.00 12,000.00
20,000.00 20,000.00
25,000.00 2,292.50
50,313.00 9,222.37
JUMLAH HARGA BAHAN 122,467.15

JUMLAH HARGA ALAT


177,967.15
26,695.07
204,662.22

Harga Satuan Jumlah Harga


(Rp) (Rp)

80,000.00 28,000.00
90,000.00 31,500.00
100,000.00 3,500.00
100,000.00 1,800.00
JUMLAH TENAGA KERJA 64,800.00

22,000.00 24,200.00
18,333.33 21,083.33
36,041.00 -
20,000.00 20,000.00
25,000.00 2,292.50
50,313.00 9,222.37
JUMLAH HARGA BAHAN 76,798.20

JUMLAH HARGA ALAT


141,598.20
21,239.73
162,837.93
HARGA SATUAN PEKERJAAN PINTU

Analisa 1 Bh Pekerjaan pintu P1


2.1000 M1 Pintu kaca wireglas 12 mm @ Rp.
93.4200 Kg Baja IWF 200.100.7.10 @ Rp.
1.0000 Set Pegangan pintu kaca stainless @ Rp.
2.0000 Bh Engsel tanam kaca stainless @ Rp.

HARGA SATUAN PEKERJAAN JENDELA

Analisa 1 Bh Pekerjaan jendela J1


14.4000 M1 Rangka aluminium 4" @ Rp.
6.3000 M1 Bingkai Jendela Aluminium @ Rp.
2.5400 M2 Kaca bening 5 mm (jendela) @ Rp.
4.0000 Bh Engsel Jendela stainless @ Rp.
2.0000 Set Grendel Jendela stainless @ Rp.
4.0000 Bh Kait angin stainless @ Rp.

Analisa 1 Bh Pekerjaan jendela J2


19.7000 M1 Rangka aluminium 4" @ Rp.
6.3000 M1 Bingkai Jendela Aluminium @ Rp.
3.7900 M2 Kaca bening 5 mm (jendela) @ Rp.
4.0000 Bh Engsel Jendela stainless @ Rp.
2.0000 Set Grendel Jendela stainless @ Rp.
4.0000 Bh Kait angin stainless @ Rp.

Analisa 1 Bh Pekerjaan jendela J3


12.5000 M1 Rangka aluminium 4" @ Rp.
6.3000 M1 Bingkai Jendela Aluminium @ Rp.
2.6350 M2 Kaca bening 5 mm (jendela) @ Rp.
4.0000 Bh Engsel Jendela stainless @ Rp.
2.0000 Set Grendel Jendela stainless @ Rp.
4.0000 Bh Kait angin stainless @ Rp.

Analisa 1 Bh Pekerjaan Ventilasi V1


6.0000 M1 Rangka aluminium 4" @ Rp.
- M1 Bingkai Jendela Aluminium @ Rp.
0.8350 M2 Kaca bening 5 mm (jendela) @ Rp.
- Bh Engsel Jendela stainless @ Rp.
- Set Grendel Jendela stainless @ Rp.
- Bh Kait angin stainless @ Rp.

Analisa 1 Bh PekerjaanVentilasi V2
2.3000 M1 Rangka aluminium 4" @ Rp.
- M1 Bingkai Jendela Aluminium @ Rp.
0.3300 M2 Kaca bening 5 mm (jendela) @ Rp.
- Bh Engsel Jendela stainless @ Rp.
- Set Grendel Jendela stainless @ Rp.
- Bh Kait angin stainless @ Rp.
HARGA SATUAN PEKERJAAN DINDING PARTISI

Analisa 1 m2 Pekerjaan Partisi PR1


41.5950 M2 Rangka aluminium 4" @ Rp.
5.3500 M2 Bingkai Pintu aluminium @ Rp.
1.2800 M2 Kaca bening 8 mm (Pintu) @ Rp.
10.5300 M2 Kaca bening 5 mm (Jendela) @ Rp.
3.0000 Bh Engsel Pintu stainless @ Rp.
1.0000 Set Kunci tanam 2 x slag @ Rp.
1.0000 Bh Memasang door closer @ Rp.
1.0000 Set Pegangan Pintu @ Rp.
LEMBAR 16

1,461,602.00 Rp 3,069,364.19
36,041.00 Rp 3,366,950.22
410,000.00 Rp 410,000.00
250,000.00 Rp 500,000.00
Total Rp 7,346,314.41

135,297.50 Rp 1,948,284.00
63,307.50 Rp 398,837.25
149,937.00 Rp 380,839.98
36,627.50 Rp 146,510.00
42,205.00 Rp 84,410.00
37,950.00 Rp 151,800.00
Total Rp 3,110,681.23

135,297.50 Rp 2,665,360.75
63,307.50 Rp 398,837.25
149,937.00 Rp 568,261.23
36,627.50 Rp 146,510.00
42,205.00 Rp 84,410.00
37,950.00 Rp 151,800.00
Total Rp 4,015,179.23

135,297.50 Rp 1,691,218.75
63,307.50 Rp 398,837.25
149,937.00 Rp 395,084.00
36,627.50 Rp 146,510.00
42,205.00 Rp 84,410.00
37,950.00 Rp 151,800.00
Total Rp 2,867,860.00

135,297.50 Rp 811,785.00
63,307.50 Rp -
149,937.00 Rp 125,197.40
36,627.50 Rp -
42,205.00 Rp -
37,950.00 Rp -
Total Rp 936,982.40

135,297.50 Rp 311,184.25
63,307.50 Rp -
149,937.00 Rp 49,479.21
36,627.50 Rp -
42,205.00 Rp -
37,950.00 Rp -
Total Rp 360,663.46
135,297.50 Rp 5,627,699.51
67,102.50 Rp 358,998.38
363,170.00 Rp 464,857.60
149,937.00 Rp 1,578,836.61
36,627.50 Rp 109,882.50
231,495.00 Rp 231,495.00
128,000.00 Rp 128,000.00
156,000.00 Rp 156,000.00
Total Rp 8,655,769.60
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu camp. 1 SP : 2 PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.600
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 140.000
Semen portland kg 43.500
Pasir pasang m3 0.080
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu camp. 1 SP : 3 PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.600
Tukang Batu OH 0.200
Kepala Tukang OH 0.020
Mandor OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 140.000
Semen portland kg 32.950
Pasir pasang m3 0.091
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu camp. 1 SP : 5 PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.6000
Tukang Batu OH 0.2000
Kepala Tukang OH 0.0200
Mandor OH 0.0300
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 140.000
Semen portland kg 22.200
Pasir pasang m3 0.102
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu campuran 1 SP : 2

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 70.000
Semen portland kg 18.950
Pasir pasang m3 0.038
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu camp. 1 SP : 3 PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Batu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m3 70.000
Semen portland kg 14.370
Pasir pasang m3 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pasangan 1 M2 dinding bata merah ( 5 x 11 x 22 ) cm tebal 1/2 batu camp. 1 SP : 5 PP


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.3000
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0150
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah m2 70.000
Semen portland kg 9.680
Pasir pasang m3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 16

l 1 batu camp. 1 SP : 2 PP A.4.4.1.1


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 48,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 3,000.00
UMLAH TENAGA KERJA 71,000.00

500.00 70,000.00
1,450.00 63,075.00
125,000.00 10,000.00
UMLAH HARGA BAHAN 143,075.00

UMLAH HARGA ALAT


214,075.00
32,111.25
246,186.25

l 1 batu camp. 1 SP : 3 PP A.4.4.1.2


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 48,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 3,000.00
UMLAH TENAGA KERJA 71,000.00

500.00 70,000.00
1,450.00 47,777.50
125,000.00 11,375.00
UMLAH HARGA BAHAN 129,152.50

UMLAH HARGA ALAT


200,152.50
30,022.88
230,175.38

l 1 batu camp. 1 SP : 5 PP A.4.4.1.4


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 48,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 3,000.00
UMLAH TENAGA KERJA 71,000.00

500.00 70,000.00
1,450.00 32,190.00
125,000.00 12,750.00
UMLAH HARGA BAHAN 114,940.00

UMLAH HARGA ALAT


185,940.00
27,891.00
213,831.00
Lembar 17

bal 1/2 batu campuran 1 SP : 2 A. 4.4.1.7


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 24,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 1,500.00
UMLAH TENAGA KERJA 35,500.00

500.00 35,000.00
1,450.00 27,477.50
125,000.00 4,750.00
UMLAH HARGA BAHAN 67,227.50

UMLAH HARGA ALAT


102,727.50
15,409.13
118,136.63

1/2 batu camp. 1 SP : 3 PP A.4.4.1.8


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 24,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 1,500.00
UMLAH TENAGA KERJA 35,500.00

500.00 35,000.00
1,450.00 20,836.50
125,000.00 5,000.00
UMLAH HARGA BAHAN 60,836.50

UMLAH HARGA ALAT


96,336.50
14,450.48
110,786.98

l 1/2 batu camp. 1 SP : 5 PP A.4.4.1.10


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 24,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 1,500.00
UMLAH TENAGA KERJA 35,500.00

500.00 35,000.00
1,450.00 14,036.00
125,000.00 5,625.00
UMLAH HARGA BAHAN 54,661.00

UMLAH HARGA ALAT


90,161.00
13,524.15
103,685.15
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 M2 plesteran 1 SP : 2 PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Kayu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 10.224
Pasir pasang m3 0.020
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 plesteran 1 SP : 3 PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Kayu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 7.776
Pasir pasang m3 0.023
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 plesteran 1 SP : 5 PP tebal 15 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Kayu OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 5.184
Pasir pasang m3 0.026
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m1 plesteran skoning camp. 1SP : 3PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.080
Tukang Batu OH 0.400
Kepala Tukang OH 0.040
Mandor OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 0.500
Pasir pasang m3 0.013
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 plesteran ciprat camp. 1SP : 2PP

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.300
Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Semen portland kg 4.320
Pasir pasang m3 0.006
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pekerjaan 1 M2 acian

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja OH 0.200
Tukang Kayu OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Semen portland Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 18

A.4.4.2.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.000 24,000.000
90,000.000 13,500.000
100,000.000 1,500.000
100,000.000 1,500.000
UMLAH TENAGA KERJA 40,500.000

1,450.000 14,824.800
125,000.000 2,500.000
UMLAH HARGA BAHAN 17,324.800

UMLAH HARGA ALAT


57,824.800
8,673.72
66,498.52

A.4.4.2.3
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.000 24,000.000
90,000.000 13,500.000
100,000.000 1,500.000
100,000.000 1,500.000
UMLAH TENAGA KERJA 40,500.000

1,450.000 11,275.200
125,000.000 2,875.000
UMLAH HARGA BAHAN 14,150.200

UMLAH HARGA ALAT


54,650.200
8,197.53
62,847.73
A.4.4.2.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.000 24,000.000
90,000.000 13,500.000
100,000.000 1,500.000
100,000.000 1,500.000
UMLAH TENAGA KERJA 40,500.000

1,450.000 7,516.800
125,000.000 3,250.000
UMLAH HARGA BAHAN 10,766.800

UMLAH HARGA ALAT


51,266.800
7,690.02
58,956.82
Lembar 19

A.4.4.2.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.000 6,400.000
90,000.000 36,000.000
100,000.000 4,000.000
100,000.000 400.000
UMLAH TENAGA KERJA 46,800.000

1,450.000 725.000
125,000.000 1,625.000
UMLAH HARGA BAHAN 2,350.000

UMLAH HARGA ALAT


49,150.000
7,372.50
56,522.50

A.4.4.2.23
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.000 24,000.000
90,000.000 9,000.000
100,000.000 1,000.000
100,000.000 1,500.000
UMLAH TENAGA KERJA 35,500.000

1,450.000 6,264.000
125,000.000 750.000
UMLAH HARGA BAHAN 7,014.000

UMLAH HARGA ALAT


42,514.000
6,377.10
48,891.10

A.4.4.2.27
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.000 16,000.000
90,000.000 9,000.000
100,000.000 1,000.000
100,000.000 1,000.000
UMLAH TENAGA KERJA 27,000.000

1,450.000 4,712.500
UMLAH HARGA BAHAN 4,712.500

UMLAH HARGA ALAT


31,712.500
4,756.88
36,469.38
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

Pemasangan 1 M2 lantai Keramik ukuran 40 x 40 cm Warna/Putih

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.250
Tukang Batu OH 0.125
Kepala Tukang OH 0.013
Mandor OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 40 x 40 cm Bh 6.630
Semen portland Kg 9.800
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 lantai Keramik ukuran 30 x 30 cm Warna/Abu-abu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.260
Tukang Batu OH 0.130
Kepala Tukang OH 0.013
Mandor OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 30 x 30 cm Bh 11.870
Semen portland Kg 10.000
Semen warna Kg 0.600
Pasir pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 lantai Keramik ukuran 20 x 20 cm Warna/Abu-abu (Ut. KM/WC)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.270
Tukang Batu OH 0.135
Kepala Tukang OH 0.014
Mandor OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 20 x 20 cm Bh 26.500
Semen portland Kg 10.400
Semen warna Kg 1.000
Pasing pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 lantai granit ukuran 60 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.240
Tukang Batu OH 0.120
Kepala Tukang OH 0.012
Mandor OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
Granit 60 x 60 cm (W. Muda) Bh 3.100
Semen portland Kg 9.600
Semen warna Kg 1.500
Pasing pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m' Plint ubin ukuran 10 x 20 cm Warna/Abu-abu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang Batu OH 0.090
Kepala Tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin Uk. 10 x 20 cm Bh 5.300
Semen portland Kg 1.140
Semen warna Kg 0.150
Pasing pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m' Plint ubin ukuran 10 x 30 cm Warna/Abu-abu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang Batu OH 0.090
Kepala Tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin Uk. 10 x 30 cm Bh 3.530
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasing pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m' Plint ubin ukuran 10 x 40 cm Warna/Abu-abu

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang Batu OH 0.090
Kepala Tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint ubin Uk. 10 x 40 cm Bh 0.663
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasing pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m' Plint granit ukuran 10 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.090
Tukang Batu OH 0.090
Kepala Tukang OH 0.009
Mandor OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint Granit 10 x 60 cm (W. Muda) Bh 1.700
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasing pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 Dinding Granit ukuran 30 x 60 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.900
Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30 x 60 cm (W. Muda) Bh 5.800
Semen portland Kg 9.300
Pasing pasang M3 0.018
Semen warna M3 1.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 dinding keramik 20 x 20 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.900
Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 20 x 20 cm Bh 26.500
Semen portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 dinding keramik 20 x 25 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.900
Tukang Batu OH 0.450
Kepala Tukang OH 0.045
Mandor OH 0.045
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 20 x 25 cm M2 20.8000
Semen portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 Dinding Batu tempel hitam

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.700
Tukang Batu OH 0.350
Kepala Tukang OH 0.035
Mandor OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu Tempel Hitam M2 1.100
Semen portland Kg 11.750
Pasing pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 Wallpaper lebar 50 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.350
Tukang Batu OH 0.175
Kepala Tukang OH 0.017
Mandor OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper M1 2.200
Lem Fox Kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 Paving Blok uk. 21 x 10,5 tebal 8 cm K 100 - 150

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.5000
Tukang Batu OH 0.5000
Kepala Tukang OH 0.0500
Mandor OH 0.0013
JUMLAH TENAGA KERJA
B BAHAN
Paving Blok uk. 21 x 10,5 tebal 8 Bh 45.805
Pasir Beton M3 0.050
JUMLAH HARGA BAHAN
C PERALATAN
Paving Blok uk. 21 x 10,5 tebal 8 % 10.00
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m1 Kansteen uk. 10 x 25 x 40 cm K 50 - 100

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.5000
Tukang Batu OH 0.5000
Kepala Tukang OH 0.0500
Mandor OH 0.0013
JUMLAH TENAGA KERJA
B BAHAN
Kansteen uk. 10 x 25 x 40 cm Bh 2.750
JUMLAH HARGA BAHAN
C PERALATAN
Paving Blok uk. 21 x 10,5 tebal 8 % 10.00
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 20

PENUTUP DINDING

A.4.4.3.4
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,000.00
90,000.00 11,250.00
100,000.00 1,250.00
100,000.00 1,250.00
UMLAH TENAGA KERJA 33,750.00

10,000.00 66,300.00
1,450.00 14,210.00
18,000.00 10,800.00
125,000.00 5,625.00
UMLAH HARGA BAHAN 96,935.00

UMLAH HARGA ALAT


130,685.00
19,602.75
150,287.75

A.4.4.3.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,800.00
90,000.00 11,700.00
100,000.00 1,300.00
100,000.00 1,300.00
UMLAH TENAGA KERJA 35,100.00

5,000.00 59,350.00
1,450.00 14,500.00
18,000.00 10,800.00
125,000.00 5,625.00
UMLAH HARGA BAHAN 90,275.00

UMLAH HARGA ALAT


125,375.00
18,806.25
144,181.25

a/Abu-abu (Ut. KM/WC) A.4.4.3.6


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 21,600.00
90,000.00 12,150.00
100,000.00 1,350.00
100,000.00 1,350.00
UMLAH TENAGA KERJA 36,450.00

3,000.00 79,500.00
1,450.00 15,080.00
18,000.00 18,000.00
125,000.00 5,625.00
UMLAH HARGA BAHAN 118,205.00

UMLAH HARGA ALAT


154,655.00
23,198.25
177,853.25
Lembar 21

A.4.4.3.13
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 19,200.00
90,000.00 10,800.00
100,000.00 1,200.00
100,000.00 1,200.00
UMLAH TENAGA KERJA 32,400.00

65,000.00 201,500.00
1,450.00 13,920.00
18,000.00 27,000.00
125,000.00 5,625.00
UMLAH HARGA BAHAN 248,045.00

UMLAH HARGA ALAT


280,445.00
42,066.75
322,511.75

A.4.4.3.19
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 7,200.00
90,000.00 8,100.00
100,000.00 900.00
100,000.00 450.00
UMLAH TENAGA KERJA 16,650.00

1,500.00 7,950.00
1,450.00 1,653.00
18,000.00 2,700.00
125,000.00 375.00
UMLAH HARGA BAHAN 12,678.00

UMLAH HARGA ALAT


29,328.00
4,399.20
33,727.20
A.4.4.3.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 7,200.00
90,000.00 8,100.00
100,000.00 900.00
100,000.00 450.00
UMLAH TENAGA KERJA 16,650.00

2,000.00 7,060.00
1,450.00 1,653.00
18,000.00 1,800.00
125,000.00 375.00
UMLAH HARGA BAHAN 10,888.00

UMLAH HARGA ALAT


27,538.00
4,130.70
31,668.70
Lembar 22

A.4.4.3.21
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 7,200.00
90,000.00 8,100.00
100,000.00 900.00
100,000.00 450.00
UMLAH TENAGA KERJA 16,650.00

3,000.00 1,987.50
1,450.00 1,653.00
18,000.00 1,800.00
125,000.00 375.00
UMLAH HARGA BAHAN 5,815.50

UMLAH HARGA ALAT


22,465.50
3,369.83
25,835.33

A.4.4.3.28
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 7,200.00
90,000.00 8,100.00
100,000.00 900.00
100,000.00 450.00
UMLAH TENAGA KERJA 16,650.00

11,500.00 19,550.00
1,450.00 1,653.00
18,000.00 1,800.00
125,000.00 375.00
UMLAH HARGA BAHAN 23,378.00

UMLAH HARGA ALAT


40,028.00
6,004.20
46,032.20
A.4.4.3.28a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 72,000.00
90,000.00 40,500.00
100,000.00 4,500.00
100,000.00 4,500.00
UMLAH TENAGA KERJA 121,500.00

33,000.00 191,400.00
1,450.00 13,485.00
125,000.00 2,250.00
1,450.00 1,885.00
UMLAH HARGA BAHAN 209,020.00

UMLAH HARGA ALAT


330,520.00
49,578.00
380,098.00
Lembar 23

A.4.4.3.54
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 72,000.00
90,000.00 40,500.00
100,000.00 4,500.00
100,000.00 4,500.00
UMLAH TENAGA KERJA 121,500.00

3,000.00 79,500.00
1,450.00 13,485.00
125,000.00 2,250.00
18,000.00 34,920.00
UMLAH HARGA BAHAN 130,155.00

UMLAH HARGA ALAT


251,655.00
37,748.25
289,403.25

A.4.4.3.54a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 72,000.00
90,000.00 40,500.00
100,000.00 4,500.00
100,000.00 4,500.00
UMLAH TENAGA KERJA 121,500.00

4,000.00 83,200.00
1,450.00 13,485.00
125,000.00 2,250.00
18,000.00 34,920.00
UMLAH HARGA BAHAN 133,855.00

UMLAH HARGA ALAT


255,355.00
38,303.25
293,658.25
A.4.4.3.58
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 56,000.00
90,000.00 31,500.00
100,000.00 3,500.00
100,000.00 3,500.00
UMLAH TENAGA KERJA 94,500.00

150,000.00 165,000.00
1,450.00 17,037.50
125,000.00 4,375.00
UMLAH HARGA BAHAN 186,412.50

UMLAH HARGA ALAT


280,912.50
42,136.88
323,049.38
Lembar 24

A.4.4.3.60
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 28,000.00
90,000.00 15,750.00
100,000.00 1,700.00
100,000.00 200.00
UMLAH TENAGA KERJA 45,650.00

25,000.00 55,000.00
18,000.00 4,500.00
UMLAH HARGA BAHAN 59,500.00

UMLAH HARGA ALAT


105,150.00
15,772.50
120,922.50

A.4.4.3.65
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 40,000.00
90,000.00 45,000.00
100,000.00 5,000.00
100,000.00 130.00
UMLAH TENAGA KERJA 90,130.00

2,375.00 108,786.85
125,000.00 6,250.00
UMLAH HARGA BAHAN 115,036.85

115,036.85 11,503.68
UMLAH HARGA ALAT 11,503.68
216,670.53
32,500.58
249,171.11

A.4.4.3.65a
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 40,000.00
90,000.00 45,000.00
100,000.00 5,000.00
100,000.00 130.00
UMLAH TENAGA KERJA 90,130.00

28,600.00 78,650.00
UMLAH HARGA BAHAN 78,650.00

78,650.00 7,865.00
UMLAH HARGA ALAT 7,865.00
176,645.00
26,496.75
203,141.75
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Tripleks 6 mm Lembar 0.3750
Paku Tripleks Bh 0.030
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 Aluminium Composite Panel (120x240) mm, tebal 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Aluminium Composite Panel Lembar 0.3640
Baut Skrup Bh 12.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m2 langit-langit Kalciboard (120x240x6) mm, tebal 6 mm


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.0500
Kepala Tukang L.03 OH 0.0050
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kalciboard 6 mm Lembar 0.3640
Paku Skrup Kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 Dinding partisi PVC Foarboard (20x5,9x4) mm, tebal 4 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang Partisi L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
PVC Foarboard tebal 4 mm Lbr 0.890
Baut Skrup Bh 24.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m1 List Langit-langit Kayu Profil uk. 4 x 5 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.050
Tukang Kayu L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List Kayu Profil M' 1.050
Paku Campur Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Lembar 25

cm, tebal 6 mm A.4.5.1.5


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 8,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 18,500.00

70,000.00 26,250.00
30,000.00 900.00
UMLAH HARGA BAHAN 27,150.00

UMLAH HARGA ALAT


45,650.00
6,847.50
52,497.50

mm, tebal 4 mm A.4.5.1.5a


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 8,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 18,500.00

650,000.00 236,600.00
1,500.00 18,000.00
UMLAH HARGA BAHAN 254,600.00

UMLAH HARGA ALAT


273,100.00
40,965.00
314,065.00

m, tebal 6 mm A.4.5.1.7
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 8,000.00
90,000.00 4,500.00
100,000.00 500.00
100,000.00 500.00
UMLAH TENAGA KERJA 13,500.00

90,000.00 32,760.00
30,000.00 3,300.00
UMLAH HARGA BAHAN 36,060.00

UMLAH HARGA ALAT


49,560.00
7,434.00
56,994.00
LEMBAR 27

4) mm, tebal 4 mm A.4.5.1.7a


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 8,000.00
90,000.00 4,500.00
100,000.00 500.00
100,000.00 500.00
UMLAH TENAGA KERJA 13,500.00

200,000.00 178,000.00
1,500.00 36,000.00
UMLAH HARGA BAHAN 214,000.00

UMLAH HARGA ALAT


227,500.00
34,125.00
261,625.00

A.4.5.1.9
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 4,000.00
90,000.00 4,500.00
100,000.00 500.00
100,000.00 300.00
UMLAH TENAGA KERJA 9,300.00

4,313.00 4,528.65
18,000.00 180.00
UMLAH HARGA BAHAN 4,708.65

UMLAH HARGA ALAT


14,008.65
2,101.30
16,109.95
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

Pemasangan 1 M2 genteng Sakura Roof

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2000
Tukang Kayu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0010
JUMLAH TENAGA KERJA
B BAHAN
Genteng Sakura Roof Lembar 1.0200
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M' nok genteng Sakura Roof

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2500
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0130
JUMLAH TENAGA KERJA
B BAHAN
Nok Genteng Sakura Roof Bh 1.1000
Paku biasa ½”-1” kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 atap seng gelombang


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2000
Tukang Kayu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0010
JUMLAH TENAGA KERJA
B BAHAN
Atap seng gelombang 3"x6" Lbr 0.7000
Paku biasa ½”-1” Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M' nok aAtap seng

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2500
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0130
JUMLAH TENAGA KERJA
B BAHAN
Nok Seng Plat BJLS 0.35 mm Lmbr 0.3000
Paku biasa ½”-1” kg 0.040
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M² atap Spandek

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Spandek 0.30 mm M² 0.8000
Paku Seng Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M' nok atap spandek

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1200
Tukang L.02 OH 0.0600
Kepala Tukang L.03 OH 0.0600
Mandor L.04 OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
Nok atap Spandek Lebar 0.40 M M1 1.0000
Sekrup Spendek Bh 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 Onduline uk. 95 x 200 cm, tebal 3 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1200
Tukang Besi L.02 OH 0.0600
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
Atap onduline Lbr 0.5263
Sekrup atap onduline Bh 8.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M' nok atap onduline uk. 50 x 100 cm, tebal 3 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1500
Tukang Besi L.02 OH 0.0700
Kepala Tukang L.03 OH 0.0700
Mandor L.04 OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
Nok Atap onduline Lbr 1.1000
Sekrup atap onduline Bh 4.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M1 Kalsiplank 8 mm, uk 30 x 240 cm rangkap

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.2000
Kepala Tukang L.03 OH 0.0200
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank 8 mm M1 2.000
Paku plafond Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 Kuda - kuda baja ringan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2000
Tukang Kayu L.02 OH 0.4500
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0500
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan profil C 75.075 M1 1.800
Baut (screw driver) Ut. Profil C bh 10.000
Dynabolt bh 1.600
Baja ringan profil U 37. 050 (Gording) M1 2.100
Baut (screw driver) Ut. Profil U bh 10.000
Talang jurai M1 -
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 28

A.4.5.2.32
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 100.00
UMLAH TENAGA KERJA 26,100.00

35,000.00 35,700.00
18,000.00 3,600.00
UMLAH HARGA BAHAN 39,300.00

UMLAH HARGA ALAT


65,400.00
9,810.00
75,210.00

A.4.5.2.36
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,000.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 1,300.00
UMLAH TENAGA KERJA 36,300.00

35,000.00 38,500.00
18,000.00 5,775.00
UMLAH HARGA BAHAN 44,275.00

UMLAH HARGA ALAT


80,575.00
12,086.25
92,661.25

A.4.5.2.39
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 100.00
UMLAH TENAGA KERJA 26,100.00

56,000.00 39,200.00
18,000.00 3,600.00
UMLAH HARGA BAHAN 42,800.00

UMLAH HARGA ALAT


68,900.00
10,335.00
79,235.00
LEMBAR 29

A.4.5.2.40
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 20,000.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 1,300.00
UMLAH TENAGA KERJA 36,300.00

75,000.00 22,500.00
18,000.00 3,375.00
UMLAH HARGA BAHAN 25,875.00

UMLAH HARGA ALAT


62,175.00
9,326.25
71,501.25

A.4.5.2. A
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 100.00
UMLAH TENAGA KERJA 26,100.00

51,000.00 40,800.00
30,000.00 6,000.00
UMLAH HARGA BAHAN 46,800.00

UMLAH HARGA ALAT -


72,900.00
10,935.00
83,835.00

A.4.5.2. B
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 9,600.00
90,000.00 5,400.00
100,000.00 6,000.00
100,000.00 600.00
UMLAH TENAGA KERJA 21,600.00

30,000.00 30,000.00
30,000.00 180,000.00
UMLAH HARGA BAHAN 210,000.00

UMLAH HARGA ALAT


231,600.00
34,740.00
266,340.00
LEMBAR 30

A.4.5.2. C
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 9,600.00
90,000.00 5,400.00
100,000.00 600.00
100,000.00 600.00
UMLAH TENAGA KERJA 16,200.00

51,000.00 26,841.30
1,500.00 12,000.00
UMLAH HARGA BAHAN 38,841.30

UMLAH HARGA ALAT


55,041.30
8,256.20
63,297.50

A.4.5.2. D
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 12,000.00
90,000.00 6,300.00
100,000.00 7,000.00
100,000.00 600.00
UMLAH TENAGA KERJA 25,900.00

30,000.00 33,000.00
1,500.00 6,000.00
UMLAH HARGA BAHAN 39,000.00

UMLAH HARGA ALAT


64,900.00
9,735.00
74,635.00

A.4.5.2. E
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 8,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 28,500.00

40,000.00 80,000.00
30,000.00 3,000.00
UMLAH HARGA BAHAN 83,000.00

UMLAH HARGA ALAT


111,500.00
16,725.00
128,225.00
LEMBAR 31

A.4.5.2. F
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 40,500.00
100,000.00 1,000.00
100,000.00 5,000.00
UMLAH TENAGA KERJA 62,500.00

10,000.00 18,000.00
1,000.00 10,000.00
6,325.00 10,120.00
10,000.00 21,000.00
1,000.00 10,000.00
48,000.00 -
UMLAH HARGA BAHAN 69,120.00

UMLAH HARGA ALAT


131,620.00
19,743.00
151,363.00
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU

Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas I

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 7.000
Tukang Kayu L.02 OH 21.000
Kepala Tukang L.03 OH 2.100
Mandor L.04 OH 0.350
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas I M3 1.100
Paku 10 cm Kg 1.250
Lem kayu kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.000
Tukang Kayu L.02 OH 18.000
Kepala Tukang L.03 OH 1.800
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II M3 1.200
Paku 10 cm Kg 1.250
Lem kayu kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pembuatan dan pemasangan 1 M2 daun pintu panel, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.000
Tukang Kayu L.02 OH 3.000
Kepala Tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.040
Lem kayu kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pembuatan dan pemasangan 1 M2 Bingkai pintu dan jendela kaca, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.800
Tukang Kayu L.02 OH 2.400
Kepala Tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.024
Lem kayu kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pembuatan dan pemasangan 1 M2 daun pintu double multipleks 6 mm, rangka papan kay

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang Kayu L.02 OH 2.100
Kepala Tukang L.03 OH 0.210
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.025
Paku 1 cm - 2,5 cm kg 0.030
Lem kayu kg 0.500
Multipleks 6 mm lbr 0.347
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 jalusi kusen kayu kelas II

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.670
Tukang Kayu L.02 OH 2.000
Kepala Tukang L.03 OH 0.200
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu kelas II M3 0.060
Paku 1 cm - 2,5 cm kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 4.000
Tukang Kayu L.02 OH 12.000
Kepala Tukang L.03 OH 1.200
Mandor L.04 OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II M3 1.100
Besi strip tebal 5mm kg 15.000
Paku 12 cm kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M3 konstruksi kuda-kuda expose, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.700
Tukang Kayu L.02 OH 20.100
Kepala Tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II M3 1.200
Besi strip tebal 5mm kg 15.000
Paku 12 cm kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M3 konstruksi gordeng, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 6.700
Tukang Kayu L.02 OH 20.100
Kepala Tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu kelas II M3 1.100
Besi strip tebal 5 mm Kg 15.000
Paku 12 cm kg 3.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2000
Tukang Kayu L.02 OH 0.3000
Kepala Tukang L.03 OH 0.0300
Mandor L.04 OH 0.0100
JUMLAH TENAGA KERJA
B BAHAN
Kaso-kaso 5 x 7 cm M3 0.0163
Paku 7 cm - 10 cm kg 0.2500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M’ lisplank ukuran (3 x 20) cm, kayu kelas II

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.1000
Tukang Kayu L.02 OH 0.2000
Kepala Tukang L.03 OH 0.0200
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu kelas II M3 0.0108
Paku 5 dan 7 cm Liter 0.1000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 32

endela, kayu kelas I A.4.6.1.1


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 560,000.00
90,000.00 1,890,000.00
100,000.00 210,000.00
100,000.00 35,000.00
UMLAH TENAGA KERJA 2,695,000.00

3,500,000.00 3,850,000.00
18,000.00 22,500.00
18,000.00 18,000.00
UMLAH HARGA BAHAN 3,890,500.00

UMLAH HARGA ALAT


6,585,500.00
987,825.00
7,573,325.00

endela, kayu kelas II A.4.6.1.2


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 480,000.00
90,000.00 1,620,000.00
100,000.00 180,000.00
100,000.00 30,000.00
UMLAH TENAGA KERJA 2,310,000.00

3,000,000.00 3,600,000.00
18,000.00 22,500.00
18,000.00 18,000.00
UMLAH HARGA BAHAN 3,640,500.00

UMLAH HARGA ALAT


5,950,500.00
892,575.00
6,843,075.00
A.4.6.1.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 80,000.00
90,000.00 270,000.00
100,000.00 30,000.00
100,000.00 5,000.00
UMLAH TENAGA KERJA 385,000.00

3,000,000.00 120,000.00
18,000.00 9,000.00
UMLAH HARGA BAHAN 129,000.00

UMLAH HARGA ALAT

514,000.00
77,100.00
591,100.00
LEMBAR 33

la kaca, kayu kelas II A.4.6.1.6


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 64,000.00
90,000.00 216,000.00
100,000.00 24,000.00
100,000.00 4,000.00
UMLAH TENAGA KERJA 308,000.00

3,000,000.00 72,000.00
18,000.00 5,400.00
UMLAH HARGA BAHAN 77,400.00

UMLAH HARGA ALAT

385,400.00
57,810.00
443,210.00

pleks 6 mm, rangka papan kayu A.4.6.1.8


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 56,000.00
90,000.00 189,000.00
100,000.00 21,000.00
100,000.00 3,500.00
JUMLAH TENAGA KERJA 269,500.00

3,000,000.00 75,000.00
18,000.00 540.00
18,000.00 9,000.00
70,000.00 24,304.00
JUMLAH HARGA BAHAN 108,844.00

JUMLAH HARGA ALAT -


378,344.00
56,751.60
435,095.60

A.4.6.1.10
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 53,600.00
90,000.00 180,000.00
100,000.00 20,000.00
100,000.00 33,500.00
UMLAH TENAGA KERJA 287,100.00

3,000,000.00 180,000.00
18,000.00 2,700.00
UMLAH HARGA BAHAN 182,700.00

UMLAH HARGA ALAT


469,800.00
70,470.00
540,270.00
LEMBAR 34

u kelas II bentang 6 meter A.4.6.1.13


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 320,000.00
90,000.00 1,080,000.00
100,000.00 120,000.00
100,000.00 20,000.00
UMLAH TENAGA KERJA 1,540,000.00

3,000,000.00 3,300,000.00
20,000.00 300,000.00
18,000.00 100,800.00
UMLAH HARGA BAHAN 3,700,800.00

UMLAH HARGA ALAT


5,240,800.00
786,120.00
6,026,920.00

A.4.6.1.14
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 536,000.00
90,000.00 1,809,000.00
100,000.00 201,000.00
100,000.00 33,500.00
UMLAH TENAGA KERJA 2,579,500.00

3,000,000.00 3,600,000.00
20,000.00 300,000.00
18,000.00 100,800.00
UMLAH HARGA BAHAN 4,000,800.00

UMLAH HARGA ALAT


6,580,300.00
987,045.00
7,567,345.00

A.4.6.1.15
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 536,000.00
90,000.00 1,809,000.00
100,000.00 201,000.00
100,000.00 33,500.00
UMLAH TENAGA KERJA 2,579,500.00

3,000,000.00 3,300,000.00
20,000.00 300,000.00
18,000.00 54,000.00
UMLAH HARGA BAHAN 3,654,000.00

UMLAH HARGA ALAT


6,233,500.00
935,025.00
7,168,525.00
LEMBAR 35

A.4.6.1.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 27,000.00
100,000.00 3,000.00
100,000.00 1,000.00
UMLAH TENAGA KERJA 47,000.00

3,000,000.00 48,900.00
18,000.00 4,500.00
UMLAH HARGA BAHAN 53,400.00

UMLAH HARGA ALAT


100,400.00
15,060.00
115,460.00

A.4.6.1.21
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 8,000.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 28,500.00

3,000,000.00 32,400.00
18,000.00 1,800.00
UMLAH HARGA BAHAN 34,200.00

UMLAH HARGA ALAT

62,700.00
9,405.00
72,105.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

Pemasangan 1 buah kunci tanam antik

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0600
Tukang Kayu L.02 OH 0.6000
Kepala Tukang L.03 OH 0.0600
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam antik Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah kunci tanam biasa 2 x slag stainless

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0100
Tukang Kayu L.02 OH 0.5000
Kepala Tukang L.03 OH 0.0500
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam 2 x slag Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah kunci kamar mandi

No Uraian Kode Satuan Koefisien


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0050
Tukang Kayu L.02 OH 0.5000
Kepala Tukang L.03 OH 0.0500
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Kunci tanam KM Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 buah engsel pintu stainless

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0150
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah engsel jendela stainless

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0100
Tukang Kayu L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Engsel jendela Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah kait angin

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0150
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0080
JUMLAH TENAGA KERJA
B BAHAN
Kait angin stainless Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah Grendel Stainless Pintu/Jendela

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0200
Tukang Kayu L.02 OH 0.2000
Kepala Tukang L.03 OH 0.0200
Mandor L.04 OH 0.0010
JUMLAH TENAGA KERJA
B BAHAN
Grendel Stainless Bh 1.0000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 kaca Bening tebal 3 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0150
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 3 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 kaca Bening tebal 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0150
Tukang Kayu L.02 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0500
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 kaca rayben tebal 5 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0170
Tukang Kayu L.02 OH 0.1700
Kepala Tukang L.03 OH 0.0170
Mandor L.04 OH 0.0009
JUMLAH TENAGA KERJA
B BAHAN
Kaca rayben 5 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0700
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 kaca Bening tebal 8 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0170
Tukang Kayu L.02 OH 0.1700
Kepala Tukang L.03 OH 0.0170
Mandor L.04 OH 0.0009
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0700
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 kaca rayben tebal 8 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0170
Tukang Kayu L.02 OH 0.1700
Kepala Tukang L.03 OH 0.0170
Mandor L.04 OH 0.0009
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0700
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 M2 kaca tebal 12 mm

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja L.01 OH 0.0250
Tukang L.02 OH 0.2500
Kepala Tukang L.03 OH 0.0250
Mandor L.04 OH 0.0013
JUMLAH TENAGA KERJA
B BAHAN
Kaca wire glas tebal 12 mm M2 1.1000
Silicon sealant / lem kaca Kg 0.0700
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M2 Kaca cermin 5 mm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0150
Tukang Batu OH 0.1500
Kepala Tukang OH 0.0150
Mandor OH 0.0080
JUMLAH TENAGA KERJA
B BAHAN
Kaca cermin 5 mm M2 1.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 36

A.4.6.2.1
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 4,800.00
90,000.00 54,000.00
100,000.00 6,000.00
100,000.00 300.00
TENAGA KERJA 65,100.00

650,000.00 650,000.00
HARGA BAHAN 650,000.00

JUMLAH HARGA ALAT


715,100.00
107,265.00
822,365.00

A.4.6.2.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 45,000.00
100,000.00 5,000.00
100,000.00 500.00
TENAGA KERJA 51,300.00

150,000.00 150,000.00
HARGA BAHAN 150,000.00

JUMLAH HARGA ALAT


201,300.00
30,195.00
231,495.00

A.4.6.2.3
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 45,000.00
100,000.00 5,000.00
100,000.00 300.00
TENAGA KERJA 50,700.00

97,500.00 97,500.00
HARGA BAHAN 97,500.00

JUMLAH HARGA ALAT


148,200.00
22,230.00
170,430.00
LEMBAR 37

A.4.6.2.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,200.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 80.00
TENAGA KERJA 16,280.00

30,000.00 30,000.00
HARGA BAHAN 30,000.00

JUMLAH HARGA ALAT


46,280.00
6,942.00
53,222.00

A.4.6.2.6
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 50.00
TENAGA KERJA 10,850.00

21,000.00 21,000.00
HARGA BAHAN 21,000.00

JUMLAH HARGA ALAT


31,850.00
4,777.50
36,627.50

A.4.6.2.9
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,200.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 800.00
TENAGA KERJA 17,000.00

16,000.00 16,000.00
HARGA BAHAN 16,000.00

JUMLAH HARGA ALAT


33,000.00
4,950.00
37,950.00

A.4.6.2.11
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,600.00
90,000.00 18,000.00
100,000.00 2,000.00
100,000.00 100.00
TENAGA KERJA 21,700.00

15,000.00 15,000.00
HARGA BAHAN 15,000.00

JUMLAH HARGA ALAT


36,700.00
5,505.00
42,205.00
LEMBAR 38

A.4.6.2.16
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,200.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 80.00
TENAGA KERJA 16,280.00

86,250.00 94,875.00
5,000.00 250.00
HARGA BAHAN 95,125.00

JUMLAH HARGA ALAT


111,405.00
16,710.75
128,115.75

A.4.6.2.17
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,200.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 80.00
TENAGA KERJA 16,280.00

103,500.00 113,850.00
5,000.00 250.00
HARGA BAHAN 114,100.00

JUMLAH HARGA ALAT


130,380.00
19,557.00
149,937.00

A.4.6.2.17a
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 1,360.00
90,000.00 15,300.00
100,000.00 1,700.00
100,000.00 90.00
TENAGA KERJA 18,450.00

155,000.00 170,500.00
5,000.00 350.00
HARGA BAHAN 170,850.00

JUMLAH HARGA ALAT


189,300.00
28,395.00
217,695.00
LEMBAR 39

A.4.6.2.18
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,360.00
90,000.00 15,300.00
100,000.00 1,700.00
100,000.00 90.00
TENAGA KERJA 18,450.00

270,000.00 297,000.00
5,000.00 350.00
HARGA BAHAN 297,350.00

JUMLAH HARGA ALAT


315,800.00
47,370.00
363,170.00

A.4.6.2.18a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,360.00
90,000.00 15,300.00
100,000.00 1,700.00
100,000.00 90.00
TENAGA KERJA 18,450.00

300,000.00 330,000.00
5,000.00 350.00
HARGA BAHAN 330,350.00

JUMLAH HARGA ALAT


348,800.00
52,320.00
401,120.00

A.4.6.2.19
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 2,000.00
90,000.00 22,500.00
100,000.00 2,500.00
100,000.00 130.00
TENAGA KERJA 27,130.00

1,130,434.78 1,243,478.26
5,000.00 350.00
HARGA BAHAN 1,243,828.26

JUMLAH HARGA ALAT


1,270,958.26
190,643.74
1,461,602.00
LEMBAR 40

A.4.6.2.20
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,200.00
90,000.00 13,500.00
100,000.00 1,500.00
100,000.00 800.00
JUMLAH TENAGA KERJA 17,000.00

140,500.00 154,550.00
JUMLAH HARGA BAHAN 154,550.00

JUMLAH HARGA ALAT


171,550.00
25,732.50
197,282.50
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

Pengecatan 1 m2 bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0700
Tukang Cat L.02 OH 0.0090
Kepala Tukang L.03 OH 0.0060
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.2000
Plamir kayu Kg 0.1500
Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Kuas Buah 0.0100
Pemgencer Kg 0.0300
Ampelas Lbr 0.2000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Int

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0200
Tukang Cat L.02 OH 0.0630
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.1000
Cat dasar Kg 0.1000
Cat penutup Kg 0.2600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Ex

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0200
Tukang Cat L.02 OH 0.0630
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.1000
Cat dasar Kg 0.1000
Cat penutup Kg 0.2600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pengecatan 1 m2 Plafond ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.0200
Tukang Cat L.02 OH 0.0630
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.1000
Cat dasar Kg 0.1000
Cat penutup Kg 0.2600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pengecatan 1 m2 Waterproofing 2x cat penutup

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.2000
Tukang Cat L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0100
JUMLAH TENAGA KERJA
B BAHAN
Sika waterproofing mortar kg 3.2500
Cat penutup ex. No drop kg 0.2600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 41

cat dasar, 2 lapis cat penutup) A.4.7.1.4


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 5,600.00
90,000.00 810.00
100,000.00 600.00
100,000.00 300.00
UMLAH TENAGA KERJA 7,310.00

25,000.00 5,000.00
15,000.00 2,250.00
66,000.00 11,220.00
66,000.00 17,160.00
5,376.00 53.76
25,000.00 750.00
4,272.00 854.40
UMLAH HARGA BAHAN 37,288.16

UMLAH HARGA ALAT


44,598.16
6,689.72
51,287.88

dasar, 2 lapis cat penutup) Inte A.4.7.1.10


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,600.00
90,000.00 5,670.00
100,000.00 630.00
100,000.00 300.00
UMLAH TENAGA KERJA 8,200.00

4,888.00 488.80
45,000.00 4,500.00
45,000.00 11,700.00
UMLAH HARGA BAHAN 16,688.80
UMLAH HARGA ALAT
24,888.80
3,733.32
28,622.12

dasar, 2 lapis cat penutup) Ext A.4.7.1.10a


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,600.00
90,000.00 5,670.00
100,000.00 630.00
100,000.00 300.00
UMLAH TENAGA KERJA 8,200.00

4,888.00 488.80
45,000.00 4,500.00
50,000.00 13,000.00
UMLAH HARGA BAHAN 17,988.80

UMLAH HARGA ALAT


26,188.80
3,928.32
30,117.12
LEMBAR 42

r, 2 lapis cat penutup) A.4.7.1.10b


Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 1,600.00
90,000.00 5,670.00
100,000.00 630.00
100,000.00 300.00
UMLAH TENAGA KERJA 8,200.00

4,888.00 488.80
40,000.00 4,000.00
40,000.00 10,400.00
UMLAH HARGA BAHAN 14,888.80

UMLAH HARGA ALAT


23,088.80
3,463.32
26,552.12

A.4.7.1.10c
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 16,000.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 1,000.00
UMLAH TENAGA KERJA 27,000.00

19,500.00 63,375.00
46,750.00 12,155.00
UMLAH HARGA BAHAN 75,530.00

UMLAH HARGA ALAT


102,530.00
15,379.50
117,909.50
A.4.7.2 HARGA SATUAN PEKERJAAN INSTALASI LISTRIK

Pemasangan 1 titik Lampu

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.2250
Tukang listrik OH 0.7500
Mandor OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
Kabel NYA (3x2,5) mm M1 3.223
Klem Kabel No. 10 Bh 24.000
Pipa PVC 1/2" btg 2.000
Inbow Dos Bh 1.000
Las Dop Bh 2.000
Isolasi Bh 1.000
T - Dos 5/8" Bh 2.000
Alat Bantu Ls 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 Buah Saklar Tunggal

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Saklar Tunggal Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT

D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 Buah Saklar Ganda

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Saklar Ganda Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 Buah Stop Kontak

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Stop Kontak Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 Buah Lampu Baret 40 Watt

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Lampu Baret Kotak Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 Buah Fiting Besi Keramik

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Fiting Besi Keramik Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 Buah Fitting Downlight 3 "

No Uraian Kode Satuan Koefisien

A TENAGA
Pembantu tukang OH 0.0050
Tukang listrik OH 0.0500
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Fitting Lampu Downlight Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 43

A.4.7.2.1
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 18,000.00
90,000.00 67,500.00
100,000.00 7,500.00
UMLAH TENAGA KERJA 93,000.00

10,670.00 34,392.61
100.00 2,400.00
16,000.00 32,000.00
5,000.00 5,000.00
2,500.00 5,000.00
10,000.00 10,000.00
7,500.00 15,000.00
5,000.00 5,000.00
UMLAH HARGA BAHAN 108,792.61

UMLAH HARGA ALAT

201,792.61
30,268.89
232,061.50

A.4.7.2.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

15,000.00 15,000.00
UMLAH HARGA BAHAN 15,000.00
UMLAH HARGA ALAT

20,400.00
3,060.00
23,460.00

A.4.7.2.3
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

20,000.00 20,000.00
UMLAH HARGA BAHAN 20,000.00

UMLAH HARGA ALAT


25,400.00
3,810.00
29,210.00
LEMBAR 44

A.4.7.2.4
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

20,000.00 20,000.00
UMLAH HARGA BAHAN 20,000.00

UMLAH HARGA ALAT


25,400.00
3,810.00
29,210.00

A.4.7.2.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

478,500.00 478,500.00
UMLAH HARGA BAHAN 478,500.00

UMLAH HARGA ALAT


483,900.00
72,585.00
556,485.00

A.4.7.2.6
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

7,000.00 7,000.00
UMLAH HARGA BAHAN 7,000.00

UMLAH HARGA ALAT


12,400.00
3.00 1,860.00
14,260.00
A.4.7.2.7
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 400.00
90,000.00 4,500.00
100,000.00 500.00
UMLAH TENAGA KERJA 5,400.00

30,000.00 30,000.00
UMLAH HARGA BAHAN 30,000.00

UMLAH HARGA ALAT


35,400.00
5,310.00
40,710.00
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI

Pemasangan 1 buah closet duduk / monoblock

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 3.3000
Tukang Batu OH 1.1000
Kepala Tukang OH 0.0100
Mandor OH 0.1600
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Bh 1.000
Perlengkapan % 6.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah closet jongkok porslen

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.0000
Tukang Batu OH 1.5000
Kepala Tukang OH 0.1500
Mandor OH 0.1600
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Bh 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 buah urinoir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.0000
Tukang Batu OH 1.0000
Kepala Tukang OH 0.1000
Mandor OH 0.0500
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 30.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 buah wastafel

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 1.2000
Tukang Batu OH 1.4500
Kepala Tukang OH 0.1500
Mandor OH 0.0600
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 12.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah Shower utk mandi ex. Onda / setara

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang Batu OH 0.4000
Kepala Tukang OH 0.0400
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Shower mandi Set 1.000
Seal tape Bh 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah floor drain


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
floor drain Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 buah tempat sabun

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang Batu OH 0.1000
Kepala Tukang OH 0.0100
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Tempat sabun Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah bak kontrol pasangan bata 30x30 cm, tinggi 35 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 2.1600
Tukang Batu OH 0.7200
Kepala Tukang OH 0.0720
Mandor OH 0.0110
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 40.000
Semen Portland Kg 44.000
Pasir pasang M3 0.070
Pasir Beton M3 0.060
Kerikil M3 0.070
Besi Beton Polos Kg 1.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 buah bak kontrol pasangan bata 45x45 cm, tinggi 50 cm

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 3.2000
Tukang Batu OH 1.1500
Kepala Tukang OH 0.0110
Mandor OH 0.0160
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 77.000
Pasir pasang M3 0.130
Pasir Beton M3 0.090
Kerikil M3 0.020
Besi Beton Polos Kg 2.600
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 M1 Saluran Air hujan

No Uraian Kode Satuan Koefisien

A TENAGA

JUMLAH TENAGA KERJA

B BAHAN
Galian Tanah Biasa M3 0.135
Pas. Beton mutu f’c = 7,4 MPa (K 100) M3 0.095
Pek. Urugan pasir bawah bBeton 5cm M3 0.023
Urugan tanah kembali M3 -
Plesteran Trasram 1/2 tebal 15 mm M2 0.650
Pemasangan besi polos dia. 12 jarak per 8 cm Kg 7.104
Pemasangan baja siku 2.20.20 Kg 1.770
Pek. Acian batu gunung M2 0.650
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 buah kran diameter ½” atau 3/4”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0100
Tukang Batu OH 0.4000
Kepala Tukang OH 0.0400
Mandor OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kran air Buah 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.036
Tukang Batu OH 0.060
Kepala Tukang OH 0.006
Mandor OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3/4" M 1.050
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m’ pipa PVC tipe AW diameter 1”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.036
Tukang Batu OH 0.060
Kepala Tukang OH 0.006
Mandor OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1" M 1.050
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m’ pipa PVC tipe AW diameter 2”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.054
Tukang Batu OH 0.090
Kepala Tukang OH 0.009
Mandor OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2" M 1.050
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

No Uraian Kode Satuan Koefisien


A TENAGA
Pekerja OH 0.0810
Tukang Batu OH 0.1350
Kepala Tukang OH 0.0135
Mandor OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 3" M 1.050
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
Pemasangan 1 m’ pipa PVC tipe AW diameter 4”

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 0.0810
Tukang Batu OH 0.1350
Kepala Tukang OH 0.0135
Mandor OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4" M 1.050
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )

Pemasangan 1 Unit Septictank dan Peresapan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja OH 3.2700
Tukang Batu OH 1.5000
Kepala Tukang OH 0.1000
Mandor OH 0.1500
JUMLAH TENAGA KERJA
B BAHAN
Galian Tanah Biasa M3 8.807
Pas. Trasram 1/2 Bata 1 : 3 M2 1.494
Urugan pasir M3 1.281
Urugan tanah kembali M3 2.169
Plesteran Trasram 1/2 tebal 15 mm M2 13.440
Ijuk M2 1.350
Plat Beton bertulang K- 200 T = 10 cm M3 0.281
Acian semen (saus semen) M2 13.440
Pipa Hawa Galvanis dia. 1" M1 0.600
Kerikil beton M3 0.900
PVC Dia. 4" dipasang + tabungan M1 9.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D JUMLAH ( A + B + C )
E OVERHEAD & PROFIT ( MAKSIMAL 15% ) 15 % x D
F HARGA SATUAN PEKERJAAN ( D + E )
LEMBAR 45

A.5.1.1.1
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 264,000.00
90,000.00 99,000.00
100,000.00 1,000.00
100,000.00 16,000.00
UMLAH TENAGA KERJA 380,000.00

1,500,000.00 1,500,000.00
1,500,000.00 90,000.00
UMLAH HARGA BAHAN 1,590,000.00

UMLAH HARGA ALAT


1,970,000.00
295,500.00
2,265,500.00

A.5.1.1.2
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 80,000.00
90,000.00 135,000.00
100,000.00 15,000.00
100,000.00 16,000.00
UMLAH TENAGA KERJA 246,000.00

170,000.00 170,000.00
1,450.00 8,700.00
125,000.00 1,250.00
UMLAH HARGA BAHAN 179,950.00

UMLAH HARGA ALAT


425,950.00
63,892.50
489,842.50
A.5.1.1.4
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 80,000.00
90,000.00 90,000.00
100,000.00 10,000.00
100,000.00 5,000.00
UMLAH TENAGA KERJA 185,000.00

1,500,000.00 1,500,000.00
1,450.00 8,700.00
125,000.00 1,250.00
1,500,000.00 450,000.00
UMLAH HARGA BAHAN 1,959,950.00

UMLAH HARGA ALAT


2,144,950.00
321,742.50
2,466,692.50
LEMBAR 46

A.5.1.1.5
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 96,000.00
90,000.00 130,500.00
100,000.00 15,000.00
100,000.00 6,000.00
UMLAH TENAGA KERJA 247,500.00

250,000.00 300,000.00
1,450.00 8,700.00
125,000.00 1,250.00
250,000.00 30,000.00
UMLAH HARGA BAHAN 339,950.00

UMLAH HARGA ALAT


587,450.00
88,117.50
675,567.50

A.5.1.1.5a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 36,000.00
100,000.00 4,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 41,300.00

860,000.00 860,000.00
4,800.00 120.00
UMLAH HARGA BAHAN 860,120.00

UMLAH HARGA ALAT


901,420.00
135,213.00
1,036,633.00

A.5.1.1.14
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 11,300.00

30,000.00 30,000.00
UMLAH HARGA BAHAN 30,000.00

UMLAH HARGA ALAT


41,300.00
6,195.00
47,495.00
LEMBAR 47

A.5.1.1.14a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 9,000.00
100,000.00 1,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 11,300.00

45,000.00 45,000.00
UMLAH HARGA BAHAN 45,000.00

UMLAH HARGA ALAT


56,300.00
8,445.00
64,745.00

ggi 35 cm A.5.1.1.15
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 172,800.00
90,000.00 64,800.00
100,000.00 7,200.00
100,000.00 1,100.00
UMLAH TENAGA KERJA 245,900.00

500.00 20,000.00
1,450.00 63,800.00
125,000.00 8,750.00
125,000.00 7,500.00
100,000.00 7,000.00
13,000.00 20,800.00
UMLAH HARGA BAHAN 127,850.00

UMLAH HARGA ALAT


373,750.00
56,062.50
429,812.50
ggi 50 cm A.5.1.1.16
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 256,000.00
90,000.00 103,500.00
100,000.00 1,100.00
100,000.00 1,600.00
UMLAH TENAGA KERJA 362,200.00

500.00 35,000.00
1,450.00 111,650.00
125,000.00 16,250.00
125,000.00 11,250.00
100,000.00 2,000.00
13,000.00 33,800.00
UMLAH HARGA BAHAN 209,950.00

UMLAH HARGA ALAT


572,150.00
85,822.50
657,972.50
LEMBAR 48

A.5.1.1.16a
Harga Satuan Jumlah Harga
(Rp) (Rp)

UMLAH TENAGA KERJA

71,875.00 9,703.13
889,052.68 84,460.00
139,150.00 3,130.88
51,750.00 -
62,847.73 40,851.02
- -
- -
36,469.38 23,705.09
UMLAH HARGA BAHAN 161,850.12

UMLAH HARGA ALAT


161,850.12
24,277.52
186,127.64

A.5.1.1.19
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 800.00
90,000.00 36,000.00
100,000.00 4,000.00
100,000.00 500.00
UMLAH TENAGA KERJA 41,300.00

50,000.00 50,000.00
4,800.00 120.00
UMLAH HARGA BAHAN 50,000.00

UMLAH HARGA ALAT


91,300.00
13,695.00
104,995.00
A.5.1.1.26
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 2,880.00
90,000.00 5,400.00
100,000.00 600.00
100,000.00 200.00
UMLAH TENAGA KERJA 9,080.00

4,160.00 4,368.00
4,160.00 1,456.00
UMLAH HARGA BAHAN 4,368.00

UMLAH HARGA ALAT


13,448.00
2,017.20
15,465.20
LEMBAR 49

A.5.1.1.27
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 2,880.00
90,000.00 5,400.00
100,000.00 600.00
100,000.00 200.00
UMLAH TENAGA KERJA 9,080.00

5,000.00 5,250.00
5,000.00 1,750.00
UMLAH HARGA BAHAN 7,000.00

UMLAH HARGA ALAT


16,080.00
2,412.00
18,492.00

A.5.1.1.29
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 4,320.00
90,000.00 8,100.00
100,000.00 900.00
100,000.00 300.00
UMLAH TENAGA KERJA 13,620.00

6,600.00 6,930.00
6,600.00 2,310.00
UMLAH HARGA BAHAN 9,240.00

UMLAH HARGA ALAT


22,860.00
3,429.00
26,289.00

A.5.1.1.31
Harga Satuan Jumlah Harga
(Rp) (Rp)
80,000.00 6,480.00
90,000.00 12,150.00
100,000.00 1,350.00
100,000.00 400.00
UMLAH TENAGA KERJA 20,380.00

8,300.00 8,715.00
8,300.00 2,905.00
UMLAH HARGA BAHAN 11,620.00

UMLAH HARGA ALAT


32,000.00
4,800.00
36,800.00
LEMBAR 50

A.5.1.1 32
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 6,480.00
90,000.00 12,150.00
100,000.00 1,350.00
100,000.00 400.00
UMLAH TENAGA KERJA 20,380.00

9,165.00 9,623.25
9,165.00 3,207.75
UMLAH HARGA BAHAN 12,831.00

UMLAH HARGA ALAT


33,211.00
4,981.65
38,192.65

A.5.1.1 32a
Harga Satuan Jumlah Harga
(Rp) (Rp)

80,000.00 261,600.00
90,000.00 135,000.00
100,000.00 10,000.00
100,000.00 15,000.00
UMLAH TENAGA KERJA 421,600.00

71,875.00 633,003.13
230,175.38 343,882.01
139,150.00 178,251.15
51,750.00 112,245.75
62,847.73 844,673.49
57,500.00 77,625.00
7,317,202.57 2,056,133.92
36,469.38 490,148.40
35,000.00 21,000.00
320,000.00 288,000.00
9,165.00 82,485.00
UMLAH HARGA BAHAN 5,127,447.85
UMLAH HARGA ALAT
5,549,047.85
832,357.18
6,381,405.03

Unaaha, November 2018


Dibuat Oleh :
KONSULTAN PERENCANA
CV. ZENITH ENGINEERING CONSULTANT

JABIRUDDIN, S.T
Direktur
HARGA UPAH KERJA

NO MATERIAL SAT.

1 Pekerja OH
2 Tukang Batu OH
3 Tukang Kayu OH
4 Tukang Besi OH
5 Tukang Cat OH
6 Kepala Tukang OH
7 Mandor OH
LEMBAR 1

HARGA SATUAN
(Rp)

Rp 80,000.00
Rp 90,000.00
Rp 90,000.00
Rp 90,000.00
Rp 90,000.00
Rp 100,000.00
Rp 100,000.00

Berlanjut Kehalaman Berikut


DAFTAR HARGA BAHAN/MATERIAL

NO URAIAN BAHAN/MATERIAL SAT.


A BAHAN DASAR
1 Tanah Urug M3
2 Sirtu M3
3 Pasir Urug M3
4 Pasir Pasang / Kali M3
5 Pasir Beton M3
6 Batu Belah/ Batu Gunung M3
7 Batu Bata Bh
8 Kerikil Sungai 2/3 M3
9 Koral Beton/Split 2/3 cm M3
10 Semen Portland (PC) Kg
11 Semen Warna Kg
12 Semen Putih Kg
13 Semen Sika Waterproofing mortal Kg
14 Air Kerja Ltr
B. BAHAN LANTAI
1 Tegel Granit warna 60 x 60 cm Bh
2 Tegel Granit warna ut. Plint 10 x 60 cm Bh
3 Tegel Granit Warna 30 X 60 cm Bh
4 Keramik Lantai 40 X 40 CM Warna Bh
5 Keramik Lantai 20 X 40 CM Warna Bh
6 Keramik Lantai 30 X 30 CM Warna Bh
7 Keramik Lantai KM/WC 20 X20 CM Bh
8 Tegel Ubin warna ut. Plint 10 x 40 cm Bh
9 Tegel Ubin warna ut. Plint 10 x 30 cm Bh
10 Tegel Ubin warna ut. Plint 10 x 20 cm Bh
11 Keramik Dinding 20 X25 CM Bh
12 Batu Tempel Hitam M2
13 Wallpaper ( Uk. 0,53 x 10 M ) Roll
C BAHAN KAYU
1 Dolken Kayu Dia 8/400 cm Btg
2 Dolken Kayu Dia 10/400 cm Btg
3 Bambu diameter 6 - 8/600 cm Btg
4 Papan Kayu Kelas I M3
5 Balok Kayu Kelas I M3
6 Papan Kayu Kelas II M3
7 Balok Kayu Kelas II M3
8 Papan / Balok Kayu Meranti Kelas III (Bekistting) M3
9 List kayu profil uk. 2 x 3 cm M1
10 List kayu profil uk. 3 x 3 cm M1
11 List kayu profil uk. 4 x 4 cm M1
12 List kayu profil uk. 4 x 5 cm M1
D BAHAN LANGIT-LANGIT & PARTISI
1 Tripleks 3 mm Lbr
2 Tripleks 3 mm M2
3 Multipleks 6 mm Lbr
4 Multipleks 6 mm M2
5 Multipleks 9 mm Lbr
6 Multipleks 9 mm M2
7 Kalsiplank 8 mm uk. 30x240 cm Lbr
8 PVC Foamboard 4 mm uk. 0,2 x 5,9 m Lbr
9 Kalciboard 6 mm Lbr
10 Aluminium Hollow Galvalum 2 x 4 cm T, 0,3 cm M1
11 Aluminium Hollow Galvalum 4 x 4 cm T, 0,3 cm M1
12 Hollow aluminium 2,5 x 3,8 cm M1
13 Sekrup plafond Bh
14 Sekrup Rangka plafond / 1000 biji Biji
15 Kawat Penggantung (Tali Scoor) M1
16 Hollow Angel (sudut) M1
17 Aluminium composite panel seven 4 mm uk. 1,2 x 2,4 m Lbr
18 HPL ex. Taco Lbr
19 Karet putih pelapis kaca 5 mm M1
E BAHAN ATAP
1 Atap Metal Zincalume (Spandek) 0,30 mm M²
2 Nok atap Spandek M'
3 Atap Onduline warna Hitam Lembar
4 Nok atap onduline Lembar
5 Atap Genteng Sakura Roof Lembar
6 Nok Genteng Sakura Roof BH
7 Rangka baja ringan canal C 75 0.75 M1
8 Baja ringan profil U 37. 050 (Gording) M1
9 Baja ringan profil I 37. 050 (Tiang) M1
10 Talang Jurai M1
11 Baut (Screw driver) BH
12 Dynabolt BH
13 Seng Datar BJLS 0,3 Lembar
14 Seng Gelombang BJLS 28 Kaki
15 Seng Plat BJLS 0.35 mm Lembar
16 Karet Talang lebar 60 cm Batang
F BAHAN BESI
1 Kawat Beton Kg
2 Besi Baja Profil Kg
3 Besi Beton Polos Kg
4 Besi Beton Ulir Kg
5 Paku Biasa 2" - 5" Kg
6 Paku Plafond Kg
7 Paku Tripleks Kg
8 Paku Gipsumboard Kg
9 Paku / Screw / Ramsel Bh
9 Paku Seng Bh
10 Besi Strip 3 cm, tebal 5 mm Kg
11 Baut Fisher Bh
12 Baut Sekrup Bh
13 Angkur Baja Dia 19 L=75 cm Bh
14 Angkur Baja Dia 19 L=25 cm Bh
15 Baut Baja Hitam Dia 16 Bh
16 Besi Hollow 2x2 cm, 3 mm M1
17 Besi Hollow 2x4 cm, 3 mm M1
18 Besi Hollow 4x4 cm, 3 mm M1
19 Besi Hollow 4 x 6 cm, 3 mm M1
20 Stainless 2 x 4 cm, 3 mm M1
21 Stainless 4 x 4 cm, 3 mm M1
22 Kawat Las elektoda 2 Kg
23 Kawat las elektoda 3,2 Kg
24 Kawat Stainless Kg
25 Kawat Duri Kg
26 Rel Pagar bh
27 Wiremesh M8 uk. 2,1 x 5,4 (61,79 kg/lbr) M2
28 Wiremesh M8 uk. 2,1 x 5,4 (61,79 kg/lbr) Lbr
G BAHAN CAT
1 Plamur tembok boyo 23 Kg Kg
2 Plamir kayu Kg
3 Dempul Kayu Ltr
4 Cat pewarna Dempul Ltr
5 Clear impra Ltr
6 Cat meni kayu/besi Kg
7 Cat tembok eksterior ex. Jotun Sintetic/setara Kg
8 Cat Tembok Interior ex. Jotun Semi sintetic/setara Kg
9 Cat langit - langit ex. Mowilex / setara Kg
10 Cat Plat Beton ex. Nodrop / Setara Kg
11 Cat Kilap Kayu ex. Avian / setara Kg
12 Sika waterproofing mortar Kg
13 Pengencer / thinner Ltr
14 Lem fox / lem kayu Kg
15 Kuas biasa 3 cm Bh
16 Kuas biasa 4" Bh
17 Kuas biasa 5 cm Bh
18 Kuas Roll Bh
19 Amplas halus Lbr
20 Amplas kasar Lbr
21 UB 888/400 Compoud Zak
22 Isolasi Gypsum Roll
23 Paku / Screw / Ramsel Bh
24 Solar Ltr
25 Minyak Bekisting Ltr
26 Residu Kg
H BAHAN PENGGANTUNG
1 Handel pintu kaca wire glass 12 Stainless Set
2 Handel pintu aluminium stainless Set
3 Kunci pintu tanam Antik Set
4 Kunci pintu tanam 2x slag stainless Set
5 Kunci tanam putar bulat KW 1 ut. Kamar mandi Bh
6 Grandel Pintu/Jendela stainless Set
7 Grendel pintu tanam (untuk pintu 2 daun) stainless Set
8 Engsel tanam pintu kaca stainless Set
9 Engsel pintu Stainless Bh
10 Engsel Jendela stainless Bh
11 Kait angin stainless Psg
12 Kunci Gembok Besar Bh
13 Kaca naco 8 Glip Set
I BAHAN INSTALASI LISTRIK
1 RM TL LED mirror stainless + balon 2 pcs 18 watt Bh
2 Fiting Besi Keramik Bh
3 Fitting Downlight panasonic 3 inchi Bh
4 Lampu hias kotak 4 mata lampu Bh
5 Lampu spot tabung slast body penutup kaca, 1 pcs Bh
6 Lampu spot tabung slast body penutup kaca, 2 pcs Bh
7 Lampu LED (5 watt) ex. Philips / setara Bh
8 Lampu LED (13 watt) ex. Philips / setara Bh
9 Lampu LED 20 watt ex. Philips/setara Bh
10 Stop Kontak ex. Panasonic/setara Bh
11 Saklar grid 3 modul ex. Panasonic/setara Bh
12 Saklar ganda 2 modul ex. Panasonic/setara Bh
13 Saklar tunggal ex. Panasonic/setara Bh
14 Exhaust fan type ceilling Set
15 AC unit 1,5 PK dalam ruang Set
16 AC floor standing (berdiri) 3 PK Bh
17 Outlet kabel data Bh
18 Speaker BMB 10 inch Bh
19 Speaker ceilling 6 inch full range Bh
20 Mix Amplifier 2 x 120 watt Bh
26 MCB 6 A 1 O Merlin Gering Bh
27 MCB 10 A 1 O Merlin Gering Bh
28 MCB 16 A 1 O Merlin Gering Bh
29 Box MCB Bh
30 Sekreng Cas (MCB) Bh
31 Kabel NYM 3 x 2,5 mm2 Eterna M1
32 Kabel NYM 3 x 2,5 mm2 Eterna (100 M) Roll
33 Kabel NYY 1x2,5 mm2 Eterna M1
34 Kabel NYY 4x6 mm2 Eterna M1
35 Kabel NYY 4 x 6 mm2 Eterna (100 M) Rooll
36 Panel Induk Lantai 40 x 60 cm2 Standart Bh
37 Panel Pembagi Lantai 40x60 cm2 Standart Bh
38 Kabel audio M1
39 Pipa Listrik 1/2 inchi, Ex Clipsal Btg
40 Kee nee Bh
41 Inbow Dos Bh
42 Las DOP Bh
43 Isolasi listrik, Ex Unibell Bh
44 Klem kabel No. 10 Bh
45 Tee Doz 5/8 Ex. Clipsal Bh
46 Ground Box set
47 Kawat Penghantar M1
48 Fisher, mur baut, plat 1 mm set
49 Penangkal petir (Tongkat tembaga) Bh
49 Arde Diameter 16 mm Bh
J BAHAN SANITER
1 Kloset duduk + Tabung euro ex. Toto/setara Bh
2 Kloset Jongkok Porslen Bh
3 Jet washer ex. Onda / setara Bh
4 Urinoir ex. Toto/setara Bh
5 Dinding kaca sekat rg. Mandi Unit
6 Bak fiber 70 x 70 cm Set
7 Wastafel top lava ex. Toto/setara Unit
8 Floor Drain Bh
9 Kran air dia 1/2" atau 3/4" Biasa ex. Onda/setara Bh
10 Kran Air Ex. Onda Stainless (Wastafel) Bh
11 Shower + Kran ex. Onda / setara Set
12 Seal tape Bh
13 Tali Ijuk M3
14 Ijuk M2
15 Tempat sabun Ex. Onda/setara Bh
16 Tangki air 1200 Liter ex. Penyu/setara Bh
17 Pompa Air Simutsu pakai tabung Bh
18 Pipa Galvanis Dia 1" M1
18 Pipa Galvanis Dia 3/4" M1
18 Pipa Galvanis Dia 2" M1
18 Pipa Galvanis Dia 2,5" M1
21 Pipa PVC Æ 3/4" AW ex. Wavin M1
22 Pipa PVC Æ 1" AW ex. Wavin M1
23 Pipa PVC Æ 2" AW ex. Wavin M1
24 Pipa PVC Æ 3" AW ex. Wavin M1
25 Pipa PVC Æ 4" AW ex. Wavin M1
K BAHAN LAIN - LAIN
1 Pintu Aluminium 60 x 190 cm Pabrikasi Bh
2 Kusen Aluminium 4" warna Silver M1
3 Bingkai Daun Pintu Aluminium M1
4 Bingkai Jendela Aluminium Architrave M1
5 Kaca bening 3 mm M2
6 Kaca bening 5 mm M2
7 Kaca bening 8 mm M2
8 Kaca Ray Ban 5 mm Ex Asahi KW 1 M2
9 Kaca Ray Ban 8 mm Ex Asahi KW 1 M2
10 Kaca wire Glass 12 mm Ex. Asahi KW 1 Uk. 1 x 2,3 m Bh
11 Kaca wire Glass 12 mm Ex. Asahi KW 1 Uk. 1 x 2,3 m M2
12 Kaca mika akrilik bening 8 mm uk. 122 x 244 cm Lbr
13 Kaca mika akrilik bening 8 mm uk. 122 x 244 cm M2
14 Kaca Cermin 5 mm M2
15 Silicon Sealant kaca / lem kaca kg
16 karet sealant tube
17 Spider Kaca Bh
18 Sekrup fisher Bh
19 Door Closer Bh
20 Stiker kaca motif daerah M2
21 Loster Uk. 10 x 20 cm Bh
22 Paving Blok uk. 21 x 10,5 tebal 8 cm K 100 - 150 Bh
23 Paving Blok uk. 21 x 10,5 tebal 8 cm K 175 - 250 Bh
24 Kansteen uk. 10 x 25 x 40 cm K 250 Bh
25 Rumput gajah mini M2

Unaaha, November 2
Dibuat Oleh
KONSULTAN PERENCA
CV. ZENITH ENGINEERING CO

JABIRUDDIN, S.T
Direktur
RIAL

LEMBAR 2

HARGA SATUAN
(Rp)

Rp 45,000.00
Rp 120,000.00
Rp 80,000.00
Rp 125,000.00
Rp 125,000.00
Rp 250,000.00
Rp 500.00
Rp 200,000.00
Rp 320,000.00
Rp 1,450.00
Rp 18,000.00
Rp 3,100.00
Rp 19,500.00
Rp 100.00

Rp 65,000.00
Rp 11,500.00
Rp 33,000.00
Rp 10,000.00
Rp 5,000.00
Rp 5,000.00
Rp 3,000.00
Rp 3,000.00
Rp 2,000.00
Rp 1,500.00
Rp 4,000.00
Rp 150,000.00
Rp 250,000.00

Rp 6,000.00
Rp 10,000.00
Rp 10,000.00
Rp 3,500,000.00
Rp 3,500,000.00
Rp 3,000,000.00
Rp 3,000,000.00
Rp 1,400,000.00
Rp 4,313.00
Rp 4,313.00
Rp 4,313.00
Rp 4,313.00
LEMBAR 3

Rp 60,000.00
Rp 20,833.33
Rp 70,000.00
Rp 24,305.56
Rp 155,250.00
Rp 53,906.25
Rp 40,000.00
Rp 200,000.00
Rp 90,000.00
Rp 5,000.00
Rp 6,000.00
Rp 21,000.00
Rp 500.00
Rp 100.00
Rp 5,000.00
Rp 6,000.00
Rp 650,000.00
Rp 178,500.00
Rp 2,500.00

Rp 51,000.00
Rp 30,000.00
Rp 156,000.00
Rp 88,000.00
Rp 35,000.00
Rp 35,000.00
Rp 10,000.00
Rp 10,000.00
Rp 10,000.00
Rp 48,000.00
Rp 1,000.00
Rp 6,325.00
Rp 29,000.00
Rp 8,000.00
Rp 75,000.00
Rp 15,000.00

Rp 20,000.00
Rp 17,600.00
Rp 13,000.00
Rp 16,125.00
Rp 18,000.00
Rp 30,000.00
Rp 30,000.00
Rp 30,000.00
Rp 500.00
Rp 30,000.00
Rp 20,000.00
Rp 3,000.00
Rp 1,500.00
Rp 30,000.00
Rp 12,000.00
Rp 12,000.00
Rp 15,583.33
Rp 18,333.33
Rp 22,000.00
Rp 30,000.00
Rp 37,500.00
Rp 40,000.00
Rp 18,000.00
Rp 25,000.00
Rp 20,000.00
Rp 21,000.00
Rp 55,000.00
Rp 65,000.00
Rp 390,000.00
LEMBAR 4

Rp 4,888.00
Rp 15,000.00
Rp 15,298.00
Rp 66,000.00
Rp 66,000.00
Rp 25,000.00
Rp 50,000.00
Rp 45,000.00
Rp 40,000.00
Rp 46,750.00
Rp 50,313.00
Rp 19,500.00
Rp 25,000.00
Rp 18,000.00
Rp 4,399.00
Rp 5,376.00
Rp 12,600.00
Rp 19,406.00
Rp 4,272.00
Rp 4,272.00
Rp 76,000.00
Rp 32,500.00
Rp 100.00
Rp 11,000.00
Rp 16,500.00
Rp 8,000.00

Rp 410,000.00
Rp 156,000.00
Rp 650,000.00
Rp 150,000.00
Rp 97,500.00
Rp 15,000.00
Rp 27,000.00
Rp 250,000.00
Rp 30,000.00
Rp 21,000.00
Rp 16,000.00
Rp 65,000.00
Rp 92,275.00

Rp 478,500.00
Rp 7,000.00
Rp 30,000.00
Rp 550,000.00
Rp 235,400.00
Rp 352,000.00
Rp 26,000.00
Rp 40,000.00
Rp 139,700.00
Rp 20,000.00
Rp 60,000.00
Rp 20,000.00
Rp 15,000.00
Rp 34,100.00
Rp 3,000,000.00
Rp 14,190,000.00
Rp 45,000.00
Rp 1,430,000.00
Rp 165,000.00
Rp 3,850,000.00
Rp 65,000.00
LEMBAR 5

Rp 75,000.00
Rp 75,000.00
Rp 50,000.00
Rp 250,000.00
Rp 10,670.00
Rp 1,067,000.00
Rp 2,550.00
Rp 34,650.00
Rp 3,465,000.00
Rp 380,000.00
Rp 380,000.00
Rp 8,000.00
Rp 16,000.00
Rp 2,500.00
Rp 5,000.00
Rp 2,500.00
Rp 10,000.00
Rp 100.00
Rp 7,500.00
Rp 88,000.00
Rp 25,000.00
Rp 40,000.00
Rp 214,500.00
Rp 700,000.00

Rp 1,500,000.00
Rp 170,000.00
Rp 70,000.00
Rp 1,500,000.00
Rp 3,000,000.00
Rp 392,667.00
Rp 250,000.00
Rp 30,000.00
Rp 50,000.00
Rp 228,000.00
Rp 860,000.00
Rp 4,800.00
Rp 17,500.00
Rp 57,500.00
Rp 45,000.00
Rp 2,300,000.00
Rp 1,850,000.00
Rp 35,000.00
Rp 32,500.00
Rp 101,000.00
Rp 240,000.00
Rp 4,160.00
Rp 5,000.00
Rp 6,600.00
Rp 8,300.00
Rp 9,165.00
LEMBAR 6

Rp 1,300,000.00
Rp 98,000.00
Rp 45,000.00
Rp 42,000.00
Rp 86,250.00
Rp 103,500.00
Rp 270,000.00
Rp 155,000.00
Rp 300,000.00
Rp 2,600,000.00
Rp 1,130,434.78
Rp 1,870,000.00
Rp 649,305.56
Rp 140,500.00
Rp 5,000.00
Rp 15,000.00
Rp 50,000.00
Rp 500.00
Rp 128,000.00
Rp 110,000.00
Rp 7,000.00
Rp 2,375.00
Rp 3,150.00
Rp 28,600.00
Rp 65,000.00

November 2018
Dibuat Oleh
LTAN PERENCANA
GINEERING CONSULTANT

BIRUDDIN, S.T
CALCULATION

NO URAIAN KEGIATAN HORIZONTAL VERTIKAL


P1 SAT P2 SAT P1 SAT
a b c d e f g h

1 PEK. GALIAN TANAH UT. PONDASI BATU GUNUNG


Pondasi Type I 27.00 M' 21.00 M'
Pondasi Type II 18.00 M'
Pondasi Type III 18.00 M'

2 PEKERJAAN URUGAN PASIR BAWAH PONDASI


Pondasi Type I
Pondasi Type II
Pondasi Type II

3 PASANGAN BATU KOSONG BAWAH PONDASI


Pondasi Type I
Pondasi Type II
Pondasi Type II

4 PASANGAN PONDASI BATU GUNUNG/KALI


Pondasi Type I
Pondasi Type II
Pondasi Type II

1 PEK. URUGAN TANAH BAWAH LANTAI


Pantry
R, Makan
Wc/Km

1 PEK. URUGAN PASIR BAWAH LANTAI

1 PEK. URUGAN PASIR BAWAH RABAT KELILING

5 PEKERJAAN SLOOF 12/20 CM

6 PEKERJAAN KOLOM UTAMA

7 PEKERJAAN KOLOM PRAKTIS


a b c d e f g h
8 PEKERJAAN BALOK (B1) 10/15 CM 36.00 M' 9.00 M'

12 PEKERJAAN PLAT LEVEL T. 10 CM

13 PEKERJAAN MEJA PLAT WASTAFEL T. 10 CM

1 PEK. RABAT DALAM BANGUNAN

1 PEK. RABAT KELILING BANGUNAN

12 PEKERJAAN DINDING 1/2 BATA 1:3 (+0,30cm) - -

13 PEKERJAAN DINDING 1/2 BATA 1:3 (+1,50cm) Ut. KM/WC

14 PEKERJAAN DINDING 1/2 BATA 1:5


Dinding + 1,5 m 18.00 21.00
Dinding + 2,5 m 6.00 3.00

15 PLESTERAN BETON PONDASI 1 : 3 - -

16 PLESTERAN 1 : 5

17 PEK. ATAP SPANDEK / RANGKA BAJA RINGAN


ATAP + 6,93 m' (DEPAN/BELAKANG)
ATAP + 7,35 m' (DEPAN)
ATAP + 7,35 m' (BELAKANG)

18 PEK. NOK ATAP SPANDEK - m1 - m1


a b c d e f g h
19 PEK. KALSIPLANK 19.60 m 1
19.60 m 1
9.10 m1
Total = 57.40 m1

20 PEK. PASANGAN PLAFOND + RANGKA

21 PEK. LIST PLAFOND 17.55 m1 34.40 m1 8.40 m1


6.40 m 1
37.05 m 1
42.05 m1
Total = - m1

22 PEK. LANTAI GRANIT GEDUNG UTAMA 40x40 CM

23 PEK. LANTAI GRANIT WASTAFEL 40x40 CM

24 PEK. DINDING GRANIT WASTAFEL 40x40 CM

25 PEK.PLINT GRANIT 10x40 CM 54.00 m1

26 PEK. LANTAI KERAMIK 20 x 20 CM (KM/WC)

27 PEK. DINDING KERAMIK 20 x 25 CM (KM/WC)

28 PEK. DINDING GRANIT 30 x 60 CM (PINTU UTAMA)

28 PEK. DINDING BATU TEMPEL HITAM


KOLOM UTAMA
DINDING + 4,7 M
DINDING + 0,50 M

29 PEK. REILLING HOLLOW

30 PEK. PENGECETAN DINDING EXTERIOR


CULATION SHEET

PERHITUNGAN
VERTIKAL LUAS 1 LUAS 2 LUAS 3 LUAS 4 JUMLAH
PANJANG LEBAR TINGGI VOLUME
P2 SAT M2 M2 M2 M2 BH, UNIT
1.00 j k l m n o p q r s

9.32
48.00 0.40 0.38 7.30
- M' 18.00 0.30 0.26 1.40
8.00 M' 26.00 0.20 0.12 0.62

0.89
48.00 0.40 0.03 0.58
18.00 0.30 0.03 0.16
26.00 0.20 0.03 0.16

-
48.00 0.40 - -
18.00 0.30 - -
26.00 0.20 - -

9.53
48.00 0.25 0.50 6.00
18.00 0.20 0.50 1.80
26.00 0.18 0.38 1.73

18.90
18.00 3.00 0.20 10.80
18.00 4.00 0.10 7.20
1.50 1.50 0.20 2.00 0.90

3.92
18.00 7.00 0.03 3.78
1.50 1.50 0.03 2.00 0.14

59.80 0.65 0.03 1.17

48.00 0.12 0.20 1.15

- 0.15 0.15 2.00 -

0.64
2.00 0.11 0.11 16.00 0.39
2.65 0.11 0.11 8.00 0.26
- 0.11 0.11 1.00 -
1.00 j k l m n o p q r s
45.00 0.10 - -

- - - - 0.10 1.00 -
- - -

1.50 0.50 0.08 6.00 0.36

6.30
18.00 7.00 0.05 6.30

59.80 0.65 0.05 1.94


Luas Bukaan
- - - -

- - -

Luas Bukaan Kusen 79.98


13.32 1.35 39.00 1.85 57.48
- 9.00 2.50 22.50

-
-
-
-
-
-
-

46.00 0.40 18.40

159.96
-

178.36
19.60 9.10 178.36
4.65 1.00 -
4.65 1.00 -

-
1.00 j k l m n o p q r s
9.10 m 1
57.40

- - - - -
- - - -
Total = - m2

6.40 m1 -

18.00 7.00 126.00

0.50 1.50 0.60 0.40

1.50 0.40 0.60

54.00

0.24 1.50 1.50 2.00 4.02

0.60 1.50 1.00 2.00 1.80

- 0.30 - -

-
- - 1.00 -
- 4.20 1.00 -
- 0.50 - -

- - -

Luas Bukaan -
- - - - -
-

Pengecetan Exterior
- - - -
-
VOLUME

m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3
m3

m3
m3
m3

m3

m3

m3

m3
m3
m3
m3
s
m3

m3

m3

m3
m3

m3

m2

m2

m2
m2

m2
m2
m2
m2
m2
m2
m2

m2

m2
m2

m2
m2
m2
m2

m1
s
m1

m2

m1

m2

m2

m2

m1

m2

m2

m2

m2
m2
m2
m2

m2

m2
m2
PERHITUNGAN PEMBESIAN BETON DALAM 1 M

1 M3 UNTUK BETON
7850 KG/M3 BJ. BESI

DIMENSI PJNG BETON SELIMUT JARAK


NO. URAIAN JENIS PEMBESIAN BETON BEUGEL
BALOK DALAM M3 (m)
(m)

1 Sloof (Sf) 0.15 x 0.20 33.333333


Tul. Pokok
Tul. Ping.
Beugel 0.03 0.15
JUMLAH PEMBESIAN DALAM 1 M3 BETON

2 Kolom Utama (Ku) 0.15 x 0.15 44.444444


Tul. Pokok
Tul. Ping.
Beugel 0.03 0.20
JUMLAH PEMBESIAN DALAM 1 M3 BETON

3 Kolom Praktis (Kp) 0.11 x 0.11 82.644628


Tul. Pokok
Tul. Ping.
Beugel 0.03 0.20
JUMLAH PEMBESIAN DALAM 1 M3 BETON

4 Balok Latey (BL) 0.10 x 0.15 66.666667


Tul. Pokok
Tul. Ping.
Beugel 0.03 0.15
JUMLAH PEMBESIAN DALAM 1 M3 BETON
DIMENSI PJNG BETON SELIMUT JARAK
NO. URAIAN JENIS PEMBESIAN BETON BEUGEL
BALOK DALAM M3 (m)
(m)

5 Ringbalk (Rb) 0.10 x 0.15 66.666667


Tul. Pokok
Tul. Ping.
Beugel 0.03 0.15
JUMLAH PEMBESIAN DALAM 1 M3 BETON

6 Plat Level (PL) 0.10 x 0.60 16.667 Tul. Pokok Atas 0.20
Tul. Pokok Bawah 0.20
Tul. Pembagi 0.20

0.600 Tul. Pokok Atas 0.20


Tul. Pokok Bawah 0.20
Tul. Pembagi 0.20

JUMLAH PEMBESIAN DALAM 1 M3 BETON


TON DALAM 1 M3

DIMENSI BESI BERAT BESI PJNG BESI


P.LENGKU L.Penampang JUMLAH
DIA. NGN (m1) (m2) BERAT BESI
JLH (Bh) KG/M1 DALAM M3
(mm)

12 4 0.12 0.000113 0.89 133.81 118.85


- - - - - - -
6 223 0.06 0.000028 0.22 142.86 31.72
150.57

12 4 0.12 0.000113 0.89 178.26 158.32


- - - - - - -
6 223 0.06 0.000028 0.22 120.54 26.77
185.09

10 4 0.10 0.000079 0.62 330.98 204.14


- - - - - - -
6 414 0.06 0.000028 0.22 157.40 34.95
239.09

10 4 0.10 0.000079 0.62 267.07 164.72


- - - - - - -
6 445 0.06 0.000028 0.22 196.00 43.52
208.24
DIMENSI BESI BERAT BESI PJNG BESI
P.LENGKU L.Penampang JUMLAH
DIA. NGN (m1) (m2) BERAT BESI
JLH (Bh) KG/M1 DALAM M3
(mm)

10 4 0.10 0.000079 0.62 267.07 164.72


- - - - - - -
6 445 0.06 0.000028 0.22 196.00 43.52
208.24

10 4 0.100 0.0000786 0.617 66.080 40.757


10 4 0.100 0.0000786 0.617 66.080 40.757
- 4 - - - 65.686 -

10 83 0.100 0.0000786 0.617 57.890 35.705


10 83 0.100 0.0000786 0.617 57.890 35.705
- 83 - - - 49.620 -

152.926
Truss / Kaso Metal (Profil C)
Truss Baja Ringan

Kaso Metal pengganti Kaso dari kayu, C75 berbahan p


Ringanyang dilapisi dengan seng dan alumunium ata
namun ada juga yang berbahan Galvanis. Tinggi profil C
bervariasi. Mulai dari 0.60mm, 0.65mm, 0.70mm, 0.7
sebagai rangka atap baja ringan / kuda-kuda utama. Un
ketebalan 0.75. Untuk melihat Harga Baja Ringan kami d

Reng Baja Ringan


Reng
Berbentuk trapesium, digunakan sebagai peletakan atap.
0.40 dengan tinggi mulai dari 28mm sampai dengan
semakin kuat. Jika anda menggunakan genteng beton /
minimun tinggi 30mm. Untuk melihat Harga Reng Baja
dibawah ini

Spandek / Atap Zincalume


Atap Spandek

Atap berbentuk gelombang bahan plat zincalume G550 d


0.5mm. Digunakan sebagai atap Pabrik, Mall, Gudang atau
dapat di pesan sesuai kebutuhan dan bahkan dapat di ceta
ini dapat pula digunakan sebagai atap kanopi untuk ruma
rumah pribadi menggunakan atap jenis ini, karena sel
bagus sehingga tahan lama dan dapat di aplikasikan
sambungannya dapat diminimalisir sehingga tidak mud
spandek yang dilapisi dengan pasir, jadi kekurangan atap
dengan atap jenis ini.

Onduline
Onduline
Atap Onduline ini terbuat dari bitumen selulosa, anti ber
menyerupai asbes (hanya gelobang) dengan panjang 2m
harga yang masih terjangkau, dan tentunya tampilan yang

Onduvilla
Onduline bermotif genteng

Untuk tampilan atap yang elegan gunakan onduvilla. Be


yang unik, sangat cantik untuk menyempunakan tampilan
Untuk tampilan atap yang elegan gunakan onduvilla. Be
yang unik, sangat cantik untuk menyempunakan tampilan
i kayu, C75 berbahan plat baja gaya tarik tinggi (G550) / Baja
ng dan alumunium atau sering disebut (Zincalume/Galvalume)
Galvanis. Tinggi profil C ini 75 Cm panjang 6m dengan ketebalan
0.65mm, 0.70mm, 0.75mm sampai dengan 1mm. Digunakan
/ kuda-kuda utama. Untuk atap rumah umumnya menggunakan
rga Baja Ringan kami dapat melihat daftar tabel dibawah ini

sebagai peletakan atap. Umumnya ketebalan reng 0.45mm dan


28mm sampai dengan 40mm, semakin tinggi profil reng maka
unakan genteng beton / keramik disarankan menggunakan reng
elihat Harga Reng Baja Ringan kami dapat melihat daftar tabel

n plat zincalume G550 dengan ketebalan 0.25mm sampai dengan


abrik, Mall, Gudang atau bangunan yang luas. Panjang gelombang
dan bahkan dapat di cetak di tempat (Roll On Site). Atap Spandek
atap kanopi untuk rumah. Namun sekarang banyak juga rumah-
ap jenis ini, karena selain ringan matreal yang digunakan juga
n dapat di aplikasikan pada sudut yang kecil (landai) karena
sir sehingga tidak mudah bocor. Saat ini muncul inovasi atap
sir, jadi kekurangan atap spandek brisik saat hujan dapat teratasi

tumen selulosa, anti berisik dan anti bocor. Modelnya minimalis


ng) dengan panjang 2m dan lebar 95cm. Pemasangan mudah dan
tentunya tampilan yang tetap menawan.

n gunakan onduvilla. Bermotif gelombang dengan warna gradasi


nyempunakan tampilan rumah anda.
TRUSS C75
No Nama Merek
1 Truss C75.60 SNI K-Steel CBM

2 Truss C75.70 SNI BMT BMT

3 Truss C75.75 SNI Prima

4 Truss C75.75 SNI HSM

5 Truss C75.65 SNI K-Steel * CBM

6 Truss C75.75 SNI TASO * TASO

7 Truss C75.75 SNI Tangguh CBM

8 Truss C75.100 Prima Inti Prima

9 Truss C75.100 BMT SNI* BMT

10 Truss C75.100 CBM CBM

11 Truss C75.100 SNI TASO * TASO

12 Truss C75.80 SNI TASO TASO

RENG
No Nama Merek
1 Reng 28.45 BMT

2 Reng 30.40 Kencana* Kencana

3 Reng 30.45 HS * HS

4 Reng 31.45 Alfa Alfa Prima

5 Reng 32.45 TASO TASO

6 Reng 40.45 TASO TASO

7 Reng 30.45 Kecana Kepuh

Onduline
No Nama Merek
1 Atap Onduline Onduline

2 Onduvilla Onduline

3 Nok Atas Besar Onduline

SPANDEK
No Nama Merek
1 Abadi Bahan 914 0.30mm Semua Merek

2 Abadi Bahan 914 0.50mm Semua Merek

3 Abadi Bahan 914 0.35mm Semua Merek

4 Abadi Bahan 914 0.40mm Semua Merek

5 Abadi Bahan 914 0.45mm Semua Merek

6 Import L Bahan 914 Warna 0.25mm Maja / Alfa

7 Import L Bahan 914 Warna 0.3 mm Maja / Alfa

8 Import L Bahan 914 Warna 0.35 mm Maja / Alfa

9 Import L Bahan 914 Warna 0.4 mm Maja / Alfa

10 Import L Bahan 914 Warna 0.45mm Maja / Alfa

11 Import L Bahan 914 Warna 0.5 mm Maja / Alfa

12 Spandek + Peredam 0.25 Kepuh

13 Spandek + Peredam 0.3 Kepuh

14 Spandek + Peredam 0.35 Kepuh

15 Spandek + Peredam 0.4 Kepuh

16 Spandek Batuan / Spandek Pasir 0.30 Addesia

17 Spandek Zincalume Bahan 1219 0.30mm * Semua Merek

18 Spandek Zincalume Bahan 1219 0.35mm Semua Merek

19 Spandek Zincalume Bahan 1219 0.40mm Semua Merek

20 Spandek Zincalume Bahan 1219 0.45mm Semua Merek

21 Spandek Zincalume Bahan 1219 0.50mm Semua Merek


TRUSS C75
Deskripsi Harga /Btg
0.60 TCT, Panjang 6m (Berat 4.1kg) 63,000

0.70 TCT, Panjang 6m (Berat 4.7kg) 70,000

0.75 TCT, Panjang 6m (Berat 5.1kg) 73,000

0.75 TCT, Panjang 6m (Berat 5.1kg) 76,000

0.65 TCT, Panjang 6m (Berat 4.3 kg) 67,000

0.75 TCT, Panjang 6m (Berat 5.1kg) 88,000

0.75 TCT, Panjang 6m (Berat 5.1kg) 85,000

1mm , Panjang 6m 95,000

1mm , Panjang 6m 105,000

1mm , Panjang 6m Tangguh 124,000

1mm , Panjang 6m (Berat 6.8Kg) 128,000

T. 0.80 TCT, Panjang 6m 97,000

RENG
Deskripsi Harga /btg
Tinggi 28mm, T 0.45. P 6m 28,000

Tinggi 30mm, T 0.40. P 6m 30,000

Tinggi 30mm, T 0.45. P 6m 32,000

Tinggi 31mm, T 0.45. P 6m 33,000

Tinggi 32mm, T 0.45. P 6m 45,000

Tinggi 40 mm, T 0.45. P 6m 58,000

Reng 0.45 30,000

Onduline
Deskripsi Harga /Lbr
Bitumen Selulosa (200Cm x 95Cm) T 3mm 145,000

Bitumen Selulosa (106Cm x 40Cm) T 3mm 43,000

Nok Besar 80,000

SPANDEK
Deskripsi Harga /m
(L Fektif 770 / 750 /680/700) Matreal Bluescope 0.30 44,500

(L Efektif 770 / 750 /680/700) Matreal Bluescope 0.5 64,500

(L Efektif 770 / 750 /680/700) Matreal Bluescope 0.35 49,500

(L Efektif 770 / 750 /680/700) Matreal Bluescope 0.4 54,500

(L Efektif 770 / 750 /680/700) Matreal Bluescope 0.45 59,500

(L Efektif 770 / 750 /680/700) Warna 0.25 53,000

(L Efektif 770 / 750 /680/700) Warna 0.30 57,000

(L Efektif 770 / 750 /680/700) Warna 0.35 62,000

(L Efektif 770 / 750 /680/700) Warna 0.4 670,000

(L Efektif 770 / 750 /680/700) Warna 0.45 72,000

(L Efektif 770 / 750 /680/700) Warna 0.5 77,000

T 0.25 Lapis foil, L. Efektif 750Cm 65,000

T 0.3 Lapis foil, L. Efektif 750Cm 70,000

T 0.35 Lapis foil, L. Efektif 750Cm 77,000

T 0.40 Lapis foil, L. Efektif 750Cm 83,000

Lebar 1m 80,000

L Efektif (1020 / 960 / 890 / 920/950) T 0.3 54,000

L Efektif (1020 / 960 / 890 / 920/950) T 0.35 62,000

L Efektif (1020 / 960 / 890 / 920/950) T 0.4 68,000

L Efektif (1020 / 960 / 890 / 920/950) T 0.45 77,000

L Efektif (1020 / 960 / 890 / 920/950) T.05mm 82,000


RUMUS MENGITUNG LUAS ATAP PERISAI
Contoh Kasus
Diketahui :
Panjang : 18 m1
Lebar : 10 m1
Oversteck : 0.70 m
Kemiringan atap: 30 derajat (cosinus 30 = 0.8660)
Bentuk atap perisai (jatuh air ke empat sisi) dengan overhang keliling ( depan, belakang, kanan,kiri )
Menentukan luas datar:
Luas Datar = (Panjang + overhang) x (lebar + overhang)
= (18+0.7+0.7) x (10+0.7+0.7)
= 19.4 x 11.4
= 221.16 M2
Menentukan Luas miringnya:
Luas Miring = Luas datar / cosinus kemiringan atap
= 221.16 / 0.8660
= 255.38 M2
Maka Luas Estimasi Rangka Atap Baja Ringan adalah = 255.38 M2