Anda di halaman 1dari 81

REKAPITULASI TOTAL

ISTANSI : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. JENIS PEKERJAAN TOTAL HARGA (Rp

A PENATAAN TAMAN KOTA ADIPURA Rp. 403,7

B PENATAAN TAMAN KOTA PATUNG PEMUDA Rp. 235,9

C PENATAAN TAMAN KOTA PATUNG PERAHU Rp. 328,6

D PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG Rp. Err:509

E RUMAH KOMPOS Rp. 22,0

Total Cost + PPN 10% Rp. Err:509

Terbilang : satu milyar empat ratus delapan puluh sembilan juta sembilan belas ribu em

Mengetahui, Dibuat Oleh,


Pejabat Pembuat Komitmen (PPK) Konsultan Perencana
Badan Lingkungan Hidup Daerah Gowa CV. CIPTA HIRARCHY KONSU

ZULFIADY MAS'UD S,Si, M.Si AMIRUDDIN ACHMAD, S


Nip. 19801008 201001 1016 Direktur

Mengetahui,
Kepala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
KAPITULASI TOTAL

TOTAL HARGA (Rp.)

403,700,000.00

235,950,000.00

328,616,200.00

Err:509

22,000,000.00

Err:509

tus delapan puluh sembilan juta sembilan belas ribu empat ratus rupiah,-

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur

Mengetahui,
ala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

INSTANSI : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : D. PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. JENIS PEKERJAAN TOTA

I. Pekerjaan Persiapan Rp.

II. Pekerjaan Pagar Batu Merah Rp.

III. Pekerjaan Joging Trek Rp.

IV. Pekerjaan Pagar BRC Rp.

V. Pekerjaan Taman Rp.

VI. Pekerjaan Mekanikal Rp.

VII. Pekerjaan Lain - Lain Rp.

Real Cost Rp.

PPN 10% Rp.

Total Biaya Fisik Rp.

Dibulatkan Rp.

Terbilang : EMPAT RATUS SEMBILAN PULUH DELAPAN JUTA TUJUH RATUS LIMA PULUH TIGA

Dibuat
Konsultan
CV. CIPTA HIRAR

AMIRUDDIN
Dire
RENCANA ANGGARAN BIAYA (RAB)

YAYASAN : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : D. PENATAAN TAMAN KOTA KEBUN KEHATI MAWANG
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. URAIAN PEKERJAAN Err:509 VOL. SAT.


Err:509
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.000 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.000 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.000 ls
4. Alat Bantu Kerja - 1.000 ls
5. Pekerjaan Pembersihan Lokasi - 1.000 ls

II. Pekerjaan Pagar Batu Merah


1. Pek. Galian Tanah (Pondasi) A6.1 53.910 m3
2. Pek. Urugan Kembali A6.9 17.970 m3
3. Pek. Pasir Urug (Bawah Pondasi) A6.11 7.815 m3
4. Pek. Pondasi Bt. Kosong B6.9 15.630 m3
5. Pek. Pondasi Bt. Kali 1 : 4 B6.2 39.388 m3
6. Pek. Sloof Beton 15/15
- Beton K. 175 Err:509 3.517 m3
- Besi Polos Err:509 527.513 Kg
- Bekisting E6.21 35.168 m2
7. Pek. Kolom Beton 11/11 E6.35 75.400 M'
8. Pek. Ringbalk 10 x 15 E6.36 156.300 M'
9. Pek. Batu Merah C6.3 186.360 m2
10. Pek. Plesteran D6.4 250.080 m2
11. Pek. Acian Err:509 250.080 m2
12. Pek. Pengecatan Kw.2 Err:509 250.080 m2

III. Pekerjaan Joging Trek


1. Pek. Galian Tanah (Pondasi) A6.1 5.058 m3
2. Pek. Urugan Kembali A6.9 1.265 m3
3. Pek. Pasir Urug (Bawah Pondasi) A6.11 1.897 m3
4. Pek. Kansteen Beton Tampa Tulangan 12/55 Err:509 16.691 m3
5. Pek. Paving Blok t. 8 cm K. 225 SPL.5 151.800 m2
6. Pek. Pair Urug A6.11 18.975 m2

IV. Pekerjaan Pagar BRC


1. Pek. Galian Tanah (Pondasi) A6.1 17.360 m3
2. Pek. Urugan Kembali A6.9 5.787 m3
3. Pek. Pasir Urug (Bawah Pondasi) A6.11 2.464 m3
4. Pek. Pondasi Bt. Kosong B6.9 4.928 m3
5. Pek. Pondasi Bt. Kali 1 : 4 B6.2 22.400 m3
6. Pek. Beton Dudukan Kolom Pagar BRC Err:509 0.552 m3
7. Pek. Pagar BRC T.1.2 ex Elecroplating Galvanized SPL.6 103.700 M'
NO. URAIAN PEKERJAAN Err:509 VOL. SAT.
8. Pek. Tiang BRC 1,2" ex Electroplating Galvanised SPL.7 46.000 Bh
9. Pek. Pintu Tunggal Lebar 90 Cm Tinggi 1,2 m - 1.000 Set
NO. URAIAN PEKERJAAN Err:509 VOL. SAT.
V. Pekerjaan Taman
1. Pek. Timbunan t. 25 cm A6.16 697.990 m3
2. Rumput Gajah Mini - 1645.700 m2
3. Beringin Dollar 1,50 - 2,00 m - 2.000 Phn
4. Serut 1,50 - 2,00 m - 1.000 Phn
5. Agave - 15.000 Pbg
6. klomentia - 30.000 Pbg
7. Ketapang Kencana t.2,00 - 2,50 m - 2.000 Phn
8. Kamboja Plumeria t. 2,50 - 3,00 m - 2.000 Phn
9. Lilis Paris Putih - 700.000 Pbg
10. Amarilis - 700.000 Pbg
11. Pandanus - 500.000 Pbg
12. Keladi Raja - 50.000 Pbg
13. Nolina - 5.000 Pbg
14. Helicolinia - 450.000 Pbg
15. Krokot Merah - 500.000 Pbg
16. Krokot Putih - 500.000 Pbg
17. Adam Hawa - 500.000 Pbg
18. Sambang Dara - 30.000 Pbg
19. Song of india - 50.000 Pbg
20. Irish - 500.000 Pbg
21. Osmoxylon - 150.000 Pbg
22. Puring - 300.000 Pbg
23. Nanas Merah - 20.000 Pbg
24. Pandang bali Cabang t. 1,50 - 2,00 m - 4.000 Phn
25. Nampo - 50.000 Pbg
26. Pohon Mangga 5 Rasa T. 1,500 - 2,00 m - 4.000 Phn
27. Pohon Rambutan Lengkeng Gowa T. 1,500 - 2,00 m - 3.000 Phn

VI.Pekerjaan Mekanikal
1. Pipa 3/4 Maspion (turun disumur) G6.26 4.000 M'
2. Selang Air 3/4 Serat - 50.000 M'
3. Kran Air 3/4" G6.35 1.000 Bh
4. Saringan Katup Otomatis - 1.000 Bh
5. Pipa 4" Maspion G6.32 23.000 M'
6. Pompa Air (setara Zhimizu tipe PS. 130 Bit) - 1.000 Bh
7. Bak Kontrol 1m x 1m ( 2 Buah )
Galian Tanah A6.1 1.600 M3
Pasangan Batu Bata 1 : 3 C6.2 8.000 M2
Pleteran 1 : 3 D6.3 8.000 M2
8. Pek. Penutup Saluran Lama t. 10 cm
- Beton K. 175 Err:509 1.300 M3
- Besi Polos Err:509 110.500 Kg
- Bekisting 2 x Pakai E6.25 10.790 M2
9. Pek. Penutup Saluran (grill besi diameter 12 jarak 8 cm) - 2.000 M2

VII. Pekerjaan Lain - Lain


1. Pek. Kansteeng Teras Kuburan (12 x 50 ) Err:509 0.840 M'
NO. URAIAN PEKERJAAN Err:509 VOL. SAT.
2. Pek. Pembersihan - 1.000 ls
I RENCANA ANGGARAN BIAYA (RAB)

TOTAL HARGA (Rp.)

3,250,000.00

Err:509

Err:509

Err:509

255,878,717.00

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

H DELAPAN JUTA TUJUH RATUS LIMA PULUH TIGA RIBU DUA RATUS RUPIA

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur
CANA ANGGARAN BIAYA (RAB) -

HARGA SAT. JML. HARGA

250,000.00 250,000.00
250,000.00 250,000.00
500,000.00 500,000.00
750,000.00 750,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,250,000.00

43,750.00 2,358,549.38
2,175.00 39,084.53
113,500.00 887,002.50
275,730.00 4,309,659.90
571,590.00 22,513,558.28

Err:509 Err:509
Err:509 Err:509
106,830.00 3,756,944.03
80,657.00 6,081,537.80
95,953.00 14,997,453.90
86,885.00 16,191,888.60
40,621.20 10,158,549.70
21,022.50 5,257,306.80
Err:509 Err:509
Jumlah (II) Err:509

43,750.00 221,287.50
2,175.00 2,750.29
113,500.00 215,281.13
Err:509 Err:509
97,925.00 14,865,015.00
113,500.00 2,153,662.50
Jumlah (III) Err:509

43,750.00 759,500.00
2,175.00 12,586.00
113,500.00 279,664.00
275,730.00 1,358,797.44
571,590.00 12,803,616.00
741,970.00 409,567.44
212,050.00 21,989,585.00
HARGA SAT. JML. HARGA
141,650.00 6,515,900.00
Err:509 Err:509
Jumlah (IV) Err:509
HARGA SAT. JML. HARGA

118,300.00 82,572,217.00
45,000.00 74,056,500.00
5,000,000.00 10,000,000.00
7,000,000.00 7,000,000.00
100,000.00 1,500,000.00
65,000.00 1,950,000.00
450,000.00 900,000.00
1,500,000.00 3,000,000.00
15,000.00 10,500,000.00
10,000.00 7,000,000.00
15,000.00 7,500,000.00
150,000.00 7,500,000.00
350,000.00 1,750,000.00
15,000.00 6,750,000.00
2,500.00 1,250,000.00
2,500.00 1,250,000.00
2,500.00 1,250,000.00
75,000.00 2,250,000.00
50,000.00 2,500,000.00
7,500.00 3,750,000
25,000.00 3,750,000.00
30,000.00 9,000,000.00
75,000.00 1,500,000.00
750,000.00 3,000,000.00
25,000.00 1,250,000.00
450,000.00 1,800,000.00
450,000.00 1,350,000.00
Jumlah (VI) ###

21,865.00 87,460.00
10,000.00 500,000.00
29,475.00 29,475.00
15,000.00 15,000.00
90,470.00 2,080,810.00
650,000.00 650,000.00

43,750.00 70,000.00
89,738.10 717,904.80
42,226.88 337,815.04

Err:509 Err:509
Err:509 Err:509
189,390.00 2,043,518.10
250,000.00 500,000.00
Err:509

Err:509 Err:509
HARGA SAT. JML. HARGA
2,000,000.00 2,000,000.00
JumlahI (VII) Err:509
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

INSTANSI : PLN KALBAR


PEKERJAAN : PERENCANAAN TAMAN
SUB PEKERJAA : PENATAAN TAMAN BUNDARAN KUBU RAYA
LOKASI : KABUPATEN KUBU RAYA PROVINSI KALIMANTAN BARAT

NO. JENIS PEKERJAAN TOTAL HARGA (R

I. Pekerjaan Persiapan Rp. 2,

II. Pekerjaan Pembuatan Pot Keliling Rp.

III. Pekerjaan Pot Bunga Lambang PLN Rp.

IV. Pekerjaan Taman Rp. 71,

V. Pekerjaan Arsitektural Rp. 12,

VI. Pekerjaan Elektrikal Rp. 36,

Total Biaya Fisik Rp. 186,2

Dibulatkan Rp. 186,2

seratus delapan puluh enam juta dua ratus tujuh puluh ribu
RENCANA ANGGARAN BIAYA (RAB)
INSTANSI : PLN KALBAR
PEKERJAAN : PERENCANAAN TAMAN
SUB PEKERJAA : PENATAAN TAMAN BUNDARAN KUBU RAYA
LOKASI : KABUPATEN KUBU RAYA PROVINSI KALIMANTAN BARAT

NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.

I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank 1.0 ls 500,000.00
2. Pek. Pembersihan Lokasi 1.0 ls 1,500,000.00
Jumlah (I)
II. Pekerjaan Pembuatan Pot Keliling
1. Pek. Galian Tanah (Pondasi) 22.5 m3 10,000.00
2. Pek. Urugan Kembali 4.5 m3 15,000.00
3. Pek. Pondasi 13.5 m3 55,000.00
4. Pek. Lantai Pot 4.5 m2 55,000.00
5. Pek. Pas. Batako Dinding Pot 25.2 m2 65,000.00
6. Pek. Acian 25.2 m2 65,000.00
7. Pek. Plesteran 25.2 m2 55,000.00
8. Pek. Cat Luar 25.2 m2 35,000.00
Jumlah (II)
III. Pekerjaan Pot Bunga Lambang PLN
1. Pek. Galian Tanah (Pondasi) 39.3 m3 10,000.00
2. Pek. Urugan Kembali 39.1 m3 15,000.00
4. Pek. Pondasi 39.2 m3 55,000.00
4. Pek. Acian 33.2 m2 65,000.00
4. Pek. Lantai Pot 39.2 m2 55,000.00
4. Pek.Plesteran 33.2 m3 55,000.00
4. Pek. Cat Luar 33.2 m2 35,000.00
Jumlah (III)
IV. Pekerjaan Taman
1. Pek. Timbunan Tanah Jadi + Pemupukan 193.5 m3 250,000.00
2. Rumput Gajah Mini 61.8 m2 50,000.00
3. Palem Ekor Tupai 24.0 Phn 350,000.00
4. Adam Hawa 40.0 Pbg 45,000.00
5. Agave 25.0 Pbg 35,000.00
6. Nanas Merah 70.0 Pbg 65,000.00
7. Sambang Dara 40.0 Pbg 75,000.00
8. Asoka Daun Kecil 50.0 Pbg 30,000.00
Jumlah (IV)
V. Pekerjaan Arsitektural
1. Huruf PT PLN, T 0,3 M
Pembesian 25.00 Btg 120,000.00
Pengemalan 30.00 Kpg 45,000.00
Pengecoran Pondasi 22.32 M2 150,000.00
Pemasanga Batako T : 0,3 M 54.72 M3 65,000.00
Pegisian Pasir 5.00 M3 150,000.00
Plesteran 11.16 M2 55,000.00
NO. URAIAN PEKERJAAN VOL. SAT. HARGA SAT.
Acian 11.16 M2 65,000.00
Pengecatan 65.16 M2 35,000.00
Jumlah (V)
VI. Pekerjaan Elektrikal
1. Pondasi tiang lampu 4.0 unit 3,000,000.00
2. Instalasi Elektrikal 4.0 titik 6,000,000.00
Jumlah (VI)
JUMLAH TOTAL

seratus delapan puluh enam juta dua ratus tujuh puluh lima ribu seratus
RENCANA ANGGARAN BIAYA (RAB)

TOTAL HARGA (Rp.)

2,000,000.00

54,612,000.00

9,450,500.00

71,588,000.00

12,624,600.00

36,000,000.00

186,275,100.00

186,270,000.00

puluh enam juta dua ratus tujuh puluh ribu


NA ANGGARAN BIAYA (RAB) -

JML. HARGA

500,000.00
1,500,000.00
2,000,000.00

225,000.00
67,500.00
742,500.00
247,500.00
1,638,000.00
1,638,000.00
1,386,000.00
882,000.00
6,826,500.00

392,600.00
585,900.00
2,153,800.00
2,156,700.00
2,153,800.00
1,824,900.00
1,161,300.00
9,450,500.00

48,375,000.00
3,088,000.00
8,400,000.00
1,800,000.00
875,000.00
4,550,000.00
3,000,000.00
1,500,000.00
###

3,000,000.00
1,350,000.00
3,348,000.00
3,556,800.00
750,000.00
613,800.00
JML. HARGA
725,400.00
2,280,600.00
###

12,000,000.00
24,000,000.00
###
###

enam juta dua ratus tujuh puluh lima ribu seratus


Panjang Lebar Tinggi
No Item Satuan Jumlah
(M) (M) (M)
I. Pot Bunga Keliling
a Pondasi
Galian M3 3 15 0.5 22.5
Urugan M3 3 15 0.1 4.5
Pembesian Btg `
Pengemalan M2 3 15 0.3
Pengecoran M 3
3 15 0.3 13.5
b Lantai
Pembesian Btg 5 2 7
Pengemalan M2
Pengecoran M3 3 15 0.1 4.5
c Dinding
Pembesian Btg 10 5 15
Pas. Batako M 2
6 30 0.7 25.2
Plesteran M 3
6 30 0.7 25.2
Acian M2 6 30 0.7 25.2
Pengecatan M2 6 30 0.7 25.2
Huruf Timbul M 2

d Tanaman
Tanah Dasar kuning M3 3 15 0.5 22.5
Tanah Hitam Gembur M3 3 15 0.2 9
Pupuk Kandang M3 3 15 0.1 4.5
Tanaman Plb

II. Pot Lambang PLN


a Pondasi
Galian M3 38.96 0.3 39.26
Urugan M 3
38.96 0.1 39.06
Pembesian Btg
Pengemalan M2
Pengecoran M3 38.96 0.2 39.16
b Lantai
Pembesian Btg
Pengemalan M2
Pengecoran M3 38.96 0.2 39.16
c Dinding
Pembesian Btg
Pengemalan M2
Pas. Batako M3 33.18 33.18
Plesteran M 3
33.18 33.18
Acian M2 33.18 33.18
Pengecatan M2 33.18 33.18
Huruf Timbul M2
d Tanaman
Tanah Dasar kuning M3
Tanah Hitam Gembur M3
Pupuk Kandang M3
Tanaman Plb

III. Tambahan
a Penerangan
Pondasi Tiang Lampu Unit
Tiang Lampu Unit
Rumah Lampu Unit
Bohlam Unit
Kabel M
Isolasi Listrik Unit
b Huruf PLN
Pembesian Btg
Pengemalan M2
Pengecoran Pondasi M3 15 3.6 0.2
Pemasanga Batako T : 0,3 M M 2
15 3.6 0.3
Plesteran M3
Acian M2
Pengecatan M2
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

INSTANSI : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : C. PENATAAN TAMAN KOTA PATUNG PERAHU
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. JENIS PEKERJAAN TOTA


I. Pekerjaan Persiapan Rp.
II. Pekerjaan Pembongkaran Rp.
III Pekerjaan Kansteen Rp.
IV. Pekerjaan Pagar BRC Rp.
V. Pekerjaan Taman Rp.
VI Pek. Sclupture Perahu Rp.
VII. Pekerjaan Lain - Lain Rp.
Real Cost Rp.
PPN 10% Rp.
Total Biaya Fisik Rp.
Dibulatkan Rp.

Terbilang :TIGA RATUS DUA PULUH DELAPAN JUTA ENAM RATUS ENAM BELAS RIBU DUA RAT

Dibuat
Konsultan
CV. CIPTA HIRAR

AMIRUDDIN
Dire
RENCANA ANGGARAN BIAYA (RAB)

YAYASAN : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : C. PENATAAN TAMAN KOTA PATUNG PERAHU
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. URAIAN PEKERJAAN KODE VOL. SAT.


ANALISA
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.000 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.000 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.000 ls
4. Alat Bantu Kerja - 1.000 ls
5. Pek. Pembersiahn LoKasi - 1.000 ls
6. Pek. Subur Bor - 1.000 ls

II. Pekerjaan Pembongkaran


1. Pek. Pembongkaran Tugu Perahu lama - 1.000 ls
2. Pek. Pembongkaran Kansting - 121.200 m'
3. Pek. Pembongkaran Pohon Lama - 6.000 Buah
4. Pek. Bongkaran Aspal - 60.800 m2
5. Pekerjaan Bongkaran Reklame + Pasang kembali - 1.000 ls

III. Pekerjaan Kansteen


1. Pekerjaan Galian A6.1 16.331 m3
2. Pekerjaan Batu Kosong B6.9 5.065 m3
3. Pekerjaan Batu Kali B6.2 23.477 m3
4. Pek. Batu Alam Undersheet Dinding 10 x 20 SPL.2 18.150 m2
5. Pekerjaan Batu Alam Acak SPL.2 21.750 m2
6. Pek. Batu Alam Undersheet (atas) 25 x 25 SPL.2 14.075 m2
7. Pekerjaan Lis Plsteran - 169.580 m'
8. Pek. Pengecatan Kw.1 SPL.4 61.600 m2
9. Pekerjaan Relief Profil - 69.850 m'

IV. Pekerjaan Pagar BRC


1. Pek. Dudukan Kolom Pagar BRC E6.5 0.300 m3
2. Pek. Pagar BRC T.1.2 SPL.6 62.670 m'
3. Pek. Tiang BRC 1,2" SPL.7 25.000 Bh
4. Pek. Pintu Lebar 90 cm - 1.000 Set

V. Pekerjaan Taman
1. Pek. Timbunan Tanah Humus A6.16 38.800 m3
2. Rumput Gajah Mini - 40.000 m2
NO. URAIAN PEKERJAAN KODE VOL. SAT.
3. Siklot - 14.000 Pbg
4. Agave Sedang - 25.000 Pbg
5. Sambang Dara - 200.000 Pbg
6. Karambosa Kuning - 500.000 Pbg
7. Karambosa Hijau - 500.000 Pbg
8. Lily Paris Putih - 300.000 Pbg
9. Sikas 1,00 -1,25 Cm - 5.000 Phn
NO. URAIAN PEKERJAAN KODE VOL. SAT.
VI Pek. Sclupture Perahu
1. Pekerjaan Galian A6.1 6.400 m3
2. Pek. Urug Kembali A6.9 2.133 m3
Pek. Pondasi Batu Kosong B6.9 1.620 m3
Pek. Pondasi Batu Kali B6.2 7.375 m3
3. Pek. Poer Pondasi
- Beton K. 175 E6.5 3.136 m3
- Besi E6.17 376.320 Kg
- Bekisting E6.20 14.112 m2
4. Pek. Kolom 0,4 x 2,00
- Beton K. 175 E6.5 2.160 m2
- Besi E6.17 172.800 Kg
- Bekisting E6.22 12.960 m2
5. Perahu Pinisi Ukuran Panjang 5,00 m x lebar 120 cm 1.000 ls
- Kayu Terbuat dari kayu Jati
- layar Dari Kulit Sapi Ukuran Tinggi 6 m x 3 lebar
- Tinggi Badan Perahu 115 cm
- Finishin Clear
6. Relief Ombak 1.000 ls

VII. Pekerjaan Lain - Lain


1. Pompa Air (setara Zhimizu tipe PS. 130 Bit) - 1.000 Ls
2. Selang Air 3/4 Serat - 50.000 M'
3. Pipa PVC 3/4 G6.26 1.000 M'
4. Kran Air 3/4" G6.35 1.000 Bh
5. Pek. Pembersihan - 1.000 ls
I RENCANA ANGGARAN BIAYA (RAB)

TOTAL HARGA (Rp.)


3,220,000.00
7,038,000.00
47,423,671.30
Err:509
125,490,040.00
100,501,286.41
2,701,340.00
Err:509
Err:509
Err:509
Err:509

AN JUTA ENAM RATUS ENAM BELAS RIBU DUA RATUS RUPIAH,-

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur
CANA ANGGARAN BIAYA (RAB)
-

HARGA SAT. JML. HARGA

220,000.00 220,000.00
250,000.00 250,000.00
500,000.00 500,000.00
500,000.00 500,000.00
250,000.00 250,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,220,000.00

1,500,000.00 1,500,000.00
15,000.00 1,818,000.00
200,000.00 1,200,000.00
25,000.00 1,520,000.00
1,000,000.00 1,000,000.00
Jumlah (II) 7,038,000.00

43,750.00 714,476.88
275,730.00 1,396,627.60
571,590.00 13,419,447.07
317,177.50 5,756,771.63
193,977.50 4,219,010.63
314,977.50 4,433,308.31
55,000.00 9,326,900.00
36,037.00 2,219,879.20
85,000.00 5,937,250.00
Jumlah (III) ###

741,970.00 222,591.00
212,050.00 13,289,173.50
141,650.00 3,541,250.00
Err:509 Err:509
Jumlah (IV) Err:509

118,300.00 4,590,040.00
45,000.00 1,800,000.00
HARGA SAT. JML. HARGA
150,000.00 2,100,000.00
100,000.00 2,500,000.00
75,000.00 15,000,000.00
45,000.00 22,500,000.00
45,000.00 22,500,000.00
15,000.00 4,500,000.00
10,000,000.00 50,000,000.00
Jumlah (V) ###
HARGA SAT. JML. HARGA

43,750.00 280,000.00
2,175.00 4,640.00
275,730.00 446,682.60
571,590.00 4,215,756.33

741,970.00 2,326,892.12
16,095.00 6,056,870.40
144,280.00 2,036,079.36

741,970.00 1,602,655.20
16,095.00 2,781,216.00
289,390.00 3,750,494.40
65,000,000.00 65,000,000.00

12,000,000.00 12,000,000.00
Jumlah (VI) ###

650,000.00 650,000.00
10,000.00 500,000.00
21,865.00 21,865.00
29,475.00 29,475.00
1,500,000.00 1,500,000.00
JumlahI (VII) 2,701,340.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

INSTANSI : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : E. RUMAH KOMPOS
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. JENIS PEKERJAAN TOTA

I. Pekerjaan Persiapan Rp.

II. Pekerjaan Pondasi Rp.

III. Pekerjaan Dinding dan Beton Rp.

IV. Pekerjaan Atap Rp.

V. Pekerjaan Lain - Lain Rp.

Real Cost Rp.

PPN 10% Rp.

Total Biaya Fisik Rp.

Dibulatkan Rp.

Terbilang : DUA PULUH DUA JUTA RUPIAH,-

Mengetahui, Dibuat
Pejabat Pembuat Komitmen (PPK) Konsultan
Badan Lingkungan Hidup Daerah Gowa CV. CIPTA HIRAR

ZULFIADY MAS'UD S,Si, M.Si AMIRUDDIN


Nip. 19801008 201001 1016 Dire

Mengetahui,
Kepala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
RENCANA ANGGARAN BIAYA (RAB)

YAYASAN : BADAN LINGKUNGAN HIDUP DAERAH


PEKERJAAN : PERENCANAAN TAMAN KOTA
SUB PEKERJAA : E. RUMAH KOMPOS
ANGGARAN : TAHUN 2013
LOKASI : KABUPATEN GOWA PROVINSI SULAWESI SELATAN

NO. URAIAN PEKERJAAN KODE VOL. SAT.


ANALISA
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.00 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.00 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.00 ls
4. Alat Bantu Kerja - 1.00 ls

II. Pekerjaan Pondasi


1. Pek. Galian Tanah (Pondasi) A6.1 6.73 M3
2. Pek. Urugan Kembali A6.9 2.24 M3
3. Pek. Pasir Urug (Bawah Pondasi) A6.11 0.90 M3
5. Pek. Pondasi Bt. Kosong B6.9 1.80 M3
6. Pek. Pondasi Bt. Kali 1 : 4 B6.2 3.29 M3
8. Pek. Timbunan Tanah A6.16 8.00 M3

III. Pekerjaan Dinding dan Beton


1. Pek. Sloof 15/15
- Beton K. 175 E6.5 0.410 M3
- Besi Polos E6.17 61.500 Kg
- Bekisting E6.21 3.403 M2
2. Pek. Kolom Kayu Kls II 11/11 F6.13 0.46 M3
3. Pek. Batu Merah 1 : 4 C6.2 14.45 M2
4. Pek. Plesteran 1 : 4 D6.4 28.90 M2
5. Pek. Acian D6.27 28.90 M2

IV. Pekerjaan Atap


1. Pek. Kuda-Kuda Kayu Kls II F6.13 0.146 M3
2. Pek. Gording Kls II F6.15 0.420 M3
3. Pek. Balok Atas 5/10 Kls II F6.15 0.090 M3
4. Pek. Atap Seng Gelombang F6.18 49.000 M2
5. Pekerjaan Nok Seng SPL.1 7.000 M'
6. Pekerjaan Lisplank Woodplank F6.32 20.800 M'

V. Pekerjaan Lain - Lain


1. Pek. Cat Kayu H6.8 23.15 M2
2. Pek. Pembersihan - 1.00 ls
I RENCANA ANGGARAN BIAYA (RAB)

TOTAL HARGA (Rp.)

1,100,000.00

3,727,087.16

7,111,015.53

7,063,493.39

1,072,956.03

20,074,552.11

2,007,455.21

22,082,007.33

22,000,000.00

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur

Mengetahui,
ala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
CANA ANGGARAN BIAYA (RAB) -

HARGA SAT. JML. HARGA

250,000.00 250,000.00
200,000.00 200,000.00
250,000.00 250,000.00
400,000.00 400,000.00
Jumlah (I) 1,100,000.00

43,750.00 294,525.00
2,175.00 4,880.70
113,500.00 102,150.00
275,730.00 496,314.00
571,590.00 1,882,817.46
118,300.00 946,400.00
Jumlah (II) 3,727,087.16

741,970.00 304,207.70
16,095.00 989,842.50
106,830.00 363,542.49
5,111,924.00 2,375,204.37
89,738.10 1,296,715.55
40,621.20 1,173,952.68
21,022.50 607,550.25
Jumlah (III) 7,111,015.53

5,111,924.00 743,784.94
4,617,095.00 1,939,179.90
4,617,095.00 415,538.55
48,480.00 2,375,520.00
27,090.00 189,630.00
67,300.00 1,399,840.00
Jumlah (IV) 7,063,493.39

35,555.00 822,956.03
250,000.00 250,000.00
JumlahI (V) 1,072,956.03
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

INSTANSI : PLN KALBAR


PEKERJAAN : PERENCANAAN TAMAN
SUB PEKERJAA : PENATAAN TAMAN BUNDARAN KUBU RAYA
LOKASI : KABUPATEN KUBU RAYA PROVINSI KALIMANTAN BARAT

NO. JENIS PEKERJAAN TOTA

I. Pekerjaan Persiapan Rp.

V. Pekerjaan Patung Adipura Rp.

VI. Pekerjaan Taman Rp.

VII. Pek. Sclupture Rp.

VIII. Pekerjaan Lain - Lain Rp.

Real Cost Rp.

PPN 10% Rp.

Total Biaya Fisik Rp.

Dibulatkan Rp.

Terbilang : EMPAT RATUS TIGA JUTA TUJUH RATUS RIBU RUPIAH,-

Mengetahui, Dibuat
Pejabat Pembuat Komitmen (PPK) Konsultan
Badan Lingkungan Hidup Daerah Gowa CV. CIPTA HIRARC

ZULFIADY MAS'UD S,Si, M.Si AMIRUDDIN A


Nip. 19801008 201001 1016 Dire

Mengetahui,
Kepala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
RENCANA ANGGARAN BIAYA (RAB)

YAYASAN : PLN KALBAR


PEKERJAAN : PERENCANAAN TAMAN
SUB PEKERJAA : PENATAAN TAMAN BUNDARAN KUBU RAYA
ANGGARAN #REF!
LOKASI : KABUPATEN KUBU RAYA PROVINSI KALIMANTAN BARAT

NO. URAIAN PEKERJAAN KODE VOL. SAT.

ANALISA
I. Pekerjaan Persiapan
1. Pengukuran & Pas. Bowplank - 1.00 ls
2. P3K (Pertolongan Pertama Pada Kecelakaan) - 1.00 ls
3. Administrasi, Dokumentasi Dan Quality Kontrol - 1.00 ls
4. Alat Bantu Kerja - 1.00 ls
5. Pek. Pembersihan Lokasi - 1.00 ls
6. Pek. Subur Bor - 1.00 ls

II. Pekerjaan Pembongkaran


1. Pek. Pembongkaran Pos Timbangan - 1.00 ls
2. Pek. Pembongkaran Tugu KKN - 1.00 ls
3. Pek. Pembongkaran Kansting - 121.20 m'
4. Pek. Pembongkaran Pedestrian (jalan keramik) - 74.10 m2
5. Pek. Pembongkaran Aspal Lama - 28.21 M2
6. Pek. Pembongkaran Keramik Tugu Adipura - 27.70 M2
7. Pek. Pembongkaran Tanaman Existing - 1.00 ls
8. Pek. Perapihan ex Bongkaran dengan Beton K.175 t.12 cm E6.5 6.60 M3

III. Pekerjaan Pedestrian


1. Pek. Galian Tanah (Pondasi) A6.1 15.26 M3
2. Pek. Urugan Kembali A6.9 3.82 M3
3. Pek. Pasir Urug (Bawah Pondasi) A6.11 5.37 M3
4. Pasir Urug Bawah Lantai Batu Alam A6.11 9.75 M3
5. Pek. Pondasi Bt. Kosong B6.9 10.73 M3
6. Pek. Pondasi Bt. Kali 1 : 4 B6.2 36.81 M3
7. Pek. Plesteran 1 : 3 D6.3 40.40 M2
8. Pek. Lantai Kerja t. 5 cm E6.1 3.25 M3
9. Pek. Batu Alam Undersheet (atas) 25 x 25 SPL.2 31.46 M2
10. Pek. Batu Alam Undersheet Dinding 10 x 20 SPL.2 15.96 M2
11. Pek. Dinding Batu Alam Acak SPL.2 18.62 M2
12. Pek. Dinding Batu Sikat SPL.2 1.71 M2
13. Pek. Lantai Pedistrian Batu sikat bunga teratai SPL.2 6.84 M2
14. Pek. Lantai Pedistrian Batu Acak SPL.2 12.72 M2
15. Pek. Lantai Pedistrian Batu Undersheet 30 x 30 SPL.2 19.68 M2
16. Pek. Lantai Pedistrian Batu sikat SPL.2 19.68 M2
18. Pek. Lis Plesteran 1 : 2 D6.2 398.80 M'
18. Pek. Cat SPL.4 59.82 M2

IV. Pekerjaan Pagar BRC


NO. URAIAN PEKERJAAN KODE VOL. SAT.

1. Pek. Dudukan Kolom Pagar BRC E6.5 0.58 M3


2. Pek. Pagar BRC T.1.2 SPL.6 115.20 M'
3. Pek. Tiang BRC 1,2" SPL.7 48.00 BH
4. Pek. Pintu Lebar 90 cm - 1.00 Set

V. Pekerjaan Patung Adipura


1. Pek. Batu Alam Undersheet Dinding 10 x 20 SPL.2 43.68 M2
2. Pek. Batu Alam Undersheet Dinding & Lt 30 x 30 (bawah) SPL.2 11.51 M2
3. Pek. Dinding Beton K. 100 E6.1 3.61 M3
4. Pek. Pengecatan Patung SPL.4 25.20 M2
5. Pek. Pemasangan Kembali Logo Gowa - 1.00 ls
NO. URAIAN PEKERJAAN KODE VOL. SAT.

VI. Pekerjaan Taman


1. Pek. Timbunan dari Luar A6.16 221.10 M3
2. Rumput Gajah Mini - 54.00 M2
3. Serut / Kolasa Besar Tinggi 2,50 - 3,00 m - 2.00 Phn
4. Beringin Dollar tinggi 2,00 - 2,50 m - 1.00 Phn
5. Cemara Udang 1,50 - 2,00 m - 1.00 Phn
6. Sikas 50 - 70 Cm - 3.00 Phn
7. Sikas 1,00 -1,25 Cm - 2.00 Phn
8. Lily Paris Putih - 500.00 Pbg
9. Amarilis - 500.00 Pbg
10. Sansiefera - 100.00 Pbg
11. Sambang Dara - 100.00 Pbg
12. Keladi Raja - 30.00 Pbg
13. Agave - 25.00 Pbg
13. Krokot Merah - 250.00 Pbg
14. Krokot Putih - 250.00 Pbg
15. Osmoxylon - 150.00 Pbg
16. Karambosa Kuning - 100.00 Pbg
17. Adam Hawa - 300.00 Pbg
18. Azoka - 1,000.00 Pbg
19. Song of india - 30.00 Pbg

VII. Pek. Sclupture


a. Bunga Teratai
1. Pek. Timbunan Tanah A6.16 7.150 M3
2. Pek. Batu Kosong B6.9 2.300 M3
3. Pek. Batu Kali dudukan Sclupture 1 : 4 B6.2 7.700 M3
4. Pek. Pasir Urug A6.11 1.150 M3
5. Pek. Pondasi Poer
- Beton K. 175 E6.5 0.250 M3
- Besi Polos E6.17 20.000 Kg
- Bekisting E6.20 0.750 M2
6. Pek. Kolom 40/40
- Beton K. 175 E6.5 0.304 M3
- Besi Polos E6.17 36.480 Kg
- Bekisting E6.22 3.040 M2
7. Pek. Sloof 20/30
- Beton K. 175 E6.5 0.384 M3
- Besi Polos E6.17 57.600 Kg
- Bekisting E6.21 3.187 M2
8. Pek. Pas. Batu Acak SPL.2 7.700 M2
9. Pek. Batu Alam Andesit Dinding 10 x 20 SPL.2 8.250 M2
10. Pek. Paving Blok t. 8 cm K. 225 SPL.5 4.900 M2
11. Pek. Pembuatan Narasi dari Plat Kuningan 1.000 ls
12. Pek. Daun Bunga Teratai 12 Daun + 1 Mahkota (klopak)
( Rangka Pipa Gip 2" + Besi diameter 10 + Pipa PVC + acc) - 1.000 ls

b.Meriam dan Tempat Duduk


NO. URAIAN PEKERJAAN KODE VOL. SAT.

1. Galian Tanah A6.1 7.72 M3


2. Pek. Batu Kosong B6.9 3.16 M3
3. Pek. Bt Kali dudukan Sclupture & Keliling wadah 1 : 4 B6.2 5.61 M3
4. Pek. Canon-canon ( meriam artifisial) - 4.00 BH
5. Pek. Batu Alam Acak ( tempat Duduk ) SPL.2 17.76 M2
6. Pek. Rabat Beton T. 7 cm E6.1 0.91 M2
7. Pek. Hamparan Koral Putih - 13.50 M2

VIII. Pekerjaan Lain - Lain


1. Pompa Air (setara Zhimizu tipe PS. 130 Bit) - 1.00 ls
2. Selang Air 3/4 Serat - 50.00 M'
3. Pipa PVC 3/4 G6.26 1.00 M'
4. Kran Air 3/4" G6.35 1.00 Bh
5. Pek. Pembersihan - 1.00 ls
I RENCANA ANGGARAN BIAYA (RAB)

TOTAL HARGA (Rp.)

3,800,000.00

21,099,035.01

162,836,130.00

55,178,797.98

3,201,340.00

246,115,302.99

24,611,530.30

270,726,833.29

270,700,000.00

H RATUS RIBU RUPIAH,-

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur

Mengetahui,
ala Badan Lingkungan Hidup Gowa

Drs. H. ZULKARNAEN, M.Si


Nip. 195811021981021003
CANA ANGGARAN BIAYA (RAB) -

HARGA SAT. JML. HARGA

350,000.00 350,000.00
200,000.00 200,000.00
500,000.00 500,000.00
750,000.00 750,000.00
500,000.00 500,000.00
1,500,000.00 1,500,000.00
Jumlah (I) 3,800,000.00

1,000,000.00 1,000,000.00
325,000.00 325,000.00
15,000.00 1,818,000.00
12,000.00 889,200.00
25,000.00 705,250.00
15,000.00 415,500.00
3,500,000.00 3,500,000.00
741,970.00 4,894,330.91
Jumlah (II) ###

43,750.00 667,625.00
2,175.00 8,297.63
113,500.00 608,927.50
113,500.00 1,106,454.75
275,730.00 2,958,582.90
571,590.00 21,039,084.72
42,226.88 1,705,965.95
609,013.13 1,978,988.15
314,977.50 9,909,979.59
317,177.50 5,062,152.90
270,977.50 5,045,601.05
193,977.50 331,701.53
193,977.50 1,326,806.10
270,977.50 3,446,833.80
193,977.50 3,817,477.20
270,977.50 5,332,837.20
55,000.00 21,934,000.00
36,037.00 2,155,733.34
Jumlah (III) ###
HARGA SAT. JML. HARGA

741,970.00 427,374.72
212,050.00 24,428,160.00
141,650.00 6,799,200.00
Err:509 Err:509
Jumlah (IV) Err:509

317,177.50 13,854,313.20
316,077.50 3,638,052.03
609,013.13 2,198,537.38
36,037.00 908,132.40
500,000.00 500,000.00
Jumlah (V) ###
HARGA SAT. JML. HARGA

118,300.00 26,156,130.00
45,000.00 2,430,000.00
15,000,000.00 30,000,000.00
10,000,000.00 10,000,000.00
7,500,000.00 7,500,000.00
5,000,000.00 15,000,000.00
10,000,000.00 20,000,000.00
15,000.00 7,500,000.00
10,000.00 5,000,000.00
30,000.00 3,000,000.00
75,000.00 7,500,000.00
150,000.00 4,500,000.00
100,000.00 2,500,000.00
2,500.00 625,000.00
2,500.00 625,000.00
25,000.00 3,750,000.00
45,000.00 4,500,000.00
2,500.00 750,000.00
10,000.00 10,000,000.00
50,000.00 1,500,000.00
Jumlah (VI) ###

118,300.00 845,845.00
275,730.00 634,179.00
571,590.00 4,401,243.00
113,500.00 130,525.00

741,970.00 185,492.50
16,095.00 321,900.00
144,280.00 108,210.00

741,970.00 225,558.88
16,095.00 587,145.60
289,390.00 879,745.60

741,970.00 284,916.48
16,095.00 927,072.00
154,980.00 493,952.26
270,978 2,086,526.75
317,177.50 2,616,714.38
97,925.00 479,832.50
2,000,000.00 2,000,000.00

18,500,000.00 18,500,000.00
HARGA SAT. JML. HARGA

43,750.00 337,750.00
275,730.00 871,306.80
571,590.00 3,206,619.90
2,000,000.00 8,000,000.00
270,977.50 4,812,560.40
609,013.13 554,201.94
125,000.00 1,687,500.00
Jumlah (VII) ###

650,000.00 650,000.00
10,000.00 500,000.00
21,865.00 21,865.00
29,475.00 29,475.00
2,000,000.00 2,000,000.00
JumlahI (VIII) 3,201,340.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

KODE KOEFESIEN SATUAN KEBUTUHAN HARGA


ANALISA SATUAN
A A6.1 Menggali 1 M3 tanah biasa sedalam 1 m
0.750 Oh Pekerja @ Rp 55,000.00
0.025 Oh Mandor @ Rp 100,000.00

A6.4 Menggali 1 M3 tanah keras sedalam 1 m


1.000 Oh Pekerja @ Rp 55,000.00
0.032 Oh Mandor @ Rp 100,000.00

A6.9 Mengurug kembali 1 M3 galian


0.025 Oh Pekerja @ Rp 55,000.00
0.008 Oh Mandor @ Rp 100,000.00

A6.11 Mengurug 1 M3 pasir urug


1.200 M3 Pasir urug @ Rp 80,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.010 Oh Mandor @ Rp 100,000.00

A6.16 Mengurug 1 M3 Tanah Timbunan


1.200 M3 Tanah timbunan @ Rp 84,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.010 Oh Mandor @ Rp 100,000.00

B PEKERJAAN PONDASI
B6.2 Memasang 1 M3 pondasi batu kali, campuran 1PC : 4PP
1.200 M3 Batu Kali @ Rp 135,000.00
163.000 Kg Semen Portland @ Rp 1,130.00
0.520 M3 Pasir pasang @ Rp 130,000.00
1.500 Oh Tukang batu @ Rp 75,000.00
0.600 Oh Pekerja @ Rp 55,000.00
0.060 Oh Kepala Tukang Batu @ Rp 80,000.00
0.075 Oh Mandor @ Rp 100,000.00

B6.9 Memasang 1 M3 batu kosong (aanstamping)


1.200 M3 Batu kali @ Rp 135,000.00
0.432 M3 Pasir urug @ Rp 80,000.00
0.780 Oh Pekerja @ Rp 55,000.00
0.390 Oh Tukang batu @ Rp 75,000.00
0.039 Oh Kepala Tukang Batu @ Rp 80,000.00
0.039 Oh Mandor @ Rp 100,000.00

C PEKERJAAN DINDING

C6.2 Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC
70.000 Bh Batu merah @ Rp 600.00
14.370 Kg Semen Portland @ Rp 1,130.00
0.040 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00

C6.3 Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC
70.000 Bh Batu merah @ Rp 600.00
11.500 Kg Semen Portland @ Rp 1,130.00
0.043 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00
D PEKERJAAN PLESTERAN
D6.2 Memasang 1 M2 plesteran 1PC : 2PP, tebal 15 mm
10.224 Kg Semen Portland @ Rp 1,130.00
0.020 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.150 Oh Tukang batu @ Rp 75,000.00
0.015 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00

D6.3 Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm


7.776 Kg Semen Portland @ Rp 1,130.00
0.023 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.150 Oh Tukang batu @ Rp 75,000.00
0.015 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00

D6.4 Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm


6.240 Kg Semen Portland @ Rp 1,130.00
0.024 M3 Pasir pasang @ Rp 130,000.00
0.300 Oh Pekerja @ Rp 55,000.00
0.150 Oh Tukang batu @ Rp 75,000.00
0.015 Oh Kepala Tukang Batu @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00

D6.27 Memasang 1 M2 acian


3.250 Kg Semen Portland @ Rp 1,130.00
0.150 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00
0.008 Oh Mandor @ Rp 100,000.00

E PEKERJAAN BETON
E6.1 Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w
230.000 Kg Semen Portland @ Rp 1,130.00
893.000 Kg Pasir beton (Kg) @ Rp 85.63
1,027.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00
200.000 Ltr Air @ Rp 150.00
1.200 Oh Pekerja @ Rp 55,000.00
0.200 Oh Tukang batu @ Rp 75,000.00
0.020 Oh Kepala Tukang Batu @ Rp 80,000.00
0.060 Oh Mandor @ Rp 100,000.00

E6.5 Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
326.000 Kg Semen Portland @ Rp 1,130.00
760.000 Kg Pasir beton (Kg) @ Rp 85.63
1,029.000 Kg split/chipping 2-3 cm(Kg) @ Rp 150.00
215.000 Ltr Air @ Rp 150.00
1.650 Oh Pekerja @ Rp 55,000.00
0.275 Oh Tukang batu @ Rp 75,000.00
0.028 Oh Kepala Tukang Batu @ Rp 80,000.00
0.083 Oh Mandor @ Rp 100,000.00

E6.17 Pembesian 1 Kg dengan besi polos atau besi ulir


10.500 Kg Besi beton polos @ Rp 14,000.00
0.150 Kg Kawat beton @ Rp 23,600.00
0.070 Oh Pekerja @ Rp 55,000.00
0.070 Oh Tukang besi @ Rp 80,000.00
0.007 Oh Kepala Tukang Besi @ Rp 80,000.00
0.004 Oh Mandor @ Rp 100,000.00
Untuk Pembesian 10 Kg
Untuk Pembesian Polos 1 Kg
E6.35 Membuat 1 M' Kolom Praktis Beton Bertulang ( 11 x 11)
0.002 M3 Kayu Kls III @ Rp 2,140,000.00
0.01 Kg Paku @ Rp 17,500.00
3.000 Kg Besi beton polos @ Rp 14,000.00
0.450 Kg Kawat beton @ Rp 23,600.00
4.000 Kg Semen Portland @ Rp 1,130.00
0.006 M3 Pasir Beton @ Rp 137,000.00
0.009 M3 Batu Pecah 2 -3 cm @ Rp 240,000.00
0.180 Oh Pekerja @ Rp 55,000.00
0.020 Oh Tukang Batu @ Rp 80,000.00
0.020 Oh Tukang Kayu @ Rp 80,000.00
0.020 Oh Tukang besi @ Rp 80,000.00
0.006 Oh Kepala Tukang @ Rp 80,000.00
0.009 Oh Mandor @ Rp 100,000.00

E6.36 Membuat 1 M' Kolom Praktis Beton Bertulang ( 10 x 15)


0.003 M3 Kayu Kls III @ Rp 2,140,000.00
0.02 Kg Paku @ Rp 17,500.00
3.600 Kg Besi beton polos @ Rp 14,000.00
0.050 Kg Kawat beton @ Rp 23,600.00
5.500 Kg Semen Portland @ Rp 1,130.00
0.009 M3 Pasir Beton @ Rp 137,000.00
0.015 M3 Batu Pecah 2 -3 cm @ Rp 240,000.00
0.297 Oh Pekerja @ Rp 55,000.00
0.033 Oh Tukang Batu @ Rp 80,000.00
0.033 Oh Tukang Kayu @ Rp 80,000.00
0.033 Oh Tukang besi @ Rp 80,000.00
0.010 Oh Kepala Tukang @ Rp 80,000.00
0.015 Oh Mandor @ Rp 100,000.00

E6.20 Memasang 1 M2 bekisting untuk pondasi


0.040 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.100 Ltr Minyak bekisting @ Rp 6,500.00
0.520 Oh Pekerja @ Rp 55,000.00
0.260 Oh Tukang kayu @ Rp 75,000.00
0.026 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.026 Oh Mandor @ Rp 100,000.00

Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.100 Ltr Minyak bekisting @ Rp 6,500.00
0.520 Oh Pekerja @ Rp 55,000.00
0.260 Oh Tukang kayu @ Rp 75,000.00
0.026 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.026 Oh Mandor @ Rp 100,000.00

E6.21 Memasang 1 M2 bekisting untuk sloof


0.045 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.100 Ltr Minyak bekisting @ Rp 6,500.00
0.520 Oh Pekerja @ Rp 55,000.00
0.260 Oh Tukang batu @ Rp 75,000.00
0.026 Oh Kepala Tukang Batu @ Rp 80,000.00
0.026 Oh Mandor @ Rp 100,000.00
Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian
0.023 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(Papan 2 kali Pakai)
0.300 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.100 Ltr Minyak bekisting @ Rp 6,500.00
0.520 Oh Pekerja @ Rp 55,000.00
0.260 Oh Tukang batu @ Rp 75,000.00
0.026 Oh Kepala Tukang Batu @ Rp 80,000.00
0.026 Oh Mandor @ Rp 100,000.00

E6.22 Memasang 1 M2 bekisting untuk kolom


0.040 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.015 M3 Kayu klas II (balok) @ Rp 3,100,000.00
0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
2.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.008 M3 Kayu klas II (balok) @ Rp 3,100,000.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

E6.23 Memasang 1 M2 bekisting untuk balok


0.040 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.018 M3 Kayu klas II (balok) @ Rp 3,100,000.00
0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
2.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.009 M3 Kayu klas II (balok) @ Rp 3,100,000.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
(Multipleks 2x pakai)

1.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00


(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00
E6.24 Memasang 1 M2 bekisting untuk lantai
0.040 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.015 M3 Kayu klas II (balok) @ Rp 3,100,000.00
0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
6.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian


0.020 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.008 M3 Kayu klas II (balok) @ Rp 3,100,000.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
(Multipleks 2x pakai)
3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
(dolken 2x pakai)
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

E6.25 Memasang 1 M2 bekisting untuk dinding


0.030 M3 Kayu klas III (papan) @ Rp 2,140,000.00
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.020 M3 Kayu klas II (balok) @ Rp 3,100,000.00
0.350 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
3.000 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00

Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian


0.015 M3 Kayu klas III (papan) @ Rp 2,140,000.00
(papan 2 x pakai)
0.400 Kg Paku biasa 2" - 5" @ Rp 17,500.00
0.200 Ltr Minyak bekisting @ Rp 6,500.00
0.010 M3 Kayu klas II (balok) @ Rp 3,100,000.00
(Balok 2x pakai)
0.175 Lbr Multipleks 1.22 x 2.44 x 9 mm @ Rp 120,000.00
(Multipleks 2x pakai)
1.500 Btg Dolken kayu Ø8-10/400 cm @ Rp 20,000.00
(dolken 2x pakai)
(spacer 2x pemakaian)
0.660 Oh Pekerja @ Rp 55,000.00
0.330 Oh Tukang kayu @ Rp 75,000.00
0.033 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.033 Oh Mandor @ Rp 100,000.00
F PEKERJAAN KAYU
F6.13 Memasang 1 M3 konstruksi Kuda-Kuda Konvensional
1.100 M3 Balok Kayu @ Rp 3,100,000.00
15.000 Kg Besi Strip tebal 5 mm @ Rp 16,500.00
5.600 Kg Paku @ Rp 17,500.00
4.000 Oh Pekerja @ Rp 55,000.00
12.000 Oh Tukang Kayu @ Rp 75,000.00
1.200 Oh Kepala Tukang kayu @ Rp 80,000.00
0.200 Oh Mandor @ Rp 100,000.00

F6.15 Memasang 1 M3 konstruksi Gording


1.100 M3 Balok Kayu @ Rp 3,100,000.00
15.000 Kg Besi Strip tebal 5 mm @ Rp 16,500.00
3.000 Kg Paku @ Rp 17,500.00
2.400 Oh Pekerja @ Rp 55,000.00
7.200 Oh Tukang Kayu @ Rp 75,000.00
0.720 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.120 Oh Mandor @ Rp 100,000.00

F6.18 Memasang 1 M2 MENUTUP ATAP DENGAN ATAP SENG


0.700 Lbr Seng Gelombang @ Rp 50,000.00
0.020 Kg Paku Seng @ Rp 65,000.00
0.120 Oh Pekerja @ Rp 55,000.00
0.060 Oh Tukang Kayu @ Rp 75,000.00
0.006 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.006 Oh Mandor @ Rp 100,000.00

SPL.1 Memasang 1 M2 MENUTUP ATAP DENGAN ATAP NOK


0.300 Lbr Seng Plat @ Rp 35,000.00
0.040 Kg Paku Seng @ Rp 65,000.00
0.150 Oh Pekerja @ Rp 55,000.00
0.060 Oh Tukang Kayu @ Rp 75,000.00
0.008 Oh Kepala Tukang Kayu @ Rp 80,000.00
0.006 Oh Mandor @ Rp 100,000.00

F6.32 Memasang 1 m' Lisplank Ukuran 2 x 0.8/30 cm, woodplank


1.100 M' Woodplank T. 8 @ Rp 30,000.00
0.050 Kg Paku sekrup 2" - 3" @ Rp 150,000.00
0.100 Oh Pekerja @ Rp 60,000.00
0.120 Oh Tukang kayu @ Rp 80,000.00
0.012 Oh Kepala Tukang Kayu @ Rp 100,000.00
0.050 Oh Mandor @ Rp 100,000.00
1.000 Ls Alat Bantu @ Rp 5,000.00

G PEKERJAAN PIPA DAN SANITER

G6.26 Memasang 1 M' pipa PVC tipe AW diameter 3/4"


1.200 M' Pipa PVC AW 3/4'' @ Rp 9,500.00
35 % Perlengkapan
0.036 Oh Pekerja @ Rp 55,000.00
0.060 Oh Tukang pipa @ Rp 75,000.00
0.006 Oh Kepala Tukang pipa @ Rp 80,000.00
0.002 Oh Mandor @ Rp 100,000.00

G6.32 Memasang 1 M' pipa PVC tipe AW diameter 4"


1.200 M' Pipa PVC AW 4'' @ Rp 48,000.00
35 % Perlengkapan
0.081 Oh Pekerja @ Rp 55,000.00
0.135 Oh Tukang pipa @ Rp 75,000.00
0.014 Oh Kepala Tukang pipa @ Rp 80,000.00
0.004 Oh Mandor @ Rp 100,000.00
G6.35 Memasang 1 Bh kran diameter 3/4" atau 1/2"
1.000 Bh Kran air biasa 1/2" - 3/4" @ Rp 20,000.00
0.025 Bh Seal tape @ Rp 5,000.00
0.010 Oh Pekerja @ Rp 55,000.00
0.100 Oh Tukang pipa @ Rp 75,000.00
0.010 Oh Kepala Tukang pipa @ Rp 80,000.00
0.005 Oh Mandor @ Rp 100,000.00

SPL.2 Memasang 1 M2 dinding batu Alam Undersheet


1.100 M2 Batu Alam Undersheet 25/25 @ Rp 210,000.00
1.100 M2 Batu Alam Undersheet 30/30 @ Rp 211,000.00
1.100 M2 Batu Alam Undersheet 10/20 @ Rp 212,000.00
1.100 M2 Batu Alam Acak @ Rp 170,000.00
1.100 M2 Batu Alam Sikat @ Rp 100,000.00
11.750 Kg Semen Portland @ Rp 1,130.00
0.035 M3 Pasir pasang @ Rp 130,000.00
0.620 Oh Pekerja @ Rp 55,000.00
0.350 Oh Tukang batu @ Rp 75,000.00
0.035 Oh Kepala Tukang Batu @ Rp 80,000.00
0.030 Oh Mandor @ Rp 100,000.00
Batu Alam Undersheet 25/25
Batu Alam Undersheet 30/30
Batu Alam Undersheet 10/20
Batu Alam Acak
Batu Alam Sikat
H PEKERJAAN PENGECATAN

H6.8 Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat
0.200 Kg Cat meni @ Rp 21,000.00
0.150 Kg Dempul @ Rp 25,000.00
0.170 Kg Cat dasar @ Rp 55,000.00
0.260 Kg Cat kayu @ Rp 50,000.00
0.070 Oh Pekerja @ Rp 55,000.00
0.009 Oh Tukang cat @ Rp 75,000.00
0.006 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0025 Oh Mandor @ Rp 100,000.00

SPL.3 Melabur 1 M2 bidang Batu Alam dengan Coating


0.360 Ltr Coating @ Rp 50,000.00
0.040 Oh Pekerja @ Rp 55,000.00
0.063 Oh Tukang cat @ Rp 75,000.00
0.063 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0025 Oh Mandor @ Rp 100,000.00

SPL.4 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat p
0.100 Kg Plamur tembok @ Rp 21,000.00
0.100 Kg Cat dasar @ Rp 12,000.00
0.260 Kg Cat tembok Kw. 1 (Interior) @ Rp 50,000.00
0.060 Oh Pekerja @ Rp 55,000.00
0.189 Oh Tukang cat @ Rp 75,000.00
0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0075 Oh Mandor @ Rp 100,000.00
SPL.4 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat p
0.100 Kg Plamur tembok @ Rp 21,000.00
0.100 Kg Cat dasar @ Rp 12,000.00
0.260 Kg Cat tembok Kw. 1 (Exterior) @ Rp 12,000.00
0.060 Oh Pekerja @ Rp 55,000.00
0.189 Oh Tukang cat @ Rp 75,000.00
0.0189 Oh Kepala Tukang Cat @ Rp 80,000.00
0.0075 Oh Mandor @ Rp 100,000.00
H6.22 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 la
cat mutakhir dengan tebal 200 µm
0.300 Kg Cat meni @ Rp 21,000.00
0.006 Oh Pekerja @ Rp 55,000.00
0.060 Oh Tukang cat @ Rp 75,000.00
0.012 Oh Kepala Tukang Cat @ Rp 80,000.00
0.006 Oh Mandor @ Rp 100,000.00

I PEKERJAAN SALURAN
SPL.5 Mengerjakan 1 M2 Pasangan Paving Block
50.000 Bh Paving Block K300, Uk. 10 x 20 Tb@ Rp 1,400.00
0.250 Oh Tukang Batu @ Rp 75,000.00
0.025 Oh Kepala Tukang Batu @ Rp 80,000.00
0.125 Oh Pekerja @ Rp 55,000.00
0.003 Oh Mandor @ Rp 100,000.00

SPL.6 1 M' MEMASANG PAGAR BRC T. 1,2 M


1.0000 m' Pagar Brc @ Rp 200,000.00
0.100 Oh Pekerja @ Rp 55,000.00
0.020 Oh Mandor @ Rp 100,000.00
0.050 Oh Tukang Batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00

SPL.7 1 BH TIANG PAGAR PAGAR BRC 1,5" (termasuk baut, u-clip, angkur dan cup
1.2000 m' Pipa BRC 1,5" @ Rp 108,000.00
0.100 Bh Pekerja @ Rp 55,000.00
0.020 Bh Mandor @ Rp 80,000.00
0.050 Oh Tukang Batu @ Rp 75,000.00
0.010 Oh Kepala Tukang Batu @ Rp 80,000.00

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTA

AMIRUDDIN ACHMAD, ST
Direktur
KERJAAN

JUMLAH
HARGA

Rp 41,250.00
Rp 2,500.00
Rp 43,750.00

Rp 55,000.00
Rp 3,200.00
Rp 58,200.00

Rp 1,375.00
Rp 800.00
Rp 2,175.00

Rp 96,000.00
Rp 16,500.00
Rp 1,000.00
Rp 113,500.00

Rp 100,800.00
Rp 16,500.00
Rp 1,000.00
Rp 118,300.00

Rp 162,000.00
Rp 184,190.00
Rp 67,600.00
Rp 112,500.00
Rp 33,000.00
Rp 4,800.00
Rp 7,500.00
Rp 571,590.00

Rp 162,000.00
Rp 34,560.00
Rp 42,900.00
Rp 29,250.00
Rp 3,120.00
Rp 3,900.00
Rp 275,730.00

tebal 1/2 bt. camp. 1PC : 3PP


Rp 42,000.00
Rp 16,238.10
Rp 5,200.00
Rp 16,500.00
Rp 7,500.00
Rp 800.00
Rp 1,500.00
Rp 89,738.10
ebal 1/2 bt. camp. 1PC : 4PP
Rp 42,000.00
Rp 12,995.00
Rp 5,590.00
Rp 16,500.00
Rp 7,500.00
Rp 800.00
Rp 1,500.00
Rp 86,885.00
Rp 11,553.12
Rp 2,600.00
Rp 16,500.00
Rp 11,250.00
Rp 1,200.00
Rp 1,500.00
Rp 44,603.12

Rp 8,786.88
Rp 2,990.00
Rp 16,500.00
Rp 11,250.00
Rp 1,200.00
Rp 1,500.00
Rp 42,226.88

Rp 7,051.20
Rp 3,120.00
Rp 16,500.00
Rp 11,250.00
Rp 1,200.00
Rp 1,500.00
Rp 40,621.20

Rp 3,672.50
Rp 8,250.00
Rp 7,500.00
Rp 800.00
Rp 800.00
Rp 21,022.50

100), slump (3-6) cm, w/c=0,87


Rp 259,900.00
Rp 76,463.13
Rp 154,050.00
Rp 30,000.00
Rp 66,000.00
Rp 15,000.00
Rp 1,600.00
Rp 6,000.00
Rp 609,013.13
p (12 ± 2) cm, w/c=0,66
Rp 368,380.00
Rp 65,075.00
Rp 154,350.00
Rp 32,250.00
Rp 90,750.00
Rp 20,625.00
Rp 2,240.00
Rp 8,300.00
Rp 741,970.00

Rp 147,000.00
Rp 3,540.00
Rp 3,850.00
Rp 5,600.00
Rp 560.00
Rp 400.00
Rp 160,950.00
Rp 16,095.00
Rp 4,280.00
Rp 175.00
Rp 42,000.00
Rp 10,620.00
Rp 4,520.00
Rp 822.00
Rp 2,160.00
Rp 9,900.00
Rp 1,600.00
Rp 1,600.00
Rp 1,600.00
Rp 480.00
Rp 900.00
Rp 80,657.00

Rp 6,420.00
Rp 350.00
Rp 50,400.00
Rp 1,180.00
Rp 6,215.00
Rp 1,233.00
Rp 3,600.00
Rp 16,335.00
Rp 2,640.00
Rp 2,640.00
Rp 2,640.00
Rp 800.00
Rp 1,500.00
Rp 95,953.00

Rp 85,600.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 144,280.00

Rp 42,800.00

Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 101,480.00

Rp 96,300.00
Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 154,980.00
Rp 48,150.00

Rp 5,250.00
Rp 650.00
Rp 28,600.00
Rp 19,500.00
Rp 2,080.00
Rp 2,600.00
Rp 106,830.00

Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 46,500.00
Rp 42,000.00
Rp 40,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 289,390.00

Rp 42,800.00

Rp 7,000.00
Rp 1,300.00
Rp 23,250.00

Rp 21,000.00

Rp 20,000.00

Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 182,340.00

Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 55,800.00
Rp 42,000.00
Rp 40,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 298,690.00

Rp 42,800.00
Rp 7,000.00
Rp 1,300.00
Rp 27,900.00

Rp 21,000.00

Rp 20,000.00

Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 186,990.00
Rp 85,600.00
Rp 7,000.00
Rp 1,300.00
Rp 46,500.00
Rp 42,000.00
Rp 120,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 369,390.00

Rp 42,800.00

Rp 7,000.00
Rp 1,300.00
Rp 23,250.00

Rp 21,000.00

Rp 60,000.00

Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 222,340.00

Rp 64,200.00
Rp 7,000.00
Rp 1,300.00
Rp 62,000.00
Rp 42,000.00
Rp 60,000.00
Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 303,490.00

Rp 32,100.00

Rp 7,000.00
Rp 1,300.00
Rp 31,000.00

Rp 21,000.00

Rp 30,000.00

Rp 36,300.00
Rp 24,750.00
Rp 2,640.00
Rp 3,300.00
Rp 189,390.00
Rp 3,410,000.00
Rp 465,000.00
Rp 924.00
Rp 220,000.00
Rp 900,000.00
Rp 96,000.00
Rp 20,000.00
Rp 5,111,924.00

Rp 3,410,000.00
Rp 465,000.00
Rp 495.00
Rp 132,000.00
Rp 540,000.00
Rp 57,600.00
Rp 12,000.00
Rp 4,617,095.00

Rp 35,000.00
Rp 1,300.00
Rp 6,600.00
Rp 4,500.00
Rp 480.00
Rp 600.00
Rp 48,480.00

Rp 10,500.00
Rp 2,600.00
Rp 8,250.00
Rp 4,500.00
Rp 640.00
Rp 600.00
Rp 27,090.00

Rp 33,000.00
Rp 7,500.00
Rp 6,000.00
Rp 9,600.00
Rp 1,200.00
Rp 5,000.00
Rp 5,000.00
Rp 67,300.00

Rp 11,400.00
Rp 3,325.00
Rp 1,980.00
Rp 4,500.00
Rp 480.00
Rp 180.00
Rp 21,865.00

Rp 57,600.00
Rp 16,800.00
Rp 4,455.00
Rp 10,125.00
Rp 1,080.00
Rp 410.00
Rp 90,470.00
Rp 20,000.00
Rp 125.00
Rp 550.00
Rp 7,500.00
Rp 800.00
Rp 500.00
Rp 29,475.00

Rp 231,000.00
Rp 232,100.00
Rp 233,200.00
Rp 187,000.00
Rp 110,000.00
Rp 13,277.50
Rp 4,550.00
Rp 34,100.00
Rp 26,250.00
Rp 2,800.00
Rp 3,000.00
Rp 314,977.50
Rp 316,077.50
Rp 317,177.50
Rp 270,977.50
Rp 193,977.50

is cat dasar, 2 lapis cat penutup


Rp 4,200.00
Rp 3,750.00
Rp 9,350.00
Rp 13,000.00
Rp 3,850.00
Rp 675.00
Rp 480.00
Rp 250.00
Rp 35,555.00

Rp 18,000.00
Rp 2,200.00
Rp 4,725.00
Rp 5,040.00
Rp 250.00
Rp 30,215.00

dasar, dan 2 lapis cat penutup), (Interior)


Rp 2,100.00
Rp 1,200.00
Rp 13,000.00
Rp 3,300.00
Rp 14,175.00
Rp 1,512.00
Rp 750.00
Rp 36,037.00
dasar, dan 2 lapis cat penutup), (Eksterior)
Rp 2,100.00
Rp 1,200.00
Rp 3,120.00
Rp 3,300.00
Rp 14,175.00
Rp 1,512.00
Rp 750.00
Rp 26,157.00
cara manual sistem 1 lapis

Rp 6,300.00
Rp 330.00
Rp 4,500.00
Rp 960.00
Rp 600.00
Rp 12,690.00

Rp 70,000.00
Rp 18,750.00
Rp 2,000.00
Rp 6,875.00
Rp 300.00
Rp 97,925.00

Rp. 200,000.00
Rp. 5,500.00
Rp. 2,000.00
Rp. 3,750.00
Rp. 800.00
Rp 212,050.00
clip, angkur dan cup
Rp. 129,600.00
Rp. 5,500.00
Rp. 2,000.00
Rp. 3,750.00
Rp. 800.00
Rp 141,650.00

leh,
n Perencana
TA HIRARCHY KONSULTAN

DDIN ACHMAD, ST
DAFTAR HARGA BAHAN DAN UPAH
Tahun Anggaran 2013
I. HARGA BAHAN

BAHAN BATU, PASIR, CIPPING DAN BATU MERAH SAT


Batu Kali M3 Rp.
Pasir pasang M3 Rp.
Pasir beton M3 Rp.
Pasir beton (Kg) Kg Rp.
Pasir urug M3 Rp.
split/chipping 2-3 cm M3 Rp.
split/chipping 2-3 cm(Kg) Kg Rp.
Tanah Timbunan M3 Rp.
Batu merah Bh Rp.
Paving Block K225, Uk. 10 x 20 Tbl 8 cm Bj Rp.
Air Ltr Rp.
BAHAN SEMEN
Semen PC 50kg (zak) Zak Rp.
Semen Portland Kg Rp.
BAHAN BESI
Besi beton polos Kg Rp.
Kawat beton Kg Rp.
Paku biasa 2" - 5" Kg Rp.
Besi Strep Kg Rp.
Paku Seng Kg Rp.
Woodplank T. 8 M' Rp.
Paku sekrup 2" - 3" Kg Rp.

BAHAN PLAPON DAN ATAP


Multipleks 1.22 x 2.44 x 9 mm Lbr Rp.
Seng Gelombang Lbr Rp.
Seng Plat Lbr Rp.
BAHAN KERAMIK
Batu Alam Undersheet 25/25 M2 Rp.
Batu Alam Undersheet 30/30 M2 Rp.
Batu Alam Undersheet 10/20 M2 Rp.
Batu Alam Acak M2 Rp.
Batu Koral Alam Sikat M2 Rp.
BAHAN KAYU
Kayu klas II (balok) M3 Rp.
Kayu klas II (papan) M3 Rp.
Kayu klas III (balok) M3 Rp.
Kayu klas III (papan) M3 Rp.
Dolken kayu Ø8-10/400 cm Btg Rp.
Bambu, Uk. Besar Btg Rp.
BAHAN CAT
Cat tembok Kw. 1 (Interior) Kg Rp.
Cat tembok Kw. 1 (Exterior) Kg Rp.
Cat tembok Metrolite Kg Rp.
Cat kayu Kg Rp.
Cat Besi Kg Rp.
Minyak bekisting Ltr Rp.
Cat meni Kg Rp.
Plamur tembok Kg Rp.
Lem kayu Kg Rp.
Kertas amplas Lbr Rp.
Dempul Kg Rp.
Minyak cat Kg Rp.
Cat dasar Kg Rp.
Cat dasar Kayu Kg Rp.
Coating Ltr Rp.
BAHAN PIPA
Pompa Air (setara Zhimizu tipe PS. 130 Bit)
Pipa PVC AW 1/2'' M' Rp.
Pipa PVC AW 1'' M' Rp.
Pipa PVC AW 1 1/2'' M' Rp.
Pipa PVC AW 3/4'' M' Rp.
Pipa PVC AW 2'' M' Rp.
Pipa PVC AW 3'' M' Rp.
Pipa PVC AW 4'' M' Rp.
Slang Air Serat 3/4" M' Rp.
Lem pipa Klg Rp.
Kran Air 3/4 Bh Rp.
Seal Tape Roll Rp.
TANAMAN
Agave Pbg Rp.
Adam Hawa Pbg Rp.
Amarilis Pbg Rp.
Asoka Daun Kecil Pbg Rp.
Beringin Dollar 1,50 - 2,00 m Phn Rp.
Beringin Dollar tinggi 2,00-2,50 m Phn Rp.
Cemara Udang Phn Rp.
Helicolinia Pbg Rp.
Irish Pbg Rp.
klomentia Pbg Rp.
Krokot Merah Pbg Rp.
Krokot Putih Pbg Rp.
Keladi Raja Pbg Rp.
Karambosa Kuning Pbg Rp.
Ketapang Kencana t.2,00 - 2,50 m Phn Rp.
Kamboja Plumeria t. 2,50 - 3,00 m Phn Rp.
Lily Paris Putih Pbg Rp.
Nolina Phn Rp.
Nampo Pbg Rp.
Nanas Merah Pbg Rp.
Osmoxylon Pbg Rp.
Osmoxylon Pbg Rp.
Pandang bali Cabang t. 150 - 200 Phn Rp.
Pandanus Pbg Rp.
Puring Pbg Rp.
Palm Lontara tinggi Batang 2 - 2,5 m Phn Rp.
Rumput Gajah Mini M2 Rp.
Serut /Kolasa 1,50 - 2,00 m Phn Rp.
Serut / Kolasa 2,50 - 3,00 m Phn Rp.
Siklot Pbg Rp.
Sikas 50 -70 Cm Phn Rp.
Sikas 1,00 -1,25 Cm Phn Rp.
Sansiefera Pbg Rp.
Sambang Dara Pbg Rp.
Song of india Pbg Rp.
Sansifera Tiger Pbg Rp.
Sansifera Tanduk Rusa Pbg Rp.
Song of india Pbg Rp.
Pohon Mangga 5 Rasa T. 1,500 - 2,00 m Phn Rp.
Pohon Rambutan Lengkeng Gowa T. 1,500 - 2,00 m Phn Rp.
II. HARGA UPAH KERJA
Tukang kayu Oh Rp.
Tukang las Oh Rp.
Tukang Pipa Oh Rp.
Tukang gali Oh Rp.
Tukang batu Oh Rp.
Tukang besi Oh Rp.
Tukang cat Oh Rp.
Tukang listrik Oh Rp.
Kepala Tukang Kayu Oh Rp.
Kepala Tukang Batu Oh Rp.
Kepala Tukang Cat Oh Rp.
Kepala Tukang Listrik Oh Rp.
Kepala Tukang Pipa Oh Rp.
Kepala Tukang Besi Oh Rp.
Mandor Oh Rp.
Pekerja Oh Rp.

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KON

AMIRUDDIN ACHMAD, ST
Direktur
AN UPAH
13

HARGA
135,000.00
130,000.00
137,000.00
85.63
80,000.00
240,000.00
150.00
84,000.00
600.00
1,400.00
150.00

56,500.00
1,130.00

14,000.00
23,600.00
17,500.00
16,500.00
65,000.00
30,000.00
150,000.00

120,000.00
50,000.00
35,000.00

210,000.00
211,000.00
212,000.00
170,000.00
100,000.00

3,100,000.00
3,780,000.00
2,085,000.00
2,140,000.00
20,000.00
20,000.00

45,000.00
50,000.00
20,000.00
50,000.00
51,000.00
6,500.00
21,000.00
21,000.00
25,000.00
4,000.00
25,000.00
30,000.00
12,000.00
55,000.00
50,000.00
650,000.00
7,800.00
12,000.00
11,000.00
9,500.00
13,000.00
37,000.00
48,000.00
10,000.00
75,000.00
20,000.00
5,000.00

100,000.00
2,500.00
10,000.00
10,000.00
5,000,000.00
10,000,000.00
7,500,000.00
15,000.00
7,500.00
65,000.00
2,500.00
2,500.00
150,000.00
45,000.00
450,000.00
1,500,000.00
15,000.00
350,000.00
25,000.00
75,000.00
25,000.00
25,000.00
750,000.00
15,000.00
30,000.00
8,500,000.00
45,000.00
7,000,000.00
15,000,000.00
150,000.00
5,000,000.00
10,000,000.00
30,000.00
75,000.00
50,000.00
75,000.00
75,000.00
100,000.00
450,000.00
450,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
80,000.00
75,000.00
90,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
100,000.00
55,000.00

Dibuat Oleh,
Konsultan Perencana
CV. CIPTA HIRARCHY KONSULTAN

AMIRUDDIN ACHMAD, ST
Direktur
25 #REF!