HARGA
TOTAL BIAYA
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi & Demobilisasi Alat Bor & Personil Rate 2.00 9,000,000 18,000,000
1.2 Pembersihan Lokasi Ls 1.00 2,000,000 2,000,000
1,443,833 / m
2376
600,000
1,425,600,000