I MATERIAL
II ANGKUTAN
TOTAL I + II
PPN 10 %
JUMLAH
DIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
I MATERIAL
JUMLAH I
II ANGKUTAN
JUMLAH II
TOTAL I + II
PPN 10 %
JUMLAH
DIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
I MATERIAL
1 Tiang Besi 9 meter 100 daN btg 71
2 LVTC 3 X 50+1X35 mm2 km 9,833
JUMLAH I
II ANGKUTAN
TOTAL I + II
PPN 10 %
JUMLAH
DIBULATKAN
Terbilang ;
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
I MATERIAL UTAMA
1 Tiang besi 9 mtr 100 daN Btg 71
3 LVTC 3 x 50- + 1 x 35 mm2 km 9,64
ACCESSORIES LVTC :
5 Suspension Assembly Set 129
6 Large Angle Assembly Set 38
7 Fixed Dead End Assembly Set 14
8 Adjustable Dead End Assembly Set 14
9 Bundle End Protection Set 14
10 Bimetalic Joint 50 mm2 Bh 16
11 Joint Sleves 50 mm2 Bh 40
12 Arde TR ( 5 ohm ) Set 20
13 Tap Conector Bh 32
III PEKERJAAN PERSIAPAN
1 Pengedropan Material m3 15,47
2 Pengedropan Tiang Besi Btg 71
3 Pembersihan Trase kms 9,64
IV PEKERJAAN FINISHING
1 Foto dokumentasi Lbr 16
2 Gambar revisi Lbr 8
3 Penomoran tiang Btg 181
4 Pengecatan tiang Btg 71
5 Komisioning kms 9,64
SUB. JUMLAH Rp
PPN 10 % Rp
JUMLAH Rp
DIBULATKAN Rp
PT. PLN (PERSERO)
SATUAN KERJA LISTRIK PERDESAAN
PROVINSI NUSA TENGGARA TIMUR
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDU
KABUPATEN TIMOR TENGAH UTARA
DESA TUNTUN, DESA JAK DAN DESA TUNOE KEC. MIOMAFO TIMUR
030.DL/611/LISDES.NTT/2015
JUMLAH HARGA
NO URAIAN SATUAN VOLUME
RP
Terbilang :
PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK)
SATKER LISTRIK PERDESAAN NTT
JUMLAH
HARGA BAGIAN
NO. URAIAN STN VOLUME HARGA SATUAN HARGA
( Rp.) ( Rp.) (Rp.)
Jumlah
Pembulatan
2 Type A2 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm Btg 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
3 Type A3 Balance UNP 100x50x5x2000
1 UNP 100x50x5x2000 mm btng 2
2 Pole band 2/2, 4" (6x50) bh 2
3 Steel Plate typre I (6x100x37,5) bh 4
4 Steel Plate typre II (6x100x12) bh 4
5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1
6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3
7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14
Jumlah
Pembulatan
4 Type B3 Balance UNP 100x50x5x2200
1 UNP 10x50x5x2200 mm btng 2
2 Pole band 2/2, 4" (6x50) set 2
3 Steel Plate typre I (6x100x37,5) bh 6
4 Bollt & nut 5/8 x 140 + ring (galvanis) bh 12
5 Bollt & nut 5/8 x200 + 4 mur (galv) bh 4
Jumlah
Pembulatan
5 Treck scoor - Guy Wire TM
1 Stall drad 64 mm2 mtr 15
2 Pole band 2/2, 4" (6x50) set 1
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 2
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 1
5 Guy isolator/tui isolator bh 1
6 Wire clip/cros by 35 mm2 bh 4
7 Stay road 16 mm2 panjang = 2500 mm (anker) btng 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 2
9 Beton Block 40x40x10 bh 1
10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
6 Kontramast - Horizontal Guy Wire
1 Stall drad 64 mm2 mtr 26
2 Pole band 2/2, 4" (6x50) set 2
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4
4 Spanschroef 3/4" / Turn Bucle 50 KN bh 2
5 Guy isolator/tui isolator bh 2
6 Wire clip/cros by 12 mm2 bh 6
7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1
Jumlah
Pembulatan
7 Druck Schoor TM
1 Pole band galvanise 1/2 4" bh 1
2 Pole band galvanise 2/2 4" (atas) bh 2
3 Pole band galvanise 2/2 8' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panajang 2000 mm btng 1
5 Besi UNP 100x50x5x200 mm u/stop druck btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah
Pembulatan
Jumlah
Pembulatan
8 Pengecatan T. besi 9 mtr (1 batang) - Material m2/btg 2,814
Upah m2/btg 2,814
Jumlah
Pembulatan
Jumlah
Pembulatan
9 ARDE GARDU
1 Grounding Rod 16 mm2 L = 1750 mm bh 1,00
2 BC 50 mm2 Mtr 11,00
3 Pipa Galvanis 1/2" L = 2000 mm bh 1,00
4 Klem Steinless Steel 4 titik mtr 4,00
5 Connector Cu 35 - 50 mm mm2 bh 2,00
6 Sepatu Kabel CU 50 mm2 bh 1,00
7 Stoping Bukle bh 4,00
8 Link bh 4,00
Jumlah
Pembulatan
Jumlah -
Pembulatan -
Jumlah
Pembulatan
12 BETON BLOCK UNTUK SCHOOR TARIK
1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) M3 0,0160
2 Besi Beton 16 mm2 Galvanis L=2500 mm btg 1,0000
3 U. Bolt 3/4" Buah 1,00
Jumlah -
Pembulatan -
13 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu
1 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu set 1,00
2 UNP 100 x 50x100 mm L 1000 mm galv btg 2,00
3 Pole band 1/2, 7" bh 2,00
4 Bolt nut + plat & spring plat 5/8" 50 mm bh 4,00
Jumlah -
Pembulatan
14 Pipa Inlet / Oulet Gardu
1 Pipa 2" Galvanise btg 3,00
2 L - bow pipa PVC 2" u/ bagian atas bh 3,00
3 UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv btng 2,00
4 Pole band 1/2 4" bh 2,00
5 Pole band 1/2 2" bh 6,00
6 Bolt nut + plat & spring plat 5/8" 50 mm bh 16,00
Jumlah
Pembulatan
18 1 M3 URUGAN KEMBALI :
1 Pekerja OH 0,400
2 Tukang Batu OH -
3 Kepala Tukang OH -
4 Mandor OH 0,200
Jumlah
Pembulatan
19 1 M3 PEMADATAN TANAH :
1 Pekerja OH 0,250
2 Tukang Batu OH
3 Kepala Tukang OH
4 Mandor OH 0,125
Jumlah
Pembulatan
Jumlah
Pembulatan
2 Large Angle Assembly
1 Strain Clamp 25 - 70 bh 2
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 3
Jumlah
Pembulatan
3 Fixed Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
Jumlah
Pembulatan
4 Adjustable Dead And Assembly
1 Strain Clamp 25 - 70 bh 1
2 Pole Bracket bh 1
3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
4 Stopping bukle bh 2
5 Plastic strip bh 2
6 Turn Buckle/Span Scroef bh 1
Jumlah
Pembulatan
5 Bundle Protection
1 Pipa PVC 2" 50 cm bh 1
2 Stainless Steel Strip 20 x 0,7 mm mtr 1,75
3 Stopping bukle Bh 2
4 Link Set 2
5 End cap Set 4
Jumlah
Pembulatan
(Persero) UNIT PELAKSANA KONTRUKSI (UPK)
SATKER LISTRIK PERDESAAN NTT
Jumlah -
Pembulatan -
7 Kontramast - Horizontal Guy Wire
1 Stall drad 35 mm2 mtr 26
2 Pole band 2/2, 4" (6x50) bh 2
3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4
4 Spanschroef 3/4" / Turn Bucle 17 KN bh 2
5 Guy isolator/tui isolator bh 2
6 Wire clip/cros by 12 mm2 bh 8
7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1
8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4
9 Beton Block 40 cmx40 cmx10 cm bh 1
10 U bolt 16 mm + nut plat u. Beton block bh 1
Jumlah -
Pembulatan -
8 Druck Schoor TR
1 Pole band galvanise 1/2 3" bh 1
2 Pole band galvanise 2/2 3" (atas) bh 2
3 Pole band galvanise 2/2 5' (bawah) u/sekang bh 2
4 Pipa galvanise Diameter 2"- panjang 1200 mm btng 1
5 Besi UNP 8 L=160 mm btng 1
6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9
Jumlah -
Pembulatan -
9 GROUNDING TR
1 Grounding Rod 16 mm2 L = 1750 mm bh 1
2 BC 50 mm2 Mtr 10
3 Pipa Galvanis 1/2" L= 6000 mm Btg 1
4 Klem Steinless Steel 4 titik 3 titik mtr 4
5 AL/CU 35 - 50 mm2 bh 1
6 Electroda clam cu bh 1
7 Stoping bukle bh 4
8 Link 25 x 25 bh 4
Jumlah -
Pembulatan -
31
t9
F=
9ts
i:9i
i
ea
I'a .'. -
B
;E
tq
9;
iE
t6
+t
i
qE
9B
i
:
,5"
B ;
Y
\
\."
\3
F
F .i
, l il
: I -JI
! I j
!;
6. ti i
: I
A
t
{
? x
I
E
?
z
c
I I I
e
: t
3
q
..' EE
\ t9
9;
!ii€
!!
EC
5i