DAFTAR STANDARD ANALISA

SATUAN HARGA BAHAN DAN UPAH KERJA


PT ( Persero ) PELABUHAN INDONESIA I
WILAYAH SUMUT I
( KP, UTPK, BLW, RSP, UGK, KTJ, PKL SUSU, TBA ± 5 % )

M E D A N
2 0 11
2

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR SATUAN UPAH KERJA HARIAN


TAHUN 2011

HARGA SATUAN HARGA SATUAN


No JENIS TENAGA KERJA KODE SATUAN
( Rp./Hari ) ( Rp./Jam )
1 2 3 4 5 6

1. PEKERJA L01 Orang/Hari/jam 50,000.00 6,250.00

2. TUKANG L02 Orang/Hari/jam 72,000.00 9,000.00

3. MANDOR L03 Orang/Hari/jam 72,000.00 9,000.00

4. OPERATOR L04 Orang/Hari/jam 72,000.00 9,000.00

5. PEMBANTU OPERATOR L05 Orang/Hari/jam 50,000.00 6,250.00

6. SUPIR/DRIVER L06 Orang/Hari/jam 72,000.00 9,000.00

7. PEMBANTU SUPIR/DRIVER L07 Orang/Hari/jam 50,000.00 6,250.00

8. MEKANIK L08 Orang/Hari/jam 72,000.00 9,000.00

9. PEMBANTU MEKANIK L09 Orang/Hari/jam 50,000.00 6,250.00

10. KEPALA TUKANG L10 Orang/Hari/jam 80,000.00 10,000.00

Medan, September 2011

MENEJER TEKNIK

SADARUDDIN, ST. MM
DAFTAR ISI
ANALYSA PEKERJAAN SIPIL
TAHUN 2009

NO. URAIAN HALAMAN


1 Daftar Peralatan 1
2 Daftar Upah 2
3 Daftar Bahan 3
4 Daftar Rekap 9
5 Daftar Pekerjaan Tanah 16
6 Daftar Pekerjaan Jalan & Aspal 18
7 Daftar Pekerjaan Pancang & T. Berskrup 21
8 Daftar Pekerjaan Rangka Atap & Plafond 23
9 Daftar Pekerjaan Kuda - Kuda & List Plank 25
10 Daftar Pekerjaan Jembatan 26
11 Daftar Pekerjaan Kosen 27
12 Daftar Pekerjaan Pintu dan Jendela 29
13 Daftar Pekerjaan Langit - Langit, Lantai, dan Dinding Papan 31
14 Daftar Pekerjaan Cetakan 34
15 Daftar Pekerjaan Batu Kosong, Turap 35
16 Daftar Pekerjaan Plesteran 36
17 Daftar Pekerjaan Pasangan Bata 38
18 Daftar Pekerjaan Beton 41
19 Daftar Pekerjaan Beton Bertulang 43
20 Daftar Pekerjaan Lantai 45
21 Daftar Pekerjaan Rabung dan Talang 47
22 Daftar Pekerjaan Pembesian 49
23 Daftar Pekerjaan Mengecat 50
24 Daftar Pekerjaan Bongkar Pasang 53
25 Daftar Pekerjaan Suplemen 55
26 Daftar Pekerjaan Instalasi Listrik 59
27 Daftar Pekerjaan Pipa Galvanis 65
28 Daftar Pekerjaan Pipa PVC 66
29 Daftar Pekerjaan Alat Sambung 67
30 Daftar Pekerjaan Instalasi Air 70

Medan, Mei 2004

PEMELIHARAAN BANGUNAN
ASISTEN MENEJER
SADARUDDIN, ST. MM
5

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SEWA PERALATAN


TAHUN 2009

BIAYA SEWA
No. U R A I A N SATUAN
( Rp.)
1 2 3 4

1. MESIN GILING HARI 400,000.00

2. PONTON PANCANG HARI 1,750,000.00

3. PERALATAN PANCANG HARI 475,000.00

4. C RAN E HARI 1,600,000.00

5. JACK SNIPER HARI 225,000.00

6. M E S I N LAS HARI 350,000.00

7. BOR BETON HARI 150,000.00

8. BOR BETON MATA INTAN HARI 275,000.00

9. VIBRO COMPACTOR HARI 1,100,000.00

10. EXAVATOR HARI 1,500,000.00

11. BULDOZER HARI 1,400,000.00

12. S TAM P E R HARI 150,000.00

13. THEODOLITH HARI 75,000.00

14. WATERPASS HARI 45,000.00

15. COMPRESSOR HARI 550,000.00

16. PERANCAH KERJA HARI 275,000.00

17. GRADER HARI 1,400,000.00

Medan, Januari
2009
ASM PEMELIHARAAN

SADARUDDIN, ST. MM
6

T ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SATUAN BAHAN


TAHUN 2011

H. SATUAN
No. URAIAN/JENIS BAHAN BANGUNAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5 6

A. BAHAN BANGUNAN GEDUNG


1 Agregat Kasar m3 -
2 Agregat Halus m3 -
3 Agregat Kelas C1 m3 -
4 Agregat Kelas C2 m3 -
5 Aspal 60/70 kg -
6 Aspal Emulsi kg -
7 Asphalt Concrete (AC) ton -
8 Atap Asbes Gelombang kaki 25,000.00
9 Atap Aluminium Gelombang kaki 10,000.00
10 Atap Super Dek kaki 18,000.00
11 Atap Plastik Gelbang Fiber lembar 54,000.00
12 Atap Nipah lembar 4,000.00
13 Atap Rumbia lembar 4,000.00
14 Atap Gemteng Metal lembar 77,000.00
15 Amplas lbr 3,000.00
16 Asbes keping 13,000.00
17 Batu Gunung m3 133,000.00
18 Batu Kali m3 133,000.00
19 Batu Koral m3 145,000.00
20 Batu Pecah 10-15cm m3 197,000.00
21 Batu Pecah 5-7cm m3 197,000.00
22 Batu Pecah 3-5cm m3 197,000.00
23 Batu Pecah 2-3cm m3 197,000.00
24 Batu Belah m3 145,000.00
25 Besi Beton Polos kg 13,000.00
26 Besi Beton Ulir kg 13,000.00
27 Besi Profil kg 21,000.00
28 Besi Baja IWF kg 21,000.00
29 Besi Plat Strip kg 21,000.00
30 Bak Air Fiberglass bh 375,000.00
31 Bak Cuci piring 2 lobang komplet unit 692,000.00
32 Bensin liter 4,500.00
33 Batu Alam (paras) m2 180,000.00
34 Batu Tempel m2 135,000.00
35 Batu Bata cetak mesin bh 800.00
36 Batu Kerawang bh 4,000.00
37 Cat Kilat setara Bee brand kg 43,000.00
38 Cat Perak setara Bee Brand kg 43,000.00
39 Cat Tembok setara Paragon kg 13,000.00
40 Cat Tembok setara Vinilex kg 19,000.00
41 Cat Vernis kg 34,000.00
42 Cat Manie Besi kg 20,000.00
43 Cat Manie Kayu kg 20,000.00
44 Cat Dasar kg 34,000.00
7

H. SATUAN
No. URAIAN/JENIS BAHAN BANGUNAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5 6

45 Casing m2 27,000.00
46 Conblok 6 cm bh 1,800.00
47 Door Closer bh 180,000.00
48 Door Holder bh 90,000.00
49 Dempul kg 15,000.00
50 Engsel Pintu Nyilon 4" pasang 10,000.00
51 Engsel Jendela Nyilon 4" pasang 10,000.00
52 Filler kg 19,000.00
53 Filter Plastik m2 13,000.00
54 Floor Drain bh 15,000.00
55 Floor Hardener kg 3,500.00
56 Geotextienle Non Woven m2 45,000.00
57 Gebalan rumput m2 18,000.00
58 Genteng Keramik keping 9,000.00
59 Genteng PC warna keping 6,000.00
60 Genteng Rabung keping 7,000.00
61 Gedek/Topas bambu lembar 27,000.00
62 Gedek/ Topas kelapa sawit lembar 27,000.00
63 Gypsum m2 20,000.00
64 Grendel Besar 4" bh 4,000.00
65 Hak Angin Biasa pasang 10,000.00
66 Handle (pegangan) bh 4,000.00
67 Hot Roll Sheet (HSR) ton 800,000.00
68 Ijuk m2 27,000.00
69 Jerjak Besi m2 270,000.00
70 Kayu Bulat O4"K btg 18,000.00
71 Kayu Profil btg 18,000.00
72 Kayu papan /Broti (Setara Kayyu kuat Klas 1) m3 7,902,000.00
73 Kayu papan /Broti (Setara Kayyu kuat Klas 2) m3 5,822,000.00
74 Kayu papan /Broti (Setara Kayyu kuat Klas 3) m3 3,115,000.00
75 Kayu papan /Broti (Setara Kayyu kuat Klas 4) m3 3,115,000.00
76 Kayu setara Damuli 8-10 btg 18,000.00
77 Kerikil Beton m3 166,000.00
78 Keramik polos 20x20 cm bh 1,960.00
79 Keramik polos 20x25 cm bh 2,250.00
80 Keramik polos 30x30 cm bh 4,909.09
81 Keramik polos 40x40 cm bh 8,833.33
82 Keramik 60x60cm bh 45,000.00
83 Keramik Warna polos 20X20 cm bh 1,960.00
84 Keramik Siku (bon-bon) m' 9,300.00
85 Karpet m2 36,000.00
86 Kanstin 15X30X45 cm bh 22,000.00
87 Kanstin 15X30X60 cm bh 27,000.00
88 kawat licin /Bronjong kg 13,000.00
89 Kawat Beton kg 19,000.00
90 kawat Las dos 8,000.00
91 Kloset duduk (dengan bak air) bh 1,350,000.00
92 Kloset jongkok bh 143,000.00
93 Kran air lokal bh 13,000.00
94 Kran air bebek Lokal bh 31,000.00
95 Kran air setara San Ei bh 100,000.00
96 Kran Air bebek setara San Ei bh 126,000.00
8

H. SATUAN
No. URAIAN/JENIS BAHAN BANGUNAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5 6

97 kunci Tanam 4" bh 52,000.00


98 Kunci Lock KCL Biasa 6" (antik) bh 135,000.00
99 Kunci Lock Besar Uk.4" bh 52,000.00
100 Kunci silinder bh 27,000.00
101 Kuas bh 13,000.00
102 Kaca 3 mm kaki 13,000.00
103 Kaca 5 mm kaki 14,000.00
104 Kaca 8 mm (tempred) kaki 90,000.00
105 Kaca 12 mm (tempred) kaki 135,000.00
106 Kaca jendela nako+ rangka m2 108,000.00
107 Kaca Blok bh 23,000.00
108 Kipas angin Stainlesstell lengkap bh 900,000.00
109 Lantai kayu (Gym floor) m2 180,000.00
110 Lem Kayu kg 13,000.00
111 Lem kg 45,000.00
112 Lisplank motif bunga 14x40 bh 8,600.00
113 minyak Silinder liter 27,000.00
114 Minyak gemuk liter 35,000.00
115 Minyak Solar liter 4,500.00
116 Minyak tanah/lampu liter 7,500.00
117 Kerosine liter 7,500.00
118 Minyak bekisting kg 22,000.00
119 Minyak Gerdang liter 24,000.00
120 Minyak Cat liter 15,000.00
121 Material pilihan m3 197,000.00
122 Oxygen las kg 9,000.00
123 Paving blok bh 1,800.00
124 Pintu Gulung besi m2 450,000.00
125 Pintu Besi m2 720,000.00
126 Pintu lipar Harmonika m2 1,186,000.00
127 Pintu KM/WC PVC set 336,000.00
128 Pipa Porous m' 15,000.00
129 Plat baja kg 21,000.00
130 Paku kg 16,000.00
131 Paku skrup kg 23,000.00
132 Plamur kg 18,000.00
133 Porselin Polos 30x30cm bh 8,000.00
134 Parquet Kayu Solid m2 270,000.00
135 Pipa medium 6 m (GI) 1/2" m' 2,900.00
136 Pipa medium 6 m (GI) 3/4" m' 3,700.00
137 Pipa medium 6 m (GI) 1" m' 5,700.00
138 Pipa medium 6 m (GI) 1 1/2" m' 6,700.00
139 Pipa medium 6 m (GI) 2" m' 7,500.00
140 Pipa medium 6 m (GI) 2,5" m' 9,000.00
141 Pipa medium 6 m (GI) 3" m' 11,600.00
142 Pipa medium 6 m (GI) 4" m' 16,400.00
143 Pipa medium 6 m (GI) 6" m' 23,900.00
144 Pipa Galvanis 6 m 1/2" m' 10,950.00
145 Pipa Galvanis 6 m 3/4" m' 14,400.00
146 Pipa Galvanis 6 m 1" m' 18,000.00
147 Pipa Galvanis 6 m 1 1/2" m' 27,000.00
9

H. SATUAN
No. URAIAN/JENIS BAHAN BANGUNAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5 6

148 Pipa Galvanis 6 m 2" m' 36,900.00


149 Pipa Galvanis 6 m 2 1/2" m' 0.00
150 Pipa Galvanis 6 m 3" m' 0.00
151 Pipa Galvanis 6 m 4" m' 0.00
152 Pipa Galvanis 6 m 5" m' 0.00
153 Pipa Galvanis 6 m 6" m' 0.00
154 Pasir pasang/ Beton m3 90,000.00
155 Pasir urug m3 73,000.00
156 Pagar Besi Strip m2 270,000.00
157 Profil Gipsum m' 9,000.00
158 Rabung Genteng Metal m' 37,000.00
159 Rabung Seng Lebar 30 cm lembar 20,000.00
160 Rabung Seng Lebar 30 cm per 7 kaki lembar 20,000.00
161 Rabung Genteng Keramik keping 14,000.00
162 Rangka Furing Plafond Gypsum m2 72,000.00
163 Rangka Atap Zincalum m2 194,000.00
164 Rangka Atap Baja Ringan Atap Seng m2 167,000.00
165 Rangka Atap Baja Ringan Atap Genteng Metal m2 194,000.00
166 Rangka Atap Baja Ringan Atap Keramik/ Beton m2 216,000.00
167 rabung Asbes Panjang 0.5 m' lembar 10,000.00
168 Riol dia. 150 mm bh 38,000.00
169 Semen Putih 40 kg zak 123,000.00
170 Semen Portland (Andalas) 40 Kg zak 44,000.00
171 Semen Portland (Andalas) kg 1,100.00
172 Sirtu (Pasir Batu) m3 99,000.00
173 Seng GL BJLS 20 lembar 38,000.00
174 Seng GL BJLS 32 lembar 66,000.00
175 Seng Plat BJLS 30 kaki 13,000.00
176 Septiktank Kapasitas 3 m3 bh 3,339,000.00
177 Tanah timbun m3 69,000.00
178 Tanah Timbun Pilihan m3 69,000.00
179 Talang Kantong Seng BJLS m' 130,000.00
180 Tripleks 4 mm lembar 60,000.00
181 Tripleks 6 mm lembar 90,000.00
182 Tripleks 9 mm lembar 110,000.00
183 Tempat Sabun Keramik 10x20 cm bh 33,000.00
184 tepas Kelapa sawit lembar 27,000.00
185 Tepas bambu lembar 27,000.00
186 Urinoir bh 740,000.00
187 Urugan porus m3 73,000.00
188 Wallpapper m2 94,000.00
189 Wastafel Biasa bh 459,000.00
190 Instalasi titik nyala titik 92,000.00
191 Instalasi stop kontak titik 92,000.00
192 Instalasi Air Bersih titik 92,000.00
193 Lampu SL 23 watt komplet bh 30,000.00
194 Lampu SL 18 watt komplet bh 21,000.00
195 Box Zekering 1 Group set 3,500.00
196 Box Zekering 2 Group set 5,500.00
197 Saklar Seri Tanam bh 6,500.00
198 Saklar bh 6,500.00

Medan, September 2011

MENEJER TEKNIK
10

H. SATUAN
No. URAIAN/JENIS BAHAN BANGUNAN KODE SATUAN KETERANGAN
(Rp.)
1 2 3 4 5 6

SADARUDDIN, ST. MM
DAFTAR ANALISA PEKERJAAN
PT. T-38-2000-C
PEKERJAAN PENGECATAN

PT. T-38-2000-C.1
1 m2 pelaburan bidang kayu dengan vernis
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Vernis kg 0.150 Rp. 34,000.00 Rp. Rp. 5,100.00 Rp.
Dempul kg 0.050 Rp. 15,000.00 Rp. Rp. 750.00 Rp.
Bahan
Ampelas lbr 0.100 Rp. 3,000.00 Rp. Rp. 300.00 Rp.
Kuas bh 0.010 Rp. 13,000.00 Rp. Rp. 130.00 Rp.
Pekerja Oh 0.160 Rp. Rp. 50,000.00 Rp. Rp. 8,000.00
Tukang cat Oh 0.160 Rp. Rp. 72,000.00 Rp. Rp. 11,520.00
Tenaga
Kepala Tukang Oh 0.016 Rp. Rp. 80,000.00 Rp. Rp. 1,280.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
6,280.00 20,980.00
Jumlah harga = Rp. 27,260.00
Pembulatan = Rp. 27,260.00

PT. T-38-2000-C.2
1 m2 pengecatan bidang kayu lama
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Plamur kg 0.150 Rp. 18,000.00 Rp. Rp. 2,700.00 Rp.
Bahan Cat dasar kg 0.170 Rp. 34,000.00 Rp. Rp. 5,780.00 Rp.
Cat kilat setara bee brand kg 0.170 Rp. 43,000.00 Rp. Rp. 7,310.00 Rp.
Pekerja Oh 0.070 Rp. Rp. 50,000.00 Rp. Rp. 3,500.00
Tukang cat Oh 0.075 Rp. Rp. 72,000.00 Rp. Rp. 5,400.00
Tenaga
Kepala Tukang Oh 0.008 Rp. Rp. 80,000.00 Rp. Rp. 600.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
15,790.00 9,680.00
Jumlah harga = Rp. 25,470.00
Pembulatan = Rp. 25,470.00

PT. T-38-2000-C.3
1 m2 pengecatan bidang kayu baru
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Cat meni kg 0.200 Rp. 20,000.00 Rp. Rp. 4,000.00 Rp.
Plamur Kg 0.150 Rp. 18,000.00 Rp. Rp. 2,700.00 Rp.
Bahan
Cat dasar Kg 0.170 Rp. 34,000.00 Rp. Rp. 5,780.00 Rp.
Cat kilat setara bee brand Kg 0.260 Rp. 43,000.00 Rp. Rp. 11,180.00 Rp.
Pekerja Oh 0.070 Rp. Rp. 50,000.00 Rp. Rp. 3,500.00
Tukang Batu Oh 0.009 Rp. Rp. 72,000.00 Rp. Rp. 648.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 480.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
23,660.00 4,808.00
Jumlah harga = Rp. 28,468.00
Pembulatan = Rp. 28,470.00

PT. T-38-2000-C.4
1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Plamur kg 0.100 Rp. 18,000.00 Rp. Rp. 1,800.00 Rp.
Bahan Cat dasar kg 0.110 Rp. 34,000.00 Rp. Rp. 3,740.00 Rp.
Cat tembok setara vinilex kg 0.260 Rp. 19,000.00 Rp. Rp. 4,940.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
10,480.00 6,220.00
Jumlah harga = Rp. 16,700.00
Pembulatan = Rp. 16,700.00
PT. T-38-2000-C.4.1
1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Cat dasar kg 0.100 Rp. 34,000.00 Rp. Rp. 3,400.00 Rp.
Bahan
Cat tembok setara vinilex kg 0.260 Rp. 19,000.00 Rp. Rp. 4,940.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
8,340.00 6,220.00
Jumlah harga = Rp. 14,560.00
Pembulatan = Rp. 14,560.00

PT. T-38-2000-C.4.2
1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Cat tembok setara vinilex kg 0.260 Rp. 19,000.00 Rp. Rp. 4,940.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
4,940.00 6,220.00
Jumlah harga = Rp. 11,160.00
Pembulatan = Rp. 11,160.00

PT. T-38-2000-C.5
1 m2 pengecatan tembok/plafond baru str paragon (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Plamur kg 0.100 Rp. 18,000.00 Rp. Rp. 1,800.00 Rp.
Bahan Cat dasar kg 0.100 Rp. 34,000.00 Rp. Rp. 3,400.00 Rp.
Cat tembok setara paragon kg 0.260 Rp. 13,000.00 Rp. Rp. 3,380.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
8,580.00 6,220.00
Jumlah harga = Rp. 14,800.00
Pembulatan = Rp. 14,800.00

PT. T-38-2000-C.5.1
1 m2 pengecatan tembok/plafond lama str paragon ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Cat dasar kg 0.100 Rp. 34,000.00 Rp. Rp. 3,400.00 Rp.
Bahan
Cat tembok setara paragon kg 0.260 Rp. 13,000.00 Rp. Rp. 3,380.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
6,780.00 6,220.00
Jumlah harga = Rp. 13,000.00
Pembulatan = Rp. 13,000.00

PT. T-38-2000-C.5.2
1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Cat tembok setara paragon kg 0.260 Rp. 13,000.00 Rp. Rp. 3,380.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00 Rp. Rp. 1,000.00
Tukang batu Oh 0.063 Rp. Rp. 72,000.00 Rp. Rp. 4,536.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 504.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 180.00
3,380.00 6,220.00
Jumlah harga = Rp. 9,600.00
Pembulatan = Rp. 9,600.00

PT. T-38-2000-C.6
1 m2 pengecatan permukaan baja dengan meni besi dan perancah
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Meni besi kg 0.100 Rp. 20,000.00 Rp. Rp. 2,000.00 Rp.
Bahan Kuas bh 0.010 Rp. 13,000.00 Rp. Rp. 130.00 Rp.
Perancah kayu m3 0.002 Rp. 5,822,000.00 Rp. Rp. 11,644.00 Rp.
Pekerja Oh 0.250 Rp. Rp. 50,000.00 Rp. Rp. 12,500.00
Tukang batu Oh 0.225 Rp. Rp. 72,000.00 Rp. Rp. 16,200.00
Tenaga
Kepala Tukang Oh 0.023 Rp. Rp. 80,000.00 Rp. Rp. 1,800.00
Mandor Oh 0.008 Rp. Rp. 72,000.00 Rp. Rp. 540.00
13,774.00 31,040.00
Jumlah harga = Rp. 44,814.00
Pembulatan = Rp. 44,810.00
sero ) Pelabuhan Indonesia I 14

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4
A. RSNI.T-15-2002
PEKERJAAN PERSIAPAN
1 RSNI.T-15-2002.1 1 m' Pagar sementara dari seng gelombang tinggi 2 m Rp. 522,970.00
2 RSNI.T-15-2002.2 1 m' Pek. Pengukuran & pemasangan Bowplank Rp. 72,870.00
3 RSNI.T-15-2002.3 1 m2 Pek. Kantor direksi keet dengan lantai plesteran Rp. 1,328,690.00
4 RSNI.T-15-2002.4 1 m2 Pembuatan gudang sementara dan alat-alat Rp. 1,130,750.00
5 RSNI.T-15-2002.5 1 m2 Pembuatan rumah jaga konstruksi kayu Rp. 1,386,540.00
6 RSNI.T-15-2002.6 1 m2 Membersihkan lapangan dan perataan Rp. 8,600.00
7 RSNI.T-15-2002.7 1 m2 Pembuatan bedeng buruh Rp. 1,149,290.00

B. SNI.DT 91-0006-2007
PEKERJAAN TANAH
1 SNI.DT 91-0006-2007.6.1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp. 39,300.00
2 SNI.DT 91-0006-2007.6.2 Menggali 1 m3 tanah biasa sedalam 2 meter Rp. 48,200.00
3 SNI.DT 91-0006-2007.6.3 Menggali 1 m3 tanah biasa sedalam 3 meter Rp. 57,300.00
4 SNI.DT 91-0006-2007.6.5 Menggali 1 m3 tanah cadas sedalam 1 meter Rp. 79,300.00
5 SNI.DT 91-0006-2007.6.6 Menggali 1 m3 tanah lumpur sedalam 1 meter Rp. 63,200.00
6 SNI.DT 91-0006-2007.6.7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter Rp. 2,860.00
7 SNI.DT 91-0006-2007.6.8 Membuang 1 m3 tanah sejauh 30 meter Rp. 17,220.00
8 SNI.DT 91-0006-2007.6.8 A Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 60 meter
9 SNI.DT 91-0006-2007.6.8 B Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll
3
Rp.
sejauh 90 meter
10 SNI.DT 91-0006-2007.6.8 C Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 120 meter
11 SNI.DT 91-0006-2007.6.8 D Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 150 meter
12 SNI.DT 91-0006-2007.6.8 E Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll
3
Rp.
sejauh 180 meter
13 SNI.DT 91-0006-2007.6.8 F Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 180 meter
14 SNI.DT 91-0006-2007.6.8 G Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll
3
Rp.
sejauh 240 meter
15 SNI.DT 91-0006-2007.6.8 H Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 270 meter
16 SNI.DT 91-0006-2007.6.8 I Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 300 meter
17 SNI.DT 91-0006-2007.6.9 Mengurug kembali 1 m3 galian Rp. 19,100.00
18 SNI.DT 91-0006-2007.6.10 Memadatkan 1 m3 tanah (per 20 cm) Rp. 28,600.00
19 SNI.DT 91-0006-2007.6.11 Mengurug 1 m3 pasir urug Rp. 103,300.00
20 SNI.DT 91-0006-2007.6.12 Mengurug 1 m3 tanah urug Rp. 98,500.00
22 SNI.DT 91-0006-2007.6.14 Memasang 1 m2 lapisan ijuk tebal 10 cm Rp. 170,580.00
23 SNI.DT 91-0006-2007.6.15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp. 133,100.00

C. SNI.DT 91-0007-2006
PEKERJAAN PONDASI
1 SNI.DT 91-0007-2006.6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP Rp. 642,650.00
2 SNI.DT 91-0007-2006.6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP Rp. 602,900.00
3 SNI.DT 91-0007-2006.6.9 Memasang 1 m3 batu kosong (anstamping) Rp. 340,940.00
4 SNI.DT 91-0007-2006.6.10 Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR Rp. 2,350,680.00
5 SNI.DT 91-0007-2006.6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp. 614,890.00

D. SNI.DT 91-0008-2007
PEKERJAAN BETON
1 SNI.DT 91-0008-2007.6.1 Membuat 1 m3 beton mutu K 100 Rp. 657,230.00
2 SNI.DT 91-0008-2007.6.2 Membuat 1 m3 beton mutu K 125 Rp. 656,630.00
3 SNI.DT 91-0008-2007.6.4 Membuat 1 m3 beton mutu K 150 Rp. 680,150.00
4 SNI.DT 91-0008-2007.6.5 Membuat 1 m3 beton mutu K 175 Rp. 708,330.00
5 SNI.DT 91-0008-2007.6.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200 Rp. 734,650.00
sero ) Pelabuhan Indonesia I 15

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4
6 SNI.DT 91-0008-2007.6.7 Membuat 1 m3 beton mutu K 225 Rp. 755,240.00
7 SNI.DT 91-0008-2007.6.8 Membuat 1 m3 beton mutu K 250 Rp. 767,670.00
8 SNI.DT 91-0008-2007.6.9 Membuat 1 m3 beton mutu K 275 Rp. 788,990.00
9 SNI.DT 91-0008-2007.6.10 Membuat 1 m3 beton mutu K 300 Rp. 795,590.00
10 SNI.DT 91-0008-2007.6.11 Membuat 1 m3 beton mutu K 325 Rp. 850,760.00
11 SNI.DT 91-0008-2007.6.12 Membuat 1 m3 beton mutu K 350 Rp. 859,390.00
12 SNI.DT 91-0008-2007.6.17 Pembesian 10 kg dengan besi polos atau besi ulir Rp. 148,700.00
13 SNI.DT 91-0008-2007.6.18 Memasang 10 kg kabel pres stressed polos /strands Rp. 145,100.00
14 SNI.DT 91-0008-2007.6.19 Memasang 10 kg jaring kawat baja/wire mest Rp. 138,700.00
15 SNI.DT 91-0008-2007.6.20 Memasang 1 m2 bekisting untuk pondasi Rp. 180,270.00
16 SNI.DT 91-0008-2007.6.21 Memasang 1 m2 bekisting untuk sloof Rp. 195,850.00
17 SNI.DT 91-0008-2007.6.22 Memasang 1 m2 bekisting untuk kolom Rp. 318,400.00
18 SNI.DT 91-0008-2007.6.23 Memasang 1 m2 bekisting untuk balok Rp. 327,750.00
19 SNI.DT 91-0008-2007.6.24 Memasang 1 m2 bekisting untuk lantai Rp. 390,400.00
20 SNI.DT 91-0008-2007.6.25 Memasang 1 m2 bekisting untuk dinding Rp. 320,830.00
21 SNI.DT 91-0008-2007.6.26 Memasang 1 m2 bekisting untuk tangga Rp. 286,150.00
22 SNI.DT 91-0008-2007.6.27 Memasang 1 m2 jembatan untuk pengecoran beton Rp. 111,670.00
23 SNI.DT 91-0008-2007.6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp. 3,792,750.00
24 SNI.DT 91-0008-2007.6.28A Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting) Rp. 3,451,500.00
25 SNI.DT 91-0008-2007.6.28B Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting) Rp. 3,110,250.00
26 SNI.DT 91-0008-2007.6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp. 5,172,550.00
27 SNI.DT 91-0008-2007.6.29A Membuat 1 m3 sloof beton bertulang (150 kg besi + bekisting) Rp. 4,490,050.00
28 SNI.DT 91-0008-2007.6.29B Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting) Rp. 4,148,800.00
29 SNI.DT 91-0008-2007.6.29C Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting) Rp. 3,807,550.00
30 SNI.DT 91-0008-2007.6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp. 8,405,420.00
31 SNI.DT 91-0008-2007.6.30A Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting) Rp. 7,040,420.00
32 SNI.DT 91-0008-2007.6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp. 6,440,380.00
33 SNI.DT 91-0008-2007.6.31A Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting) Rp. 5,757,880.00
34 SNI.DT 91-0008-2007.6.31B Membuat 1 m3 balok beton bertulang (125 kg besi + bekisting) Rp. 5,416,630.00
35 SNI.DT 91-0008-2007.6.31C Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting) Rp. 5,075,380.00
36 SNI.DT 91-0008-2007.6.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp. 5,803,000.00
37 SNI.DT 91-0008-2007.6.32A Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting) Rp. 5,461,800.00
38 SNI.DT 91-0008-2007.6.32B Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting) Rp. 5,120,500.00
39 SNI.DT 91-0008-2007.6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp. 5,642,700.00
40 SNI.DT 91-0008-2007.6.33A Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting) Rp. 5,301,500.00
41 SNI.DT 91-0008-2007.6.33B Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting) Rp. 4,959,970.00
42 SNI.DT 91-0008-2007.6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp. 5,892,760.00
43 SNI.DT 91-0008-2007.6.35 Membuat 1 m' kolom praktis beton bertulang (11x11) cm Rp. 101,220.00
44 SNI.DT 91-0008-2007.6.36 Membuat 1 m' ring balok beton bertulang (10x15) cm Rp. 117,020.00

E. SNI.DT 91-0009-2007
PEKERJAAN DINDING
1 SNI.DT 91-0009-2007.6.1 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi
Rp.
1 PC: 2PP 215,210.00
2 SNI.DT 91-0009-2007.6.2 Memasang 1 m dinding bata merah tebal 1 bata, campuran spesi
2
Rp.
1 PC: 3PP 204,600.00
3 SNI.DT 91-0009-2007.6.3 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi
Rp.
1 PC: 4PP 197,740.00
4 SNI.DT 91-0009-2007.6.7 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran
Rp.
spesi 1 PC: 2PP 104,350.00
5 SNI.DT 91-0009-2007.6.8 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran
Rp.
spesi 1 PC: 3PP 99,490.00
6 SNI.DT 91-0009-2007.6.9 Memasang 1 m dinding bata merah tebal 1/2 bata, campuran
2
Rp.
spesi 1 PC: 4PP 96,600.00
7 SNI.DT 91-0009-2007.6.23 Memasang 1 m dinding terawang campuran spesi 1 PC: 4PP
2 Rp. 159,330.00

F. SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN
1 SNI.DT 91-0010-2007.6.1 Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm Rp. 46,570.00
2 SNI.DT 91-0010-2007.6.2 Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm Rp. 41,130.00
3 SNI.DT 91-0010-2007.6.3 Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm Rp. 38,700.00
sero ) Pelabuhan Indonesia I 16

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4
4 SNI.DT 91-0010-2007.6.4 Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm Rp. 37,100.00
5 SNI.DT 91-0010-2007.6.23 Memasang 1 m2 plesteran ciprat 1 PC: 2PP Rp. 29,370.00
6 SNI.DT 91-0010-2007.6.27 Memasang 1 m2 acian Rp. 22,300.00
sero ) Pelabuhan Indonesia I 17

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4

G. SNI.DT 91-0011-2007
PEKERJAAN KAYU
1 SNI.DT 91-0011-2007.6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela
Rp.
kayu klas I 10,780,400.00
2 SNI.DT 91-0011-2007.6.2 Membuat dan memasang 1 m kusen pintu dan kusen jendela
3
Rp.
kayu klas II 8,781,000.00
3 SNI.DT 91-0011-2007.6.3 Membuat dan memasang 1 m daun pintu panel , kayu klas II
2 Rp. 532,980.00
4 SNI.DT 91-0011-2007.6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas
Rp.
II 378,510.00
5 SNI.DT 91-0011-2007.6.7 Membuat dan memasang 1 m pintu dan jendela jalusi , kayu klas
2
Rp.
II 672,710.00
6 SNI.DT 91-0011-2007.6.9 Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II
Rp.
500,900.00
7 SNI.DT 91-0011-2007.6.10 Memasang 1 m jalusi kusen, kayu klas II
2
Rp. 569,340.00
8 SNI.DT 91-0011-2007.6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II
Rp.
7,983,200.00
9 SNI.DT 91-0011-2007.6.15 Memasang 1 m3 konstruksi gordeng, kayu klas II Rp. 7,471,840.00
10 SNI.DT 91-0011-2007.6.16 Memasang 1 m2 rangka atap genteng keramik, kayu klas II Rp. 308,460.00
11 SNI.DT 91-0011-2007.6.17 Memasang 1 m2 rangka atap genteng beton, kayu klas II Rp. 430,720.00
12 SNI.DT 91-0011-2007.6.18 Memasang 1 m2 rangka atap seng BJLS, kayu klas II Rp. 979,860.00
13 SNI.DT 91-0011-2007.6.19 Memasang 1 m2 rangka plafond, kayu klas III Rp. 88,070.00
14 SNI.DT 91-0011-2007.6.21 Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II Rp. 85,840.00
15 SNI.DT 91-0011-2007.6.23 Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII Rp. 133,700.00
16 SNI.DT 91-0011-2007.6.25 Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas
Rp.
III 233,020.00

H. SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING
1 SNI.DT 91-0012-2007.6.13 Memasang 1 m2 lantai keramik ukuran (60x60) cm Rp. 169,190.00
2 SNI.DT 91-0012-2007.6.34 Memasang 1 m2 lantai keramik ukuran (40x40) cm Rp. 105,980.00
3 SNI.DT 91-0012-2007.6.35 Memasang 1 m2 lantai keramik ukuran (30x30) cm Rp. 141,640.00
4 SNI.DT 91-0012-2007.6.36 Memasang 1 m2 lantai keramik ukuran (20x20) cm Rp. 134,990.00
5 SNI.DT 91-0012-2007.6.36.1 Memasang 1 m2 dinding keramik ukuran (20x25) cm Rp. 130,990.00
6 SNI.DT 91-0012-2007.6.44 Memasang 1 m2 lantai karpet Rp. 76,300.00
7 SNI.DT 91-0012-2007.6.46 Memasang 1 m2 lantai parquet Rp. 376,020.00
8 SNI.DT 91-0012-2007.6.47 Memasang 1 m2 lantai kayu (gym floor) Rp. 281,520.00
9 SNI.DT 91-0012-2007.6.57 Memasang 1 m2 dinding batu paras Rp. 279,600.00
10 SNI.DT 91-0012-2007.6.58 Memasang 1 m2 dinding batu tempel hitam Rp. 230,100.00
11 SNI.DT 91-0012-2007.6.60 Memasang 1 m2 wall paper Rp. 249,650.00
12 SNI.DT 91-0012-2007.6.61 Memasang 1 m2 floor hardener Rp. 33,530.00
13 SNI.DT 91-0012-2007.6.7 Memasang 1 m2 conblok #6 cm Rp. 114,140.00

I. SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT
1 SNI.DT 91-0013-2007.6.1 Memasang 1 m2 langit-langit asbes semen Rp. 21,850.00
2 SNI.DT 91-0013-2007.6.5 Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm Rp. 36,340.00
3 SNI.DT 91-0013-2007.6.6 Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm Rp. 153,770.00
4 SNI.DT 91-0013-2007.6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x
Rp.
90)mm 19,170.00
5 SNI.DT 91-0013-2007.6.9 Memasang 1 m' list langit-langit kayu profil Rp. 11,600.00

J. SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM
1 SNI.DT 91-0014-2007.6.1 Memasang 1 kg besi profil Rp. 32,170.00
2 SNI.DT 91-0014-2007.6.2 Memasang 1 kg rangka kuda-kuda baj IWF Rp. 32,170.00
3 SNI.DT 91-0014-2007.6.7 Memasang 1 m2 pintu rollling door besi Rp. 606,430.00
4 SNI.DT 91-0014-2007.6.8 Memasang 1 m2 pintu lipat (folding door) Rp. 1,244,780.00
sero ) Pelabuhan Indonesia I 18

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4
5 SNI.DT 91-0014-2007.6.20 Memasang 1 m' pipa galvanis diameter 1/2" Rp. 28,820.00
6 SNI.DT 91-0014-2007.6.20A Memasang 1 m' pipa galvanis diameter 3/4" Rp. 34,160.00
7 SNI.DT 91-0014-2007.6.20B Memasang 1 m' pipa galvanis diameter 1" Rp. 42,890.00
8 SNI.DT 91-0014-2007.6.20C Memasang 1 m' pipa galvanis diameter 1 1/2" Rp. 65,500.00
9 SNI.DT 91-0014-2007.6.20D Memasang 1 m' pipa galvanis diameter 2" Rp. 77,380.00
10 SNI.DT 91-0014-2007.6.20E Memasang 1 m' pipa galvanis diameter 2 1/2" Rp. 20,190.00
11 SNI.DT 91-0014-2007.6.20F Memasang 1 m' pipa galvanis diameter 3" Rp. 20,190.00
12 SNI.DT 91-0014-2007.6.20G Memasang 1 m' pipa galvanis diameter 4" Rp. 20,190.00
13 SNI.DT 91-0014-2007.6.20H Memasang 1 m' pipa galvanis diameter 5" Rp. 20,190.00
14 SNI.DT 91-0014-2007.6.20I Memasang 1 m' pipa galvanis diameter 6" Rp. 20,190.00

K. SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP
1 SNI. 03-3436-1994.1 1 m2 pasang atap genteng keramik Rp. 118,200.00
2 SNI. 03-3436-1994.2 1 m' pasang nok genteng keramik Rp. 126,410.00
3 SNI. 03-3436-1994.3 1 m2 pasang atap genteng beton Rp. 85,200.00
4 SNI. 03-3436-1994.4 1 m' pasang nok genteng beton Rp. 101,910.00
5 SNI. 03-3436-1994.5 1 m2 pasang atap genteng metal Rp. 99,810.00
6 SNI. 03-3436-1994.6 1 m' pasang nok genteng metal Rp. 66,940.00
7 SNI. 03-3436-1994.7 1 m2 pasang atap seng gelombang Rp. 57,750.00
8 SNI. 03-3436-1994.8 1 m2 pasang atap nok seng Rp. 13,500.00

L. RSNI. T-15-2002
PEKERJAAN SANITASI
1 RSNI. T-15-2002.1 Memasang 1 buah kloset duduk/monobox Rp. 2,010,800.00
2 RSNI. T-15-2002.2 Memasang I buah kloset jongkok porselen Rp. 440,020.00
3 RSNI. T-15-2002.3 Memasang i1 buah urinoir Rp. 1,106,700.00
4 RSNI. T-15-2002.4 Memasang 1 buah wastafel Rp. 789,650.00
5 RSNI. T-15-2002.6 Memasang 1 buah bak mandi fiberglass volume 0.3 m3 Rp. 710,520.00
6 RSNI. T-15-2002.7 Memasang 1 buah bak mandi batu bata volume 0.3 m3 Rp. 753,480.00
7 RSNI. T-15-2002.8 Memasang 1 buah bak cuci piring stainless steel Rp. 717,640.00
8 RSNI. T-15-2002.10 Memasang 1 buah kran Ø 3/4" atau 1/2" Rp. 21,860.00
9 RSNI. T-15-2002.11 Memasanh 1 buah floor drain Rp. 23,860.00
10 RSNI. T-15-2002.12 Memasang 1 m' pipa PVC tipe AW Ø1/2" Rp. 10,210.00
11 RSNI. T-15-2002.13 Memasang 1 m' pipa PVC tipe AW Ø3/4" Rp. 11,170.00
12 RSNI. T-15-2002.14 Memasang 1 m' pipa PVC tipe AW Ø1 " Rp. 13,600.00
13 RSNI. T-15-2002.15 Memasang 1 m' pipa PVC tipe AW Ø 1 1/2" Rp. 14,800.00
14 RSNI. T-15-2002.16 Memasang 1 m' pipa PVC tipe AW Ø 2" Rp. 19,100.00
15 RSNI. T-15-2002.17 Memasang 1 m' pipa PVC tipe AW Ø 2 1/2" Rp. 17,530.00
16 RSNI. T-15-2002.18 Memasang 1 m' pipa PVC tipe AW Ø 3" Rp. 29,070.00
17 RSNI. T-15-2002.19 Memasang 1 m' pipa PVC tipe AW Ø 4" Rp. 34,830.00

M. PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA
1 PT. T-30-2000-C.1 1 Buah pasang kunci tanam antik Rp. 186,220.00
2 PT. T-30-2000-C.2 1 Buah pasang kunci tanam biasa Rp. 89,660.00
3 PT. T-30-2000-C.3 1 Buah pasang kunci tanam kamar mandi Rp. 88,830.00
4 PT. T-30-2000-C.4 1 Buah pasang kunci silinder Rp. 63,670.00
5 PT. T-30-2000-C.5 1 Buah pasang engsel pintu Rp. 22,800.00
6 PT. T-30-2000-C.6 1 Buah pasang ensel jendela Rp. 18,540.00
7 PT. T-30-2000-C.7 1 Buah pasang hak angin Rp. 27,720.00
8 PT. T-30-2000-C.8 1 Buah pasang pegangan jendela Rp. 16,800.00
9 PT. T-30-2000-C.9 1 Buah pasang door closer Rp. 222,680.00
10 PT. T-30-2000-C.11 1 Buah pasang pegangan pintu/door holder Rp. 132,680.00
11 PT. T-30-2000-C.12 1 m2 pasang kaca tebal 3 mm Rp. 27,100.00
12 PT. T-30-2000-C.13 1 m2 pasang kaca tebal 5 mm Rp. 28,200.00
13 PT. T-30-2000-C.14 1 m2 pasang kaca tebal 8 mm Rp. 113,100.00
14 PT. T-30-2000-C.15 1 m2 pasang kaca buram tebal 12 mm Rp. 169,800.00
sero ) Pelabuhan Indonesia I 19

REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No. No.SNI JENIS PEKERJAAN H. SATUAN (Rp.)

1 2 3 4

N. PT. T-38-2000-C
PEKERJAAN PENGECATAN
1 PT. T-38-2000-C.1 1 m2 pelaburan bidang kayu dengan vernis Rp. 27,260.00
2 PT. T-38-2000-C.2 1 m2 pengecatan bidang kayu lama Rp. 25,470.00
3 PT. T-38-2000-C.3 1 m2 pengecatan bidang kayu baru Rp. 28,470.00
4 PT. T-38-2000-C.4 1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1 16,700.00
Rp.
lps cat dasar,2 lps cat penutup)
5 PT. T-38-2000-C.4.1 1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat
Rp.
dasar,2 lps cat penutup) 14,560.00
6 PT. T-38-2000-C.4.2 1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat
Rp.
penutup) 11,160.00
7 PT. T-38-2000-C.5 1 m pengecatan tembok/plafond baru str paragon (1 lps plamur, 1
2
Rp.
lps cat dasar,2 lps cat penutup) 14,800.00
8 PT. T-38-2000-C.5.1 1 m pengecatan tembok/plafond lama str paragon ( 1 lps cat
2
Rp.
dasar,2 lps cat penutup) 13,000.00
9 PT. T-38-2000-C.5.2 1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat
Rp.
penutup) 9,600.00
10 PT. T-38-2000-C.6 1 m2 pengecatan permukaan baja dengan meni besi dan perancah
Rp.
44,810.00

PEKERJAAN PEMASANGAN KOZEN


O.
PINTU/JENDELA METAL
1 1 Unit Kozen Metal Type PJ1 Rp.
2 1 Unit Kozen Metal Type P1 Rp.
3 1 Unit Kozen Metal Type P2 Rp.
4 1 Unit Kozen Metal Type P3 Rp.
5 1 Unit Kozen Metal Type P4 Rp.
6 1 Unit Kozen Metal Type J1 Rp.
7 1 Unit Kozen Metal Type J2 Rp.
8 1 Unit Kozen Metal Type J3 Rp.
9 1 Unit Kozen Metal Type J4 Rp.
10 1 Unit Kozen Metal Type V1 Rp.
11 1 Unit Kozen Metal Type V2 Rp.
12 1 Unit Kozen Metal Type V3 Rp.
13 1 Unit Kozen Metal Type V4 Rp.
14 1 Unit Kozen Metal Type PJ 1K Rp.
15 1 Unit Kozen Metal Type P1 K Rp.
16 1 Unit Kozen Metal Type P2 K Rp.
17 1 Unit Kozen Metal Type P3 K Rp.
18 1 Unit Kozen Metal Type J 1 K Rp.
19 1 Unit Kozen Metal Type J 2 K Rp.
20 1 Unit Kozen Metal Type J 3 K Rp.
21 1 Unit Kozen Metal Type J 4 K Rp.
22 1 Unit Kozen Metal Type V 1 K Rp.
23 1 Unit Kozen Metal Type V 2 K Rp.
24 1 Unit Kozen Metal Type V 3 K Rp.
25 1 Unit Kozen Metal Type V 4 K Rp.
DAFTAR ANALISA PEKERJAAN
PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA

PT. T-30-2000-C.1
1 Buah pasang kunci tanam antik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kunci Lock KCL biasa 6" (antik) bh 1.000 Rp. 135,000.00 Rp. Rp. 135,000.00 Rp.
Pekerja Oh 0.060 Rp. Rp. 50,000.00Rp. Rp. 3,000.00
Tukang kayu Oh 0.600 Rp. Rp. 72,000.00Rp. Rp. 43,200.00
Tenaga
Kepala Tukang Oh 0.060 Rp. Rp. 80,000.00Rp. Rp. 4,800.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 216.00
135,000.00 51,216.00
Jumlah harga = Rp. 186,216.00
Pembulatan = Rp. 186,220.00

PT. T-30-2000-C.2
1 Buah pasang kunci tanam biasa
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kunci tanam 4" bh 1.000 Rp. 52,000.00 Rp. Rp. 52,000.00 Rp.
Pekerja Oh 0.010 Rp. Rp. 50,000.00Rp. Rp. 500.00
Tukang kayu Oh 0.500 Rp. Rp. 72,000.00Rp. Rp. 36,000.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
52,000.00 37,660.00
Jumlah harga = Rp. 89,660.00
Pembulatan = Rp. 89,660.00

PT. T-30-2000-C.3
1 Buah pasang kunci tanam kamar mandi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kunci Lock besar 4" bh 1.000 Rp. 52,000.00 Rp. Rp. 52,000.00 Rp.
Pekerja Oh 0.005 Rp. Rp. 50,000.00Rp. Rp. 250.00
Tukang kayu Oh 0.500 Rp. Rp. 72,000.00Rp. Rp. 36,000.00
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00Rp. Rp. 400.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 180.00
52,000.00 36,830.00
Jumlah harga = Rp. 88,830.00
Pembulatan = Rp. 88,830.00

PT. T-30-2000-C.4
1 Buah pasang kunci silinder
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kunci silinder bh 1.000 Rp. 27,000.00 Rp. Rp. 27,000.00 Rp.
Pekerja Oh 0.005 Rp. Rp. 50,000.00Rp. Rp. 250.00
Tukang kayu Oh 0.500 Rp. Rp. 72,000.00Rp. Rp. 36,000.00
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00Rp. Rp. 400.00
Mandor Oh 0.000 Rp. Rp. 72,000.00Rp. Rp. 18.00
27,000.00 36,668.00
Jumlah harga = Rp. 63,668.00
Pembulatan = Rp. 63,670.00

PT. T-30-2000-C.5
1 Buah pasang engsel pintu
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Engsel pintu Nyilon 4" bh 1.000 Rp. 10,000.00 Rp. Rp. 10,000.00 Rp.
Pekerja Oh 0.015 Rp. Rp. 50,000.00Rp. Rp. 750.00
Tukang kayu Oh 0.150 Rp. Rp. 72,000.00Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00Rp. Rp. 1,200.00
Mandor Oh 0.001 Rp. Rp. 72,000.00Rp. Rp. 54.00
10,000.00 12,804.00
Jumlah harga = Rp. 22,804.00
Pembulatan = Rp. 22,800.00

PT. T-30-2000-C.6
1 Buah pasang ensel jendela
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Engsel jendela Nyilon 4" bh 1.000 Rp. 10,000.00 Rp. Rp. 10,000.00 Rp.
Pekerja Oh 0.010 Rp. Rp. 50,000.00Rp. Rp. 500.00
Tukang kayu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.001 Rp. Rp. 72,000.00Rp. Rp. 36.00
10,000.00 8,536.00
Jumlah harga = Rp. 18,536.00
Pembulatan = Rp. 18,540.00

PT. T-30-2000-C.7
1 Buah pasang hak angin
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Hak angin biasa pasang 1.000 Rp. 10,000.00 Rp. Rp. 10,000.00 Rp.
Pekerja Oh 0.020 Rp. Rp. 50,000.00Rp. Rp. 1,000.00
Tukang kayu Oh 0.200 Rp. Rp. 72,000.00Rp. Rp. 14,400.00
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00Rp. Rp. 1,600.00
Mandor Oh 0.010 Rp. Rp. 72,000.00Rp. Rp. 720.00
10,000.00 17,720.00
Jumlah harga = Rp. 27,720.00
Pembulatan = Rp. 27,720.00

PT. T-30-2000-C.8
1 Buah pasang pegangan jendela
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Handle (pegangan) bh 1.000 Rp. 4,000.00 Rp. Rp. 4,000.00 Rp.
Pekerja Oh 0.015 Rp. Rp. 50,000.00Rp. Rp. 750.00
Tukang kayu Oh 0.150 Rp. Rp. 72,000.00Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00Rp. Rp. 1,200.00
Mandor Oh 0.001 Rp. Rp. 72,000.00Rp. Rp. 54.00
4,000.00 12,804.00
Jumlah harga = Rp. 16,804.00
Pembulatan = Rp. 16,800.00

PT. T-30-2000-C.9
1 Buah pasang door closer
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Door closer bh 1.000 Rp. 180,000.00 Rp. Rp. 180,000.00 Rp.
Pekerja Oh 0.050 Rp. Rp. 50,000.00Rp. Rp. 2,500.00
Tukang kayu Oh 0.500 Rp. Rp. 72,000.00Rp. Rp. 36,000.00
Tenaga
Kepala Tukang Oh 0.050 Rp. Rp. 80,000.00Rp. Rp. 4,000.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 180.00
180,000.00 42,680.00
Jumlah harga = Rp. 222,680.00
Pembulatan = Rp. 222,680.00

PT. T-30-2000-C.11
1 Buah pasang pegangan pintu/door holder
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Door Holder bh 1.000 Rp. 90,000.00 Rp. Rp. 90,000.00 Rp.
Pekerja Oh 0.050 Rp. Rp. 50,000.00Rp. Rp. 2,500.00
Tukang kayu Oh 0.500 Rp. Rp. 72,000.00Rp. Rp. 36,000.00
Tenaga
Kepala Tukang Oh 0.050 Rp. Rp. 80,000.00Rp. Rp. 4,000.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 180.00
90,000.00 42,680.00
Jumlah harga = Rp. 132,680.00
Pembulatan = Rp. 132,680.00

PT. T-30-2000-C.12
1 m2 pasang kaca tebal 3 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kaca 3 mm m2 1.100 Rp. 13,000.00 Rp. Rp. 14,300.00 Rp.
Pekerja Oh 0.015 Rp. Rp. 50,000.00 Rp. Rp. 750.00
Tukang kayu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.001 Rp. Rp. 72,000.00 Rp. Rp. 54.00
14,300.00 12,804.00
Jumlah harga = Rp. 27,104.00
Pembulatan = Rp. 27,100.00

PT. T-30-2000-C.13
1 m2 pasang kaca tebal 5 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kaca 5 mm m2 1.100 Rp. 14,000.00 Rp. Rp. 15,400.00 Rp.
Pekerja Oh 0.015 Rp. Rp. 50,000.00 Rp. Rp. 750.00
Tukang kayu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.001 Rp. Rp. 72,000.00 Rp. Rp. 54.00
15,400.00 12,804.00
Jumlah harga = Rp. 28,204.00
Pembulatan = Rp. 28,200.00

PT. T-30-2000-C.14
1 m2 pasang kaca tebal 8 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kaca 8 mm (tempred) m2 1.100 Rp. 90,000.00 Rp. Rp. 99,000.00 Rp.
Pekerja Oh 0.017 Rp. Rp. 50,000.00 Rp. Rp. 825.00
Tukang kayu Oh 0.165 Rp. Rp. 72,000.00 Rp. Rp. 11,880.00
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 80,000.00 Rp. Rp. 1,320.00
Mandor Oh 0.001 Rp. Rp. 72,000.00 Rp. Rp. 57.60
99,000.00 14,082.60
Jumlah harga = Rp. 113,082.60
Pembulatan = Rp. 113,100.00

PT. T-30-2000-C.15
1 m2 pasang kaca buram tebal 12 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kaca 12 mm (tempred) m2 1.100 Rp. 135,000.00 Rp. Rp. 148,500.00 Rp.
Pekerja Oh 0.025 Rp. Rp. 50,000.00 Rp. Rp. 1,250.00
Tukang kayu Oh 0.250 Rp. Rp. 72,000.00 Rp. Rp. 18,000.00
Tenaga
Kepala Tukang Oh 0.025 Rp. Rp. 80,000.00 Rp. Rp. 2,000.00
Mandor Oh 0.001 Rp. Rp. 72,000.00 Rp. Rp. 90.00
148,500.00 21,340.00
Jumlah harga = Rp. 169,840.00
Pembulatan = Rp. 169,800.00
DAFTAR ANALISA PEKERJAAN
RSNI. T-15-2002
PEKERJAAN SANITASI

RSNI. T-15-2002.1
Memasang 1 buah kloset duduk/monobox
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kloset duduk (dengan bak air) bh 1.000 Rp. 1,350,000.00 Rp. Rp. 1,350,000.00 Rp.
Bahan
Perlengkapan 30% Dari bahan Rp. 405,000.00 Rp. Rp. 405,000.00 Rp.
Pekerja Oh 3.300 Rp. Rp. 50,000.00 Rp. Rp. 165,000.00
Tukang batu Oh 1.100 Rp. Rp. 72,000.00 Rp. Rp. 79,200.00
Tenaga
Kepala Tukang Oh 0.001 Rp. Rp. 80,000.00 Rp. Rp. 80.00
Mandor Oh 0.160 Rp. Rp. 72,000.00 Rp. Rp. 11,520.00
1,755,000.00 255,800.00
Jumlah harga = Rp. 2,010,800.00
Pembulatan = Rp. 2,010,800.00

RSNI. T-15-2002.2
Memasang I buah kloset jongkok porselen
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kloset jongkok porselen bh 1.000 Rp. 143,000.00 Rp. Rp. 143,000.00 Rp.
Bahan Semen portland Pasir pasang kg 6.000 Rp. 1,100.00 Rp. Rp. 6,600.00 Rp.
Pasir pasang m3 0.010 Rp. 90,000.00 Rp. Rp. 900.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang batu Oh 1.500 Rp. Rp. 72,000.00 Rp. Rp. 108,000.00
Tenaga
Kepala Tukang Oh 1.500 Rp. Rp. 80,000.00 Rp. Rp. 120,000.00
Mandor Oh 0.160 Rp. Rp. 72,000.00 Rp. Rp. 11,520.00
150,500.00 289,520.00
Jumlah harga = Rp. 440,020.00
Pembulatan = Rp. 440,020.00

RSNI. T-15-2002.3
Memasang i1 buah urinoir
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Urinoir bh 1.000 Rp. 740,000.00 Rp. Rp. 740,000.00 Rp.
Perlengkapan 30% Dari bahan Rp. 222,000.00 Rp. Rp. 222,000.00 Rp.
Bahan Portland Semen kg 6.000 Rp. 1,100.00 Rp. Rp. 6,600.00 Rp.
Pasir pasang m3 0.010 Rp. 90,000.00 Rp. Rp. 900.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang Batu Oh 1.000 Rp. Rp. 72,000.00 Rp. Rp. 72,000.00
Tenaga
Kepala Tukang Oh 0.100 Rp. Rp. 80,000.00 Rp. Rp. 8,000.00
Mandor Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
969,500.00 137,200.00
Jumlah harga = Rp. 1,106,700.00
Pembulatan = Rp. 1,106,700.00

RSNI. T-15-2002.4
Memasang 1 buah wastafel
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Westafel biasa bh 1.000 Rp. 459,000.00 Rp. Rp. 459,000.00 Rp.
Perlengkapan 30% dari bahan Rp. 137,700.00 Rp. Rp. 137,700.00 Rp.
Bahan Semen Putih kg 6.000 Rp. 3,075.00 Rp. Rp. 18,450.00 Rp.
Pasir pasang m3 0.010 Rp. 90,000.00 Rp. Rp. 900.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang batu Oh 1.450 Rp. Rp. 72,000.00 Rp. Rp. 104,400.00
Tenaga
Kepala Tukang Oh 0.150 Rp. Rp. 80,000.00 Rp. Rp. 12,000.00
Mandor Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
616,050.00 173,600.00
Jumlah harga = Rp. 789,650.00
Pembulatan = Rp. 789,650.00

RSNI. T-15-2002.6
Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bak fibreglass bh 1.000 Rp. 375,000.00 Rp. Rp. 375,000.00 Rp.
Bahan
Perlengkapan Rp.
Pekerja Oh 1.800 Rp. Rp. 50,000.00 Rp. Rp. 90,000.00
Tukang batu Oh 2.700 Rp. Rp. 72,000.00 Rp. Rp. 194,400.00
Tenaga
Kepala Tukang Oh 0.540 Rp. Rp. 80,000.00 Rp. Rp. 43,200.00
Mandor Oh 0.110 Rp. Rp. 72,000.00 Rp. Rp. 7,920.00
375,000.00 335,520.00
Jumlah harga = Rp. 710,520.00
Pembulatan = Rp. 710,520.00

RSNI. T-15-2002.7
Memasang 1 buah bak mandi batu bata volume 0.3 m3
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 0.400 Rp. 800.00 Rp. Rp. 320.00 Rp.
Semen portland kg 120.000 Rp. 1,100.00 Rp. Rp. 132,000.00 Rp.
Bahan Pair pasang m3 0.300 Rp. 90,000.00 Rp. Rp. 27,000.00 Rp.
Keramik polos 20x20cm m2 7.200 Rp. 1,960.00 Rp. Rp. 14,112.00 Rp.
Semen putih 40 kg kg 6.000 Rp. 3,075.00 Rp. Rp. 18,450.00 Rp.
Pekerja Oh 6.000 Rp. Rp. 50,000.00Rp. Rp. 300,000.00
Tukang batu Oh 3.000 Rp. Rp. 72,000.00Rp. Rp. 216,000.00
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 80,000.00Rp. Rp. 24,000.00
Mandor Oh 0.300 Rp. Rp. 72,000.00Rp. Rp. 21,600.00
191,882.00 561,600.00
Jumlah harga = Rp. 753,482.00
Pembulatan = Rp. 753,480.00

RSNI. T-15-2002.8
Memasang 1 buah bak cuci piring stainless steel
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Bak cuci stainless steel 2 lobang unit 1.000 Rp. 692,000.00 Rp. Rp. 692,000.00 Rp.
Pekerja Oh 0.030 Rp. Rp. 50,000.00Rp. Rp. 1,500.00
Tukang batu Oh 0.300 Rp. Rp. 72,000.00Rp. Rp. 21,600.00
Tenaga
Kepala Tukang Oh 0.030 Rp. Rp. 80,000.00Rp. Rp. 2,400.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 144.00
692,000.00 25,644.00
Jumlah harga = Rp. 717,644.00
Pembulatan = Rp. 717,640.00

RSNI. T-15-2002.10
Memasang 1 buah kran Ø 3/4" atau 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Kran air lokal bh 1.000 Rp. 13,000.00 Rp. Rp. 13,000.00 Rp.
Pekerja Oh 0.010 Rp. Rp. 50,000.00Rp. Rp. 500.00
Tukang batu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
13,000.00 8,860.00
Jumlah harga = Rp. 21,860.00
Pembulatan = Rp. 21,860.00

RSNI. T-15-2002.11
Memasanh 1 buah floor drain
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Floor drain bh 1.000 Rp. 15,000.00 Rp. Rp. 15,000.00 Rp.
Pekerja Oh 0.010 Rp. Rp. 50,000.00Rp. Rp. 500.00
Tukang batu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
15,000.00 8,860.00
Jumlah harga = Rp. 23,860.00
Pembulatan = Rp. 23,860.00

RSNI. T-15-2002.12
Memasang 1 m' pipa PVC tipe AW Ø1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC D 1/2" m' 1.200 Rp. 2,900.00 Rp. Rp. 3,480.00 Rp.
Pekerja Oh 0.036 Rp. Rp. 50,000.00Rp. Rp. 1,800.00
Tukang batu Oh 0.060 Rp. Rp. 72,000.00Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 129.60
3,480.00 6,729.60
Jumlah harga = Rp. 10,209.60
Pembulatan = Rp. 10,210.00

RSNI. T-15-2002.13
Memasang 1 m' pipa PVC tipe AW Ø3/4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 3/4' m' 1.200 Rp. 3,700.00 Rp. Rp. 4,440.00 Rp.
Pekerja Oh 0.036 Rp. Rp. 50,000.00Rp. Rp. 1,800.00
Tukang batu Oh 0.060 Rp. Rp. 72,000.00Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 129.60
4,440.00 6,729.60
Jumlah harga = Rp. 11,169.60
Pembulatan = Rp. 11,170.00

RSNI. T-15-2002.14
Memasang 1 m' pipa PVC tipe AW Ø1 "
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 1' m' 1.200 Rp. 5,700.00 Rp. Rp. 6,840.00 Rp.
Pekerja Oh 0.036 Rp. Rp. 50,000.00Rp. Rp. 1,800.00
Tukang batu Oh 0.060 Rp. Rp. 72,000.00Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 129.60
6,840.00 6,729.60
Jumlah harga = Rp. 13,569.60
Pembulatan = Rp. 13,600.00

RSNI. T-15-2002.15
Memasang 1 m' pipa PVC tipe AW Ø 1 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 1 1/2" m' 1.200 Rp. 6,700.00 Rp. Rp. 8,040.00 Rp.
Pekerja Oh 0.036 Rp. Rp. 50,000.00Rp. Rp. 1,800.00
Tukang batu Oh 0.060 Rp. Rp. 72,000.00Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 129.60
8,040.00 6,729.60
Jumlah harga = Rp. 14,769.60
Pembulatan = Rp. 14,800.00

RSNI. T-15-2002.16
Memasang 1 m' pipa PVC tipe AW Ø 2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 2" m' 1.200 Rp. 7,500.00 Rp. Rp. 9,000.00 Rp.
Pekerja Oh 0.054 Rp. Rp. 50,000.00Rp. Rp. 2,700.00
Tukang batu Oh 0.090 Rp. Rp. 72,000.00Rp. Rp. 6,480.00
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 80,000.00Rp. Rp. 720.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 194.40
9,000.00 10,094.40
Jumlah harga = Rp. 19,094.40
Pembulatan = Rp. 19,100.00

RSNI. T-15-2002.17
Memasang 1 m' pipa PVC tipe AW Ø 2 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 2 1/2" m' 1.200 Rp. 9,000.00 Rp. Rp. 10,800.00 Rp.
Pekerja Oh 0.036 Rp. Rp. 50,000.00Rp. Rp. 1,800.00
Tukang batu Oh 0.060 Rp. Rp. 72,000.00Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.002 Rp. Rp. 72,000.00Rp. Rp. 129.60
10,800.00 6,729.60
Jumlah harga = Rp. 17,529.60
Pembulatan = Rp. 17,530.00

RSNI. T-15-2002.18
Memasang 1 m' pipa PVC tipe AW Ø 3"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 3" m' 1.200 Rp. 11,600.00 Rp. Rp. 13,920.00 Rp.
Pekerja Oh 0.081 Rp. Rp. 50,000.00Rp. Rp. 4,050.00
Tukang kayu Oh 0.135 Rp. Rp. 72,000.00Rp. Rp. 9,720.00
Tenaga
Kepala Tukang Oh 0.014 Rp. Rp. 80,000.00Rp. Rp. 1,080.00
Mandor Oh 0.004 Rp. Rp. 72,000.00Rp. Rp. 295.20
13,920.00 15,145.20
Jumlah harga = Rp. 29,065.20
Pembulatan = Rp. 29,070.00
RSNI. T-15-2002.19
Memasang 1 m' pipa PVC tipe AW Ø 4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pipa PVC tipe AW Ø 4" m' 1.200 Rp. 16,400.00 Rp. Rp. 19,680.00 Rp.
Pekerja Oh 0.081 Rp. Rp. 50,000.00Rp. Rp. 4,050.00
Tukang kayu Oh 0.135 Rp. Rp. 72,000.00Rp. Rp. 9,720.00
Tenaga
Kepala Tukang Oh 0.014 Rp. Rp. 80,000.00Rp. Rp. 1,080.00
Mandor Oh 0.004 Rp. Rp. 72,000.00Rp. Rp. 295.20
19,680.00 15,145.20
Jumlah harga = Rp. 34,825.20
Pembulatan = Rp. 34,830.00
DAFTAR ANALISA PEKERJAAN
SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP

SNI. 03-3436-1994.1
1 m2 pasang atap genteng keramik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Genteng keramik Lbr 11.000 Rp. 9,000.00 Rp. Rp. 99,000.00 Rp.
Bahan
Paku biasa 2"-5" kg 0.030 Rp. 16,000.00 Rp. Rp. 480.00 Rp.
Pekerja Oh 0.200 Rp. Rp. 50,000.00 Rp. Rp. 10,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
99,480.00 18,720.00
Jumlah harga = Rp. 118,200.00
Pembulatan = Rp. 118,200.00

SNI. 03-3436-1994.2
1 m' pasang nok genteng keramik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Rabung genteng keramik lbr 3.500 Rp. 14,000.00 Rp. Rp. 49,000.00 Rp.
Paku biasa 2"-5" kg 0.050 Rp. 16,000.00 Rp. Rp. 800.00 Rp.
Bahan Semen abu-abu kg 10.800 Rp. 3,075.00 Rp. Rp. 33,210.00 Rp.
Pasir pasang m3 0.032 Rp. 90,000.00 Rp. Rp. 2,880.00 Rp.
Semen warna kg 1.000 Rp. 3,075.00 Rp. Rp. 3,075.00 Rp.
Pekerja Oh 0.400 Rp. Rp. 50,000.00 Rp. Rp. 20,000.00
Tukang Kayu Oh 0.200 Rp. Rp. 72,000.00 Rp. Rp. 14,400.00
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00 Rp. Rp. 1,600.00
Mandor Oh 0.020 Rp. Rp. 72,000.00 Rp. Rp. 1,440.00
88,965.00 37,440.00
Jumlah harga = Rp. 126,405.00
Pembulatan = Rp. 126,410.00

SNI. 03-3436-1994.3
1 m2 pasang atap genteng beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Genteng beton Lbr 11.000 Rp. 6,000.00 Rp. Rp. 66,000.00 Rp.
Bahan
Paku biasa 2"-5" kg 0.030 Rp. 16,000.00 Rp. Rp. 480.00 Rp.
Pekerja Oh 0.200 Rp. Rp. 50,000.00 Rp. Rp. 10,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
66,480.00 18,720.00
Jumlah harga = Rp. 85,200.00
Pembulatan = Rp. 85,200.00

SNI. 03-3436-1994.4
1 m' pasang nok genteng beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Rabung genteng beton lbr 3.500 Rp. 7,000.00 Rp. Rp. 24,500.00 Rp.
Paku biasa 2"-5" kg 0.050 Rp. 16,000.00 Rp. Rp. 800.00 Rp.
Bahan Semen abu-abu kg 10.800 Rp. 3,075.00 Rp. Rp. 33,210.00 Rp.
Pasir pasang m3 0.032 Rp. 90,000.00 Rp. Rp. 2,880.00 Rp.
Semen warna kg 1.000 Rp. 3,075.00 Rp. Rp. 3,075.00 Rp.
Pekerja Oh 0.400 Rp. Rp. 50,000.00 Rp. Rp. 20,000.00
Tukang Kayu Oh 0.200 Rp. Rp. 72,000.00 Rp. Rp. 14,400.00
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00 Rp. Rp. 1,600.00
Mandor Oh 0.020 Rp. Rp. 72,000.00 Rp. Rp. 1,440.00
64,465.00 37,440.00
Jumlah harga = Rp. 101,905.00
Pembulatan = Rp. 101,910.00

SNI. 03-3436-1994.5
1 m2 pasang atap genteng metal
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Genteng metal Lbr 1.020 Rp. 77,000.00 Rp. Rp. 78,540.00 Rp.
Bahan
Paku biasa 2"-5" kg 0.200 Rp. 16,000.00 Rp. Rp. 3,200.00 Rp.
Pekerja Oh 0.200 Rp. Rp. 50,000.00 Rp. Rp. 10,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.001 Rp. Rp. 72,000.00 Rp. Rp. 72.00
81,740.00 18,072.00
Jumlah harga = Rp. 99,812.00
Pembulatan = Rp. 99,810.00

SNI. 03-3436-1994.6
1 m' pasang nok genteng metal
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Rabung genteng metal Lbr 1.100 Rp. 37,000.00 Rp. Rp. 40,700.00 Rp.
Bahan
Paku biasa 1/2"-1" kg 0.050 Rp. 16,000.00 Rp. Rp. 800.00 Rp.
Pekerja Oh 0.250 Rp. Rp. 50,000.00 Rp. Rp. 12,500.00
Tukang Kayu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.013 Rp. Rp. 72,000.00 Rp. Rp. 936.00
41,500.00 25,436.00
Jumlah harga = Rp. 66,936.00
Pembulatan = Rp. 66,940.00

SNI. 03-3436-1994.7
1 m2 pasang atap seng gelombang
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Seng gelombang 3"x6" BJ Lbr 0.700 Rp. 66,000.00 Rp. Rp. 46,200.00 Rp.
Bahan
Paku biasa 1/2"-1" kg 0.020 Rp. 16,000.00 Rp. Rp. 320.00 Rp.
Pekerja Oh 0.120 Rp. Rp. 50,000.00 Rp. Rp. 6,000.00
Tukang Kayu Oh 0.060 Rp. Rp. 72,000.00 Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 480.00
Mandor Oh 0.006 Rp. Rp. 72,000.00 Rp. Rp. 432.00
46,520.00 11,232.00
Jumlah harga = Rp. 57,752.00
Pembulatan = Rp. 57,750.00

SNI. 03-3436-1994.8
1 m2 pasang atap nok seng
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Rabung seng Lbr 0.300 Rp. 20,000.00 Rp. Rp. 6,000.00 Rp.
Bahan
Paku biasa 1/2"-1" kg 0.040 Rp. 16,000.00 Rp. Rp. 640.00 Rp.
Pekerja Oh 0.015 Rp. Rp. 50,000.00 Rp. Rp. 750.00
Tukang Kayu Oh 0.070 Rp. Rp. 72,000.00 Rp. Rp. 5,040.00
Tenaga
Kepala Tukang Oh 0.008 Rp. Rp. 80,000.00 Rp. Rp. 640.00
Mandor Oh 0.006 Rp. Rp. 72,000.00 Rp. Rp. 432.00
6,640.00 6,862.00
Jumlah harga = Rp. 13,502.00
Pembulatan = Rp. 13,500.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM

SNI.DT 91-0014-2007.6.1
Memasang 1 kg besi profil
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Besi Profil kg 1.150 Rp. 21,000.00 Rp. Rp. 24,150.00 Rp.
Pekerja Oh 0.060 Rp. Rp. 50,000.00 Rp. Rp. 3,000.00
Tukang las Oh 0.060 Rp. Rp. 72,000.00 Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 480.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 216.00
24,150.00 8,016.00
Jumlah harga = Rp. 32,166.00
Pembulatan = Rp. 32,170.00

SNI.DT 91-0014-2007.6.2
Memasang 1 kg rangka kuda-kuda baj IWF
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Besi baja IWF kg 1.150 Rp. 21,000.00 Rp. Rp. 24,150.00 Rp.
Pekerja Oh 0.060 Rp. Rp. 50,000.00 Rp. Rp. 3,000.00
Tukang Oh 0.060 Rp. Rp. 72,000.00 Rp. Rp. 4,320.00
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00 Rp. Rp. 480.00
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp. 216.00
24,150.00 8,016.00
Jumlah harga = Rp. 32,166.00
Pembulatan = Rp. 32,170.00

SNI.DT 91-0014-2007.6.7
Memasang 1 m2 pintu rollling door besi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pintu gulung besi m2 1.000 Rp. 450,000.00 Rp. Rp. 450,000.00 Rp.
Pekerja Oh 1.200 Rp. Rp. 50,000.00 Rp. Rp. 60,000.00
Tukang Oh 1.200 Rp. Rp. 72,000.00 Rp. Rp. 86,400.00
Tenaga
Kepala Tukang Oh 0.120 Rp. Rp. 80,000.00 Rp. Rp. 9,600.00
Mandor Oh 0.006 Rp. Rp. 72,000.00 Rp. Rp. 432.00
450,000.00 156,432.00
Jumlah harga = Rp. 606,432.00
Pembulatan = Rp. 606,430.00

SNI.DT 91-0014-2007.6.8
Memasang 1 m2 pintu lipat (folding door)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Pintu lipat m2 1.000 Rp. 1,186,000.00 Rp. Rp. 1,186,000.00 Rp.
Pekerja Oh 0.440 Rp. Rp. 50,000.00 Rp. Rp. 22,000.00
Tukang Oh 0.440 Rp. Rp. 72,000.00 Rp. Rp. 31,680.00
Tenaga
Kepala Tukang Oh 0.044 Rp. Rp. 80,000.00 Rp. Rp. 3,520.00
Mandor Oh 0.022 Rp. Rp. 72,000.00 Rp. Rp. 1,584.00
1,186,000.00 58,784.00
Jumlah harga = Rp. 1,244,784.00
Pembulatan = Rp. 1,244,780.00

SNI.DT 91-0014-2007.6.20
Memasang 1 m' pipa galvanis diameter 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 10,950.00 Rp. Rp. 13,140.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 10,950.00 Rp. Rp. 3,832.50 Rp.
Pekerja Oh 0.054 Rp. Rp. 50,000.00 Rp. Rp. 2,700.00
Tukang Oh 0.090 Rp. Rp. 72,000.00 Rp. Rp. 6,480.00
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 80,000.00 Rp. Rp. 720.00
Mandor Oh 0.027 Rp. Rp. 72,000.00 Rp. Rp. 1,944.00
16,972.50 11,844.00
Jumlah harga = Rp. 28,816.50
Pembulatan = Rp. 28,820.00
SNI.DT 91-0014-2007.6.20A
Memasang 1 m' pipa galvanis diameter 3/4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 14,400.00 Rp. Rp. 17,280.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 14,400.00 Rp. Rp. 5,040.00 Rp.
Pekerja Oh 0.054 Rp. Rp. 50,000.00 Rp. Rp. 2,700.00
Tukang Oh 0.090 Rp. Rp. 72,000.00 Rp. Rp. 6,480.00
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 80,000.00 Rp. Rp. 720.00
Mandor Oh 0.027 Rp. Rp. 72,000.00 Rp. Rp. 1,944.00
22,320.00 11,844.00
Jumlah harga = Rp. 34,164.00
Pembulatan = Rp. 34,160.00

SNI.DT 91-0014-2007.6.20B
Memasang 1 m' pipa galvanis diameter 1"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 18,000.00 Rp. Rp. 21,600.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 27,000.00 Rp. Rp. 9,450.00 Rp.
Pekerja Oh 0.054 Rp. Rp. 50,000.00 Rp. Rp. 2,700.00
Tukang Oh 0.090 Rp. Rp. 72,000.00 Rp. Rp. 6,480.00
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 80,000.00 Rp. Rp. 720.00
Mandor Oh 0.027 Rp. Rp. 72,000.00 Rp. Rp. 1,944.00
31,050.00 11,844.00
Jumlah harga = Rp. 42,894.00
Pembulatan = Rp. 42,890.00

SNI.DT 91-0014-2007.6.20C
Memasang 1 m' pipa galvanis diameter 1 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 27,000.00 Rp. Rp. 32,400.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 36,900.00 Rp. Rp. 12,915.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
45,315.00 20,188.80
Jumlah harga = Rp. 65,503.80
Pembulatan = Rp. 65,500.00

SNI.DT 91-0014-2007.6.20D
Memasang 1 m' pipa galvanis diameter 2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 36,900.00 Rp. Rp. 44,280.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 36,900.00 Rp. Rp. 12,915.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
57,195.00 20,188.80
Jumlah harga = Rp. 77,383.80
Pembulatan = Rp. 77,380.00

SNI.DT 91-0014-2007.6.20E
Memasang 1 m' pipa galvanis diameter 2 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 0.00 Rp. Rp. 0.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 0.00 Rp. Rp. 0.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
0.00 20,188.80
Jumlah harga = Rp. 20,188.80
Pembulatan = Rp. 20,190.00
SNI.DT 91-0014-2007.6.20F
Memasang 1 m' pipa galvanis diameter 3"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 0.00 Rp. Rp. 0.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 0.00 Rp. Rp. 0.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
0.00 20,188.80
Jumlah harga = Rp. 20,188.80
Pembulatan = Rp. 20,190.00

SNI.DT 91-0014-2007.6.20G
Memasang 1 m' pipa galvanis diameter 4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 0.00 Rp. Rp. 0.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 0.00 Rp. Rp. 0.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
0.00 20,188.80
Jumlah harga = Rp. 20,188.80
Pembulatan = Rp. 20,190.00

SNI.DT 91-0014-2007.6.20H
Memasang 1 m' pipa galvanis diameter 5"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 0.00 Rp. Rp. 0.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 0.00 Rp. Rp. 0.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
0.00 20,188.80
Jumlah harga = Rp. 20,188.80
Pembulatan = Rp. 20,190.00

SNI.DT 91-0014-2007.6.20I
Memasang 1 m' pipa galvanis diameter 6"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pipa galvanis m' 1.200 Rp. 0.00 Rp. Rp. 0.00 Rp.
Bahan
Perlengkapan 35% Harga pipa Rp. 0.00 Rp. Rp. 0.00 Rp.
Pekerja Oh 0.108 Rp. Rp. 50,000.00 Rp. Rp. 5,400.00
Tukang Oh 0.180 Rp. Rp. 72,000.00 Rp. Rp. 12,960.00
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 80,000.00 Rp. Rp. 1,440.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 388.80
0.00 20,188.80
Jumlah harga = Rp. 20,188.80
Pembulatan = Rp. 20,190.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0006-2007
PEKERJAAN TANAH

SNI.DT 91-0006-2007.6.1
Menggali 1 m3 tanah biasa sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.750 Rp. Rp. 50,000.00 Rp. Rp. 37,500.00
Tenaga
Mandor Oh 0.025 Rp. Rp. 72,000.00 Rp. Rp. 1,800.00
0.00 39,300.00
Jumlah harga = Rp. 39,300.00
Pembulatan = Rp. 39,300.00

SNI.DT 91-0006-2007.6.2
Menggali 1 m3 tanah biasa sedalam 2 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.900 Rp. Rp. 50,000.00 Rp. Rp. 45,000.00
Tenaga
Mandor Oh 0.045 Rp. Rp. 72,000.00 Rp. Rp. 3,240.00
0.00 48,240.00
Jumlah harga = Rp. 48,240.00
Pembulatan = Rp. 48,200.00

SNI.DT 91-0006-2007.6.3
Menggali 1 m3 tanah biasa sedalam 3 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 1.050 Rp. Rp. 50,000.00 Rp. Rp. 52,500.00
Tenaga
Mandor Oh 0.067 Rp. Rp. 72,000.00 Rp. Rp. 4,824.00
0.00 57,324.00
Jumlah harga = Rp. 57,324.00
Pembulatan = Rp. 57,300.00

SNI.DT 91-0006-2007.6.5
Menggali 1 m3 tanah cadas sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 1.500 Rp. Rp. 50,000.00 Rp. Rp. 75,000.00
Tenaga
Mandor Oh 0.060 Rp. Rp. 72,000.00 Rp. Rp. 4,320.00
0.00 79,320.00
Jumlah harga = Rp. 79,320.00
Pembulatan = Rp. 79,300.00

SNI.DT 91-0006-2007.6.6
Menggali 1 m3 tanah lumpur sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 1.200 Rp. Rp. 50,000.00 Rp. Rp. 60,000.00
Tenaga
Mandor Oh 0.045 Rp. Rp. 72,000.00 Rp. Rp. 3,240.00
0.00 63,240.00
Jumlah harga = Rp. 63,240.00
Pembulatan = Rp. 63,200.00

SNI.DT 91-0006-2007.6.7
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.050 Rp. Rp. 50,000.00 Rp. Rp. 2,500.00
Tenaga
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 360.00
0.00 2,860.00
Jumlah harga = Rp. 2,860.00
Pembulatan = Rp. 2,860.00
SNI.DT 91-0006-2007.6.8
Membuang 1 m3 tanah sejauh 30 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.330 Rp. Rp. 50,000.00 Rp. Rp. 16,500.00
Tenaga
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
0.00 17,220.00
Jumlah harga = Rp. 17,220.00
Pembulatan = Rp. 17,220.00

SNI.DT 91-0006-2007.6.9
Mengurug kembali 1 m3 galian
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali upah pekerjaan
Menggali 1 m3 tanah biasa sedalam 3 meter Jumlah harga = Rp. 19,100.00
Pembulatan = Rp. 19,100.00

SNI.DT 91-0006-2007.6.10
Memadatkan 1 m3 tanah (per 20 cm)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.500 Rp. Rp. 50,000.00 Rp. Rp. 25,000.00
Tenaga
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
0.00 28,600.00
Jumlah harga = Rp. 28,600.00
Pembulatan = Rp. 28,600.00

SNI.DT 91-0006-2007.6.11
Mengurug 1 m3 pasir urug
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pasir Urug m3 1.200 Rp. 73,000.00 Rp. Rp. 87,600.00 Rp.
Bahan
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tenaga
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
87,600.00 15,720.00
Jumlah harga = Rp. 103,320.00
Pembulatan = Rp. 103,300.00

SNI.DT 91-0006-2007.6.12
Mengurug 1 m3 tanah urug
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Tanah Timbun m3 1.200 Rp. 69,000.00 Rp. Rp. 82,800.00 Rp.
Bahan
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tenaga
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
82,800.00 15,720.00
Jumlah harga = Rp. 98,520.00
Pembulatan = Rp. 98,500.00

SNI.DT 91-0006-2007.6.14
Memasang 1 m2 lapisan ijuk tebal 10 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Ijuk kg 6.000 Rp. 27,000.00 Rp. Rp. 162,000.00 Rp.
Bahan
Pekerja Oh 0.150 Rp. Rp. 50,000.00 Rp. Rp. 7,500.00
Tenaga
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
162,000.00 8,580.00
Jumlah harga = Rp. 170,580.00
Pembulatan = Rp. 170,580.00
SNI.DT 91-0006-2007.6.15
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Sirtu m3 1.200 Rp. 99,000.00 Rp. Rp. 118,800.00 Rp.
Bahan
Pekerja Oh 0.250 Rp. Rp. 50,000.00 Rp. Rp. 12,500.00
Tenaga
Mandor Oh 0.025 Rp. Rp. 72,000.00 Rp. Rp. 1,800.00
118,800.00 14,300.00
Jumlah harga = Rp. 133,100.00
Pembulatan = Rp. 133,100.00
DAFTAR ANALISA PEKERJAAN
RSNI T-15-2002
PEKERJAAN PERSIAPAN

RSNI T-15-2002.1
1 m' Pagar sementara dari seng gelombang tinggi 2 m
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Broti kayu kls III btg 0.030 Rp. 3,115,000.00 Rp. Rp. 93,450.00 Rp.
Semen portland kg 2.500 Rp. 1,100.00 Rp. Rp. 2,750.00 Rp.
Seng Gelombang 3"-5" lbr 1.200 Rp. 38,000.00 Rp. Rp. 45,600.00 Rp.
Pasir pasang m3 1.200 Rp. 90,000.00 Rp. Rp. 108,000.00 Rp.
Bahan
Kerikil beton m3 0.009 Rp. 166,000.00 Rp. Rp. 1,494.00 Rp.
Papan kayu klas III m3 0.072 Rp. 3,115,000.00 Rp. Rp. 224,280.00 Rp.
Paku biasa 2"-5" Meni besi kg 0.060 Rp. 16,000.00 Rp. Rp. 960.00 Rp.
Meni besi Lt 0.450 Rp. 20,000.00 Rp. Rp. 9,000.00 Rp.
Pekerja Oh 0.400 Rp. Rp. 50,000.00 Rp. Rp. 20,000.00
Tukang Kayu Oh 0.200 Rp. Rp. 72,000.00 Rp. Rp. 14,400.00
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00 Rp. Rp. 1,600.00
Mandor Oh 0.020 Rp. Rp. 72,000.00 Rp. Rp. 1,440.00
485,534.00 37,440.00
Jumlah harga = Rp. 522,974.00
Pembulatan = Rp. 522,970.00

RSNI.T-15-2002.2
1 m' Pek. Pengukuran & pemasangan Bowplank
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Broti kayu kls III btg 0.012 Rp. 3,115,000.00 Rp. Rp. 37,380.00 Rp.
Bahan Paku biasa 2"-5" Meni besi kg 0.020 Rp. 16,000.00 Rp. Rp. 320.00 Rp.
Papan kayu klas III m3 0.007 Rp. 3,115,000.00 Rp. Rp. 21,805.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00 Rp. Rp. 5,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp. 360.00
59,505.00 13,360.00
Jumlah harga = Rp. 72,865.00
Pembulatan = Rp. 72,870.00

RSNI.T-15-2002.3
1 m2 Pek. Kantor direksi keet dengan lantai plesteran
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu setara Damuli 8-10 m' 5.625 Rp. 18,000.00 Rp. Rp. 101,250.00 Rp.
Broti kayu kls III m3 0.180 Rp. 3,115,000.00 Rp. Rp. 560,700.00 Rp.
Paku kg 0.850 Rp. 16,000.00 Rp. Rp. 13,600.00 Rp.
Besi Strip kg 1.100 Rp. 21,000.00 Rp. Rp. 23,100.00 Rp.
Semen portland kg 35.000 Rp. 1,100.00 Rp. Rp. 38,500.00 Rp.
Pasir pasang m3 0.250 Rp. 90,000.00 Rp. Rp. 22,500.00 Rp.
Bahan Koral m3 0.150 Rp. 145,000.00 Rp. Rp. 21,750.00 Rp.
Bata Merah bh 30.000 Rp. 800.00 Rp. Rp. 24,000.00 Rp.
Seng Gelombang BJLS 32 lbr 1.500 Rp. 66,000.00 Rp. Rp. 99,000.00 Rp.
Jendela Nako (Rangka+kaca m2 0.500 Rp. 108,000.00 Rp. Rp. 54,000.00 Rp.
Kaca Polos m2 0.080 Rp. 13,000.00 Rp. Rp. 1,040.00 Rp.
Kunci Tanam bh 0.150 Rp. 135,000.00 Rp. Rp. 20,250.00 Rp.
Tripleks 6mm lbr 0.060 Rp. 90,000.00 Rp. Rp. 5,400.00 Rp.
Pekerja Oh 2.000 Rp. Rp. 50,000.00 Rp. Rp. 100,000.00
Tukang Kayu Oh 2.000 Rp. Rp. 72,000.00 Rp. Rp. 144,000.00
Tenaga Tukang Batu Oh 1.000 Rp. Rp. 72,000.00 Rp. Rp. 72,000.00
Kepala Tukang Oh 0.300 Rp. Rp. 80,000.00 Rp. Rp. 24,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
985,090.00 343,600.00
Jumlah harga = Rp. 1,328,690.00
Pembulatan = Rp. 1,328,690.00
RSNI.T-15-2002.4
1 m2 Pembuatan gudang sementara dan alat-alat
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu setara Damuli 8-10 m' 7.650 Rp. 18,000.00 Rp. Rp. 137,700.00 Rp.
Broti kayu kls III m3 0.210 Rp. 3,115,000.00 Rp. Rp. 654,150.00 Rp.
Paku kg 0.300 Rp. 16,000.00 Rp. Rp. 4,800.00 Rp.
Bahan Semen portland kg 10.500 Rp. 1,100.00 Rp. Rp. 11,550.00 Rp.
Pasir pasang m3 0.030 Rp. 90,000.00 Rp. Rp. 2,700.00 Rp.
Koral m3 0.050 Rp. 145,000.00 Rp. Rp. 7,250.00 Rp.
Seng Gelombang BJLS 32 lbr 1.500 Rp. 66,000.00 Rp. Rp. 99,000.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang Kayu Oh 2.000 Rp. Rp. 72,000.00 Rp. Rp. 144,000.00
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 80,000.00 Rp. Rp. 16,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
917,150.00 213,600.00
Jumlah harga = Rp. 1,130,750.00
Pembulatan = Rp. 1,130,750.00

RSNI.T-15-2002.5
1 m2 Pembuatan rumah jaga konstruksi kayu
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu setara Damuli 8-10 m' 13.500 Rp. 18,000.00 Rp. Rp. 243,000.00 Rp.
Broti kayu kls III m3 0.276 Rp. 3,115,000.00 Rp. Rp. 859,740.00 Rp.
Bahan
Paku kg 0.700 Rp. 16,000.00 Rp. Rp. 11,200.00 Rp.
Seng Gelombang BJLS 32 lbr 1.500 Rp. 66,000.00 Rp. Rp. 99,000.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang Kayu Oh 1.500 Rp. Rp. 72,000.00 Rp. Rp. 108,000.00
Tenaga
Kepala Tukang Oh 0.150 Rp. Rp. 80,000.00 Rp. Rp. 12,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
1,212,940.00 173,600.00
Jumlah harga = Rp. 1,386,540.00
Pembulatan = Rp. 1,386,540.00

RSNI.T-15-2002.6
1 m2 Membersihkan lapangan dan perataan
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Pekerja Oh 0.100 Rp. Rp. 50,000.00 Rp. Rp. 5,000.00
Tenaga
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
0.00 8,600.00
Jumlah harga = Rp. 8,600.00
Pembulatan = Rp. 8,600.00

RSNI.T-15-2002.7
1 m2 Pembuatan bedeng buruh
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu setara Damuli 8-10 m' 5.625 Rp. 18,000.00 Rp. Rp. 101,250.00 Rp.
Broti kayu kls III m3 0.186 Rp. 3,115,000.00 Rp. Rp. 579,390.00 Rp.
Paku kg 0.300 Rp. 16,000.00 Rp. Rp. 4,800.00 Rp.
Bahan Semen portland kg 18.000 Rp. 1,100.00 Rp. Rp. 19,800.00 Rp.
Pasir pasang m3 0.030 Rp. 90,000.00 Rp. Rp. 2,700.00 Rp.
Koral m3 0.050 Rp. 145,000.00 Rp. Rp. 7,250.00 Rp.
Seng Gelombang BJLS 32 lbr 1.500 Rp. 66,000.00 Rp. Rp. 99,000.00 Rp.
Tripleks 6mm lbr 1.350 Rp. 90,000.00 Rp. Rp. 121,500.00
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang Kayu Oh 2.000 Rp. Rp. 72,000.00 Rp. Rp. 144,000.00
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 80,000.00 Rp. Rp. 16,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
935,690.00 213,600.00
Jumlah harga = Rp. 1,149,290.00
Pembulatan = Rp. 1,149,290.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0008-2007
PEKERJAAN BETON

SNI.DT 91-0008-2007.6.1
Membuat 1 m3 beton mutu K 100
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 247.000 Rp. 1,100.00 Rp. Rp. 271,700.00 Rp.
Bahan Pasir pasang m3 0.869 Rp. 90,000.00 Rp. Rp. 78,210.00 Rp.
Batu Pecah 5-7 cm m3 0.999 Rp. 197,000.00 Rp. Rp. 196,803.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00 Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00 Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00 Rp. Rp. 5,976.00
546,713.00 110,516.00
Jumlah harga = Rp. 657,229.00
Pembulatan = Rp. 657,230.00

SNI.DT 91-0008-2007.6.2
Membuat 1 m3 beton mutu K 125
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 276.000 Rp. 1,100.00 Rp. Rp. 303,600.00 Rp.
Bahan Pasir pasang m 3
0.828 Rp. 90,000.00 Rp. Rp. 74,520.00 Rp.
Kerikil Beton m3 1.012 Rp. 166,000.00 Rp. Rp. 167,992.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00 Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00 Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00 Rp. Rp. 5,976.00
546,112.00 110,516.00
Jumlah harga = Rp. 656,628.00
Pembulatan = Rp. 656,630.00

SNI.DT 91-0008-2007.6.4
Membuat 1 m3 beton mutu K 150
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 299.000 Rp. 1,100.00 Rp. Rp. 328,900.00 Rp.
Bahan Pasir pasang m3 0.799 Rp. 90,000.00 Rp. 71,910.00
Kerikil Beton m3 1.017 Rp. 166,000.00 Rp. Rp. 168,822.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00 Rp. Rp. 82,500.00
Tukang Batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00 Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00 Rp. Rp. 5,976.00
569,632.00 110,516.00
Jumlah harga = Rp. 680,148.00
Pembulatan = Rp. 680,150.00

SNI.DT 91-0008-2007.6.5
Membuat 1 m3 beton mutu K 175
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 326.000 Rp. 1,100.00 Rp. Rp. 358,600.00 Rp.
Bahan Pasir pasang m3 0.760 Rp. 90,000.00 Rp. Rp. 68,400.00 Rp.
Kerikil Beton m3 1.029 Rp. 166,000.00 Rp. Rp. 170,814.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00 Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00 Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00 Rp. Rp. 5,976.00
597,814.00 110,516.00
Jumlah harga = Rp. 708,330.00
Pembulatan = Rp. 708,330.00
SNI.DT 91-0008-2007.6.6
Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 352.000 Rp. 1,100.00 Rp. Rp. 387,200.00 Rp.
Bahan Pasir pasang m3 0.731 Rp. 90,000.00 Rp. Rp. 65,790.00 Rp.
Kerikil Beton m3 1.031 Rp. 166,000.00 Rp. Rp. 171,146.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00Rp. Rp. 5,976.00
624,136.00 110,516.00
Jumlah harga = Rp. 734,652.00
Pembulatan = Rp. 734,650.00

SNI.DT 91-0008-2007.6.7
Membuat 1 m3 beton mutu K 225
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 371.000 Rp. 1,100.00 Rp. Rp. 408,100.00 Rp.
Bahan Pasir pasang m3 0.698 Rp. 90,000.00 Rp. Rp. 62,820.00 Rp.
Kerikil Beton m3 1.047 Rp. 166,000.00 Rp. Rp. 173,802.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00Rp. Rp. 5,976.00
644,722.00 110,516.00
Jumlah harga = Rp. 755,238.00
Pembulatan = Rp. 755,240.00

SNI.DT 91-0008-2007.6.8
Membuat 1 m3 beton mutu K 250
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 384.000 Rp. 1,100.00 Rp. Rp. 422,400.00 Rp.
Bahan Pasir pasang m3 0.692 Rp. 90,000.00 Rp. Rp. 62,280.00 Rp.
Kerikil Beton m3 1.039 Rp. 166,000.00 Rp. Rp. 172,474.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00Rp. Rp. 5,976.00
657,154.00 110,516.00
Jumlah harga = Rp. 767,670.00
Pembulatan = Rp. 767,670.00

SNI.DT 91-0008-2007.6.9
Membuat 1 m3 beton mutu K 275
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 406.000 Rp. 1,100.00 Rp. Rp. 446,600.00 Rp.
Bahan Pasir pasang m3 0.684 Rp. 90,000.00 Rp. Rp. 61,560.00 Rp.
Kerikil Beton m3 1.026 Rp. 166,000.00 Rp. Rp. 170,316.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00Rp. Rp. 5,976.00
678,476.00 110,516.00
Jumlah harga = Rp. 788,992.00
Pembulatan = Rp. 788,990.00
SNI.DT 91-0008-2007.6.10
Membuat 1 m3 beton mutu K 300
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 413.000 Rp. 1,100.00 Rp. Rp. 454,300.00 Rp.
Bahan Pasir pasang m3 0.681 Rp. 90,000.00 Rp. Rp. 61,290.00 Rp.
Kerikil Beton m3 1.021 Rp. 166,000.00 Rp. Rp. 169,486.00 Rp.
Pekerja Oh 1.650 Rp. Rp. 50,000.00Rp. Rp. 82,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 80,000.00Rp. Rp. 2,240.00
Mandor Oh 0.083 Rp. Rp. 72,000.00Rp. Rp. 5,976.00
685,076.00 110,516.00
Jumlah harga = Rp. 795,592.00
Pembulatan = Rp. 795,590.00

SNI.DT 91-0008-2007.6.11
Membuat 1 m3 beton mutu K 325
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 439.000 Rp. 1,100.00 Rp. Rp. 482,900.00 Rp.
Bahan Pasir pasang m3 0.670 Rp. 90,000.00 Rp. Rp. 60,300.00 Rp.
Kerikil Beton m3 1.006 Rp. 166,000.00 Rp. Rp. 166,996.00 Rp.
Pekerja Oh 2.100 Rp. Rp. 50,000.00Rp. Rp. 105,000.00
Tukang batu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp. 25,200.00
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp. 2,800.00
Mandor Oh 0.105 Rp. Rp. 72,000.00Rp. Rp. 7,560.00
710,196.00 140,560.00
Jumlah harga = Rp. 850,756.00
Pembulatan = Rp. 850,760.00

SNI.DT 91-0008-2007.6.12
Membuat 1 m3 beton mutu K 350
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Portland Semen kg 448.000 Rp. 1,100.00 Rp. Rp. 492,800.00 Rp.
Bahan Pasir pasang m3 0.667 Rp. 90,000.00 Rp. Rp. 60,030.00 Rp.
Kerikil Beton m3 1.000 Rp. 166,000.00 Rp. Rp. 166,000.00 Rp.
Pekerja Oh 2.100 Rp. Rp. 50,000.00Rp. Rp. 105,000.00
Tukang batu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp. 25,200.00
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp. 2,800.00
Mandor Oh 0.105 Rp. Rp. 72,000.00Rp. Rp. 7,560.00
718,830.00 140,560.00
Jumlah harga = Rp. 859,390.00
Pembulatan = Rp. 859,390.00

SNI.DT 91-0008-2007.6.17
Pembesian 10 kg dengan besi polos atau besi ulir
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Besi beton (polos/ulir) kg 10.500 Rp. 13,000.00 Rp. Rp. 136,500.00 Rp.
Bahan
Kawat beton kg 0.150 Rp. 19,000.00 Rp. Rp. 2,850.00 Rp.
Pekerja Oh 0.070 Rp. Rp. 50,000.00Rp. Rp. 3,500.00
Tukang batu Oh 0.070 Rp. Rp. 72,000.00Rp. Rp. 5,040.00
Tenaga
Kepala Tukang Oh 0.007 Rp. Rp. 80,000.00Rp. Rp. 560.00
Mandor Oh 0.004 Rp. Rp. 72,000.00Rp. Rp. 288.00
139,350.00 9,388.00
Jumlah harga = Rp. 148,738.00
Pembulatan = Rp. 148,700.00

SNI.DT 91-0008-2007.6.18
Memasang 10 kg kabel pres stressed polos /strands
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Besi beton (polos/ulir) kg 10.500 Rp. 13,000.00 Rp. Rp. 136,500.00 Rp.
Bahan
Kawat beton kg 0.100 Rp. 19,000.00 Rp. Rp. 1,900.00 Rp.
Pekerja Oh 0.050 Rp. Rp. 50,000.00Rp. Rp. 2,500.00
Tukang batu Oh 0.050 Rp. Rp. 72,000.00Rp. Rp. 3,600.00
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00Rp. Rp. 400.00
Mandor Oh 0.003 Rp. Rp. 72,000.00Rp. Rp. 216.00
138,400.00 6,716.00
Jumlah harga = Rp. 145,116.00
Pembulatan = Rp. 145,100.00
SNI.DT 91-0008-2007.6.19
Memasang 10 kg jaring kawat baja/wire mest
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Jaring kawat baja dila kg 10.200 Rp. 13,000.00 Rp. Rp. 132,600.00 Rp.
Bahan
Kawat beton kg 0.050 Rp. 19,000.00 Rp. Rp. 950.00 Rp.
Pekerja Oh 0.025 Rp. Rp. 50,000.00Rp. Rp. 1,250.00
Tukang batu Oh 0.025 Rp. Rp. 72,000.00Rp. Rp. 1,800.00
Tenaga
Kepala Tukang Oh 0.025 Rp. Rp. 80,000.00Rp. Rp. 2,024.00
Mandor Oh 0.001 Rp. Rp. 72,000.00Rp. Rp. 72.00
133,550.00 5,146.00
Jumlah harga = Rp. 138,696.00
Pembulatan = Rp. 138,700.00

SNI.DT 91-0008-2007.6.20
Memasang 1 m2 bekisting untuk pondasi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.040 Rp. 3,115,000.00 Rp. Rp. 124,600.00 Rp.
Bahan Paku 5cm-10cm kg 0.300 Rp. 16,000.00 Rp. Rp. 4,800.00 Rp.
minyak bekisting Ltr 0.100 Rp. 22,000.00 Rp. Rp. 2,200.00 Rp.
Pekerja Oh 0.520 Rp. Rp. 50,000.00Rp. Rp. 26,000.00
Tukang kayu Oh 0.260 Rp. Rp. 72,000.00Rp. Rp. 18,720.00
Tenaga
Kepala Tukang Oh 0.026 Rp. Rp. 80,000.00Rp. Rp. 2,080.00
Mandor Oh 0.026 Rp. Rp. 72,000.00Rp. Rp. 1,872.00
131,600.00 48,672.00
Jumlah harga = Rp. 180,272.00
Pembulatan = Rp. 180,270.00

SNI.DT 91-0008-2007.6.21
Memasang 1 m2 bekisting untuk sloof
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.045 Rp. 3,115,000.00 Rp. Rp. 140,175.00 Rp.
Bahan Paku 5cm-10cm kg 0.300 Rp. 16,000.00 Rp. Rp. 4,800.00 Rp.
minyak bekisting Ltr 0.100 Rp. 22,000.00 Rp. Rp. 2,200.00 Rp.
Pekerja Oh 0.520 Rp. Rp. 50,000.00Rp. Rp. 26,000.00
Tukang kayu Oh 0.260 Rp. Rp. 72,000.00Rp. Rp. 18,720.00
Tenaga
Kepala Tukang Oh 0.026 Rp. Rp. 80,000.00Rp. Rp. 2,080.00
Mandor Oh 0.026 Rp. Rp. 72,000.00Rp. Rp. 1,872.00
147,175.00 48,672.00
Jumlah harga = Rp. 195,847.00
Pembulatan = Rp. 195,850.00

SNI.DT 91-0008-2007.6.22
Memasang 1 m2 bekisting untuk kolom
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.040 Rp. 3,115,000.00 Rp. Rp. 124,600.00 Rp.
Bahan Paku 5cm-12cm kg 0.400 Rp. 16,000.00 Rp. Rp. 6,400.00 Rp.
minyak bekisting Ltr 0.200 Rp. 22,000.00 Rp. Rp. 4,400.00 Rp.
Balok kayu klas III m3 0.015 Rp. 3,115,000.00 Rp. Rp. 46,725.00 Rp.
Tripleks tebal 9 mm Lbr 0.350 Rp. 110,000.00 Rp. Rp. 38,500.00 Rp.
Kayu Bulat O4" K Btg 2.000 Rp. 18,000.00 Rp. Rp. 36,000.00 Rp.
Pekerja Oh 0.660 Rp. Rp. 50,000.00Rp. Rp. 33,000.00
Tukang kayu Oh 0.330 Rp. Rp. 72,000.00Rp. Rp. 23,760.00
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 80,000.00Rp. Rp. 2,640.00
Mandor Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
256,625.00 61,776.00
Jumlah harga = Rp. 318,401.00
Pembulatan = Rp. 318,400.00
SNI.DT 91-0008-2007.6.23
Memasang 1 m2 bekisting untuk balok
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.040 Rp. 3,115,000.00 Rp. Rp. 124,600.00 Rp.
Bahan Paku 5cm-12cm kg 0.400 Rp. 16,000.00 Rp. Rp. 6,400.00 Rp.
minyak bekisting Ltr 0.200 Rp. 22,000.00 Rp. Rp. 4,400.00 Rp.
Balok kayu klas III m3 0.018 Rp. 3,115,000.00 Rp. Rp. 56,070.00 Rp.
Tripleks tebal 9 mm Lbr 0.350 Rp. 110,000.00 Rp. Rp. 38,500.00 Rp.
Kayu Bulat O4" K Btg 2.000 Rp. 18,000.00 Rp. Rp. 36,000.00 Rp.
Pekerja Oh 0.660 Rp. Rp. 50,000.00Rp. Rp. 33,000.00
Tukang kayu Oh 0.330 Rp. Rp. 72,000.00Rp. Rp. 23,760.00
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 80,000.00Rp. Rp. 2,640.00
Mandor Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
265,970.00 61,776.00
Jumlah harga = Rp. 327,746.00
Pembulatan = Rp. 327,750.00

SNI.DT 91-0008-2007.6.24
Memasang 1 m2 bekisting untuk lantai
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.040 Rp. 3,115,000.00 Rp. Rp. 124,600.00 Rp.
Bahan Paku 5cm-12cm kg 0.400 Rp. 16,000.00 Rp. Rp. 6,400.00 Rp.
minyak bekisting Ltr 0.200 Rp. 22,000.00 Rp. Rp. 4,400.00 Rp.
Balok kayu klas III m3 0.015 Rp. 3,115,000.00 Rp. Rp. 46,725.00 Rp.
Tripleks tebal 9 mm Lbr 0.350 Rp. 110,000.00 Rp. Rp. 38,500.00 Rp.
Kayu Bulat O4" K Btg 6.000 Rp. 18,000.00 Rp. Rp. 108,000.00 Rp.
Pekerja Oh 0.660 Rp. Rp. 50,000.00Rp. Rp. 33,000.00
Tukang kayu Oh 0.330 Rp. Rp. 72,000.00Rp. Rp. 23,760.00
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 80,000.00Rp. Rp. 2,640.00
Mandor Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
328,625.00 61,776.00
Jumlah harga = Rp. 390,401.00
Pembulatan = Rp. 390,400.00

SNI.DT 91-0008-2007.6.25
Memasang 1 m2 bekisting untuk dinding
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.030 Rp. 3,115,000.00 Rp. Rp. 93,450.00 Rp.
Bahan Paku 5cm-12cm kg 0.400 Rp. 16,000.00 Rp. Rp. 6,400.00 Rp.
minyak bekisting Ltr 0.200 Rp. 22,000.00 Rp. Rp. 4,400.00 Rp.
Balok kayu klas III m3 0.020 Rp. 3,115,000.00 Rp. Rp. 62,300.00 Rp.
Tripleks tebal 9 mm Lbr 0.350 Rp. 110,000.00 Rp. Rp. 38,500.00 Rp.
Kayu Bulat O4" K Btg 3.000 Rp. 18,000.00 Rp. Rp. 54,000.00 Rp.
Pekerja Oh 0.660 Rp. Rp. 50,000.00Rp. Rp. 33,000.00
Tukang kayu Oh 0.330 Rp. Rp. 72,000.00Rp. Rp. 23,760.00
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 80,000.00Rp. Rp. 2,640.00
Mandor Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
259,050.00 61,776.00
Jumlah harga = Rp. 320,826.00
Pembulatan = Rp. 320,830.00

SNI.DT 91-0008-2007.6.26
Memasang 1 m2 bekisting untuk tangga
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.030 Rp. 3,115,000.00 Rp. Rp. 93,450.00 Rp.
Bahan Paku 5cm-12cm kg 0.400 Rp. 16,000.00 Rp. Rp. 6,400.00 Rp.
minyak bekisting Ltr 0.150 Rp. 22,000.00 Rp. Rp. 3,300.00 Rp.
Balok kayu klas III m3 0.015 Rp. 3,115,000.00 Rp. Rp. 46,725.00 Rp.
Tripleks tebal 9 mm Lbr 0.350 Rp. 110,000.00 Rp. Rp. 38,500.00 Rp.
Kayu Bulat O4" K Btg 2.000 Rp. 18,000.00 Rp. Rp. 36,000.00 Rp.
Pekerja Oh 0.660 Rp. Rp. 50,000.00Rp. Rp. 33,000.00
Tukang kayu Oh 0.330 Rp. Rp. 72,000.00Rp. Rp. 23,760.00
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 80,000.00Rp. Rp. 2,640.00
Mandor Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
224,375.00 61,776.00
Jumlah harga = Rp. 286,151.00
Pembulatan = Rp. 286,150.00

SNI.DT 91-0008-2007.6.27
Memasang 1 m2 jembatan untuk pengecoran beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.026 Rp. 3,115,000.00 Rp. Rp. 80,990.00 Rp.
Bahan
Bahan Paku 5cm-12cm kg 0.600 Rp. 16,000.00 Rp. Rp. 9,600.00 Rp.
Kayu Bulat O4" K Btg 0.500 Rp. 18,000.00 Rp. Rp. 9,000.00 Rp.
Pekerja Oh 0.150 Rp. Rp. 50,000.00 Rp. Rp. 7,500.00
Tukang kayu Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00 Rp. Rp. 400.00
Mandor Oh 0.008 Rp. Rp. 72,000.00 Rp. Rp. 576.00
99,590.00 12,076.00
Jumlah harga = Rp. 111,666.00
Pembulatan = Rp. 111,670.00

SNI.DT 91-0008-2007.6.28
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.200 Rp. 3,115,000.00 Rp. Rp. 623,000.00 Rp.
Paku 5cm-12cm kg 1.500 Rp. 16,000.00 Rp. Rp. 24,000.00 Rp.
minyak bekisting Ltr 0.400 Rp. 22,000.00 Rp. Rp. 8,800.00 Rp.
Besi beton polos kg 157.500 Rp. 13,000.00 Rp. Rp. 2,047,500.00 Rp.
Bahan Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.262 Rp. Rp. 80,000.00Rp. Rp. 20,960.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
3,298,710.00 494,040.00
Jumlah harga = Rp. 3,792,750.00
Pembulatan = Rp. 3,792,750.00

SNI.DT 91-0008-2007.6.28A
Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.200 Rp. 3,115,000.00 Rp. Rp. 623,000.00 Rp.
Paku 5cm-12cm kg 1.500 Rp. 16,000.00 Rp. Rp. 24,000.00 Rp.
minyak bekisting Ltr 0.400 Rp. 22,000.00 Rp. Rp. 8,800.00 Rp.
Besi beton polos kg 131.250 Rp. 13,000.00 Rp. Rp. 1,706,250.00 Rp.
Bahan Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.262 Rp. Rp. 80,000.00Rp. Rp. 20,960.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
2,957,460.00 494,040.00
Jumlah harga = Rp. 3,451,500.00
Pembulatan = Rp. 3,451,500.00
SNI.DT 91-0008-2007.6.28B
Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.200 Rp. 3,115,000.00 Rp. Rp. 623,000.00 Rp.
Paku 5cm-12cm kg 1.500 Rp. 16,000.00 Rp. Rp. 24,000.00 Rp.
minyak bekisting Ltr 0.400 Rp. 22,000.00 Rp. Rp. 8,800.00 Rp.
Besi beton polos kg 105.000 Rp. 13,000.00 Rp. Rp. 1,365,000.00 Rp.
Bahan Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.262 Rp. Rp. 80,000.00Rp. Rp. 20,960.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
2,616,210.00 494,040.00
Jumlah harga = Rp. 3,110,250.00
Pembulatan = Rp. 3,110,250.00

SNI.DT 91-0008-2007.6.29
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.270 Rp. 3,115,000.00 Rp. Rp. 841,050.00 Rp.
Paku 5cm-12cm kg 2.000 Rp. 16,000.00 Rp. Rp. 32,000.00 Rp.
minyak bekisting Ltr 0.600 Rp. 22,000.00 Rp. Rp. 13,200.00 Rp.
Besi beton polos kg 210.000 Rp. 13,000.00 Rp. Rp. 2,730,000.00 Rp.
Bahan Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.650 Rp. Rp. 50,000.00Rp. Rp. 282,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.560 Rp. Rp. 72,000.00Rp. Rp. 112,320.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.323 Rp. Rp. 80,000.00Rp. Rp. 25,840.00
Mandor Oh 0.283 Rp. Rp. 72,000.00Rp. Rp. 20,376.00
4,610,910.00 561,636.00
Jumlah harga = Rp. 5,172,546.00
Pembulatan = Rp. 5,172,550.00

SNI.DT 91-0008-2007.6.29A
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.270 Rp. 3,115,000.00 Rp. Rp. 841,050.00 Rp.
Paku 5cm-12cm kg 2.000 Rp. 16,000.00 Rp. Rp. 32,000.00 Rp.
minyak bekisting Ltr 0.600 Rp. 22,000.00 Rp. Rp. 13,200.00 Rp.
Besi beton polos kg 157.500 Rp. 13,000.00 Rp. Rp. 2,047,500.00 Rp.
Bahan Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.650 Rp. Rp. 50,000.00Rp. Rp. 282,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.560 Rp. Rp. 72,000.00Rp. Rp. 112,320.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.323 Rp. Rp. 80,000.00Rp. Rp. 25,840.00
Mandor Oh 0.283 Rp. Rp. 72,000.00Rp. Rp. 20,376.00
3,928,410.00 561,636.00
Jumlah harga = Rp. 4,490,046.00
Pembulatan = Rp. 4,490,050.00
SNI.DT 91-0008-2007.6.29B
Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.270 Rp. 3,115,000.00 Rp. Rp. 841,050.00 Rp.
Paku 5cm-12cm kg 2.000 Rp. 16,000.00 Rp. Rp. 32,000.00 Rp.
minyak bekisting Ltr 0.600 Rp. 22,000.00 Rp. Rp. 13,200.00 Rp.
Besi beton polos kg 131.250 Rp. 13,000.00 Rp. Rp. 1,706,250.00 Rp.
Bahan Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.650 Rp. Rp. 50,000.00Rp. Rp. 282,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.560 Rp. Rp. 72,000.00Rp. Rp. 112,320.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.323 Rp. Rp. 80,000.00Rp. Rp. 25,840.00
Mandor Oh 0.283 Rp. Rp. 72,000.00Rp. Rp. 20,376.00
3,587,160.00 561,636.00
Jumlah harga = Rp. 4,148,796.00
Pembulatan = Rp. 4,148,800.00

SNI.DT 91-0008-2007.6.29C
Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.270 Rp. 3,115,000.00 Rp. Rp. 841,050.00 Rp.
Paku 5cm-12cm kg 2.000 Rp. 16,000.00 Rp. Rp. 32,000.00 Rp.
minyak bekisting Ltr 0.600 Rp. 22,000.00 Rp. Rp. 13,200.00 Rp.
Besi beton polos kg 105.000 Rp. 13,000.00 Rp. Rp. 1,365,000.00 Rp.
Bahan Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Pekerja Oh 5.650 Rp. Rp. 50,000.00Rp. Rp. 282,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.560 Rp. Rp. 72,000.00Rp. Rp. 112,320.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.323 Rp. Rp. 80,000.00Rp. Rp. 25,840.00
Mandor Oh 0.283 Rp. Rp. 72,000.00Rp. Rp. 20,376.00
3,245,910.00 561,636.00
Jumlah harga = Rp. 3,807,546.00
Pembulatan = Rp. 3,807,550.00

SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.400 Rp. 3,115,000.00 Rp. Rp. 1,246,000.00 Rp.
Paku 5cm-12cm kg 4.000 Rp. 16,000.00 Rp. Rp. 64,000.00 Rp.
minyak bekisting Ltr 2.000 Rp. 22,000.00 Rp. Rp. 44,000.00 Rp.
Besi beton polos kg 315.000 Rp. 13,000.00 Rp. Rp. 4,095,000.00 Rp.
Kawat beton kg 4.500 Rp. 19,000.00 Rp. Rp. 85,500.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.150 Rp. 5,822,000.00 Rp. Rp. 873,300.00 Rp.
Kayu bulat O4"K Btg 20.000 Rp. 18,000.00 Rp. Rp. 360,000.00 Rp.
Pekerja Oh 7.050 Rp. Rp. 50,000.00Rp. Rp. 352,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 2.100 Rp. Rp. 72,000.00Rp. Rp. 151,200.00
Kepala Tukang Oh 0.403 Rp. Rp. 80,000.00Rp. Rp. 32,240.00
Mandor Oh 0.353 Rp. Rp. 72,000.00Rp. Rp. 25,416.00
7,705,460.00 699,956.00
Jumlah harga = Rp. 8,405,416.00
Pembulatan = Rp. 8,405,420.00

SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.400 Rp. 3,115,000.00 Rp. Rp. 1,246,000.00 Rp.
Paku 5cm-12cm kg 4.000 Rp. 16,000.00 Rp. Rp. 64,000.00 Rp.
minyak bekisting Ltr 2.000 Rp. 22,000.00 Rp. Rp. 44,000.00 Rp.
Besi beton polos kg 210.000 Rp. 13,000.00 Rp. Rp. 2,730,000.00 Rp.
Kawat beton kg 4.500 Rp. 19,000.00 Rp. Rp. 85,500.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 3.500 Rp. 110,000.00 Rp. Rp. 385,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.150 Rp. 5,822,000.00 Rp. Rp. 873,300.00 Rp.
Kayu bulat O4"K Btg 20.000 Rp. 18,000.00 Rp. Rp. 360,000.00 Rp.
Pekerja Oh 7.050 Rp. Rp. 50,000.00 Rp. Rp. 352,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00 Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 2.100 Rp. Rp. 72,000.00 Rp. Rp. 151,200.00
Kepala Tukang Oh 0.403 Rp. Rp. 80,000.00 Rp. Rp. 32,240.00
Mandor Oh 0.353 Rp. Rp. 72,000.00 Rp. Rp. 25,416.00
6,340,460.00 699,956.00
Jumlah harga = Rp. 7,040,416.00
Pembulatan = Rp. 7,040,420.00

SNI.DT 91-0008-2007.6.31
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 210.000 Rp. 13,000.00 Rp. Rp. 2,730,000.00 Rp.
Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.140 Rp. 5,822,000.00 Rp. Rp. 815,080.00 Rp.
Kayu bulat O4"K Btg 16.000 Rp. 18,000.00 Rp. Rp. 288,000.00 Rp.
Pekerja Oh 6.350 Rp. Rp. 50,000.00Rp. Rp. 317,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.333 Rp. Rp. 80,000.00Rp. Rp. 26,640.00
Mandor Oh 0.318 Rp. Rp. 72,000.00Rp. Rp. 22,896.00
5,833,940.00 606,436.00
Jumlah harga = Rp. 6,440,376.00
Pembulatan = Rp. 6,440,380.00

SNI.DT 91-0008-2007.6.31A
Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 157.500 Rp. 13,000.00 Rp. Rp. 2,047,500.00 Rp.
Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.140 Rp. 5,822,000.00 Rp. Rp. 815,080.00 Rp.
Kayu bulat O4"K Btg 16.000 Rp. 18,000.00 Rp. Rp. 288,000.00 Rp.
Pekerja Oh 6.350 Rp. Rp. 50,000.00Rp. Rp. 317,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.333 Rp. Rp. 80,000.00Rp. Rp. 26,640.00
Mandor Oh 0.318 Rp. Rp. 72,000.00Rp. Rp. 22,896.00
5,151,440.00 606,436.00
Jumlah harga = Rp. 5,757,876.00
Pembulatan = Rp. 5,757,880.00

SNI.DT 91-0008-2007.6.31B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 131.250 Rp. 13,000.00 Rp. Rp. 1,706,250.00 Rp.
Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.140 Rp. 5,822,000.00 Rp. Rp. 815,080.00 Rp.
Kayu bulat O4"K Btg 16.000 Rp. 18,000.00 Rp. Rp. 288,000.00 Rp.
Pekerja Oh 6.350 Rp. Rp. 50,000.00 Rp. Rp. 317,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00 Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00 Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00 Rp. Rp. 100,800.00
Kepala Tukang Oh 0.333 Rp. Rp. 80,000.00 Rp. Rp. 26,640.00
Mandor Oh 0.318 Rp. Rp. 72,000.00 Rp. Rp. 22,896.00
4,810,190.00 606,436.00
Jumlah harga = Rp. 5,416,626.00
Pembulatan = Rp. 5,416,630.00

SNI.DT 91-0008-2007.6.31C
Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 105.000 Rp. 13,000.00 Rp. Rp. 1,365,000.00 Rp.
Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.140 Rp. 5,822,000.00 Rp. Rp. 815,080.00 Rp.
Kayu bulat O4"K Btg 16.000 Rp. 18,000.00 Rp. Rp. 288,000.00 Rp.
Pekerja Oh 6.350 Rp. Rp. 50,000.00Rp. Rp. 317,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.650 Rp. Rp. 72,000.00Rp. Rp. 118,800.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.333 Rp. Rp. 80,000.00Rp. Rp. 26,640.00
Mandor Oh 0.318 Rp. Rp. 72,000.00Rp. Rp. 22,896.00
4,468,940.00 606,436.00
Jumlah harga = Rp. 5,075,376.00
Pembulatan = Rp. 5,075,380.00

SNI.DT 91-0008-2007.6.32
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 157.500 Rp. 13,000.00 Rp. Rp. 2,047,500.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.120 Rp. 5,822,000.00 Rp. Rp. 698,640.00 Rp.
Kayu bulat O4"K Btg 32.000 Rp. 18,000.00 Rp. Rp. 576,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.265 Rp. Rp. 80,000.00Rp. Rp. 21,200.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
5,308,750.00 494,280.00
Jumlah harga = Rp. 5,803,030.00
Pembulatan = Rp. 5,803,000.00
SNI.DT 91-0008-2007.6.32A
Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 131.250 Rp. 13,000.00 Rp. Rp. 1,706,250.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.120 Rp. 5,822,000.00 Rp. Rp. 698,640.00 Rp.
Kayu bulat O4"K Btg 32.000 Rp. 18,000.00 Rp. Rp. 576,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.265 Rp. Rp. 80,000.00Rp. Rp. 21,200.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
4,967,500.00 494,280.00
Jumlah harga = Rp. 5,461,780.00
Pembulatan = Rp. 5,461,800.00

SNI.DT 91-0008-2007.6.32B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.320 Rp. 3,115,000.00 Rp. Rp. 996,800.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 105.000 Rp. 13,000.00 Rp. Rp. 1,365,000.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.120 Rp. 5,822,000.00 Rp. Rp. 698,640.00 Rp.
Kayu bulat O4"K Btg 32.000 Rp. 18,000.00 Rp. Rp. 576,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.265 Rp. Rp. 80,000.00Rp. Rp. 21,200.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
4,626,250.00 494,280.00
Jumlah harga = Rp. 5,120,530.00
Pembulatan = Rp. 5,120,500.00

SNI.DT 91-0008-2007.6.33
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.240 Rp. 3,115,000.00 Rp. Rp. 747,600.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 157.500 Rp. 13,000.00 Rp. Rp. 2,047,500.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.160 Rp. 5,822,000.00 Rp. Rp. 931,520.00 Rp.
Kayu bulat O4"K Btg 24.000 Rp. 18,000.00 Rp. Rp. 432,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.265 Rp. Rp. 80,000.00Rp. Rp. 21,200.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
5,148,430.00 494,280.00
Jumlah harga = Rp. 5,642,710.00
Pembulatan = Rp. 5,642,700.00
SNI.DT 91-0008-2007.6.33A
Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.240 Rp. 3,115,000.00 Rp. Rp. 747,600.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 131.250 Rp. 13,000.00 Rp. Rp. 1,706,250.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.160 Rp. 5,822,000.00 Rp. Rp. 931,520.00 Rp.
Kayu bulat O4"K Btg 24.000 Rp. 18,000.00 Rp. Rp. 432,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.265 Rp. Rp. 80,000.00Rp. Rp. 21,200.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
4,807,180.00 494,280.00
Jumlah harga = Rp. 5,301,460.00
Pembulatan = Rp. 5,301,500.00

SNI.DT 91-0008-2007.6.33B
Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.240 Rp. 3,115,000.00 Rp. Rp. 747,600.00 Rp.
Paku 5cm-12cm kg 3.200 Rp. 16,000.00 Rp. Rp. 51,200.00 Rp.
minyak bekisting Ltr 1.600 Rp. 22,000.00 Rp. Rp. 35,200.00 Rp.
Besi beton polos kg 105.000 Rp. 13,000.00 Rp. Rp. 1,365,000.00 Rp.
Kawat beton kg 2.250 Rp. 19,000.00 Rp. Rp. 42,750.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.800 Rp. 110,000.00 Rp. Rp. 308,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.160 Rp. 5,822,000.00 Rp. Rp. 931,520.00 Rp.
Kayu bulat O4"K Btg 24.000 Rp. 18,000.00 Rp. Rp. 432,000.00 Rp.
Pekerja Oh 5.300 Rp. Rp. 50,000.00Rp. Rp. 265,000.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.300 Rp. Rp. 72,000.00Rp. Rp. 93,600.00
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 72,000.00Rp. Rp. 75,600.00
Kepala Tukang Oh 0.262 Rp. Rp. 80,000.00Rp. Rp. 20,960.00
Mandor Oh 0.265 Rp. Rp. 72,000.00Rp. Rp. 19,080.00
4,465,930.00 494,040.00
Jumlah harga = Rp. 4,959,970.00
Pembulatan = Rp. 4,959,970.00

SNI.DT 91-0008-2007.6.34
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.250 Rp. 3,115,000.00 Rp. Rp. 778,750.00 Rp.
Paku 5cm-12cm kg 3.000 Rp. 16,000.00 Rp. Rp. 48,000.00 Rp.
minyak bekisting Ltr 1.200 Rp. 22,000.00 Rp. Rp. 26,400.00 Rp.
Besi beton polos kg 210.000 Rp. 13,000.00 Rp. Rp. 2,730,000.00 Rp.
Kawat beton kg 3.000 Rp. 19,000.00 Rp. Rp. 57,000.00 Rp.
Bahan Portland cement kg 336.000 Rp. 1,100.00 Rp. Rp. 369,600.00 Rp.
Tripleks 9 mm Lbr 2.500 Rp. 110,000.00 Rp. Rp. 275,000.00 Rp.
Pasir pasang/beton m3 0.540 Rp. 90,000.00 Rp. Rp. 48,600.00 Rp.
Krikel beton m3 0.810 Rp. 166,000.00 Rp. Rp. 134,460.00 Rp.
Kayu klas II balok m3 0.105 Rp. 5,822,000.00 Rp. Rp. 611,310.00 Rp.
Kayu bulat O4"K Btg 14.000 Rp. 18,000.00 Rp. Rp. 252,000.00 Rp.
Pekerja Oh 5.650 Rp. Rp. 50,000.00Rp. Rp. 282,500.00
Tukang batu Oh 0.275 Rp. Rp. 72,000.00Rp. Rp. 19,800.00
Tukang kayu Oh 1.560 Rp. Rp. 72,000.00Rp. Rp. 112,320.00
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 72,000.00Rp. Rp. 100,800.00
Kepala Tukang Oh 0.323 Rp. Rp. 80,000.00Rp. Rp. 25,840.00
Mandor Oh 0.283 Rp. Rp. 72,000.00Rp. Rp. 20,376.00
5,331,120.00 561,636.00
Jumlah harga = Rp. 5,892,756.00
Pembulatan = Rp. 5,892,760.00
SNI.DT 91-0008-2007.6.35
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.002 Rp. 3,115,000.00 Rp. Rp. 6,230.00 Rp.
Paku 5cm-12cm kg 0.010 Rp. 16,000.00 Rp. Rp. 160.00 Rp.
minyak bekisting Ltr 1.200 Rp. 22,000.00 Rp. Rp. 26,400.00 Rp.
Besi beton polos kg 3.000 Rp. 13,000.00 Rp. Rp. 39,000.00 Rp.
Bahan Kawat beton kg 0.450 Rp. 19,000.00 Rp. Rp. 8,550.00 Rp.
Portland cement kg 4.000 Rp. 1,100.00 Rp. Rp. 4,400.00 Rp.
Pasir pasang/beton m3 0.006 Rp. 90,000.00 Rp. Rp. 540.00 Rp.
Krikel beton m3 0.009 Rp. 166,000.00 Rp. Rp. 1,494.00 Rp.
Pekerja Oh 0.180 Rp. Rp. 50,000.00Rp. Rp. 9,000.00
Tukang batu Oh 0.020 Rp. Rp. 72,000.00Rp. Rp. 1,440.00
Tukang kayu Oh 0.020 Rp. Rp. 72,000.00Rp. Rp. 1,440.00
Tenaga
Tukang Besi Oh 0.020 Rp. Rp. 72,000.00Rp. Rp. 1,440.00
Kepala Tukang Oh 0.006 Rp. Rp. 80,000.00Rp. Rp. 480.00
Mandor Oh 0.009 Rp. Rp. 72,000.00Rp. Rp. 648.00
86,774.00 14,448.00
Jumlah harga = Rp. 101,222.00
Pembulatan = Rp. 101,220.00

SNI.DT 91-0008-2007.6.36
Membuat 1 m' ring balok beton bertulang (10x15) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas III m3 0.003 Rp. 3,115,000.00 Rp. Rp. 9,345.00 Rp.
Paku 5cm-12cm kg 0.020 Rp. 16,000.00 Rp. Rp. 320.00 Rp.
minyak bekisting Ltr 1.200 Rp. 22,000.00 Rp. Rp. 26,400.00 Rp.
Besi beton polos kg 3.600 Rp. 13,000.00 Rp. Rp. 46,800.00 Rp.
Bahan Kawat beton kg 0.050 Rp. 19,000.00 Rp. Rp. 950.00 Rp.
Portland cement kg 5.500 Rp. 1,100.00 Rp. Rp. 6,050.00 Rp.
Pasir pasang/beton m3 0.009 Rp. 90,000.00 Rp. Rp. 810.00 Rp.
Krikel beton m3 0.015 Rp. 166,000.00 Rp. Rp. 2,490.00 Rp.
Pekerja Oh 0.297 Rp. Rp. 50,000.00Rp. Rp. 14,850.00
Tukang batu Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
Tukang kayu Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
Tenaga
Tukang Besi Oh 0.033 Rp. Rp. 72,000.00Rp. Rp. 2,376.00
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.015 Rp. Rp. 72,000.00Rp. Rp. 1,080.00
93,165.00 23,858.00
Jumlah harga = Rp. 117,023.00
Pembulatan = Rp. 117,020.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0007-2006
PEKERJAAN PONDASI

SNI.DT 91-0007-2006.6.1
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu belah 10-15cm m3 1.200 Rp. 197,000.00 Rp. Rp. 236,400.00 Rp.
Bahan Semen portland kg 202.000 Rp. 1,100.00 Rp. Rp. 222,200.00 Rp.
Pasir pasang m3 0.485 Rp. 90,000.00 Rp. Rp. 43,650.00 Rp.
Pekerja Oh 1.500 Rp. Rp. 50,000.00 Rp. Rp. 75,000.00
Tukang batu Oh 0.750 Rp. Rp. 72,000.00 Rp. Rp. 54,000.00
Tenaga
Kepala Tukang Oh 0.075 Rp. Rp. 80,000.00 Rp. Rp. 6,000.00
Mandor Oh 0.075 Rp. Rp. 72,000.00 Rp. Rp. 5,400.00
502,250.00 140,400.00
Jumlah harga = Rp. 642,650.00
Pembulatan = Rp. 642,650.00

SNI.DT 91-0007-2006.6.2
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu belah 10-15cm m3 1.200 Rp. 197,000.00 Rp. Rp. 236,400.00 Rp.
Bahan Semen portland kg 163.000 Rp. 1,100.00 Rp. Rp. 179,300.00 Rp.
Pasir pasang m3 0.520 Rp. 90,000.00 Rp. Rp. 46,800.00 Rp.
Pekerja Oh 1.500 Rp. Rp. 50,000.00 Rp. Rp. 75,000.00
Tukang batu Oh 0.750 Rp. Rp. 72,000.00 Rp. Rp. 54,000.00
Tenaga
Kepala Tukang Oh 0.075 Rp. Rp. 80,000.00 Rp. Rp. 6,000.00
Mandor Oh 0.075 Rp. Rp. 72,000.00 Rp. Rp. 5,400.00
462,500.00 140,400.00
Jumlah harga = Rp. 602,900.00
Pembulatan = Rp. 602,900.00

SNI.DT 91-0007-2006.6.9
Memasang 1 m3 batu kosong (anstamping)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu belah 10-15cm m3 1.200 Rp. 197,000.00 Rp. Rp. 236,400.00 Rp.
Bahan
Pasir Urug m3 0.432 Rp. 73,000.00 Rp. Rp. 31,536.00 Rp.
Pekerja Oh 0.780 Rp. Rp. 50,000.00 Rp. Rp. 39,000.00
Tukang Batu Oh 0.390 Rp. Rp. 72,000.00 Rp. Rp. 28,080.00
Tenaga
Kepala Tukang Oh 0.039 Rp. Rp. 80,000.00 Rp. Rp. 3,120.00
Mandor Oh 0.039 Rp. Rp. 72,000.00 Rp. Rp. 2,808.00
267,936.00 73,008.00
Jumlah harga = Rp. 340,944.00
Pembulatan = Rp. 340,940.00

SNI.DT 91-0007-2006.6.10
Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu belah 10-15cm m3 0.480 Rp. 197,000.00 Rp. Rp. 94,560.00 Rp.
Semen portland kg 194.000 Rp. 1,100.00 Rp. Rp. 213,400.00 Rp.
Pasir pasang m3 0.312 Rp. 90,000.00 Rp. Rp. 28,080.00 Rp.
Bahan
Batu pecah 5-7 m3 0.468 Rp. 197,000.00 Rp. Rp. 92,196.00 Rp.
Besi beton kg 126.000 Rp. 13,000.00 Rp. Rp. 1,638,000.00 Rp.
Kawat beton kg 1.800 Rp. 19,000.00 Rp. Rp. 34,200.00 Rp.
Pekerja Oh 3.400 Rp. Rp. 50,000.00 Rp. Rp. 170,000.00
Tukang batu Oh 0.850 Rp. Rp. 72,000.00 Rp. Rp. 61,200.00
Tenaga
Kepala Tukang Oh 0.085 Rp. Rp. 80,000.00 Rp. Rp. 6,800.00
Mandor Oh 0.170 Rp. Rp. 72,000.00 Rp. Rp. 12,240.00
2,100,436.00 250,240.00
Jumlah harga = Rp. 2,350,676.00
Pembulatan = Rp. 2,350,680.00
SNI.DT 91-0007-2006.6.11
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu belah 10-15cm m3 0.450 Rp. 197,000.00 Rp. Rp. 88,650.00 Rp.
Semen portland kg 194.000 Rp. 1,100.00 Rp. Rp. 213,400.00 Rp.
Bahan
Pasir pasang m3 0.312 Rp. 90,000.00 Rp. Rp. 28,080.00 Rp.
Batu pecah 5-7 m3 0.468 Rp. 197,000.00 Rp. Rp. 92,196.00 Rp.
Pekerja Oh 2.400 Rp. Rp. 50,000.00 Rp. Rp. 120,000.00
Tukang batu Oh 0.800 Rp. Rp. 72,000.00 Rp. Rp. 57,600.00
Tenaga
Kepala Tukang Oh 0.080 Rp. Rp. 80,000.00 Rp. Rp. 6,400.00
Mandor Oh 0.119 Rp. Rp. 72,000.00 Rp. Rp. 8,568.00
422,326.00 192,568.00
Jumlah harga = Rp. 614,894.00
Pembulatan = Rp. 614,890.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN

SNI.DT 91-0010-2007.6.1
Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Semen portland kg 15.504 Rp. 1,100.00 Rp. Rp. 17,054.40 Rp.
Bahan
Pasir pasang m3 0.016 Rp. 90,000.00 Rp. Rp. 1,440.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tukang batu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
18,494.40 28,080.00
Jumlah harga = Rp. 46,574.40
Pembulatan = Rp. 46,570.00

SNI.DT 91-0010-2007.6.2
Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Semen portland kg 10.224 Rp. 1,100.00 Rp. Rp. 11,246.40 Rp.
Bahan
Pasir pasang m3 0.020 Rp. 90,000.00 Rp. Rp. 1,800.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tukang batu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
13,046.40 28,080.00
Jumlah harga = Rp. 41,126.40
Pembulatan = Rp. 41,130.00

SNI.DT 91-0010-2007.6.3
Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Semen portland kg 7.776 Rp. 1,100.00 Rp. 8,553.60
Bahan
Pasir pasang m3 0.023 Rp. 90,000.00 Rp. Rp. 2,070.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tukang Batu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
10,623.60 28,080.00
Jumlah harga = Rp. 38,703.60
Pembulatan = Rp. 38,700.00

SNI.DT 91-0010-2007.6.4
Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Semen portland kg 6.240 Rp. 1,100.00 Rp. Rp. 6,864.00 Rp.
Bahan
Pasir pasang m3 0.024 Rp. 90,000.00 Rp. Rp. 2,160.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tukang batu Oh 0.150 Rp. Rp. 72,000.00 Rp. Rp. 10,800.00
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 80,000.00 Rp. Rp. 1,200.00
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
9,024.00 28,080.00
Jumlah harga = Rp. 37,104.00
Pembulatan = Rp. 37,100.00

SNI.DT 91-0010-2007.6.23
Memasang 1 m2 plesteran ciprat 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Semen portland kg 4.320 Rp. 1,100.00 Rp. Rp. 4,752.00 Rp.
Bahan
Pasir pasang m3 0.006 Rp. 90,000.00 Rp. Rp. 540.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp. 15,000.00
Tukang batu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp. 1,080.00
5,292.00 24,080.00
Jumlah harga = Rp. 29,372.00
Pembulatan = Rp. 29,370.00
SNI.DT 91-0010-2007.6.27
Memasang 1 m2 acian
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Semen portland kg 3.250 Rp. 1,100.00 Rp. Rp. 3,575.00 Rp.
Pekerja Oh 0.200 Rp. Rp. 50,000.00 Rp. Rp. 10,000.00
Tukang batu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp. 800.00
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp. 720.00
3,575.00 18,720.00
Jumlah harga = Rp. 22,295.00
Pembulatan = Rp. 22,300.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0011-2007
PEKERJAAN KAYU

SNI.DT 91-0011-2007.6.1
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas I
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Balok kayu klas I m3 1.100 Rp. 7,902,000.00 Rp. Rp. 8,692,200.00 Rp.
Bahan Paku 10 cm kg 1.250 Rp. 16,000.00 Rp. Rp. 20,000.00 Rp.
Lem kayu kg 1.000 Rp. 13,000.00 Rp. Rp. 13,000.00 Rp.
Pekerja Oh 7.000 Rp. Rp. 50,000.00Rp. Rp. 350,000.00
Tukang Kayu Oh 21.000 Rp. Rp. 72,000.00Rp. Rp. 1,512,000.00
Tenaga
Kepala Tukang Oh 2.100 Rp. Rp. 80,000.00Rp. Rp. 168,000.00
Mandor Oh 0.350 Rp. Rp. 72,000.00Rp. Rp. 25,200.00
8,725,200.00 2,055,200.00
Jumlah harga = Rp. 10,780,400.00
Pembulatan = Rp. 10,780,400.00

SNI.DT 91-0011-2007.6.2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Balok kayu kls II m3 1.200 Rp. 5,822,000.00 Rp. Rp. 6,986,400.00 Rp.
Bahan Paku 10 cm kg 1.250 Rp. 16,000.00 Rp. Rp. 20,000.00 Rp.
Lem kayu kg 1.000 Rp. 13,000.00 Rp. Rp. 13,000.00 Rp.
Pekerja Oh 6.000 Rp. Rp. 50,000.00Rp. Rp. 300,000.00
Tukang Kayu Oh 18.000 Rp. Rp. 72,000.00Rp. Rp. 1,296,000.00
Tenaga Kepala Tukang Oh 1.800 Rp. Rp. 80,000.00Rp. Rp. 144,000.00
Mandor Oh 0.300 Rp. Rp. 72,000.00Rp. Rp. 21,600.00
7,019,400.00 1,761,600.00
Jumlah harga = Rp. 8,781,000.00
Pembulatan = Rp. 8,781,000.00

SNI.DT 91-0011-2007.6.3
Membuat dan memasang 1 m2 daun pintu panel , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan kayu kls II m3 0.040 Rp. 5,822,000.00 Rp. Rp. 232,880.00 Rp.
Bahan
Lem kayu kg 0.500 Rp. 13,000.00 Rp. Rp. 6,500.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00Rp. Rp. 50,000.00
Tukang Kayu Oh 3.000 Rp. Rp. 72,000.00Rp. Rp. 216,000.00
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 80,000.00Rp. Rp. 24,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00Rp. Rp. 3,600.00
239,380.00 293,600.00
Jumlah harga = Rp. 532,980.00
Pembulatan = Rp. 532,980.00

SNI.DT 91-0011-2007.6.6
Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan kayu kls II m3 0.024 Rp. 5,822,000.00 Rp. Rp. 139,728.00 Rp.
Bahan
Lem kayu kg 0.300 Rp. 13,000.00 Rp. Rp. 3,900.00 Rp.
Pekerja Oh 0.800 Rp. Rp. 50,000.00Rp. Rp. 40,000.00
Tukang Kayu Oh 2.400 Rp. Rp. 72,000.00Rp. Rp. 172,800.00
Tenaga
Kepala Tukang Oh 0.240 Rp. Rp. 80,000.00Rp. Rp. 19,200.00
Mandor Oh 0.040 Rp. Rp. 72,000.00Rp. Rp. 2,880.00
143,628.00 234,880.00
Jumlah harga = Rp. 378,508.00
Pembulatan = Rp. 378,510.00

SNI.DT 91-0011-2007.6.7
Membuat dan memasang 1 m2 pintu dan jendela jalusi , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan kayu kls II m3 0.064 Rp. 5,822,000.00 Rp. Rp. 372,608.00 Rp.
Bahan
Lem kayu kg 0.500 Rp. 13,000.00 Rp. Rp. 6,500.00 Rp.
Pekerja Oh 1.000 Rp. Rp. 50,000.00 Rp. Rp. 50,000.00
Tukang Kayu Oh 3.000 Rp. Rp. 72,000.00 Rp. Rp. 216,000.00
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 80,000.00 Rp. Rp. 24,000.00
Mandor Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp. 3,600.00
379,108.00 293,600.00
Jumlah harga = Rp. 672,708.00
Pembulatan = Rp. 672,710.00
SNI.DT 91-0011-2007.6.9
Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan kayu klas II m3 0.026 Rp. 5,822,000.00 Rp. Rp. 149,043.20 Rp.
Bahan Paku 1cm-2.5 cm kg 0.030 Rp. 16,000.00 Rp. Rp. 480.00 Rp.
Lem kayu kg 0.500 Rp. 13,000.00 Rp. Rp. 6,500.00 Rp.
Tripleks 9mm lbr 1.000 Rp. 110,000.00 Rp. Rp. 110,000.00
Pekerja Oh 0.800 Rp. Rp. 50,000.00Rp. Rp. 40,000.00
Tukang Kayu Oh 2.400 Rp. Rp. 72,000.00Rp. Rp. 172,800.00
Tenaga
Kepala Tukang Oh 0.240 Rp. Rp. 80,000.00Rp. Rp. 19,200.00
Mandor Oh 0.040 Rp. Rp. 72,000.00Rp. Rp. 2,880.00
266,023.20 234,880.00
Jumlah harga = Rp. 500,903.20
Pembulatan = Rp. 500,900.00

SNI.DT 91-0011-2007.6.10
Memasang 1 m2 jalusi kusen, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan kayu klas II m3 0.060 Rp. 5,822,000.00 Rp. Rp. 349,320.00 Rp.
Bahan
Paku 1cm-2.5 cm kg 0.150 Rp. 16,000.00 Rp. Rp. 2,400.00 Rp.
Pekerja Oh 0.670 Rp. Rp. 50,000.00Rp. Rp. 33,500.00
Tukang Kayu Oh 2.000 Rp. Rp. 72,000.00Rp. Rp. 144,000.00
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 80,000.00Rp. Rp. 16,000.00
Mandor Oh 0.335 Rp. Rp. 72,000.00Rp. Rp. 24,120.00
351,720.00 217,620.00
Jumlah harga = Rp. 569,340.00
Pembulatan = Rp. 569,340.00

SNI.DT 91-0011-2007.6.13
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Balok kayu klas II m3 1.100 Rp. 5,822,000.00 Rp. Rp. 6,404,200.00 Rp.
Bahan Besi strip tebal 5 mm kg 15.000 Rp. 21,000.00 Rp. Rp. 315,000.00 Rp.
Paku 12 cm kg 5.600 Rp. 16,000.00 Rp. Rp. 89,600.00 Rp.
Pekerja Oh 4.000 Rp. Rp. 50,000.00Rp. Rp. 200,000.00
Tukang Kayu Oh 12.000 Rp. Rp. 72,000.00Rp. Rp. 864,000.00
Tenaga
Kepala Tukang Oh 1.200 Rp. Rp. 80,000.00Rp. Rp. 96,000.00
Mandor Oh 0.200 Rp. Rp. 72,000.00Rp. Rp. 14,400.00
6,808,800.00 1,174,400.00
Jumlah harga = Rp. 7,983,200.00
Pembulatan = Rp. 7,983,200.00

SNI.DT 91-0011-2007.6.15
Memasang 1 m3 konstruksi gordeng, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Balok kayu klas II m3 1.100 Rp. 5,822,000.00 Rp. Rp. 6,404,200.00 Rp.
Bahan Besi strip tebal 5 mm kg 15.000 Rp. 21,000.00 Rp. Rp. 315,000.00 Rp.
Paku 12 cm kg 3.000 Rp. 16,000.00 Rp. Rp. 48,000.00 Rp.
Pekerja Oh 2.400 Rp. Rp. 50,000.00Rp. Rp. 120,000.00
Tukang Kayu Oh 7.200 Rp. Rp. 72,000.00Rp. Rp. 518,400.00
Tenaga Kepala Tukang Oh 0.720 Rp. Rp. 80,000.00Rp. Rp. 57,600.00
Mandor Oh 0.120 Rp. Rp. 72,000.00Rp. Rp. 8,640.00
6,767,200.00 704,640.00
Jumlah harga = Rp. 7,471,840.00
Pembulatan = Rp. 7,471,840.00
SNI.DT 91-0011-2007.6.16
Memasang 1 m2 rangka atap genteng keramik, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kaso-kaso (5x7)cm m3 0.014 Rp. 5,822,000.00 Rp. Rp. 81,508.00 Rp.
Bahan Reng (2x3)cm m3 0.036 Rp. 5,822,000.00 Rp. Rp. 209,592.00 Rp.
Paku 5 cm dan 10 cm kg 0.250 Rp. 16,000.00 Rp. Rp. 4,000.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00Rp. Rp. 5,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
295,100.00 13,360.00
Jumlah harga = Rp. 308,460.00
Pembulatan = Rp. 308,460.00

SNI.DT 91-0011-2007.6.17
Memasang 1 m2 rangka atap genteng beton, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kaso-kaso (5x7)cm m3 0.014 Rp. 5,822,000.00 Rp. Rp. 81,508.00 Rp.
Bahan Reng (2x3)cm m3 0.057 Rp. 5,822,000.00 Rp. Rp. 331,854.00 Rp.
Paku 5 cm dan 10 cm kg 0.250 Rp. 16,000.00 Rp. Rp. 4,000.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00Rp. Rp. 5,000.00
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp. 7,200.00
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp. 800.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
417,362.00 13,360.00
Jumlah harga = Rp. 430,722.00
Pembulatan = Rp. 430,720.00

SNI.DT 91-0011-2007.6.18
Memasang 1 m2 rangka atap seng BJLS, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kayu klas II m3 0.165 Rp. 5,822,000.00 Rp. Rp. 960,630.00 Rp.
Bahan
Paku 5 cm dan 10 cm kg 0.200 Rp. 16,000.00 Rp. Rp. 3,200.00 Rp.
Pekerja Oh 0.120 Rp. Rp. 50,000.00Rp. Rp. 6,000.00
Tukang Kayu Oh 0.120 Rp. Rp. 72,000.00Rp. Rp. 8,640.00
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 80,000.00Rp. Rp. 960.00
Mandor Oh 0.006 Rp. Rp. 72,000.00Rp. Rp. 432.00
963,830.00 16,032.00
Jumlah harga = Rp. 979,862.00
Pembulatan = Rp. 979,860.00

SNI.DT 91-0011-2007.6.19
Memasang 1 m2 rangka plafond, kayu klas III
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Kaso-kaso (5x7)cm m3 0.015 Rp. 3,115,000.00 Rp. Rp. 47,971.00 Rp.
Bahan
Paku 7 cm dan 10 cm kg 0.200 Rp. 16,000.00 Rp. Rp. 3,200.00 Rp.
Pekerja Oh 0.150 Rp. Rp. 50,000.00Rp. Rp. 7,500.00
Tukang Kayu Oh 0.300 Rp. Rp. 72,000.00Rp. Rp. 21,600.00
Tenaga
Kepala Tukang Oh 0.030 Rp. Rp. 80,000.00Rp. Rp. 2,400.00
Mandor Oh 0.075 Rp. Rp. 72,000.00Rp. Rp. 5,400.00
51,171.00 36,900.00
Jumlah harga = Rp. 88,071.00
Pembulatan = Rp. 88,070.00

SNI.DT 91-0011-2007.6.21
Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan Kayu klas II m3 0.011 Rp. 5,822,000.00 Rp. Rp. 62,877.60 Rp.
Bahan
Paku 5 cm dan 7 cm kg 0.100 Rp. 16,000.00 Rp. Rp. 1,600.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00Rp. Rp. 5,000.00
Tukang Kayu Oh 0.200 Rp. Rp. 72,000.00Rp. Rp. 14,400.00
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00Rp. Rp. 1,600.00
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp. 360.00
64,477.60 21,360.00
Jumlah harga = Rp. 85,837.60
Pembulatan = Rp. 85,840.00
SNI.DT 91-0011-2007.6.23
Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Papan Kayu klas III m3 0.028 Rp. 3,115,000.00 Rp. Rp. 87,220.00 Rp.
Bahan
Paku 5 cm dan 7 cm kg 0.150 Rp. 16,000.00 Rp. Rp. 2,400.00 Rp.
Pekerja Oh 0.150 Rp. Rp. 50,000.00Rp. Rp. 7,500.00
Tukang Kayu Oh 0.450 Rp. Rp. 72,000.00Rp. Rp. 32,400.00
Tenaga
Kepala Tukang Oh 0.045 Rp. Rp. 80,000.00Rp. Rp. 3,600.00
Mandor Oh 0.008 Rp. Rp. 72,000.00Rp. Rp. 576.00
89,620.00 44,076.00
Jumlah harga = Rp. 133,696.00
Pembulatan = Rp. 133,700.00
SNI.DT 91-0011-2007.6.25
Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas III
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Balok kayu, ukuran (6x12) m3 0.028 Rp. 3,115,000.00 Rp. Rp. 87,220.00 Rp.
Bahan Paku 5 cm- 10 cm kg 0.150 Rp. 16,000.00 Rp. Rp. 2,400.00 Rp.
Lem kayu kg 0.560 Rp. 13,000.00 Rp. Rp. 7,280.00 Rp.
Tripleks 6mm lbr 0.860 Rp. 90,000.00 Rp. Rp. 77,400.00
Pekerja Oh 0.200 Rp. Rp. 50,000.00Rp. Rp. 10,000.00
Tukang Kayu Oh 0.600 Rp. Rp. 72,000.00Rp. Rp. 43,200.00
Tenaga
Kepala Tukang Oh 0.060 Rp. Rp. 80,000.00Rp. Rp. 4,800.00
Mandor Oh 0.010 Rp. Rp. 72,000.00Rp. Rp. 720.00
174,300.00 58,720.00
Jumlah harga = Rp. 233,020.00
Pembulatan = Rp. 233,020.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT

SNI.DT 91-0013-2007.6.1
Memasang 1 m2 langit-langit asbes semen
Kebutuhan Satuan Indeks Harga satuan Harga satuanJumlah harga bahan Jumlah harga upah
Asbes semen m2 1.100 Rp. 13,000.00 Rp. Rp. 14,300.00 Rp.
Bahan
Paku tripleks kg 0.010 Rp. 16,000.00 Rp. Rp. 160.00 Rp.
Pekerja Oh 0.030 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.070 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.007 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.004 Rp. Rp. 72,000.00Rp. Rp.
14,460.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0013-2007.6.5
Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuanJumlah harga bahan Jumlah harga upah
Tripleks 4 mm Lbr 0.375 Rp. 60,000.00 Rp. Rp. 22,500.00 Rp.
Bahan
Paku tripleks kg 0.030 Rp. 16,000.00 Rp. Rp. 480.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.005 Rp. Rp. 72,000.00Rp. Rp.
22,980.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0013-2007.6.6
Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuanJumlah harga bahan Jumlah harga upah
Kayu Papan klas I m3 0.015 Rp. 3,115,000.00 Rp. Rp. 46,725.00 Rp.
Bahan
Paku tripleks kg 0.010 Rp. 16,000.00 Rp. Rp. 160.00 Rp.
Pekerja Oh 0.800 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.800 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.080 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.040 Rp. Rp. 72,000.00Rp. Rp.
46,885.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0013-2007.6.7
Memasang 1 m2 langit-langit gypsum board ukuran (120x240x 90)mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Gypsum board lbr 0.364 Rp. 20,000.00 Rp. Rp. 7,280.00 Rp.
Bahan
Paku skrup kg 0.110 Rp. 23,000.00 Rp. Rp. 2,530.00 Rp.
Pekerja Oh 0.100 Rp. Rp. 50,000.00 Rp. Rp.
Tukang Kayu Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.005 Rp. Rp. 72,000.00 Rp. Rp.
9,810.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0013-2007.6.9
Memasang 1 m' list langit-langit kayu profil
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
List kayu profil m' 1.050 Rp. 4,500.00 Rp. Rp. 4,725.00 Rp.
Bahan
Paku kg 0.010 Rp. 16,000.00 Rp. Rp. 160.00 Rp.
Pekerja Oh 0.050 Rp. Rp. 50,000.00 Rp. Rp.

Tenaga
Tukang Kayu Oh 0.050 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.003 Rp. Rp. 72,000.00 Rp. Rp.
4,885.00
Jumlah harga = Rp.
Pembulatan = Rp.
Jumlah harga upah

1,500.00
5,040.00
560.00
288.00
7,388.00
21,848.00
21,850.00

Jumlah harga upah

5,000.00
7,200.00
800.00
360.00
13,360.00
36,340.00
36,340.00

Jumlah harga upah

40,000.00
57,600.00
6,400.00
2,880.00
106,880.00
153,765.00
153,770.00

Jumlah harga upah

5,000.00
3,600.00
400.00
360.00
9,360.00
19,170.00
19,170.00

Jumlah harga upah

2,500.00
3,600.00
400.00
216.00
6,716.00
11,601.00
11,600.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING

SNI.DT 91-0012-2007.6.13
Memasang 1 m2 lantai keramik ukuran (60x60) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Lantai keramik 60x60 Bh 3.100 Rp. 45,000.00 Rp. Rp. 139,500.00 Rp.
Portland cement kg 9.600 Rp. 1,100.00 Rp. Rp. 10,560.00 Rp.
Bahan
Pasir pasang m3 0.045 Rp. 90,000.00 Rp. Rp. 4,050.00 Rp.
Semen warna kg 1.500 Rp. 3,075.00 Rp. Rp. 4,612.50 Rp.
Pekerja Oh 0.240 Rp. Rp. Rp. Rp.
Tukang Batu Oh 0.120 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.012 Rp. Rp. 72,000.00Rp. Rp.
158,722.50
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.34
Memasang 1 m2 lantai keramik ukuran (40x40) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Lantai keramik Bh 6.500 Rp. 8,833.33 Rp. Rp. 57,416.65 Rp.
Portland cement kg 8.190 Rp. 1,100.00 Rp. Rp. 9,009.00 Rp.
Bahan
Pasir pasang m3 0.045 Rp. 90,000.00 Rp. Rp. 4,050.00 Rp.
Semen warna kg 1.620 Rp. 3,075.00 Rp. Rp. 4,981.50 Rp.
Pekerja Oh 0.700 Rp. Rp. Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
75,457.15
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.35
Memasang 1 m2 lantai keramik ukuran (30x30) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Lantai keramik Bh 11.500 Rp. 4,909.09 Rp. Rp. 56,454.54 Rp.
Portland cement kg 10.000 Rp. 1,100.00 Rp. Rp. 11,000.00 Rp.
Bahan
Pasir pasang m3 0.045 Rp. 90,000.00 Rp. Rp. 4,050.00 Rp.
Semen warna kg 1.500 Rp. 3,075.00 Rp. Rp. 4,612.50 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
76,117.04
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.36
Memasang 1 m2 lantai keramik ukuran (20x20) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Lantai keramik Bh 25.000 Rp. 1,960.00 Rp. Rp. 49,000.00 Rp.
Portland cement kg 10.400 Rp. 1,100.00 Rp. Rp. 11,440.00 Rp.
Bahan
Pasir pasang m3 0.045 Rp. 90,000.00 Rp. Rp. 4,050.00 Rp.
Semen warna kg 1.620 Rp. 3,075.00 Rp. Rp. 4,981.50 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
69,471.50
Jumlah harga = Rp.
Pembulatan = Rp.
SNI.DT 91-0012-2007.6.36.1
Memasang 1 m2 dinding keramik ukuran (20x25) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Lantai keramik Bh 20.000 Rp. 2,250.00 Rp. Rp. 45,000.00 Rp.
Portland cement kg 10.400 Rp. 1,100.00 Rp. Rp. 11,440.00 Rp.
Bahan
Pasir pasang m3 0.045 Rp. 90,000.00 Rp. Rp. 4,050.00 Rp.
Semen warna kg 1.620 Rp. 3,075.00 Rp. Rp. 4,981.50 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
65,471.50
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.44
Memasang 1 m2 lantai karpet
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Karpet m2 1.050 Rp. 36,000.00 Rp. Rp. 37,800.00 Rp.
Bahan
Lem kg 0.350 Rp. 45,000.00 Rp. Rp. 15,750.00 Rp.
Pekerja Oh 0.170 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.170 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.009 Rp. Rp. 72,000.00Rp. Rp.
53,550.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.46
Memasang 1 m2 lantai parquet
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Parquet m2 1.050 Rp. 270,000.00 Rp. Rp. 283,500.00 Rp.
Bahan
Lem kg 0.600 Rp. 45,000.00 Rp. Rp. 27,000.00 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
310,500.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.47
Memasang 1 m2 lantai kayu (gym floor)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Gymfloor m2 1.050 Rp. 180,000.00 Rp. Rp. 189,000.00 Rp.
Bahan
Lem kg 0.600 Rp. 45,000.00 Rp. Rp. 27,000.00 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00Rp. Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00Rp. Rp.
216,000.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.57
Memasang 1 m2 dinding batu paras
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu paras m2 1.100 Rp. 180,000.00 Rp. Rp. 198,000.00 Rp.
Bahan Potrland cement kg 11.750 Rp. 1,100.00 Rp. Rp. 12,925.00 Rp.
Pasir pasang m3 0.035 Rp. 90,000.00 Rp. Rp. 3,150.00 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00 Rp. Rp.
Tukang batu Oh 0.350 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00 Rp. Rp.
Tenaga
Mandor Oh 0.035 Rp. Rp. 72,000.00 Rp. Rp.
214,075.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.58
Memasang 1 m2 dinding batu tempel hitam
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu tempel hitam m2 1.100 Rp. 135,000.00 Rp. Rp. 148,500.00 Rp.
Bahan Potrland cement kg 11.750 Rp. 1,100.00 Rp. Rp. 12,925.00 Rp.
Pasir pasang m3 0.035 Rp. 90,000.00 Rp. Rp. 3,150.00 Rp.
Pekerja Oh 0.700 Rp. Rp. 50,000.00 Rp. Rp.
Tukang batu Oh 0.350 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.035 Rp. Rp. 72,000.00 Rp. Rp.
164,575.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.60
Memasang 1 m2 wall paper
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Wallpaper m2 2.200 Rp. 94,000.00 Rp. Rp. 206,800.00 Rp.
Bahan
Lem kg 0.250 Rp. 45,000.00 Rp. Rp. 11,250.00 Rp.
Pekerja Oh 0.350 Rp. Rp. 50,000.00 Rp. Rp.
Tukang Oh 0.175 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.002 Rp. Rp. 72,000.00 Rp. Rp.
218,050.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.61
Memasang 1 m2 floor hardener
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bahan Floor Hardener kg 5.000 Rp. 3,500.00 Rp. Rp. 17,500.00 Rp.
Pekerja Oh 0.120 Rp. Rp. 50,000.00 Rp. Rp.
Tukang Oh 0.120 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.006 Rp. Rp. 72,000.00 Rp. Rp.
17,500.00
Jumlah harga = Rp.
Pembulatan = Rp.

SNI.DT 91-0012-2007.6.7
Memasang 1 m2 conblok #6 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Conblok #6cm bh 44.000 Rp. 1,800.00 Rp. Rp. 79,200.00 Rp.
Bahan
Pasir urug m3 0.055 Rp. 73,000.00 Rp. Rp. 4,015.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp.
Tukang Oh 0.200 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.010 Rp. Rp. 72,000.00 Rp. Rp.
83,215.00
Jumlah harga = Rp.
Pembulatan = Rp.
Jumlah harga upah

0.00
8,640.00
960.00
864.00
10,464.00
169,186.50
169,190.00

Jumlah harga upah

0.00
25,200.00
2,800.00
2,520.00
30,520.00
105,977.15
105,980.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
141,637.04
141,640.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
134,991.50
134,990.00
Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
130,991.50
130,990.00

Jumlah harga upah

8,500.00
12,240.00
1,360.00
648.00
22,748.00
76,298.00
76,300.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
376,020.00
376,020.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
281,520.00
281,520.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
279,595.00
279,600.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
230,095.00
230,100.00

Jumlah harga upah

17,500.00
12,600.00
1,360.00
144.00
31,604.00
249,654.00
249,650.00

Jumlah harga upah

6,000.00
8,640.00
960.00
432.00
16,032.00
33,532.00
33,530.00

Jumlah harga upah

15,000.00
14,400.00
800.00
720.00
30,920.00
114,135.00
114,140.00
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0009-2007
PEKERJAAN DINDING

SNI.DT 91-0009-2007.6.1
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 140.000 Rp. 800.00 Rp. Rp. 112,000.00 Rp.
Bahan Semen portland kg 43.500 Rp. 1,100.00 Rp. Rp. 47,850.00 Rp.
Pasir pasang m3 0.080 Rp. 90,000.00 Rp. Rp. 7,200.00 Rp.
Pekerja Oh 0.600 Rp. Rp. 50,000.00Rp. Rp.
Tukang batu Oh 0.200 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.030 Rp. Rp. 72,000.00Rp. Rp.
167,050.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.2
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 3PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 140.000 Rp. 800.00 Rp. Rp. 112,000.00 Rp.
Bahan Semen portland kg 32.950 Rp. 1,100.00 Rp. Rp. 36,245.00 Rp.
Pasir pasang m3 0.091 Rp. 90,000.00 Rp. Rp. 8,190.00 Rp.
Pekerja Oh 0.600 Rp. Rp. 50,000.00Rp. Rp.
Tukang batu Oh 0.200 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.030 Rp. Rp. 72,000.00Rp. Rp.
156,435.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.3
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 140.000 Rp. 800.00 Rp. Rp. 112,000.00 Rp.
Bahan Semen portland kg 26.550 Rp. 1,100.00 Rp. 29,205.00
Pasir pasang m3 0.093 Rp. 90,000.00 Rp. Rp. 8,370.00 Rp.
Pekerja Oh 0.600 Rp. Rp. 50,000.00Rp. Rp.
Tukang Batu Oh 0.200 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.030 Rp. Rp. 72,000.00Rp. Rp.
149,575.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.7
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 70.000 Rp. 800.00 Rp. Rp. 56,000.00 Rp.
Bahan Semen portland kg 18.950 Rp. 1,100.00 Rp. Rp. 20,845.00 Rp.
Pasir pasang m3 0.038 Rp. 90,000.00 Rp. Rp. 3,420.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00Rp. Rp.
Tukang batu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.015 Rp. Rp. 72,000.00Rp. Rp.
80,265.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.8
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 3PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 70.000 Rp. 800.00 Rp. Rp. 56,000.00 Rp.
Bahan Semen portland kg 14.370 Rp. 1,100.00 Rp. Rp. 15,807.00 Rp.
Pasir pasang m3 0.040 Rp. 90,000.00 Rp. Rp. 3,600.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00Rp. Rp.
Tukang batu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.015 Rp. Rp. 72,000.00Rp. Rp.
75,407.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.9
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Bata merah bh 70.000 Rp. 800.00 Rp. Rp. 56,000.00 Rp.
Bahan Semen portland kg 11.500 Rp. 1,100.00 Rp. Rp. 12,650.00 Rp.
Pasir pasang m3 0.043 Rp. 90,000.00 Rp. Rp. 3,870.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00 Rp. Rp.
Tukang batu Oh 0.100 Rp. Rp. 72,000.00 Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00 Rp. Rp.
Mandor Oh 0.015 Rp. Rp. 72,000.00 Rp. Rp.
72,520.00
Jumlah harga = Rp.
Pembulatan Rp.

SNI.DT 91-0009-2007.6.23
Memasang 1 m2 dinding terawang campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan Jumlah harga upah
Batu kerawang bh 30.000 Rp. 4,000.00 Rp. Rp. 120,000.00 Rp.
Bahan Semen portland kg 11.000 Rp. 1,100.00 Rp. Rp. 12,100.00 Rp.
Pasir pasang m3 0.035 Rp. 90,000.00 Rp. Rp. 3,150.00 Rp.
Pekerja Oh 0.300 Rp. Rp. 50,000.00Rp. Rp.
Tukang batu Oh 0.100 Rp. Rp. 72,000.00Rp. Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 80,000.00Rp. Rp.
Mandor Oh 0.015 Rp. Rp. 72,000.00Rp. Rp.
135,250.00
Jumlah harga = Rp.
Pembulatan Rp.
Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
215,210.00
215,210.00

Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
204,595.00
204,600.00

Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
197,735.00
197,740.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
104,345.00
104,350.00
Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
99,487.00
99,490.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
96,600.00
96,600.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
159,330.00
159,330.00