PENGUJIAN MUTU PENGHAMPARAN DAN PEMADATAN CAMPURAN BERASPAL PANAS AC- BC .L
Pada hari ………. tanggal ……………. Bulan Oktober Tahun Dua Ribu Sembilan Belas ,telah dilaksanakan uji Mutu
Penghamparan dan Pemadatan
Dengan Campuran AC.Binder Course ..Dengan aspal Pen 60/70.
###
KEGIATAN : PENINGKATAN JALAN PAKET.5
###JENIS UJI : Trial Komposisi Campuran AC -BINDER COURSE Kadar Asphalt 5.60% + 0.2% Aditif ( Antistriping )
###
KOMPOSISI CAMPURAN : 1. Bin I 48.00 %
2. Bin II 25.00 %
4. Bin IV - %
6. Aspal 5.70 %
Finishing 1 Passing
Finishing 1 Passing
Finishing 1 Passing
KESIMPULAN : Sesuai hasil Evaluasi Density Lapangan hasil Core drill Terhadap Hasil Uji Marshall Test ,Maka Produksi
AC- BC dapat dilanjutkan dengan lintasan pemadatan Tandom Roller 2 Passing Tire Roller 16 Passing
Finishing .1 Passing
VERIFIKAT OR
NO. NAMA PETUGAS DARI TANDA TANGAN
###
1................................................. 1. .......................
###
2. ............................................... 2. .......................
###
3. ............................................... 3. .......................
###
4. ............................................... 4. .......................
###
5. .............................................. 5. ......................
###
6. .............................................. 6. .......................
RINGKASAN PERCOBAAN PENGHAMPARAN DAN PEMADATAN
AC.BINDER COURSE Aditif (Antistriping) 0.20%
II. EVALUASI
Untuk mencapai tebal hamparan yang sesuai dengan tebal design 6.0 cm ,padat dan Kepadatan
Lapangan > 98 % adalah.
A. Jumlah passing yang dibutuhkan / di pakai untuk acuan pekerjaan overly di lapangan
C. KESIMPULAN
Hasil evaluasi di atas sebagai acuan untuk pekerjaan AC BINDER COURSE,bila ada perubahan /
penggantian alat atau material, harus di adakan evaluasi ulang
1.32
1.7 28.33333
34.00 1.33
4.50 1.31
0.28 1.6
1.26
5.76
1.89
Kegiatan PENINGKATAN JALAN PAKET.5
BERAT CONTOH CORE DRILL BERAT JENIS BERAT JENIS % HASL KEPADATAN
ISI
TEBAL TEBAL DI UDARA DALAM AIR SSD BULK LAP BULK LAB TEST SPEC
GEMBUR PADAT LOSE A B C D E F G H
NO LOKASI / STA ( CM ) ( CM ) (%) DATA DATA DATA
TIMB TIMB TIMB C-B A/D DATA LAB E / F x 100
LAB LAB LAB
PERCOBAAN PASSING 2 - 12 - 1
1 1+850 Kr 7.80 6.67 16.94 1191.5 667.1 1198.4 531.3 2.243 2.271 98.76 98.00
2 kr.cL 7.00 5.80 20.69 947.0 529.8 952.7 422.9 2.239 2.271 98.61 98.00
3 Kr 7.70 6.20 24.19 1048.6 586.0 1054.8 468.8 2.237 2.271 98.49 98.00
BERAT CONTOH CORE DRILL BERAT JENIS BERAT JENIS % HASL KEPADATAN
ISI
TEBAL TEBAL DI UDARA DALAM AIR SSD BULK LAP BULK LAB TEST SPEC
GEMBUR PADAT LOSE A B C D E F G H
NO LOKASI / STA ( CM ) ( CM ) (%) DATA DATA DATA
TIMB TIMB TIMB C-B A/D DATA LAB E / F x 100
LAB LAB LAB
PERCOBAAN PASSING 2 - 14 - 1
4 Kr 8.50 6.40 32.81 1147.6 643.0 1155.5 512.5 2.239 2.271 98.60 98.00
5 Kr.cL 7.20 6.00 20.00 1023.4 575.0 1031.4 456.4 2.242 2.271 98.74 98.00
6 Kr 7.60 6.43 18.20 1113.9 624.0 1121.5 497.5 2.239 2.271 98.59 98.00
ROHADI INDRA, ST
NIP:19630831 199003 1 006 HENDRO, ST Lab Tech
Kegiatan PENINGKATAN JALAN PAKET.5
BERAT CONTOH CORE DRILL BERAT JENIS BERAT JENIS % HASL KEPADATAN
ISI
TEBAL TEBAL DI UDARA DALAM AIR SSD BULK LAP BULK LAB TEST SPEC
GEMBUR PADAT LOSE A B C D E F G H
NO LOKASI / STA ( CM ) ( CM ) (%) DATA DATA DATA
TIMB TIMB TIMB C-B A/D DATA LAB E / F x 100
LAB LAB LAB
PERCOBAAN PASSING 2 - 16 - 1
7 Kr 7.90 6.40 23.4 1175.6 658.8 1182.5 523.7 2.245 2.271 98.85 98.00
8 Kr.cL 8.00 6.30 27.0 1051.6 691.4 1160.3 468.9 2.243 2.271 98.75 98.00
9 1+775 Kr 8.60 6.70 28.4 1128.9 633.4 1136.4 503.0 2.244 2.271 98.83 98.00
1+775 1+850
Selected: TERPILIH
HENDRO, ST INDRA, ST
LAB TECH Lab Tech
867
2+775
833
2+825
Kegiatan PENINGKATAN JALAN PAKET.5
Paket RUAS JALAN.PLANGGOK - NGLENGKING.KEC,MINGGIR,KAB.SLEMAN
Penyedia Jasa CV. SAPANYANA
Direksi Teknis PT.DARMASRAYA MITRA AMERTA
Jenis campuran AC - BINDER COURSE
material
Asal Material EX.PROGO
Tanggal
ROHADI
NIP:19630831 199003 1 006
HENDRA ZAKIR.ST
LAB TECH
INDRA, ST
Lab Tech
ANTHONY S., ST
Quality Engineer
SITE ENGINER
IR. BAGIYO
PEJABAT PEMBUAT KOMITMEN
PEMERINTAH PROVINSI DAERAH ISTIMEWA YOGYAKARTA
DINAS PEKERJAAN UMUM BINA MARGA DAN CIPTA KARYA
SATUAN KERJA PERANGKAT DAERAH TUGAS PEMBANTUAN
Jalan ................................................................
LAPORAN HASIL
TES TRIAL COMPACTION
AC - BC
NAMA PAKET PENINGKATAN JALAN PAKET.5
PENYEDIA JASA :
CV. SAPANYANA
KONSULTAN SUPERVISI :
PT.DARMASRAYA MITRA AMERTA
GGIR,KAB.SLEMAN