TITLE
: ANALISA TEKNIS ALTERNATIF DESAIN STRUKTUR PIER 3
JUDUL
PROJECT
: FLY OVER ACHMAD YANI SUMMARECON BEKASI
PROYEK
4 Ir.B.SUCIPTO.MM 17-Jun-11
7 Revision 0
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
1. STANDARD
2. DESAIN KRITERIA
Concrete
at service ( f'c) = 35 Mpa = 350.00 [kg/cm2] ( Pier )
( f'c) = 30 Mpa = 300.00 [kg/cm2] ( Pile cap )
( f'c) = 30 Mpa = 300.00 [kg/cm ]2
( Borepile )
Modulus of elasticity ( Ec ) Ec = 4730*√fc' = 279,829.51 [kg/cm2]
Modulus rupture ( fr ) = 29.75 [kg/cm2]
Compressive 0.40 * fc' = 140.00 [kg/cm2]
Reinforcement Steel
Yield Stress ulimate ( fy ) = 400 [Mpa]
Specific Grafity
Specific Gravity of Steel ( gst ) = 7.85 [ton/m3]
Specific Gravity of Concrete ( gcr ) = 2.45 [ton/m3]
Specific Gravity of Asphalt ( gas ) = 2.20 [ton/m3]
Page 3
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Struktur atas fly over Bekasi menggunakan balok girder dengan bentang span adalah 38,30 m
dimana jumlah girder untuk setiap span adalah 12 buah. Struktur pier dengan sistem pilar tunggal dimana
kolom pier adalah 15,00 x 2,50 m dengan ketinggian maksimum adalah 9,80 m.
P.4
P.4
2200 384
160
150 190 160
355
505
500
355
505
1500
200 150
200 150
250 250 99 35
384
400
930
400
930
330
330
440 250 440
250
250
250 540 540 250
175 390 390 175
1580 1130
P.4
3. PEMBEBANAN
Beban mati merata struktur atas untuk masing-masing girder terdiri dari :
Page 4
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
untuk masing-masing girder
DL per gider = 177.283848 Ton
Page 5
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
3.2 Beban Hidup ( LL )
Beban hidup terdiri dari beban hidup merata (beban D) dan beban hidup terpusat (beban T) :
K.E.L
U.D.L
Beban Truck
Beban truck "T" ditempatkan ditengah lajur lalu lintas, besarnya sesuai gambat di atas.
Page 6
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
V = C . S . I . Wt ; dimana :
C = Koefesien geser untuk daerah, waktu dan kondisi setempat yang sesuai
W = Berat total nominal bangunan yang mempengaruhi percepatan gempa, diambil sebagai beban
mati ditambah beban mati tambahan.
94 o 96 o 98 o 1 00 o 102 o 10 4 o 1 06 o 10 8 o 11 0 o 11 2 o 11 4 o 11 6 o 11 8 o 120 o 12 2 o 1 24 o 126 o 1 28 o 130 o 13 2 o 134 o 13 6 o 138 o 140 o
10 o 10 o
o 0 80 2 00 400
8 8o
K ilo m eter
6o 6o
B anda Ac eh
1
2
3 4 5 6 5 4 3 2 1
o o
4 4
2o 2o
M anado
Ternate
P ekanbaru
1
0o Sama rinda
0o
2
1
Palu Manokwari 3
Padang 2
3 S orong
4 Jam bi Biak 4
5
6
2o 4
5 Palangkaraya 5 2o
3
2 Jayapura
6
1
P alembang Banjarmasin
5
B engkulu Kendari Ambo n
4o 4 4o
1 M akasar 3
B andarlam pung
Tual 2
6o Jakarta 2 1
6o
B andung
G arut Sema rang
S ukabum i Surabay a
Tasikm alaya Solo
Jogjakarta 3
o C ilacap B litar Malang o
8 B anyuw angi
4
8
Denpasar M ataram
M erauke
5
6
10 o 5 K upang 10 o
4
W ila ya h 1 : 0 ,0 3 g 3
2
12 o W ila ya h 2 : 0 ,1 0 g 1
12 o
W ila ya h 3 : 0 ,1 5 g
W ila ya h 4 : 0 ,2 0 g
o o
14 14
W ila ya h 5 : 0 ,2 5 g
W ila ya h 6 : 0 ,3 0 g
16 o 16 o
o o o o o o o o o o o o o o o o o o o o o o o o
94 96 98 1 00 102 10 4 1 06 10 8 11 0 11 2 11 4 11 6 11 8 120 12 2 1 24 126 1 28 130 13 2 134 13 6 138 140
T = Waktu getar dalam detik untuk free body pilar dengan derajat kebebasan tunggal pada jembatan bentang
sederhana.
WTP
T = 2
g .K p
g = percepatan gravitasi (m/dt2)
Wtp = berat total nominal bangunan atas termasuk beban mati tambahan (kN)
Kp = Kekakuan gabungan sebagai gaya horisontal yang diperlukan untuk menimbulkan satu satuan lendutan
pada bagian atas pilar (kN/m)
Kp = 12 x Ec x Ic / H3
Ec = 4700 x √ fc'
= 27510.024 MPa
Ic x = 19.5313 m4 Ic y = 703.1250 m4
Kp = 6.851E+09 Kp = 2.466E+11
6850528 246618996
Tx = 0.03
Ty = 0.01
Page 7
0.20
C (Tanah lunak) 0.15
T 0.30 C (Tanah keras)
T
0.08
C C (T anah sedang) C
T
0.20 0.20
0.05
C (Tanah keras) 0.15
0.13 T
0.12
CALCULATION SHEET
0.10
0.08 Title :
0.05
0.04 ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero)
0 0.2 0.5 0.6 1.0 2.0
FO ACHMAD YANI BEKASI
3.0
Rev : 2
0 0.2 0.5 0.6 1.0 2.0 3.0
ENGINEERING DEPT. SIPIL UMUM T BEKASI T Date : 06-Feb-22
0 0.2 0.5 0.6 1.0 2.0 3.0 0 0.2 0.5 0.6 1.0 2.0 3.0
T T
Beban0.36
Angin (Tew) 0.38
0.36
0.32
0.33
0.28
6
CW V W Ab
2
TEW
10000
0 0.2 0.5 0.6 1.0 2.0 3.0
Vw = Kecepatan angin T
rencana (m/s) =
0 0.2 301.0
0.5 0.6 (m/s) 2.0 3.0
T
Cw = Koefisien serat lihat tabel 27 (BMS) = 1.2
Ab = Luas koefisien samping jembatan (m2) = 80.85 (m2)
Tew = 52.3908 kN
= 5.23908 Ton
Kondisi Ultimate :
C1 : ( 1,2*Beam + 1,3*Slab + 2*Asphalt + 1.3*Barrier + 1,2*Diaphragm) + 1.8 * LL + 1.8 * Bf + 1.2 Tew
C5 : ( 1,2*Beam + 1,3*Slab + 2*Asphalt + 1.3*Barrier + 1,2*Diaphragm) + 1.8* LL +/- EQL +/- 0.3 * EQT
C6 : ( 1,2*Beam + 1,3*Slab + 2*Asphalt + 1.3*Barrier + 1,2*Diaphragm) + 1.8 * LL +/- 0.3 * EQL +/- EQT
Kondisi Layan :
C1 ( Beam + Slab + Asphalt + Barrier + Diaphragm) + LL + Bf
Page 8
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
C5 ( Beam + Slab + Asphalt + Barrier + Diaphragm) + LL + Tew
4. ANALISA STRUKTUR
Page 9
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Page 10
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Dari hasil analisa struktur SAP 2000, didapatkan gaya-gaya dalam dari element-element struktur pier, yang
terdiri dari :
Momen
Axial Force Shear Force
Element M 2-2 M 3-3
(ton.m) (ton.m) (ton) (ton.m)
Pier Head
Kondisi Ultimate
C1 1997.10 746.75
C2 1513.99 557.52
C3 1513.99 557.52
C4 1514.14 557.57
C5 2187.41 806.80
C6 1982.22 756.23
Kondisi Layan :
C1 1533.16 572.14
C2 1533.16 572.14
C3 1211.19 446.02
C4 1211.19 446.02
C5 1533.29 572.18
C6 1211.19 446.02
Pier Column
Kondisi Ultimate
C1 418.50 4355.00 45.00
C2 418.50 3289.69 60.06
C3 0 3289.69 0
C4 58.36 3289.69 6.27
C5 2384.51 4355.00 256.39
C6 7948.39 4355.01 854.66
Kondisi Layan :
Page 11
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Pier Head
r = As /b*d = 0.00217
r min = 1.4/fy = 0.00350
r max = 0.02440
Kontrol Geser
Struktur pier head menggunakan tulangan geser / sengkang D16 - 100, kemampuan kapasitas geser pier head
dikontrol terhadap gaya geser maksimum :
Vs = Vu - Vc
f
Page 12
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Kontrol dimensi dan penulangan kolom pilar dengan menggunakan program PCACOL.
Page 13
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Berdasarkan data yang ada kemaampuan kolom dalam menahan beban yang ada dapat terlihat pada diagram
interaksi kolom seperti gambar dibawah.
Page 14
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Berdasarkan hasil output SAP seperti diatas dianalisa penulangan pile cap dibawah.
r = As /b*d = 0.00182
r min = 1.4/fy = 0.00350
r max = 0.02440
r = As /b*d = 0.00182
r min = 1.4/fy = 0.00350
r max = 0.02440
Page 15
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
Kontrol Bore pile
Kapasitas Axial bore pile pada kedalaman 50 m = 1874.00 ton > 960.27 ton OK
(Perhitungan kapasitas axial bore pile terlampir )
Kontrol dimensi dan penulangan Bore pile dengan menggunakan program PCACOL.
Page 16
CALCULATION SHEET
Title :
ANALISA TEKNIS STRUKTUR PIER
PT. WIJAYA KARYA (Persero) FO ACHMAD YANI BEKASI Rev : 2
ENGINEERING DEPT. SIPIL UMUM BEKASI Date : 06-Feb-22
5. KESIMPULAN
- Struktur Pier Head dengan tulangan lentur 32 D 29 dan tulangan sengkang D13-200 mampu
terhadap gaya kondisi ultimate. (gambar terlampir)
- Struktur Pier dimensi 10 m x 2.5 m dengan tulangan lentur 292 D 29 dan tulangan sengkang D13-200
mampu terhadap gaya kondisi ultimate. (gambar terlampir)
- Struktur Pile cap dimensi sesuai P4 dengan tulangan lentur D 29 - 200 (2 lapis) mampu terhadap
gaya kondisi ultimate. (gambar terlampir)
- Struktur Bore pile diameter 1,8 m jumlah 7 buah dengan tulangan lentur 34 D 29 dan tulangan sengkang
D16-600 mampu terhadap gaya kondisi ultimate. (gambar terlampir)
Page 17
TABEL PERHITUNGAN PENULANGAN LENTUR PILE CAP
Mutu tulangan U = 40
Modulus Elastisitas (E) = 25,742,960 kN/m2
SECTION MOMENT DIMENSI f'c fy Rn m CONTROL r.min < r. pakai < r.max
Mu (ton.m) Mu (N.mm) Mn (N.mm) b (mm) h (mm) d' (mm) d (mm) Mpa Mpa Mpa Mpa r.b r.max r.min r.hitung check ! r.pakai
Pile cap
arah memanjang 465.58 4,655,800,000 5,819,750,000 1000 2500.0 70 2430.00 30.00 400 0.986 15.69 0.03251 0.02438 0.00353 0.00251 Ok 0.00353
arah memendek 321.50 3,215,000,000 4,018,750,000 1000 2500.0 70 2430.00 30.00 400 0.681 15.69 0.03251 0.02438 0.00353 0.00172 Ok 0.00353
SF = 1,5 SF = 3
0.00 0.00 0 0 0.000 0.000 0.00 0.00
SF = 1,5 SF = 3
0.00 0.00 0 0 0.000 0.000 0.00 0.00
A p . E p
koefesien pegas vertikal Kv = a.
L
1 / 2
Koefesien reaksi tanah permukaan ( k ) = k 0 .y
Bor log