5m

P = 12 T 2.1

TINGGI = 4.8

P = 12 T 2.1 5m
Oprit/TPT

SYP/ Sayap
Aliran Sungai
P = 16 M T 2.5

P = 16 M T 2.5
HARGA SATUAN BAHAN UPAH DAN ALAT
NO URAIAN SATUAN HARGA DATA PENDUKUNG LA
BAHAN KABUPATEN
1 Batu Kali m3 Rp 75,000 KECAMATAN
2 Pasir m3 Rp 150,000 DESA
3 Kerikil 2/3 m3 Rp 160,000 DUSUN
4 Semen Gresik ( 50 kg ) Zak Rp 64,000 FK
5 Besi O 16 ljr Rp 160,000 FT
6 Besi O 12 ljr Rp 68,000 PJOK
7 Besi O 10 ljr Rp 48,000 NIP
8 Besi O 8 ljr Rp 42,000 TPK
9 Besi O 6 ljr Rp 27,000 TANGGAL
10 Bendrat kg Rp 15,000 KADER TEKNIS
11 Pipa Hand Ril O 2,5 " btg Rp 375,000 JENIS KEGIATAN 1
12 Pipa PVC D 3/4 " btg Rp 20,000 UKURAN
13 Pipa PVC D 2,5 " btg Rp 60,000 JENIS KEGIATAN 2
14 Karet Landasan bj Rp 25,000 UKURAN
15 Ijuk ikat Rp 8,000 GAMBAR
16 Cat Besi kg Rp 25,000
17 Triplek 5 mm lbr Rp 90,000
18 Papan begesting 2/20 x 200 lbr Rp 7,000
19 Kayu 4/6 - 3 m btg Rp 25,000
20 Bambu btg Rp 10,000
21 Plat L 45.45.5 ljr Rp 90,000
22 Paku usuk kg Rp 14,000
23 Paku Reng kg Rp 14,000
24 Kawat bendrat kg Rp 15,000
25 Tanah Urug m3 Rp 45,000

ALAT
1 Prasasti bh Rp 300,000
2 Papan nama proyek bh Rp 150,000
3 Sekop bh Rp 30,000
4 Selang timbangan m Rp 3,000
5 Tali Senar rol Rp 3,000
6 Ember bh Rp 10,000
7 Sewa Molen hari Rp 150,000
8

Upah
1 Pekerja HOK Rp 30,000
2 Tukang HOK Rp 40,000
ATA PENDUKUNG LAINNYA
KAB. MAGETAN
KEC. PANEKAN
REJOMULYO
DUSUN SEKANCIL
NUR SOFRUDIN, SE
RIPTO PRIHARTONO, ST
KUNTADI SUWANDONO,S.Sos 95
NIP : 19630527198611 1 001 58
SUYATNO
21 Maret 2012 27
Muhajirin
Jembatan Beton
P= 6 X L= 3
Talud Bagian Jembatan
31 m
GAMBAR RENCANA
PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET

0.5 0.7

0.7

I
6.0

II

0.4

IV
1.5 III

2.1 5
0.2 0.2
1.0

Volume Pasangan Pondasi


Pias Luas Lebar Volume Luas Tot
I 3.15 3.5 11.03
II 3.9 3.5 13.65
III 3.15 3.5 11.03
IV 2.00 3.5 7.00
Volume pondasi 42.70
Vol. Pondasi Ka/Ki 85.40

a Volume Pasangan
Kegiatan a t d b Luas Panjang Volume
0.30 2.00 0.80 0.80 1.74 10.00 17.40
t 0.30 2.00 0.80 0.80 1.74 10.00 17.40
Sayap
0.30 2.00 0.80 0.80 1.74 10.00 17.40
0.30 2.00 0.80 0.80 1.74 10.00 17.40
d
0.30 5.20 1.50 1.20 5.70
18.00 60.62
b
0.30 1.50 0.60 0.60 1.04
0.30 5.20 1.50 1.20 5.70
18.00 60.62
0.30 1.50 0.60 0.60 1.04
Oprit/TPT
0.30 5.20 1.50 1.20 5.70
13.00 43.78
0.30 1.50 0.60 0.60 1.04
0.30 5.20 1.50 1.20 5.70
13.00 43.78
0.30 1.50 0.60 0.60 1.04
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

Total pasangan 278.39

Volume Galian

Pondasi (1,5 x 2,1 x 3,5) x 2 sisi = 22.05 m3

Oprit ((1,5 x 1,2)+(0,6 x 0,6))/2 x 18 = 19.44 m3


((1,5 x 1,2)+(0,6 x 0,6))/2 x 18 = 19.44 m3
((1,5 x 1,2)+(0,6 x 0,6))/2 x 13 = 14.04 m3
((1,5 x 1,2)+(0,6 x 0,6))/2 x 13 = 14.04 m3

Sayap (0,8 x 0,8 x 10) x 4 sisi = 25.60 m3

Talud x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3

Volume Galian Total = 114.61 m3

0.2 Volume Beton = ((0,2 x 0,7)+((0,7 - 0,2) x 0,2) x 3,5x2


= 1.68 m3
O 12-- 20 Besi Ø 12 = (((0,7+0,2+0,7+0,2+0,2)+(0,7+0,2+0,7+0,2+0,2)x((3,5/0,2)+1))+(12x3,5))x2)/12
= 20
0.7 O 12 - 20 Btg
Balok Tumpu camp. 1 : 2 : 3

Papan begesting = (0,5 + 0,2) x 3,5


0.2
= 2.45 m2

0.7

URUGAN OPRIT

Sebelah Kiri panjang oprit 18 m', lebar 3,5, tinggi 5,2 m 163.8 m3
Sebelah Kiri panjang oprit 13 m', lebar 3,5, tinggi 5,2 m 118.3 m3
total = 282.1 m3
PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET
No Uraian Panjang Lebar Tinggi Luas
1 Perhitungan Plat Beton

3.00 6.00 3.00 0.20 18.00

6.00
0.20

2 Pembesian Plat Jembatan

3.00 = ((3/0,15)+1)x6x2

Φ 12 mm - 15 cm 252.00

6.00 = ((6/0,15)+1)x3x2

Φ 12 mm - 15 cm 246.00

3 Pembesian Tiang Hand Rail

'm 0,15

1.20 0.15 0.15 0.02


'm 1

4 - Φ 12 mm = 4 x 1,2 x 6
28.80

Begel Ø 10 - 15
=(1,2/0,1)+1)x0,6x6
46.80
No Uraian Panjang Lebar Tinggi Luas

4 Pembesian Balok Jembatan .

Begel Ø 10 - 15

Ø 16 2
6.00 0.20 0.50 1.20

Ø 12 2

Ø 12 2
Ø 12 4

Ø 16 4

25
Tul Pokok 8 Ø 12 96.00
Tul Utama 6 Ø 16 72.00
Begel Ø 10 - 15 =((6/0,15)+1)x1.5 x2

123.00

5 Perhitungan Begesting

Papan 2/20 x 200 m


=(6x3)+0,2x8x6

Kayu 4/6 x 3 m
=((6/0,3)+1)x3
93.00
EET
Volume

3.60 m3 Vol Beton 3.60 m3


0.22 m3
1.20

12 58.00

10 17.00

300/15

23.00 ljr

23.00 ljr

0.22 m3

3.00 ljr

5.00 ljr
Volume

1.20 m3

9.00 ljr
7.00 ljr

12.00 ljr

63.00 lbr

31.00 btg
ANALISA PERHITUNGAN JEMBATAN PLAT BETON

No Uraian Analisa Volume Kebutuhan Harga sat Bahan Upah

A/1 Galian Tanah


Pekerja 0.7500 114.61 m3 85.96 HOK 30,000 3,438,300
SNI Pasangan Batu Kali 1 : 4
Pondasi
Batu Gebal 1.1000 85.4 m3 93.94 m3 75,000 7,045,500
Semen (50 Kg) 3.2600 85.4 m3 278.40 zak 64,000 17,817,900
Pasir 0.5200 85.4 m3 44.41 m3 150,000 6,661,200
Kepala Tukang 0.0500 85.4 m3 4.27 HOK 40,000 227,700
Tukang 0.5000 85.4 m3 42.70 HOK 40,000 2,277,300
Pekerja 1.2500 85.4 m3 106.75 HOK 30,000 4,270,000

Sayap Jembatan 1 : 4
Batu Gebal 1.1000 69.60 m3 76.56 m3 75,000 5,742,000
Semen (50 Kg) 3.2600 69.60 m3 226.90 zak 64,000 14,521,300
Pasir 0.5200 69.60 m3 36.19 m3 150,000 5,428,800
Kepala Tukang 0.0500 69.6 m3 3.48 HOK 40,000 185,600
Tukang 0.5000 69.60 m3 34.80 HOK 40,000 1,856,000
Pekerja 1.2500 69.60 m3 87.00 HOK 30,000 3,480,000

Oprit 1 : 4
Batu Gebal 1.1000 282.10 m3 310.31 m3 75,000 23,273,300
Semen (50 Kg) 3.2600 282.10 m3 919.65 zak 64,000 58,857,300
Pasir 0.5200 282.10 m3 146.69 m3 150,000 22,003,800
Kepala Tukang 0.0500 282.10 m3 14.11 HOK 40,000 752,300
Tukang 0.5000 282.10 m3 141.05 HOK 40,000 7,522,700
Pekerja 1.2500 282.10 m3 352.63 HOK 30,000 14,105,000

Talud 1 : 5
Batu Gebal 1.1000 0.00 m3 - m3 75,000 -
Semen (50 Kg) 2.7200 0.00 m3 - zak 64,000 -
Pasir 0.5440 0.00 m3 - m3 150,000 -
Kepala Tukang 0.0500 0.00 m3 - HOK 40,000 -
Tukang 0.5000 0.00 m3 - HOK 40,000 -
Pekerja 1.2500 0.00 m3 - HOK 30,000 -

Pekerjaan Beton
SNI Beton Bertulang 1 : 2 : 3
Semen (50 Kg) 6.8000 6.696 m3 45.53 zak 64,000 2,914,100
Pasir 0.5400 6.696 m3 3.62 m3 150,000 542,400
Kerikil 0.8200 6.696 m3 5.49 m3 160,000 878,500
Kep Tukang 0.0833 6.696 m3 0.56 HOK 40,000 29,800
Tukang 0.8333 6.696 m3 5.58 HOK 40,000 297,600
Pekerja 5.0000 6.696 m3 33.48 HOK 30,000 1,339,200
ANALISA PERHITUNGAN JEMBATAN PLAT BETON

No Uraian Analisa Volume Kebutuhan Harga sat Bahan Upah


SNI Pembesian
Besi ø 10 1.1000 17.00 btg 18.70 btg 48,000 897,600
Besi ø 12 1.1000 78.00 btg 85.80 btg 68,000 5,834,400
Besi ø 16 1.1000 7.00 btg 7.70 btg 160,000 1,232,000
Kawat Bendrat 2.0000 6.696 m3 13.39 kg 15,000 200,900
Tukang Besi 7.5000 6.696 m3 50.22 HOK 40,000 2,678,400
Kepala Tukang 2.5000 6.696 m3 16.74 HOK 40,000 892,800
Pekerja 7.5000 6.696 m3 50.22 HOK 30,000 2,008,800
Dihitung Perancah/Begesting
Papan begesting 2 /20 1.5000 m2 63.00 lbr 7,000 441,000
K. Begesting 5/7 x 300 2.0000 0 m2 31.00 btg 25,000 775,000
Paku 0.2500 0 m2 5.00 kg 14,000 70,000
Tk Kayu 0.2917 12 m2 3.50 HOK 40,000 186,700
Kep Tukang 0.0292 12 m2 0.35 HOK 40,000 18,700
Pekerja 0.1167 12 m2 1.40 HOK 30,000 56,000
- -
F. I / 6 Pek. Sandaran
Hand raill dia 2,5" 0.1667 24 m' 4.00 btg 375,000 1,500,000

176,637,000 45,622,900
Pekerja Tukang Kep tukang

3,438,300

227,700
2,277,300
4,270,000

38,299,600

185,600
1,856,000
31,213,700 3,480,000

752,300
7,522,700
14,105,000

29,800
297,600
1,339,200
2,678,400
892,800
2,008,800

186,700
18,700
56,000

28,697,300 14,818,700 2,106,900


Mandor

-
-

-
PNPM-Mandiri Perdesaan
RENCANA ANGGARAN BIAYA

Propinsi : JAWA TIMUR No. RAB : 01


Kabupaten : MAGETAN Pogram : PNPM MP
Kecamatan : KEC. PANEKAN Jenis Kegiatan Jembatan Beton
Desa : REJOMULYO Ukuran/Dimensi P= 6 X L= 3
VOLUME Harga Jumlah
Kategori
U RAIAN Dari Dari Satuan Satuan Swadaya
Total Biaya
Swadaya PNPM-MP ( Rp. ) ( Rp. )
BAHAN a b c=a-b d e f g=bxf
1 Batu Kali 481.00 120 361.00 m3 75,000 9,000,000
2 Pasir 231.00 20 211.00 m3 150,000 3,000,000
3 Kerikil 2/3 5.00 - 5.00 m3 160,000 -
4 Semen ( 50 kg ) 1,470.00 - 1,470.00 Zak 64,000 -
5 Besi O 16 8.00 - 8.00 ljr 160,000 -
6 Besi O 12 86.00 - 86.00 ljr 68,000 -
7 Besi O 10 19.00 - 19.00 ljr 48,000 -
8 Bendrat 13.00 - 13.00 kg 15,000 -
9 Pipa Hand Ril O 2,5 " 4.00 2 2.00 btg 375,000 750,000
10 Cat Besi 2.00 - 2.00 kg 25,000 -
11 Papan begesting 2/20 x 400 63.00 - 63.00 lbr 7,000 -
12 Kayu 4/6 - 4 m 31.00 - 31.00 btg 25,000 -
13 Bambu 15.00 10 5.00 btg 10,000 100,000
14 Paku 5.00 - 5.00 kg 14,000 -
15 Tanah Urug 282.00 - 282.00 m3 45,000 -
Sub Total 1 12,850,000
ALAT
1 Prasasti 1 - 1 bh 300,000 -
2 Papan nama proyek 1 - 1 bh 150,000 -
3 Sekop 1 - 1 bh 30,000 -
4 Selang timbangan 10 - 10 m 3,000 -
5 Tali Senar 6 - 6 rol 3,000 -
6 Ember 10 10 0 bh 10,000 100,000
7 Sewa Molen 15 15 - hari 150,000 2,250,000

Sub Total 2 2,350,000


UPAH
1 Pekerja 717.00 0.00 717 HOK 30,000 -
2 Tukang 317.00 0.00 317 HOK 40,000 -
Kepala Tukang 40.00 40 40,000 -
Sub Total 3 -

Total Biaya (PNPM MP + Swadaya) Rp 228,


Sumber Dana Total Biaya PNPM MP Rp 212,
Total Biaya Swadaya Rp 15,

Catatan : REJOMULYO 21 Maret 2012


Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form .6a, 6b dan 6c

Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya

Operasional TPK dilaporkan pada form Rekapitulasi

Diketahui Diperiksa Dbuat oleh


PjOK Fasilitator Teknik Kecamatan Ketua TPK

KUNTADI SUWANDONO,S.Sos RIPTO PRIHARTONO, ST SUYATNO


NIP : 19630527198611 1 001
Form.7e

Jembatan Beton

Jumlah
PNPM MP
( Rp. )
h=cxf
27,075,000
31,650,000
800,000
94,080,000
1,280,000
5,848,000 95,000 8,170,000 5,848,000
912,000 68,000 1,292,000 912,000
195,000 9,462,000 6,760,000 2,702,000
750,000
50,000
441,000
775,000
50,000
70,000
12,690,000
176,666,000

300,000
150,000
30,000
30,000
18,000
-
-

528,000

21,510,000
12,680,000
1,600,000
35,790,000

Rp 228,184,000
Rp 212,984,000
Rp 15,200,000

21 Maret 2012

Dbuat oleh
Ketua TPK

SUYATNO
PNPM-Mandiri Perdesaan Kab Magetan 2012
RENCANA ANGGARAN BIAYA SUMBER DANA DARI SWADAYA MASYARAKAT
Propinsi : Jawa Timur No. RAB : 02
Kabupaten : Ngawi Pogram : PNPM-MP
Kecamatan : KEC. PANEKAN Jenis Kegiatan : Jembatan Beton
Desa : REJOMULYO Ukuran/Dimensi : P= 6 X L= 3

VOLUME Harga Nilai Swadaya Nilai Swadaya Jumlah


U RAIAN Total Volume Volume Swadaya Swadaya Uang Satuan Satuan Selain Uang Uang Total
Volume PNPM Swadaya Selain Uang ( Rp. ) ( Rp. ) ( Rp. )
( Rp. )
a b=a-c c=d+e d e f g h=dxg i=exg j=h+i
BAHAN
Batu Kali 481.00 361 120 120 m3 75,000 - 9,000,000 9,000,000
Pasir 231.00 211 20 20 m3 150,000 - 3,000,000 3,000,000
Kerikil 2/3 5.00 5 - m3 160,000 - - -
Semen ( 50 kg ) 1,470.00 1,470 - Zak 64,000 - - -
Besi O 16 8.00 8 - ljr 160,000 - - -
Besi O 12 86.00 86 - ljr 68,000 - - -
Besi O 10 19.00 19 - ljr 48,000 - - -
Bendrat 13.00 13 - kg 15,000 - - -
Pipa Hand Ril O 2,5 " 4.00 2 2 2 btg 375,000 - 750,000 750,000
Cat Besi 2.00 2 - kg 25,000 - - -
Papan begesting 2/20 x 400 63.00 63 - lbr 7,000 - - -
Kayu 4/6 - 4 m 31.00 31 - btg 25,000 - - -
Bambu 15.00 5 10 10 btg 10,000 - 100,000 100,000
Paku 5.00 5 - kg 14,000 - - -
Tanah Urug 282.00 282 - m3 45,000 - - -
Sub Total 1 ) - 12,850,000 12,850,000
ALAT
Prasasti 1 1 - bh 300,000 - - -
Papan nama proyek 1 1 - bh 150,000 - - -
Sekop 1 1 - bh 30,000 - - -
Selang timbangan 10 10 - m 3,000 - - -
Tali Senar 6 6 - rol 3,000 - - -
Ember 10 - 10 10 bh 10,000 - 100,000 100,000
Sewa Molen 15 - 15 15 hari 150,000 - 2,250,000 2,250,000
UPAH Sub Total 2 ) - 2,350,000 2,350,000
Pekerja 20 20 - HOK 30,000 - - -
Tukang 795 645 - HOK 40,000 - - -
Sub Total 3 ) - - -
TOTAL BIAYA SWADAYA - 15,200,000 15,200,000
Swadaya Selain Uang - -
Sumber Dana
Swadaya Uang 15,200,000 15,200,000

Disetujui Oleh, Diperiksa Dibuat Oleh,


PjOK Fasilitator Teknik Kecamatan Ketua TPK

KUNTADI SUWANDONO,S.Sos RIPTO PRIHARTONO, ST SUYATNO


NIP : 19630527198611 1 001 REJOMULYO
PNPM-Mandiri Perdesaan Magetan 2012 Form 8.b

REKAPITULASI RENCANA ANGGARAN BIAYA ( R-RAB )


Propinsi : Jawa Timur Jenis Prasarana : Jembatan Beton Kecamatan KEC. PANEKAN
Kabupaten : Magetan Desa REJOMULYO

Kegiatan : Jembatan Beton Kegiatan : Kegiatan :


Ukuran : P= 6 X L= 3 Bobot Ukuran : Bobot Ukuran : Bobot Bobot
No Uraian JUMLAH TOTAL
Jumlah : 1 % Jumlah : 1 % Jumlah : % %
No. RAB : 01 No. RAB : 02 No. RAB :
PNPM SWADAYA PNPM SWADAYA PNPM SWADAYA PNPM SWADAYA
I BAHAN 176,666,000 12,850,000 83.1 176,666,000 12,850,000 83.1

II PERALATAN 528,000 2,350,000 1.3 528,000 2,350,000 1.3

III UPAH 35,790,000 - 15.7 35,790,000 - 15.7

Jumlah 212,984,000 15,200,000 100 - - - 212,984,000 15,200,000 95.0

IV Operasional UPK 2 % 4,484,000 2.00

V Operasional TPK 3 % 6,726,000 3.00

JUMLAH (PNPM MP + Swadaya) 228,184,000 100 - - 224,194,000 15,200,000 100.00

Jumlah Biaya Upah Konstruksi 35,790,000 - 100.0 35,790,000 - 100.0

Jumlah Biaya Upah Pengumpulan Bahan - - - -


Jumlah Biaya Upah 35,790,000 - 100 35,790,000 - 100
Jumlah Upah 40.00 0.00 HOK HOK HOK 40.00 - HOK

REJOMULYO 21 Maret 2012

PjOK Fasilitator Kecamatan Ketua TPK

KUNTADI SUWANDONO,S.Sos RIPTO PRIHARTONO, ST SUYATNO


NIP : 19630527198611 1 001
U KE JABUNG
GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
KEC. PANEKAN
DESA REJOMULYO
TPT 1 JENIS PRASARANA

SYP 1 Jembatan Beton


TPT 2
B LOKASI
DUSUN SEKANCIL
10,0
JUDUL GAMBAR
0
1,50
Denah Jembatan
A

Dibuat Oleh :
10,00 SYP 2 TPK / KPMD
A 10,00

SYP 3 SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
10,00
TPT 3 B
RIPTO PRIHARTONO, ST
SYP 4 Disetujui Oleh
Faskab Teknik
TPT 4
PARAPET

Ir. HARI BUDI S


Diketahui Oleh
PjOK
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
6.0 GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
1,50 1,50
0.2 1.2 1.2 1.2 0.2 KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA
Jembatan Beton
PARAPET 0,90
"Pipa GI Ø 2 2012 LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR
0.7
Balok Gelagar Beton Bertulang * Potongan B - B

5.20
MAB Dibuat Oleh :
TPK / KPMD
4.50
5M
40 CM SUYATNO
Diperiksa Oleh
F Teknik Kecamatan

1.5
1.5 RIPTO PRIHARTONO, S
Disetujui Oleh
0,10
Faskab Teknik
0,2 0,2

2.1 0.2 -0.4 0.2 2.1


Pas. Batu Kali 1 : 4 Ir. HARI BUDI S
Diketahui Oleh
PjOK
POTONGAN B - B
POTONGAN B - B

KUNTADI SUWANDONO,S
NIP : 19630527198611 1 00
A
UR

YO
A

ST
O,S.Sos
001
0,60 3 0,60

GAMBAR RENCANA
0,75 1.5 0,75 PROPINSI JAWA TIMUR
PARAPET
KABUPATEN Magetan
KEC. PANEKAN
Plat Beton Bertulang, camp. 1:2:3 DESA REJOMULYO
0,90 JENIS PRASARANA
Plesteran, camp. 1:4 Jembatan Beton
0,50 LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR

* Potongan A - A

3,20 Pas. Batu Kali 1 : 4 Dibuat Oleh :


2,00 TPK / KPMD

SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
0,20
0,80
1,60 RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0,10

Ir. HARI BUDI S


Diketahui Oleh
POTONGAN A - A PjOK
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
A
UR
n

ST
S.Sos
001
0,20

Ø 12-20
GAMBAR RENCANA
PROPINSI JAWA TIMUR
0,50 Ø 12 - 20 KAB. MAGETAN
Ø 12 - 15 KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA
0,20
Ø 12 - 15 Jembatan Beton
LOKASI
DUSUN SEKANCIL
6 JUDUL GAMBAR
0,70

* Detail Penulangan
PENULANGAN BALOK LANDAS

Dibuat Oleh :
TPK / KPMD

Ø 6 - 10
SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
Ø6-8
0,20
0
RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik

0,15

Ir. HARI BUDI S


PENULANGAN BALOK DIAFRAGMA Diketahui Oleh
0.75 1.50 0.75 PjOK
DETAIL PENULANGAN BALOK
GELAGAR KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
R

T
S.Sos
01
0,1 3 0,15
5

0,1 0,10
0 GAMBAR RENCANA
0.10 PROPINSI JAWA TIMUR
Ø 8 - 15 KABUPATEN MAGETAN
"Pipa GI Ø 2 0.40 KEC. PANEKAN
DESA REJOMULYO
Ø 12 - 15 Ø 12 - 15 JENIS PRASARANA
Ø 8 - 10 0.40
Jembatan Beton
LOKASI
0.20
DUSUN SEKANCIL
JUDUL GAMBAR
0.30
* Detail Penulangan

0.75 0.75
1.5 Ø 16 2 Dibuat Oleh :
TPK / KPMD

Sengkang Ø 10 - 15
Ø 12 2
DETAIL PENULANGAN LANTAI PLAT
SUYATNO
Ø 12 4
Diperiksa Oleh
F Teknik Kecamatan
Ø 16 4
Ø 16 2 Ø 10-15
Ø 12 2
1 2 Ø 12 2 POTONGAN 1 - 1 RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0.50
Ø 16 2

1 2 Ø 12 8 Ø 16 4
Begel Ø 10 - 15 Ø 12 2 Ir. HARI BUDI S
Diketahui Oleh
Ø 12 2 PjOK
Ø 12 4
Ø 12 4

Ø 16 4
DETAIL PENULANGAN BALOK GELAGAR

POTONGAN 2 - 2
KUNTADI SUWANDONO,S.So
NIP : 19630527198611 1 001
A
UR
AN

ST
S.Sos
001
0,30 0,30
Sulingan + Ijuk Plesteran camp. 1 : 3
Pas. Batu Kali 1 : 4
Tanah Urug Tanah Urug

GAMBAR RENCANA
2,00 2,00 PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA REJOMULYO
Pas. Batu Kali camp. 1 : 4 JENIS PRASARANA
0,80 0,80
Jembatan Beton
LOKASI
0,80 DUSUN SEKANCIL
0,80
JUDUL GAMBAR
POT. MELINTANG SAYAP 1 POT. MELINTANG SAYAP 2
panjang = 10 m panjang = 10 m * Potongan Melintang
Sayap
0,30
0,30 Pas. Batu Kali 1 : 4 Tanah Urug Dibuat Oleh :
Sulingan + Ijuk Plesteran camp. 1 : 3
Tanah Urug TPK / KPMD

SUYATNO
2,00
Diperiksa Oleh
2,00
F Teknik Kecamatan

0.8 RIPTO PRIHARTONO, ST


Pas. Batu Kali camp. 1 :
4 0,80 Disetujui Oleh
Faskab Teknik

0.80
0,80

POT. MELINTANG SAYAP 3 POT. MELINTANG SAYAP 4 Ir. HARI BUDI S


panjang = 10 m panjang = 10 m Diketahui Oleh
PjOK
Kebutuhan Sayap Jembatan :
* Panjang : 40.00 m'
* Volume Talud : 65.32 m³
* Vol. Galian Tanah : 32.60 m³ KUNTADI SUWANDONO,S.So
* Luas Plester : 16.00 m² NIP : 19630527198611 1 001
* Volume Tanah Urug : 425.50 m²
TPT 1 & 2 : 26,00

* Panjang : 52.00 m'


* Volume Talud : 122.20 m³ GAMBAR RENCANA
* Vol. Galian Tanah : 44.20 m³ PROPINSI JAWA TIMUR
* Luas Plester : 20.80 m² T1 KABUPATEN NGAWI
* Volume Tanah Urug : 58.00 m² KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA
T0
Jembatan Beton
Titik
KODE
0 1 LOKASI
DUSUN SEKANCIL
H 4.00 1.00 JUDUL GAMBAR

B 1.50 0.50 POTONGAN MELINTANG


TALUD
C 1.00 0.40 3,50
Pas. Batu Kali 1 : 5
0.30 Dibuat Oleh :
0.30
TPK / KPMD

SUYATNO
H H Diperiksa Oleh
F Teknik Kecamatan

RIPTO PRIHARTONO, ST
B B Disetujui Oleh
Faskab Teknik

C C
POT. TPT 1 & 2
Ir. HARI BUDI S
panjang = 26 m
Diketahui Oleh
PjOK
KUNTADI SUWANDONO,S.S
NIP : 19630527198611 1 001
A
UR
WI

NG

ST
,S.Sos
001
0.00 m
Ø 12 2 Ø 12 2
Ø 10-15
1 2 Ø 12 2

GAMBAR RENCANA
0.40 PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
1 2 Ø 12 8 DESA REJOMULYO
JENIS PRASARANA
Ø 12 2 0,75
JEMBATAN BETON
LOKASI
Ø 12 2 DETAIL PENULANGAN BALOK DUSUN SEKANCIL
GELAGAR JUDUL GAMBAR
4.00
Detail Penulangan Balok
Ø 12 2

Sengkang Ø 10 - 15
Ø 12 2 Dibuat Oleh :
TPK / KPMD
Ø 12 4

Ø 12 4 SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
POTONGAN 1 - 1

KUNTADI SUWANDONO,S.So
Disetujui Oleh
Faskab Teknik
Ø 12 2

Begel Ø 10 - 15
Ø 12 2
Ir. HARI BUDI S
Ø 12 2 Diketahui Oleh
Ø 12 4 PjOK
Ø 12 4
POTONGAN 2 - 2
KUNTADI SUWANDONO,S.So
NIP : 19630527198611 1 001
R

S.Sos
S.Sos
01
0.10
0.20

0.12
0.40 GAMBAR RENCANA
0.10
PROPINSI JAWA TIMUR
"Pipa GI Ø 2 0.10 KABUPATEN NGAWI
KEC. PANEKAN
0.40
DESA REJOMULYO
JENIS PRASARANA
0.40 JEMBATAN BETON
m
LOKASI
PERSPEKTIF BALOK SANDARAN DUSUN SEKANCIL
JUDUL GAMBAR
0.50 GAMBAR DETAIL
ABUTMENT
SANDARAN
PENULANGAN PLAT

m Dibuat Oleh :
TPK / KPMD
DETAIL ABUTMENT
0.10
Ø 6 - 15
SUYATNO
Pipa GI Ø 2 0.40 Diperiksa Oleh
" F Teknik Kecamatan
Ø 12 - 15 Ø 12 - 15
Ø 6 - 20
0.40
KUNTADI SUWANDONO,S.So
Disetujui Oleh
0.20 Faskab Teknik
0.20

Ir. HARI BUDI S


Diketahui Oleh
PjOK

DETAIL PENULANGAN LANTAI PLAT


DETAIL PENULANGAN LANTAI PLAT

KUNTADI SUWANDONO,S.So
NIP : 19630527198611 1 001
R

S.Sos
S.Sos
01