Diketahui:
H1 3.2 m Bt 2m
H2 0.7 m ka1 lihat tabel 0.319
h1 1.8 m ka2 lihat tabel 0.285
h2 2.1 m tebal pot. t.pancang. 35 cm
b 0.7 m Luas pot T. Pancang. 1225 cm²
B 2.8 m Kliling pot T. Pancang. 140 cm
Lb 9m Jumlah tiang .p.( n ). 8
Q1 30 derajat conus 150 kg /cm²
Q2 32 derajat Jhp 1000 kg / cm
d1 5 derajat fc' beton t. panc. 300 kg /cm²
d2 10 derajat Fc' beton t. panc.=fc'/4 75 kg /cm²
g1 1.7 t/m³
g2 2 t/m³
gbeton 2.4 t/m³
Pa1=1/2x h'xg1 x Ka1 1.56 ton h1' 2.40 m
Pa2=h'xh2xg1 x Ka 2 2.44 ton X1 1.40 m
Pa3=1/2xh2²xg2x Ka 2 1.26 ton X2 1.40 m
W3 =(H1x0,5 +H2xB)x g beton, 7.53 ton X3 0.88 m
W 4 =(X1-0,5b)x (h1+0,60)x 4.28 ton X4 1.05 m
W5 =(X1-0,5b) x (h2-H2)x g2 3.22 ton Y1 2.70 m
W1 =0,358 ton 0.36 ton Y2 1.05 m
W2 = 14 ton 14.00 ton Y3 0.70 m
y4 5.40 m
Beban Besar Arah Jarak M+ M- Arah Arah
(selebar 1 m ) (ton ) thd ttkT t m tm ton ton
Pa1cos d1 1.56 2.7 4.20 1.56
Pa1sin d1 0.14 1.4 0.19 0.14
Pa2cos d2 2.41 1.05 2.53 2.41
Pa2sin d2 0.42 1.4 0.59 0.42
Pa3cos d2 1.24 0.70 0.87 1.24
Pa3sin d2 0.22 1.4 0.31 0.22
W1 0.36 5.4 1.93 0.36
W2 14.00 0 0.00 14.00
W3 7.53 0 0.00 7.53
W4 4.28 0.825 3.53 4.28
W5 3.22 0.825 2.66 3.22
Total 9.53 7.28 29.81 5.56
2.25 59.62 4.00
Mtot Vtot Htot
S M,selebar. Abut.=Mtot x Lb= 20.21 tm
S V,selebar. Abut.=Vtot x Lb= 536.57 ton
S H,.selebar. Abut.=Vtot x Lb= 36.03 ton
2. Mencari Beban YG yg Terjadi Satu Tiang Pancang( Pv&Ph )
Pv 2 = V/n - M/ (Bt x n)
Ph = H/( ½.n )
b/ a = Pv1 / Ph
b/a 8
a= 1
b= 8
c 8.06
Pt 89.25 ton
Ptv .=b/cxPt= 88.56 ton
Pth .=a/cxPt= 11.07 ton
4 Kontrol apakah Abutmen cukup Stabil thp penurunan
Beban yg Terjadi 1 T. P. Daya dukung 1 T.P. Keterangan