Cor Beton Sloof 15 / 20

BESI POKOK = : 12 mm
BEGEL : 8 mm
SELIMUT BETON 0.02 m
TINGGI BETON 20 cm
LEBAR BETON 15 cm

PERHITUNGAN BESI BEGEL 8 mm


a. LUAS DIMENSI 0.15 X 0.200 = 0.030 m2
b PANJANG DARI 1M3 =1 m3 : (luas dimensi) = 33.333 m'
c. SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 0.604 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 222.222 bh
PANJANG TOTAL BEUGEL = 134.222 m
TOTAL BERAT BEUGEL = 52.682 kg

PERHITUNGAN TULANGAN POKOK 12 mm


JUMLAH BESI = 4.000 bh
PANJANG BESI /m3 = 133.333 m
TOTAL BERAT BESI = 118.667 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 13.333 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 118.6666666667 Kg
BEGEL 52.68222222222 Kg 171.349
BEKISTING 13.333 m2
Cor Beton Sloof 15 / 20
BESI POKOK = : 12 mm
BEGEL : 8 mm
SELIMUT BETON 0.02 m
TINGGI BETON 20 cm
LEBAR BETON 15 cm

PERHITUNGAN BESI BEGEL 8 mm


a. LUAS DIMENSI 0.15 X 0.200 = 0.030 m2
b PANJANG DARI 1M3 =1 m3 : (luas dimensi) = 33.333 m'
c. SELIMUT BETON = 0.020 m'

PANJANG I BUAH BEUGEL = 0.604 m'


JRK ANTAR BEUGEL = 0.150 m'
JML BUGEL YANG DI BUTUHKAN / 1M3 = 222.222 bh
PANJANG TOTAL BEUGEL = 134.222 m
TOTAL BERAT BEUGEL = 52.682 kg

PERHITUNGAN TULANGAN POKOK 12 mm


JUMLAH BESI = 4.000 bh
PANJANG BESI /m3 = 133.333 m
TOTAL BERAT BESI = 118.667 kg

PERHITUNGAN BEKISTING
LUAS BEKISTING/M3 = 13.333 m2
JADI 1 M3 BETON MEMBUTUHKAN:
BESI POKOK 118.6666666667 Kg
BEGEL 52.68222222222 Kg 171.349
BEKISTING 13.333 m2
INFORMASI UMUM

No. URAIAN INFORMASI

1. Nama Kegiatan : BELANJA MODAL PEMBANGUNAN LOS PASAR JIBAMA


2. Nama Paket : PEMBANGUNAN LOS PASAR JIBAMA (7X24) 9 UNIT
3. Nomor Paket : 81
4. Lokasi pekerjaan : A. DISTRIK TIOM
B.
5. Kondisi Jalan : =(aspal-japat kondisi rusak - topography bukit-gunung)

6 Kecepatan Dump Truck Bermuatan rata 2 V1= 1.00 Km/H --- (max beban yang dapat dibawa 2 - 3 ton)
Kecepatan Dump Truck Kosong rata 2 V2= 1.00 Km/H ---(analisa sewa alat berat dan truk
menggunakan Standar Bina Marga)
---(analisa ongkos angkut ---BM)
O 0.0 Km #A## Km

Lokasi Proyek

QUARRY 1 SUMBER QUARRY 2

WAMENA DISTRIK TIOM (Base Camp)

7 Jam kerja efektif dalam 1 hari 6.0 jam


8 Asuransi, Pajak, dsb. untuk Peralatan 0.002 x Harga Pokok Alat
9 Tingkat Suku Bunga Investasi Alat 20.00 %
10 PPN Biaya Umum dan Keuntungan 10.00 % x Biaya Langsung

11 METODE PERHITUNGAN ANALISA 12 KONVERSI dan ASUMSI


Standar Nasional Indonesia (Analisa Biaya Konstruksi) sumber http://www.bsn.go.id/sni (update 1-1-09)
sumber http://pu.go.id/balitbang/sni (update 1-1-09)
NO PEKERJAAN ANALISA 1.00 m = 100
1 #REF! SNI-2000 1.00 m = 1000
2 #REF! #REF! 1.00 km = 1000
3 #REF! #REF! 1.00 ton = 1000
4 #REF! #REF! 1.00 m3 pasir = 1400
5 #REF! #REF! 1.00 m3 kerikil = 1350
6 #REF! #REF! 1.00 Roll kabel = 50
7 #REF! #REF! 1 Batang Pipa PVC = 4
8 #REF! SNI 2001 1 Batang Pipa GIV = 6
9 #REF! #REF! 1 Lembar Tripleks = 1,2 x 2,4 cm2
10 #REF! SNI 2001 1 zak semen PC = 50
11 #REF! #REF! Tabel Pembesian (besi Polos)
12 #REF! SNI 2001 dia BERAT (Kg/m) BERAT/
13 #REF! SNI 2001 (mm) BERAT BATANG
14 #REF! #REF! 16.00 1.57 17.27
15 PEKERJAAN LISTRIK (SUPLEMENT) 14.00 1.21 13.31
12.00 0.89 9.79
12 SATUAN YANG DIGUNAKAN: 10.00 0.61 6.7353
NO LAMBANG ARTI keterangan 8.00 0.39 4.3175
1 mm milimeter sat. panjang 6.00 0.22 2.442
2 cm centimeter sat. panjang *): Besi yang tersedia di toko2 wamena 1 batang = 11 m'
3 " Inci sat. panjang
4 OH Orang Hari 1 hari = 6 jam kerja Standar Kayu Kelas II 1 m' besi strip 30.3 =1,36 kg
5 Ttk Titik (pada pekerjaan Lampu) - Cemara (PPKI)
3 Kg Kilogram diasumsikan sebagai satuan berat benda sumber:
4 m' meter satuan panjang
5 m2 meter persegi satuan luas Standar Kayu Kelas I
6 m3 meter kubik satuan isi - Kayu Sage, Kayu Besi (PPKI)
7 Mpa Mega Pascal Satuan Tekanan - Kayu Sage, Kayu Besi (PPKI)
8 bh buah
9 OH Orang Hari 1 hari = 6 jam kerja Standar Kayu Kelas II
10 Ttk Titik (pada pekerjaan Lampu) - Cemara (PPKI)
11 Standar Kayu Kelas III --- (kayu weki) definis agregat:
Pasir Beton =agregat halus dengan ukuran < 5 mm
selengkapnya lihat spesifikasi teknis Kerikil =agregat kasar dengan ukuran 5 s.d 40 mm
Bucking Factor Pasir = 20 %
w/c =water/cemen slump (lihat spek)

[2-UMUM.XLS] cv.triaxial@gmail.com
INFORMASI UMUM

INFORMASI

TIOM

###

###

cm
mm
m'
kg
kg
kg
m'
m
m
1,2 x 2,4 cm2
Kg

[2-UMUM.XLS] cv.triaxial@gmail.com
NAMA PAKET : PEMBANGUNAN LOS PASAR JIBAMA (7X24) 9 UNIT
LOKASI : JLN JB WENAS - WAMENA KAB. JAYAWIJAYA
TAHUN : 2009
SATKER : DINAS PERINDUSTRIAN DAN PERDAGANGAN KAB. JAYAWIJAYA

NO NAMA BAHAN SATUAN HARGA QUARRY BASIC PRIZE QUARRY KETERANGAN


(goverm.) (ANALISA JARAK) (jarak quarry ke
(Rp) (Rp) base camp) km
1 Batu Kali/Gunung M3 650,000.00 650,000.00 PROYEK $ -

2 Pasir Pasang M3 650,000.00 650,000.00 WAMENA $ -

3 Pasir Beton M3 650,000.00 650,000.00 WAMENA $ -

4 Pasir Urug M3 400,000.00 400,000.00 PROYEK $ -

5 Kerikil Sungai Tanpa Pasir M3 500,000.00 500,000.00 PROYEK $ -

6 Kerikil Sungai Tanpa Pasir M3 500,000.00 500,000.00 WAMENA $ -

7 Sirtu M3 400,000.00 400,000.00 PROYEK $ -

8 Tanah Timbunan M3 100,000.00 100,000.00 PROYEK $ -

9 Batu Batako Bh 7,500.00 7,500.00 PROYEK $ -

10 Batu Merah Bh 3,000.00 3,000.00 WAMENA $ -

11 Batu Kerawang Bh 20,000.00 20,000.00 WAMENA $ -

12 Glass Blok 20/20 Bh 70,000.00 70,000.00 WAMENA $ -

12 Kayu Kelas I M3 3,500,000.00 3,500,000.00 PROYEK $ -

13 Kayu Kelas II M3 3,000,000.00 3,000,000.00 PROYEK $ -

14 Kayu Kelas III (Bekisting) M3 2,500,000.00 2,500,000.00 PROYEK $ -

15 Kayu Dolken Btg 20,000.00 20,000.00 PROYEK $ -

16 Besi Beton φ 6 mm Kg 17,608.52 17,608.52 WAMENA $ -

17 Besi Beton φ 8 mm Kg 18,066.01 18,066.01 WAMENA $ -

18 Besi Beton φ 10 mm Kg 17,074.22 17,074.22 WAMENA $ -

17 Besi Beton φ 12 mm Kg 21,961.18 21,961.18 WAMENA $ -

18 Besi Beton φ 16 mm Kg 19,397.80 19,397.80 WAMENA $ -

18 Kawat Beton Kg 30,000.00 30,000.00 WAMENA $ -

19 Semen PC kg 11,600.00 11,600.00 WAMENA $ -

20 Semen warna Zak 900,000.00 900,000.00 WAMENA $ -

21 Tripleks 3 mm Lbr 95,000.00 95,000.00 WAMENA $ -

22 Teakwood 3 mm Lbr 170,000.00 170,000.00 WAMENA $ -

23 Plafon Kalsibor Lbr 90,000.00 90,000.00 WAMENA $ -

24 Palat Timbal M2 750,000.00 750,000.00 WAMENA $ -

23 Kayu Profil Untuk Lis Plafound M' 15,000.00 15,000.00 WAMENA $ -

24 Melamin/Formika Lbr 165,000.00 165,000.00 WAMENA $ -

25 Kaca Polos 3 mm M2 350,000.00 350,000.00 WAMENA $ -

26 Kaca Polos 5 mm M2 500,000.00 500,000.00 WAMENA $ -

27 Kaca Buram 3 mm M2 350,000.00 350,000.00 WAMENA $ -


28 Kaca Buram 5 mm M2 450,000.00 450,000.00 WAMENA $ -

29 Cermin 5 mm M2 450,000.00 450,000.00 WAMENA $ -

30 Kawat Harmonika M2 55,000.00 55,000.00 WAMENA $ -

31 Kawat Duri Roll 285,000.00 285,000.00 WAMENA $ -

32 Atap Genteng Multi Roof Lbr 120,000.00 120,000.00 WAMENA $ -

33 Nok Multi Roof M' 130,000.00 130,000.00 WAMENA $ -

24 Atap Seng Gelombang BJLS 20 Lbr 85,000.00 85,000.00 WAMENA $ -

25 Seng Plat BJLS 20 Lbr 75,000.00 75,000.00 WAMENA $ -

26 Paku Biasa Kg 30,000.00 30,000.00 WAMENA $ -

27 Paku Seng Kg 35,000.00 35,000.00 WAMENA $ -

28 Paku Skrup Dos 25,000.00 25,000.00 WAMENA $ -

29 Paku Tripleks Kg 35,000.00 35,000.00 WAMENA $ -

30 Tegel Keramik 10 x 20 Dos 220,000.00 220,000.00 WAMENA $ -

31 Tegel Keramik 20 x 20 Dos 220,000.00 220,000.00 WAMENA $ -

32 Cat Minyak Kg 50,000.00 50,000.00 WAMENA $ -

33 Plamur Kg 40,000.00 40,000.00 WAMENA $ -

34 Cat Tembok 25 Kg Bh 320,000.00 320,000.00 WAMENA $ -

35 Minyak cat Ltr 50,000.00 50,000.00 WAMENA $ -

36 Cat Meni Kg 40,000.00 40,000.00 WAMENA $ -

37 Residu Ltr 25,000.00 25,000.00 WAMENA $ -

38 Dempul Kg 40,000.00 40,000.00 WAMENA $ -

39 Kuas 4" Bh 25,000.00 25,000.00 WAMENA $ -

40 Kertas Gosok / Amplas Lbr 5,000.00 5,000.00 WAMENA $ -

41 Kunci Tanam Antik (Royal Besar) Set 175,000.00 175,000.00 WAMENA $ -

42 Kunci Tanam Biasa Set 90,000.00 90,000.00 WAMENA $ -

43 Engsel Pintu Set 25,000.00 25,000.00 WAMENA $ -

44 Engsel Jendela Set 20,000.00 20,000.00 WAMENA $ -

45 Engsel Angin Psg 30,000.00 30,000.00 WAMENA $ -

46 kait Angin Psg 30,000.00 30,000.00 WAMENA $ -

47 Grendel Pintu Psg 25,000.00 25,000.00 WAMENA $ -

48 Grendel Jendela Psg 15,000.00 15,000.00 WAMENA $ -

49 Lem Kayu Kg 60,000.00 60,000.00 WAMENA $ -

50 Besi Strip 30,3 Kg 18,382.35 18,382.35 WAMENA $ -

51 Baut Mur Panjang 30 Cm Bh 20,000.00 20,000.00 WAMENA $ -


52 Angker Bh 10,000.00 10,000.00 WAMENA $ -

53 Lampu TL 1 x 20 watt Set 100,000.00 100,000.00 WAMENA $ -

54 Lampu TL 1 x 40 watt Set 135,000.00 135,000.00 WAMENA $ -

55 Sakelar Ganda Bh 30,000.00 30,000.00 WAMENA $ -

56 Stop Kontak Bh 25,000.00 25,000.00 WAMENA $ -

57 Sekring Box 1 group Set 70,000.00 70,000.00 WAMENA $ -

58 Kabel NYM 2,5 x 2 Roll 600,000.00 600,000.00 WAMENA $ -

59 Fitting Bh 15,000.00 15,000.00 WAMENA $ -

60 Kunci Selot bh 15,000.00 15,000.00 WAMENA $ -

61 Air Bersih untuk cor beton ltr 50.00 50.00 WAMENA $ -

62 Kawat Las Kg 100,000.00 100,000.00 WAMENA $ -

63 Sewa Alat Las Listrik Jam 1,000.00 1,000.00 WAMENA $ -

64 Anyaman Bambu/Lokop Lbr 1,000.00 1,000.00 PROYEK $ -

DIPERIKSA OLEH DISIAPKAN


KASUBDIN PERMUKIMAN DAN PENATAAN RUANG KONSULTAN PERENCANA
DINAS PERMUKIMAN DAN PRASARANA WILAYAH CV. DINAMIKA KONSULTAN
KABUPATEN JAYAWIJAYA

ONES WANDIKBO SRI LESTARI ISMAIL ABU, ST


Nip. 640 017 330 #REF!

DISETUJUI OLEH MENGETAHUI


PEJABAT PELAKSANA TEKNIS KEGIATAN KUASA PENGGUNA ANGGARAN
KEPALA DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN JAYAWIJAYA

LUKAS KOSAY, SE.MSi WIKLIP WAKERKWA, S.Sos


Nip. 460 023 787 Nip. 090 009 109
DAFTAR
HARGA DASAR SATUAN UPAH
HARGA HARGA
No. URAIAN KODE SATUAN SATUAN SATUAN
( Rp./hari) ( Rp/jam.)

1. Pekerja L01 O/H 60,000.00 10,000.00

2. Tukang L02 O/H 115,000.00 19,166.67

3. Mandor L03 O/H 150,000.00 25,000.00

4. Operator L04 O/H 150,000.00 25,000.00

5. Pembantu Operator L05 O/H 85,000.00 14,166.67

6. Sopir / Driver L06 O/H 120,000.00 20,000.00

7. Pembantu Sopir / Driver L07 O/H 65,000.00 10,833.33

8. Mekanik L08 O/H 150,000.00 25,000.00

9. Pembantu Mekanik L09 O/H 100,000.00 16,666.67

10 Kepala Tukang L10 O/H 140,000.00 23,333.33

*) 1 hari kerja = 6 jam efektif


E
REKAPITULASI BELANJA ANGGARAN

PEKERJAAN : PEMBANGUNAN PASAR dan TOKO PAKAIAN


LOKASI : Jl. SAFRI DARWIN (ruas antara Jl. TAWES - Jl. PATTIMURA)
Tahun Anggaran : 2010 / 2011

TOTAL HARGA
NO URAIAN PEKERJAAN
(Rp.)
1 2 3

I. BIAYA FISIK (sudah termasuk PPN 10 %) #REF!

II. BIAYA PERENCANAAN TEKNIS (sudah termasuk PPN 10 %) #REF!

III. BIAYA PENGAWASAN TEKNIS (sudah termasuk PPN 10 %) #REF!

IV. BIAYA ADMINISTRASI 33,480,000.00

JUMLAH REAL COST I s/d IV + PPN (dibulatkan) #REF!

Wamena, 31 Maret 2011


Konsultan Perencana
Menyetujui PT. SILVA PATRIA
Kabid Cipta Karya Dinas Pekerjaan Umum
Kabupaten Mimika

TOHARUN Amd. Tek. MUH. YUSUF, ST.


NIP. 19720404 199403 1 009 Kepala Cabang

Mengetahui
Kepala Dinas Pemuda dan Olah Raga
Kabupaten Mimika

ONES WANDIKBO
NIP. 19610918 198603 1 016
E DASAR PERHITUNGAN BIAYA PENGAWASAN TEKNIS

PEKERJAAN : #REF!
LOKASI : Jl. SAFRI DARWIN (ruas antara Jl. TAWES - Jl. PATTIMURA)
Tahun Anggaran : #REF!

BIAYA FISIK BIAYA PENGAWASAN TOTAL


NO URAIAN PEKERJAAN
Rp. Biaya Dasar Biaya PENGAWASAN
1 2 3 4 = 3% x 3 8=4

I. #REF! #REF! #REF! #REF!

JUMLAH REAL COST I s/d X #REF! #REF! #REF!


PPN 10 % #REF! #REF! #REF!
JUMLAH REAL COST I s/d X + PPN (dibulatkan) #REF! #REF! #REF!

Wamena, 31 Maret 2011


Konsultan Perencana
Pejabat Pembuat Komitmen PT. SILVA PATRIA
PPK

TOHARUN Amd. Tek. MUH. YUSUF, ST.


NIP. 19720404 199403 1 009 Kepala Cabang

Kepala SKPD Kabid. CIPTA KARYA


Dinas Pekerjaan Umum Dinas Pekerjaan Umum
KAB. JAYAWIJAYA KAB. JAYAWIJAYA

MARCUS ADOLF HATTU, BE. ONES WANDIKBO


NIP. 19680814 198103 1 008 NIP. 19610918 198603 1 016
E DASAR PERHITUNGAN BIAYA PERENCANAAN TEKNIS

PEKERJAAN : #REF!
LOKASI : Jl. SAFRI DARWIN (ruas antara Jl. TAWES - Jl. PATTIMURA)
Tahun Anggaran : #REF!

BIAYA FISIK BIAYA PERENCANAAN


NO URAIAN PEKERJAAN
Rp. Biaya Dasar Biaya Pengulangan I Biaya Pengulangan II
1 2 3 4 = (4% x 3)/n 5 = 75% x 4 6 = 65% x 4

I. #REF! #REF! #REF! #REF! #REF!

JUMLAH REAL COST I s/d X #REF! #REF! #REF! #REF!


PPN 10 % #REF! #REF! #REF! #REF!
JUMLAH REAL COST I s/d X + PPN (dibulatkan) #REF! #REF! #REF! #REF!

Pejabat Pembuat Komitmen


PPK

TOHARUN Amd. Tek.


NIP. 19720404 199403 1 009

Kepala SKPD
Dinas Pekerjaan Umum
KAB. JAYAWIJAYA

MARCUS ADOLF HATTU, BE.


NIP. 19680814 198103 1 008 NIP. 19610918 198
TUNGAN BIAYA PERENCANAAN TEKNIS

BIAYA PERENCANAAN TOTAL


Biaya Pengulangan III Biaya PERENCANAAN
7 = 50% x 4 8 = 4+5+6+7

- #REF!

- #REF!
- #REF!
- #REF!

Wamena, 31 Maret 2011


Konsultan Perencana
PT. SILVA PATRIA

MUH. YUSUF, ST.


Kepala Cabang

Kabid. CIPTA KARYA


Dinas Pekerjaan Umum
KAB. JAYAWIJAYA

ONES WANDIKBO
NIP. 19610918 198603 1 016
E
REKAPITULASI ENGINEER ESTIMATE (TERHITUNG KONDISI LAPANGAN)

PEKERJAAN : PEMBANGUNAN PASAR dan TOKO PAKAIAN


LOKASI : Jl. SAFRI DARWIN (ruas antara Jl. TAWES - Jl. PATTIMURA)
Tahun Anggaran : 2010 / 2011

HITUNGAN LAPANGAN
TOTAL HARGA AWAL TOTAL HARGA
NO URAIAN PEKERJAAN
LAPANGAN
Rp. Rp.
1 2 3 4

I. PEMBANGUNAN LOS PASAR BARU tipe L1, n = 3 unit #REF! #REF!

II. PEMBANGUNAN LOS PASAR BARU tipe L2, n = 1 unit #REF! #REF!

III. PEMBANGUNAN LOS PASAR BARU tipe L3, n = 3 unit #REF! #REF!

IV. PEMBANGUNAN LOS PASAR BARU tipe L4, n = 3 unit #REF! #REF!

V. PEMBANGUNAN LOS PASAR BARU tipe L5, n = 3 unit #REF! #REF!

VI. PEMBANGUNAN RUKO tipe R1, n = 1 unit #REF! #REF!

VII. PEMBANGUNAN RUKO tipe R2, n = 1 unit #REF! #REF!

VIII. PEMBANGUNAN PAGAR KELILING, SUMUR BOR dan SALURAN #REF! #REF!

IX. PEMBANGUNAN KM dan WC tipe KWC 1, n = 4 unit #REF! #REF!

X. PEMBANGUNAN KM dan WC tipe KWC 2, n = 2 unit #REF! #REF!

JUMLAH REAL COST I s/d X. #REF! #REF!


SELISIH #REF!

Wamena, 28 Juli 2011


Kontraktor Pelaksana Konsultan Pengawas
PT. BALIEM MAJU MANDIRI PT. PATRIA AYUSIA

OPENG BAMBANG S., ST.


Direktur Utama Kepala Cabang

Kepala SKPD
Dinas Pekerjaan Umum Pejabat Pembuat Komitmen
KAB. JAYAWIJAYA PPK

MARCUS ADOLF HATTU, BE. TOHARUN Amd. Tek.


NIP. 19680814 198103 1 008 NIP. 19720404 199403 1 009
ENGINEER ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
LOKASI : #REF!
### : #REF!
TAHUN ANGGARA : #REF!
TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME #REF!
(Rp.)

D. PEKERJAAN MECHANICAL & ELECTRICAL


I PEKERJAAN INSTALASI LISTRIK
1 Pas. Lampu SL 18 Watt Ttk 14.000 #NAME? #NAME?
2 Pas. Lampu Down Light 20 Watt Ttk 60.000 #NAME? #NAME?
3 Pas. Instalasi Titik Listrik Ttk 157.000 125,000.00 19,625,000.00
4 Pas. Saklar ganda Ttk 17.000 #NAME? #NAME?
5 Pas. Saklar Tunggal Ttk 16.000 #NAME? #NAME?
6 Pas. Stop Kontak bh 44.000 #NAME? #NAME?
7 Pas. Kabel Data + Stop Kontak ( 2 Lantai ) Set 12.000 350,000.00 4,200,000.00
8 Pas. Stop Kontak ( AC ) bh 18.000 180,000.00 3,240,000.00
9 Pas. Instalasi Titik AC Ls 1.000 7,500,000.00 7,500,000.00
10 Pemasangan AC Unit 1 Pk bh 18.000 5,750,000.00 103,500,000.00
11 PABX bh 6.000 2,000,000.00 12,000,000.00
12 Smoke Detektor bh 12.000 350,000.00 4,200,000.00
13 Kamera CCTV Set 8.000 2,750,000.00 22,000,000.00
14 Fire Alarm bh 2.000 500,000.00 1,000,000.00
15 Hydrant ( Tabung ) Pemadan Kebakaran bh 4.000 2,000,000.00 8,000,000.00
16 Instalasi Jaringan Generator Set Ls 1.000 3,500,000.00 3,500,000.00
17 Lampu Sorot Mercury (Bilboard) Bank Papua Unit 2.000 1,500,000.00 3,000,000.00
18 Lampu Taman ( Stick/Tongkat) bh 6.000 750,000.00 4,500,000.00
19 Panel Box Unit 1.000 2,500,000.00 2,500,000.00
20 Instalasi Jaringan Pemadam Kebakaran Ls 1.000 4,500,000.00 4,500,000.00
21 Instalasi Koneksi daya PLN Unit 1.000 7,500,000.00 7,500,000.00
22 Instalasi Penangkal Petir Set 1.000 2,500,000.00 2,500,000.00
23 Test And Comisioning Instalasi Ls 1.000 7,000,000.00 7,000,000.00
SUB TOTAL I : #NAME?

JUMLAH REAL COST D = #NAME?


DAFTAR HARGA BAHAN
TAHUN ANGGARAN 2012

PROFIT HARGA SATUAN


SATUAN HARGA DASAR HARGA SATUAN
NO URAIAN JENIS O.H.(10%) JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=10% x 4 6=4+5 7=6

1 Batu kali / Gunung M3 682,500.00 68,250.00 750,750.00 750,750.00


2 Kerikil sungai tanpa pasir M3 68,181.82 6,818.18 75,000.00 75,000.00
2 Kerikil pecah / ciping M3 900,000.00 90,000.00 990,000.00 990,000.00
3 Batu split ukuran 5-7 cm M3 735,000.00 73,500.00 808,500.00 808,500.00
3 Batu split ukuran 3-5 cm M3 867,272.73 86,727.27 954,000.00 954,000.00
4 Batu split ukuran 2-3 cm M 3
1,126,818.18 112,681.82 1,239,500.00 1,239,500.00
4 Batu split ukuran 1-2 cm M3 1,350,909.09 135,090.91 1,486,000.00 1,486,000.00
5 Batu Batako Bh 8,056.82 805.68 8,862.50 8,862.50
5 Bata Merah Bh 3,465.00 346.50 3,811.50 3,811.50
6 Batu Kerawang Bh 20,000.00 2,000.00 22,000.00 22,000.00
6 Pasir pasang M3 896,590.91 89,659.09 986,250.00 986,250.00
7 Pasir beton M3 896,590.91 89,659.09 986,250.00 986,250.00
7 Pasir urug M3 864,318.18 86,431.82 950,750.00 950,750.00
8 Sirtu M3 590,909.09 59,090.91 650,000.00 650,000.00
8 Tanah timbunan M3 450,000.00 45,000.00 495,000.00 495,000.00
9 Kayu kelas I M3 3,856,818.18 385,681.82 4,242,500.00 4,242,500.00
9 Kayu kelas II M3 3,331,818.18 333,181.82 3,665,000.00 3,665,000.00
10 Kayu kelas III (bekisting) M3 2,681,818.18 268,181.82 2,950,000.00 2,950,000.00
10 Kayu Dolken Btg 20,000.00 2,000.00 22,000.00 22,000.00
11 Glass block 20x20 Bh 66,500.00 6,650.00 73,150.00 73,150.00
11 Besi beton Ø 6 mm Btg 38,568.18 3,856.82 42,425.00 42,425.00
12 Besi beton Ø 8 mm Btg 85,818.18 8,581.82 94,400.00 94,400.00
12 Besi beton Ø 10 mm Btg 120,886.36 12,088.64 132,975.00 132,975.00
13 Besi beton Ø 12 mm Btg 183,886.36 18,388.64 202,275.00 202,275.00
13 Besi beton Ø 16 mm Btg 384,227.27 38,422.73 422,650.00 422,650.00
14 Besi beton D 12 mm Btg 207,477.27 20,747.73 228,225.00 228,225.00
14 Besi beton D 16 mm Btg 398,193.18 39,819.32 438,012.50 438,012.50
15 Besi beton Kg 31,818.18 3,181.82 35,000.00 35,000.00
15 Kawat Beton Kg 35,068.18 3,506.82 38,575.00 38,575.00
16 Kawat harmonika lubang 4 cm M¹ 61,666.67 6,166.67 67,833.34 67,833.34
16 Kawat harmonika lubang 2 cm M¹ 56,250.00 5,625.00 61,875.00 61,875.00
17 Kawat harmonika lubang 1 cm M¹ 41,666.67 4,166.67 45,833.34 45,833.34
17 Kawat harmonika lubang 0,5 cm M¹ 33,333.34 3,333.33 36,666.67 36,666.67
18 Kawat has nyamuk M¹ 25,000.00 2,500.00 27,500.00 27,500.00
18 kawat duri Roll 291,666.67 29,166.67 320,833.34 320,833.34
19 Kawat las Dos 199,000.00 19,900.00 218,900.00 218,900.00
19 Aspal Kg 23,500.00 2,350.00 25,850.00 25,850.00
20 Semen PC 50 Kg Zak 444,840.91 44,484.09 489,325.00 489,325.00
20 Semen warna 40 kg Zak 952,000.00 95,200.00 1,047,200.00 1,047,200.00
21 Tripleks 3 mm Lbr 76,300.00 7,630.00 83,930.00 83,930.00
21 Tripleks 6 mm Lbr 155,750.00 15,575.00 171,325.00 171,325.00
22 Tripleks 12 mm Lbr 365,750.00 36,575.00 402,325.00 402,325.00
22 Teakwood 3 mm Lbr 165,000.00 16,500.00 181,500.00 181,500.00
23 playwood 9 mm Lbr 170,000.00 17,000.00 187,000.00 187,000.00
23 Plafon Kalsibor M² 90,000.00 9,000.00 99,000.00 99,000.00
24 Plat timbal M¹ 700,000.00 70,000.00 770,000.00 770,000.00
24 Kayu profil untuk lis plafon Lbr 15,000.00 1,500.00 16,500.00 16,500.00
25 Melamin 3 mm M² 165,000.00 16,500.00 181,500.00 181,500.00
25 Kaca polos 3 mm M² 367,500.00 36,750.00 404,250.00 404,250.00
26 Kaca polos 5 mm M² 507,500.00 50,750.00 558,250.00 558,250.00
26 Kaca buram 3 mm M² 350,000.00 35,000.00 385,000.00 385,000.00
PROFIT HARGA SATUAN
SATUAN HARGA DASAR HARGA SATUAN
NO URAIAN JENIS O.H.(10%) JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=10% x 4 6=4+5 7=6

27 Kaca buram 5 mm M² 480,000.00 48,000.00 528,000.00 528,000.00


27 Cermin 5 mm M² 136,500.00 13,650.00 150,150.00 150,150.00
28 Kaca nako polos 5 mm 7 klip Set 295,050.00 29,505.00 324,555.00 324,555.00
28 Kaca nako buram 5 mm 7 klip Set 319,900.00 31,990.00 351,890.00 351,890.00
29 Atap genteng multi roof Lbr 60,550.00 6,055.00 66,605.00 66,605.00
29 Nok multi roof M¹ 57,750.00 5,775.00 63,525.00 63,525.00
30 Atap seng gelombang BJLS 20 Lbr 69,600.00 6,960.00 76,560.00 76,560.00
30 Seng plat BJLS 20 uk. 45 cm Lbr 29,050.00 2,905.00 31,955.00 31,955.00
31 Seng plat BJLS 20 uk. 100 cm Lbr 95,000.00 9,500.00 104,500.00 104,500.00
31 Seng plat BJLS 30 uk. 45 cm Lbr 45,000.00 4,500.00 49,500.00 49,500.00
32 Paku jembatan Kg 38,500.00 3,850.00 42,350.00 42,350.00
32 Paku15 cm Kg 30,450.00 3,045.00 33,495.00 33,495.00
33 Paku10 cm Kg 26,250.00 2,625.00 28,875.00 28,875.00
33 Paku 7 cm Kg 26,250.00 2,625.00 28,875.00 28,875.00
34 Paku 5 cm Kg 26,250.00 2,625.00 28,875.00 28,875.00
34 Paku 3 cm Kg 29,750.00 2,975.00 32,725.00 32,725.00
35 Paku campur Kg 26,250.00 2,625.00 28,875.00 28,875.00
35 Paku seng Kg 35,000.00 3,500.00 38,500.00 38,500.00
36 Paku sekrup Dos 21,700.00 2,170.00 23,870.00 23,870.00
36 Paku tiplek Kg 31,500.00 3,150.00 34,650.00 34,650.00
37 Tegel keramik 10x20 polos Dos 183,818.18 18,381.82 202,200.00 202,200.00
37 Tegel keramik 20x20 polos Dos 190,818.18 19,081.82 209,900.00 209,900.00
38 Tegel keramik 20x25 polos Dos 196,068.18 19,606.82 215,675.00 215,675.00
38 Tegel keramik 30x30 polos Dos 206,568.18 20,656.82 227,225.00 227,225.00
39 Tegel keramik 40x40 polos Dos 225,886.36 22,588.64 248,475.00 248,475.00
39 Tegel keramik 10x20 warna Dos 192,568.18 19,256.82 211,825.00 211,825.00
40 Tegel keramik 20x20 warna Dos 196,068.18 19,606.82 215,675.00 215,675.00
40 Tegel keramik 20x25 warna Dos 199,568.18 19,956.82 219,525.00 219,525.00
41 Tegel keramik 30x30 warna Dos 227,568.18 22,756.82 250,325.00 250,325.00
41 Tegel keramik 40x40 warna Dos 247,727.27 24,772.73 272,500.00 272,500.00
42 Badkip porselen Bh 150,000.00 15,000.00 165,000.00 165,000.00
42 Kloset jongkok KIA Bh 586,250.00 58,625.00 644,875.00 644,875.00
43 Kloset duduk Set 2,607,500.00 260,750.00 2,868,250.00 2,868,250.00
43 Urinoir Set 1,800,000.00 180,000.00 1,980,000.00 1,980,000.00
44 Wastafel stainles Set 800,000.00 80,000.00 880,000.00 880,000.00
44 Wastafel keramik Set 498,750.00 49,875.00 548,625.00 548,625.00
45 Bak fiberglass Bh 8,000,000.00 800,000.00 8,800,000.00 8,800,000.00
45 Bak cuci stianles steel Bh 500,000.00 50,000.00 550,000.00 550,000.00
46 Cat minyak KG 50,000.00 5,000.00 55,000.00 55,000.00
46 Teak oil Ltr 50,000.00 5,000.00 55,000.00 55,000.00
47 Vernis Kg 500,000.00 50,000.00 550,000.00 550,000.00
47 Politur Ltr 40,000.00 4,000.00 44,000.00 44,000.00
48 Politur jadi Kg 45,000.00 4,500.00 49,500.00 49,500.00
48 Plamur Kg 40,000.00 4,000.00 44,000.00 44,000.00
49 Cat tembok 25 kg ex. Danabrite Bh 916,818.18 91,681.82 1,008,500.00 1,008,500.00
49 Cat tembok 5 kg ex. Danabrite Bh 188,613.64 18,861.36 207,475.00 207,475.00
50 Cat tembok 25 kg ex. Aries Bh 281,750.00 28,175.00 309,925.00 309,925.00
50 Cat tembok 5 kg ex. Aries Bh 80,500.00 8,050.00 88,550.00 88,550.00
51 Minyak cat Ltr 43,750.00 4,375.00 48,125.00 48,125.00
51 Cat meni Kg 36,750.00 3,675.00 40,425.00 40,425.00
52 Residu Ltr 96,250.00 9,625.00 105,875.00 105,875.00
52 Dempul Kg 36,750.00 3,675.00 40,425.00 40,425.00
53 Batu apung Kg 25,000.00 2,500.00 27,500.00 27,500.00
53 Kuas 4" Bh 29,750.00 2,975.00 32,725.00 32,725.00
54 Kuas 3" Bh 22,750.00 2,275.00 25,025.00 25,025.00
54 Kuas 2" Bh 16,450.00 1,645.00 18,095.00 18,095.00
55 Kuas 1" Bh 9,800.00 980.00 10,780.00 10,780.00
55 Kertas gosok / amplas Lbr 5,000.00 500.00 5,500.00 5,500.00
56 Kunci tanam ex. Yale Besar set 140,000.00 14,000.00 154,000.00 154,000.00
56 Kunci tanam ex. Yale kecil set 68,250.00 6,825.00 75,075.00 75,075.00
PROFIT HARGA SATUAN
SATUAN HARGA DASAR HARGA SATUAN
NO URAIAN JENIS O.H.(10%) JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=10% x 4 6=4+5 7=6

57 Kunci tanam u/ kamar mandi set 51,666.67 5,166.67 56,833.34 56,833.34


57 Engsel pintu besar set 20,000.00 2,000.00 22,000.00 22,000.00
58 Engsel pintu sedang set 15,000.00 1,500.00 16,500.00 16,500.00
58 Engsel pintu Koboy set 45,000.00 4,500.00 49,500.00 49,500.00
59 Engsel H besar set 18,375.00 1,837.50 20,212.50 20,212.50
59 Engsel H sedang set 12,250.00 1,225.00 13,475.00 13,475.00
60 Engsel H kecil set 9,450.00 945.00 10,395.00 10,395.00
60 Engsel jendela set 9,450.00 945.00 10,395.00 10,395.00
61 kait angin antik Psg 31,500.00 3,150.00 34,650.00 34,650.00
61 Kait angin sedang Psg 22,750.00 2,275.00 25,025.00 25,025.00
62 Kait angin biasa Psg 14,000.00 1,400.00 15,400.00 15,400.00
62 Grendel pintu antik Psg 31,500.00 3,150.00 34,650.00 34,650.00
63 Grendel pintu sedang Psg 22,750.00 2,275.00 25,025.00 25,025.00
63 Grendel pintu biasa Psg 17,500.00 1,750.00 19,250.00 19,250.00
64 Grendel jendela antik Psg 29,750.00 2,975.00 32,725.00 32,725.00
64 Grendel jendela sedang Psg 21,000.00 2,100.00 23,100.00 23,100.00
65 Grendel jendela sbiasa Psg 14,700.00 1,470.00 16,170.00 16,170.00
65 Door holder Set 25,000.00 2,500.00 27,500.00 27,500.00
66 Rell pintu dorong harmonika kwalitas 1 Set 24,000,000.00 2,400,000.00 26,400,000.00 26,400,000.00
66 Rell pintu dorong harmonika kwalitas 2 Set 19,000,000.00 1,900,000.00 20,900,000.00 20,900,000.00
67 Rell pintu dorong harmonika kwalitas 3 Set 16,000,000.00 1,600,000.00 17,600,000.00 17,600,000.00
67 Kunci lemari Set 15,000.00 1,500.00 16,500.00 16,500.00
68 Walter drain + assesoris Set 25,000.00 2,500.00 27,500.00 27,500.00
68 Alfa kran Bh 25,000.00 2,500.00 27,500.00 27,500.00
69 Floor drain Bh 15,000.00 1,500.00 16,500.00 16,500.00
69 Pipa GIP 3" medium A Btg 997,500.00 99,750.00 1,097,250.00 1,097,250.00
70 Pipa GIP 2" medium A Btg 498,750.00 49,875.00 548,625.00 548,625.00
70 Pipa GIP 1,5" medium A Btg 402,500.00 40,250.00 442,750.00 442,750.00
71 Pipa GIP 1" medium A Btg 309,750.00 30,975.00 340,725.00 340,725.00
71 Pipa GIP 3/4" medium A Btg 210,000.00 21,000.00 231,000.00 231,000.00
72 Pipa GIP 1/2" medium A Btg 168,000.00 16,800.00 184,800.00 184,800.00
72 Pipa GIP 3" medium B Btg 853,125.00 85,312.50 938,437.50 938,437.50
73 Pipa GIP 2" medium B Btg 467,250.00 46,725.00 513,975.00 513,975.00
73 Pipa GIP 1,5" medium B Btg 378,000.00 37,800.00 415,800.00 415,800.00
74 Pipa GIP 1" medium B Btg 253,750.00 25,375.00 279,125.00 279,125.00
74 Pipa GIP 3/4" medium B Btg 203,000.00 20,300.00 223,300.00 223,300.00
75 Pipa GIP 1/2" medium B Btg 162,750.00 16,275.00 179,025.00 179,025.00
75 Pipa PVC 1/2" Btg 34,300.00 3,430.00 37,730.00 37,730.00
76 Pipa PVC 3/4" Btg 44,800.00 4,480.00 49,280.00 49,280.00
76 Pipa PVC 1" Btg 63,000.00 6,300.00 69,300.00 69,300.00
77 Pipa PVC 1,5" Btg 91,000.00 9,100.00 100,100.00 100,100.00
77 Pipa PVC 2" Btg 117,250.00 11,725.00 128,975.00 128,975.00
78 Pipa PVC 2,5" Btg 136,500.00 13,650.00 150,150.00 150,150.00
78 Pipa PVC 3" Btg 189,000.00 18,900.00 207,900.00 207,900.00
79 Pipa PVC 4" Btg 318,500.00 31,850.00 350,350.00 350,350.00
79 Ijuk Ikat 150,000.00 15,000.00 165,000.00 165,000.00
80 Premium Ltr 21,000.00 2,100.00 23,100.00 23,100.00
80 Solar Ltr 21,000.00 2,100.00 23,100.00 23,100.00
81 Minyak tanah Ltr 15,750.00 1,575.00 17,325.00 17,325.00
81 Minyak pelumas Ltr 45,000.00 4,500.00 49,500.00 49,500.00
82 Minyak bekisting / oli kotor Ltr 10,000.00 1,000.00 11,000.00 11,000.00
82 Seal tip Bh 5,000.00 500.00 5,500.00 5,500.00
83 Lem kayu Kg 60,000.00 6,000.00 66,000.00 66,000.00
83 Besi strip 30.3 M¹ 25,000.00 2,500.00 27,500.00 27,500.00
84 Baut mur panjang 30 cm Bh 20,000.00 2,000.00 22,000.00 22,000.00
84 Pagar BRC ( termasuk cat ) M¹ 3,000,000.00 300,000.00 3,300,000.00 3,300,000.00
85 Pintu pagar BRC dorong ( 4m ) Unit 4,000,000.00 400,000.00 4,400,000.00 4,400,000.00
85 Angker Bh 100,000.00 10,000.00 110,000.00 110,000.00
86 Alumunium profil C M¹ - - -
86 Besi profil C M¹ - - -
PROFIT HARGA SATUAN
SATUAN HARGA DASAR HARGA SATUAN
NO URAIAN JENIS O.H.(10%) JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=10% x 4 6=4+5 7=6

87 Lampu SL 18 watt Set 61,590.91 6,159.09 67,750.00 67,750.00


87 Lampu SL 9 watt Set 45,390.91 4,539.09 49,930.00 49,930.00
88 Lampu TL 1x20 watt + bak Set 112,000.00 11,200.00 123,200.00 123,200.00
88 Lampu TL 1x40 watt + bak Set 147,000.00 14,700.00 161,700.00 161,700.00
89 Bolam pijar 40 watt Bh 10,500.00 1,050.00 11,550.00 11,550.00
89 Sakelar tunggal Bh 30,090.91 3,009.09 33,100.00 33,100.00
90 Sakelar ganda Bh 37,090.91 3,709.09 40,800.00 40,800.00
90 Stop kontak Bh 30,090.91 3,009.09 33,100.00 33,100.00
91 Sekering box 1 group Set 57,750.00 5,775.00 63,525.00 63,525.00
91 Sekering box 2 group Set 78,659.09 7,865.91 86,525.00 86,525.00
92 Kabel NYM 2,5x2 Roll 554,750.00 55,475.00 610,225.00 610,225.00
92 Pipa Union 5/8" M¹ 7,000.00 700.00 7,700.00 7,700.00
93 Fitting Bh 15,750.00 1,575.00 17,325.00 17,325.00
93 Limit Bh 64,750.00 6,475.00 71,225.00 71,225.00
94 Lampu taman set 450,000.00 45,000.00 495,000.00 495,000.00
94 Bunga hidup Rpn 25,000.00 2,500.00 27,500.00 27,500.00
95 Pohon palem dan sejenisnya Rpn 10,000.00 1,000.00 11,000.00 11,000.00
95 Rumput hidup M² 50,000.00 5,000.00 55,000.00 55,000.00
DAFTAR HARGA UPAH KERJA
TAHUN ANGGARAN 2012

PROFIT HARGA SATUAN


SATUAN HARGA DASAR HARGA SATUAN
NO URAIAN JENIS O.H.(10%) JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=10% x 4 6=4+5 7=6

DAFTAR UPAH
1 Mandor Org/Hr 180,000.00
2 Operator Org/Hr 150,000.00
3 Pembantu operator Org/Hr 145,000.00
4 Supir / driver Org/Hr 180,000.00
5 Pembantu driver Org/Hr 105,000.00
6 Mekanik Org/Hr 420,000.00
7 Pembantu mekanik Org/Hr 180,000.00
8 Kepala tukang Org/Hr 170,000.00
9 Tukang kayu Org/Hr 140,000.00
10 Tukang batu Org/Hr 140,000.00
11 Tukang besi Org/Hr 140,000.00
12 Tukang listrik Org/Hr 140,000.00
13 Tukang cat Org/Hr 140,000.00
14 Tukang pipa Org/Hr 140,000.00
15 Tukang las Org/Hr 140,000.00
16 Pekerja Org/Hr 60,000.00
17 Buruh terampil' Org/Hr 85,000.00
18 Buruh tidak terampil Org/Hr 75,000.00
ENGINEER ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
LOKASI : #REF!
#REF! : #REF!
TAHUN ANGGARAN : #REF!

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

H. PEKERJAAN PAGAR DAN LANDSCAPE

I PEKERJAAN TANAH DAN PASIR


1 Galian Tanah
- Galian Pondasi Lajur Pasangan Batu Kali 1 : 4 m3 46.944 #REF! #REF!
- Galian Pondasi Foot Plat Kolom Pedestal 25/25 m3 - #REF! #REF!
2 Urugan Tanah Kembali m3 (12.518) #REF! #REF!
3 Urugan Pasir bawah Pondasi (Tapak ) m3 - #REF! #REF!
4 Urugan Pasir bawah Pondasi (Lajur) m3 10.432 #REF! #REF!

SUB TOTAL I : #REF!

II. PEKERJAAN STRUKTUR PAGAR


1 Pondasi Lajur ( Batu Gunung/Batu Kali )
- Pek. Anstamping Batu Kosong m3 20.864 #REF! #REF!
- Pek. Pondasi Batu Kali 1 PC : 4 Psr m3 46.944 #REF! #REF!
2 Lantai Kerja Beton k125 Tebal 5 cm ( Pondasi Foof Plat 90 x 90 cm ) m3 - #REF! #REF!
3 Pondasi Foot Plat K4 ukuran 90 x 90 cm ( sisi D 13 Titik )
- Beton K-250 M³ - #REF! #REF!
- Pembesian (besi ulir) Kg - #REF! #REF!
- Mall/Bekisting M² - #REF! #REF!
4 Pedestal K4 25/25 ( sisi D : 13 Titik )
- Beton K-250 M³ - #REF! #REF!
- Pembesian (besi ulir) Kg - #REF! #REF!
- Pembesian (besi polos) Kg - #REF! #REF!
- Mall/Bekisting M² - #REF! #REF!
5 Sloof Beton S1a Ukuran : 20/25 ( sisi C dan D )
- Beton K-250 M³ 3.260 #REF! #REF!
- Pembesian (besi ulir) Kg - #REF! #REF!
- Pembesian (besi polos) Kg 358.449 #REF! #REF!
- Mall/Bekisting M² 32.600 #REF! #REF!
6 Sloof Beton S2a Ukuran : 20/25 ( sisi A dan B )
- Beton K-250 M³ 2.810 #REF! #REF!
- Pembesian (besi polos) Kg 291.723 #REF! #REF!
- Mall/Bekisting M² 28.100 #REF! #REF!
7 Kolom K4a Ukuran : 20/25 ( sisi C dan D : 17 Titik )
- Beton K-250 M³ 1.700 #REF! #REF!
- Pembesian (besi ulir) Kg - #REF! #REF!
- Pembesian (besi polos) Kg 279.776 #REF! #REF!
- Mall/Bekisting M² 28.305 #REF! #REF!
8 Kolom K4b Ukuran : 25/25 ( sisi A dan B : 18 Titik )
- Beton K-250 M³ 1.350 #REF! #REF!
- Pembesian (besi polos) Kg 203.137 #REF! #REF!
- Mall/Bekisting M² 21.600 #REF! #REF!
9 Ringbalk Beton Ukuran : 15/20 ( sisi C dan D )
- Beton K-250 M³ 1.829 #REF! #REF!
- Pembesian (besi polos) Kg 489.713 #REF! #REF!
- Mall/Bekisting M² 25.740 #REF! #REF!
10 Ringbalk Praktis Beton Ukuran : 10/15 ( sisi A dan B )
- Beton K-250 M³ 0.960 #REF! #REF!
- Pembesian (besi polos) Kg 285.472 #REF! #REF!
- Mall/Bekisting M² 25.560 #REF! #REF!

SUB TOTAL II : #REF!

H. LANDSCAPE&PAGAR.. Hal. : 20 dari 214


HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
III. PEKERJAAN DINDING PAGAR
1 Pek. Pasangan dinding Bata Tela Camp. 1 PC : 4 PS M² 124.346 #REF! #REF!
2 Plest. Dinding Luar & Dalam 1 PC : 4 Ps, t = 15 mm + acian M² 269.241 #REF! #REF!
3 Plest. Beton Luar & Dalam 1 PC : 2 Ps, t = 15 mm + acian M² 55.960 #REF! #REF!
4 Profil Pilar Pagar Sisi A Dan B Buah 18.000 1,500,000.000 27,000,000.00
5 Cat dinding exterior ex. Dulux ICI Wheatershield, setara M² 352.849 #REF! #REF!
6 Besi siku 50.50.5 Bh 32.000 #REF! #REF!
7 Kawat berduri galvanized M' 237.400 #REF! #REF!

SUB TOTAL III : #REF!

IV. PEKERJAAN PLAZA PARKIR DAN JALAN


1 Pasangan Paving Blok Tebal 8 cm + Pasir 5 cm terpadatkan M² 428.400 #REF! #REF!
2 Pasangan Kanstin Beton K250 M' 107.700 #REF! #REF!
3 Pasangan Pagar Steinless Steel ( Sisi A ) Unit 5.000 #REF! #REF!
4 Pasangan Pagar Steinless Steel ( Sisi B ) Unit 10.000 #REF! #REF!
5 Pasangan Pintu Geser Steinless Steel ( Sisi A ) Unit 1.000 #REF! #REF!
6 Pasangan Pintu Geser Steinless Steel ( Sisi B ) Unit 1.000 #REF! #REF!
7 Pasangan Pintu Swing Steinless Steel ( Sisi A ) Unit 1.000 #REF! #REF!
8 Pengecatan Kanstin Beton M² 39.849 #REF! #REF!

SUB TOTAL IV : #REF!

VI. PEKERJAAN SANITASI KOMPLEKS


1 Galian Tanah M³ 11.750 #REF! #REF!
2 Saluran Beton U
- Beton K-250 M³ 5.649 #REF! #REF!
- Pembesian (besi polos) Kg 339.011 #REF! #REF!
- Mall/Bekisting M² 95.603 #REF! #REF!
- Plastik cor M² 32.592 2,500.000 81,480.00
3 Tutup Saluran Blok Beton Modul ± 100 cm
- Beton K-250 M³ 1.508 #REF! #REF!
- Pembesian (besi polos) Kg 127.243 #REF! #REF!
- Mall/Bekisting M² 13.723 #REF! #REF!
4 Tutup Bak Kontrol Besi L.50.50.5 + jalusi Ø16 mm Bh 11.000 #REF! #REF!
5 Saluran Pasangan dinding Bata Tela Camp. 1 PC : 2 PS M² 34.300 #REF! #REF!
6 Plest. Pasangan Batu Tela 1 PC : 2 Ps, t = 15 mm + acian M² 49.000 #REF! #REF!
7 Plat Deucker Pintu Masuk
- Pek. Pondasi Batu Kali 1 PC : 4 Psr M³ 6.240 #REF! #REF!
- Plesteran 1 PC : 4 Ps, t = 15 mm + acian M² 12.000 #REF! #REF!
- Beton K-250 M³ 2.880 #REF! #REF!
- Pembesian (besi polos) Kg 282.076 #REF! #REF!
- Mall/Bekisting M² 14.400 #REF! #REF!
8 Pipa PVC AW Ø 4" (pembuangan ke saluran kota) M' 9.000 121,381.75 1,092,435.75

SUB TOTAL VI : #REF!

VII. PEKERJAAN LANDSCAPE


1 Timbunan Tanah Humus M³ 8.840 #REF! #REF!
2 Rumput Gajah Mini M² 44.200 #REF! #REF!
3 Pohon Cemara Pua-Pua tinggi 150 -200 cm Phn 9.000 #REF! #REF!
4 Pohon Daun Glodogan tinggi 150 -200 cm Phn 7.000 #REF! #REF!
5 Pohon Palm Ponik tinggi 200 -250 cm Phn 9.000 #REF! #REF!
6 Tanaman Perdu Rpn 20.000 #REF! #REF!

SUB TOTAL VII : #REF!

JUMLAH REAL COST H = #REF!

H. LANDSCAPE&PAGAR.. Hal. : 21 dari 214


ENGINEER ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
LOKASI : #REF!
#REF! : #REF!
TAHUN ANGGARAN : #REF!

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

H. PEKERJAAN PAGAR

I PEKERJAAN TANAH DAN PASIR


1 Galian Tanah
- Galian Pondasi Lajur Pasangan Batu Kali 1 : 4 m3 36.32 #REF! #REF!
- Galian Pondasi Foot Plat Kolom Pedestal 25/25 m3 35.42 #REF! #REF!
2 Urugan Tanah Kembali m3 15.21 #REF! #REF!
3 Urugan Pasir bawah Pondasi (Tapak ) m3 0.72 #REF! #REF!
4 Urugan Pasir bawah Pondasi (Lajur) m3 10.11 #REF! #REF!

SUB TOTAL I : #REF!

II. PEKERJAAN STRUKTUR PAGAR


1 Pondasi Lajur ( Batu Gunung/Batu Kali )
- Pek. Anstamping Batu Kosong m3 20.86 #REF! #REF!
- Pek. Pondasi Batu Kali 1 PC : 4 Psr m3 46.94 #REF! #REF!
2 Lantai Kerja Beton k125 Tebal 5 cm ( Pondasi Foof Plat 90 x 90 cm ) m3 0.72 #REF! #REF!
3 Pondasi Foot Plat K4 ukuran 90 x 90 cm ( sisi D 16 Titik )
- Beton K-250 M³ 2.81 #REF! #REF!
- Pembesian (besi ulir) Kg 803.40 #REF! #REF!
- Mall/Bekisting M² 14.40 #REF! #REF!
4 Pedestal K4 25/25 ( sisi D : 16 Titik )
- Beton K-250 M³ 1.25 #REF! #REF!
- Pembesian (besi ulir) Kg 418.64 #REF! #REF!
- Pembesian (besi polos) Kg 53.47 #REF! #REF!
- Mall/Bekisting M² 20.00 #REF! #REF!
5 Sloof Beton S1a Ukuran : 20/25 ( sisi C dan D )
- Beton K-250 M³ 3.06 #REF! #REF!
- Pembesian (besi ulir) Kg 386.78 #REF! #REF!
- Pembesian (besi polos) Kg 119.12 #REF! #REF!
- Mall/Bekisting M² 30.60 #REF! #REF!
6 Sloof Beton S2a Ukuran : 20/25 ( sisi A dan B )
- Beton K-250 M³ 2.81 #REF! #REF!
- Pembesian (besi polos) Kg 291.72 #REF! #REF!
- Mall/Bekisting M² 28.10 #REF! #REF!
7 Kolom K4a Ukuran : 25/25 ( sisi D : 16 Titik )
- Beton K-250 M³ 3.20 #REF! #REF!
- Pembesian (besi ulir) Kg 500.54 #REF! #REF!
- Pembesian (besi polos) Kg 118.82 #REF! #REF!
- Mall/Bekisting M² 48.80 #REF! #REF!
8 Kolom K4b Ukuran : 25/25 ( sisi A dan B : 18 Titik )
- Beton K-250 M³ 1.35 #REF! #REF!
- Pembesian (besi polos) Kg 203.14 #REF! #REF!
- Mall/Bekisting M² 21.60 #REF! #REF!
9 Ringbalk Beton Ukuran : 25/15 ( sisi C dan D )
- Beton K-250 M³ 2.15 #REF! #REF!
- Pembesian (besi polos) Kg 489.71 #REF! #REF!
- Mall/Bekisting M² 25.74 #REF! #REF!
10 Ringbalk Praktis Beton Ukuran : 10/15 ( sisi A dan B )
- Beton K-250 M³ 0.96 #REF! #REF!
- Pembesian (besi polos) Kg 285.47 #REF! #REF!
- Mall/Bekisting M² 25.56 #REF! #REF!

SUB TOTAL II : #REF!

H.PAGAR Hal. : 22 dari 214


HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)
III. PEKERJAAN DINDING PAGAR
1 Pek. Pasangan dinding Bata Tela Camp. 1 PC : 4 PS M² 192.66 #REF! #REF!
2 Plest. Dinding Luar & Dalam 1 PC : 4 Ps, t = 15 mm + acian M² 405.87 #REF! #REF!
3 Plest. Beton Luar & Dalam 1 PC : 2 Ps, t = 15 mm + acian M² 77.91 #REF! #REF!
4 Profil Pilar Pagar Sisi A Dan B Buah 18.00 1,500,000.00 27,000,000.00
5 Cat dinding exterior ex. Dulux ICI Wheatershield, setara M² 511.43 #REF! #REF!
6 Pasangan Pagar Steinless Steel ( Sisi A ) Unit 5.00 #REF! #REF!
7 Pasangan Pagar Steinless Steel ( Sisi B ) Unit 10.00 #REF! #REF!
8 Pasangan Pintu Geser Steinless Steel ( Sisi A ) Unit 1.00 #REF! #REF!
9 Pasangan Pintu Geser Steinless Steel ( Sisi B ) Unit 1.00 #REF! #REF!
10 Pasangan Pintu Swing Steinless Steel ( Sisi A ) Unit 1.00 #REF! #REF!

SUB TOTAL III : #REF!

JUMLAH REAL COST H = #REF!

H.PAGAR Hal. : 23 dari 214


ENGINEER ESTIMATE ( EE )
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR BANK PAPUA CABANG PEMBANTU SP. IV TIMIKA
LOKASI : #REF!
#REF! : #REF!
TAHUN ANGGARAN : #REF!

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

H. PEKERJAAN PAGAR DAN LANDSCAPE

I PEKERJAAN TANAH DAN PASIR


1 Galian Tanah
- Galian Pondasi Lajur Pasangan Batu Kali 1 : 4 m3 36.317 #REF! #REF!
- Galian Pondasi Foot Plat Kolom Pedestal 25/25 m3 35.424 #REF! #REF!
2 Urugan Tanah Kembali m3 15.212 #REF! #REF!
3 Urugan Pasir bawah Pondasi (Tapak ) m3 0.722 #REF! #REF!
4 Urugan Pasir bawah Pondasi (Lajur) m3 10.112 #REF! #REF!

SUB TOTAL I : #REF!

II. PEKERJAAN STRUKTUR PAGAR


1 Pondasi Lajur ( Batu Gunung/Batu Kali )
- Pek. Anstamping Batu Kosong m3 20.864 #REF! #REF!
- Pek. Pondasi Batu Kali 1 PC : 4 Psr m3 46.944 #REF! #REF!
2 Lantai Kerja Beton k125 Tebal 5 cm ( Pondasi Foof Plat 90 x 90 cm ) m3 0.722 #REF! #REF!
3 Pondasi Foot Plat K4 ukuran 90 x 90 cm ( sisi D 13 Titik )
- Beton K-250 M³ 2.808 #REF! #REF!
- Pembesian (besi ulir) Kg 803.40 #REF! #REF!
- Mall/Bekisting M² 14.400 #REF! #REF!
4 Pedestal K4 25/25 ( sisi D : 13 Titik )
- Beton K-250 M³ 1.250 #REF! #REF!
- Pembesian (besi ulir) Kg 418.637 #REF! #REF!
- Pembesian (besi polos) Kg 53.467 #REF! #REF!
- Mall/Bekisting M² 20.000 #REF! #REF!
5 Sloof Beton S1a Ukuran : 20/25 ( sisi C dan D )
- Beton K-250 M³ 3.060 #REF! #REF!
- Pembesian (besi ulir) Kg 386.784 #REF! #REF!
- Pembesian (besi polos) Kg 119.116 #REF! #REF!
- Mall/Bekisting M² 30.600 #REF! #REF!
6 Sloof Beton S2a Ukuran : 20/25 ( sisi A dan B )
- Beton K-250 M³ 2.810 #REF! #REF!
- Pembesian (besi polos) Kg 291.723 #REF! #REF!
- Mall/Bekisting M² 28.100 #REF! #REF!
7 Kolom K4a Ukuran : 25/25 ( sisi D : 13 Titik )
- Beton K-250 M³ 3.200 #REF! #REF!
- Pembesian (besi ulir) Kg 500.544 #REF! #REF!
- Pembesian (besi polos) Kg 118.816 #REF! #REF!
- Mall/Bekisting M² 48.800 #REF! #REF!
8 Kolom K4b Ukuran : 25/25 ( sisi A dan B : 18 Titik )
- Beton K-250 M³ 1.350 #REF! #REF!
- Pembesian (besi polos) Kg 203.137 #REF! #REF!
- Mall/Bekisting M² 21.600 #REF! #REF!
9 Ringbalk Beton Ukuran : 15/25 ( sisi C dan D )
- Beton K-250 M³ 2.145 #REF! #REF!
- Pembesian (besi ulir) Kg 385.204 #REF! #REF!
- Pembesian (besi polos) Kg 104.509 #REF! #REF!
- Mall/Bekisting M² 25.740 #REF! #REF!
10 Ringbalk Praktis Beton Ukuran : 10/15 ( sisi A dan B )
- Beton K-250 M³ 0.960 #REF! #REF!
- Pembesian (besi polos) Kg 285.472 #REF! #REF!
- Mall/Bekisting M² 25.560 #REF! #REF!

SUB TOTAL II : #REF!

H. LANDSCAPE&PAGAR (awal) Hal. : 24 dari 214


HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SAT VOLUME
(Rp.) (Rp.)

III. PEKERJAAN DINDING PAGAR


1 Pek. Pasangan dinding Bata Tela Camp. 1 PC : 4 PS m2 192.662 #REF! #REF!
2 Plest. Dinding Luar & Dalam 1 PC : 4 Ps, t = 15 mm + acian m2 405.873 #REF! #REF!
3 Plest. Beton Luar & Dalam 1 PC : 2 Ps, t = 15 mm + acian m2 77.910 #REF! #REF!
4 Profil Pilar Pagar Sisi A Dan B Buah 18.000 1,500,000.000 27,000,000.00
5 Cat dinding exterior ex. Dulux ICI Wheatershield, setara 511.431 #REF! #REF!

SUB TOTAL III : #REF!

IV. PEKERJAAN PLAZA PARKIR DAN JALAN


1 Pasangan Paving Blok Tebal 8 cm + Pasir 5 cm terpadatkan m2 376.680 #REF! #REF!
2 Pasangan Kanstin Beton K250 m1 98.940 #REF! #REF!
3 Pasangan Pagar Steinless Steel ( Sisi A ) Unit 5.000 #REF! #REF!
4 Pasangan Pagar Steinless Steel ( Sisi B ) Unit 10.000 #REF! #REF!
5 Pasangan Pintu Geser Steinless Steel ( Sisi A ) Unit 1.000 #REF! #REF!
6 Pasangan Pintu Geser Steinless Steel ( Sisi B ) Unit 1.000 #REF! #REF!
7 Pasangan Pintu Swing Steinless Steel ( Sisi A ) Unit 1.000 #REF! #REF!
8 Pengecatan Kanstin Beton M² 36.608 #REF! #REF!

SUB TOTAL IV : #REF!

VI. PEKERJAAN SANITASI KOMPLEKS


1 Galian Tanah M³ 11.750 #REF! #REF!
2 Saluran Pasangan dinding Bata Tela Camp. 1 PC : 2 PS ( Pas. 1 bata ) M² 39.200 #REF! #REF!
3 Plest. Pasangan Batu Tela 1 PC : 2 Ps, t = 15 mm + acian M² 39.200 #REF! #REF!
4 Saluran Buis Beton Ø 30" M² 40.000 #REF! #REF!
5 Bak kontrol 50 x 50 Bh 6.000 #REF! #REF!
6 Plat Deucker
- Pek. Pondasi Batu Kali 1 PC : 4 Psr M³ 2.080 #REF! #REF!
- Plesteran 1 PC : 4 Ps, t = 15 mm + acian M² 7.200 #REF! #REF!
- Beton K-250 M³ 0.600 #REF! #REF!
- Pembesian (besi polos) Kg 71.202 #REF! #REF!
- Mall/Bekisting M² 3.200 #REF! #REF!
7 Pipa PVC AW Ø 4" (pembuangan ke saluran kota) M' 9.000 121,381.75 1,092,435.75

SUB TOTAL VI : #REF!

VII. PEKERJAAN LANDSCAPE


1 Timbunan Tanah Humus M³ 25.200 #REF! #REF!
2 Rumput Gajah Mini M² 84.000 #REF! #REF!
3 Pohon Cemara Pua-Pua tinggi 150 -200 cm Phn 9.000 #REF! #REF!
4 Pohon Daun Glodogan tinggi 150 -200 cm Phn 7.000 #REF! #REF!
5 Pohon Palm Ponik tinggi 200 -250 cm Phn 9.000 #REF! #REF!
6 Tanaman Perdu Rpn 20.000 #REF! #REF!

SUB TOTAL VII : #REF!

JUMLAH REAL COST H = #REF!

H. LANDSCAPE&PAGAR (awal) Hal. : 25 dari 214


DAFTAR SATUAN BAHAN DAN UPAH

HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
1 Semen PC Zak 85,000.00
2 Semen Warna Kg 20,000.00
3 Pasir Beton m3 325,000.00
4 Pasir Pasangan m3 337,500.00
5 Pasir Urug / Timbunan m3 310,000.00
6 Sirtu m3 302,000.00
7 Batu pecah 1-2 m3 500,000.00
8 Batu pecah 2-3 m3 500,000.00
9 Batu pecah 3-5 m3 475,000.00
10 Abu Batu M3 990,000.00
11 Batu Belah / Batu Kali M3 485,000.00
12 Gravel M3 825,000.00
13 Bahan Timbunan Pilihan M3 220,000.00
14 Tanah Hitam M3 220,000.00
15 Ijuk M3 1,500,000.00
16 Karangan Urug m3 510,000.00
17 Tanah Timbunan m3 220,000.00
18 Batu Kali / Batu Gunung m3 450,000.00
19 Batu Tela (27x18x10cm) Bh 3,000.00
20 Batu Terawang/Roster Bh 55,000.00
Besi U24 diameter 6 mm Btg 41,800.00
Besi U24 diameter 8 mm Btg 64,900.00
Besi U24 diameter 10 mm Btg 97,900.00
Besi U24 diameter 12 mm Btg 141,900.00
Besi U24 diameter 16 mm Btg 280,500.00
Besi U36 diameter 16 mm Btg 308,000.00
21 Besi Beton U-24 Kg 15,690.69
22 Besi Beton Ulir U-36 Kg 16,244.73
23 Besi WF/Baja Konstruksi Kg 19,013.50
Besi Plat 10 mm Lbr 4,430,146.66
24 Besi Plat 6 mm Lbr 2,661,890.70
Besi Plat 5 mm Lbr 2,186,553.07
25 Plat Besi 2 mm Lbr 887,930.68
Plat Besi 1 mm Lbr 558,997.05
Plat bordes 2,7 mm Lbr 1,426,012.87
Plat bordes 2,3 mm Lbr 1,121,796.79
26 Angkur dia. 16 mm panjang 30 cm Bh 45,000.00
27 Angkur dia. 19 mm panjang 30 cm Bh 60,000.00
28 Angkur dia. 19 mm panjang 60 cm Bh 90,000.00
29 Angkur dia. 22 mm panjang 100 cm Bh
Angkur dia. 24 mm panjang 60 cm Bh 125,000.00
Baut HTB A325 M16 Bh 25,000.00
Baut HTB A325 M22 Bh 35,000.00
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
30 Tiang bollard dia.3" tinggi 35 cm Bh
31 Rubber Vender Bh
30 Kawat Ikat ( Bandrat ) Kg 30,000.00
31 Kawat Bronjong Kg 30,180.00
32 Kawat Razor CBT 65 Double M' 141,625.00
33 Kawat galvanized 4 mm M' 5,000.00
34 Pagar BRC 8 mm, 190 x 240 cm Unit 858,459.39
35 Balok Kayu Kelas I ( 5/10 dan 6/12 ) m3 5,500,000.00
36 Balok Kayu Kelas II ( 5/5, 5/7, 5/10 dan 6/12 ) m3 2,200,000.00
37 Balok Kayu Kelas III ( 5/5, 5/7, 5/10 dan 6/12 ) m3 2,000,000.00
38 Papan Kelas I ( 2/20 dan 2/25 ) m3 5,700,000.00
39 Papan Kelas II ( 2/20 dan 2/25 ) m3 2,200,000.00
40 Papan Kelas III (Bekisting dan Bouwplak ) m3 1,800,000.00
41 Benang gloss 20,000.00
42 Kayu dolken/kayu buah dia. 8-10 cm panjang 4 m btg 15,000.00
43 List Profil kayu M' 15,000.00
44 Tripleks 3 mm Lbr 65,000.00
45 Tripleks 4 mm Lbr 95,000.00
46 Multipleks 6 mm Lbr 120,000.00
47 Multipleks 9 mm Lbr 160,000.00
48 Teackwood Lbr 165,000.00
49 Formika Lbr 75,000.00
Pipa Stainless Steel 1,5" Btg 343,000.00
Pipa Stainless Steel 1" Btg 273,000.00
50 Pipa PVC type AW dia 1/2" (4 Meter) Btg 31,200.00
51 Pipa PVC type AW dia 3/4" (4 Meter) Btg 39,000.00
52 Pipa PVC type AW dia 1" (4 Meter) Btg 49,400.00
53 Pipa PVC type AW dia 1.5" (4 Meter) Btg 80,400.00
54 Pipa PVC type AW dia 2" (4 Meter) Btg 93,600.00
55 Pipa PVC type AW dia 3" (4 Meter) Btg 198,000.00
56 Pipa PVC type AW dia 4" (4 Meter) Btg 318,000.00
57 Pipa Hitam Medium A dia 1/2" (6 Meter) Btg 264,407.00
58 Pipa Hitam Medium A dia 3/4" (6 Meter) Btg 338,052.00
59 Pipa Hitam Medium A dia 1" (6 Meter) Btg 525,811.00
60 Pipa Hitam Medium A dia 1,5" (6 Meter) Btg 785,785.00
61 Pipa Hitam Medium A dia 2" (6 Meter) Btg 1,071,785.00
62 Pipa Hitam Medium A dia 2,5" (6 Meter) Btg 1,365,078.00
62 Pipa Hitam Medium A dia 3" (6 Meter) Btg 1,760,902.00
63 Pipa Hitam Medium A dia 4" (6 Meter) Btg 2,548,117.00
64 Pipa Hitam Medium A dia 5" (6 Meter) Btg 3,430,570.00
64 Pipa Hitam Medium A dia 6" (6 Meter) Btg 4,084,938.00
65 Pipa Hitam Medium A dia 8" (6 Meter) Btg 6,097,091.00
66 Pipa GIP Medium A dia 1/2" (6 Meter) Btg 375,111.00
67 Pipa GIP Medium A dia 3/4" (6 Meter) Btg 483,070.50
68 Pipa GIP Medium A dia 1" (6 Meter) Btg 748,588.50
69 Pipa GIP Medium A dia 1.5" (6 Meter) Btg 1,116,126.00
70 Pipa GIP Medium A dia 2" (6 Meter) Btg 1,524,055.50
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
71 Pipa GIP Medium A dia 2.5" (6 Meter) Btg 1,941,043.50
72 Pipa GIP Medium A dia 3" (6 Meter) Btg 2,506,531.50
73 Pipa GIP Medium A dia 4" (6 Meter) Btg 3,630,082.50
74 Pipa GIP Medium A dia 5" (6 Meter) Btg 4,884,016.50
75 Pipa GIP Medium A dia 6" (6 Meter) Btg 5,815,557.00
76 Pipa GIP Medium A dia 8" (6 Meter) Btg 8,161,560.00
Pipa GIP Medium B dia 1/2" (6 Meter) Btg 155,250.00
Pipa GIP Medium B dia 3/4" (6 Meter) Btg 189,750.00
Pipa GIP Medium B dia 1" (6 Meter) Btg 281,750.00
Pipa GIP Medium B dia 1,5" (6 Meter) Btg 460,000.00
Pipa GIP Medium B dia 2" (6 Meter) Btg 713,000.00
65 Pipa Instalasi (konduit) Btg 12,000.00
66 Socket Pipa Medium 1/2" Bh 6,500.00
67 Socket Pipa PVC 2" Bh 15,000.00
68 Socket Pipa PVC 4" Bh 25,000.00
69 Socket Pipa Galvanis 1/2" Bh 15,000.00
70 Socket Pipa Galvanis 3/4" Bh 22,000.00
71 Lem kayu Kg 30,000.00
72 Lem fox Kg 75,000.00
73 Lem PVC tube 15,000.00
74 Kloset Duduk Toto Set 2,643,750.00
75 Kloset Duduk Monoblok Lokal Set 1,687,500.00
76 Kloset Jongkok Toto Set 850,000.00
77 Kloset Jongkok KIA Bh 450,000.00
78 Wastafel lengkap + Cermin Set 2,700,000.00
79 Kitchen Sink Stanles Steel + aksesoris Bh 650,000.00
80 Bak Air Viber Glass 150 Liter Bh 585,000.00
81 Bak Air Viber Glass 220 Liter Bh 725,000.00
82 Reservior Viber Glass 1100 Liter Bh 2,500,000.00
83 Floor Drain stailess steel Bh 495,000.00
84 Kran Air 1/2", 3/4" Bh 415,000.00
85 Kran Dapur Bh 425,000.00
Besi Siku L 150, 150,12 (6 Meter) Btg 2,834,740.74
86 Besi Siku L 100, 100,10 (6 Meter) Btg 1,566,021.41
87 Besi Siku L 70, 70,7 (6 Meter) Btg 695,800.00
88 Besi Siku L 60, 60,6 (6 Meter) Btg 495,000.00
89 Besi Siku L 50, 50,5 (6 Meter) Btg 306,250.00
Besi Siku L 40, 40,4 (6 Meter) Btg 227,847.79
90 Besi Strip Kg 19,013.50
91 Seal Type Roll 12,000.00
92 Kuas Biasa Bh 15,000.00
93 Kuas Roll Bh 45,000.00
94 Plastik cor M' 2,000.00
95 Gypsum Board 9 mm Lbr 110,000.00
96 List Gypsum Board M' 30,000.00
97 Genteng Metal Roof Lbr 85,000.00
98 Nok Genteng Metal Roof M' 49,500.00
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
99 Flashing Genteng Metal M' 45,000.00
100 Aluminium Foil (1.2 x 30 ) meter Roll 945,000.00
101 List kayu 2x3xm M1 22,000.00
102 Glass block Bh 47,000.00
103 Besi Hollow Kotak 40,60,1,7 mm x 6 m Btg 325,000.00
104 Besi Hollow Kotak 40,40,1.7 mm x 6 m Btg 268,750.00
105 Besi Hollow Kotak 40,20,1.7 mm x 6 m Btg 150,000.00
106 Stocket 3/4" Bh
107 Stocket 1,5" Bh
108 Stocket 2" Bh
109 Stocket 3" Bh
110 Stocket 4" Bh
111 Stocket PVC 1/2" Bh
112 Stocket 3/4" Bh
113 Stocket 1,5" Bh
114 Stocket 2" Bh
115 Stocket 3" Bh
116 Stocket 4" Bh
117 Tee 1/2 Bh
118 Tee 3/4" Bh
119 Tee 1,5" Bh
120 Tee 2" Bh
121 Tee 3" Bh
122 Tee 4" Bh
123 Tee PVC 1/2" Bh
124 Tee 3/4" Bh
125 Tee 1,5" Bh
126 Tee 2" Bh
127 Tee 3" Bh
128 Tee 4" Bh
129 Elbow PVC 1/2" Bh
130 Elbow 3/4" Bh
131 Elbow 1,5" Bh
132 Elbow 2" Bh
133 Elbow 3" Bh
134 Elbow 4" Bh
135 Elbow GIP 1/2" Bh
136 Elbow 3/4" Bh
137 Elbow 1,5" Bh
138 Elbow 2" Bh
139 Elbow 3" Bh
140 Elbow 4" Bh
140 Post Cap Pipa Galvanized dia.2" Bh
104 Paku Campur Kg 22,000.00
105 Paku Seng Kg 27,000.00
106 Paku Biasa Kg 20,000.00
107 Paku Genteng Metal Kg 25,000.00
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
108 Paku Tripleks Kg 25,000.00
109 Paku Skrup Kg 50,000.00
110 Seng Plat BJLS 30 Lbr 30,000.00
111 Seng Gelombang BJLS 30 Lbr 65,000.00
112 Seng Gelombang BJLS 20 Lbr 55,000.00
113 Seng Plat Bubungan BJLS 20 Lbr 25,000.00
114 Seng Plat Bubungan BJLS 30 M' 30,000.00
115 Karpet Talang lebar 60 cm M' 12,000.00
116 Kaca Bening 5 mm M2 400,000.00
117 Kaca Riben 5 mm M2 450,000.00
118 Kaca Cermin 5 mm uk. 60x80 Unit 750,000.00
119 Lis bon bon 10 cm Bh 2,000.00
120 Keramik 5 cm x 20 cm, ex platinum setara BH 15,000.00
121 Keramik 20 cm x 20 cm, ex platinum setara Dos 75,000.00
122 Keramik 20 cm x 25 cm, ex platinum setara Dos 76,000.00
123 Keramik 30 cm x 30 cm, ex platinum setara Dos 75,000.00
124 Keramik 40 cm x 40 cm Asia Tile, setara Dos 82,110.00
125 Keramik 50 cm x 50 cm Dos 85,000.00
126 Batu Alam M2 650,000.00
127 Lockcase + cylinder + handle Set 650,000.00
128 Pegangan Pintu(dorong) Set 750,000.00
129 Engsel Pintu Bh 72,500.00
130 Engsel Pintu Kuningan Bh 37,500.00
131 Engsel Jendela Bh 70,000.00
132 Engsel Jendela Kuningan Bh 35,000.00
133 Handle Bh 215,000.00
134 Espagnolet Set 225,000.00
135 Spring Knip Bh 55,000.00
136 Hak / Kait Angin Bh 125,000.00
137 Kertas Gosok ( Amplas ) Lbr 7,500.00
138 Politur Kg 65,000.00
139 Plamur biasa Kg 45,000.00
140 Plamur Tembok (khusus) Kg 72,000.00
141 Dempul Kayu Kg 38,000.00
142 Dempul Besi Kg 70,000.00
143 Residu Ltr 27,000.00
144 Minyak bekisting Ltr 15,000.00
145 Meni kayu Kg 52,000.00
146 Meni besi Kg 55,000.00
147 Cat Tembok Biasa (interior) Kg 58,000.00
148 Cat Tembok Lux (interior) Kg 130,000.00
149 Cat Tembok Biasa (exterior) Kg 65,000.00
150 Cat Tembok Lux (exterior) Kg 144,000.00
151 Cat Kilat Kayu Kg 65,000.00
152 Cat Tembok (Khusus/Lux) Kg 130,000.00
153 Cat Genteng / Seng Kg 75,000.00
154 Cat Besi Kg 65,000.00
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
155 Tinner Ltr 35,000.00
156 Kuas Biasa Bh 12,000.00
157 Kuas Roll Bh 45,000.00
158 LED open tipe 11W/865/220V Bh 350,000.00
159 Lampu LED 9 watt Bh 75,000.00
160 Saklar Tunggal Merk Broco Bh 55,000.00
161 Saklar Ganda Merk Broco Bh 57,000.00
162 Stop Kontak 220 Watt Merk Broco Bh 55,000.00
163 Saklar Tunggal Biasa Bh 28,750.00
164 Saklar Ganda Biasa Bh 26,667.00
165 Fitting ( Bagus = Warna putih ) Bh 30,000.00
166 Fitting ( Bagus = Warna hitam ) Bh 30,000.00
167 Kabel distribusi tegangan rendah (standartPLN) Mtr 16,900.00
168 Kabel NYFGBY 4 x 6 mm² Mtr 80,000.00
169 Kabel NYFGBY 4 x 4 mm² Mtr 65,000.00
170 Kabel NYM 2 x 1,5 mm² Mtr 13,000.00
171 Kabel NYM 2 x 2,5 mm² Mtr 16,000.00
172 Kabel NYM 3 x 1,5 mm² Mtr 17,500.00
173 Kabel NYM 3 x 2,5 mm² Mtr 22,500.00
174 Kabel NYM 1 x 1,5 mm² Mtr 6,000.00
175 Kabel NYM 1 x 2,5 mm² Mtr 7,000.00
176 Kabel NYM 2 x 2,5 mm2 Mtr 15,642.00
177 Kabel NYM 3 x 2,5 mm2 Mtr 20,394.00
178 Kabel NYY 3 x 2,5 mm2 Mtr 25,680.60
179 Kabel NYY 3 x 4 mm2 Mtr 39,402.00
180 Kabel NYY 3 x 6 mm2 Mtr 54,806.40
181 Kabel NYY 3 x 10 mm2 Mtr 89,060.40
182 Kabel NYY 3 x 16 mm2 Mtr 121,405.50
183 Kabel NYY 4 x 2,5 mm2 Mtr 32,670.00
184 Kabel NYY 4 x 4 mm2 Mtr 51,381.00
185 Kabel NYY 4 x 6 mm2 Mtr 71,933.40
186 Kabel NYY 4 x 10 mm2 Mtr 114,741.00
187 Kabel NYY 4 x 16 mm2 Mtr 140,250.00
188 Kabel NYY 4 x 25 mm2 Mtr 224,664.00
189 Kabel NYY 4 x 50 mm2 Mtr 437,920.00
190 Kabel NYY 4 x 70mm2 Mtr 578,864.00
191 Kabel NYY 4 x 95 mm2 Mtr 797,824.00
192 Kabel NYF GbY 4 x 2,5 mm2 Mtr 43,500.00
193 Kabel NYF GbY 4 x 4 mm2 Mtr 60,000.00
194 Kabel NYF GbY 4 x 6 mm2 Mtr 75,750.00
195 Kabel NYF GbY 4 x 10 mm2 Mtr 115,500.00
196 Kabel NYF GbY 4 x 16 mm2 Mtr 149,250.00
197 Kabel NYF GbY 4 x 25 mm2 Mtr 223,500.00
198 Kabel NYMHY 3 x 2.5 mm2 Mtr 21,450.00
199 Kabel FRC 3 x 2.5 mm2 Mtr 106,350.00
200 Kabel BC 100 mm2 Mtr 155,250.00
201 Kabel BC 16 mm2 Mtr 20,700.00
HARGA
NO URAIAN SATUAN
( Rp )
1 2 3 4
202 Kondouit PVC High Impact Ø20 mm Mtr 12,000.00
203 Shock High Impact Ø20 mm Bh 2,000.00
204 Outbowdoos Bh 5,000.00
205 Lastdop Bh 2,000.00
206 Klem Kabel Bh 2,000.00
207 MCB 6A s/d 10A Bh 125,000.00
208 MCB 50A Bh 350,000.00
209 Sekring Khas Bh 85,000.00
210 Sekring Box Bh 85,000.00
211 Panel Box MDT Bh 1,200,000.00
212 Minyak Solar / Diesel Ltr 11,249.20
213 Pelumas Ltr 30,664.83
214 Minyak Tanah Ltr 8,300.00
215 Premium Ltr 10,527.00
216 Kawat Las Kg 75,000.00
217 Elpiji Kg 25,000.00
218 Oksigen Kg 42,000.00
219 Grouting Sika 215 Kg 33,600.00
220 Exhausf Fan (metal blade) kap. 1400 cfm Unit 1,786,200.00
221 Roof drain cash iron 3" Bh 250,000.00
222 Waterprofing coating Kg 85,000.00
223 Water stop lebar 20 cm M' 117,000.00

II DAFTAR UPAH KODE HARGA (H.O)


1 Mandor (L03) 375,000.00
2 Kepala Tukang (L10) 312,500.00
3 Tukang (L02) 287,500.00
4 Pekerja (L01) 250,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

1 1 M3 PEMBERSIHAN LOKASI
Upah Kerja
0.1000 H.o Pekerja Rp. 250,000.00 Rp. 25,000.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
0.0010 Ls Alat Bantu Rp. 50,000.00 Rp. 50.00
Jumlah Rp. 28,800.00
Overhead & Keuntungan 15% Rp. 4,320.00
Total Rp. 33,120.00

2 1 M' PASANGAN BOUWPLANK


Bahan
0.0120 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 26,400.00
0.1000 GlossBenang Rp. 20,000.00 Rp. 2,000.00
0.0100 Kg Paku Rp. 22,000.00 Rp. 220.00
Upah Kerja
0.0400 H.o Pekerja Rp. 250,000.00 Rp. 10,000.00
0.0600 H.o Tukang Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 58,870.00
Overhead & Keuntungan 15% Rp. 8,830.50
Total Rp. 67,700.50

3 1 M' PAGAR SEMENTARA DARI KAYU SETINGGI 2 M


Bahan
1.2500 Btg Kayu Dolken dia 8-10/4m Rp. 15,000.00 Rp. 18,750.00
0.0500 Zak Semen Portland Rp. 85,000.00 Rp. 4,250.00
0.0050 M3 Pasir Beton Rp. 325,000.00 Rp. 1,625.00
0.0090 M3 Kerikil Beton Rp. 500,000.00 Rp. 4,500.00
0.0720 M3 Kayu 5/7 Rp. 2,200,000.00 Rp. 158,400.00
0.0600 Kg Paku Campur Rp. 22,000.00 Rp. 1,320.00
0.4000 Ltr Residu Rp. 27,000.00 Rp. 10,800.00
Upah Kerja
0.4000 H.o Pekerja Rp. 250,000.00 Rp. 100,000.00
0.2000 H.o Tukang Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0200 H.o Mandor Rp. 375,000.00 Rp. 7,500.00
Jumlah Rp. 370,895.00
Overhead & Keuntungan 15% Rp. 55,634.25
Total Rp. 426,529.25

4 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG SETINGGI 2 M


Bahan
1.2500 Btg Kayu Dolken dia 8-10/4m Rp. 15,000.00 Rp. 18,750.00
1.2000 Lbr Seng Gelombang 3" - 5" Rp. 25,000.00 Rp. 30,000.00
0.0500 Zak Semen Portland Rp. 85,000.00 Rp. 4,250.00
0.0050 M3 Pasir Beton Rp. 325,000.00 Rp. 1,625.00
0.0090 M3 Kerikil Beton Rp. 500,000.00 Rp. 4,500.00
0.0720 M3 Kayu 5/7 Rp. 2,200,000.00 Rp. 158,400.00
0.0600 Kg Paku Campur Rp. 22,000.00 Rp. 1,320.00
0.4000 Kg Meni Besi Rp. 52,000.00 Rp. 20,800.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

Upah Kerja
0.4000 H.o Pekerja Rp. 250,000.00 Rp. 100,000.00
0.2000 H.o Tukang Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0200 H.o Mandor Rp. 375,000.00 Rp. 7,500.00
Jumlah Rp. 410,895.00
Overhead & Keuntungan 15% Rp. 61,634.25
Total Rp. 472,529.25

5 1 M2 PEKERJAN STRIPPING SETINGGI 1 METER


Upah Kerja
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 14,375.00
Overhead & Keuntungan 15% Rp. 2,156.25
Total Rp. 16,531.25

6 1 M3 PEMBUANGAN TANAH SEJAUH 150 METER


Upah Kerja
0.5160 H.o Pekerja Rp. 250,000.00 Rp. 129,000.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 147,750.00
Overhead & Keuntungan 15% Rp. 22,162.50
Total Rp. 169,912.50

3 1 M3 URUGAN KEMBALI
Upah Kerja
0.1920 H.o Pekerja Rp. 250,000.00 Rp. 48,000.00
0.0190 H.o Mandor Rp. 375,000.00 Rp. 7,125.00
Jumlah Rp. 55,125.00
Overhead & Keuntungan 15% Rp. 8,268.75
Total Rp. 63,393.75

4 1 M3 PEMADATAN TANAH
Upah Kerja
0.5000 H.o Pekerja Rp. 250,000.00 Rp. 125,000.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 143,750.00
Overhead & Keuntungan 15% Rp. 21,562.50
Total Rp. 165,312.50

5 1 M3 URUGAN PASIR
Bahan
1.2000 M3 Pasir Urug Rp. 310,000.00 372,000.00
Upah Kerja
0.3000 H.o Pekerja Rp. 250,000.00 Rp. 75,000.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 450,750.00
Overhead & Keuntungan 15% Rp. 67,612.50
Total Rp. 518,362.50
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI

1 1 M3 GALIAN TANAH BIASA


0.7500 H.o Pekerja Rp. 250,000.00 Rp. 187,500.00
0.0250 H.o Mandor Rp. 375,000.00 Rp. 9,375.00
Jumlah Rp. 196,875.00
Overhead & Keuntungan 15% Rp. 29,531.25
Total Rp. 226,406.25

2 1 M3 PASANGAN PONDASI BATU KALI 1 : 3


0.4270 M3 Pasir Pasangan Rp. 337,500.00 Rp. 144,112.50
1.2000 M3 Batu Kali Rp. 450,000.00 Rp. 540,000.00
4.0400 Zak Semen Rp. 85,000.00 Rp. 343,400.00
1.5000 H.o Pekerja Rp. 250,000.00 Rp. 375,000.00
0.6000 H.o Tukang Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0750 H.o Mandor Rp. 375,000.00 Rp. 28,125.00
Jumlah Rp. 1,621,887.50
Overhead & Keuntungan 15% Rp. 243,283.13
Total Rp. 1,865,170.63
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

1 1 M3 MEMBUAT BETON TUMBUK 1 Pc : 3 Ps : 5 Kr


4.3600 Zak Semen Portland Rp. 85,000.00 Rp. 370,600.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.8700 M3 Batu Pecah Rp. 500,000.00 Rp. 435,000.00
1.6500 H.o Pekerja Rp. 200,000.00 Rp. 330,000.00
0.2500 H.o Tukang Batu Rp. 250,000.00 Rp. 62,500.00
0.0250 H.o Kepala Tukang Rp. 275,000.00 Rp. 6,875.00
0.0800 H.o Mandor Rp. 300,000.00 Rp. 24,000.00
Jumlah Rp. 1,397,975.00
Overhead & Keuntungan 15% Rp. 209,696.25
Total Rp. 1,607,671.25

2 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 1 Ps : 2 Kr


9.5800 Zak Semen Portland Rp. 85,000.00 Rp. 814,300.00
0.3700 M3 Pasir Beton Rp. 325,000.00 Rp. 120,250.00
0.7400 M3 Batu Pecah Rp. 500,000.00 Rp. 370,000.00
1.6500 H.o Pekerja Rp. 200,000.00 Rp. 330,000.00
0.2500 H.o Tukang Batu Rp. 250,000.00 Rp. 62,500.00
0.0250 H.o Kepala Tukang Rp. 275,000.00 Rp. 6,875.00
0.0800 H.o Mandor Rp. 300,000.00 Rp. 24,000.00
Jumlah Rp. 1,727,925.00
Overhead & Keuntungan 15% Rp. 259,188.75
Total Rp. 1,987,113.75

3 1 M1 MEMASANG PVC WATERSTOP LEBAR 200 mm


1.0500 M1 Waterstop Lebar 200 mm Rp. 117,000.00 Rp. 122,850.00
0.0500 H.o Pekerja Rp. 200,000.00 Rp. 10,000.00
0.0300 H.o Tukang Batu Rp. 250,000.00 Rp. 7,500.00
0.0030 H.o Kepala Tukang Rp. 275,000.00 Rp. 825.00
0.0020 H.o Mandor Rp. 300,000.00 Rp. 600.00
Jumlah Rp. 141,775.00
Overhead & Keuntungan 15% Rp. 21,266.25
Total Rp. 163,041.25

4 1 KG PEMBESIAN DENGAN BESI ULIR


1.0500 Kg Besi Beton ( Ulir ) Rp. 16,244.73 Rp. 17,056.96
0.0150 Kg Kawat Beton Rp. 30,000.00 Rp. 450.00
0.0070 H.o Pekerja Rp. 200,000.00 Rp. 1,400.00
0.0070 H.o Tukang Besi Rp. 250,000.00 Rp. 1,750.00
0.0007 H.o Kepala Tukang Rp. 275,000.00 Rp. 192.50
0.0003 H.o Mandor Rp. 300,000.00 Rp. 90.00
Jumlah Rp. 20,939.46
Overhead & Keuntungan 15% Rp. 3,140.92
Total Rp. 24,080.38

5 1 KG PEMBESIAN DENGAN BESI POLOS


1.0500 Kg Besi Beton ( Polos ) Rp. 15,690.69 Rp. 16,475.23
0.0150 Kg Kawat Beton Rp. 15,000.00 Rp. 225.00
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

0.0070 H.o Pekerja Rp. 200,000.00 Rp. 1,400.00


0.0070 H.o Tukang Besi Rp. 250,000.00 Rp. 1,750.00
0.0007 H.o Kepala Tukang Rp. 275,000.00 Rp. 192.50
0.0003 H.o Mandor Rp. 300,000.00 Rp. 90.00
Jumlah Rp. 20,132.73
Overhead & Keuntungan 15% Rp. 3,019.91
Total Rp. 23,152.63

23 1 KG KABEL PRESSTRESSED POLOS/STANDARS


1.0500 Kg Besi Presstressed Polos Rp. Rp. -
0.0100 Kg Kawat Beton Rp. 30,000.00 Rp. 300.00
0.0050 H.o Pekerja Rp. 200,000.00 Rp. 1,000.00
0.0050 H.o Tukang Besi Rp. 250,000.00 Rp. 1,250.00
0.0005 H.o Kepala Tukang Rp. 275,000.00 Rp. 137.50
0.0003 H.o Mandor Rp. 300,000.00 Rp. 90.00
Jumlah Rp. 2,777.50
Overhead & Keuntungan 15% Rp. 416.63
Total Rp. 3,194.13

24 1 KG JARING KAWAT BAJA


1.0200 Kg Besi Jaring Kawat Baja Rp. Rp. -
0.8050 Kg Kawat Beton Rp. 30,000.00 Rp. 24,150.00
0.0250 H.o Pekerja Rp. 200,000.00 Rp. 5,000.00
0.0250 H.o Tukang Besi Rp. 250,000.00 Rp. 6,250.00
0.0025 H.o Kepala Tukang Rp. 275,000.00 Rp. 687.50
0.0015 H.o Mandor Rp. 300,000.00 Rp. 450.00
Jumlah Rp. 36,537.50
Overhead & Keuntungan 15% Rp. 5,480.63
Total Rp. 42,018.13

25 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 88,000.00
0.3000 Kg Paku Campur Rp. 22,000.00 Rp. 6,600.00
0.1000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 1,500.00
0.3000 H.o Pekerja Rp. 200,000.00 Rp. 60,000.00
0.2600 H.o Tukang Kayu Rp. 250,000.00 Rp. 65,000.00
0.0260 H.o Kepala Tukang Rp. 275,000.00 Rp. 7,150.00
0.0050 H.o Mandor Rp. 300,000.00 Rp. 1,500.00
Jumlah Rp. 229,750.00
Overhead & Keuntungan 15% Rp. 34,462.50
Total Rp. 264,212.50

26 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0450 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 99,000.00
0.3000 Kg Paku Campur Rp. 22,000.00 Rp. 6,600.00
0.1000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 1,500.00
0.3000 H.o Pekerja Rp. 200,000.00 Rp. 60,000.00
0.2600 H.o Tukang Kayu Rp. 250,000.00 Rp. 65,000.00
0.0260 H.o Kepala Tukang Rp. 275,000.00 Rp. 7,150.00
0.0050 H.o Mandor Rp. 300,000.00 Rp. 1,500.00
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

Jumlah Rp. 240,750.00


Overhead & Keuntungan 15% Rp. 36,112.50
Total Rp. 276,862.50
6 1 M2 PASANG BEKISTING UNTUK KOLOM
0.0400 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 88,000.00
0.4000 Kg Paku Campur Rp. 22,000.00 Rp. 8,800.00
0.2000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 3,000.00
0.0150 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp. 33,000.00
0.3500 Lbr Plywood 9 mm Rp. 160,000.00 Rp. 56,000.00
2.0000 Btg Balok 5/10 Rp. 44,000.00 Rp. 88,000.00
0.3000 H.o Pekerja Rp. 200,000.00 Rp. 60,000.00
0.3300 H.o Tukang Kayu Rp. 250,000.00 Rp. 82,500.00
0.0330 H.o Kepala Tukang Rp. 275,000.00 Rp. 9,075.00
0.0060 H.o Mandor Rp. 300,000.00 Rp. 1,800.00
Jumlah Rp. 430,175.00
Overhead & Keuntungan 15% Rp. 64,526.25
Total Rp. 494,701.25
7 1 M2 PASANG BEKISTING UNTUK BALOK
0.0400 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 88,000.00
0.4000 Kg Paku Campur Rp. 22,000.00 Rp. 8,800.00
0.2000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 3,000.00
0.0180 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp. 39,600.00
0.3500 Lbr Plywood 9 mm Rp. 160,000.00 Rp. 56,000.00
2.0000 Btg Balok 5/10 Rp. 44,000.00 Rp. 88,000.00
0.3200 H.o Pekerja Rp. 200,000.00 Rp. 64,000.00
0.3300 H.o Tukang Kayu Rp. 250,000.00 Rp. 82,500.00
0.0330 H.o Kepala Tukang Rp. 275,000.00 Rp. 9,075.00
0.0060 H.o Mandor Rp. 300,000.00 Rp. 1,800.00
Jumlah Rp. 440,775.00
Overhead & Keuntungan 15% Rp. 66,116.25
Total Rp. 506,891.25

8 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 88,000.00
0.4000 Kg Paku Campur Rp. 22,000.00 Rp. 8,800.00
0.2000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 3,000.00
0.0150 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp. 33,000.00
0.3500 Lbr Plywood 9 mm Rp. 160,000.00 Rp. 56,000.00
6.0000 Btg Balok 5/10 Rp. 44,000.00 Rp. 264,000.00
0.3200 H.o Pekerja Rp. 200,000.00 Rp. 64,000.00
0.3300 H.o Tukang Kayu Rp. 250,000.00 Rp. 82,500.00
0.0330 H.o Kepala Tukang Rp. 275,000.00 Rp. 9,075.00
0.0060 H.o Mandor Rp. 300,000.00 Rp. 1,800.00
Jumlah Rp. 610,175.00
Overhead & Keuntungan 15% Rp. 91,526.25
Total Rp. 701,701.25
9 1 M2 PASANG BEKISTING UNTUK DINDING
0.0300 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00 Rp. 66,000.00
0.4000 Kg Paku Campur Rp. 22,000.00 Rp. 8,800.00
0.2000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 3,000.00
0.0200 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp. 44,000.00
0.3500 Lbr Plywood 9 mm Rp. 160,000.00 Rp. 56,000.00
3.0000 Btg Balok 5/10 Rp. 44,000.00 Rp. 132,000.00
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

4.0000 Bh Formitie/Penjaga Jarak Rp. - Rp. -


0.3200 H.o Pekerja Rp. 200,000.00 Rp. 64,000.00
0.3300 H.o Tukang Kayu Rp. 250,000.00 Rp. 82,500.00
0.0330 H.o Kepala Tukang Rp. 275,000.00 Rp. 9,075.00
0.0060 H.o Mandor Rp. 300,000.00 Rp. 1,800.00
Jumlah Rp. 467,175.00
Overhead & Keuntungan 15% Rp. 70,076.25
Total Rp. 537,251.25

31 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 M3 Kayu Bekisting ( Matoa ) Rp. 2,200,000.00Rp. 66,000.00
0.4000 Kg Paku Campur Rp. 22,000.00Rp. 8,800.00
0.1500 Ltr Minyak Bekisting Rp. 15,000.00Rp. 2,250.00
0.0150 M3 Balok Kayu Matoa Rp. 2,200,000.00Rp. 33,000.00
0.3500 Lbr Plywood 9 mm Rp. 160,000.00Rp. 56,000.00
2.0000 Btg Balok 5/10 Rp. 44,000.00Rp. 88,000.00
0.3200 H.o Pekerja Rp. 200,000.00 Rp. 64,000.00
0.3300 H.o Tukang Kayu Rp. 250,000.00 Rp. 82,500.00
0.0330 H.o Kepala Tukang Rp. 275,000.00 Rp. 9,075.00
0.0060 H.o Mandor Rp. 300,000.00 Rp. 1,800.00
Jumlah Rp. 411,425.00
Overhead & Keuntungan 15% Rp. 61,713.75
Total Rp. 473,138.75

32 1 M3 MEMBUAT BETON BERTULANG DENGAN MUTU K 225


6.7600 Zak Semen Portland Rp. 85,000.00 Rp. 574,600.00
0.6500 M3 Pasir Beton Rp. 325,000.00 Rp. 211,250.00
0.6500 M3 Batu Pecah Rp. 500,000.00 Rp. 325,000.00
6.0000 H.o Pekerja Rp. 200,000.00 Rp. 1,200,000.00
1.0000 H.o Tukang Batu Rp. 250,000.00 Rp. 250,000.00
0.1000 H.o Kepala Tukang Rp. 275,000.00 Rp. 27,500.00
0.3000 H.o Mandor Rp. 300,000.00 Rp. 90,000.00
Jumlah Rp. 2,678,350.00
Overhead & Keuntungan 15% Rp. 401,752.50
Total Rp. 3,080,102.50

10 1 M3 MEMBUAT BETON BERTULANG DENGAN MUTU K 250


9.0000 Zak Semen Portland Rp. 85,000.00 Rp. 765,000.00
0.5369 M3 Pasir Beton Rp. 325,000.00 Rp. 174,492.50
0.7479 M3 Batu Pecah Rp. 500,000.00 Rp. 373,950.00
1.6500 H.o Pekerja Rp. 200,000.00 Rp. 330,000.00
0.2750 H.o Tukang Batu Rp. 250,000.00 Rp. 68,750.00
0.0280 H.o Kepala Tukang Rp. 275,000.00 Rp. 7,700.00
0.0830 H.o Mandor Rp. 300,000.00 Rp. 24,900.00
1.0000 Ls Alat bantu Rp. 184,701.11 Rp. 184,701.11
Jumlah Rp. 1,929,493.61
Overhead & Keuntungan 15% Rp. 289,424.04
Total Rp. 2,218,917.65
34 1 M2 PASANG JEMBATAN COR
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

0.0264 M3 Kayu Matoa Rp. 2,200,000.00 Rp. 58,080.00


0.6000 Kg Paku Campur Rp. 22,000.00 Rp. 13,200.00
0.5000 Btg Balok 5/10 Matoa Rp. 44,000.00 Rp. 22,000.00
0.1500 H.o Pekerja Rp. 200,000.00 Rp. 30,000.00
0.0500 H.o Tukang Batu Rp. 250,000.00 Rp. 12,500.00
0.0050 H.o Kepala Tukang Rp. 275,000.00 Rp. 1,375.00
0.0070 H.o Mandor Rp. 300,000.00 Rp. 2,100.00
Jumlah Rp. 139,255.00
Overhead & Keuntungan 15% Rp. 20,888.25
Total Rp. 160,143.25

35 1 M3 MEMBUAT PONDASI BETON BERTULANG ( 150 Kg Besi + Bekisting )


0.2000 M3 Kayu Matoa Rp. 2,200,000.00 Rp. 440,000.00
1.5000 Kg Paku Campur Rp. 22,000.00 Rp. 33,000.00
0.4000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 6,000.00
150.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 2,436,708.86
2.2500 Kg Kawat Beton Rp. 30,000.00 Rp. 67,500.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
3.9000 H.o Pekerja Rp. 200,000.00 Rp. 780,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
1.0400 H.o Tukang Kayu Rp. 250,000.00 Rp. 260,000.00
1.0500 H.o Tukang Besi Rp. 250,000.00 Rp. 262,500.00
0.2450 H.o Kepala Tukang Rp. 275,000.00 Rp. 67,375.00
0.1650 H.o Mandor Rp. 300,000.00 Rp. 49,500.00
Jumlah Rp. 5,294,563.86
Overhead & Keuntungan 15% Rp. 794,184.58
Total Rp. 6,088,748.44

36 1 M3 MEMBUAT SLOOF BETON BERTULANG ( 200 Kg Besi + Bekisting )


0.2700 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 594,000.00
2.0000 Kg Paku Campur Rp. 22,000.00 Rp. 44,000.00
0.6000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 9,000.00
200.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 3,248,945.15
3.0000 Kg Kawat Beton Rp. 30,000.00 Rp. 90,000.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
4.8500 H.o Pekerja Rp. 200,000.00 Rp. 970,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
1.5600 H.o Tukang Kayu Rp. 250,000.00 Rp. 390,000.00
1.4000 H.o Tukang Besi Rp. 250,000.00 Rp. 350,000.00
0.3310 H.o Kepala Tukang Rp. 275,000.00 Rp. 91,025.00
0.1700 H.o Mandor Rp. 300,000.00 Rp. 51,000.00
Jumlah Rp. 6,729,950.15
Overhead & Keuntungan 15% Rp. 1,009,492.52
Total Rp. 7,739,442.67

37 1 M3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting )


ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

0.4000 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 880,000.00


4.0000 Kg Paku Campur Rp. 22,000.00 Rp. 88,000.00
2.0000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 30,000.00
300.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 4,873,417.72
4.5000 Kg Kawat Beton Rp. 30,000.00 Rp. 135,000.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
0.1500 M3 Balok Matoa Rp. 2,200,000.00 Rp. 330,000.00
3.5000 Lbr Plywood 9 mm Rp. 100,000.00 Rp. 350,000.00
20.0000 Btg Balok 5/10 Rp. 25,000.00 Rp. 500,000.00
7.3000 H.o Pekerja Rp. 200,000.00 Rp. 1,460,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
3.3000 H.o Tukang Kayu Rp. 250,000.00 Rp. 825,000.00
2.1000 H.o Tukang Besi Rp. 250,000.00 Rp. 525,000.00
0.5700 H.o Kepala Tukang Rp. 275,000.00 Rp. 156,750.00
0.2500 H.o Mandor Rp. 300,000.00 Rp. 75,000.00
Jumlah Rp. 11,120,147.72
Overhead & Keuntungan 15% Rp. 1,668,022.16
Total Rp. 12,788,169.88

38 1 M3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting )


0.3200 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 704,000.00
3.2000 Kg Paku Campur Rp. 22,000.00 Rp. 70,400.00
1.6000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 24,000.00
200.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 3,248,945.15
3.0000 Kg Kawat Beton Rp. 30,000.00 Rp. 90,000.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
0.1400 M3 Balok Matoa Rp. 2,200,000.00 Rp. 308,000.00
2.8000 Lbr Plywood 9 mm Rp. 100,000.00 Rp. 280,000.00
32.0000 Btg Balok 5/10 Rp. 25,000.00 Rp. 800,000.00
5.9600 H.o Pekerja Rp. 200,000.00 Rp. 1,192,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
2.8000 H.o Tukang Kayu Rp. 250,000.00 Rp. 700,000.00
1.4000 H.o Tukang Besi Rp. 250,000.00 Rp. 350,000.00
0.4550 H.o Kepala Tukang Rp. 275,000.00 Rp. 125,125.00
0.2080 H.o Mandor Rp. 300,000.00 Rp. 62,400.00
Jumlah Rp. 8,846,850.15
Overhead & Keuntungan 15% Rp. 1,327,027.52
Total Rp. 10,173,877.67

39 1 M3 MEMBUAT BALOK BETON BERTULANG ( 150 Kg Besi + Bekisting )


0.3200 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 704,000.00
3.2000 Kg Paku Campur Rp. 22,000.00 Rp. 70,400.00
1.6000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 24,000.00
150.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 2,436,708.86
2.2500 Kg Kawat Beton Rp. 30,000.00 Rp. 67,500.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00


0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
0.1200 M3 Balok Matoa Rp. 2,200,000.00 Rp. 264,000.00
2.8000 Lbr Plywood 9 mm Rp. 100,000.00 Rp. 280,000.00
32.0000 Btg Balok 5/10 Rp. 25,000.00 Rp. 800,000.00
5.8000 H.o Pekerja Rp. 200,000.00 Rp. 1,160,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
2.8000 H.o Tukang Kayu Rp. 250,000.00 Rp. 700,000.00
1.0500 H.o Tukang Besi Rp. 250,000.00 Rp. 262,500.00
0.4200 H.o Kepala Tukang Rp. 275,000.00 Rp. 115,500.00
0.1850 H.o Mandor Rp. 300,000.00 Rp. 55,500.00
Jumlah Rp. 7,832,088.86
Overhead & Keuntungan 15% Rp. 1,174,813.33
Total Rp. 9,006,902.19

40 1 M3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting )


0.2400 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 528,000.00
3.2000 Kg Paku Campur Rp. 22,000.00 Rp. 70,400.00
1.6000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 24,000.00
150.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 2,436,708.86
2.2500 Kg Kawat Beton Rp. 30,000.00 Rp. 67,500.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
0.1600 M3 Balok Matoa Rp. 2,200,000.00 Rp. 352,000.00
2.8000 Lbr Plywood 9 mm Rp. 100,000.00 Rp. 280,000.00
24.0000 Btg Balok 5/10 Rp. 25,000.00 Rp. 600,000.00
5.6000 H.o Pekerja Rp. 200,000.00 Rp. 1,120,000.00
0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00
2.6400 H.o Tukang Kayu Rp. 250,000.00 Rp. 660,000.00
1.0500 H.o Tukang Besi Rp. 250,000.00 Rp. 262,500.00
0.4000 H.o Kepala Tukang Rp. 275,000.00 Rp. 110,000.00
0.1930 H.o Mandor Rp. 300,000.00 Rp. 57,900.00
Jumlah Rp. 7,460,988.86
Overhead & Keuntungan 15% Rp. 1,119,148.33
Total Rp. 8,580,137.19

41 1 M3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg Besi + Bekisting )


0.2500 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 550,000.00
3.0000 Kg Paku Campur Rp. 22,000.00 Rp. 66,000.00
1.2000 Ltr Minyak Bekisting Rp. 15,000.00 Rp. 18,000.00
200.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 3,248,945.15
3.0000 Kg Kawat Beton Rp. 30,000.00 Rp. 90,000.00
6.4600 Zak Semen Portland Rp. 38,000.00 Rp. 245,480.00
0.5200 M3 Pasir Beton Rp. 325,000.00 Rp. 169,000.00
0.7800 M3 Batu Pecah Rp. 500,000.00 Rp. 390,000.00
0.1050 M3 Balok Matoa Rp. 2,200,000.00 Rp. 231,000.00
2.5000 Lbr Plywood 9 mm Rp. 100,000.00 Rp. 250,000.00
14.0000 Btg Balok 5/10 Rp. 25,000.00 Rp. 350,000.00
5.6000 H.o Pekerja Rp. 200,000.00 Rp. 1,120,000.00
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

0.3500 H.o Tukang Batu Rp. 250,000.00 Rp. 87,500.00


2.3000 H.o Tukang Kayu Rp. 250,000.00 Rp. 575,000.00
1.4000 H.o Tukang Besi Rp. 250,000.00 Rp. 350,000.00
0.4050 H.o Kepala Tukang Rp. 275,000.00 Rp. 111,375.00
0.2020 H.o Mandor Rp. 300,000.00 Rp. 60,600.00
Jumlah Rp. 7,912,900.15
Overhead & Keuntungan 15% Rp. 1,186,935.02
Total Rp. 9,099,835.17

42 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG ( 11 x 11 ) Cm


0.0020 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 4,400.00
0.0100 Kg Paku Campur Rp. 22,000.00 Rp. 220.00
3.0000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 48,734.18
0.4500 Kg Kawat Beton Rp. 30,000.00 Rp. 13,500.00
0.0800 Zak Semen Portland Rp. 38,000.00 Rp. 3,040.00
0.0060 M3 Pasir Beton Rp. 325,000.00 Rp. 1,950.00
0.0090 M3 Batu Pecah Rp. 500,000.00 Rp. 4,500.00
0.0600 H.o Pekerja Rp. 200,000.00 Rp. 12,000.00
0.0200 H.o Tukang Batu Rp. 250,000.00 Rp. 5,000.00
0.0200 H.o Tukang Kayu Rp. 250,000.00 Rp. 5,000.00
0.0200 H.o Tukang Besi Rp. 250,000.00 Rp. 5,000.00
0.0060 H.o Kepala Tukang Rp. 275,000.00 Rp. 1,650.00
0.0030 H.o Mandor Rp. 300,000.00 Rp. 900.00
Jumlah Rp. 105,894.18
Overhead & Keuntungan 15% Rp. 15,884.13
Total Rp. 121,778.30

43 1 M1 MEMBUAT RING BALK BETON BERTULANG ( 10 x 15 ) Cm


0.0030 M3 Papan Kayu Matoa Rp. 2,200,000.00 Rp. 6,600.00
0.0200 Kg Paku Campur Rp. 22,000.00 Rp. 440.00
3.6000 Kg Besi Beton Polos/Ulir Rp. 16,244.73 Rp. 58,481.01
0.0500 Kg Kawat Beton Rp. 30,000.00 Rp. 1,500.00
0.1100 Zak Semen Portland Rp. 38,000.00 Rp. 4,180.00
0.0090 M3 Pasir Beton Rp. 325,000.00 Rp. 2,925.00
0.0150 M3 Batu Pecah Rp. 500,000.00 Rp. 7,500.00
0.1000 H.o Pekerja Rp. 200,000.00 Rp. 20,000.00
0.0330 H.o Tukang Batu Rp. 250,000.00 Rp. 8,250.00
0.0330 H.o Tukang Kayu Rp. 250,000.00 Rp. 8,250.00
0.0330 H.o Tukang Besi Rp. 250,000.00 Rp. 8,250.00
0.0100 H.o Kepala Tukang Rp. 275,000.00 Rp. 2,750.00
0.0050 H.o Mandor Rp. 300,000.00 Rp. 1,500.00
Jumlah Rp. 130,626.01
Overhead & Keuntungan 15% Rp. 19,593.90
Total Rp. 150,219.91

44 1 M3 MEMBUAT PILE CAP BETON BERTULANG ( 161 Kg Besi + Bekisting )


1.0000 M3 Beton K275 Rp. 2,218,917.65 Rp. 2,218,917.65
32.1852 Kg Besi Polos Rp. 23,152.63 Rp. 745,171.81
128.7407 Kg Besi Ulir Rp. 24,080.38 Rp. 3,100,126.13
8.3333 M2 Bekisting/Perancah Rp. 494,701.25 Rp. 4,122,510.42
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

Jumlah Rp. 10,186,726.01


Overhead & Keuntungan 15% Rp. 1,528,008.90
Total Rp. 11,714,734.91

45 1 M3 MEMBUAT BALOK BETON BERTULANG ( 158 Kg Besi + Bekisting )


1.0000 M3 Beton K275 Rp. 2,218,917.65 Rp. 2,218,917.65
42.3440 Kg Besi Polos Rp. 23,152.63 Rp. 980,375.13
116.1300 Kg Besi Ulir Rp. 24,080.38 Rp. 2,796,454.68
7.5000 M2 Bekisting/Perancah Rp. 506,891.25 Rp. 3,801,684.38
Jumlah Rp. 9,797,431.84
Overhead & Keuntungan 15% Rp. 1,469,614.78
Total Rp. 11,267,046.62

46 1 M3 MEMBUAT PLAT BETON BERTULANG ( 110 Kg Besi + Bekisting )


1.0000 M3 Beton K275 Rp. 2,218,917.65 Rp. 2,218,917.65
109.6889 Kg Besi Polos Rp. 23,152.63 Rp. 2,539,586.70
- Kg Besi Ulir Rp. 24,080.38 Rp. -
6.6667 M2 Bekisting/Perancah Rp. 701,701.25 Rp. 4,678,008.33
Jumlah Rp. 9,436,512.68
Overhead & Keuntungan 15% Rp. 1,415,476.90
Total Rp. 10,851,989.58

47 1 M3 MEMBUAT PLAT BETON DUDUKAN RUBBER FENDER ( 153 Kg Besi + Bekisting )


1.0000 M3 Beton K275 Rp. 2,218,917.65 Rp. 2,218,917.65
81.6333 Kg Besi Polos Rp. 23,152.63 Rp. 1,890,026.69
109.0952 Kg Besi Ulir Rp. 24,080.38 Rp. 2,627,054.93
11.6667 M2 Bekisting/Perancah Rp. 494,701.25 Rp. 5,771,514.58
Jumlah Rp. 12,507,513.85
Overhead & Keuntungan 15% Rp. 1,876,127.08
Total Rp. 14,383,640.93

48 1 M3 MEMBUAT BALOK SLOOF ( 115 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
115.2800 Kg Besi Polos Rp. 23,152.63 Rp. 2,669,035.65
Kg Besi Ulir Rp. 24,080.38 Rp. -
10.0000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 1,384,312.50
Jumlah Rp. 5,864,684.40
Overhead & Keuntungan 15% Rp. 879,702.66
Total Rp. 6,744,387.06

49 1 M3 MEMBUAT BALOK SLOOF ( 175 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
174.5778 Kg Besi Polos Rp. 23,152.63 Rp. 4,041,935.39
Kg Besi Ulir Rp. 24,080.38 Rp. -
13.3333 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 1,845,750.00
Jumlah Rp. 7,699,021.64
Overhead & Keuntungan 15% Rp. 1,154,853.25
Total Rp. 8,853,874.89

50 1 M3 MEMBUAT KOLOM ( 194 Kg Besi + Bekisting )


ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25


222.4667 Kg Besi Polos Rp. 23,152.63 Rp. 5,150,689.31
Kg Besi Ulir Rp. 24,080.38 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 2,768,625.00
Jumlah Rp. 9,730,650.56
Overhead & Keuntungan 15% Rp. 1,459,597.58
Total Rp. 11,190,248.15

51 1 M3 MEMBUAT BALOK LINTOL ( 202 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
167.5556 Kg Besi Polos Rp. 23,152.63 Rp. 3,879,352.45
Kg Besi Ulir Rp. 24,080.38 Rp. -
16.6667 M2 Bekisting/Perancah Rp. 228,101.06 Rp. 3,801,684.38
Jumlah Rp. 9,492,373.08
Overhead & Keuntungan 15% Rp. 1,423,855.96
Total Rp. 10,916,229.04

52 1 M3 MEMBUAT RING BALOK ( 234 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
233.9333 Kg Besi Polos Rp. 23,152.63 Rp. 5,416,172.85
Kg Besi Ulir Rp. 24,080.38 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 2,768,625.00
Jumlah Rp. 9,996,134.10
Overhead & Keuntungan 15% Rp. 1,499,420.11
Total Rp. 11,495,554.21

53 1 M3 MEMBUAT PONDASI PLAT SETEMPAT ( 108 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
108.7463 Kg Besi Polos Rp. 23,152.63 Rp. 2,517,762.13
Kg Besi Ulir Rp. 24,080.38 Rp. -
12.5000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 1,730,390.63
Jumlah Rp. 6,059,489.00
Overhead & Keuntungan 15% Rp. 908,923.35
Total Rp. 6,968,412.35

54 1 M3 MEMBUAT PONDASI PLAT SETEMPAT ( 96 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
96.9571 Kg Besi Polos Rp. 23,152.63 Rp. 2,244,813.24
Kg Besi Ulir Rp. 24,080.38 Rp. -
7.1429 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 988,794.64
Jumlah Rp. 5,044,944.14
Overhead & Keuntungan 15% Rp. 756,741.62
Total Rp. 5,801,685.76

55 1 M3 MEMBUAT PONDASI PLAT SETEMPAT ( 80 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
79.5389 Kg Besi Polos Rp. 23,152.63 Rp. 1,841,534.78
Kg Besi Ulir Rp. 24,080.38 Rp. -
13.3333 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 1,845,750.00
Jumlah Rp. 5,498,621.03
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

Overhead & Keuntungan 15% Rp. 824,793.16


Total Rp. 6,323,414.19

56 1 M3 MEMBUAT PONDASI PLAT SETEMPAT ( 98 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
97.9488 Kg Besi Polos Rp. 23,152.63 Rp. 2,267,771.56
Kg Besi Ulir Rp. 24,080.38 Rp. -
4.1667 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 576,796.88
Jumlah Rp. 4,655,904.69
Overhead & Keuntungan 15% Rp. 698,385.70
Total Rp. 5,354,290.39

57 1 M3 MEMBUAT PEDESTAL KOLOM ( 195 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
194.9859 Kg Besi Polos Rp. 23,152.63 Rp. 4,514,437.78
Kg Besi Ulir Rp. 24,080.38 Rp. -
26.6667 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 3,691,500.00
Jumlah Rp. 10,017,274.03
Overhead & Keuntungan 15% Rp. 1,502,591.10
Total Rp. 11,519,865.13

58 1 M3 MEMBUAT PEDESTAL KOLOM ( 106 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
178.0833 Kg Besi Polos Rp. 23,152.63 Rp. 4,123,098.24
Kg Besi Ulir Rp. 24,080.38 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 2,768,625.00
Jumlah Rp. 8,703,059.49
Overhead & Keuntungan 15% Rp. 1,305,458.92
Total Rp. 10,008,518.41

59 1 M3 MEMBUAT PEDESTAL KOLOM ( 43 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
43.0749 Kg Besi Polos Rp. 23,152.63 Rp. 997,298.17
Kg Besi Ulir Rp. 24,080.38 Rp. -
8.0000 M2 Bekisting/Perancah Rp. 138,431.25 Rp. 1,107,450.00
Jumlah Rp. 3,916,084.42
Overhead & Keuntungan 15% Rp. 587,412.66
Total Rp. 4,503,497.08

60 1 M3 MEMBUAT PLAT TEBAL 10 CM ( 105 Kg Besi + Bekisting )


1.0000 M3 Beton K175 Rp. 1,811,336.25 Rp. 1,811,336.25
52.6667 Kg Besi Polos Rp. 23,152.63 Rp. 1,219,372.06
Kg Besi Ulir Rp. 24,080.38 Rp. -
10.0000 M2 Bekisting/Perancah Rp. 175,425.31 Rp. 1,754,253.13
Jumlah Rp. 4,784,961.43
Overhead & Keuntungan 15% Rp. 717,744.21
Total Rp. 5,502,705.65

11 1 M3 MEMBUAT BALOK TIE BEAM 30 X 50 CM ( 130 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

37.6076 Kg Besi Polos Rp. 20,132.73 Rp. 757,143.86


130.6143 Kg Besi Ulir Rp. 20,939.46 Rp. 2,734,992.88
- M2 Bekisting/Perancah Rp. - Rp. -
Jumlah Rp. 5,421,630.34
Overhead & Keuntungan 15% Rp. 813,244.55
Total Rp. 6,234,874.89
12 1 M3 MEMBUAT PLAT T:25 CM ( 113 Kg Besi + Bekisting )
1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
- Kg Besi Polos Rp. 20,132.73 Rp. -
35.9889 Kg Besi Ulir Rp. 20,939.46 Rp. 753,587.97
- M2 Bekisting/Perancah Rp. - Rp. -
Jumlah Rp. 2,683,081.58
Overhead & Keuntungan 15% Rp. 402,462.24
Total Rp. 3,085,543.81
13 1 M3 MEMBUAT KOLOM 40X40 CM ( 142 Kg Besi + Bekisting )
1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
61.7000 Kg Besi Polos Rp. 20,132.73 Rp. 1,242,189.15
121.4625 Kg Besi Ulir Rp. 20,939.46 Rp. 2,543,359.41
7.5000 M2 Bekisting/Perancah Rp. 430,175.00 Rp. 3,226,312.50
Jumlah Rp. 8,941,354.66
Overhead & Keuntungan 15% Rp. 1,341,203.20
Total Rp. 10,282,557.86
14 1 M3 MEMBUAT KOLOM 30X30 CM ( 182 Kg Besi + Bekisting )
1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
38.6222 Kg Besi Polos Rp. 20,132.73 Rp. 777,570.59
143.9556 Kg Besi Ulir Rp. 20,939.46 Rp. 3,014,351.89
13.3333 M2 Bekisting/Perancah Rp. 430,175.00 Rp. 5,735,666.67
Jumlah Rp. 11,457,082.75
Overhead & Keuntungan 15% Rp. 1,718,562.41
Total Rp. 13,175,645.16

15 1 M3 MEMBUAT DINDING BETON T: 20 CM ( 108 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
- Kg Besi Polos Rp. 20,132.73 Rp. -
161.9500 Kg Besi Ulir Rp. 20,939.46 Rp. 3,391,145.88
10.0000 M2 Bekisting/Perancah Rp. 467,175.00 Rp. 4,671,750.00
Jumlah Rp. 9,992,389.48
Overhead & Keuntungan 15% Rp. 1,498,858.42
Total Rp. 11,491,247.90

15 1 M3 MEMBUAT DINDING BETON T: 15 CM ( 108 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
160.3556 Kg Besi Polos Rp. 20,132.73 Rp. 3,228,394.34
Kg Besi Ulir Rp. 20,939.46 Rp. -
13.3333 M2 Bekisting/Perancah Rp. 467,175.00 Rp. 6,229,000.00
Jumlah Rp. 11,386,887.94
Overhead & Keuntungan 15% Rp. 1,708,033.19
Total Rp. 13,094,921.14

16 1 M3 MEMBUAT BALOK 30 X 40 CM ( 130 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

34.2333 Kg Besi Polos Rp. 20,132.73 Rp. 689,210.29


82.9500 Kg Besi Ulir Rp. 20,939.46 Rp. 1,736,928.38
5.4167 M2 Bekisting/Perancah Rp. 440,775.00 Rp. 2,387,531.25
Jumlah Rp. 6,743,163.52
Overhead & Keuntungan 15% Rp. 1,011,474.53
Total Rp. 7,754,638.05

16 1 M3 MEMBUAT BALOK 30 X 40 CM ( 130 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
34.2333 Kg Besi Polos Rp. 20,132.73 Rp. 689,210.29
110.6000 Kg Besi Ulir Rp. 20,939.46 Rp. 2,315,904.50
6.6667 M2 Bekisting/Perancah Rp. 440,775.00 Rp. 2,938,500.00
Jumlah Rp. 7,873,108.40
Overhead & Keuntungan 15% Rp. 1,180,966.26
Total Rp. 9,054,074.66

18 1 M3 MEMBUAT BALOK 30 X 50 CM ( 145 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
49.3600 Kg Besi Polos Rp. 20,132.73 Rp. 993,751.32
110.6000 Kg Besi Ulir Rp. 20,939.46 Rp. 2,315,904.50
7.6667 M2 Bekisting/Perancah Rp. 440,775.00 Rp. 3,379,275.00
Jumlah Rp. 8,618,424.42
Overhead & Keuntungan 15% Rp. 1,292,763.66
Total Rp. 9,911,188.09
19 1 M3 MEMBUAT BALOK 20 X 40 CM ( 168 Kg Besi + Bekisting )
1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
43.4500 Kg Besi Polos Rp. 20,132.73 Rp. 874,766.91
124.4250 Kg Besi Ulir Rp. 20,939.46 Rp. 2,605,392.56
8.7500 M2 Bekisting/Perancah Rp. 440,775.00 Rp. 3,856,781.25
Jumlah Rp. 9,266,434.33
Overhead & Keuntungan 15% Rp. 1,389,965.15
Total Rp. 10,656,399.48

20 1 M3 MEMBUAT PLAT LANTAI T:15 CM ( 90 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
112.4311 Kg Besi Polos Rp. 20,132.73 Rp. 2,263,544.67
Kg Besi Ulir Rp. 20,939.46 Rp. -
6.6667 M2 Bekisting/Perancah Rp. 610,175.00 Rp. 4,067,833.33
Jumlah Rp. 8,260,871.61
Overhead & Keuntungan 15% Rp. 1,239,130.74
Total Rp. 9,500,002.35

21 1 M3 MEMBUAT PLAT LANTAI T:12 CM ( 67 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
89.9722 Kg Besi Polos Rp. 20,132.73 Rp. 1,811,386.03
Kg Besi Ulir Rp. 20,939.46 Rp. -
8.3333 M2 Bekisting/Perancah Rp. 610,175.00 Rp. 5,084,791.67
Jumlah Rp. 8,825,671.30
Overhead & Keuntungan 15% Rp. 1,323,850.70
Total Rp. 10,149,522.00

21 1 M3 MEMBUAT PLAT LANTAI T:10 CM ( 67 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BETON

107.9667 Kg Besi Polos Rp. 20,132.73 Rp. 2,173,663.23


Kg Besi Ulir Rp. 20,939.46 Rp. -
10.0000 M2 Bekisting/Perancah Rp. 610,175.00 Rp. 6,101,750.00
Jumlah Rp. 10,204,906.84
Overhead & Keuntungan 15% Rp. 1,530,736.03
Total Rp. 11,735,642.87

22 1 M3 MEMBUAT LISPLANK T:8 CM ( 75 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
75.0911 Kg Besi Polos Rp. 20,132.73 Rp. 1,511,789.41
Kg Besi Ulir Rp. 20,939.46 Rp. -
24.1667 M2 Bekisting/Perancah Rp. 183,052.50 Rp. 4,423,768.75
Jumlah Rp. 7,865,051.76
Overhead & Keuntungan 15% Rp. 1,179,757.76
Total Rp. 9,044,809.53

60 1 M3 MEMBUAT BETON TANGGUL 10x10 CM ( 90 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
89.8625 Kg Besi Polos Rp. 20,132.73 Rp. 1,809,177.02
Kg Besi Ulir Rp. 20,939.46 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 183,052.50 Rp. 3,661,050.00
Jumlah Rp. 7,399,720.63
Overhead & Keuntungan 15% Rp. 1,109,958.09
Total Rp. 8,509,678.72

60 1 M3 MEMBUAT KOLOM PRAKTIS 10x15 CM ( 226 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 2,678,350.00 Rp. 2,678,350.00
169.9350 Kg Besi Polos Rp. 20,132.73 Rp. 3,421,254.66
Kg Besi Ulir Rp. 20,939.46 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 107,543.75 Rp. 2,150,875.00
Jumlah Rp. 8,250,479.66
Overhead & Keuntungan 15% Rp. 1,237,571.95
Total Rp. 9,488,051.61

23 1 M3 MEMBUAT BETON TANGGUL 10x10 CM ( 66 Kg Besi + Bekisting )


1.0000 M3 Beton K-250 Rp. 1,929,493.61 Rp. 1,929,493.61
89.8625 Kg Besi Polos Rp. 20,132.73 Rp. 1,809,177.02
Kg Besi Ulir Rp. 20,939.46 Rp. -
20.0000 M2 Bekisting/Perancah Rp. 107,543.75 Rp. 2,150,875.00
Jumlah Rp. 5,889,545.63
Overhead & Keuntungan 15% Rp. 883,431.84
Total Rp. 6,772,977.47
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA

1 10 CM PENGELASAN DENGAN LAS LISTRIK


0.0650 Kg Kawat Las Rp. 75,000.00 Rp.
0.0325 Ltr Solar Rp. 11,249.20 Rp.
0.0195 Ltr Minyak Pelumas Rp. 30,664.83 Rp.
0.0100 H.o Pekerja Rp. 250,000.00 Rp.
0.0100 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0010 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0010 H.o Mandor Rp. 375,000.00 Rp.
0.0595 Jam Sewa Alat Rp. 315,651.41 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
Per 1 cm Las Rp.

3 1 BH PEMASANGAN ANGKUR 3/4" PANJANG 30 CM


1.0000 Bh Angkur besi dia.3/4" x 30 cm Rp. 60,000.00 Rp.
0.0400 H.o Pekerja Rp. 250,000.00 Rp.
0.0200 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0020 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0020 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 BH PEMASANGAN ANGKUR 5/8" PANJANG 30 CM


1.0000 Bh Angkur besi dia.5/8" x 30 cm Rp. 45,000.00 Rp.
0.0400 H.o Pekerja Rp. 250,000.00 Rp.
0.0200 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0020 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0020 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 BH PEMASANGAN ANGKUR 1" PANJANG 60 CM


1.0000 Bh Angkur besi dia.1" x 60 cm Rp. 125,000.00 Rp.
0.0400 H.o Pekerja Rp. 250,000.00 Rp.
0.0200 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0020 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0020 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


3 1 BH PEMASANGAN MUR BAUT HTB A325 M16
1.0000 Bh HTB A325 M16 Rp. 25,000.00 Rp.
0.0200 H.o Pekerja Rp. 250,000.00 Rp.
0.0200 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0020 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0020 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 BH PEMASANGAN MUR BAUT HTB A325 M16


1.0000 Bh HTB A325 M16 Rp. 35,000.00 Rp.
0.0200 H.o Pekerja Rp. 250,000.00 Rp.
0.0200 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0020 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0020 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 BH PEMASANGAN BASE PLATE 400X400X20


25.9444 Kg Base plate Rp. 19,013.50 Rp.
4.0000 Bh Pengeboran lubang baut Rp. 10,000.00 Rp.
0.2594 Ltr Solar Rp. 11,249.20 Rp.
0.0259 Ltr Minyak Pelumas Rp. 30,664.83 Rp.
0.1297 Kg Elpiji Rp. 25,000.00 Rp.
0.1297 Kg Oksigen Rp. 42,000.00 Rp.
0.2854 H.o Pekerja Rp. 250,000.00 Rp.
0.2854 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0285 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0143 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 400X400X20


25.9444 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 800X120X15


9.3333 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


Total Rp.

1 BH PEMASANGAN BASE PLATE 800X90X15


7.0000 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 300X300X8


5.8438 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 300X600X8


11.6875 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 300X500X8


9.7396 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 450X70X8


2.0453 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 170X170X8


1.8765 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 150X75X8


0.7305 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 280X120X12


ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


3.2667 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 130X70X8


0.5909 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 150X75X8


0.7305 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 130X160X8


1.3506 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 BH PEMASANGAN BASE PLATE 200X160X10


1.4025 Kg Base plate Rp. 37,206.40 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

4 1 KG FABRIKASI DAN PEMASANGAN BAJA


1.1500 Kg Baja Rp. 19,013.50 Rp.
0.0100 M3 Solar Rp. 11,249.20 Rp.
0.0010 M3 Minyak Pelumas Rp. 30,664.83 Rp.
0.0050 Kg Elpiji Rp. 25,000.00 Rp.
0.0050 Kg Oksigen Rp. 42,000.00 Rp.
0.0410 H.o Pekerja Rp. 250,000.00 Rp.
0.0410 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0041 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0021 H.o Mandor Rp. 375,000.00 Rp.
0.0080 Jam Sewa Alat Rp. 315,651.41 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

4 1 KG FABRIKASI DAN PEMASANGAN BASE PLATE


1.1500 Kg Baja Rp. 19,013.50 Rp.
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


0.0100 M3 Solar Rp. 11,249.20 Rp.
0.0010 M3 Minyak Pelumas Rp. 30,664.83 Rp.
0.0050 Kg Elpiji Rp. 25,000.00 Rp.
0.0050 Kg Oksigen Rp. 42,000.00 Rp.
0.0210 H.o Pekerja Rp. 250,000.00 Rp.
0.0210 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0021 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0011 H.o Mandor Rp. 375,000.00 Rp.
0.0080 Jam Sewa Alat Rp. 315,651.41 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

5 1 M' RAILLING PIPA GALVANIZED 3/4"


1.1000 M' Pipa Galvanized Medium B Rp. 31,625.00 Rp.
6.2800 Cm Penyambungan Rp. 2,301.17
0.1080 H.o Pekerja Rp. 250,000.00 Rp.
0.0180 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0180 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0054 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

5 1 M' RAILLING PIPA GALVANIZED 1"


1.1000 M' Pipa Galvanized Medium B Rp. 46,958.33 Rp.
7.5360 Cm Penyambungan Rp. 2,301.17
0.1080 H.o Pekerja Rp. 250,000.00 Rp.
0.0180 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0180 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0054 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

5 1 M' RAILLING PIPA GALVANIZED 1,5"


1.1000 M' Pipa Galvanized Medium B Rp. 76,666.67 Rp.
12.5600 Cm Penyambungan Rp. 2,301.17
0.1080 H.o Pekerja Rp. 250,000.00 Rp.
0.0180 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0180 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0054 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


5 1 M' RAILLING PIPA GALVANIZED 2"
1.1000 M' Pipa Galvanized Medium B Rp. 118,833.33 Rp.
15.7000 Cm Penyambungan Rp. 2,301.17
0.2700 H.o Pekerja Rp. 250,000.00 Rp.
0.0450 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0450 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0135 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

6 1 BH PEMASANGAN TIANG BOLLARD DIA.3" TINGGI 35 CM


1.0000 Bh Bolllard dia.3" tinggi 35 cm Rp. - Rp.
6.0000 Bh Angkur besi dia.16 x 30 cm Rp. 45,000.00 Rp.
0.1600 H.o Pekerja Rp. 250,000.00 Rp.
0.0800 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0080 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0080 H.o Mandor Rp. 375,000.00 Rp.
Rp.

7 1 BH PEMASANGAN RUBBER FENDER TYPE V150H


1.0000 Bh Rubber Vender V150H Rp. - Rp.
0.2000 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Besi Rp. 287,500.00 Rp.
0.1000 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0250 H.o Mandor Rp. 375,000.00 Rp.
1.0000 Jam Sewa alat bor Rp. - Rp.
Rp.

6 1 UNIT PINTU BESI 4 DAUN


11.20 M' Kusen Pintu CNP 125.50.20.3,2 Rp. 40,535.90 Rp.
6.60 M' Kusen hollow 20x40 cm, tebal 2 mm 11,068.06 Rp.
26.0000 M' Rangka daun pintu hollow 4x4 cm, t:3 mm Rp. 14,757.42 Rp.
62.40 M' Jalusi besi hollow 2x4 cm, tebal 2 mm Rp. 11,068.06 Rp.
2.4960 M2 Plat besi tebal 1,2 mm Rp. 71,394.75 Rp.
16.0000 Bh Engsel cylinder 5" Rp. 35,000.00 Rp.
1.0000 Set Lockcase, cylinder dan handle Rp. 825,000.00 Rp.
6.0000 Bh Grendel Tanam Rp. 55,000.00 Rp.
Rp.

7 1 UNIT JENDELA KAYU BESI + JALUSI BESI Ø12


0.0527 M3 Kayu Besi 6x12 cm Rp. 5,500,000.00 Rp.
21.7360 Kg Besi Ø12 jarak @ 5 cm Rp. 23,152.63 Rp.
0.3162 H.o Pekerja Rp. 250,000.00 Rp.
1.0541 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.1054 H.o Kepala Tukang Rp. 312,500.00 Rp.
ANALISA HARGA SATUAN

ANALISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


0.0158 H.o Mandor Rp. 375,000.00 Rp.
Rp.
2 1 BH MANHOLE 75 X 75 CM
6.6000 M' Rangka Siku L. 40.40.4 Rp. 37,974.63 Rp.
0.2344 Lbr Plat Baja Hitam t : 1 mm Rp. 558,997.05 Rp.
2.0000 Bh Engsel cylinder Rp. 45,000.00 Rp.
1.0000 Bh Gembok + handle Rp. 145,000.00 Rp.
90.0000 Cm Pengelasan Rp. 2,301.17 Rp.
19.6088 Kg Upah Kerja Rp. 24,087.50 Rp.
2.0850 M2 Cat Dasar + Finish Rp. 69,517.50 Rp.
1.0000 Ls Alat bantu Rp. 36,208.33 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 PINTU BESI DOUBLE


5.8000 M' Kusen Pintu Rp. 762,084.68 Rp.
3.3600 M2 Daun pintu rangka besi hollow Rp. 2,698,758.40 Rp.
(lapis plat tebal 1,8 mm)
1.0000 Unit Door closer Rp. 101,170.82 Rp.
6.0000 Bh Engsel cylinder/bulat Rp. 142,995.31 Rp.
1.0000 Set Espagnolet Rp. 338,243.75 Rp.
1.0000 Set Kunci + handle Rp. 1,419,243.75 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA

4,875.00
365.60
597.96
2,500.00
2,875.00
312.50
375.00
18,781.26
30,682.32
4,602.35
35,284.67
3,528.47

60,000.00
10,000.00
5,750.00
625.00
750.00
77,125.00
11,568.75
88,693.75

45,000.00
10,000.00
5,750.00
625.00
750.00
62,125.00
9,318.75
71,443.75

125,000.00
10,000.00
5,750.00
625.00
750.00
142,125.00
21,318.75
163,443.75
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA

25,000.00
5,000.00
5,750.00
625.00
750.00
37,125.00
5,568.75
42,693.75

35,000.00
5,000.00
5,750.00
625.00
750.00
47,125.00
7,068.75
54,193.75

493,294.82
40,000.00
2,918.54
795.58
3,243.06
5,448.33
71,347.22
82,049.31
8,918.40
5,351.04
713,366.31
107,004.95
820,371.26

965,299.35
965,299.35
144,794.90
1,110,094.25

347,259.72
347,259.72
52,088.96
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


399,348.68

260,444.79
260,444.79
39,066.72
299,511.51

217,424.89
217,424.89
32,613.73
250,038.63

434,849.79
434,849.79
65,227.47
500,077.25

362,374.82
362,374.82
54,356.22
416,731.05

76,098.71
76,098.71
11,414.81
87,513.52

69,817.55
69,817.55
10,472.63
80,290.18

27,178.11
27,178.11
4,076.72
31,254.83
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


121,540.90
121,540.90
18,231.14
139,772.04

21,984.07
21,984.07
3,297.61
25,281.68

27,178.11
27,178.11
4,076.72
31,254.83

50,249.31
50,249.31
7,537.40
57,786.70

52,181.97
52,181.97
7,827.30
60,009.27

21,865.53
112.49
30.66
125.00
210.00
10,250.00
11,787.50
1,281.25
768.75
2,525.21
48,956.40
7,343.46
56,299.86

21,865.53
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


112.49
30.66
125.00
210.00
5,250.00
6,037.50
656.25
393.75
2,525.21
37,206.40
5,580.96
42,787.36

34,787.50
14,451.37
27,000.00
5,175.00
5,625.00
2,025.00
89,063.87
13,359.58
102,423.45

51,654.17
17,341.65
27,000.00
5,175.00
5,625.00
2,025.00
108,820.82
16,323.12
125,143.94

84,333.33
28,902.75
27,000.00
5,175.00
5,625.00
2,025.00
153,061.08
22,959.16
176,020.24
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA

130,716.67
36,128.43
67,500.00
12,937.50
14,062.50
5,062.50
266,407.60
39,961.14
306,368.74

-
270,000.00
40,000.00
23,000.00
2,500.00
3,000.00
338,500.00

-
50,000.00
28,750.00
31,250.00
9,375.00
-
119,375.00

454,002.06
73,049.21
383,692.84
690,647.11
178,201.29
560,000.00
825,000.00
330,000.00
3,494,592.51

289,872.00
503,245.65
79,056.00
303,048.00
32,940.00
ANALISA HARGA SATUAN

ISA PEKERJAAN KONSTRUKSI PEKERJAAN BESI/BAJA


5,929.20
1,214,090.85

250,632.57
131,014.93
90,000.00
145,000.00
207,105.68
472,325.77
144,943.99
36,208.33
1,477,231.26
221,584.69
1,698,815.95

4,420,091.13
9,067,828.22

101,170.82
857,971.88
338,243.75
1,419,243.75
16,204,549.54
2,430,682.43
18,635,231.97
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING

1 1 M2 PASANGAN BATU TELA TEBAL 1/2 BATA 1 PC : 3 PC


0.0450 M3 Pasir Pasangan Rp. 337,500.00 Rp. 15,187.50
18.0000 Bh Bata Tela Rp. 3,000.00 Rp. 54,000.00
25.0000 Kg Semen Portland Rp. 1,700.00 Rp. 42,500.00
0.3000 H.o Pekerja Rp. 250,000.00 Rp. 75,000.00
0.1000 H.o Tukang Batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0015 H.o Mandor Rp. 375,000.00 Rp. 562.50
Jumlah Rp. 219,125.00
Overhead & Keuntungan 15% Rp. 32,868.75
Total Rp. 251,993.75

1 1 M2 PASANGAN BATU TELA TEBAL 1/2 BATA 1 PC : 5 PC


0.0034 M3 Pasir Pasangan Rp. 337,500.00 Rp. 1,140.75
18.0000 Bh Bata Tela Rp. 3,000.00 Rp. 54,000.00
7.2600 Kg Semen Portland Rp. 1,700.00 Rp. 12,342.00
0.3000 H.o Pekerja Rp. 250,000.00 Rp. 75,000.00
0.1000 H.o Tukang Batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0015 H.o Mandor Rp. 375,000.00 Rp. 562.50
Jumlah Rp. 174,920.25
Overhead & Keuntungan 15% Rp. 26,238.04
Total Rp. 201,158.29

2 1 M2 PASANGAN BATU TELA TEBAL 1 BATA 1 PC : 5 PC


0.0068 M3 Pasir Pasangan Rp. 337,500.00 Rp. 2,281.50
36.0000 Bh Bata Tela Rp. 3,000.00 Rp. 108,000.00
14.5200 Kg Semen Portland Rp. 1,700.00 Rp. 24,684.00
0.4500 H.o Pekerja Rp. 250,000.00 Rp. 112,500.00
0.1500 H.o Tukang Batu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0023 H.o Mandor Rp. 375,000.00 Rp. 843.75
Jumlah Rp. 296,121.75
Overhead & Keuntungan 15% Rp. 44,418.26
Total Rp. 340,540.01
ANALISA HARGA SATUAN
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

1 1 M2 PLESTERAN 1 : 5 Tebal 15 mm
0.0220 M3 Pasir Pasangan Rp. 337,500.00 Rp. 7,425.00
0.0864 Zak Semen Rp. 85,000.00 Rp. 7,344.00
0.2000 H.o Pekerja Rp. 250,000.00 Rp. 50,000.00
0.1500 H.o Tukang Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Mandor Rp. 312,500.00 Rp. 4,687.50
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 116,331.50
Overhead & Keuntungan 15% Rp. 17,449.73
Total Rp. 133,781.23
2 1 M2 PLESTERAN 1 : 2 Tebal 20 mm
0.0230 M3 Pasir Pasangan Rp. 337,500.00 Rp. 7,762.50
0.2856 Zak Semen Rp. 85,000.00 Rp. 24,276.00
0.2500 H.o Pekerja Rp. 250,000.00 Rp. 62,500.00
0.2000 H.o Tukang Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Mandor Rp. 312,500.00 Rp. 6,250.00
0.0125 H.o Mandor Rp. 375,000.00 Rp. 4,687.50
Jumlah Rp. 162,976.00
Overhead & Keuntungan 15% Rp. 24,446.40
Total Rp. 187,422.40

3 1 M2 PLESTERAN BETON 1 PC : 3 PS, Tebal 15 mm


0.0210 M3 Pasir Pasangan Rp. 337,500.00 Rp. 7,087.50
0.1414 Zak Semen Rp. 85,000.00 Rp. 12,019.00
0.2600 H.o Pekerja Rp. 250,000.00 Rp. 65,000.00
0.2000 H.o Tukang Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Mandor Rp. 312,500.00 Rp. 6,250.00
0.0130 H.o Mandor Rp. 375,000.00 Rp. 4,875.00
Jumlah Rp. 152,731.50
Overhead & Keuntungan 15% Rp. 22,909.73
Total Rp. 175,641.23
4 1 M2 PLESTERAN WATERFROOF BATACOTE 3 LAPIS
0.0060 M3 Pasir Pasangan Rp. 337,500.00 Rp. 2,025.00
0.0100 Zak Semen PC Rp. 85,000.00 Rp. 850.00
2.9000 Kg Floor Hardener Rp. 44,000.00 Rp. 127,600.00
0.3000 H.o Pekerja Rp. 250,000.00 Rp. 75,000.00
0.2000 H.o Tukang Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Mandor Rp. 312,500.00 Rp. 6,250.00
0.0150 H.o Mandor Rp. 375,000.00 Rp. 5,625.00
Jumlah Rp. 274,850.00
Overhead & Keuntungan 15% Rp. 41,227.50
Total Rp. 316,077.50
ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN

5 1 M2 ACIAN
0.0600 Zak Semen Portland Rp. 85,000.00 Rp. 5,100.00
0.2000 H.o Pekerja Rp. 250,000.00 Rp. 50,000.00
0.1000 H.o Tukang Batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 90,725.00
Overhead & Keuntungan 15% Rp. 13,608.75
Total Rp. 104,333.75

6 1 M2 PERAPIHAN DAK
0.0095 M3 Pasair Pasangan Rp. 337,500.00 Rp. 3,206.25
0.1248 Zak Semen Portland Rp. 85,000.00 Rp. 10,608.00
0.3000 H.o Pekerja Rp. 250,000.00 Rp. 75,000.00
0.2125 H.o Tukang Batu Rp. 287,500.00 Rp. 61,093.75
0.0175 H.o Kepala Tukang Rp. 312,500.00 Rp. 5,468.75
0.0150 H.o Mandor Rp. 375,000.00 Rp. 5,625.00
Jumlah Rp. 161,001.75
Overhead & Keuntungan 15% Rp. 24,150.26
Total Rp. 185,152.01
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI

1 MEMASANG 1 M2 LANTAI KERAMIK UKURAN 40 x 40 Cm


6.8750 Bh Ubin Keramik 40 x 40 cm Rp. 13,685.00 Rp. 94,084.38
0.2276 Zak Semen Portland Rp. 85,000.00 Rp. 19,346.00
0.0420 M3 Pasir Pasangan Rp. 337,500.00 Rp. 14,175.00
0.2500 Kg Semen Warna Rp. 20,000.00 Rp. 5,000.00
0.3100 H.o Pekerja Rp. 250,000.00 Rp. 77,500.00
0.1750 H.o Tukang Kayu Rp. 287,500.00 Rp. 50,312.50
0.0175 H.o Kepala Tukang Rp. 312,500.00 Rp. 5,468.75
0.0150 H.o Mandor Rp. 375,000.00 Rp. 5,625.00
Jumlah Rp. 271,511.63
Overhead & Keuntungan 15% Rp. 40,726.74
Total Rp. 312,238.37

2 MEMASANG 1 M1 PLINT KERAMIK UKURAN 10 x 40 Cm


2.6250 Bh Plint Keramik 10 x 40 cm Rp. 4,447.63 Rp. 11,675.02
0.0330 Zak Semen Portland Rp. 85,000.00 Rp. 2,805.00
0.0032 M3 Pasir Pasangan Rp. 337,500.00 Rp. 1,080.00
0.0500 Kg Semen Warna Rp. 20,000.00 Rp. 1,000.00
0.0900 H.o Pekerja Rp. 250,000.00 Rp. 22,500.00
0.0900 H.o Tukang Kayu Rp. 287,500.00 Rp. 25,875.00
0.0090 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,812.50
0.0045 H.o Mandor Rp. 375,000.00 Rp. 1,687.50
Jumlah Rp. 69,435.02
Overhead & Keuntungan 15% Rp. 10,415.25
Total Rp. 79,850.27
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI KAYU

1 1 M2 PEKERJAAN PLAFOND PLYWOOD 4 mm + RANGKA KAYU MATOA


0.0230 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp. 50,600.00
0.0600 Kg Paku Campur Rp. 22,000.00 Rp. 1,320.00
0.3900 Lbr Plywoow 4 mm Rp. 95,000.00 Rp. 37,050.00
0.2700 H.o Pekerja Rp. 250,000.00 Rp. 67,500.00
0.4000 H.o Tukang Kayu Rp. 287,500.00 Rp. 115,000.00
0.0400 H.o Kepala Tukang Rp. 312,500.00 Rp. 12,500.00
0.0135 H.o Mandor Rp. 375,000.00 Rp. 5,062.50
Jumlah Rp. 289,032.50
Overhead & Keuntungan 15% Rp. 43,354.88
Total Rp. 332,387.38

2 1 M1 PEKERJAAN LIST PLAFOND KAYU PROFIL


1.1000 M1 List Kayu Profil Rp. 15,000.00 Rp. 16,500.00
0.0500 Kg Paku Rp. 22,000.00 Rp. 1,100.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0500 H.o Tukang Kayu Rp. 287,500.00 Rp. 14,375.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 47,162.50
Overhead & Keuntungan 15% Rp. 7,074.38
Total Rp. 54,236.88

3 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU BESI


1.1000 M3 Papan Kayu Besi Rp. 5,500,000.00 Rp. 6,050,000.00
0.8000 Kg Paku Campur Rp. 22,000.00 Rp. 17,600.00
15.0000 Kg Besi Strip Rp. 60,000.00 Rp. 900,000.00
4.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,000,000.00
12.0000 H.o Tukang Kayu Rp. 287,500.00 Rp. 3,450,000.00
1.2000 H.o Kepala Tukang Rp. 312,500.00 Rp. 375,000.00
0.2000 H.o Mandor Rp. 375,000.00 Rp. 75,000.00
Jumlah Rp. 11,867,600.00
Overhead & Keuntungan 15% Rp. 1,780,140.00
Total Rp. 13,647,740.00

4 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU BESI (LENGKUNG)


1.7500 M3 Papan Kayu Besi Rp. 5,500,000.00 Rp. 9,625,000.00
0.8000 Kg Paku Campur Rp. 22,000.00 Rp. 17,600.00
15.0000 Kg Besi Strip Rp. 60,000.00 Rp. 900,000.00
4.8000 H.o Pekerja Rp. 250,000.00 Rp. 1,200,000.00
14.4000 H.o Tukang Kayu Rp. 287,500.00 Rp. 4,140,000.00
1.4400 H.o Kepala Tukang Rp. 312,500.00 Rp. 450,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI KAYU

0.2400 H.o Mandor Rp. 375,000.00 Rp. 90,000.00


Jumlah Rp. 16,422,600.00
Overhead & Keuntungan 15% Rp. 2,463,390.00
Total Rp. 18,885,990.00

5 1 M3 GORDING KAYU KELAS I


1.1000 m3 Balok Kayu Kelas I Rp. 5,500,000.00 Rp. 6,050,000.00
3.0000 Kg Paku Kayu Rp. 22,000.00 Rp. 66,000.00
6.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,500,000.00
9.0000 H.o Tukang Rp. 287,500.00 Rp. 2,587,500.00
1.5000 H.o Kep. Tukang Rp. 312,500.00 Rp. 468,750.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 10,784,750.00
Overhead & Keuntungan 15% Rp. 1,617,712.50
Total Rp. 12,402,462.50

6 1 M2 PASANG KASO + RENG GENTENG METAL MULTIROOF


0.0133 M3 Kayu Besi Rp. 5,500,000.00 Rp. 73,260.00
0.1500 Kg Paku Campur Rp. 22,000.00 Rp. 3,300.00
0.1000 H.o Pekerja Rp. 250,000.00 Rp. 25,000.00
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 135,310.00
Overhead & Keuntungan 15% Rp. 20,296.50
Total Rp. 155,606.50

7 1 M1 PASANG LISTPLANG KAYU ( Ukuran 2,5 cm x 25 cm ) KAYU BESI


0.0075 M3 Papan Kayu Besi Rp. 5,700,000.00 Rp. 42,750.00
0.0500 Kg Paku Campur Rp. 22,000.00 Rp. 1,100.00
0.1000 H.o Pekerja Rp. 250,000.00 Rp. 25,000.00
0.2000 H.o Tukang Kayu Rp. 287,500.00 Rp. 57,500.00
0.0250 H.o Kepala Tukang Rp. 312,500.00 Rp. 7,812.50
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 136,037.50
Overhead & Keuntungan 15% Rp. 20,405.63
Total Rp. 156,443.13

8 1 M3 GELAGAR KAYU KELAS I


1.1000 m3 Balok Kayu Kelas I Rp. 5,500,000.00 Rp. 6,050,000.00
3.0000 Kg Paku Kayu Rp. 22,000.00 Rp. 66,000.00
6.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,500,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI KAYU

9.0000 H.o Tukang Rp. 287,500.00 Rp. 2,587,500.00


1.5000 H.o Kep. Tukang Rp. 312,500.00 Rp. 468,750.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 10,784,750.00
Overhead & Keuntungan 15% Rp. 1,617,712.50
Total Rp. 12,402,462.50

9 1 M3 RAILLING KAYU KELAS I


1.1000 m3 Balok Kayu Kelas I Rp. 5,500,000.00 Rp. 6,050,000.00
1.1000 m3 Scraab kayu Rp. 400,000.00 Rp. 440,000.00
3.0000 Kg Paku Kayu Rp. 22,000.00 Rp. 66,000.00
6.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,500,000.00
9.0000 H.o Tukang Rp. 287,500.00 Rp. 2,587,500.00
1.5000 H.o Kep. Tukang Rp. 312,500.00 Rp. 468,750.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 11,224,750.00
Overhead & Keuntungan 15% Rp. 1,683,712.50
Total Rp. 12,908,462.50

10 MEMASANG 1 M3 LANTAI PANGGUNG PAPAN KAYU 3X30 CM


1.1000 M3 Papan Kayu Besi/Klas 1 uk. 3 x 30 cm Rp. 5,700,000.00 Rp. 6,270,000.00
1.1000 m3 Scraab kayu (1 SISI) Rp. 400,000.00 Rp. 440,000.00
3.4875 Kg Paku Kayu Rp. 22,000.00 Rp. 76,725.56
3.0000 H.o Pekerja Rp. 250,000.00 Rp. 750,000.00
9.0000 H.o Tukang Kayu Rp. 287,500.00 Rp. 2,587,500.00
0.9000 H.o Kepala Tukang Rp. 312,500.00 Rp. 281,250.00
0.1500 H.o Mandor Rp. 375,000.00 Rp. 56,250.00
Jumlah Rp. 10,461,725.56
Overhead & Keuntungan 15% Rp. 1,569,258.83
Total Rp. 12,030,984.39

11 1 M3 PASANG KUZEN PINTU DAN JENDELA KAYU BESI


1.2000 M3 Kayu Besi Rp. 5,500,000.00 Rp. 6,600,000.00
1.2000 M3 Scrab Kayu Rp. 450,000.00 Rp. 540,000.00
8.0000 H.o Pekerja Rp. 250,000.00 Rp. 2,000,000.00
20.0000 H.o Tukang Kayu Rp. 287,500.00 Rp. 5,750,000.00
3.0000 H.o Kepala Tukang Rp. 312,500.00 Rp. 937,500.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 15,940,000.00
Overhead & Keuntungan 15% Rp. 2,391,000.00
Total Rp. 18,331,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI KAYU

1 1 M 2 PASANG PINTU PANEL KAYU BESI


0.0400 M3 Papan Kayu Besi Rp. 5,700,000.00 Rp. 228,000.00
0.0400 M3 Scrab Kayu Rp. 450,000.00 Rp. 18,000.00
0.0500 Kg Paku Campur Rp. 22,000.00 Rp. 1,100.00
1.0000 H.o Pekerja Rp. 250,000.00 Rp. 250,000.00
1.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 460,000.00
0.2500 H.o Kepala Tukang Rp. 312,500.00 Rp. 78,125.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 1,053,975.00
Overhead & Keuntungan 15% Rp. 158,096.25
Total Rp. 1,212,071.25

12 1 M 2 PASANG PINTU PANEL KAYU BESI + LAPIS SENG


0.0400 M3 Papan Kayu Besi Rp. 5,700,000.00 Rp. 228,000.00
0.0500 Kg Paku Campur Rp. 22,000.00 Rp. 1,100.00
1.0000 M2 Seng Rp. 120,000.00 Rp. 120,000.00
1.0000 H.o Pekerja Rp. 250,000.00 Rp. 250,000.00
2.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 718,750.00
0.2500 H.o Kepala Tukang Rp. 312,500.00 Rp. 78,125.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 1,414,725.00
Overhead & Keuntungan 15% Rp. 212,208.75
Total Rp. 1,626,933.75

13 1 M 2 PASANG JENDELA + KACA 5MM


Ukuran Jendela 70 x 110 cm
0.0184 M3 Kayu Besi Rp. 5,700,000.00 Rp. 104,606.40
0.5452 M2 Kaca Rayban 5 mm Rp. 450,000.00 Rp. 245,340.00
0.0184 M3 Scrab Kayu Rp. 450,000.00 Rp. 8,258.40
6.0800 M' Profil Kayu Rp. 10,000.00 Rp. 60,800.00
0.0500 Kg Paku Campur Rp. 22,000.00 Rp. 1,100.00
0.5000 H.o Pekerja Rp. 250,000.00 Rp. 125,000.00
0.7500 H.o Tukang Kayu Rp. 287,500.00 Rp. 215,625.00
0.2500 H.o Kepala Tukang Rp. 312,500.00 Rp. 78,125.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 857,604.80
Overhead & Keuntungan 15% Rp. 128,640.72
Total Rp. 986,245.52
1 M2 Rp. 1,280,838.34

2 1 M ' PASANG JALUSI JENDELA BESI Ø12 MM


Ukuran Jendela 70 x 110 cm
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI KAYU

1.0250 M' Besi Ø12 mm Rp. 20,559.54 Rp. 21,073.53


0.5452 M2 Kaca Rayban 5 mm Rp. 450,000.00 Rp. 245,340.00
0.0184 M3 Scrab Kayu Rp. 1,000,000.00 Rp. 18,352.00
6.0800 M' Profil Kayu Rp. 10,000.00 Rp. 60,800.00
0.0500 Kg Paku Campur Rp. - Rp. -
0.5000 H.o Pekerja Rp. 250,000.00 Rp. 125,000.00
0.7500 H.o Tukang Kayu Rp. 287,500.00 Rp. 215,625.00
0.2500 H.o Kepala Tukang Rp. 312,500.00 Rp. 78,125.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 783,065.53
Overhead & Keuntungan 15% Rp. 117,459.83
Total Rp. 900,525.36
1 M2 Rp. 1,169,513.45
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KONSTRUKSI PENUTUP ATAP

1 1 M2 PASANG ATAP GENTENG METAL


1.9044 Lbr Genteng metal Rp. 85,000.00 Rp.
0.2000 Kg Paku Biasa 2" - 5" Rp. 22,000.00 Rp.
0.2000 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukuang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0010 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

2 1 M' PASANG NOK GENTENG METAL


1.1000 Bh Nok Genteng Metal Rp. 49,500.00 Rp.
0.0500 Kg Paku Biasa 1/2" - 1" Rp. 22,000.00 Rp.
0.2500 H.o Pekerja Rp. 250,000.00 Rp.
0.1500 H.o Tukuang Kayu Rp. 287,500.00 Rp.
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0130 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 M2 PASANG ATAP SENG GELOMBANG BLJS 20


0.8224 Lbr Seng Gelombang BJLS 20 80x180 cm Rp. 65,000.00 Rp.
0.0300 Kg Paku Biasa Payung Rp. 27,000.00 Rp.
0.1200 H.o Pekerja Rp. 250,000.00 Rp.
0.0600 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

4 1 M' PASANG NOK SENG PLAT BJLS 30


1.1000 Lbr Nok seng Plat BJLS 30 Rp. 30,000.00 Rp.
0.0400 Kg Paku Payung/paku biasa Rp. 27,000.00 Rp.
0.0080 M3 Papan 2x20 cm kayu klas 2 Rp. 2,200,000.00 Rp.
0.1500 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0080 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

5 1 M2 PASANG TALANG SENG GELOMBANG BJLS 30


1.1000 Lbr Nok seng Plat BJLS 30 Rp. 45,000.00 Rp.
0.0400 Kg Paku Payung/paku biasa Rp. 27,000.00 Rp.
0.0080 M3 Papan 2x20 cm kayu klas 2 Rp. 2,200,000.00 Rp.
0.1500 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0080 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 M2 PASANG LAPISAN KARPET TALANG ISOLASI ATAP


2.0000 M' Karpet Talang lebar 60 cm Rp. 12,000.00 Rp.
0.0300 Kg Paku Biasa Payung Rp. - Rp.
0.1200 H.o Pekerja Rp. 250,000.00 Rp.
0.0600 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 M2 PASANG PENUTUP ATAP ANYAMAN DAUN SAGU


1.0000 M2 Atap daun sagu Rp. - Rp.
2.0000 M' Kawat galvanized Rp. 5,000.00 Rp.
0.1200 H.o Pekerja Rp. 250,000.00 Rp.
0.0600 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

4 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK


1.4880 M' C-75, 0.8 Rp. 14,500.00 Rp.
2.2320 M' C-75, 0.6 Rp. 12,500.00 Rp.
28.0000 Bh Baut (Screw driver) Rp. 500.00 Rp.
1.6000 BH Dynabolt Rp. 3,500.00 Rp.
3.6000 M' Reng Rp. 7,000.00 Rp.
0.1240 M' Talang Jurai Rp. 48,000.00 Rp.
0.2000 H.o Pekerja Rp. 250,000.00 Rp.
0.4500 H.o Tukang Besi Rp. 287,500.00 Rp.
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0060 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
ARGA SATUAN

ERJAAN KONSTRUKSI PENUTUP ATAP

161,876.73
4,400.00
50,000.00
28,750.00
3,125.00
375.00
248,526.73
37,279.01
285,805.74

54,450.00
1,100.00
62,500.00
43,125.00
4,687.50
4,875.00
170,737.50
25,610.63
196,348.13

53,453.95 seng 80x1 1.216 0.822368


810.00 70,109.79
30,000.00 paku 200 150
17,250.00
1,875.00 51,375.00
2,250.00
105,638.95
15,845.84
121,484.79

33,000.00
1,080.00
17,600.00
37,500.00
20,125.00
2,500.00
2,250.00 62,375.00
114,055.00
17,108.25
131,163.25

49,500.00
1,080.00
17,600.00
37,500.00
20,125.00
2,500.00
2,250.00
130,555.00
19,583.25
150,138.25

24,000.00 seng 80x1 1.216 0.822368


-
30,000.00 paku 200 150
17,250.00
1,875.00
2,250.00
75,375.00
11,306.25
86,681.25

- seng 80x1 1.216 0.822368


10,000.00
30,000.00 paku 200 150
17,250.00
1,875.00
2,250.00
61,375.00
9,206.25
70,581.25

21,576.00 seng 80x1 1.216 0.822368


27,900.00
14,000.00
5,600.00 142,787.20
25,200.00
5,952.00
50,000.00 paku 200 150
129,375.00
1,875.00
2,250.00
283,728.00
42,559.20
326,287.20
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT ( PLAFOND )

1 1 M2 PEKERJAAN PLAFOND ASBES ( 1 x 1 ) M, TEBAL 6 MM


1.1000 Lbr Plat Asbes Tebal 6 mm Rp. Rp.
0.0100 Kg Paku Asbes Rp. 27,000.00 Rp.
0.0300 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0070 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0015 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

2 1 M2 PEKERJAAN PLAFOND ASBES ( 1 x 1 ) M, TEBAL 5 MM


1.1000 Lbr Plat Asbes Tebal 5 mm Rp. Rp.
0.0100 Kg Paku Asbes Rp. 27,000.00 Rp.
0.0300 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0070 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0015 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

3 1 M2 PEKERJAAN PLAFOND ASBES ( 1 x 1 ) M, TEBAL 4 MM


1.1000 Lbr Plat Asbes Tebal 4 mm Rp. Rp.
0.0100 Kg Paku Asbes Rp. 27,000.00 Rp.
0.0300 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0070 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0015 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

4 1 M2 PEKERJAAN PLAFOND ASBES ( 1 x 1 ) M, TEBAL 3,5 MM


1.1000 Lbr Plat Asbes Tebal 3,5 mm Rp. Rp.
0.0100 Kg Paku Asbes Rp. 27,000.00 Rp.
0.0300 H.o Pekerja Rp. 250,000.00 Rp.
0.0700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0070 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0015 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
5 1 M2 PEKERJAAN PLAFOND AKUSTIK ( 30 x 30 ) CM
11.5000 Lbr Akustik Ukuran 30 x 30 cm Rp. Rp.
0.0500 Kg Paku Rp. 22,000.00 Rp.
0.0600 H.o Pekerja Rp. 250,000.00 Rp.
0.1200 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0120 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0030 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

6 1 M2 PEKERJAAN PLAFOND AKUSTIK ( 30 x 60 ) CM


5.8000 Lbr Akustik Ukuran 30 x 60 cm Rp. Rp.
0.0500 Kg Paku Rp. 22,000.00 Rp.
0.0600 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0030 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

7 1 M2 PEKERJAAN PLAFOND AKUSTIK ( 60 x 120 ) CM


1.5000 Lbr Akustik Arm Strong Rp. Rp.
0.0500 Kg Paku Rp. 22,000.00 Rp.
0.0600 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0030 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

8 1 M2 PEKERJAAN PLAFOND PLYWOOD ( 30 x 60 ) CM, TEBAL 4 mm


0.3600 Lbr Plywood 4 mm Rp. Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

9 1 M2 PEKERJAAN PLAFOND PLYWOOD ( 30 x 60 ) CM, TEBAL 6 mm


0.3600 Lbr Plywood 6 mm Rp. 65,000.00 Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

10 1 M2 PEKERJAAN PLAFOND PLYWOOD ( 60 x 120 ) CM, TEBAL 4 mm


0.3750 Lbr Plywood 4 mm Rp. Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

11 1 M2 PEKERJAAN PLAFOND PLYWOOD ( 60 x 120 ) CM, TEBAL 6 mm


0.3750 Lbr Plywood 4 mm Rp. Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

12 1 M2 PEKERJAAN PLAFOND TEACKWOOD ( 30 x 60 ) CM, TEBAL 4 mm


0.3600 Lbr Teackwood 4 mm Rp. Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

13 1 M2 PEKERJAAN PLAFOND TEACKWOOD ( 60 x 120 ) CM, TEBAL 4 mm


0.3750 Lbr Teackwood 4 mm Rp. Rp.
0.0300 Kg Paku Tripleks Rp. 22,000.00 Rp.
0.0700 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0035 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

14 1 M2 PEKERJAAN PLAFOND LAT KAYU BESI


0.0240 M3 Papan Kayu Besi Rp. 1,400,000.00 Rp.
0.0100 Kg Paku Rp. 7,500.00 Rp.
0.0500 Kg Paku Skrup Rp. 25,000.00 Rp.
0.2000 H.o Pekerja Rp. 250,000.00 Rp.
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0100 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

15 1 M2 PEKERJAAN PLAFOND SOFT BOARD


0.3500 Lbr Soft Board 4 mm Rp. Rp.
0.0300 Kg Paku Rp. 22,000.00 Rp.
0.6000 H.o Pekerja Rp. 250,000.00 Rp.
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0030 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

16 1 M2 PEKERJAAN PLAFOND AKUSTIK 60 x 120 Cm + RANGKA ALUMINIUM


3.6000 M1 Profil Aluminium T Rp. Rp.
0.1500 Kg Kawat Seng Polos Rp. Rp.
1.0000 Bh Ramset/Dina Bolt Rp. Rp.
1.5000 Lbr Akustik Arm Strong Rp. Rp.
0.1500 H.o Pekerja Rp. 250,000.00 Rp.
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0500 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0075 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

1 1 M1 PEKERJAAN LIST PLAFOND KAYU PROFIL


1.1000 M1 List Kayu Profil Rp. 15,000.00 Rp.
0.0100 Kg Paku Rp. 22,000.00 Rp.
0.0500 H.o Pekerja Rp. 250,000.00 Rp.
0.0500 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0030 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

18 1 M2 PEKERJAAN PLAFOND ASBES ( 1 x 1 ) m, TEBAL 3,2 mm + RANGKA KAYU MATOA


0.0120 M3 Balok Kayu Matoa Rp. 1,200,000.00 Rp.
0.0600 Kg Paku Campur Rp. 7,500.00 Rp.
1.1000 Lbr Asbes 1 m x 1 m Rp. Rp.
0.1500 H.o Pekerja Rp. 250,000.00 Rp.
0.3200 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0320 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0090 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

2 1 M2 PEKERJAAN PLAFOND PLYWOOD 4 mm + RANGKA KAYU MATOA


0.0230 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp.
0.0600 Kg Paku Campur Rp. 22,000.00 Rp.
0.3900 Lbr Plywoow 4 mm Rp. 95,000.00 Rp.
0.2700 H.o Pekerja Rp. 250,000.00 Rp.
0.4000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0400 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0135 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

20 1 M2 PEKERJAAN PLAFOND AKUSTIK ( 30 x 60 ) Cm + RANGKA KAYU MATOA


0.0230 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp.
0.0600 Kg Paku Campur Rp. 22,000.00 Rp.
5.8000 Lbr Akustik 30 x 60 cm Rp. Rp.
0.2600 H.o Pekerja Rp. 250,000.00 Rp.
0.4000 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0400 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0130 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.

21 1 M2 PEKERJAAN PLAFOND AKUSTIK ( 30 x 30 ) Cm + RANGKA KAYU MATOA


0.0270 M3 Balok Kayu Matoa Rp. 2,200,000.00 Rp.
0.0600 Kg Paku Campur Rp. 22,000.00 Rp.
11.5000 Lbr Akustik 30 x 60 cm Rp. Rp.
0.3100 H.o Pekerja Rp. 250,000.00 Rp.
0.4700 H.o Tukang Kayu Rp. 287,500.00 Rp.
0.0470 H.o Kepala Tukang Rp. 312,500.00 Rp.
0.0155 H.o Mandor Rp. 375,000.00 Rp.
Jumlah Rp.
Overhead & Keuntungan 15% Rp.
Total Rp.
PLAFOND )

-
270.00
7,500.00
20,125.00
2,187.50
562.50
30,645.00
4,596.75
35,241.75

-
270.00
7,500.00
20,125.00
2,187.50
562.50
30,645.00
4,596.75
35,241.75

-
270.00
7,500.00
20,125.00
2,187.50
562.50
30,645.00
4,596.75
35,241.75

-
270.00
7,500.00
20,125.00
2,187.50
562.50
30,645.00
4,596.75
35,241.75
-
1,100.00
15,000.00
34,500.00
3,750.00
1,125.00
55,475.00
8,321.25
63,796.25

-
1,100.00
15,000.00
28,750.00
3,125.00
1,125.00
49,100.00
7,365.00
56,465.00

-
1,100.00
15,000.00
28,750.00
3,125.00
1,125.00
49,100.00
7,365.00
56,465.00

-
660.00
17,500.00
28,750.00
3,125.00
1,312.50
51,347.50
7,702.13
59,049.63

23,400.00
660.00
17,500.00
28,750.00
3,125.00
1,312.50
74,747.50
11,212.13
85,959.63

-
660.00
17,500.00
28,750.00
3,125.00
1,312.50
51,347.50
7,702.13
59,049.63

- 0.72
660.00 0.2304
17,500.00
28,750.00 2.88
3,125.00 1.08
1,312.50
51,347.50
7,702.13
59,049.63

-
660.00
17,500.00
28,750.00
3,125.00
1,312.50
51,347.50
7,702.13
59,049.63

-
660.00
17,500.00
28,750.00
3,125.00
1,312.50
51,347.50
7,702.13
59,049.63

33,600.00
75.00
1,250.00
50,000.00
172,500.00
18,750.00
3,750.00
279,925.00
41,988.75
321,913.75

-
660.00
150,000.00
28,750.00
3,125.00
1,125.00
183,660.00
27,549.00
211,209.00

-
-
-
-
37,500.00
143,750.00
15,625.00
2,812.50
199,687.50
29,953.13
229,640.63

16,500.00
220.00 23,662.38
12,500.00
14,375.00
1,562.50
1,125.00
46,282.50
6,942.38
53,224.88

U MATOA
14,400.00
450.00
-
37,500.00
92,000.00
10,000.00
3,375.00
157,725.00
23,658.75
181,383.75

50,600.00
1,320.00
37,050.00 132,324.88
67,500.00
115,000.00
12,500.00
5,062.50
289,032.50
43,354.88
332,387.38

50,600.00
1,320.00
-
65,000.00
115,000.00
12,500.00
4,875.00
249,295.00
37,394.25
286,689.25

59,400.00
1,320.00
-
77,500.00
135,125.00
14,687.50
5,812.50
293,845.00
44,076.75
337,921.75
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN

1 1 M2 PENGECATAN PERMUKAAN BAJA


0.0750 Kg Meni Besi Rp. 55,000.00 Rp. 4,125.00
0.1250 Kg Cat Finish Rp. 65,000.00 Rp. 8,125.00
0.1500 Ltr Thinner Rp. 35,000.00 Rp. 5,250.00
0.0200 Bh Kuas Rp. 16,500.00 Rp. 330.00
0.1000 Lbr Amplas Rp. 7,500.00 Rp. 750.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.1250 H.o Tukang Cat Rp. 287,500.00 Rp. 35,937.50
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 69,517.50
Overhead & Keuntungan 15% Rp. 10,427.63
Total Rp. 79,945.13

1 1 M2 PENGECATAN PERMUKAAN TEMBOK BARU (BAGIAN DALAM)


0.0769 Kg Cat Dasar Rp. 130,000.00 Rp. 10,000.00
0.1538 Kg Cat Penutup 2 Kali Rp. 130,000.00 Rp. 20,000.00
0.0200 Bh Kuas Rp. 16,500.00 Rp. 330.00
0.2500 Lbr Amplas Rp. 7,500.00 Rp. 1,875.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.0630 H.o Tukang Cat Rp. 287,500.00 Rp. 18,112.50
0.0063 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,968.75
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 58,411.25
Overhead & Keuntungan 15% Rp. 8,761.69
Total Rp. 67,172.94

2 1 M2 PENGECATAN PERMUKAAN TEMBOK BARU (BAGIAN LUAR)


0.0769 Kg Cat Dasar Rp. 144,000.00 Rp. 11,076.92
0.1538 Kg Cat Penutup 2 Kali Rp. 144,000.00 Rp. 22,153.85
0.0200 Bh Kuas Rp. 16,500.00 Rp. 330.00
0.2500 Lbr Amplas Rp. 7,500.00 Rp. 1,875.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.0630 H.o Tukang Cat Rp. 287,500.00 Rp. 18,112.50
0.0063 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,968.75
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 61,642.02
Overhead & Keuntungan 15% Rp. 9,246.30
Total Rp. 70,888.32

3 1 M2 PENGECATAN PERMUKAAN KAYU


0.0750 Kg Cat Meni Rp. 65,000.00 Rp. 4,875.00
0.1250 Kg Cat Penutup 2 Kali Rp. 65,000.00 Rp. 8,125.00
0.1500 Ltr Thinner Rp. 35,000.00 Rp. 5,250.00
0.0200 Bh Kuas Rp. 16,500.00 Rp. 330.00
0.2500 Lbr Amplas Rp. 7,500.00 Rp. 1,875.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.1500 H.o Tukang Cat Rp. 287,500.00 Rp. 43,125.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 78,580.00
Overhead & Keuntungan 15% Rp. 11,787.00
Total Rp. 90,367.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

1 MEMASANG 1 SET KUNCI PINTU (LOCKCASE LEVEL HANDLE, CYLINDER DAN HANDLE)
1.0000 Set Kunci Rp. 650,000.00 Rp. 650,000.00
0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0035 H.o Mandor Rp. 375,000.00 Rp. 1,312.50
Jumlah Rp. 846,312.50
Overhead & Keuntungan 15% Rp. 126,946.88
Total Rp. 973,259.38

2 MEMASANG 1 BUAH ENGSEL PINTU


1.0000 Bh Engsel Pintu Rp. 72,500.00 Rp. 72,500.00
0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.1500 H.o Tukang Kayu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0008 H.o Mandor Rp. 375,000.00 Rp. 281.25
Jumlah Rp. 124,343.75
Overhead & Keuntungan 15% Rp. 18,651.56
Total Rp. 142,995.31
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

3 MEMASANG 1 BUAH ENGSEL JENDELA


1.0000 Bh Engsel Jendela Rp. 70,000.00 Rp. 70,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0005 H.o Mandor Rp. 375,000.00 Rp. 187.50
Jumlah Rp. 104,562.50
Overhead & Keuntungan 15% Rp. 15,684.38
Total Rp. 120,246.88

4 MEMASANG 1 BUAH ENGSEL ANGIN


1.0000 Bh Engsel Angin Rp. 20,000.00 Rp. 20,000.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.2000 H.o Tukang Kayu Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 92,500.00
Overhead & Keuntungan 15% Rp. 13,875.00
Total Rp. 106,375.00

4 MEMASANG 1 BUAH SPRING KNIP


ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

1.0000 Bh Spring Knip Rp. 55,000.00 Rp. 55,000.00


0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.1500 H.o Tukang Kayu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0008 H.o Mandor Rp. 375,000.00 Rp. 281.25
Jumlah Rp. 106,843.75
Overhead & Keuntungan 15% Rp. 16,026.56
Total Rp. 122,870.31

5 MEMASANG 1 BUAH PASANG KAIT ANGIN


1.0000 Bh Kait Angin Rp. 125,000.00 Rp. 125,000.00
0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.1500 H.o Tukang Kayu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0008 H.o Mandor Rp. 375,000.00 Rp. 281.25
Jumlah Rp. 176,843.75
Overhead & Keuntungan 15% Rp. 26,526.56
Total Rp. 203,370.31

10 MEMASANG 1 BUAH DOOR CLOSER


1.0000 Bh Door Closer Rp. 29,500.00 Rp. 29,500.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00


0.0500 H.o Kepala Tukang Rp. 312,500.00 Rp. 15,625.00
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 202,312.50
Overhead & Keuntungan 15% Rp. 30,346.88
Total Rp. 232,659.38

6 MEMASANG 1 BUAH ESPAGNOLET


1.0000 Bh Espagnolet Rp. 225,000.00 Rp. 225,000.00
0.0200 H.o Pekerja Rp. 250,000.00 Rp. 5,000.00
0.2000 H.o Tukang Kayu Rp. 287,500.00 Rp. 57,500.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0010 H.o Mandor Rp. 375,000.00 Rp. 375.00
Jumlah Rp. 294,125.00
Overhead & Keuntungan 15% Rp. 44,118.75
Total Rp. 338,243.75

6 MEMASANG 1 BUAH PEGANGAN PINTU/HANDLE


1.0000 Bh Door Holder Rp. 215,000.00 Rp. 215,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

0.0500 H.o Kepala Tukang Rp. 312,500.00 Rp. 15,625.00


0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 387,812.50
Overhead & Keuntungan 15% Rp. 58,171.88
Total Rp. 445,984.38

13 MEMASANG 1 BUAH DOOR STOP


1.0000 Bh Door Stop Rp. Rp. -
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang Kayu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0005 H.o Mandor Rp. 375,000.00 Rp. 187.50
Jumlah Rp. 34,562.50
Overhead & Keuntungan 15% Rp. 5,184.38
Total Rp. 39,746.88

14 MEMASANG 1 BUAH REL PINTU DORONG


1.0000 Bh Rel Pintu Dorong Rp. Rp. -
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00


Jumlah Rp. 207,375.00
Overhead & Keuntungan 15% Rp. 31,106.25
Total Rp. 238,481.25

15 MEMASANG 1 BUAH KUNCI LEMARI


1.0000 Bh Kunci Lemari Rp. Rp. -
0.0250 H.o Pekerja Rp. 250,000.00 Rp. 6,250.00
0.2500 H.o Tukang Kayu Rp. 287,500.00 Rp. 71,875.00
0.0250 H.o Kepala Tukang Rp. 312,500.00 Rp. 7,812.50
0.0013 H.o Mandor Rp. 375,000.00 Rp. 468.75
Jumlah Rp. 86,406.25
Overhead & Keuntungan 15% Rp. 12,960.94
Total Rp. 99,367.19

16 MEMASANG 1 M2 PASANG KACA, TEBAL 3 mm


1.1000 M2 Kaca 3 mm Rp. Rp. -
0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.1500 H.o Tukang Kayu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0008 H.o Mandor Rp. 375,000.00 Rp. 281.25
ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA

1 MEMASANG 1 BUAH KUNCI TANAM ANTIK


1.0000 Bh Kunci Tanam Antik Rp. 150,000.00 Rp. 150,000.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.6000 H.o Tukang Kayu Rp. 287,500.00 Rp. 172,500.00
0.0600 H.o Kepala Tukang Rp. 312,500.00 Rp. 18,750.00
0.0030 H.o Mandor Rp. 375,000.00 Rp. 1,125.00
Jumlah Rp. 357,375.00
Overhead & Keuntungan 15% Rp. 53,606.25
Total Rp. 410,981.25

2 MEMASANG 1 BUAH KUNCI TANAM BIASA


1.0000 Bh Kunci Tanam Biasa Rp. 100,000.00 Rp. 100,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 251,250.00
Overhead & Keuntungan 15% Rp. 37,687.50
Total Rp. 288,937.50

3 MEMASANG 1 BUAH KUNCI TANAM KAMAR MANDI


1.0000 Bh Kunci Tanam Kamar Mandi Rp. 90,000.00 Rp. 90,000.00
0.0050 H.o Pekerja Rp. 250,000.00 Rp. 1,250.00
0.5000 H.o Tukang Kayu Rp. 287,500.00 Rp. 143,750.00
0.0050 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,562.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 237,500.00
Overhead & Keuntungan 15% Rp. 35,625.00
Total Rp. 273,125.00

Jumlah Rp. 51,843.75


Overhead & Keuntungan 15% Rp. 7,776.56
Total Rp. 59,620.31

7 MEMASANG 1 M2 PASANG KACA, TEBAL 5 mm


1.1000 M2 Kaca Rayban 5 mm Rp. 255,000.00 Rp. 280,500.00
0.0150 H.o Pekerja Rp. 250,000.00 Rp. 3,750.00
0.1500 H.o Tukang Kayu Rp. 287,500.00 Rp. 43,125.00
0.0150 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,687.50
0.0008 H.o Mandor Rp. 375,000.00 Rp. 281.25
Jumlah Rp. 332,343.75
Overhead & Keuntungan 15% Rp. 49,851.56
Total Rp. 382,195.31
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK

1 1 M KABEL DISTRIBUSI DARI JARINGAN RENDAH KE PELANGAN


1.0000 M' Kabel distribusi standart PLN Rp. 16,900.00 Rp. 16,900.00
1.0000 Ls Material dan Peralatan bantu Rp. 422.50 Rp. 422.50
1.0000 Ls Upah Inslalasi Rp. 4,500.00 Rp. 4,500.00
Jumlah Rp. 21,822.50
Overhead & Keuntungan 15% Rp. 3,273.38
Total Rp. 25,095.88

1 1 M KABEL DISTRIBUSI
1.0000 M' Kabel distribusi NYY 4X4 mm² Rp. 51,381.00 Rp. 51,381.00
1.0000 M' Klem kabel Rp. 2,000.00 Rp. 2,000.00
0.3333 Btg Pipa konduit Rp. 12,000.00 Rp. 3,999.60
1.0000 Ls Peralatan bantu Rp. 1,000.00 Rp. 1,000.00
1.0000 Ls Upah Inslalasi Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 63,380.60
Overhead & Keuntungan 15% Rp. 9,507.09
Total Rp. 72,887.69

1 1 TITK INTALASI PENERANGAN


8.0000 M' Kabel distribusi NYM 3 x2,5 mm² Rp. 22,500.00 Rp. 180,000.00
8.0000 M' Kondouit PVC High Impact Ø20 mm Rp. 4,000.00 Rp. 32,000.00
3.0000 Bh Shock High Impact Ø20 mm Rp. 2,000.00 Rp. 6,000.00
1.0000 Bh Outbowdoos Rp. 5,000.00 Rp. 5,000.00
2.0000 Bh Lastdop Rp. 2,000.00 Rp. 4,000.00
1.0000 Ls Upah Inslalasi Rp. 50,000.00 Rp. 50,000.00
Jumlah Rp. 277,000.00
Overhead & Keuntungan 15% Rp. 41,550.00
Total Rp. 318,550.00

2 1 TITK INTALASI TITIK DAYA


12.0000 M' Kabel distribusi NYM 3 x2,5 mm² Rp. 22,500.00 Rp. 270,000.00
12.0000 M' Kondouit PVC High Impact Ø20 mm Rp. 4,000.00 Rp. 48,000.00
4.0000 Bh Shock High Impact Ø20 mm Rp. 2,000.00 Rp. 8,000.00
1.0000 Bh Outbowdoos Rp. 5,000.00 Rp. 5,000.00
2.0000 Bh Lastdop Rp. 2,000.00 Rp. 4,000.00
1.0000 Ls Upah Inslalasi Rp. 50,000.00 Rp. 50,000.00
Jumlah Rp. 385,000.00
Overhead & Keuntungan 15% Rp. 57,750.00
Total Rp. 442,750.00

3 1 TITK INTALASI TITIK DAYA


10.0000 M' Kabel distribusi NYM 3 x 4 mm² Rp. 39,402.00Rp. 394,020.00
10.0000 M' Kondouit PVC High Impact Ø20 mm Rp. 4,000.00Rp. 40,000.00
4.0000 Bh Shock High Impact Ø20 mm Rp. 2,000.00Rp. 8,000.00
1.0000 Bh Outbowdoos Rp. 5,000.00Rp. 5,000.00
2.0000 Bh Lastdop Rp. 2,000.00Rp. 4,000.00
1.0000 Ls Upah Inslalasi Rp. 50,000.00 Rp. 50,000.00
Jumlah Rp. 501,020.00
Overhead & Keuntungan 15% Rp. 75,153.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK

1 1 M KABEL DISTRIBUSI DARI JARINGAN RENDAH KE PELANGAN


1.0000 M' Kabel distribusi standart PLN Rp. 16,900.00 Rp. 16,900.00
1.0000 Ls Material dan Peralatan bantu Rp. 422.50 Rp. 422.50
1.0000 Ls Upah Inslalasi Rp. 4,500.00 Rp. 4,500.00
Jumlah Rp. 21,822.50
Overhead & Keuntungan 15% Rp. 3,273.38
Total Rp. 25,095.88

1 1 M KABEL DISTRIBUSI
1.0000 M' Kabel distribusi NYY 4X4 mm² Rp. 51,381.00 Rp. 51,381.00
1.0000 M' Klem kabel Rp. 2,000.00 Rp. 2,000.00
0.3333 Btg Pipa konduit Rp. 12,000.00 Rp. 3,999.60
1.0000 Ls Peralatan bantu Rp. 1,000.00 Rp. 1,000.00
1.0000 Ls Upah Inslalasi Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 63,380.60
Overhead & Keuntungan 15% Rp. 9,507.09
Total Rp. 72,887.69

Total Rp. 576,173.00

3 1 BH PEMASANGAN LAMPU PENERANGAN JALAN UMUM


1.0000 Bh Lampu jalan lengkap LED 40-50 watt Rp. - Rp. -
1.0000 Ttk Instalasi penerangan Rp. 318,550.00 Rp. 318,550.00
15.0000 M' Kabel distribusi NYFGBY 4 x 4 mm² Rp. 72,887.69 Rp. 1,093,315.35
1.0000 Bh Base plate 30 x 30 x 1,5 cm Rp. 80,319.09 Rp. 80,319.09
4.0000 Bh Angkur besi dia.19 x 30 cm Rp. 88,693.75 354,775.00
0.1500 H.o Pekerja Rp. 250,000.00 Rp. 37,500.00
0.1500 H.o Tukang Listrik Rp. 287,500.00 Rp. 43,125.00
0.0200 H.o Kepala Tukang Rp. 312,500.00 Rp. 6,250.00
0.0100 H.o Mandor Rp. 375,000.00 Rp. 3,750.00
Jumlah Rp. 1,937,584.44
Overhead & Keuntungan 15% Rp. 290,637.67
Total Rp. 2,228,222.11

4 1 BH PEMASANGAN LAMPU LED + FITTING


1.0000 Bh LED 9 watt Rp. 75,000.00 Rp. 75,000.00
1.0000 Bh Fitiing (outbow) Rp. 30,000.00 Rp. 30,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0750 H.o Tukang Listrik Rp. 287,500.00 Rp. 21,562.50
Jumlah Rp. 139,062.50
Overhead & Keuntungan 15% Rp. 20,859.38
Total Rp. 159,921.88

4 1 BH PEMASANGAN LAMPU LED + ARMATURE


1.0000 Set LED Open Tipe 11W/865/220V Rp. 350,000.00 Rp. 350,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0750 H.o Tukang Listrik Rp. 287,500.00 Rp. 21,562.50
Jumlah Rp. 384,062.50
Overhead & Keuntungan 15% Rp. 57,609.38
Total Rp. 441,671.88
ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK

1 1 M KABEL DISTRIBUSI DARI JARINGAN RENDAH KE PELANGAN


1.0000 M' Kabel distribusi standart PLN Rp. 16,900.00 Rp. 16,900.00
1.0000 Ls Material dan Peralatan bantu Rp. 422.50 Rp. 422.50
1.0000 Ls Upah Inslalasi Rp. 4,500.00 Rp. 4,500.00
Jumlah Rp. 21,822.50
Overhead & Keuntungan 15% Rp. 3,273.38
Total Rp. 25,095.88

1 1 M KABEL DISTRIBUSI
1.0000 M' Kabel distribusi NYY 4X4 mm² Rp. 51,381.00 Rp. 51,381.00
1.0000 M' Klem kabel Rp. 2,000.00 Rp. 2,000.00
0.3333 Btg Pipa konduit Rp. 12,000.00 Rp. 3,999.60
1.0000 Ls Peralatan bantu Rp. 1,000.00 Rp. 1,000.00
1.0000 Ls Upah Inslalasi Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 63,380.60
Overhead & Keuntungan 15% Rp. 9,507.09
Total Rp. 72,887.69

5 1 BH PEMASANGAN STOP KONTAK 1 PH 10A


1.0000 Bh Stop Kontak Rp. 55,000.00 Rp. 55,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0750 H.o Tukang Listrik Rp. 287,500.00 Rp. 21,562.50
Jumlah Rp. 89,062.50
Overhead & Keuntungan 15% Rp. 13,359.38
Total Rp. 102,421.88

6 1 BH PEMASANGAN SAKLAR SINGLE


1.0000 Bh Saklar single Rp. 55,000.00 Rp. 55,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0750 H.o Tukang Listrik Rp. 287,500.00 Rp. 21,562.50
Jumlah Rp. 89,062.50
Overhead & Keuntungan 15% Rp. 13,359.38
Total Rp. 102,421.88

7 1 BH PEMASANGAN SAKLAR DOUBLE


1.0000 Bh Saklar Double Rp. 57,000.00 Rp. 57,000.00
0.0500 H.o Pekerja Rp. 250,000.00 Rp. 12,500.00
0.0750 H.o Tukang Listrik Rp. 287,500.00 Rp. 21,562.50
Jumlah Rp. 91,062.50
Overhead & Keuntungan 15% Rp. 13,659.38
Total Rp. 104,721.88

8 1 SET BOX + MCB


1.0000 Bh MCB 2A Rp. 125,000.00 Rp. 125,000.00
1.0000 Bh MCB 4A Rp. 125,000.00 Rp. 125,000.00
1.0000 Bh Box MCB Rp. 85,000.00 Rp. 85,000.00
0.5000 H.o Pekerja Rp. 250,000.00 Rp. 125,000.00
0.5000 H.o Tukang Listrik Rp. 287,500.00 Rp. 143,750.00
ANALISA BIAYA KONSTRUKSI PEKERJAAN LISTRIK

1 1 M KABEL DISTRIBUSI DARI JARINGAN RENDAH KE PELANGAN


1.0000 M' Kabel distribusi standart PLN Rp. 16,900.00 Rp. 16,900.00
1.0000 Ls Material dan Peralatan bantu Rp. 422.50 Rp. 422.50
1.0000 Ls Upah Inslalasi Rp. 4,500.00 Rp. 4,500.00
Jumlah Rp. 21,822.50
Overhead & Keuntungan 15% Rp. 3,273.38
Total Rp. 25,095.88

1 1 M KABEL DISTRIBUSI
1.0000 M' Kabel distribusi NYY 4X4 mm² Rp. 51,381.00 Rp. 51,381.00
1.0000 M' Klem kabel Rp. 2,000.00 Rp. 2,000.00
0.3333 Btg Pipa konduit Rp. 12,000.00 Rp. 3,999.60
1.0000 Ls Peralatan bantu Rp. 1,000.00 Rp. 1,000.00
1.0000 Ls Upah Inslalasi Rp. 5,000.00 Rp. 5,000.00
Jumlah Rp. 63,380.60
Overhead & Keuntungan 15% Rp. 9,507.09
Total Rp. 72,887.69

Jumlah Rp. 603,750.00


Overhead & Keuntungan 15% Rp. 90,562.50
Total Rp. 694,312.50

9 1 SET EXHAUST FAN


1.0000 Bh Exhausf Fan kap. 1400 CFM Rp. 1,786,200.00 Rp. 1,786,200.00
1.0000 Ttk Instalasi titik daya Rp. 576,173.00 Rp. 576,173.00
1.0000 Bh Stop Kontak Rp. 102,421.88 Rp. 102,421.88
Jumlah Rp. 2,464,794.88
Overhead & Keuntungan 15% Rp. 369,719.23
Total Rp. 2,834,514.11
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

1 MEMASANG 1 BUAH KLOSET DUDUK / MONOBLOCK


1.0000 Bh Closet Duduk/Monoblock Rp. 750,000.00 Rp. 750,000.00
0.0600 Ls Perlengkapan Rp. 750,000.00 Rp. 45,000.00
3.3000 H.o Pekerja Rp. 250,000.00 Rp. 825,000.00
1.1000 H.o Tukang batu Rp. 287,500.00 Rp. 316,250.00
0.0010 H.o Kepala Tukang Rp. 312,500.00 Rp. 312.50
0.1600 H.o Mandor Rp. 375,000.00 Rp. 60,000.00
Jumlah Rp. 1,996,562.50
Overhead & Keuntungan 15% Rp. 299,484.38
Total Rp. 2,296,046.88

1 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 Bh Closet Jongkok Porselin Rp. 450,000.00 Rp. 450,000.00
0.1200 Zak Semen Portland Rp. 85,000.00 Rp. 10,200.00
0.0100 M3 Pasir Pasangan Rp. 337,500.00 Rp. 3,375.00
1.0000 H.o Pekerja Rp. 250,000.00 Rp. 250,000.00
1.5000 H.o Tukang batu Rp. 287,500.00 Rp. 431,250.00
1.5000 H.o Kepala Tukang Rp. 312,500.00 Rp. 468,750.00
0.1600 H.o Mandor Rp. 375,000.00 Rp. 60,000.00
Jumlah Rp. 1,673,575.00
Overhead & Keuntungan 15% Rp. 251,036.25
Total Rp. 1,924,611.25

3 MEMASANG 1 BUAH KLOSET JONGKOK TERASO


1.0000 Bh Closet Jongkok Teraso Rp. 200,000.00 Rp. 200,000.00
4.0000 Bh Batu Tela Rp. 1,850.00 Rp. 7,400.00
0.1200 Zak Semen Portland Rp. 85,000.00 Rp. 10,200.00
0.0100 M3 Pasir Pasangan Rp. 337,500.00 Rp. 3,375.00
1.0000 H.o Pekerja Rp. 250,000.00 Rp. 250,000.00
1.5000 H.o Tukang batu Rp. 287,500.00 Rp. 431,250.00
0.3000 H.o Kepala Tukang Rp. 312,500.00 Rp. 93,750.00
0.1100 H.o Mandor Rp. 375,000.00 Rp. 41,250.00
Jumlah Rp. 1,037,225.00
Overhead & Keuntungan 15% Rp. 155,583.75
Total Rp. 1,192,808.75

4 MEMASANG 1 BUAH URINOIR


1.0000 Bh Urinoir Rp. - Rp. -
0.3000 Ls Perlengkapan Rp. - Rp. -
0.1200 Zak Semen Portland Rp. 85,000.00 Rp. 10,200.00
0.0100 M3 Pasir Pasangan Rp. 337,500.00 Rp. 3,375.00
1.0000 H.o Pekerja Rp. 250,000.00 Rp. 250,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

1.0000 H.o Tukang batu Rp. 287,500.00 Rp. 287,500.00


0.1000 H.o Kepala Tukang Rp. 312,500.00 Rp. 31,250.00
0.1000 H.o Mandor Rp. 375,000.00 Rp. 37,500.00
Jumlah Rp. 619,825.00
Overhead & Keuntungan 15% Rp. 92,973.75
Total Rp. 712,798.75

2 MEMASANG 1 BUAH WASHTAFEL GANTIUNG


1.0000 Set Washtafel + Cermin Rp. 2,000,000.00 Rp. 2,000,000.00
0.1200 Ls Perlengkapan Rp. 2,000,000.00 Rp. 240,000.00
1.2000 H.o Pekerja Rp. 250,000.00 Rp. 300,000.00
1.4500 H.o Tukang batu Rp. 287,500.00 Rp. 416,875.00
0.1500 H.o Kepala Tukang Rp. 312,500.00 Rp. 46,875.00
0.1000 H.o Mandor Rp. 375,000.00 Rp. 37,500.00
Jumlah Rp. 3,041,250.00
Overhead & Keuntungan 15% Rp. 456,187.50
Total Rp. 3,497,437.50

6 MEMASANG 1 BUAH BAK MANDI TERASO VOLUME 0,30 M3


1.0000 Bh Bak Teraso Rp. Rp. -
0.1200 Zak Semen Portland Rp. 85,000.00 Rp. 10,200.00
0.0100 M3 Pasir Pasangan Rp. 337,500.00 Rp. 3,375.00
2.1000 H.o Pekerja Rp. 250,000.00 Rp. 525,000.00
0.7500 H.o Tukang batu Rp. 287,500.00 Rp. 215,625.00
0.0700 H.o Kepala Tukang Rp. 312,500.00 Rp. 21,875.00
0.1100 H.o Mandor Rp. 375,000.00 Rp. 41,250.00
Jumlah Rp. 817,325.00
Overhead & Keuntungan 15% Rp. 122,598.75
Total Rp. 939,923.75

3 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,30 M3


1.0000 Bh Bak Fibreglass Rp. 585,000.00 Rp. 585,000.00
0.1800 Ls Perlengkapan Rp. 585,000.00 Rp. 105,300.00
0.5000 H.o Pekerja Rp. 250,000.00 Rp. 125,000.00
0.5000 H.o Tukang batu Rp. 287,500.00 Rp. 143,750.00
0.0500 H.o Kepala Tukang Rp. 312,500.00 Rp. 15,625.00
0.0500 H.o Mandor Rp. 375,000.00 Rp. 18,750.00
Jumlah Rp. 993,425.00
Overhead & Keuntungan 15% Rp. 149,013.75
Total Rp. 1,142,438.75

8 MEMASANG 1 BUAH BAK MANDI BATU TELA VOLUME 0,30 M3


ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

88.0000 Bh Batu Tela Rp. 1,850.00 Rp. 162,800.00


2.4000 Zak Semen Portland Rp. 38,000.00 Rp. 91,200.00
0.3000 M3 Pasir Pasangan Rp. 150,000.00 Rp. 45,000.00
36.0000 Bh Porselen ( 10 x 20 ) cm Rp. 1,040.00 Rp. 37,440.00
6.0000 Kg Semen Warna Rp. 4,000.00 Rp. 24,000.00
6.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,500,000.00
3.0000 H.o Tukang batu Rp. 287,500.00 Rp. 862,500.00
0.3000 H.o Kepala Tukang Rp. 312,500.00 Rp. 93,750.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 2,929,190.00
Overhead & Keuntungan 15% Rp. 439,378.50
Total Rp. 3,368,568.50

9 MEMASANG 1 BUAH BADKIP PORSELEN


1.0000 Bh Badkip Porselen Rp. Rp. -
0.2000 Ls Perlengkapan Rp. - Rp. -
- H.o Pekerja Rp. 250,000.00 Rp. -
0.0750 H.o Tukang batu Rp. 287,500.00 Rp. 21,562.50
0.7500 H.o Kepala Tukang Rp. 312,500.00 Rp. 234,375.00
0.2500 H.o Mandor Rp. 375,000.00 Rp. 93,750.00
Jumlah Rp. 349,687.50
Overhead & Keuntungan 15% Rp. 52,453.13
Total Rp. 402,140.63

10 MEMASANG 1 BUAH BAK BETON VOLUME 1 M3 AIR


0.9000 M3 Beton 1 : 1.5 : 2.5 Rp. -Rp. -
180.0000 Kg Besi Beton Rp. 8,000.00Rp. 1,440,000.00
8.0000 M3 Kayu Cetakan Rp. 1,200,000.00Rp. 9,600,000.00
5.0000 M2 Ubin Porselen Rp. 52,000.00Rp. 260,000.00
0.1000 Ls Perlengkapan Rp. 1,130,000.00Rp. 113,000.00
6.0000 H.o Pekerja Rp. 250,000.00 Rp. 1,500,000.00
3.0000 H.o Tukang batu Rp. 287,500.00 Rp. 862,500.00
0.3000 H.o Kepala Tukang Rp. 312,500.00 Rp. 93,750.00
0.3000 H.o Mandor Rp. 375,000.00 Rp. 112,500.00
Jumlah Rp. 13,981,750.00
Overhead & Keuntungan 15% Rp. 2,097,262.50
Total Rp. 16,079,012.50

10 MEMASANG 1 BUAH BAK FIBREGLASS VOLUME 1 M3 AIR


1.0000 Bh Bak Fibreglass Rp. Rp. -
0.1200 Ls Perlengkapan Rp. - Rp. -
3.0000 H.o Pekerja Rp. 250,000.00 Rp. 750,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

4.5000 H.o Tukang batu Rp. 287,500.00 Rp. 1,293,750.00


0.9000 H.o Kepala Tukang Rp. 312,500.00 Rp. 281,250.00
0.9000 H.o Mandor Rp. 375,000.00 Rp. 337,500.00
Jumlah Rp. 2,662,500.00
Overhead & Keuntungan 15% Rp. 399,375.00
Total Rp. 3,061,875.00

11 MEMASANG 1 M1 PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA 15 CM


1.6000 M' Pipa Tanah Rp. Rp. -
0.0136 Zak Semen Portland Rp. 38,000.00 Rp. 516.80
0.0130 M3 Pasir Pasangan Rp. 150,000.00 Rp. 1,950.00
0.0110 M3 Pasir Urug Rp. 140,000.00 Rp. 1,540.00
0.0600 H.o Pekerja Rp. 250,000.00 Rp. 15,000.00
0.0300 H.o Tukang batu Rp. 287,500.00 Rp. 8,625.00
0.0030 H.o Kepala Tukang Rp. 312,500.00 Rp. 937.50
0.0025 H.o Mandor Rp. 375,000.00 Rp. 937.50
Jumlah Rp. 29,506.80
Overhead & Keuntungan 15% Rp. 4,426.02
Total Rp. 33,932.82

12 MEMASANG 1 M1 PIPA PENYALUR AIR LIMBAH JENIS PIPA TANAH, DIA 20 CM


1.6000 M' Pipa Tanah Rp. Rp. -
0.0174 Zak Semen Portland Rp. 38,000.00 Rp. 661.20
0.0140 M3 Pasir Pasangan Rp. 150,000.00 Rp. 2,100.00
0.0140 M3 Pasir Urug Rp. 140,000.00 Rp. 1,960.00
0.0800 H.o Pekerja Rp. 250,000.00 Rp. 20,000.00
0.0400 H.o Tukang batu Rp. 287,500.00 Rp. 11,500.00
0.0040 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,250.00
0.0070 H.o Mandor Rp. 375,000.00 Rp. 2,625.00
Jumlah Rp. 40,096.20
Overhead & Keuntungan 15% Rp. 6,014.43
Total Rp. 46,110.63

13 MEMASANG 1 M1 PIPA BETON, DIA 15 - 20 CM


1.1000 M' Pipa Beton Rp. Rp. -
6.0000 Bh Batu Tela Rp. 1,850.00 Rp. 11,100.00
0.0784 Zak Semen Portland Rp. 38,000.00 Rp. 2,979.20
0.0560 M3 Pasir Pasangan Rp. 150,000.00 Rp. 8,400.00
0.0240 M3 Pasir Urug Rp. 140,000.00 Rp. 3,360.00
0.1400 H.o Pekerja Rp. 250,000.00 Rp. 35,000.00
0.0700 H.o Tukang batu Rp. 287,500.00 Rp. 20,125.00
0.0070 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,187.50
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

0.0070 H.o Mandor Rp. 375,000.00 Rp. 2,625.00


Jumlah Rp. 85,776.70
Overhead & Keuntungan 15% Rp. 12,866.51
Total Rp. 98,643.21

14 MEMASANG 1 M1 PIPA BETON, DIA 30 - 100 CM


1.1000 M' Pipa Beton Rp. Rp. -
122.0000 Bh Batu Tela Rp. 1,850.00 Rp. 225,700.00
0.2062 Zak Semen Portland Rp. 38,000.00 Rp. 7,835.60
0.0610 M3 Pasir Pasangan Rp. 150,000.00 Rp. 9,150.00
0.0690 M3 Pasir Urug Rp. 140,000.00 Rp. 9,660.00
0.3800 H.o Pekerja Rp. 250,000.00 Rp. 95,000.00
0.1900 H.o Tukang batu Rp. 287,500.00 y Rp. 54,625.00
0.0190 H.o Kepala Tukang Rp. 312,500.00 Rp. 5,937.50
0.0190 H.o Mandor Rp. 375,000.00 Rp. 7,125.00
Jumlah Rp. 415,033.10
Overhead & Keuntungan 15% Rp. 62,254.97
Total Rp. 477,288.07

15 MEMASANG 1 BUAH BAK KONTROL PAS. BATU TELA UKURAN ( 30 x 30 ) CM, TINGGI 35 Cm
32.0000 Bh Batu Tela Rp. 3,000.00 Rp. 96,000.00
0.8800 Zak Semen Portland Rp. 85,000.00 Rp. 74,800.00
0.0700 M3 Pasir Pasangan Rp. 337,500.00 Rp. 23,625.00
0.0700 M3 Batu Krikil Rp. 500,000.00 Rp. 35,000.00
1.6000 Kg Besi Beton Rp. 15,690.69 Rp. 25,105.11
0.0600 M3 Pasir Beton Rp. 325,000.00 Rp. 19,500.00
3.2000 H.o Pekerja Rp. 250,000.00 Rp. 800,000.00
1.0150 H.o Tukang batu Rp. 287,500.00 Rp. 291,812.50
0.0015 H.o Kepala Tukang Rp. 312,500.00 Rp. 468.75
0.0160 H.o Mandor Rp. 375,000.00 Rp. 6,000.00
Jumlah Rp. 1,372,311.36
Overhead & Keuntungan 15% Rp. 205,846.70
Total Rp. 1,578,158.06

16 MEMASANG 1 BUAH BAK KONTROL PAS. BATU TELA UKURAN ( 45 x 45 ) CM, TINGGI 50 Cm
56.0000 Bh Batu Tela Rp. 3,000.00 Rp. 168,000.00
1.5400 Zak Semen Portland Rp. 85,000.00 Rp. 130,900.00
0.1300 M3 Pasir Pasangan Rp. 337,500.00 Rp. 43,875.00
0.0200 M3 Batu Krikil Rp. 500,000.00 Rp. 10,000.00
2.6000 Kg Besi Beton Rp. 15,690.69 Rp. 40,795.80
0.0900 M3 Pasir Beton Rp. 325,000.00 Rp. 29,250.00
1.4200 H.o Pekerja Rp. 250,000.00 Rp. 355,000.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

0.4730 H.o Tukang batu Rp. 287,500.00 Rp. 135,987.50


0.0470 H.o Kepala Tukang Rp. 312,500.00 Rp. 14,687.50
0.0710 H.o Mandor Rp. 375,000.00 Rp. 26,625.00
Jumlah Rp. 955,120.80
Overhead & Keuntungan 15% Rp. 143,268.12
Total Rp. 1,098,388.92

17 MEMASANG 1 BUAH BAK KONTROL PAS. BATU TELA UKURAN ( 60 x 60 ) CM, TINGGI 65 Cm
82.0000 Bh Batu Tela Rp. 3,000.00 Rp. 246,000.00
2.2800 Zak Semen Portland Rp. 85,000.00 Rp. 193,800.00
0.1840 M3 Pasir Pasangan Rp. 337,500.00 Rp. 62,100.00
0.0330 M3 Batu Krikil Rp. 500,000.00 Rp. 16,500.00
4.8500 Kg Besi Beton Rp. 15,690.69 Rp. 76,099.85
0.1200 M3 Pasir Beton Rp. 325,000.00 Rp. 39,000.00
2.1600 H.o Pekerja Rp. 250,000.00 Rp. 540,000.00
0.7200 H.o Tukang batu Rp. 287,500.00 Rp. 207,000.00
0.0720 H.o Kepala Tukang Rp. 312,500.00 Rp. 22,500.00
0.1080 H.o Mandor Rp. 375,000.00 Rp. 40,500.00
0.1000 H.o Tukang Gali Rp. 250,000.00 Rp. 25,000.00
Jumlah Rp. 1,468,499.85
Overhead & Keuntungan 15% Rp. 220,274.98
Total Rp. 1,688,774.83

18 MEMASANG 1 M1 PIPA GALVANIS DIA 0,5"


1.2000 M' Pipa Galvanis dia 0,5" Rp. 10,000.00 Rp. 12,000.00
0.3500 Ls Perlengkapan Rp. 10,000.00 Rp. 3,500.00
0.0540 H.o Pekerja Rp. 250,000.00 Rp. 13,500.00
0.0900 H.o Tukang batu Rp. 287,500.00 Rp. 25,875.00
0.0090 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,812.50
0.0270 H.o Mandor Rp. 375,000.00 Rp. 10,125.00
Jumlah Rp. 67,812.50
Overhead & Keuntungan 15% Rp. 10,171.88
Total Rp. 77,984.38

19 MEMASANG 1 M1 PIPA GALVANIS DIA 3/4"


1.2000 M' Pipa Galvanis dia 3/4" Rp. 11,250.00 Rp. 13,500.00
0.3500 Ls Perlengkapan Rp. 11,250.00 Rp. 3,937.50
0.0540 H.o Pekerja Rp. 250,000.00 Rp. 13,500.00
0.0900 H.o Tukang batu Rp. 287,500.00 Rp. 25,875.00
0.0090 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,812.50
0.0270 H.o Mandor Rp. 375,000.00 Rp. 10,125.00
Jumlah Rp. 69,750.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

Overhead & Keuntungan 15% Rp. 10,462.50


Total Rp. 80,212.50

20 MEMASANG 1 M1 PIPA GALVANIS DIA 1"


1.2000 M' Pipa Galvanis dia 1" Rp. Rp. -
0.3500 Ls Perlengkapan Rp. - Rp. -
0.0540 H.o Pekerja Rp. 250,000.00 Rp. 13,500.00
0.0900 H.o Tukang batu Rp. 287,500.00 Rp. 25,875.00
0.0090 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,812.50
0.0270 H.o Mandor Rp. 375,000.00 Rp. 10,125.00
Jumlah Rp. 52,312.50
Overhead & Keuntungan 15% Rp. 7,846.88
Total Rp. 60,159.38

21 MEMASANG 1 M1 PIPA GALVANIS DIA 1,5"


1.2000 M' Pipa Galvanis dia 1,5" Rp. Rp. -
0.3500 Ls Perlengkapan Rp. - Rp. -
0.1080 H.o Pekerja Rp. 250,000.00 Rp. 27,000.00
0.1800 H.o Tukang batu Rp. 287,500.00 Rp. 51,750.00
0.0180 H.o Kepala Tukang Rp. 312,500.00 Rp. 5,625.00
0.0054 H.o Mandor Rp. 375,000.00 Rp. 2,025.00
Jumlah Rp. 86,400.00
Overhead & Keuntungan 15% Rp. 12,960.00
Total Rp. 99,360.00

22 MEMASANG 1 M1 PIPA GALVANIS DIA 3"


1.2000 M' Pipa Galvanis dia 3" Rp. Rp. -
0.3500 Ls Perlengkapan Rp. - Rp. -
0.1080 H.o Pekerja Rp. 250,000.00 Rp. 27,000.00
0.1800 H.o Tukang batu Rp. 287,500.00 Rp. 51,750.00
0.0180 H.o Kepala Tukang Rp. 312,500.00 Rp. 5,625.00
0.0054 H.o Mandor Rp. 375,000.00 Rp. 2,025.00
Jumlah Rp. 86,400.00
Overhead & Keuntungan 15% Rp. 12,960.00
Total Rp. 99,360.00

23 MEMASANG 1 M1 PIPA GALVANIS DIA 4"


1.2000 M' Pipa Galvanis dia 4" Rp. Rp. -
0.3500 Ls Perlengkapan Rp. - Rp. -
0.1350 H.o Pekerja Rp. 250,000.00 Rp. 33,750.00
0.2250 H.o Tukang batu Rp. 287,500.00 Rp. 64,687.50
0.0225 H.o Kepala Tukang Rp. 312,500.00 Rp. 7,031.25
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

0.0068 H.o Mandor Rp. 375,000.00 Rp. 2,550.00


Jumlah Rp. 108,018.75
Overhead & Keuntungan 15% Rp. 16,202.81
Total Rp. 124,221.56

4 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 0,5"


1.2000 M' Pipa PVC 0,5" Rp. 7,800.00 Rp. 9,360.00
0.3500 Ls Perlengkapan Rp. 7,800.00 Rp. 2,730.00
0.0360 H.o Pekerja Rp. 250,000.00 Rp. 9,000.00
0.0600 H.o Tukang batu Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0018 H.o Mandor Rp. 375,000.00 Rp. 675.00
Jumlah Rp. 40,890.00
Overhead & Keuntungan 15% Rp. 6,133.50
Total Rp. 47,023.50

5 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 3/4"


1.2000 M' Pipa PVC 3/4" Rp. 9,750.00 Rp. 11,700.00
0.3500 Ls Perlengkapan Rp. 9,750.00 Rp. 3,412.50
0.0360 H.o Pekerja Rp. 250,000.00 Rp. 9,000.00
0.0600 H.o Tukang batu Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0018 H.o Mandor Rp. 375,000.00 Rp. 675.00
Jumlah Rp. 43,912.50
Overhead & Keuntungan 15% Rp. 6,586.88
Total Rp. 50,499.38

6 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 1"


1.2000 M' Pipa PVC 1" Rp. 12,350.00 Rp. 14,820.00
0.3500 Ls Perlengkapan Rp. 12,350.00 Rp. 4,322.50
0.0360 H.o Pekerja Rp. 250,000.00 Rp. 9,000.00
0.0600 H.o Tukang batu Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0018 H.o Mandor Rp. 375,000.00 Rp. 675.00
Jumlah Rp. 47,942.50
Overhead & Keuntungan 15% Rp. 7,191.38
Total Rp. 55,133.88

7 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 1¼"


1.2000 M' Pipa PVC 1,5" Rp. 16,225.00 Rp. 19,470.00
0.3500 Ls Perlengkapan Rp. 16,225.00 Rp. 5,678.75
0.0360 H.o Pekerja Rp. 287,500.00 Rp. 10,350.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

0.0600 H.o Tukang batu Rp. 312,500.00 Rp. 18,750.00


0.0060 H.o Kepala Tukang Rp. 375,000.00 Rp. 2,250.00
0.0018 H.o Mandor Rp. - Rp. -
Jumlah Rp. 56,498.75
Overhead & Keuntungan 15% Rp. 8,474.81
Total Rp. 64,973.56
7 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 1,5"
1.2000 M' Pipa PVC 1,5" Rp. 20,100.00 Rp. 24,120.00
0.3500 Ls Perlengkapan Rp. 20,100.00 Rp. 7,035.00
0.0360 H.o Pekerja Rp. 250,000.00 Rp. 9,000.00
0.0600 H.o Tukang batu Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0018 H.o Mandor Rp. 375,000.00 Rp. 675.00
Jumlah Rp. 59,955.00
Overhead & Keuntungan 15% Rp. 8,993.25
Total Rp. 68,948.25

8 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 2"


1.2000 M' Pipa PVC 2" Rp. 23,400.00 Rp. 28,080.00
0.3500 Ls Perlengkapan Rp. 23,400.00 Rp. 8,190.00
0.0540 H.o Pekerja Rp. 250,000.00 Rp. 13,500.00
0.0900 H.o Tukang batu Rp. 287,500.00 Rp. 25,875.00
0.0090 H.o Kepala Tukang Rp. 312,500.00 Rp. 2,812.50
0.0027 H.o Mandor Rp. 375,000.00 Rp. 1,012.50
Jumlah Rp. 79,470.00
Overhead & Keuntungan 15% Rp. 11,920.50
Total Rp. 91,390.50

9 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 2,5"


1.2000 M' Pipa PVC 2,5" Rp. 36,450.00 Rp. 43,740.00
0.3500 Ls Perlengkapan Rp. 36,450.00 Rp. 12,757.50
0.0360 H.o Pekerja Rp. 250,000.00 Rp. 9,000.00
0.0600 H.o Tukang batu Rp. 287,500.00 Rp. 17,250.00
0.0060 H.o Kepala Tukang Rp. 312,500.00 Rp. 1,875.00
0.0018 H.o Mandor Rp. 375,000.00 Rp. 675.00
Jumlah Rp. 85,297.50
Overhead & Keuntungan 15% Rp. 12,794.63
Total Rp. 98,092.13

1 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 3"


1.2000 M' Pipa PVC 3" Rp. 49,500.00 Rp. 59,400.00
0.3500 Ls Perlengkapan Rp. 49,500.00 Rp. 17,325.00
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

0.0810 H.o Pekerja Rp. 250,000.00 Rp. 20,250.00


0.1350 H.o Tukang batu Rp. 287,500.00 Rp. 38,812.50
0.0135 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,218.75
0.0041 H.o Mandor Rp. 375,000.00 Rp. 1,537.50
Jumlah Rp. 141,543.75
Overhead & Keuntungan 15% Rp. 21,231.56
Total Rp. 162,775.31

11 MEMASANG 1 M1 PIPA PVC TYPE AW DIA 4"


1.2000 M' Pipa PVC 4" Rp. 79,500.00 Rp. 95,400.00
0.3500 Ls Perlengkapan Rp. 79,500.00 Rp. 27,825.00
0.0810 H.o Pekerja Rp. 250,000.00 Rp. 20,250.00
0.1350 H.o Tukang batu Rp. 287,500.00 Rp. 38,812.50
0.0135 H.o Kepala Tukang Rp. 312,500.00 Rp. 4,218.75
0.0041 H.o Mandor Rp. 375,000.00 Rp. 1,537.50
Jumlah Rp. 188,043.75
Overhead & Keuntungan 15% Rp. 28,206.56
Total Rp. 216,250.31

12 MEMASANG 1 BUAH BAK CUCI PIRING STAINLES STEEL


1.0000 Bh Bak Cuci Piring Stainles Rp. 650,000.00 Rp. 650,000.00
0.2000 Set Water Drain + Asesories Rp. 650,000.00 Rp. 130,000.00
0.0300 H.o Pekerja Rp. 250,000.00 Rp. 7,500.00
0.3000 H.o Tukang batu Rp. 287,500.00 Rp. 86,250.00
0.0300 H.o Kepala Tukang Rp. 312,500.00 Rp. 9,375.00
0.0015 H.o Mandor Rp. 375,000.00 Rp. 562.50
Jumlah Rp. 883,687.50
Overhead & Keuntungan 15% Rp. 132,553.13
Total Rp. 1,016,240.63

33 MEMASANG 1 BUAH BAK CUCI PIRING teraso


1.0000 Bh Bak Cuci Piring teraso Rp. Rp. -
1.0000 Set Water Drain + Asesories Rp. Rp. -
0.4000 Zak Semen Portland Rp. 38,000.00 Rp. 15,200.00
0.0500 M3 Pasir Pasangan Rp. 150,000.00 Rp. 7,500.00
0.0300 H.o Pekerja Rp. 250,000.00 Rp. 7,500.00
0.3000 H.o Tukang batu Rp. 287,500.00 Rp. 86,250.00
0.0300 H.o Kepala Tukang Rp. 312,500.00 Rp. 9,375.00
0.0015 H.o Mandor Rp. 375,000.00 Rp. 562.50
Jumlah Rp. 126,387.50
Overhead & Keuntungan 15% Rp. 18,958.13
Total Rp. 145,345.63
ANALISA HARGA SATUAN

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI

13 MEMASANG 1 BUAH KRAN DIA 3/4" ATAU 1/2"


1.0000 Bh Kran Air Rp. 415,000.00 Rp. 415,000.00
0.0250 Bh Seal Tape Rp. 20,000.00 Rp. 500.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 451,750.00
Overhead & Keuntungan 15% Rp. 67,762.50
Total Rp. 519,512.50

14 MEMASANG 1 BUAH KRAN DAPUR


1.0000 Bh Kran Dapur Rp. 425,000.00 Rp. 425,000.00
0.0250 Bh Seal Tape Rp. 20,000.00 Rp. 500.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 461,750.00
Overhead & Keuntungan 15% Rp. 69,262.50
Total Rp. 531,012.50

15 MEMASANG 1 BUAH FLOOR DRAIN


1.0000 Bh Floor Drain Aluminium Rp. 495,000.00 Rp. 495,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 531,250.00
Overhead & Keuntungan 15% Rp. 79,687.50
Total Rp. 610,937.50

2 MEMASANG 1 BUAH ROOF DRAIN CASH IRON


1.0000 Bh Roof Drain Cash Iron 3" Rp. 250,000.00 Rp. 250,000.00
0.0100 H.o Pekerja Rp. 250,000.00 Rp. 2,500.00
0.1000 H.o Tukang batu Rp. 287,500.00 Rp. 28,750.00
0.0100 H.o Kepala Tukang Rp. 312,500.00 Rp. 3,125.00
0.0050 H.o Mandor Rp. 375,000.00 Rp. 1,875.00
Jumlah Rp. 286,250.00
Overhead & Keuntungan 15% Rp. 42,937.50
Total Rp. 329,187.50
SUPLEMENT PEKERJAAN LISTRIK

No. Uraian Pekerjaan Harga Satuan Bahan (Rp.) Harga Satuan Upah (Rp.) Jumlah Harga Satuan (Rp.)
1 2 3 4 5

L. 01 1 TITIK PASANG LAMPU SL 20 WATT


1.0000 Set Lampu SL 18 watt Philips #REF! #REF!
1.0000 Bh Fitting #REF! #REF!
10.0000 M' Kabel NYM #REF! #REF!
1.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang Listrik #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 02 1 TITIK PASANG LAMPU SL 9 WATT
1.0000 Set Lampu SL 9 watt Philips #REF! #REF!
1.0000 Bh Fitting #REF! #REF!
10.0000 M' Kabel NYM #REF! #REF!
1.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang Listrik #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 03 1 TITIK PASANG LAMPU TL 20 WATT
1.0000 Set Lampu TL20 watt Philips + Box #REF! #REF!
10.0000 M' Kabel NYM #REF! #REF!
1.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 04 1 TITIK PASANG LAMPU TL 40 WATT
1.0000 Set Lampu TL 40 watt Philips #REF! #REF!
10.0000 M' Kabel NYA #REF! #REF!
1.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 05 1 TITIK PASANG LAMPU SL.E DOWNLIGTH 18 WATT
1.0000 Set Lampu SL. E 18 watt Philips Rp 55,000.00 Rp 55,000.00
10.0000 M' Kabel NYA Rp 12,000.00 Rp 120,000.00
1.0000 M' Pipa union 5/8" Rp 7,500.00 Rp 7,500.00
0.1500 Ho Tukang Rp 115,000.00 Rp 17,250.00
0.0150 Ho Kepala Tukang Rp 140,000.00 Rp 2,100.00
0.2000 Ho Pekerja Rp 60,000.00 Rp 12,000.00
0.0150 Ho Mandor Rp 150,000.00 Rp 2,250.00
Rp 216,100.00
L. 06 1 TITIK PASANG SAKLAR GANDA
1.0000 Bh Saklar Ganda Broco #REF! #REF!
15.0000 M' Kabel NYM #REF! #REF!
2.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 07 1 TITIK PASANG SAKLAR TUNGGAL
1.0000 Bh Saklar Tunggal Broco #REF! #REF!
15.0000 M' Kabel NYM #REF! #REF!
2.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
No. Uraian Pekerjaan Harga Satuan Bahan (Rp.) Harga Satuan Upah (Rp.) Jumlah Harga Satuan (Rp.)
1 2 3 4 5

L. 08 1 TITIK PASANG STOP KONTAK


1.0000 Bh Stop kontak Broco #REF! #REF!
15.0000 M' Kabel NYM #REF! #REF!
2.0000 M' Pipa union 5/8" #REF! #REF!
0.1500 Ho Tukang #REF! #REF!
0.0150 Ho Kepala Tukang #REF! #REF!
0.2000 Ho Pekerja #REF! #REF!
0.0150 Ho Mandor #REF! #REF!
#REF!
L. 09 1 BH PASANG BOX SEKRING
1.0000 Set Limit & sekring Standar #REF! #REF!
1.4000 Ho Tukang #REF! #REF!
0.1400 Ho Kepala Tukang #REF! #REF!
1.9000 Ho Pekerja #REF! #REF!
0.0950 Ho Mandor #REF! #REF!
#REF!
SUMBER: KUMPULAN ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (EDISI REVISI)- PENERBIT BSN
ANALISA HARGA SATUAN SNI-STANDAR (BADAN STANDARISASI NAS)
I. PEKERJAAN PENDAHULUAN ANALISA BIAYA KONSTRUKSI (ABK)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

1.1 1M' Pengukuran dan pemasangan bouwplank


Bahan :
- Kayu 5/7, kayu bekisting Kelas III 0.012 M3 #REF! #REF!
- Paku Biasa 2" - 5" 0.020 Kg #REF! #REF!
- Kayu Papan 3/20 kelas III 0.007 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Tukang Kayu 0.100 OH #REF! #REF!
- Pekerja 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
1.2 1 M2 Membersihkan lapangan dan perataan
- Pekerja 1.000 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

II. PEKERJAAN TANAH SNI:2535:2008

NO. URAIAN PEKERJAAN INDEKS SATUAN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

2.1 Menggali 1 m3 Tanah Biasa sedalam 1 m


Tenaga :
- Pekerja 0.750 OH #REF! #REF!
- Mandor 0.0250 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
2.2 1 M3 Urugan Kembali (DIHITUNG1/3 INDEKS)
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Mandor 0.008 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
2.3 Menguruk 1 M3 Pasir di bawah lantai dan pondasi
Bahan :
- Pasir 1.200 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.300 OH #REF! #REF!
- Mandor 0.010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
2.4 Menguruk 1 M3 Sirtu untuk Peninggian Lantai Bangunan
Bahan :
- Sirtu 1.200 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Mandor 0.025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

III. PEKERJAAN PONDASI SNI:2538:2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

3.1 Memasang 1 m3 pondasi batu kali, campuran 1 Pc : 4 Ps

Bahan :
- Batu Kali 1.200 M3 #REF! #REF!
- Semen Portland 163.000 Kg #REF! #REF!
- Pasir Pasang 0.520 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.500 OH #REF! #REF!
- Tukang Batu 0.750 OH #REF! #REF!
- Kepala Tukang 0.075 OH #REF! #REF!
- Mandor 0.075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
3.2 Memasang 1 M3 Pondasi batu kali, 1 Pc : 5 Ps

Bahan :
- Batu Kali 1.200 M3 #REF! #REF!
- Semen Portland 136.000 Kg #REF! #REF!
- Pasir Pasang 0.544 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.500 OH #REF! #REF!
- Tukang Batu 0.750 OH #REF! #REF!
- Kepala Tukang 0.075 OH #REF! #REF!
- Mandor 0.075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
3.2. Memasang 1 M3 batu kosong (ANSTAMPING)
Bahan :
- batu kali 1.200 M3 #REF! #REF!
- Pasir urug 0.432 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.780 OH #REF! #REF!
- Tukang Batu 0.390 OH #REF! #REF!
- Kepala Tukang 0.039 OH #REF! #REF!
- Mandor 0.039 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

IV. PEKERJAAN DINDING SNI-6897-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
4.1 1 m2 Pasang dinding Batu Tela 1:4 (1/2 BT) SUP
(8 cm x 14 cm x 28 cm)
Bahan :
- Batu Tela 22.000 Bh #REF! #REF!
- Semen Portland 8.030 Kg #REF! #REF!
- Pasir pasang 0.026 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.300 OH #REF! #REF!
- Tukang Batu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
4.2 1 m2 Pasang dinding roster/ terawang (12x11x24) cm
1 Pc : 4 Ps
Bahan :
Roster/ terawang 30.000 Bh #REF! #REF!
Semen Portland 11.000 Kg #REF! #REF!
Pasir pasang 0.035 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Batu 0.100 OH #REF! #REF!
Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
4.3 Memasang 1 m2 dinding bata merah tebal 1/2 bata, 1 Pc : 3 Ps
(Ukuran Batu Bata Merah 5 cm x 11 cm x 22 cm)
Bahan :
Bata Merah 5x11x22xCm 70.000 Bh #REF! #REF!
Semen Portland 14.370 Kg #REF! #REF!
Pasir Pasang 0.040 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Batu 0.100 OH #REF! #REF!
Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
4.2 Memasang 1 m2 dinding bata merah tebal 1/2 bata, 1 Pc : 4 Ps
(Ukuran Batu Bata Merah 5 cm x 11 cm x 22 cm)
Bahan :
Bata Merah 5x11x22xCm 70.000 Bh #REF! #REF!
Semen Portland 11.500 Kg #REF! #REF!
Pasir Pasang 0.043 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Batu 0.100 OH #REF! #REF!
Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

4.5 Memasang 1 m2 dinding bata merah tebal 1/2 bata, 1 Pc : 5 Ps


(Ukuran Batu Bata Merah 5 cm x 11 cm x 22 cm)
Bahan :
Bata Merah 5x11x22xCm 55.000 Bh #REF! #REF!
Semen Portland 9.680 Kg #REF! #REF!
Pasir Pasang 0.045 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Batu 0.100 OH #REF! #REF!
Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

V. PEKERJAAN KAYU SNI-3434-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
5.1 Membuat dan Memasang 1M3 Kusen Pintu dan Kusen Jendela Kayu Kls I
Bahan :
- Balok Kayu Kelas I 1.100 M3 #REF! #REF!
- Paku 10 cm 1.250 Kg #REF! #REF!
Lem Kayu 1.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 7.000 OH #REF! #REF!
- Tukang Kayu 21.000 OH #REF! #REF!
- Kepala Tukang 2.100 OH #REF! #REF!
- Mandor 0.350 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.2 Membuat dan Memasang 1M3 Kusen Pintu dan Kusen Jendela Kayu Kls II atau III
Bahan :
- Balok Kayu Kelas II 1.100 M3 #REF! #REF!
- Paku 10 cm 1.250 Kg #REF! #REF!
Lem Kayu 1.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 6.000 OH #REF! #REF!
- Tukang Kayu 18.000 OH #REF! #REF!
- Kepala Tukang 1.800 OH #REF! #REF!
- Mandor 0.300 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.2 Membuat dan Memasang 1M2 Daun Pintu Paneel, Kayu Kelas I
Bahan :
- Papan Kayu Kelas I 0.040 M3 #REF! #REF!
- Lem Kayu 0.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.000 OH #REF! #REF!
- Tukang Kayu 3.000 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.3 Membuat dan Memasang 1 m2 Pintu dan Jendela Kaca Kayu Kelas I
Bahan :
- Papan Kayu Kelas I 0.035 M3 #REF! #REF!
- Kaca bening 5 mm 1.000 M2 #REF! #REF!
- Paku Campur 0.030 Kg #REF! #REF!
- Lem Kayu 0.300 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.800 OH #REF! #REF!
- Tukang Kayu 2.000 OH #REF! #REF!
- Kepala Tukang 0.200 OH #REF! #REF!
- Mandor 0.040 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.5. Membuat dan Memasang 1 m2 Pintu dan Jendela Jalusi Kayu Kelas I atau II
Bahan :
- Papan Kayu Kelas II 0.064 M3 #REF! #REF!
- Lem Kayu 0.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.000 OH #REF! #REF!
- Tukang Kayu 3.000 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.4 Memasang 1 m2 Jalusi Kusen, kayu kelas I
Bahan :
- Papan Kayu Kelas I 0.060 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm 0.150 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.670 OH #REF! #REF!
- Tukang Kayu 2.000 OH #REF! #REF!
- Kepala Tukang 0.200 OH #REF! #REF!
- Mandor 0.335 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.5 Membuat 1 m2 daun pintu kayu lapis (tripleks) rangkap, rangka tertutup kayu kelas I (lebar sampai dengan 90 cm)
Bahan :
- Papan Kayu Kelas I 0.025 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm (paku tripleks) 0.300 Kg #REF! #REF!
- Lem Kayu 0.500 M3 #REF! #REF!
- Tripleks 3 mm 0.700 Lbr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.700 OH #REF! #REF!
- Tukang Kayu 2.100 OH #REF! #REF!
- Kepala Tukang 0.210 OH #REF! #REF!
- Mandor 0.035 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

1 2 3 4 5 6
5.6 Memasang 1 m2 Tripleks Rangkap Lapis Sengplat, expose kayu kelas I
Bahan :
- Papan Kayu Kelas I 0.020 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm 0.030 Kg #REF! #REF!
- Lem Kayu 0.800 Kg #REF! #REF!
- Tripleks 3 mm 1.000 Lbr #REF! #REF!
- Sengplat 1.000 Lbr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.800 OH #REF! #REF!
- Tukang Kayu 2.500 OH #REF! #REF!
- Kepala Tukang 0.250 OH #REF! #REF!
- Mandor 0.040 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.7 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 m
Bahan :
- Balok Kayu Kelas I 1.100 M3 #REF! #REF!
- Besi strip tebal 5 mm 15.000 Kg 18,382.35 275,735.29
- Paku 12 cm 5.600 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 4.000 OH #REF! #REF!
- Tukang Kayu 12.000 OH #REF! #REF!
- Kepala Tukang 1.200 OH #REF! #REF!
- Mandor 0.200 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.8 Memasang 1 m3 konstruksi gording kayu kelas I
Bahan :
- Balok Kayu Kelas I 1.100 M3 #REF! #REF!
- Besi strip tebal 5 mm 15.000 Kg 18,382.35 275,735.29
- Paku 12 cm 3.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 2.400 OH #REF! #REF!
- Tukang Kayu 7.200 OH #REF! #REF!
- Kepala Tukang 0.720 OH #REF! #REF!
- Mandor 0.120 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.9 Memasang 1 m2 Kaso + Reng Kayu Kelas I
Bahan :
- Balok Kayu Kelas I 0.014 M3 #REF! #REF!
- Paku Campur 0.150 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.100 OH #REF! #REF!
- Tukang Kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.10 Memasang 1 m2 rangka langit2, Kayu Kelas I
Bahan :
- Kayu Kelas I 0.0120 M3 #REF! #REF!
- Paku 7 cm - 10 cm 0.100 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.250 OH #REF! #REF!
- Kepala Tukang 0.025 OH #REF! #REF!
- Mandor 0.075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.12 Memasang 1 m2 rangka langit2 (60 x 120) cm2 , Kayu Kelas II
Bahan :
- Kaso 5/5 Kelas II 0.0070 M3 #REF! #REF!
- Paku 7 cm - 10 cm 0.100 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.200 OH #REF! #REF!
- Tukang Kayu 0.300 OH #REF! #REF!
- Kepala Tukang 0.030 OH #REF! #REF!
- Mandor 0.010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.11 Memasang 1 m' listplank ukuran (2,5 x 25) cm Kayu Kelas I
Bahan :
- Papan Kayu Kelas I 0.0108 M3 #REF! #REF!
- Paku 5 cm dan 7 cm 0.100 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.100 OH #REF! #REF!
- Tukang Kayu 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.14 Memasang 1 m2 rangka dinding pemisah (60 x 120) cm Kayu Kelas II
Bahan :
- Balok Kayu Kelas II 0.0280 M3 #REF! #REF!
- Paku 5 cm dan 7 cm 0.150 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
- Mandor 0.008 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.15 Memasang 1 m2 dinding pemisah tripleks rangkap, rangka kayu kelas II
Bahan :
- Balok Kayu 6 x 12 cm kelas II 0.0280 M3 #REF! #REF!
- Paku 5 cm dan 10 cm 0.150 Kg #REF! #REF!
- Tripleks 3 mm (120 x 240 cm2) 0.7000 Lbr #REF! #REF!
- Lem Kayu 0.560 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
- Mandor 0.008 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.16 Memasang 1 m2 dinding pemisah tripleks rangkap, rangka kayu kelas II
Bahan :
- Balok Kayu 6 x 12 cm kelas II 0.0280 M3 #REF! #REF!
- Paku 5 cm dan 10 cm 0.150 Kg #REF! #REF!
- Tripleks 3 mm (120 x 240 cm2) 0.7000 Lbr #REF! #REF!
- Lem Kayu 0.560 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
- Mandor 0.008 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.17 Memasang 1 m2 dinding lamberzering dari papan kayu kelas I
Bahan :
- Papan Kayu Kelas I 0.0070 M3 #REF! #REF!
- Paku 5 cm dan 10 cm 0.100 Kg #REF! #REF!
- Paku sekrup 10 cm 0.1500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.600 OH #REF! #REF!
- Tukang Kayu 1.800 OH #REF! #REF!
- Kepala Tukang 0.180 OH #REF! #REF!
- Mandor 0.030 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.18 Memasang 1 m2 dinding lamberzering dari tripleks (120 x 240) cm
Bahan :
- Tripleks 3 mm 0.4000 Lbr #REF! #REF!
- Paku tripleks 0.050 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.025 OH #REF! #REF!
- Tukang Kayu 0.075 OH #REF! #REF!
- Kepala Tukang 0.008 OH #REF! #REF!
- Mandor 0.001 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.19 Memasang 1 m2 dinding bilik, rangka kayu kelas III
Bahan :
- Bilik Bambu/Lokop 1.5000 M2 1,000.00 1,500.00
- Kaso 5/7 0.014 M3 #REF! #REF!
- Paku 0.0120 Kg #REF! #REF!
- List Kayu 2/4 0.003 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.100 OH #REF! #REF!
- Tukang Kayu 0.050 OH #REF! #REF!
- Kepala Tukang 0.005 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VI PEKERJAAN PLESTERAN SNI-2837-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
6.1 Acian
Bahan :
- Semen Portland 3.250 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
Pekerja 0.200 OH #REF! #REF!
- Tukang Batu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

6.2 Membuat 1M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm


Bahan :
- Semen Portland 10.244 Kg #REF! #REF!
- Pasir Pasang 0.020 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
Pekerja 0.300 OH #REF! #REF!
- Tukang Batu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
6.3 Membuat 1M2 Plesteran 1Pc : 3Ps Tebal 15 mm
Bahan :
- Semen Portland 7.776 Kg #REF! #REF!
- Pasir Pasang 0.023 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.300 OH #REF! #REF!
- Tukang Batu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
6.4 1M2 Plesteran 1Pc : 4 Ps Tebal 20 mm
Bahan :
- Semen Portland 8.680 Kg #REF! #REF!
Pasir Pasang 0.028 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Tukang Batu 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.012 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
6.4 1M2 Plesteran 1Pc : 5 Ps Tebal 15 mm

Bahan :
- Semen Portland 5.184 Kg #REF! #REF!
- Pasir Pasang 0.026 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.300 OH #REF! #REF!
- Tukang Batu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VII. PEKERJAAN BETON SNI:2002 edisi revisi


*) bobot isi pasir = 1400 Kg/m3, bobot isi kerikil=1350 kg/ bucking factor pasir = 20%
1M3 PASIR = 1400 kg
1 M3 Kerikil = 1350 kg
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

7.1 Membuat 1 m3 beton mutu f'c=7,4 Mpa,(K-100)


slump (12±2 cm), w/c =0,87
Bahan :
- Semen Portland 247.000 Kg #REF! #REF!
- Pasir Beton 869.000 Kg #REF! #REF!
- Kerikil max 30 mm 999.000 Kg #REF! #REF!
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.650 OH #REF! #REF!
- Tukang Batu 0.275 OH #REF! #REF!
- Kepala Tukang 0.028 OH #REF! #REF!
- Mandor 0.083 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.1 Membuat 1 m3 beton tumbuk 1 : 3 : 5 (KODE 6.2)
slump (12±2 cm), w/c =0,78
Bahan :
- Semen Portland 218.000 Kg #REF! #REF!
- Pasir Beton 0.520 M³ #REF! #REF!
- Kerikil max 30 mm 0.870 M³ 1,039,500.00 904,365.00
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 1.650 OH #REF! #REF!
Tukang Batu 0.275 OH #REF! #REF!
Kepala Tukang 0.028 OH #REF! #REF!
Mandor 0.083 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.3 Membuat 1 m3 beton mutu f'c=12,2Mpa,(K-150)
slump (12±2 cm), w/c =0,72
Bahan :
- Semen Portland 299.000 Kg #REF! #REF!
- Pasir Beton 799.000 Kg #REF! #REF!
- Kerikil max 30 mm 1017.000 Kg 1,039,500.00 1,057,171,500.00
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.650 OH #REF! #REF!
- Tukang Batu 0.250 OH #REF! #REF!
- Kepala Tukang 0.025 OH #REF! #REF!
- Mandor 0.080 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.4 Membuat 1 m3 Lantai Kerja, beton mutu f'c=7,4Mpa,(K-100)(KODE 6.4)
slump (3-6)cm , w/c =0,87
Bahan :
- Semen Portland 230.000 Kg #REF! #REF!
- Pasir Beton 893.000 Kg #REF! #REF!
- Kerikil max 30 mm 1027.000 Kg 1,039,500.00 1,067,566,500.00
- Air 200.000 Ltr 50.00 10,000.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.200 OH #REF! #REF!
- Tukang Batu 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.5 Membuat 1 m3 beton mutu f'c=14,5Mpa,(K-175) (KODE 6.5)
slump (12±2 cm), w/c =0,66
Bahan :
- Semen Portland 326.000 Kg #REF! #REF!
- Pasir Beton 760.000 Kg #REF! #REF!
- Kerikil max 30 mm 1029.000 Kg 1,039,500.00 1,069,645,500.00
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.650 OH #REF! #REF!
- Tukang Batu 0.275 OH #REF! #REF!
- Kepala Tukang 0.028 OH #REF! #REF!
- Mandor 0.083 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.6 Membuat 1 m3 beton mutu f'c=16,9Mpa,(K-200) (KODE 6.6)
slump (12±2 cm), w/c =0,61
Bahan :
- Semen Portland 352.000 Kg #REF! #REF!
- Pasir Beton 731.000 Kg #REF! #REF!
- Kerikil max 30 mm 1031.000 Kg 1,039,500.00 1,071,724,500.00
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.650 OH #REF! #REF!
- Tukang Batu 0.275 OH #REF! #REF!
- Kepala Tukang 0.028 OH #REF! #REF!
- Mandor 0.083 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.2 Membuat 1 m3 beton mutu f'c=19,3Mpa,(K-225)
slump (12±2 cm), w/c =0,58
Bahan :
- Semen Portland 388.000 Kg #REF! #REF!
- Pasir Beton 0.650 M³ #REF! #REF!
- Kerikil max 30 mm 0.650 M³ 1,039,500.00 675,675.00
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 6.000 OH #REF! #REF!
- Tukang Batu 1.000 OH #REF! #REF!
- Kepala Tukang 0.100 OH #REF! #REF!
- Mandor 0.300 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.4 Pembesian 1 Kg dengan besi polos 8 mm
Bahan :
Besi beton 8 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.5 Pembesian 1 Kg dengan besi polos 10 mm
Bahan :
Besi beton 10 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.6 Pembesian 1 Kg dengan besi polos 12 mm
Bahan :
Besi beton 12 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.6 Pembesian 1 Kg dengan besi ulir 12 mm
Bahan :
Besi beton 12 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.7 1 M2 Pasang bekesting untuk sloof
Bahan :
Kayu bekisting klas III 0.045 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.300 Kg #REF! #REF!
Minyak bekesting 0.100 Ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Kayu 0.260 OH #REF! #REF!
Kepala Tukang 0.026 OH #REF! #REF!
Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.8 1 M2 Pasang bekesting untuk pondasi
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.300 Kg #REF! #REF!
Minyak bekesting 0.100 ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Kayu 0.260 OH #REF! #REF!
Kepala Tukang 0.026 OH #REF! #REF!
Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.9 1 M2 Pasang bekesting untuk kolom
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.400 Kg #REF! #REF!
Minyak bekesting 0.200 Lt #REF! #REF!
Balok Kelas III 0.015 m3 #REF! #REF!
Tripleks 3 mm 0.350 Lbr #REF! #REF!
Dolken kayu galam ø-8- 10/4 m 2.000 Btg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.3000 OH #REF! #REF!
Tukang Kayu 0.3300 OH #REF! #REF!
Kepala Tukang 0.0330 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.10 1 M2 Pasang bekesting untuk balok Kode : 6.23
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.400 Kg #REF! #REF!
Minyak bekesting 0.200 Lt #REF! #REF!
Balok Kelas III 0.018 m3 #REF! #REF!
Tripleks 3 mm 0.350 Lbr #REF! #REF!
Dolken kayu galam ø-8- 10/4 m 2.000 Btg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.3200 OH #REF! #REF!
Tukang Kayu 0.3300 OH #REF! #REF!
Kepala Tukang 0.0330 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.11 1 M2 Pasang bekesting untuk plat Lantai Kode : 6.24
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.400 Kg #REF! #REF!
Minyak bekesting 0.200 Lt #REF! #REF!
Balok Kelas III 0.015 m3 #REF! #REF!
Tripleks 3 mm 0.350 Lbr #REF! #REF!
Dolken kayu galam ø-8- 10/4 m 6.000 Btg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.3200 OH #REF! #REF!
Tukang Kayu 0.3300 OH #REF! #REF!
Kepala Tukang 0.0330 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VIII. PEKERJAAN PENUTUP ATAP SNI-2000

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

8.1 1 M2 Pasang Atap Seng Gelombang


Bahan
- Seng Gelombang Bj.Ls 0.2 0.700 Lbr #REF! #REF!
- Paku Seng 0.020 Kg #REF! #REF!
Tenaga A. JUMLAH HARGA BAHAN #REF!
- Pekerja 0.120 OH #REF! #REF!
- Tukang Kayu 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
8.2 1 M2 Pasang Atap Nok Seng
Bahan
- Seng Plat Bj.Ls 20 0.300 Lbr #REF! #REF!
- Paku Seng 0.040 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.070 OH #REF! #REF!
- Kepala Tukang 0.008 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
8.3 1 M2 Pasang Atap Multiroof
Bahan
- Atap Multiroof 1.250 Lbr #REF! #REF!
- Paku Seng 0.020 Kg #REF! #REF!
Tenaga A. JUMLAH HARGA BAHAN #REF!
- Pekerja 0.120 OH #REF! #REF!
- Tukang Kayu 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
8.4 1 M2 Pasang Atap Nok Multiroof
Bahan
- Nok Multiroof 1.100 Lbr #REF! #REF!
- Paku Seng 0.040 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.070 OH #REF! #REF!
- Kepala Tukang 0.008 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

IX PEKERJAAN LANGIT - LANGIT SNI 2839 :2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
9.1 1 M2 Langit - Langit Tripleks ukuran (60 x 120) cm tebal 3,4 dan 6 mm
Bahan
- Tripleks 3 mm 0.375 Lbr #REF! #REF!
- Paku Tripleks 0.030 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.070 OH #REF! #REF!
- Tukang Kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.0035 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
9.2 1 M' List Langit - Langit Kayu Profil 6.10
Bahan
- List Kayu Profil 1.050 M #REF! #REF!
- Paku 0.010 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.050 OH #REF! #REF!
- Tukang Kayu 0.050 OH #REF! #REF!
- Kepala Tukang 0.005 OH #REF! #REF!
- Mandor 0.003 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

X. PEKERJAAN SANITASI T-15-2002

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
10.1 Memasang 1 buah Kloset jongkok KIA
Bahan
- Kloset jongkok KIA 1.000 Bh #REF! #REF!
- Batu Bata 5 x 11 x 22 7.000 Bh #REF! #REF!
- Semen portland 6.000 Kg #REF! #REF!
- Pasir Pasang 0.010 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 1.000 OH #REF! #REF!
- Tukang Batu 1.500 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.110 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.7 Memasang 1 M' Pipa Galvanis diameter 1/2 "
Bahan
- Pipa Galvanis 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.7 Memasang 1 M' Pipa Galvanis diameter 3/4 "
Bahan
- Pipa Galvanis 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.8 Memasang 1 M' Pipa Galvanis diameter 1 "


Bahan
- Pipa Galvanis 1.200 1,2 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.9 Memasang 1 M' Pipa Galvanis diameter 1 1/2 "


Bahan
- Pipa Galvanis 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.108 OH #REF! #REF!
- Tukang Pipa 0.180 OH #REF! #REF!
- Kepala Tukang 0.018 OH #REF! #REF!
- Mandor 0.0054 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.10 Memasang 1 M' Pipa Galvanis diameter 3"


Bahan
- Pipa Galvanis 1.200 1,2 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.108 OH #REF! #REF!
- Tukang Pipa 0.180 OH #REF! #REF!
- Kepala Tukang 0.018 OH #REF! #REF!
- Mandor 0.0054 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.11 Memasang 1 M' Pipa Galvanis diameter 2 "


Bahan
- Pipa Galvanis 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.108 OH #REF! #REF!
- Tukang Pipa 0.180 OH #REF! #REF!
- Kepala Tukang 0.018 OH #REF! #REF!
- Mandor 0.0054 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.12 Memasang 1 M' Pipa PVC tipe AW diameter 1/2 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.036 OH #REF! #REF!
- Tukang Pipa 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0018 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.13 Memasang 1 M' Pipa PVC tipe AW diameter 3/4 "
Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.036 OH #REF! #REF!
- Tukang Pipa 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0018 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.14 Memasang 1 M' Pipa PVC tipe AW diameter 1 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.036 OH #REF! #REF!
- Tukang Pipa 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0018 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.15 Memasang 1 M' Pipa PVC tipe AW diameter 1 1/2 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.036 OH #REF! #REF!
- Tukang Pipa 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0018 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.16 Memasang 1 M' Pipa PVC tipe AW diameter 2 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.0027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.17 Memasang 1 M' Pipa PVC tipe AW diameter 2 1/2 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.036 OH #REF! #REF!
- Tukang Pipa 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0018 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.18 Memasang 1 M' Pipa PVC tipe AW diameter 3 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.081 OH #REF! #REF!
- Tukang Pipa 0.135 OH #REF! #REF!
- Kepala Tukang 0.0135 OH #REF! #REF!
- Mandor 0.0041 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.19 Memasang 1 M' Pipa PVC tipe AW diameter 4 "


Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.081 OH #REF! #REF!
- Tukang Pipa 0.135 OH #REF! #REF!
- Kepala Tukang 0.0135 OH #REF! #REF!
- Mandor 0.0041 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.20 Memasang 1 buah Kran diameter 3/4" atau 1/2"


Bahan
- Kran Air 1.000 Bh #REF! #REF!
- Seal Tape 0.025 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang Pipa 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

10.21 Memasang 1 buah Floor Drain


Bahan
- Floor Drain 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang Pipa 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

XI. PEKERJAAN BESI DAN ALUMINIUM AN 7393 SNI -2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
11.1 Mengerjakan Pengelasan 10 cm dengan Las Listrik KODE:
Bahan
- Kawat Las 0.400 Kg #REF! #REF!
Solar 0.300 Ltr #REF! #REF!
Minyak Pelumas 0.040 Ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.040 OH #REF! #REF!
Tukang Besi Konstruksi 0.020 OH #REF! #REF!
- Kepala Tukang 0.002 OH #REF! #REF!
- Mandor 0.0020 OH #REF! #REF!
Sewa alat Las 0.1700 Jam 1,000.00 170.00
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

11.2 1M2 Pasang Terali Besi Strip (2 x 3) mm KODE:


Bahan
- Besi Strip 11.500 Kg #REF! #REF!
Pengelasan 6.770 CM #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 1.200 OH #REF! #REF!
- Tulang Las 1.200 OH #REF! #REF!
- Kepala Tukang 0.012 OH #REF! #REF!
- Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

11.3 Memasang 1 m2 kawat nyamuk Alumunium Tebal KODE:


Bahan
- Kawat Nyamuk 1.100 M² #REF! #REF!
Paku Biasa 0.020 Kg #REF! #REF!
- Papan Kayu Kelas I 0.020 M³ #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Tukang Las 1.200 OH #REF! #REF!
- Pekerja 1.200 OH #REF! #REF!
- Kepala Tukang 0.012 OH #REF! #REF!
- Mandor 0.0010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
11.4 Memasang 1 m2 jendela nako dan tralis KODE:
Bahan
- Jendela Nako ( rangka+kaca 5 mm) 1.100 m2 #REF! #REF!
Paku sekrup 1 cm - 2,5 cm 10.000 buah 500.00 5,000.00
- Besi Strip 7.000 m' #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.200 OH #REF! #REF!
- Tukang 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.0010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

11.5 Memasang 1 m' talang Datar/Jurai seng bjls 28 lebar 90 cm


Bahan
- Seng Plat 1.050 m' #REF! #REF!
Paku 1 cm - 2,5 cm 0.015 Kg #REF! #REF!
- Papan Kayu Kelas II 0.019 m3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.200 OH #REF! #REF!
- Tukang 0.400 OH #REF! #REF!
- Kepala Tukang 0.025 OH #REF! #REF!
- Mandor 0.0100 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

11.6 Memasang 1 m' talang 1/2 Lingkaran D-15 cm, seng Plat Bj.30 Lebar 45 cm
Bahan
- Seng Plat 1.050 m' #REF! #REF!
Paku 1 cm - 2,5 cm 0.010 buah #REF! #REF!
- Besi strip 0.500 m3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.150 OH #REF! #REF!
- Tukang 0.300 OH #REF! #REF!
- Kepala Tukang 0.030 OH #REF! #REF!
- Mandor 0.0080 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

11.7 Memasang 1 m' talang Datar/Jurai seng bjls 20 lebar 45 cm


Bahan
- Seng Plat 1.050 m' #REF! #REF!
Paku 1 cm - 2,5 cm 0.015 Kg #REF! #REF!
- Papan Kayu Kelas II 0.019 m3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.200 OH #REF! #REF!
- Tukang 0.400 OH #REF! #REF!
- Kepala Tukang 0.025 OH #REF! #REF!
- Mandor 0.0100 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

XII PEKERJAAN KUNCI DAN KACA SNI T-30-2000-C

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

12.1 1 pasang kunci tanam Biasa


Bahan
- Kunci Tanam Biasa 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang kayu 0.500 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

12.2 1 pasang kunci tanam Kamar mandi


Bahan
- Kunci Tanam Kamar Mandi 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.005 OH #REF! #REF!
- Tukang kayu 0.500 OH #REF! #REF!
- Kepala Tukang 0.005 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

12.3 1 pasang Engsel Pintu


Bahan
- Engsel Pintu 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

12.4 1 pasang Engsel Jendela Kupu - Kupu


Bahan
- Engsel Jendela 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.0005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

12.5 1 Pasang Gerendel Pintu


Bahan
- Gerendel Pintu 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

12.6 1 buah Pasang Gerendel Jendela


Bahan
- Gerendel Jendela 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

13 PEKERJAAN PENGECATAN SNI T-38-2000-C

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
13.1 1 M2 pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar 2 lapis cat penutup
Bahan
- Cat meni 0.200 Kg #REF! #REF!
- Plamir 0.150 Kg #REF! #REF!
- Cat dasar 0.170 Kg 50,000.00 8,500.00
- Cat penutup 2 kali 0.260 Kg 50,000.00 13,000.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.070 OH #REF! #REF!
- Tukang Cat 0.009 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

13.2 1 M2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
- Plamir 0.100 Kg #REF! #REF!
- Cat dasar 0.100 Kg #REF! #REF!
- Cat penutup 2 x 0.260 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.020 OH #REF! #REF!
- Tukang Cat 0.063 OH #REF! #REF!
- Kepala Tukang 0.0063 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

13.3 1 M2 pelaburan bidang kayu dengan teak oil


Bahan
- Teak oil 0.360 Ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.040 OH #REF! #REF!
- Tukang Cat 0.063 OH #REF! #REF!
- Kepala Tukang 0.063 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

13.4 1 M2 pelaburan bidang kayu dengan politur


Bahan
- Politur 0.150 Kg #REF! #REF!
- Politur jadi 0.372 Kg #REF! #REF!
- Ampelas 2.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.000 OH #REF! #REF!
- Tukang Cat 0.060 OH #REF! #REF!
- Kepala Tukang 0.016 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

1 2 3 4 5 6

13.5 1 M2 pelaburan bidang kayu dengan cat residu dan ter


Bahan
- Residu atau ter 0.350 Ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.100 OH #REF! #REF!
- Tukang Cat 0.000 OH #REF! #REF!
- Kepala Tukang 0.000 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
13.6 1 M2 pengecatan permukaan baja dengan meni besi
Bahan
Meni besi 0.1000 Kg 40,000.00 4,000.00
Kuas 0.0100 Bh 25,000.00 250.00
A. JUMLAH HARGA BAHAN 4,250.00
tenaga
Pekerja 0.0200 OH #REF! #REF!
Tukang Cat 0.2000 OH #REF! #REF!
Kepala Tukang 0.0200 OH #REF! #REF!
Mandor 0.0100 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
13.7 1 M2 pengecatan permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat
Mutakhir dengan tebal 200 um.
Bahan
Cat 0.3000 Kg 50,000.00 15,000.00
A. JUMLAH HARGA BAHAN 15,000.00
Tenaga
Pekerja 0.0060 OH #REF! #REF!
Tukang Cat 0.0600 OH #REF! #REF!
Kepala Tukang 0.0120 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
14 PEKERJAAN PENUTUP LANTAI DAN DINDING SNI 7395 2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
14.1 Memasang 1 m2 lantai keramik ukaran (30 x 30) cm 6.35
Bahan
- Keramik 1.000 Dos #REF! #REF!
- PC 10.000 Kg #REF! #REF!
- Pasir Pasang 0.045 m3 #REF! #REF!
- Semen Warna 1.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.700 OH #REF! #REF!
- Tukang Batu 0.350 OH #REF! #REF!
- Kepala Tukang 0.035 OH #REF! #REF!
- Mandor 0.0350 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
14.2 Memasang 1 m2 lantai keramik ukaran (20 x 20) cm
Bahan
- Ubin Keramik 1.000 Dos #REF! #REF!
- PC 10.400 Kg #REF! #REF!
- Pasir Pasang 0.0450 M3 #REF! #REF!
Semen Warna 1.6200 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
- Tenaga
- Pekerja 0.700 OH #REF! #REF!
- Tukang Batu 0.350 OH #REF! #REF!
- Kepala Tukang 0.0350 OH #REF! #REF!
Mandor 0.035 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

14.3 Memasang 1 m' lantai plint keramik ukaran (10 x 20) cm


Bahan
- Plint Keramik artistik 0.100 Dos #REF! #REF!
- PC 1.140 Kg #REF! #REF!
- Pasir Pasang 0.0030 M3 #REF! #REF!
Semen Warna 0.0250 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
- Tenaga
- Pekerja 0.0900 OH #REF! #REF!
- Tukang Batu 0.0900 OH #REF! #REF!
- Kepala Tukang 0.0090 OH #REF! #REF!
Mandor 0.0050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

14.4 Memasang 1 m2 dinding keramik ukuran (10 x 20 ) cm 6.53


Bahan
- Keramik 1.000 Dos #REF! #REF!
- Semen Portland 9.300 Kg #REF! #REF!
- Pasir Pasang 0.0018 M3 #REF! #REF!
- Semen Warna 2.750 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.900 OH #REF! #REF!
- Tukang Batu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
- Mandor 0.0450 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

14.5 Memasang 1 m2 dinding keramik ukuran (20 x 20 ) cm


Bahan
- Keramik 1.000 Dos #REF! #REF!
- Semen Portland 9.300 Kg #REF! #REF!
- Pasir Pasang 0.0018 M3 #REF! #REF!
- Semen Warna 1.940 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.900 OH #REF! #REF!
- Tukang Batu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
- Mandor 0.0450 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

14.6 Memasang 1 m2 dinding keramik ukuran (20 x 25 ) cm


Bahan
- Keramik 1.0000 Dos #REF! #REF!
- Semen Portland 9.3000 Kg #REF! #REF!
- Pasir Pasang 0.0018 M3 #REF! #REF!
- Semen Warna 1.9400 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.9000 OH #REF! #REF!
- Tukang Batu 0.4500 OH #REF! #REF!
- Kepala Tukang 0.0450 OH #REF! #REF!
- Mandor 0.0450 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
SUMBER: KUMPULAN ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN (EDISI REVISI)- PENERBIT BSN
ANALISA HARGA SATUAN SNI-STANDAR (BADAN STANDARISASI NAS)
I. PEKERJAAN PENDAHULUAN ANALISA BIAYA KONSTRUKSI (ABK)

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6

1.1 1 m1 Pengukuran dan pemasangan bouwplank


Bahan :
- Kayu 5/7, kayu bekisting Kelas III 0.012 M3 #REF! #REF!
- Paku Biasa 2" - 5" 0.020 Kg #REF! #REF!
- Kayu Papan 3/20 kelas III 0.007 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Tukang Kayu 0.100 OH #REF! #REF!
- Pekerja 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

II. PEKERJAAN TANAH SNI:2535:2008

NO. URAIAN PEKERJAAN INDEKS SATUAN HARGA SATUAN JUMLAH HARGA


( Rp ) ( Rp )
1 2 3 4 5 6

2.1 Menggali 1 m3 Tanah Biasa sedalam 1 m


Tenaga :
- Pekerja 0.750 OH #REF! #REF!
- Mandor 0.0250 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
2.2 1 m3 Urugan Kembali (DIHITUNG1/3 INDEKS)
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Mandor 0.008 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
2.3 Menguruk 1 m3 Sirtu untuk Peninggian Lantai Bangunan
Bahan :
- Sirtu 1.200 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Mandor 0.025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

III. PEKERJAAN PONDASI SNI:2538:2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
3.1 Memasang 1 m3 Pondasi batu kali, 1 Pc : 5 Ps

Bahan :
- Batu Kali 1.200 M3 #REF! #REF!
- Semen Portland 136.000 Kg #REF! #REF!
- Pasir Pasang 0.544 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.500 OH #REF! #REF!
- Tukang Batu 0.750 OH #REF! #REF!
- Kepala Tukang 0.075 OH #REF! #REF!
- Mandor 0.075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
3.2. Memasang 1 M3 batu kosong (ANSTAMPING)
Bahan :
- batu kali 1.200 M3 #REF! #REF!
- Pasir urug 0.432 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.780 OH #REF! #REF!
- Tukang Batu 0.390 OH #REF! #REF!
- Kepala Tukang 0.039 OH #REF! #REF!
- Mandor 0.039 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

IV. PEKERJAAN DINDING SNI-6897-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
4.1 1 m2 Pasang dinding Batu Tela 1:4 (1/2 BT)
(8 cm x 14 cm x 28 cm)
Bahan :
- Batu Tela 22.000 Bh #REF! #REF!
- Semen Portland 8.030 Kg #REF! #REF!
- Pasir pasang 0.026 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.300 OH #REF! #REF!
- Tukang Batu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
4.5 Memasang 1 m2 dinding bata merah tebal 1/2 bata, 1 Pc : 5 Ps
(Ukuran Batu Bata Merah 5 cm x 11 cm x 22 cm)
Bahan :
Bata Merah 5x11x22xCm 55.000 Bh #REF! #REF!
Semen Portland 9.680 Kg #REF! #REF!
Pasir Pasang 0.045 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Batu 0.100 OH #REF! #REF!
Kepala Tukang 0.010 OH #REF! #REF!
Mandor 0.015 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

V. PEKERJAAN KAYU SNI-3434-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
5.1 Membuat dan Memasang 1 m2 Daun Pintu Paneel, Kayu Kelas I
Bahan :
- Papan Kayu Kelas I 0.040 M3 #REF! #REF!
- Lem Kayu 0.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.000 OH #REF! #REF!
- Tukang Kayu 3.000 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.2 Memasang 1 m2 Jalusi Kusen, kayu kelas II
Bahan :
- Papan Kayu Kelas II 0.060 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm 0.150 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.670 OH #REF! #REF!
- Tukang Kayu 2.000 OH #REF! #REF!
- Kepala Tukang 0.200 OH #REF! #REF!
- Mandor 0.335 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.3 Membuat 1 m2 daun pintu kayu lapis (tripleks) rangkap, rangka tertutup kayu kelas I (lebar sampai dengan 90 cm)
Bahan :
- Papan Kayu Kelas I 0.025 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm (paku tripleks) 0.300 Kg #REF! #REF!
- Lem Kayu 0.500 M3 #REF! #REF!
- Tripleks 3 mm 0.700 Lbr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.700 OH #REF! #REF!
- Tukang Kayu 2.100 OH #REF! #REF!
- Kepala Tukang 0.210 OH #REF! #REF!
- Mandor 0.035 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.4 Memasang 1 m2 Tripleks Rangkap Lapis Sengplat, expose kayu kelas I
Bahan :
- Papan Kayu Kelas I 0.020 M3 #REF! #REF!
- Paku 1 cm - 2,5 cm 0.030 Kg #REF! #REF!
- Lem Kayu 0.800 Kg #REF! #REF!
- Tripleks 3 mm 1.000 Lbr #REF! #REF!
- Sengplat 1.000 Lbr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.800 OH #REF! #REF!
- Tukang Kayu 2.500 OH #REF! #REF!
- Kepala Tukang 0.250 OH #REF! #REF!
- Mandor 0.040 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.5 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 m
Bahan :
- Balok Kayu Kelas I 1.100 M3 #REF! #REF!
- Besi strip tebal 5 mm 15.000 Kg 18,382.35 275,735.29
- Paku 12 cm 5.600 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 4.000 OH #REF! #REF!
- Tukang Kayu 12.000 OH #REF! #REF!
- Kepala Tukang 1.200 OH #REF! #REF!
- Mandor 0.200 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.6 Memasang 1 m3 konstruksi gording kayu kelas I
Bahan :
- Balok Kayu Kelas I 1.100 M3 #REF! #REF!
- Besi strip tebal 5 mm 15.000 Kg 18,382.35 275,735.29
- Paku 12 cm 3.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 2.400 OH #REF! #REF!
- Tukang Kayu 7.200 OH #REF! #REF!
- Kepala Tukang 0.720 OH #REF! #REF!
- Mandor 0.120 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.7 Memasang 1 m2 Kaso + Reng Kayu Kelas I
Bahan :
- Balok Kayu Kelas I 0.014 M3 #REF! #REF!
- Paku Campur 0.150 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.100 OH #REF! #REF!
- Tukang Kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.8 Memasang 1 m2 rangka langit2 (60 x 120) cm2 , Kayu Kelas II
Bahan :
- Kaso 5/5 Kelas II 0.0070 M3 #REF! #REF!
- Paku 7 cm - 10 cm 0.100 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.200 OH #REF! #REF!
- Tukang Kayu 0.300 OH #REF! #REF!
- Kepala Tukang 0.030 OH #REF! #REF!
- Mandor 0.010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
5.9 Memasang 1 m1 listplank ukuran (2,5 x 25) cm Kayu Kelas I
Bahan :
- Papan Kayu Kelas I 0.0108 M3 #REF! #REF!
- Paku 5 cm dan 7 cm 0.100 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.100 OH #REF! #REF!
- Tukang Kayu 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.050 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VI PEKERJAAN PLESTERAN SNI-2837-2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
6.1 Acian
Bahan :
- Semen Portland 3.250 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
Pekerja 0.200 OH #REF! #REF!
- Tukang Batu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.010 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
6.2 1 m2 Plesteran 1Pc : 4 Ps Tebal 20 mm Kode : 6.4
Bahan :
- Semen Portland 8.680 Kg #REF! #REF!
Pasir Pasang 0.028 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 0.250 OH #REF! #REF!
- Tukang Batu 0.200 OH #REF! #REF!
- Kepala Tukang 0.020 OH #REF! #REF!
- Mandor 0.012 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VII. PEKERJAAN BETON SNI:2002 edisi revisi


*) bobot isi pasir = 1400 Kg/m3, bobot isi kerikil=1350 kg/m3 bucking factor pasir = 20%
1 m3 PASIR = 1400 kg
1 m3 Kerikil = 1350 kg
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
7.1 Membuat 1 m3 beton tumbuk 1 : 3 : 5
slump (12±2 cm), w/c =0,78
Bahan :
- Semen Portland 218.000 Kg #REF! #REF!
- Pasir Beton 0.520 M³ #REF! #REF!
- Kerikil max 30 mm 0.870 M³ #REF! #REF!
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 1.650 OH #REF! #REF!
- Tukang Batu 0.275 OH #REF! #REF!
- Kepala Tukang 0.028 OH #REF! #REF!
- Mandor 0.083 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.2 Membuat 1 m3 beton mutu f'c=19,3Mpa,(K-225)
slump (12±2 cm), w/c =0,58
Bahan :
- Semen Portland 388.000 Kg #REF! #REF!
- Pasir Beton 0.650 M³ #REF! #REF!
- Kerikil max 30 mm 0.650 M³ #REF! #REF!
- Air 215.000 Ltr 50.00 10,750.00
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
- Pekerja 6.000 OH #REF! #REF!
- Tukang Batu 1.000 OH #REF! #REF!
- Kepala Tukang 0.100 OH #REF! #REF!
- Mandor 0.300 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.3 Pembesian 1 Kg dengan besi polos 8 mm
Bahan :
Besi beton 8 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.4 Pembesian 1 Kg dengan besi polos 10 mm
Bahan :
Besi beton 10 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.5 Pembesian 1 Kg dengan besi polos 12 mm
Bahan :
Besi beton 12 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.6 Pembesian 1 Kg dengan besi ulir 12 mm
Bahan :
Besi beton 12 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.7 Pembesian 1 Kg dengan besi ulir 16 mm
Bahan :
Besi beton 16 MM 1.050 Kg #REF! #REF!
Kawat beton 0.015 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.007 OH #REF! #REF!
Tukang besi 0.007 OH #REF! #REF!
Kepala Tukang 0.0007 OH #REF! #REF!
Mandor 0.0004 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.8 1 m2 Pasang bekesting untuk sloof
Bahan :
Kayu bekisting klas III 0.045 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.300 Kg #REF! #REF!
Minyak bekesting 0.100 Ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Kayu 0.260 OH #REF! #REF!
Kepala Tukang 0.026 OH #REF! #REF!
Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.9 1 m2 Pasang bekesting untuk pondasi
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.300 Kg #REF! #REF!
Minyak bekesting 0.100 ltr #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.300 OH #REF! #REF!
Tukang Kayu 0.260 OH #REF! #REF!
Kepala Tukang 0.026 OH #REF! #REF!
Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.10 1 m2 Pasang bekesting untuk kolom
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.400 Kg #REF! #REF!
Minyak bekesting 0.200 Lt #REF! #REF!
Balok Kelas III 0.015 m3 #REF! #REF!
Tripleks 3 mm 0.350 Lbr #REF! #REF!
Dolken kayu galam ø-8- 10/4 m 2.000 Btg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.3000 OH #REF! #REF!
Tukang Kayu 0.3300 OH #REF! #REF!
Kepala Tukang 0.0330 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
7.11 1 m2 Pasang bekesting untuk balok
Bahan :
Kayu bekisting klas III 0.040 M3 #REF! #REF!
Paku biasa 5 cm - 10 cm 0.400 Kg #REF! #REF!
Minyak bekesting 0.200 Lt #REF! #REF!
Balok Kelas III 0.018 m3 #REF! #REF!
Tripleks 3 mm 0.350 Lbr #REF! #REF!
Dolken kayu galam ø-8- 10/4 m 2.000 Btg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga :
Pekerja 0.3200 OH #REF! #REF!
Tukang Kayu 0.3300 OH #REF! #REF!
Kepala Tukang 0.0330 OH #REF! #REF!
Mandor 0.0060 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

VIII. PEKERJAAN PENUTUP ATAP SNI-2000

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
8.1 1 m2 Pasang Atap Multiroof
Bahan
- Atap Multiroof 1.250 Lbr #REF! #REF!
- Paku Seng 0.020 Kg #REF! #REF!
Tenaga A. JUMLAH HARGA BAHAN #REF!
- Pekerja 0.120 OH #REF! #REF!
- Tukang Kayu 0.060 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
8.2 1 m2 Pasang Atap Nok Multiroof
Bahan
- Nok Multiroof 1.100 Lbr #REF! #REF!
- Paku Seng 0.040 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.150 OH #REF! #REF!
- Tukang Kayu 0.070 OH #REF! #REF!
- Kepala Tukang 0.008 OH #REF! #REF!
- Mandor 0.006 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

IX PEKERJAAN LANGIT - LANGIT SNI 2839 :2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
9.1 1 m2 Langit - Langit Tripleks ukuran (60 x 120) cm tebal 3,4 dan 6 mm
Bahan
- Tripleks 3 mm 0.375 Lbr #REF! #REF!
- Paku Tripleks 0.030 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.070 OH #REF! #REF!
- Tukang Kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.0035 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
9.2 1 m1 List Langit - Langit Kayu Profil 6.10
Bahan
- List Kayu Profil 1.050 M #REF! #REF!
- Paku 0.010 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.050 OH #REF! #REF!
- Tukang Kayu 0.050 OH #REF! #REF!
- Kepala Tukang 0.005 OH #REF! #REF!
- Mandor 0.003 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

X. PEKERJAAN SANITASI T-15-2002

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
10.1 Memasang 1 buah Kloset jongkok
Bahan
- Kloset jongkok 1.000 Bh #REF! #REF!
- Batu Bata 5 x 11 x 22 7.000 Bh #REF! #REF!
- Semen portland 6.000 Kg #REF! #REF!
- Pasir Pasang 0.010 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 1.000 OH #REF! #REF!
- Tukang Batu 1.500 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.110 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.2 Memasang 1 buah Kloset Duduk
Bahan
- Kloset Duduk 1.000 Bh #REF! #REF!
- Perlengkapan 6%Harga Kloset #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 1.000 OH #REF! #REF!
- Tukang Batu 1.500 OH #REF! #REF!
- Kepala Tukang 0.300 OH #REF! #REF!
- Mandor 0.110 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.3 Memasang 1 Buah Wastafel
Bahan
Wastafel 1.000 Bh #REF! #REF!
Perlengkapan 12%Harga Washtafel #REF! #REF!
Semen Abu - Abu 6.000 Kg #REF! #REF!
Pasir Pasang 0.010 M3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
Pekerja 1.200 OH #REF! #REF!
Tukang Batu 1.450 OH #REF! #REF!
Kepala Tukang 0.150 OH #REF! #REF!
Mandor 0.100 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.4 Memasang 1 m1 Pipa Galvanis diameter 3/4 "
Bahan
- Pipa Galvanis 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.5 Memasang 1 m1 Pipa Galvanis diameter 1 "
Bahan
- Pipa Galvanis 1.200 1,2 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.054 OH #REF! #REF!
- Tukang Pipa 0.090 OH #REF! #REF!
- Kepala Tukang 0.009 OH #REF! #REF!
- Mandor 0.027 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.6 Memasang 1 M' Pipa PVC tipe AW diameter 4 "
Bahan
- Pipa PVC 1.200 M' #REF! #REF!
- Perlengkapan 35% Harga Pipa #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.081 OH #REF! #REF!
- Tukang Pipa 0.135 OH #REF! #REF!
- Kepala Tukang 0.0135 OH #REF! #REF!
- Mandor 0.0041 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.7 Memasang 1 buah Kran diameter 3/4" atau 1/2"
Bahan
- Kran Air 1.000 Bh #REF! #REF!
- Seal Tape 0.025 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang Pipa 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.8 Memasang 1 buah Floor Drain
Bahan
- Floor Drain 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang Pipa 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
10.9 Memasang 1 buah Bak Cuci Piring Stainles steel
Bahan
Bak cuci stainless steel 1.000 Bh #REF! #REF!
Water drain + asesories 1.000 Set #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
Pekerja 0.030 OH #REF! #REF!
Tukang Pipa 0.300 OH #REF! #REF!
Kepala Tukang 0.030 OH #REF! #REF!
Mandor 0.002 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

XI. PEKERJAAN BESI DAN ALUMINIUM AN 7393 SNI -2008

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
11.1 Memasang 1 m1 talang Datar/Jurai seng bjls 20 lebar 45 cm
Bahan
- Seng Plat 1.050 m' #REF! #REF!
Paku 1 cm - 2,5 cm 0.015 Kg #REF! #REF!
- Papan Kayu Kelas II 0.019 m3 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.200 OH #REF! #REF!
- Tukang 0.400 OH #REF! #REF!
- Kepala Tukang 0.025 OH #REF! #REF!
- Mandor 0.0100 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

XII PEKERJAAN KUNCI DAN KACA SNI T-30-2000-C

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
12.1 1 pasang kunci tanam Biasa
Bahan
- Kunci Tanam Biasa 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang kayu 0.500 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
12.2 1 pasang kunci tanam Kamar mandi
Bahan
- Kunci Tanam Kamar Mandi 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.005 OH #REF! #REF!
- Tukang kayu 0.500 OH #REF! #REF!
- Kepala Tukang 0.005 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
12.3 1 pasang Engsel Pintu
Bahan
- Engsel Pintu 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
12.4 1 pasang Engsel Jendela Kupu - Kupu
Bahan
- Engsel Jendela 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.010 OH #REF! #REF!
- Tukang kayu 0.100 OH #REF! #REF!
- Kepala Tukang 0.010 OH #REF! #REF!
- Mandor 0.0005 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
12.5 1 Pasang Gerendel Pintu
Bahan
- Gerendel Pintu 1.000 Bh #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
12.6 1 m2 Memasang kaca Tebal 5 mm
Bahan
- Kaca tebal 5 mm 1.100 M2 #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.015 OH #REF! #REF!
- Tukang kayu 0.150 OH #REF! #REF!
- Kepala Tukang 0.015 OH #REF! #REF!
- Mandor 0.00075 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

13 PEKERJAAN PENGECATAN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
13.1 1 m2 pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar 2 lapis cat penutup
Bahan
- Cat meni 0.200 Kg #REF! #REF!
- Plamir 0.150 Kg #REF! #REF!
- Cat dasar 0.170 Kg - -
- Cat penutup 2 kali 0.260 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.070 OH #REF! #REF!
- Tukang Cat 0.009 OH #REF! #REF!
- Kepala Tukang 0.006 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
13.2 1 m2 pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Bahan
- Plamir 0.100 Kg #REF! #REF!
- Cat dasar 0.100 Kg #REF! #REF!
- Cat penutup 2 x 0.260 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.020 OH #REF! #REF!
- Tukang Cat 0.063 OH #REF! #REF!
- Kepala Tukang 0.0063 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
13.3 1 m2 pelaburan bidang kayu dengan politur
Bahan
- Politur 0.150 Kg #REF! #REF!
- Politur jadi 0.372 Kg #REF! #REF!
- Ampelas 2.000 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.000 OH #REF! #REF!
- Tukang Cat 0.060 OH #REF! #REF!
- Kepala Tukang 0.016 OH #REF! #REF!
- Mandor 0.0025 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
14 PEKERJAAN PENUTUP LANTAI DAN DINDING

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN INDEKS SATUAN
( Rp ) ( Rp )
1 2 3 4 5 6
14.1 Memasang 1 m2 lantai keramik ukaran (30 x 30) cm
Bahan
- Keramik 1.000 Dos #REF! #REF!
- PC 10.000 Kg #REF! #REF!
- Pasir Pasang 0.045 m3 #REF! #REF!
- Semen Warna 1.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.700 OH #REF! #REF!
- Tukang Batu 0.350 OH #REF! #REF!
- Kepala Tukang 0.035 OH #REF! #REF!
- Mandor 0.0350 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!

1 2 3 4 5 6
14.2 Memasang 1 m2 lantai keramik ukaran (20 x 20) cm
Bahan
- Ubin Keramik 1.000 Dos #REF! #REF!
- PC 9.300 Kg #REF! #REF!
- Pasir Pasang 0.0018 M3 #REF! #REF!
Semen Warna 1.940 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
- Tenaga
- Pekerja 0.900 OH #REF! #REF!
- Tukang Batu 0.450 OH #REF! #REF!
- Kepala Tukang 0.045 OH #REF! #REF!
Mandor 0.0450 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
14.3 Memasang 1 m2 dinding keramik ukuran (20 x 25 ) cm
Bahan
- Keramik 1.0000 Dos #REF! #REF!
- Semen Portland 9.3000 Kg #REF! #REF!
- Pasir Pasang 0.0018 M3 #REF! #REF!
- Semen Warna 1.9400 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.9000 OH #REF! #REF!
- Tukang Batu 0.4500 OH #REF! #REF!
- Kepala Tukang 0.0450 OH #REF! #REF!
- Mandor 0.0450 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
14.5 Memasang 1 m2 lantai keramik ukaran (40 x 40) cm
Bahan
- Keramik 1.000 Dos #REF! #REF!
- PC 10.000 Kg #REF! #REF!
- Pasir Pasang 0.045 m3 #REF! #REF!
- Semen Warna 1.500 Kg #REF! #REF!
A. JUMLAH HARGA BAHAN #REF!
Tenaga
- Pekerja 0.700 OH #REF! #REF!
- Tukang Batu 0.350 OH #REF! #REF!
- Kepala Tukang 0.035 OH #REF! #REF!
- Mandor 0.0350 OH #REF! #REF!
B. JUMLAH UPAH #REF!
C. JUMLAH BAHAN DAN UPAH #REF!
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK
2. Tenaga Pw 120.0 HP
3. Kapasitas Cp 6.0 Ton
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahu W 2,000.0 Jam
c. Harga Alat B 254,800,000 Rupiah
5. Alat Yang a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 254,800,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa = 10 % x B C 25,480,000 Rupiah

2. Faktor Angsuran Modi x (1 + i)^A' D 0.33438 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembal ( B' - C ) x D E 38,339.98 Rupiah
W'

b. Asurans 0.002 x B' F 254.80 Rupiah


W'

Biaya Pasti per Jam ( E + F ) G 38,594.78 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Ja H 300,000.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam I 42,000.00 Rupiah

3. Perawatan(12,5 % - 17,5 %) x B' K 15,925.00 Rupiah


per W'

4. Operator = ( 1 Orang / Jam ) x U1 L 20,000.00 Rupiah


5. Pembantu = ( 1 Orang / Jam ) x U2 M 10,833.33 Rupiah

Biaya Operasi per(H+I+K+L+M)


Ja P 388,758.33 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( S 0.00 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / U2 10,833.33 Rp./Jam
4. Bahan Bakar Bensin Mb 20,000.00 Liter
5. Bahan Bakar Solar Ms 20,000.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.

E09

Alat baru
Alat baru
Alat baru

% / Tahun
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.5 M3
4. Alat Baru a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahu W 2,000.0 Jam
c. Harga Alat B 1,400,000,000 Rupiah
5. Alat Yang a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 1,400,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa = 10 % x B C 140,000,000 Rupiah

2. Faktor Angsuran Modi x (1 + i)^A' D 0.33438 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembal ( B' - C ) x D E 210,659.21 Rupiah
W'

b. Asurans 0.002 x B' F 1,400.00 Rupiah


W'

Biaya Pasti per Jam ( E + F ) G 212,059.21 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Ja H 200,000.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam I 28,000.00 Rupiah

3. Perawatan(12,5 % - 17,5 %) x B' K 87,500.00 Rupiah


per W'

4. Operator = ( 1 Orang / Jam ) x U1 L 20,000.00 Rupiah


5. Pembantu = ( 1 Orang / Jam ) x U2 M 10,833.33 Rupiah

Biaya Operasi per(H+I+K+L+M)


Ja P 346,333.33 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( S 0.00 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 20.00 % / Tahun
2. Upah Operator / Sopir U1 20,000.00 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 10,833.33 Rp./Jam
4. Bahan Bakar Bensin Mb 20,000.00 Liter
5. Bahan Bakar Solar Ms 20,000.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
KET.

E10

Alat baru
Alat baru
Alat baru

% / Tahun
RINGKASAN ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
No. URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

1. ASPHALT MI E01 150.0 50.0 T/Jam ### ### Alat baru


2. ASPHALT FI E02 47.0 6.0 Ton ### 541,573.40 Alat baru
3. ASPHALT S E03 15.0 800.0 Liter 85,000,000 94,913.95 Alat baru
4. BULLDOZER E04 150.0 - ### 786,077.73 Alat Baru
5. COMPRESSORE05 80.0 - ### 333,271.96 Alat baru
6. CONCRETE M E06 15.0 500.0 Liter 61,000,000 91,203.56 Alat baru
7. CRANE 10-1 E07 150.0 15.0 Ton ### 503,636.18 Alat baru
8. DUMP TRUCK E08 100.0 6.0 Ton ### 347,803.62 Alat baru
1 DUMP TRUC E09 120.0 6.0 Ton ### 0.00 Alat baru
2 EXCAVATOR E10 80.0 0.5 M3 ### 0.00 Alat baru
11. FLAT BED T E11 100.0 4.0 M3 ### 365,645.02 Alat baru
12. GENERATOR E12 175.0 5.0 KVA 5,000,000 516,687.71 Alat baru
13. MOTOR GRAD E13 125.0 - ### 577,211.37 Alat baru
14. TRACK LOAD E14 90.0 1.6 M3 ### 463,678.12 Alat baru
15. WHEEL LOAD E15 105.0 1.5 M3 ### 496,134.58 Alat baru
16. THREE WHEE E16 55.0 8.0 Ton ### 266,696.23 Alat baru
17. TANDEM ROL E17 50.0 8.0 Ton ### 263,009.78 Alat baru
18. TIRE ROLLER E18 60.0 10.0 Ton ### 336,951.40 Alat baru
19. VIBRATORY E19 75.0 7.0 Ton ### 386,997.89 Alat baru
20. CONCRETE E20 10.0 - 18,000,000 70,885.31 Alat baru
21. STONE CRU E21 220.0 50.0 T/Jam ### 956,816.41 Alat baru
22. WATER PUMP E22 6.0 - 3,000,000 51,907.56 Alat baru
23. WATER TANK E23 100.0 4,000.0 Liter ### 371,126.64 Alat baru
24. PEDESTRIA E24 11.0 0.98 Ton 37,000,000 73,999.64 Alat baru
25. TAMPER E25 5.0 0.17 Ton 6,000,000 50,804.39 Alat baru
26. JACK HAMM E26 3.0 - 80,000,000 80,175.25 Alat baru
27. FULVI MIXE E27 75.0 - ### 281,442.06 Alat baru
28. CHAIN SAW E28 3.0 - 10,000,000 35,086.14 Alat baru
29. STONE BRE E29 80.00 ### 411,788.64 Alat baru
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M01 - Pasir
Lokasi : Quarry KEC. TRUK ISI 1.00 km/jam

Tujuan : Base Camp KEC. MOBIL KOSONG 1.00 km/jam


JARAK QUARRY I 0.00 km
JARAK QUARRY II 0.00 km
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Base Camp L 0.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3 650,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 0.00

II. URUTAN KERJA


1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E08)


Kapasitas bak saat mengangkut material V 2.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 1.00 KM/Jam
Kecepatan rata-rata kosong v2 1.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 0.00 menit
- Muat = (V/Q1) x 60 T3 5.35 menit
- Lain-lain T4 10.00 menit
Ts2 15.35 menit

Bersambung
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M01 - Pasir
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 6.49 M3 / Jam
Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 650,000.00 Rupiah

Dibulatkan : M01 650,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry II
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke Lokasi Pekerjaan L 0.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3 650,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 0.00

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 14.94 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 2.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 1.00 KM/Jam
Kecepatan rata-rata kosong v2 1.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 0.00 menit
- Muat = (V/Q1) x 60 T3 8.03 menit
- Lain-lain T4 10.00 menit
Ts2 18.03 menit

Bersambung
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M02 - Batu Kali
Lokasi : Quarry II
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 5.52 M3 / Jam
Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 ) M02 650,000.00 Rupiah

Dibulatkan : M02 650,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M07 - Batu Pecah
Lokasi : Quarry
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke Lokasi Pekerjaan L 0.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3 500,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 0.00

II. URUTAN KERJA


1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 14.94 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 2.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 1.00 KM/Jam
Kecepatan rata-rata kosong v2 1.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 0.00 menit
- Muat = (V/Q1) x 60 T3 8.03 menit
- Lain-lain T4 1.00 menit
Ts2 9.03 menit

Bersambung
ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M07 - Batu Pecah
Lokasi : Quarry
Tujuan : Base Camp

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 11.03 M3 / Jam
Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 ) M07 500,000.00 Rupiah

Dibulatkan : M07 500,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN
Jenis : M16- Sirtu
Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi Pek L 0.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3 400,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 0.00

II. URUTAN KERJA


1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 3.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 1.00 KM/Jam
Kecepatan rata-rata kosong v2 1.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 0.00 menit
- Muat = (V/Q1) x 60 T3 8.03 menit
- Lain-lain T4 1.00 menit
Ts2 9.03 menit

Bersambung
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M16- Sirtu


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 16.54 M3 / Jam
Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 ) M16 400,000.00 Rupiah

Dibulatkan : M16 400,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M44 - Pasir Urug


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan pasir urug di Quarry RpM44 1.00 M3 400,000.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 0.00
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 0.00

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 22.41 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 0.00 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 2.50 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 1.00 KM/Jam
Kecepatan rata-rata kosong v2 1.00 KM/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 0.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T2 0.00 menit
- Muat = (V/Q1) x 60 T3 6.69 menit
- Lain-lain T4 1.00 menit
Ts2 7.69 menit

Bersambung
ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M44 - Pasir Urug


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 16.18 M3 / Jam
Ts2

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 400,000.00 Rupiah

Dibulatkan : M44 400,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M12 - Semen PC


Lokasi : Wamena
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan semen di Wamena RpM44 1.00 kg 11,600.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 Kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 180.00 menit
- Memuat T1 60.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 60.00 menit
- Lain - lain T4 60.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 553.33 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Semen =

( RpM44 + Rp1 ) M44 11,600.00 Rupiah

Dibulatkan : M44 11,600.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M14 - Semen Warna


Lokasi : Quarry1
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan kawat beton di Wamena RpM44 1.00 Kg 900,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut kawat beton tsb
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 40.00 zak
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 28.46 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE11 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar kawat beton =

( RpM44 + Rp1 ) M44 900,000.00 Rupiah

Dibulatkan : M44 900,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M14 - Kawat Beton


Lokasi : Quarry1
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan kawat beton di Wamena RpM44 1.00 Kg 30,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut kawat beton tsb
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 KG
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE11 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar kawat beton =

( RpM44 + Rp1 ) M44 30,000.00 Rupiah

Dibulatkan : M44 30,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M19 - Kayu Perancah (KELAS III)


Lokasi : Quarry2
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan kayu perancah di Wamena RpM44 1.00 M3 2,500,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut kayu perancah tsb
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2.00 M3
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = (Cp x Fa x 60 ) : Ts Q1 1.42 M3 / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE11 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar kayu perancah =

( RpM44 + Rp1 ) M44 2,500,000.00 Rupiah

Dibulatkan : M44 2,500,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M19 - (KELAS II)


Lokasi : Quarry2
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan kayu perancah di Wamena RpM44 1.00 Set 3,000,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut kayu perancah tsb
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2.00 M3
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = (Cp x Fa x 60 ) : Ts Q1 1.42 M3 / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE11 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar kayu perancah =

( RpM44 + Rp1 ) M44 3,000,000.00 Rupiah

Dibulatkan : M44 3,000,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M19 - Kayu Kelas I


Lokasi : Quarry2
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 m' 3,500,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut kayu perancah tsb
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2.00 M3
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = (Cp x Fa x 60 ) : Ts Q1 1.42 M3 / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE11 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar kayu perancah =

( RpM44 + Rp1 ) M44 3,500,000.00 Rupiah

Dibulatkan : M44 3,500,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M42 - Besi Beton D6


Lokasi : Quarry1
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan besi beton di Wamena RpM44 1.00 Kg 17,608.52
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut besi beton tersebut
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 50.00 menit
- Memuat T1 20.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 20.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,992.00 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE13 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Besi Beton =

( RpM44 + Rp1 ) M44 17,608.52 Rupiah

Dibulatkan : M44 17,608.52 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M45 - Besi Beton D10


Lokasi : Quarry1
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan besi beton di Wamena RpM44 1.00 Kg 17,074.22
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut besi beton tersebut
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 50.00 menit
- Memuat T1 20.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 20.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,992.00 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE13 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Besi Beton =

( RpM44 + Rp1 ) M44 17,074.22 Rupiah

Dibulatkan : M44 17,074.22 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M51 - Seng Gelombang Bj.20


Lokasi : Quarry1
Tujuan : Lokasi Pekerjaan

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan besi beton di Quarry RpM44 1.00 Kg 85,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut besi beton tersebut
ke lokasi pekerjaan.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 250.00 lbr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 50.00 menit
- Memuat T1 20.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 20.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 249.00 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE13 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Besi Beton =

( RpM44 + Rp1 ) M44 85,000.00 Rupiah

Dibulatkan : M44 85,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M12 - Seng Plat. Bj.30


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan seng Gel di Wamena RpM44 1.00 Lbr 75,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 250.00 Lbr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 177.86 Lbr / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 75,000.00 Rupiah

Dibulatkan : M44 75,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M12 - Tripleks 3 mm


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan seng Gel di Wamena RpM44 1.00 Lbr 95,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> asumsi = 200 lembar Cp 210.00 Lbr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 149.40 Lbr / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 95,000.00 Rupiah

Dibulatkan : M44 95,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : M12 - Plywood 3 mm


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan seng Gel di Wamena RpM44 1.00 Lbr 170,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> asumsi = 200 lembar Cp 200.00 Lbr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v = ... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 142.29 Lbr / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 170,000.00 Rupiah

Dibulatkan : M44 170,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Batu Tela/Paving block


Lokasi : Quarry2
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan batu tela di lokasi kerja RpM44 1.00 bh 7,500.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut - Cp 400.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 284.57 Lbr / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 7,500.00 Rupiah

Dibulatkan : M44 7,500.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Paku Campur


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan Batu Bata Merah di Wamena RpM44 1.00 bh 30,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 30,000.00 Rupiah

Dibulatkan : M44 30,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Paku Tripleks


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan Paku Tripleks di Wamena RpM44 1.00 bh 35,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 35,000.00 Rupiah

Dibulatkan : M44 35,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Paku Seng


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan Paku Seng di Wamena RpM44 1.00 bh 35,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 ton
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar =

( RpM44 + Rp1 ) M44 35,000.00 Rupiah

Dibulatkan : M44 35,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Kunci Tanam Biasa


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan kunci tanam Km/Wc baik di Wamena RpM44 1.00 bh 90,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> asumsi = 600 bh Cp 600.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 426.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 90,000.00 Rupiah

Dibulatkan : M44 90,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Engsel Pintu


Lokasi : Quarry1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan m 0.00 Km
4 Harga satuan Engsel Pintu baik di Wamena RpM44 1.00 psg 25,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 1,200.00 psg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 853.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 25,000.00 Rupiah

Dibulatkan : M44 25,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Gerendel Pintu


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan m 0.00 Km
4 Harga satuan Gerendel Pintu di Wamena RpM44 1.00 psg 25,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> asumsi Cp 1,200.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 853.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 25,000.00 Rupiah

Dibulatkan : M44 25,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Stop Kontak


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan Stop Kontak di Wamena RpM44 1.00 bh 25,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 1,200.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 853.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 25,000.00 Rupiah

Dibulatkan : M44 25,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Saklar Ganda


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan Saklar Tunggal di Wamena RpM44 1.00 bh 30,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> asumsi Cp 1,200.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 853.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 30,000.00 Rupiah

Dibulatkan : M44 30,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Sekring Box 1 group


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan m 0.00 Km
4 Harga satuan Skreing Box di Wamena RpM44 1.00 m 70,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 75.00 bh
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 53.36 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 70,000.00 Rupiah

Dibulatkan : M44 70,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Besi Strip 30,3


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuanBesi Strip 30.3 di Wamena RpM44 1.00 m' 18,382.35
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 150.00 m'
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 106.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 18,382.35 Rupiah

Dibulatkan : M44 18,382.35 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Lem Kayu


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 Kg 60,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 Kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 60,000.00 Rupiah

Dibulatkan : M44 60,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Cat Meni


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 Kg 40,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 ltr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 40,000.00 Rupiah

Dibulatkan : M44 40,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Minyak cat


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 Ltr 40,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 Ltr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 40,000.00 Rupiah

Dibulatkan : M44 40,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Cat Tembok 25 Kg


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 ember 320,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 80.00 ember
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 56.91 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 320,000.00 Rupiah

Dibulatkan : M44 320,000.00 Rupiah

Harga per kg = m44/25 12,800.00 Rupiah/Kg


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Plamur
Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 Kg 40,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 Kg
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 40,000.00 Rupiah

Dibulatkan : M44 40,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Cat Minyak


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 ltr 50,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut Cp 2,000.00 ltr
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 50,000.00 Rupiah

Dibulatkan : M44 50,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Minyak Bekisting/Oli Kotor


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 liter 10,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 2,000.00 liter
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 1,422.86 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 10,000.00 Rupiah

Dibulatkan : M44 10,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Kayu Profil Untuk Lis Plafound


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 m' 15,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 500.00 m'
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 355.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 15,000.00 Rupiah

Dibulatkan : M44 15,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Tegel Keramik 10 x 20


Lokasi : Quary 1
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 dos 220,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 100.00 dos
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 71.14 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 220,000.00 Rupiah

Dibulatkan : M44 220,000.00 Rupiah


ANALISA HARGA SATUAN DASAR BAHAN

Jenis : Kayu Dolken


Lokasi : Wamena
Tujuan : Base Camp

HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(RP)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Quarry ke lokasi pekerjaan L 0.00 Km
4 Harga satuan di Wamena RpM44 1.00 batang 20,000.00
5 Harga Satuan Dasar Dump Truck RpE11 1.00 Jam 0.00

II. URUTAN KERJA


1 Dump Truck mengangkut bahan tersebut
ke Base Camp.

III. PERHITUNGAN

Dump Truck (E11)


Kapasitas Angkut ---> Cp 500.00 batang
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts 70.00 menit
- Memuat T1 30.00 menit
- Angkut ( v =.... km / jam )--> 2 x ( L : v ) x 60 T2 0.00 menit
- Bongkar Muatan T3 30.00 menit
- Lain - lain T4 10.00 menit
Kap. Prod. /Jam ---> Q1
Q1 = {(Cp x Fa x 60 ) : Ts} Q1 355.71 Kg / Jam

Biaya Dump Truck / Kg = (1 : Q1) x RpE12 Rp1 0.00 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar. =

( RpM44 + Rp1 ) M44 20,000.00 Rupiah

Dibulatkan : M44 20,000.00 Rupiah


FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA AEROSPORT


PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA AEROSPORT
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN : PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : GROUNDING PANEL TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : TITIK % THD. BIAYA PROYEK :

PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS

A. TENAGA
1 Upah Instalasi (L04) Ls 1.0000

Jumlah Harga Tenaga


B. BAHAN
1 Rod tembaga 5/8" M' 6.0000
2 Ground Rod Coupler Bh 2.0000
3 Klem kable (tembaga) Bh 2.0000
4 Kabel NYA 6 mm2 M' 5.0000
5 Pipa M' 3.0000
7 Bak kontrol Bh 1.0000

Jumlah Harga Bahan

C. PERALATAN
1 Alat bantu Ls 1.0000

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
UK
N PEKERJAAN

N PRASARANA AEROSPORT
N PRASARANA AEROSPORT

PERKIRAAN VOL. PEK. : 6.00


TOTAL HARGA (Rp.) : 18,132,000.00
% THD. BIAYA PROYEK : 0.34
1 TITK INTALASI PENERANGAN
HARGA JUMLAH 10.0000 M' Kabel distribusi NYM 2 x1,5 mm²
SATUAN HARGA 10.0000 M' Kondouit PVC High Impact Ø20 mm
(Rp) (Rp) 3.0000 Bh Shock High Impact
Rp. 150000
1.0000 Bh OutbowdoosRp. 170000
2.0000 Bh Lastdop Rp. 200000
525,000.00 525,000.00 1.0000 Ls Upah InslalaRp. 206000

Jumlah Harga Tenaga 525,000.00

268,125.00 1,608,750.00 13650


78,650.00 157,300.00
28,600.00 57,200.00 MCB 84500
18,975.00 94,875.00
51,654.17 154,962.50
866,359.79 866,359.79

Jumlah Harga Bahan 2,939,447.29

Alat Bantu steger


50,000.00 50,000.00 set 4 ### ###
1 hari ttk 36 ###
Jumlah Harga Peralatan 50,000.00
3,514,447.29 ###
527,167.09
4,041,614.39
4,041,600.00

volume dan/atau ukuran

satuan pekerjaan dari

dan operator.
(tetapi tidak termasuk
Rp. 95287.5 Rp. 104816.3
Rp. 3310.013 13857.92
Rp. 16200
Rp. 3060
Rp. 3600
Rp. 1112.4
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GWT SP. II
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : BAK KONTROL 40X40X50 CM
SATUAN PEMBAYARAN : UNIT

PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS

1 Galian tanah biasa M3 0.60


2 Urugan kembali tanah bekas galian M3 0.35
3 Beton ad. 1 : 2 : 3 M3 0.14
4 Besi Tulangan U-24 Kg 7.54
5 Tutup Manhole
- Plat beton tebal 10 cm. ad. 1 : 2 : 3 M3 0.04
- Hand hole 12 mm Bh 2.00

D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN


E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
NTUK
UAN PEKERJAAN

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

196,875.00 118,125.00 ###


55,125.00 19,527.48
1,727,925.00 234,997.80 8 mm 0.395 1.6 8
20,132.73 151,891.35 8 mm 0.395 2.1 3

7,865,051.76 322,152.52
9,832.82 19,665.65 0.55 0.888 1.00 0.4884

866,359.79
129,953.97
996,313.76
996,300.00

peralatan, volume dan/atau ukuran

saikan satu satuan pekerjaan dari

habis pakai dan operator.


g berkaitan (tetapi tidak termasuk
5.056 7.5445
2.4885

20,132.73
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GWT SP. II
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : BALL VALVE DIA. 2"
SATUAN PEMBAYARAN : BH

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp)

A. TENAGA
1 Mandor (L04) Jam 0.0350 53,571.43
2 Kep. Tukang(L03) Jam 0.0700 44,642.86
3 Tukang (L02) Jam 0.3500 41,071.43
2 Pekerja (L01) Jam 0.3500 35,714.29

Jumlah Harga Tenaga


B. BAHAN
1 Ball Valve 2" Kitz. Setara Bh 1.0000 950,000.00
2 Selotif Bh 0.1333 15,000.00

Jumlah Harga Bahan

C. PERALATAN
1 Gergaji potong Jam - 53,926.68
1 Alat bantu Ls 1.0000 2,000.00

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
RJAAN

JUMLAH
HARGA
(Rp)

1,875.00
3,125.00 0.0500 H.o Pekerja
14,375.00 0.0500 H.o Tukang Kayu
12,500.00 0.0100 H.o Kepala Tukang
0.0050 H.o mandor
31,875.00

950,000.00
2,000.00

952,000.00

-
2,000.00

2,000.00
985,875.00
147,881.25
1,133,756.25
1,133,700.00

ralatan, volume dan/atau ukuran

kan satu satuan pekerjaan dari

bis pakai dan operator.


erkaitan (tetapi tidak termasuk
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GWT SP. II
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : BALL VALVE DIA. 1¼"
SATUAN PEMBAYARAN : BH

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp)

A. TENAGA
1 Mandor (L04) Jam 0.0350 34,285.71
2 Kep. Tukang(L03) Jam 0.0700 32,857.14
3 Tukang (L02) Jam 0.3500 27,857.14
2 Pekerja (L01) Jam 0.3500 20,000.00

Jumlah Harga Tenaga


B. BAHAN
1 Ball Valve 1¼" Kitz. Setara Bh 1.0000 700,000.00
2 Selotif Bh 0.1333 15,000.00

Jumlah Harga Bahan

C. PERALATAN
1 Gergaji potong Jam - 53,926.68
1 Alat bantu Ls 1.0000 2,000.00

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
RJAAN

JUMLAH
HARGA
(Rp)

1,200.00
2,300.00 0.0500 H.o Pekerja
9,750.00 0.0500 H.o Tukang Kayu
7,000.00 0.0100 H.o Kepala Tukang
0.0050 H.o mandor
20,250.00

700,000.00
2,000.00

702,000.00

-
2,000.00

2,000.00
724,250.00
108,637.50
832,887.50
832,800.00

peralatan, volume dan/atau ukuran

saikan satu satuan pekerjaan dari

habis pakai dan operator.


g berkaitan (tetapi tidak termasuk
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GWT SP. II
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : BALL VALVE DIA. 1¼"
SATUAN PEMBAYARAN : BH

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp)

A. TENAGA
1 Mandor (L04) Jam 0.0350 34,285.71
2 Kep. Tukang(L03) Jam 0.0700 32,857.14
3 Tukang (L02) Jam 0.3500 27,857.14
2 Pekerja (L01) Jam 0.3500 20,000.00

Jumlah Harga Tenaga


B. BAHAN
1 Ball Valve 1¼" Kitz. Setara Bh 1.0000 450,000.00
2 Selotif Bh 0.1333 15,000.00

Jumlah Harga Bahan

C. PERALATAN
1 Gergaji potong Jam - 53,926.68
1 Alat bantu Ls 1.0000 2,000.00

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
RJAAN

JUMLAH
HARGA
(Rp)

1,200.00
2,300.00 0.0500 H.o Pekerja
9,750.00 0.0500 H.o Tukang Kayu
7,000.00 0.0100 H.o Kepala Tukang
0.0050 H.o mandor
20,250.00

450,000.00
2,000.00

452,000.00

-
2,000.00

2,000.00
474,250.00
71,137.50
545,387.50
545,300.00

peralatan, volume dan/atau ukuran

saikan satu satuan pekerjaan dari

habis pakai dan operator.


g berkaitan (tetapi tidak termasuk
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GUDANG AIR BERSIH DINAS PUPR
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : PAGAR BRC EP 7 MM 190 X 240 CM
SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp)

A. TENAGA
1 Mandor (L04) jam 0.0756 53,571.43
2 Kep. Tukang(L03) jam 0.2520 44,642.86
3 Tukang (L02) jam 0.2520 41,071.43
2 Pekerja (L01) jam 1.5120 35,714.29

Jumlah Harga Tenaga


B. BAHAN
1 Pagar BRC-EP 190 x 240 cm Bh 1.0000 1,089,866.67
2 Accessories Ls 1.0000 55,000.00

Jumlah Harga Bahan

C. PERALATAN
Alat bantu Ls 1.0000 2,000.00

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
RJAAN

RSIH DINAS PUPR

1 M' RAILLING PIPA GALVANIZED 3"


JUMLAH 1.1000 M' Pipa Galvanized Medium A
HARGA 4.1867 Cm Penyambungan
(Rp) 0.1080 H.o Pekerja Rp. 150000
0.0180 H.o Tukang Besi Rp. 170000
0.0180 H.o Kepala Tukang Rp. 200000
4,050.00 0.0054 H.o Mandor Rp. 206000
11,250.00
10,350.00 Sewa Alat 0.05 Jam 250000 12500
54,000.00

79,650.00

1,089,866.67 harga material


55,000.00 sby 561,000.00 bh 15.30
volume 3.00 bh
brt 5.10 per m
673,200.00
1,144,866.67 1,089,866.67

55539000
2,000.00

2,000.00
1,226,516.67 ###
183,977.50
1,410,494.17
1,410,400.00 ### ###
###
eralatan, volume dan/atau ukuran

aikan satu satuan pekerjaan dari

abis pakai dan operator.


berkaitan (tetapi tidak termasuk
Rp. 95287.5 Rp. 104816.3
Rp. 3310.01289291119 13857.92
Rp. 16200
Rp. 3060
Rp. 3600
Rp. 1112.4
Rp. 142646.6

kontainer 20,000,000.00 Kapasitas 1 kontainer Ukuran Kontainer 20 ft


416,666.67 21.36 40.00
0.48 8.00
4.80 48.00
1.10
bh
dalam luar
lebar 2.35 2.438
tinggi 2.385 2.591
panjang 5.898 6.058
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA HARGA SATUAN PEKERJAAN

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR


PEKERJAAN : PEMBANGUNAN PAGAR GUDANG AIR BERSIH DINAS PUPR
KABUPATEN : MIMIKA
PROPINSI : PAPUA
ITEM PEMBAYARAN :
JENIS PEKERJAAN : TIANG PIPA GALVANIZED 2"
SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp)

A. TENAGA
1 Mandor (L04) jam 0.0378 53,571.43
2 Kep. Tukang(L03) jam 0.1260 44,642.86
3 Tukang (L02) jam 0.1260 41,071.43
2 Pekerja (L01) jam 0.7560 35,714.29

Jumlah Harga Tenaga


B. BAHAN
1 Pipa galvanized medium B dia."2" M' 3.0000 118,833.33
2 Dop pipa galvanized dia."2" Bh 2.0000 25,000.00
3 Pengelasan Cm 15.7000 2,190.99

Jumlah Harga Bahan

C. PERALATAN
1 Gurinda Jam 0.0333 53,926.68
2 Welding Set Jam 0.0167 145,864.46
3 Gergaji potong Jam 0.0333 53,926.68

Jumlah Harga Peralatan


D. JUMLAH HARGA TENAGA, BAHAN & PERALATAN (A+B+C)
E. OVERHEAD & PROFIT 15% X D
F. HARGA SATUAN PEKERJAAN (D + E)
G. DIBULATKAN

Note : 1. Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2. Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari
nomor mata pembayaran.
3. Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis pakai dan operator.
4. Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk
PPN yang dibayar dari kontrak) dan biaya-biaya lainnya.
ERJAAN

RSIH DINAS PUPR

1 M' RAILLING PIPA GALVANIZED 3"


JUMLAH 1.1000 M' Pipa Galvanized Medium A
HARGA 4.1867 Cm Penyambungan
(Rp) 0.1080 H.o Pekerja Rp. 150000
0.0180 H.o Tukang BesiRp. 170000
0.0180 H.o Kepala Tuk Rp. 200000
2,025.00 0.0054 H.o Mandor Rp. 206000
5,625.00
5,175.00 Sewa Alat 0.05 Jam 250000 12500
27,000.00

39,825.00

356,500.00 118,833.33
50,000.00 2.88
34,398.47

440,898.47

1,797.56
2,431.07
1,797.56

6,026.19
486,749.66 ###
73,012.45
559,762.11
559,700.00

eralatan, volume dan/atau ukuran

aikan satu satuan pekerjaan dari

abis pakai dan operator.


berkaitan (tetapi tidak termasuk
Rp. 95287.5 Rp. 104816.3
Rp. 3310.013 13857.92
Rp. 16200
Rp. 3060
Rp. 3600
Rp. 1112.4
Rp. 142646.6