P = 12 T 2.1
TINGGI = 4.8
P = 12 T 2.1 5m
P = 16 M T 2.5
TINGGI = 4.8
P = 16 M T 2.5
HARGA SATUAN BAHAN UPAH DAN ALAT
NO URAIAN SATUAN HARGA
BAHAN
1 Batu Kali m3 Rp 75,000
2 Pasir m3 Rp 150,000
3 Kerikil 2/3 m3 Rp 160,000
4 Semen Gresik ( 50 kg ) Zak Rp 64,000
5 Besi O 16 ljr Rp 160,000
6 Besi O 12 ljr Rp 68,000
7 Besi O 10 ljr Rp 48,000
8 Besi O 8 ljr Rp 42,000
9 Besi O 6 ljr Rp 27,000
10 Bendrat kg Rp 15,000
11 Pipa Hand Ril O 2,5 " btg Rp 375,000
12 Pipa PVC D 3/4 " btg Rp 20,000
13 Pipa PVC D 2,5 " btg Rp 60,000
14 Karet Landasan bj Rp 25,000
15 Ijuk ikat Rp 8,000
16 Cat Besi kg Rp 25,000
17 Triplek 5 mm lbr Rp 90,000
18 Papan begesting 2/20 x 200 lbr Rp 7,000
19 Kayu 4/6 - 3 m btg Rp 25,000
20 Bambu btg Rp 10,000
21 Plat L 45.45.5 ljr Rp 90,000
22 Paku usuk kg Rp 14,000
23 Paku Reng kg Rp 14,000
24 Kawat bendrat kg Rp 15,000
25 Tanah Urug m3 Rp 45,000
ALAT
1 Prasasti bh Rp 300,000
2 Papan nama proyek bh Rp 150,000
3 Sekop bh Rp 30,000
4 Selang timbangan m Rp 3,000
5 Tali Senar rol Rp 3,000
6 Ember bh Rp 10,000
7 Sewa Molen hari Rp 150,000
8
Upah
1 Pekerja HOK Rp 30,000
2 Tukang HOK Rp 40,000
DATA PENDUKUNG LAINNYA
KABUPATEN KAB. MAGETAN
KECAMATAN KEC. PANEKAN
DESA REJOMULYO
DUSUN DUSUN SEKANCIL
FK NUR SOFRUDIN, SE
FT RIPTO PRIHARTONO, ST
PJOK KUNTADI SUWANDONO,S.Sos 95
NIP NIP : 19630527198611 1 001 58
TPK SUYATNO
TANGGAL 21 Maret 2012 27
KADER TEKNIS Muhajirin
JENIS KEGIATAN 1 Jembatan Beton
UKURAN P= 6 X L= 3
JENIS KEGIATAN 2 Talud Bagian Jembatan
UKURAN 31 m
GAMBAR GAMBAR RENCANA
PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET
0.5 0.7
0.7
I 6.0
II
0.4
IV
1.5 III
2.1 5
0.2 0.2
1.0
a Volume Pasangan
Kegiatan a t d b Luas Panjang Volume
0.30 2.00 0.80 0.80 1.74 10.00 17.40
t 0.30 2.00 0.80 0.80 1.74 10.00 17.40
Sayap
0.30 2.00 0.80 0.80 1.74 10.00 17.40
0.30 2.00 0.80 0.80 1.74 10.00 17.40
d
0.30 5.20 1.50 1.20 5.70
18.00 60.62
0.30 1.50 0.60 0.60 1.04
b
0.30 5.20 1.50 1.20 5.70
18.00 60.62
0.30 1.50 0.60 0.60 1.04
Oprit/TPT
0.30 5.20 1.50 1.20 5.70
13.00 43.78
0.30 1.50 0.60 0.60 1.04
0.30 5.20 1.50 1.20 5.70
13.00 43.78
0.30 1.50 0.60 0.60 1.04
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Volume Galian
Pondasi (1.5 x 2.1 x 3.5) x 2 sisi = 22.05 m3
Talud x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
x x = 0.00 m3
0.7
URUGAN OPRIT
Sebelah Kiri panjang oprit 18 m', lebar 3.5, tinggi 5.2 m 163.8 m3
Sebelah Kiri panjang oprit 13 m', lebar 3.5, tinggi 5.2 m 118.3 m3
total = 282.1 m3
((0.2 x 0.7)+((0.7 - 0.2) x 0.2) x 3.5x2
+0.7+0.2+0.2)x((3.5/0,2)+1))+(12x3.5))x2)/12
PERHITUNGAN VOLUME PEKERJAAN / TAKE OFF SHEET
No Uraian Panjang Lebar Tinggi Luas Volume
1 Perhitungan Plat Beton
6.00
0.20
3.00 = ((3/0,15)+1)x6x2
6.00 = ((6/0,15)+1)x3x2
0,15 m'
4 - 12 mm = 4 x 1,2 x 6
28.80 3.00 ljr
Begel 10 - 15
=(1,2/0,1)+1)x0,6x6
46.80 5.00 ljr
2 16
6.00 0.20 0.50 1.20 1.20 m3
2 12
2 12
4 12
4 16
25
Tul Pokok 8 12 96.00 9.00 ljr
Tul Utama 6 16 72.00 7.00 ljr
Begel 10 - 15 =((6/0,15)+1)x1.5 x2
5 Perhitungan Begesting
Kayu 4/6 x 3 m
=((6/0,3)+1)x3
93.00 31.00 btg
Vol Beton 3.60 m3
0.22 m3
1.20
12 58.00
10 17.00
300/15
ANALISA PERHITUNGAN JEMBATAN PLAT BETON
Sayap Jembatan 1 : 4
Batu Gebal 1.1000 69.60 m3 76.56 m3 75,000 5,742,000
Semen (50 Kg) 3.2600 69.60 m3 226.90 zak 64,000 14,521,300
Pasir 0.5200 69.60 m3 36.19 m3 150,000 5,428,800
Kepala Tukang 0.0500 69.6 m3 3.48 HOK 40,000
Tukang 0.5000 69.60 m3 34.80 HOK 40,000
Pekerja 1.2500 69.60 m3 87.00 HOK 30,000
Oprit 1 : 4
Batu Gebal 1.1000 282.10 m3 310.31 m3 75,000 23,273,300
Semen (50 Kg) 3.2600 282.10 m3 919.65 zak 64,000 58,857,300
Pasir 0.5200 282.10 m3 146.69 m3 150,000 22,003,800
Kepala Tukang 0.0500 282.10 m3 14.11 HOK 40,000
Tukang 0.5000 282.10 m3 141.05 HOK 40,000
Pekerja 1.2500 282.10 m3 352.63 HOK 30,000
Talud 1 : 5
Batu Gebal 1.1000 0.00 m3 - m3 75,000 -
Semen (50 Kg) 2.7200 0.00 m3 - zak 64,000 -
Pasir 0.5440 0.00 m3 - m3 150,000 -
Kepala Tukang 0.0500 0.00 m3 - HOK 40,000
Tukang 0.5000 0.00 m3 - HOK 40,000
Pekerja 1.2500 0.00 m3 - HOK 30,000
Pekerjaan Beton
SNI Beton Bertulang 1 : 2 : 3
Semen (50 Kg) 6.8000 6.696 m3 45.53 zak 64,000 2,914,100
Pasir 0.5400 6.696 m3 3.62 m3 150,000 542,400
Kerikil 0.8200 6.696 m3 5.49 m3 160,000 878,500
Kep Tukang 0.0833 6.696 m3 0.56 HOK 40,000
Tukang 0.8333 6.696 m3 5.58 HOK 40,000
Pekerja 5.0000 6.696 m3 33.48 HOK 30,000
SNI Pembesian
Besi 10 1.1000 17.00 btg 18.70 btg 48,000 897,600
Besi 12 1.1000 78.00 btg 85.80 btg 68,000 5,834,400
Besi 16 1.1000 7.00 btg 7.70 btg 160,000 1,232,000
Kawat Bendrat 2.0000 6.696 m3 13.39 kg 15,000 200,900
Tukang Besi 7.5000 6.696 m3 50.22 HOK 40,000
Kepala Tukang 2.5000 6.696 m3 16.74 HOK 40,000
Pekerja 7.5000 6.696 m3 50.22 HOK 30,000
ANALISA PERHITUNGAN JEMBATAN PLAT BETON
176,637,000
Upah
Pekerja
3,438,300 3,438,300
227,700
2,277,300
4,270,000 4,270,000
38,299,600
185,600
1,856,000
3,480,000 31,213,700 3,480,000
752,300
7,522,700
14,105,000 14,105,000
-
-
-
29,800
297,600
1,339,200 1,339,200
2,678,400
892,800
2,008,800 2,008,800
Upah
186,700
18,700
56,000 56,000
-
45,622,900 28,697,300
Tukang Kep tukang Mandor
227,700
2,277,300
185,600
1,856,000
752,300
7,522,700
29,800
297,600
2,678,400
892,800
186,700
18,700
14,818,700 2,106,900 -
PNPM-Mandiri Perdesaan Form.7e
RENCANA ANGGARAN BIAYA
Sumbangan dalam bentuk bahan, upah, dan alat ditulis dalam kolom volume dari swadaya
Dibuat Oleh :
10,00 SYP 2 TPK / KPMD
A 10,00
SUYATNO
SYP 3
Diperiksa Oleh
F Teknik Kecamatan
10,00
TPT 3 B
RIPTO PRIHARTONO, ST
SYP 4 Disetujui Oleh
Faskab Teknik
TPT 4
PARAPET
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
6.0 GAMBAR RENCANA
PROPINSI JAWA TIMUR
KAB. MAGETAN
1,50 1,50
0.2 1.2 1.2 1.2 0.2 KEC. PANEKAN
DESA REJOMULYO
JENIS PRASARANA
Jembatan Beton
PARAPET 0,90
2012 LOKASI
Pipa GI 2 "
DUSUN SEKANCIL
JUDUL GAMBAR
0.7
Balok Gelagar Beton Bertulang * Potongan B - B
1.5
1.5 RIPTO PRIHARTONO, ST
Disetujui Oleh
0,10
Faskab Teknik
0,2 0,2
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
3 0,60
0,60
GAMBAR RENCANA
0,75 1.5 0,75 PROPINSI JAWA TIMUR
PARAPET KABUPATEN Magetan
KEC. PANEKAN
Plat Beton Bertulang, camp. 1:2:3 DESA REJOMULYO
0,90 JENIS PRASARANA
Plesteran, camp. 1:4 Jembatan Beton
0,50 LOKASI
DUSUN SEKANCIL
JUDUL GAMBAR
* Potongan A - A
SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
0,20
0,80
1,60 RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0,10
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
0,20
12-20
GAMBAR RENCANA
PROPINSI JAWA TIMUR
0,50 12 - 20 KAB. MAGETAN
KEC. PANEKAN
12 - 15
DESA REJOMULYO
JENIS PRASARANA
0,20
12 - 15 Jembatan Beton
LOKASI
DUSUN SEKANCIL
6 JUDUL GAMBAR
0,70
* Detail Penulangan
PENULANGAN BALOK LANDAS
Dibuat Oleh :
TPK / KPMD
6 - 10 SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
6-8
0,20
0 RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0,15
0,10 0,10
GAMBAR RENCANA
0.10 PROPINSI JAWA TIMUR
8 - 15
KABUPATEN MAGETAN
Pipa GI 2 " 0.40 KEC. PANEKAN
DESA REJOMULYO
12 - 15 12 - 15 JENIS PRASARANA
8 - 10
0.40
Jembatan Beton
LOKASI
0.20 DUSUN SEKANCIL
JUDUL GAMBAR
0.30
* Detail Penulangan
Sengkang 10 - 15
2 12
DETAIL PENULANGAN LANTAI PLAT
SUYATNO
Diperiksa Oleh
4 12
F Teknik Kecamatan
4 16
2 16 10-15
2 12
1 2 2 12 POTONGAN 1 - 1 RIPTO PRIHARTONO, ST
Disetujui Oleh
Faskab Teknik
0.50 2 16
1 2 8 12 4 16
Begel 10 - 15
2 12 Ir. HARI BUDI S
Diketahui Oleh
2 12 PjOK
4 12
4 16
DETAIL PENULANGAN BALOK GELAGAR
POTONGAN 2 - 2
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
0,30 0,30 Plesteran camp. 1 : 3
Pas. Batu Kali 1 : 4 Sulingan + Ijuk
Tanah Urug Tanah Urug
GAMBAR RENCANA
2,00 2,00 PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
DESA REJOMULYO
Pas. Batu Kali camp. 1 : 4 JENIS PRASARANA
0,80 0,80
Jembatan Beton
LOKASI
0,80 DUSUN SEKANCIL
0,80
JUDUL GAMBAR
POT. MELINTANG SAYAP 1 POT. MELINTANG SAYAP 2
panjang = 10 m panjang = 10 m * Potongan Melintang
Sayap
0,30
0,30 Pas. Batu Kali 1 : 4 Tanah Urug Dibuat Oleh :
Sulingan + Ijuk Plesteran camp. 1 : 3
Tanah Urug TPK / KPMD
SUYATNO
2,00 Diperiksa Oleh
2,00
F Teknik Kecamatan
0,80 0.80
SUYATNO
H H Diperiksa Oleh
F Teknik Kecamatan
RIPTO PRIHARTONO, ST
B B Disetujui Oleh
Faskab Teknik
C C
POT. TPT 1 & 2 Ir. HARI BUDI S
panjang = 26 m Diketahui Oleh
PjOK
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001
0.00 m
2 12 2 12
10-15
1 2 2 12
GAMBAR RENCANA
0.40 PROPINSI JAWA TIMUR
KABUPATEN NGAWI
KEC. PANEKAN
1 2 8 12 DESA REJOMULYO
JENIS PRASARANA
2 12 0,75
JEMBATAN BETON
LOKASI
2 12 DETAIL PENULANGAN BALOK DUSUN SEKANCIL
GELAGAR JUDUL GAMBAR
4.00
Detail Penulangan Balok
2 12
4 12
4 12 SUYATNO
Diperiksa Oleh
F Teknik Kecamatan
POTONGAN 1 - 1
KUNTADI SUWANDONO,S.Sos
Disetujui Oleh
Faskab Teknik
2 12
Begel 10 - 15
2 12
Ir. HARI BUDI S
2 12 Diketahui Oleh
4 12 PjOK
4 12
0.12
0.40 GAMBAR RENCANA
0.10
PROPINSI JAWA TIMUR
Pipa GI 2 " 0.10 KABUPATEN NGAWI
KEC. PANEKAN
0.40 DESA REJOMULYO
JENIS PRASARANA
0.40 JEMBATAN BETON
m
LOKASI
PERSPEKTIF BALOK SANDARAN DUSUN SEKANCIL
JUDUL GAMBAR
GAMBAR DETAIL
0.50
ABUTMENT
SANDARAN
PENULANGAN PLAT
m Dibuat Oleh :
TPK / KPMD
DETAIL ABUTMENT
0.10
SUYATNO
6 - 15
Pipa GI 2 " 0.40 Diperiksa Oleh
F Teknik Kecamatan
12 - 15 12 - 15
6 - 20
0.40
KUNTADI SUWANDONO,S.Sos
Disetujui Oleh
0.20 Faskab Teknik
0.20
KUNTADI SUWANDONO,S.Sos
NIP : 19630527198611 1 001