RENCANA ANGGARAN BIAYA
Propinsi Jawa Timur Panjang
Kabupaten Situbondo
Kecamatan Cipta Desa
Desa
Bahan
1 Paku 2.00 2.00 kg 22,000
2 Batu belah 4.00 4.00 m3 165,000
3 Semen 40 kg 29.00 29.00 zak 62,000
4 Pasir 5.00 5.00 m3 185,000
5 Koral 1.00 1.00 m3 350,000
6 Besi beton B 6 4.00 4.00 ij 64,000
7 Besi beton B 10 19.00 19.00 ij 105,000
8 Bendrat 3.00 3.00 kg 22,000
9 Begisting 10.00 10.00 Ibr 25,000
10 Batu bata 2000.00 2000.00 bh 700
11 Kayu 5/7 2.00 2.00 bendel 250,000
12 Tripleks 4.00 4.00 Ibr 160,000
13 Plamir 8.00 8.00 kg 38,000
14 Kertas gosok 5.00 5.00 Ibr 10,000
15 Cat tembok 23.00 23.00 kg 35,000
16 Pintu Besi + Kusen Besi 1.00 1.00 bh 1,500,000
17 Sepiral 8" 4.00 4.00 m 370,000
18 Bambu 20.00 20.00 Ijr 25,000
19 Lem PVC 1.00 1.00 bh 25,000
20 Mesin Kompa 1.00 1.00 bh 33,700,000
21 Waterpam SNI 1.00 1.00 bh 27,540,000
22 Pipa PVC SNI 8" 19.00 19.00 Ijr 2,518,000
23 Pasang Meter Listrik 900W 1.00 1.00 Is 1,560,000
24 Tiang Listrik 3.00 3.00 bh 1,200,000
Sub Total 1) la
Upah
1 Pekerja 47.00 47.00 Oh 85,000
2 Tukang 20.00 20.00 Oh 95,000
3 Upah Pengeboran 100 m 100.0 100.00 m 850,000
4 Mobilisasi Alat Bor 1.0 1.00 Is 3,000,000
Su b Total 2) Ila
Alat
1 Timba 7.00 7.00 bh 11,000
2 Benang 2.00 2.00 bh 7,000
3 Perencanaan 1.00 1.00 Ls 3,300,000
4 Meteran 1.00 1.00 bh 43,200
Sub Total 3) Ila
Sumber Dana rofa/ Biaya DD (a+b)
rofa/ Biaya Swadaya (a+ b)
JUMLAH TOTAL ( DD + Swadaya )
Terbilang :
44,000
660,000
1,798,000
925,000
350,000
256,000
1,995,000
66,000
250,000
1,400,000
500,000
640,000
304,000
50,000
805,000
1,500,000
1,480,000
500,000
25,000
33,700,000
27,540,000
47,842,000
1,560,000
3,600,000
127,790,000
3,995,000
1,900,000
85,000,000
3,000,000
93,895,000.00
77,000
14,000
3,300,000
43,200
3,434,200.00
225,119,200.00
225,119,200.00
GAMBAR HITUNGAN
1. Pemasangan bowplank Panjang 16 m
2. Galian tanah pondasi Panjang galian 9,4 m
a. Galian Pondasi Utama Lebar galian 0,8 m
0,95 Tinggi galian 0,9 m
b. Galian Pondasi Teras 6,77 m3
3. Urugan tanah kembali Panjang galian 4,3 m
4. Urugan pasir di bawah pondasi Lebar galian 0,3 m
0.05 Tinggi galian 0,45 m
0.7 0,58 m3
0.05 1/4 galian tanah Bangunan induk
0.5 Panjang 9,4 m
5. Anstamping Lebar 0,5 m
0.2 Tinggi 0,05 m
6. Pasangan batu Teras
Panjang 4,3 m
Lebar 0,5 m
Tinggi 0,05 m
Bangunan induk
Panjang 9,4 m
Lebar 0,5 m
Tinggi 0,2 m
Bangunan Utama
Luas penampamg = ((0.3+0.5)/2)*0,5
= 0,24 m2
Volume 1 Luas penampang x Panjang 0,24 x 9
Teras
Luas penampamg = ((0.22+0.4)/2)*0,4
= 0,078 m2
Volume 1 Luas penampang x Panjang 0,12 x 2,3
Bangunan rolag
Luas Penampang 2,3 x 0,11
0,55 m2
Bangunan rolag
Luas Penampang 2,3 x 0,11
0,55 m2
Jenis Prasarana : Sumur Bor
Lokasi
Volume : 2,5 x 2,5 m
VOLUME
16 m’
21,957 m3
5,489m3
0,235 m3
0,1075 m3
Volume tot 0,343 m3
0,94 m3
0,94 m3
2,256 m3
0,335 m3
Volume total
2,591 m3
0,550 m2
Take Of Sheet
Kabupaten : Situbondo Kecamatan : Jenis Prasarana
Cipta Desa Lokasi
Volume
Desa
GAMBAR HITUNGAN VOLUME
Besig 10
Beton
Besig 8
Begisting
Bambu
: Sumur Bor
: 2,5 x 2,5 m
VOLUME
0.24 m3
44.57 m
37.60 m
3.76 m2
0.23 m3
40.60 m
40.00 m
48.00 m2
0.24 m3
40.75 m
37.60 m
1.07 m3
221.2 m
10.73 m2
14.80 btg
Kabupaten Situbondo Kecamatan
Take Of Sheet
Jenis Prasar
Cipta Desa Lokasi
Desa Volume
GAMBAR HITUNGAN VOLUME
Pel‹erjaan dinding/ Pasangan bata
1. Bangunan induk 1:4 Bangunan Induk
3m
7,5 Panjang 9,4 m
Pel‹erjaan plesteran Plesteran dinding
Tinggi 2,5 m
1:4 Pekerjaan cat
Luas 23,5 m2
Total
Volume
VOLUME
26.91 m2
26.911 m2
27,461 m2
64,551 m2
75,281 m2
ANALISA PERHITUNGAN GEDUNG
ANALISA BANGUNAN SNI ( Standar Nasional Indonesia ) 2008
1 Pemasangan bowplank
|Kayu | 0,0120 | 16,0 m1 | 0,192 m3 | 250,000 |
| Papan | 0,0070 | 16,0 m1 | 0,112 m3 | 25,000 |
I aku I 0,0200 I 16,0 m1 I 0,32 kg I 22,000 I
| Pekerja | 0,1000 | 16,0 m1 | 1,60 Oh | 85,000 |
| Tukang | 0,1000 | 16,0 m1 | 1,60 Oh | 95,000 |
I I I I I I
2 Galian Tanah pondasi untuk tiap m°
|Pekerja | 0,1000 | 21,96 m3 | 2,20 Oh | 85,000 |
I I I I I I
I I I I I I
4 Urugan pasir bawah temasuk penyiramannya ( m° )
|Pasir | 1,2000 | 0,34 m3 | 0,41 m3 | 185,000 |
I ekerja I 0,3000 I 0,34 m3 I 0,10 Oh I 85,000 I
I I I I I I
5 |Pekerjaan Astampeng | | | | |
|Batu | 1,1000 | 0,94 m3 | 1,03 m3 | 165,000 |
I asir I 0,3000 I 0,94 m3 I 0,28 m3 I 185,000 I
| Tukang | 0,390| 0,94 m3 | 0,37 Oh | 95,000 |
| Pekerja | 0,780| 0,94 m3 | 0,73 Oh | 85,000 |
I I I I I I
6 |Pas Batu Kali Pondasi 1 : 6 untuk tiap m° | | |
|Batu Belah | 1,100| 2,59 m3 | 2,85 m3 | 165,000 |
l semen 40kg I 117,0001 2,59 m3 I 7,58 zak I 62,000 1
|PasirPasang | 0,560| 2,59 m3 | 1,45 m3 | 185,000 |
|Tukang | 0,600| 2,59 m3 | 1,55 Oh | 95,000 |
I ekerja I 1,7001 2,59 m3 I 4,41 Oh I 85,000 I
I I I I I I
7 I ekerjaan Beton I I I I I
a|Pekerjaan Beton Sloof 15/17per m' | | | |
I Pek Beton 1:2:3 untuk tiap m3 | | | |
ISemen 40 kg I 232,00 I 0,24 m3 I 1,39 zak I 62,000 I
| Pasir Pasang | 0,5200 | 0,24 m3 | 0,12 m3 | 185,000 |
| Kerikil 2/3 | 0,7800 | 0,24 m3 | 0,19 m3 | 350,000 |
| Tukang batu | 0,2500 | 0,24 m3 | 0,06 Oh | 95,000 |
I ekerja I 1,6500 I 0,24 m3 I 0,40 Oh I 85,000 I
48.000 | | 48,000
2.800 | | 2,800
7.040 I I 7,040
| 136.000 | 136,000
152,000 I 152,000
I Sub total I 345,840
I 186.635 I 186,635
I Sub total I 186,635
89,585 I 89,585
I Sub total I
76.035 | | 76,035
8,734 I 8,734
I Sub total | 84,769
| |
170.610 | | 170,610
52.170 I I 52,170
| 34.827 | 34,827
62,322 I 62,322
I Sub total I 319,929
| |
470.339 | | 470,339
469.950 1 I 469,950
268.469 | | 268,469
| 147.710 | 147,710
I 374.457 I 374,457
I Sub total | 1,730,926
I I
| |
| |
86.196 I I 86,196
23.059 | | 23,059
65.438 | | 65,438
| 5.693 | 5,693
I 33.618 I 33,618
I I
98.082 I I 98,082
5.780 | | 5,780
| 10.421 | 10,421
I 11.647 I 11,647
I I
214.179 | | 214,179
| 13.871 | 13,871
I 15.502 I 15,502
| |
1.692 I I 1,692
12.408 | | 12,408
| 95.880 | 95,880
92,872 I 92,872
I Subtotal | 786,339
| |
80.910 1 I 80,910
21.645 | | 21,645
61.425 | | 61,425
I 5.344 I 5,344
| 31.556 | 31,556
| |
89.352 | 9,352
5.265 I I 5,265
| 9.494 | 9,494
10
No Uraian Analisa Volume Kebutuhan Harga sal. Bahan Rp
Pembesian dengan besi polos dia 10 mm lm' (An. Membuat)
Rp.
tg
DAFTAR HARGA BAHAN, ALAT, UPAH
Bahan Rp Upah Total
Rp. Rp.
227,850 227,850
14,756 14,756
16,492 16,492
Sub total 574,700
86,196 86,196
23.059 23.059
65.438 65.438
5,693 5,693
33,618 33,618
89,675 89,675
5,284 5.284
12.704 12.704
14.199 14.199
214.179 214.179
18.494 18.494
20.670 20.670
Sub total 589.210
385.851 385.851
103.223 103.223
292.929 292.929
25.484 25.484
150.488 150.488
837.825 837.825
45.258 45.258
108.801 108.801
121.601 121.601
701.027 701.027
35.409 35.409
483 483
4.829 4.829
273.615 273.615
265.031 265.031
Sub total 3.351.852
1.345.565 1.345.565
354.131 354.131
248.929 248.929
260.875 260.875
350.121 350.121
Sub total 2.559.621
354.131 354.131
262.723 262.723
490.588 490.588
329.210 329.210
Sub total 1.436.651
790,451 790,451
286,068 286,068
214.551 214.551
319.944 319.944
Sub total 1.611.013
3.764.516 3.764.516
Sub total 5.375.529
tg'cijpta2
AT, UPAH
Total
Rp.
227,850
14,756
16,492
574,700
86,196
23.059
65.438
5,693
33,618
89,675
5.284
12.704 12.704
14.199 14.199
214.179
18.494
20.670
589.210
85.851
3.223
2.929
7.825
258
01.027
.409
3
829
345.565
4.131
48.929
4.131
2.723
790,451
286,068
4.551
9.944
611.013
764.516
375.529
URAIAN Satuan
Bahan
1 Paku kg
2 Batu Kali m3
3 Semen 40 kg zak
4 Pasir m3
5 Koral 2/3 m3
6 Besi beton Ø 6 Ij
7 Besi beton Ø 10 Ij
8 Bendrat kg
9 Begisting Ibr
10 Batu bata bh
11 Kayu 5/7 bendel
12 Keras gosok Ibr
13 Plamir kg
14 Cat tembok kg
15 Paralon 4’ Ljr
16 Keni 4" bh
17 Pintu besi bh
18 Tripleks Ibr
19 Bambu Ijr
20 Pipa PVC 8" Ljr
21 Mesin Kompa 4 selinder bh
22 Waterpam SNI 8" bh
23 Lem PVC bh
Alat
1 Meteran bh
2 Timba bh
3 Benang bh
Upah
1 Pekerja Oh
2 Tukang Oh
“ Ó'cipta
HARGA SATUAN
<Rp.>
22,000
165,000
62,000
185,000
350,000
64,000
105,000
22,000
25,000
700
250,000
10,000
38,000
32,000
370,000
60,000
1,500,000
160,000
25,000
2,518,000
33,700,000
27,540,000
25,000
43,200
11,000
7,000
85,000
95,000
Ó'cipta2
N
S
Tg. Pecinan
KETERANGAN :
BATAS KABUPATEN
O• KANTOR BUPATI
SITUBONDO KANTOR KECAMATAN
LOKASI
DANA DESA ( D D )
KABUPATEN SITUBONDO
DESA
KEGIATAN SUMU@ B
ycij¿ta1
DANA DESA ( D D )
KABUPATEN SITUBONDO
KECAMATAN CIPTA
DESA
DESA
IM PENG E GIATAN
DES
t” TAN
a esa
JUDUL GAMBAR
«pci¡pta
0.3
03 25
A12 50
?: 0 00
1 0.00 1.00
KABUPATEN
SITUBONDO
KECAMATAN CIPTA
DESA
DESA
IM PENGELOLA K GI
«pci¡pta1
TAMPAK DEPAN
TAMPAK SAMPING KANAN
TAMPAK DEPAN
KANAN TAMPAK SAMPING KIRI
DANA DESA ( D D )
KABUPATEN
SITUBONDO
KECAMATAN CIPTA
DESA
DESA
III P ’A KE TAN
MENGETAHUI
KEP DESA
CATATAN
POTONGAN B - B
0.10 :
2 50
0.20
0.80
0.20
OMPA POTONGAN A - A
0.10 :
2.50
0.20:
0.80
0.20:
POTONGAN B - B
DANA DESA ( D D )
KABUPATEN
SITUBONDO
KECAMATAN CIPTA DESA
DESA
TA
Sloof 15/20
80
80
POTONGAN A
RENCANA PONDASI
DENAH PINTU
30 80
Pas. Batu Kali 1 : 6
Sloof 15/20
80
80
POTONGAN A
RENCANA PONDASI
DANA DESA ( D D )
KABUPATEN
SITUBONDO
KECAMATAN CIPTA DESA
DESA
IM EL’
ES
CATATAN