Anda di halaman 1dari 78

KABUPATEN SITUBONDO

SUMUR BOR
Lokasi Kęgiatan RT. OO RW. OO
ecamatan Cipta Desa
GAM
@,BĄ,AR,/Ę{§j

UMUR BOR
iatan RT. OO RW. OO
ecamatan Cipta Desa
RENCANA ANGGARAN BIAYA
Propinsi Jawa Timur Panjang
Kabupaten Situbondo
Kecamatan Cipta Desa
Desa

URAIAN Volume Satuan Harga


Total Dari Dana Satuan
Swadaya DD Rp.

Bahan
1 Paku 2.00 2.00 kg 22,000
2 Batu belah 4.00 4.00 m3 165,000
3 Semen 40 kg 29.00 29.00 zak 62,000
4 Pasir 5.00 5.00 m3 185,000
5 Koral 1.00 1.00 m3 350,000
6 Besi beton B 6 4.00 4.00 ij 64,000
7 Besi beton B 10 19.00 19.00 ij 105,000
8 Bendrat 3.00 3.00 kg 22,000
9 Begisting 10.00 10.00 Ibr 25,000
10 Batu bata 2000.00 2000.00 bh 700
11 Kayu 5/7 2.00 2.00 bendel 250,000
12 Tripleks 4.00 4.00 Ibr 160,000
13 Plamir 8.00 8.00 kg 38,000
14 Kertas gosok 5.00 5.00 Ibr 10,000
15 Cat tembok 23.00 23.00 kg 35,000
16 Pintu Besi + Kusen Besi 1.00 1.00 bh 1,500,000
17 Sepiral 8" 4.00 4.00 m 370,000
18 Bambu 20.00 20.00 Ijr 25,000
19 Lem PVC 1.00 1.00 bh 25,000
20 Mesin Kompa 1.00 1.00 bh 33,700,000
21 Waterpam SNI 1.00 1.00 bh 27,540,000
22 Pipa PVC SNI 8" 19.00 19.00 Ijr 2,518,000
23 Pasang Meter Listrik 900W 1.00 1.00 Is 1,560,000
24 Tiang Listrik 3.00 3.00 bh 1,200,000

Sub Total 1) la
Upah
1 Pekerja 47.00 47.00 Oh 85,000
2 Tukang 20.00 20.00 Oh 95,000
3 Upah Pengeboran 100 m 100.0 100.00 m 850,000
4 Mobilisasi Alat Bor 1.0 1.00 Is 3,000,000

Su b Total 2) Ila
Alat
1 Timba 7.00 7.00 bh 11,000
2 Benang 2.00 2.00 bh 7,000
3 Perencanaan 1.00 1.00 Ls 3,300,000
4 Meteran 1.00 1.00 bh 43,200
Sub Total 3) Ila
Sumber Dana rofa/ Biaya DD (a+b)
rofa/ Biaya Swadaya (a+ b)
JUMLAH TOTAL ( DD + Swadaya )
Terbilang :

Mengetahui, Pengelola Kegiatan (PK)


Kepala Desa ..................
Pe
AYA
Panjang : 2,5 x 2,5 M

Dana Dari Dana DD


Swadaya Rp.
Rp.

44,000
660,000
1,798,000
925,000
350,000
256,000
1,995,000
66,000
250,000
1,400,000
500,000
640,000
304,000
50,000
805,000
1,500,000
1,480,000
500,000
25,000
33,700,000
27,540,000
47,842,000
1,560,000
3,600,000

127,790,000

3,995,000
1,900,000
85,000,000
3,000,000

93,895,000.00

77,000
14,000
3,300,000
43,200
3,434,200.00
225,119,200.00

225,119,200.00

Pengelola Kegiatan (PK)


Take Of Sheet
Kabupaten Situbondo Kecamatan
Cipta Desa Desa

GAMBAR HITUNGAN
1. Pemasangan bowplank Panjang 16 m
2. Galian tanah pondasi Panjang galian 9,4 m
a. Galian Pondasi Utama Lebar galian 0,8 m
0,95 Tinggi galian 0,9 m
b. Galian Pondasi Teras 6,77 m3
3. Urugan tanah kembali Panjang galian 4,3 m
4. Urugan pasir di bawah pondasi Lebar galian 0,3 m
0.05 Tinggi galian 0,45 m
0.7 0,58 m3
0.05 1/4 galian tanah Bangunan induk
0.5 Panjang 9,4 m
5. Anstamping Lebar 0,5 m
0.2 Tinggi 0,05 m
6. Pasangan batu Teras
Panjang 4,3 m
Lebar 0,5 m
Tinggi 0,05 m
Bangunan induk
Panjang 9,4 m
Lebar 0,5 m
Tinggi 0,2 m
Bangunan Utama
Luas penampamg = ((0.3+0.5)/2)*0,5
= 0,24 m2
Volume 1 Luas penampang x Panjang 0,24 x 9
Teras
Luas penampamg = ((0.22+0.4)/2)*0,4
= 0,078 m2
Volume 1 Luas penampang x Panjang 0,12 x 2,3
Bangunan rolag
Luas Penampang 2,3 x 0,11
0,55 m2
Bangunan rolag
Luas Penampang 2,3 x 0,11
0,55 m2
Jenis Prasarana : Sumur Bor
Lokasi
Volume : 2,5 x 2,5 m

VOLUME
16 m’
21,957 m3
5,489m3
0,235 m3
0,1075 m3
Volume tot 0,343 m3
0,94 m3
0,94 m3
2,256 m3
0,335 m3
Volume total
2,591 m3
0,550 m2
Take Of Sheet
Kabupaten : Situbondo Kecamatan : Jenis Prasarana
Cipta Desa Lokasi
Volume
Desa
GAMBAR HITUNGAN VOLUME

Pel‹erjaan beton bertulang Panjang (34,1/0,15)+1 9,4 m m2


1. Beton sloof 15/17 Luas penampang 9,4 0,026 bh
Beton
Beton Besi B 8 Kebutuhan 34,1*4 64 mm
Besi Begel Panjang ((54,8/0,15)+1)*1 0,70 mm
Begisting 0,2 ((0,15+0,17)X2)) (54,8*1) 44,6 m m2
0,2 Kebutuhan besi ((65,7/0,15)+1 9,40 m
2. Kolom praktis 15/15 Beton Besi B 10 Panjang ((3,3/0,15)+1)*2,6 37,6 m2 buah Besi0 8
Besi Kebutuhan besi ((2,6/0,1)+1)*3,3 9,4 bh
Begisting Panjang 0,4 mm
3. Ring balok 15/17 Luas penampang 2,5 mm
Beton (0,2+0,2) 0,023 m m2 Besig 10
Besi 0,2
Tinggi 4 m m2
0,2 Luas penampang 68 bh
7. Pekerjaan Plat Atap Jumlah 0,60 mm Begisting
a. Atap depan Besi B 8 Kebutuhan 40,6 mm
4,0
Begel Panjang 10,00 mmm
Beton ((0,15+0,15)X2) 40 m3
Besi Kebutuhan besi 10 mmm
4,5
Besi B 10 Panjang 0,8 m m m2
Begisting
Kebutuhan besi 9,4 btg Beton
(54,8*4)*1 0,026
Panjang 64
Besig 8
Luas penampang 0,64
(0,2+0,2) 40,7
Panjang 9,40
Luas penampang 37,6
Besi B 8 Kebutuhan 3,70
Begel Panjang 2,90
Besig 10
((0,15+0,17)X2) 0,1
Kebutuhan besi 1,07
Besi B 10 Panjang 110
Kebutuhan besi 111
65,7*4 221,20 Begisting
Panjang Lebar Tebal 3,70
Volume 2,90
Besi B 8 Memanjang 10,73
Beton
Melebar 14,80
Panjang Lebar Luas
Bambu f,5/0,4)*1 Besig 8

Besig 10

Beton
Besig 8

Begisting
Bambu
: Sumur Bor
: 2,5 x 2,5 m

VOLUME

0.24 m3

44.57 m

37.60 m

3.76 m2

0.23 m3

40.60 m

40.00 m

48.00 m2

0.24 m3

40.75 m

37.60 m

1.07 m3
221.2 m

10.73 m2
14.80 btg
Kabupaten Situbondo Kecamatan
Take Of Sheet
Jenis Prasar
Cipta Desa Lokasi
Desa Volume
GAMBAR HITUNGAN VOLUME
Pel‹erjaan dinding/ Pasangan bata
1. Bangunan induk 1:4 Bangunan Induk
3m
7,5 Panjang 9,4 m
Pel‹erjaan plesteran Plesteran dinding
Tinggi 2,5 m
1:4 Pekerjaan cat
Luas 23,5 m2

Total

Volume

Luas 64.551 m2 Volume

Dinding dan 75.281 m2


ana : Sumur Bor
: 2,5 x 2,5 m

VOLUME

26.91 m2
26.911 m2

27,461 m2

64,551 m2

75,281 m2
ANALISA PERHITUNGAN GEDUNG
ANALISA BANGUNAN SNI ( Standar Nasional Indonesia ) 2008

No Uraian Analisa Volume Kebutuhan Rep

1 Pemasangan bowplank
|Kayu | 0,0120 | 16,0 m1 | 0,192 m3 | 250,000 |
| Papan | 0,0070 | 16,0 m1 | 0,112 m3 | 25,000 |
I aku I 0,0200 I 16,0 m1 I 0,32 kg I 22,000 I
| Pekerja | 0,1000 | 16,0 m1 | 1,60 Oh | 85,000 |
| Tukang | 0,1000 | 16,0 m1 | 1,60 Oh | 95,000 |
I I I I I I
2 Galian Tanah pondasi untuk tiap m°
|Pekerja | 0,1000 | 21,96 m3 | 2,20 Oh | 85,000 |
I I I I I I

3 (Timbunan Kembali untuk tiap m°


|Pekerja | 0,1920 | 5,49 m3 | 1,05 Oh | 85,000 |

I I I I I I
4 Urugan pasir bawah temasuk penyiramannya ( m° )
|Pasir | 1,2000 | 0,34 m3 | 0,41 m3 | 185,000 |
I ekerja I 0,3000 I 0,34 m3 I 0,10 Oh I 85,000 I
I I I I I I
5 |Pekerjaan Astampeng | | | | |
|Batu | 1,1000 | 0,94 m3 | 1,03 m3 | 165,000 |
I asir I 0,3000 I 0,94 m3 I 0,28 m3 I 185,000 I
| Tukang | 0,390| 0,94 m3 | 0,37 Oh | 95,000 |
| Pekerja | 0,780| 0,94 m3 | 0,73 Oh | 85,000 |
I I I I I I
6 |Pas Batu Kali Pondasi 1 : 6 untuk tiap m° | | |
|Batu Belah | 1,100| 2,59 m3 | 2,85 m3 | 165,000 |
l semen 40kg I 117,0001 2,59 m3 I 7,58 zak I 62,000 1
|PasirPasang | 0,560| 2,59 m3 | 1,45 m3 | 185,000 |
|Tukang | 0,600| 2,59 m3 | 1,55 Oh | 95,000 |
I ekerja I 1,7001 2,59 m3 I 4,41 Oh I 85,000 I
I I I I I I

7 I ekerjaan Beton I I I I I
a|Pekerjaan Beton Sloof 15/17per m' | | | |
I Pek Beton 1:2:3 untuk tiap m3 | | | |
ISemen 40 kg I 232,00 I 0,24 m3 I 1,39 zak I 62,000 I
| Pasir Pasang | 0,5200 | 0,24 m3 | 0,12 m3 | 185,000 |
| Kerikil 2/3 | 0,7800 | 0,24 m3 | 0,19 m3 | 350,000 |
| Tukang batu | 0,2500 | 0,24 m3 | 0,06 Oh | 95,000 |
I ekerja I 1,6500 I 0,24 m3 I 0,40 Oh I 85,000 I

| Pembesian Begel dengan besi polos dia 8 mm /m' (An. Membuat) I I


IBesi Ø 6 mm I 1,0500 I 17,51 kg I 1,53 LJ I 64,000 I
I Bendrat | 0,0150 | 17,51 kg | 0,26 Kg | 22,000 |
| Pekerja | 0,0070 | 17,51 kg | 0,12 Oh | 85,000 |
l Tukang Besi I 0,0070 I 17,51 kg I 0,12 Oh I 95,000 I

I embesian Pokok dengan besi polos dia 10 mm /m' (An. Membuat) I I


|Besi Ø 10 mm | 1,0500 | 23,31 kg | 2,04 LJ | 105,000 |
| Pekerja | 0,0070 | 23,31 kg | 0,16 Oh | 85,000 |
l Tukang Besi I 0,0070 I 23,31 kg I 0,16 Oh I 95,000 I

| Pasangan begisting /m2 | | | | |


IKayu I 0,0450 I 3,76 m2 I 0,01 m3 I 250,000 I
| Paku | 0,3000 | 3,76 m2 | 0,56 kg | 22,000 |
| Pekerja | 0,3000 | 3,76 m2 | 1,13 Oh | 85,000 |
l Tukang Kayu I 0,2600 1 3,76 m2 I 0,98 Oh I 95,000 1
I I I I I I
b|Pekerjaan beton koIompraktis15/15 | | | |
( Pek Beton 1:2:3 untuk tiap m°
l Semen40kg I 232,00 1 0,23 m3
l 1,31 zak I 62,000 1
I asirPasang | 0,5200 | 0,23 m3 | 0,12 m3 | 185,000 |
|KerikiI2/3 | 0,7800 | 0,23 m3 | 0,18 m3 | 350,000 |
I
Tk
Kayu I 0,2500 I 0,23 m3 I 0,06 Oh I 95,000 I
| Pekerja | 1,6500 | 0,23 m3 | 0,37 Oh | 85,000 |

| Pembesian dengan besi polos dia 8 mm /m' (An. Membuat) | |


|Besi Ø 6 mm | 1,0500 | 15,96 Kg | 40 Ij | 64,000 |
IBendrat I 0,0150 I 15,96 Kg I 0,24 Kg I 22,000 I
lPekerja | 0,0070 | 15,96 K 0,11 Oh | 85,000 l
Tuk g Besi 0,0070 T5, Kg 0,11 Oh 95,000
GEDUNG
Indonesia ) 2008

Bahan Upah Total


Rp Rp. Rp.

48.000 | | 48,000
2.800 | | 2,800
7.040 I I 7,040
| 136.000 | 136,000
152,000 I 152,000
I Sub total I 345,840

I 186.635 I 186,635
I Sub total I 186,635

89,585 I 89,585

I Sub total I

76.035 | | 76,035
8,734 I 8,734
I Sub total | 84,769
| |
170.610 | | 170,610
52.170 I I 52,170
| 34.827 | 34,827
62,322 I 62,322
I Sub total I 319,929

| |
470.339 | | 470,339
469.950 1 I 469,950
268.469 | | 268,469
| 147.710 | 147,710
I 374.457 I 374,457
I Sub total | 1,730,926

I I
| |
| |
86.196 I I 86,196
23.059 | | 23,059
65.438 | | 65,438
| 5.693 | 5,693
I 33.618 I 33,618

I I
98.082 I I 98,082
5.780 | | 5,780
| 10.421 | 10,421
I 11.647 I 11,647

I I
214.179 | | 214,179
| 13.871 | 13,871
I 15.502 I 15,502

| |
1.692 I I 1,692
12.408 | | 12,408
| 95.880 | 95,880
92,872 I 92,872
I Subtotal | 786,339
| |

80.910 1 I 80,910
21.645 | | 21,645
61.425 | | 61,425
I 5.344 I 5,344
| 31.556 | 31,556

| |
89.352 | 9,352
5.265 I I 5,265
| 9.494 | 9,494
10
No Uraian Analisa Volume Kebutuhan Harga sal. Bahan Rp
Pembesian dengan besi polos dia 10 mm lm' (An. Membuat)
Rp.

Besi CI 10 mm 1.0500 24,80 kg 2.17 ij 105,000 227,850


Pekerja 0.0070 24,80 kg 0.17 Oh 85,000
Tukang Besi 0.0070 24,80 kg 0.17 Oh 95,000

Pekerjaan Beton Ring Balk


Pek Beton 1:2:3 untuk tiap m3 0,24 m3 1.39 zak 62,000 86,196
Semen 40 kg 232,00

Pasir Pasang 0,5200 0,24 m3 0,12 m3 185.000 23.059


65.438
Kerikil 2/3 0,7800 0,24 m3 0,19 m3 350.000

Tukang batu 0.2500 0,24 m3 0.06 Oh 95,000


Pekerja 1.6500 0,24 m3 0.40 Oh 85,000
Pembesian Begel dengan besi polos dia 8 mm lm' (An. Membuat)
Besi CI 6 mm 1,0500 16,01 kg 1,40 ij 64,000 89,675

Bendrat 0,0150 16,01 kg 0,24 Kg 22.000 5,284


Pekerja 0,0070 16,01 kg 0,15 Oh 85.000
Tukang Besi 0,0070 16,01 kg 0,15 Oh 95.000
Pembesian dengan besi polos dia 10 mm lm' (An. Membuat)

Besi CI 10 mm 1,0500 23,31 kg 2.04 ij 105,000


Pekerja 0,0093 23,31 kg 0.22 Oh 85,000
Tukang Besi 0,0093 23,31 kg 0.22 Oh 95,000

d Pekerjaan Beton Plat


Pek Beton 1:2:3 untuk tiap m3 1,07 m3 6.22 zak 62,000
Semen 40 kg 232,00
Pasir Pasang 0,5200 1,07 m3 0,56 m3 185.000
Kerikil 2/3 0,7800 1,07 m3 0,84 m3 350.000
Tukang batu 0,2500 1,07 m3 0,27 Oh 95.000
Pekerja 1,6500 1,07 m3 1,77 Oh 85.000
Pembesian besi polos dia 10 mm lm' (An. Membuat) 13,09 ij 64.000
Besi CI 10 mm 1,0500 137,14 kg 2,06 Kg 22.000
Bendrat 0,0150 137,14 kg 1,28 Oh 85.000
Pekerja 0,0070 137,14 kg 1,28 Oh 95.000
Tukang Besi 0,0070 137,14 kg 4,38 Ibr 160.000
Pasangan begisting /m2
1,61 kg 22.000
Tripleks 0,9800 10,73 m2
0,02 m3 25.000
Paku 0,3000 10,73 m2
0,02 m3 250.000
Papan 0,0450 10,73 m2
3,22 Oh 85.000
Kayu 0,0450 10,73 m2
2,79 Oh 95.000
Pekerja 0,3000 10,73 m2
1.922,24 biji 700
Tukang Kayu 0,2600 10,73 m2
5,71 zak 62.000
8 Pasangan bata merah tebal 1/2 batu (/m2) 1 PC : 6 Ps Batu
1,35 m3 185.000
Bata 70,00 27,46 m2
2,75 Oh 95.000
Semen 40 kg 8,3200 27,46 m2
4,12 Oh 85.000
Pasir 0,0490 27,46 m2
5,71 zak 62.000
Tukang Batu 0,1000 27,46 m2
1,42 m3 185.000
Pekerja 0,1500 27,46 m2
5,16 Oh 95.000
9 Plesteran dan Acian Dinding Luar Dalam ( 1 : 5 ) m*
3,87 Oh 85.000
Semen40 kg 4,3200 64,55 m2
dalam dan langit langit ( m * )
Pasir Pasang 0,0220 64,55 m2
Tukang Batu 0,0800 64,55 m2
Pekerja 0,0600 64,55 m2
10 Mlamir dan Mengecat dengan cat Tembok dinding luar

Cat Tembok 0.3000 75,28 m2 22,58 kg 35,000


Plamer 0.1000 75,28 m2 7,53 kg 38,000
Tukang Cat 0,0300 75,28 m2 2,26 Oh 95.000
Pekerja 0,0500 75,28 m2 3,76 Oh 85.000
11 Pek. Langsiran > 50 - 100 m 45,22 m3 20,35 Oh 185.000
Pekerja 0,4500

tg
DAFTAR HARGA BAHAN, ALAT, UPAH
Bahan Rp Upah Total
Rp. Rp.

227,850 227,850

14,756 14,756
16,492 16,492
Sub total 574,700

86,196 86,196

23.059 23.059
65.438 65.438

5,693 5,693
33,618 33,618

89,675 89,675

5,284 5.284
12.704 12.704
14.199 14.199

214.179 214.179
18.494 18.494
20.670 20.670
Sub total 589.210

385.851 385.851
103.223 103.223
292.929 292.929
25.484 25.484
150.488 150.488
837.825 837.825
45.258 45.258
108.801 108.801
121.601 121.601
701.027 701.027
35.409 35.409
483 483
4.829 4.829
273.615 273.615
265.031 265.031
Sub total 3.351.852
1.345.565 1.345.565
354.131 354.131
248.929 248.929
260.875 260.875
350.121 350.121
Sub total 2.559.621
354.131 354.131
262.723 262.723
490.588 490.588
329.210 329.210
Sub total 1.436.651

790,451 790,451
286,068 286,068
214.551 214.551
319.944 319.944
Sub total 1.611.013
3.764.516 3.764.516
Sub total 5.375.529

tg'cijpta2
AT, UPAH
Total
Rp.

227,850

14,756
16,492
574,700

86,196

23.059
65.438

5,693
33,618

89,675

5.284
12.704 12.704
14.199 14.199

214.179
18.494
20.670
589.210

85.851
3.223
2.929

7.825
258

01.027
.409
3
829

345.565
4.131
48.929

4.131
2.723

790,451
286,068
4.551
9.944
611.013
764.516
375.529
URAIAN Satuan

Bahan
1 Paku kg
2 Batu Kali m3
3 Semen 40 kg zak
4 Pasir m3
5 Koral 2/3 m3
6 Besi beton Ø 6 Ij
7 Besi beton Ø 10 Ij
8 Bendrat kg
9 Begisting Ibr
10 Batu bata bh
11 Kayu 5/7 bendel
12 Keras gosok Ibr
13 Plamir kg
14 Cat tembok kg
15 Paralon 4’ Ljr
16 Keni 4" bh
17 Pintu besi bh
18 Tripleks Ibr
19 Bambu Ijr
20 Pipa PVC 8" Ljr
21 Mesin Kompa 4 selinder bh
22 Waterpam SNI 8" bh
23 Lem PVC bh
Alat
1 Meteran bh
2 Timba bh
3 Benang bh
Upah
1 Pekerja Oh
2 Tukang Oh
“ Ó'cipta
HARGA SATUAN
<Rp.>

22,000
165,000
62,000
185,000
350,000
64,000
105,000
22,000
25,000
700
250,000
10,000
38,000
32,000
370,000
60,000
1,500,000
160,000
25,000
2,518,000
33,700,000
27,540,000
25,000

43,200
11,000
7,000

85,000
95,000
Ó'cipta2
N
S
Tg. Pecinan
KETERANGAN :
BATAS KABUPATEN

PETA KABUPATEN SITUBONDO BATAS KECAMATAN

O• KANTOR BUPATI
SITUBONDO KANTOR KECAMATAN
LOKASI
DANA DESA ( D D )

KABUPATEN SITUBONDO

KECAMATAN CIPTA DESA

DESA

KEGIATAN SUMU@ B

" NGEL " ” “

JUDUL GAMBAR sKALA

ycij¿ta1
DANA DESA ( D D )

KABUPATEN SITUBONDO

KECAMATAN CIPTA
DESA
DESA

KEGIATAN SUMUR BOR

IM PENG E GIATAN
DES

t” TAN

a esa

JUDUL GAMBAR

«pci¡pta
0.3
03 25
A12 50
?: 0 00
1 0.00 1.00

DENAH RUMAH POMPA


DANA DESA ( D D )

KABUPATEN
SITUBONDO

KECAMATAN CIPTA
DESA
DESA

KEGIATAN SUMUR BOR

IM PENGELOLA K GI

JUDUL GAMBAR SKALA

«pci¡pta1
TAMPAK DEPAN
TAMPAK SAMPING KANAN
TAMPAK DEPAN
KANAN TAMPAK SAMPING KIRI
DANA DESA ( D D )

KABUPATEN
SITUBONDO
KECAMATAN CIPTA
DESA
DESA

III P ’A KE TAN

MENGETAHUI
KEP DESA

CATATAN

JUDUL GAMBAR SKALA


yci¿ita
0.10 :
2 50
0.20
0.80
0.20
DENAH RUMAH POMPA
0.10 :
2.50
0.20:
0.80
0.20:

POTONGAN B - B
0.10 :
2 50
0.20
0.80
0.20
OMPA POTONGAN A - A
0.10 :
2.50
0.20:
0.80
0.20:

POTONGAN B - B
DANA DESA ( D D )

KABUPATEN
SITUBONDO
KECAMATAN CIPTA DESA

DESA

KEGIATAN SUMUR BOR

SIM PENGELOLA KEGIATAN DESA

TA

JUDUL GAMBAR sKALA


ycij¿ta
Pintu Besi
2.00
1,20
DENAH RUMAH POMPA DENAH PINTU

Sloof 15/20
80
80
POTONGAN A

RENCANA PONDASI
DENAH PINTU

30 80
Pas. Batu Kali 1 : 6
Sloof 15/20
80
80
POTONGAN A

RENCANA PONDASI
DANA DESA ( D D )

KABUPATEN
SITUBONDO
KECAMATAN CIPTA DESA

DESA

IM EL’
ES

MENGETAHUI KEPALA DESA

CATATAN

JUDUL GAMBAR sKALA


ycij¿ta

Anda mungkin juga menyukai