BAHAN DASAR
1 Semen Tonasa 40 Kg Sak 55,000.00
2 Semen Warna kg 6,000.00
3 Pasir Pasangan M3 150,000.00
4 kerikil/Batu Pecah M3 325,000.00
5 Batu Merah Biji 900.00
6 Timbunan Tanah / Pasir M3 100,000.00
7 Batu Kali / Batu Gunung M3 250,000.00
8 Sirtu M3 75,000.00
9 Besi Beton Kg 13,500.00
10 Besi Tulangan Dia 12 Btg 95,000.00
11 Besi Tulangan Dia 10 Btg 85,000.00
12 Besi Tulangan Dia 8 Btg 65,000.00
13 Besi Tulangan Dia 6 Btg 35,000.00
14 Keramik 40 x 40 cm Dos -
15 Atap Seng m' 26,400.00
16 Seng Plat lbr 30,000.00
17 Kawat Beton Kg 25,000.00
18 Tripleks 3 mm lbr 60,000.00
19 Tripleks 6 mm lbr 142,800.00
20 Balok Kayu Kls I Lokal M3 13,440,000.00
21 Papan Kayu Kls I Lokal M3 6,720,000.00
22 Balok Kayu Kls II Lokal M3 5,040,000.00
23 Papan Kayu Kls II Lokal M3 5,040,000.00
24 Balok Kayu Kls III (Beqisting) M3 3,696,000.00
25 Papan Kayu Kls III (Beqisting) M3 3,696,000.00
26 Mor / Baut / Angker Bj 15,000.00
27 Besi Strip 40,6 mm btg 65,000.00
28 Paku Kg 25,000.00
29 Paku Seng Kg 50,000.00
30 Paving Blok Bh 3,360.00
31 Cat Dasar kg 35,000.00
32 Cat Tembok kg 45,000.00
33 Cat Kayu kg 64,000.00
34 Cat Menie kg 64,000.00
35 Cat Minyak kg 25,000.00
36 Kawat Ram m' 45,000.00
37 Kaca 3 mm m2 125,000.00
UPAH TENAGA
1 Pekerja Hok 85,000.00
2 Tukang Hok 100,000.00
3 Kepala Tukang (Kader Teknik) Hok 120,000.00
4 Mandor (PTPKD) Hok 120,000.00
Mengetahui, Diajukan :
Kepala Desa Kalepu ……………….
REHAB
Kegiatan KANTOR BPD
No Uraian Jumlah Total (Rp) Bobot (%)
Target
Amiruddin ……………………..
Rekap Page 2
PROGRAM PEMBANGUNAN DAN PEMBERDAYAAN MASYARAKAT DESA
KECAMATAN SAMPAGA KABUPATEN MAMUJU
REKAPITULASI BAHAN, UPAH DAN ALAT
Desa : Bunde
Bidang Pembangunan : Rehab Kantor BPD
I Bahan
1 Tripleks 3 Mm 6.00 6.00 lbr 70,000.00 420,000.00
2 Paku 0.34 1.00 Kg 25,000.00 25,000.00
3 List Kayu 33.60 34.00 m 8,000.00 272,000.00
4 Cat Dasar 3.66 4.00 kg 50,000.00 200,000.00
5 Cat Tembok 16.60 17.00 kg 90,000.00 1,530,000.00
6 Cat Kayu 3.00 3.00 Kg 95,000.00 285,000.00
7 Daun Pintu 2.00 2.00 Bh 500,000.00 1,000,000.00
8 Papan Kegiatan 1.00 bh 100,000.00 100,000.00
3,832,000.00
II Upah
1 Pekerja 2.88 3.00 Hok 85,000.00 255,000.00
2 Tukang 5.62 6.00 Hok 100,000.00 600,000.00
3 Kader Teknik 0.56 2.00 Hok 120,000.00 240,000.00
4 PPKD 0.26 1.00 Hok 120,000.00 120,000.00
5 Perencanaan dan 1.00 1.00 Ls 404,110.00 404,110.00
Operasional TPK 1,619,110.00
III Alat
1 Alat Bantu 1.00 1.00 Ls 355,000.00 355,000.00
355,000.00
Jumlah Alat -
JUMLAH (a+b+c) - -
Jumlah Alat -
JUMLAH (a+b+c) - -
Jumlah Alat -
JUMLAH (a+b+c) 1,383,591 -
HARGA SATUAN JUMLAH HARGA
NO URAIAN KOEFISIEN VOL SAT HOK
( Rp ) ( Rp )
3 Pek. List Kayu Profil 32.00 m
a. Bahan
List Kayu Profil 1.050 33.60 m - -
Paku 0.010 0.34 kg - -
Jumlah Bahan -
b. Upah
Pekerja 0.050 1.60 Hok 85,000.00 136,000 1.60
Tukang 0.050 1.60 Hok 100,000.00 160,000 1.60
Kepala Tukang 0.005 0.16 Hok 120,000.00 19,200 0.16
Mandor 0.003 0.10 Hok 120,000.00 11,520 0.10
Jumlah Upah 326,720
c. Alat
Jumlah Alat -
JUMLAH (a+b+c) 326,720 3.46
PERHITUNGAN VOLUME BPD
BNYAK/
TEBAL/ JUMLAH
NO URAIAN PEKERJAAN La Lb Vol PANJANG Bukaan SAT
TINGGI VOL
Kusen
G PEKERJAAN PLAFOND
1 Pek. Rangka Plafond 9.00 7.00 m2
2 Pek. Plafond Tripleks 4 mm 8.20 14.40 m2
3 Pek. Cat Plafond 6.20 10.30 63.86 m2
4 Pek. Cat Dinding 6.20 2.80 17.36 m2
10.30 2.80 28.84 m2
110.06