RENCANA ANGGARAN BIAYA

DESA NAMO KECAMATAN KULAWI


TAHUN ANGGARAN 2018

Bidang : Pelaksanaan Pembangunan Desa


Kegiatan : Pembangunan Sarana Air Minum Skala Desa
Volume : 564.00 M
Waktu Pelasanaan : 2018
Sumber Dana : DDS
Output/Keluaran : Pek.Jaringan Perpipaan

Harga Satuan Jumlah Total


URAIAN Volume Satuan
Rp Rp
a b c d e=bxd
1. BAHAN & MATERIAL
1 Pipa PVC Dia 4" 60.00 M1 78,000.00 4,680,000.0
2 Pipa PVC Dia 3" 504.00 M1 53,500.00 26,964,000.0
3 Reducer 4"-3 " PVC 1.00 Buah 190,000.00 190,000.0
4 Lem Pipa 6.00 Kaleng 55,500.00 333,000.0

Sub Total 1) 32,167,000.00


2. ALAT

Sub Total 2) 0.00


3. UPAH
1 Pekerja 91.00 HOK 70,000.0 6,370,000.0
2 Tukang 51.00 HOK 100,000.0 5,100,000.0
3 Mandor 8.00 HOK 120,000.0 960,000.0

Sub Total 3) 12,430,000.00


4. LAIN-LAIN
- Ls 100,000.0 -

Sub Total 4) -
Jumlah Total 44,597,000.00
Di Bulatkan 44,597,000.00

Namo , 01 Mei 2018


Disetujui/mengesahkan Diperiksa : Pelaksana Kegiatan
Kepala Desa PDTI

( SUKARMAN ) ( HAMIRUDIN, ( AJIS )


ST )
RENCANA ANGGARAN BIAYA
DESA NAMO KECAMATAN KULAWI
TAHUN ANGGARAN 2018

Bidang : Pelaksanaan Pembangunan Desa


Kegiatan : Pembangunan Sarana Air Minum Skala Desa
Volume : 1 Unit
Waktu Pelasanaan : 2018
Sumber Dana : DDS
Output/Keluaran : Pek.Intake

Harga Satuan Jumlah Total


URAIAN Volume Satuan
Rp Rp
a b c d e=bxd
1. BAHAN & MATERIAL
1 Pasir Pasang 3.50 M3 200,000.00 700,000.0
2 Pasir Urug 1.50 M3 115,000.00 172,500.0
3 Kerikil/Sirtu 2.50 M3 350,000.00 875,000.0
4 Batu Kali 3.50 M3 350,000.00 1,225,000.0
5 Kayu Klas III 1.50 M3 1,600,000.00 2,400,000.0
6 Dolken / Kayu Perancah 100.00 Btng 2,000.00 200,000.0
7 Semen Portland 26.00 Zak 78,750.00 2,047,500.0
8 Besi Polos 350.00 Kg 11,500.00 4,025,000.0
9 Bendrat / Kawat Pengikat 5.00 Kg 30,000.00 150,000.0
10 Paku Tanam 12.00 Kg 23,000.00 276,000.0
11 Cat Tembok Polimer 4.00 Kg 40,000.00 160,000.0
12 Pipa GIP Dia 6" 6.00 M' 238,500.00 1,431,000.0
13 Pipa PVC Dia 6" 12.00 M' 111,500.00 1,338,000.0
14 Pipa Strainer 6" 1.00 Bh 880,000.00 880,000.0
15 Gate Valve 6" (Cast Iron) 1.00 Bh 1,650,000.00 1,650,000.0
16 Flanged Steel Dia 6" 2.00 Bh 112,000.00 224,000.0
17 Flanged Socket 6" 1.00 Bh 363,000.00 363,000.0
18 Elbow 4" PVC 3.00 Bh 167,000.00 501,000.0
19 Packing Karet Dia 6" 2.00 Bh 18,500.00 37,000.0
20 Baut 5/8" 8.00 Bh 5,000.00 40,000.0
21 Lem Pipa (dos) 1.00 Kg 16,500.00 16,500.0

Sub Total 1) 18,711,500.00


2. ALAT

Sub Total 2) 0.00


3. UPAH
1 Pekerja 38.00 HOK 70,000.0 2,660,000.0
2 Tukang 23.00 HOK 100,000.0 2,300,000.0
3 Mandor 3.00 HOK 120,000.0 360,000.0

Sub Total 3) 5,320,000.00


4. LAIN-LAIN

t43whtrewsrd
Sub Total 4) -
Jumlah Total 24,031,500.00
Di Bulatkan 24,031,500.00

Namo ,01 Mei 2018


Disetujui/mengesahkan Diperiksa : Pelaksana Kegiatan
Kepala Desa PDTI

( SUKARMAN ) ( HAMIRUDIN, ST ) ( AJIZ )


RENCANA ANGGARAN BIAYA
DESA NAMO KECAMATAN KULAWI
TAHUN ANGGARAN 2018

Bidang : Pelaksanaan Pembangunan Desa


Kegiatan : Pembangunan Sarana Air Minum Skala Desa
Volume : 1 Unit
Waktu Pelasanaan : 2018
Sumber Dana : DDS
Output/Keluaran : Pek.Intake & Pemasangan Pipa

Harga Satuan Jumlah Total


URAIAN Volume Satuan
Rp Rp
a b c d e=bxd
1. PEMBANGUAN IMTEK
18,711,500.00

Sub Total 1) 18,711,500.00


2.PEMASANGAN PIPA
32,167,000.00

Sub Total 2) 32,167,000.00


3. UPAH
1 IMTEK HOK 5,320,000.0
2 PEMASANGAN PIPA HOK 12,430,000.0

Sub Total 3) 17,750,000.00


4. LAIN-LAIN
1 PERENCANAN 2,200,000.0
2 BOK TPK 1,401,500.00
Sub Total 4) 3,601,500.00
Jumlah Total 72,230,000.00
Di Bulatkan 72,230,000.00

Namo , 01 Mei 2018


Disetujui/mengesahkan Diperiksa : Pelaksana Kegiatan
Kepala Desa PDTI

( SUKARMAN ) ( HAMIRUDIN, ST ) ( AJIS )