VOLUME
Harga PPN dan Jumlah
URAIAN Dari Dari Satuan Jumlah
Total Satuan (Rp) PPH 22 Penerimaan
Swadaya DANA
1 Belanja Barang
1.1 Besi Pagar Jadi t.0,9m x p.22m 22,0 - 22 m2 300.000 6.600.000 834.900 6.600.000
1.2 Pintu Pagar Jadi t. 2m x p.3,5m 1,0 - 1 Unit 750.000 750.000 94.875 750.000
1.3 Pasir Pasang 6,0 6 m3 425.000 2.550.000 322.575 2.550.000
1.4 Semen Gresik 40 Kg 50,0 50 sak 60.000 3.000.000 3.000.000
1.5 Batu Koral 2-3 4,0 4 m3 365.000 1.460.000 184.690 1.460.000
1.6 Bata Merah 1.490,0 1.490 bh 900 1.341.000 1.341.000
1.7 Pilar l 25 x t 25 cm 6,0 6 Unit 140.000 840.000 840.000
1.8 Pilar l 40 x t 40 cm 1,0 1 Unit 170.000 170.000 170.000
1.9 Besi @8a 22,0 22 batang 52.500 1.155.000 1.155.000
1.10 Besi @6a 12,0 12 batang 26.000 312.000 312.000
1.11 Batu Andesif/ Kumbung 49,0 49 bh 14.000 686.000 686.000
1.12 Cat tembok 25,0 25 kg 140.000 3.500.000 3.500.000
1.13 Bak Cor 4,0 4 biji 12.000 48.000 48.000
1.14 Triplek 8mm 4,0 4 biji 160.000 640.000 640.000
1.15 Palamir 40 40 Kg 35.000 1.400.000 1.400.000
Sub Total 1 24.452.000 ######## 24.452.000
2 Belanja Barang dan Alat
2.1 Paku 2 2 kg 19.000 38.000 38.000