Anda di halaman 1dari 6

RENCANA ANGGARAN BIAYA

Program : PEMBANGUNAN DESA Dimensi


Kegiatan : PEMBANGUNAN RABAT JALAN Panjang 261.50
Pekerjaan : RABAT TEBAL 0.15
Lokasi : JL. BOTORIYAN RT 02 RW 01 DUKUH KRAJAN LEBAR 2.5
Sumber Dana : HIBAH PROPINSI Volume 98.063
Tahun Anggaran : 2022

VOLUME Harga Jumlah Jumlah


BELANJA MODAL Dari Dari Satuan Satuan Harga Swadaya Total
Total
Swadaya Hibah Prop. ( Rp. ) (Rp.) ( Rp. )
a b c=a-b d e f=b x e g=cxe
I BAHAN MATERIAL
1 Semen ( 40 Kg) 863.00 863.00 zak 62,500 53,937,500
2 Pasir Beton 52.00 52.00 m3 380,000 19,760,000
3 Batu Pecah 2/3 75.00 75.00 m3 320,000 24,000,000
4 Pasir Urug 35.00 35.00 Kg 100,000 3,500,000
5 Plastik Cor 449.00 449.00 m3 4,000 1,796,000
Sub Total 1) Rp 102,993,500
II ALAT
1 Benang 7.00 7.00 roll 3,000 21,000
2 Ember 20.00 20.00 bh 12,500 250,000
3 Paku 3.00 3.00 Kg 18,000 54,000
4 kayu reng bakesting 3.00 3.00 bgk 80,000 240,000
5 kayu usuk bakesting ( 3m) 10.00 10.00 ljr 30,000 300,000
6 papan cor 98.00 98.00 lbr 15,000 1,470,000
7 Arco 3.00 3.00 unit 550,000 1,650,000
Sub Total 2) Rp 3,985,000
III UPAH PEKERJA
1 Tukang 67.00 67.00 hok 100,000 6,700,000
2 Pekerja 263.00 263.00 hok 85,000 22,355,000
Sub Total 3) Rp 29,055,000
IV PRASASTI
1 Prasasti 1.00 1.00 buah Rp 303,500 303,500
Sub Total 4) Rp 303,500
TOTAL BIAYA Rp 136,337,000

Ngrandu, 27 September 2022


DIBUAT OLEH
KETUA POKMAS BOTORIYAN

EKO WAHYUDI
REKAPITULASI
LAPORAN PENGGUNAAN DANA HIBAH

Program : PEMBANGUNAN DESA


Kegiatan : PEMBANGUNAN RABAT JALAN
Pekerjaan : RABAT
Lokasi : JL. BOTORIYAN RT 02 RW 01 DUKUH KRAJAN
Sumber Dana : HIBAH PROPINSI
Tahun Anggaran : 2022

NO URAIAN BELANJA RENCANA (JUMLAH/ Rp ) REALISASI ( Jumlah/ Rp) SELISIH ( Rp) KET.

I BAHAN MATERIAL
1 Semen ( 40 Kg) 53,937,500 53,937,500 -
2 Pasir Beton 19,760,000 19,760,000 -
3 Batu Pecah 2/3 24,000,000 24,000,000 -
4 Pasir Urug 3,500,000 3,500,000 -
5 Plastik Cor 1,796,000 1,796,000 -
JUMLAH I 102,993,500 102,993,500 -
II ALAT
1 Benang 21,000 21,000 -
2 Ember 250,000 250,000 -
3 Paku 54,000 54,000 -
4 kayu reng bakesting 240,000 240,000 -
5 kayu usuk bakesting ( 3m) 300,000 300,000 -
6 papan cor 1,470,000 1,470,000 -
7 Arco 1,650,000 1,650,000 -
JUMLAH II 3,985,000 3,985,000 -
III UPAH PEKERJA
1 Tukang 6,700,000 6,700,000 -
2 Pekerja 22,355,000 22,355,000 -
JUMLAH III 29,055,000 29,055,000 -
IV PRASASTI
1 Prasasti 303500 303500 -
JUMLAH IV 303500 303500 -
JUMLAH I,II,II & IV 136,337,000 136,337,000
-

ember 2022
IBUAT OLEH
BOTORIYAN

EKO WAHYUDI
RENCANA ANGGARAN BIAYA

Program : PEMBANGUNAN JEMBATAN Dimensi


Kegiatan : PLAT DEUKER Panjang
Pekerjaan : JEMBATAN Volume
Lokasi : Dukuh Ngeluk RT 03 RW 01
Sumber Dana : BKKD
Tahun Anggaran : Desember 2021

VOLUME Harga Jumlah


BELANJA MODAL Dari Dari Satuan Satuan Harga Swadaya
Total
SwadayaHibah Prop. ( Rp. ) (Rp.)
a b c=a-b d e f=b x e
I TENAGA KERJA
1 Pekerja 103.00 103.00 oh 75,000
2 Tukang 51.00 51.00 oh 90,000
Sub Total 1)
II BAHAN
1 Semen Portland 30.00 30.00 roll 3,000
2 Pasir Pasang 11.00 11.00 Bngk 70,000
3 Pasir Beton 11.00 11.00 Kg 14,000
4 Batu Belah 15/200cm 25.00 25.00 buah 12,500
5 Batu Pecah 2/3 3.00 3.00 buah 15,000
6 Kawat Bendrat 4.00 4.00 buah 30,000
7 Besi Ø12-150
8 Besi Ø10
9 Besi Ø6-150
10 kelas IV ( kayu meranti/kayu lokal
11 Paku Biasa
12 Minyak bekesting
13 kelas IV Kayu Balok Lokal
14 Triplek tebal 9mm (120x240)
3.00 3.00 buah 650,000
Sub Total 2)
III UPAH PEKERJA
1 Tukang 171.00 171.00 hok 100,000
2 Pekerja 394.00 394.00 hok 90,000
Sub Total 3)
IV PRASASTI
1 Prasasti 1.00 1.00 buah Rp 377,500
Sub Total 4)
TOTAL BIAYA

Ngrandu, 16 November 2021


DIBUAT OLEH
KETUA POKMAS SIDO MUKTI
SUPARDI
4x2,60 m
10.40 m3

Jumlah
Total
( Rp. )
g=cxe

7,725,000
4,590,000
Rp 12,315,000

90,000
770,000
154,000
312,500
45,000
120,000

1,950,000
Rp 3,441,500

17,100,000
35,460,000
Rp 52,560,000

377,500
Rp 377,500
Rp 68,694,000

, 16 November 2021

OKMAS SIDO MUKTI

Anda mungkin juga menyukai