IV PEKERJAAN BAJA
1 Pipa hitam dia. 12" 424.00 kg 34,255.00 14,524,120.00
2 Besi hollow 40 x 40 tb. 2 mm 164.20 m' 27,474.00 4,511,230.80
3 Besi siku 50.50.4 22.87 kg 27,474.00 628,330.38
4 Angkur HTB 32 mm 16.00 bh 200,000.00 3,200,000.00
5 Base plate tb. 19 mm 53.68 kg 27,474.00 1,474,804.32
6 Plat simpul tb. 19 mm 4.56 kg 27,474.00 125,281.44
7 Besi polos dia. 10 mm 6.12 kg 20,399.00 124,841.88
8 Pengecatan baja termasuk cat anti karat 1.00 ls 1,000,000.00 1,000,000.00
JUMLAH IV 25,588,608.82
V PEKERJAAN PENYELESAIAN
1 Pembersihan/Perapihan Kembali 1.00 ls 500,000.00 500,000.00
JUMLAH V 500,000.00
JUMLAH Rp 33,636,476.66
PPN 10 % Rp 3,363,647.67
TOTAL JUMLAH Rp 37,000,124.32
DIBULATKAN Rp 37,000,000.00
1 2 3 4 5 6 7 9 10 12 13 14 15 16 17
GALIAN PONDASI
1.00 x 1.00 x 1.00 = 1.00
1.00 x 20 = 20.00
20.00 x 2 = 40.00 40.00
LANTAI KERJA
1.00 x 1.00 x 0.05 = 0.05
0.05 x 20 = 1.00
1.00 x 2 = 2.00 2.00
PASIR URUG
1.00 x 1.00 x 0.08 = 0.08
0.08 x 20 = 1.60
1.60 x 2 = 3.20 3.20
BEKISTING PONDASI
4 x 0.3 x 0.6 = 0.72
0.72 x 40 = 28.80 28.80
PONDASI
BETON K-225
1.00 x 1.00 x 0.35 = 0.35
1.00 x 1.00 x 0.05 = 0.05
0.30 x 0.30 x 0.6 = 0.05 +
0.45
0.45 x 20 = 9.08
9.08 x 2 = 18.16 18.16
BEKISTING SLOOF
0.3 x 2 x 2 = 1.2
1.2 x 10 = 12.00 12.00
BEKISTING SLOOF
0.4 x 2 x 2 = 1.6
1.60 x 10 = 16.00 16.00
TIPE-2
4 x 0.3 x 0.3 = 0.36
0.36 x 2 = 0.72
0.72 x 2 = 1.44
TIPE-3
4.5 x 0.3 x 0.3 = 0.41
0.41 x 2 = 0.81
0.81 x 2 = 1.62
BEKISTING KOLOM
TIPE-1
0.3 x 3.5 x 4 = 4.2
4.2 x 2 = 8.4
8.4 x 6 = 50.4
TIPE-2
0.30 x 4 x 4.00 = 4.80
4.80 x 2 = 9.60
9.60 x 2 = 19.20
TIPE-3
0.30 x 4.5 x 4.00 = 5.40
5.40 x 2 = 10.80
10.80 x 2 = 21.60
BEKISTING KOLOM
0.4 x 4 x 2 = 3.2
0.2 x 4 x 2 = 1.6 +
4.8
= 9.00 x 10.00
= 90.00 90.00
BEKISTING BALOK
0.25 x 2 x 2.00 = 1.00
0.20 x 2 = 0.40 +
1.40
= 1.40 + 1.00
= 2.40
= 2.40 x 10.00
= 24.00 24.00
JUMLAH 40.00 2.00 3.20 28.80 18.16 28.00 2.80 181.20 18.84 12.56 5.40 24.00 2.00
PERHITUNGAN PEMBESIAN
KOLONEL YOSO
PONDASI
TULANGAN UTAMA
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
A B C D E F (C x D x E) G H (F x G)
1 12 2.8 10 20 560 0.888 497.28
S1 20X30
P-0.40
100 30
30
100
100
Ш10 - 150
20
tinggi 1 m
lebar 20 cm
URUGAN PASIR 8 CM
bengkokan 5 cm
P-110
200 ∅10 - 200
L ANTAI KERJA 5 CM
100
6 Ш 12
300
300
tebal selimut 50 mm
bengkokan 5 cm
SLOOF 20 x 30
TULANGAN UTAMA SLOOF
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
4 Ш 12
200
sengkang 20 x 10
tebal selimut beton 50 mm
KOLOM 30 x 30
TULANGAN UTAMA KOLOM
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
1 12 4 6 4 96 0.888 85.248
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
6 Ш 12
bengkokan 5 cm
JUMLAH ∅ 10 233.226
BALOK 20x25
TULANGAN UTAMA BALOK
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
2 Ш 12
200
3 Ш 12
bengkokan 5 cm
TULANGAN SENGKANG BALOK
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
∅ 10 388.093 KG
KETERANGAN JUMLAH KEBUTUHAN BESI ∅ 12 1152.624 KG
PERHITUNGAN PEMBESIAN
GOR PAKANSARI
PONDASI
TULANGAN UTAMA
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
P-0.40
100 30
30
100
Ш10 - 150
20
URUGA N PASIR 8 CM
P-110
200 LANTAI KERJA 5 CM
1 00
tinggi 1 m
lebar 20 cm
bengkokan 5 cm
6 Ш 12
SLOOF 20 X 40
TULANGAN UTAMA SLOOF
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
4 Ш 12
100
PANJANG 2,5 M
BENGKOKAN 5 CM
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
6 Ш 12
No Diameter Besi Panjang (m) Jumlah Besi Tulangan (bh) Jumlah Unit (bh) Panjang Total (m) Koef. Berat/m' Volume (kg)
I PEKERJAAN PERSIAPAN
1 Mobilisasi 1.00 Ls 3,000,000.00 3,000,000.00
2 Papan nama kegiatan 2.00 Unit 500,000.00 1,000,000.00
3 Pekerjaan Pembongkaran Papan Reklame 4x6 1.00 ls 5,000,000.00 5,000,000.00
4 Penebangan Pohon dan pemangkasan 1.00 Ls 2,000,000.00 2,000,000.00
JUMLAH I 11,000,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian tanah Pondasi 40.00 m3 132,278.44 5,291,137.50
2 Urugan tanah kembali 21.80 m3 97,906.88 2,134,369.88
JUMLAH II 7,425,507.38
5 sloof Jl.Pakansari
Beton Sitemix K.225 1.60 m3 1,674,691.16 2,679,505.86
Besi Beton Dia.10 77.74 kg 18,980.63 1,475,591.86
Besi Beton Dia.12 92.35 kg 18,980.63 1,752,898.81
Bekisting Multiplek 12 mm 16.00 m2 222,350.00 3,557,600.00
7 Kolom Jl.Pakansari
Beton Sitemix K.225 12.00 m3 1,674,691.16 20,096,293.96
Besi Beton Dia.10 222.12 kg 18,980.63 4,215,976.74
Besi Beton Dia.12 399.60 kg 18,980.63 7,584,658.31
Bekisting Multiplek 12 mm 90.00 m2 222,350.00 20,011,500.00
V PEKERJAAN PENGECATAN
1 Cat tembok Vinilex Jl.kolonel Yoso 90 m2 58,246.40 5,242,176.23
2 Cat tembok Vinilex Jl.Pakansari 109.2 m2 58,246.40 6,360,507.15
JUMLAH V 11,602,683.38
VI PEKERJAAN ELEKTRIKAL
1 Pemasangan lampu 20.00 Titik 681,155.20 13,623,104.00
2 lampu LED strip SMD 5050 outdoor 12 Volt Jl. Gor Pakansari 114.00 m 45,000.00 5,130,000.00
3 lampu LED strip SMD 5050 outdoor 12 Volt Jl. Kolonel Yoso 106.00 m 45,000.00 4,770,000.00
4 Lampu sorot taman outdor 100 watt outdoor 20.00 buah 275,000.00 5,500,000.00
5 Kabel NYY 3x4mm 2.00 roll 2,835,000.00 5,670,000.00
6 Pipa kabel 20.00 btg 16,500.00 330,000.00
7 powes supply 60 watt 8.00 buah 66,000.00 528,000.00
8 stop kontak timer 4.00 buah 100,000.00 400,000.00
9 box panel listrik outdoor topi 4.00 buah 400,000.00 1,600,000.00
10 Pemasangan MCB 24.00 Buah 878,540.59 21,084,974.26
11 Penyambungan Sumber listrik 900 Wt 4.00 Titik 2,500,000.00 10,000,000.00
JUMLAH VI 68,636,078.26
JUMLAH Rp 454,545,528.80
PPN 10% Rp 45,454,552.88
JUMLAH + PPN Rp 500,000,081.68
DIBULATKAN Rp 500,000,000.00
JUMLAH X
PEMERINTAH KABUPATEN BOGOR
I PEKERJAAN PERSIAPAN
1 Mobilisasi 1.00 Ls 3,000,000.00 3,000,000.00
2 Papan nama kegiatan 2.00 Unit 500,000.00 1,000,000.00
JUMLAH I 4,000,000.00
II PEKERJAAN TANAH DAN PONDASI
1 Galian tanah Pondasi 40.00 m3 132,278.44 5,291,137.50
2 Urugan tanah kembali 21.80 m3 97,906.88 2,134,369.88
3 Penebangan Pohon 1.00 Ls 1,000,000.00 1,000,000.00
JUMLAH II 8,425,507.38
V PEKERJAAN PENGECATAN
1 Cat tembok Vinilex Jl.jendral Yoso 90 m2 69,176.44 6,225,879.83
2 Cat tembok Vinilex Jl.Pakansari 109.2 m2 69,176.44 7,554,067.52
JUMLAH V 13,779,947.35
VI PEKERJAAN ELEKTRIKAL
1 Pemasangan lampu 20.00 Titik 681,155.20 13,623,104.00
2 lampu LED strip SMD 5050 outdoor 12 Volt Jl. Gor Pakansari 114.00 m 28,600.00 3,260,400.00
3 lampu LED strip SMD 5050 outdoor 12 Volt Jl. Jendral Yoso 106.00 m 28,600.00 3,031,600.00
4 Lampu sorot tama outdor 100 watt outdoor 20.00 buah 275,000.00 5,500,000.00
5 Kabel NYY 3x4mm 2.00 roll 1,835,000.00 3,670,000.00
6 Pipa kabel 20.00 btg 12,500.00 250,000.00
7 powes supply 60 watt 8.00 buah 66,000.00 528,000.00
8 stop kontak timer 4.00 buah 40,000.00 160,000.00
9 box panel listrik outdoor topi 4.00 buah 400,000.00 1,600,000.00
10 Pemasangan MCB 24.00 Buah 661,390.40 15,873,369.60
11 Penyambungan Sumber listrik 900 Wt 4.00 Titik 1,000,000.00 4,000,000.00
JUMLAH VI 51,496,473.60
JUMLAH Rp 451,583,309.58
PPN 10% Rp 45,158,330.96
JUMLAH + PPN Rp 496,741,640.53
DIBULATKAN Rp 496,741,000.00
Terbilang : Empat Ratus Sembilan Puluh Sembilan Juta sembilan ratus sembilan puluh sembilan Ribu Rupiah
II PEKERJAAN BETON
1 Lantai Kerja Beton Tumbuk ad.1 : 3 : 5 0.05 m3 897,635.20 44,881.76
2 Pasir urug 0.05 m3 528,330.00 26,416.50
3 Pondasi Poor Plate
Beton Sitemix K.225 0.75 m3 1,622,360.19 1,216,770.14
Besi Beton dia. 16 mm 70.45 kg 44,887.04 3,162,291.97
4 Pedestal
Beton Sitemix K.225 0.54 m3 1,622,360.19 876,074.50
Besi Beton dia. 16 mm 64.60 kg 44,887.04 2,899,702.78
Bekisting Multiplek 3.00 m2 206,828.60 620,485.80
JUMLAH III 8,846,623.46
JUMLAH IV 27,314,649.44
IV PEKERJAAN PENYELESAIAN
1 Pembersihan/Perapihan Kembali 1.00 ls 550,000.00 550,000.00
JUMLAH V 550,000.00
JUMLAH Rp 38,030,182.06
DIBULATKAN Rp 38,000,000.00
3 (TIGA ) UNIT Rp 114,000,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A Tenaga Kerja
B Bahan -
C Peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0070 119,000.00 833.00
Tukang Besi OH 0.0070 157,000.00 1,099.00
Kepala Tukang OH 0.0007 197,000.00 137.90
Mandor OH 0.0003 240,000.00 72.00
JUMLAH TENAGA KERJA 2,141.90
B BAHAN
Besi Beton ( Polos / Ulir ) Kg 1.0500 36483.3333333333 38,307.50
Kawat Beton Kg 0.0150 23800 357.00
JUMLAH HARGA BAHAN 38,664.50
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 119,000.00 35,700.00
Tukang Kayu OH 0.2600 155,000.00 40,300.00
Kepala Tukang OH 0.0260 200,000.00 5,200.00
Mandor OH 0.0050 240,000.00 1,200.00
JUMLAH TENAGA KERJA 82,400.00
B BAHAN
Kayu papan terentang M3 0.0400 2335900 93,436.00
Paku Biasa 2" - 5" Kg 0.3000 20900 6,270.00
Minyak Bekisting Ltr 0.2000 29600 5,920.00
JUMLAH HARGA BAHAN 105,626.00
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
B BAHAN
C PERALATAN
SHT 2017
NO BAHAN/MATERIAL SPESIFIKASI SATUAN
BAHAN HARGA HARGA
SWAKELOLA KONTRAKTUAL
1 2 3 4 5
A. BAHAN/MATERIAL AGREGAT DLL
1 Penggalian tanah biasa m3 132,278
2 Pengurugan kembali galian tanah m3 97,907
3 beton untuk lantai kerja m3 1,252,661
4 Pengurugan pasir m3 484,551
5 beton mutu k225 m3 1,674,691
6 Pembesian dengan besi polos atau besi ulir Kg 18,981
7 Memasang bekisting m2 222,350
8 Pemasangan 1 buah titik lampu Titik 681,155
9 Pemasangan 1 buah MCB Buah 878,541
10 Pengecatan m2 58,246
Penggalian 1 m3 tanah biasa sedalam 1 m
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.750 151,500.00 113,625.00
Mandor L.04 OH 0.025 265,125.00 6,628.13
JUMLAH TENAGA KERJA 120,253.13
B BAHAN
Pengurugan 1 m3 pasir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA (Rp) (Rp)
Pekerja L.01 OH 0.300 151,500.00 45,450.00
Mandor L.04 OH 0.010 265,125.00 2,651.25
JUMLAH TENAGA KERJA 48,101.25
B BAHAN
Pasir urug 1.200 327,000.00 392,400.00
JUMLAH HARGA BAHAN 392,400.00
C PERALATAN
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 151,500.00 3,030.00
Tukang cat L.02 OH 0.063 189,375.00 11,930.63
Kepala tukang L.03 OH 0.006 227,250.00 1,431.68
Mandor L.04 OH 0.003 265,125.00 795.38
JUMLAH TENAGA KERJA 17,187.68
B BAHAN
Plamuur Kg 0.150 50,000.00 7,500.00
Cat dasar Kg 0.150 121,000.00 18,150.00
Cat penutup vinilex Kg 0.300 33,712.00 10,113.60
JUMLAH HARGA BAHAN 35,763.60
C PERALATAN
Memasang 1 m2 bekisting
Kayu kelas III 0.030 m³ 2,650,000.00 79,500.00
Bahan
Paku 5-12 cm 0.400 kg 16,000.00 6,400.00
Pekerja 0.660 HO 151,500.00 99,990.00
Tenaga
Kepala tukang 0.033 HO 227,250.00 7,499.25
kerja
Mandor 0.033 HO 265,125.00 8,749.13
Jumlah 202,138.38
Overhead + Profit 20,213.84
Jumlah 222,352.21
Dibulatkan 222,350.00
Pekerjaan Ornamen Stainless Jl.Kol. Edy Yoso Martadipura Tipe 1 per Unit
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.000 151,500.00 303,000.00
Tukang Las L.02 OH 2.000 189,375.00 378,750.00
Tukang Khusus Alumunium L.02 OH 1.500 189,375.00 284,062.50
Kepala Tukang L.03 OH 0.300 227,250.00 68,175.00
Mandor L.04 OH 0.165 265,125.00 43,745.63
JUMLAH TENAGA KERJA 1,077,733.13
B BAHAN
Stainles warna M 9.600 150,000.00 1,440,000.00
Stainles M 35.132 113,750.00 3,996,315.05
JUMLAH HARGA BAHAN 5,436,315.05
C PERALATAN
Mesin Las Listrik 250A, diesel 1.500 150,000.00 225,000.00
JUMLAH HARGA ALAT 225,000.00
Pekerjaan Ornamen Stainless Jl.Kol. Edy Yoso Martadipura Tipe 2 Per Unit
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA (Rp) (Rp)
Pekerja L.01 OH 2.000 151,500.00 303,000.00
Tukang Las L.02 OH 2.000 189,375.00 378,750.00
Tukang Khusus Alumunium L.02 OH 1.500 189,375.00 284,062.50
Kepala Tukang L.03 OH 0.300 227,250.00 68,175.00
Mandor L.04 OH 0.165 265,125.00 43,745.63
JUMLAH TENAGA KERJA 1,077,733.13
B BAHAN
Stainles warna M 12.800 150,000.00 1,920,000.00
Stainles M 43.000 113,750.00 4,891,250.00
JUMLAH HARGA BAHAN 6,811,250.00
C PERALATAN
Mesin Las Listrik 250A, diesel 1.500 150,000.00 225,000.00
JUMLAH HARGA ALAT 225,000.00
HARGA HARGA
NO BAHAN/MATERIAL SPESIFIKASI BAHAN SATUAN
SWAKELOLA KONTRAKTUAL
1 2 3 4 5 6
1 PC /Portland Cement kg 1,690 1859
2 PB / Pasir Beton m3 405000 445500
3 Kr / Krikil m3 357000 392700
4 Pasir urug m3 327000 359700
5 Air ltr 300 330
6 Besi beton (polos/ulir) 12 kg 13508 14859
7 Kawat Beton kg 28000 30800
8 Pipa listrik 5/8” btg 13400 14740
9 Kabel m 4900 5390
10 T Dus bh 10100 11110
11 L Bow bh 5700 6270
12 Las Dop bh 44400 48840
13 Klem bh 8400 9240
14 Mongkok bh 10900 11990
15 Saklar bh 24800 27280
16 Fitting bh 14600 16060
17 Plamuur kg 50000 55000
18 MCB bh 161400 177540
19 Cat dasar kg 121000 133100
20 Cat penutup vinilex kg 33712 37083
21 Kayu kelas III m3 2,650,000 2915000
22 Angkur bh 30,000 33000
23 Paku 5-12 cm kg 16000 17600
24 Stainless m 455000 500500
28 Kabel NYY 3x4mm roll 2835000 3118500
STANDAR UPAH
UPAH (SWAKELOLA) UPAH (KONTRAKTUAL)
NO.
URAIAN Org/jam Org/hari Org/jam Org/hari
1 2 3 4 5 6
1 Mandor 37,875.00 265,125.00 41,662.50 291,637.50
2 Kepala Tukang Batu 32,464.29 227,250.00 35,710.71 249,975.00
3 Kepala Tukang Kayu 32,464.29 227,250.00 35,710.71 249,975.00
4 Kepala Tukang Besi 32,464.29 227,250.00 35,710.71 249,975.00
5 Kepala Tukang Cat 32,464.29 227,250.00 35,710.71 249,975.00
6 Kepala Tukang Listrik 32,464.29 227,250.00 35,710.71 249,975.00
7 Tukang Batu 27,053.57 189,375.00 29,758.93 208,312.50
8 Tukang Kayu 27,053.57 189,375.00 29,758.93 208,312.50
9 Tukang Besi/Baja 27,053.57 189,375.00 29,758.93 208,312.50
10 Tukang Aluminium 27,053.57 189,375.00 29,758.93 208,312.50
11 Tukang Cat 27,053.57 189,375.00 29,758.93 208,312.50
12 Tukang Listrik 27,053.57 189,375.00 29,758.93 208,312.50
13 Tukang Pipa 27,053.57 189,375.00 29,758.93 208,312.50
14 Tukang Plitur 27,053.57 189,375.00 29,758.93 208,312.50
15 Tukang Taman 27,053.57 189,375.00 29,758.93 208,312.50
16 Pembantu Tukang 21,642.86 151,500.00 23,807.14 166,650.00
17 Pekerja Biasa 21,642.86 151,500.00 23,807.14 166,650.00
18 Penjaga Malam 27,053.57 189,375.00 29,758.93 208,312.50
19 Sopir 32,464.29 227,250.00 35,710.71 249,975.00
20 Operator 37,875.00 265,125.00 41,662.50 291,637.50
21 Mekanik 37,875.00 265,125.00 41,662.50 291,637.50
22 Pembantu Sopir 21,642.86 151,500.00 23,807.14 166,650.00
23 Pembantu Operator 21,642.86 151,500.00 23,807.14 166,650.00
24 Pembantu Mekanik 21,642.86 151,500.00 23,807.14 166,650.00