Anda di halaman 1dari 28

RENCANA ANGGARAN BIAYA

KEGIATAN #REF!
PEKERJAAN : PEMBANGUNAN RUMAH DINAS BPP BLANGPIDIE
LOKASI #REF!
TAHUN ANGGARAN #REF!

JUMLAH
NO JENIS PEKERJAAN VOLUME/SAT ANALISA HARGA SATUAN
HARGA
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Pkt Taksir 850,000.00 850,000.00
2 Pemasangan Bowplank 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
3 Direksi Keet / Sewa Gudang 1.00 Unt Taksir 1,000,000.00 1,000,000.00
4 Administrasi & Dokumentasi 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Papan Nama Kegiatan 1.00 Unt Taksir 650,000.00 650,000.00
Jumlah I 5,500,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 42.60 M³ A.1 31,425.00 1,338,705.00
2 Urugan Bekas Galian 14.20 M³ A.11 12,826.50 182,136.30
3 Urugan Tanah Bawah Lantai 35.81 M³ A.12 102,855.00 3,683,237.55
4 Urugan Pasir dibawah Lantai 13.79 M³ A.12a 90,570.00 1,248,675.00
Jumlah II 6,452,753.85

III PEKERJAAN PASANGAN DAN BETON


1 Aanstamping 9.80 M³ G.I.1 10,260.00 100,548.00
2 Pasangan Pondasi Batu Kali 20.83 M³ G.I.5 623,430.00 12,982,929.75
3 Lantai Kerja 1 : 3 : 5 0.54 M³ G.XIII.12 727,371.00 392,780.34
4 Pasangan Trasraam Bata 1 : 2 49.48 M² G.II.2 133,914.10 6,626,069.67
5 Pasangan Bata Pelapis Kolom 1 : 2 20.00 M² G.II.2 133,914.10 2,678,282.00
6 Pasangan Bata 1 : 4 257.10 M² G.II.4 116,624.10 29,984,540.33
7 Plesteran 1 : 2 108.98 M² G.X.2 37,480.50 4,084,624.89
8 Plesteran 1 : 4 514.21 M² G.X.4 33,105.50 17,023,123.01
Jumlah III 73,872,897.99

IV PEKERJAAN BETON BERTULANG


1 Kolom Utama 20 X 20 cm 2.24 M³ G.XIV.6 5,850,640.12 13,105,433.87
2 Kolom Praktis 13 x 13 cm 1.04 M³ G.XIV.2 6,641,389.54 6,907,045.12
3 Balok Sloof 20 x 25 cm 3.50 M³ G.XIV.3a 4,839,996.21 16,939,986.74
4 Ring Balok 13 x 15 1.71 M³ G.XIV.20 5,022,004.14 8,587,627.08
Jumlah IV 45,540,092.80

V PEKERJAAN LANTAI
1 Lantai Tumbuk 1 : 3 : 5 T= 5 cm 93.00 M² H. 2 65,512.00 6,092,616.00
2 Pas. Keramik 40 x40 cm (Dalam Ruangan) 78.00 M² H. 4 122,583.00 9,561,474.00
3 Pas. Keramik 40 x40 cm (Selasar) 15.00 M² H. 4 122,583.00 1,838,745.00
4 Pas. Keramik 30 x 30 cm (Tangga) 5.64 M² H. 5 113,683.00 641,172.12
5 Lantai Keramik 20 x 25 cm KM/WC 6.00 M² H. 9 113,683.00 682,098.00
6 Pas. Dinding Keramik 20 x 25 cm, t = 1.50 m 17.99 M² H. 8 136,911.00 2,463,028.89
7 Stop Nossing Keramik 44.70 M' Taksir 25,000.00 1,117,500.00
Jumlah V 22,396,634.01

VI PEKERJAAN KAYU DAN ATAP


1 Rangka Kayu Kuda - Kuda + Gording 3.02 M³ F14 5,991,300.00 18,093,726.00
2 Kosen Pintu,Jendela Dan Ventilasi 2.61 M³ F16 5,633,666.00 14,703,868.26
3 Daun Pintu Panel 8.00 Bh Taksir 650,000.00 5,200,000.00
4 Daun Pintu Panel 1/2 Lapis Seng 2.00 Bh Taksir 450,000.00 900,000.00
5 Daun Jendela + Kaca Terpasang 14.00 Bh Taksir 400,000.00 5,600,000.00
6 Ventilasi Kaca Untuk KM/WC 2.00 Bh Taksir 250,000.00 500,000.00
7 Ventilasi Moyet 12.00 Bh Taksir 115,000.00 1,380,000.00
8 Lysplank Papan 2.5/30 cm 22.36 M² F12 58,577.50 1,309,792.90
9 Papan Jalusi Terpasang 140.00 Bh Taksir 15,000.00 2,100,000.00
10 Plat Strip & Baut Untuk Kuda - Kuda 1.00 Pkt Taksir 450,000.00 450,000.00
Jumlah VI 50,237,387.16

VII PEKERJAAN PENGUNCI , PENUTUP DAN


PENGGANTUNG
1 Atap Seng Motief Genteng 167.99 M² J. 3 84,671.95 14,224,040.88
2 Rabung Seng Motief Genteng 14.00 M' J. 4 38,543.25 539,605.50
3 Plafon Tryplek 4 mm 126.84 M² F1 87,390.00 11,084,547.60
4 Engsel Pintu 20.00 Bh Taksir 17,000.00 340,000.00
5 Engsel Jendela 28.00 Bh Taksir 15,000.00 420,000.00
6 Kunci Pintu Tanam 2 Slag 10.00 Bh Taksir 115,000.00 1,150,000.00
7 Pacok Jendela 28.00 Bh Taksir 17,500.00 490,000.00
8 Kait Angin 28.00 Bh Taksir 12,500.00 350,000.00
Jumlah VII 28,598,193.98
1 2 3 4 5 6

VIII PEKERJAAN CAT


1 Cat Tembok Emulsion 623.19 M² I. 3 16,620.80 10,357,888.16
2 Cat Plafond Trypleks 126.84 M² Anl. G.53 18,812.50 2,386,177.50
3 Cat Kilat Kosen & Lysplank 96.35 M² Anl. K10+K23+K28 32,421.60 3,123,821.16
4 Residu Kuda - Kuda 61.54 M² I. 18 23,300.00 1,433,882.00
Jumlah VIII 17,301,768.82
IX PEKERJAAN INSTALASI LISTRIK
1 Pemasukan Arus Listrik, 6 amph 2.00 Pkt Taksir 3,500,000.00 7,000,000.00
2 Titik Api 14.00 Ttk Taksir 75,000.00 1,050,000.00
3 Jaringan Instalasi Listirk 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
4 Lampu TL 40 Watt (Philips) 4.00 Bh Taksir 106,950.00 427,800.00
5 Lampu HE 20 Watt (Philips) 10.00 Bh Taksir 51,150.00 511,500.00
6 Stop Kontak 8.00 Bh Taksir 15,500.00 124,000.00
7 Saklar Ganda 2.00 Bh Taksir 17,500.00 35,000.00
8 Saklar Tunggal 8.00 Bh Taksir 15,500.00 124,000.00
9 Panel Zakering 2.00 Bh Taksir 125,000.00 250,000.00
Jumlah IX 11,022,300.00
X PEKERJAAN SANITASI AIR
1 Pekerjaan Pipa Ketok Galvanis 1.00 Unt Taksir 5,000,000.00 5,000,000.00
2 Pengadaan Pompa Air Listrik 1.00 Bh Taksir 750,000.00 750,000.00
3 Instalasi Air Bersih 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
4 Instalasi Air Kotor 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Klosed Jongkok 2.00 Bh Taksir 141,100.00 282,200.00
6 Floor Drain 2.00 Bh Taksir 17,600.00 35,200.00
7 Kran Air 2.00 Bh Taksir 29,400.00 58,800.00
8 Septictank + Bak Kontrol + Resepan 1.00 Unt Taksir 3,500,000.00 3,500,000.00
Jumlah X 12,126,200.00
XI PEKERJAAN LAIN - LAIN
1 Relief Bangunan 1.00 Pkt Taksir 3,000,000.00 3,000,000.00
2 Pemasukan Arus Gedung BPP Blangpidie, 6 amph 1.00 Pkt Taksir 3,500,000.00 3,500,000.00
3 Pembersihan Akhir 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
Jumlah XI 7,500,000.00
Sub Total 280,548,228.62
DAFTAR ANALISA HARGA SATUAN

Taksir 1 M² MEMBERSIH LAPANGAN


0.050 OH Pekerja @ Rp. 40,000.00 Rp. 2,000.00
0.005 OH Mandor @ Rp. 57,000.00 Rp. 267.90
Total Rp. 2,267.90
Dibulatkan Rp. 2,300.00

Taksir 1 M' PENGUKURAN DAN PEMASANGAN BOWPLANK


0.004 M³ Kayu Kaso 5/7 @ Rp. 3,120,000.00 Rp. 10,920.00
0.004 M³ Papan Bowplank @ Rp. 3,800,000.00 Rp. 13,300.00
0.020 Kg Paku Kayu @ Rp. 16,500.00 Rp. 330.00

0.100 OH Pekerja @ Rp. 40,000.00 Rp. 4,000.00


0.005 OH Kepala Tukang Kayu @ Rp. 70,000.00 Rp. 350.00
0.005 OH Mandor @ Rp. 57,000.00 Rp. 285.00
0.050 OH Tukang Kayu @ Rp. 59,000.00 Rp. 2,950.00
Total Rp. 32,135.00
Dibulatkan Rp. 32,100.00

A.1 1 M³ GALIAN TANAH BIASA SEDALAM 1 M'


0.7500 OH Pekerja @ Rp. 40,000.00 Rp. 30,000.00
0.0250 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 31,425.00
Dibulatkan Rp. 31,400.00

A.1a 1 M³ GALIAN TANAH BIASA SEDALAM 2 M'


0.526 OH Pekerja @ Rp. 40,000.00 Rp. 21,040.00
0.052 OH Mandor @ Rp. 57,000.00 Rp. 2,964.00
Total Rp. 24,004.00
Dibulatkan Rp. 24,000.00

A.11 1 M³ URUGAN KEMBALI ( TANAH BIASA )


0.300 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.015 OH Mandor @ Rp. 57,000.00 Rp. 826.50
Total Rp. 12,826.50
Dibulatkan Rp. 12,800.00

A.12 1 M³ TANAH URUG


1.200 M³ Tanah Urug @ Rp. 75,000.00 Rp. 90,000.00
0.300 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.015 OH Mandor @ Rp. 57,000.00 Rp. 855.00
Total Rp. 102,855.00
Dibulatkan Rp. 102,900.00

A.12a 1 M³ URUGAN PASIR


1.2000 M³ Pasir Urug @ Rp. 65,000.00 Rp. 78,000.00
0.3000 OH Pekerja @ Rp. 40,000.00 Rp. 12,000.00
0.0100 OH Mandor @ Rp. 57,000.00 Rp. 570.00
Total Rp. 90,570.00
Dibulatkan Rp. 90,600.00

E. 3 1 M² MENGETAM KAYU
0.067 OH Tukang Kayu @ Rp. 59,000.00 Rp. 3,953.00
0.007 OH Kepala Tukang @ Rp. 70,000.00 Rp. 469.00
0.160 OH Pekerja @ Rp. 40,000.00 Rp. 6,400.00
0.008 OH Mandor @ Rp. 57,000.00 Rp. 456.00
Total Rp. 11,278.00
Dibulatkan Rp. 11,300.00

F1 1 M² MEMASANG PLAFOND TRYPLEK 4 MM


0.011 M³ Kayu Rangka Kls II @ Rp. 2,700,000.00 Rp. 29,700.00
0.347 Lbr Tryplek 4 mm @ Rp. 95,000.00 Rp. 32,965.00
0.200 Kg Paku Campur @ Rp. 16,500.00 Rp. 3,300.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 87,390.00
Dibulatkan Rp. 87,400.00
F12 1 M² MEMASANG LYSPLANK
1.100 M² Papan Lysplank 3/30 @ Rp. 23,500.00 Rp. 25,850.00
1.100 E. 3 @ Rp. 11,300.00 Rp. 12,430.00
0.020 Kg Paku @ Rp. 16,500.00 Rp. 330.00
0.520 OH Tukang Kayu @ Rp. 59,000.00 Rp. 30,680.00
0.052 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,640.00
0.190 OH Pekerja @ Rp. 40,000.00 Rp. 7,600.00
0.010 OH Mandor @ Rp. 57,000.00 Rp. 541.50
Total Rp. 81,071.50
Dibulatkan Rp. 81,100.00

F14 1 M³ PEKERJAAN KAYU KUDA KUDA


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
10.000 Kg Paku @ Rp. 95,000.00 Rp. 950,000.00
6.000 OH Tukang Kayu @ Rp. 59,000.00 Rp. 354,000.00
2.350 OH Kepala Tukang @ Rp. 70,000.00 Rp. 164,500.00
8.000 OH Pekerja @ Rp. 40,000.00 Rp. 320,000.00
0.400 OH Mandor @ Rp. 57,000.00 Rp. 22,800.00
Total Rp. 5,991,300.00
Dibulatkan Rp. 5,991,300.00

F14a 1 M³ PEKERJAAN KAYU KUDA KUDA KORIDOR


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
10.000 Kg Paku @ Rp. 95,000.00 Rp. 950,000.00
25.800 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,522,200.00
2.580 OH Kepala Tukang @ Rp. 70,000.00 Rp. 180,600.00
8.800 OH Pekerja @ Rp. 40,000.00 Rp. 352,000.00
0.440 OH Mandor @ Rp. 57,000.00 Rp. 25,080.00
Total Rp. 7,209,880.00
Dibulatkan Rp. 7,209,900.00

F16 1 M³ PEKERJAAN KAYU KOSEN PINTU DAN JENDELA


1.100 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 4,180,000.00
0.250 Kg Paku @ Rp. 95,000.00 Rp. 23,750.00
18.000 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,062,000.00
1.730 OH Kepala Tukang @ Rp. 70,000.00 Rp. 121,100.00
5.760 OH Pekerja @ Rp. 40,000.00 Rp. 230,400.00
0.288 OH Mandor @ Rp. 57,000.00 Rp. 16,416.00
Total Rp. 5,633,666.00
Dibulatkan Rp. 5,633,700.00

F. 21 1 M² PEKERJAAN PINTU / JENDELA PANEL


0.039 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 146,300.00
3.450 OH Tukang Kayu @ Rp. 59,000.00 Rp. 203,550.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.160 OH Pekerja @ Rp. 40,000.00 Rp. 46,400.00
0.534 OH Mandor @ Rp. 57,000.00 Rp. 30,415.20
Total Rp. 450,815.20
Dibulatkan Rp. 450,800.00

F. 21a 1 M² PEKERJAAN PINTU 1/2 LAPIS SENG


0.039 M³ Kayu Meuranti @ Rp. 2,700,000.00 Rp. 103,950.00
1.000 Lbr Seng Plat 0.30 mm @ Rp. 53,000.00 Rp. 53,000.00
0.050 Kg Lem Kayu @ Rp. 37,200.00 Rp. 1,860.00
0.270 Kg Paku @ Rp. 16,500.00 Rp. 4,455.00
3.450 OH Tukang Kayu @ Rp. 59,000.00 Rp. 203,550.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.160 OH Pekerja @ Rp. 40,000.00 Rp. 46,400.00
0.534 OH Mandor @ Rp. 57,000.00 Rp. 30,415.20
Total Rp. 467,780.20
Dibulatkan Rp. 467,780.00
F. 24 1 M² PEKERJAAN JENDELA KACA ALUMINIUM
1.100 M² Kaca 5 mm @ Rp. 141,100.00 Rp. 155,210.00
1.100 M² Karet Kaca @ Rp. 16,000.00 Rp. 17,600.00
0.010 Kg Lem Kaca @ Rp. 37,200.00 Rp. 372.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.000 OH Tukang Kaca @ Rp. 59,000.00 Rp. 59,000.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 295,754.00
Dibulatkan Rp. 295,800.00

F. 25 1 M² PEKERJAAN JENDELA KACA MATI BINGKAI ALUMINIUM


1.100 M² Kaca Rayben 5 mm @ Rp. 141,100.00 Rp. 155,210.00
1.100 M² Karet Kaca @ Rp. 16,000.00 Rp. 17,600.00
0.010 Kg Lem @ Rp. 37,200.00 Rp. 372.00
0.345 OH Kepala Tukang @ Rp. 70,000.00 Rp. 24,150.00
1.000 OH Tukang Kaca @ Rp. 59,000.00 Rp. 59,000.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 295,754.00
Dibulatkan Rp. 295,800.00

F. 26 1 M² PEKERJAAN PINTU/JENDELA KACA 3 CM


1.100 M² Kaca 5 mm @ Rp. 141,100.00 Rp. 155,210.00
0.025 M³ Kayu Seumantok @ Rp. 3,800,000.00 Rp. 93,632.00
2.760 OH Tukang Kayu @ Rp. 59,000.00 Rp. 162,840.00
0.276 OH Kepala Tukang @ Rp. 70,000.00 Rp. 19,320.00
0.920 OH Pekerja @ Rp. 40,000.00 Rp. 36,800.00
0.046 OH Mandor @ Rp. 57,000.00 Rp. 2,622.00
Total Rp. 470,424.00
Dibulatkan Rp. 470,400.00

F. 27b 1 M² MEMASANG PLAFOND PAPAN RIDER


0.015 M³ Kayu Rangka Plafond @ Rp. 2,700,000.00 Rp. 41,580.00
1.000 M² Papan Rider @ Rp. 58,800.00 Rp. 58,800.00
0.250 Kg Paku Campur @ Rp. 95,000.00 Rp. 23,750.00
0.800 OH Tukang Kayu @ Rp. 59,000.00 Rp. 47,200.00
0.080 OH Kepala Tukang @ Rp. 70,000.00 Rp. 5,600.00
0.280 OH Pekerja @ Rp. 40,000.00 Rp. 11,200.00
0.014 OH Mandor @ Rp. 57,000.00 Rp. 798.00
Total Rp. 188,928.00
Dibulatkan Rp. 188,900.00

G.I.1 1 M³ PASANGAN BATU KOSONG


1.100 M3 Batu Kali @ 125,000.00 Rp. 137,500.00
0.120 OH Kepala Tukang @ 70,000.00 Rp. 8,400.00
1.200 OH Tukang @ 59,000.00 Rp. 70,800.00
3.600 OH Pekerja @ 40,000.00 Rp. 144,000.00
0.180 OH Mandor @ 57,000.00 Rp. 10,260.00
Total Rp 370,960.00
Dibulatkan Rp 370,960.00

G.I.5 1 M³ PASANGAN BATU GUNUNG/BELAH/KALI 1:4


1.200 M³ Batu Belah/Gunung @ Rp. 125,000.00 Rp. 150,000.00
3.260 Zak Semen PC @ Rp. 60,000.00 Rp. 195,600.00
0.522 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 44,370.00
1.200 OH Tukang Batu @ Rp. 59,000.00 Rp. 70,800.00
0.120 OH Kepala Tukang @ Rp. 70,000.00 Rp. 8,400.00
3.600 OH Pekerja @ Rp. 40,000.00 Rp. 144,000.00
0.180 OH Mandor @ Rp. 57,000.00 Rp. 10,260.00
Total Rp. 623,430.00
Dibulatkan Rp. 623,400.00
G.II.2 1 M² PASANGAN BATA 1 : 2
80.000 Bh Batu Bata @ Rp. 600.00 Rp. 48,000.00
0.778 Zak Cemen PC @ Rp. 60,000.00 Rp. 46,680.00
0.061 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 5,185.00
0.175 OH Tukang Batu @ Rp. 59,000.00 Rp. 10,325.00
0.018 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,225.00
0.525 OH Pekerja @ Rp. 40,000.00 Rp. 21,000.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,499.10
Total Rp. 133,914.10
Dibulatkan Rp. 133,900.00

G.II.4 1 M² PASANGAN BATA 1 : 4


80.000 Bh Batu Bata @ Rp. 600.00 Rp. 48,000.00
0.470 Zak Cemen PC @ Rp. 60,000.00 Rp. 28,200.00
0.075 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 6,375.00
0.175 OH Tukang Batu @ Rp. 59,000.00 Rp. 10,325.00
0.018 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,225.00
0.525 OH Pekerja @ Rp. 40,000.00 Rp. 21,000.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,499.10
Total Rp. 116,624.10
Dibulatkan Rp. 116,600.00

G.II.3 1 M² PLESTERAN 1 : 3 TEBAL 15 MM


0.177 Zak Cemen PC @ Rp. 60,000.00 Rp. 10,620.00
0.021 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,785.00
0.132 OH Tukang Batu @ Rp. 59,000.00 Rp. 7,788.00
0.013 OH Kepala Tukang @ Rp. 70,000.00 Rp. 924.00
0.264 OH Pekerja @ Rp. 40,000.00 Rp. 10,560.00
0.013 OH Mandor @ Rp. 57,000.00 Rp. 752.40
Total Rp. 32,429.40
Dibulatkan Rp. 32,400.00

G.X.2 1 M² PLESTERAN DAN ACIAN 1 : 2 TEBAL 15 mm


0.310 Zak Cemen PC @ Rp. 60,000.00 Rp. 18,600.00
0.018 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,530.00
0.165 OH Tukang Batu @ Rp. 59,000.00 Rp. 9,735.00
0.017 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,155.00
0.138 OH Pekerja @ Rp. 40,000.00 Rp. 5,520.00
0.017 OH Mandor @ Rp. 57,000.00 Rp. 940.50
Total Rp. 37,480.50
Dibulatkan Rp. 37,500.00

G.X.4 1 M² PLESTERAN DAN ACIAN 1 : 4 TEBAL 15 mm


0.230 Zak Cemen PC @ Rp. 60,000.00 Rp. 13,800.00
0.023 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 1,955.00
0.165 OH Tukang Batu @ Rp. 59,000.00 Rp. 9,735.00
0.017 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,155.00
0.138 OH Pekerja @ Rp. 40,000.00 Rp. 5,520.00
0.017 OH Mandor @ Rp. 57,000.00 Rp. 940.50
Total Rp. 33,105.50
Dibulatkan Rp. 33,100.00

G.XIII.10 1 M³ BETON COOR 1 : 2 : 3


8.750 Zak Cemen PC @ Rp. 60,000.00 Rp. 525,000.00
0.680 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 57,800.00
0.940 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 94,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 898,571.00
Dibulatkan Rp. 898,600.00
G.XIII.11 1 M³ BETON COOR 1 : 2 : 4
7.350 Zak Cemen PC @ Rp. 60,000.00 Rp. 441,000.00
0.590 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 50,150.00
1.080 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 108,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 820,921.00
Dibulatkan Rp. 820,900.00

G.XIII.12 1 M³ BETON COOR 1 : 3 : 6 UNTUK LANTAI


5.730 Zak Cemen PC @ Rp. 60,000.00 Rp. 343,800.00
0.680 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 57,800.00
1.040 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 104,000.00
0.700 OH Tukang Batu @ Rp. 59,000.00 Rp. 41,300.00
0.070 OH Kepala Tukang @ Rp. 70,000.00 Rp. 4,900.00
4.100 OH Pekerja @ Rp. 40,000.00 Rp. 164,000.00
0.203 OH Mandor @ Rp. 57,000.00 Rp. 11,571.00
Total Rp. 727,371.00
Dibulatkan Rp. 727,400.00

G.XIV 1 M³ PEKERJAAN BETON BERTULANG


a. Mengerjakan 1 Kg Besi Beton Polos
0.049 OH Tukang Besi @ Rp. 59,000.00 Rp. 2,867.40
0.016 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,134.00
0.049 OH Pekerja @ Rp. 40,000.00 Rp. 1,944.00
1.250 Kg Besi Beton Polos @ Rp. 10,400.00 Rp. 13,000.00
0.023 Kg Kawat Beton @ Rp. 21,000.00 Rp. 483.00
Total Rp. 19,428.40
Dibulatkan Rp. 19,400.00

b. Mengerjakan 1 Kg Besi Beton Ulir


0.005 OH Tukang Besi @ Rp. 59,000.00 Rp. 286.74
0.016 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,134.00
0.049 OH Pekerja @ Rp. 40,000.00 Rp. 1,944.00
1.250 Kg Besi Beton Ulir @ Rp. 15,500.00 Rp. 19,375.00
0.023 Kg Kawat Beton @ Rp. 21,000.00 Rp. 483.00
Total Rp. 23,222.74
Dibulatkan Rp. 23,200.00

c. 1 M² Cetakan Beton / Bekisting Memakai Tryplek


0.380 Lbr Multiplek @ Rp. 95,000.00 Rp. 36,100.00
0.021 M³ Kasau ( Meranti ) @ Rp. 2,700,000.00 Rp. 56,160.00
0.250 Kg Paku @ Rp. 16,500.00 Rp. 4,125.00
0.220 OH Pekerja @ Rp. 40,000.00 Rp. 8,800.00
0.500 OH Tukang Kayu @ Rp. 59,000.00 Rp. 29,500.00
0.050 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,500.00
0.011 OH Mandor @ Rp. 57,000.00 Rp. 627.00
3.000 OH Pekerja Bkr/Siram @ Rp. 40,000.00 Rp. 120,000.00
Total Rp. 258,812.00
Dibulatkan Rp. 258,800.00

d. 1 M² Cetakan Beton / Bekisting Memakai Papan


0.048 M³ Papan Bekisting @ Rp. 2,000,000.00 Rp. 96,800.00
0.400 Kg Paku @ Rp. 95,000.00 Rp. 38,000.00
0.200 OH Pekerja @ Rp. 40,000.00 Rp. 8,000.00
0.500 OH Tukang Kayu @ Rp. 59,000.00 Rp. 29,500.00
0.050 OH Kepala Tukang @ Rp. 70,000.00 Rp. 3,500.00
0.010 OH Mandor @ Rp. 57,000.00 Rp. 570.00
4.000 OH Pekerja Bkr/Siram @ Rp. 40,000.00 Rp. 160,000.00
Total Rp. 336,370.00
Dibulatkan Rp. 336,400.00
d. 1 M³ Kayu Perancah / Stut Werk
0.420 M³ Papan Bekisting @ Rp. 2,000,000.00 Rp. 840,000.00
0.400 Kg Paku @ Rp. 95,000.00 Rp. 38,000.00
2.125 OH Pekerja @ Rp. 40,000.00 Rp. 85,000.00
5.875 OH Tukang Kayu @ Rp. 59,000.00 Rp. 346,625.00
0.788 OH Kepala Tukang @ Rp. 70,000.00 Rp. 55,160.00
0.131 OH Mandor @ Rp. 57,000.00 Rp. 7,467.00
Total Rp. 1,372,252.00
Dibulatkan Rp. 1,372,300.00

G.XIV.1 1 M³ PONDASI TAPAK


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
112.297 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,178,555.98
4.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,661,667.80
Total Rp. 4,738,823.78
Dibulatkan Rp. 4,738,800.00

G.XIV.2 1 M³ KOLOM 13/13


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
210.367 Kg Besi + Upah @ Rp. 19,400.00 Rp. 4,081,121.74
4.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,661,667.80
Total Rp. 6,641,389.54
Dibulatkan Rp. 6,641,400.00

G.XIV.4 1 M³ PONDASI TAPAK TYPE. D


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
115.846 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,247,421.71
3.940 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,325,297.80
Total Rp. 4,471,319.51
Dibulatkan Rp. 4,471,300.00

G.XIV.3 1 M³ BALOK SLOOF 25/40


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
135.143 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,621,774.20
2.030 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 682,831.10
Total Rp. 4,203,205.30
Dibulatkan Rp. 4,203,200.00

G.XIV.3a 1 M³ BALOK SLOOF 20/20


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,600.00 Rp. 898,600.00
145.375 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,820,275.00
3.333 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,121,121.21
Total Rp. 4,839,996.21
Dibulatkan Rp. 4,840,000.00

G.XIV.4a 1 M³ BALOK 15/30


1.000 M³ Beton Coor G.XIII.11 @ Rp. 898,600.00 Rp. 898,600.00
185.692 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,602,432.56
5.558 M² Bekisting + Upah @ Rp. 336,370.00 Rp. 1,869,376.28
0.200 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 274,460.00
Total Rp. 6,644,868.84
Dibulatkan Rp. 6,644,900.00

G.XIV.5 1 M³ KOLOM 20/25


1.000 M³ Beton Coor G.XIII.10 @ Rp. 898,571.00 Rp. 898,571.00
126.011 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,444,613.40
3.826 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,287,066.40
0.125 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 171,537.50
Total Rp. 4,801,788.30
Dibulatkan Rp. 4,801,800.00
G.XIV.6 1 M³ KOLOM 20/20
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
148.375 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,878,478.88
5.267 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,771,684.24
0.220 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 301,906.00
Total Rp. 5,850,640.12
Dibulatkan Rp. 5,850,600.00
G.XIV.7 1 M³ KOLOM 25/30
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
142.465 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,763,828.76
4.400 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,480,160.00
0.120 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 164,676.00
Total Rp. 5,307,235.76
Dibulatkan Rp. 5,307,200.00

G.XIV.8 1 M³ KOLOM PRAKTIS 13/13


1.000 M³ Beton Coor G.XIII. 11 @ Rp. 898,571.00 Rp. 898,571.00
182.318 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,536,973.08
4.130 M² Bekisting + Upah @ Rp. 336,400.00 Rp. 1,389,332.00
Total Rp. 5,824,876.08
Dibulatkan Rp. 5,824,900.00
G.XIV.9 1 M³ RING BALK 13/13
1.000 M³ Beton Coor G.XIII. 11 @ Rp. 898,571.00 Rp. 898,571.00
182.318 Kg Besi + Upah @ Rp. 19,400.00 Rp. 3,536,973.08
5.478 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,417,706.40
Total Rp. 5,853,250.48
Dibulatkan Rp. 5,853,300.00

G.XIV.10 1 M³ BALOK LANTAI 25/40


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
135.143 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,621,774.20
5.833 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,509,658.04
0.270 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 370,521.00
Total Rp. 5,400,524.24
Dibulatkan Rp. 5,400,500.00

G.XIV.11 1 M³ PEMBAGI PLAT LANTAI 20/30


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
217.690 Kg Besi + Upah @ Rp. 19,400.00 Rp. 4,223,186.00
4.445 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,150,366.00
0.200 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 274,460.00
Total Rp. 6,546,583.00
Dibulatkan Rp. 6,546,600.00

G.XIV.12 1 M³ PLAT LANTAI


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
113.514 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,202,171.60
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,366,472.60
Dibulatkan Rp. 4,366,500.00

G.XIV.13 1 M³ COOR PLAT DAAG


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
116.015 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,250,682.46
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,414,983.46
Dibulatkan Rp. 4,415,000.00

G.XIV.14 1 M³ PLAT KUBAH


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
137.061 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,658,983.40
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,823,284.40
Dibulatkan Rp. 4,823,300.00
G.XIV.15 1 M³ BALOK PLAT DAG 25/35
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
116.015 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,250,682.46
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,414,983.46
Dibulatkan Rp. 4,415,000.00

G.XIV.16a 1 M³ KOLOM Ø 30
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
117.339 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,276,376.60
3.412 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 883,025.60
0.320 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 439,136.00
Total Rp. 4,497,109.20
Dibulatkan Rp. 4,497,100.00

G.XIV.17 1 M³ KOLOM 50/50


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
88.620 Kg Besi + Upah @ Rp. 19,400.00 Rp. 1,719,228.00
2.930 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 758,284.00
0.400 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 548,920.00
Total Rp. 3,925,003.00
Dibulatkan Rp. 3,925,000.00

G.XIV.17a 1 M³ RING BALOK 25/30


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
142.974 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,773,687.84
4.280 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,107,664.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 5,191,612.84
Dibulatkan Rp. 5,191,600.00

G.XIV.18 1 M³ PLAT TALANG


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
110.000 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,134,000.00
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,298,301.00
Dibulatkan Rp. 4,298,300.00

G.XIV.19 1 M³ PLAT TANGGA


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
143.000 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,774,200.00
3.300 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 854,040.00
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 4,938,501.00
Dibulatkan Rp. 4,938,500.00

H. 1 1 M³ PEREKAT 1 : 2
10.048 Zak Cemen PC @ Rp. 60,000.00 Rp. 602,880.00
0.950 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 80,750.00
Total Rp. 683,630.00
Dibulatkan Rp. 683,600.00

G.XIV.20 1 M³ BALOK 15/18


1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
149.532 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,900,922.74
3.133 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 810,820.40
0.300 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 411,690.00
Total Rp. 5,022,004.14
Dibulatkan Rp. 5,022,000.00
G.XIV.20a 1 M³ RING BALOK 15/15
1.000 M³ Beton Coor G.XIII. 10 @ Rp. 898,571.00 Rp. 898,571.00
152.174 Kg Besi + Upah @ Rp. 19,400.00 Rp. 2,952,167.84
4.280 M² Bekisting + Upah @ Rp. 258,800.00 Rp. 1,107,664.00
0.350 M³ Kayu Perancah @ Rp. 1,372,300.00 Rp. 480,305.00
Total Rp. 5,438,707.84
Dibulatkan Rp. 5,438,700.00

H. 2 1 M² COOR LANTAI TUMBUK TEBAL 7 CM


0.437 Zak Cemen PC @ Rp. 60,000.00 Rp. 26,220.00
0.044 M³ Pasir Beton @ Rp. 85,000.00 Rp. 3,740.00
0.070 M³ Kerikil Beton @ Rp. 100,000.00 Rp. 7,000.00
0.095 OH Tukang Batu @ Rp. 59,000.00 Rp. 5,605.00
0.010 OH Kepala Tukang @ Rp. 70,000.00 Rp. 665.00
0.520 OH Pekerja @ Rp. 40,000.00 Rp. 20,800.00
0.026 OH Mandor @ Rp. 57,000.00 Rp. 1,482.00
Total Rp. 65,512.00
Dibulatkan Rp. 65,500.00

H. 3 1 M² LANTAI KERAMIK 60X60 CM


1.000 M² Keramik @ Rp. 159,300.00 Rp. 159,300.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 211,783.00
Dibulatkan Rp. 211,800.00

H. 11 1 M² LANTAI MARMER
1.052 Bh Marmer @ Rp. 255,750.00 Rp. 269,049.00
14.150 Kg Semen Portland @ Rp. 1,500.00 Rp. 21,225.00
0.039 M³ Pasir Pasang @ Rp. 85,000.00 Rp. 3,315.00
2.000 Kg Semen Warna @ Rp. 4,650.00 Rp. 9,300.00
0.350 OH Tukang Batu @ Rp. 59,000.00 Rp. 20,650.00
0.035 OH Kepala Tukang @ Rp. 70,000.00 Rp. 2,450.00
0.620 OH Pekerja @ Rp. 40,000.00 Rp. 24,800.00
0.030 OH Mandor @ Rp. 57,000.00 Rp. 1,710.00
Total Rp. 352,499.00
Dibulatkan Rp. 352,500.00
H. 4 1 M² LANTAI KERAMIK 40X40 CM
1.000 M² Keramik @ Rp. 70,100.00 Rp. 70,100.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 122,583.00
Dibulatkan Rp. 122,600.00
H. 5 1 M² LANTAI KERAMIK 30X30 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 113,683.00
Dibulatkan Rp. 113,700.00
H. 7 1 M² DINDING KERAMIK 30X30 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.030 Zak Cemen Putih @ Rp. 129,400.00 Rp. 3,882.00
1.000 OH Tukang Batu @ Rp. 59,000.00 Rp. 59,000.00
0.100 OH Kepala Tukang @ Rp. 70,000.00 Rp. 7,000.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.075 OH Mandor @ Rp. 75,000.00 Rp. 5,625.00
Total Rp. 166,961.00
Dibulatkan Rp. 167,000.00

H. 8 1 M² DINDING KERAMIK 20X25 CM ( KM/WC)


1.000 M² Keramik @ Rp. 70,100.00 Rp. 70,100.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.030 Zak Cemen Putih @ Rp. 129,400.00 Rp. 3,882.00
0.500 OH Tukang Batu @ Rp. 59,000.00 Rp. 29,500.00
0.025 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,750.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 136,911.00
Dibulatkan Rp. 136,900.00
H. 9 1 M² LANTAI KERAMIK 25X25 CM
1.000 M² Keramik @ Rp. 61,200.00 Rp. 61,200.00
0.015 M³ Perekat H.1 @ Rp. 683,600.00 Rp. 10,254.00
0.020 Zak Cemen Putih @ Rp. 129,400.00 Rp. 2,588.00
0.276 OH Tukang Batu @ Rp. 59,000.00 Rp. 16,284.00
0.028 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,932.00
0.500 OH Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.025 OH Mandor @ Rp. 57,000.00 Rp. 1,425.00
Total Rp. 113,683.00
Dibulatkan Rp. 113,700.00

I. 3 1 M² MENGECAT DINDING / TEMBOK 3 X SAPU DAN MEMPLAMOUR


0.200 Kg Cat Tembok @ Rp. 8,500.00 Rp. 1,700.00
0.050 Lbr Kertas Amplas @ Rp. 5,300.00 Rp. 265.00
0.100 OH Tukang Cat @ Rp. 59,000.00 Rp. 5,900.00
0.010 OH Kepala Tukang @ Rp. 70,000.00 Rp. 700.00
0.188 OH Pekerja @ Rp. 40,000.00 Rp. 7,520.00
0.009 OH Mandor @ Rp. 57,000.00 Rp. 535.80
Total Rp. 16,620.80
Dibulatkan Rp. 16,600.00
I. 18 1 M² RESIDU
0.350 Ltr Residu @ Rp. 47,000.00 Rp. 16,450.00
0.100 OH Pekerja @ Rp. 40,000.00 Rp. 4,000.00
0.050 OH Mandor @ Rp. 57,000.00 Rp. 2,850.00
Total Rp. 23,300.00
Dibulatkan Rp. 23,300.00

J. 3 1 M² MEMASANG ATAP SENG MOTIF GENTENG


1.000 Lbr Genteng Jumbo Metal @ Rp. 70,000.00 Rp. 70,000.00
0.053 Kg Paku Seng @ Rp. 29,400.00 Rp. 1,558.20
0.150 OH Tukang Kayu @ Rp. 59,000.00 Rp. 8,850.00
0.015 OH Kepala Tukang @ Rp. 70,000.00 Rp. 1,050.00
0.075 OH Pekerja @ Rp. 40,000.00 Rp. 3,000.00
0.004 OH Mandor @ Rp. 57,000.00 Rp. 213.75
Total Rp. 84,671.95
Dibulatkan Rp. 84,700.00

J. 4 1 M² MEMASANG RABUNG SENG MOTIF GENTENG


0.700 Lbr Rabung Seng Multi Roof @ Rp. 51,150.00 Rp. 35,805.00
0.030 Kg Paku Seng @ Rp. 29,400.00 Rp. 882.00
0.019 OH Tukang Kayu @ Rp. 59,000.00 Rp. 1,106.25
0.019 OH Pekerja @ Rp. 40,000.00 Rp. 750.00
Total Rp. 38,543.25
Dibulatkan Rp. 38,500.00
J. 8 1 M² MEMASANG TALANG ATAP
0.040 Lbr Seng Plat 0.30 @ Rp. 53,000.00 Rp. 2,120.00
0.500 M¹ Plat Strip 2 Cm @ Rp. 6,950.00 Rp. 3,475.00
0.750 OH Tukang Kayu @ Rp. 59,000.00 Rp. 44,250.00
0.075 OH Kepala Tukang @ Rp. 70,000.00 Rp. 5,250.00
0.150 OH Pekerja @ Rp. 40,000.00 Rp. 6,000.00
0.023 OH Mandor @ Rp. 57,000.00 Rp. 1,282.50
Total Rp. 62,377.50
Dibulatkan Rp. 62,400.00

J. 9 1 M¹ MEMASANG PIPA PVC ø 4 " UNTUK PEMBUANGAN AIR HUJAN


0.173 Btg Pipa PVC @ Rp. 75,000.00 Rp. 12,975.00
0.020 Kg Lem Pipa @ Rp. 93,200.00 Rp. 1,864.00
0.117 OH Tukang Kayu @ Rp. 59,000.00 Rp. 6,903.00
0.012 OH Kepala Tukang @ Rp. 70,000.00 Rp. 819.00
0.070 OH Pekerja @ Rp. 40,000.00 Rp. 2,792.00
0.003 OH Mandor @ Rp. 57,000.00 Rp. 198.93
Total Rp. 25,551.93
Dibulatkan Rp. 25,600.00
Anl. G.53 10 M² MENGECAT TEMBOK DAN PLAFOND
1.000 Org Tukang @ Rp. 59,000.00 Rp. 59,000.00
3.000 Org Pekerja @ Rp. 40,000.00 Rp. 120,000.00
0.100 Org Kepala Tukang @ Rp. 70,000.00 Rp. 7,000.00
0.250 Kg Cat Tembok @ Rp. 8,500.00 Rp. 2,125.00
Jumlah Rp. 188,125.00
Untuk 1 M2 Luas Cat Tembok = 1/10 x … @ Rp. 188,125.00 Rp. 18,812.50

Anl. K10+K23+K28 10 M2 MENGECAT KOSEN PINTU JENDELA DAN LYSPLANK


0.075 Org Tukang @ Rp. 59,000.00 Rp. 4,425.00
0.025 Org Mandor @ Rp. 57,000.00 Rp. 1,425.00
0.500 Org Pekerja @ Rp. 40,000.00 Rp. 20,000.00
0.075 Org Kepala Tukang @ Rp. 70,000.00 Rp. 5,250.00
6.430 Kg Cat Minyak @ Rp. 41,200.00 Rp. 264,916.00
1.000 Kg Dempul @ Rp. 17,600.00 Rp. 17,600.00
2.000 Lbr Amplas @ Rp. 5,300.00 Rp. 10,600.00
Jumlah Rp. 324,216.00
Untuk 1 M2 Luas Cat Tembok = 1/10 x … @ Rp. 324,216.00 Rp. 32,421.60

Anl. G. 67. a 1 M² PASANGAN PAVING BLOK


46.000 Bh Paving Blok @ Rp. 4,100.00 Rp. 188,600.00
0.011 M3 Pasir Pasang @ Rp. 85,000.00 Rp. 969.00

0.250 Org Kepala Tukang @ Rp. 70,000.00 Rp. 17,500.00


0.013 Org Tukang @ Rp. 59,000.00 Rp. 784.11
0.125 Org Pekerja @ Rp. 40,000.00 Rp. 5,018.00
0.013 Org Mandor @ Rp. 57,000.00 Rp. 763.80
Jumlah Rp. 213,634.91

#REF!
#REF!
#REF!

#REF!
#REF!
HARGA SATUAN UPAH

HARGA SATUAN
NO BAHAN MATERIAL SATUAN (RP)
1 2 3 4
1 Tukang OH 59,000.00
2 Kepala Tukang OH 70,000.00
3 Pekerja OH 40,000.00
4 Mandor OH 57,000.00

HARGA SATUAN / BAHAN MATERIAL


HARGA SATUAN
NO BAHAN MATERIAL SATUAN (RP)
1 2 3 4
1 Ampelas Lbr 5,300.00
2 Asbes rata 1 x 1 Lbr 21,200.00
3 Alat - alat bantu Set 110,000.00
4 Batu Gunung m3 120,000.00
5 Batu Kali m3 125,000.00
6 Batu Bata Bh 600.00
7 Besi Beton Polos Kg 10,400.00
8 Besi Beton Ulir Kg 15,500.00
9 Bonbon Keramik m' 19,100.00
10 Baja Ringan Audie Trus CT - 100 (Zincalum) m2 225,000.00
11 Besi Pagar BRC, Uk. 90 x 240 Kw 1 Pnl 175,000.00
12 Bunga Besi Pengaman Atas Pagar Bh 7,500.00
13 Kerikil m3 90,000.00
14 Cat Tembok Kg 8,500.00
15 Cat Minyak Kg 41,200.00
16 Cat Kayu Dasar Kg 23,500.00
17 Cat Menie Kg 29,400.00
18 Cat Kayu Kilat Kg 41,200.00
19 Cat Kayu Kg 41,200.00
20 Cat Menie Kayu Kg 29,400.00
21 Dempul Kayu Kg 17,600.00
22 Engsel Pintu Bh 8,200.00
23 Engsel Jendela Bh 5,900.00
24 Floor Drain Bh 17,600.00
25 Genteng Jumbo Multi Roof m2 135,100.00
26 Genteng Jumbo Metal m2 70,000.00
27 Kaca Rayband 3 mm m2 94,100.00
28 Kaca Rayband 5 mm m2 141,100.00
29 Kaca Block Ktk 35,300.00
30 Klosek Jongkok Bh 141,100.00
31 Klosek Duduk Bh 141,100.00
32 Kran Air dia 1/2" Bh 23,500.00
33 Kran Air dia 3/4" Bh 29,400.00
34 Kayu Kaso 3/5 m3 3,120,000.00
35 Kayu Perancah m3 2,160,000.00
1 2 3 4
36 Kayu / Papan Bekisting M³ 2,000,000.00
37 Kayu Bahan Pintu M³ 3,800,000.00
38 Kayu Klas I (Semantok,dll) M³ 3,800,000.00
39 Kayu Klas II (Merante, Krueng dll) M³ 2,700,000.00
40 Kayu Klas III (Borneo,dll) M³ 1,850,000.00
41 Kayu Lat Btg 9,400.00
42 Kapur Kg 29,400.00
43 Kawat Beton Kg 21,000.00
44 Kawat Duri m' 7,500.00
45 Keramik 20 x 20 (Setera Ikat) m2 60,500.00
46 Keramik 20 x 25 (Setera Ikat) m2 70,100.00
47 Keramik 25 x 25 (Setera Ikat) m2 70,100.00
48 Keramik 30 x 30 (setera Ikat) m2 61,200.00
49 Keramik 40 x 40 (Setera Ikat) m2 70,100.00
50 Keramik 60 x 60 (Setera Ikat) m2 159,300.00
51 Koral / Kerikil Bersih m3 100,000.00
52 Kran Air 1/2" Bh 27,000.00
53 Kran Air 3/4" Bh 35,300.00
54 Kunci Tanam 2 Slag Bh 88,200.00
55 Kunci Pacok Bh 9,400.00
56 Kerandel Jendela Bh 9,400.00
57 Lem Kayu Kg 37,200.00
58 Lem Pipa Kg 93,200.00
59 Lampu TL 40 Watt (Philips) Bh 106,950.00
60 Lampu HE 20 Watt (Philips) Bh 51,150.00
61 Mosaik 30 x 30 Bh 41,850.00
62 Marmer Bh 255,750.00
63 Plat Strip Bh 6,950.00
64 Plamir Kg 23,500.00
65 Pipa PVC tipe AW 2½" Btg 88,350.00
66 Pipa PVC tipe AW ¾" m' 69,750.00
67 Pipa Galpanis ½ m' 209,250.00
68 Paku Plywood Kg 12,550.00
69 Pasir Pasang m3 85,000.00
70 Pasir Urug m3 65,000.00
71 Pasir Beton m3 85,000.00
72 Paku Biasa ½" - 1" Kg 16,500.00
73 Paku Kayu (biasa) Kg 16,500.00
74 Paku Seng Kg 29,400.00
75 Papan Bekisting Lbr 47,000.00
76 Papan Kayu Klas I (Semantok,dll) m3 3,800,000.00
77 Papan Kayu Klas II (Krueng / Merante) m3 2,700,000.00
78 Papan Kayu Klas III (Borneo, dll) m3 1,850,000.00
79 Papan Lysplank Klas I 1,3 x 30 cm m' 23,500.00
80 Papan Rider Lbr 58,800.00
81 Penutup Pipa Besi BRC Dia. 2" Bh 20,000.00
82 Plamor Tembok Kg 23,500.00
83 Pipa Pagar BRC Dia 2" Bh 135,000.00
84 Rabung Genteng Metal Lbr 51,150.00
1 2 3 4

79 Semen Warna Kg 4,650.00


80 Sirtu M³ 90,000.00
81 Semen PC @ 40 KG Zak 60,000.00
82 Semen Putih Zak 129,400.00
83 Seng Plat 0.30 m' 53,000.00
84 Sekring 1 Group Bh 58,550.00
85 Sekring 2 Group Bh 99,500.00
86 Sklip BRC Bh 2,500.00
87 Stop Kontak Bh 5,900.00
88 Sakelar Seri Bh 5,900.00
89 Tanah Timbun m3 75,000.00
90 Tear Residu Ltr 47,000.00
91 Plafond Jaya Board Gibsum Standar + Rangka m2 165,500.00
92 Paving Blok Bh 4,100.00
93 Tryplek 3 mm Lbr 95,000.00
94 Genteng Tanah Bh 11,600.00
95 Rabung Genteng m' 11,600.00

#REF!
#REF!
#REF!

#REF!
#REF!
RENCANA ANGGARAN BIAYA

KEGIATAN : PENINGKATAN SARANA & PRASARANA IBADAH


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR PASANTREN JABBAL NUR JADID
LOKASI : KECAMATAN MANGGENG
TAHUN ANGGARAN : 2009

JUMLAH
NO JENIS PEKERJAAN VOLUME/SAT ANALISA HARGA SATUAN
HARGA
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Pkt Taksir 500,000.00 500,000.00
2 Pemasangan Bowplank 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
3 Direksi Keet / Sewa Gudang 1.00 Unt Taksir 1,000,000.00 1,000,000.00
4 Administrasi & Dokumentasi 1.00 Pkt Taksir 800,000.00 800,000.00
5 Papan Nama Kegiatan 1.00 Unt Taksir 550,000.00 550,000.00
Jumlah I 3,850,000.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 61.34 M³ A.1 31,400.00 1,926,076.00
2 Urugan Bekas Galian 20.45 M³ A.11 12,826.50 262,259.17
3 Urugan Tanah Bawah Lantai 92.44 M³ A.12 102,855.00 9,507,659.06
4 Urugan Pasir dibawah Lantai & Pondasi 12.33 M³ A.12a 90,570.00 1,116,275.25
Jumlah II 12,812,269.48

III PEKERJAAN PASANGAN DAN BETON


1 Aanstamping 6.56 M³ G.I.1 10,260.00 67,305.60
2 Pasangan Pondasi Batu Kali 23.20 M³ G.I.5 623,430.00 14,463,576.00
3 Pondasi Telapak 5.58 M³ G.XIV.1 4,738,823.78 26,442,636.69
4 Pasangan Trasraam Bata 1 : 2 + Kolom 98.71 M² G.II.2 133,914.10 13,218,660.81
5 Pasangan Bata 1 : 4 387.96 M² G.II.4 116,624.10 45,245,485.84
6 Plesteran 1 : 2 197.42 M² G.X.2 37,480.50 7,399,400.31
7 Plesteran 1 : 4 775.92 M² G.X.4 33,105.50 25,687,219.56
Jumlah III 132,524,284.81

IV PEKERJAAN BETON BERTULANG


1 Balok Sloof 25 x 40 cm 6.80 M³ G.XIV.3 4,203,205.30 28,581,796.04
2 Kolom Utama 25 X 25 cm Lt. I & Lt. II 8.12 M³ G.XIV.5 4,801,788.30 38,990,521.00
3 Kolom Praktis 13 x 13 cm Lt. I & Lt. II 1.56 M³ G.XIV.2 6,641,389.54 10,368,537.35
4 Balok Lantai II 25 x 40 cm 7.60 M³ G.XIV.10 5,400,524.24 41,043,984.22
5 Ring Balok 25 x 30 5.70 M³ G.XIV.17a 5,191,612.84 29,592,193.19
6 Balok 13 x 13 cm 0.81 M³ G.XIV.9 5,824,876.08 4,718,149.62
7 Pengecoran Plat Lantai 10.85 M³ G.XIV.12 4,366,472.60 47,376,227.71
8 Pengecoran Tangga 2.18 M³ G.XIV.19 4,938,501.00 10,765,932.18
9 Balok Tangga 15 x 18 cm 0.53 M³ G.XIV.20 5,022,004.14 2,661,662.19
Jumlah IV 214,099,003.51

V PEKERJAAN LANTAI
1 Lantai Tumbuk 1 : 3 : 5 T= 5 cm 108.50 M² H. 2 65,512.00 7,108,052.00
2 Pas. Lantai Keramik 40 x 40 cm Lt. I & Lt. II 203.20 M² H. 4 122,583.00 24,908,865.60
3 Pas. Keramik 25 x 25 cm Anti Slip Lt I & Lt. II 4.80 M² H. 9 113,683.00 545,678.40
4 Pas. Keramik 30 x 30 cm (Tangga)+ Border 22.50 M² H. 5 113,683.00 2,557,867.50
5 Pas. Dinding Keramik 20 x 25 cm Lt. I & Lt. II 42.70 M² H. 8 136,911.00 5,846,099.70
6 Stop Nossing Keramik 56.85 M' Taksir 25,000.00 1,421,250.00
Jumlah V 42,387,813.20

VI PEKERJAAN KAYU DAN ATAP


1 Rangka Atap Baja Ringan C Truess 75/100 229.41 M² Taksir 245,000.00 56,205,450.00
2 Kosen Pintu,Jendela Dan Ventilasi 1.12 M³ F16 5,633,666.00 6,309,705.92
3 Daun Pintu Double Panel 3.00 Bh Taksir 750,000.00 2,250,000.00
4 Daun Pintu Panel 6.00 Bh Taksir 650,000.00 3,900,000.00
5 Daun Pintu Panel 1/2 Lapis Seng 2.00 Bh Taksir 550,000.00 1,100,000.00
6 Daun Jendela + Kaca Terpasang Type A 14.00 Bh Taksir 385,000.00 5,390,000.00
7 Daun Jendela + Kaca Terpasang Type B 12.00 Bh Taksir 315,000.00 3,780,000.00
8 Ventilasi Kaca Untuk KM/WC 4.00 Bh Taksir 225,000.00 900,000.00
9 Papan Jalusi Terpasang 132.00 Bh Taksir 12,000.00 1,584,000.00
10 Lysplank Papan 2.5/30 cm 27.48 M² F12 81,071.50 2,227,844.82
Jumlah VI 83,647,000.74

VII PEKERJAAN PENGUNCI , PENUTUP DAN


PENGGANTUNG
1 Atap Seng Motief Genteng 229.41 M² J. 3 84,671.95 19,424,592.05
2 Rabung Seng Motief Genteng 22.25 M' J. 4 38,543.25 857,587.31
3 Talang Patahan Atap 14.48 M' J. 8 62,377.50 903,226.20
4 Plafon Tryplek 4 mm 148.27 M² F1 87,390.00 12,957,315.30
5 Engsel Pintu 22.00 Bh Taksir 17,000.00 374,000.00
6 Engsel Jendela 52.00 Bh Taksir 15,000.00 780,000.00
7 Kunci Pintu Tanam 2 Slag 11.00 Bh Taksir 115,000.00 1,265,000.00
8 Pacok Jendela 52.00 Bh Taksir 17,500.00 910,000.00
9 Kait Angin 52.00 Bh Taksir 12,500.00 650,000.00
Jumlah VII 38,121,720.86
1 2 3 4 5 6

VIII PEKERJAAN CAT


1 Cat Tembok Emulsion 3 Lapis 973.34 M² I. 3 16,620.80 16,177,689.47
2 Cat Plafond Trypleks 148.27 M² Anl. G.53 18,812.50 2,789,329.38
3 Cat Kilat Kosen & Lysplank 52.05 M² Anl. K10+K23+ 32,421.60 1,687,544.28
Jumlah VIII 20,654,563.13
IX PEKERJAAN INSTALASI LISTRIK
1 Pemasukan Arus Listrik 1.00 Pkt Taksir 2,500,000.00 2,500,000.00
2 Titik Api 22.00 Ttk Taksir 75,000.00 1,650,000.00
3 Jaringan Instalasi Listirk 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
4 Lampu TL 20 Watt (Philips) 14.00 Bh Taksir 106,950.00 1,497,300.00
5 Lampu HE 20 Watt (Philips) 8.00 Bh Taksir 51,150.00 409,200.00
6 Stop Kontak 17.00 Bh Taksir 15,500.00 263,500.00
7 Saklar Ganda 12.00 Bh Taksir 17,500.00 210,000.00
8 Saklar Tunggal 8.00 Bh Taksir 15,500.00 124,000.00
9 Panel Zakering 1.00 Bh Taksir 175,000.00 175,000.00
Jumlah IX 8,329,000.00
X PEKERJAAN SANITASI AIR
1 Pekerjaan Sumur Pipa 1.00 Unt Taksir 5,000,000.00 5,000,000.00
2 Pengadaan Pompa Air Listrik 1.00 Bh Taksir 750,000.00 750,000.00
3 Instalasi Air Bersih 1.00 Pkt Taksir 1,000,000.00 1,000,000.00
4 Instalasi Air Kotor 1.00 Pkt Taksir 1,500,000.00 1,500,000.00
5 Klosed Jongkok 2.00 Bh Taksir 141,100.00 282,200.00
6 Floor Drain 2.00 Bh Taksir 17,600.00 35,200.00
7 Kran Air 2.00 Bh Taksir 29,400.00 58,800.00
8 Septictank + Bak Kontrol + Resepan 1.00 Unt Taksir 3,500,000.00 3,500,000.00
Jumlah X 12,126,200.00
XI PEKERJAAN LAIN - LAIN
1 Relief Bangunan 1.00 Pkt Taksir 5,000,000.00 5,000,000.00
2 Pipa Pengaman Galvanis Dia 2" 16.00 M' Taksir 125,000.00 2,000,000.00
3 Papan Ukir Tolak Angin Terpasang 3.00 Unt Taksir 1,750,000.00 5,250,000.00
4 Ukiran Papan Untuk Pagar Teras Atas Terpasang 16.00 Unt Taksir 250,000.00 4,000,000.00
5 Pengaman Tangga dan Void 1.00 Pkt Taksir 3,500,000.00 3,500,000.00
6 Pembersihan Akhir 1.00 Pkt Taksir 500,000.00 500,000.00
Jumlah XI 20,250,000.00

Sub Total 588,801,855.73


REKAPITULASI RENCANA ANGGARAN BIAYA

Nama Paket : Pembangunan Pagar Panel


Nilai Paket : Rp. 198.000.000,-
Konsultan Perencana
Kabupaten : Lombok Barat
Propinsi : Nusa Tenggara Barat
Tahun Anggaran : 2018

NO U RAIAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp.


II PEKERJAAN PAGAR BETON 420 METER Rp.
III PEKERJAAN LAIN - LAIN Rp.

JUMLAH Rp.
PPN 10%
TOTAL
DIBULATKAN

TERBILANG : SERATUS SEMBILAN PULUH DELAPAN JUTA RUPIAH

Dibuat Oleh,
Konsultan Perencana
CV. Zet Persada Consultant

Nuzul Akmal, SE
Direktur
NGGARAN BIAYA

JUMLAH HARGA

3,500,000.00
-
#REF!

#REF!
#REF!
#REF!
#REF!

DELAPAN JUTA RUPIAH

Dibuat Oleh,
Konsultan Perencana
CV. Zet Persada Consultant

Nuzul Akmal, SE
Direktur
RENCANA ANGGARAN BIAYA

Nama Pekerjaan : Pekerjaan Pagar Panel Beton & Saluran Drainase


Lokasi : PT. Pantai Damai Sejahtera
Dusun Teluk Waru, Desa Labuan Tereng, Kecamatan Lembar
Kabupaten : Lombok Barat
Propinsi : Nusa Tenggara Barat
Tahun : 2018

Harga Satuan Jumlah Harga


No. Uraian Pekerjaan Volume/Sat Analisa
( Rp ) ( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 1.00 Pkt Taksir 1,750,000.00 1,750,000.00
2 Pengukuran & Bowplank 1.00 Pkt Taksir 1,100,000.00 1,100,000.00
3 Papan Nama Kegiatan 1.00 Pkt Taksir 650,000.00 650,000.00
Jumlah 3,500,000.00

II PEKERJAAN PAGAR BETON 420 METER


A PEKERJAAN TANAH
1 Galian Tanah Pondasi & Drainase 663.20 M3 SNI DT-91-0006-2007-6.1 55,500.00 36,807,600.00
2 Urugan Bekas Galian 105.00 M3 SNI DT-91-0006-2007-6.9 18,500.00 1,942,500.00
3 Urugan Pasir Bawah Pondasi 21.00 M3 SNI DT-91-0006-2007-6.11 158,700.00 3,332,700.00
Jumlah 42,082,800.00
B PEKERJAAN PASANGAN
1 Pas. Batu Kosong 41.44 M3 SNI DT-91-0007-2007-6.9 428,805.00 17,769,679.20
2 Pas. Pondasi Batu Kali 540.54 M3 SNI DT-91-0007-2007-6.2 845,142.00 456,833,056.68
Jumlah 474,602,735.88
C PEKERJAAN PAGAR PANEL 420 METER
1 Panel PANEL 240 x 40 x 5 + Ongkos pasang 1,008.0 M2 Taksir 145,000.00 146,160,000.00
Jumlah 146,160,000.00

J U M L A H 666,345,535.88

Dibuat Oleh,
PT. Pantai Damai Sejahtera

Muh Siroj Abdurrofi


DAFTAR ANALISA HARGA SATUAN

I. PEKERJAAN PERSIAPAN
RSNI T-12-2002-B8
1 M2 Membersihkan Lapangan dan Perataan
0.100 OH Pekerja @Rp 70,000.00 Rp. 7,000.00
0.050 OH Mandor @Rp 120,000.00 Rp. 6,000.00
Jumlah Rp. 13,000.00
Dibulatkan Rp. 13,000.00

RSNI T-12-2002-B12
1 M2 Pembuatan Jalan Sementara
0.150 M3 Batu Belah 15/20 @Rp 227,500.00 Rp. 34,125.00
0.090 M3 Batu Pecah 5/7 @Rp 227,500.00 Rp. 20,475.00
0.010 M3 Pasir Pasang @Rp 260,000.00 Rp. 2,600.00
1.000 OH Pekerja @Rp 70,000.00 Rp. 70,000.00
0.050 OH Mandor @Rp 120,000.00 Rp. 6,000.00
Jumlah Rp. 133,200.00
Dibulatkan Rp. 133,200.00

II. PEKERJAAN TANAH


SNI DT-91-0006-2007-6.1
1 M3 Galian tanah biasa sedalam 1 m
0.750 OH Pekerja @Rp 70,000.00 Rp. 52,500.00
0.025 OH Mandor @Rp 120,000.00 Rp. 3,000.00
Jumlah Rp. 55,500.00
Dibulatkan Rp. 55,500.00

SNI DT-91-0006-2007-6.9
1 M3 Urugan Tanah Kembali
0.250 OH Pekerja @Rp 70,000.00 Rp. 17,500.00
0.008 OH Mandor @Rp 120,000.00 Rp. 1,000.00
Jumlah Rp. 18,500.00
Dibulatkan Rp. 18,500.00

SNI DT-91-0006-2007-6.10
1 M3 Pemadatan Tanah
0.500 OH Pekerja @Rp 70,000.00 Rp. 35,000.00
0.050 OH Mandor @Rp 120,000.00 Rp. 6,000.00
Jumlah Rp. 41,000.00
Dibulatkan Rp. 41,000.00

SNI DT-91-0006-2007-6.11
1 M3 Mengurug Pasir Urug
1.200 M3 Pasir Urug @Rp 113,750.00 Rp. 136,500.00
0.300 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.010 OH Mandor @Rp 120,000.00 Rp. 1,200.00
Jumlah Rp. 158,700.00
Dibulatkan Rp. 158,700.00

SNI DT-91-0006-2007-6.16
1 M3 Mengurug Tanah Timbun
1.200 M3 Tanah urug @Rp 130,000.00 Rp. 156,000.00
0.300 OH Pekerja @Rp 70,000.00 Rp. 21,000.00
0.010 OH Mandor @Rp 120,000.00 Rp. 1,200.00
Jumlah Rp. 178,200.00
Dibulatkan Rp. 178,200.00
III. PEKERJAAN PONDASI
SNI DT-91-0007-2007-6.9
1 M3 Pasangan Batu Kosong (aanstamping)
1.200 M3 Batu Kali @Rp 227,500.00 Rp. 273,000.00
0.432 M3 Pasir Urug @Rp 113,750.00 Rp. 49,140.00
0.780 OH Pekerja @Rp 70,000.00 Rp. 54,600.00
0.390 OH Tukang @Rp 110,000.00 Rp. 42,900.00
0.039 OH Kepala Tukang @Rp 115,000.00 Rp. 4,485.00
0.039 OH Mandor @Rp 120,000.00 Rp. 4,680.00
Jumlah Rp. 428,805.00
Dibulatkan Rp. 428,805.00

SNI DT-91-0007-2007-6.2
1 M3 Pasangan Batu Kali 1 PC : 4 PS
1.200 M3 Batu Kali @Rp 227,500.00 Rp. 273,000.00
0.520 M3 Pasir Pasang @Rp 260,000.00 Rp. 135,200.00
163.000 Kg Semen Portland @Rp 1,534.00 Rp. 250,042.00
1.500 Org Pekerja @Rp 70,000.00 Rp. 105,000.00
0.600 Org Tukang @Rp 110,000.00 Rp. 66,000.00
0.060 Org Kepala Tukang @Rp 115,000.00 Rp. 6,900.00
0.075 Org Mandor @Rp 120,000.00 Rp. 9,000.00
Jumlah Rp. 845,142.00
Dibulatkan Rp. 845,142.00
DAFTAR HARGA UPAH DAN BAHAN

A. UPAH
1 Pekerja Rp 70,000 Hari
2 Tukang Rp 110,000 Hari
3 Kepala Tukang Rp 115,000 Hari
4 Mandor Rp 120,000 Hari

B. BAHAN
1 Tanah Urug Rp 130,000 M3
2 Pasir Urug Rp 113,750 M3
3 Pasir Pasang Rp 260,000 M3
4 Semen Gresik 50 kg Rp 76,700 Zak
5 Pasir Beton Rp 276,500 M3
6 Batu Kali/Batu Belah (Sungai/Gunung) Rp 227,500 M3
7 Kerikil Beton Rp 211,000 M3
8 Koral Beton Rp 201,500 M3
9 Pagar Panel 240 x 40 x 5 + Ongkos Pasang Rp 145,000 M2
BACK UP DATA
NO SKET GAMBAR PERHITUNGAN VOLUME SATUAN

I. PEKERJAAN PERSIAPAN

1 PEMBERSIHAN LAPANGAN

V = 1.00 1.00 Pkt

2 PENGUKURAN & BOWPLANK

V = 1.00 1.00 Pkt

BACK UP DATA
NO SKET GAMBAR PERHITUNGAN VOLUME SATUAN

PEKERJAAN PAGAR
A. PEKERJAAN TANAH
1 Galian Tanah Pondasi

PAGAR PANEL 1.00 x 1.00 x 420.00 420.00


DRAINASE 1.00 x 1.60 x 152.00 243.20
Jumlah total galian 663.20 m3
1
2 Urugan Bekas Galian

PAGAR PANEL 420.00 / 4.00 Jumlah 105.00 m3

3 Urugan Pasir
a. Urugan Tanah
PAGAR PANEL 0.05 x 1.00 x 420.00 Jumlah 21.00 m3

Jumlah total galian 21.00 m3

BACK UP DATA
NO SKET GAMBAR PERHITUNGAN VOLUME SATUAN

B. PEKERJAAN PASANGAN
1. Pas Batu Kosong

PAGAR PANEL 0.80 x 0.10 x 420.00 33.60 m3


DRAINASE 0.80 x 0.10 x 98.00 7.84 m3
2 Jumlah 41.44 m3

2. Pas. Pondasi Batu Kali

PAGAR PANEL 0.30 + 0.60 x 2.10 x 420.00 396.90 m3


2.00

DRAINASE 0.30 + 0.60 x 2.10 x 152.00 143.64 m3


2.00 540.54 m3