PEKERJAAN SIPIL
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
( Rp. ) ( Rp. )
VI PEKERJAAN LAIN-LAIN
1 Pekerjaan pemasangan logo "NEW STAR CINEPLEX" + accesoris atas pintu 1.00 ls 30,000,000.0 12,300,000.00
SUB TOTAL 12,300,000.00
TOTAL 551,742,977.91
1 Instalasi Titik lampu Cable NYM 2,5mm (Suprime)/Setara Ttk 110.00 255,000.00 11,500,500.00
2 Instalasi Stop Contak Cable NYM 2,5mm (Suprime)/setara Ttk 24.00 255,000.00 2,509,200.00
3 Saklar Satu Gang (Panasonic) Bh 7.00 38,500.00 110,495.00
4 Saklar Dua Gang (Panasonic) Bh 32.00 49,500.00 649,440.00
5 Stop Kontak (Panasonic) Bh 24.00 42,500.00 418,200.00
6 Down Light 5''+PL 18Watt (Meiwa DL 996 white) Unit 110.00 105,000.00 4,735,500.00
7 Panel SDP Penerangan, stop contak dan AC Unit 1.00 12,000,000.00 4,920,000.00
8 Material bantu dan support ls 1.00 1,000,000.00 410,000.00
1 Instalasi Titik lampu Cable NYM 2,5mm (Suprime) Ttk 30.00 225,000.00 2,767,500.00
2 Instalasi Stop Contak Cable NYM 2,5mm (Suprime) Ttk 12.00 225,000.00 1,107,000.00
3 Intalasi kabel power Dogotal proyektor m 46.00 30,000.00 565,800.00
4 Saklar Daimer (Panasonic) Bh 6.00 250,000.00 615,000.00
4 Saklar satu Gang (Panasonic) Bh 2.00 38,500.00 31,570.00
5 Saklar Dua Gang (Panasonic) Bh 2.00 49,500.00 40,590.00
6 Stop Kontak (Panasonic) Bh 12.00 42,500.00 209,100.00
7 Down Light 5''+PL 18Watt (Meiwa DL 996 white) Unit 30.00 105,000.00 1,291,500.00
PEKERJAAN TRIBUN
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT
( Rp. ) ( Rp. )
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp)
A PEKERJAAN SIPIL
I PEKERJAAN PERSIAPAN & PEMBONGKARAN Rp. 17,425,000.00
II PEKERJAAN ENTRANCE, HALL, KASIR, CAFÉ, R. GANTI DAN KANTOR Rp. 80,544,676.41
III PEKERJAAN RUANG OPERATOR Rp. 19,639,287.00
IV PEKERJAAN R. CINEMA Rp. 383,548,214.50
V PEKERJAAN PELAPIS LANTAI Rp. 38,285,800.00
VI PEKERJAAN LAIN-LAIN Rp. 12,300,000.00