SATUAN KERJA : BALAI PERHUBUNGAN TRANSPORTASI DARAT WIAYAH XIII PROVINSI NTT
PEKERJAAN : PEMBANGUNAN PORTAL PELABUHAN
LOKASI : MARAPOKOT - KABUPATEN NAGEKEO
TAHUN ANGGARAN : 2020
E LAIN-LAIN 7,150,000.00
SUPERVISI 8,000,000.00
SATUAN KERJA : BALAI PERHUBUNGAN TRANSPORTASI DARAT WIAYAH XIII PROVINSI NTT
PEKERJAAN : PEMBANGUNAN PORTAL PELABUHAN
LOKASI : MARAPOKOT - KABUPATEN NAGEKEO
TAHUN ANGGARAN : 2020
3 Timbunan atau urugan tanah kembali (m3) (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 0.3300 90,000.00 29,700.00
Mandor oh 0.0330 120,000.00 3,960.00
7 Pemasangan pondasi batu belah 1SP : 5PP (m3) (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 1.5000 90,000.00 135,000.00
Tukang batu oh 0.7500 100,000.00 75,000.00
Kepala tukang oh 0.0750 110,000.00 8,250.00
Mandor oh 0.0750 120,000.00 9,000.00
Batu belah m3 1.2000 250,000.00 300,000.00
Semen PC kg 136.0000 1,500.00 204,000.00
Pasir pasang m3 0.5440 245,000.00 133,280.00
Harga Satuan Pekerjaan 864,530.00
8 Memasang dinding batako besar pres ukuran (8 x 20 x30) cm, campuran spesi 1 PC : 4 PP (m2)
Pekerja oh 0.3000 90,000.00 27,000.00
Tukang Batu oh 0.1000 100,000.00 10,000.00
Kepala Tukang oh 0.0100 110,000.00 1,100.00
Mandor oh 0.0150 120,000.00 1,800.00
Semen PC kg 9.0000 1,500.00 13,500.00
Batu tela/batako/batu pres m3 11.0000 2,750.00 30,250.00
Pasir pasang bh 0.0320 245,000.00 7,840.00
Harga Satuan Pekerjaan 91,490.00
12 Membuat beton mutu f'c (m3) (PM= 14.5 Mpa, (slump (120 ± 20)mm (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 1.6500 90,000.00 148,500.00
Tukang batu oh 0.2750 100,000.00 27,500.00
Kepala Tukang oh 0.0280 110,000.00 3,080.00
Mandor oh 0.0830 120,000.00 9,960.00
Semen PC kg 326.0000 1,500.00 489,000.00
Pasir beton m3 0.5429 250,000.00 135,714.29
Kerikil (maks 30 mm) m3 0.7097 269,000.00 190,897.24
Harga Satuan Pekerjaan 1,004,651.53
13 Pembesian dengan besi polos atau besi ulir (10 kg) (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 0.0700 90,000.00 6,300.00
Tukang besi oh 0.0700 100,000.00 7,000.00
Kepala Tukang oh 0.0070 110,000.00 770.00
Mandor oh 0.0040 120,000.00 480.00
Besi Beton Polos kg 10.5000 11,000.00 115,500.00
Kawat Beton/Bendrat RRT kg 0.1500 21,000.00 3,150.00
Jumlah (a) 133,200.00
Utk 1 kg = a/10 13,320.00
Harga Satuan Pekerjaan 13,320.00
34 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) (m2) (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 0.0200 90,000.00 1,800.00
Tukang cat oh 0.0630 100,000.00 6,300.00
Kepala tukang oh 0.0063 110,000.00 693.00
Mandor oh 0.0030 120,000.00 360.00
Plamur kg 0.1000 12,700.00 1,270.00
Cat dasar kg 0.1000 68,750.00 6,875.00
Cat penutup kg 0.2600 70,000.00 18,200.00
Harga Satuan Pekerjaan 35,498.00
35 Pengecatan bid. kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) (m2) (PM PUPR No. 28/PRT/M/2016)
Pekerja oh 0.0700 90,000.00 6,300.00
Tukang cat oh 0.0090 100,000.00 900.00
Kepala tukang oh 0.0060 110,000.00 660.00
Mandor oh 0.0030 120,000.00 360.00
Cat meni kayu kg 0.2000 50,100.00 10,020.00
Plamur kg 0.1500 12,700.00 1,905.00
Cat dasar kg 0.1700 68,750.00 11,687.50
Cat penutup kg 0.2600 70,000.00 18,200.00
Kuas buah 0.0100 18,000.00 180.00
Pengencer kg 0.0300 41,000.00 1,230.00
Ampelas kg 0.2000 27,900.00 5,580.00
Harga Satuan Pekerjaan 57,022.50
Pemasangan, penyambungan dan instalasi konektor (1 unit) (Permen.Hub PM.78 TAHUN 2014-hal.178-
43
no.6147)
Pekerja oh 1.5000 90,000.00 135,000.00
Tukang listrik oh 0.8500 100,000.00 85,000.00
Mandor oh 0.2000 120,000.00 24,000.00
Alat bantu instalasi listrik oh 1.0000 50,000.00 50,000.00
Harga Satuan Pekerjaan 294,000.00
58 Pemasangan UPS ICA atau yang setara, kapasitas 1000 Watt (unit)
Pemasangan UPS unit 1.0000 1,800,000.00 1,800,000.00
Harga Dasar
No. Upah, Alat dan Bahan Satuan
(Rp.)
A. TENAGA KERJA
1 Pekerja oh 90,000.00
2 Tukang oh 100,000.00
3 Kepala Tukang oh 110,000.00
4 Mandor oh 120,000.00
5 Tukang Batu oh 100,000.00
6 Tukang Besi oh 100,000.00
7 Tukang Cat oh 100,000.00
8 Tukang Kayu oh 100,000.00
9 Tukang Listrik oh 100,000.00
D. BAHAN / MATERIAL
SEMEN
1 Semen Pc kg 1,500.00
2 Semen warna kg 3,000.00
AGGREGAT
1 Agregat Kasar m3 269,000.00
2 Agregat 0.5 mm m3 269,000.00
3 Agregat Pecah Mesin 20-30 mm m5 269,000.00
4 Bata Merah Press Mesin bh 2,500.00
5 Batu belah m3 250,000.00
6 Batu tela/batako/batu pres bh 2,750.00
7 Kerikil (maks 30 mm) m3 269,000.00
8 Koral/krikil m3 175,000.00
9 Pasir beton m3 250,000.00
10 Pasir pasang m3 245,000.00
11 Pasir urug m3 220,000.00
12 Paving block m2 170,000.00
13 Sirtu m3 210,000.00
14 Besi beton kg 11,000.00
15 Besi Beton Polos kg 11,000.00
16 Besi Strip kg 13,000.00
17 Rangka profil kusen alluminium m 90,000.00
18 Rangka alumunium profil kaca m 100,000.00
PAKU-KAWAT-BAUT-MUR-ANGKUR
1 Paku 5 cm - 10 cm kg 20,000.00
Harga Dasar
No. Upah, Alat dan Bahan Satuan
(Rp.)
2 Paku 5 cm - 12 cm kg 20,000.00
3 Paku Sekrup kg 30,000.00
4 Kawat Beton/Bendrat RRT kg 21,000.00
5 Angkur bh 9,000.00
6 Angker Bar 10 mm bh 20,000.00
7 Baut Segala Ukuran kg 40,000.00
PIPA
1 Pipa Galvanis Dia. 3" m' 216,666.67
2 Pipa PVC 5/8 (6m) Ljr 8,500.00
KAYU
1 Dolken Kayu Dia. 8 cm btg 24,600.00
2 Kayu Balok Kelas II m3 7,222,500.00
3 Kayu kelas III m3 3,745,000.00
4 Plywood (t=4 mm) lbr 115,900.00
5 Plywood tebal 9 mm lbr 133,750.00
6 Minyak bekisting ltr 2,675.00
7 Thinner ltr 41,000.00
CAT-PLASTIK
1 Cat Dasar kg 68,750.00
2 Cat meni kayu kg 50,100.00
3 Cat Tembok kg 70,000.00
4 Kuas bh 18,000.00
5 Lem Pipa PVC kg 27,900.00
6 Plamur kg 12,700.00
ATAP DAN PLAFOND
1 Atap Seng Gelombang lbr 77,400.00
2 List Gypsum m' 25,000.00
3 Shadow line m 20,000.00
4 Gypsum Board lbr 90,850.00
Harga Dasar
No. Upah, Alat dan Bahan Satuan
(Rp.)
PINTU, JENDELA, KACA
1 Kunci Tanam Antik bh
2 Kunci Tanam bh 400,000.00
3 Kunci Silinder bh 350,000.00
4 Engsel Pintu bh 26,750.00
5 Hak Angin bh 35,600.00
6 Kait Angin bh 25,000.00
7 Grendel Jendela bh 10,700.00
8 Kaca bening tebal 5 mm m2 109,200.00
9 Kaca Polos tebal 3 mm m2 61,525.00
10 Jendela Nako + accessories set 133,750.00
11 Sealant kg 77,000.00
Harga Dasar
No. Upah, Alat dan Bahan Satuan
(Rp.)
LANTAI
1 Keramik Roman 40 x 40 Golongan D bh 19,000.00
2 Keramik Roman 20 x 20 Golongan D bh 3,924.53
LISTRIK
1 Alat bantu instalasi listrik Ls 50,000.00
2 Instalasi penerangan m' 70,000.00
3 Kabel NYA 2.5 mm m' 9,000.00
4 Lampu SL 8 Watt + fiting bh 25,000.00
5 Lampu SL 18 Watt + fiting bh 50,000.00
6 Lampu Sorot LED 50 w unit 900,000.00
7 Saklar ganda bh 89,600.00
8 Saklar tunggal bh 56,700.00
9 Stop Kontak bh 21,400.00
10 T dos PVC bh 2,000.00
LAIN-LAIN
1 Pemasangan kaca tebal 5 mm (m2) m2 151,049.33
2 Pengadaan 1 m kusen alluminium m 99,000.00
3 Memasang 1 m2 pintu kaca rangka alluminium m2 488,530.00
4 Pengadaan portal barier unit 10,000,000.00
5 Pengadaan manless tiket box (Unit) unit 4,000,000.00
6 Pengadaan Antena Of The Reader unit 2,500,000.00
7 Pengadaan Traffic Light Lampu Ganda unit 4,000,000.00
8 Pengadaan kamera monitoring (Unit) unit 1,200,000.00
9 Pemasangan trafic light unit 5,100,000.00
10 Pengadaan DVD Player unit 1,500,000.00
11 Pemasangan Paging Microphone unit 1,450,000.00
12 Pemasangan speaker outdor unit 4,000,000.00
13 Pemasangan Handie Talkie (HT) unit 950,000.00
14 Pemasangan Panel daya listrik systim portal unit 7,000,000.00
15 Pemasangan PC Core I 5 , window 7 original / C560 unit 5,000,000.00
16 Pemasangan External Display unit 1,600,000.00
17 Pemasangan Server system unit 12,000,000.00
18 Pemasangan UPS unit 1,800,000.00
19 Pengadaan kursi operator unit 450,000.00
20 Pengadaan meja operator unit 1,500,000.00
21 Pengadaan road barier water unit 1,200,000.00
22 Pengadaan stick cone unit 350,000.00
23 Pengadaan kerucut Traffic Cone unit 350,000.00