KODE ANALISA
JENIS PEKERJAAN
SATUAN PEMBAYARAN
:
:
:
NO.
D.001
Pasangan bata ringan tebal 7,5 cm dengan mort
m
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
Bata ringan
Mortar
M022
M037
bh
zak
PERALATAN
=
=
680,000.00
98,000.00
:
:
:
D.002
Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
m
NO.
KOMPONEN
A.
TENAGA
1
2
3
4
Pekerja Biasa
Tukang Batu
Kepala Tukang Batu
Mandor
SATUAN
L17
L07
L02
L01
Org/hr
Org/hr
Org/hr
Org/hr
BAHAN
1
2
3
Bata Merah
Portland Cement (PC)
Pasir Pasang
M022
M037
M002
PERALATAN
bh
kg
m
RGA SATUAN
PERKIRAAN
KUANTITAS
0.3000
0.1000
0.0100
0.0150
HARGA
SATUAN
(Rp.)
JUMLAH
HARGA
(Rp.)
50,000.00
60,000.00
65,000.00
70,000.00
15,000.00
6,000.00
650.00
1,050.00
22,700.00
8.3333
0.08
6,120.06
98,000.00
51,000.51
7,350.00
58,350.51
81,050.51
RGA SATUAN
PERKIRAAN
HARGA
JUMLAH
KUANTITAS
0.3000
0.1000
0.0100
0.0150
SATUAN
(Rp.)
50,000.00
60,000.00
65,000.00
70,000.00
HARGA
(Rp.)
15,000.00
6,000.00
650.00
1,050.00
22,700.00
70.0000
8.3200
0.0490
550.00
1,450.00
181,700.00
38,500.00
12,064.00
8,903.30
59,467.30
82,167.30
KODE
2
4
19
22
40
65
83
108
110
M002
M004
M019
M022
M037
M061
M085
M112
M114
114
131
134
139
145
157
164
213
M117
M132
M135
M140
M146
M151
M158
M206
425
426
432
434
435
437
438
439
465
472
473
480
M402
M403
M409
M411
M412
M414
M415
M415.a
M437
M441
M442
M449
M479
M473
M483
510
521
BAHAN BANGUNAN
Pasir Pasang
Pasir Cor
Batu pecah mesin 2/3
Bata Merah
Portland Cement (PC)
Besi Hollow
Papan Kayu kelas III
Besi Beton Polos
Besi Strip / Plat Plendes
Seng Plat BJLS 30
Angker Bar / Dynabolt
Baja Ringan
Kawat Beton/Bendrat RRT
Paku Kayu Segala Ukuran
Baut Segala Ukuran
Genteng Karang Pilang ex. Malang
Bubung Genteng Karang Pilang ex. Malang
Gypsum Board
List Gypsum
Listplank uk. 20
Listplank uk. 30
Plamir Kayu
Plamir Tembok
Cat meni kayu
Cat Dasar Kayu
Cat Dasar Tembok
Cat Kayu
Cat Tembok
Cat Tembok Interior
Kabel NYA 2.5 mm
Las doof
Isolator
Lampu XL 20 Watt + Fitting
Lampu XL 40 Watt + Fitting
Elektroda
Solar Industri
SATUAN
1 m
1 m
1 m
1 bh
1 kg
1 m1
1 m
1 kg
1 kg
1 m1
1 kg
1 Kg
1 Kg
1 Kg
1 kg
1 bh
1 bh
1 Ibr
1m1
1m2
1m3
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 kg
1 m
1 bh
1 m
1 bh
1 bh
1 kg
1 Itr
523
M484
Minyak Pelumas
1 Itr
HAN BANGUNAN
ARAN 2014
HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
KETERANGAN
181,700.00
227,100.00
256,900.00
550.00
1,450.00 Semen
47,000.00
2,200,000.00
9,700.00 Besi dan Aluminium
15,500.00
25,000.00
17,000.00
20,500.00
15,800.00
14,000.00
15,525.00
2,000.00
3,000.00
103,000.00
12,000.00
20,000.00
30,000.00
25,000.00
18,000.00
25,000.00
32,000.00
60,000.00
63,000.00
68,000.00
5,500.00 Instalasi Listrik
1,000.00
3,000.00
55,000.00
98,000.00
26,000.00
5,000.00
Rp
48,950.00
DAFTAR PERALATAN
TAHUN ANGGARAN 2014
No.
KODE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
38
E01
E02
E03
E04
E05
E06
E07
E08
E09
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
URAIAN
Sewa Mesin Bor
Sewa Kompresor
Sewa Genset
Sewa Pompa Tes
Sewa Mesin Las
Sewa Alat Geolistrik
Sewa Alat Geofisikal, Elektrikal, Logging
Sewa Mud Pump
Sewa Alat Sandblasting
Sewa Excavator
Sewa Whell Loader
Sewa Motor Grader
Sewa Vibro Roller
Sewa Water Tanker
Pesawat Ukur
Meteran
Palu
Keranjang
Ganco
Alat pelancip/pisau besar
Palu Besar/bodem
Timbris
Kereta Dorong
Jack Hammer
Molen
Ember
Kotak Adukan
Cetok
Kuas
Kasut Kayu
Tang Pemotong Kawat
Vibrator
Gergaji
Gunting pemotong besi
Kunci Pembengkok tulangan
Bor Besi
Stamper
Sewa Dump Truk
Sewa Mobil Picup
SATUAN
hari
hari
hari
hari
hari
hari
hari
Jam
hari
hari
hari
hari
hari
hari
Unit/hr
bh
bh
bh
bh
bh
bh
Unit
Unit
bh
Unit/hr
bh
bh
bh
bh
bh
bh
Unit/hr
bh
bh
bh
bh
Unit/hr
hr
hr
AR PERALATAN
ANGGARAN 2014
HARGA
KETERANGAN
Rp
1,350,000.00
Rp
2,400,000.00
Rp
1,000,000.00
Rp
4,000,000.00
Rp
400,000.00
Rp
1,750,000.00
Rp
1,750,000.00
Rp
60,000.00
Rp
1,100,000.00
Rp
1,600,000.00
Rp
2,400,000.00
Rp
2,400,000.00
Rp
1,750,000.00
Rp
1,000,000.00
Rp
100,000.00
Rp
100,000.00
Rp
25,000.00
Rp
10,000.00
Rp
75,000.00
Rp
25,000.00
Rp
100,000.00
Rp
30,000.00
Rp
100,000.00
Rp
100,000.00
Rp
100,000.00
Rp
5,000.00
Rp
25,000.00
Rp
10,000.00
Rp
10,000.00
Rp
10,000.00
Rp
50,000.00
Rp
100,000.00
Rp
50,000.00
Rp
50,000.00
Rp
25,000.00
Rp
100,000.00
Rp
160,000.00
Rp
1,000,000.00
Rp
500,000.00
DAFTAR UPAH
TAHUN ANGGARAN 2014
KODE
URAIAN
SATUAN
UPAH
L01
Mandor
Org/hr
70,000.00
L02
Org/hr
65,000.00
L03
Org/hr
65,000.00
L04
Org/hr
65,000.00
L05
Org/hr
65,000.00
L06
Org/hr
65,000.00
L07
Tukang Batu
Org/hr
60,000.00
L08
Tukang Kayu
Org/hr
60,000.00
L09
Tukang Besi/Baja
Org/hr
60,000.00
L10
Tukang Cat
Org/hr
60,000.00
L11
Tukang Listrik
Org/hr
60,000.00
L12
Tukang Pipa
Org/hr
60,000.00
L13
Tukang Plitur
Org/hr
60,000.00
L14
Tukang Taman
Org/hr
60,000.00
L15
Tukang Aspal
Org/hr
60,000.00
L16
Pembantu Tukang
Org/hr
55,000.00
L17
Pekerja Biasa
Org/hr
50,000.00
L18
Penjaga Malam
Org/hr
55,000.00
L19
Sopir
Org/hr
60,000.00
L20
Operator
Org/hr
70,000.00
L21
Mekanik
Org/hr
70,000.00
L22
Pembantu Sopir
Org/hr
55,000.00
L23
Pembantu Operator
Org/hr
60,000.00
L24
Pembantu Mekanik
Org/hr
60,000.00
L25
Juru Ukur
Org/hr
196,000.00
L26
Ls
665,000.00
L27
Org/hr
770,000.00
L28
Or / hr
700,000.00
KETERANGAN