Anda di halaman 1dari 112

DAFTAR ISI

HARGA SATUAN POKOK KEGIATAN (HSPK)

NO URAIAN HALAMAN

A. HARGA SATUAN DASAR (BASIC PRICE)


1. HARGA SATUAN DASAR UPAH A.1 -1 s/d A.1 - 2
2. HARGA SATUAN DASAR BAHAN A.2 -1 s/d A.2 - 58
3. HARGA SATUAN DASAR PERALATAN
a. HARGA SATUAN DASAR ALAT A.3 -1 s/d A.3 - 3
b. HARGA SEWA ALAT A.3 -4 s/d A.3 - 7

B. HARGA SATUAN POKOK KEGIATAN


1. BIDANG BINA MARGA B.1 - 1 s/d B.1 -4
2. BIDANG CIPTA KARYA B.2 - 1 s/d B.2 -14
3. BIDANG SUMBER DAYA AIR B.3 - 1 s/d B.3 -9

C. BIAYA PEMBANGUNAN BANGUNAN GEDUNG NEGARA C - 1 s/d C - 77

D. STANDAR HARGA SATUAN TERTINGGI (SHST) PEMBANGUNAN D - 1 s/d D - 2


BANGUNAN GEDUNG NEGARA

E. REMUNERASI TENAGA AHLI UNTUK LAYANAN JASA KONSULTANSI KONSTRUKSI


1. BIAYA LANGSUNG PERSONIL E.1 - 1 s/d E.1 - 4
2. BIAYA LANGSUNG NON PERSONIL E.2 - 1 s/d E.2 - 4
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
harga satuan dasar (basic price) - upah
HARGA SATUAN DASAR UPAH BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023

NO URAIAN KODE SATUAN KABUPATEN BULUNGAN


Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Sekatak Tj Palas Tj Palas Barat Peso Bunyu
dan Tanjung Tengah dan Timur dan Peso Hilir
Palas Tj Palas Utara

A TENAGA KERJA KONSTRUKSI DAN


TEKNISI
I UPAH PER HARI
1 Pekerja L.01 oh 133,200.00 138,750.00 144,300.00 138,750.00 138,750.00 144,300.00 149,850.00
2 Tukang L.02 oh 160,950.00 166,500.00 172,050.00 166,500.00 166,500.00 172,050.00 177,600.00
3 Mandor L.03 oh 177,600.00 188,700.00 188,700.00 188,700.00 188,700.00 188,700.00 210,900.00
4 Operator L.04 oh 166,500.00 166,500.00 166,500.00 166,500.00 166,500.00 166,500.00 166,500.00
5 Pembantu Operator L.05 oh 133,200.00 133,200.00 144,300.00 133,200.00 133,200.00 144,300.00 144,300.00
6 Sopir / Driver L.06 oh 155,400.00 155,400.00 166,500.00 155,400.00 155,400.00 166,500.00 172,050.00
7 Pembantu Sopir / Driver L.07 oh 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00
8 Mekanik L.08 oh 166,500.00 172,050.00 177,600.00 172,050.00 172,050.00 177,600.00 188,700.00
9 Pembantu Mekanik L.09 oh 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 138,750.00
10 Kepala Tukang L.10 oh 166,500.00 177,600.00 177,600.00 177,600.00 177,600.00 177,600.00 188,700.00
11 Surveyor oh 222,000.00 227,550.00 230,880.00 227,550.00 227,550.00 230,880.00 239,760.00
12 Pembantu juru ukur oh 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00
13 Juru ukur oh 222,000.00 233,100.00 230,880.00 233,100.00 233,100.00 230,880.00 239,760.00
14 Drafter CAD oh 172,050.00 177,600.00 183,150.00 177,600.00 177,600.00 183,150.00 183,150.00
15 Desain engineer oh 388,500.00 399,600.00 404,040.00 399,600.00 399,600.00 404,040.00 404,040.00
16 Operator Komputer oh 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00 133,200.00

II UPAH PER JAM jam/hari 7 7 7 7 7 7 7


1 Pekerja L.01 jam 19,028.57 19,821.43 20,614.29 19,821.43 19,821.43 20,614.29 21,407.14
2 Tukang L.02 jam 22,992.86 23,785.71 24,578.57 23,785.71 23,785.71 24,578.57 25,371.43
3 Mandor L.03 jam 25,371.43 26,957.14 26,957.14 26,957.14 26,957.14 26,957.14 30,128.57
4 Operator L.04 jam 23,785.71 23,785.71 23,785.71 23,785.71 23,785.71 23,785.71 23,785.71
5 Pembantu Operator L.05 jam 19,028.57 19,028.57 20,614.29 19,028.57 19,028.57 20,614.29 20,614.29
6 Sopir / Driver L.06 jam 22,200.00 22,200.00 23,785.71 22,200.00 22,200.00 23,785.71 24,578.57
A.1 - 3
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Sekatak Tj Palas Tj Palas Barat Peso Bunyu
dan Tanjung Tengah dan Timur dan Peso Hilir
Palas Tj Palas Utara

7 Pembantu Sopir / Driver L.07 jam 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57
8 Mekanik L.08 jam 23,785.71 24,578.57 25,371.43 24,578.57 24,578.57 25,371.43 26,957.14
9 Pembantu Mekanik L.09 jam 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,821.43
10 Kepala Tukang L.10 jam 23,785.71 25,371.43 25,371.43 25,371.43 25,371.43 25,371.43 26,957.14
11 Surveyor jam 31,714.29 32,507.14 32,982.86 32,507.14 32,507.14 32,982.86 34,251.43
12 Pembantu juru ukur jam 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57
13 Juru ukur jam 31,714.29 33,300.00 32,982.86 33,300.00 33,300.00 32,982.86 34,251.43
14 Drafter CAD jam 24,578.57 25,371.43 26,164.29 25,371.43 25,371.43 26,164.29 26,164.29
15 Desain engineer jam 55,500.00 57,085.71 57,720.00 57,085.71 57,085.71 57,720.00 57,720.00
16 Operator Komputer jam 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57 19,028.57

A.1 - 4
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
harga satuan dasar (basic price) - bahan
HARGA SATUAN DASAR BAHAN BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

I ALAT PERTUKANGAN
1 Batu Asahan AP.1 buah 44,400.00 49,950.00 55,500.00 47,730.00 49,950.00 55,500.00 49,950.00
2 Benang Nylon AP.2 roll 16,650.00 18,870.00 22,200.00 17,760.00 18,870.00 22,200.00 19,980.00
3 Bethel AP.3 buah 44,400.00 46,620.00 55,500.00 47,730.00 46,620.00 55,500.00 49,950.00
4 Bodem AP.4 buah 199,800.00 210,900.00 244,200.00 210,900.00 210,900.00 244,200.00 222,000.00
5 Cangkul AP.5 buah 105,450.00 111,000.00 122,100.00 111,000.00 111,000.00 122,100.00 116,550.00
6 Cangkul (lengkap) AP.6 buah 122,100.00 127,650.00 166,500.00 127,650.00 127,650.00 166,500.00 138,750.00
7 Cetakan armor AP.7 buah 1,665,000.00 1,731,600.00 1,914,750.00 1,748,250.00 1,731,600.00 1,914,750.00 1,864,800.00
8 Cetakan armor 0,5 ton AP.8 buah 2,775,000.00 2,886,000.00 3,191,250.00 2,913,750.00 2,886,000.00 3,191,250.00 3,108,000.00
9 Cetakan armor 0,75 ton AP.9 buah 3,885,000.00 4,040,400.00 4,467,750.00 4,079,250.00 4,040,400.00 4,467,750.00 4,351,200.00
10 Cetakan armor 1 ton AP.10 buah 4,440,000.00 4,617,600.00 5,106,000.00 4,662,000.00 4,617,600.00 5,106,000.00 4,972,800.00
11 Cetakan armor 1,5 ton AP.11 buah 5,550,000.00 5,772,000.00 6,382,500.00 5,827,500.00 5,772,000.00 6,382,500.00 6,216,000.00
12 Cetakan armor 2 ton AP.12 buah 6,660,000.00 6,926,400.00 7,659,000.00 6,993,000.00 6,926,400.00 7,659,000.00 7,459,200.00
13 Ember Cor AP.13 buah 19,980.00 21,090.00 22,200.00 21,090.00 21,090.00 22,200.00 22,200.00
14 Gergaji besi AP.14 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
15 Gergaji Kayu AP.15 buah 138,750.00 144,300.00 160,950.00 144,300.00 144,300.00 160,950.00 155,400.00
16 Gerobak Pasir AP.16 buah 654,900.00 682,650.00 754,800.00 688,200.00 682,650.00 754,800.00 732,600.00
17 Gunting Pemotong AP.17 buah 499,500.00 521,700.00 577,200.00 527,250.00 521,700.00 577,200.00 559,440.00
18 Hammer Cabut AP.18 buah 105,450.00 111,000.00 122,100.00 111,000.00 111,000.00 122,100.00 118,770.00
19 Hammer konde AP.19 buah 94,350.00 99,900.00 122,100.00 99,900.00 99,900.00 122,100.00 111,000.00
20 Kain Majun AP.20 kg 24,420.00 27,750.00 33,300.00 27,750.00 27,750.00 33,300.00 27,750.00
21 Kasut Kayu AP.21 buah 22,200.00 27,750.00 38,850.00 24,420.00 27,750.00 38,850.00 27,750.00
22 Keranjang AP.22 buah 66,600.00 72,150.00 88,800.00 72,150.00 72,150.00 88,800.00 77,700.00
23 Kereta Dorong AP.23 buah 710,400.00 732,600.00 799,200.00 743,700.00 732,600.00 799,200.00 777,000.00
24 Kotak Adukan AP.24 Jam 38,850.00 44,400.00 55,500.00 44,400.00 44,400.00 55,500.00 49,950.00
25 Kuas AP.25 buah 27,750.00 29,970.00 32,190.00 29,970.00 29,970.00 32,190.00 31,080.00
26 Kuas 2" - 4" AP.26 buah 22,200.00 24,420.00 27,750.00 25,530.00 24,420.00 27,750.00 26,640.00
27 Kunci Pembengkok AP.27 buah 22,200.00 27,750.00 38,850.00 27,750.00 27,750.00 38,850.00 27,750.00
28 Linggis AP.28 buah 94,350.00 99,900.00 122,100.00 99,900.00 99,900.00 122,100.00 105,450.00
29 Motor 2 Kw 1350 rpm + pengkabelan AP.29 set 5,550,000.00 5,772,000.00 6,382,500.00 5,827,500.00 5,772,000.00 6,382,500.00 6,216,000.00
30 Roll meter 50 m AP.30 buah 111,000.00 116,550.00 133,200.00 122,100.00 116,550.00 133,200.00 122,100.00
A.2 - 6
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

31 Pahat beton AP.31 buah 83,250.00 86,580.00 95,682.00 87,357.00 86,580.00 95,682.00 93,240.00
32 Palu AP.32 buah 72,150.00 77,700.00 88,800.00 77,700.00 77,700.00 88,800.00 83,250.00
33 Tang Pemotong Kawat AP.33 buah 44,400.00 49,950.00 61,050.00 49,950.00 49,950.00 61,050.00 49,950.00

II RINCIAN KEGIATAN PEYELENGGARAAN SMK3


A PENYIAPAN RKK
1 Pembuatan Dokumen Rencana Keselamatan Konstruksi PR.1
Set 6,660,000.00 6,660,000.00 6,660,000.00 6,660,000.00 6,660,000.00 6,660,000.00 6,660,000.00
2 Pembuatan Prosedur dan Instruksi Kerja PR.2
3 Penyiapan Formulir PR.3

B SOSIALISASI, PROMOSI DAN PELATIHAN


1 Induksi K3 ( Safety Induction) SPP.1 orang 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00
2 Pengarahan K3 ( Safety Briefing) SPP.2 orang 22,200.00 22,200.00 22,200.00 22,200.00 22,200.00 22,200.00 22,200.00
3 Pertemuan Mengenai Keselamatan ( Safety meeting, SPP.3 orang 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00
Safety Talk dan/atau Toll Box meeting)
4 Pelatihan K3 SPP.4 orang 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00
5 Simulasi HIV/AIDS, COVID dll SPP.5 orang 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00
6 Simulasi K3 SPP.6 orang 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00 16,650.00
7 Spanduk ( Banner ) SPP.7 lembar 222,000.00 222,000.00 222,000.00 222,000.00 222,000.00 222,000.00 222,000.00
8 Poster, dan SPP.8 lembar 111,000.00 111,000.00 111,000.00 111,000.00 111,000.00 111,000.00 111,000.00
9 Papan Informasi K3 SPP.9 buah 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00

C ALAT PELINDUNG DIRI (APD )


1 Topi pelindung (Safety helmet) APD.1 buah 111,000.00 116,550.00 133,200.00 122,100.00 116,550.00 133,200.00 127,650.00
2 Pelindung mata (Goggles, Spectacles) APD.2 buah 35,520.00 38,850.00 44,400.00 38,850.00 38,850.00 44,400.00 38,850.00
3 Tameng muka (Face shield) APD.3 buah 455,100.00 471,750.00 521,700.00 477,300.00 471,750.00 521,700.00 488,400.00
4 Masker Selam ( Breathing Apparatus ) APD.4 buah 111,000.00 122,100.00 144,300.00 133,200.00 122,100.00 144,300.00 133,200.00
5 Pelindung Telinga ( Ear Plug, Ear Muff ) APD.5 psg 55,500.00 61,050.00 77,700.00 66,600.00 61,050.00 77,700.00 66,600.00
6 Pelindung pernafasan dan mulut (Masker) APD.6 box 61,050.00 66,600.00 77,700.00 66,600.00 66,600.00 77,700.00 66,600.00
7 Sarung tangan (Safety gloves) APD.7 psg 27,750.00 33,300.00 38,850.00 33,300.00 33,300.00 38,850.00 33,300.00
8 Sepatu keselamatan (Safety shoes) APD.8 psg 499,500.00 521,700.00 582,750.00 527,250.00 521,700.00 582,750.00 566,100.00
9 Penunjang seluruh tubuh (Full bodu harness) APD.9 buah 888,000.00 926,850.00 1,021,200.00 932,400.00 926,850.00 1,021,200.00 999,000.00
10 Jaket Pelampung ( Life Vest ) APD.10 buah 111,000.00 122,100.00 144,300.00 133,200.00 122,100.00 144,300.00 133,200.00
11 Rompi keselamatan (Safety vest) APD.11 buah 116,550.00 116,550.00 133,200.00 122,100.00 116,550.00 133,200.00 127,650.00

A.2 - 7
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

12 Celemek (A[ron/coveralls) APD.12 buah 288,600.00 299,700.00 333,000.00 299,700.00 299,700.00 333,000.00 321,900.00
13 Pelindung jatuh (Fall arrester) APD.13 buah 333,000.00 349,650.00 388,500.00 349,650.00 349,650.00 388,500.00 371,850.00

D ALAT PELINDUNG KERJA ( APK )


1 Jaring Pengaman (Safety Net) APK.1 Ls 22,200,000.00 23,088,000.00 25,530,000.00 23,310,000.00 23,088,000.00 25,530,000.00 24,864,000.00
2 Tali Keselamatan (Life Line) APK.2 Ls 5,550,000.00 5,772,000.00 6,382,500.00 5,827,500.00 5,772,000.00 6,382,500.00 6,216,000.00
3 Penahan Jatuh ( Safety Deck ) APK.3 Ls 11,100,000.00 11,544,000.00 12,765,000.00 11,655,000.00 11,544,000.00 12,765,000.00 12,432,000.00
4 Pagar Pengaman (Guard Railling) APK.4 Ls 11,100,000.00 11,544,000.00 12,765,000.00 11,655,000.00 11,544,000.00 12,765,000.00 12,432,000.00
5 Pembatas Area (Restricted Area) APK.5 Ls 3,330,000.00 3,463,200.00 3,829,500.00 3,496,500.00 3,463,200.00 3,829,500.00 3,729,600.00
6 Pelindung Jatuh ( Fall Arrester ) APK.6 Ls 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00
7 Perlengkapan Keselamatan Bencana APK.7 Ls 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00

E ASURANSI DAN PERIJINAN


1 Asuransi ADP.1 Ls 33,300,000.00 33,300,000.00 33,300,000.00 33,300,000.00 33,300,000.00 33,300,000.00 33,300,000.00
2 Surat Ijin Laik Operasi ( SILO ) ADP.2 set 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00
3 Surat Kompetensi Operator ADP.3 buah 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00
4 Surat Izin Pengesahan Panitia Pembina K3 ADP.4 Ls 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00

F PERSONIL K3 KONSTRUKSI
1 Ahli K3 Konstruksi PKK.1 orang 11,100,000.00 11,100,000.00 11,100,000.00 11,100,000.00 11,100,000.00 11,100,000.00 11,100,000.00
2 Petugas K3 Konstruksi PKK.2 orang 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00
3 Petugas Tanggap Darurat PKK.3 orang 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00
4 Petugas P3K PKK.4 orang 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00
5 Petugas Pengatur Lalu Lintas ( Flagman ) PKK.5 orang 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00
6 Tenaga Paramedis PKK.6 orang 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00 4,440,000.00

G FASILITAS SARANA DAN PRASARANA KESEHATAN

1 Peralatan P3K (Kotak P3K, Tandu,Obat Luka,Perban dll) AFSPK.1 Ls 2,220,000.00 2,308,800.00 2,553,000.00 2,331,000.00 2,308,800.00 2,553,000.00 2,486,400.00

2 Ruang P3K (Tempat Tidur Pasien,Tabung AFSPK.2 Ls 16,650,000.00 17,316,000.00 19,147,500.00 17,482,500.00 17,316,000.00 19,147,500.00 18,648,000.00
Oksigen,Stetoskop,timbangan berat Badan,tensi
meter,dll)
3 Peralatan Pengasapan (Fogging) AFSPK.3 buah 1,110,000.00 1,154,400.00 1,276,500.00 1,165,500.00 1,154,400.00 1,276,500.00 1,243,200.00
4 Obat Pengasapan AFSPK.4 Ls 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00

A.2 - 8
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

5 Ambulans AFSPK.5 bulan 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00

H RAMBU RAMBU YANG DIPERLUKAN


1 Rambu Petunjuk RR.1 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
2 Rambu Larangan RR.2 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
3 Rambu Peringatan RR.3 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
5 Rambu Kewajiban RR.4 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
6 Rambu Informasi RR.5 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
7 Rambu Pekerja Sementara RR.6 buah 166,500.00 172,050.00 188,700.00 177,600.00 172,050.00 188,700.00 177,600.00
8 Jalur Evakuasi ( Escape Route ) RR.7 Ls 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00
9 Tongkat Pengatur Lalu Lintas ( Warning Lights Stick ) RR.8 buah 222,000.00 233,100.00 255,300.00 244,200.00 233,100.00 255,300.00 244,200.00
10 Kerucut Lalu Lintas ( Traffic Cone ) RR.9 buah 111,000.00 116,550.00 133,200.00 122,100.00 116,550.00 133,200.00 122,100.00
11 Lampu Putar ( Rotary Lamp ) RR.10 buah 555,000.00 577,200.00 632,700.00 610,500.00 577,200.00 632,700.00 610,500.00
12 Lampu Selang Lalu Lintas RR.11 Ls 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00

I KONSULTASI DENGAN AHLI TERKAIT KESELAMATAN


KONSTRUKSI
1 Ahli Lingkungan KDA.1 OJ 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00
2 Ahli Konstruksi KDA.2 OJ 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00

J LAIN-LAIN TERKAIT PENGENDALIAN RESIKO


KESELAMATAN KONSTRUKSI
1 Pemeriksaan dan Pengujian Peralatan LL.1 Ls 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00 2,220,000.00
2 Alat Pemadam Api Ringan ( APAR ) LL.2 buah 777,000.00 810,300.00 854,700.00 832,500.00 810,300.00 854,700.00 832,500.00
3 Sirine LL.3 buah 333,000.00 344,100.00 388,500.00 355,200.00 344,100.00 388,500.00 366,300.00
4 Bendera K3 LL.4 buah 111,000.00 111,000.00 122,100.00 111,000.00 111,000.00 122,100.00 122,100.00
5 LampuDarurat (Emergency Lamp ) LL.5 buah 333,000.00 344,100.00 388,500.00 366,300.00 344,100.00 388,500.00 366,300.00
6 Pemeriksaan Lingkungan Kerja LL.6 Ls 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00
7 Pembuatan Kartu Identitas ( KIP ) LL.7 lembar 22,200.00 27,750.00 33,300.00 27,750.00 27,750.00 33,300.00 27,750.00
8 Limbah B3 LL.8 Ls 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00 3,330,000.00
9 Polusi Udara LL.9 Ls 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00
10 Program inspeksi dan Audit Internal LL.10 Ls 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00 5,550,000.00
11 Pelaporan dan Penyelidikan Insiden LL.11 Ls 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00
12 Patroli Keselamatan LL.12 unit 555,000.00 555,000.00 555,000.00 555,000.00 555,000.00 555,000.00 555,000.00
13 CCTV LL.13 unit 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00 1,110,000.00

A.2 - 9
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

II BAHAN
A BAHAN BERBUTIR
1 Abu Batu Filler BB.1 m3 777,000.00 808,080.00 893,550.00 815,850.00 808,080.00 893,550.00 870,240.00
2 Abu Batu Filler (kg) BB.2 kg 538.65 560.19 619.45 565.58 560.19 619.45 603.29 Berat isi = 1.261
kg/m3 (min) ;
1.624 kg/m3
(maks)

3 Agg. Halus LP A M04a m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
4 Agregat Lolos # 1 " M04b m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
5 Lolos screen1 ukuran ( 0 - 5) M04c m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
6 Lolos screen2 ukuran ( 0 - 5) M04d m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
7 Lolos screen2 ukuran ( 5 - 9,5) M04e m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
8 Lolos screen2 ukuran ( 9.5 - 19,0) M04f m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
9 Agr.Base Kelas A M26 m3 721,500.00 750,360.00 830,280.00 758,130.00 750,360.00 830,280.00 808,080.00
10 Agr.Base Kelas B M27 m3 666,000.00 692,640.00 765,900.00 699,300.00 692,640.00 765,900.00 745,920.00
11 Agr.Base Kelas S M28 m3 566,100.00 588,300.00 651,570.00 594,960.00 588,300.00 651,570.00 633,810.00
12 Agregat Pecah Kasar M03 m3 638,250.00 663,780.00 733,710.00 670,440.00 663,780.00 733,710.00 749,840.00
13 Agregat Pecah Mesin 0-5 mm M91 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
14 Agregat Pecah Mesin 10-20 mm M92 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
15 Agregat Pecah Mesin 20-30 mm M93 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
16 Agregat Pecah Mesin 5-10 & 10-20 mm M92 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
17 Agregat Pecah Mesin 5-10 mm M92 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
18 Arbocell M45 kg 35,520.00 36,852.00 40,848.00 37,296.00 36,852.00 40,848.00 39,738.00
19 Asbuton B 5/20 M161 kg 18,870.00 19,536.00 21,645.00 19,758.00 19,536.00 21,645.00 21,090.00
20 Asbuton B 50/20 M163 kg 19,425.00 20,202.00 22,311.00 20,313.00 20,202.00 22,311.00 21,756.00
21 Aspal M10 kg 20,000.00 21,000.00 22,000.00 21,000.00 21,000.00 22,000.00 22,600.00
22 Aspal Emulsi M31 kg 20,535.00 21,312.00 23,532.00 21,534.00 21,312.00 23,532.00 22,977.00
23 Aspal Emulsi CRS-1 atau RS-1 M31b liter 22,200.00 23,088.00 25,530.00 23,310.00 23,088.00 25,530.00 24,864.00
24 Aspal Emulsi CSS-1 atau SS-1 M31a liter 23,310.00 24,198.00 26,751.00 24,420.00 24,198.00 26,751.00 26,085.00
25 Aspal Emulsi Modifikasi Polimer 1h M31c liter 29,970.00 31,080.00 34,410.00 31,413.00 31,080.00 34,410.00 33,522.00
26 Aspal Emulsi Modifikasi Polimer 2h M31d liter 33,300.00 34,632.00 38,295.00 34,965.00 34,632.00 38,295.00 37,296.00
27 Aspal modifikasi BB.3 kg 27,750.00 28,860.00 31,857.00 29,082.00 28,860.00 31,857.00 31,080.00
28 Asphaltic plug M255 kg 61,050.00 63,492.00 70,152.00 64,047.00 63,492.00 70,152.00 68,376.00
29 Asphaltic plug Moveable M256 kg 64,380.00 66,933.00 74,037.00 67,599.00 66,933.00 74,037.00 72,039.00

A.2 - 10
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

30 Bahan Pengisi (Filler) Tambahan BB.4 kg 888.00 888.00 944.00 888.00 888.00 944.00 999.00
31 Bahan Pilihan M65 m3 163,170.00 169,608.00 187,590.00 171,273.00 169,608.00 187,590.00 182,706.00
32 Bahan Tanah Timbunan M66 m3 96,154.00 99,900.00 110,556.00 100,899.00 99,900.00 110,556.00 107,670.00
33 Batu Belah / Kerakal M06 m3 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00
34 Batu Gunung belah 15/20 BB.5 m3 516,150.00 537,240.00 593,850.00 541,680.00 537,240.00 593,850.00 875,000.00
35 Batu Kali M02 m3 505,050.00 525,030.00 580,530.00 530,580.00 525,030.00 580,530.00 566,100.00
36 Batu Pecah BB.6 kg 566.39 594.71 623.03 594.71 594.71 623.03 668.70 Berat isi = 1.254
kg/m3 (min) ;
1.363 kg/m3
(maks)

37 Batu Pecah 1 - 2 cm BB.7 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
38 Batu Pecah 10 -15 cm BB.8 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
39 Batu Pecah 2 - 3 cm BB.9 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
40 Batu Pecah 3 - 5 cm BB.10 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
41 Batu Pecah 5 - 7 cm BB.11 m3 741,125.00 778,181.25 815,237.50 778,181.25 778,181.25 815,237.50 875,000.00
42 Batubara M88 kg 666.00 666.00 666.00 666.00 666.00 666.00 666.00
43 Chipping M41 m3 721,500.00 750,360.00 830,280.00 758,130.00 750,360.00 830,280.00 808,080.00
44 Chipping (kg) M41kg kg 555.00 555.00 555.00 555.00 555.00 555.00 555.00
45 Filler M05 kg 422.00 438.00 485.00 443.00 438.00 485.00 472.00
46 Gravel M07 m3 999,000.00 1,038,960.00 1,148,850.00 1,048,950.00 1,038,960.00 1,148,850.00 1,118,880.00
47 Ijuk BB.12 kg 44,400.00 46,176.00 51,060.00 46,620.00 46,176.00 51,060.00 49,728.00
48 Kapur M40 m3 333,000.00 346,320.00 382,950.00 349,650.00 346,320.00 382,950.00 372,960.00
49 Kerikil BB.13 kg 233.28 242.61 268.06 245.16 242.61 268.06 261.28
50 Kerikil BB.14 m3 305,250.00 317,460.00 350,760.00 320,790.00 317,460.00 350,760.00 341,880.00
51 Pasir Beton BB.15 kg 195.19 203.00 224.69 204.74 203.00 224.69 218.62 Berat isi = 1.243
kg/m3 (min) ;
1.316 kg/m3
(maks)

52 Pasir Beton BB.16 m3 249,750.00 259,740.00 287,490.00 261,960.00 259,740.00 287,490.00 279,720.00
53 Pasir Beton (Kasar) M01a m3 249,750.00 259,740.00 287,490.00 261,960.00 259,740.00 287,490.00 279,720.00
54 Pasir Beton ex Palu BB.17 m3 577,200.00 600,510.00 663,780.00 606,060.00 600,510.00 663,780.00 646,020.00
55 Pasir Halus (untuk HRS) M01c m3 216,450.00 225,330.00 248,640.00 227,550.00 225,330.00 248,640.00 241,980.00
56 Pasir Kasar M164 m3 222,000.00 230,880.00 277,500.00 233,100.00 230,880.00 277,500.00 248,640.00
57 Pasir Pasang BB.18 m3 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
58 Pasir Pasang (Sedang) M01b m3 210,900.00 219,780.00 255,300.00 222,000.00 219,780.00 255,300.00 236,430.00
A.2 - 11
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

59 Pasir Tailing BB.19 m3 177,600.00 184,260.00 204,240.00 186,480.00 184,260.00 204,240.00 198,690.00
60 Pasir untuk sand blasting M219 m3 25,530.00 26,529.00 29,304.00 26,751.00 26,529.00 29,304.00 28,527.00
61 Pasir Urug M44 m3 144,300.00 149,850.00 277,500.00 152,070.00 149,850.00 277,500.00 162,060.00
62 Pasir Urug (ada unsur lempung) M01d m3 133,200.00 138,750.00 222,000.00 139,860.00 138,750.00 222,000.00 148,740.00
63 Sirtu M16 m3 222,000.00 230,880.00 277,500.00 233,100.00 230,880.00 277,500.00 248,640.00
64 Semen merah BB.20 m3 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
65 Tanah liat BB.21 m3 194,250.00 202,020.00 223,110.00 204,240.00 202,020.00 223,110.00 217,560.00
66 Tanah Urug BB.22 m3 149,850.00 152,958.00 161,505.00 153,735.00 152,958.00 161,505.00 159,174.00
67 Tanah Urug Pilihan BB.23 m3 199,800.00 204,240.00 216,450.00 205,350.00 204,240.00 216,450.00 213,120.00

B BAHAN PASANGAN
1 Bata berongga ekspose BP.1 buah 3,885.00 3,996.00 4,440.00 3,996.00 3,996.00 4,440.00 4,329.00
2 Bata Pelapis BP.2 buah 6,660.00 6,882.00 7,659.00 6,993.00 6,882.00 7,659.00 7,437.00
3 Bata Ringan 7,5 x 20 x 60 BP.3 buah 17,760.00 18,426.00 20,424.00 18,648.00 18,426.00 20,424.00 19,869.00
4 Bata Ringan 9 x 19 x 39 BP.4 buah 6,105.00 6,327.00 6,327.00 6,327.00 6,660.00 6,993.00 6,771.00
5 Bataco ukuran 8 x 15 x 30 BP.5 buah 3,996.00 4,107.00 4,551.00 4,107.00 4,107.00 4,551.00 4,440.00
6 Batu Bata 8 x 8 x 16 BP.6 buah 1,332.00 1,332.00 2,220.00 1,332.00 1,332.00 2,220.00 1,443.00
7 Batu candi BP.7 buah 14,430.00 14,985.00 16,539.00 15,096.00 14,985.00 16,539.00 16,095.00
8 Batu granit BP.8 kg 30,525.00 31,746.00 35,076.00 31,968.00 31,746.00 35,076.00 34,188.00
9 Batu muka BP.9 buah 14,430.00 14,985.00 16,539.00 15,096.00 14,985.00 16,539.00 16,095.00
10 Batu paras BP.10 m2 188,700.00 196,248.00 217,005.00 198,135.00 196,248.00 217,005.00 211,344.00
11 Batu tempel hitam BP.11 m2 194,250.00 202,020.00 223,332.00 203,907.00 202,020.00 223,332.00 217,560.00
12 Batu teraso BP.12 kg 20,535.00 21,312.00 23,532.00 21,534.00 21,312.00 23,532.00 22,977.00
13 Concrete Block BP.13 buah 13,320.00 13,764.00 15,318.00 13,986.00 13,764.00 15,318.00 14,874.00
14 Grass Block Abu-abu (6 cm) isi 9/m2 BP.14 buah 38,850.00 40,404.00 44,622.00 40,737.00 40,404.00 44,622.00 43,512.00
15 Hollow Block 20 BP.15 buah 6,660.00 6,882.00 7,659.00 6,993.00 6,882.00 7,659.00 7,437.00
16 Kaca glass block BP.16 buah 49,950.00 51,948.00 57,387.00 52,392.00 51,948.00 57,387.00 55,944.00
17 Kansteen Type 15/20 x 40 x 50 cm BP.17 buah 66,600.00 69,264.00 76,590.00 69,930.00 69,264.00 76,590.00 74,592.00
18 Kansteen Type K.225 15/20 x 20 x 50 cm BP.18 buah 38,850.00 40,404.00 44,622.00 40,737.00 40,404.00 44,622.00 43,512.00
19 Kansteen Type K.225 15/20 x 30 x 50 cm BP.19 buah 55,500.00 57,720.00 63,825.00 58,275.00 57,720.00 63,825.00 62,160.00
20 Kansteen Type K.225 15/20 x 30 x 50 cm L BP.20 buah 55,500.00 57,720.00 63,825.00 58,275.00 57,720.00 63,825.00 62,160.00
21 Kansteen Type K.225 15/20 x 40 x 50 cm BP.21 buah 72,150.00 75,036.00 82,917.00 75,702.00 75,036.00 82,917.00 80,808.00
22 Kansteen Type K.225 20/20 x 30 x 50 cm BP.22 buah 72,150.00 75,036.00 82,917.00 75,702.00 75,036.00 82,917.00 80,808.00
23 Kansteen Type K.300 15/20 x 20 x 50 cm BP.23 buah 38,850.00 40,404.00 44,622.00 40,737.00 40,404.00 44,622.00 43,512.00
24 Kansteen Type K.300 15/20 x 30 x 50 cm BP.24 buah 61,050.00 63,492.00 70,152.00 64,047.00 63,492.00 70,152.00 68,376.00

A.2 - 12
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

25 Kansteen Type K.300 15/20 x 30 x 50 cm L BP.25 buah 66,600.00 69,264.00 76,590.00 69,930.00 69,264.00 76,590.00 74,592.00
26 Kansteen Type K.300 20/20 x 30 x 50 cm BP.26 buah 77,700.00 80,808.00 89,355.00 81,585.00 80,808.00 89,355.00 87,024.00
27 Paving Block M78 buah 3,219.00 3,330.00 3,663.00 3,330.00 3,330.00 3,663.00 3,552.00
28 Paving Block Bata Merah (8 cm) isi 48/m2 BP.27 buah 3,996.00 4,107.00 4,551.00 4,107.00 4,107.00 4,551.00 4,440.00
29 Paving Block Benteng Merah (8 cm) isi 35/m2 BP.28 buah 4,329.00 4,440.00 4,884.00 4,440.00 4,440.00 4,884.00 4,773.00
30 Paving Block Bata Abu-abu (6 cm) isi 48/m2 BP.29 buah 3,219.00 3,330.00 3,663.00 3,330.00 3,330.00 3,663.00 3,552.00
31 Paving Block Bata Abu-abu (8 cm) isi 48/m2 BP.30 buah 5,328.00 5,439.00 6,105.00 5,550.00 5,439.00 6,105.00 5,883.00
32 Paving Block Bata Merah (6 cm) isi 48/m2 BP.31 buah 3,330.00 3,441.00 3,774.00 3,441.00 3,441.00 3,774.00 3,663.00
33 Paving Block Benteng Abu-abu (6 cm) isi 35/m2 BP.32 buah 4,107.00 4,218.00 4,662.00 4,218.00 4,218.00 4,662.00 4,551.00
34 Paving Block Benteng Abu-abu (8 cm) isi 35/m2 BP.33 buah 4,995.00 5,106.00 5,661.00 5,217.00 5,106.00 5,661.00 5,550.00
35 Paving Block Benteng Merah (6 cm) isi 35/m2 BP.34 buah 4,329.00 4,440.00 4,884.00 4,440.00 4,440.00 4,884.00 4,773.00
36 Paving Block Diagonal Abu-abu (6 cm) isi 40/m2 BP.35 buah 3,552.00 3,663.00 3,996.00 3,663.00 3,663.00 3,996.00 3,885.00
37 Paving Block Diagonal Abu-abu (8 cm) isi 40/m2 BP.36 buah 4,662.00 4,773.00 5,328.00 4,884.00 4,773.00 5,328.00 5,217.00
38 Paving Block Diagonal Jumbo Abu-abu (6 cm) isi 30/m2 BP.37 buah 4,773.00 4,884.00 5,439.00 4,995.00 4,884.00 5,439.00 5,328.00

39 Paving Block Diagonal Jumbo Abu-abu (8 cm) isi 30/m2 BP.38 buah 6,105.00 6,327.00 6,993.00 6,327.00 6,327.00 6,993.00 6,771.00

40 Paving Block Diagonal Jumbo Merah (6 cm) isi BP.39 buah 4,773.00 4,884.00 5,439.00 4,995.00 4,884.00 5,439.00 5,328.00
41 Paving Block Diagonal Jumbo Merah (8 cm) isi 30/m2 BP.40 buah 6,105.00 6,327.00 6,993.00 6,327.00 6,327.00 6,993.00 6,771.00
42 Paving Block Diagonal Merah (6 cm) isi 40/m2 BP.41 buah 3,774.00 3,885.00 4,329.00 3,885.00 3,885.00 4,329.00 4,218.00
43 Paving Block Diagonal Merah (8 cm) isi 40/m2 BP.42 buah 4,773.00 4,884.00 5,439.00 4,995.00 4,884.00 5,439.00 5,328.00
44 Paving Block Serasi Abu-abu (6 cm) isi 44/m2 BP.43 buah 3,774.00 3,885.00 4,329.00 3,885.00 3,885.00 4,329.00 4,218.00
45 Paving Block Serasi Abu-abu (6 cm) isi 44/m2 BP.44 buah 3,774.00 3,885.00 4,329.00 3,885.00 3,885.00 4,329.00 4,218.00
46 Paving Block Serasi Merah (6 cm) isi 44/m2 BP.45 buah 4,218.00 4,329.00 4,773.00 4,329.00 4,329.00 4,773.00 4,662.00
47 Paving Block Serasi Merah (8 cm) isi 44/m2 BP.46 buah 4,662.00 4,773.00 5,328.00 4,884.00 4,773.00 5,328.00 5,217.00
48 Paving Block Tiga Berlian Abu-abu (6 cm) isi BP.47 buah 3,330.00 3,441.00 3,774.00 3,441.00 3,441.00 3,774.00 3,663.00
49 Paving Block Tiga Berlian Abu-abu (8 cm) isi 35/m2 BP.48 buah 3,885.00 3,996.00 4,440.00 3,996.00 3,996.00 4,440.00 4,329.00
50 Paving Block Tiga Berlian Merah (6 cm) isi 35/m2 BP.49 buah 3,330.00 3,441.00 3,774.00 3,441.00 3,441.00 3,774.00 3,663.00
51 Paving Block Tiga Berlian Merah (8 cm) isi 35/m2 BP.50 buah 4,440.00 4,551.00 5,106.00 4,662.00 4,551.00 5,106.00 4,884.00
52 Paving Blok Abu-abu Besar Ukuran Tbl 6 cm BP.51 buah 3,330.00 3,441.00 3,774.00 3,441.00 3,441.00 3,774.00 3,663.00
53 Paving Blok Abu-abu Kecil Ukuran Tbl 6 cm BP.52 buah 3,219.00 3,330.00 3,663.00 3,330.00 3,330.00 3,663.00 3,552.00
54 Roster Ukuran 10 x 20 x 20 BP.53 buah 5,550.00 5,772.00 6,327.00 5,772.00 5,772.00 6,327.00 6,216.00
55 Roster Ukuran 10 x 20 x 25 BP.54 buah 6,660.00 6,882.00 7,659.00 6,993.00 6,882.00 7,659.00 7,437.00

C BAHAN SEMEN

A.2 - 13
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

1 Bahan Grouting M141 kg 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
2 Bahan grouting tersedia jenis preformed M181 kg 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
3 Beva Gabion 2 m x 1 m x 0.5 m φ2.7 mm BS.10 unit 528,138.00 580,952.00 633,766.00 686,579.00 686,579.00 639,047.00 686,579.00
4 Beva Gabion 3 m x 1 m x 0.5 m φ2.7 mm BS.11 unit 818,181.00 899,999.00 981,817.00 1,063,635.00 1,063,635.00 989,999.00 1,063,635.00
5 Beva Gabion 3 m x 1.5 m x 0.5 m φ2.7 mm BS.12 unit 1,098,123.00 1,207,935.00 1,317,748.00 1,427,560.00 1,427,560.00 1,328,729.00 1,427,560.00
6 Beva Gabion 2 m x 1 m x 1 m φ2.7 mm BS.13 unit 841,269.00 925,396.00 1,009,523.00 1,093,650.00 1,093,650.00 1,017,935.00 1,093,650.00
7 Beva Gabion 2 m x 1 m x 0.5 m φ 3.0 mm BS.14 unit 649,350.00 714,285.00 779,220.00 844,155.00 844,155.00 785,714.00 844,155.00
8 Beva Gabion 3 m x 1 m x 0.5 m φ 3.0 mm BS.15 unit 955,266.00 1,050,793.00 1,146,319.00 1,241,846.00 1,241,846.00 1,155,872.00 1,241,846.00
9 Beva Gabion 3 m x 1.5 m x 0.5 m φ 3.0 mm BS.16 unit 1,305,915.00 1,436,507.00 1,567,098.00 1,697,690.00 1,697,690.00 1,580,157.00 1,697,690.00
10 Beva Gabion 2 m x 1 m x 1 m φ 3.0 mm BS.17 unit 978,354.00 1,076,189.00 1,174,025.00 1,271,860.00 1,271,860.00 1,183,808.00 1,271,860.00
11 Bore Pile D 30 cm BS.144 m 654,900.00 681,540.00 753,690.00 688,200.00 681,540.00 753,690.00 733,710.00
12 Bore Pile D 35 cm BS.145 m 699,300.00 727,050.00 804,750.00 734,820.00 727,050.00 804,750.00 783,660.00
13 Bore Pile D 40 cm BS.146 m 754,800.00 784,770.00 868,020.00 792,540.00 784,770.00 868,020.00 845,820.00
14 Bore Pile D 45 cm BS.147 m 821,400.00 854,700.00 944,610.00 862,470.00 854,700.00 944,610.00 920,190.00
15 Casing M100 m2 13,320.00 13,320.00 15,540.00 14,430.00 13,320.00 15,540.00 14,430.00
16 Capping Precast (200x60x45) BS.18 buah 1,804,456.00 1,984,901.00 2,165,347.00 2,345,792.00 2,345,792.00 2,183,391.00 2,345,792.00
17 Capping Precast (200x60x60) BS.19 buah 2,207,324.00 2,428,056.00 2,648,789.00 2,869,521.00 2,869,521.00 2,670,862.00 2,869,521.00
18 Capping Precast (200x100x100) BS.20 buah 5,411,716.00 5,952,888.00 6,494,059.00 7,035,231.00 7,035,231.00 6,548,177.00 7,035,231.00
19 Grouting berbahan dasar Cellular Plastic M270 kg 444,000.00 461,760.00 510,600.00 466,200.00 461,760.00 510,600.00 497,280.00
20 Grouting berbahan dasar semen M269 kg 388,500.00 404,040.00 447,330.00 408,480.00 404,040.00 447,330.00 435,120.00
21 Grouting M119 m2 88,800.00 92,130.00 102,120.00 93,240.00 92,130.00 102,120.00 99,900.00
22 Grouting Semen BS.21 kg 9,990.00 9,990.00 11,100.00 9,990.00 9,990.00 11,100.00 11,100.00
23 Joint Sealent M94 kg 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
24 Kerb jenis 1 BS.22 buah 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
25 Kerb jenis 2 BS.23 buah 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
26 Kerb jenis 3 BS.24 buah 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
27 Kerb Type A M77 buah 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
28 Mata Kucing M64 buah 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
29 Matras Concrete M85 buah 338,550.00 351,870.00 389,610.00 355,200.00 351,870.00 389,610.00 379,620.00
30 Mikro Pile 16x16x16 M84 m' 67,433.00 69,930.00 77,700.00 71,040.00 69,930.00 77,700.00 75,480.00
31 Mortar BS.25 m3 888,000.00 923,520.00 1,021,200.00 932,400.00 923,520.00 1,021,200.00 994,560.00
32 Mortar Instant (40 kg) BS.26 zak 105,450.00 109,890.00 120,990.00 111,000.00 109,890.00 120,990.00 117,660.00
33 PCI Girder L=17m M58a buah 95,460,000.00 99,278,400.00 109,779,000.00 100,233,000.00 99,278,400.00 109,779,000.00 106,915,200.00
34 PCI Girder L=21m M58b buah 107,670,000.00 111,976,800.00 123,820,500.00 113,053,500.00 111,976,800.00 123,820,500.00 120,590,400.00
35 PCI Girder L=26m M58c buah 137,640,000.00 143,145,600.00 158,286,000.00 144,522,000.00 143,145,600.00 158,286,000.00 154,156,800.00

A.2 - 14
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

36 PCI Girder L=32m M58d buah 174,270,000.00 181,240,800.00 200,410,500.00 182,983,500.00 181,240,800.00 200,410,500.00 195,182,400.00
37 PCI Girder L=36m M58e buah 186,480,000.00 193,939,200.00 214,452,000.00 195,804,000.00 193,939,200.00 214,452,000.00 208,857,600.00
38 PCI Girder L=41m M58f buah 213,120,000.00 221,644,800.00 245,088,000.00 223,776,000.00 221,644,800.00 245,088,000.00 238,694,400.00
39 Perkerasan beton fast track <8 jam M226 kg 3,219,000.00 3,347,760.00 3,701,850.00 3,379,950.00 3,347,760.00 3,701,850.00 3,605,280.00
40 Pintu Bulat tipe PA-FG2.60 Frame Lurus BS.27 unit 21,253,392.00 23,378,731.00 25,504,070.00 33,155,292.00 33,155,292.00 33,155,292.00 33,155,292.00
41 Pintu Bulat tipe PA-FG2.80 Frame Lurus BS.28 unit 25,766,208.00 28,342,829.00 30,919,450.00 40,195,284.00 40,195,284.00 40,195,284.00 40,195,284.00
42 Pintu Bulat tipe PA-FG2.100 Frame Lurus BS.29 unit 30,601,368.00 33,661,505.00 36,721,642.00 47,738,134.00 47,738,134.00 47,738,134.00 47,738,134.00
43 Pintu Bulat tipe PA-FG2.120 Frame Lurus BS.30 unit 37,531,764.00 41,284,940.00 45,038,117.00 58,549,552.00 58,549,552.00 58,549,552.00 58,549,552.00
44 Pintu Persegi tipe PA-FG1.60 Frame Lurus BS.31 unit 17,868,780.00 19,655,658.00 21,442,536.00 27,875,297.00 27,875,297.00 27,875,297.00 27,875,297.00
45 Pintu Persegi tipe PA-FG1.60 Frame Miring / Siku BS.32 unit 19,883,430.00 21,871,773.00 23,860,116.00 31,018,151.00 31,018,151.00 31,018,151.00 31,018,151.00
46 Pintu Persegi tipe PA-FG1.80 Frame Lurus BS.33 unit 22,589,388.00 24,848,327.00 27,107,266.00 35,239,445.00 35,239,445.00 35,239,445.00 35,239,445.00
47 Pintu Persegi tipe PA-FG1.80 Frame Miring / Siku BS.34 unit 25,168,140.00 27,684,954.00 30,201,768.00 39,262,298.00 39,262,298.00 39,262,298.00 39,262,298.00
48 Pintu Persegi tipe PA-FG1.100 Frame Lurus BS.35 unit 27,234,072.00 29,957,479.00 32,680,886.00 42,485,152.00 42,485,152.00 42,485,152.00 42,485,152.00
49 Pintu Persegi tipe PA-FG1.100 Frame Miring / Siku BS.36 unit 30,941,028.00 34,035,131.00 37,129,234.00 48,268,004.00 48,268,004.00 48,268,004.00 48,268,004.00
50 Pintu Persegi tipe PA-FG1.120 Frame Lurus BS.37 unit 38,420,208.00 42,262,229.00 46,104,250.00 59,935,524.00 59,935,524.00 59,935,524.00 59,935,524.00
51 Pintu Persegi tipe PA-FG1.120 Frame Miring / Siku BS.38 unit 43,416,540.00 47,758,194.00 52,099,848.00 67,729,802.00 67,729,802.00 67,729,802.00 67,729,802.00
52 Pintu Sorong Baja (satu draad) stang (b=0,30 ; h=0,30) BS.39 buah 3,885,000.00 4,040,400.00 4,040,400.00 4,079,250.00 4,273,500.00 4,467,750.00 4,351,200.00
53 Pintu Sorong Baja (satu draad) stang (b=0,30 ; h=0,50) BS.40 buah 4,162,500.00 4,329,000.00 4,329,000.00 4,370,625.00 4,578,750.00 4,786,875.00 4,662,000.00
54 Pintu Sorong Baja (satu draad) stang (b=0,30 ; h=1,00) BS.41 buah 4,440,000.00 4,617,600.00 4,617,600.00 4,662,000.00 4,884,000.00 5,106,000.00 4,972,800.00
55 Pintu Sorong Baja (satu draad) stang (b=0,40 ; h=0,30) BS.42 buah 4,162,500.00 4,329,000.00 4,329,000.00 4,370,625.00 4,578,750.00 4,786,875.00 4,662,000.00
56 Pintu Sorong Baja (satu draad) stang (b=0,40 ; h = 0,50) BS.43 buah 4,440,000.00 4,617,600.00 4,617,600.00 4,662,000.00 4,884,000.00 5,106,000.00 4,972,800.00

57 Pintu Sorong Baja (satu draad) stang (b=0,40 ; h = 1,00) BS.44 buah 4,995,000.00 5,194,800.00 5,194,800.00 5,244,750.00 5,494,500.00 5,744,250.00 5,594,400.00

58 Pintu Sorong Baja (satu draad) stang (b=0,50 ; h=0,30) BS.45 buah 4,440,000.00 4,617,600.00 4,617,600.00 4,662,000.00 4,884,000.00 5,106,000.00 4,972,800.00
59 Pintu Sorong Baja (satu draad) stang (b=0,50 ; h=0,50) BS.46 buah 4,662,000.00 4,848,480.00 4,848,480.00 4,895,100.00 5,128,200.00 5,361,300.00 5,221,440.00
60 Pintu Sorong Baja (satu draad) stang (b=0,50 ; h=1,00) BS.47 buah 6,105,000.00 6,349,200.00 6,349,200.00 6,410,250.00 6,715,500.00 7,020,750.00 6,837,600.00
61 Pintu Sorong Baja (satu draad) stang (b=0,60 ; h=0,30) BS.48 buah 4,662,000.00 4,848,480.00 4,848,480.00 4,895,100.00 5,128,200.00 5,361,300.00 5,221,440.00
62 Pintu Sorong Baja (satu draad) stang (b=0,60 ; h=0,50) BS.49 buah 5,106,000.00 5,310,240.00 5,310,240.00 5,361,300.00 5,616,600.00 5,871,900.00 5,718,720.00
63 Pintu Sorong Baja (satu draad) stang (b=0,60 ; h=1,00) BS.50 buah 5,328,000.00 5,541,120.00 5,541,120.00 5,594,400.00 5,860,800.00 6,127,200.00 5,967,360.00
64 Pintu Sorong Baja (satu draad) stang (b=0,70 ; h=0,30) BS.51 buah 5,550,000.00 5,772,000.00 5,772,000.00 5,827,500.00 6,105,000.00 6,382,500.00 6,216,000.00
65 Pintu Sorong Baja (satu draad) stang (b=0,70 ; h=0,50) BS.52 buah 6,660,000.00 6,926,400.00 6,926,400.00 6,993,000.00 7,326,000.00 7,659,000.00 7,459,200.00
66 Pintu Sorong Baja (satu draad) stang (b=0,70 ; h=1,00) BS.53 buah 7,770,000.00 8,080,800.00 8,080,800.00 8,158,500.00 8,547,000.00 8,935,500.00 8,702,400.00
67 Pintu Sorong Baja (satu draad) stang (b=0,80 ; h=0,30) BS.54 buah 6,660,000.00 6,926,400.00 6,926,400.00 6,993,000.00 7,326,000.00 7,659,000.00 7,459,200.00
68 Pintu Sorong Baja (satu draad) stang (b=0,80 ; h=0,50) BS.55 buah 7,770,000.00 8,080,800.00 8,080,800.00 8,158,500.00 8,547,000.00 8,935,500.00 8,702,400.00

A.2 - 15
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

69 Pintu Sorong Baja (satu draad) stang (b=0,80 ; h=1,00) BS.56 buah 8,880,000.00 9,235,200.00 9,235,200.00 9,324,000.00 9,768,000.00 10,212,000.00 9,945,600.00
70 Pintu Sorong Baja (satu draad) stang (b=0,90 ; h=0,30) BS.57 buah 7,770,000.00 8,080,800.00 8,080,800.00 8,158,500.00 8,547,000.00 8,935,500.00 8,702,400.00
71 Pintu Sorong Baja (satu draad) stang (b=0,90 ; h=0,50) BS.58 buah 8,325,000.00 8,658,000.00 8,658,000.00 8,741,250.00 9,157,500.00 9,573,750.00 9,324,000.00
72 Pintu Sorong Baja (satu draad) stang (b=0,90 ; h=1,00) BS.59 buah 9,435,000.00 9,812,400.00 9,812,400.00 9,906,750.00 10,378,500.00 10,850,250.00 10,567,200.00
73 Pintu Sorong Baja (satu draad) stang (b=1,00 ; h=0,30) BS.60 buah 7,770,000.00 8,080,800.00 8,080,800.00 8,158,500.00 8,547,000.00 8,935,500.00 8,702,400.00
74 Pintu Sorong Baja (satu draad) stang (b=1,00 ; h=0,50) BS.61 buah 8,880,000.00 9,235,200.00 9,235,200.00 9,324,000.00 9,768,000.00 10,212,000.00 9,945,600.00
75 Pintu Sorong Baja (satu draad) stang (b=1,00 ; h=1,00) BS.62 buah 9,990,000.00 10,389,600.00 10,389,600.00 10,489,500.00 10,989,000.00 11,488,500.00 11,188,800.00
76 Pintu Sorong Baja (satu draad) stang (b=1,50 ; h=0,30) BS.63 buah 11,100,000.00 11,544,000.00 11,544,000.00 11,655,000.00 12,210,000.00 12,765,000.00 12,432,000.00
77 Pintu Sorong Baja (satu draad) stang (b=1,50 ; h=0,50) BS.64 buah 12,210,000.00 12,698,400.00 12,698,400.00 12,820,500.00 13,431,000.00 14,041,500.00 13,675,200.00
78 Pintu Sorong Baja (satu draad) stang (b=1,50 ; h=1,00) BS.65 buah 13,320,000.00 13,852,800.00 13,852,800.00 13,986,000.00 14,652,000.00 15,318,000.00 14,918,400.00
79 Pintu Sorong Baja (satu draad) stang (b=2,00 ; h=0,30) BS.66 buah 12,210,000.00 12,698,400.00 12,698,400.00 12,820,500.00 13,431,000.00 14,041,500.00 13,675,200.00
80 Pintu Sorong Baja (satu draad) stang (b=2,00 ; h=0,50) BS.67 buah 13,320,000.00 13,852,800.00 13,852,800.00 13,986,000.00 14,652,000.00 15,318,000.00 14,918,400.00
81 Pintu Sorong Baja (satu draad) stang (b=2,00 ; h=1,00) BS.68 buah 15,540,000.00 16,161,600.00 16,161,600.00 16,317,000.00 17,094,000.00 17,871,000.00 17,404,800.00
82 Pintu Sorong Baja (dua draad) stang (b=1,20 ; h=1,00) BS.69 buah 11,100,000.00 11,544,000.00 11,544,000.00 11,655,000.00 12,210,000.00 12,765,000.00 12,432,000.00
83 Pintu Sorong Baja (dua draad) stang (b=1,20 ; h=1,50) BS.70 buah 15,540,000.00 16,161,600.00 16,161,600.00 16,317,000.00 17,094,000.00 17,871,000.00 17,404,800.00
84 Pintu Sorong Baja (dua draad) stang (b=1,20 ; h=2.00) BS.71 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
85 Pintu Sorong Baja (dua draad) stang (b=1,30 ; h=1,00) BS.72 buah 11,100,000.00 11,544,000.00 11,544,000.00 11,655,000.00 12,210,000.00 12,765,000.00 12,432,000.00
86 Pintu Sorong Baja (dua draad) stang (b=1,30 ; h=1,50) BS.73 buah 12,210,000.00 12,698,400.00 12,698,400.00 12,820,500.00 13,431,000.00 14,041,500.00 13,675,200.00
87 Pintu Sorong Baja (dua draad) stang (b=1,30 ; h=2,00) BS.74 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
88 Pintu Sorong Baja (dua draad) stang (b=1,40 ; h=1,00) BS.75 buah 11,988,000.00 12,467,520.00 12,467,520.00 12,587,400.00 13,186,800.00 13,786,200.00 13,426,560.00
89 Pintu Sorong Baja (dua draad) stang (b=1,40 ; h=1,50) BS.76 buah 13,320,000.00 13,852,800.00 13,852,800.00 13,986,000.00 14,652,000.00 15,318,000.00 14,918,400.00
90 Pintu Sorong Baja (dua draad) stang (b=1,40 ; h=2,00) BS.77 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
91 Pintu Sorong Baja (dua draad) stang (b=1,50 ; h=1,00) BS.78 buah 13,320,000.00 13,852,800.00 13,852,800.00 13,986,000.00 14,652,000.00 15,318,000.00 14,918,400.00
92 Pintu Sorong Baja (dua draad) stang (b=1,50 ; h=1,50) BS.79 buah 14,430,000.00 15,007,200.00 15,007,200.00 15,151,500.00 15,873,000.00 16,594,500.00 16,161,600.00
93 Pintu Sorong Baja (dua draad) stang (b=1,50 ; h=2,00) BS.80 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
94 Pintu Sorong Baja (dua draad) stang (b=1,70 ; h=1,00) BS.81 buah 16,650,000.00 17,316,000.00 17,316,000.00 17,482,500.00 18,315,000.00 19,147,500.00 18,648,000.00
95 Pintu Sorong Baja (dua draad) stang (b=1,70 ; h=1,50) BS.82 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
96 Pintu Sorong Baja (dua draad) stang (b=1,70 ; h=2,00) BS.83 buah 18,870,000.00 19,624,800.00 19,624,800.00 19,813,500.00 20,757,000.00 21,700,500.00 21,134,400.00
97 Pintu Sorong Baja (dua draad) stang (b=1,80 ; h=1,00) BS.84 buah 16,650,000.00 17,316,000.00 17,316,000.00 17,482,500.00 18,315,000.00 19,147,500.00 18,648,000.00
98 Pintu Sorong Baja (dua draad) stang (b=1,80 ; h=1,50) BS.85 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
99 Pintu Sorong Baja (dua draad) stang (b=1,80 ; h=2,00) BS.86 buah 18,870,000.00 19,624,800.00 19,624,800.00 19,813,500.00 20,757,000.00 21,700,500.00 21,134,400.00
100 Pintu Sorong Baja (dua draad) stang (b=1,90 ; h=1,00) BS.87 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00
101 Pintu Sorong Baja (dua draad) stang (b=1,90 ; h=1,50) BS.88 buah 18,870,000.00 19,624,800.00 19,624,800.00 19,813,500.00 20,757,000.00 21,700,500.00 21,134,400.00
102 Pintu Sorong Baja (dua draad) stang (b=1,90 ; h=2,00) BS.89 buah 19,980,000.00 20,779,200.00 20,779,200.00 20,979,000.00 21,978,000.00 22,977,000.00 22,377,600.00
103 Pintu Sorong Baja (dua draad) stang (b=2,00 ; h=1,00) BS.90 buah 17,760,000.00 18,470,400.00 18,470,400.00 18,648,000.00 19,536,000.00 20,424,000.00 19,891,200.00

A.2 - 16
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

104 Pintu Sorong Baja (dua draad) stang (b=2,00 ; h=1,50) BS.91 buah 18,870,000.00 19,624,800.00 19,624,800.00 19,813,500.00 20,757,000.00 21,700,500.00 21,134,400.00
105 Pintu Sorong Baja (dua draad) stang (b=2,00 ; h=2,00) BS.92 buah 19,980,000.00 20,779,200.00 20,779,200.00 20,979,000.00 21,978,000.00 22,977,000.00 22,377,600.00
106 Pipa Beton diameter 15 cm BS.92,a m 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
107 Pipa Beton diameter 30 cm BS.92,b m 227,550.00 236,430.00 261,960.00 238,650.00 236,430.00 261,960.00 255,300.00
108 Polyfelt TS 50 BS.93 149,850.00 155,400.00 172,050.00 157,620.00 155,400.00 172,050.00 167,610.00
109 Screening untuk grouting BS.94 kg 2,775.00 3,330.00 5,550.00 3,330.00 3,330.00 5,550.00 3,330.00
110 Semen BS.95 kg 2,220.00 2,331.00 2,553.00 2,442.00 4,218.00 4,440.00 2,664.00
111 Semen / PC (kg) M12 kg 2,220.00 2,331.00 2,553.00 2,442.00 4,218.00 4,440.00 2,664.00
112 Semen 50 kg BS.96 zak 111,000.00 116,550.00 127,650.00 122,100.00 210,900.00 222,000.00 133,200.00
113 Semen grout BS.97 kg 5,106.00 6,660.00 7,770.00 6,660.00 6,660.00 7,770.00 6,660.00
114 Semen Patching BS.98 kg 10,545.00 12,210.00 13,320.00 12,210.00 12,210.00 13,320.00 12,210.00
115 Semen Putih 40 Kg BS.99 zak 177,600.00 184,260.00 255,300.00 186,480.00 184,260.00 255,300.00 198,690.00
116 Semen Warna BS.100 kg 11,655.00 13,320.00 14,430.00 13,320.00 13,320.00 14,430.00 13,320.00
117 Sheet Pile Type W-325-1000 A BS.101 m' 1,233,637.00 1,357,001.00 1,480,365.00 1,603,729.00 1,603,729.00 1,492,701.00 1,603,729.00
118 Sheet Pile Type W-325-1000 B BS.102 m' 1,265,872.00 1,392,459.00 1,519,046.00 1,645,633.00 1,645,633.00 1,531,705.00 1,645,633.00
119 Sheet Pile Type W-350-1000 A BS.103 m' 1,985,346.00 2,183,881.00 2,382,415.00 2,580,950.00 2,580,950.00 2,402,269.00 2,580,950.00
120 Sheet Pile Type W-350-1000 B BS.104 m' 1,934,980.00 2,128,478.00 2,321,976.00 2,515,474.00 2,515,474.00 2,341,325.00 2,515,474.00
121 Sheet Pile Type W-400-1000 A BS.105 m' 2,153,661.00 2,369,027.00 2,584,393.00 2,799,759.00 2,799,759.00 2,605,930.00 2,799,759.00
122 Sheet Pile Type W-400-1000 B BS.106 m' 2,103,295.00 2,313,624.00 2,523,954.00 2,734,283.00 2,734,283.00 2,544,986.00 2,734,283.00
123 Sheet Pile Type W-450-1000 A BS.107 m' 2,229,210.00 2,452,131.00 2,675,052.00 2,897,973.00 2,897,973.00 2,697,344.00 2,897,973.00
124 Sheet Pile Type W-450-1000 B BS.108 m' 2,111,453.00 2,322,598.00 2,533,744.00 2,744,889.00 2,744,889.00 2,554,858.00 2,744,889.00
125 Sheet Pile Type W-500-1000 A BS.109 m' 2,262,788.00 2,489,066.00 2,715,345.00 2,941,624.00 2,941,624.00 2,737,973.00 2,941,624.00
126 Sheet Pile Type W-500-1000 B BS.110 m' 2,275,914.00 2,503,505.00 2,731,096.00 2,958,688.00 2,958,688.00 2,753,855.00 2,958,688.00
127 Sheet Pile Type W-600-1000 A BS.111 m' 2,538,720.00 2,792,592.00 3,046,464.00 3,300,336.00 3,300,336.00 3,071,851.00 3,300,336.00
128 Sheet Pile Type W-600-1000 B BS.112 m' 2,604,834.00 2,865,318.00 3,125,801.00 3,386,285.00 3,386,285.00 3,151,850.00 3,386,285.00
129 Terra Gabion ukuran 2 m x 1 m x 0,5 m BS.113 unit 603,153.00 663,468.00 796,161.00 1,035,010.00 1,035,010.00 1,035,010.00 1,035,010.00
130 Terra Gabion ukuran 2 m x 1 m x 1 m BS.114 unit 866,501.00 953,151.00 1,143,781.00 1,486,916.00 1,486,916.00 1,486,916.00 1,486,916.00
131 Tiang pancang spun pile d = 30 cm BS.115 m 693,750.00 721,500.00 798,090.00 728,160.00 721,500.00 798,090.00 777,000.00
132 Tiang pancang spun pile d = 35 cm BS.116 m 915,750.00 952,380.00 1,053,390.00 961,260.00 952,380.00 1,053,390.00 1,025,640.00
133 Tiang pancang spun pile d = 40 cm BS.117 m 1,176,600.00 1,223,220.00 1,353,090.00 1,235,430.00 1,223,220.00 1,353,090.00 1,317,570.00
134 Tiang pancang spun pile d = 45 cm BS.118 m 1,482,960.00 1,541,790.00 1,704,960.00 1,557,330.00 1,541,790.00 1,704,960.00 1,660,560.00
135 Tiang pancang spun pile d = 50 cm BS.119 m 1,798,200.00 1,870,350.00 2,067,930.00 1,888,110.00 1,870,350.00 2,067,930.00 2,013,540.00
136 Tiang pancang spun pile d = 60 cm BS.120 m 2,442,000.00 2,539,680.00 2,808,300.00 2,564,100.00 2,539,680.00 2,808,300.00 2,735,040.00
137 Tiang pancang square pile 10 x 10 cm BS.120.a m 119,880.00 124,320.00 137,640.00 125,430.00 124,320.00 137,640.00 134,310.00
138 Tiang pancang square pile 12 x 12 cm BS.120.b m 170,940.00 177,600.00 196,470.00 179,820.00 177,600.00 196,470.00 190,920.00

A.2 - 17
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

139 Tiang pancang square pile 20 x 20 cm BS.121 m 399,600.00 415,140.00 459,540.00 419,580.00 415,140.00 459,540.00 447,330.00
140 Tiang pancang square pile 25 x 25 cm BS.122 m 566,100.00 588,300.00 651,570.00 594,960.00 588,300.00 651,570.00 633,810.00
141 Tiang pancang square pile 30 x 30 cm BS.123 m 749,250.00 779,220.00 861,360.00 786,990.00 779,220.00 861,360.00 839,160.00
142 Tiang pancang square pile 35 x 35 cm BS.124 m 976,800.00 1,015,650.00 1,123,320.00 1,025,640.00 1,015,650.00 1,123,320.00 1,094,460.00
143 Tiang pancang square pile 40 x 40 cm BS.125 m 1,237,650.00 1,287,600.00 1,423,020.00 1,299,810.00 1,287,600.00 1,423,020.00 1,386,390.00
144 Tiang pancang square pile 45 x 45 cm BS.126 m 1,548,450.00 1,610,610.00 1,780,440.00 1,626,150.00 1,610,610.00 1,780,440.00 1,733,820.00
145 Turap Beton tebal 15 cm BS.126.a m2 1,665,000.00 1,731,600.00 1,914,750.00 1,748,250.00 1,731,600.00 1,914,750.00 1,864,800.00
146 Turap beton tulang precast 30x12 cm BS.127 m 382,950.00 398,490.00 440,670.00 401,820.00 398,490.00 440,670.00 428,460.00
147 Turap beton tulang precast 40 x 15 cm BS.128 m 593,850.00 617,160.00 682,650.00 623,820.00 617,160.00 682,650.00 664,890.00
148 Water stop PVC lebar 150 mm BS.129 m2 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
149 Water stop PVC lebar 200 mm BS.130 m2 249,750.00 259,740.00 287,490.00 261,960.00 259,740.00 287,490.00 279,720.00
150 Water stop PVC lebar 230 - 320 mm BS.131 m2 310,800.00 323,010.00 357,420.00 326,340.00 323,010.00 357,420.00 348,540.00
151 Water stop rubber lebar 150 - 200 mm BS.132 m2 255,300.00 265,290.00 294,150.00 268,620.00 265,290.00 294,150.00 286,380.00
152 Bore Pile D 30 cm BS.133 m' 676,087.00 703,074.00 777,444.00 709,845.00 703,074.00 777,444.00 757,131.00
153 Bore Pile D 35 cm BS.134 m' 753,045.00 783,105.00 865,911.00 790,653.00 783,105.00 865,911.00 843,378.00
154 Bore Pile D 40 cm BS.135 m' 869,885.00 904,650.00 1,000,332.00 913,308.00 904,650.00 1,000,332.00 974,247.00
155 Bore Pile D 45 cm BS.136 m' 962,092.00 1,000,554.00 1,106,337.00 1,010,100.00 1,000,554.00 1,106,337.00 1,077,477.00
156 Blok Beton Type I (kaki delapan) BS.137 buah 4,508,154.00 4,958,969.00 5,409,785.00 5,860,600.00 5,860,600.00 5,454,866.00 5,860,600.00
157 Hexapod 2,1 Ton BS.138 buah 5,644,128.00 6,208,541.00 6,772,954.00 7,337,366.00 7,337,366.00 6,829,395.00 7,337,366.00
158 Tetrapod 0,5 Ton K 350 BS.139 buah 1,426,572.00 1,569,229.00 1,711,886.00 1,854,544.00 1,854,544.00 1,726,152.00 1,854,544.00
159 Tetrapod 1,0 Ton K 350 BS.140 buah 2,402,484.00 2,642,732.00 2,882,981.00 3,123,229.00 3,123,229.00 2,907,006.00 3,123,229.00
160 Tetrapod 2,0 Ton K 350 BS.141 buah 4,340,322.00 4,774,354.00 5,208,386.00 5,642,419.00 5,642,419.00 5,251,790.00 5,642,419.00
161 Tetrapod 3,2 Ton K 350 BS.142 buah 6,338,766.00 6,972,643.00 7,606,519.00 8,240,396.00 8,240,396.00 7,669,907.00 8,240,396.00
162 Akmond Block H=1,55 m, W=2,4 ton K400 BS.143 buah 6,231,540.00 6,854,694.00 7,477,848.00 8,101,002.00 8,101,002.00 7,540,163.00 8,101,002.00

D BAHAN KAYU
1 Ajir tinggi 2 m BK.1 batang 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
2 Bahan Turap Kayu dengan pengawetan M196 m3 2,775,000.00 2,886,000.00 3,191,250.00 2,913,750.00 2,886,000.00 3,191,250.00 3,108,000.00
3 Bahan turap kayu tanpa pengawetan M192 m3 2,553,000.00 2,655,120.00 2,935,950.00 2,680,650.00 2,655,120.00 2,935,950.00 2,859,360.00
4 Bambu BK.2 batang 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
5 Bekisting BK.3 m2 138,750.00 144,300.00 159,840.00 145,410.00 144,300.00 159,840.00 155,400.00
6 Bibit Mangrove BK.4 buah 13,320.00 13,320.00 15,540.00 14,430.00 13,320.00 15,540.00 14,430.00
7 Bilik bambu BK.5 m2 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
8 Cerucuk M61 m 8,325.00 8,880.00 9,990.00 8,880.00 8,880.00 9,990.00 8,880.00

A.2 - 18
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

9 Dolken Kayu Galam Diameter 8-10 cm panjang 300 cm BK.6 batang 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00

10 Dolken Kayu Galam Diameter 8-10 cm panjang 400 cm BK.7 batang 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00

11 Floordeck BK.8 m2 277,500.00 288,600.00 319,680.00 291,930.00 288,600.00 319,680.00 310,800.00


12 Formite/penjaga jarak bekisting/spacer BK.9 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
13 Gebalan Rumput M32 m2 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
14 Karung goni BK.10 m2 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
15 Karung plastik / bagor BK.11 buah 6,105.00 6,660.00 6,660.00 6,660.00 6,660.00 6,660.00 6,660.00
16 Kayu Acuan M99 m3 1,665,000.00 1,731,600.00 2,220,000.00 1,748,250.00 1,731,600.00 2,220,000.00 1,864,800.00
17 Kayu Bekisting BK.12 m3 1,665,000.00 1,731,600.00 2,220,000.00 1,748,250.00 1,731,600.00 2,220,000.00 1,864,800.00
18 Kayu Bengkirai Papan 2 cm x 20 cm x 4 m BK.13 m3 4,384,500.00 4,559,880.00 5,042,730.00 4,604,280.00 4,559,880.00 5,042,730.00 4,910,640.00
19 Kayu Bengkirai Papan 2,5 cm x 20 cm x 4 m BK.14 m3 4,384,500.00 4,559,880.00 5,042,730.00 4,604,280.00 4,559,880.00 5,042,730.00 4,910,640.00
20 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m BK.15 m3 4,051,500.00 4,213,560.00 4,659,780.00 4,254,630.00 4,213,560.00 4,659,780.00 4,537,680.00
21 Kayu Bengkirai Ukuran 5 cm x 10 cm x 4 m BK.16 m3 4,162,500.00 4,329,000.00 4,787,430.00 4,371,180.00 4,329,000.00 4,787,430.00 4,662,000.00
22 Kayu Bengkirai Ukuran 5 cm x 3 cm x 4 m BK.17 m3 4,162,500.00 4,329,000.00 4,787,430.00 4,371,180.00 4,329,000.00 4,787,430.00 4,662,000.00
23 Kayu Bengkirai Ukuran 5 cm x 5 cm x 4 m BK.18 m3 4,162,500.00 4,329,000.00 4,787,430.00 4,371,180.00 4,329,000.00 4,787,430.00 4,662,000.00
24 Kayu Bengkirai Ukuran 5 cm x 7 cm x 4 m BK.19 m3 4,162,500.00 4,329,000.00 4,787,430.00 4,371,180.00 4,329,000.00 4,787,430.00 4,662,000.00
25 Kayu Bengkirai Ukuran 7 cm x 14 cm x 4 m BK.20 m3 4,384,500.00 4,559,880.00 5,042,730.00 4,604,280.00 4,559,880.00 5,042,730.00 4,910,640.00
26 Kayu Kelas 1 M142 m3 5,272,500.00 5,483,400.00 6,063,930.00 5,536,680.00 5,483,400.00 6,063,930.00 5,905,200.00
27 Kayu Keruing Ukuran 8 cm x 15 cm x 4 m BK.21 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
28 Kayu Keruing Ukuran 5 cm x 7 cm x 4 m BK.22 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
29 Kayu Keruing Ukuran 4 cm x 6 cm x 4 m BK.23 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
30 Kayu Keruing ukuran 3 cm x 4 cm x 4 m BK.24 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
31 Kayu Keruing ukuran 3 cm x 5 cm x 4 m BK.25 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
32 Kayu Keruing ukuran 2 cm x 3 cm x 4 m BK.26 m3 3,774,000.00 3,885,000.00 3,885,000.00 3,912,750.00 4,051,500.00 4,190,250.00 4,107,000.00
33 Kayu List Profil Panjang 400 cm BK.27 batang 99,900.00 104,340.00 115,440.00 105,450.00 104,340.00 115,440.00 112,110.00
34 Kayu Meranti Ukuran 2,5 cm x 20 cm x 4 m BK.28 m3 3,274,500.00 3,405,480.00 3,766,230.00 3,438,780.00 3,405,480.00 3,766,230.00 3,667,440.00
35 Kayu Meranti Ukuran 10 cm x 10 cm x 4 m BK.29 m3 3,163,500.00 3,290,040.00 3,638,580.00 3,322,230.00 3,290,040.00 3,638,580.00 3,543,120.00
36 Kayu Meranti Ukuran 5 cm x 10 cm x 4 m BK.30 m3 3,163,500.00 3,290,040.00 3,638,580.00 3,322,230.00 3,290,040.00 3,638,580.00 3,543,120.00
37 Kayu Meranti Ukuran 5 cm x 3 cm x 4 m BK.31 m3 3,274,500.00 3,405,480.00 3,766,230.00 3,438,780.00 3,405,480.00 3,766,230.00 3,667,440.00
38 Kayu Meranti Ukuran 5 cm x 5 cm x 4 m BK.32 m3 3,274,500.00 3,405,480.00 3,766,230.00 3,438,780.00 3,405,480.00 3,766,230.00 3,667,440.00
39 Kayu Meranti Ukuran 5 cm x 7 cm x 4 m BK.33 m3 3,274,500.00 3,405,480.00 3,766,230.00 3,438,780.00 3,405,480.00 3,766,230.00 3,667,440.00
40 Kayu Meranti Ukuran 6 cm x 12 cm x 4 m BK.34 m3 3,274,500.00 3,405,480.00 3,766,230.00 3,438,780.00 3,405,480.00 3,766,230.00 3,667,440.00
41 Kayu Perancah M19 m3 1,665,000.00 1,731,600.00 2,220,000.00 1,748,250.00 1,731,600.00 2,220,000.00 1,864,800.00

A.2 - 19
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

42 Kayu Ulin Papan 2.5 x 20 x 400 cm BK.35 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
43 Kayu Ulin Ukuran 10 cm x 10 cm x 4 m BK.36 m3 5,494,500.00 5,714,280.00 6,319,230.00 5,769,780.00 5,714,280.00 6,319,230.00 6,153,840.00
44 Kayu Ulin Ukuran 12 cm x 12 cm x 4 m BK.37 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
45 Kayu Ulin Ukuran 15 cm x 15 cm x 4 m BK.38 m3 6,105,000.00 6,349,200.00 7,020,750.00 6,410,250.00 6,349,200.00 7,020,750.00 6,837,600.00
46 Kayu Ulin Ukuran 2 cm x 10 cm x 4 m BK.39 m3 5,494,500.00 5,714,280.00 6,319,230.00 5,769,780.00 5,714,280.00 6,319,230.00 6,153,840.00
47 Kayu Ulin Ukuran 2,5 cm x 20 cm x 4 m BK.40 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
48 Kayu Ulin Ukuran 20 cm x 20 cm x 4 m BK.41 m3 6,216,000.00 6,464,640.00 7,148,400.00 6,526,800.00 6,464,640.00 7,148,400.00 6,961,920.00
49 Kayu Ulin Ukuran 5 cm x 10 cm x 4 m BK.42 m3 5,494,500.00 5,714,280.00 6,319,230.00 5,769,780.00 5,714,280.00 6,319,230.00 6,153,840.00
50 Kayu Ulin Ukuran 5 cm x 20 cm x 4 m BK.43 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
51 Kayu Ulin Ukuran 5 cm x 5 cm x 4 m BK.44 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
52 Kayu Ulin Ukuran 5 cm x 7 cm x 4 m BK.45 m3 5,772,000.00 6,002,880.00 6,637,800.00 6,060,600.00 6,002,880.00 6,637,800.00 6,464,640.00
53 Kayu Ulin Ukuran 7 cm x 14 cm x 4 m BK.46 m3 6,105,000.00 6,349,200.00 7,020,750.00 6,410,250.00 6,349,200.00 7,020,750.00 6,837,600.00
54 Lem kayu BK.47 kg 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
55 Lumbercoll 16 mm BK.48 lembar 233,100.00 241,980.00 268,620.00 245,310.00 241,980.00 268,620.00 260,850.00
56 Melamine BK.49 lembar 88,800.00 92,130.00 102,120.00 93,240.00 92,130.00 102,120.00 99,900.00
57 Mini Timber Pile M79 buah 77,700.00 81,030.00 89,910.00 82,140.00 81,030.00 89,910.00 86,580.00
58 Multipleks Mega Sungkai BK.50 lembar 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
59 Multipleks 12 mm M73 lembar 277,500.00 288,600.00 319,680.00 291,930.00 288,600.00 319,680.00 310,800.00
60 Multipleks 18 mm BK.51 lembar 388,500.00 404,040.00 447,330.00 408,480.00 404,040.00 447,330.00 435,120.00
61 Multipleks 9 mm BK.52 lembar 210,900.00 219,780.00 243,090.00 222,000.00 219,780.00 243,090.00 236,430.00
62 Multiplek Sengon 12 mm BK.53 lembar 249,750.00 259,740.00 287,490.00 261,960.00 259,740.00 287,490.00 279,720.00
63 Multiplek Sengon 18 mm BK.54 lembar 310,800.00 323,010.00 357,420.00 326,340.00 323,010.00 357,420.00 348,540.00
64 Multiplek Sengon 9 mm BK.55 lembar 183,150.00 190,920.00 210,900.00 192,030.00 190,920.00 210,900.00 205,350.00
65 Multiplek Mega Sungkai BK.56 lembar 133,200.00 138,528.00 153,180.00 139,860.00 138,528.00 153,180.00 149,184.00
66 Papan Sungkai BK.57 batang 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
67 Phenol film 12 mm BK.58 lembar 172,050.00 178,710.00 197,580.00 180,930.00 178,710.00 197,580.00 193,140.00
68 Plastic aerator BK.59 lembar 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
69 Plastic sheet BK.60 m2 19,980.00 21,090.00 23,310.00 21,090.00 21,090.00 23,310.00 22,200.00
70 Plastik Filter M23 m2 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
71 Tali rapia / plastik BK.61 m 56.00 56.00 78.00 0.00 56.00 78.00 67.00
72 Tali pengikat BK.62 m 555.00 555.00 555.00 555.00 555.00 555.00 555.00
73 Teakwood 3 mm BK.63 lembar 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
74 Teakwood 4 mm BK.64 lembar 210,900.00 219,780.00 243,090.00 222,000.00 219,780.00 243,090.00 236,430.00
75 Tiang Pancang Kayu M245 m3 5,550,000.00 5,772,000.00 6,382,500.00 5,827,500.00 5,772,000.00 6,382,500.00 6,216,000.00
76 Tiang pancang kayu dia 20 cm BK.65 m 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00

A.2 - 20
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

77 Triplek 3 mm BK.66 lembar 94,350.00 97,680.00 108,780.00 98,790.00 97,680.00 108,780.00 105,450.00
78 Triplek 3,6 mm BK.67 lembar 105,450.00 109,890.00 120,990.00 111,000.00 109,890.00 120,990.00 117,660.00
79 Triplek 4 mm BK.68 lembar 108,780.00 113,220.00 125,430.00 114,330.00 113,220.00 125,430.00 122,100.00
80 Triplek 5 mm BK.69 lembar 116,550.00 120,990.00 134,310.00 122,100.00 120,990.00 134,310.00 130,980.00
81 Triplek 6 mm BK.70 lembar 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
82 Triplek Lapisan Aluminium BK.71 lembar 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
83 HPL BK.72 lembar 399,600.00 415,140.00 459,540.00 419,580.00 415,140.00 459,540.00 447,330.00

E BAHAN BESI DAN ALUMUNIUM


1 Alat penyambung tiang pancang baja BBA.1 buah 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
2 Alat penyambung tiang pancang beton BBA.2 buah 99,900.00 104,340.00 115,440.00 105,450.00 104,340.00 115,440.00 112,110.00
3 Alat penyambung tiang pancang kayu BBA.3 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
4 Alat Penyuntik Anti Gravitasi M127 kg 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
5 Aluminium Foil Ds 820 1,25 x 60 m BBA.4 roll 266,400.00 277,500.00 306,360.00 279,720.00 277,500.00 306,360.00 298,590.00
6 Aluminium Foil SS 810 1,25 x 60 m BBA.5 roll 255,300.00 265,290.00 294,150.00 268,620.00 265,290.00 294,150.00 286,380.00
7 Alumunium gelombang 0.35 mm BBA.6 m 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
8 Alumunium strip lebar 1,25 cm BBA.7 Lembar 11,100.00 11,100.00 13,320.00 12,210.00 11,100.00 13,320.00 12,210.00
9 Alumunium strip lebar 2,5 cm BBA.7.a Lembar 18,870.00 19,980.00 22,200.00 19,980.00 19,980.00 22,200.00 21,090.00
10 Alumunium strip lebar 8 cm BBA.7.b Lembar 56,610.00 58,830.00 65,490.00 59,940.00 58,830.00 65,490.00 63,270.00
11 Ampelas BBA.8 lembar 7,770.00 8,103.00 8,991.00 8,214.00 8,103.00 8,991.00 8,658.00
12 Anchorage M65 buah 721,500.00 750,360.00 829,725.00 757,575.00 750,360.00 829,725.00 808,080.00
13 Angkur M120 m2 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
14 Anti Korosif Baja M129 kg 88,800.00 89,910.00 97,680.00 89,910.00 89,910.00 97,680.00 91,020.00
15 Anyaman Kawat Baja Dilas M258 kg 35,520.00 36,630.00 44,400.00 36,630.00 36,630.00 44,400.00 37,740.00
16 Atap spandek zincalume 0,4 mm BBA.9 m2 105,450.00 109,890.00 120,990.00 111,000.00 109,890.00 120,990.00 117,660.00
17 Backer rod 1 1/6 inci M179 m' 19,980.00 21,090.00 28,860.00 21,090.00 21,090.00 28,860.00 22,200.00
18 Backer rod 3/8 inci M165 kg 14,430.00 15,540.00 23,310.00 15,540.00 15,540.00 23,310.00 16,650.00
19 Backrod BBA.10 m' 38,850.00 40,404.00 44,622.00 40,737.00 40,404.00 44,622.00 43,512.00
20 Baja Bergelombang M46 kg 41,070.00 42,180.00 49,950.00 42,180.00 42,180.00 49,950.00 43,290.00
21 Baja Grade 250 M220 kg 29,970.00 31,080.00 38,850.00 31,080.00 31,080.00 38,850.00 32,190.00
22 Baja Grade 345 M221 kg 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
23 Baja Grade 485 M222 kg 32,190.00 33,300.00 41,070.00 33,300.00 33,300.00 41,070.00 34,410.00
24 Baja pelat tebal 3 mm BBA.11 kg 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
25 Baja Prategang M56 kg 49,950.00 51,060.00 58,830.00 51,060.00 51,060.00 58,830.00 52,170.00
26 Baja profil 40.40.4 BBA.12 kg 29,970.00 31,080.00 38,850.00 31,080.00 31,080.00 38,850.00 32,190.00

A.2 - 21
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

27 Baja profil 50.50.5 BBA.13 kg 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
28 Baja Profil WF BBA.14 kg 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
29 Baja Ringan Canal Dingin C75 ; 4 m BBA.15 batang 146,520.00 152,070.00 168,720.00 154,290.00 152,070.00 168,720.00 164,280.00
30 Baja Struktur M48 kg 29,970.00 31,080.00 38,850.00 31,080.00 31,080.00 38,850.00 32,190.00
31 Baja Struktur Grade 690 (Kuat Leleh 690 Mpa untuk M223 kg 34,410.00 35,520.00 43,290.00 35,520.00 35,520.00 43,290.00 36,630.00
Tebal Pelat
≤ 2,5 inch)
32 Baja Struktur Grade 690 (Kuat Leleh 620 Mpa untuk M224 kg 35,520.00 36,630.00 44,400.00 36,630.00 36,630.00 44,400.00 37,740.00
Tebal Pelat > 2,5 - 4,0 inch)
33 Baja Tulangan Angkur M267 kg 22,200.00 23,310.00 31,080.00 23,310.00 23,310.00 31,080.00 24,420.00
34 Baja Tulangan M268 kg 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
35 Baja Tulangan (Polos) U24 M39a kg 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
36 Baja Tulangan (Polos) U28 M57a kg 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
37 Baja Tulangan (Ulir) U28 M39b kg 19,425.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 21,090.00
38 Baja Tulangan (Ulir) D42A M39c kg 19,425.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 21,090.00
39 Baja Tulangan (Ulir) D42B M39d kg 19,425.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 21,090.00
40 Baja Tulangan (Ulir) D52 M39d kg 19,980.00 21,090.00 28,860.00 21,090.00 21,090.00 28,860.00 22,200.00
41 Baja Tulangan (Ulir) D55 M39d kg 19,980.00 21,090.00 28,860.00 21,090.00 21,090.00 28,860.00 22,200.00
42 Baja Tulangan (Ulir) D70 M39d kg 19,980.00 21,090.00 28,860.00 21,090.00 21,090.00 28,860.00 22,200.00
43 Baja untuk pelat buhul dan pelat ganjal M209 buah 12,210.00 12,210.00 14,430.00 13,320.00 12,210.00 14,430.00 13,320.00
44 Batang Skoor L.40.40.4 (* BBA.16 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
45 Baut Angkur M134 kg 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
46 Baut Biasa Grade A diameter M25 M212 buah 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
47 Baut Biasa Grade B diameter M25 M213 buah 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
48 Baut Biasa Grade C untuk anchor bolts diameter M25 M214 buah 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
49 Baut dan Mur M223 buah 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
50 Baut dan Mur BBA.17 buah 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
51 Baut diameter 12 mm panjang 20 mm BBA.18 kg 22,200.00 23,310.00 31,080.00 23,310.00 23,310.00 31,080.00 24,420.00
52 Baut mutu tinggi A325 Tipe 1 diameter M25 M210 buah 83,250.00 84,360.00 92,130.00 84,360.00 84,360.00 92,130.00 85,470.00
53 Baut Mutu Tinggi A490 Tipe 1 diameter M25 M211 buah 138,750.00 139,860.00 147,630.00 139,860.00 139,860.00 147,630.00 140,970.00
54 Besi Beton M13 kg 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
55 Besi beton polos BBA.19 kg 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
56 Besi Beton U24 BBA.20 kg 23,199.00 24,087.00 24,087.00 24,309.00 25,419.00 26,640.00 25,974.00
57 Besi Beton U 39 BBA.21 kg 25,197.00 26,196.00 26,196.00 26,418.00 27,639.00 28,971.00 28,194.00
58 Besi beton ulir BBA.22 kg 19,425.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 21,090.00

A.2 - 22
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

59 Besi hollow 20.20.1,8 BBA.22.a kg 13,320.00 14,430.00 22,200.00 14,430.00 14,430.00 22,200.00 15,540.00
60 Besi hollow 20.20.1,8 BBA.23 m' 14,985.00 15,540.00 17,760.00 15,540.00 15,540.00 17,760.00 16,650.00
61 Besi hollow 40.40.2 BBA.24 kg 13,320.00 14,430.00 22,200.00 14,430.00 14,430.00 22,200.00 15,540.00
62 Besi hollow 40.40.2 BBA.25 m' 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
63 Besi hollow 50.50.2,8 BBA.26 kg 13,320.00 14,430.00 22,200.00 14,430.00 14,430.00 22,200.00 15,540.00
64 Besi hollow 50.50.2,8 BBA.26.a m' 58,830.00 61,050.00 67,710.00 62,160.00 61,050.00 67,710.00 65,490.00
65 Besi plat BBA.27 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
66 Besi profil BBA.28 kg 29,970.00 31,080.00 38,850.00 31,080.00 31,080.00 38,850.00 32,190.00
67 Besi siku 30.30.3 BBA.29 kg 29,970.00 31,080.00 38,850.00 31,080.00 31,080.00 38,850.00 32,190.00
68 Besi strip BBA.30 kg 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
69 Bonding Agent M198 Ltr 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
70 Bracket Besi Hollow BBA.31 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
71 Bracket Besi Rangka Hollow BBA.32 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
72 Bracket Siku Panel ACP BBA.33 buah 16,650.00 17,760.00 18,870.00 17,760.00 17,760.00 18,870.00 18,870.00
73 Bridging Plate PL 125 x 6 M261 kg 17,760.00 18,870.00 26,640.00 18,870.00 18,870.00 26,640.00 19,980.00
74 Canal C-75 tebal 0,6 mm BBA.34 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
75 Canal C-75 tebal 0,8 mm BBA.35 m 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
76 CPHMA M162 ton 999,000.00 1,038,960.00 1,148,850.00 1,048,950.00 1,038,960.00 1,148,850.00 1,118,880.00
77 Curing membrane M259 kg 222,000.00 223,110.00 230,880.00 223,110.00 223,110.00 230,880.00 224,220.00
78 Deck Drain M239 buah 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
79 Dinabolt 12 mm BBA.36 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
80 Ducting (Kabel prestress) M70 m' 97,680.00 102,120.00 112,110.00 102,120.00 102,120.00 112,110.00 109,890.00
81 Ducting (Strand prestress) M71 m' 97,680.00 102,120.00 112,110.00 102,120.00 102,120.00 112,110.00 109,890.00
82 Dynabolt / raamset Ø 8 mm panjang 4 - 5 cm BBA.37 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
83 Elastomer M62 buah 366,300.00 380,730.00 421,800.00 385,170.00 380,730.00 421,800.00 410,700.00
84 Elastomer Alam BBA.38 kg 377,400.00 378,510.00 386,280.00 378,510.00 378,510.00 386,280.00 379,620.00
85 Elastomer bearing pad; (450x400x45) mm3 M264 buah 1,193,250.00 1,240,980.00 1,372,182.00 1,252,857.00 1,240,980.00 1,372,182.00 1,336,440.00
86 Elastomer jenis 1 M74a buah 344,100.00 357,420.00 396,270.00 361,860.00 357,420.00 396,270.00 385,170.00
87 Elastomer jenis 2 M74b buah 721,500.00 750,360.00 830,280.00 758,130.00 750,360.00 830,280.00 808,080.00
88 Elastomer jenis 3 M74c buah 982,350.00 1,021,200.00 1,129,980.00 1,031,190.00 1,021,200.00 1,129,980.00 1,100,010.00
89 Elastomer Sintesis BBA.39 kg 421,800.00 421,800.00 421,800.00 421,800.00 421,800.00 421,800.00 421,800.00
90 Elektroda Las FCAW M218 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
91 Elektroda Las GMAW M217 kg 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
92 Elektroda Las SAW M216 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
93 Elektroda Las SMAW M215 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00

A.2 - 23
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

94 Epoxy Bahan Penutup (sealant) M126 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
95 Expansion Cap M96 m2 7,770.00 7,770.00 8,880.00 7,770.00 7,770.00 8,880.00 8,880.00
96 Expansion Join Baja Siku M75f m 3,163,500.00 3,290,040.00 3,638,580.00 3,322,230.00 3,290,040.00 3,638,580.00 3,543,120.00
97 Expansion Join Tipe Rubber M75e m 1,332,000.00 1,385,280.00 1,531,800.00 1,398,600.00 1,385,280.00 1,531,800.00 1,491,840.00
98 Expansion Joint Tipe Torma M80 m' 1,665,000.00 1,731,600.00 1,914,750.00 1,748,250.00 1,731,600.00 1,914,750.00 1,864,800.00
99 Expansion Tipe Joint Asphaltic Plug M75d m 1,110,000.00 1,154,400.00 1,276,500.00 1,165,500.00 1,154,400.00 1,276,500.00 1,243,200.00
100 Fibre jenis e-glass BBA.40 m2 1,942,500.00 2,020,200.00 2,234,430.00 2,040,180.00 2,020,200.00 2,234,430.00 2,175,600.00
101 Formwork plate BBA.41 m2 155,400.00 162,060.00 178,710.00 163,170.00 162,060.00 178,710.00 174,270.00
102 FRP jenis carbon untuk daerah basah M208 m2 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
103 FRP jenis carbon untuk daerah kering M207 m2 155,400.00 162,060.00 178,710.00 163,170.00 162,060.00 178,710.00 174,270.00
104 FRP jenis E-glass untuk daerah basah M205 m2 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
105 FRP jenis E-glass untuk daerah kering M204 m2 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
106 FRP jenis glass untuk daerah kering M206 m2 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
107 Insulasi M257 m2 333,000.00 346,320.00 382,950.00 349,650.00 346,320.00 382,950.00 372,960.00
108 Jendela nako BBA.42 m2 77,700.00 81,030.00 89,910.00 82,140.00 81,030.00 89,910.00 86,580.00
109 Joint Socket Pile 16x16x16 M83 set 77,700.00 81,030.00 89,910.00 82,140.00 81,030.00 89,910.00 86,580.00
110 Joint Socket Pile 35x35 M82 set 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
111 Kabel Prategang M116 kg 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
112 Kabel pre-stressed BBA.43 kg 72,150.00 72,150.00 72,150.00 72,150.00 72,150.00 72,150.00 72,150.00
113 Karet Pengisi Sambungan Compression Seal M229 m' 1,332,000.00 1,385,280.00 1,531,800.00 1,398,600.00 1,385,280.00 1,531,800.00 1,491,840.00
114 Karet Pengisi Sambungan Strip Seal M228 m' 1,332,000.00 1,385,280.00 1,531,800.00 1,398,600.00 1,385,280.00 1,531,800.00 1,491,840.00
115 Kawat Bendrat BBA.44 kg 28,860.00 28,860.00 28,860.00 28,860.00 28,860.00 28,860.00 28,860.00
116 Kawat Beton M14 kg 28,860.00 29,970.00 33,300.00 29,970.00 29,970.00 33,300.00 32,190.00
117 Kawat Bronjong M15 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
118 Kawat bronjong pabrikasi BBA.45 kg 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
119 Kawat bronjong dia 10 mm BBA.46 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
120 Kawat bronjong dia 8 mm BBA.47 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
121 Kawat bronjong dia 6 mm BBA.48 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
122 Kawat bronjong dia 3 mm BBA.49 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
123 Kawat bronjong dia 2 mm BBA.50 kg 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
124 Kawat Duri (Pj = 7 m) BBA.51 roll 116,550.00 120,990.00 134,310.00 122,100.00 120,990.00 134,310.00 130,980.00
125 Kawat Kasa Lebar 90 cm BBA.52 M 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
126 Kawat Las BBA.53 kg 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
127 Kawat Las M51 dos 199,800.00 207,570.00 229,770.00 209,790.00 207,570.00 229,770.00 224,220.00
128 Kawat Las Ukuran 2,6 mm RB 26 BBA.54 dos 199,800.00 207,570.00 229,770.00 209,790.00 207,570.00 229,770.00 224,220.00

A.2 - 24
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

129 Kawat Las Ukuran 3,2 mm RB 26 BBA.55 dos 216,450.00 225,330.00 248,640.00 227,550.00 225,330.00 248,640.00 241,980.00
130 Kawat Las Ukuran 4 mm RB 26 BBA.56 dos 277,500.00 288,600.00 319,680.00 291,930.00 288,600.00 319,680.00 310,800.00
131 Kawat Nyamuk Lebar 90 cm BBA.57 m 42,180.00 44,400.00 48,840.00 44,400.00 44,400.00 48,840.00 47,730.00
132 Kawat penggantung BBA.58 kg 102,120.00 102,120.00 102,120.00 102,120.00 102,120.00 102,120.00 102,120.00
133 Kawat seng BBA.59 kg 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
134 Kawat Wiremesh Ukuran 8 mm x 2,25 m 50 m BBA.60 M 88,800.00 92,130.00 102,120.00 93,240.00 92,130.00 102,120.00 99,900.00
135 Kawat Wiremesh Ukuran 5 mm ulir BBA.61 kg 25,530.00 26,640.00 34,410.00 26,640.00 26,640.00 34,410.00 27,750.00
136 Kusen Alluminium 3" BBA.62 m' 236,430.00 246,420.00 271,950.00 248,640.00 246,420.00 271,950.00 265,290.00
137 Kusen Allumunium SF 4" BBA.63 m' 236,430.00 246,420.00 271,950.00 248,640.00 246,420.00 271,950.00 265,290.00
138 Kusen Allumunium SF 6" BBA.64 m' 260,850.00 270,840.00 299,700.00 274,170.00 270,840.00 299,700.00 291,930.00
139 Lampu LED 100 watt M278 buah 2,664,000.00 2,770,560.00 3,063,600.00 2,797,200.00 2,770,560.00 3,063,600.00 2,983,680.00
140 Lampu penerangan Jalan Tipe Merkuri 250 Watt M277 buah 777,000.00 808,080.00 893,550.00 815,850.00 808,080.00 893,550.00 870,240.00
141 Lampu penerangan Jalan Tipe Merkuri 400 Watt M276 buah 1,054,500.00 1,096,680.00 1,213,230.00 1,107,780.00 1,096,680.00 1,213,230.00 1,181,040.00
142 Landasan logam berongga (Pot Bearing) M234 buah 3,885,000.00 4,040,400.00 4,467,750.00 4,079,250.00 4,040,400.00 4,467,750.00 4,351,200.00
143 Landasan logam jenis Spherical M235 buah 4,995,000.00 5,194,800.00 5,744,250.00 5,244,750.00 5,194,800.00 5,744,250.00 5,594,400.00
144 Marmer M266 m2 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
145 Mistar ukur besi/allumunium pelat BBA.65 m' 138,750.00 144,300.00 159,840.00 145,410.00 144,300.00 159,840.00 155,400.00
146 Nok spandek zincalume BBA.66 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
147 Pagar BRC 0,90 x 2,40 m BBA.67 buah 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
148 Pagar BRC 1,20 x 2,40 m BBA.68 buah 388,500.00 404,040.00 446,775.00 407,925.00 404,040.00 446,775.00 435,120.00
149 Paku M18 kg 25,530.00 26,529.00 29,304.00 26,751.00 26,529.00 29,304.00 28,527.00
150 Paku 1 s/d 3 cm BBA.69 Kg 25,530.00 26,529.00 26,529.00 26,751.00 28,083.00 29,304.00 28,527.00
151 Paku 5 s/d 10 cm BBA.70 Kg 17,760.00 18,426.00 18,426.00 18,648.00 19,536.00 20,424.00 19,869.00
152 Paku 8 s/d 12 cm BBA.71 Kg 17,760.00 18,426.00 18,426.00 18,648.00 19,536.00 20,424.00 19,869.00
153 Paku asbes BBA.72 kg 49,950.00 51,060.00 58,830.00 51,060.00 51,060.00 58,830.00 52,170.00
154 Paku beton BBA.73 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
155 Paku Biasa BBA.74 kg 24,420.00 25,530.00 33,300.00 25,530.00 25,530.00 33,300.00 26,640.00
156 Paku hak BBA.75 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
157 Paku Jalan Memantul Bujur Sangkar M281 buah 82,140.00 85,470.00 94,350.00 86,580.00 85,470.00 94,350.00 92,130.00
158 Paku Jalan Memantul Persegi Panjang M282 buah 95,460.00 98,790.00 109,890.00 99,900.00 98,790.00 109,890.00 106,560.00
159 Paku jalan Tidak Memantul M280 buah 75,480.00 78,810.00 86,580.00 78,810.00 78,810.00 86,580.00 84,360.00
160 Paku pancing BBA.76 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
161 Paku Payung BBA.77 kg 35,520.00 36,630.00 44,400.00 36,630.00 36,630.00 44,400.00 37,740.00
162 Paku Sekrup BBA.78 buah 555.00 555.00 555.00 555.00 555.00 555.00 555.00
163 Paku seng BBA.79 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00

A.2 - 25
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

164 Paku Seng 1 3/4 " Kecil BBA.80 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
165 Paku Seng 2" Besar BBA.81 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
166 Paku Sumbat BBA.82 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
167 Paku Tripleks BBA.83 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
168 Paku Ulin BBA.84 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
169 Panel ACP BBA.85 m2 666,000.00 692,640.00 765,900.00 699,300.00 692,640.00 765,900.00 745,920.00
170 Pelat Baja M133 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
171 Pelat Rambu (Eng. Grade) M35a buah 305,250.00 317,460.00 350,760.00 320,790.00 317,460.00 350,760.00 341,880.00
172 Pelat Rambu (High I. Grade) M35b buah 339,660.00 352,980.00 390,720.00 356,310.00 352,980.00 390,720.00 380,730.00
173 Pelat Strip / 3 x 30 x 300 mm BBA.86 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
174 Pemantul Cahaya (Reflector) M43 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
175 Penutup karet neoprene M233 m' 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
176 Perancah/ formwoks M195 m2 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
177 Perletakan logam tipe fixed 150 Ton M262 buah 1,665,000.00 1,731,600.00 1,914,750.00 1,748,250.00 1,731,600.00 1,914,750.00 1,864,800.00
178 Perletakan logam tipe movable 150 Ton M263 buah 2,220,000.00 2,308,800.00 2,553,000.00 2,331,000.00 2,308,800.00 2,553,000.00 2,486,400.00
179 Pintu Besi BBA.87 m2 1,332,000.00 1,385,280.00 1,531,800.00 1,398,600.00 1,385,280.00 1,531,800.00 1,491,840.00
180 Pintu gulung besi BBA.88 m2 310,800.00 323,010.00 357,420.00 326,340.00 323,010.00 357,420.00 348,540.00
181 Pintu Klep Fiber Resin Type PA-FG1. 60 (persegi/Frame BBA.89 unit 21,256,500.00 21,356,400.00 21,516,240.00 21,376,380.00 21,356,400.00 21,516,240.00 21,416,340.00
lurus)
182 Pintu Klep Fiber Resin Type PA-FG1. 60 (persegi/Frame BBA.90 unit 21,922,500.00 22,022,400.00 22,182,240.00 22,042,380.00 22,022,400.00 22,182,240.00 22,082,340.00
Miring)
183 Pintu Klep Fiber Resin Type PA-FG1. 80 (persegi/Frame BBA.91 unit 27,139,500.00 27,267,150.00 27,471,390.00 27,292,680.00 27,267,150.00 27,471,390.00 27,343,740.00
lurus)
184 Pintu Klep Fiber Resin Type PA-FG1. 80 (persegi/Frame BBA.92 unit 27,472,500.00 27,600,150.00 27,804,390.00 27,625,680.00 27,600,150.00 27,804,390.00 27,676,740.00
Miring)
185 Pintu Klep Fiber Resin Type PA-FG1. 100 (persegi/Frame BBA.92.a unit 32,689,500.00 32,889,300.00 33,208,980.00 32,929,260.00 32,889,300.00 33,208,980.00 33,009,180.00
lurus)
186 Pintu Klep Fiber Resin Type PA-FG1. 100 (persegi/Frame BBA.92.b unit 33,799,500.00 33,999,300.00 34,318,980.00 34,039,260.00 33,999,300.00 34,318,980.00 34,119,180.00
Miring)
187 Pintu Klep Fiber Resin Type PA-FG1. 120 (persegi/Frame BBA.92.c unit 41,292,000.00 41,525,100.00 41,898,060.00 41,571,720.00 41,525,100.00 41,898,060.00 41,664,960.00
lurus)
188 Pintu Klep Fiber Resin Type PA-FG1. 120 (persegi/Frame BBA.92.d unit 43,068,000.00 43,301,100.00 43,674,060.00 43,347,720.00 43,301,100.00 43,674,060.00 43,440,960.00
Miring)
189 Pintu Klep Fiber Resin Type PA-FG2. 60 (Bulat/Frame BBA.92.e unit 23,809,500.00 23,909,400.00 24,069,240.00 23,929,380.00 23,909,400.00 24,069,240.00 23,969,340.00
lurus)

A.2 - 26
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

190 Pintu Klep Fiber Resin Type PA-FG2. 80 (Bulat/Frame BBA.92.f unit 34,243,500.00 34,371,150.00 34,575,390.00 34,396,680.00 34,371,150.00 34,575,390.00 34,447,740.00
lurus)
191 Pintu Klep Fiber Resin Type PA-FG2. 100 (Bulat/Frame BBA.92.g unit 41,458,500.00 41,658,300.00 41,977,980.00 41,698,260.00 41,658,300.00 41,977,980.00 41,778,180.00
lurus)
192 Pintu Klep Fiber Resin Type PA-FG2. 120 (Bulat/Frame BBA.92.h unit 52,614,000.00 52,847,100.00 53,220,060.00 52,893,720.00 52,847,100.00 53,220,060.00 52,986,960.00
lurus)
193 Pintu lipat BBA.93 m2 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00
194 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.a unit 44,400,000.00 44,810,700.00 45,467,820.00 44,892,840.00 44,810,700.00 45,467,820.00 45,057,120.00
tebal 5 cm, (200x110)cm, Frame full cover fiberglass,
(360x110)cm
195 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.b unit 39,960,000.00 40,304,100.00 40,854,660.00 40,372,920.00 40,304,100.00 40,854,660.00 40,510,560.00
tebal 5 cm, (160x65)cm, Frame full cover fiberglass,
(280x65)cm
196 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.c unit 42,180,000.00 42,568,500.00 43,190,100.00 42,646,200.00 42,568,500.00 43,190,100.00 42,801,600.00
tebal 5 cm, (210x65)cm, Frame full cover fiberglass,
(400x65)cm
197 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.d unit 26,640,000.00 26,895,300.00 27,303,780.00 26,946,360.00 26,895,300.00 27,303,780.00 27,048,480.00
teb 5 cm,(70x70)cm, Frame full cover fiber,
(200x70)cm,Tanpa Girbox
198 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.e unit 32,190,000.00 32,478,600.00 32,940,360.00 32,536,320.00 32,478,600.00 32,940,360.00 32,651,760.00
teb5
cm, (120x120)cm, Frame full cover fiber, (240x130)cm,
Tanpa Girbox
199 Pintu Sorong /Manual lapis cetak Fiberglass, daun pintu BBA.93.f unit 45,510,000.00 45,843,000.00 46,375,800.00 45,909,600.00 45,843,000.00 46,375,800.00 46,042,800.00
tebal 5 cm, (160x160)cm,2 ulir, Tanpa Frame cover ,
(270x160)cm
200 Pintu Sorong /Manual lapis cetak Fiberglass, Papan BBA.93.g unit 24,975,000.00 25,185,900.00 25,523,340.00 25,228,080.00 25,185,900.00 25,523,340.00 25,312,440.00
limpas fiberglass tebal 5 cm, (30x110)cm x 6 lbr, Bingkai
tebal 200 cm
201 Pipa Galvanis Dia 8" M132 m 94,350.00 98,124.00 108,447.00 99,012.00 98,124.00 108,447.00 105,672.00
202 Pipa Galvanise Dia 6" M275 m 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
203 Pipa Porus diameter 4" BBA.93.h m 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
204 Pipa Porus diameter 5" M25a m' 85,470.00 88,800.00 98,790.00 89,910.00 88,800.00 98,790.00 95,460.00
205 Pipa Porus diameter 6" M25b m' 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
206 Pipa Porus diameter 8" M25c m' 157,620.00 164,280.00 180,930.00 165,390.00 164,280.00 180,930.00 176,490.00

A.2 - 27
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

207 Profil alumunim T BBA.94 m 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
208 Profil Alumunium BBA.95 kg 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
209 Profil holow BBA.96 kg 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
210 Profil kaca BBA.97 m 16,206.00 16,650.00 18,870.00 16,650.00 16,650.00 18,870.00 17,760.00
211 Ramset BBA.98 buah 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
212 Rangka Jendela Almunium BBA.99 m' 256,410.00 266,622.00 266,622.00 269,175.00 282,051.00 294,816.00 287,157.00
213 Rangka Pintu Almunium BBA.100 m' 256,410.00 266,622.00 266,622.00 269,175.00 282,051.00 294,816.00 287,157.00
214 Kusen & Pintu PVC toilet BBA.101 unit 388,500.00 404,040.00 404,040.00 407,925.00 427,350.00 446,775.00 435,120.00
215 Rel Pengaman M36 m' 477,300.00 496,170.00 549,450.00 501,720.00 496,170.00 549,450.00 535,020.00
216 Rolling Door BBA.102 m2 1,681,650.00 1,749,360.00 1,933,620.00 1,766,010.00 1,749,360.00 1,933,620.00 1,883,670.00
217 Rolling door alumunium BBA.103 m2 1,637,250.00 1,702,740.00 1,882,560.00 1,719,390.00 1,702,740.00 1,882,560.00 1,833,720.00
218 Sambungan Pipa Baja M243 buah 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
219 Sambungan Pipa PVC M242 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
220 Sambungan siar muai tipe dobel siku M232 m' 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
221 Sambungan siar muai tipe finger plate M231 m' 388,500.00 404,040.00 447,330.00 408,480.00 404,040.00 447,330.00 435,120.00
222 Sambungan siar muai tipe Karet (Preformed T-shape) M260 kg 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
223 Sambungan siar muai tipe modular M230 m' 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
224 Screw Cteks 10x16-16 BBA.104 buah 1,110.00 1,110.00 1,221.00 1,110.00 1,110.00 1,221.00 1,221.00
225 Screw Cteks 12-4x50 BBA.105 buah 666.00 666.00 666.00 666.00 666.00 666.00 666.00
226 Selongsong Kabel prategang M117 m' 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
227 Seng Aluminium Plat Tebal 0.35 mm BBA.106 lembar 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
228 Seng Gelombang Besar BJLS 20 Kl BBA.107 lembar 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
229 Seng Gelombang Besar BJLS 30 BBA.108 lembar 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
230 Seng Gelombang Kecil BJLS 20 Kl BBA.109 lembar 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
231 Seng Gelombang Kecil BJLS 30 BBA.110 lembar 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
232 Seng Plat BJLS 20 Kl BBA.111 lembar 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
233 Seng Plat BJLS 20 Lebar 30 BBA.112 m 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
234 Seng Plat BJLS 20 Lebar 40 BBA.113 m 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
235 Seng Plat BJLS 20 Lebar 50 BBA.114 m 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
236 Seng Plat BJLS 30 Lebar 30 BBA.115 m 26,640.00 27,750.00 31,080.00 27,750.00 27,750.00 31,080.00 29,970.00
237 Seng Plat BJLS 30 Lebar 40 BBA.116 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
238 Seng Plat BJLS 30 Lebar 50 BBA.117 m 52,170.00 54,390.00 59,940.00 54,390.00 54,390.00 59,940.00 58,830.00
239 Seng Plat BJLS 30 Lebar 90 BBA.118 m 96,348.00 100,122.00 100,122.00 101,121.00 105,894.00 110,778.00 107,892.00
240 Serat Selulosa M158 kg 26,640.00 27,750.00 31,080.00 27,750.00 27,750.00 31,080.00 29,970.00
241 Silicon Seal M227 kg 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00

A.2 - 28
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

242 Skrup Fixer BBA.119 buah 666.00 1,110.00 1,110.00 1,110.00 1,110.00 1,110.00 1,110.00
243 Spandrel Aluminium BBA.120 m2 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00
244 Stang ulir diameter 16 mm BBA.121 buah 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
245 Stang ulir diameter 20 mm + gear BBA.122 buah 999,000.00 1,038,960.00 1,148,850.00 1,048,950.00 1,038,960.00 1,148,850.00 1,118,880.00
246 Stopper Lateral dan Horizontal M236 buah 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
247 Strand 1/2 inci M194 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
248 Strip Bearing M81 buah 327,450.00 340,770.00 376,290.00 344,100.00 340,770.00 376,290.00 366,300.00
249 Sunscreen alumunium BBA.123 m2 255,300.00 265,290.00 294,150.00 268,620.00 265,290.00 294,150.00 286,380.00
250 Super plastiziser, maks 0,3 % Sm M171 kg 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
251 SDE - 90 A2 90x240/6 mm Electro Plating BBA.123.a set 365,690.00 385,170.00 515,040.00 388,500.00 385,170.00 515,040.00 396,270.00
252 SDE - 90 A2 90x240/6 mm Hot Dip BBA.123.b set 468,254.00 487,290.00 617,160.00 491,730.00 487,290.00 617,160.00 498,390.00
253 SDE - 90 A3 90x240/7 mm Electro Plating BBA.123.c set 477,411.00 503,940.00 680,430.00 508,380.00 503,940.00 680,430.00 519,480.00
254 SDE - 90 A3 90x240/ 7 mm Hot Dip BBA.123.d set 625,763.00 651,570.00 829,170.00 657,120.00 651,570.00 829,170.00 667,110.00
255 SDE - 90 A4 90x240/8 mm Electro Plating BBA.123.e set 607,448.00 641,580.00 872,460.00 648,240.00 641,580.00 872,460.00 661,560.00
256 SDE - 90 A4 90x240/8 mm Hot Dip BBA.123.f set 810,744.00 844,710.00 1,075,590.00 851,370.00 844,710.00 1,075,590.00 864,690.00
257 SDE - 120 A2 120x240/6 mm Electro Plating BBA.123.g set 421,245.00 446,220.00 617,160.00 451,770.00 446,220.00 617,160.00 461,760.00
258 SDE - 120 A2 120x240/6 mm Hot Dip BBA.123.h set 533,577.00 558,330.00 729,270.00 563,880.00 558,330.00 729,270.00 573,870.00
259 SDE - 120 A3 120x240/7 mm Electro Plating BBA.123.i set 559,218.00 593,850.00 825,840.00 600,510.00 593,850.00 825,840.00 613,830.00
260 SDE - 120 A3 120x240/7 mm Hot Dip BBA.123.j set 722,832.00 757,020.00 989,010.00 763,680.00 757,020.00 989,010.00 777,000.00
261 SDE - 120 A4 120x240/8 mm Electro Plating BBA.123.k set 714,285.00 759,240.00 1,062,270.00 768,120.00 759,240.00 1,062,270.00 785,880.00
262 SDE - 120 A4 120x240/8 mm Hot Dip BBA.123.l set 935,286.00 980,130.00 1,283,160.00 989,010.00 980,130.00 1,283,160.00 1,006,770.00
263 SDE - 150 A2 150x240/6 mm Electro Plating BBA.123.m set 481,074.00 511,710.00 723,720.00 518,370.00 511,710.00 723,720.00 530,580.00
264 SDE - 150 A2 150x240/6 mm Hot Dip BBA.123.n set 615,995.00 647,130.00 858,030.00 653,790.00 647,130.00 858,030.00 666,000.00
265 SDE - 150 A3 150x240/7 mm Electro Plating BBA.123.o set 648,351.00 690,420.00 979,020.00 699,300.00 690,420.00 979,020.00 715,950.00
266 SDE - 150 A3 150x240/7 mm Hot Dip BBA.123.p set 848,151.00 890,220.00 1,178,820.00 899,100.00 890,220.00 1,178,820.00 915,750.00
267 SDE - 150 A4 150x240/8 mm Electro Plating BBA.123.q set 825,951.00 881,340.00 1,257,630.00 892,440.00 881,340.00 1,257,630.00 914,640.00
268 SDE - 150 A4 150x240/8 mm Hot Dip BBA.123.r set 1,090,353.00 1,121,100.00 1,333,110.00 1,127,760.00 1,121,100.00 1,333,110.00 1,139,970.00
269 SDE - 175 A2 175x240/6 mm Electro Plating BBA.123.s set 561,660.00 598,290.00 843,600.00 604,950.00 598,290.00 843,600.00 619,380.00
270 SDE - 175 A2 175x240/6 mm Hot Dip BBA.123.t set 726,495.00 775,890.00 1,110,000.00 785,880.00 775,890.00 1,110,000.00 804,750.00
271 SDE - 175 A3 175x240/ 7mm Electro Plating BBA.123.u set 663,003.00 712,620.00 1,045,620.00 721,500.00 712,620.00 1,045,620.00 741,480.00
272 SDE - 175 A3 175x240/ 7mm Hot Dip BBA.123.v set 879,120.00 943,500.00 1,379,730.00 955,710.00 943,500.00 1,379,730.00 981,240.00
273 SDE - 175 A4 175x240/8 mm Electro Plating BBA.123.w set 880,341.00 944,610.00 1,380,840.00 956,820.00 944,610.00 1,380,840.00 983,460.00
274 SDE - 175 A4 175x240/8 mm Hot Dip BBA.123.x set 1,169,718.00 1,234,320.00 1,670,550.00 1,246,530.00 1,234,320.00 1,670,550.00 1,272,060.00
275 SDE - 190 A2 190x240/6 mm Electro Plating BBA.123.y set 593,406.00 632,700.00 897,990.00 640,470.00 632,700.00 897,990.00 656,010.00
276 SDE - 190 A2 190x240/6 mm Hot Dip BBA.123.z set 771,672.00 810,300.00 1,076,700.00 818,070.00 810,300.00 1,076,700.00 834,720.00

A.2 - 29
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

277 SDE - 190 A3 190x240/7 mm Electro Plating BBA.123.aa set 726,495.00 779,220.00 1,141,080.00 790,320.00 779,220.00 1,141,080.00 811,410.00
278 SDE - 190 A3 190x240/7 mm Hot Dip BBA.123.ab set 961,538.00 1,014,540.00 1,376,400.00 1,025,640.00 1,014,540.00 1,376,400.00 1,046,730.00
279 SDE - 190 A4 190x240/8 mm Electro Plating BBA.123.ac set 936,507.00 1,005,660.00 1,478,520.00 1,020,090.00 1,005,660.00 1,478,520.00 1,047,840.00
280 SDE - 190 A4 190x240/8 mm Hot Dip BBA.123.ad set 1,247,862.00 1,317,570.00 1,789,320.00 1,330,890.00 1,317,570.00 1,789,320.00 1,358,640.00
281 SDE - 240 A3 240x240/7 mm Electro Plating BBA.123.ae set 1,042,068.00 1,108,890.00 1,562,880.00 1,122,210.00 1,108,890.00 1,562,880.00 1,148,850.00
282 SDE - 240 A3 240x240/7 mm Hot Dip BBA.123.af set 1,365,078.00 1,431,900.00 1,885,890.00 1,445,220.00 1,431,900.00 1,885,890.00 1,471,860.00
283 SDE - 240 A4 240x240/8 mm Electro Plating BBA.123.ag set 1,293,039.00 1,379,730.00 1,973,580.00 1,397,490.00 1,379,730.00 1,973,580.00 1,433,010.00
284 SDE - 240 A4 240x240/8 mm Hot Dip BBA.123.ah set 1,278,665.00 1,366,410.00 1,959,150.00 1,383,060.00 1,366,410.00 1,959,150.00 1,418,580.00
285 Talang jurai atap spandek BBA.124 m 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
286 Termoplastik (sealant tuang panas) M178 kg 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
287 Termoseting (sealant tuang dingin) M180 kg 77,700.00 81,030.00 89,910.00 82,140.00 81,030.00 89,910.00 86,580.00
288 Tiang Pagar BRC d=1,5 in t=0,90 m Electro Plating BBA.125 unit 158,730.00 160,950.00 178,710.00 162,060.00 160,950.00 178,710.00 163,170.00
289 Tiang Pagar BRC d=1,5 in t=0,90 m Hot dip BBA.126 unit 189,810.00 192,030.00 209,790.00 193,140.00 192,030.00 209,790.00 194,250.00
290 Tiang Pagar BRC d=1,5 in t=1,20 m Electro Plating BBA.126.a unit 189,810.00 193,140.00 216,450.00 194,250.00 193,140.00 216,450.00 195,360.00
291 Tiang Pagar BRC d=1,5 in t=1,20 m Hot Dip BBA.126.b unit 206,460.00 209,790.00 233,100.00 210,900.00 209,790.00 233,100.00 212,010.00
292 Tiang Pagar BRC d=1,5 in t=1,5 m Electro Plating BBA.126.c unit 199,800.00 204,240.00 233,100.00 205,350.00 204,240.00 233,100.00 206,460.00
293 Tiang Pagar BRC d=1,5 in t=1,5 m Hot Dip BBA.126.d unit 224,220.00 228,660.00 257,520.00 229,770.00 228,660.00 257,520.00 230,880.00
294 Tiang Pagar BRC d=1,5 in t=1,75 m Electro Plating BBA.126.e unit 220,890.00 225,330.00 259,740.00 226,440.00 225,330.00 259,740.00 228,660.00
295 Tiang Pagar BRC d=1,5 in t=1,75 m Hot Dip BBA.126.f unit 258,630.00 263,070.00 297,480.00 264,180.00 263,070.00 297,480.00 266,400.00
296 Tiang Pagar BRC d=1,5 in t=2 m Electro Plating BBA.126.g unit 240,870.00 246,420.00 285,270.00 247,530.00 246,420.00 285,270.00 249,750.00
297 Tiang Pagar BRC d=1,5 in t=2 m Hot Dip BBA.126.h unit 270,840.00 276,390.00 315,240.00 277,500.00 276,390.00 315,240.00 279,720.00
298 Tiang Pagar BRC d=1,5 in t=2,2 m Electro Plating BBA.126.i unit 277,500.00 284,160.00 326,340.00 285,270.00 284,160.00 326,340.00 287,490.00
299 Tiang Pagar BRC d=1,5 in t=2,2 m Hot Dip BBA.126.j unit 296,370.00 303,030.00 345,210.00 304,140.00 303,030.00 345,210.00 306,360.00
300 Tiang Pagar BRC d=2 in t=0,90 m Electro Plating BBA.126.k unit 180,930.00 184,260.00 205,350.00 184,260.00 184,260.00 205,350.00 186,480.00
301 Tiang Pagar BRC d=2 in t=0,90 m Hot dip BBA.126.l unit 197,580.00 200,910.00 222,000.00 200,910.00 200,910.00 222,000.00 203,130.00
302 Tiang Pagar BRC d=2 in t=1,20 m Electro Plating BBA.126.m unit 203,130.00 207,570.00 236,430.00 208,680.00 207,570.00 236,430.00 209,790.00
303 Tiang Pagar BRC d=2 in t=1,20 m Hot Dip BBA.126.n unit 218,670.00 223,110.00 251,970.00 224,220.00 223,110.00 251,970.00 225,330.00
304 Tiang Pagar BRC d=2 in t=1,5 m Electro Plating BBA.126.o unit 240,870.00 246,420.00 281,940.00 247,530.00 246,420.00 281,940.00 249,750.00
305 Tiang Pagar BRC d=2 in t=1,5 m Hot Dip BBA.126.p unit 270,840.00 276,390.00 311,910.00 277,500.00 276,390.00 311,910.00 279,720.00
306 Tiang Pagar BRC d=2 in t=1,75 m Electro Plating BBA.126.q unit 254,190.00 260,850.00 303,030.00 261,960.00 260,850.00 303,030.00 264,180.00
307 Tiang Pagar BRC d=2 in t=1,75 m Hot Dip BBA.126.r unit 289,710.00 296,370.00 338,550.00 297,480.00 296,370.00 338,550.00 299,700.00
308 Tiang Pagar BRC d=2 in t=2 m Electro Plating BBA.126.s unit 273,060.00 279,720.00 328,560.00 281,940.00 279,720.00 328,560.00 284,160.00
309 Tiang Pagar BRC d=2 in t=2 m Hot Dip BBA.126.t unit 326,340.00 333,000.00 381,840.00 335,220.00 333,000.00 381,840.00 337,440.00
310 Tiang Pagar BRC d=2 in t=2,2 m Electro Plating BBA.126.u unit 309,690.00 317,460.00 370,740.00 318,570.00 317,460.00 370,740.00 321,900.00
311 Tiang Pagar BRC d=2 in t=2,2 m Hot Dip BBA.126.v unit 344,100.00 351,870.00 405,150.00 352,980.00 351,870.00 405,150.00 356,310.00

A.2 - 30
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

312 Tiang Pagar BRC d=2 in t=2,25 m Electro Plating BBA.126.w unit 333,000.00 340,770.00 395,160.00 342,990.00 340,770.00 395,160.00 346,320.00
313 Tiang Pagar BRC d=2 in t=2,25 m Hot Dip BBA.126.x unit 359,640.00 367,410.00 421,800.00 369,630.00 367,410.00 421,800.00 372,960.00
314 Tiang Pagar BRC d=2 in t=2,4 m Electro Plating BBA.126.y unit 342,990.00 351,870.00 409,590.00 352,980.00 351,870.00 409,590.00 356,310.00
315 Tiang Pagar BRC d=2 in t=2,4 m Hot Dip BBA.126.z unit 372,960.00 381,840.00 439,560.00 382,950.00 381,840.00 439,560.00 386,280.00
316 Tiang Pagar BRC d=2 in t=3 m Electro Plating BBA.126.aa unit 384,060.00 395,160.00 467,310.00 397,380.00 395,160.00 467,310.00 400,710.00
317 Tiang Pagar BRC d=2 in t=3 m Hot Dip BBA.126.ab unit 442,890.00 453,990.00 526,140.00 456,210.00 453,990.00 526,140.00 459,540.00
318 Tiang pancang baja dia 30 cm BBA.127 m 432,900.00 450,660.00 498,390.00 455,100.00 450,660.00 498,390.00 485,070.00
319 Tiang pancang baja kotak 30x30 cm BBA.128 m 471,750.00 490,620.00 542,790.00 495,060.00 490,620.00 542,790.00 528,360.00
320 Tiang pancang baja dia. 40 cm tebal 9 mm M49a m 2,020,200.00 2,097,900.00 2,319,900.00 2,120,100.00 2,097,900.00 2,319,900.00 2,264,400.00
321 Tiang pancang baja dia. 50 cm tebal 10 mm M49b m 3,263,400.00 3,396,600.00 3,751,800.00 3,429,900.00 3,396,600.00 3,751,800.00 3,651,900.00
322 Tiang pancang baja dia. 50 cm tebal 12 mm M49c m 3,996,000.00 4,151,400.00 4,595,400.00 4,195,800.00 4,151,400.00 4,595,400.00 4,473,300.00
323 Tiang pancang baja dia. 60 cm tebal 10 mm M49d m 4,018,200.00 4,173,600.00 4,617,600.00 4,218,000.00 4,173,600.00 4,617,600.00 4,495,500.00
324 Tiang pancang baja dia. 60 cm tebal 12 mm M49e m 4,806,300.00 4,995,000.00 5,527,800.00 5,050,500.00 4,995,000.00 5,527,800.00 5,383,500.00
325 Tiang pancang baja dia. 40 cm tebal 9 mm M49a m 2,020,200.00 2,097,900.00 2,319,900.00 2,120,100.00 2,097,900.00 2,319,900.00 2,264,400.00
326 Tiang pancang baja dia. 40 cm tebal 9 mm M49a1 kg 23,277.00 24,176.00 26,729.00 24,420.00 24,176.00 26,729.00 26,085.00
327 Tiang pancang baja dia. 50 cm tebal 10 mm M49b m 3,263,400.00 3,396,600.00 3,751,800.00 3,429,900.00 3,396,600.00 3,751,800.00 3,651,900.00
328 Tiang pancang baja dia. 50 cm tebal 10 mm M49b1 kg 28,916.00 30,092.00 33,245.00 30,392.00 30,092.00 33,245.00 32,357.00
329 Tiang pancang baja dia. 50 cm tebal 12 mm M49c m 3,996,000.00 4,151,400.00 4,595,400.00 4,195,800.00 4,151,400.00 4,595,400.00 4,473,300.00
330 Tiang pancang baja dia. 50 cm tebal 12 mm M49c1 kg 27,672.00 28,749.00 31,824.00 29,060.00 28,749.00 31,824.00 30,980.00
331 Tiang pancang baja dia. 60 cm tebal 10 mm M49d m 4,018,200.00 4,173,600.00 4,617,600.00 4,218,000.00 4,173,600.00 4,617,600.00 4,495,500.00
332 Tiang pancang baja dia. 60 cm tebal 10 mm M49d1 kg 27,717.00 28,793.00 31,846.00 29,093.00 28,793.00 31,846.00 31,013.00
333 Tiang pancang baja dia. 60 cm tebal 12 mm M49e m 4,806,300.00 4,995,000.00 5,527,800.00 5,050,500.00 4,995,000.00 5,527,800.00 5,383,500.00
334 Tiang pancang baja dia. 60 cm tebal 12 mm M49e1 kg 27,617.00 28,705.00 31,757.00 29,015.00 28,705.00 31,757.00 30,936.00
335 Tiang sandaran baja M238 m' 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
336 Turap baja profi larsen lebar 350 mm BBA.129 m 493,950.00 513,930.00 568,320.00 518,370.00 513,930.00 568,320.00 552,780.00
337 Ulir halus diameter 20 mm BBA.130 kg 160,950.00 167,610.00 185,370.00 168,720.00 167,610.00 185,370.00 179,820.00
338 Ulir kasar diameter 16 mm BBA.131 kg 94,350.00 97,680.00 108,780.00 98,790.00 97,680.00 108,780.00 105,450.00
339 Venetions blinds dan vertical blinds BBA.132 m2 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00

F BAHAN PLAFOND
1 Accoustic Ceiling Ukuran 15 x 600 x 1200 mm BPF.1 lembar 355,200.00 369,630.00 408,480.00 372,960.00 369,630.00 408,480.00 397,380.00
2 Akustik 30 x 30 cm BPF.2 lembar 344,100.00 357,420.00 396,270.00 361,860.00 357,420.00 396,270.00 385,170.00
3 Akustik 30 x 60 cm BPF.3 lembar 327,450.00 340,770.00 376,290.00 344,100.00 340,770.00 376,290.00 366,300.00
4 Akustik 60 x 120 cm BPF.4 lembar 305,250.00 317,460.00 350,760.00 320,790.00 317,460.00 350,760.00 341,880.00
5 Asbes semen BPF.5 m2 26,640.00 27,750.00 31,080.00 27,750.00 27,750.00 31,080.00 29,970.00

A.2 - 31
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

6 Gypsum Denseshield Ukuran 12 x 1200 BPF.6 m2 99,900.00 104,340.00 115,440.00 105,450.00 104,340.00 115,440.00 112,110.00
7 Gypsum Denseshield Ukuran 15 x 1200 BPF.7 m2 116,550.00 120,990.00 134,310.00 122,100.00 120,990.00 134,310.00 130,980.00
8 Gypsum Fireshield Ukuran 12 x 1200 BPF.8 m2 105,450.00 109,890.00 120,990.00 111,000.00 109,890.00 120,990.00 117,660.00
9 Gypsum Fireshield Ukuran 15 x 1200 BPF.9 m2 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
10 Gypsum Moistureshield Ukuran 12 x 1200 BPF.10 m2 109,890.00 114,330.00 126,540.00 115,440.00 114,330.00 126,540.00 123,210.00
11 Gypsum Moistureshield Ukuran 15 x 1200 BPF.11 m2 127,650.00 133,200.00 146,520.00 134,310.00 133,200.00 146,520.00 143,190.00
12 Gypsum Moistureshield Ukuran 9 x 1200 BPF.12 m2 94,350.00 97,680.00 108,780.00 98,790.00 97,680.00 108,780.00 105,450.00
13 Gypsum Standard Board Ukuran 12 x 1200 BPF.13 m2 102,120.00 106,560.00 117,660.00 107,670.00 106,560.00 117,660.00 114,330.00
14 Gypsum Standard Board Ukuran 9 x 1200 BPF.14 m2 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
15 Gypsumboard 1200 x 2400 x 9 mm BPF.15 m2 88,800.00 92,130.00 102,120.00 93,240.00 92,130.00 102,120.00 99,900.00
16 Kalsi Board Ukuran 1200 x 2400 x 3,5 BPF.16 lembar 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
17 Kalsi Board Ukuran 1200 x 2400 x 4,5 BPF.17 lembar 88,800.00 92,130.00 102,120.00 93,240.00 92,130.00 102,120.00 99,900.00
18 Lis profil gypsum BPF.18 m 37,740.00 38,850.00 43,290.00 39,960.00 38,850.00 43,290.00 42,180.00
19 Plafon plywood 4 mm BPF.19 m2 102,120.00 106,560.00 117,660.00 107,670.00 106,560.00 117,660.00 114,330.00
20 Rangka plafond Metal furing BPF.20 m2 163,725.00 170,274.00 170,274.00 171,828.00 180,042.00 188,256.00 183,372.00
21 Tepung gypsum BPF.21 kg 8,880.00 9,213.00 10,212.00 9,324.00 9,213.00 10,212.00 9,990.00

G BAHAN PELAPIS LANTAI DAN DINDING


1 Floor hardener BPLD.1 kg 27,750.00 28,860.00 33,300.00 28,860.00 28,860.00 33,300.00 29,970.00
2 Granit alam BPLD.2 m2 2,109,000.00 2,128,980.00 2,553,000.00 2,133,420.00 2,128,980.00 2,553,000.00 2,141,190.00
3 Homogenous tile 30 x 30 cm BPLD.4 box 155,400.00 173,160.00 216,450.00 176,490.00 173,160.00 216,450.00 184,260.00
4 Homogenous tile 30 x 60 cm BPLD.5 m2 222,000.00 239,760.00 288,600.00 243,090.00 239,760.00 288,600.00 250,860.00
5 Homogenous tile 40 x 40 cm BPLD.6 m2 233,100.00 250,860.00 305,250.00 254,190.00 250,860.00 305,250.00 261,960.00
6 Homogenous tile 50 x 50 cm BPLD.7 m2 288,600.00 306,360.00 366,300.00 309,690.00 306,360.00 366,300.00 317,460.00
7 Homogenous tile 60 x 60 cm BPLD.8 m2 310,800.00 328,560.00 394,050.00 331,890.00 328,560.00 394,050.00 339,660.00
8 Internal cove 5x5x20 BPLD.9 buah 33,300.00 34,410.00 44,400.00 34,410.00 34,410.00 44,400.00 35,520.00
9 Karpet BPLD.10 m2 166,500.00 172,050.00 210,900.00 173,160.00 172,050.00 210,900.00 175,380.00
10 Keramik dinding 10 x 20 cm BPLD.11 buah 83,250.00 99,900.00 133,200.00 103,230.00 99,900.00 133,200.00 109,890.00
11 Keramik Polos 20 x 20 cm BPLD.12 kotak 94,350.00 111,000.00 144,300.00 114,330.00 111,000.00 144,300.00 120,990.00
12 Keramik Polos 20 x 30 cm BPLD.13 kotak 94,350.00 111,000.00 144,300.00 114,330.00 111,000.00 144,300.00 120,990.00
13 Keramik Polos 30 x 30 cm BPLD.14 kotak 94,350.00 111,000.00 144,300.00 114,330.00 111,000.00 144,300.00 120,990.00
14 Keramik polos 40 x 40 cm BPLD.15 kotak 111,000.00 128,760.00 149,850.00 132,090.00 128,760.00 149,850.00 139,860.00
15 Keramik Warna 10 x 20 cm BPLD.16 kotak 88,800.00 106,560.00 138,750.00 109,890.00 106,560.00 138,750.00 117,660.00
16 Keramik Warna 20 x 20 cm BPLD.17 kotak 94,350.00 112,110.00 144,300.00 115,440.00 112,110.00 144,300.00 123,210.00
17 Keramik Warna 20 x 25 cm BPLD.18 kotak 83,250.00 101,010.00 144,300.00 104,340.00 101,010.00 144,300.00 112,110.00

A.2 - 32
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

18 Keramik Warna 20 x 40 cm BPLD.19 kotak 94,350.00 112,110.00 144,300.00 115,440.00 112,110.00 144,300.00 123,210.00
19 Keramik Warna 25 x 40 cm BPLD.20 kotak 94,350.00 112,110.00 144,300.00 115,440.00 112,110.00 144,300.00 123,210.00
20 Keramik Warna 30 x 30 cm BPLD.21 kotak 83,250.00 101,010.00 133,200.00 104,340.00 101,010.00 133,200.00 112,110.00
21 Keramik Warna 50 x 50 cm BPLD.22 kotak 138,750.00 156,510.00 199,800.00 159,840.00 156,510.00 199,800.00 167,610.00
22 Keramik Warna 60 x 60 cm BPLD.23 kotak 210,900.00 228,660.00 288,600.00 231,990.00 228,660.00 288,600.00 239,760.00
23 Keramik Warna 30 x 60 cm BPLD.24 kotak 155,400.00 173,160.00 222,000.00 176,490.00 173,160.00 222,000.00 184,260.00
24 Lem BPLD.25 kg 61,050.00 62,160.00 72,150.00 62,160.00 62,160.00 72,150.00 63,270.00
25 Lem Perekat Khusus BPLD.26 kg 105,450.00 106,560.00 122,100.00 106,560.00 106,560.00 122,100.00 107,670.00
26 Marmer 1 x 1 m BPLD.27 buah 2,775,000.00 2,802,750.00 3,219,000.00 2,808,300.00 2,802,750.00 3,219,000.00 2,819,400.00
27 Nat Pengisi AM-50 BPLD.28 kg 27,750.00 28,860.00 44,400.00 28,860.00 28,860.00 44,400.00 29,970.00
28 Parquet BPLD.29 m2 499,500.00 506,160.00 577,200.00 507,270.00 506,160.00 577,200.00 510,600.00
29 Plin Lantai MDF 1,2 x 4 x 240 cm BPLD.31 batang 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
30 Plin Lantai MDF 1,2 x 6 x 240 cm BPLD.32 batang 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
31 Plin Lantai MDF 1,2 x 8 x 240 cm BPLD.32.a batang 166,500.00 173,160.00 192,030.00 175,380.00 173,160.00 192,030.00 186,480.00
32 Plin Lantai MDF 1,2 x 10 x 240 cm BPLD.32.b batang 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
33 Plin Ubin abu-abu 10 x 20 BPLD.33 buah 3,996.00 4,107.00 5,550.00 4,107.00 4,107.00 5,550.00 4,440.00
34 Plin Ubin abu-abu 10 x 30 BPLD.34 buah 5,994.00 6,216.00 7,770.00 6,216.00 6,216.00 7,770.00 6,660.00
35 Plin Ubin abu-abu 10 x 40 BPLD.35 buah 7,992.00 8,214.00 9,990.00 8,325.00 8,214.00 9,990.00 8,880.00
36 Plin Ubin abu-abu 15 x 20 BPLD.36 buah 5,994.00 6,216.00 7,770.00 6,216.00 6,216.00 7,770.00 6,660.00
37 Plin Ubin granit 10 x 30 BPLD.37 buah 14,430.00 15,540.00 16,650.00 15,540.00 15,540.00 16,650.00 16,650.00
38 Plin Ubin granit 10 x 40 BPLD.38 buah 19,980.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 22,200.00
39 Plin Ubin teralux 10 x 30 BPLD.39 buah 14,430.00 15,540.00 22,200.00 15,540.00 15,540.00 22,200.00 16,650.00
40 Plin Ubin teralux 10 x 40 BPLD.40 buah 19,980.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 22,200.00
41 Plin Ubin teralux marmer 10 x 30 BPLD.41 buah 16,650.00 17,760.00 22,200.00 17,760.00 17,760.00 22,200.00 18,870.00
42 Plin Ubin teralux marmer 10 x 40 BPLD.42 buah 22,200.00 23,310.00 27,750.00 23,310.00 23,310.00 27,750.00 24,420.00
43 Plin Ubin teralux marmer 10 x 60 BPLD.43 buah 33,300.00 34,410.00 44,400.00 35,520.00 34,410.00 44,400.00 37,740.00
44 Plin Ubin teraso 10 x 30 BPLD.44 buah 5,550.00 5,772.00 11,100.00 5,772.00 5,772.00 11,100.00 6,216.00
45 Plin Ubin teraso 10 x 40 BPLD.45 buah 7,437.00 7,659.00 11,100.00 7,770.00 7,659.00 11,100.00 8,325.00
46 Plin Ubin warna 10 x 20 BPLD.46 buah 4,440.00 4,551.00 11,100.00 4,662.00 4,551.00 11,100.00 4,884.00
47 Plin Ubin warna 10 x 30 BPLD.47 buah 6,660.00 6,882.00 11,100.00 6,993.00 6,882.00 11,100.00 7,437.00
48 Plin Ubin warna 10 x 40 BPLD.48 buah 8,547.00 8,880.00 11,100.00 8,880.00 8,880.00 11,100.00 9,546.00
49 Plint Keramik 10 x 10 cm BPLD.49 buah 3,330.00 3,441.00 5,550.00 3,441.00 3,441.00 5,550.00 3,663.00
50 Plint Keramik 10 x 20 cm BPLD.50 buah 6,660.00 6,882.00 11,100.00 6,993.00 6,882.00 11,100.00 7,437.00
51 Plint Keramik 10 x 30 cm BPLD.51 buah 9,990.00 10,323.00 16,650.00 10,434.00 10,323.00 16,650.00 11,100.00
52 Plint Keramik 10 x 40 cm BPLD.52 buah 13,320.00 13,320.00 22,200.00 14,430.00 13,320.00 22,200.00 14,430.00

A.2 - 33
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

53 Plint Keramik 5 x 20 cm BPLD.53 buah 3,330.00 3,441.00 6,660.00 3,441.00 3,441.00 6,660.00 3,663.00
54 Porselen 10 x 20 cm BPLD.54 buah 4,440.00 4,551.00 11,100.00 4,662.00 4,551.00 11,100.00 4,884.00
55 Porselen 11 x 11 cm BPLD.55 buah 2,775.00 2,886.00 5,550.00 2,886.00 2,886.00 5,550.00 3,108.00
56 Porselen 20 x 20 cm BPLD.56 buah 8,880.00 9,213.00 16,650.00 9,324.00 9,213.00 16,650.00 9,879.00
57 Step Nosing Kayu 1,2 m BPLD.57 batang 49,950.00 52,170.00 61,050.00 52,170.00 52,170.00 61,050.00 55,500.00
58 Step Nosing Kayu 2,4 m BPLD.58 batang 83,250.00 86,580.00 99,900.00 87,690.00 86,580.00 99,900.00 93,240.00
59 Step Nosing Tangga Aluminium Panjang 2,7 m BPLD.59 batang 144,300.00 149,850.00 166,500.00 152,070.00 149,850.00 166,500.00 162,060.00
60 Steptread Bullnose 10 x 30 cm BPLD.60 boks 21,090.00 22,200.00 27,750.00 22,200.00 22,200.00 27,750.00 23,310.00
61 Ubin abu-abu 20 x 20 BPLD.61 buah 5,994.00 6,216.00 11,100.00 6,216.00 6,216.00 11,100.00 6,660.00
62 Ubin abu-abu 30 x 30 BPLD.62 buah 13,653.00 14,430.00 16,650.00 14,430.00 14,430.00 16,650.00 15,540.00
63 Ubin abu-abu 40 x 40 BPLD.63 buah 23,976.00 24,420.00 27,750.00 25,530.00 24,420.00 27,750.00 26,640.00
64 Ubin granit 20 x 20 BPLD.64 buah 16,983.00 17,760.00 22,200.00 17,760.00 17,760.00 22,200.00 18,870.00
65 Ubin granit 30 x 30 BPLD.65 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
66 Ubin granit 40 x 40 BPLD.66 buah 68,820.00 71,040.00 83,250.00 72,150.00 71,040.00 83,250.00 76,590.00
67 Ubin teralux 20 x 20 BPLD.67 buah 16,983.00 17,760.00 22,200.00 17,760.00 17,760.00 22,200.00 18,870.00
68 Ubin teralux 30 x 30 BPLD.68 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
69 Ubin teralux 40 x 40 BPLD.69 buah 68,820.00 71,040.00 83,250.00 72,150.00 71,040.00 83,250.00 76,590.00
70 Ubin teralux marmer 30 x 30 BPLD.70 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
71 Ubin teralux marmer 40 x 40 BPLD.71 buah 69,375.00 72,150.00 83,250.00 73,260.00 72,150.00 83,250.00 77,700.00
72 Ubin teralux marmer 60 x 60 BPLD.72 buah 155,400.00 162,060.00 177,600.00 163,170.00 162,060.00 177,600.00 174,270.00
73 Ubin teraso 20 x 20 BPLD.73 buah 8,880.00 9,213.00 11,100.00 9,324.00 9,213.00 11,100.00 9,879.00
74 Ubin teraso 30 x 30 BPLD.74 buah 19,980.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 22,200.00
75 Ubin teraso 40 x 40 BPLD.75 buah 20,313.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 22,200.00
76 Ubin warna 20 x 20 BPLD.76 buah 8,880.00 9,213.00 11,100.00 9,324.00 9,213.00 11,100.00 9,879.00
77 Ubin warna 30 x 30 BPLD.77 buah 19,980.00 21,090.00 27,750.00 21,090.00 21,090.00 27,750.00 22,200.00
78 Ubin warna 40 x 40 BPLD.78 buah 35,520.00 36,630.00 44,400.00 37,740.00 36,630.00 44,400.00 39,960.00
79 Under-layer BPLD.79 m2 21,090.00 22,200.00 27,750.00 22,200.00 22,200.00 27,750.00 23,310.00
80 Vynil BPLD.80 buah 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
81 Wallpaper BPLD.81 m2 35,520.00 36,630.00 44,400.00 37,740.00 36,630.00 44,400.00 39,960.00
82 Prasasti Peresmian (granit) BPLD.82 buah 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00 4,000,000.00

H BAHAN PENUTUP ATAP


1 Aluminium Tape BPA.1 roll 355,200.00 369,630.00 408,480.00 372,960.00 369,630.00 408,480.00 397,380.00
2 Alumunium foil BPA.2 roll 865,800.00 900,210.00 995,670.00 909,090.00 900,210.00 995,670.00 970,140.00
3 Asbes gelombang BPA.3 lembar 62,160.00 64,380.00 71,040.00 65,490.00 64,380.00 71,040.00 69,930.00

A.2 - 34
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

4 Asbes gelombang 105 x 150 x 4 mm BPA.4 lembar 46,620.00 48,840.00 53,280.00 48,840.00 48,840.00 53,280.00 52,170.00
5 Asbes gelombang 105 x 180 x 6 mm BPA.5 lembar 62,160.00 64,380.00 71,040.00 65,490.00 64,380.00 71,040.00 69,930.00
6 Asbes gelombang 105 x 210 x 4 mm BPA.6 lembar 64,380.00 66,600.00 74,370.00 67,710.00 66,600.00 74,370.00 72,150.00
7 Asbes gelombang 105 x 210 x 6 mm BPA.7 lembar 71,040.00 74,370.00 82,140.00 74,370.00 74,370.00 82,140.00 79,920.00
8 Asbes gelombang 105 x 240 x 4 mm BPA.8 lembar 73,260.00 76,590.00 84,360.00 76,590.00 76,590.00 84,360.00 82,140.00
9 Asbes gelombang 105 x 240 x 6 mm BPA.9 lembar 81,030.00 84,360.00 93,240.00 85,470.00 84,360.00 93,240.00 91,020.00
10 Asbes gelombang 105 x 270 x 4 mm BPA.10 lembar 82,140.00 85,470.00 94,350.00 86,580.00 85,470.00 94,350.00 92,130.00
11 Asbes gelombang 105 x 270 x 6 mm BPA.11 lembar 91,020.00 94,350.00 104,340.00 95,460.00 94,350.00 104,340.00 102,120.00
12 Asbes gelombang 105 x 300 x 4 mm BPA.12 lembar 89,910.00 93,240.00 103,230.00 94,350.00 93,240.00 103,230.00 101,010.00
13 Asbes gelombang 105 x 300 x 6 mm BPA.13 lembar 101,010.00 105,450.00 116,550.00 106,560.00 105,450.00 116,550.00 113,220.00
14 Asbes gelombang 92 x 180 x 5 mm BPA.15 lembar 56,610.00 58,830.00 65,490.00 59,940.00 58,830.00 65,490.00 63,270.00
15 Asbes gelombang 92 x 225 x 5 mm BPA.16 lembar 65,490.00 67,710.00 75,480.00 68,820.00 67,710.00 75,480.00 73,260.00
16 Asbes gelombang 92 x 250 x 5 mm BPA.17 lembar 73,260.00 76,590.00 84,360.00 76,590.00 76,590.00 84,360.00 82,140.00
17 Asbes Gelombang Plat BPA.18 lembar 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
18 Atap Metal Multy Roop 0,4 mm BPA.19 lembar 109,890.00 114,330.00 126,540.00 115,440.00 114,330.00 126,540.00 123,210.00
19 Atap Metal Nok C BPA.20 m 54,390.00 56,610.00 62,160.00 56,610.00 56,610.00 62,160.00 61,050.00
20 Atap Metal Nok Pinggir L BPA.22 m 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
21 Atap Metal Nok U BPA.24 m 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
22 Atap Metal Spyro roop 0.3 mm BPA.26 lembar 64,380.00 66,600.00 74,370.00 67,710.00 66,600.00 74,370.00 72,150.00
23 Seng Spandex 0,30 Silver /Merah BPA.27 m 53,280.00 55,500.00 61,050.00 55,500.00 55,500.00 61,050.00 59,940.00
24 Seng Spandex 0,35 Silver /Merah BPA.28 m 64,380.00 66,600.00 74,370.00 67,710.00 66,600.00 74,370.00 72,150.00
25 Spandex Gel.9 BPA.29 m 77,700.00 81,030.00 89,910.00 82,140.00 81,030.00 89,910.00 86,580.00
26 Bubungan Spandek BPA.30 m 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
27 Bubung stel gelombang 105 cm BPA.31 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
28 Bubung stel gelombang 108 cm BPA.32 buah 31,080.00 32,190.00 35,520.00 32,190.00 32,190.00 35,520.00 34,410.00
29 Bubung stel gelombang 92 cm BPA.33 buah 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
30 Bumbungan Asbes Gelombang BPA.34 buah 42,180.00 44,400.00 48,840.00 44,400.00 44,400.00 48,840.00 47,730.00
31 Genteng aspal BPA.35 buah 9,990.00 10,323.00 11,433.00 10,434.00 10,323.00 11,433.00 11,100.00
32 Genteng beton BPA.36 buah 9,435.00 9,768.00 10,767.00 9,879.00 9,768.00 10,767.00 10,545.00
33 Genteng bubung kodok glazur BPA.37 buah 9,213.00 9,546.00 10,545.00 9,657.00 9,546.00 10,545.00 10,212.00
34 Genteng bubung palentong besar BPA.38 buah 6,105.00 6,327.00 6,993.00 6,327.00 6,327.00 6,993.00 6,771.00
35 Genteng kodok glazuur BPA.39 buah 9,435.00 9,768.00 10,767.00 9,879.00 9,768.00 10,767.00 10,545.00
36 Genteng Keramik Glazur BPA.40 buah 29,138.00 30,303.00 30,303.00 30,525.00 31,968.00 33,411.00 32,634.00
37 Genteng metal BPA.41 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
38 Genteng palentong besar BPA.42 buah 7,215.00 7,437.00 8,214.00 7,548.00 7,437.00 8,214.00 7,992.00

A.2 - 35
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

39 Genteng palentong kecil BPA.43 buah 2,775.00 2,886.00 3,108.00 2,886.00 2,886.00 3,108.00 3,108.00
40 Glasswoll D. 16 Kg/M3 Tebal 25 mm x 1,2 m x 30 m BPA.44 roll 260,850.00 270,840.00 299,700.00 274,170.00 270,840.00 299,700.00 291,930.00
41 Glasswoll D. 24 Kg/M3 Tebal 25 mm x 1,2 m x 30 m BPA.45 roll 371,850.00 386,280.00 427,350.00 390,720.00 386,280.00 427,350.00 416,250.00
42 Glasswoll D. 32 Kg/M3 Tebal 25 mm x 1,2 m x 30 m BPA.46 roll 521,700.00 542,790.00 600,510.00 548,340.00 542,790.00 600,510.00 583,860.00
43 Nok genteng aspal BPA.47 buah 9,990.00 10,323.00 11,433.00 10,434.00 10,323.00 11,433.00 11,100.00
44 Nok genteng beton BPA.48 buah 25,530.00 26,640.00 28,860.00 26,640.00 26,640.00 28,860.00 28,860.00
45 Nok Genteng keramik glazur BPA.49 buah 31,080.00 32,301.00 32,301.00 32,634.00 34,188.00 35,742.00 34,743.00
46 Nok genteng metal BPA.50 buah 12,765.00 13,320.00 14,430.00 13,320.00 13,320.00 14,430.00 14,430.00
47 Nok paten 105 cm BPA.51 buah 13,320.00 13,320.00 15,540.00 14,430.00 13,320.00 15,540.00 14,430.00
48 Nok paten 108 cm BPA.52 buah 13,875.00 14,430.00 15,540.00 14,430.00 14,430.00 15,540.00 15,540.00
49 Nok paten 92 cm BPA.53 buah 11,655.00 12,210.00 13,320.00 12,210.00 12,210.00 13,320.00 13,320.00
50 Nok standar 18 x 40 cm BPA.54 buah 12,765.00 13,320.00 14,430.00 13,320.00 13,320.00 14,430.00 14,430.00
51 Rockwoll Blanket D. 40 Kg/M3 Tebal 50 mm x 0,6 m x 5 BPA.55 roll 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
m
52 Rooflight 90 x 180 BPA.56 lembar 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
53 Roofmesh 3315 : 1.8 x 30 m BPA.57 roll 304,140.00 316,350.00 349,650.00 319,680.00 316,350.00 349,650.00 340,770.00
54 Sirap kayu BPA.58 buah 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00

I BAHAN CAT DAN CAIRAN LAINNYA


1 Additive M67a liter 53,280.00 54,390.00 62,160.00 54,390.00 54,390.00 62,160.00 55,500.00
2 Aditif anti pengelupasan BC.1 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
3 Aditif pelunak BC.2 liter 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
4 Air BC.3 liter 72.00 74.00 82.00 75.00 74.00 82.00 80.00
5 Alang - Alang BC.4 buah 3,885.00 5,550.00 12,210.00 5,550.00 5,550.00 12,210.00 5,550.00
6 Anti strpping agent M66 liter 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
7 Assetilline M86 botol 255,300.00 256,410.00 264,180.00 256,410.00 256,410.00 264,180.00 257,520.00
8 Bensin Industri M20 liter 16,650.00 17,094.00 18,648.00 17,316.00 17,094.00 18,648.00 18,204.00
9 Bahan pengawet: kreosot M63 liter 5,550.00 6,660.00 14,430.00 6,660.00 6,660.00 14,430.00 7,770.00
10 Bensin Industri BC.5 liter 17,205.00 17,760.00 19,314.00 17,871.00 17,760.00 19,314.00 18,870.00
11 Bunker Oil M54 liter 16,650.00 17,760.00 25,530.00 17,760.00 17,760.00 25,530.00 18,870.00
12 Cairan Perekat (Epoxy Resin) M125 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
13 Cairan Perekat (Epoxy Resin) 2 komponen M166 liter 305,250.00 306,360.00 314,130.00 306,360.00 306,360.00 314,130.00 307,470.00
14 Cat M42 kg 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
15 Cat akhir dekoratif beton M201 kg 49,950.00 51,060.00 58,830.00 51,060.00 51,060.00 58,830.00 52,170.00
16 Cat akhir protektif baja M203 m2 72,150.00 73,260.00 81,030.00 73,260.00 73,260.00 81,030.00 74,370.00

A.2 - 36
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

17 Cat akhir protektif beton M200 kg 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
18 Cat akhir protektif kayu M225 kg 58,830.00 59,940.00 67,710.00 59,940.00 59,940.00 67,710.00 61,050.00
19 Cat Anti Karat M95 kg 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
20 Cat Besi BC.6 kg 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
21 Cat Dasar Alkali Sealer BC.7 liter 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
22 Cat dasar baja M202 kg 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
23 Cat dasar beton M199 kg 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
24 Cat dasar kayu M224 kg 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
25 Cat Kayu Transparan Melamine BC.8 liter 72,150.00 73,260.00 81,030.00 73,260.00 73,260.00 81,030.00 74,370.00
26 Cat Kilap untuk kayu BC.9 kg 58,830.00 59,940.00 67,710.00 59,940.00 59,940.00 67,710.00 61,050.00
27 Cat Lap. Tennis TNK - 1000 WA 5 Kg BC.10 Klg 88,800.00 89,910.00 97,680.00 89,910.00 89,910.00 97,680.00 91,020.00
28 Cat Marka (Non Thermoplas) M17a kg 88,800.00 89,910.00 97,680.00 89,910.00 89,910.00 97,680.00 91,020.00
29 Cat Marka (Thermoplastic) M17b kg 94,350.00 95,460.00 103,230.00 95,460.00 95,460.00 103,230.00 96,570.00
30 Cat Meni Besi BC.11 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
31 Cat Meni Kayu BC.12 kg 35,520.00 36,630.00 44,400.00 36,630.00 36,630.00 44,400.00 37,740.00
32 Cat Tembok Eksterior Mutu A BC.13 kg 133,200.00 134,310.00 142,080.00 134,310.00 134,310.00 142,080.00 135,420.00
33 Cat Tembok Interior Mutu A BC.14 kg 94,350.00 95,460.00 103,230.00 95,460.00 95,460.00 103,230.00 96,570.00
34 Cat Tembok Eksterior Mutu B BC.15 kg 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
35 Cat Tembok Interior Mutu B BC.16 kg 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
36 Cat Zincromate BC.17 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
37 Curing Compound M98 Ltr 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
38 Dempul 1 Kg BC.18 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
39 Dempul kayu BC.19 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
40 Kalkarium BC.20 kg 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
41 Kerosen / Minyak Tanah M11 liter 14,430.00 15,540.00 23,310.00 15,540.00 15,540.00 23,310.00 16,650.00
42 Kerosin BC.21 liter 14,430.00 15,540.00 23,310.00 15,540.00 15,540.00 23,310.00 16,650.00
43 Kreosol M197 kg 14,430.00 15,540.00 23,310.00 15,540.00 15,540.00 23,310.00 16,650.00
44 Melamine Lack BC.22 liter 116,550.00 117,660.00 125,430.00 117,660.00 117,660.00 125,430.00 118,770.00
45 Minyak Bekisting BC.23 liter 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
46 Minyak Cat 1 Kg BC.24 kaleng 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
47 Minyak Fluks M53 liter 16,650.00 17,760.00 25,530.00 17,760.00 17,760.00 25,530.00 18,870.00
48 Minyak pelumas BC.25 liter 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
49 Minyak Pelumas / Olie M22 liter 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
50 Oli SAE 20 BC.26 liter 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
51 Oli SAE 90 BC.27 liter 77,700.00 78,810.00 86,580.00 78,810.00 78,810.00 86,580.00 79,920.00

A.2 - 37
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

52 Olie BC.28 liter 54,279.00 56,388.00 62,382.00 56,943.00 56,388.00 62,382.00 60,717.00
53 Oxygen M87 botol 177,600.00 178,710.00 186,480.00 178,710.00 178,710.00 186,480.00 179,820.00
54 Petroleum jelly BC.29 kg 21,090.00 22,200.00 29,970.00 22,200.00 22,200.00 29,970.00 23,310.00
55 Plamir BC.30 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
56 Plamir kayu BC.31 kg 38,850.00 39,960.00 47,730.00 39,960.00 39,960.00 47,730.00 41,070.00
57 Polimer BC.32 kg 49,950.00 51,060.00 58,830.00 51,060.00 51,060.00 58,830.00 52,170.00
58 Politur BC.33 liter 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
59 Politur Transparan BC.34 liter 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
60 Polytene 125 mikron M97 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
61 Residu BC.35 kg 15,540.00 16,650.00 24,420.00 16,650.00 16,650.00 24,420.00 17,760.00
62 Solar industri M21 liter 21,090.00 21,534.00 23,088.00 21,756.00 21,534.00 23,088.00 22,644.00
63 Sabun BC.36 kg 27,750.00 28,860.00 36,630.00 28,860.00 28,860.00 36,630.00 29,970.00
64 Sending Sealer BC.38 liter 31,080.00 32,190.00 39,960.00 32,190.00 32,190.00 39,960.00 33,300.00
65 Soda api BC.39 liter 19,980.00 21,090.00 28,860.00 21,090.00 21,090.00 28,860.00 22,200.00
66 Solar industri BC.40 liter 21,090.00 21,534.00 23,088.00 21,756.00 21,534.00 23,088.00 22,644.00
67 Stempet BC.41 kg 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
68 Teak oil BC.42 liter 42,180.00 43,290.00 51,060.00 43,290.00 43,290.00 51,060.00 44,400.00
69 Ter BC.43 liter 18,870.00 19,980.00 27,750.00 19,980.00 19,980.00 27,750.00 21,090.00
70 Thinner M33 liter 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
71 Tyfo Epoxy S BC.44 kg 721,500.00 722,610.00 730,380.00 722,610.00 722,610.00 730,380.00 723,720.00
72 Tyfo Epoxy SW BC.45 kg 1,387,500.00 1,388,610.00 1,396,380.00 1,388,610.00 1,388,610.00 1,396,380.00 1,389,720.00
73 Tyfo SCH41 BC.46 m2 2,775,000.00 2,778,330.00 2,800,530.00 2,779,440.00 2,778,330.00 2,800,530.00 2,780,550.00
74 Tyfo SEH51A BC.47 m2 888,000.00 891,330.00 913,530.00 892,440.00 891,330.00 913,530.00 893,550.00
75 Vernis BC.48 liter 53,280.00 54,390.00 62,160.00 54,390.00 54,390.00 62,160.00 55,500.00
76 Wall Filler Decor DWF - 200 4 Kg BC.49 kg 144,300.00 145,410.00 153,180.00 145,410.00 145,410.00 153,180.00 146,520.00
77 Water Proofing 1 Kg BC.50 kaleng 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
78 WaterProofing Membrane sheet BC.51 m2 105,450.00 108,780.00 130,980.00 109,890.00 108,780.00 130,980.00 111,000.00
79 WaterProofing Sika 120 BC.52 kg 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
80 WaterProofing Sika Rain Tite Compound (Red & Grey) BC.53 kg 49,950.00 51,060.00 58,830.00 51,060.00 51,060.00 58,830.00 52,170.00
81 WaterProofing Sikaproof 400 SBS BC.54 kg 149,850.00 150,960.00 158,730.00 150,960.00 150,960.00 158,730.00 152,070.00
82 WaterProofing Sikaproof Primer BC.55 kg 55,500.00 56,610.00 64,380.00 56,610.00 56,610.00 64,380.00 57,720.00
83 WaterProofing Sikaset Accelerator Per Kg BC.56 kg 22,200.00 23,310.00 31,080.00 23,310.00 23,310.00 31,080.00 24,420.00
84 Wood filler BC.57 kg 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00

J BAHAN KACA PENGGANTUNG DAN PENGUNCI

A.2 - 38
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

1 Card Lock ( Card Issuer, Handset Program/Software, Key BKP.1 unit 1,720,500.00 1,726,050.00 1,763,790.00 1,727,160.00 1,726,050.00 1,763,790.00 1,729,380.00
Card )
2 Cylinder - BK - 60 mm - SN BKP.2 buah 149,850.00 152,070.00 167,610.00 152,070.00 152,070.00 167,610.00 153,180.00
3 Door closer BKP.3 buah 111,000.00 112,110.00 119,880.00 112,110.00 112,110.00 119,880.00 113,220.00
4 Door holder BKP.4 buah 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
5 Door stop BKP.5 buah 44,400.00 45,510.00 53,280.00 45,510.00 45,510.00 53,280.00 46,620.00
6 Door Viewer 200 C-PB BKP.6 buah 99,900.00 102,120.00 117,660.00 102,120.00 102,120.00 117,660.00 103,230.00
7 Engsel angin BKP.7 buah 44,400.00 46,620.00 57,720.00 46,620.00 46,620.00 57,720.00 46,620.00
8 Engsel kupu kupu BKP.8 buah 27,750.00 29,970.00 41,070.00 29,970.00 29,970.00 41,070.00 29,970.00
9 Engsel Kupu -Kupu 4" BKP.9 pasang 24,420.00 26,640.00 37,740.00 26,640.00 26,640.00 37,740.00 26,640.00
10 Engsel pintu BKP.10 buah 38,850.00 41,070.00 52,170.00 41,070.00 41,070.00 52,170.00 41,070.00
11 Engsel Standart Mutu A 3" BKP.11 pasang 31,080.00 33,300.00 44,400.00 33,300.00 33,300.00 44,400.00 33,300.00
12 Engsel Standart utu A 4" BKP.12 pasang 44,400.00 46,620.00 57,720.00 46,620.00 46,620.00 57,720.00 46,620.00
13 Engsel Laci BKP.13 set 29,970.00 32,190.00 43,290.00 32,190.00 32,190.00 43,290.00 32,190.00
14 Handle Laci BKP.14 buah 24,420.00 26,640.00 37,740.00 26,640.00 26,640.00 37,740.00 26,640.00
15 Rel Laci BKP.15 set 44,400.00 46,620.00 57,720.00 46,620.00 46,620.00 57,720.00 46,620.00
16 Escutheon - ESCN - DKS - SQ01 - SS BKP.16 buah 94,350.00 96,570.00 107,670.00 96,570.00 96,570.00 107,670.00 96,570.00
17 Flush Bolt - FB - Mico - 508 - NA BKP.17 buah 22,200.00 24,420.00 35,520.00 24,420.00 24,420.00 35,520.00 24,420.00
18 Grendel BKP.18 buah 36,630.00 38,850.00 49,950.00 38,850.00 38,850.00 49,950.00 38,850.00
19 Grendel Tanam BKP.19 buah 94,350.00 96,570.00 107,670.00 96,570.00 96,570.00 107,670.00 96,570.00
20 Hak Angin Kuningan 20 cm BKP.20 buah 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00
21 Handle Pintu Type HRE 75.01 BKP.21 buah 388,500.00 404,040.00 404,040.00 407,925.00 427,350.00 446,775.00 435,120.00
22 Handle 4" BKP.22 buah 25,530.00 27,750.00 38,850.00 27,750.00 27,750.00 38,850.00 27,750.00
23 Hinges - ES - S/S - EL - 4" x 3" x 2" mm - 2BB BKP.23 psg 88,800.00 91,020.00 102,120.00 91,020.00 91,020.00 102,120.00 91,020.00
24 Kaca Bening 3 mm BKP.24 m2 155,400.00 163,170.00 216,450.00 164,280.00 163,170.00 216,450.00 167,610.00
25 Kaca Bening 5 mm BKP.25 m2 222,000.00 233,100.00 308,580.00 235,320.00 233,100.00 308,580.00 239,760.00
26 Kaca Bening 8 mm BKP.26 m2 266,400.00 277,500.00 352,980.00 279,720.00 277,500.00 352,980.00 284,160.00
27 Kaca Bening 10 mm BKP.27 m2 344,100.00 357,420.00 448,440.00 359,640.00 357,420.00 448,440.00 365,190.00
28 Kaca Grafir 5 mm BKP.27.a m2 1,887,000.00 1,892,550.00 1,930,290.00 1,893,660.00 1,892,550.00 1,930,290.00 1,895,880.00
29 Kaca Patri tebal 5 mm BKP.28 m2 2,442,000.00 2,450,880.00 2,510,820.00 2,453,100.00 2,450,880.00 2,510,820.00 2,456,430.00
30 Kaca Penasap Grey 10 mm BKP.29 m2 475,635.00 494,616.00 546,897.00 499,389.00 494,616.00 546,897.00 532,689.00
31 Kaca Penasap Grey 6 mm BKP.30 m2 339,660.00 353,202.00 390,609.00 356,643.00 353,202.00 390,609.00 380,397.00
32 Kaca Penasap Grey 8 mm BKP.31 m2 407,592.00 423,798.00 468,642.00 427,905.00 423,798.00 468,642.00 456,432.00
33 Kaca Rayband 3 mm BKP.32 m2 138,750.00 144,300.00 182,040.00 145,410.00 144,300.00 182,040.00 147,630.00
34 Kaca Rayband 5 mm BKP.33 m2 199,800.00 208,680.00 268,620.00 210,900.00 208,680.00 268,620.00 214,230.00

A.2 - 39
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

35 Kaca Rayben 8 mm BKP.33.a m2 249,750.00 260,850.00 336,330.00 263,070.00 260,850.00 336,330.00 267,510.00
36 Kaca Rayben 10 mm BKP.33.b m2 333,000.00 346,320.00 437,340.00 348,540.00 346,320.00 437,340.00 354,090.00
37 Kaca Tempered Tinted/ Panasap 5 mm BKP.33.c m2 488,400.00 495,060.00 540,570.00 496,170.00 495,060.00 540,570.00 499,500.00
38 Kaca Tempered Tinted/ Panasap 8 mm BKP.33.d m2 865,800.00 875,790.00 943,500.00 878,010.00 875,790.00 943,500.00 881,340.00
39 Kaca Tempered Tinted/ Panasap 10 mm BKP.34 m2 1,082,250.00 1,093,350.00 1,168,830.00 1,095,570.00 1,093,350.00 1,168,830.00 1,100,010.00
40 Kaca Tempered Tinted/ Panasap 12 mm BKP.34.a m2 1,320,900.00 1,335,330.00 1,433,010.00 1,338,660.00 1,335,330.00 1,433,010.00 1,344,210.00
41 Kaca wireglassed tebal 5 mm BKP.35 m2 277,500.00 284,160.00 329,670.00 285,270.00 284,160.00 329,670.00 288,600.00
42 Kait angin BKP.36 buah 16,650.00 17,760.00 25,530.00 17,760.00 17,760.00 25,530.00 18,870.00
43 Kunci lemari BKP.37 buah 39,960.00 42,180.00 53,280.00 42,180.00 42,180.00 53,280.00 42,180.00
44 Kunci Pintu Besar Standart 1 x slag BKP.38 set 199,800.00 202,020.00 213,120.00 202,020.00 202,020.00 213,120.00 202,020.00
45 Kunci Pintu Besar Standart 2 x slag BKP.39 set 188,700.00 190,920.00 202,020.00 190,920.00 190,920.00 202,020.00 190,920.00
46 Kunci Pintu Kecil Standart 1 x slag BKP.40 set 111,000.00 113,220.00 124,320.00 113,220.00 113,220.00 124,320.00 113,220.00
47 Kunci Pintu Kecil Standart 2 x slag BKP.41 set 149,850.00 152,070.00 163,170.00 152,070.00 152,070.00 163,170.00 152,070.00
48 Kunci silinder BKP.42 buah 66,600.00 68,820.00 79,920.00 68,820.00 68,820.00 79,920.00 68,820.00
49 Kunci slot BKP.43 buah 21,090.00 23,310.00 34,410.00 23,310.00 23,310.00 34,410.00 23,310.00
50 Kunci tanam BKP.44 buah 61,050.00 62,160.00 69,930.00 62,160.00 62,160.00 69,930.00 63,270.00
51 Kunci tanam kamar mandi BKP.45 buah 94,350.00 95,460.00 103,230.00 95,460.00 95,460.00 103,230.00 96,570.00
52 Profil kaca BKP.46 M 16,650.00 18,870.00 29,970.00 18,870.00 18,870.00 29,970.00 18,870.00
53 Rel pintu sorong BKP.47 buah 166,500.00 168,720.00 179,820.00 168,720.00 168,720.00 179,820.00 168,720.00
54 Sealent BKP.48 tube 36,630.00 37,740.00 45,510.00 37,740.00 37,740.00 45,510.00 38,850.00
55 Selinder type 08510 BKP.49 buah 333,000.00 346,320.00 346,320.00 349,650.00 366,300.00 382,950.00 372,960.00
56 Spring knip BKP.50 buah 66,600.00 67,710.00 75,480.00 67,710.00 67,710.00 75,480.00 68,820.00
57 Stiker kaca sanblast uk 90 cm x 50 cm BKP.51 pcs 22,200.00 23,310.00 31,080.00 23,310.00 23,310.00 31,080.00 24,420.00
58 Stiker kaca sanblast uk 120 cm x 50 cm BKP.52 pcs 33,300.00 34,410.00 42,180.00 34,410.00 34,410.00 42,180.00 35,520.00

K BAHAN SANITAIR
1 Bak air fiberglass 120 ltr BSR.1 buah 499,500.00 2,119,878.00 2,344,098.00 2,140,302.00 2,119,878.00 2,344,098.00 2,282,937.00
2 Bak Cuci Piring Almunium, Lubang 1 BSR.2 buah 388,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
3 Bak Cuci Piring Almunium, Lubang 2 BSR.3 buah 865,800.00 900,432.00 995,670.00 909,090.00 900,432.00 995,670.00 969,696.00
4 Bak cuci piring stainless steel BSR.4 buah 1,110,000.00 1,154,400.00 1,276,500.00 1,165,500.00 1,154,400.00 1,276,500.00 1,243,200.00
5 Bak cuci piring teraso BSR.5 buah 666,000.00 282,495.00 312,465.00 285,270.00 282,495.00 312,465.00 304,251.00
6 Bak Mandi Viber 220 ltr BSR.6 buah 721,500.00 494,616.00 546,897.00 499,389.00 494,616.00 546,897.00 532,689.00
7 Bathtub porselen BSR.7 buah 7,215,000.00 4,040,400.00 4,467,750.00 4,079,250.00 4,040,400.00 4,467,750.00 4,351,200.00
8 Bathup W / Apported Anti Selip ( 1700 x 800 x 410 ) BSR.8 buah 6,882,000.00 6,165,717.00 6,817,842.00 6,224,991.00 6,165,717.00 6,817,842.00 6,640,020.00
9 Bathup w / Apported Anti Selip 9 1700 x 700 x 390 ) + 4 BSR.9 buah 5,661,000.00 3,676,764.00 4,065,597.00 3,712,062.00 3,676,764.00 4,065,597.00 3,959,592.00

A.2 - 40
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

10 Closet Duduk Standar BSR.10 buah 3,441,000.00 3,174,600.00 3,510,375.00 3,205,125.00 3,174,600.00 3,510,375.00 3,418,800.00
11 Closet Jongkok Keramik BSR.11 buah 277,500.00 259,740.00 287,157.00 262,182.00 259,740.00 287,157.00 279,720.00
12 Closet Jongkok Porselen BSR.12 buah 305,250.00 308,247.00 340,881.00 311,244.00 308,247.00 340,881.00 332,001.00
13 Closet Jongkok Teraso BSR.13 buah 210,900.00 183,483.00 202,908.00 185,259.00 183,483.00 202,908.00 197,580.00
14 Grease Trap PVC BSR.14 buah 888,000.00 943,500.00 1,110,000.00 999,000.00 943,500.00 1,110,000.00 1,054,500.00
15 Fiberglass 1 m3 BSR.15 buah 2,109,000.00 2,119,878.00 2,344,098.00 2,140,302.00 2,119,878.00 2,344,098.00 2,282,937.00
16 Floor drain BSR.16 buah 83,250.00 70,596.00 78,033.00 71,262.00 70,596.00 78,033.00 76,035.00
17 Floordrain Type TX 1 BN BSR.17 buah 360,750.00 373,071.00 412,476.00 376,623.00 373,071.00 412,476.00 401,709.00
18 Grab Bar TX 3 A1 BSR.18 buah 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
19 Head Shower Type TX 436 S BSR.19 buah 499,500.00 461,760.00 510,600.00 466,200.00 461,760.00 510,600.00 497,280.00
20 Jet Washer ex - Toto type TB 19 CSN CR BSR.20 buah 188,700.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
21 Kaca Cermin Wastafel t = 5 mm BSR.22 buah 360,750.00 375,180.00 414,807.00 378,732.00 375,180.00 414,807.00 404,040.00
22 Klep diameter 3/4 m' BSR.23 buah 139,860.00 145,410.00 145,410.00 146,853.00 153,846.00 160,839.00 156,621.00
23 Klosed duduk Type CW 420 J / SW 420 JP BSR.24 buah 3,274,500.00 3,059,160.00 3,382,725.00 3,088,575.00 3,059,160.00 3,382,725.00 3,294,480.00
24 Kran Air Galvanis Ukuran 3/4 " BSR.26 buah 55,500.00 57,720.00 63,825.00 58,275.00 57,720.00 63,825.00 62,160.00
25 Kran Air Steinliss Ukuran 1/2 " BSR.27 buah 83,250.00 63,492.00 70,152.00 64,047.00 63,492.00 70,152.00 68,376.00
26 Kran Air Steinliss Ukuran 3/4 " BSR.28 buah 99,900.00 75,036.00 82,917.00 75,702.00 75,036.00 82,917.00 80,808.00
27 Kran Bebek Steinliss BSR.29 buah 305,250.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
28 Kran dinding type T 23 B13V7N BSR.30 buah 222,000.00 230,880.00 230,880.00 233,100.00 244,200.00 255,300.00 248,640.00
29 Kran Shoower Steinliss BSR.31 buah 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
30 Kran Washtafel Steinliss BSR.32 buah 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
31 Paper Holder Type TX 703 AC BSR.34 buah 471,750.00 484,959.00 536,241.00 489,621.00 484,959.00 536,241.00 522,255.00
32 Pelampung otomatis BSR.35 buah 88,800.00 92,352.00 92,352.00 93,240.00 97,680.00 102,120.00 99,456.00
33 Roof Drain Metal BSR.36 buah 209,790.00 218,115.00 218,115.00 220,224.00 230,769.00 241,203.00 234,876.00
34 Septik Tank Individu 0.6 m3 (5 Jiwa) Material PVC BSR.37 unit 3,885,000.00 4,107,000.00 4,218,000.00 4,107,000.00 4,218,000.00 4,440,000.00 4,551,000.00
35 Septik Tank Individu 0.8 m3 (5 Jiwa) Material PVC BSR.38 unit 4,440,000.00 4,662,000.00 4,773,000.00 4,662,000.00 4,773,000.00 4,995,000.00 5,106,000.00
36 Septik Tank Individu 1 m3 (5 Jiwa) Material PVC BSR.39 unit 4,995,000.00 5,217,000.00 5,328,000.00 5,217,000.00 5,328,000.00 5,550,000.00 5,661,000.00
37 Septik Tank Komunal 3 M3 (25 Jiwa) Material PVC BSR.40 unit 27,750,000.00 29,415,000.00 29,970,000.00 29,415,000.00 29,970,000.00 32,190,000.00 33,300,000.00
38 IPAL Domestik 30 M3 (250 Jiwa) Material PVC BSR.41 unit 177,600,000.00 194,250,000.00 205,350,000.00 194,250,000.00 205,350,000.00 210,900,000.00 222,000,000.00
39 Septik Tank Individu 0.6 m3 (5 Jiwa) Material HDPE BSR.42 unit 4,662,000.00 4,884,000.00 4,995,000.00 4,884,000.00 4,995,000.00 5,217,000.00 5,328,000.00
40 Septik Tank Individu 0.8 m3 (5 Jiwa) Material HDPE BSR.43 unit 5,550,000.00 5,772,000.00 5,883,000.00 5,772,000.00 5,883,000.00 6,105,000.00 6,216,000.00
41 Septik Tank Individu 1 m3 (5 Jiwa) Material HDPE BSR.44 unit 6,660,000.00 6,882,000.00 6,993,000.00 6,882,000.00 6,993,000.00 7,215,000.00 7,326,000.00
42 Septik Tank Komunal 3 m3 (25 Jiwa) Material HDPE BSR.45 unit 31,080,000.00 32,745,000.00 33,300,000.00 32,745,000.00 33,300,000.00 35,520,000.00 36,630,000.00
43 Septik Tank Komunal 6 m3 (50 Jiwa) Material HDPE BSR.46 unit 55,500,000.00 57,165,000.00 57,720,000.00 57,165,000.00 57,720,000.00 59,940,000.00 61,050,000.00
44 IPAL Domestik (250 Jiwa) Material HDPE BSR.47 unit 222,000,000.00 238,650,000.00 249,750,000.00 238,650,000.00 249,750,000.00 255,300,000.00 266,400,000.00

A.2 - 41
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

45 Shower curtain BSR.48 buah 249,750.00 254,856.00 281,829.00 257,298.00 254,856.00 281,829.00 274,392.00
46 Shower Tray (komplit) BSR.51 buah 4,440,000.00 4,617,600.00 5,106,000.00 4,662,000.00 4,617,600.00 5,106,000.00 4,972,800.00
47 Singel Lever Shower Mixer Type TX 405 SJ BSR.52 buah 999,000.00 1,038,960.00 1,148,850.00 1,048,950.00 1,038,960.00 1,148,850.00 1,118,880.00
48 Soap Holder BSR.53 buah 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
49 Tandon Air 1.000 Ltr BSR.55 buah 1,387,500.00 1,443,000.00 1,595,625.00 1,456,875.00 1,443,000.00 1,595,625.00 1,554,000.00
50 Tandon Air 1.200 Ltr BSR.56 buah 1,943,277.00 2,020,977.00 2,234,763.00 2,040,402.00 2,020,977.00 2,234,763.00 2,176,377.00
51 Tandon Air 2.200 Ltr BSR.57 buah 4,185,588.00 4,352,976.00 4,813,404.00 4,394,823.00 4,352,976.00 4,813,404.00 4,687,752.00
52 Tandon Air 650 Ltr BSR.59 buah 1,216,227.00 1,264,845.00 1,398,600.00 1,276,944.00 1,264,845.00 1,398,600.00 1,362,081.00
53 Tandon Air 5.200 Ltr BSR.60 buah 8,819,727.00 9,172,485.00 10,142,625.00 9,260,619.00 9,172,485.00 10,142,625.00 9,878,001.00
54 Urinoir BSR.63 set 1,609,500.00 9,172,485.00 10,142,625.00 9,260,619.00 9,172,485.00 10,142,625.00 9,878,001.00
55 Mesin Jet Pump kap.250 BSR.65 unit 3,496,500.00 3,636,360.00 3,636,360.00 3,671,325.00 3,846,150.00 4,020,975.00 3,916,080.00
56 Mesin Pompa tekan kap. 150 watt BSR.66 unit 1,942,500.00 2,020,200.00 2,020,200.00 2,039,625.00 2,136,750.00 2,233,875.00 2,175,600.00
57 Wastafel Under Counter Type L 546 BSR.67 buah 1,720,500.00 3,212,118.00 3,551,778.00 3,242,976.00 3,212,118.00 3,551,778.00 3,459,204.00
58 Waterdrain BSR.69 buah 77,700.00 1,766,565.00 1,953,378.00 1,783,548.00 1,766,565.00 1,953,378.00 1,902,429.00

L BAHAN PIPA
Pipa PVC Type AW
1 PIPA PVC AW diameter 1 1/2" BPP.1 batang 79,920.00 83,028.00 91,908.00 83,916.00 83,028.00 91,908.00 89,466.00
2 PIPA PVC AW diameter 1 1/4" BPP.2 batang 67,710.00 70,374.00 77,811.00 71,040.00 70,374.00 77,811.00 75,813.00
3 PIPA PVC AW diameter 1" BPP.3 batang 46,620.00 48,396.00 53,613.00 48,951.00 48,396.00 53,613.00 52,170.00
4 PIPA PVC AW diameter 1/2" BPP.4 batang 25,530.00 26,529.00 29,304.00 26,751.00 26,529.00 29,304.00 28,527.00
5 PIPA PVC AW diameter 2 1/2" BPP.5 batang 133,200.00 138,528.00 153,180.00 139,860.00 138,528.00 153,180.00 149,184.00
6 PIPA PVC AW diameter 2" BPP.6 batang 105,450.00 109,668.00 121,212.00 110,667.00 109,668.00 121,212.00 118,104.00
7 PIPA PVC AW diameter 3" BPP.7 batang 188,700.00 196,248.00 217,005.00 198,135.00 196,248.00 217,005.00 211,344.00
8 PIPA PVC AW diameter 3/4" BPP.8 batang 31,080.00 32,301.00 35,742.00 32,634.00 32,301.00 35,742.00 34,743.00
9 PIPA PVC AW diameter 4" BPP.9 batang 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
10 PIPA PVC AW diameter 5" BPP.10 batang 538,350.00 559,884.00 619,047.00 565,212.00 559,884.00 619,047.00 602,952.00
11 PIPA PVC AW diameter 6" BPP.11 batang 660,006.00 686,313.00 758,907.00 692,973.00 686,313.00 758,907.00 739,149.00
12 Pipa PVC AW diameter 8" BPP.12 batang 1,311,687.00 1,364,079.00 1,442,889.00 1,377,177.00 1,442,889.00 1,508,379.00 1,468,974.00
13 Pipa PVC AW diameter 10" BPP.13 batang 2,028,192.00 2,109,333.00 2,231,100.00 2,129,535.00 2,231,100.00 2,332,332.00 2,271,615.00
14 Pipa PVC AW diameter 12" BPP.14 batang 2,859,915.00 2,974,245.00 3,145,851.00 3,002,772.00 3,145,851.00 3,288,819.00 3,203,016.00

Pipa Galvanis
1 Pipa galvanis diameter 1/2" BPP.15 batang 210,900.00 219,336.00 242,535.00 221,445.00 219,336.00 242,535.00 236,208.00
2 Pipa galvanis diameter 3/4" BPP.16 batang 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00

A.2 - 42
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

3 Pipa galvanis diameter 1" BPP.17 batang 355,200.00 369,408.00 408,480.00 372,960.00 369,408.00 408,480.00 397,824.00
4 Pipa galvanis diameter 1 1/2" BPP.18 batang 582,750.00 606,060.00 670,107.00 611,832.00 606,060.00 670,107.00 652,680.00
5 Pipa galvanis diameter 2" BPP.19 batang 826,950.00 860,028.00 950,937.00 868,242.00 860,028.00 950,937.00 926,184.00
6 Pipa galvanis diameter 3" BPP.20 batang 1,498,500.00 1,558,440.00 1,723,275.00 1,573,425.00 1,558,440.00 1,723,275.00 1,678,320.00
7 Pipa galvanis diameter 4" BPP.21 batang 2,164,500.00 2,251,080.00 2,489,175.00 2,272,725.00 2,251,080.00 2,489,175.00 2,424,240.00
8 Pipa Baja M52 kg 29,138.00 30,303.00 33,411.00 30,525.00 30,303.00 33,411.00 32,634.00
9 Pipa Galvanis Dia 1,5" M24b m 62,438.00 64,935.00 71,706.00 65,490.00 64,935.00 71,706.00 69,930.00
10 Pipa Galvanis Dia 3" M24a m 124,875.00 129,870.00 143,523.00 131,091.00 129,870.00 143,523.00 139,860.00
11 Pipa Galvanis Dia. 1.6" M24 batang 249,750.00 259,740.00 287,157.00 262,182.00 259,740.00 287,157.00 279,720.00
12 Pipa Porus M25 m' 105,450.00 109,668.00 121,212.00 110,667.00 109,668.00 121,212.00 118,104.00

Pipa Ø Jenis GIV Medium A


1 PIPA GIV Medium A diameter 500 mm BPP.22 m 1,946,496.00 2,050,614.00 2,107,890.00 2,107,890.00 2,224,662.00 2,294,925.00 2,207,457.00
2 PIPA GIV Medium A diameter 450 mm BPP.23 m 1,844,043.00 1,942,722.00 1,997,001.00 1,997,001.00 2,107,668.00 2,174,157.00 2,091,240.00
3 PIPA GIV Medium A diameter 400 mm BPP.24 m 1,782,660.00 1,877,898.00 1,930,401.00 1,930,401.00 2,037,405.00 2,101,674.00 2,021,532.00
4 PIPA GIV Medium A diameter 350 mm BPP.25 m 1,680,207.00 1,770,006.00 1,819,512.00 1,819,512.00 1,920,300.00 1,980,906.00 1,905,315.00
5 PIPA GIV Medium A diameter 300 mm BPP.26 m 1,608,390.00 1,694,415.00 1,741,812.00 1,741,812.00 1,838,271.00 1,896,324.00 1,824,063.00
6 PIPA GIV Medium A diameter 250 mm BPP.27 m 1,567,431.00 1,651,236.00 1,697,412.00 1,697,412.00 1,791,429.00 1,848,039.00 1,777,554.00
7 PIPA GIV Medium A diameter 200 mm BPP.28 m 1,495,725.00 1,575,756.00 1,619,823.00 1,619,823.00 1,709,511.00 1,763,457.00 1,696,191.00
8 PIPA GIV Medium A diameter 150 mm BPP.29 m 1,270,395.00 1,338,327.00 1,375,734.00 1,375,734.00 1,451,880.00 1,497,723.00 1,440,669.00
9 PIPA GIV Medium A diameter 100 mm BPP.30 m 817,515.00 861,249.00 885,336.00 885,336.00 934,398.00 963,813.00 927,072.00
10 PIPA GIV Medium A diameter 75 mm BPP.31 m 737,595.00 777,111.00 798,756.00 798,756.00 843,045.00 869,685.00 836,496.00
11 PIPA GIV Medium A diameter 50 mm BPP.32 m 307,359.00 323,787.00 332,778.00 332,778.00 351,315.00 362,304.00 348,540.00
12 PIPA GIV Medium A diameter 40 mm BPP.33 m 172,161.00 181,263.00 186,369.00 186,369.00 196,692.00 202,908.00 195,138.00
13 PIPA GIV Medium A diameter 25 mm BPP.34 m 79,920.00 84,138.00 86,580.00 86,580.00 91,353.00 94,239.00 90,576.00
14 PIPA GIV Medium A diameter 20 mm BPP.35 m 71,151.00 74,925.00 77,034.00 77,034.00 81,252.00 83,805.00 80,586.00
15 PIPA GIV Medium A diameter 12,5 mm BPP.36 m 45,066.00 47,508.00 48,840.00 48,840.00 51,504.00 53,169.00 51,171.00

Pipa Ø HDPE SDR 17 PN 10


1 PIPA HDPE SDR 17 PN 10 diameter 500 mm BPP.37 m 8,144,625.00 8,580,189.00 8,819,949.00 8,819,949.00 9,308,682.00 9,602,388.00 9,236,310.00
2 PIPA HDPE SDR 17 PN 10 diameter 450 mm BPP.38 m 6,761,565.00 7,123,203.00 7,322,226.00 7,322,226.00 7,727,931.00 7,971,798.00 7,667,880.00
3 PIPA HDPE SDR 17 PN 10 diameter 400 mm BPP.39 m 5,327,334.00 5,612,160.00 5,769,003.00 5,769,003.00 6,088,683.00 6,280,824.00 6,041,397.00
4 PIPA HDPE SDR 17 PN 10 diameter 355 mm BPP.40 m 4,097,898.00 4,317,123.00 4,437,780.00 4,437,780.00 4,683,645.00 4,831,386.00 4,647,237.00
5 PIPA HDPE SDR 17 PN 10 diameter 315 mm BPP.41 m 3,380,838.00 3,561,546.00 3,661,113.00 3,661,113.00 3,864,021.00 3,985,899.00 3,833,940.00
6 PIPA HDPE SDR 17 PN 10 diameter 250 mm BPP.42 m 2,069,484.00 2,180,151.00 2,241,090.00 2,241,090.00 2,365,188.00 2,439,891.00 2,346,873.00

A.2 - 43
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

7 PIPA HDPE SDR 17 PN 10 diameter 200 mm BPP.43 m 1,413,807.00 1,489,398.00 1,531,023.00 1,531,023.00 1,615,827.00 1,666,887.00 1,603,284.00
8 PIPA HDPE SDR 17 PN 10 diameter 160 mm BPP.44 m 907,647.00 956,265.00 982,905.00 982,905.00 1,037,406.00 1,070,151.00 1,029,303.00
9 PIPA HDPE SDR 17 PN 10 diameter 110 mm BPP.45 m 430,236.00 453,324.00 465,978.00 465,978.00 491,730.00 507,270.00 487,956.00
10 PIPA HDPE SDR 17 PN 10 diameter 75 mm BPP.46 m 194,694.00 205,017.00 210,789.00 210,789.00 222,444.00 229,437.00 220,779.00
11 PIPA HDPE SDR 17 PN 10 diameter 50 mm BPP.47 m 114,552.00 120,657.00 123,987.00 123,987.00 130,869.00 135,087.00 129,870.00
12 PIPA HDPE SDR 17 PN 10 diameter 40 mm BPP.48 m 58,830.00 61,938.00 63,714.00 63,714.00 67,155.00 69,375.00 66,711.00
13 PIPA HDPE SDR 17 PN 10 diameter 25 mm BPP.49 m 32,190.00 33,855.00 34,854.00 34,854.00 36,741.00 37,962.00 36,519.00

Pipa Ø PVC RRJ S. 12,5


1 Pipa PVC RRJ S. 12,5 diameter 300 mm BPP.50 m 706,404.00 744,144.00 764,901.00 764,901.00 807,303.00 832,833.00 800,976.00
2 Pipa PVC RRJ S. 12,5 diameter 250 mm BPP.51 m 548,340.00 624,486.00 645,132.00 645,132.00 701,742.00 740,370.00 740,370.00
3 Pipa PVC RRJ S. 12,5 diameter 200 mm BPP.52 m 437,229.00 460,650.00 473,526.00 473,526.00 499,722.00 515,484.00 495,837.00
4 Pipa PVC RRJ S. 12,5 diameter 150 mm BPP.53 m 304,140.00 320,457.00 329,337.00 329,337.00 347,652.00 358,530.00 344,877.00
5 Pipa PVC RRJ S. 12,5 diameter 100 mm BPP.54 m 258,519.00 272,283.00 279,942.00 279,942.00 295,371.00 304,695.00 293,151.00
6 Pipa PVC RRJ S. 12,5 diameter 75 mm BPP.55 m 152,292.00 160,395.00 164,835.00 164,835.00 174,048.00 179,487.00 172,605.00
7 Pipa PVC RRJ S. 12,5 diameter 50 mm BPP.56 m 77,922.00 82,029.00 84,360.00 84,360.00 89,022.00 91,797.00 88,356.00
8 Pipa PVC RRJ S. 12,5 diameter 40 mm BPP.57 m 46,065.00 48,507.00 49,839.00 49,839.00 52,614.00 54,279.00 52,170.00
9 Pipa PVC RRJ S. 12,5 diameter 25 mm BPP.58 m 26,529.00 27,972.00 28,749.00 28,749.00 30,303.00 31,302.00 30,081.00

Pipa Ø PVC SC S. 12,5


1 Pipa PVC SC S. 12,5 diamater 300 mm BPP.59 m 706,404.00 744,144.00 764,901.00 764,901.00 807,303.00 832,833.00 800,976.00
2 Pipa PVC SC S. 12,5 diamater 250 mm BPP.60 m 548,340.00 624,486.00 645,132.00 645,132.00 701,742.00 740,370.00 740,370.00
3 Pipa PVC SC S. 12,5 diamater 200 mm BPP.61 m 437,229.00 460,650.00 473,526.00 473,526.00 499,722.00 515,484.00 495,837.00
4 Pipa PVC SC S. 12,5 diamater 150 mm BPP.62 m 302,697.00 318,903.00 327,783.00 327,783.00 345,987.00 356,865.00 343,323.00
5 Pipa PVC SC S. 12,5 diamater 100 mm BPP.63 m 258,519.00 272,283.00 279,942.00 279,942.00 295,371.00 304,695.00 293,151.00
6 Pipa PVC SC S. 12,5 diamater 75 mm BPP.64 m 152,403.00 160,617.00 165,057.00 165,057.00 174,159.00 179,709.00 172,827.00
7 Pipa PVC SC S. 12,5 diamater 50 mm BPP.65 m 77,922.00 82,029.00 84,360.00 84,360.00 89,022.00 91,797.00 88,356.00
8 Pipa PVC SC S. 12,5 diamater 40 mm BPP.66 m 46,065.00 48,507.00 49,839.00 49,839.00 52,614.00 54,279.00 52,170.00
9 Pipa PVC SC S. 12,5 diamater 25 mm BPP.67 m 26,529.00 27,972.00 28,749.00 28,749.00 30,303.00 31,302.00 30,081.00
10 Pipa PVC SC S. 12,5 diamater 20 mm BPP.68 m 15,984.00 16,761.00 17,205.00 17,205.00 18,204.00 18,759.00 18,093.00
11 Pipa PVC SC S. 12,5 diamater 12,5 mm BPP.69 m 10,656.00 11,211.00 11,544.00 11,544.00 12,099.00 12,543.00 12,099.00

Gate Valve CI
1 Gate Valve CI diameter 500 mm BPP.70 buah 92,203,815.00 97,134,213.00 99,849,051.00 99,849,051.00 105,381,291.00 108,706,629.00 104,561,667.00
2 Gate Valve CI diameter 450 mm BPP.71 buah 79,910,010.00 84,182,955.00 86,535,822.00 86,535,822.00 91,330,467.00 94,212,360.00 90,620,178.00

A.2 - 44
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

3 Gate Valve CI diameter 400 mm BPP.72 buah 64,542,726.00 67,993,938.00 69,894,369.00 69,894,369.00 73,766,937.00 76,094,607.00 73,193,178.00
4 Gate Valve CI diameter 350 mm BPP.73 buah 51,634,092.00 54,395,106.00 55,915,473.00 55,915,473.00 59,013,483.00 60,875,730.00 58,554,609.00
5 Gate Valve CI diameter 300 mm BPP.74 buah 35,856,996.00 37,774,410.00 38,830,242.00 38,830,242.00 40,981,644.00 42,274,794.00 40,662,852.00
6 Gate Valve CI diameter 250 mm BPP.75 buah 27,456,294.00 28,924,380.00 29,732,793.00 29,732,793.00 31,380,255.00 32,370,375.00 31,136,166.00
7 Gate Valve CI diameter 200 mm BPP.76 buah 18,850,575.00 19,858,566.00 20,413,566.00 20,413,566.00 21,544,656.00 22,224,420.00 21,377,046.00
8 Gate Valve CI diameter 150 mm BPP.77 buah 14,855,019.00 15,649,446.00 16,086,786.00 16,086,786.00 16,978,116.00 17,513,802.00 16,846,026.00
9 Gate Valve CI diameter 100 mm BPP.78 buah 8,195,907.00 8,634,135.00 8,875,449.00 8,875,449.00 9,367,179.00 9,662,772.00 9,294,363.00
10 Gate Valve CI diameter 75 mm BPP.79 buah 5,122,428.00 5,396,376.00 5,547,225.00 5,547,225.00 5,854,473.00 6,039,288.00 5,808,963.00
11 Gate Valve CI diameter 50 mm BPP.80 buah 3,893,103.00 4,101,228.00 4,215,891.00 4,215,891.00 4,449,435.00 4,589,850.00 4,414,803.00

Butterfly Valve CI
1 Butterfly Valve CI diameter 300 mm BPP.81 buah 14,826,381.00 15,619,143.00 16,055,706.00 16,055,706.00 16,945,260.00 17,480,058.00 16,813,503.00
2 Butterfly Valve CI diameter 250 mm BPP.82 buah 12,834,819.00 13,521,132.00 13,898,976.00 13,898,976.00 14,669,094.00 15,131,964.00 14,554,986.00
3 Butterfly Valve CI diameter 200 mm BPP.83 buah 10,179,255.00 10,723,599.00 11,023,299.00 11,023,299.00 11,634,132.00 12,001,209.00 11,543,667.00
4 Butterfly Valve CI diameter 150 mm BPP.84 buah 7,855,803.00 8,275,827.00 8,507,151.00 8,507,151.00 8,978,457.00 9,261,840.00 8,908,638.00
5 Butterfly Valve CI diameter 100 mm BPP.85 buah 4,204,458.00 4,429,344.00 4,553,109.00 4,553,109.00 4,805,412.00 4,957,038.00 4,768,005.00
6 Butterfly Valve CI diameter 75 mm BPP.86 buah 2,876,787.00 3,030,633.00 3,115,326.00 3,115,326.00 3,287,931.00 3,391,605.00 3,262,290.00
7 Butterfly Valve CI diameter 50 mm BPP.87 buah 2,124,429.00 2,237,982.00 2,300,475.00 2,300,475.00 2,428,014.00 2,504,604.00 2,409,144.00

Check Valve CI
1 Check Valve CI diameter 300 mm BPP.88 buah 16,596,720.00 17,484,165.00 17,972,787.00 17,972,787.00 18,968,679.00 19,567,191.00 18,821,160.00
2 Check Valve CI diameter 250 mm BPP.89 buah 14,137,959.00 14,893,869.00 15,310,230.00 15,310,230.00 16,158,492.00 16,668,315.00 16,032,840.00
3 Check Valve CI diameter 200 mm BPP.90 buah 11,884,104.00 12,519,468.00 12,869,451.00 12,869,451.00 13,582,515.00 14,011,086.00 13,476,843.00
4 Check Valve CI diameter 150 mm BPP.91 buah 9,425,232.00 9,929,283.00 10,206,783.00 10,206,783.00 10,772,328.00 11,112,210.00 10,688,523.00
5 Check Valve CI diameter 100 mm BPP.92 buah 7,171,377.00 7,554,882.00 7,766,004.00 7,766,004.00 8,196,351.00 8,454,981.00 8,132,526.00
6 Check Valve CI diameter 75 mm BPP.93 buah 3,893,103.00 4,101,228.00 4,215,891.00 4,215,891.00 4,449,435.00 4,589,850.00 4,414,803.00
7 Check Valve CI diameter 50 mm BPP.94 buah 2,663,667.00 2,806,080.00 2,884,557.00 2,884,557.00 3,044,397.00 3,140,412.00 3,020,643.00

Flange Socked PVC


1 Flange Socked PVC diameter 500 mm BPP.95 buah 2,622,708.00 2,762,901.00 2,840,157.00 2,840,157.00 2,997,555.00 3,092,127.00 2,974,245.00
2 Flange Socked PVC diameter 450 mm BPP.96 buah 2,376,843.00 2,503,938.00 2,573,868.00 2,573,868.00 2,716,503.00 2,802,195.00 2,695,413.00
3 Flange Socked PVC diameter 400 mm BPP.97 buah 2,048,949.00 2,158,506.00 2,218,890.00 2,218,890.00 2,341,767.00 2,415,693.00 2,323,563.00
4 Flange Socked PVC diameter 350 mm BPP.98 buah 1,946,496.00 2,050,614.00 2,107,890.00 2,107,890.00 2,224,662.00 2,294,925.00 2,207,457.00
5 Flange Socked PVC diameter 300 mm BPP.99 buah 1,782,660.00 1,877,898.00 1,930,401.00 1,930,401.00 2,037,405.00 2,101,674.00 2,021,532.00
6 Flange Socked PVC diameter 250 mm BPP.100 buah 1,536,684.00 1,618,935.00 1,664,112.00 1,664,112.00 1,756,353.00 1,811,742.00 1,742,700.00

A.2 - 45
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

7 Flange Socked PVC diameter 200 mm BPP.101 buah 1,434,231.00 1,510,932.00 1,553,223.00 1,553,223.00 1,639,248.00 1,690,974.00 1,626,483.00
8 Flange Socked PVC diameter 150 mm BPP.102 buah 922,077.00 971,361.00 998,445.00 998,445.00 1,053,834.00 1,087,023.00 1,045,620.00
9 Flange Socked PVC diameter 100 mm BPP.103 buah 512,265.00 539,682.00 554,667.00 554,667.00 585,414.00 603,951.00 580,863.00
10 Flange Socked PVC diameter 75 mm BPP.104 buah 430,236.00 453,324.00 465,978.00 465,978.00 491,730.00 507,270.00 487,956.00
11 Flange Socked PVC diameter 50 mm BPP.105 buah 225,441.00 237,429.00 244,089.00 244,089.00 257,631.00 265,734.00 255,633.00

Flange Spigote PVC


1 Flange Spigote PVC diameter 500 mm BPP.106 buah 2,294,814.00 2,417,580.00 2,485,179.00 2,485,179.00 2,622,819.00 2,705,625.00 2,602,395.00
2 Flange Spigote PVC diameter 450 mm BPP.107 buah 2,048,949.00 2,158,506.00 2,218,890.00 2,218,890.00 2,341,767.00 2,415,693.00 2,323,563.00
3 Flange Spigote PVC diameter 400 mm BPP.108 buah 1,885,002.00 1,985,901.00 2,041,401.00 2,041,401.00 2,154,510.00 2,222,442.00 2,137,749.00
4 Flange Spigote PVC diameter 350 mm BPP.109 buah 1,700,631.00 1,791,540.00 1,841,712.00 1,841,712.00 1,943,721.00 2,004,993.00 1,928,625.00
5 Flange Spigote PVC diameter 300 mm BPP.110 buah 1,475,301.00 1,554,111.00 1,597,623.00 1,597,623.00 1,686,090.00 1,739,259.00 1,672,992.00
6 Flange Spigote PVC diameter 250 mm BPP.111 buah 1,434,231.00 1,510,932.00 1,553,223.00 1,553,223.00 1,639,248.00 1,690,974.00 1,626,483.00
7 Flange Spigote PVC diameter 200 mm BPP.112 buah 1,270,395.00 1,338,327.00 1,375,734.00 1,375,734.00 1,451,880.00 1,497,723.00 1,440,669.00
8 Flange Spigote PVC diameter 150 mm BPP.113 buah 922,077.00 971,361.00 998,445.00 998,445.00 1,053,834.00 1,087,023.00 1,045,620.00
9 Flange Spigote PVC diameter 100 mm BPP.114 buah 860,583.00 906,537.00 931,956.00 931,956.00 983,571.00 1,014,540.00 975,912.00
10 Flange Spigote PVC diameter 75 mm BPP.115 buah 307,359.00 323,787.00 332,778.00 332,778.00 351,315.00 362,304.00 348,540.00
11 Flange Spigote PVC diameter 50 mm BPP.116 buah 286,824.00 302,142.00 310,689.00 310,689.00 327,894.00 338,217.00 325,341.00

Stub Flange HDPE


1 Stub Flange HDPE diameter 315 mm BPP.117 buah 2,155,176.00 2,270,394.00 2,333,886.00 2,333,886.00 2,463,201.00 2,540,901.00 2,443,998.00
2 Stub Flange HDPE diameter 250 mm BPP.118 buah 1,777,443.00 1,872,459.00 1,924,851.00 1,924,851.00 2,031,411.00 2,095,569.00 2,015,649.00
3 Stub Flange HDPE diameter 200 mm BPP.119 buah 1,369,740.00 1,443,000.00 1,483,404.00 1,483,404.00 1,565,544.00 1,614,939.00 1,553,334.00
4 Stub Flange HDPE diameter 160 mm BPP.120 buah 930,069.00 979,797.00 1,007,214.00 1,007,214.00 1,062,936.00 1,096,569.00 1,054,722.00
5 Stub Flange HDPE diameter 110 mm BPP.121 buah 578,754.00 609,612.00 626,706.00 626,706.00 661,449.00 682,317.00 656,232.00
6 Stub Flange HDPE diameter 90 mm BPP.122 buah 475,413.00 500,832.00 514,818.00 514,818.00 543,345.00 560,439.00 539,127.00
7 Stub Flange HDPE diameter 63 mm BPP.123 buah 273,282.00 287,823.00 295,926.00 295,926.00 312,243.00 322,122.00 309,912.00

Flange Las CI
1 Flange Las CI diameter 500 mm BPP.124 buah 1,741,590.00 1,834,719.00 1,886,001.00 1,886,001.00 1,990,563.00 2,053,389.00 1,975,023.00
2 Flange Las CI diameter 450 mm BPP.125 buah 1,659,672.00 1,748,361.00 1,797,312.00 1,797,312.00 1,896,879.00 1,956,708.00 1,882,116.00
3 Flange Las CI diameter 400 mm BPP.126 buah 1,577,754.00 1,662,114.00 1,708,512.00 1,708,512.00 1,803,195.00 1,860,138.00 1,789,209.00
4 Flange Las CI diameter 350 mm BPP.127 buah 1,475,301.00 1,554,111.00 1,597,623.00 1,597,623.00 1,686,090.00 1,739,259.00 1,672,992.00
5 Flange Las CI diameter 300 mm BPP.128 buah 1,434,231.00 1,510,932.00 1,553,223.00 1,553,223.00 1,639,248.00 1,690,974.00 1,626,483.00
6 Flange Las CI diameter 250 mm BPP.129 buah 1,106,448.00 1,165,611.00 1,198,134.00 1,198,134.00 1,264,623.00 1,304,472.00 1,254,744.00

A.2 - 46
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

7 Flange Las CI diameter 200 mm BPP.130 buah 696,636.00 733,932.00 754,467.00 754,467.00 796,203.00 821,289.00 789,987.00
8 Flange Las CI diameter 150 mm BPP.131 buah 471,306.00 496,503.00 510,378.00 510,378.00 538,572.00 555,666.00 534,465.00
9 Flange Las CI diameter 100 mm BPP.132 buah 327,783.00 345,321.00 354,978.00 354,978.00 374,736.00 386,502.00 371,739.00
10 Flange Las CI diameter 75 mm BPP.133 buah 245,865.00 259,074.00 266,289.00 266,289.00 281,052.00 289,932.00 278,832.00
11 Flange Las CI diameter 50 mm BPP.134 buah 143,412.00 151,071.00 155,289.00 155,289.00 163,947.00 169,053.00 162,615.00

Galvanize Backing Ring


1 Galvanize Backing Ring diameter 315 mm BPP.135 buah 860,583.00 906,537.00 931,956.00 931,956.00 983,571.00 1,014,540.00 975,912.00
2 Galvanize Backing Ring diameter 250 mm BPP.136 buah 655,677.00 690,753.00 710,067.00 710,067.00 749,361.00 773,004.00 743,589.00
3 Galvanize Backing Ring diameter 200 mm BPP.137 buah 573,759.00 604,395.00 621,267.00 621,267.00 655,677.00 676,434.00 650,571.00
4 Galvanize Backing Ring diameter 160 mm BPP.138 buah 450,771.00 474,858.00 488,178.00 488,178.00 515,151.00 531,468.00 511,155.00
5 Galvanize Backing Ring diameter 110 mm BPP.139 buah 245,865.00 259,074.00 266,289.00 266,289.00 281,052.00 289,932.00 278,832.00
6 Galvanize Backing Ring diameter 90 mm BPP.140 buah 225,441.00 237,429.00 244,089.00 244,089.00 257,631.00 265,734.00 255,633.00
7 Galvanize Backing Ring diameter 63 mm BPP.141 buah 147,519.00 155,400.00 159,729.00 159,729.00 168,609.00 173,937.00 167,277.00

Blind Flange CI
1 Blind Flange CI diameter 500 mm BPP.142 buah 2,151,402.00 2,266,509.00 2,329,779.00 2,329,779.00 2,458,872.00 2,536,461.00 2,439,780.00
2 Blind Flange CI diameter 450 mm BPP.143 buah 1,997,778.00 2,104,560.00 2,163,390.00 2,163,390.00 2,283,270.00 2,355,309.00 2,265,510.00
3 Blind Flange CI diameter 400 mm BPP.144 buah 1,936,284.00 2,039,847.00 2,096,790.00 2,096,790.00 2,213,007.00 2,282,826.00 2,195,802.00
4 Blind Flange CI diameter 350 mm BPP.145 buah 1,874,790.00 1,975,023.00 2,030,301.00 2,030,301.00 2,142,744.00 2,210,343.00 2,126,094.00
5 Blind Flange CI diameter 300 mm BPP.146 buah 1,844,043.00 1,942,722.00 1,997,001.00 1,997,001.00 2,107,668.00 2,174,157.00 2,091,240.00
6 Blind Flange CI diameter 250 mm BPP.147 buah 1,362,525.00 1,435,452.00 1,475,523.00 1,475,523.00 1,557,330.00 1,606,392.00 1,545,231.00
7 Blind Flange CI diameter 200 mm BPP.148 buah 942,501.00 992,895.00 1,020,645.00 1,020,645.00 1,077,255.00 1,111,221.00 1,068,819.00
8 Blind Flange CI diameter 150 mm BPP.149 buah 686,424.00 723,165.00 743,367.00 743,367.00 784,548.00 809,301.00 778,443.00
9 Blind Flange CI diameter 100 mm BPP.150 buah 430,236.00 453,324.00 465,978.00 465,978.00 491,730.00 507,270.00 487,956.00
10 Blind Flange CI diameter 75 mm BPP.151 buah 249,972.00 263,292.00 270,729.00 270,729.00 285,714.00 294,705.00 283,494.00
11 Blind Flange CI diameter 50 mm BPP.152 buah 194,694.00 205,017.00 210,789.00 210,789.00 222,444.00 229,437.00 220,779.00

All Socket Tee PVC


1 200 X200 BPP.153 buah 1,349,094.00 1,403,151.00 1,446,774.00 1,428,459.00 1,498,056.00 1,538,460.00 1,453,767.00
2 X150 BPP.154 buah 1,167,054.00 1,213,896.00 1,251,636.00 1,235,763.00 1,295,925.00 1,331,001.00 1,257,630.00
3 X100 BPP.155 buah 1,039,293.00 1,080,918.00 1,114,551.00 1,100,454.00 1,153,956.00 1,185,147.00 1,119,879.00
4 X75 BPP.156 buah 578,643.00 601,842.00 620,601.00 612,720.00 642,468.00 659,895.00 623,487.00
5 X50 BPP.157 buah 578,643.00 601,842.00 620,601.00 612,720.00 642,468.00 659,895.00 623,487.00
6 150 X150 BPP.158 buah 591,519.00 615,273.00 634,365.00 626,373.00 656,898.00 674,547.00 637,473.00

A.2 - 47
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

7 X100 BPP.159 buah 591,519.00 615,273.00 634,365.00 626,373.00 656,898.00 674,547.00 637,473.00
8 X75 BPP.160 buah 548,784.00 570,762.00 588,522.00 581,085.00 609,390.00 625,818.00 591,297.00
9 X50 BPP.161 buah 548,784.00 570,762.00 588,522.00 581,085.00 609,390.00 625,818.00 591,297.00
10 100 X100 BPP.162 buah 463,203.00 481,851.00 496,836.00 490,509.00 514,374.00 528,249.00 499,167.00
11 X75 BPP.163 buah 463,203.00 481,851.00 496,836.00 490,509.00 514,374.00 528,249.00 499,167.00
12 X50 BPP.164 buah 463,203.00 481,851.00 496,836.00 490,509.00 514,374.00 528,249.00 499,167.00
13 75 X75 BPP.165 buah 192,474.00 200,133.00 206,349.00 203,796.00 213,675.00 219,447.00 207,348.00
14 X50 BPP.166 buah 192,474.00 200,133.00 206,349.00 203,796.00 213,675.00 219,447.00 207,348.00
15 50 X50 BPP.167 buah 140,415.00 146,076.00 150,627.00 148,629.00 155,955.00 160,062.00 151,293.00

All Flange Tee CI


1 200 X200 BPP.168 buah 2,324,229.00 2,448,549.00 2,517,036.00 2,517,036.00 2,656,452.00 2,740,257.00 2,635,806.00
2 X150 BPP.169 buah 1,905,759.00 2,007,657.00 2,063,823.00 2,063,823.00 2,178,153.00 2,246,862.00 2,161,170.00
3 X100 BPP.170 buah 1,673,880.00 1,763,457.00 1,812,741.00 1,812,741.00 1,913,196.00 1,973,580.00 1,898,322.00
4 X75 BPP.171 buah 1,632,477.00 1,719,723.00 1,767,786.00 1,767,786.00 1,865,799.00 1,924,629.00 1,851,258.00
5 X50 BPP.172 buah 1,624,929.00 1,711,842.00 1,759,683.00 1,759,683.00 1,857,141.00 1,915,749.00 1,842,711.00
6 150 X150 BPP.173 buah 1,585,302.00 1,670,106.00 1,716,837.00 1,716,837.00 1,811,853.00 1,869,129.00 1,797,756.00
7 X100 BPP.174 buah 1,462,758.00 1,541,013.00 1,584,081.00 1,584,081.00 1,671,882.00 1,724,607.00 1,658,895.00
8 X75 BPP.175 buah 1,564,545.00 1,648,239.00 1,694,304.00 1,694,304.00 1,788,210.00 1,844,598.00 1,774,335.00
9 X50 BPP.176 buah 1,389,276.00 1,463,535.00 1,504,494.00 1,504,494.00 1,587,855.00 1,637,916.00 1,575,534.00
10 100 X100 BPP.177 buah 1,249,749.00 1,316,571.00 1,353,423.00 1,353,423.00 1,428,459.00 1,473,525.00 1,417,248.00
11 X75 BPP.178 buah 1,044,288.00 1,100,121.00 1,130,868.00 1,130,868.00 1,193,583.00 1,231,212.00 1,184,259.00
12 X50 BPP.179 buah 989,676.00 1,042,623.00 1,071,705.00 1,071,705.00 1,131,090.00 1,166,832.00 1,122,321.00
13 75 X75 BPP.180 buah 863,358.00 909,534.00 934,953.00 934,953.00 986,790.00 1,017,870.00 979,020.00
14 X50 BPP.181 buah 789,876.00 832,056.00 855,366.00 855,366.00 902,763.00 931,179.00 895,659.00
15 50 X50 BPP.182 buah 659,784.00 695,082.00 714,507.00 714,507.00 754,023.00 777,888.00 748,251.00

All Flange Tee GIV


1 300 X300 BPP.183 buah 3,585,744.00 3,777,441.00 3,883,002.00 3,883,002.00 4,098,120.00 4,227,435.00 4,066,263.00
2 X250 BPP.184 buah 3,298,809.00 3,475,299.00 3,572,424.00 3,572,424.00 3,770,337.00 3,889,329.00 3,741,033.00
3 X200 BPP.185 buah 3,298,809.00 3,475,299.00 3,572,424.00 3,572,424.00 3,770,337.00 3,889,329.00 3,741,033.00
4 250 X250 BPP.186 buah 2,827,614.00 2,978,796.00 3,062,046.00 3,062,046.00 3,231,654.00 3,333,663.00 3,206,568.00
5 X200 BPP.187 buah 2,827,614.00 2,978,796.00 3,062,046.00 3,062,046.00 3,231,654.00 3,333,663.00 3,206,568.00
6 X100 BPP.188 buah 2,827,614.00 2,978,796.00 3,062,046.00 3,062,046.00 3,231,654.00 3,333,663.00 3,206,568.00
7 200 X200 BPP.189 buah 2,262,069.00 2,383,059.00 2,449,659.00 2,449,659.00 2,585,301.00 2,666,886.00 2,565,210.00

A.2 - 48
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

8 X150 BPP.190 buah 1,885,002.00 1,985,901.00 2,041,401.00 2,041,401.00 2,154,510.00 2,222,442.00 2,137,749.00
9 X100 BPP.191 buah 1,696,524.00 1,787,322.00 1,837,272.00 1,837,272.00 1,939,059.00 2,000,220.00 1,923,963.00
10 X75 BPP.192 buah 1,696,524.00 1,787,322.00 1,837,272.00 1,837,272.00 1,939,059.00 2,000,220.00 1,923,963.00
11 X50 BPP.193 buah 1,696,524.00 1,787,322.00 1,837,272.00 1,837,272.00 1,939,059.00 2,000,220.00 1,923,963.00
12 150 X150 BPP.194 buah 1,602,285.00 1,687,977.00 1,735,152.00 1,735,152.00 1,831,278.00 1,889,109.00 1,817,070.00
13 X100 BPP.195 buah 1,536,351.00 1,618,491.00 1,663,668.00 1,663,668.00 1,755,909.00 1,811,298.00 1,742,256.00
14 X75 BPP.196 buah 1,536,351.00 1,618,491.00 1,663,668.00 1,663,668.00 1,755,909.00 1,811,298.00 1,742,256.00
15 X50 BPP.197 buah 1,413,807.00 1,489,398.00 1,531,023.00 1,531,023.00 1,615,827.00 1,666,887.00 1,603,284.00
16 100 X100 BPP.198 buah 1,168,719.00 1,231,212.00 1,265,622.00 1,265,622.00 1,335,774.00 1,377,954.00 1,325,340.00
17 X75 BPP.199 buah 1,036,740.00 1,092,240.00 1,122,765.00 1,122,765.00 1,184,925.00 1,222,332.00 1,175,712.00
18 X50 BPP.200 buah 1,036,740.00 1,092,240.00 1,122,765.00 1,122,765.00 1,184,925.00 1,222,332.00 1,175,712.00
19 75 X75 BPP.201 buah 791,763.00 834,054.00 857,364.00 857,364.00 904,872.00 933,399.00 897,879.00
20 X50 BPP.202 buah 791,763.00 834,054.00 857,364.00 857,364.00 904,872.00 933,399.00 897,879.00
21 50 X50 BPP.203 buah 603,174.00 635,475.00 653,235.00 653,235.00 689,421.00 711,177.00 684,093.00

Tee HDPE SDR 17


1 315 x 315 BPP.204 buah 10,859,574.00 11,440,215.00 11,760,006.00 11,760,006.00 12,411,576.00 12,803,184.00 12,315,006.00
2 300 X300 BPP.205 buah 8,605,719.00 9,065,814.00 9,319,227.00 9,319,227.00 9,835,599.00 10,145,955.00 9,759,120.00
3 X250 BPP.206 buah 7,376,283.00 7,770,777.00 7,987,893.00 7,987,893.00 8,430,450.00 8,696,517.00 8,364,960.00
4 X200 BPP.207 buah 7,376,283.00 7,770,777.00 7,987,893.00 7,987,893.00 8,430,450.00 8,696,517.00 8,364,960.00
5 X150 BPP.208 buah 7,376,283.00 7,770,777.00 7,987,893.00 7,987,893.00 8,430,450.00 8,696,517.00 8,364,960.00
6 250 X250 BPP.209 buah 3,688,197.00 3,885,333.00 3,994,002.00 3,994,002.00 4,215,225.00 4,348,314.00 4,182,480.00
7 X200 BPP.210 buah 3,688,197.00 3,885,333.00 3,994,002.00 3,994,002.00 4,215,225.00 4,348,314.00 4,182,480.00
8 X150 BPP.211 buah 3,688,197.00 3,885,333.00 3,994,002.00 3,994,002.00 4,215,225.00 4,348,314.00 4,182,480.00
9 X100 BPP.212 buah 3,688,197.00 3,885,333.00 3,994,002.00 3,994,002.00 4,215,225.00 4,348,314.00 4,182,480.00
10 200 X200 BPP.213 buah 2,253,855.00 2,374,401.00 2,440,779.00 2,440,779.00 2,575,977.00 2,657,229.00 2,555,997.00
11 X150 BPP.214 buah 2,089,908.00 2,201,685.00 2,263,290.00 2,263,290.00 2,388,609.00 2,463,978.00 2,370,072.00
12 X100 BPP.215 buah 2,089,908.00 2,201,685.00 2,263,290.00 2,263,290.00 2,388,609.00 2,463,978.00 2,370,072.00
13 150 X150 BPP.216 buah 1,270,395.00 1,338,327.00 1,375,734.00 1,375,734.00 1,451,880.00 1,497,723.00 1,440,669.00
14 X100 BPP.217 buah 1,270,395.00 1,338,327.00 1,375,734.00 1,375,734.00 1,451,880.00 1,497,723.00 1,440,669.00
15 X75 BPP.218 buah 1,270,395.00 1,338,327.00 1,375,734.00 1,375,734.00 1,451,880.00 1,497,723.00 1,440,669.00
16 100 X100 BPP.219 buah 629,814.00 663,558.00 682,095.00 682,095.00 719,835.00 742,590.00 714,285.00
17 X75 BPP.220 buah 629,814.00 663,558.00 682,095.00 682,095.00 719,835.00 742,590.00 714,285.00
18 X50 BPP.221 buah 629,814.00 663,558.00 682,095.00 682,095.00 719,835.00 742,590.00 714,285.00
19 75 X75 BPP.222 buah 320,679.00 333,555.00 343,989.00 339,549.00 356,088.00 365,745.00 345,543.00

A.2 - 49
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

20 X50 BPP.223 buah 320,679.00 333,555.00 343,989.00 339,549.00 356,088.00 365,745.00 345,543.00
21 50 X50 BPP.224 buah 263,736.00 274,281.00 282,828.00 279,165.00 292,818.00 300,699.00 284,160.00

Segment Bend PVC


1 90 x300 BPP.225 buah 890,886.00 926,628.00 955,377.00 943,278.00 989,232.00 1,015,983.00 959,928.00
2 X250 BPP.226 buah 734,043.00 763,458.00 787,212.00 777,222.00 815,073.00 837,162.00 790,986.00
3 X200 BPP.227 buah 734,043.00 763,458.00 787,212.00 777,222.00 815,073.00 837,162.00 790,986.00
4 X150 BPP.228 buah 477,522.00 496,614.00 512,043.00 505,605.00 530,247.00 544,566.00 514,596.00
5 X100 BPP.229 buah 265,068.00 275,724.00 284,382.00 280,719.00 294,372.00 302,364.00 285,714.00
6 X75 BPP.230 buah 239,316.00 248,973.00 256,632.00 253,413.00 265,734.00 272,949.00 257,964.00
7 X50 BPP.231 buah 118,881.00 125,208.00 128,649.00 128,649.00 135,864.00 140,082.00 134,754.00
8 45 ; 22,5 X250 BPP.232 buah 734,043.00 1,148,295.00 1,180,485.00 1,180,485.00 1,245,864.00 1,285,158.00 1,236,207.00
9 X200 BPP.233 buah 734,043.00 763,458.00 787,212.00 777,222.00 815,073.00 837,162.00 790,986.00
10 X150 BPP.234 buah 477,522.00 496,614.00 512,043.00 505,605.00 530,247.00 544,566.00 514,596.00
11 X100 BPP.235 buah 229,437.00 238,650.00 246,087.00 242,979.00 254,856.00 261,738.00 247,308.00
12 X75 BPP.236 buah 199,911.00 207,903.00 214,341.00 211,677.00 222,000.00 227,994.00 215,451.00
13 X50 BPP.237 buah 97,236.00 101,121.00 104,229.00 102,897.00 107,892.00 110,889.00 104,784.00

Segment Bend CI
1 90 x300 BPP.238 buah 3,485,067.00 3,624,816.00 3,737,592.00 3,690,084.00 3,869,793.00 3,974,355.00 3,755,463.00
2 X200 BPP.239 buah 3,481,515.00 3,621,153.00 3,733,707.00 3,686,310.00 3,865,908.00 3,970,359.00 3,751,578.00
3 X150 BPP.240 buah 939,282.00 989,454.00 1,017,093.00 1,017,093.00 1,073,481.00 1,107,336.00 1,065,156.00
4 X100 BPP.241 buah 563,325.00 593,406.00 610,056.00 610,056.00 643,800.00 664,113.00 638,805.00
5 X75 BPP.242 buah 435,009.00 458,208.00 470,973.00 470,973.00 497,169.00 512,820.00 493,284.00
6 X50 BPP.243 buah 382,617.00 403,152.00 414,363.00 414,363.00 437,340.00 451,104.00 433,899.00
7 45 ; 22,5 X200 BPP.244 buah 1,119,546.00 1,179,375.00 1,212,342.00 1,212,342.00 1,279,608.00 1,319,901.00 1,269,618.00
8 X150 BPP.245 buah 857,253.00 903,096.00 928,404.00 928,404.00 979,797.00 1,010,766.00 972,138.00
9 X100 BPP.246 buah 537,129.00 565,878.00 581,751.00 581,751.00 613,941.00 633,255.00 609,168.00
10 X75 BPP.247 buah 484,848.00 510,822.00 525,030.00 525,030.00 554,112.00 571,650.00 549,894.00
11 X50 BPP.248 buah 361,305.00 380,619.00 391,275.00 391,275.00 412,920.00 425,907.00 409,701.00

Segment Bend GIV


1 90 x300 BPP.249 buah 2,157,174.00 2,272,503.00 2,335,995.00 2,335,995.00 2,465,421.00 2,543,232.00 2,446,329.00
2 X200 BPP.250 buah 2,075,256.00 2,186,145.00 2,247,306.00 2,247,306.00 2,371,737.00 2,446,662.00 2,353,311.00
3 X150 BPP.251 buah 1,130,979.00 1,191,474.00 1,224,774.00 1,224,774.00 1,292,706.00 1,333,443.00 1,282,605.00

A.2 - 50
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

4 X100 BPP.252 buah 642,690.00 677,100.00 695,970.00 695,970.00 734,598.00 757,797.00 728,826.00
5 X75 BPP.253 buah 568,764.00 599,178.00 615,939.00 615,939.00 650,127.00 670,551.00 645,021.00
6 X50 BPP.254 buah 542,568.00 571,539.00 587,523.00 587,523.00 620,157.00 639,693.00 615,273.00
7 45 ; 22,5 X300 BPP.255 buah 2,073,591.00 2,184,480.00 2,245,530.00 2,245,530.00 2,369,961.00 2,444,664.00 2,351,424.00
8 X250 BPP.256 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
9 X200 BPP.257 buah 1,716,171.00 1,807,968.00 1,858,473.00 1,858,473.00 1,961,481.00 2,023,419.00 1,946,274.00
10 X150 BPP.258 buah 1,357,197.00 1,429,791.00 1,469,751.00 1,469,751.00 1,551,225.00 1,600,176.00 1,539,126.00
11 X100 BPP.259 buah 837,606.00 882,450.00 907,092.00 907,092.00 957,375.00 987,567.00 949,938.00
12 X75 BPP.260 buah 813,075.00 856,476.00 880,452.00 880,452.00 929,181.00 958,596.00 921,966.00
13 X50 BPP.261 buah 472,083.00 497,280.00 511,266.00 511,266.00 539,571.00 556,554.00 535,353.00

Segmented Bend HDPE


1 90° x315 BPP.262 buah 3,196,356.00 3,367,296.00 3,461,424.00 3,461,424.00 3,653,232.00 3,768,450.00 3,624,816.00
2 x250 BPP.263 buah 3,196,356.00 3,367,296.00 3,461,424.00 3,461,424.00 3,653,232.00 3,768,450.00 3,624,816.00
3 X200 BPP.264 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
4 X160 BPP.265 buah 901,542.00 937,728.00 966,921.00 954,600.00 1,001,109.00 1,028,193.00 971,472.00
5 X110 BPP.266 buah 534,465.00 555,999.00 573,204.00 565,989.00 593,517.00 609,612.00 575,979.00
6 X90 BPP.267 buah 266,511.00 277,278.00 285,825.00 282,273.00 295,926.00 303,918.00 287,268.00
7 X63 BPP.268 buah 178,155.00 185,370.00 191,031.00 188,700.00 197,802.00 203,241.00 192,030.00
8 45° X315 BPP.269 buah 3,196,356.00 3,367,296.00 3,461,424.00 3,461,424.00 3,653,232.00 3,768,450.00 3,624,816.00
9 X250 BPP.270 buah 2,458,761.00 2,590,296.00 2,662,668.00 2,662,668.00 2,810,187.00 2,898,876.00 2,788,320.00
10 X200 BPP.271 buah 1,229,436.00 1,295,148.00 1,331,334.00 1,331,334.00 1,405,038.00 1,449,438.00 1,394,160.00
11 X160 BPP.272 buah 688,422.00 716,061.00 738,372.00 728,937.00 764,457.00 785,103.00 741,924.00
12 X110 BPP.273 buah 475,413.00 494,394.00 509,823.00 503,385.00 527,805.00 542,124.00 512,265.00
13 X90 BPP.274 buah 190,143.00 197,802.00 203,907.00 201,354.00 211,122.00 216,894.00 204,906.00
14 X63 BPP.275 buah 178,155.00 185,370.00 191,031.00 188,700.00 197,802.00 203,241.00 192,030.00

DOP PVC
1 DOP PVC diameter 200 mm BPP.276 buah 200,022.00 210,678.00 216,561.00 216,561.00 228,549.00 235,764.00 226,773.00
2 DOP PVC diameter 150 mm BPP.277 buah 175,380.00 184,815.00 189,921.00 189,921.00 200,466.00 206,793.00 198,912.00
3 DOP PVC diameter 100 mm BPP.278 buah 129,537.00 136,419.00 140,193.00 140,193.00 147,963.00 152,625.00 146,853.00
4 DOP PVC diameter 75 mm BPP.279 buah 95,127.00 100,122.00 103,008.00 103,008.00 108,669.00 112,110.00 107,781.00
5 DOP PVC diameter 50 mm BPP.280 buah 79,476.00 83,805.00 86,136.00 86,136.00 90,909.00 93,684.00 90,132.00
6 DOP PVC diameter 25 mm BPP.281 buah 29,526.00 31,080.00 31,968.00 31,968.00 33,744.00 34,743.00 33,411.00

A.2 - 51
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

STUB END/ END CUP HDPE


1 STUB END/ END CUP HDPE diameter 300 mm BPP.282 buah 3,114,438.00 3,280,938.00 3,372,624.00 3,372,624.00 3,559,548.00 3,671,880.00 3,531,909.00
2 STUB END/ END CUP HDPE diameter 250 mm BPP.283 buah 1,788,876.00 1,860,582.00 1,918,413.00 1,894,104.00 1,986,345.00 2,040,069.00 1,927,626.00
3 STUB END/ END CUP HDPE diameter 200 mm BPP.284 buah 1,073,703.00 1,116,771.00 1,151,403.00 1,136,862.00 1,192,251.00 1,224,441.00 1,156,953.00
4 STUB END/ END CUP HDPE diameter 150 mm BPP.285 buah 598,290.00 622,266.00 641,691.00 633,477.00 664,335.00 682,317.00 644,688.00
5 STUB END/ END CUP HDPE diameter 100 mm BPP.286 buah 286,824.00 298,368.00 307,692.00 303,696.00 318,570.00 327,117.00 309,135.00
6 STUB END/ END CUP HDPE diameter 75 mm BPP.287 buah 137,862.00 143,412.00 147,852.00 145,965.00 153,069.00 157,176.00 148,518.00
7 STUB END/ END CUP HDPE diameter 50 mm BPP.288 buah 74,481.00 77,478.00 79,920.00 78,810.00 82,695.00 84,915.00 80,253.00

Clamb Sadle
1 75 x 1/2 BPP.289 buah 150,405.00 156,510.00 161,394.00 159,285.00 167,055.00 171,606.00 162,060.00
2 50 x 1/2 BPP.290 buah 122,544.00 127,539.00 131,424.00 129,759.00 136,086.00 139,749.00 132,090.00

Water Meter Induk


1 Water Meter Induk diameter 500 mm BPP.291 buah 254,072,784.00 267,658,629.00 275,139,585.00 275,139,585.00 290,383,992.00 299,547,042.00 288,125,586.00
2 Water Meter Induk diameter 400 mm BPP.292 buah 163,098,294.00 171,819,564.00 176,621,868.00 176,621,868.00 186,407,850.00 192,289,962.00 184,958,079.00
3 Water Meter Induk diameter 350 mm BPP.293 buah 132,773,538.00 139,873,209.00 143,782,629.00 143,782,629.00 151,749,099.00 156,537,528.00 150,568,836.00
4 Water Meter Induk diameter 300 mm BPP.294 buah 121,299,246.00 127,785,420.00 131,356,956.00 131,356,956.00 138,634,893.00 143,009,625.00 137,556,750.00
5 Water Meter Induk diameter 250 mm BPP.295 buah 45,077,433.00 47,487,798.00 48,815,136.00 48,815,136.00 51,519,762.00 53,145,468.00 51,119,052.00
6 Water Meter Induk diameter 200 mm BPP.296 buah 31,800,057.00 33,500,466.00 34,436,862.00 34,436,862.00 36,344,841.00 37,491,693.00 36,062,124.00
7 Water Meter Induk diameter 150 mm BPP.297 buah 24,915,504.00 26,247,837.00 26,981,436.00 26,981,436.00 28,476,384.00 29,374,929.00 28,254,939.00
8 Water Meter Induk diameter 100 mm BPP.298 buah 15,572,190.00 16,404,912.00 16,863,342.00 16,863,342.00 17,797,740.00 18,359,289.00 17,659,323.00
9 Water Meter Induk diameter 75 mm BPP.299 buah 13,605,159.00 14,332,653.00 14,733,252.00 14,733,252.00 15,549,546.00 16,040,277.00 15,428,667.00
10 Water Meter Induk diameter 50 mm BPP.300 buah 11,851,248.00 12,484,947.00 12,833,931.00 12,833,931.00 13,544,997.00 13,972,458.00 13,439,658.00
11 Water Meter Induk diameter 40 mm BPP.301 buah 6,905,865.00 7,275,162.00 7,478,514.00 7,478,514.00 7,892,877.00 8,141,850.00 7,831,494.00
12 Water Meter Induk diameter 30/32 mm BPP.302 buah 5,015,868.00 5,284,044.00 5,431,785.00 5,431,785.00 5,732,706.00 5,913,636.00 5,688,195.00
13 Water Meter Induk diameter 25 mm BPP.303 buah 4,170,048.00 4,393,047.00 4,515,813.00 4,515,813.00 4,766,007.00 4,916,412.00 4,728,933.00
14 Water Meter Induk diameter 20 mm BPP.304 buah 1,818,069.00 1,643,910.00 1,689,864.00 1,689,864.00 1,783,548.00 1,839,825.00 1,769,673.00
15 Water Meter Induk diameter 15 mm BPP.305 buah 700,077.00 466,200.00 479,298.00 479,298.00 505,827.00 521,811.00 501,942.00

Reducer PVC
1 200 X 150 BPP.306 buah 545,898.00 574,980.00 591,075.00 591,075.00 623,820.00 643,578.00 619,047.00
2 X 100 BPP.307 buah 531,135.00 559,440.00 575,091.00 575,091.00 606,948.00 626,151.00 602,286.00
3 150 X 100 BPP.308 buah 316,350.00 329,004.00 339,327.00 334,998.00 351,315.00 360,750.00 340,881.00
4 X 75 BPP.309 buah 316,350.00 329,004.00 339,327.00 334,998.00 351,315.00 360,750.00 340,881.00

A.2 - 52
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

5 100 X 75 BPP.310 buah 223,776.00 232,767.00 239,982.00 236,985.00 248,529.00 255,189.00 241,203.00
6 X 50 BPP.311 buah 223,776.00 232,767.00 239,982.00 236,985.00 248,529.00 255,189.00 241,203.00
7 75 X 50 BPP.312 buah 122,988.00 127,872.00 131,868.00 130,203.00 136,530.00 140,193.00 132,423.00
8 50 X 32 BPP.313 buah 95,460.00 99,345.00 102,453.00 101,121.00 106,005.00 108,891.00 102,897.00
9 50 X 25 BPP.314 buah 65,934.00 68,598.00 70,707.00 69,819.00 73,149.00 75,147.00 71,040.00

Reducer GIV
1 300 x250 BPP.315 buah 2,376,843.00 2,503,938.00 2,573,868.00 2,573,868.00 2,716,503.00 2,802,195.00 2,695,413.00
2 300 x200 BPP.316 buah 2,130,978.00 2,244,864.00 2,307,579.00 2,307,579.00 2,435,451.00 2,512,374.00 2,416,581.00
3 300 x150 BPP.317 buah 2,016,204.00 2,123,985.00 2,183,370.00 2,183,370.00 2,304,360.00 2,377,065.00 2,286,378.00
4 300 x100 BPP.318 buah 1,842,489.00 1,940,946.00 1,995,225.00 1,995,225.00 2,105,781.00 2,172,159.00 2,089,353.00
5 200 X 150 BPP.319 buah 1,675,212.00 1,742,478.00 1,796,646.00 1,773,780.00 1,860,249.00 1,910,421.00 1,805,193.00
6 X 100 BPP.320 buah 1,675,212.00 1,742,478.00 1,796,646.00 1,773,780.00 1,860,249.00 1,910,421.00 1,805,193.00
7 150 X 100 BPP.321 buah 1,218,669.00 1,267,620.00 1,307,025.00 1,290,375.00 1,353,312.00 1,389,831.00 1,313,241.00
8 X 75 BPP.322 buah 901,542.00 937,728.00 966,921.00 954,600.00 1,001,109.00 1,028,193.00 971,472.00
9 X 50 BPP.323 buah 901,542.00 937,728.00 966,921.00 954,600.00 1,001,109.00 1,028,193.00 971,472.00
10 100 X 75 BPP.324 buah 590,076.00 613,719.00 632,811.00 624,819.00 655,233.00 672,993.00 635,919.00
11 X 50 BPP.325 buah 524,586.00 545,565.00 562,548.00 555,444.00 582,417.00 598,179.00 565,212.00
12 75 X 50 BPP.326 buah 426,240.00 443,334.00 457,098.00 451,215.00 473,193.00 486,069.00 459,207.00
13 50 X 32 BPP.327 buah 311,466.00 323,898.00 333,999.00 329,781.00 345,876.00 355,200.00 335,664.00
14 50 X 25 BPP.328 buah 180,264.00 187,590.00 193,362.00 190,920.00 200,244.00 205,683.00 194,250.00
15 25 X 3/4 BPP.329 buah 177,045.00 186,480.00 191,697.00 191,697.00 202,353.00 208,680.00 200,799.00
16 1/4 X 1/2 BPP.330 buah 170,496.00 179,598.00 184,593.00 184,593.00 194,805.00 201,021.00 193,362.00

Reducer Flange CI
1 200 X 150 BPP.331 buah 1,191,585.00 1,239,315.00 1,277,832.00 1,261,626.00 1,323,120.00 1,358,862.00 1,284,048.00
2 X 100 BPP.332 buah 1,191,585.00 1,239,315.00 1,277,832.00 1,261,626.00 1,323,120.00 1,358,862.00 1,284,048.00
3 150 X 100 BPP.333 buah 1,090,464.00 1,134,198.00 1,169,385.00 1,154,622.00 1,210,788.00 1,243,533.00 1,175,046.00
4 X 75 BPP.334 buah 620,046.00 644,910.00 665,001.00 656,565.00 688,533.00 707,070.00 668,109.00
5 100 X 75 BPP.335 buah 440,892.00 458,652.00 472,860.00 466,866.00 489,621.00 502,830.00 475,191.00
6 X 50 BPP.336 buah 408,258.00 424,575.00 437,784.00 432,234.00 453,324.00 465,534.00 439,893.00
7 75 X 50 BPP.337 buah 408,258.00 424,575.00 437,784.00 432,234.00 453,324.00 465,534.00 439,893.00
8 50 X 32 BPP.338 buah 204,906.00 213,120.00 219,780.00 217,005.00 227,550.00 233,655.00 220,779.00
9 50 X 25 BPP.339 buah 167,166.00 173,937.00 179,265.00 177,045.00 185,703.00 190,698.00 180,153.00
10 25 X 3/4 BPP.340 buah 130,203.00 135,420.00 139,638.00 137,862.00 144,633.00 148,518.00 140,304.00

A.2 - 53
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

11 3/4 X 1/2 BPP.341 buah 117,216.00 121,878.00 125,652.00 124,098.00 130,092.00 133,644.00 126,318.00

Reducer HDPE SDR 17


1 315 X 250 BPP.342 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
2 X 200 BPP.343 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
3 X 160 BPP.344 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
4 X 110 BPP.345 buah 1,803,084.00 1,899,543.00 1,952,601.00 1,952,601.00 2,060,826.00 2,125,872.00 2,044,731.00
5 250 X 200 BPP.346 buah 1,581,861.00 1,666,443.00 1,712,952.00 1,712,952.00 1,807,857.00 1,864,911.00 1,793,760.00
6 X 150 BPP.347 buah 1,581,861.00 1,666,443.00 1,712,952.00 1,712,952.00 1,807,857.00 1,864,911.00 1,793,760.00
7 200 X 160 BPP.348 buah 1,294,926.00 1,364,190.00 1,402,374.00 1,402,374.00 1,480,074.00 1,526,694.00 1,468,530.00
8 X 110 BPP.349 buah 1,294,926.00 1,364,190.00 1,402,374.00 1,402,374.00 1,480,074.00 1,526,694.00 1,468,530.00
9 160 X 110 BPP.350 buah 1,049,061.00 1,091,130.00 1,125,096.00 1,110,777.00 1,164,945.00 1,196,358.00 1,130,424.00
10 X 90 BPP.351 buah 890,886.00 926,628.00 955,377.00 943,278.00 989,232.00 1,015,983.00 959,928.00
11 X 63 BPP.352 buah 605,838.00 630,036.00 649,683.00 641,469.00 672,660.00 690,864.00 652,791.00
12 110 X 90 BPP.353 buah 344,211.00 362,637.00 372,738.00 372,738.00 393,384.00 405,816.00 390,387.00
13 X 63 BPP.354 buah 344,211.00 362,637.00 372,738.00 372,738.00 393,384.00 405,816.00 390,387.00
14 90 X 63 BPP.355 buah 207,681.00 216,006.00 222,777.00 219,891.00 230,658.00 236,874.00 223,776.00

Rubber Packing
1 Rubber Packing diameter 350 mm BPP.356 buah 245,865.00 259,074.00 266,289.00 266,289.00 281,052.00 289,932.00 278,832.00
2 Rubber Packing diameter 300 mm BPP.357 buah 180,264.00 189,921.00 195,249.00 195,249.00 206,127.00 212,565.00 204,462.00
3 Rubber Packing diameter 250 mm BPP.358 buah 155,733.00 164,058.00 168,609.00 168,609.00 177,933.00 183,594.00 176,601.00
4 Rubber Packing diameter 200 mm BPP.359 buah 122,988.00 129,537.00 133,089.00 133,089.00 140,526.00 144,966.00 139,416.00
5 Rubber Packing diameter 150 mm BPP.360 buah 101,676.00 107,115.00 110,001.00 110,001.00 116,106.00 119,769.00 115,218.00
6 Rubber Packing diameter 100 mm BPP.361 buah 73,815.00 77,700.00 79,920.00 79,920.00 84,360.00 86,913.00 83,694.00
7 Rubber Packing diameter 75 mm BPP.362 buah 65,601.00 69,042.00 71,040.00 71,040.00 74,925.00 77,256.00 74,370.00
8 Rubber Packing diameter 50 mm BPP.363 buah 40,959.00 43,179.00 44,400.00 44,400.00 46,842.00 48,285.00 46,509.00

Giboult Joint
1 Giboult Joint diameter 200 mm BPP.364 buah 1,144,188.00 1,205,349.00 1,238,982.00 1,238,982.00 1,307,691.00 1,348,983.00 1,297,479.00
2 Giboult Joint diameter 150 mm BPP.365 buah 885,336.00 932,622.00 958,707.00 958,707.00 1,011,876.00 1,043,733.00 1,003,995.00
3 Giboult Joint diameter 100 mm BPP.366 buah 578,643.00 609,612.00 626,595.00 626,595.00 661,338.00 682,206.00 656,232.00
4 Giboult Joint diameter 75 mm BPP.367 buah 436,008.00 459,318.00 472,194.00 472,194.00 498,390.00 514,041.00 494,505.00
5 Giboult Joint diameter 50 mm BPP.368 buah 413,919.00 436,008.00 448,218.00 448,218.00 473,082.00 487,956.00 469,419.00

A.2 - 54
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

Puddle Pipe GIV


1 Puddle Pipe GIV diameter 300 mm BPP.369 buah 1,767,897.00 1,862,358.00 1,914,417.00 1,914,417.00 2,020,533.00 2,084,247.00 2,004,771.00
2 Puddle Pipe GIV diameter 250 mm BPP.370 buah 1,117,881.00 1,177,710.00 1,210,566.00 1,210,566.00 1,277,721.00 1,318,014.00 1,267,731.00
3 Puddle Pipe GIV diameter 200 mm BPP.371 buah 717,948.00 756,354.00 777,444.00 777,444.00 820,623.00 846,486.00 814,185.00
4 Puddle Pipe GIV diameter 150 mm BPP.372 buah 698,301.00 735,597.00 756,243.00 756,243.00 798,090.00 823,287.00 791,874.00
5 Puddle Pipe GIV diameter 100 mm BPP.373 buah 647,463.00 682,095.00 701,187.00 701,187.00 740,037.00 763,347.00 734,265.00

Stop Kran
1 Stop Kran diameter 50 mm BPP.374 buah 254,079.00 267,621.00 275,169.00 275,169.00 290,376.00 299,589.00 288,156.00
2 Stop Kran diameter 25 mm BPP.375 buah 81,918.00 86,358.00 88,800.00 88,800.00 93,684.00 96,681.00 92,907.00
3 Stop Kran dia 1" BPP.376 buah 72,150.00 75,036.00 75,036.00 75,702.00 79,365.00 82,917.00 80,808.00

Pipa Air Limbah


1 Pipa Tanah diameter 150 mm BPP.402 m' 277,500.00 305,250.00 388,500.00 333,000.00 305,250.00 388,500.00 360,750.00
2 Pipa Tanah diameter 200 mm BPP.403 m' 444,000.00 471,750.00 555,000.00 499,500.00 471,750.00 555,000.00 527,250.00
3 Pipa Beton (RCP) ∅-150 BPP.404 m' 376,290.00 404,040.00 487,290.00 431,790.00 404,040.00 487,290.00 459,540.00
4 Pipa Beton (RCP) ∅-300 BPP.405 m' 521,700.00 549,450.00 632,700.00 577,200.00 549,450.00 632,700.00 604,950.00

Lain-lain
1 Air Valve 3 Inc mm CI BPP.377 buah 3,770,115.00 3,971,691.00 4,082,691.00 4,082,691.00 4,308,909.00 4,444,884.00 4,275,387.00
2 Air Valve 2 Inc mm CI BPP.378 buah 3,442,221.00 3,626,370.00 3,727,713.00 3,727,713.00 3,934,284.00 4,058,382.00 3,903,648.00
3 Air Valve 1 Inc mm CI BPP.379 buah 3,032,520.00 3,194,580.00 3,283,935.00 3,283,935.00 3,465,864.00 3,575,199.00 3,438,891.00
4 Air Valve 3/4 Inc mm CI BPP.380 buah 2,294,814.00 2,417,580.00 2,485,179.00 2,485,179.00 2,622,819.00 2,705,625.00 2,602,395.00
5 Air Valve 1/2 Inc mm CI BPP.381 buah 1,967,031.00 2,072,148.00 2,130,090.00 2,130,090.00 2,248,083.00 2,319,123.00 2,230,656.00
6 Bahan Kimia BPP.382 gram 47,508.00 50,061.00 51,504.00 51,504.00 54,279.00 56,055.00 53,946.00
7 Dresser Joint Ø 75 mm CI BPP.383 buah 568,764.00 599,178.00 615,939.00 615,939.00 650,127.00 670,551.00 645,021.00
8 Dresser Joint Ø 100 mm CI BPP.384 buah 727,827.00 766,677.00 788,100.00 788,100.00 831,834.00 858,030.00 825,285.00
9 Flexible Joint Ø 50 mm CI BPP.385 buah 413,031.00 435,120.00 447,330.00 447,330.00 472,083.00 486,957.00 468,420.00
10 Flexible Joint Ø 75 mm CI BPP.386 buah 481,296.00 507,048.00 521,145.00 521,145.00 550,005.00 567,432.00 545,787.00
11 Flexible Joint Ø 100 mm CI BPP.387 buah 584,970.00 616,272.00 633,477.00 633,477.00 668,553.00 689,643.00 663,336.00
12 Flexible Joint Ø 150 mm CI BPP.388 buah 697,968.00 735,264.00 755,799.00 755,799.00 797,757.00 822,843.00 791,541.00
13 Flexible Joint Ø 200 mm CI BPP.389 buah 799,089.00 841,824.00 865,356.00 865,356.00 913,308.00 942,168.00 906,204.00
14 Flexible Joint Ø 250 mm CI BPP.390 buah 860,583.00 906,537.00 931,956.00 931,956.00 983,571.00 1,014,540.00 975,912.00
15 Flexible Joint Ø 300 mm CI BPP.391 buah 975,357.00 1,027,416.00 1,056,165.00 1,056,165.00 1,114,662.00 1,149,849.00 1,106,004.00
16 Isolatif TBA BPP.392 buah 11,100.00 11,100.00 13,320.00 12,210.00 11,100.00 13,320.00 12,210.00

A.2 - 55
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

17 Lem PVC Kecil 1/2 Kg BPP.393 kaleng 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
18 Lem PVC Kecil (2 ons) BPP.394 kaleng 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
19 Lem PVC BPP.395 tube 12,210.00 12,210.00 14,430.00 13,320.00 12,210.00 14,430.00 13,320.00
20 Nosel BPP.397 buah 57,387.00 60,384.00 62,160.00 62,160.00 65,601.00 67,599.00 65,046.00
21 Pasir Silika BPP.398 kg 17,871.00 18,537.00 19,092.00 18,870.00 19,758.00 20,313.00 19,203.00
22 Presure Geauge 0 - 10 bar c/w BPP.399 buah 778,665.00 820,290.00 843,156.00 843,156.00 889,887.00 917,970.00 883,005.00
23 Selotif BPP.400 buah 4,440.00 4,440.00 5,550.00 4,440.00 4,440.00 5,550.00 4,440.00
24 Street Box BPP.401 buah 286,824.00 302,142.00 310,689.00 310,689.00 327,894.00 338,217.00 325,341.00

M BAHAN MEKANIKAL ELEKTRIKAL


1 MCFA-5 Zone BME.1 buah 6,771,000.00 7,041,840.00 7,786,650.00 7,109,550.00 7,041,840.00 7,786,650.00 7,583,520.00
2 Antena UHF BME.2 buah 804,750.00 836,940.00 925,740.00 844,710.00 836,940.00 925,740.00 901,320.00
3 AC Split 1/2 PK Flash Inventer Setara Daikin BME.3 unit 5,960,700.00 6,199,350.00 6,855,360.00 6,259,290.00 6,199,350.00 6,855,360.00 6,675,540.00
4 AC Split 1 PK Flash Inventer Setara Daikin BME.4 unit 5,439,000.00 5,656,560.00 6,254,850.00 5,710,950.00 5,656,560.00 6,254,850.00 6,091,680.00
5 BC-50 mm BME.5 m 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
6 Bell Alarm BME.6 buah 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
7 Box 40x40x40cm BME.7 buah 543,900.00 566,100.00 626,040.00 571,650.00 566,100.00 626,040.00 609,390.00
8 Box hager BME.8 buah 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
9 Coaxial 7c-2v BME.10 m 19,980.00 21,090.00 23,310.00 21,090.00 21,090.00 23,310.00 22,200.00
10 Conduit pipa 2 x dia. 32 BME.11 m 21,090.00 22,200.00 24,420.00 22,200.00 22,200.00 24,420.00 23,310.00
11 Conduit pipa dia. 20 BME.12 m 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
12 Conduit pipa dia. 32 BME.13 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
13 Down light / PLC 13 W BME.14 buah 139,860.00 145,410.00 145,410.00 146,853.00 153,846.00 160,839.00 156,621.00
14 Elbow w=400 mm BME.15 buah 288,600.00 299,700.00 331,890.00 303,030.00 299,700.00 331,890.00 323,010.00
15 Fittings BME.16 buah 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
16 Fitting Gantung 216 L BME.17 pcs 16,650.00 17,760.00 18,870.00 17,760.00 17,760.00 18,870.00 18,870.00
17 Fitting Kombinasi 226 BME.18 pcs 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
18 Fitting Plafon 1210 BME.19 pcs 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
19 Fitting Plafon 1211 BME.20 pcs 25,530.00 26,640.00 28,860.00 26,640.00 26,640.00 28,860.00 28,860.00
20 Fitting Plafon 1212 BME.21 pcs 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
21 Fitting Plafon 327 (210L) BME.22 pcs 15,540.00 16,650.00 17,760.00 16,650.00 16,650.00 17,760.00 17,760.00
22 Fitting plafond + lampu SL BME.23 buah 104,895.00 109,002.00 109,002.00 110,112.00 115,329.00 120,546.00 117,438.00
23 FRC 3x 2.5 mm BME.24 m 105,450.00 109,890.00 120,990.00 111,000.00 109,890.00 120,990.00 117,660.00
24 FRC 4x4 mm BME.25 m 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
25 FRC 4x6 mm BME.26 m 244,200.00 254,190.00 280,830.00 256,410.00 254,190.00 280,830.00 273,060.00

A.2 - 56
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

26 Genset-25 kVA BME.27 unit 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
27 gronding rod Gip 1" BME.28 m 399,600.00 415,140.00 459,540.00 419,580.00 415,140.00 459,540.00 447,330.00
28 Heat detector BME.29 buah 81,030.00 84,360.00 93,240.00 85,470.00 84,360.00 93,240.00 91,020.00
29 Indikator Lamp BME.30 buah 83,250.00 86,580.00 95,460.00 87,690.00 86,580.00 95,460.00 93,240.00
30 Isolasi listrik BME.31 buah 22,533.00 23,421.00 23,421.00 23,643.00 24,753.00 25,863.00 25,197.00
31 Jelly armoured 10x2x0,6 mm BME.32 m 24,420.00 25,530.00 27,750.00 25,530.00 25,530.00 27,750.00 27,750.00
32 Kabel Coaxial 5V-2C BME.33 m 13,320.00 13,320.00 15,540.00 14,430.00 13,320.00 15,540.00 14,430.00
33 Kabel ITC 4x0,6 mm BME.34 m 4,440.00 4,440.00 5,550.00 4,440.00 4,440.00 5,550.00 4,440.00
34 Kabel NYA 2x1,5 mm2 BME.35 m 6,660.00 6,660.00 7,770.00 6,660.00 6,660.00 7,770.00 7,770.00
35 Kabel NYA 2x2,5 mm2 BME.36 m 9,990.00 9,990.00 11,100.00 9,990.00 9,990.00 11,100.00 11,100.00
36 Kabel NYFGBY 3x2,5 mm2 BME.37 m 29,970.00 31,080.00 34,410.00 31,080.00 31,080.00 34,410.00 33,300.00
37 Kabel NYM 3x2,5 mm2 BME.38 m 20,535.00 21,090.00 23,310.00 21,090.00 21,090.00 23,310.00 23,310.00
38 Kabel NYA 3x4 mm BME.39 m 32,190.00 33,300.00 36,630.00 33,300.00 33,300.00 36,630.00 35,520.00
39 Lampu armatur HPI-T 250 W BME.40 buah 1,332,000.00 1,385,280.00 1,531,800.00 1,398,600.00 1,385,280.00 1,531,800.00 1,491,840.00
40 Lampu Baret-32w BME.41 buah 277,500.00 288,600.00 319,680.00 291,930.00 288,600.00 319,680.00 310,800.00
41 Lampu -Pijar 40W BME.42 buah 9,990.00 9,990.00 11,100.00 9,990.00 9,990.00 11,100.00 11,100.00
42 Lampu Pijar SL 13w BME.43 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
43 Lampu Pl-7w BME.44 buah 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
44 Lampu Taman-SL26W BME.45 buah 388,500.00 404,040.00 447,330.00 408,480.00 404,040.00 447,330.00 435,120.00
45 Lampu LED 3 Watt BME.46 buah 29,970.00 31,080.00 34,410.00 31,080.00 31,080.00 34,410.00 33,300.00
46 Lampu LED 5 Watt BME.47 buah 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
47 Lampu LED 10 Watt BME.48 buah 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
48 Lampu LED 12 Watt BME.49 buah 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
49 Lampu LED 19 Watt BME.50 buah 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
50 Lampu TL-D 10 Watt BME.51 buah 17,760.00 18,870.00 19,980.00 18,870.00 18,870.00 19,980.00 19,980.00
51 Lampu TL-D 18 Watt BME.52 buah 21,090.00 22,200.00 24,420.00 22,200.00 22,200.00 24,420.00 23,310.00
52 Lampu TL-D BRIGHT BOOST 18 W BME.53 buah 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
53 Lampu TL-E 22 W LIFEMAX (RING) BME.54 buah 25,530.00 26,640.00 28,860.00 26,640.00 26,640.00 28,860.00 28,860.00
54 Lampu TL-E 32 W LIFEMAX (RING) BME.55 buah 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
55 Lampu SIMBAT TMS012 1XTL-D18W SINGLE LAMP BME.59 buah 140,970.00 146,520.00 162,060.00 147,630.00 146,520.00 162,060.00 157,620.00
56 Lampu SIMBAT TMS012 1XTL-D36W SINGLE LAMP BME.60 buah 172,050.00 178,710.00 197,580.00 180,930.00 178,710.00 197,580.00 193,140.00
57 Lampu SIMBAT TMS012 2XTL-D18W TWIN LAMP BME.61 buah 172,050.00 178,710.00 197,580.00 180,930.00 178,710.00 197,580.00 193,140.00
58 Lampu SIMBAT TMS012 2XTL-D36W TWIN LAMP BME.62 buah 271,950.00 283,050.00 313,020.00 285,270.00 283,050.00 313,020.00 304,140.00
59 Lampu TL Bulk-36W BME.63 buah 177,600.00 184,260.00 204,240.00 186,480.00 184,260.00 204,240.00 198,690.00
60 Manual push button BME.64 buah 183,150.00 190,920.00 210,900.00 192,030.00 190,920.00 210,900.00 205,350.00

A.2 - 57
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

61 Master Amplifier BME.65 unit 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
62 MCB,1p, 6A BME.66 buah 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
63 MDF-FA BME.68 buah 444,000.00 461,760.00 510,600.00 466,200.00 461,760.00 510,600.00 497,280.00
64 NYA 16 mm BME.69 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
65 NYA 2,5 mm BME.70 m 6,660.00 6,660.00 7,770.00 6,660.00 6,660.00 7,770.00 7,770.00
66 NYA 20x1,5 mm BME.71 m 66,600.00 68,820.00 76,590.00 69,930.00 68,820.00 76,590.00 74,370.00
67 NYA 3x2x2,5 mm BME.72 m 19,980.00 21,090.00 23,310.00 21,090.00 21,090.00 23,310.00 22,200.00
68 NYA 4 mm BME.73 m 8,880.00 8,880.00 9,990.00 8,880.00 8,880.00 9,990.00 9,990.00
69 NYA 5x2x2,5 mm BME.74 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
70 NYA 6 mm BME.75 m 13,320.00 13,320.00 15,540.00 14,430.00 13,320.00 15,540.00 14,430.00
71 NYA 95 mm BME.76 m 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
72 NYFGBY 4x240 mm BME.77 m 1,509,600.00 1,569,540.00 1,736,040.00 1,585,080.00 1,569,540.00 1,736,040.00 1,690,530.00
73 NYM 3x2,5 mm BME.79 m 26,085.00 26,640.00 29,970.00 27,750.00 26,640.00 29,970.00 28,860.00
74 NYM 3x4 mm BME.80 m 31,968.00 32,745.00 36,741.00 33,966.00 32,745.00 36,741.00 35,409.00
75 NYY 3x2,5 mm BME.81 m 30,414.00 31,080.00 34,965.00 32,301.00 31,080.00 34,965.00 33,633.00
76 NYY 4x16 mm BME.82 m 140,970.00 146,520.00 162,060.00 147,630.00 146,520.00 162,060.00 157,620.00
77 NYY 4x185 mm BME.83 m 820,623.00 853,590.00 943,500.00 861,360.00 853,590.00 943,500.00 919,080.00
78 NYY 4x2,5 mm BME.84 m 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
79 NYY 4x240 mm BME.85 m 1,122,987.00 1,167,831.00 1,291,374.00 1,179,042.00 1,167,831.00 1,291,374.00 1,257,741.00
80 NYY 4x4 mm BME.86 m 49,950.00 52,170.00 57,720.00 52,170.00 52,170.00 57,720.00 55,500.00
81 NYY 4x6 mm BME.87 m 69,930.00 73,260.00 79,920.00 73,260.00 73,260.00 79,920.00 78,810.00
82 NYY 70 mm BME.88 m 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
83 Reducer w=400 mm BME.91 buah 210,900.00 219,780.00 243,090.00 222,000.00 219,780.00 243,090.00 236,430.00
84 Saklar ganda BME.92 buah 27,750.00 28,860.00 44,400.00 28,860.00 28,860.00 44,400.00 31,080.00
85 skalar tunggal BME.93 buah 22,200.00 23,310.00 38,850.00 23,310.00 23,310.00 38,850.00 24,420.00
86 Smoke detector BME.94 buah 410,700.00 427,350.00 472,860.00 431,790.00 427,350.00 472,860.00 459,540.00
87 Splitter 6 port BME.95 buah 149,850.00 155,400.00 172,050.00 157,620.00 155,400.00 172,050.00 167,610.00
88 splitzen lengkap BME.96 set 2,997,000.00 3,116,880.00 3,446,550.00 3,146,850.00 3,116,880.00 3,446,550.00 3,356,640.00
89 Stop kontak 13 A BME.97 buah 38,850.00 39,960.00 49,950.00 41,070.00 39,960.00 49,950.00 43,290.00
90 Stop kontak-TELEPON BME.98 buah 72,150.00 75,480.00 83,250.00 75,480.00 75,480.00 83,250.00 81,030.00
91 Stop kontak-TV BME.99 buah 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
92 TEE w=200 mm BME.100 buah 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
93 TEE w=400 mm BME.101 buah 310,800.00 323,010.00 357,420.00 326,340.00 323,010.00 357,420.00 348,540.00
94 Terminal BME.102 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
95 Terminal Fire Alarm BME.103 buah 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00

A.2 - 58
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

96 Terminal TV BME.104 buah 27,750.00 28,860.00 32,190.00 28,860.00 28,860.00 32,190.00 31,080.00
97 Tiang Lampu 1.5 m BME.105 buah 188,700.00 196,470.00 217,560.00 198,690.00 196,470.00 217,560.00 210,900.00
98 Tiang Lampu 2.5 m BME.106 buah 310,800.00 323,010.00 357,420.00 326,340.00 323,010.00 357,420.00 348,540.00
99 Tray w=200 mm BME.107 m 149,850.00 155,400.00 172,050.00 157,620.00 155,400.00 172,050.00 167,610.00
100 Tray w=400 mm BME.108 m 233,100.00 241,980.00 268,620.00 245,310.00 241,980.00 268,620.00 260,850.00
101 Tray w=600 mm BME.109 m 299,700.00 311,910.00 345,210.00 315,240.00 311,910.00 345,210.00 335,220.00
102 Tray w=900 mm BME.110 m 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00
103 Panel MDP BME.111 unit 6,882,000.00 7,157,280.00 7,914,300.00 7,226,100.00 7,157,280.00 7,914,300.00 7,707,840.00
104 Panel DB Pengelola BME.112 unit 11,877,000.00 12,352,080.00 13,658,550.00 12,470,850.00 12,352,080.00 13,658,550.00 13,302,240.00
105 Panel DB Unit lt 1 BME.113 unit 16,317,000.00 16,969,680.00 18,764,550.00 17,132,850.00 16,969,680.00 18,764,550.00 18,275,040.00
106 Panel DB Unit lt 2,3,4,5 BME.114 unit 14,763,000.00 15,353,520.00 16,977,450.00 15,501,150.00 15,353,520.00 16,977,450.00 16,534,560.00
107 Panel Kebakaran BME.115 unit 6,882,000.00 7,157,280.00 7,914,300.00 7,226,100.00 7,157,280.00 7,914,300.00 7,707,840.00
108 pipa Gip ø 100" BME.116 m 266,067.00 276,612.00 305,916.00 279,276.00 276,612.00 305,916.00 297,924.00
109 Panel Pompa Air Bersih BME.117 unit 12,210,000.00 12,698,400.00 14,041,500.00 12,820,500.00 12,698,400.00 14,041,500.00 13,675,200.00
110 Panel Unit BME.118 unit 610,500.00 634,920.00 702,630.00 641,580.00 634,920.00 702,630.00 683,760.00
111 Box Panel BME.119 unit 1,221,000.00 1,269,840.00 1,404,150.00 1,282,050.00 1,269,840.00 1,404,150.00 1,367,520.00
112 Cu Bar BME.120 unit 621,600.00 646,020.00 714,840.00 652,680.00 646,020.00 714,840.00 695,970.00
113 MCCB,3p 300 A BME.121 unit 4,773,000.00 4,963,920.00 5,488,950.00 5,011,650.00 4,963,920.00 5,488,950.00 5,345,760.00

N BAHAN LANSEKAP
1 Ara Rea BL.1 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
2 Asoka BL.2 polyback 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
3 Bakung BL.3 polyback 12,210.00 12,210.00 14,430.00 13,320.00 12,210.00 14,430.00 13,320.00
4 Brokoli BL.4 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
5 Brokoli Kuning BL.5 polyback 61,050.00 63,270.00 69,930.00 64,380.00 63,270.00 69,930.00 68,820.00
6 Bugenvil Parigata t = 0,75 m BL.6 pohon 432,900.00 450,660.00 498,390.00 455,100.00 450,660.00 498,390.00 485,070.00
7 Bunga Krisan BL.7 polyback 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
8 Dolar t= 1 m BL.8 Pohon 3,552,000.00 3,694,080.00 4,084,800.00 3,729,600.00 3,694,080.00 4,084,800.00 3,978,240.00
9 Kalatea kodok BL.9 polyback 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
10 Kalatea Merah BL.10 polyback 99,900.00 104,340.00 115,440.00 105,450.00 104,340.00 115,440.00 112,110.00
11 Kucai BL.11 polyback 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
12 Lili Brasil BL.12 polyback 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
13 Lili Paris BL.13 polyback 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
14 Nanas nanasan BL.14 polyback 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
15 Palem Putri t = 2 m BL.15 pohon 643,800.00 669,330.00 740,370.00 675,990.00 669,330.00 740,370.00 721,500.00

A.2 - 59
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

16 Palem Kuning BL.16 rumpun 355,200.00 369,630.00 408,480.00 372,960.00 369,630.00 408,480.00 397,380.00
17 Palem Phonik t= 1 m BL.17 pohon 499,500.00 519,480.00 574,980.00 525,030.00 519,480.00 574,980.00 559,440.00
18 Palem Regu BL.18 rumpun 288,600.00 299,700.00 331,890.00 303,030.00 299,700.00 331,890.00 323,010.00
19 Pucuk Merah t = 0,75 m BL.19 pohon 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
20 Pupuk Kompos BL.20 kg 2,220.00 2,220.00 2,220.00 2,220.00 2,220.00 2,220.00 2,220.00
21 Rembusa Hijau BL.21 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
22 Rembusa Putih BL.22 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
23 Rumput Jepang BL.23 m2 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
24 Sambang dara BL.24 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00
25 Tabib Buya t = 3-4 m BL.25 pohon 710,400.00 739,260.00 816,960.00 745,920.00 739,260.00 816,960.00 795,870.00
26 Taiwan Beuty BL.26 polyback 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
27 Terang Bulan BL.27 polyback 22,200.00 23,310.00 25,530.00 23,310.00 23,310.00 25,530.00 24,420.00
28 Top soil BL.28 m3 288,600.00 299,700.00 331,890.00 303,030.00 299,700.00 331,890.00 323,010.00
29 Rumput Gajah Mini BL.29 m2 94,350.00 97,680.00 108,780.00 98,790.00 97,680.00 108,780.00 105,450.00
30 Melati putih BL.30 polyback 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
31 Bulu domba BL.31 polyback 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
32 Adam hawa BL.32 polyback 35,520.00 36,630.00 41,070.00 37,740.00 36,630.00 41,070.00 39,960.00
33 Trembesi BL.33 polyback 38,850.00 39,960.00 44,400.00 41,070.00 39,960.00 44,400.00 43,290.00
34 Palm Ekor Tupai BL.34 polyback 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
35 Asam jawa BL.35 polyback 55,500.00 57,720.00 64,380.00 58,830.00 57,720.00 64,380.00 62,160.00

O BAHAN GEOTEKSTIL DAN LAINNYA


1 Accelerator M256 kg 19,980.00 21,090.00 23,310.00 21,090.00 21,090.00 23,310.00 22,200.00
2 Bahan Geosynthetic BG.1 m2 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
3 Bahan Modifikasi M67 kg 11,100.00 11,100.00 13,320.00 12,210.00 11,100.00 13,320.00 12,210.00
4 Geogrid Biaxial BG.2 m2 160,950.00 167,610.00 185,370.00 168,720.00 167,610.00 185,370.00 179,820.00
5 Geotekstil Filter BG.3 m2 160,950.00 167,610.00 185,370.00 168,720.00 167,610.00 185,370.00 179,820.00
6 Geotekstil Separator kelas 1 BG.4 m2 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
7 Geotekstil Separator kelas 2 BG.5 m2 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
8 Geotekstil Separator kelas 3 BG.6 m2 94,350.00 97,680.00 108,780.00 98,790.00 97,680.00 108,780.00 105,450.00
9 Geotekstil Stabilisator kelas 1 BG.7 m2 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
10 Geotextile M30 m2 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
11 Geotextile Non Woven BG.8 m2 133,200.00 138,750.00 153,180.00 139,860.00 138,750.00 153,180.00 148,740.00
12 Geotextile Woven BG.9 m2 122,100.00 126,540.00 140,970.00 128,760.00 126,540.00 140,970.00 136,530.00
13 Glass Bead M34 m2 144,300.00 150,072.00 165,945.00 151,515.00 150,072.00 165,945.00 161,616.00

A.2 - 60
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN KETERANGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat Peso Bunyu
dan Tanjung dan Tj Palas dan Peso Hilir
Palas Utara

14 Glass Bead M34 kg 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
15 Kapur Padam BG.10 kg 83,250.00 86,025.00 94,350.00 88,800.00 86,025.00 94,350.00 91,575.00
16 Pengeras Beton BG.11 liter 66,600.00 69,375.00 77,700.00 72,150.00 69,375.00 77,700.00 74,925.00
17 Plastizier M182 kg 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
18 Pormika BG.12 lembar 388,500.00 416,250.00 499,500.00 444,000.00 416,250.00 499,500.00 471,750.00
19 Pupuk M272 kg 33,300.00 34,410.00 38,850.00 35,520.00 34,410.00 38,850.00 37,740.00
20 Tanah humus M271 m3 155,400.00 162,060.00 178,710.00 163,170.00 162,060.00 178,710.00 174,270.00
21 Wax M160 kg 44,400.00 46,620.00 51,060.00 46,620.00 46,620.00 51,060.00 49,950.00
22 Zeolit M159 kg 7,770.00 7,770.00 8,880.00 7,770.00 7,770.00 8,880.00 8,880.00

A.2 - 61
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
harga satuan dasar (basic price) - peralatan
HARGA SATUAN DASAR ALAT BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
1 2 3 4 5 6 7 8 9
A ALAT BERAT
1 Aggregat (chip) Spreader E40 unit 473,193,000.00 474,613,800.00 480,285,900.00 475,091,100.00 474,613,800.00 480,285,900.00 470,862,000.00
2 AMP (Emulsi, Asbuton) E01a unit 6,506,409,300.00 6,525,923,100.00 6,604,000,500.00 6,532,438,800.00 6,525,923,100.00 6,604,000,500.00 6,474,352,500.00
3 AMP (Warm Mix) E01a unit 6,506,409,300.00 6,525,923,100.00 6,604,000,500.00 6,532,438,800.00 6,525,923,100.00 6,604,000,500.00 6,474,352,500.00
4 Asphalt Distributor E41 unit 3,717,945,000.00 3,729,100,500.00 3,773,711,400.00 3,732,819,000.00 3,729,100,500.00 3,773,711,400.00 3,699,630,000.00
5 Asphalt Finisher E02 unit 3,717,945,000.00 3,729,100,500.00 3,773,711,400.00 3,732,819,000.00 3,729,100,500.00 3,773,711,400.00 3,699,630,000.00
6 Asphalt Liquid Mixer E34a unit 177,444,600.00 177,977,400.00 180,108,600.00 178,155,000.00 177,977,400.00 180,108,600.00 176,578,800.00
7 Asphalt Liquid Mixer (kap 20000) E34 unit 141,957,900.00 142,379,700.00 144,089,100.00 142,524,000.00 142,379,700.00 144,089,100.00 141,258,600.00
8 Asphalt Mixing Plant E01a unit 6,506,409,300.00 6,525,923,100.00 6,604,000,500.00 6,532,438,800.00 6,525,923,100.00 6,604,000,500.00 6,474,352,500.00
9 Asphalt Tanker E45 unit 591,496,800.00 593,272,800.00 600,365,700.00 593,861,100.00 593,272,800.00 600,365,700.00 588,577,500.00
10 Baby Vibratory Roller 1-2 T. E19a unit 132,378,600.00 132,778,200.00 134,365,500.00 132,911,400.00 132,778,200.00 134,365,500.00 131,734,800.00
11 Bar Bender E53 unit 185,902,800.00 186,457,800.00 188,688,900.00 186,646,500.00 186,457,800.00 188,688,900.00 184,981,500.00
12 Bar Cutter E54 unit 77,744,400.00 77,977,500.00 78,909,900.00 78,055,200.00 77,977,500.00 78,909,900.00 77,355,900.00
13 Blending Equipment E52 unit 591,496,800.00 593,272,800.00 600,365,700.00 593,861,100.00 593,272,800.00 600,365,700.00 588,577,500.00
14 Bore Pile Machine E33 unit 2,661,713,400.00 2,669,694,300.00 2,701,640,100.00 2,672,358,300.00 2,669,694,300.00 2,701,640,100.00 2,648,604,300.00
15 Bore Pile Machine Dia 60 E33 unit 1,384,092,300.00 1,388,243,700.00 1,404,849,300.00 1,389,631,200.00 1,388,243,700.00 1,404,849,300.00 1,377,276,900.00
16 Breaker E55 unit 1,951,923,900.00 1,957,784,700.00 1,981,205,700.00 1,959,727,200.00 1,957,784,700.00 1,981,205,700.00 1,942,311,300.00
17 Bulldozer 100-150 Hp E04 unit 2,957,461,800.00 2,966,330,700.00 3,001,828,500.00 2,969,294,400.00 2,966,330,700.00 3,001,828,500.00 2,942,887,500.00
18 Cement Tanker E46 unit 591,496,800.00 593,272,800.00 600,365,700.00 593,861,100.00 593,272,800.00 600,365,700.00 588,577,500.00
19 Chain Saw P.7 unit 18,592,500.00 18,648,000.00 18,870,000.00 18,670,200.00 18,648,000.00 18,870,000.00 18,503,700.00
20 Cold Milling E36 unit 6,269,812,800.00 6,288,627,300.00 6,363,863,100.00 6,294,887,700.00 6,288,627,300.00 6,363,863,100.00 6,238,921,500.00
21 Cold Paint Spray Machine E86 unit 82,806,000.00 83,050,200.00 84,049,200.00 83,139,000.00 83,050,200.00 84,049,200.00 82,406,400.00
22 Cold Recycler E38 unit 23,363,901,600.00 23,433,998,100.00 23,714,361,900.00 23,457,352,500.00 23,433,998,100.00 23,714,361,900.00 23,248,816,800.00
23 Compressor 4000-6500 L\M E05 unit 301,942,200.00 302,852,400.00 306,471,000.00 303,152,100.00 302,852,400.00 306,471,000.00 300,454,800.00
24 Concrete Breaker E44 unit 1,206,647,700.00 1,210,266,300.00 1,224,751,800.00 1,211,476,200.00 1,210,266,300.00 1,224,751,800.00 1,200,698,100.00
25 Concrete Cutter 130 Feet/Mnt E76 unit 30,758,100.00 30,846,900.00 31,224,300.00 30,880,200.00 30,846,900.00 31,224,300.00 30,602,700.00
26 Concrete Mixer (350) E47 unit 41,691,600.00 41,813,700.00 42,313,200.00 41,858,100.00 41,813,700.00 42,313,200.00 41,480,700.00
27 Concrete Mixer 0.3-0.6 M3 E06 unit 41,403,000.00 41,525,100.00 42,024,600.00 41,569,500.00 41,525,100.00 42,024,600.00 41,203,200.00
28 Concrete Pan Mixer E43 unit 1,182,982,500.00 1,186,534,500.00 1,200,731,400.00 1,187,711,100.00 1,186,534,500.00 1,200,731,400.00 1,177,155,000.00
29 Concrete Pump E28 unit 2,780,572,200.00 2,788,919,400.00 2,822,286,000.00 2,791,694,400.00 2,788,919,400.00 2,822,286,000.00 2,766,874,800.00
30 Concrete Vibrator E20 unit 29,859,000.00 29,947,800.00 30,303,000.00 29,981,100.00 29,947,800.00 30,303,000.00 29,714,700.00
31 Crane 10-15 Ton E07 unit 2,309,632,500.00 2,316,558,900.00 2,344,275,600.00 2,318,867,700.00 2,316,558,900.00 2,344,275,600.00 2,298,255,000.00

A.3 - 63
HARGA SATUAN DASAR ALAT BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023

NO URAIAN KODE SATUAN KABUPATEN BULUNGAN


Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
1 2 3 4 5 6 7 8 9

32 Crane On Track 35 Ton E31 unit 7,062,974,400.00 7,084,164,300.00 7,168,923,900.00 7,091,223,900.00 7,084,164,300.00 7,168,923,900.00 7,028,175,900.00
33 Crane On Track 75 - 100 Ton E51 unit 12,468,641,100.00 12,506,048,100.00 12,655,676,100.00 12,518,513,400.00 12,506,048,100.00 12,655,676,100.00 12,407,213,700.00
34 Drum Mixer (Untuk Asphaltic Plug) E79 unit 709,789,500.00 711,920,700.00 720,434,400.00 712,631,100.00 711,920,700.00 720,434,400.00 706,293,000.00
35 Dump Truck 10 T atau 8 M3 E09 unit 574,591,500.00 576,312,000.00 583,205,100.00 576,889,200.00 576,312,000.00 583,205,100.00 571,761,000.00
36 Dump Truck 3-4 M3 E08 unit 535,164,300.00 536,773,800.00 543,189,600.00 537,306,600.00 536,773,800.00 543,189,600.00 532,522,500.00
37 Excavatot Long Arm 155 HP E10 unit 2,112,474,300.00 2,118,812,400.00 2,144,164,800.00 2,120,921,400.00 2,118,812,400.00 2,144,164,800.00 2,102,062,500.00
38 Excavator 80-140 Hp E10 unit 1,881,505,500.00 1,887,155,400.00 1,909,732,800.00 1,889,031,300.00 1,887,155,400.00 1,909,732,800.00 1,872,237,000.00
39 Flat Bed Truck 10 ton E11 unit 828,093,300.00 830,579,700.00 840,514,200.00 831,401,100.00 830,579,700.00 840,514,200.00 824,008,500.00
40 Fulvi Mixer E27 unit 1,064,689,800.00 1,067,886,600.00 1,080,662,700.00 1,068,952,200.00 1,067,886,600.00 1,080,662,700.00 1,059,439,500.00
41 Generator Set E12 unit 244,877,100.00 245,609,700.00 248,551,200.00 245,853,900.00 245,609,700.00 248,551,200.00 243,667,200.00
42 Grouting Pump E56 unit 28,393,800.00 28,482,600.00 28,815,600.00 28,504,800.00 28,482,600.00 28,815,600.00 28,249,500.00
43 Hot Recycler E39 unit 18,927,720,000.00 18,984,507,600.00 19,211,635,800.00 19,003,433,100.00 18,984,507,600.00 19,211,635,800.00 18,834,480,000.00
44 Hydrolic Pump E83 unit 18,925,500.00 18,981,000.00 19,214,100.00 19,003,200.00 18,981,000.00 19,214,100.00 18,836,700.00
45 Jack Hammer E26 unit 172,383,000.00 172,904,700.00 174,969,300.00 173,071,200.00 172,904,700.00 174,969,300.00 171,528,300.00
46 Jack Hidrolic E57 unit 459,673,200.00 461,049,600.00 466,566,300.00 461,515,800.00 461,049,600.00 466,566,300.00 457,408,800.00
47 Jack Hidrolik Jembatan E82 unit 88,722,300.00 88,988,700.00 90,054,300.00 89,077,500.00 88,988,700.00 90,054,300.00 88,289,400.00
48 Kunci Torsi 200-1000N.M E74 unit 17,748,900.00 17,804,400.00 18,015,300.00 17,815,500.00 17,804,400.00 18,015,300.00 17,660,100.00
49 Manifold E84 unit 5,916,300.00 5,938,500.00 6,005,100.00 5,938,500.00 5,938,500.00 6,005,100.00 5,883,000.00
50 Mesin Las E58 unit 57,464,700.00 57,642,300.00 58,330,500.00 57,697,800.00 57,642,300.00 58,330,500.00 57,176,100.00
51 Mini Excavator 40-60 HP E10a unit 968,919,000.00 971,827,200.00 983,448,900.00 972,792,900.00 971,827,200.00 983,448,900.00 964,146,000.00
52 Mobile Crane 1 Ton E78 unit 1,064,689,800.00 1,067,886,600.00 1,080,662,700.00 1,068,952,200.00 1,067,886,600.00 1,080,662,700.00 1,059,439,500.00
53 Motor Grader >100 Hp E13 unit 2,906,757,000.00 2,915,481,600.00 2,950,357,800.00 2,918,378,700.00 2,915,481,600.00 2,950,357,800.00 2,892,438,000.00
54 Pedestrian Roller E24 unit 788,655,000.00 791,019,300.00 800,487,600.00 791,807,400.00 791,019,300.00 800,487,600.00 784,770,000.00
55 Peralatan Pengeboran lengkap P.42 unit 90,132,000.00 90,398,400.00 91,486,200.00 90,487,200.00 90,398,400.00 91,486,200.00 89,688,000.00
56 Peralatan Sondir lengkap P.43 unit 53,235,600.00 53,391,000.00 54,034,800.00 53,446,500.00 53,391,000.00 54,034,800.00 52,969,200.00
57 Pile Hammer E60 unit 692,040,600.00 694,116,300.00 702,419,100.00 694,804,500.00 694,116,300.00 702,419,100.00 688,632,900.00
58 Pile Driver + Hammer E30 unit 692,040,600.00 694,116,300.00 702,419,100.00 694,804,500.00 694,116,300.00 702,419,100.00 688,632,900.00
59 Pile Driver Leader, 75 Kw E59 unit 473,193,000.00 474,613,800.00 480,285,900.00 475,091,100.00 474,613,800.00 480,285,900.00 470,862,000.00
60 Pile Hammer, 2,5 Ton E61 unit 473,193,000.00 474,613,800.00 480,285,900.00 475,091,100.00 474,613,800.00 480,285,900.00 470,862,000.00
61 Pompa + Mixer Epoxy, 600 Watt P.44 unit 8,280,600.00 8,302,800.00 8,402,700.00 8,313,900.00 8,302,800.00 8,402,700.00 8,236,200.00
62 Pompa + Mixer Epoxy, 810 Watt E75 unit 7,092,900.00 7,115,100.00 7,203,900.00 7,126,200.00 7,115,100.00 7,203,900.00 7,059,600.00

HARGA SATUAN DASAR ALAT BIDANG KE PU AN

A.3 - 64
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
1 2 3 4 5 6 7 8 9

63 Power Broom E03 unit 41,125,500.00 41,247,600.00 41,747,100.00 41,292,000.00 41,247,600.00 41,747,100.00 40,925,700.00
64 Rock Drill Breaker E37 unit 14,196,900.00 14,241,300.00 14,407,800.00 14,252,400.00 14,241,300.00 14,407,800.00 14,130,300.00
65 Sand Blasting E77 unit 8,902,200.00 8,924,400.00 9,035,400.00 8,935,500.00 8,924,400.00 9,035,400.00 8,857,800.00
66 Slip Form Paver E42 unit 16,336,425,000.00 16,385,431,500.00 16,581,468,600.00 16,401,770,700.00 16,385,431,500.00 16,581,468,600.00 16,255,950,000.00
67 Stamper E81 unit 35,486,700.00 35,597,700.00 36,019,500.00 35,631,000.00 35,597,700.00 36,019,500.00 35,320,200.00
68 Stone Crusher E21 unit 4,140,444,300.00 4,152,865,200.00 4,202,548,800.00 4,157,005,500.00 4,152,865,200.00 4,202,548,800.00 4,120,042,500.00
69 Stressing Jack E62 unit 354,900,300.00 355,965,900.00 360,228,300.00 356,321,100.00 355,965,900.00 360,228,300.00 353,146,500.00
70 Tamper E25 unit 122,810,400.00 123,176,700.00 124,653,000.00 123,298,800.00 123,176,700.00 124,653,000.00 122,199,900.00
71 Tandem Roller 6-8 T. E17 unit 2,009,943,600.00 2,015,970,900.00 2,040,091,200.00 2,017,980,000.00 2,015,970,900.00 2,040,091,200.00 2,000,042,400.00
72 Tandem Roller 8-10 T. E17a unit 1,774,479,300.00 1,779,807,300.00 1,801,097,100.00 1,781,572,200.00 1,779,807,300.00 1,801,097,100.00 1,765,732,500.00
73 Thermoplastic Road Marking Machine E85 unit 131,823,600.00 132,223,200.00 133,799,400.00 132,356,400.00 132,223,200.00 133,799,400.00 131,168,700.00
74 Thermoplastic spreading machine E.85 unit 141,957,900.00 142,379,700.00 144,089,100.00 142,524,000.00 142,379,700.00 144,089,100.00 141,258,600.00
75 Three Wheel Roller 6-8 T E16 unit 828,093,300.00 830,579,700.00 840,514,200.00 831,401,100.00 830,579,700.00 840,514,200.00 824,008,500.00
76 Tire Roller 8-10 T. E18 unit 1,689,975,000.00 1,695,047,700.00 1,715,327,400.00 1,696,734,900.00 1,695,047,700.00 1,715,327,400.00 1,681,650,000.00
77 Track Loader 75-100 Hp E14 unit 1,301,286,300.00 1,305,193,500.00 1,320,800,100.00 1,306,492,200.00 1,305,193,500.00 1,320,800,100.00 1,294,870,500.00
78 Trailer 20 Ton E29 unit 1,005,537,900.00 1,008,557,100.00 1,020,622,800.00 1,009,556,100.00 1,008,557,100.00 1,020,622,800.00 1,000,587,300.00
79 Tronton 15 Ton E29 unit 1,005,537,900.00 1,008,557,100.00 1,020,622,800.00 1,009,556,100.00 1,008,557,100.00 1,020,622,800.00 1,000,587,300.00
80 Truk Mixer E35 unit 1,685,745,900.00 1,690,807,500.00 1,711,031,700.00 1,692,483,600.00 1,690,807,500.00 1,711,031,700.00 1,677,443,100.00
81 Vibrating Rammer E48 unit 9,690,300.00 9,723,600.00 9,834,600.00 9,723,600.00 9,723,600.00 9,834,600.00 9,645,900.00
82 Vibratory Roller 5-8 T. E19 unit 762,192,600.00 764,479,200.00 773,625,600.00 765,245,100.00 764,479,200.00 773,625,600.00 758,440,800.00
83 Water Jet Blasting E64 unit 16,905,300.00 16,960,800.00 17,160,600.00 16,971,900.00 16,960,800.00 17,160,600.00 16,816,500.00
84 Water Pump 70-100 Mm E22 unit 8,902,200.00 8,924,400.00 9,035,400.00 8,935,500.00 8,924,400.00 9,035,400.00 8,857,800.00
85 Water Tanker 3000-4500 L. E23 unit 780,774,000.00 783,116,100.00 792,484,500.00 783,893,100.00 783,116,100.00 792,484,500.00 776,922,300.00
86 Welding Machine, 300 A E63 unit 58,585,800.00 58,763,400.00 59,462,700.00 58,818,900.00 58,763,400.00 59,462,700.00 58,297,200.00
87 Welding Set E32 unit 56,332,500.00 56,499,000.00 57,176,100.00 56,554,500.00 56,499,000.00 57,176,100.00 56,055,000.00
88 Wheel Loader 1.0-1.6 M3 E15 unit 2,309,632,500.00 2,316,558,900.00 2,344,275,600.00 2,318,867,700.00 2,316,558,900.00 2,344,275,600.00 2,298,255,000.00

A.3 - 65
HARGA SEWA PERALATAN BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
1 2 3 4 5 6 7 8 9
A ALAT BERAT
1 Aggregat (Chip) Spreader E40 Rp/jam 883,829.37 896,061.55 957,400.61 900,140.88 896,061.55 957,400.61 921,831.91
2 Asphalt Tanker E45 Rp/jam 996,204.73 1,013,750.41 1,095,383.83 1,019,823.89 1,013,750.41 1,095,384.40 1,049,367.92
3 Asphalt Distributor E41 Rp/jam 1,371,578.57 1,383,417.70 1,442,030.78 1,387,321.53 1,383,419.49 1,442,039.02 1,400,024.97
4 Asphalt Finisher E02 Rp/jam 1,577,218.17 1,588,005.92 1,637,549.32 1,591,601.84 1,588,008.45 1,637,560.95 1,594,665.61
5 Asphalt Liquid Mixer (Kap 20000 ) E34 Rp/jam 106,627.08 107,165.01 111,184.45 107,342.47 107,165.01 111,185.50 109,206.93
6 Asphalt Liquid Mixer E34a Rp/jam 234,923.88 238,270.20 255,510.28 239,371.76 238,271.30 255,511.11 246,014.52
7 Asphalt Mixing Plant E01 Rp/jam 14,545,140.16 14,816,953.16 15,809,983.33 14,947,076.54 14,816,959.25 15,810,000.79 15,459,062.16
8 Asphalt Mixing Plant (Modifikasi, Asbuton) E01b Rp/jam 13,669,223.69 13,933,664.47 14,894,272.56 14,061,220.62 13,933,668.48 14,894,284.07 14,569,173.17
9 Asphalt Mixing Plant (Warm Mix) E01a Rp/jam 13,669,223.69 13,933,664.47 14,894,272.56 14,061,220.62 13,933,668.48 14,894,284.07 14,569,173.17
10 Baby Vibratory Roller 1-2 T. E19a Rp/jam 129,044.30 129,709.28 133,696.35 130,015.30 129,708.43 133,697.39 132,145.71
11 Bar Bender E53 Rp/jam 118,008.15 118,489.09 122,202.15 118,650.61 118,490.13 122,201.99 120,192.10
12 Bar Cutter E54 Rp/jam 82,687.97 83,063.79 86,352.54 83,189.07 83,063.90 86,352.59 85,045.92
13 Blending Equipment E52 Rp/jam 446,297.92 451,779.51 478,617.80 453,605.69 451,779.51 478,618.54 462,068.80
14 Bore Pile Machine E33 Rp/jam 1,191,045.12 1,204,880.18 1,270,296.20 1,209,437.15 1,204,882.52 1,270,302.33 1,226,167.40
15 Bore Pile Machine E50 Rp/jam 1,025,591.18 1,039,216.09 1,103,623.61 1,043,758.73 1,039,217.30 1,103,626.41 1,062,772.11
16 Breaker E55 Rp/jam 1,149,979.80 1,165,079.20 1,236,675.87 1,170,046.92 1,165,079.20 1,236,681.19 1,190,530.06
17 Bulldozer 100-150 HP E04 Rp/jam 1,318,415.50 1,332,979.16 1,401,590.93 1,337,778.03 1,332,981.67 1,401,599.06 1,354,214.92
18 Cement Tanker E46 Rp/jam 911,844.73 927,614.41 1,003,031.83 932,799.89 927,614.41 1,003,032.40 958,791.92
19 Cold Milling E36 Rp/jam 2,437,983.22 2,461,681.72 2,574,798.61 2,469,489.92 2,461,684.24 2,574,814.26 2,493,835.40
20 Cold Paint Sray Machine E86 Rp/jam 100,053.24 100,516.60 103,780.61 100,735.04 100,518.36 103,781.39 102,762.19
21 Cold Recycler E38 Rp/jam 8,886,622.15 8,975,388.07 9,386,096.77 9,004,641.21 8,975,400.61 9,386,152.90 9,083,156.86
22 Compressor 4000-6500 L\M E05 Rp/jam 404,913.30 411,196.22 442,153.69 413,261.94 411,195.41 442,154.34 424,311.43
23 Concrete Breaker E44 Rp/jam 1,489,831.17 1,514,147.53 1,632,585.63 1,522,146.52 1,514,148.54 1,632,589.50 1,563,418.15
24 CONCRETE CUTTER 130 feet/mnt E76 Rp/jam 119,750.48 120,672.38 125,523.55 121,126.32 120,674.63 125,526.81 124,268.33
25 CONCRETE MIXER 0.3-0.6 M3 E06 Rp/jam 160,998.62 163,060.37 174,230.32 163,749.54 163,061.52 174,230.84 168,474.03
26 CONCRETE PAN MIXER E43 Rp/jam 479,344.55 481,856.19 497,677.92 482,691.37 481,856.19 497,682.49 487,120.45
27 CONCRETE PUMP E28 Rp/jam 1,216,073.61 1,229,985.81 1,295,699.86 1,234,566.15 1,229,986.16 1,295,707.14 1,251,072.02
28 CONCRETE VIBRATOR E20 Rp/jam 84,999.94 85,595.87 89,933.48 85,796.45 85,596.32 89,931.61 88,158.48
29 Concrete Mixer (350) E47 Rp/jam 136,461.75 138,127.10 147,511.72 138,676.17 138,128.23 147,510.50 142,809.76
30 CRANE 10-15 TON E07 Rp/jam 1,105,421.63 1,118,168.85 1,178,552.94 1,122,366.86 1,118,170.76 1,178,558.14 1,137,829.73
31 CRANE ON TRACK 35 TON E31 Rp/jam 2,019,875.76 2,034,466.54 2,101,474.89 2,039,283.10 2,034,470.17 2,101,491.61 2,044,381.34
32 CRANE ON TRACK 75-100 TON E51 Rp/jam 3,643,874.29 3,668,532.74 3,780,043.27 3,676,677.38 3,668,539.76 3,780,074.22 3,679,975.94
33 DRUM MIXER E79 Rp/jam 579,676.90 582,355.24 593,977.77 583,470.02 582,355.24 593,981.28 583,715.79
34 DUMP TRUCK 3 - 4 M3 E08 Rp/jam 555,569.40 564,036.09 605,143.72 566,820.48 564,035.49 605,144.51 580,756.18

A.3 - 66
HARGA SEWA PERALATAN BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023

NO URAIAN KODE SATUAN KABUPATEN BULUNGAN


Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
35 DUMP TRUCK 6-8 M3 E09 Rp/jam 917,125.33 932,909.79 1,008,391.58 938,101.82 932,910.87 1,008,391.76 964,047.67
36 EXCAVATOR 80-140 HP E10 Rp/jam 1,041,280.48 1,053,489.62 1,111,435.22 1,057,509.29 1,053,490.70 1,111,441.03 1,072,696.90
37 EXCAVATOR Long Arm 155 HP P.1 Rp/jam 557,173.92 565,678.44 592,467.78 569,599.50 565,678.44 592,467.78 594,335.21
38 FLAT BED TRUCK 3-4 TON E11 Rp/jam 621,759.31 630,424.13 672,325.77 633,273.74 630,424.14 672,327.64 646,620.03
39 FULVI MIXER E27 Rp/jam 2,265,930.69 2,302,069.47 2,471,174.28 2,314,115.73 2,302,069.47 2,471,181.49 2,368,164.77
40 GENERATOR SET E12 Rp/jam 803,440.44 818,191.38 888,972.35 823,041.75 818,191.98 888,973.15 848,309.16
41 GROUTING PUMP E56 Rp/jam 441,060.12 449,183.18 488,918.00 451,852.20 449,182.38 488,917.14 466,811.22
42 HOT RECYCLER E39 Rp/jam 5,925,077.58 5,970,321.24 6,178,646.87 5,985,253.63 5,970,331.28 6,178,692.02 6,005,558.32
43 HYDROLIC PUMP E83 Rp/jam 147,652.87 149,140.13 155,944.73 149,881.55 149,140.66 155,946.69 154,331.50
44 JACK HAMMER E26 Rp/jam 81,765.75 81,883.64 83,935.33 81,921.26 81,882.71 83,935.86 83,158.34
45 JACK HIDROLIC E57 Rp/jam 185,864.52 186,985.83 193,624.75 187,357.57 186,986.69 193,625.39 189,358.37
46 JACK HIDROLIK JEMBATAN E82 Rp/jam 175,392.32 176,963.39 184,099.98 177,731.29 176,963.39 184,100.81 181,934.18
47 KUNCI TORSI 200-1000N.M E74 Rp/jam 60,326.73 60,361.79 62,080.51 60,368.80 60,360.40 62,080.74 61,856.35
48 MANIFOLD E84 Rp/jam 46,551.77 46,565.79 48,193.50 46,565.79 46,562.99 48,193.58 48,116.45
49 Mesin Amplas kayu E73 Rp/jam 20,000.00 20,000.00 20,000.00 20,000.00 22,000.00 20,000.00 20,000.00
50 MESIN LAS E58 Rp/jam 95,699.19 96,117.56 99,558.79 96,254.55 96,114.18 99,561.75 97,991.15
51 MESIN POTONG RUMPUT E65 Rp/jam 24,333.33 24,333.33 24,333.33 24,333.33 26,766.66 24,333.33 24,333.33
52 MINI EXCAVATOR 40-60 HP E10a Rp/jam 649,068.16 653,553.97 671,411.00 655,602.77 653,554.39 671,413.52 660,411.94
53 MOBILE CRANE 1 TON E78 Rp/jam 963,742.39 974,587.93 1,014,488.60 979,890.31 974,587.94 1,014,491.72 999,572.95
54 MOTOR GRADER >100 HP E13 Rp/jam 1,228,592.30 1,241,502.75 1,302,360.80 1,245,753.78 1,241,503.47 1,302,367.60 1,259,609.81
55 PEDESTRIAN ROLLER E24 Rp/jam 304,587.01 305,981.47 313,643.19 306,443.03 305,982.53 313,646.38 307,182.48
56 PILE DRIVER + HAMMER E30 Rp/jam 297,144.50 299,639.27 312,618.15 300,460.77 299,639.77 312,619.32 304,009.71
57 PILE DRIVER LEADER, 75 kw E59 Rp/jam 339,370.73 345,109.72 373,613.55 346,996.99 345,109.72 373,613.55 357,785.32
58 PILE HAMMER E60 Rp/jam 611,343.68 613,903.10 626,388.57 614,753.45 613,904.76 626,392.48 613,364.64
59 PILE HAMMER, 2,5 Ton E61 Rp/jam 73,463.12 73,624.41 75,911.27 73,678.02 73,624.41 75,911.27 75,159.14
60 POMPA + MIXER EPOXY, 810 Watt E75 Rp/jam 47,295.06 47,309.08 48,947.94 47,316.09 47,308.51 48,950.89 48,859.73
61 POWER BROOM E03 Rp/jam 99,126.56 100,126.51 106,392.68 100,456.22 100,126.82 106,393.85 103,570.88
62 ROCK DRILL BREAKER E37 Rp/jam 97,798.05 98,079.95 104,141.97 98,172.90 98,079.46 104,141.45 103,346.14
63 SAND BLASTING E77 Rp/jam 379,788.53 384,783.53 403,851.74 387,281.03 384,783.53 403,851.74 398,856.74
64 SLIP FORM PAVER E42 Rp/jam 4,202,670.90 4,227,089.58 4,339,338.20 4,235,165.54 4,227,099.04 4,339,373.92 4,232,586.67
65 STAMPER E81 Rp/jam 162,549.16 164,084.49 171,064.31 164,838.12 164,081.68 171,064.86 169,157.90
66 STONE CRUSHER E21 Rp/jam 1,859,438.96 1,880,072.17 1,978,221.26 1,886,868.51 1,880,074.68 1,978,230.65 1,911,236.02
67 STRESSING JACK E62 Rp/jam 480,646.17 488,125.38 524,664.14 490,585.52 488,125.38 524,666.20 503,327.79
68 TAMPER E25 Rp/jam 114,338.91 114,680.49 117,737.33 114,794.35 114,681.77 117,738.24 116,054.63
69 TANDEM ROLLER 6-8 T. E17 Rp/jam 788,069.37 795,451.01 830,766.91 797,884.07 795,452.75 830,771.35 805,394.51
70 TANDEM ROLLER 8-10 T. E17a Rp/jam 1,119,426.04 1,131,198.85 1,186,521.91 1,135,119.41 1,131,198.85 1,186,528.38 1,148,054.97

A.3 - 67
HARGA SEWA PERALATAN BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023

NO URAIAN KODE SATUAN KABUPATEN BULUNGAN


Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
71 THERMOPLASTIC ROAD MARKING MACHINE E85 Rp/jam 119,534.38 120,059.49 123,553.75 120,295.58 120,057.99 123,553.69 122,141.87

72 THREE WHEEL ROLLER 6-8 T E16 Rp/jam 445,435.81 450,454.28 475,223.07 452,105.09 450,454.29 475,224.94 459,407.43
73 TIRE ROLLER 8-10 T. E18 Rp/jam 953,649.62 965,734.89 1,023,296.88 969,712.53 965,735.25 1,023,301.53 986,021.53
74 TRACK LOADER 75-100 HP E14 Rp/jam 611,132.46 617,687.43 649,448.83 619,845.68 617,687.43 649,450.69 628,207.07
75 TRAILER 20 TON E29 Rp/jam 940,256.24 955,072.25 1,025,823.81 959,944.62 955,072.26 1,025,826.43 983,145.99
76 TRONTON 15 TON E35 Rp/jam 1,080,644.28 1,096,456.48 1,174,445.98 1,101,725.18 1,096,456.48 1,174,449.39 1,129,000.05
77 Truk Mixer E49 Rp/jam 1,285,749.52 1,304,719.83 1,394,632.05 1,310,959.36 1,304,719.83 1,394,635.98 1,338,694.74
78 VIBRATING RAMMER E48 Rp/jam 68,166.12 68,603.13 72,205.48 68,742.99 68,600.93 72,204.98 70,987.33
79 VIBRATORY ROLLER 5-8 T. E19 Rp/jam 536,339.06 543,500.20 578,370.64 545,857.74 543,500.64 578,372.48 556,919.38
80 WATER JET BLASTING E64 Rp/jam 80,039.46 80,500.17 83,700.22 80,722.18 80,497.79 83,701.17 83,095.82
81 WATER PUMP 70-100 mm E22 Rp/jam 68,889.71 69,382.29 73,284.45 69,545.33 69,383.60 73,284.38 71,914.51
82 WATER TANKER 3000-4500 L. E23 Rp/jam 748,207.59 759,675.86 814,775.39 763,447.83 759,676.37 814,777.00 781,590.28
83 WELDING MACHINE, 300 A E63 Rp/jam 65,053.38 65,466.56 68,987.58 65,602.27 65,466.48 68,987.52 67,835.95
84 WELDING SET E32 Rp/jam 98,644.41 99,573.37 105,500.29 99,878.95 99,573.96 105,500.11 102,829.20
85 WHEEL LOADER 1.0-1.6 M3 E15 Rp/jam 940,853.03 950,196.99 994,590.42 953,276.12 950,198.90 994,595.62 963,097.97
86 TRAILER TRONTON 30 T ; 200 HP E35a Rp/jam 566,656.71 585,501.47 601,206.95 585,692.38 589,101.47 601,206.95 591,598.23

B ALAT LAINNYA
1 Alat pancang hammer 2 ton P.2 Rp/hari 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
2 Alat pancang hammer 0,5 ton P.3 Rp/hari 388,500.00 404,040.00 446,775.00 407,925.00 404,040.00 446,775.00 435,120.00
3 Alat pancang dengan tripod tinggi 5 - 7m beban P.4 Rp/hari 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
tumbuk 1-2 ton
4 Bor Listrik P.5 Rp/hari 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
5 Bore Pile Machine portable P.6 Rp/jam 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
6 Chain Saw P.7 Rp/hari 33,300.00 34,632.00 38,295.00 34,965.00 34,632.00 38,295.00 37,296.00
7 Drone P.8 Rp/hari 181,621.00 188,811.00 208,791.00 190,698.00 188,811.00 208,791.00 203,352.00
8 Generator Set 1500 watt P.9 Rp/jam 55,500.00 57,720.00 63,825.00 58,275.00 57,720.00 63,825.00 62,160.00
9 Hose P.1 Rp/hari 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10 Jack Tension P.10 Rp/hari 2,775,000.00 2,886,000.00 3,191,250.00 2,913,750.00 2,886,000.00 3,191,250.00 3,108,000.00
11 Jack-in hydraulics kap 380 ton P.11 Rp/jam 2,220,000.00 2,308,800.00 2,553,000.00 2,331,000.00 2,308,800.00 2,553,000.00 2,486,400.00
12 Kendaraan roda 4 pick up L300 P.12 Rp/hari 333,000.00 346,320.00 382,950.00 349,650.00 346,320.00 382,950.00 372,960.00
13 Lift Kerja P.14 Rp/hari 610,500.00 634,920.00 702,075.00 641,025.00 634,920.00 702,075.00 683,760.00
14 Mesin Las listrik 250 A diesel P.15 Rp/hari 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
15 Mesin potong besi P.16 Rp/hari 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
16 Molen/Beton Mixer P.17 Rp/hari 122,100.00 126,984.00 140,415.00 128,205.00 126,984.00 140,415.00 136,752.00
17 Motor 2 Kw 1350 rpm + pengkabelan P.18 Rp/hari 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00

A.3 - 68
HARGA SEWA PERALATAN BIDANG KE PU AN
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA TAHUN 2023

NO URAIAN KODE SATUAN KABUPATEN BULUNGAN


Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir
18 Perahu P.19 Rp/hari 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
19 Peralatan potong pipa T1/manual (gergaji) / saw P.20 Rp/hari 83,250.00 86,580.00 95,682.00 87,357.00 86,580.00 95,682.00 93,240.00

20 Peralatan potong pipa T2/mekanik / cilinder saw P.21 Rp/hari 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00

21 Pompa air diesel 10 KW P.22 Rp/hari 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
22 Pompa air diesel 20 KW P.23 Rp/hari 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
23 Pompa air diesel 5 KW P.24 Rp/hari 111,000.00 115,440.00 127,650.00 116,550.00 115,440.00 127,650.00 124,320.00
24 Pompa Submersible 3m³/h P.25 Rp/hari 133,200.00 138,528.00 153,180.00 139,860.00 138,528.00 153,180.00 149,184.00
25 Ponton P.26 Rp/hari 666,000.00 692,640.00 765,900.00 699,300.00 692,640.00 765,900.00 745,920.00
26 Scaffolding P.27 Rp/bln 66,600.00 69,264.00 76,590.00 69,930.00 69,264.00 76,590.00 74,592.00
27 Sewa Komputer P.28 Rp/hari 55,500.00 57,720.00 63,825.00 58,275.00 57,720.00 63,825.00 62,160.00
28 Sewa scanner ukuran A4 P.29 Rp/hari 16,650.00 17,316.00 19,092.00 17,427.00 17,316.00 19,092.00 18,648.00
29 Stamper P.30 Rp/hari 222,000.00 230,880.00 255,300.00 233,100.00 230,880.00 255,300.00 248,640.00
30 Stamper Kodok P.31 Rp/hari 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
31 Support pipa P.32 Rp/hari 88,800.00 92,352.00 102,120.00 93,240.00 92,352.00 102,120.00 99,456.00
32 Tamper P.33 Rp/jam 38,850.00 40,404.00 44,622.00 40,737.00 40,404.00 44,622.00 43,512.00
33 Theodolith P.34 Rp/hari 388,500.00 404,040.00 446,775.00 407,925.00 404,040.00 446,775.00 435,120.00
34 Tinta hitam P.35 Rp/hari 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
35 Tongkang P.36 Rp/hari 555,000.00 577,200.00 638,250.00 582,750.00 577,200.00 638,250.00 621,600.00
36 Total Station P.37 Rp/hari 534,160.00 555,444.00 614,274.00 560,772.00 555,444.00 614,274.00 598,179.00
37 Tripod tinggi 5 m P.38 Rp/hari 138,750.00 144,300.00 159,507.00 145,632.00 144,300.00 159,507.00 155,400.00
38 Tripod tinggi 7 m P.39 Rp/hari 166,500.00 173,160.00 191,475.00 174,825.00 173,160.00 191,475.00 186,480.00
39 Tripot/tackel dan handle crane 2 T P.40 Rp/hari 277,500.00 288,600.00 319,125.00 291,375.00 288,600.00 319,125.00 310,800.00
40 Waterpass P.41 Rp/hari 333,000.00 346,320.00 382,950.00 349,650.00 346,320.00 382,950.00 372,960.00

A.3 - 69
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
analisa harga satuan pekerjaan bidang ke PU an
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
ahsp bidang bina marga
HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2023
NO URAIAN KODE SATUAN KAB BULUNGAN
ANALISA Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
dan Tanjung dan Tj Palas Peso Hilir
Palas Utara

A. MOBILISASI
1. Mobilisasi Pekerjaan Lapis Pondasi Agregat Kelas B 1.2 LS 44,282,650.00 65,163,500.00 79,682,150.00 87,182,550.00 87,182,550.00 94,982,285.00 120,550,250.00
2. Mobilisasi Pekerjaan Laston AC - BC 1.2 LS 66,932,148.00 91,082,150.00 107,302,500.00 110,782,500.00 110,782,250.00 148,703,350.00 175,445,750.00
3. Mobilisasi Pekerjaan Perkerasan Beton Semen (Rigid) 1.2 LS 45,324,950.00 87,023,875.00 95,632,150.00 107,332,148.00 107,332,148.00 115,132,326.00 153,762,378.00
4. Mobilisasi Pekerjaan Jembatan 1.2 LS 73,540,235.00 81,332,148.00 100,832,350.00 104,732,500.00 104,732,500.00 116,432,975.00 139,975,250.00

B. PEKERJAAN DRAINASE
1. Galian untuk Selokan Drainase dan Saluran Air 2.1.(1) M3 84,531.75 85,783.36 90,937.69 86,148.40 85,783.30 90,937.86 88,198.37
2. Pasangan Batu dengan Mortar 2.2.(1) M3 1,492,152.38 1,553,671.33 1,700,369.87 1,582,854.20 1,903,049.92 2,049,748.16 1,698,525.47
3. Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm 2.3.(1) M1 164,300.36 169,426.65 184,480.79 170,606.57 169,426.99 184,481.06 181,183.71
4. Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm 2.3.(2) M1 209,170.65 215,878.37 234,482.41 217,312.79 215,878.76 234,482.73 230,966.00
5. Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm 2.3.(3) M1 259,800.10 268,160.24 292,372.91 270,108.82 268,160.71 292,373.30 286,776.42
6. Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm 2.3.(4) M1 715,425.62 740,587.90 853,387.07 744,392.32 740,589.21 853,388.08 784,872.72
7. Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm 2.3.(5) M1 1,102,816.58 1,143,890.51 1,335,335.91 1,149,680.71 1,143,892.32 1,335,337.28 1,212,912.03
8. Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm 2.3.(6) M1 1,738,164.42 1,801,796.38 2,099,263.82 1,810,784.70 1,801,799.21 2,099,265.92 1,908,718.46
9. Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm 2.3.(7) M1 2,371,737.43 2,462,426.25 2,899,419.25 2,474,447.25 2,462,429.75 2,899,421.82 2,611,109.90
10. Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm 2.3.(8) M1 3,092,536.77 3,216,522.37 3,820,497.28 3,232,509.69 3,216,526.62 3,820,500.40 3,417,470.69
11. Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm 2.3.(9) M1 4,538,426.75 4,725,570.32 5,648,572.41 4,748,895.58 4,725,575.79 5,648,576.45 5,024,550.48
12. Gorong-gorong Pipa Baja Bergelombang 2.3.(10) Ton 55,001,249.09 56,561,137.03 66,535,778.59 56,616,161.91 56,561,140.54 66,535,781.28 58,546,811.53
13. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm 2.3.(11) M1 744,986.96 775,676.61 930,345.52 779,151.31 775,676.94 930,345.82 823,714.16
14. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm 2.3.(12) M1 987,087.72 1,029,523.67 1,246,692.51 1,034,197.56 1,029,524.10 1,246,692.85 1,094,544.49
15. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm 2.3.(13) M1 1,253,940.82 1,308,193.79 1,585,658.39 1,314,228.38 1,308,194.49 1,585,658.93 1,391,180.75
16. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm 2.3.(14) M1 1,892,790.03 1,971,595.90 2,365,910.26 1,981,080.19 1,971,597.97 2,365,911.77 2,094,821.33
17. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm 2.3.(15) M1 3,280,546.50 3,410,439.73 4,044,324.90 3,427,394.69 3,410,445.16 4,044,328.82 3,618,046.33
18. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm 2.3.(16) M1 5,056,410.29 5,240,015.78 6,095,028.26 5,267,129.41 5,240,027.72 6,095,036.81 5,547,189.82
19. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm 2.3.(17) M1 8,337,933.45 8,626,232.92 9,932,749.82 8,671,695.69 8,626,255.93 9,932,766.25 9,119,206.42
20. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm 2.3.(18) M1 10,067,787.22 10,400,949.22 11,869,465.56 10,456,629.50 10,400,980.00 11,869,487.52 10,984,654.60
21. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm 2.3.(19) M1 12,794,115.79 13,212,480.06 15,044,273.60 13,283,440.90 13,212,520.41 15,044,302.38 13,948,438.72
22. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm 2.3.(20) M1 18,620,993.45 19,194,145.48 21,601,531.05 19,299,187.99 19,194,211.40 21,601,578.01 20,236,256.17
23. Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm 2.3.(21) M1 26,386,457.28 27,155,758.84 30,257,210.74 27,306,674.83 27,155,860.77 30,257,283.31 28,597,663.76
24. Saluran berbentuk U Tipe DS 1 2.3.(22) M1 586,914.00 615,706.00 767,589.00 620,653.00 682,853.00 834,736.00 662,144.00
25. Saluran berbentuk U Tipe DS 1a (dengan tutup) 2.3.(23) M1 743,901.00 779,742.00 948,102.00 789,426.00 914,011.00 1,082,371.00 847,482.00
26. Saluran berbentuk U Tipe DS 2 2.3.(24) M1 609,341.00 639,140.00 793,377.00 644,764.00 715,876.00 870,113.00 688,621.00
27. Saluran berbentuk U Tipe DS 2a (dengan tutup) 2.3.(25) M1 788,754.00 826,610.00 999,677.00 837,647.00 980,056.00 1,153,123.00 900,436.00
28. Saluran berbentuk U Tipe DS 3 2.3.(26) M1 631,767.00 662,574.00 819,164.00 668,874.00 748,899.00 905,489.00 715,098.00
B.1 - 72
NO URAIAN KODE SATUAN KAB BULUNGAN
ANALISA Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
dan Tanjung dan Tj Palas Peso Hilir
Palas Utara

29. Saluran berbentuk U Tipe DS 3a (dengan tutup) 2.3.(27) M1 833,607.00 873,477.00 1,051,252.00 885,868.00 1,046,102.00 1,223,876.00 953,390.00
30. Saluran berbentuk U Tipe DS 4 2.3.(28) M1 676,621.00 709,441.00 870,740.00 717,095.00 814,944.00 976,242.00 768,052.00
31. Saluran berbentuk U Tipe DS 4a (dengan tutup) 2.3.(29) M1 923,314.00 967,212.00 1,154,402.00 982,310.00 1,178,192.00 1,365,381.00 1,059,297.00
32. Saluran berbentuk U Tipe DS 5 2.3.(30) M1 721,474.00 756,309.00 922,315.00 765,316.00 880,989.00 1,046,994.00 821,005.00
33. Saluran berbentuk U Tipe DS 5a (dengan tutup) 2.3.(31) M1 1,013,020.00 1,060,947.00 1,257,553.00 1,078,752.00 1,310,282.00 1,506,887.00 1,165,205.00
34. Saluran berbentuk U Tipe DS 6 2.3.(32) M1 721,474.00 756,309.00 922,315.00 765,316.00 880,989.00 1,046,994.00 821,005.00
35. Saluran berbentuk U Tipe DS 6a (dengan tutup) 2.3.(33) M1 1,013,020.00 1,060,947.00 1,257,553.00 1,078,752.00 1,310,282.00 1,506,887.00 1,165,205.00
36. Pasangan Batu tanpa Adukan (Aanstamping) 2.3.(34) M3 1,904,882.84 1,982,182.24 2,120,171.24 1,990,829.45 1,982,182.24 2,120,171.24 2,136,303.60

C. PEKERJAAN TANAH
1. Galian Biasa 3.1.(1) M3 117,483.35 119,398.60 128,145.49 119,998.05 119,398.74 128,145.68 123,036.04
2. Galian Batu Lunak 3.1.(2) M3 24,808.09 25,136.95 26,848.24 25,241.29 25,136.92 26,848.27 25,939.54
3. Galian Batu 3.1.(3) M3 97,780.98 99,189.16 106,243.67 99,642.71 99,189.04 106,243.78 102,294.56
4. Timbunan Biasa dari sumber galian 3.2.(1a) M3 302,007.86 309,873.61 336,515.87 312,064.04 309,873.83 336,516.18 325,630.38
5. Timbunan Biasa dari hasil galian 3.2.(1b) M3 169,290.09 172,096.26 185,479.58 173,015.76 172,096.44 185,479.73 177,558.39
6. Timbunan Pilihan dari sumber galian 3.2.(2a) M3 381,837.93 393,193.23 429,738.27 396,296.66 393,193.42 429,738.49 415,968.54
7. Timbunan Pilihan dari galian 3.2.(2b) M3 186,857.19 189,847.71 204,062.62 190,824.38 189,847.93 204,062.85 195,572.91
8. Penyiapan Badan Jalan 3.3.(1) M2 7,475.84 7,553.74 7,897.75 7,577.34 7,553.75 7,897.79 7,664.20
9. Pembersihan dan Pengupasan Lahan 3.4.(1) M2 29,267.80 29,737.14 31,771.46 29,874.36 29,737.17 31,771.52 30,610.12

D. PEKERJAAN PERKERASAN BERBUTIR


1. Lapis Pondasi Agregat Kelas A 5.1.(1) M3 1,165,528.07 1,209,914.28 1,335,713.59 1,221,931.22 1,209,914.40 1,335,713.68 1,298,573.88
2. Lapis Pondasi Agregat Kelas B 5.1.(2) M3 1,068,399.28 1,108,933.84 1,223,270.37 1,119,163.31 1,108,933.95 1,223,270.47 1,189,891.53
3. Lapis Pondasi Agregat Kelas S 5.1.(3) M3 898,075.87 936,135.22 1,025,100.54 939,269.89 936,135.44 1,025,100.89 1,027,675.74
4. Lapis Permukaan Agregat Tanpa Penutup Aspal 5.2,(1) M3 1,127,346.44 1,171,097.83 1,293,513.90 1,182,876.78 1,171,097.89 1,293,514.01 1,258,491.52
5. Lapis Pondasi Agregat Tanpa Penutup Aspal 5.2,(2) M3 1,035,519.42 1,075,787.44 1,187,795.27 1,085,889.95 1,075,787.50 1,187,795.36 1,156,233.00
6. Perkerasan Beton Semen (PPC) 5.3.(1.a) M3 2,482,642.74 2,590,735.83 2,951,385.78 2,644,257.01 3,317,160.12 3,677,810.92 2,864,226.53
7. Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal 5.3.(2.a) M3 2,462,131.72 2,567,132.94 2,984,394.95 2,610,101.38 3,159,448.38 3,576,709.81 2,807,924.98
8. Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) 5.3.(3) M3 1,938,212.40 2,018,310.10 2,211,957.31 2,067,662.51 2,693,326.02 2,886,973.16 2,254,371.21

E. PEKERJAAN ASPAL
1. Lapis Resap Pengikat - Aspal Cair/Emulsi 6.1 (1) Liter 38,717.00 40,165.75 44,315.43 40,579.26 40,165.75 44,315.43 43,267.52
2. Lapis Perekat - Aspal Cair/Emulsi 6.1 (2a) Liter 42,041.48 43,699.13 48,276.74 44,113.69 43,699.13 48,276.74 47,014.82
3. Lapis Perekat - Aspal Emulsi Modifikasi Polimer 6.1 (2b) Liter 63,233.90 65,554.72 72,532.69 66,250.40 65,554.72 72,532.69 70,658.06
4. Lataston Lapis Aus (HRS-WC) 6.3(3) Ton 2,804,876.85 2,929,430.44 3,083,405.91 2,936,076.25 2,970,557.48 3,124,533.58 3,156,951.39
5. Lataston Lapis Fondasi (HRS-Base) 6.3.(4) Ton 2,444,054.73 2,551,117.32 2,686,696.42 2,557,696.31 2,593,138.42 2,728,718.08 2,752,541.61
6. Laston Lapis Aus (AC-WC) 6.3(5a) Ton 2,531,676.98 2,643,952.17 2,779,152.17 2,648,639.04 2,664,962.83 2,800,163.37 2,862,280.96
7. Laston Lapis Aus Modifikasi (AC-WC Mod) 6.3(5b) Ton 3,286,730.84 3,408,574.41 3,715,505.49 3,437,638.88 3,429,585.02 3,736,516.70 3,690,984.18
8. Laston Lapis Antara (AC-BC) 6.3(6a) Ton 2,433,051.60 2,539,863.35 2,670,779.66 2,544,644.93 2,560,873.90 2,691,790.83 2,749,845.01

B.1 - 73
NO URAIAN KODE SATUAN KAB BULUNGAN
ANALISA Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
dan Tanjung dan Tj Palas Peso Hilir
Palas Utara

9. Laston Lapis Antara Modifikasi (AC-BC Mod) 6.3(6b) Ton 3,107,055.16 3,222,566.83 3,510,288.13 3,249,682.53 3,243,577.48 3,531,299.21 3,491,215.37
10. Laston Lapis Fondasi (AC-Base) 6.3(7a) Ton 2,210,320.67 2,307,440.51 2,426,735.47 2,312,071.70 2,328,674.67 2,447,970.04 2,502,060.44
11. Laston Lapis Fondasi Modifikasi (AC-Base Mod) 6.3(7b) Ton 2,809,228.83 2,914,189.06 3,169,181.25 2,938,058.57 2,935,423.18 3,190,415.82 3,159,871.37
12. Bahan anti pengelupasan 6.3.(8) Kg 52,591.80 53,906.60 63,110.16 53,906.60 53,906.60 63,110.16 55,221.39
13. Lapis Penetrasi Macadam 6.7.(1) M3 3,521,046.73 3,691,970.71 3,869,177.76 3,692,529.40 3,691,970.92 3,869,178.20 4,040,453.37

F. PEKERJAAN STRUKTUR
1. Beton struktur, fc’50 MPa 7.1 (1) M3 3,530,889.47 3,681,653.82 4,179,421.10 3,774,951.37 4,973,571.57 5,471,338.77 4,088,960.42
2. Beton struktur, fc’45 MPa 7.1 (2) M3 2,554,594.99 2,662,946.29 2,950,935.87 2,734,685.80 3,698,514.51 3,986,504.04 2,971,361.01
3. Beton struktur, fc’40 MPa 7.1 (3) M3 2,444,761.32 2,547,510.32 2,824,761.80 2,613,788.51 3,488,777.50 3,766,028.93 2,839,472.95
4. Beton struktur, fc’35 MPa 7.1 (4) M3 2,333,978.87 2,431,097.17 2,697,368.66 2,491,802.71 3,276,185.78 3,542,457.21 2,706,435.02
5. Beton struktur, fc’30 MPa 7.1 (5a) M3 2,228,902.78 2,320,699.81 2,576,410.36 2,376,053.65 3,073,476.66 3,329,187.16 2,580,204.58
6. Beton struktur, fc’25 Mpa 7.1 (6a) M3 2,166,799.46 2,251,070.02 2,547,683.04 2,298,729.86 2,862,607.64 3,159,221.03 2,473,533.89
7. Beton strukur, fc’20 MPa 7.1 (7a) M3 2,063,475.87 2,133,671.99 2,378,473.57 2,164,870.18 2,489,062.34 2,733,859.66 2,317,601.96
8. Beton struktur, fc’15 Mpa 7.1 (8) M3 1,940,805.29 2,013,552.00 2,222,056.87 2,051,566.47 2,511,098.52 2,719,596.72 2,214,023.78
9. Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter 7.2 (1a) Buah 97,564,456.80 101,437,723.58 118,541,981.58 102,150,559.76 101,437,730.72 118,542,013.93 108,132,270.64
10. Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter 7.2 (2a) Buah 9,845,854.26 9,921,700.18 10,219,287.25 9,943,282.26 9,921,718.80 10,219,369.28 9,973,032.47
11. Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter 7.2 (2b) Buah 13,277,960.32 13,380,244.91 13,781,566.02 13,409,350.16 13,380,270.02 13,781,676.65 13,449,470.81
12. Baja Prategang 7.2.(7) Kg 614,854.99 627,757.76 665,621.11 629,531.78 627,758.36 665,623.00 650,203.36
13. Penyediaan Panel Full Depth slab 7.2.(12a) Buah 1,943,279.52 1,993,817.66 2,235,220.29 1,999,939.47 1,993,819.68 2,235,229.17 2,060,702.10
14. Penmasangan Panel Full Depth slab 7.2.(12b) Buah 1,208,029.74 1,217,539.60 1,254,102.84 1,220,172.71 1,217,541.87 1,254,112.85 1,224,315.01
15. Baja Tulangan Polos-BjTP 280 7.3 (1) Kg 28,778.69 30,399.85 40,433.14 30,399.85 30,399.85 40,433.14 32,238.01
16. Baja Tulangan Sirip BjTS 280 7.3 (2) Kg 28,778.69 30,399.85 40,433.14 30,399.85 30,399.85 40,433.14 32,238.01
17. Baja Tulangan Sirip BjTS 420A 7.3 (3) Kg 28,778.69 30,399.85 40,433.14 30,399.85 30,399.85 40,433.14 32,238.01
18. Baja Tulangan Sirip BjTS 420B 7.3 (4) Kg 29,802.35 31,232.03 41,137.67 31,232.03 31,232.03 41,137.67 32,687.24
19. Baja Tulangan Sirip BjTS 520 7.3 (5) Kg 27,259.66 28,791.46 38,199.26 28,791.46 28,791.46 38,199.26 30,540.26
20. Baja Tulangan Sirip BjTS 550 7.3 (6) Kg 27,259.66 28,791.46 38,199.26 28,791.46 28,791.46 38,199.26 30,540.26
21. Baja Tulangan Sirip BjTS 700 7.3 (7) Kg 27,259.66 28,791.46 38,199.26 28,791.46 28,791.46 38,199.26 30,540.26
22. Anyaman Kawat Yang Dilas (Welded Wire Mesh) 7.3 (8) Kg 30,482.82 32,142.27 41,677.73 32,142.27 32,142.27 41,677.73 34,146.38
23. Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) 7.4 (1a) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
24. Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) 7.4 (1b) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
25. Penyediaan Baja Struktur Grade 485 (Kuat Leleh 485 MPa) 7.4 (1c) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
26. Penyediaan Baja Struktur Grade 690 (Kuat Leleh 690 Mpa Untuk Tebal Pelat < 2,5) 7.4 (1d) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
27. Penyediaan Baja Struktur Grade 690 (Kuat Leleh 620 Mpa Untuk Tebal Pelat < 2,5-4,0 inch) 7.4 (1e) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
28. Pemasangan Baja Struktur 7.4 (2) Kg 4,947.88 5,018.46 5,152.71 5,027.87 5,018.47 5,152.74 5,115.90
29. Penyediaan Struktur Jembatan Rangka Baja Standar …… m 7.4 (3) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07
30. Pemasangan Jembatan Rangka Baja Standar Panjang ….. M 7.4 (4) Kg 4,947.88 5,018.46 5,152.71 5,027.87 5,018.47 5,152.74 5,115.90
31. Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa 7.4 (5a) Kg 4,947.88 5,018.46 5,152.71 5,027.87 5,018.47 5,152.74 5,115.90
32. Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa 7.4 (5b) Kg 35,201.66 36,491.77 45,449.14 36,492.81 36,493.60 45,449.14 37,775.07

B.1 - 74
NO URAIAN KODE SATUAN KAB BULUNGAN
ANALISA Tanjung Selor Tj Palas Tengah Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
dan Tanjung dan Tj Palas Peso Hilir
Palas Utara

33. Fondasi Cerucuk, Penyediaan dan Pemancangan 7.6 (1) M1 85,274.76 89,136.17 93,211.85 89,136.17 89,136.17 93,211.85 95,518.67
34. Dinding Turap Baja, Penyediaan dan Pemancangan 7.6.(4) M2 5,077,404.95 5,273,178.79 5,802,321.30 5,311,360.33 5,273,179.22 5,802,322.36 5,664,553.42
35. Dinding Turap Beton, Penyediaan dan Pemancangan 7.6.(5) M2 1,005,889.52 1,014,124.77 1,051,585.60 1,016,152.47 1,014,127.13 1,051,585.89 1,034,251.09
36. Pemancangan Tiang Pancang Kayu 7.6.(13) M1 268,862.62 280,481.06 287,436.58 280,508.91 280,481.06 287,436.58 304,347.75
37. Pemancangan Tiang Pancang Baja dia. 40 cm s.d 60 cm 7.6.(14) M1 696,911.35 708,281.34 732,095.69 709,601.41 708,282.35 732,099.76 726,633.64
38. Pemancangan Tiang Pancang Beton Bertulang Pracetak (Square Pile) 35 cm x 35 cm 7.6.(16b) M1 382,997.33 392,053.28 404,612.01 392,739.54 392,053.56 404,612.83 409,705.57
39. Pemancangan Tiang Pancang Beton Pratekan Pracetak (Square Pile) 40 cm x 40 cm 7.6.(16b) M1 382,997.33 392,053.28 404,612.01 392,739.54 392,053.56 404,612.83 409,705.57
40. Pemancangan Tiang Pancang Beton Pratekan Pracetak (Spun Pile) dia. 40 cm s.d 60 cm 7.6.(18) M1 643,381.11 662,262.87 684,647.41 662,949.13 662,263.15 684,648.22 699,566.76
41. Pasangan Batu 7.9.(1) M3 1,346,127.73 1,402,339.91 1,535,316.03 1,432,446.53 1,777,759.09 1,910,734.92 1,538,748.76
42. Bronjong dengan kawat yang dilapisi Galvanis 7.10.(3a) M3 1,269,957.94 1,323,156.08 1,438,838.89 1,330,176.83 1,323,156.08 1,438,838.89 1,430,956.50
43. Landasan Elastomerik Karet Alam Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm 7.12.(2) Buah 1,455,741.88 1,514,354.50 1,667,896.18 1,528,013.05 1,514,354.50 1,667,896.18 1,631,579.75
44. Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm 7.12.(3) Buah 1,213,206.88 1,261,607.50 1,389,363.88 1,273,096.00 1,261,607.50 1,389,363.88 1,359,685.25
45. Papan Nama Jembatan 7.14.(1) M1 710,588.95 740,374.15 799,412.67 745,161.22 740,377.40 799,415.93 799,944.73

G. PEKERJAAN REHABILITASI JEMBATAN


1. Pengecetan protektif pada elemen struktur beton, tebal 200µm 8.3.(1a) M2 73,341.32 74,886.70 82,713.21 75,045.18 74,886.48 82,713.32 77,382.86
2. Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm 8.3.(2a) M2 73,341.32 74,886.70 82,713.21 75,045.18 74,886.48 82,713.32 77,382.86
3. Pengecatan struktur baja pada daerah kering tebal 80 mikron 8.7.(1a) M2 237,894.37 242,697.14 261,485.13 243,715.22 242,697.22 261,485.24 252,205.12
4. Pengecatan struktur baja pada daerah kering tebal 240 mikron 8.7.(1b) M2 434,462.29 443,319.18 475,654.69 445,355.34 443,319.35 475,654.91 461,586.50

H. PEKERJAAN HARIAN & PEKERJAAN LAIN - LAIN


1. Marka Jalan Termoplastik 9.2.(1) M2 438,693.52 445,484.93 482,590.19 446,138.59 445,484.89 482,590.20 454,844.36
2. Marka Jalan Bukan Termoplastik 9.2.(2) M2 104,031.77 104,063.59 104,221.71 104,074.29 104,063.59 104,221.72 104,131.18
3. Kerb Pracetak Jenis 1 (Peninggi/Mountable) 9.2(10a) M1 136,029.23 140,806.27 153,068.89 141,883.97 140,806.27 153,068.89 150,360.36

B.1 - 75
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
ahsp bidang cipta karya
HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2023
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

A. PEKERJAAN PERSIAPAN
1. K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter A.2.2.1.1 m2 469,696.86 489,650.08 536,795.57 493,092.80 500,500.33 547,645.82 527,589.19
2. (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter A.2.2.1.2 m2 586,470.05 610,784.32 668,607.47 613,907.91 616,209.44 674,032.59 655,509.81
3. (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter A.2.2.1.3 m2 635,211.93 660,218.20 724,773.55 665,079.65 664,558.30 729,113.65 713,436.58
4. Pengukuran dan pemasangan 1 m’ Bouwplank A.2.2.1.4 m' 95,916.21 99,753.37 110,118.55 100,346.94 99,753.37 110,118.55 107,274.51
5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran A.2.2.1.5 m2 2,835,604.34 2,947,821.45 3,200,070.62 2,971,206.93 3,023,773.20 3,276,022.37 3,172,064.21
6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) A.2.2.1.6 m2 2,158,689.15 2,247,160.81 2,451,349.75 2,261,253.37 2,247,160.81 2,451,349.75 2,415,551.59
7. (K3) Pembuatan 1 m2 gudang semen dan peralatan A.2.2.1.7 m2 1,914,558.53 1,992,425.03 2,159,774.18 2,005,075.14 2,015,210.55 2,182,559.70 2,142,796.73
8. (K3) Pembuatan 1 m2 bedeng pekerja A.2.2.1.8 m2 1,947,428.40 2,026,836.91 2,198,155.98 2,040,623.11 2,065,897.81 2,237,216.88 2,181,505.31
9. (K3) Pembersihan 1 m2 lapangan dan perataan A.2.2.1.9 m2 25,530.00 26,806.50 27,444.75 26,806.50 26,806.50 27,444.75 29,359.50
10. (K3) Pembuatan 1 m2 steger/perancah dari bambu A.2.2.1.10 m2 621,259.79 645,574.05 670,553.11 645,669.02 645,574.05 670,553.11 691,649.57
11. Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm A.2.2.1.11 buah 251,802.39 261,733.56 285,106.28 263,648.31 261,733.56 285,106.28 281,110.83
12. Pembuatan 1 m2 jalan sementara A.2.2.1.12 m2 322,496.49 336,518.28 356,782.16 337,309.71 336,518.28 356,782.16 417,899.45
13. Pembongkaran 1 m3 beton bertulang A.2.2.1.13 m3 2,178,525.96 2,272,131.71 2,357,235.96 2,272,131.71 2,272,131.71 2,357,235.96 2,459,343.20
14. Pembongkaran 1 m3 dinding tembok bata A.2.2.1.14 m3 1,089,262.98 1,136,065.85 1,178,617.98 1,136,065.85 1,136,065.85 1,178,617.98 1,229,671.60
15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm A.2.2.1.15 m2 35,355.22 36,942.68 39,432.87 37,125.73 36,942.68 39,432.87 40,275.11
16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar A.2.2.1.16 m2 1,563,329.55 1,575,560.97 1,598,193.32 1,582,053.25 1,673,213.22 1,695,845.57 1,605,614.89

B. PEKERJAAN TANAH
1. Penggalian 1 m3 tanah biasa sedalam 1 m A.2.3.1.1 m3 119,991.00 125,097.00 129,883.88 125,097.00 125,097.00 129,883.88 135,309.00
2. Penggalian 1 m3 tanah biasa sedalam 2 m A.2.3.1.2 m3 147,052.80 153,371.48 159,115.73 153,371.48 153,371.48 159,115.73 166,008.83
3. Menggali 1 m3 tanah biasa sedalam 3 m A.2.3.1.3 m3 174,523.08 182,079.96 188,781.59 182,079.96 182,079.96 188,781.59 197,193.72
4. Menggali 1 m3 tanah keras sedalam 1 m A.2.3.1.4 m3 159,715.68 166,506.66 172,889.16 166,506.66 166,506.66 172,889.16 180,088.62
5. Menggali 1 m3 tanah cadas sedalam 1 m A.2.3.1.5 m3 242,024.40 252,364.05 261,937.80 252,364.05 252,364.05 261,937.80 273,043.35
6. Menggali 1 m3 tanah lumpur sedalam 1 m A.3.2.1.6 m3 193,006.80 201,240.23 208,899.23 201,240.23 201,240.23 208,899.23 217,707.08
7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter A.3.2.1.7 m2 8,680.20 9,063.15 9,382.28 9,063.15 9,063.15 9,382.28 9,829.05
8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter A.2.3.1.8 m3 52,591.80 54,825.68 56,931.90 54,825.68 54,825.68 56,931.90 59,293.43
9. Pengurugan kembali 1 m3 galian tanah A.2.3.1.9 m3 86,802.00 90,631.50 93,822.75 90,631.50 90,631.50 93,822.75 98,290.50
10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) A.2.3.1.10 m3 86,802.00 90,631.50 93,822.75 90,631.50 90,631.50 93,822.75 98,290.50
11. Pengurugan 1 m3 dengan pasir urug A.2.3.1.11 m3 323,720.40 331,890.00 350,654.55 333,421.80 331,890.00 350,654.55 348,229.20
12. Pemasangan 1 m3 lapisan pudel campuran 1 KP : 3 PP : 7 TL A.2.3.1.12 m3 547,395.11 569,572.39 612,749.36 573,444.65 569,572.39 612,749.36 613,416.34
13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan A.2.3.1.13 m2 332,400.60 345,803.85 380,460.83 348,867.45 345,803.85 380,460.83 372,610.35
14. Pengurugan 1 m3 sirtu padat A.2.3.1.14 m3 319,125.00 327,166.95 345,612.38 328,698.75 327,166.95 345,612.38 343,250.85
15. Pengurugan 1 m3 tanah urug A.2.3.1.15 m3 250,194.00 256,397.79 269,788.28 257,470.05 256,397.79 269,788.28 268,805.37

B.2 - 77
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

C. PEKERJAAN PONDASI
1. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 PP A.3.2.1.1 m3 1,750,081.50 1,826,199.20 1,983,872.48 1,859,349.90 2,264,549.30 2,422,222.58 2,411,162.47
2. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 4 PP A.3.2.1.2 m3 1,659,450.00 1,730,946.77 1,879,646.25 1,759,208.48 2,084,664.92 2,233,364.40 2,301,689.83
3. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 5 PP A.3.2.1.3 m3 1,596,646.20 1,664,941.50 1,807,421.88 1,689,817.94 1,960,068.30 2,102,548.68 2,225,835.09
4. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 6 PP A.3.2.1.4 m3 1,552,479.30 1,618,522.86 1,756,629.95 1,641,017.34 1,872,418.71 2,010,525.80 2,172,487.60
5. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 8 PP A.3.2.1.5 m3 1,491,973.20 1,554,932.73 1,687,047.93 1,574,167.04 1,752,407.28 1,884,522.48 2,099,410.53
6. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 1 KP : 2 PP A.3.2.1.6 m3 1,214,066.39 1,263,482.25 1,367,183.84 1,271,041.69 1,263,851.16 1,367,552.75 1,769,278.27
7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP A.3.2.1.7 m3 1,405,969.01 1,464,628.66 1,587,908.56 1,480,267.70 1,597,001.71 1,720,281.61 1,996,677.18
8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4 PP A.3.2.1.8 m3 1,361,291.51 1,417,663.67 1,536,554.96 1,430,777.79 1,506,635.72 1,625,527.01 1,942,584.22
9. (K3) Pemasangan 1 m3 batu kosong (anstamping) A.3.2.1.9 m3 1,018,647.00 1,058,420.19 1,150,075.44 1,065,098.84 1,058,420.19 1,150,075.44 1,545,368.68
10. Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah A.3.2.1.10 m3 4,791,820.47 5,042,974.02 6,306,649.94 5,070,985.54 5,463,963.72 6,727,639.64 5,583,501.65
11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm A.3.2.1.11 m3 1,806,201.86 1,888,372.34 2,017,520.58 1,916,230.67 2,309,362.04 2,438,510.28 2,241,639.16

D. PEKERJAAN BETON
1. Membuat 1 m3 beton mutu f’c = 7,4 MPa A.4.1.1.1 m3 1,818,604.02 1,904,031.23 2,036,639.16 1,938,053.78 2,440,033.58 2,572,641.51 2,128,285.47
2. Membuat 1 m3 beton mutu f’c = 9,8 Mpa A.4.1.1.2 m3 1,891,945.33 1,981,122.89 2,120,519.25 2,018,742.63 2,580,056.69 2,719,453.05 2,216,861.81
3. Membuat 1 m3 beton mutu f’c = 12,2 Mpa A.4.1.1.3 m3 1,947,441.17 2,039,455.11 2,184,148.94 2,079,936.76 2,688,300.06 2,832,993.89 2,283,911.25
4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 A.4.1.1.4 m3 1,708,525.04 1,789,105.38 1,915,430.37 1,821,000.01 2,288,216.88 2,414,541.87 2,002,167.27
5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm A.4.1.1.5 m3 2,015,472.23 2,110,967.20 2,261,956.72 2,154,795.83 2,818,403.50 2,969,393.02 2,366,092.32
6. Membuat 1 m3 beton mutu f’c = 16,9 Mpa A.4.1.1.6 m3 2,076,674.03 2,175,292.59 2,332,245.92 2,222,366.08 2,939,150.19 3,096,103.52 2,440,027.20
7. Membuat 1 m3 beton mutu f’c = 19,3 MPa A.4.1.1.7 m3 2,128,225.48 2,229,485.12 2,390,977.68 2,278,899.71 3,034,573.67 3,196,066.23 2,502,274.44
8. Membuat 1 m3 beton mutu f’c = 21,7 MPa A.4.1.1.8 m3 2,154,866.03 2,257,476.21 2,421,868.98 2,308,534.93 3,090,775.41 3,255,168.18 2,534,452.46
9. Membuat 1 m3 beton mutu f’c = 24,0 MPa A.4.1.1.9 m3 2,200,781.74 2,305,713.87 2,475,087.55 2,359,560.47 3,186,754.17 3,356,127.85 2,589,860.21
10. Membuat 1 m3 beton mutu f’c = 26,4 MPa A.4.1.1.10 m3 2,214,727.50 2,320,366.81 2,491,285.05 2,375,099.30 3,216,597.46 3,387,515.70 2,606,712.57
11. Membuat 1 m3 beton mutu f’c = 28,8 MPa A.4.1.1.11 m3 2,357,529.56 2,469,631.79 2,649,759.98 2,527,655.09 3,422,283.74 3,602,411.93 2,771,807.42
12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm A.4.1.1.12 m3 2,375,930.30 2,488,963.10 2,671,113.27 2,548,127.60 3,461,145.50 3,643,295.67 2,794,018.52
13. Membuat 1 m3 beton kedap air dengan strorox – 100 A.4.1.1.13 m3 1,505,641.96 1,577,039.62 1,703,486.39 1,630,984.46 2,445,059.62 2,571,506.39 1,770,465.52
14. Pemasangan 1 m' PVC Waterstop lebar 150 mm A.4.1.1.14 m' 243,785.97 253,819.26 279,859.86 256,499.91 253,819.26 279,859.86 272,507.22
15. Pemasangan 1 m' PVC Waterstop lebar 200 mm A.4.1.1.15 m' 320,969.54 333,843.05 368,021.33 336,523.70 333,843.05 368,021.33 359,538.99
16. Membuat 1 m' PVC Waterstop lebar 230 mm – 320 mm A.4.1.1.16 m' 396,531.96 412,143.56 454,459.53 416,164.53 412,143.56 454,459.53 444,656.01
17. Pembesian 10 kg dengan besi polos atau besi ulir A.4.1.1.17 kg 25,867.00 27,310.72 36,782.35 27,310.72 27,310.72 36,782.35 28,848.90
18. Pemasangan 10 kg kabel prategang (prestressed) polos/strands A.4.1.1.18 kg 256,359.50 277,204.74 358,262.49 277,204.74 277,204.74 358,262.49 278,621.66
19. Pemasangan 10 kg jaring kawat baja (wiremesh) A.4.1.1.19 kg 23,645.25 25,012.38 34,158.50 25,012.38 25,012.38 34,158.50 26,412.70
20. (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 m2 226,910.64 236,126.97 267,145.92 236,892.87 236,126.97 267,145.92 253,717.14
21. (K3) Pemasangan 1 m2 bekisting untuk sloof A.4.1.1.21 m2 236,484.39 246,083.67 279,910.92 246,945.31 246,083.67 279,910.92 264,439.74
22. (K3) Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.22 m2 481,023.50 501,536.85 557,715.62 503,304.80 501,536.85 557,715.62 538,376.64
23. (K3) Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 m2 491,937.57 512,887.49 570,268.72 514,766.50 512,887.49 570,268.72 550,600.40
24. (K3) Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 m2 685,263.50 715,988.85 792,591.62 717,756.80 715,988.85 792,591.62 768,146.64
25. (K3) Pemasangan 1 m2 bekisting untuk dinding A.4.1.1.25 m2 709,836.12 737,970.18 816,066.45 744,837.75 737,970.18 816,066.45 793,880.88

B.2 - 78
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

26. (K3) Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.26 m2 459,961.25 479,644.88 529,760.27 481,221.35 479,644.88 529,760.27 514,889.04
27. Pemasangan 1 m2 jembatan untuk pengecoran beton A.4.1.1.27 m2 127,752.12 133,258.94 157,277.57 133,764.44 133,258.94 157,277.57 142,804.61
28. Membuat 1 m' kolom praktis beton bertulang (11 x 11) cm A.4.1.1.35 m' 153,076.76 160,013.85 192,948.11 160,578.06 168,694.05 201,628.31 170,459.46
29. Membuat 1 m' ring balok beton bertulang (10 x 15) cm A.4.1.1.36 m' 191,953.94 201,351.23 242,027.87 202,133.72 213,286.50 253,963.15 216,235.68

E. PEKERJAAN BETON PRACETAK


1. (K3) Pembuatan 1 m2 lahan produksi tebal 8 cm beton f’c 14,5 MPa, slump (120 ± 20) mm A.4.1.2.1 m2 161,265.35 168,906.48 180,985.64 172,412.77 225,501.38 237,580.55 189,322.62
2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 MPa, slump (120 ± 20) mm A.4.1.2.2 m2 62,408.09 63,780.32 65,012.15 63,780.32 63,780.32 65,012.15 66,486.50
3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 MPa, slump (120 ± 20) mm A.4.1.2.3 m2 241,795.91 253,251.22 271,369.96 258,510.65 338,143.57 356,262.31 283,862.65
4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 MPa, slump (120 ± 20) mm A.4.1.2.4 m2 302,425.19 316,755.49 339,405.52 323,329.79 422,870.94 445,520.97 355,038.95
5. Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 kali pakai) A.4.1.2.5 m2 390,194.85 410,052.10 520,951.47 415,658.35 414,045.00 524,944.36 442,890.43
6. Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai) A.4.1.2.6 m2 75,864.95 78,477.94 87,490.03 79,663.81 78,477.94 87,490.03 84,278.36
7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai) A.4.1.2.7 m2 73,088.56 75,589.22 84,294.95 76,749.56 75,589.22 84,294.95 81,171.36
8. Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak A.4.1.2.8 buah 12,471.41 12,988.39 13,441.55 12,988.39 12,988.39 13,441.55 14,022.35
9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak A.4.1.2.9 buah 20,207.00 21,030.34 21,789.86 21,030.34 21,030.34 21,789.86 22,677.02
10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak A.4.1.2.10 buah 16,339.20 17,009.36 17,615.70 17,009.36 17,009.36 17,615.70 18,349.69
11. Penuangan/menebar beton 1 m3 komponen untuk pelat pracetak A.4.1.2.11 m3 100,077.60 104,226.23 107,009.00 104,226.23 104,226.23 107,009.00 112,089.47
12. Penuangan/menebar beton 1 m3 komponen untuk balok pracetak A.4.1.2.12 m3 102,898.67 107,168.56 110,034.30 107,168.56 107,168.56 110,034.30 115,236.04
13. Penuangan/menebar beton 1 m3 komponen untuk kolom pracetak A.4.1.2.13 m3 92,578.16 96,458.72 98,986.19 96,458.72 96,458.72 98,986.19 103,798.60
14. Ereksi 1 buah komponen untuk pelat pracetak A.4.1.2.14 buah 1,479,447.96 1,493,177.72 770,010.46 1,496,807.05 742,513.31 1,529,657.43 1,511,169.66
15. Ereksi 1 buah komponen untuk balok pracetak A.4.1.2.15 buah 1,329,709.17 1,341,504.72 681,173.05 1,344,636.93 658,063.99 1,372,791.93 1,356,484.22
16. Ereksi 1 buah komponen untuk kolom pracetak A.4.1.2.16 buah 1,862,252.68 1,880,438.25 987,813.79 1,885,229.41 950,510.68 1,928,869.01 1,905,082.61
17. Lansir 1 buah komponen untuk pelat pracetak (± 20 m) A.4.1.2.17 buah 376,746.57 378,761.47 170,065.63 379,473.10 165,886.48 385,487.92 380,349.96
18. Lansir 1 buah komponen untuk balok pracetak (± 20 m) A.4.1.2.18 buah 376,746.57 378,761.47 170,065.63 379,473.10 165,886.48 385,487.92 380,349.96
19. Lansir 1 buah komponen untuk kolom pracetak (± 20 m) A.4.1.2.19 buah 376,746.57 378,761.47 170,065.63 379,473.10 165,886.48 385,487.92 380,349.96
20. Bahan 1 m3 grout campuran A.4.1.2.20 m3 9,149,186.10 11,709,462.15 14,903,839.58 11,709,908.93 11,709,462.15 14,903,839.58 11,712,142.80
21. Bahan 1 m3 grout (tidak campuran) A.4.1.2.21 m3 10,895,693.40 14,202,849.60 16,567,948.80 14,203,360.20 14,202,849.60 16,567,948.80 14,205,913.20
22. Upah 1 titik pekerjaan grout pada joint beton pracetak A.4.1.2.22 OH 89,654.98 93,414.27 95,756.65 93,414.27 93,414.27 95,756.65 99,988.25
23. Pemasangan 1 titik bekisting joint pracetak A.4.1.2.23 buah 113,880.39 118,463.03 129,923.45 118,999.16 118,463.03 129,923.45 127,099.83
24. Upah 1 titik joint dengan sling A.4.1.2.24 OH 82,142.78 86,636.06 88,180.62 86,636.06 86,636.06 88,180.62 92,814.32

F. PEKERJAAN BESI DAN ALUMINIUM


1. Pemasangan 1 kg besi profil A.4.2.1.1 kg 61,693.25 64,042.01 75,083.73 64,042.01 64,042.01 75,083.73 67,194.96
2. Pemasangan 1 kg rangka kuda kuda baja IWF A.4.2.1.2 kg 50,013.27 53,051.34 64,093.07 53,051.34 53,051.34 64,093.07 56,893.61
3. Pemasangan 100 kg Pekerjaan Perakitan A.4.2.1.3 kg 116,735.93 118,727.27 122,684.42 118,982.57 118,727.27 122,684.42 122,824.83
4. Pembuatan 1 m² pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku A.4.2.1.4 kg 2,003,236.98 2,079,788.69 2,520,564.14 2,079,788.69 2,079,788.69 2,520,564.14 2,170,471.25
5. Pengerjaan 10 cm pengelasan dengan las listrik A.4.2.1.5 kg 51,723.78 53,383.23 56,702.13 53,459.82 53,383.23 56,702.13 56,191.53
6. Pembuatan 1 m² rangka atap jendela besi scuare tube A.4.2.1.6 m2 1,901,747.57 1,976,274.75 2,031,616.13 1,990,403.05 2,060,733.09 2,185,950.08 2,118,313.46
7. Pemasangan 1 m² pintu rolling door besi A.4.2.1.7 m2 787,549.44 818,517.33 873,406.83 822,346.83 818,517.33 873,406.83 880,197.81
8. Pemasangan 1 m² pintu lipat (folding door) bahan plastik/ pvc A.4.2.1.8 m2 736,183.08 765,619.17 835,060.77 772,001.67 765,619.17 835,060.77 823,929.69
9. Pemasangan 1 m² sunscreen alluminium A.4.2.1.9 m2 470,058.36 488,235.72 527,041.32 492,065.22 488,235.72 527,041.32 524,845.74

B.2 - 79
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

10. Pemasangan 1 m² rolling door alluminium A.4.2.1.10 m2 2,250,469.50 2,340,462.75 2,560,020.75 2,359,610.25 2,340,462.75 2,560,020.75 2,519,172.75
11. Pemasangan 1 m kusen pintu aluminium A.4.2.1.11 m2 344,215.88 358,862.45 359,947.47 362,091.99 378,380.13 395,612.88 386,122.10
12. Pemasangan 1 m² pintu aluminium strip lebar 8 cm A.4.2.1.12 m2 1,515,042.11 1,567,961.97 1,606,320.79 1,599,517.05 1,646,032.71 1,748,982.43 1,692,891.75
13. Pemasangan 1 m² pintu kaca rangka aluminium A.4.2.1.13 m2 407,567.30 422,706.59 471,392.30 428,323.19 422,706.59 471,392.30 453,674.48
14. Pemasangan 1 m² venetions blinds dan vertical blinds A.4.2.1.14 m2 345,778.32 359,858.12 388,579.37 362,411.12 359,858.12 388,579.37 386,294.43
15. Pemasangan 1 m² terali besi strip (2x3) mm A.4.2.1.15 m2 974,689.65 1,011,577.18 1,097,076.89 1,011,784.59 1,011,577.18 1,097,076.89 1,073,952.84
16. Pemasangan 1 m² kawat nyamuk A.4.2.1.16 m2 213,300.24 221,610.63 247,524.35 221,695.73 221,610.63 247,524.35 233,941.88
17. Pemasangan 1 m² jendela nako & tralis A.4.2.1.17 m2 426,555.24 442,524.26 518,858.96 443,928.41 442,524.26 518,858.96 463,867.34
18. Pemasangan 1 m' talang datar / jurai seng bjls 28 lebar 90 A.4.2.1.18 m' 260,150.70 270,409.93 280,979.35 272,343.83 277,379.62 293,846.47 290,922.01
19. Pemasangan 1 m talang ½ lingkarang D-15 cm, seng pelat bjls 30 lebar 45 cm A.4.2.1.19 m' 220,477.08 229,042.40 236,471.63 230,248.69 236,012.09 249,338.75 245,407.13
20. Pemasangan 1 m² rangka besi hollow 1 x 40.40.2 mm, modul 60 x 120 cm, untuk partisi A.4.2.1.20 m2 264,337.62 273,758.19 299,926.44 279,502.44 273,758.19 299,926.44 298,024.46
21. Pemasangan 1 m² rangka besi hollow 1 x 40.40.2 mm, modul 60 x 60 cm, untuk plafon A.4.2.1.21 m2 320,248.32 331,775.12 361,772.87 338,157.62 331,775.12 361,772.87 360,764.43
22. (K3) Pemasangan 1 m² rangka pelana rangka atap baja canai dingin profil C75 A.4.2.1.22 m2 471,280.80 489,685.30 521,947.33 492,737.62 489,685.30 521,947.33 527,088.63
23. (K3) Pemasangan 1 m² atap jurai rangka atap baja canai dingin profil C75 A.4.2.1.23 m2 975,828.83 1,013,365.30 1,102,196.02 1,023,915.19 1,013,365.30 1,102,196.02 1,092,743.03

G. PEKERJAAN PASANGAN DINDING


1. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2PP A.4.4.1.1 m2 484,814.70 496,928.69 658,354.88 502,685.70 591,325.86 752,752.05 544,325.13
2. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3PP A.4.4.1.2 m2 460,688.85 471,568.46 630,610.15 476,006.85 543,071.61 702,113.30 515,149.45
3. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4PP A.4.4.1.3 m2 444,860.25 454,943.32 612,407.26 458,569.86 512,558.15 670,022.09 496,114.28
4. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5PP A.4.4.1.4 m2 436,052.40 445,672.10 602,278.23 448,766.34 493,847.21 650,453.34 485,361.04
5. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6PP A.4.4.1.5 m2 431,712.30 441,063.94 597,287.12 443,736.93 481,209.86 637,433.04 479,744.44
6. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3KP : 10 PP A.4.4.1.6 m2 405,317.48 413,380.81 566,889.19 414,991.43 435,254.91 588,763.29 448,409.87
7. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 2 PP A.4.4.1.7 m2 234,748.35 240,427.50 320,369.59 242,943.48 281,549.95 361,492.04 263,012.61
8. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 PP A.4.4.1.8 m2 223,566.21 228,681.15 307,510.13 230,617.60 259,864.76 338,693.75 249,553.20
9. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 4 PP A.4.4.1.9 m2 217,005.00 221,784.22 299,964.74 223,361.97 246,739.79 324,920.31 241,618.47
10. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 5 PP A.4.4.1.10 m2 212,869.14 217,436.46 295,208.50 218,786.99 238,442.54 316,214.58 236,614.59
11. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 6 PP A.4.4.1.11 m2 210,418.26 214,852.82 292,389.98 216,039.97 232,907.64 310,444.80 233,591.84
12. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 8 PP A.4.4.1.12 m2 206,027.10 210,239.55 287,340.15 211,196.93 224,344.88 301,445.48 228,302.03
13. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 3 KP : 10PP A.4.4.1.13 m2 202,357.16 206,362.19 283,095.79 207,112.13 216,127.41 292,861.01 223,754.50
14. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SP : 1 KP : 1 PP A.4.4.1.14 m2 183,032.23 186,147.91 260,867.33 186,253.60 186,186.97 260,906.39 201,189.42
15. Pemasangan 1 m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 SM : 1 KP : 2 PP A.4.4.1.15 m2 185,192.07 188,396.59 263,357.52 188,514.54 188,426.97 263,387.90 203,615.28
16. Pemasangan 1 m² dinding conblock HB20 campuran 1SP : 3 PP A.4.4.1.16 m2 453,004.32 471,470.17 516,517.85 478,794.73 537,266.09 582,313.77 513,318.95
17. Pemasangan 1 m² dinding conblock HB20 campuran 1SP : 4PP A.4.4.1.17 m2 448,766.34 466,907.96 511,644.18 473,571.29 519,553.37 564,289.59 507,334.71
18. Pemasangan 1 m² dinding conblock HB15 campuran 1SP : 3PP A.4.4.1.18 m2 353,143.73 367,579.66 402,518.11 373,083.30 416,926.60 451,865.05 400,040.43
19. Pemasangan 1 m² dinding conblock HB15 campuran 1SP : 4PP A.4.4.1.19 m2 201,138.11 209,377.91 227,711.65 212,897.87 248,872.82 267,206.56 228,866.88
20. Pemasangan 1 m² dinding conblock HB10 campuran 1SP : 3 PP A.4.4.1.20 m2 255,019.17 265,496.68 290,228.87 269,158.96 298,394.64 323,126.83 288,699.62
21. Pemasangan 1 cm² dinding conblock HB10 campuran 1SP : 4 PP A.4.4.1.21 cm2 253,410.78 263,746.60 288,379.22 267,083.37 290,069.31 314,701.93 286,279.38
22. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP : 3 PP A.4.4.1.22 cm2 336,230.10 348,522.80 381,673.50 353,845.80 372,393.35 405,544.05 378,214.19
23. Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP A.4.4.1.23 cm2 327,294.60 339,229.88 371,397.68 344,463.53 363,100.43 395,268.23 368,206.43

B.2 - 80
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

24. Pemasangan 1 cm2 dinding bata berongga ekspose 12x11x24 campuran 1SP :3PP A.4.4.1.24 cm2 659,695.20 682,935.16 752,828.64 693,739.46 713,315.86 783,209.34 739,946.20
25. Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai A.4.4.1.25 m2 565,206.61 586,865.36 621,507.34 589,312.19 586,865.36 621,507.34 629,676.33
26. Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai A.4.4.1.26 m2 564,116.79 585,729.60 620,247.11 588,163.34 585,729.60 620,247.11 628,461.73

H. PEKERJAAN PLESTERAN
1. Pemasangan 1 m2 plesteran 1SP : 1PP tebal 15 mm A.4.4.2.1 m2 123,320.11 128,717.66 135,997.29 130,737.60 162,362.12 169,641.74 141,300.38
2. Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm A.4.4.2.2 m2 110,861.47 115,625.88 121,669.85 116,982.03 137,812.47 143,856.44 126,268.32
3. Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 15 mm A.4.4.2.3 m2 105,377.63 109,860.19 115,363.43 110,911.51 126,734.49 132,237.74 119,626.43
4. Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 15 mm A.4.4.2.4 m2 101,711.52 106,008.22 111,147.41 106,866.03 119,549.33 124,688.52 115,206.68
5. Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm A.4.4.2.5 m2 99,526.15 103,708.48 108,634.23 104,436.59 114,958.02 119,883.77 112,543.39
6. Pemasangan 1 m2 Plesteran 1SP : 6PP tebal 15 mm A.4.4.2.6 m2 97,820.75 101,915.25 106,673.02 102,547.88 111,498.19 116,255.96 110,476.48
7. Pemasangan 1 m2 Plesteran 1SP : 7PP tebal 15 mm A.4.4.2.7 m2 96,850.61 100,894.05 105,557.36 101,467.96 109,435.37 114,098.68 109,291.89
8. Pemasangan 1 m2 Plesteran 1SP : 8PP tebal 15 mm A.4.4.2.8 m2 95,880.47 99,872.85 104,441.70 100,388.04 107,372.54 111,941.39 108,107.30
9. Pemasangan 1 m2 Plesteran 1SP : 1/2KP : 3PP tebal 15 mm A.4.4.2.9 m2 101,641.31 105,965.46 110,893.38 106,743.48 118,464.95 123,392.87 115,195.83
10. Pemasangan 1 m2 Plesteran 1SP : 2KP : 8PP tebal 15 mm A.4.4.2.10 m2 96,573.61 100,623.31 105,062.33 101,073.27 107,133.46 111,572.48 108,952.47
11. Pemasangan 1 m2 Plesteran 1SM : 1KP : 1PP tebal 15 mm A.4.4.2.11 m2 88,212.53 91,848.65 95,446.46 91,923.32 91,848.65 95,446.46 98,967.69
12. Pemasangan 1 m2 Plesteran 1SM : 1KP : 2PP tebal 15 mm A.4.4.2.12 m2 89,169.91 92,845.59 96,549.35 92,924.09 92,845.59 96,549.35 100,043.78
13. Pemasangan 1 m2 Plesteran 1SP : 1PP tebal 20 mm A.4.4.2.13 m2 148,308.88 154,690.35 162,758.35 156,499.41 184,272.48 192,340.47 168,938.14
14. Pemasangan 1 m2 Plesteran 1SP : 3PP tebal 20 mm A.4.4.2.14 m2 117,713.72 122,710.97 129,164.44 124,113.58 145,210.04 151,663.52 133,773.63
15. Pemasangan 1 m2 Plesteran 1SP : 4PP tebal 20 mm A.4.4.2.15 m2 136,023.84 141,778.30 148,630.55 142,922.05 159,833.12 166,685.37 154,093.97
16. Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 20 mm A.4.4.2.16 m2 133,195.12 138,800.48 145,377.52 139,772.15 153,799.87 160,376.91 150,638.23
17. Pemasangan 1 m2 Plesteran 1SP : 6PP tebal 20 mm A.4.4.2.17 m2 130,836.14 136,321.01 142,664.70 137,164.52 149,098.26 155,441.96 147,787.04
18. Pemasangan 1 m2 Plesteran 1SM : 1KP : 2PP tebal 20 mm A.4.4.2.18 m2 124,005.59 129,061.18 134,060.58 129,158.82 129,061.18 134,060.58 138,891.50
19. Pemasangan 1 m2 Berapen 1SP : 5PP tebal 15 mm A.4.4.2.19 m2 59,897.21 62,464.76 65,954.46 63,192.88 73,714.30 77,204.00 68,159.48
20. Pemasangan 1 m2 Plesteran Skoning 1SP : 3PP tebal 10 mm A.4.4.2.20 m2 99,362.76 103,184.60 106,740.93 103,281.62 104,269.63 107,825.96 110,381.51
21. Pemasangan 1 m2 Plesteran Granit 1SP : 2 Granit tebal 1 cm A.4.4.2.21 m2 148,201.23 154,492.82 161,683.24 155,799.26 176,193.32 183,383.74 168,058.92
22. Pemasangan 1 m2 Plesteran Traso 1SP : 2 Traso tebal 1 cm A.4.4.2.22 m2 148,201.23 154,492.82 161,683.24 155,799.26 176,193.32 183,383.74 168,058.92
23. Pemasangan 1 m2 Plesteran Ciprat 1SP : 2 PP A.4.4.2.23 m2 80,471.76 83,895.39 87,551.41 84,446.84 93,270.00 96,926.02 91,166.42
24. Pemasangan 1 m2 Finishing Siar Pasangan Bata Merah A.4.4.2.24 m2 47,959.38 49,996.42 52,225.96 50,393.16 56,740.94 58,970.47 54,365.11
25. Pemasangan 1 m2 Finishing Siar Pasangan Conblock Ekspose A.4.4.2.25 m2 22,868.50 23,845.02 24,923.66 24,049.26 27,317.10 28,395.74 25,951.25
26. Pemasangan 1 m2 Finishing Siar Pasangan Batu Kali, campuran 1SP : 2PP A.4.4.2.26 m2 98,903.22 103,090.14 107,917.86 103,930.08 116,848.26 121,675.98 112,081.81
27. Pemasangan 1 m2 Acian A.4.4.2.27 m2 61,399.65 63,984.56 66,729.04 64,399.43 71,037.23 73,781.70 69,441.60

I. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1. Pemasangan 1 m² lantai ubin PC abu-abu ukuran 40cm x 40cm A.4.4.3.1 m2 285,888.77 293,709.89 325,258.58 303,538.94 314,976.38 346,525.07 320,592.98
2. Pemasangan 1 m² lantai ubin PC abu-abu ukuran 30cm x 30cm A.4.4.3.2 m2 289,964.63 305,032.44 341,546.72 306,423.83 326,732.94 363,247.22 330,217.79
3. Pemasangan 1 m² lantai ubin PC abu-abu ukuran 20cm x 20cm A.4.4.3.3 m2 292,592.95 304,087.83 459,431.50 305,530.28 326,656.35 482,000.02 328,226.45
4. Pemasangan 1 m² lantai ubin warna ukuran 40cm x 40cm A.4.4.3.4 m2 381,947.95 395,995.83 462,163.21 405,824.88 417,262.32 483,429.70 431,342.12

B.2 - 81
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

5. Pemasangan 1 m² lantai ubin warna ukuran 30cm x 30cm A.4.4.3.5 m2 386,830.56 407,688.57 505,672.71 409,079.96 429,389.07 527,373.21 433,065.39
6. Pemasangan 1 m² lantai ubin warna ukuran 20cm x 20 cm A.4.4.3.6 m2 393,947.05 410,739.41 476,026.00 415,564.58 433,307.93 498,594.52 441,643.47
7. Pemasangan 1 m² lantai ubin teraso ukuran 40cm x 40cm A.4.4.3.7 m2 275,384.45 288,233.70 346,831.43 289,599.56 309,500.19 368,097.92 306,653.60
8. Pemasangan 1 m² lantai ubin teraso ukuran 30cm x 30cm A.4.4.3.8 m2 398,893.49 421,474.77 520,607.76 422,866.16 443,175.27 542,308.26 446,851.59
9. Pemasangan 1 m² lantai ubin granit ukuran 40cm x 40cm A.4.4.3.9 m2 645,226.07 669,077.48 769,991.18 678,906.53 690,343.97 791,257.67 721,350.15
10. Pemasangan 1 m² lantai ubin granit ukuran 30cm x 30cm A.4.4.3.10 m2 1,065,583.91 1,103,317.25 1,278,210.51 1,119,860.69 1,125,017.75 1,299,911.01 1,189,302.29
11. Pemasangan 1 m² lantai ubin teralux marmer ukuran 40cm x 40cm A.4.4.3.11 m2 645,226.07 669,077.48 769,991.18 678,906.53 690,343.97 791,257.67 721,350.15
12. Pemasangan 1 m² lantai ubin teralux ukuran 30cm x 30cm A.4.4.3.12 m2 656,478.42 679,059.71 747,888.59 695,603.15 700,760.21 769,589.09 734,740.64
13. Pemasangan 1 m² lantai ubin teralux marmer ukuran 60cm x 60 cm A.4.4.3.13 m2 673,826.06 704,730.12 768,057.29 710,027.60 725,562.60 788,889.77 757,909.11
14. Pemasangan 1 m² lantai ubin teralux marmer ukuran 40cm x 40cm A.4.4.3.14 m2 649,457.67 677,540.67 769,991.18 687,369.72 698,807.16 791,257.67 729,813.35
15. Pemasangan 1 m² lantai ubin teralux marmer ukuran 30cm x 30cm A.4.4.3.15 m2 656,478.42 679,059.71 747,888.59 695,603.15 700,760.21 769,589.09 734,740.64
16. Pemasangan 1 m' plint ubin PC abu-abu ukuran 15cm x 20cm A.4.4.3.16 m' 74,956.08 77,888.20 89,042.26 78,109.04 81,468.78 92,622.84 83,848.18
17. Pemasangan 1 m' plint ubin PC abu-abu ukuran 10cm x 30cm A.4.4.3.17 m' 61,453.26 63,870.95 71,729.09 64,036.90 66,561.82 74,419.95 68,749.74
18. Pemasangan 1 m' plint ubin PC abu-abu ukuran 10cm x 40cm A.4.4.3.18 m' 61,476.24 63,669.27 70,631.30 64,173.48 66,360.13 73,322.16 68,775.27
19. Pemasangan 1 m' plint ubin warna ukuran 10cm x 20cm A.4.4.3.19 m' 52,406.71 54,535.91 76,209.60 55,027.36 57,009.77 78,683.46 58,588.80
20. Pemasangan 1 m' plint warna ukuran 10cm x 30cm A.4.4.3.20 m' 65,241.92 67,838.32 86,613.08 68,442.10 70,312.17 89,086.94 73,129.41
21. Pemasangan 1 m' plint ubin warna ukuran 10cm x 40cm A.4.4.3.21 m' 64,252.63 66,962.64 75,379.88 67,115.82 69,436.49 77,853.74 72,030.34
22. Pemasangan 1 m' plint ubin teraso ukuran 10cm x 30cm A.4.4.3.22 m' 60,735.87 63,332.27 86,613.08 63,485.45 65,806.13 89,086.94 68,172.76
23. Pemasangan 1 m' plint ubin teraso ukuran 10cm x 40cm A.4.4.3.23 m' 60,869.90 63,241.64 75,379.88 63,733.09 65,715.50 77,853.74 68,309.34
24. Pemasangan 1 m' plint ubin granit ukuran 10cm x 40cm A.4.4.3.24 m' 99,094.70 104,172.61 126,120.75 104,325.79 106,646.47 128,594.61 110,593.41
25. Pemasangan 1 m' plint ubin granit ukuran 10cm x 30cm A.4.4.3.25 m' 96,784.23 102,985.47 109,143.30 103,138.65 105,459.32 111,617.16 110,529.58
26. Pemasangan 1 m' plint ubin teralux kerang ukuran 10cm x 40cm A.4.4.3.26 m' 98,635.16 103,687.54 125,482.50 103,840.72 106,161.40 127,956.36 110,082.81
27. Pemasangan 1 m' plint ubin teralux kerang ukuran 10cm x 30cm A.4.4.3.27 m' 96,784.23 102,985.47 131,673.53 103,138.65 105,459.32 134,147.39 110,529.58
28. Pemasangan 1 m' plint ubin teralux marmer ukuran 10cm x 60cm A.4.4.3.28 m' 103,307.15 107,172.39 128,354.63 109,495.62 109,646.24 130,828.49 116,720.61
29. Pemasangan 1 m' plint ubin teralux marmer ukuran 10cm x 40cm A.4.4.3.29 m' 105,860.15 110,938.06 126,120.75 111,091.24 113,411.92 128,594.61 117,358.86
30. Pemasangan 1 m' plint ubin teralux marmer ukuran 10cm x 30cm A.4.4.3.30 m' 105,796.32 111,997.56 131,673.53 112,150.74 114,471.41 134,147.39 119,541.67
31. Pemasangan 1 m² lantai teraso cor di tempat, tebal 3 cm A.4.4.3.31 m2 97,774.79 101,904.53 105,570.63 101,913.72 101,904.53 105,570.63 109,555.87
32. Pemasangan 1 m² lantai keramik artistik 10cm x 20cm A.4.4.3.32 m2 363,362.11 399,377.28 452,183.53 404,596.89 417,149.99 469,956.24 431,707.19
33. Pemasangan 1 m2 lantai keramik artistik 10 cm x 10 cm atau 5 cm x 20 cm A.4.4.3.33 m2 369,393.57 406,270.38 459,651.06 411,489.99 424,043.09 477,423.77 438,600.29
34. Pemasangan 1 m2 lantai keramik ukuran 33 cmx 33 cm A.4.4.3.34 m2 350,277.98 382,450.89 437,376.13 388,034.30 400,223.60 455,148.84 414,519.12
35. Pemasangan 1 m2 lantai keramik ukuran 30 cmx 30 cm A.4.4.3.35 m2 343,506.15 373,899.62 425,265.98 379,311.98 395,600.12 446,966.48 405,454.70
36. Pemasangan 1 m2 lantai keramik ukuran 20 cmx 20 cm A.4.4.3.36 m2 344,527.35 374,971.88 426,440.36 380,435.30 397,540.40 449,008.88 406,680.14
37. Pemasangan 1m² lantai keramik ukuran 10 cm x 33 cm untuk variasi/border A.4.4.3.37 m2 478,323.70 520,658.82 581,758.49 526,195.00 541,925.31 603,024.98 559,976.30
38. Pemasangan 1m² lantai keramik mozaik ukuran 30 cm x 30 cm A.4.4.3.38 m2 362,056.01 397,724.56 451,633.25 403,762.76 428,430.76 482,339.46 432,458.01
39. Pemasangan 1m' plint keramik ukuran 10 cm x 20 cm A.4.4.3.39 m' 82,771.46 86,008.02 113,272.78 86,837.74 88,481.87 115,746.64 92,760.70
40. Pemasangan 1m' plint keramik ukuran 10 cm x 10 cm A.4.4.3.40 m' 83,106.53 86,390.97 113,687.64 86,544.15 88,864.82 116,161.50 92,467.11
41. Pemasangan 1m' plint keramik ukuran 5 cm x 20 cm A.4.4.3.41 m' 60,476.11 62,925.07 83,897.96 63,001.66 64,162.00 85,134.89 67,399.20
42. Pemasangan 1m' plint internal cove artistik 5cm x 5cm x 20cm A.4.4.3.42 m' 483,806.27 501,955.54 572,921.28 502,108.72 504,429.40 575,395.14 530,293.84
43. Pemasangan 1m² lantai marmer ukuran 100cm x 100cm A.4.4.3.43 m2 3,602,777.01 3,645,961.00 4,163,597.07 3,653,886.79 3,663,733.71 4,181,369.78 3,685,056.37
44. Pemasangan 1m² lantai karpet A.4.4.3.44 m2 288,220.94 297,871.28 350,973.68 299,211.60 297,871.28 350,973.68 307,125.90
45. Pemasangan 1m² underlayer (pelapis bawah karpet) A.4.4.3.45 m2 94,154.64 97,703.31 109,957.71 97,703.31 97,703.31 109,957.71 102,860.37
46. Pemasangan 1m² lantai parquet kayu A.4.4.3.46 m2 831,129.15 847,532.18 946,907.70 848,872.50 847,532.18 946,907.70 868,402.95

B.2 - 82
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

47. Pemasangan 1m² lantai kayu gymfloor A.4.4.3.47 m2 2,372,502.90 2,466,644.78 2,716,136.70 2,488,089.98 2,466,644.78 2,716,136.70 2,653,715.85
48. Pemasangan 1m² dinding porselen 11cm x 11cm A.4.4.3.48 m2 575,318.55 599,487.80 876,355.55 600,720.90 619,669.27 896,537.01 646,460.45
49. Pemasangan 1m² dinding porselen 10cm x 20cm A.4.4.3.49 m2 574,776.04 597,943.24 1,012,111.32 605,941.79 618,124.70 1,032,292.79 641,124.68
50. Pemasangan 1m² dinding porselen 20cm x 20cm A.4.4.3.50 m2 558,813.41 583,620.91 819,959.78 588,172.91 603,802.37 840,141.24 626,419.40
51. Pemasangan 1m² dinding keramik artistik 10cm x 20cm A.4.4.3.51 m2 405,639.79 442,337.89 497,937.12 447,630.26 462,519.35 518,118.59 477,400.79
52. Pemasangan 1m² dinding keramik artistik 5cm x 20cm A.4.4.3.52 m2 407,650.28 444,635.59 500,426.30 449,927.96 464,817.05 520,607.76 479,698.49
53. Pemasangan 1m² dinding keramik 10cm x 20cm A.4.4.3.53 m2 405,639.79 442,337.89 497,937.12 447,630.26 462,519.35 518,118.59 477,400.79
54. Pemasangan 1m² dinding keramik 20cm x 20cm A.4.4.3.54 m2 356,727.50 384,263.52 423,606.53 388,033.67 404,444.98 443,787.99 414,759.75
55. Pemasangan 1m² dinding marmer 100cm x 100cm A.4.4.3.55 m2 3,776,678.43 3,827,698.86 4,352,261.22 3,836,116.10 3,854,694.28 4,379,256.64 3,880,650.63
56. Pemasangan 1m² dinding bata pelapis 3cm x 7cm x 24cm A.4.4.3.56 m2 823,029.76 857,072.74 930,328.52 866,766.48 884,068.16 957,323.94 923,619.23
57. Pemasangan 1m² dinding batu paras A.4.4.3.57 m2 235,641.90 245,528.39 257,406.23 247,226.14 271,026.48 282,904.31 266,354.49
58. Pemasangan 1m² dinding batu tempel hitam A.4.4.3.58 m2 235,961.03 245,860.28 257,770.03 247,558.03 271,358.37 283,268.12 266,711.91
59. Pemasangan 1m² lantai vynil ukuran 30cm x 30cm A.4.4.3.59 m2 3,110,230.55 3,234,102.11 3,573,383.04 3,264,406.22 3,234,102.11 3,573,383.04 3,481,206.98
60. Pemasangan 1m² wallpaper lebar 50 cm A.4.4.3.60 m2 188,309.28 194,870.49 219,315.47 197,678.79 194,870.49 219,315.47 210,424.64
61. Pemasangan 1m² floor harderner A.4.4.3.61 m2 203,678.34 211,822.41 238,884.21 211,822.41 211,822.41 238,884.21 221,574.87
62. Pemasangan 1m' plint vynil 15cm x 30cm A.4.4.3.62 m' 495,333.06 515,450.70 566,357.52 519,943.98 515,450.70 566,357.52 554,613.72
63. Pemasangan 1m' plint kayu tebal 2 cm lebar 10 cm A.4.4.3.63 m' 76,794.24 79,352.35 83,074.62 79,551.48 79,352.35 83,074.62 84,315.38
64. Pemasangan 1m² paving block natural tebal 6 cm A.4.4.3.64 m2 283,233.65 293,475.01 312,596.98 293,538.83 293,475.01 312,596.98 313,319.48
65. Pemasangan 1m² paving block berwarna tebal 8 cm A.4.4.3.65 m2 634,175.41 657,615.78 715,077.43 660,258.14 657,615.78 715,077.43 708,370.70
66. Pemasangan 1m² paving block berwarna tebal 6 cm A.4.4.3.66 m2 283,233.65 293,475.01 312,596.98 293,538.83 293,475.01 312,596.98 313,319.48
67. Pemasangan 1m² paving block berwarna tebal 8 cm A.4.4.3.67 m2 656,737.55 680,177.92 742,151.99 687,332.70 680,177.92 742,151.99 730,932.84

J. PEKERJAAN LANGIT-LANGIT (PLAFOND)


1. Pemasangan 1 m² langit-langit asbes semen, tebal 4 mm, 5mm dan 6mm A.4.5.1.1 m2 53,855.54 56,051.12 60,991.17 56,051.12 56,051.12 60,991.17 60,340.16
2. Pemasangan 1 m² langit-langit akustik ukuran (30 x 30) cm A.4.5.1.2 m2 4,794,929.72 4,980,571.11 5,518,679.69 5,041,843.11 4,980,571.11 5,518,679.69 5,366,954.90
3. Pemasangan 1 m² langit-langit akustik ukuran (30 x 60) cm A.4.5.1.3 m2 2,230,441.22 2,321,111.01 2,560,007.99 2,343,322.11 2,321,111.01 2,560,007.99 2,494,829.90
4. Pemasangan 1 m² langit-langit akustik ukuran (60 x 120) cm A.4.5.1.4 m2 565,553.33 588,147.38 647,313.15 593,891.63 588,147.38 647,313.15 633,144.00
5. Pemasangan 1 m² langit-langit tripleks ukuran (120x240) cm, tebal 3 mm, 4 mm & 6 mm A.4.5.1.5 m2 95,546.03 99,445.73 107,213.24 99,924.42 99,445.73 107,213.24 106,600.52
6. Pemasangan 1 m² langit-langit lambrisering kayu, tebal 9 mm A.4.5.1.6 m2 351,037.50 365,053.47 381,577.76 365,627.90 365,053.47 381,577.76 392,051.45
7. Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm A.4.5.1.7 m2 189,771.64 194,871.20 207,872.21 196,209.38 194,871.20 207,872.21 206,344.69
8. Pemasangan 1 m² langit-langit akustik ukuran (60x120) cm berikut rangka alluminium A.4.5.1.8 m2 1,018,072.58 1,058,346.15 1,156,445.18 1,068,685.80 1,058,346.15 1,156,445.18 1,136,914.73
9. Pemasangan 1 m² list langit-langit kayu profil A.4.5.1.9 m2 48,921.86 51,015.32 55,093.74 51,350.41 51,015.32 55,093.74 54,790.58
10. Pemasangan 1 m² rangka langit-langit besi hollow 40.40 A.4.5.1.10 m2 58,974.30 61,067.76 67,156.67 62,408.09 61,067.76 67,156.67 66,518.42

K. PEKERJAAN PENUTUP ATAP


1. Pemasangan 1 m2 Atap Genteng Palentong Kecil A.4.5.2.1 m2 119,710.17 124,535.34 132,353.90 124,535.34 124,535.34 132,353.90 134,089.94
2. Pemasangan 1 m2 Atap Genteng Kodok Glazuur A.4.5.2.2 m2 311,280.91 322,494.96 352,652.27 325,686.21 322,494.96 352,652.27 348,012.20
3. Pemasangan 1 m2 Atap Genteng Palentong Besar/Super A.4.5.2.3 m2 139,591.66 144,295.56 156,454.22 145,827.36 144,295.56 156,454.22 155,133.05
4. Pemasangan 1 m' Bubung Genteng Palentong A.4.5.2.4 m' 166,225.83 172,960.64 183,560.70 174,063.54 190,321.04 200,921.10 187,196.17
B.2 - 83
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

5. Pemasangan 1 m' Bubung Genteng Kodok Glazuur A.4.5.2.5 m' 184,096.83 191,469.89 203,984.70 193,211.04 208,830.29 221,345.10 206,981.92
6. Pemasangan 1 m' Bubung Genteng Pelantong Besar A.4.5.2.6 m' 159,205.08 165,684.59 175,518.75 166,787.49 183,044.99 192,879.15 179,409.52
7. Pemasangan 1 m2 Roof Light Fibreglass 90 x 180 A.4.5.2.7 m2 57,168.05 59,497.67 63,563.32 59,497.67 59,497.67 63,563.32 64,003.71
8. Pemasangan 1 m2 Atap Asbes Gelombang 0,92 m x 2,5 m x 5 mm A.4.5.2.8 m2 84,446.86 88,091.27 95,003.51 88,091.27 88,091.27 95,003.51 94,486.53
9. Pemasangan 1 m2 Atap Asbes Gelombang 0,92 m x 2,25 m x 5 mm A.4.5.2.9 m2 87,510.46 90,771.92 98,577.71 91,537.82 90,771.92 98,577.71 97,805.43
10. Pemasangan 1 m2 Atap Asbes Gelombang 0,92 m x 2,00 m x 5 mm A.4.5.2.10 m2 80,062.08 83,266.10 90,274.08 84,032.00 83,266.10 90,274.08 89,431.59
11. Pemasangan 1 m2 atap asbes gelombang 0,92 m x 1,80 m x 5 mm A.4.5.2.11 m2 89,827.31 93,414.27 101,571.11 94,371.65 93,414.27 101,571.11 100,345.67
12. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm A.4.5.2.12 m2 77,189.96 80,202.50 86,636.06 80,649.27 80,202.50 86,636.06 86,431.82
13. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,70 m x 4 mm A.4.5.2.13 m2 80,674.80 83,955.41 90,657.03 84,491.54 83,955.41 90,657.03 90,274.08
14. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm A.4.5.2.14 m2 78,070.74 81,427.94 87,772.14 81,427.94 81,427.94 87,772.14 87,338.13
15. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm A.4.5.2.15 m2 78,760.05 81,734.30 88,703.99 82,385.31 81,734.30 88,703.99 88,091.27
16. Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,50 m x 4 mm A.4.5.2.16 m2 83,891.58 87,606.20 94,103.58 87,606.20 87,606.20 94,103.58 93,771.69
17. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 3,00 m x 6 mm A.4.5.2.17 m2 83,980.94 87,542.37 94,678.01 88,014.68 87,542.37 94,678.01 93,950.40
18. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,70 m x 6 mm A.4.5.2.18 m2 80,776.92 83,904.35 90,682.56 84,389.42 83,904.35 90,682.56 90,401.73
19. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,40 m x 6 mm A.4.5.2.19 m2 83,866.05 87,299.84 94,409.94 87,887.03 87,299.84 94,409.94 93,924.87
20. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 2,10 m x 6 mm A.4.5.2.20 m2 81,032.22 84,580.89 91,371.87 84,580.89 84,580.89 91,371.87 90,810.21
21. Pemasangan 1 m2 atap asbes gelombang 1,08 m x 1,80 m x 6 mm A.4.5.2.21 m2 81,747.06 84,874.49 91,652.70 85,602.09 84,874.49 91,652.70 91,614.41
22. Pemasangan 1 m’ bubung stel gelombang 0,92 m A.4.5.2.22 m' 110,538.52 115,153.07 122,614.21 115,153.07 115,153.07 122,614.21 124,216.22
23. Pemasangan 1 m’ bubung stel gelombang 1,05 m A.4.5.2.23 m' 110,155.57 114,387.17 123,763.06 114,387.17 114,387.17 123,763.06 122,684.42
24. Pemasangan 1 m’ bubung stel gelombang 1,08 m A.4.5.2.24 m' 116,410.42 120,578.19 129,762.61 120,578.19 120,578.19 129,762.61 128,747.79
25. Pemasangan 1 m’ nok paten 0,92 m A.4.5.2.25 m' 59,223.22 61,540.07 64,405.81 61,540.07 61,540.07 64,405.81 66,007.82
26. Pemasangan 1 m' nok paten 1,05 m A.4.5.2.26 m' 61,520.92 63,071.87 67,469.41 64,603.67 63,071.87 67,469.41 67,539.62
27. Pemasangan 1 m' nok paten 1,08 m A.4.5.2.27 m' 62,286.82 64,603.67 67,469.41 64,603.67 64,603.67 67,469.41 69,071.42
28. Pemasangan 1 m' nok stel rata 0,92 m A.4.5.2.28 m' 64,961.09 67,475.79 70,475.57 67,475.79 67,475.79 70,475.57 72,339.26
29. Pemasangan 1 m' nok stel rata 1,05 m A.4.5.2.29 m' 59,989.12 61,540.07 65,682.31 62,944.22 61,540.07 65,682.31 65,880.17
30. Pemasangan 1 m2 genteng beton A.4.5.2.30 m2 187,773.15 194,155.65 208,707.75 195,559.80 194,155.65 208,707.75 208,197.15
31. Pemasangan 1 m2 genteng aspal A.4.5.2.31 m2 235,271.72 244,181.69 263,533.43 245,509.25 244,181.69 263,533.43 261,720.80
32. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana A.4.5.2.32 m2 98,367.09 102,337.01 111,017.21 102,337.01 102,337.01 111,017.21 109,893.89
33. Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai A.4.5.2.33 m2 120,705.84 125,569.31 136,930.16 125,569.31 125,569.31 136,930.16 134,913.29
34. Pemasangan 1 m2 atap sirap kayu A.4.5.2.34 m2 1,615,538.40 1,695,460.07 1,853,082.29 1,695,460.07 1,695,460.07 1,853,082.29 1,816,433.97
35. Pemasangan 1 m' nok genteng beton A.4.5.2.35 m' 259,512.45 272,004.28 290,148.45 273,464.60 295,440.82 313,584.99 294,217.93
36. Pemasangan 1 m' nok genteng aspal A.4.5.2.36 m' 117,929.45 122,432.94 130,261.09 122,911.63 122,432.94 130,261.09 131,312.28
37. Pemasangan 1 m' nok genteng metal A.4.5.2.37 m' 89,138.00 92,814.32 97,218.24 92,814.32 92,814.32 97,218.24 99,911.66
38. Pemasangan 1 m' nok sirap A.4.5.2.38 m' 85,474.44 88,901.84 93,210.03 88,901.84 88,901.84 93,210.03 95,309.87
39. Pemasangan 1 m2 atap seng gelombang A.4.5.2.39 m2 90,503.85 94,512.06 102,094.47 94,512.06 94,512.06 102,094.47 101,532.81
40. Pemasangan 1 m'nok atap seng A.4.5.2.40 m' 48,047.46 50,051.57 52,579.04 50,051.57 50,051.57 52,579.04 53,919.36
41. Pemasangan 1 m2 atap alumunium A.4.5.2.41 m2 259,397.57 268,945.79 284,251.02 270,286.11 268,945.79 284,251.02 288,335.82
42. Pemasangan 1 m' nok alumunium A.4.5.2.42 m' 248,662.20 258,414.66 267,324.63 258,414.66 258,414.66 267,324.63 276,592.02
43. Pemasangan 1 m2 alumunium foil/sisalation A.4.5.2.43 m2 356,500.92 371,346.62 407,471.57 374,027.27 371,346.62 407,471.57 399,633.86

L. PEKERJAAN KAYU

B.2 - 84
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I A.4.6.1.1 m3 12,475,872.75 12,966,750.83 13,926,997.95 13,038,234.83 12,966,750.83 13,926,997.95 13,921,381.35
2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III A.4.6.1.2 m3 10,327,523.25 10,734,024.68 11,519,263.65 10,791,977.78 10,734,024.68 11,519,263.65 11,523,731.40
3. Pembuatan dan pemasangan 1 m2 kusen pintu dan kusen jendela, kayu kelas II atau III A.4.6.1.3 m2 474,832.47 493,469.37 525,062.75 495,511.77 493,469.37 525,062.75 529,339.02
4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III A.4.6.1.4 m2 423,772.47 440,366.97 466,343.75 441,898.77 440,366.97 466,343.75 472,151.82
5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II A.4.6.1.5 m2 980,032.88 1,018,161.93 1,066,158.33 1,020,268.16 1,018,161.93 1,066,158.33 1,090,654.37
6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II A.4.6.1.6 m2 755,305.05 784,526.69 819,809.15 786,135.08 784,526.69 819,809.15 840,289.31
7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II A.4.6.1.7 m2 1,121,149.95 1,164,693.92 1,228,314.68 1,168,600.01 1,164,693.92 1,228,314.68 1,248,590.60
8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) A.4.6.1.8 m2 817,611.02 849,434.16 898,049.66 852,625.41 849,434.16 898,049.66 910,999.76
9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II A.4.6.1.9 m2 898,247.52 933,191.45 984,693.12 936,413.34 933,191.45 984,693.12 1,000,615.67
10. Pemasangan 1 m2 jalusi kusen, kayu kelas I atau II A.4.6.1.10 m2 886,273.95 922,437.20 974,135.45 925,500.80 922,437.20 974,135.45 992,019.21
11. Pemasangan 1 m2 teakwood rangkap, rangka expose kayu kelas I A.4.6.1.11 m2 1,043,921.70 1,085,190.95 1,152,475.26 1,089,786.35 1,085,190.95 1,152,475.26 1,163,733.99
12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II A.4.6.1.12 m2 1,288,358.69 1,346,133.08 1,460,743.63 1,366,940.03 1,346,133.08 1,460,743.63 1,458,133.19
13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter A.4.6.1.13 m3 7,799,670.30 8,106,030.30 8,833,124.70 8,146,750.65 8,106,030.30 8,833,124.70 8,677,136.40
14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I A.4.6.1.14 m3 13,532,942.40 14,063,519.63 15,253,472.93 14,140,109.63 14,063,519.63 15,253,472.93 15,072,720.53
15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II A.4.6.1.15 m3 10,945,476.90 11,374,444.73 12,270,803.03 11,426,398.28 11,374,444.73 12,270,803.03 12,183,745.73
16. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II A.4.6.1.16 m2 283,127.70 294,488.55 324,358.65 296,913.90 294,488.55 324,358.65 316,763.48
17. Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II A.4.6.1.17 m2 383,652.08 399,033.90 439,975.08 402,477.90 399,033.90 439,975.08 429,350.78
18. Pemasangan 1 m2 rangka atap sirap, kayu kelas II A.4.6.1.18 m2 110,945.72 115,389.22 124,614.48 116,050.44 115,389.22 124,614.48 124,050.27
19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III A.4.6.1.19 m2 163,175.00 169,962.40 181,010.51 170,552.14 169,962.40 181,010.51 182,898.96
20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III A.4.6.1.20 m2 162,351.65 168,827.85 181,015.24 169,452.06 168,827.85 181,015.24 181,078.16
21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau II A.4.6.1.21 m' 114,450.99 118,990.73 127,796.03 119,542.18 118,990.73 127,796.03 127,687.27
22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II A.4.6.1.22 m' 114,055.28 118,571.53 127,041.11 119,133.19 118,571.53 127,041.11 127,284.92
23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm, kayu kelas II atau III A.4.6.1.23 m2 222,596.07 231,368.18 247,760.99 232,404.70 231,368.18 247,760.99 248,146.49
24. Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu kelas II A.4.6.1.25 m2 433,218.57 450,162.83 487,091.98 453,405.14 450,162.83 487,091.98 483,808.82
25. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I A.4.6.1.26 m2 592,551.30 612,536.18 633,858.84 613,000.83 612,536.18 633,858.84 650,080.60
26. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm A.4.6.1.27 m2 70,890.43 73,749.79 80,451.41 74,260.39 73,749.79 80,451.41 79,302.56
27. Pemasangan 1 m2 dinding bilik, rangka kayu kelas III atau IV A.4.6.1.28 m2 138,773.42 144,349.17 158,210.69 145,000.19 144,349.17 158,210.69 155,421.53
28. Struktur Jembatan Kayu kelas I A.4.6.1.29 m3 10,237,530.00 10,641,542.25 11,473,820.25 10,705,367.25 10,641,542.25 11,473,820.25 11,429,142.75
29. Struktur Lantai Jembatan Kayu kelas I A.4.6.1.30 m2 349,556.76 363,215.31 386,498.67 364,542.87 363,215.31 386,498.67 389,255.91

M. PEKERJAAN KUNCI DAN KACA


1. Pemasangan 1 buah kunci tanam antik A.4.6.2.1 buah 202,555.02 208,848.17 221,996.12 208,848.17 208,848.17 221,996.12 219,392.06
2. Pemasangan 1 buah kunci tanam biasa A.4.6.2.2 buah 174,880.50 180,114.15 192,304.73 180,114.15 180,114.15 192,304.73 188,666.70
3. Pemasangan 1 buah kunci kamar mandi A.4.6.2.3 buah 173,706.12 178,882.33 191,040.99 178,882.33 178,882.33 191,040.99 187,319.99
4. Pemasangan 1 buah kunci silinder A.4.6.2.4 buah 180,088.62 186,541.33 202,529.49 186,541.33 186,541.33 202,529.49 193,702.49
5. Pemasangan 1 buah engsel pintu A.4.6.2.5 buah 77,774.59 81,582.39 95,400.50 81,582.39 81,582.39 95,400.50 83,900.52
6. Pemasangan 1 buah engsel jendela kupu-kupu A.4.6.2.6 buah 53,970.42 57,359.53 70,826.60 57,359.53 57,359.53 70,826.60 58,904.09
7. Pemasangan 1 buah engsel angin A.4.6.2.7 buah 93,541.92 97,696.93 111,802.25 97,696.93 97,696.93 111,802.25 100,645.64
8. Pemasangan 1 buah spring knip A.4.6.2.8 buah 109,687.09 112,218.39 122,207.00 112,218.39 112,218.39 122,207.00 115,813.02
9. Pemasangan 1 buah kait angin A.4.6.2.9 buah 52,244.59 54,775.89 64,764.50 54,775.89 54,775.89 64,764.50 58,370.52
10. Pemasangan 1 buah door closer A.4.6.2.10 buah 238,041.72 243,505.14 255,951.02 243,505.14 243,505.14 255,951.02 252,517.23
B.2 - 85
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

11. Pemasangan 1 buah kunci slot A.4.6.2.11 buah 68,369.34 72,594.56 86,763.71 72,594.56 72,594.56 86,763.71 75,683.69
12. Pemasangan 1 buah door holder A.4.6.2.12 buah 180,599.22 186,062.64 198,508.52 186,062.64 186,062.64 198,508.52 195,074.73
13. Pemasangan 1 buah door stop A.4.6.2.13 buah 74,037.00 76,207.05 85,844.63 76,207.05 76,207.05 85,844.63 79,143.00
14. Pemasangan 1 buah rel pintu sorong A.4.6.2.14 buah 323,822.52 331,392.17 348,369.62 331,392.17 331,392.17 348,369.62 340,659.56
15. Pemasangan 1 buah kunci lemari A.4.6.2.15 buah 101,109.01 105,752.92 120,273.11 105,752.92 105,752.92 120,273.11 109,615.61
16. Pemasangan 1 m2 kaca tebal 3 mm A.4.6.2.16 m2 231,784.32 242,931.99 311,831.08 244,336.14 242,931.99 311,831.08 250,930.54
17. Pemasangan 1 m2 kaca tebal 5 mm A.4.6.2.17 m2 316,033.32 331,393.44 428,375.53 334,201.74 331,393.44 428,375.53 342,200.29
18. Pemasangan 1 m2 kaca tebal 8 mm A.4.6.2.18 m2 377,453.39 393,006.27 490,307.48 395,814.57 393,006.27 490,307.48 404,147.56
19. Pemasangan 1 m2 kaca buram tebal 12 mm A.4.6.2.19 m2 493,390.23 512,420.29 629,941.26 515,228.59 512,420.29 629,941.26 526,201.38
20. Pemasangan 1 m2 kaca cermin tebal 5 mm A.4.6.2.20 m2 490,916.37 510,517.03 561,698.30 515,010.31 510,517.03 561,698.30 549,526.87
21. Pemasangan 1 m2 kaca cermin tebal 8 mm A.4.6.2.21 m2 769,321.02 800,052.76 881,451.33 807,242.01 800,052.76 881,451.33 861,299.23
22. Pemasangan 1 m2 kaca wireglassed tebal 5 mm A.4.6.2.22 m2 385,605.12 395,376.73 453,999.99 396,780.88 395,376.73 453,999.99 403,495.27
23. Pemasangan 1 m2 kaca patri 5 mm A.4.6.2.23 m2 3,134,177.69 3,147,153.31 3,224,860.25 3,149,961.61 3,147,153.31 3,224,860.25 3,157,403.60

N. PEKERJAAN PENGECATAN
1. 1 m2 Pengikisan/pengerokan permukaan cat lama A.4.7.1.1 m2 25,115.39 26,195.82 27,746.51 26,195.82 26,195.82 27,746.51 28,271.92
2. 1 m2 Pencucian bidang permukaan tembok yang pernah di cat A.4.7.1.2 m2 25,185.35 26,244.84 27,648.99 26,244.84 26,244.84 27,648.99 28,300.01
3. 1 m2 Pengerokan karat pada permukaan baja cara manual A.4.7.1.3 m2 26,206.55 27,329.87 28,734.02 27,329.87 27,329.87 28,734.02 29,512.68
4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat A.4.7.1.4 m2 56,619.16 58,374.35 66,346.09 58,399.88 58,374.35 66,346.09 60,710.34
5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat, dasar, 3 lapis cat penutup) A.4.7.1.5 m2 80,093.99 82,551.26 91,939.91 82,576.79 82,551.26 91,939.91 86,202.05
6. Pelaburan 1 m2 bidang kayu dengan teak oil A.4.7.1.6 m2 47,926.19 49,885.62 53,759.80 49,885.62 49,885.62 53,759.80 52,540.74
7. Pelaburan 1 m2 bidang kayu dengan politur A.4.7.1.7 m2 76,385.76 78,698.78 86,043.76 78,954.08 78,698.78 86,043.76 82,198.94
8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter A.4.7.1.8 m2 24,138.62 25,300.23 29,065.91 25,300.23 25,300.23 29,065.91 27,176.69
9. Pelaburan 1 m2 bidang kayu dengan vernis A.4.7.1.9 m2 69,799.02 72,377.55 76,309.17 72,390.32 72,377.55 76,309.17 77,062.31
10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup A.4.7.1.10 m2 65,305.74 66,541.39 71,181.47 66,541.39 66,541.39 71,181.47 68,345.09
11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.11 m2 47,179.44 48,101.07 51,228.50 48,101.07 48,101.07 51,228.50 49,507.78
12. Pelaburan 1 m2 tembok dengan kalkarium A.4.7.1.12 m2 18,585.84 19,252.17 20,592.50 19,252.17 19,252.17 20,592.50 20,403.58
13. Pelaburan 1 m2 tembok dengan kapur sirih A.4.7.1.13 m2 40,062.95 42,055.57 46,472.26 42,547.02 42,055.57 46,472.26 45,069.39
14. Pelaburan 1 m2 tembok lama dengan kapur sirih (pemeliharaan) A.4.7.1.14 m2 39,284.29 41,122.45 46,400.78 42,105.35 41,122.45 46,400.78 43,809.48
15. Pemasangan 1 m2 wallpaper A.4.7.1.15 m2 117,693.30 121,171.76 136,872.71 122,703.56 121,171.76 136,872.71 129,149.89
16. Pengecatan 1 m2 permukaan baja dengan menie besi A.4.7.1.16 m2 49,209.08 51,053.62 53,376.85 51,053.62 51,053.62 53,376.85 54,321.46
17. Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah A.4.7.1.17 m2 94,716.30 98,450.06 103,613.51 98,488.36 98,450.06 103,613.51 105,451.67
18. Pengecatan 1 m2 permukaan baja galvanis secara manual 4 lapis A.4.7.1.18 m2 88,088.71 91,213.58 96,223.85 91,213.58 91,213.58 96,223.85 96,735.72
19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir A.4.7.1.19 m2 46,822.02 48,200.64 51,762.08 48,200.64 48,200.64 51,762.08 50,370.69
20. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis A.4.7.1.20 m2 219,494.18 227,651.01 237,365.18 227,651.01 227,651.01 237,365.18 242,432.88
21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir A.4.7.1.21 m2 227,791.43 236,356.74 246,147.50 236,356.74 236,356.74 246,147.50 252,198.11
22. Plituran 10 m2 dengan plitur melamic A.4.7.1.22 m2 2,147,925.70 2,223,861.11 2,361,225.79 2,224,627.01 2,223,861.11 2,361,225.79 2,347,282.32

O. PEKERJAAN SANITASI DALAM GEDUNG

B.2 - 86
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

1. (K3) Pemasangan 1 buah closet duduk/monoblock A.5.1.1.1 buah 4,938,267.90 4,643,779.35 5,081,172.08 4,680,989.33 4,643,779.35 5,081,172.08 5,001,837.60
2. Pemasangan 1 buah closet jongkok porselen A.5.1.1.2 buah 861,126.90 885,354.87 940,652.85 889,592.85 898,375.17 953,673.15 953,085.96
3. Pemasangan 1 buah closet jongkok teraso A.5.1.1.3 buah 740,880.60 728,728.32 775,984.35 731,562.15 741,748.62 789,004.65 783,439.11
4. (K3) Pemasangan 1 buah urinoir A.5.1.1.4 buah 2,791,705.50 14,113,915.85 15,578,852.78 14,246,467.61 14,126,936.15 15,591,873.08 15,199,247.21
5. (K3) Pemasangan 1 buah westafel A.5.1.1.5 buah 3,122,765.78 5,407,504.19 5,941,834.33 5,455,138.07 5,420,524.49 5,954,854.63 5,822,356.48
6. (K3) Pemasangan 1 buah bathcuip porselen A.5.1.1.6 buah 10,121,981.22 5,747,294.45 6,342,303.02 5,800,907.45 5,747,294.45 6,342,303.02 6,187,763.54
7. (K3) Pemasangan 1 buah bak fiberglass vol 1 m³ A.5.1.1.7 buah 2,129,202.00 4,276,244.36 4,612,908.47 4,302,550.48 4,276,244.36 4,612,908.47 4,605,617.11
8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3 A.5.1.1.8 buah 3,379,916.70 3,517,395.75 4,877,634.15 3,533,479.65 3,777,801.75 5,138,040.15 3,800,012.85
9. Pemasangan 1 buah bak mandi teraso vol 0,30 m3 A.5.1.1.9 buah 2,129,202.00 4,276,244.36 4,612,908.47 4,302,550.48 4,276,244.36 4,612,908.47 4,605,617.11
10. Pemasangan 1 buah bak air fiberglass vol 1 m3 A.5.1.1.10 buah 784,281.60 2,876,881.24 3,170,463.47 2,903,187.35 2,876,881.24 3,170,463.47 3,097,432.36
11. (K3) Pemasangan 1 buah bak beton vol 1 m3 A.5.1.1.11 buah 14,324,797.93 14,950,611.08 19,238,103.07 15,068,617.12 15,658,047.38 19,945,539.37 16,113,957.75
12. Pemasangan 1 buah bak cuci piring stainlessteel A.5.1.1.12 buah 1,434,786.00 3,430,721.40 3,788,077.58 3,463,016.85 3,430,721.40 3,788,077.58 3,694,063.35
13. Pemasangan 1 buah bak cuci piring teraso A.5.1.1.13 buah 1,033,965.00 2,542,660.35 2,801,981.33 2,568,062.70 2,586,061.35 2,845,382.33 2,740,900.80
14. Pemasangan 1 buah floor drain A.5.1.1.14 buah 118,714.50 105,055.95 114,310.58 105,821.85 105,055.95 114,310.58 112,970.25
15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm A.5.1.1.15 buah 796,131.80 828,233.13 922,987.31 834,181.62 923,715.33 1,018,469.51 901,584.49
16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm A.5.1.1.16 buah 1,165,639.75 1,211,107.88 1,365,709.23 1,221,498.59 1,378,201.73 1,532,803.08 1,317,156.21
17. Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm A.5.1.1.17 buah 1,441,699.40 1,497,076.29 1,742,783.04 1,512,404.50 1,744,461.99 1,990,168.74 1,631,278.92
18. Pemasangan 1 m’ pipa galvanis diameter ½” A.5.1.1.18 m' 94,822.67 98,707.49 106,518.60 99,334.04 98,707.49 106,518.60 106,362.23
19. Pemasangan 1 buah kran diameter ½” atau ¾ ” A.5.1.1.19 buah 148,201.65 153,945.90 163,615.39 154,584.15 153,945.90 163,615.39 164,923.80
20. Pemasangan 1 m’ pipa galvanis diameter ¾ ” A.5.1.1.20 m' 114,608.42 119,284.67 129,272.21 120,109.08 119,284.67 129,272.21 128,522.27
21. Pemasangan 1 m’ pipa galvanis diameter 1 ” A.5.1.1.21 m' 137,691.80 143,291.38 155,818.10 144,346.62 143,291.38 155,818.10 154,375.66
22. Pemasangan 1 m’ pipa galvanis diameter 1½ ” A.5.1.1.22 m' 227,453.15 236,509.92 257,375.37 238,224.68 236,509.92 257,375.37 254,393.69
23. Pemasangan 1 m’ pipa galvanis diameter 3” A.5.1.1.23 m' 513,338.09 533,825.92 585,093.35 538,277.72 533,825.92 585,093.35 574,507.97
24. Pemasangan 1 m’ pipa galvanis diameter 4” A.5.1.1.24 m' 3,926,379.97 4,083,389.47 4,510,091.51 4,121,971.68 4,083,389.47 4,510,091.51 4,397,114.87
25. Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” A.5.1.1.25 m' 29,554.17 30,714.19 32,563.52 30,813.11 30,714.19 32,563.52 32,957.63
26. Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” A.5.1.1.26 m' 32,027.39 33,286.34 35,432.45 33,434.73 33,286.34 35,432.45 35,727.64
27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 ” A.5.1.1.27 m' 38,952.40 40,458.67 43,396.22 40,705.99 40,458.67 43,396.22 43,493.55
28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1½ ” A.5.1.1.28 m' 62,880.39 65,337.65 70,213.88 65,733.37 65,337.65 70,213.88 70,236.23
29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” A.5.1.1.29 m' 74,257.20 77,209.10 83,272.48 77,654.28 77,209.10 83,272.48 82,998.03
30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2½” A.5.1.1.30 m' 100,154.19 104,130.49 112,038.41 104,724.06 104,130.49 112,038.41 111,910.76
31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” A.5.1.1.31 m' 124,886.38 129,851.96 140,480.42 130,692.85 129,851.96 140,480.42 139,610.81
32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4” A.5.1.1.32 m' 164,457.88 171,006.32 185,987.65 172,242.93 171,006.32 185,987.65 183,930.89
33. Pemasangan 1 m’ pipa air limbah jenis pipa tanah Ǿ 20 cm A.5.1.1.33 m' 933,542.75 990,131.52 1,153,543.69 1,045,707.52 1,066,083.27 1,229,495.44 1,107,725.77
34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm A.5.1.1.34 m' 533,481.26 585,451.15 739,852.38 636,640.98 586,926.79 741,328.02 689,439.44
35. Pemasangan 1 m’ pipa beton diameter 15 – 20 cm A.5.1.1.35 m' 541,660.31 579,441.13 688,929.60 615,209.69 587,947.73 697,436.20 655,417.27
36. Pemasangan 1 m’ pipa beton diameter 30 – 100 cm A.5.1.1.36 m' 815,447.35 856,858.54 971,390.34 893,494.48 879,210.05 993,741.85 940,823.39

P. PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG


1. (K3) Pemasangan 1 m pipa PVC Ø 2 1/2" A.8.4.1.1 m' 61,840.04 64,329.22 69,530.96 64,731.32 64,329.22 69,530.96 69,307.57
2. (K3) Pemasangan 1 m pipa PVC Ø 4" A.8.4.1.2 m' 107,270.68 111,578.87 121,535.57 112,402.21 111,578.87 121,535.57 120,195.24
3. (K3) Pemasangan 1 m pipa PVC Ø 5" A.8.4.1.3 m' 186,107.32 193,574.84 211,943.68 195,138.56 193,574.84 211,943.68 208,509.89
4. (K3) Pemasangan 1 m pipa PVC Ø 6" A.8.4.1.4 m' 225,027.80 234,027.13 256,448.85 235,980.17 234,027.13 256,448.85 252,089.60
5. (K3) Pemasangan 1 m pipa PVC Ø 8" A.8.4.1.5 m' 435,184.38 452,608.61 477,921.60 456,450.87 475,266.48 496,749.98 487,488.97
6. (K3) Pemasangan 1 m pipa PVC Ø 10" A.8.4.1.6 m' 662,171.61 688,716.43 727,368.85 694,633.01 723,724.44 756,473.05 741,806.06
7. (K3) Pemasangan 1 m pipa PVC Ø 12" A.8.4.1.7 m' 913,157.04 949,722.38 1,003,277.94 958,051.55 999,059.11 1,044,381.24 1,022,884.98

B.2 - 87
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

8. (K3) Pemasangan 1 m pipa HDPE Ø 50 mm A.8.4.1.17 m' 146,918.77 154,552.24 159,380.60 158,442.38 166,296.04 172,145.60 166,372.63
9. (K3) Pemasangan 1 m pipa HDPE Ø 75 mm A.8.4.1.18 m' 240,607.49 253,155.48 260,843.21 259,853.92 273,196.53 282,288.41 272,634.87
10. (K3) Pemasangan 1 m pipa HDPE Ø 110 mm A.8.4.1.19 m' 513,006.20 540,297.77 555,950.86 554,910.51 584,464.67 603,436.66 581,605.31
11. (K3) Pemasangan 1 m pipa HDPE Ø 160 mm A.8.4.1.20 m' 1,066,317.89 1,123,141.29 1,155,037.84 1,153,837.93 1,216,453.44 1,255,370.74 1,208,960.39
12. (K3) Pemasangan 1 m pipa HDPE Ø 200 mm A.8.4.1.21 m' 1,659,047.90 1,747,324.26 1,796,836.51 1,795,253.65 1,892,717.61 1,953,080.11 1,880,986.58
13. (K3) Pemasangan 1 m pipa HDPE Ø 250 mm A.8.4.1.22 m' 2,428,739.11 2,557,984.73 2,630,815.44 2,628,198.62 2,770,777.28 2,859,436.59 2,753,672.18
14. (K3) Pemasangan 1 m pipa HDPE Ø 315 mm A.8.4.1.23 m' 3,953,952.37 4,164,440.84 4,282,852.17 4,279,150.32 4,512,287.09 4,656,356.07 4,483,042.47
15. (K3) Pemasangan 1 m pipa HDPE Ø 400 mm A.8.4.1.24 m' 6,252,124.67 6,584,761.43 6,773,243.03 6,765,615.95 7,132,762.88 7,361,837.18 7,088,557.68
16. (K3) Pemasangan 1 m pipa HDPE Ø 450 mm A.8.4.1.25 m' 7,935,285.66 8,357,622.07 8,596,959.44 8,587,136.77 9,053,059.27 9,343,967.24 8,996,906.03
17. (K3) Pemasangan 1 m pipa HDPE Ø 500 mm A.8.4.1.26 m' 9,560,397.81 10,069,153.27 10,357,792.26 10,345,678.28 10,906,920.22 11,257,597.11 10,839,406.13
18. (K3) Pemasangan 1 m pipa GIP Ø 75 mm A.8.4.1.33 m' 945,924.80 995,344.49 1,024,202.97 1,020,296.88 1,071,168.59 1,105,771.32 1,071,589.84
19. (K3) Pemasangan 1 m pipa GIP Ø 100 mm A.8.4.1.34 m' 1,052,665.73 1,107,542.46 1,139,738.99 1,135,303.15 1,191,663.81 1,229,987.54 1,192,404.18
20. (K3) Pemasangan 1 m pipa GIP Ø 125 mm A.8.4.1.35 m' 125,339.54 130,445.54 135,401.55 130,506.17 130,445.54 135,401.55 140,657.54
21. (K3) Pemasangan 1 m pipa GIP Ø 150 mm A.8.4.1.36 m' 1,601,771.35 1,685,631.02 1,734,160.36 1,728,709.70 1,816,216.97 1,874,447.71 1,814,800.05
22. (K3) Pemasangan 1 m pipa GIP Ø 200 mm A.8.4.1.37 m' 1,938,084.42 2,039,004.51 2,097,969.24 2,089,742.20 2,192,822.76 2,263,148.34 2,195,273.64
23. (K3) Pemasangan 1 m pipa GIP Ø 250 mm A.8.4.1.38 m' 2,068,638.46 2,175,851.69 2,239,517.13 2,229,088.13 2,337,073.64 2,412,738.18 2,342,792.36
24. (K3) Pemasangan 1 m pipa GIP Ø 300 mm A.8.4.1.39 m' 2,125,404.41 2,235,559.98 2,301,519.93 2,290,273.97 2,400,994.38 2,479,208.73 2,407,108.82
25. (K3) Pemasangan 1 m pipa GIP Ø 400 mm A.8.4.1.40 m' 2,421,099.26 2,545,711.19 2,623,028.79 2,606,574.71 2,729,144.24 2,819,992.74 2,741,066.75
26. (K3) Pemasangan 1 m pipa GIP Ø 450 mm A.8.4.1.41 m' 2,544,421.92 2,675,129.14 2,757,520.83 2,738,188.24 2,864,817.04 2,961,250.23 2,880,377.57
27. (K3) Pemasangan 1 m pipa GIP Ø 500 mm A.8.4.1.42 m' 2,709,658.46 2,848,541.66 2,937,287.14 2,915,210.07 3,048,696.86 3,152,377.39 3,067,206.11

Q. PEKERJAAN PEMOTONGAN PIPA


1. (K3) Pemotongan 1 buah pipa PVC Ø 2 1/2" A.8.4.2.1 m' 39,820.42 41,414.77 45,703.30 41,800.40 41,414.77 45,703.30 44,603.46
2. (K3) Pemotongan 1 buah pipa PVC Ø 4" A.8.4.2.2 m' 83,712.87 87,062.41 96,003.78 87,862.90 87,062.41 96,003.78 93,761.48
3. (K3) Pemotongan 1 buah pipa PVC Ø 5" A.8.4.2.3 m' 160,877.30 167,315.96 184,567.35 168,850.45 167,315.96 184,567.35 180,193.29
4. (K3) Pemotongan 1 buah pipa PVC Ø 6" A.8.4.2.4 m' 198,176.63 206,083.27 227,279.04 208,000.70 206,083.27 227,279.04 221,960.37
5. (K3) Pemotongan 1 buah pipa PVC Ø 8" A.8.4.2.5 m' 400,182.75 416,184.95 439,793.06 419,965.82 438,842.83 458,621.43 448,221.27
6. (K3) Pemotongan 1 buah pipa PVC Ø 10" A.8.4.2.6 m' 620,085.41 644,919.71 681,467.18 650,754.59 679,927.73 710,571.38 694,588.33
7. (K3) Pemotongan 1 buah pipa PVC Ø 12" A.8.4.2.7 m' 866,826.47 901,510.25 952,715.01 909,744.83 950,846.98 993,818.31 970,909.73
8. (K3) Pemotongan 1 buah pipa HDPE Ø 50 mm A.8.4.2.17 m' 139,160.20 146,217.97 150,108.49 150,051.04 157,961.77 162,873.49 156,886.96
9. (K3) Pemotongan 1 buah pipa HDPE Ø 75 mm A.8.4.2.18 m' 239,650.11 251,610.92 258,358.49 258,253.19 271,651.97 279,803.69 269,915.93
10. (K3) Pemotongan 1 buah pipa HDPE Ø 110 mm A.8.4.2.19 m' 516,235.75 542,912.04 557,616.30 557,469.51 587,078.94 605,102.10 582,989.04
11. (K3) Pemotongan 1 buah pipa HDPE Ø 160 mm A.8.4.2.20 m' 1,072,164.26 1,128,288.14 1,159,171.52 1,158,932.19 1,221,600.29 1,259,504.42 1,212,708.19
12. (K3) Pemotongan 1 buah pipa HDPE Ø 200 mm A.8.4.2.21 m' 1,671,876.73 1,759,343.78 1,807,811.72 1,807,227.73 1,904,737.13 1,964,055.32 1,891,387.50
13. (K3) Pemotongan 1 buah pipa HDPE Ø 250 mm A.8.4.2.22 m' 2,442,225.33 2,570,308.06 2,641,266.91 2,640,408.47 2,783,100.61 2,869,888.06 2,763,669.73
14. (K3) Pemotongan 1 buah pipa HDPE Ø 315 mm A.8.4.2.23 m' 3,966,679.07 4,175,584.68 4,291,262.39 4,290,113.54 4,523,430.93 4,664,766.29 4,491,020.60
15. (K3) Pemotongan 1 buah pipa HDPE Ø 400 mm A.8.4.2.24 m' 6,249,814.21 6,579,495.86 6,762,132.38 6,759,914.46 7,127,497.31 7,350,726.53 7,077,381.92
16. (K3) Pemotongan 1 buah pipa HDPE Ø 450 mm A.8.4.2.25 m' 7,965,468.50 8,386,713.50 8,618,479.95 8,615,652.50 9,082,150.70 9,365,487.75 9,023,814.65
17. (K3) Pemotongan 1 buah pipa HDPE Ø 500 mm A.8.4.2.26 m' 9,538,518.60 10,042,755.25 10,322,024.09 10,318,555.20 10,880,522.20 11,221,828.94 10,803,970.49
18. (K3) Pemotongan 1 buah pipa GIP Ø 75 mm A.8.4.2.33 m' 853,691.29 899,356.80 924,465.04 924,251.23 975,180.90 1,006,033.39 968,093.77
19. (K3) Pemotongan 1 buah pipa GIP Ø 100 mm A.8.4.2.34 m' 955,907.03 1,006,844.48 1,035,131.21 1,034,547.22 1,090,965.83 1,125,379.76 1,083,827.64
20. (K3) Pemotongan 1 buah pipa GIP Ø 125 mm A.8.4.2.35 m' 24,732.19 25,739.35 26,651.53 25,742.03 25,739.35 26,651.53 27,753.66
21. (K3) Pemotongan 1 buah pipa GIP Ø 150 mm A.8.4.2.36 m' 1,496,179.27 1,575,735.85 1,620,042.66 1,618,756.59 1,706,321.80 1,760,330.01 1,696,298.73
22. (K3) Pemotongan 1 buah pipa GIP Ø 200 mm A.8.4.2.37 m' 1,812,202.37 1,907,992.21 1,962,102.28 1,958,684.45 2,061,810.46 2,127,281.38 2,054,000.83
23. (K3) Pemotongan 1 buah pipa GIP Ø 250 mm A.8.4.2.38 m' 1,931,644.48 2,033,279.41 2,091,240.17 2,086,408.61 2,194,501.36 2,264,461.22 2,189,063.47

B.2 - 88
NO URAIAN KODE SATUAN KABUPATEN BULUNGAN
ANALISA Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Tj Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Palas Utara Peso Hilir

24. (K3) Pemotongan 1 buah pipa GIP Ø 300 mm A.8.4.2.39 m' 1,987,248.82 2,091,782.68 2,151,501.69 2,146,322.30 2,257,217.08 2,329,190.49 2,252,088.10
25. (K3) Pemotongan 1 buah pipa GIP Ø 400 mm A.8.4.2.40 m' 2,254,752.16 2,372,615.23 2,440,959.30 2,433,070.53 2,556,048.28 2,637,923.25 2,554,473.08
26. (K3) Pemotongan 1 buah pipa GIP Ø 450 mm A.8.4.2.41 m' 2,351,555.54 2,474,446.74 2,545,551.37 2,536,915.84 2,664,134.64 2,749,280.77 2,664,063.16
27. (K3) Pemotongan 1 buah pipa GIP Ø 500 mm A.8.4.2.42 m' 2,495,595.80 2,625,807.73 2,701,409.46 2,691,736.79 2,825,962.93 2,916,499.71 2,827,129.65

R. PEKERJAAN AKSESORIS PIPA


1. (K3) Pemasangan 1 buah Valve Ø 150 mm A.8.4.3.1 m' 17,495,626.03 18,426,003.05 18,946,138.51 18,929,263.18 19,953,973.55 20,587,206.91 19,835,642.00
2. (K3) Pemasangan 1 buah Valve Ø 200 mm A.8.4.3.2 m' 22,229,998.58 23,411,609.96 24,076,800.49 24,050,817.33 25,350,613.46 26,159,282.59 25,202,705.40
3. (K3) Pemasangan 1 buah Valve Ø 250 mm A.8.4.3.3 m' 32,158,487.93 33,870,485.06 34,830,610.91 34,801,436.51 36,694,741.31 37,863,830.21 36,461,435.40
4. (K3) Pemasangan 1 buah Valve Ø 300 mm A.8.4.3.4 m' 41,927,408.40 44,160,517.50 45,411,423.68 45,376,319.93 47,848,836.60 49,372,658.48 47,538,391.80
5. (K3) Pemasangan 1 buah Valve Ø 400 mm A.8.4.3.5 m' 75,456,002.08 79,474,870.85 81,728,301.83 81,663,557.75 86,113,819.70 88,858,575.53 85,553,946.80
6. (K3) Pemasangan 1 buah Valve Ø 450 mm A.8.4.3.6 m' 93,128,378.68 98,092,240.40 100,865,972.78 100,801,228.70 106,311,879.20 109,693,991.48 105,594,996.80
7. (K3) Pemasangan 1 buah Valve Ø 500 mm A.8.4.3.7 m' 107,418,113.25 113,144,236.95 116,339,699.40 116,269,491.90 122,628,376.65 126,525,914.10 121,798,141.05
8. (K3) Pemasangan 1 buah Tee Ø 150 mm A.8.4.3.15 m' 2,064,949.37 2,171,390.33 2,234,021.80 2,225,730.93 2,336,186.48 2,411,072.35 2,335,637.58
9. (K3) Pemasangan 1 buah Tee Ø 200 mm A.8.4.3.16 m' 2,668,204.13 2,810,061.57 2,889,737.51 2,886,744.12 3,042,639.87 3,139,548.56 3,024,973.11
10. (K3) Pemasangan 1 buah Tee Ø 250 mm A.8.4.3.17 m' 3,891,391.10 4,098,330.90 4,214,450.92 4,210,149.11 4,437,624.60 4,578,891.67 4,411,877.60
11. (K3) Pemasangan 1 buah Tee Ø 300 mm A.8.4.3.18 m' 4,399,291.31 4,630,861.17 4,773,982.35 4,753,851.95 4,999,642.02 5,170,080.30 4,985,243.10
12. (K3) Pemasangan 1 buah Tee Ø 400 mm A.8.4.3.19 m' 334,238.76 347,744.13 371,576.39 349,339.76 347,744.13 371,576.39 374,754.87

S. PEKERJAAN PENYAMBUNGAN PIPA


1. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 75 mm A.8.4.4.1 m' 1,159,298.15 1,208,886.86 1,289,525.41 1,220,976.08 1,228,927.91 1,310,970.61 1,302,447.67
2. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 110 mm A.8.4.4.2 m' 1,523,394.25 1,591,428.38 1,686,689.23 1,611,885.06 1,635,595.28 1,734,175.03 1,714,221.04
3. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 160 mm A.8.4.4.3 m' 2,305,473.89 2,412,281.70 2,540,396.48 2,449,955.18 2,505,593.85 2,640,729.38 2,598,069.64
4. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm A.8.4.4.4 m' 3,120,614.87 3,267,855.83 3,429,973.37 3,323,894.94 3,413,249.18 3,586,216.97 3,519,447.34
5. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm A.8.4.4.5 m' 4,107,700.41 4,304,692.95 4,505,791.62 4,384,076.07 4,517,485.50 4,734,412.77 4,635,874.24
6. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 315 mm A.8.4.4.6 m' 5,848,814.50 6,135,768.38 6,398,059.26 6,260,706.58 6,483,614.63 6,771,563.16 6,607,300.84
7. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm A.8.4.4.7 m' 8,553,398.87 8,978,916.83 9,340,615.15 9,171,988.22 9,526,918.28 9,929,209.30 9,668,475.49
8. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm A.8.4.4.8 m' 10,435,821.51 10,959,087.45 11,386,062.80 11,201,798.74 11,654,524.65 12,133,070.60 11,800,230.49
9. (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm A.8.4.4.9 m' 12,259,397.50 12,877,092.53 13,367,685.43 13,167,784.26 13,714,859.48 14,267,490.28 13,865,224.54

T. PEKERJAAN PENGETESAN PIPA


1. (K3) Pengetesan 1 m pipa Ø 50 mm A.8.4.5.1 m' 2,867.02 2,974.25 3,168.27 2,984.46 2,974.25 3,168.27 3,191.25
2. (K3) Pengetesan 1 m pipa Ø 75 mm A.8.4.5.2 m' 3,030.41 3,142.74 3,354.64 3,155.51 3,142.74 3,354.64 3,375.07
3. (K3) Pengetesan 1 m pipa Ø 100 mm A.8.4.5.3 m' 3,357.20 3,479.74 3,727.38 3,497.61 3,479.74 3,727.38 3,742.70
4. (K3) Pengetesan 1 m pipa Ø 150 mm A.8.4.5.4 m' 4,174.16 4,322.23 4,659.23 4,352.87 4,322.23 4,659.23 4,661.78
5. (K3) Pengetesan 1 m pipa Ø 200 mm A.8.4.5.5 m' 5,236.20 5,417.47 5,870.62 5,464.70 5,417.47 5,870.62 5,856.58
6. (K3) Pengetesan 1 m pipa Ø 250 mm A.8.4.5.6 m' 6,706.73 6,933.95 7,547.94 7,004.16 6,933.95 7,547.94 7,510.93
7. (K3) Pengetesan 1 m pipa Ø 250 mm A.8.4.5.7 m' 8,504.04 8,787.43 9,598.00 8,885.72 8,787.43 9,598.00 9,532.90
8. (K3) Pengetesan 1 m pipa Ø 400 mm A.8.4.5.8 m' 12,997.32 13,421.12 14,723.15 13,589.62 13,421.12 14,723.15 14,587.84
9. (K3) Pengetesan 1 m pipa Ø 500 mm A.8.4.5.9 m' 15,611.60 16,117.09 17,705.06 16,326.44 16,117.09 17,705.06 17,528.90
10. (K3) Pengetesan 1 m pipa Ø 600 mm A.8.4.5.10 m' 25,823.60 26,648.21 29,353.12 27,017.12 26,648.21 29,353.12 29,017.40

B.2 - 89
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
ahsp bidang sumber daya air
HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA
TAHUN ANGGARAN 2023
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

I. UMUM
A.1 Pekerjaan tanah
A.1.1 Pekerjaan tanah secara manual dan semi mekanis (Normatif)
T.01 AHSP pembersihan dan pengupasan permukaan tanah
T.01.a 1 m2 pembersihan dan striping/kosrekan T.01.a M2 10,416.00 10,875.00 11,258.00 10,875.00 10,875.00 11,258.00 11,794.00
T.01.b 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan ø < 15 cm T.01.b M2 13,020.00 13,594.00 14,073.00 13,594.00 13,594.00 14,073.00 14,743.00
T.01.c Cabut 1 tunggul pohon tanaman keras ø > 15 cm dan membuang sisa tunggul kayu dan akar-akar nya T.01.c bh 37,020.00 38,644.00 39,921.00 38,667.00 38,782.00 40,174.00 41,892.00
T.02 AHSP uitzet trase saluran dan pasang profil melintang penampang
T.02.a 1 m¹ uitset trase saluran T.02.a m' 4,596.00 4,728.00 4,856.00 4,742.00 4,811.00 5,008.00 5,043.00
T.02.b Pasang 1 m' profil melintang galian tanah saluran dan pasang bouwplank T.02.b
T.02.b.1) Pasang 1 m' profil melintang galian tanah T.02.b.1) m' 51,706.00 53,510.00 57,056.00 53,832.00 53,848.00 57,667.00 57,401.00
T.02.b.2) Pasang 1 m' bouwplank T.02.b.2) 96,848.00 100,833.00 109,832.00 101,604.00 100,858.00 109,878.00 108,678.00
T.03 Pengadaan dan pemasangan patok
T.03.a Patok kayu (Ukuran 5/7) T.03.a Bh 14,641.00 15,082.00 15,349.00 15,195.00 15,446.00 16,036.00 15,950.00
T.03.b Patok Tetap Bantu (PTB) T.03.b Bh 96,781.47 101,703.90 124,886.59 101,713.09 101,703.90 124,886.59 108,424.91
T.06 Galian tanah biasa
T.06.a Cara manual
T.06.a.1) 1 m3 galian tanah biasa sedalam ≤ 1 m T.06.a.1) M3 97,739.00 102,051.00 105,644.00 102,051.00 102,051.00 105,644.00 110,675.00
T.06.a.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m T.06.a.2) M3 117,182.00 122,352.00 126,660.00 122,352.00 122,352.00 126,660.00 132,692.00
T.06.a.3) 1 m3 galian tanah biasa sedalam > 2 m s.d. 3 m T.06.a.3) M3 131,939.00 137,759.00 142,610.00 137,759.00 137,759.00 142,610.00 149,401.00
T.06.a.4) 1 m3 galian tanah biasa > 3 m, untuk setiap penambahan kedalaman 1 m T.06.a.4) M3 13,020.00 13,594.00 14,073.00 13,594.00 13,594.00 14,073.00 14,743.00
T.06.b Cara semi mekanis
T.06.b.1) 1 m3 galian tanah biasa sedalam ≤ 1 m T.06.b.1) M3 61,819.00 63,759.00 66,057.00 63,887.00 63,759.00 66,057.00 67,768.00
T.06.b.2) 1 m3 galian tanah biasa sedalam > 1 m s.d. 2 m T.06.b.2) M3 68,763.00 71,010.00 73,563.00 71,138.00 71,010.00 73,563.00 75,631.00
T.06.b.3) 1 m3 galian tanah biasa sedalam > 2 m s.d. 3 m T.06.b.3) M3 75,707.00 78,260.00 81,069.00 78,388.00 78,260.00 81,069.00 83,494.00
T.06.b.4) Kedalaman yang > 3 m menggunakan AHSP T.06.b.3) + {AHSP T.06.a.4) untuk setiap kedalaman 1 m} T.06.b.4) M3 65,101.00 67,973.00 70,367.00 67,973.00 67,973.00 70,367.00 73,717.00
T.07 Galian tanah berbatu
T.07.a Cara manual
T.07.a.1) 1 m3 galian tanah berbatu sedalam ≤ 1 m T.07.a.1) M3 234,539.00 244,886.00 253,509.00 244,886.00 244,886.00 253,509.00 265,580.00
T.07.a.2) 1 m3 galian tanah berbatu sedalam > 1 m s.d. 2 m T.07.a.2) M3 260,406.00 271,894.00 281,468.00 271,894.00 271,894.00 281,468.00 294,871.00
T.07.a.3) 1 m3 galian tanah berbatu sedalam > 2 m s.d. 3 m T.07.a.3) M3 286,446.00 299,083.00 309,615.00 299,083.00 299,083.00 309,615.00 324,358.00
T.07.a.4) 1 m3 galian tanah berbatu > 3 m, untuk setiap penambahan kedalaman 1 m T.07.a.4) M3 24,304.00 25,376.00 26,270.00 25,376.00 25,376.00 26,270.00 27,521.00
T.07.b Cara semi mekanis
T.07.b.1) 1 m3 galian tanah berbatu sedalam ≤ 1 m T.07.b.1) M3 133,716.00 137,648.00 142,626.00 137,967.00 137,648.00 142,626.00 145,830.00
T.07.b.2) 1 m3 galian tanah berbatu sedalam > 1 m s.d. 2 m T.07.b.2) M3 146,890.00 151,421.00 156,846.00 151,740.00 151,421.00 156,846.00 160,803.00
T.07.b.3) 1 m3 galian tanah berbatu sedalam > 2 m s.d. 3 m T.07.b.3) M3 128,674.00 133,524.00 139,269.00 133,843.00 133,524.00 139,269.00 143,545.00
T.07.b.4) Kedalaman yang > 3 m menggunakan AHSP T.07.b.3) + {AHSP T.07.a.4) untuk setiap kedalaman 1m} T.07.b.4) M3 175,924.00 182,735.00 190,369.00 183,101.00 182,735.00 190,369.00 196,725.00
T.08 Galian batu
T.08.a Cara manual
T.08.a.1) 1 m3 Galian batu sedalam ≤ 1 m T.08.a.1) M3 586,434.00 612,306.00 633,866.00 612,306.00 612,306.00 633,866.00 664,050.00
T.08.a.2) 1 m3 Galian batu sedalam > 1 m s.d. 2 m T.08.a.2) M3 651,015.00 679,736.00 703,670.00 679,736.00 679,736.00 703,670.00 737,178.00
T.08.a.3) 1 m3 Galian batu sedalam > 2 m s.d.3 m T.08.a.3) M3 716,116.00 747,709.00 774,037.00 747,709.00 747,709.00 774,037.00 810,896.00
T.08.a.4) 1 m3 Galian batu > 3 m untuk setiap penambahan kedalaman 1 M T.08.a.4) M3 65,101.00 67,973.00 70,367.00 67,973.00 67,973.00 70,367.00 73,717.00
T.08.b Cara semi mekanis
T.08.b.1) 1 m3 Galian batu sedalam ≤ 1 m T.08.b.1) M3 291,737.00 300,673.00 311,523.00 301,311.00 300,673.00 311,523.00 319,182.00
T.08.b.2) 1 m3 Galian batu sedalam > 1 m s.d. 2 m T.08.b.2) M3 326,458.00 336,925.00 349,052.00 337,564.00 336,925.00 349,052.00 358,498.00
T.08.b.3) 1 m3 Galian batu sedalam > 2 m s.d. 3 m T.08.b.3) M3 347,291.00 358,677.00 371,570.00 359,315.00 358,677.00 371,570.00 382,088.00
T.08.b.4) Kedalaman yang > 3 m menggunakan AHSP T.08b.3) + {AHSP T.08a.4) untuk setiap kedalaman 1m} T.08.b.4) M3 474,250.00 490,647.00 508,227.00 491,381.00 490,647.00 508,227.00 524,175.00
T.09 Galian tanah cadas atau tanah keras
T.09.a Cara manual
T.09.a.1) 1 m3 Galian tanah cadas atau tanah keras sedalam ≤ 1 m T.09.a.1) M3 217,005.00 226,578.00 234,556.00 226,578.00 226,578.00 234,556.00 245,726.00
T.09.a.2) 1 m3 Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m T.09.a.2) M3 241,656.00 252,318.00 261,202.00 252,318.00 252,318.00 261,202.00 273,640.00
T.09.a.3) 1 m3 Galian tanah cadas/tanah keras sedalam > 2 m s.d 3 m T.09.a.3) M3 260,406.00 271,894.00 281,468.00 271,894.00 271,894.00 281,468.00 294,871.00
T.09.a.4) 1 m3 Galian tanah cadas atau tanah keras > 3 m untuk setiap penambahan kedalaman 1 m T.09.a.4) M3 17,360.00 18,126.00 18,764.00 18,126.00 18,126.00 18,764.00 19,658.00
T.09.b Cara semi mekanis
T.09.b.1) 1 m3 Galian tanah cadas atau tanah keras sedalam ≤ 1 m T.09.b.1) M3 88,745.00 91,834.00 96,110.00 92,153.00 91,834.00 96,110.00 98,331.00
T.09.b.2) 1 m3 Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m T.09.b.2) M3 106,105.00 109,960.00 114,875.00 110,279.00 109,960.00 114,875.00 117,989.00
T.09.b.3) 1 m3 Galian tanah cadas atau tanah keras sedalam > 2 m s.d. 3 m T.09.b.3) M3 119,993.00 124,461.00 129,886.00 124,780.00 124,461.00 129,886.00 133,716.00
T.09.b.4) Kedalaman yang > 3 m menggunakan AHSP T.09.b.3) + {AHSP T.09.a.4) untuk setiap kedalaman 1 m} T.09.b.4) M3 157,955.00 163,975.00 170,947.00 164,341.00 163,975.00 170,947.00 176,380.00
T.10 Galian lumpur
T.10.a Cara manual
T.10.a.1) 1 m3 Galian lumpur sedalam ≤ 1 m T.10.a.1) M3 144,091.00 150,448.00 155,745.00 150,448.00 150,448.00 155,745.00 163,162.00
T.10.a.2) 1 m3 Galian lumpur sedalam > 1 m s.d. 2 m T.10.a.2) M3 173,604.00 181,263.00 187,645.00 181,263.00 181,263.00 187,645.00 196,581.00
T.10.a.3) 1 m3 Galian lumpur sedalam > 2 m s.d. 3 m T.10.a.3) M3 199,644.00 208,452.00 215,792.00 208,452.00 208,452.00 215,792.00 226,068.00
T.10.a.4) 1 m3 Galian lumpur > 3 m untuk setiap penambahan kedalaman 1 m T.10.a.4) M3 26,040.00 27,189.00 28,146.00 27,189.00 27,189.00 28,146.00 29,487.00
T.10.b Cara semi mekanis
T.10.b.1) 1 m3 Galian lumpur sedalam ≤ 1 m T.10.b.1) M3 72,118.00 74,415.00 77,556.00 74,645.00 74,415.00 77,556.00 79,240.00
T.10.b.2) 1 m3 Galian lumpur sedalam > 1 m s.d. 2 m T.10.b.2) M3 83,416.00 86,036.00 89,689.00 86,311.00 86,036.00 89,689.00 91,550.00
T.10.b.3) 1 m3 Galian lumpur sedalam > 2 m s.d. 3 m T.10.b.3) M3 95,877.00 98,811.00 103,053.00 99,148.00 98,811.00 103,053.00 105,014.00
T.10.b.4) 1 m3 Galian lumpur sedalam > 3 m untuk setiap penambahan kedalaman 1 m T.10.b.4) M3 11,592.00 11,868.00 12,425.00 11,929.00 11,868.00 12,425.00 12,481.00
T.11 Galian pasir
T.11.a Cara manual
T.11.a.1) 1 m3 Galian pasir sedalam ≤ 1 m1 T.11.a.1) M3 114,578.00 119,633.00 123,846.00 119,633.00 119,633.00 123,846.00 129,743.00
T.11.a.2) 1 m3 Galian pasir sedalam > 1 m s.d. 2 m1 T.11.a.2) M3 138,883.00 145,010.00 150,116.00 145,010.00 145,010.00 150,116.00 157,264.00
T.11.a.3) 1 m3 Galian pasir untuk pondasi bangunan sedalam > 2 m s.d. 3 m1 T.11.a.3) M3 159,715.00 166,761.00 172,633.00 166,761.00 166,761.00 172,633.00 180,854.00
T.11.a.4) 1 m3 Galian pasir kedalaman >3 m untuk setiap penambahan kedalaman 1 m T.11.a.4) M3 17,360.00 18,126.00 18,764.00 18,126.00 18,126.00 18,764.00 19,658.00
T.11.b Cara semi mekanis
B.3 - 91
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

T.11.b.1) 1 m3 Galian pasir sedalam ≤ 1 m1 T.11.b.1) M3 120,679.00 123,156.00 126,717.00 123,437.00 123,156.00 126,717.00 128,389.00
T.11.b.2) 1 m3 Galian pasir sedalam > 1 m s.d. 2 m1 T.11.b.2) M3 151,385.00 154,180.00 158,552.00 154,563.00 154,180.00 158,552.00 160,154.00
T.11.b.3) 1 m3 Galian pasir sedalam > 2 m s.d. 3 m1 T.11.b.3) M3 175,065.00 178,129.00 183,132.00 178,588.00 178,129.00 183,132.00 184,715.00
T.11.b.4) 1 m3 Galian pasir sedalam > 3 m untuk setiap penambahan kedalaman 1 m T.11.b.4) M3 19,567.00 19,810.00 20,335.00 19,872.00 19,810.00 20,335.00 20,359.00
T.12 Perkuatan dinding galian
T.12.b (K3) 1 m2 pasangan papan 3/20, JAT < 1,5 m' T.12.b M2 72,716.00 75,559.00 81,544.00 76,116.00 75,923.00 82,204.00 81,262.00
T.12.c (K3) 1 m2 Pasangan balok kayu 8/12, tebal 8 cm, JAT 4,0 m' T.12.c M2 725,657.00 749,785.00 825,380.00 760,867.00 752,370.00 830,112.00 808,708.00
T.12.d (K3) 1 m2 Pasangan balok kayu 8/12, tebal 12 cm, JAT < 6,0 m' T.12.d M2 1,084,021.00 1,120,047.00 1,233,324.00 1,136,624.00 1,123,743.00 1,240,091.00 1,208,073.00
T.13 Peledakan batuan
T.14 Timbunan dan pemadatan
T.14.a 1 m3 Timbunan tanah atau urugan tanah kembali T.14.a M3 57,289.00 59,816.00 61,923.00 59,816.00 59,816.00 61,923.00 64,871.00
T.14.b 1 m3 Pemadatan tanah T.14.b M3 96,117.00 99,946.00 103,137.00 99,946.00 99,946.00 103,137.00 107,605.00
T.14.c 1 m3 Timbunan pasir sebagai bahan pengisi T.14.c M3 375,801.00 391,119.00 427,372.00 394,183.00 391,119.00 427,372.00 421,755.00
T.14.d 1 m3 Pemadatan pasir sebagai bahan pengisi T.14.d M3 35,990.00 36,756.00 37,394.00 36,756.00 36,756.00 37,394.00 38,288.00
T.15 Angkutan material dan/atau hasil galian
T.15.a Angkutan material dan/atau hasil galian untuk jarak horizontal (datar)
T.15.a.1) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 5 m T.15.a.1) M3 40,521.00 42,262.00 43,845.00 42,262.00 42,262.00 43,845.00 45,744.00
T.15.a.2) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 10 m T.15.a.2) M3 44,442.00 46,352.00 48,088.00 46,352.00 46,352.00 48,088.00 50,171.00
T.15.a.3) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 20 m T.15.a.3) M3 51,478.00 53,690.00 55,701.00 53,690.00 53,690.00 55,701.00 58,115.00
T.15.a.4) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 30 m T.15.a.4) M3 58,167.00 60,666.00 62,939.00 60,666.00 60,666.00 62,939.00 65,665.00
T.15.a.5) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 50 m T.15.a.5) M3 68,951.00 71,914.00 74,607.00 71,914.00 71,914.00 74,607.00 77,839.00
T.15.a.6) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 100 m T.15.a.6) M3 98,035.00 102,247.00 106,077.00 102,247.00 102,247.00 106,077.00 110,672.00
T.15.a.7) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 200 m T.15.a.7) M3 155,222.00 161,892.00 167,955.00 161,892.00 161,892.00 167,955.00 175,231.00
T.15.a.8) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 300 m T.15.a.8) M3 212,409.00 221,536.00 229,833.00 221,536.00 221,536.00 229,833.00 239,790.00
T.15.a.9) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 400 m T.15.a.9) M3 269,596.00 281,181.00 291,712.00 281,181.00 281,181.00 291,712.00 304,349.00
T.15.a.10) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 500 m T.15.a.10) M3 318,614.00 332,304.00 344,750.00 332,304.00 332,304.00 344,750.00 359,685.00
T.15.a.11) Mengangkut 1 m3 material atau hasil galian dengan jarak angkut > 500 m untuk setiap penambahan jarak angkut 100 m T.15.a.11) M3 57,513.00 59,985.00 62,231.00 59,985.00 59,985.00 62,231.00 64,927.00
T.15.b Angkutan material dan/atau hasil galian untuk jarak vertikal menurun
T.15.b.1) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi 1 m T.15.b.1) M3 24,508.00 25,561.00 26,519.00 25,561.00 25,561.00 26,519.00 27,668.00
T.15.b.2) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 1 m s.d. 2 m T.15.b.2) M3 34,312.00 35,786.00 37,127.00 35,786.00 35,786.00 37,127.00 38,735.00
T.15.b.3) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 2 m s.d. 3 m T.15.b.3) M3 45,300.00 47,247.00 49,016.00 47,247.00 47,247.00 49,016.00 51,140.00
T.15.b.4) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 3 m s.d. 4 m T.15.b.4) M3 56,610.00 59,042.00 61,254.00 59,042.00 59,042.00 61,254.00 63,907.00
T.15.b.5) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 4 m s.d. 5 m T.15.b.5) M3 67,363.00 70,257.00 72,889.00 70,257.00 70,257.00 72,889.00 76,046.00
T.15.b.6) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 5 m s.d. 6 m T.15.b.6) M3 76,809.00 80,109.00 83,110.00 80,109.00 80,109.00 83,110.00 86,710.00
T.15.b.7) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 6 m s.d. 7 m T.15.b.7) M3 84,499.00 88,130.00 91,430.00 88,130.00 88,130.00 91,430.00 95,392.00
T.15.b.8) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 7 m s.d. 8 m T.15.b.8) M3 90,411.00 94,296.00 97,828.00 94,296.00 94,296.00 97,828.00 102,067.00
T.15.b.9) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 8 m s.d. 9 m T.15.b.9) M3 94,905.00 98,983.00 102,690.00 98,983.00 98,983.00 102,690.00 107,138.00
T.15.b.10) Menurunkan 1 m3 material atau hasil galian tanah sampai beda tinggi > 9 m s.d. 10 m T.15.b.10) M3 98,719.00 102,961.00 106,817.00 102,961.00 102,961.00 106,817.00 111,444.00
T.15.b.11) Menurunkan 1 m3 material atau hasil galian tanah dengan beda tinggi > 10 m untuk setiap penambahan 1 m T.15.b.11) M3 2,461.00 2,567.00 2,662.00 2,567.00 2,567.00 2,662.00 2,778.00
T.15.c Angkutan material dan/atau hasil galian untuk jarak vertikal naik
T.15.c.1) Menaikkan 1 m3 material atau hasil galian tanah sampai beda 1 m T.15.c.1) M3 49,017.00 51,123.00 53,038.00 51,123.00 51,123.00 53,038.00 55,336.00
T.15.c.2) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 1 m s.d. 2 m T.15.c.2) M3 71,703.00 74,784.00 77,585.00 74,784.00 74,784.00 77,585.00 80,946.00
T.15.c.3) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 2 m s.d. 3 m T.15.c.3) M3 98,647.00 102,885.00 106,740.00 102,885.00 102,885.00 106,740.00 111,361.00
T.15.c.4) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 3 m s.d. 4 m T.15.c.4) M3 129,079.00 134,626.00 139,668.00 134,626.00 134,626.00 139,668.00 145,718.00
T.15.c.5) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 4 m s.d. 5 m T.15.c.5) M3 160,277.00 167,164.00 173,425.00 167,164.00 167,164.00 173,425.00 180,937.00
T.15.c.6) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 5 m s.d. 6 m T.15.c.6) M3 191,270.00 199,491.00 206,958.00 199,491.00 199,491.00 206,958.00 215,932.00
T.15.c.7) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 6 m s.d. 7 m T.15.c.7) M3 219,558.00 228,991.00 237,569.00 228,991.00 228,991.00 237,569.00 247,858.00
T.15.c.8) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 7 m s.d. 8 m T.15.c.8) M3 245,853.00 256,416.00 266,022.00 256,416.00 256,416.00 266,022.00 277,543.00
T.15.c.9) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 8 m s.d. 9 m T.15.c.9) M3 269,494.00 281,072.00 291,603.00 281,072.00 281,072.00 291,603.00 304,228.00
T.15.c.10) Menaikkan 1 m3 material atau hasil galian tanah sampai beda > 9 m s.d. 10 m T.15.c.10) M3 293,186.00 305,785.00 317,235.00 305,785.00 305,785.00 317,235.00 330,983.00
T.15.c.11) Menaikkan 1 m3 material atau hasil galian tanah dengan beda tinggi > 10 m untuk setiap penambahan 1 m T.15.c.11) M3 8,271.00 8,629.00 8,948.00 8,629.00 8,629.00 8,948.00 9,343.00
T.15.d Konversi berat material tanah biasa (lepas) kepada jenis material Lain
T.15.d.1) Jika biaya angkutan dimasukan dalam HSD - bahan (dihitung tanpa Overhead + keuntungan)
T.15.d.1) a) Untuk jarak angkut horizontal 100 m
T.15.d.1) a).1 * Tanah gambut T.15.d.1) a).1 M3 55,798.69 58,196.29 60,375.93 58,196.29 58,196.29 60,375.93 62,991.49
T.15.d.1) a).2 * Agregat kasar T.15.d.1) a).2 M3 97,647.71 101,843.51 105,657.87 101,843.51 101,843.51 105,657.87 110,235.11
T.15.d.1) a).3 * Agregat halus T.15.d.1) a).3 M3 101,522.62 105,884.92 109,850.65 105,884.92 105,884.92 109,850.65 114,609.52
T.15.d.1) a).4 * Split/koral/kerikil T.15.d.1) a).4 M3 96,872.73 101,035.23 104,819.32 101,035.23 101,035.23 104,819.32 109,360.23
T.15.d.1) a).5 * Batu kali T.15.d.1) a).5 M3 75,173.24 78,403.34 81,339.79 78,403.34 78,403.34 81,339.79 84,863.54
T.15.d.1) a).6 * Batu belah T.15.d.1) a).6 M3 72,848.29 75,978.49 78,824.13 75,978.49 75,978.49 78,824.13 82,238.89
T.15.d.1) a).7 * Pasir pasang T.15.d.1) a).7 M3 99,197.67 103,460.07 107,334.98 103,460.07 103,460.07 107,334.98 111,984.87
T.15.d.1) a).8 Pipa Beton (tidak bertulang) umum T.15.d.1) a).8 M3 153,446.40 160,039.80 166,033.80 160,039.80 160,039.80 166,033.80 173,226.60
T.15.d.1) a).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.1) a).9 M3 167,396.07 174,588.87 181,127.78 174,588.87 174,588.87 181,127.78 188,974.47
T.15.d.1) a).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.1) a).10 M3 174,370.91 181,863.41 188,674.77 181,863.41 181,863.41 188,674.77 196,848.41
T.15.d.1) a).11 Kayu T.15.d.1) a).11 M3 61,998.55 64,662.55 67,084.36 64,662.55 64,662.55 67,084.36 69,990.55
T.15.d.1) a).12 Plastik T.15.d.1) a).12 M3 52,698.76 54,963.16 57,021.71 54,963.16 54,963.16 57,021.71 59,491.96
T.15.d.1) a).13 PVC T.15.d.1) a).13 M3 59,286.11 61,833.56 64,149.42 61,833.56 61,833.56 64,149.42 66,928.46
T.15.d.1) a).14 HDPE T.15.d.1) a).14 M3 55,798.69 58,196.29 60,375.93 58,196.29 58,196.29 60,375.93 62,991.49
T.15.d.1) a).15 GIP T.15.d.1) a).15 M3 495,988.36 517,300.36 536,674.91 517,300.36 517,300.36 536,674.91 559,924.36
T.15.d.1) a).16 DCIP T.15.d.1) a).16 M3 495,988.36 517,300.36 536,674.91 517,300.36 517,300.36 536,674.91 559,924.36
T.15.d.1) a).17 Baja Profil T.15.d.1) a).17 M3 483,588.65 504,367.85 523,258.04 504,367.85 504,367.85 523,258.04 545,926.25
T.15.d.1) a).18 Besi beton T.15.d.1) a).18 M3 423,140.07 441,321.87 457,850.78 441,321.87 441,321.87 457,850.78 477,685.47
T.15.d.1) b) Untuk jarak angkut vertikal turun 3 m
T.15.d.1) b).1 * Tanah gambut T.15.d.1) b).1 M3 25,783.65 26,891.63 27,898.62 26,891.63 26,891.63 27,898.62 29,107.59
T.15.d.1) b).2 * Agregat kasar T.15.d.1) b).2 M3 45,121.38 47,060.35 48,822.58 47,060.35 47,060.35 48,822.58 50,938.28
T.15.d.1) b).3 * Agregat halus T.15.d.1) b).3 M3 46,911.91 48,927.82 50,759.99 48,927.82 48,927.82 50,759.99 52,959.64
T.15.d.1) b).4 * Split/koral/kerikil T.15.d.1) b).4 M3 44,763.27 46,686.85 48,435.10 46,686.85 46,686.85 48,435.10 50,534.01
T.15.d.1) b).5 * Batu kali T.15.d.1) b).5 M3 34,736.30 36,229.00 37,585.64 36,229.00 36,229.00 37,585.64 39,214.39
T.15.d.1) b).6 * Batu belah T.15.d.1) b).6 M3 33,661.98 35,108.51 36,423.20 35,108.51 35,108.51 36,423.20 38,001.58
T.15.d.1) b).7 * Pasir pasang T.15.d.1) b).7 M3 45,837.59 47,807.34 49,597.54 47,807.34 47,807.34 49,597.54 51,746.83
T.15.d.1) b).8 Pipa Beton (tidak bertulang) umum T.15.d.1) b).8 M3 70,905.02 73,951.97 76,721.20 73,951.97 73,951.97 76,721.20 80,045.87
T.15.d.1) b).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.1) b).9 M3 77,350.94 80,674.88 83,695.86 80,674.88 80,674.88 83,695.86 87,322.77

B.3 - 92
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

T.15.d.1) b).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.1) b).10 M3 80,573.89 84,036.33 87,183.18 84,036.33 84,036.33 87,183.18 90,961.22
T.15.d.1) b).11 Kayu T.15.d.1) b).11 M3 28,648.49 29,879.59 30,998.47 29,879.59 29,879.59 30,998.47 32,341.77
T.15.d.1) b).12 Plastik T.15.d.1) b).12 M3 24,351.22 25,397.65 26,348.70 25,397.65 25,397.65 26,348.70 27,490.50
T.15.d.1) b).13 PVC T.15.d.1) b).13 M3 27,395.12 28,572.35 29,642.28 28,572.35 28,572.35 29,642.28 30,926.81
T.15.d.1) b).14 HDPE T.15.d.1) b).14 M3 25,783.65 26,891.63 27,898.62 26,891.63 26,891.63 27,898.62 29,107.59
T.15.d.1) b).15 GIP T.15.d.1) b).15 M3 229,187.96 239,036.68 247,987.72 239,036.68 239,036.68 247,987.72 258,734.14
T.15.d.1) b).16 DCIP T.15.d.1) b).16 M3 229,187.96 239,036.68 247,987.72 239,036.68 239,036.68 247,987.72 258,734.14
T.15.d.1) b).17 Baja Profil T.15.d.1) b).17 M3 223,458.26 233,060.77 241,788.03 233,060.77 233,060.77 241,788.03 252,265.78
T.15.d.1) b).18 Besi beton T.15.d.1) b).18 M3 195,525.98 203,928.17 211,564.53 203,928.17 203,928.17 211,564.53 220,732.56
T.15.d.1) c) Untuk jarak angkut vertikal naik 3 m
T.15.d.1) c).1 * Tanah gambut T.15.d.1) c).1 M3 56,147.43 58,559.56 60,753.73 58,559.56 58,559.56 60,753.73 63,383.83
T.15.d.1) c).2 * Agregat kasar T.15.d.1) c).2 M3 98,258.01 102,479.24 106,319.03 102,479.24 102,479.24 106,319.03 110,921.69
T.15.d.1) c).3 * Agregat halus T.15.d.1) c).3 M3 102,157.13 106,545.87 110,538.04 106,545.87 106,545.87 110,538.04 115,323.35
T.15.d.1) c).4 * Split/koral/kerikil T.15.d.1) c).4 M3 97,478.18 101,665.91 105,475.23 101,665.91 101,665.91 105,475.23 110,041.36
T.15.d.1) c).5 * Batu kali T.15.d.1) c).5 M3 75,643.07 78,892.75 81,848.78 78,892.75 78,892.75 81,848.78 85,392.10
T.15.d.1) c).6 * Batu belah T.15.d.1) c).6 M3 73,303.59 76,452.76 79,317.37 76,452.76 76,452.76 79,317.37 82,751.11
T.15.d.1) c).7 * Pasir pasang T.15.d.1) c).7 M3 99,817.66 104,105.89 108,006.63 104,105.89 104,105.89 108,006.63 112,682.36
T.15.d.1) c).8 Pipa Beton (tidak bertulang) umum T.15.d.1) c).8 M3 154,405.44 161,038.80 167,072.76 161,038.80 161,038.80 167,072.76 174,305.52
T.15.d.1) c).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.1) c).9 M3 168,442.30 175,678.69 182,261.19 175,678.69 175,678.69 182,261.19 190,151.48
T.15.d.1) c).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.1) c).10 M3 175,460.73 182,998.64 189,855.41 182,998.64 182,998.64 189,855.41 198,074.45
T.15.d.1) c).11 Kayu T.15.d.1) c).11 M3 62,386.04 65,066.18 67,504.15 65,066.18 65,066.18 67,504.15 70,426.47
T.15.d.1) c).12 Plastik T.15.d.1) c).12 M3 53,028.13 55,306.25 57,378.52 55,306.25 55,306.25 57,378.52 59,862.50
T.15.d.1) c).13 PVC T.15.d.1) c).13 M3 59,656.65 62,219.54 64,550.84 62,219.54 62,219.54 64,550.84 67,345.31
T.15.d.1) c).14 HDPE T.15.d.1) c).14 M3 56,147.43 58,559.56 60,753.73 58,559.56 58,559.56 60,753.73 63,383.83
T.15.d.1) c).15 GIP T.15.d.1) c).15 M3 499,088.29 520,529.45 540,033.16 520,529.45 520,529.45 540,033.16 563,411.78
T.15.d.1) c).16 DCIP T.15.d.1) c).16 M3 499,088.29 520,529.45 540,033.16 520,529.45 520,529.45 540,033.16 563,411.78
T.15.d.1) c).17 Baja Profil T.15.d.1) c).17 M3 486,611.08 507,516.22 526,532.33 507,516.22 507,516.22 526,532.33 549,326.49
T.15.d.1) c).18 Besi beton T.15.d.1) c).18 M3 425,784.70 444,076.69 460,715.79 444,076.69 444,076.69 460,715.79 480,660.68
T.15.d.2) Jika biaya angkutan dipisahkan dari HSD Komponen Pekerjaan Konstruksi - Biaya konstruksi dan biaya Angkut ditulis masing-masing
yang sudah termasuk Overhead + keuntungan
T.15.d.2) a) Untuk jarak angkut horizontal 100 m
T.15.d.2) a).1 * Tanah gambut T.15.d.2) a).1 M3 64,168.36 66,925.31 69,432.22 66,925.31 66,925.31 69,432.22 72,439.85
T.15.d.2) a).2 * Agregat kasar T.15.d.2) a).2 M3 112,294.64 117,119.29 121,506.38 117,119.29 117,119.29 121,506.38 126,769.75
T.15.d.2) a).3 * Agregat halus T.15.d.2) a).3 M3 116,750.77 121,766.88 126,328.06 121,766.88 121,766.88 126,328.06 131,800.29
T.15.d.2) a).4 * Split/koral/kerikil T.15.d.2) a).4 M3 111,403.41 116,189.77 120,542.05 116,189.77 116,189.77 120,542.05 125,763.64
T.15.d.2) a).5 * Batu kali T.15.d.2) a).5 M3 86,449.05 90,163.26 93,540.63 90,163.26 90,163.26 93,540.63 97,592.58
T.15.d.2) a).6 * Batu belah T.15.d.2) a).6 M3 83,775.36 87,374.71 90,647.62 87,374.71 87,374.71 90,647.62 94,574.25
T.15.d.2) a).7 * Pasir pasang T.15.d.2) a).7 M3 114,077.09 118,978.33 123,435.05 118,978.33 118,978.33 123,435.05 128,781.96
T.15.d.2) a).8 Pipa Beton (tidak bertulang) umum T.15.d.2) a).8 M3 176,463.00 184,044.60 190,938.60 184,044.60 184,044.60 190,938.60 199,209.60
T.15.d.2) a).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.2) a).9 M3 192,505.09 200,775.93 208,296.65 200,775.93 200,775.93 208,296.65 217,319.56
T.15.d.2) a).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.2) a).10 M3 200,526.14 209,141.59 216,975.68 209,141.59 209,141.59 216,975.68 226,374.55
T.15.d.2) a).11 Kayu T.15.d.2) a).11 M3 71,298.18 74,361.45 77,146.91 74,361.45 74,361.45 77,146.91 80,488.73
T.15.d.2) a).12 Plastik T.15.d.2) a).12 M3 60,603.45 63,207.24 65,574.87 63,207.24 63,207.24 65,574.87 68,415.42
T.15.d.2) a).13 PVC T.15.d.2) a).13 M3 68,178.89 71,108.14 73,771.73 71,108.14 71,108.14 73,771.73 76,967.35
T.15.d.2) a).14 HDPE T.15.d.2) a).14 M3 64,168.36 66,925.31 69,432.22 66,925.31 66,925.31 69,432.22 72,439.85
T.15.d.2) a).15 GIP T.15.d.2) a).15 M3 570,385.45 594,891.64 617,175.27 594,891.64 594,891.64 617,175.27 643,909.82
T.15.d.2) a).16 DCIP T.15.d.2) a).16 M3 570,385.45 594,891.64 617,175.27 594,891.64 594,891.64 617,175.27 643,909.82
T.15.d.2) a).17 Baja Profil T.15.d.2) a).17 M3 556,125.82 580,019.35 601,745.89 580,019.35 580,019.35 601,745.89 627,812.07
T.15.d.2) a).18 Besi beton T.15.d.2) a).18 M3 486,610.09 507,516.93 526,527.65 507,516.93 507,516.93 526,527.65 549,335.56
T.15.d.2) b) Untuk jarak angkut vertikal turun 3 m
T.15.d.2) b).1 * Tanah gambut T.15.d.2) b).1 M3 29,650.91 30,925.31 32,083.20 30,925.31 30,925.31 32,083.20 33,473.45
T.15.d.2) b).2 * Agregat kasar T.15.d.2) b).2 M3 51,889.09 54,119.29 56,145.60 54,119.29 54,119.29 56,145.60 58,578.55
T.15.d.2) b).3 * Agregat halus T.15.d.2) b).3 M3 53,948.18 56,266.88 58,373.60 56,266.88 56,266.88 58,373.60 60,903.09
T.15.d.2) b).4 * Split/koral/kerikil T.15.d.2) b).4 M3 51,477.27 53,689.77 55,700.00 53,689.77 53,689.77 55,700.00 58,113.64
T.15.d.2) b).5 * Batu kali T.15.d.2) b).5 M3 39,946.36 41,663.26 43,223.20 41,663.26 41,663.26 43,223.20 45,096.18
T.15.d.2) b).6 * Batu belah T.15.d.2) b).6 M3 38,710.91 40,374.71 41,886.40 40,374.71 40,374.71 41,886.40 43,701.45
T.15.d.2) b).7 * Pasir pasang T.15.d.2) b).7 M3 52,712.73 54,978.33 57,036.80 54,978.33 54,978.33 57,036.80 59,508.36
T.15.d.2) b).8 Pipa Beton (tidak bertulang) umum T.15.d.2) b).8 M3 81,540.00 85,044.60 88,228.80 85,044.60 85,044.60 88,228.80 92,052.00
T.15.d.2) b).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.2) b).9 M3 88,952.73 92,775.93 96,249.60 92,775.93 92,775.93 96,249.60 100,420.36
T.15.d.2) b).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.2) b).10 M3 92,659.09 96,641.59 100,260.00 96,641.59 96,641.59 100,260.00 104,604.55
T.15.d.2) b).11 Kayu T.15.d.2) b).11 M3 32,945.45 34,361.45 35,648.00 34,361.45 34,361.45 35,648.00 37,192.73
T.15.d.2) b).12 Plastik T.15.d.2) b).12 M3 28,003.64 29,207.24 30,300.80 29,207.24 29,207.24 30,300.80 31,613.82
T.15.d.2) b).13 PVC T.15.d.2) b).13 M3 31,504.09 32,858.14 34,088.40 32,858.14 32,858.14 34,088.40 35,565.55
T.15.d.2) b).14 HDPE T.15.d.2) b).14 M3 29,650.91 30,925.31 32,083.20 30,925.31 30,925.31 32,083.20 33,473.45
T.15.d.2) b).15 GIP T.15.d.2) b).15 M3 263,563.64 274,891.64 285,184.00 274,891.64 274,891.64 285,184.00 297,541.82
T.15.d.2) b).16 DCIP T.15.d.2) b).16 M3 263,563.64 274,891.64 285,184.00 274,891.64 274,891.64 285,184.00 297,541.82
T.15.d.2) b).17 Baja Profil T.15.d.2) b).17 M3 256,974.55 268,019.35 278,054.40 268,019.35 268,019.35 278,054.40 290,103.27
T.15.d.2) b).18 Besi beton T.15.d.2) b).18 M3 224,852.73 234,516.93 243,297.60 234,516.93 234,516.93 243,297.60 253,840.36
T.15.d.2) c) Untuk jarak angkut vertikal naik 3 m
T.15.d.2) c).1 * Tanah gambut T.15.d.2) c).1 M3 64,568.95 67,342.91 69,866.18 67,342.91 67,342.91 69,866.18 72,890.84
T.15.d.2) c).2 * Agregat kasar T.15.d.2) c).2 M3 112,995.65 117,850.09 122,265.82 117,850.09 117,850.09 122,265.82 127,558.96
T.15.d.2) c).3 * Agregat halus T.15.d.2) c).3 M3 117,479.61 122,526.68 127,117.64 122,526.68 122,526.68 127,117.64 132,620.83
T.15.d.2) c).4 * Split/koral/kerikil T.15.d.2) c).4 M3 112,098.86 116,914.77 121,295.45 116,914.77 116,914.77 121,295.45 126,546.59
T.15.d.2) c).5 * Batu kali T.15.d.2) c).5 M3 86,988.72 90,725.86 94,125.27 90,725.86 90,725.86 94,125.27 98,200.15
T.15.d.2) c).6 * Batu belah T.15.d.2) c).6 M3 84,298.35 87,919.91 91,214.18 87,919.91 87,919.91 91,214.18 95,163.04
T.15.d.2) c).7 * Pasir pasang T.15.d.2) c).7 M3 114,789.24 119,720.73 124,206.55 119,720.73 119,720.73 124,206.55 129,583.71
T.15.d.2) c).8 Pipa Beton (tidak bertulang) umum T.15.d.2) c).8 M3 177,564.60 185,193.00 192,132.00 185,193.00 185,193.00 192,132.00 200,449.80
T.15.d.2) c).9 Pipa Beton (tidak bertulang) fc'= 12,5 MPa T.15.d.2) c).9 M3 193,706.84 202,028.73 209,598.55 202,028.73 202,028.73 209,598.55 218,672.51
T.15.d.2) c).10 Pipa Beton (bertulang 155 kg besi/m3) T.15.d.2) c).10 M3 201,777.95 210,446.59 218,331.82 210,446.59 210,446.59 218,331.82 227,783.86
T.15.d.2) c).11 Kayu T.15.d.2) c).11 M3 71,743.27 74,825.45 77,629.09 74,825.45 74,825.45 77,629.09 80,989.82
T.15.d.2) c).12 Plastik T.15.d.2) c).12 M3 60,981.78 63,601.64 65,984.73 63,601.64 63,601.64 65,984.73 68,841.35
T.15.d.2) c).13 PVC T.15.d.2) c).13 M3 68,604.50 71,551.84 74,232.82 71,551.84 71,551.84 74,232.82 77,446.51

B.3 - 93
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

T.15.d.2) c).14 HDPE T.15.d.2) c).14 M3 64,568.95 67,342.91 69,866.18 67,342.91 67,342.91 69,866.18 72,890.84
T.15.d.2) c).15 GIP T.15.d.2) c).15 M3 573,946.18 598,603.64 621,032.73 598,603.64 598,603.64 621,032.73 647,918.55
T.15.d.2) c).16 DCIP T.15.d.2) c).16 M3 573,946.18 598,603.64 621,032.73 598,603.64 598,603.64 621,032.73 647,918.55
T.15.d.2) c).17 Baja Profil T.15.d.2) c).17 M3 559,597.53 583,638.55 605,506.91 583,638.55 583,638.55 605,506.91 631,720.58
T.15.d.2) c).18 Besi beton T.15.d.2) c).18 M3 489,647.84 510,683.73 529,818.55 510,683.73 510,683.73 529,818.55 552,755.51
A.1.2 Pekerjaan tanah secara mekanis (Informatif)
TM.01 AHSP penggalian tanah di situ/waduk dengan Excavator di ponton 1, hasil galian diangkut dengan ponton 2 TM.01 M3 1,912,976.65 1,916,665.62 1,926,163.94 1,917,195.42 1,916,665.62 1,926,163.94 1,923,322.19
TM.02 AHSP penggalian tanah di sungai menggunakan Excavator (di darat) yang diangkut oleh Dump truck TM.02
TM.02.a Menggali dengan Excavator dan material atau hasil galian dimuat ke DT TM.02.a M3 81,781.36 83,656.88 87,673.82 83,863.35 83,656.88 87,673.82 87,140.27
TM.03 AHSP angkutan material atau hasil galian lintas pulau TM.03 M3 881,015.10 886,692.56 900,423.53 887,449.73 886,692.56 900,423.53 897,065.86
TM.04 AHSP gali, angkut material/hasil galian dan pemadatan TM.04
TM.04.a Galian Tanah
TM.04.a.1 Galian Tanah Biasa
TM.04.a.1.a 1 m3 galian tanah biasa sedalam sd 2 m TM.04.a.1.a M3 60,914.65 62,546.89 65,401.87 62,672.62 62,546.89 65,401.87 65,648.36
TM.04.a.1.b 1 m3 galian tanah biasa sedalam 2 m - 4 m TM.04.a.1.b M3 62,231.87 63,879.55 66,807.84 64,010.37 63,879.55 66,807.84 67,005.32
TM.04.a.1.c 1 m3 galian tanah biasa sedalam > 4 m atau Galian Tanah di sungai menggunakan exavator di darat TM.04.a.1.c M3 84,816.21 86,728.69 90,913.89 86,946.69 86,728.69 90,913.89 90,271.04
TM.04.a.2 Galian Tanah Berbatu
TM.04.a.2.a 1 m3 galian tanah berbatu sedalam sd 2 m TM.04.a.2.a M3 180,262.59 185,092.78 193,541.02 185,464.90 185,092.78 193,541.02 194,270.77
TM.04.a.3 Galian Batu
TM.04.a.3.a 1 m3 galian tanah batu sedalam sd 2 m TM.04.a.3.a M3 287,295.49 294,993.68 308,458.00 295,586.76 294,993.68 308,458.00 309,621.20
TM.04.a.4 Galian Tanah Keras / Cadas
TM.04.a.4.a 1 m3 galian tanah Keras/Cadas sedalam sd 2 m TM.04.a.4.a M3 180,262.59 185,092.78 193,541.02 185,464.90 185,092.78 193,541.02 194,270.77
TM.04.a.5 Galian Lumpur
TM.04.a.5.a 1 m3 galian Lumpur sedalam sd 2 m TM.04.a.5.a M3 75,881.88 77,914.55 81,471.34 78,071.25 77,914.55 81,471.34 81,776.72
TM.04.a.6 Galian Pasir
TM.04.a.6.a 1 m3 galian Pasir sedalam sd 2 m TM.04.a.6.a M3 69,825.09 71,695.38 74,968.21 71,839.61 71,695.38 74,968.21 75,249.01
TM.04.b Memuat Material atau hasil galian M3 59,647.75 61,173.78 64,011.36 61,305.52 61,173.78 64,011.36 64,055.04
TM.04.c. Angkutan material dan/atau hasil galian
TM.04.c.1 Mengangkut 1 m3 material atau hasil galian Menggunakan Dump Truck
TM.04.c.1.a Jarak angkut < 1 Km TM.04.c.1.a M3 93,762.10 94,861.47 100,079.70 95,223.42 94,861.47 100,079.70 96,590.99
TM.04.c.1.b Jarak angkut > 1 km untuk setiap penambahan jarak angkut 100 m TM.04.c.1.b M3 3,712.16 3,755.69 3,962.29 3,770.02 3,755.69 3,962.29 3,824.16
TM.04.c.2 Mengangkut 1 m3 material atau hasil galian Menggunakan Ponton
TM.04.c.2.a Jarak angkut < 1 Km TM.04.c.2.a M3 215,740.00 215,740.00 215,740.00 215,740.00 215,740.00 215,740.00 215,740.00
TM.04.c.2.b Jarak angkut > 1 KM untuk setiap penambahan jarak angkut 1 KM TM.04.c.2.b M3 105,751.13 105,751.13 105,751.13 105,751.13 105,751.13 105,751.13 105,751.13
TM.04.c.3 Mengangkut 1 m3 material atau hasil galian Menggunakan Perahu M3 552,833.75 552,833.75 552,833.75 552,833.75 552,833.75 552,833.75 552,833.75
TM.04.c.4 Mengangkut 1 m3 material atau hasil galian Menggunakan Tongkang
TM.04.c.4.a Jarak angkut < 10 Km TM.04.c.4.a M3 55,476.00 55,476.00 55,476.00 55,476.00 55,476.00 55,476.00 55,476.00
TM.04.c.4.b Jarak angkut > 1 KM untuk setiap penambahan jarak angkut 1 KM TM.04.c.4.b M3 385.25 385.25 385.25 385.25 385.25 385.25 385.25
TM.04.d Tanah dihampar, diratakan dan dirapihkan TM.04.d M3 6,348.52 6,569.87 6,747.32 6,582.28 6,569.87 6,747.32 6,992.16
TM.04.e Pemadatan tanah di lokasi pekerjaan TM.04.e M3 31,920.11 32,499.64 34,143.91 32,626.40 32,580.37 34,291.92 33,547.80

A.2 Pekerjaan pasangan (Normatif)


A.2.1 Koefisien untuk analisis harga satuan Pekerjaan pasangan (Normatif)
P.01 Pasangan batu dengan mortar jenis PC-PP (1 m3)
P.01.a Mortar tipe M (setara campuran 1 PC:2 PP)
P.01.a.1) Manual P.01.a.1) M3 2,080,312.00 2,170,969.00 2,347,228.00 2,211,919.00 2,717,821.00 2,894,080.00 2,384,450.00
P.01.a.2) Menggunakan molen P.01.a.2) M3 1,938,139.00 2,022,083.00 2,193,575.00 2,063,094.00 2,568,936.00 2,740,427.00 2,222,252.00
P.01.b Mortar tipe S (setara campuran 1 PC:3 PP)
P.01.b.1) Manual P.01.b.1) M3 1,964,150.00 2,048,884.00 2,213,642.00 2,083,567.00 2,487,234.00 2,651,992.00 2,244,138.00
P.01.b.2) Menggunakan molen P.01.b.2) M3 1,821,978.00 1,899,999.00 2,059,989.00 1,934,742.00 2,338,349.00 2,498,339.00 2,081,939.00
P.01.c Mortar tipe N (setara campuran 1 PC:4 PP)
P.01.c.1) Manual P.01.c.1) M3 1,873,519.00 1,953,632.00 2,109,416.00 1,983,425.00 2,307,350.00 2,463,134.00 2,134,665.00
P.01.c.2) Menggunakan molen P.01.c.2) M3 1,731,346.00 1,804,746.00 1,955,763.00 1,834,600.00 2,158,465.00 2,309,481.00 1,972,467.00
P.01.d Mortar tipe O (setara campuran 1 PC:5 PP)
P.01.d.1) Manual P.01.d.1) M3 1,808,162.00 1,884,946.00 2,034,255.00 1,911,226.00 2,177,903.00 2,327,212.00 2,055,747.00
P.01.d.2) Menggunakan molen P.01.d.2) M3 1,665,989.00 1,736,061.00 1,880,602.00 1,762,401.00 2,029,017.00 2,173,559.00 1,893,548.00
P.01.e Bongkar dan pemanfaatan batu bekas pasangan
P.01.e.1) Bongkar 1 m3 pasangan batu dan pembersihan batu (manual) P.01.e.1) M3 246,467.00 257,324.00 266,259.00 257,531.00 257,396.00 266,467.00 279,042.00
P.01.e.2) Bongkar 1 m3 pasangan batu (manual) P.01.e.2) M3 211,383.00 220,694.00 228,353.00 220,879.00 220,759.00 228,538.00 239,320.00
P.01.e.3) Bongkar 1 m3 pasangan batu dengan jack hammer P.01.e.3) M3 115,662.00 120,257.00 124,087.00 120,257.00 120,257.00 124,087.00 129,448.00
P.01.e.4) Pembersihan 1 m3 bongkaran pasangan batu untuk pemanfaatan kembali material batu P.01.e.4) M3 35,083.00 36,629.00 37,906.00 36,652.00 36,637.00 37,928.00 39,722.00
P.01.e.5) 1 m3 batu dari bekas bongkaran pasangan batu **) P.01.e.5) M3 346,713.00 360,837.00 372,583.00 360,890.00 360,856.00 372,634.00 389,091.00
P.02 1 m3 pasangan bata merah
P.02.a Mortar tipe M (setara campuran 1 PC:2 PP)
P.02.a.1) Manual P.02.a.1) M3 1,935,684.00 1,987,433.00 2,574,955.00 2,010,615.00 2,367,192.00 2,954,714.00 2,177,096.00
P.02.a.2) Menggunakan molen P.02.a.2) M3 1,797,955.00 1,843,049.00 2,426,111.00 1,866,309.00 2,222,807.00 2,805,870.00 2,019,547.00
P.02.b Mortar tipe S (setara campuran 1 PC:3 PP)
P.02.b.1) Manual P.02.b.1) M3 1,829,735.00 1,876,148.00 2,453,113.00 1,893,879.00 2,162,595.00 2,739,560.00 2,049,650.00
P.02.b.2) Menggunakan molen P.02.b.2) M3 1,692,006.00 1,731,763.00 2,304,269.00 1,749,573.00 2,018,210.00 2,590,716.00 1,892,102.00
P.02.c Mortar tipe N (setara campuran 1 PC:4 PP)
P.02.c.1) Manual P.02.c.1) M3 1,771,016.00 1,814,429.00 2,385,587.00 1,828,969.00 2,045,540.00 2,616,697.00 1,978,677.00
P.02.c.2) Menggunakan molen P.02.c.2) M3 1,633,287.00 1,670,045.00 2,236,742.00 1,684,663.00 1,901,155.00 2,467,852.00 1,821,128.00
P.02.d Mortar tipe O (setara campuran 1 PC:5 PP)
P.02.d.1) Manual P.02.d.1) M3 1,736,550.00 1,778,138.00 2,345,951.00 1,790,546.00 1,971,273.00 2,539,086.00 1,936,501.00
P.02.d.2) Menggunakan molen P.02.d.2) M3 1,598,821.00 1,633,754.00 2,197,107.00 1,646,241.00 1,826,888.00 2,390,241.00 1,778,953.00
P.02.e Mortar campuran 1 PC:6 PP
P.02.e.1) Manual P.02.e.1) M3 1,721,232.00 1,761,850.00 2,328,336.00 1,772,675.00 1,924,604.00 2,491,089.00 1,916,486.00
P.02.e.2) Menggunakan molen P.02.e.2) M3 1,583,503.00 1,617,466.00 2,179,491.00 1,628,370.00 1,780,219.00 2,342,245.00 1,758,937.00
P.02.f Bongkar 1 m3 pasangan bata merah
P.02.f.1) Manual P.02.f.1) M3 105,214.00 109,851.00 113,681.00 109,915.00 109,873.00 113,744.00 119,126.00
P.02.f.2) Bongkar 1 m3 pasangan bata merah dengan jack hammer P.02.f.2) M3 8,072.00 8,225.00 8,352.00 8,225.00 8,225.00 8,352.00 8,531.00
P.03 1 m2 Pekerjaan siaran dengan mortar jenis PC-PP

B.3 - 94
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

P.03.a Siaran dengan mortar tipe M (setara campuran 1 PC:2 PP) P.03.a M2 101,966.00 106,345.00 111,172.00 107,185.00 120,103.00 124,931.00 115,719.00
P.03.b Siaran dengan mortar tipe S (setara campuran 1 PC:3 PP) P.03.b M2 99,669.00 103,917.00 108,530.00 104,581.00 114,420.00 119,033.00 112,840.00
P.04 1 m2 Pekerjaan plesteran dengan mortar jenis PC-PP (1 m2)
P.04.a Trasraam tebal 1 cm, dengan mortar tipe M (setara campuran 1 PC:2 PP) P.04.a M2 104,775.00 109,288.00 114,402.00 110,248.00 124,999.00 130,113.00 119,048.00
P.04.b Plesteran tebal 1 cm, dengan mortar tipe S (setara campuran 1 PC:3 PP) P.04.b M2 101,711.00 106,066.00 110,879.00 106,853.00 118,740.00 123,552.00 115,331.00
P.04.c Plesteran tebal 1 cm, dengan mortar tipe N (setara campuran 1 PC:4 PP) P.04.c M2 98,673.00 102,871.00 107,385.00 103,485.00 112,528.00 117,042.00 111,645.00
P.04.d Trasraam tebal 1,5 cm, dengan mortar tipe M (setara campuran 1 PC:2 PP) P.04.d M2 133,085.00 138,756.00 145,604.00 140,112.00 160,942.00 167,790.00 151,160.00
P.04.e Plesteran tebal 1,5 cm, dengan mortar tipe S (setara campuran 1 PC:3 PP) P.04.e M2 129,388.00 134,848.00 141,352.00 135,918.00 151,723.00 158,227.00 146,519.00
P.04.f Plesteran tebal 1,5 cm, dengan mortar tipe N (setara campuran 1 PC:4 PP) P.04.f M2 124,037.00 129,245.00 135,199.00 130,108.00 142,873.00 148,827.00 140,220.00
P.04.g 1 m2 pekerjaan acian P.04.g M2 63,442.00 66,154.00 68,899.00 66,569.00 73,207.00 75,951.00 71,866.00
P.05 1 m3 pasangan batu kosong* M3 965,034.00 1,004,094.00 1,090,258.00 1,011,753.00 1,004,094.00 1,090,258.00 1,081,578.00
P.06 Pasangan batu bronjong kawat (SNI 03-0090-1999)
P.06.a 1 m3 pasangan batu bronjong kawat Bentuk I
P.06.a.1) Bentuk I, Tipe A bronjong kawat ukuran L=2,0 m x B=1,0 m x T=1,0 m
P.06.a.1) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.1) a) M3 2,683,988.00 2,792,426.00 3,059,572.00 2,809,021.00 2,792,426.00 3,059,572.00 3,009,304.00
P.06.a.1) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.1) b) M3 2,715,058.00 2,824,754.00 3,094,752.00 2,841,348.00 2,824,754.00 3,094,752.00 3,044,146.00
P.06.a.1) c) Kawat bronjong wire mesh ø 5 mm ulir, dan kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.1) c) M3 3,571,168.00 3,717,199.00 4,057,770.00 3,733,794.00 3,717,199.00 4,057,770.00 4,009,263.00
P.06.a.2) Bentuk I, Tipe B bronjong kawat ukuran L=3,0 m x B=1,0 m x T=1,0 m
P.06.a.2) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.2) a) M3 4,893,194.00 5,092,198.00 5,534,089.00 5,119,004.00 5,092,198.00 5,534,089.00 5,490,206.00
P.06.a.2) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.2) b) M3 4,012,052.00 4,174,143.00 4,573,640.00 4,199,035.00 4,174,143.00 4,573,640.00 4,498,326.00
P.06.a.2) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.2) c) M3 5,138,518.00 5,346,301.00 5,847,550.00 5,371,192.00 5,346,301.00 5,847,550.00 5,761,865.00
P.06.a.3) Bentuk I, Tipe C bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 1,0 m
P.06.a.3) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.3) a) M3 5,358,829.00 5,575,197.00 6,113,412.00 5,608,386.00 5,575,197.00 6,113,412.00 6,007,934.00
P.06.a.3) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.3) b) M3 5,291,481.00 5,505,189.00 6,033,547.00 5,538,378.00 5,505,189.00 6,033,547.00 5,932,605.00
P.06.a.3) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.3) c) M3 6,784,214.00 7,058,534.00 7,720,782.00 7,091,723.00 7,058,534.00 7,720,782.00 7,607,174.00
P.06.a.4) Bentuk I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x T= 0,5 m
P.06.a.4) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.4) a) M3 1,584,238.00 1,648,963.00 1,801,537.00 1,657,260.00 1,648,963.00 1,801,537.00 1,778,413.00
P.06.a.4) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.4) b) M3 1,606,302.00 1,671,935.00 1,826,491.00 1,680,232.00 1,671,935.00 1,826,491.00 1,803,200.00
P.06.a.4) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.4) c) M3 2,115,811.00 2,201,419.00 2,404,913.00 2,209,717.00 2,201,419.00 2,404,913.00 2,372,636.00
P.06.a.5) Bentuk I, Tipe E bronjong kawat ukuran L=3,0 m x B=1,0 m x T=0,5 m
P.06.a.5) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.5) a) M3 2,298,223.00 2,391,123.00 2,617,064.00 2,403,569.00 2,391,123.00 2,617,064.00 2,576,922.00
P.06.a.5) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.5) b) M3 2,821,894.00 2,936,772.00 3,183,496.00 2,949,217.00 2,936,772.00 3,183,496.00 3,166,526.00
P.06.a.5) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.5) c) M3 3,770,206.00 3,923,731.00 4,247,464.00 3,936,177.00 3,923,731.00 4,247,464.00 4,230,780.00
P.06.a.6) Bentuk I, Tipe F Bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 0,5 m
P.06.a.6) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.a.6) a) M3 3,039,569.00 3,162,443.00 3,461,557.00 3,179,037.00 3,162,443.00 3,461,557.00 3,408,189.00
P.06.a.6) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm; P.06.a.6) b) M3 3,080,819.00 3,205,356.00 3,508,286.00 3,221,951.00 3,205,356.00 3,508,286.00 3,454,429.00
P.06.a.6) c) Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100 mm; P.06.a.6) c) M3 4,027,070.00 4,189,913.00 4,583,215.00 4,206,507.00 4,189,913.00 4,583,215.00 4,515,599.00
P.06.a.7) Pasangan bronjong pabrikasi (tenaga kerja untuk 1m3 batu bronjong) P.06.a.7) M3 2,052,994.00 2,211,063.00 2,421,916.00 2,471,929.00 2,463,632.00 2,434,544.00 2,527,202.00
P.06.b 1 m3 Pasangan bronjong kawat Bentuk II
P.06.b.1) Bentuk II, Tipe G bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,17 m
P.06.b.1) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm; P.06.b.1) a) M3 4,879,727.00 5,078,802.00 5,478,242.00 5,097,031.00 5,078,802.00 5,478,242.00 5,476,953.00
P.06.b.1) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.b.1) b) M3 3,997,449.00 4,158,999.00 4,553,441.00 4,175,925.00 4,158,999.00 4,553,441.00 4,482,099.00
P.06.b.2) Bentuk II, Tipe H bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,23 m
P.06.b.2) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm; P.06.b.2) a) M3 4,415,777.00 4,594,556.00 5,013,860.00 4,617,456.00 4,594,556.00 5,013,860.00 4,952,114.00
P.06.b.2) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.b.2) b) M3 4,765,480.00 4,958,090.00 5,427,644.00 4,980,991.00 4,958,090.00 5,427,644.00 5,343,310.00
P.06.b.3) Bentuk II, Tipe I bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,30 m
P.06.b.3) a) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm; P.06.b.3) a) M3 5,218,817.00 5,430,001.00 5,931,423.00 5,459,871.00 5,430,001.00 5,931,423.00 5,852,369.00
P.06.b.3) b) Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm; P.06.b.3) b) M3 6,173,434.00 6,423,567.00 6,999,302.00 6,453,437.00 6,423,567.00 6,999,302.00 6,923,833.00
P.06.b.4) Pasangan bronjong pabrikasi (tenaga kerja untuk 1 m3 batu bronjong) P.06.b.4) M3 4,242,192.00 4,502,203.00 4,952,998.00 4,832,433.00 4,802,563.00 4,968,016.00 5,022,223.00
P.07 Cerucuk dan pemasangan modul bronjong
P.07.a 1 m’ panjang cerucuk kayu atau dolken ø 8 - 10 cm P.07.a
P.07.d 1 m3 Pemasangan modul bronjong kawat menjadi struktur krib sungai P.07.d M3 99,176.00 101,057.00 105,487.00 101,299.00 101,057.00 105,487.00 104,486.00
P.08 1 m2 Pasangan batu muka dan batu candi
P.08.a 1 m2 Pasangan batu muka P.08.a M2 92,501.00 96,423.00 101,465.00 97,173.00 107,273.00 112,316.00 104,752.00
P.08.b 1 m2 Pasangan batu candi P.08.b M2 92,086.00 95,992.00 100,990.00 96,739.00 106,843.00 111,840.00 104,290.00
P.09 1 m2 Pasangan geotekstil
P.09.a 1 m2 Pemasangan geotekstil, Tipe-A, tipis P.09.a M2 181,901.00 189,496.00 207,686.00 190,836.00 189,496.00 207,686.00 203,346.00
P.09.b 1 m2 Pemasangan geotekstil, Tipe-B, tebal sedang P.09.b M2 199,134.00 207,456.00 226,604.00 208,835.00 207,456.00 226,604.00 222,723.00
P.09.c 1 m2 Pemasangan geotekstil, Tipe-C, tebal P.09.c M2 219,047.00 228,212.00 248,304.00 229,616.00 228,212.00 248,304.00 245,139.00
P.10 Pasangan bar screen (saringan kasar) bangunan intake, pengukur, dan pengatur 1 buah pasangan bar screen/saringan kasar P.10 bh 983,661.00 1,034,884.00 1,345,681.00 1,034,931.00 1,035,022.00 1,345,934.00 1,093,877.00
P.11 1 buah pasangan ambang ukur pada bangunan pengukur dan/atau pengatur P.11 bh 673,239.00 708,330.00 934,313.00 708,407.00 708,744.00 935,072.00 746,522.00
P.12 1 m2 pasangan lempengan rumput P.12
P.12.b Pembabadan rumput P.12.b
P.12.b.1) Secara manual P.12.b.1)
P.12.b.1)a) Perhitungan secara umum (jika tidak diketahui kondisi medan secara detail) P.12.b.1)a) M2 2,159.00 2,254.00 2,334.00 2,254.00 2,254.00 2,334.00 2,445.00
P.12.b.1)b) Perhitungan secara detail (jika diketahui kondisi medan secara detail) P.12.b.1)b)
P.12.b.1)b)(1) Daerah datar sampai pelandaian naik dengan kemiringan 1v:10 h P.12.b.1)b)(1) M2 1,388.00 1,450.00 1,501.00 1,450.00 1,450.00 1,501.00 1,572.00
P.12.b.1)b)(2) Daerah dengan kemiringan 1v:10h s.d 1v:2,5h P.12.b.1)b)(2) M2 2,159.00 2,254.00 2,334.00 2,254.00 2,254.00 2,334.00 2,445.00
P.12.b.1)b)(3) Daerah dengan kemiringan 1v:2,5h s.d 1v:1h P.12.b.1)b)(3) M2 2,905.00 3,033.00 3,140.00 3,033.00 3,033.00 3,140.00 3,290.00
P.12.b.1)b)(4) Daerah dengan kemiringan 1v:1h s.d 1h:2,5v P.12.b.1)b)(4) M2 4,340.00 4,531.00 4,691.00 4,531.00 4,531.00 4,691.00 4,914.00
P.12.b.1)b)(5) Daerah dengan kemiringan 2,5v:1h sampai dengan tegak P.12.b.1)b)(5) M2 8,680.00 9,063.00 9,382.00 9,063.00 9,063.00 9,382.00 9,829.00
P.12.b.2) Secara semi mekanis P.12.b.2)
P.12.b.2)a) Perhitungan secara umum (jika tidak diketahui kondisi medan secara detail) P.12.b.2)a) M2 847.00 875.00 908.00 876.00 875.00 908.00 931.00
P.12.b.2)b) Perhitungan secara detail (jika diketahui kondisi medan secara detail) P.12.b.2)b)
P.12.b.2)b)(1) Daerah datar sampai pelandaian naik dengan kemiringan 1v : 10h P.12.b.2)b)(1) M2 690.00 712.00 739.00 713.00 712.00 739.00 757.00
P.12.b.2)b)(2) Daerah dengan kemiringan 1v : 10h s.d 1v : 2,5h P.12.b.2)b)(2) M2 867.00 896.00 929.00 897.00 896.00 929.00 953.00
P.12.b.2)b)(3) Daerah dengan kemiringan 1v : 2,5h s.d 1v : 1h P.12.b.2)b)(3) M2 1,226.00 1,266.00 1,314.00 1,267.00 1,266.00 1,314.00 1,346.00
P.12.b.2)b)(4) Daerah dengan kemiringan 1v : 1h s.d 2,5v : 1h P.12.b.2)b)(4) M2 1,890.00 1,953.00 2,026.00 1,955.00 1,953.00 2,026.00 2,078.00
P.12.b.2)b)(5) Daerah dengan kemiringan 2,5v:1h sampai dengan tegak P.12.b.2)b)(5) M2 3,366.00 3,477.00 3,608.00 3,481.00 3,477.00 3,608.00 3,699.00
P.13 Pekerjaan pantai
P.13.b Matras bambu P.13.b M2 214,774.00 223,709.00 242,345.00 223,387.00 223,709.00 242,345.00 241,643.00
P.14 Pasangan armor

B.3 - 95
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

P.14.a Pembuatan 1 buah kubus beton ukuran 30 cm x 30 cm x 30 cm P.14.a bh 133,975.00 140,620.00 175,665.00 141,135.00 140,620.00 175,665.00 149,785.00
P.14.b Pembuatan 1 buah kubus beton ukuran 40 cm x 40 cm x 40 cm P.14.b bh 314,257.00 329,855.00 412,872.00 331,081.00 329,855.00 412,872.00 351,298.00
P.14.c Pembuatan 1 buah 3B: blok beton bergigi P.14.c bh 483,003.00 507,052.00 636,488.00 508,967.00 507,052.00 636,488.00 539,909.00
P.14.d Pembuatan 1 buah blok beton berat 0,5 ton quadripod, tetrapod, dolos, tribar P.14.d bh 1,078,890.00 1,132,745.00 1,425,935.00 1,137,092.00 1,132,745.00 1,425,935.00 1,205,858.00
P.14.e Pembuatan 1 buah blok beton berat 0,75 ton quadripod, tetrapod, dolos, tribar P.14.e bh 1,614,285.00 1,694,909.00 2,134,011.00 1,701,419.00 1,694,909.00 2,134,011.00 1,804,334.00
P.14.f Pembuatan blok beton berat 1,0 ton quadripod, tetrapod, dolos, tribar dan lain-lain P.14.f bh 2,160,814.00 2,268,703.00 2,855,234.00 2,277,396.00 2,268,703.00 2,855,234.00 2,415,285.00
P.14.g Pembuatan 1 buah blok beton berat 1,5 ton quadripod, tetrapod, dolos, tribar P.14.g bh 1,124,002.00 1,179,772.00 1,474,838.00 1,184,118.00 1,179,772.00 1,474,838.00 1,256,675.00
P.14.h Pembuatan 1 buah blok beton berat 2,0 ton quadripod, tetrapod, dolos, tribar P.14.h bh 1,124,002.00 1,179,772.00 1,474,838.00 1,184,118.00 1,179,772.00 1,474,838.00 1,256,675.00
P.14.i Pembuatan 1 buah blok beton berat 2,5 ton quadripod, tetrapod, dolos, tribar P.14.i bh 1,124,002.00 1,179,772.00 1,474,838.00 1,184,118.00 1,179,772.00 1,474,838.00 1,256,675.00
P.14.j Pemasangan 1 m3 berbagai jenis armor P.14.j M3 1,133,323.00 1,189,991.00 1,484,964.00 1,194,280.00 1,189,991.00 1,484,964.00 1,268,519.00
P.14.k 1 m3 pasangan batu 1 kg - 3 kg, void maksimum 15% P.14.k M3 913,669.00 947,677.00 1,029,373.00 955,052.00 947,677.00 1,029,373.00 1,015,028.00
P.14.l 1 m3 pasangan batu 3 kg - 5 kg, void maksimum 15% P.14.l M3 979,409.00 1,015,842.00 1,102,006.00 1,023,536.00 1,015,842.00 1,102,006.00 1,088,044.00
P.14.m 1 m3 pasangan batu 5 kg - 10 kg, void maksimum 20% P.14.m M3 1,040,012.00 1,078,596.00 1,169,227.00 1,086,644.00 1,078,596.00 1,169,227.00 1,155,030.00
P.14.n 1 m3 pasangan batu 10 kg - 30 kg, void maksimum 20% P.14.n M3 1,068,733.00 1,108,466.00 1,202,288.00 1,116,833.00 1,108,466.00 1,202,288.00 1,187,198.00
P.14.o 1 m3 pasangan batu 30 kg - 50 kg, void maksimum 25% P.14.o M3 1,117,848.00 1,159,271.00 1,256,285.00 1,167,865.00 1,159,271.00 1,256,285.00 1,241,318.00
P.14.p 1 m3 pasangan batu 50 kg - 100 kg, void maksimum 25% P.14.p M3 1,117,848.00 1,159,271.00 1,256,285.00 1,167,865.00 1,159,271.00 1,256,285.00 1,241,318.00
P.14.q 1 m3 pasangan batu 100 kg - 200 kg, void maksimum 30% P.14.q M3 1,140,825.00 1,183,167.00 1,282,734.00 1,192,017.00 1,183,167.00 1,282,734.00 1,267,052.00
P.14.r 1 m3 pasangan batu 200 kg - 300 kg, void maksimum 30% P.14.r M3 1,140,825.00 1,183,167.00 1,282,734.00 1,192,017.00 1,183,167.00 1,282,734.00 1,267,052.00
P.14.s 1 m3 pasangan batu 300 kg - 400 kg, void maksimum 30% P.14.s M3 1,207,173.00 1,251,894.00 1,356,567.00 1,261,162.00 1,251,894.00 1,356,567.00 1,340,472.00
P.14.t 1 m3 pasangan batu 400 kg - 500 kg, void maksimum 35% P.14.t M3 1,218,661.00 1,263,842.00 1,369,791.00 1,273,238.00 1,263,842.00 1,369,791.00 1,353,339.00
P.14.u 1 m3 pasangan batu 200 kg - 500 kg, void maksimum 32% P.14.u M3 1,200,854.00 1,245,307.00 1,349,750.00 1,254,576.00 1,245,307.00 1,349,750.00 1,333,349.00
P.14.v 1 m3 pasangan batu 500 kg - 650 kg, void maksimum 35% P.14.v M3 1,240,681.00 1,286,768.00 1,394,377.00 1,296,292.00 1,286,768.00 1,394,377.00 1,378,077.00
P.14.w 1 m3 pasangan batu 650 kg - 800 kg, void maksimum 35% P.14.w M3 1,257,914.00 1,304,690.00 1,414,214.00 1,314,405.00 1,304,690.00 1,414,214.00 1,397,378.00
P.15 Struktur krib laut
P.15.a 1 Buah buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai P.15.a bh 34,720.00 36,252.00 37,529.00 36,252.00 36,252.00 37,529.00 39,316.00
P.15.b Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton f'c = 7,4 MPa (K-100) P.15.b bh 1,092,632.00 1,143,181.00 1,238,828.00 1,176,692.00 1,679,184.00 1,774,830.00 1,276,049.00
P.16 1 m’ pasangan pipa suling-suling M' 223,136.00 235,681.00 257,838.00 237,073.00 235,681.00 257,838.00 245,210.00
A.3 Pekerjaan beton (Normatif) P.17
A.3.1 Koefisien untuk analisis harga satuan pekerjaan pembuatan beton
B.01 1 m³ beton untuk lantai kerja (bedding)
B.01.a Tipe-1: menggunakan campuran beton tumbuk fc' = 1,8 s.d 3,7 (B0: K-40 s.d. K-60) atau setara 1PC : 3PB : 5Kr B.01.a M3 1,669,292.00 1,749,347.00 1,863,629.00 1,776,210.00 2,183,357.00 2,297,639.00 1,957,217.00
B.01.b Tipe-2: menggunakan campuran beton fc' = 5,6 s.d 7,4 Mpa (K-80 s.d. K-100) atau setara 1PC : 2PB : 3Kr B.01.b M3 1,648,112.00 1,726,919.00 1,843,853.00 1,756,504.00 2,204,330.00 2,321,264.00 1,932,051.00
B.01.c Tipe-3: menggunakan campuran beton fc' ~ 7,4 MPa (K-100) atau setara 1PC : 2PB : 3Kr B.01.c M3 1,665,224.00 1,744,801.00 1,864,010.00 1,775,355.00 2,237,402.00 2,356,612.00 1,952,078.00
B.02 1 m³ beton mutu, f’c = 7,4 MPa (K100), slump (12±2) cm, w/c = 0,87
B.02.a Manual B.02.a M3 1,800,157.00 1,885,600.00 2,014,276.00 1,918,963.00 2,421,603.00 2,550,279.00 2,107,477.00
B.02.b Menggunakan molen B.02.b M3 1,771,973.00 1,854,837.00 1,984,089.00 1,888,398.00 2,390,840.00 2,520,091.00 2,072,040.00
B.03 1 m³ Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78
B.03.a Manual B.03.a M3 1,904,773.00 1,995,469.00 2,132,943.00 2,032,513.00 2,594,403.00 2,731,877.00 2,232,557.00
B.03.b Menggunakan molen B.03.b M3 1,876,589.00 1,964,706.00 2,102,755.00 2,001,948.00 2,563,639.00 2,701,689.00 2,197,121.00
B.04 1 m³ Beton mutu, f’c = 12,2 MPa (K150), slump (12±2) cm, w/c = 0,72
B.04.a Manual B.04.a M3 1,960,600.00 2,054,149.00 2,196,973.00 2,094,075.00 2,702,994.00 2,845,818.00 2,299,980.00
B.04.b Menggunakan molen B.04.b M3 1,932,416.00 2,023,386.00 2,166,786.00 2,063,510.00 2,672,231.00 2,815,631.00 2,264,543.00
B.05 1 m³ beton mutu f’c=14,5 MPa (K175), slump (12±2) cm, w/c = 0,66
B.05.a Manual B.05.a M3 2,029,101.00 2,126,158.00 2,275,347.00 2,169,457.00 2,833,595.00 2,982,783.00 2,382,692.00
B.05.b Menggunakan molen B.05.b M3 2,000,917.00 2,095,395.00 2,245,159.00 2,138,892.00 2,802,831.00 2,952,596.00 2,347,256.00
B.06 1 m³ Beton mutu, f’c = 16,9 MPa (K200), slump (12±2) cm, w/c = 0,61
B.06.a Manual B.06.a M3 2,090,621.00 2,190,815.00 2,346,022.00 2,237,378.00 2,954,673.00 3,109,880.00 2,456,984.00
B.06.b Menggunakan molen B.06.b M3 2,062,437.00 2,160,052.00 2,315,834.00 2,206,813.00 2,923,910.00 3,079,692.00 2,421,548.00
B.07 1 m³ Beton mutu, f’c = 19,3 MPa (K225), slump (12±2) cm, w/c = 0,58
B.07.a Manual B.07.a M3 2,142,597.00 2,245,460.00 2,405,262.00 2,294,386.00 3,050,549.00 3,210,351.00 2,519,714.00
B.07.b Menggunakan molen B.07.b M3 2,114,413.00 2,214,697.00 2,375,074.00 2,263,821.00 3,019,786.00 3,180,163.00 2,484,277.00
B.08 1 m³ Beton mutu, f’c = 21,7 MPa (K250) kedap air,slump (12±2) cm, w/c = 0,56
B.08.a Manual B.08.a M3 2,138,777.00 2,241,516.00 2,402,387.00 2,292,042.00 3,074,815.00 3,235,686.00 2,516,243.00
B.08.b Menggunakan molen B.08.b M3 2,110,593.00 2,210,752.00 2,372,199.00 2,261,477.00 3,044,052.00 3,205,498.00 2,480,807.00
B.09 1 m³ Beton mutu, f’c = 24,0 MPa (K275) kedap air, slump (12±2) cm, w/c = 0,53
B.09.a Manual B.09.a M3 2,185,095.00 2,290,165.00 2,456,060.00 2,343,486.00 3,171,206.00 3,337,100.00 2,572,115.00
B.09.b Menggunakan molen B.09.b M3 2,156,911.00 2,259,402.00 2,425,872.00 2,312,921.00 3,140,442.00 3,306,913.00 2,536,678.00
B.10 1 m³ Beton mutu, f’c = 26,4 MPa (K300) kedap air, slump (12±2)cm, w/c = 0,52 (kedap air)
B.10.a Manual B.10.a M3 2,199,194.00 2,304,975.00 2,472,431.00 2,359,184.00 3,201,206.00 3,368,662.00 2,589,144.00
B.10.b Menggunakan molen B.10.b M3 2,171,010.00 2,274,212.00 2,442,243.00 2,328,619.00 3,170,443.00 3,338,474.00 2,553,707.00
B.11 1 m³ Beton mutu, f’c = 28,8 MPa, (K325) kedap air, slump (12±2) cm, w/c = 0,49 (kedap air)
B.11.a Manual B.11.a M3 2,253,845.00 2,362,382.00 2,535,751.00 2,419,889.00 3,315,034.00 3,488,403.00 2,655,089.00
B.11.b Menggunakan molen B.11.b M3 2,225,661.00 2,331,619.00 2,505,563.00 2,389,324.00 3,284,271.00 3,458,215.00 2,619,653.00
B.12 1 m³ Beton mutu, f’c = 31,2 MPa, (K350) kedap air , slump (12±2) cm, w/c = 0,48 (kedap air)
B.12.a Manual B.12.a M3 2,272,419.00 2,381,890.00 2,557,299.00 2,440,541.00 3,354,073.00 3,529,482.00 2,677,500.00
B.12.b Menggunakan molen B.12.b M3 2,244,235.00 2,351,127.00 2,527,112.00 2,409,976.00 3,323,309.00 3,499,294.00 2,642,064.00
B.13 1 m³ Beton menggunakan Ready Mixed dan bahan aditif
B.13.a 1 m³ Beton menggunakan Ready Mixed dan pompa beton B.13.a M3 2,246,879.00 2,333,071.00 2,554,384.00 2,352,268.00 2,333,071.00 2,554,384.00 2,504,213.00
B.13.b 1 m³ beton menggunakan bahan aditif B.13.b M3 73,526.00 75,058.00 85,780.00 75,058.00 75,058.00 85,780.00 76,590.00
A.3.2 Penambahan koefisien tenaga kerja dan/atau peralatan
B.14 Mengangkut/menaikan campuran beton dengan jarak > 5 m
B.14.a 1 m³ beton dicorkan pada tapak berjarak < 25 m dengan beda tinggi < 1 m
B.14.a.1) Manual B.14.a.1) M3 71,177.00 74,317.00 76,934.00 74,317.00 74,317.00 76,934.00 80,598.00
B.14.b 1 m3 Beton dicorkan pada tapak berjarak setiap tambahan jarak 25 m
B.14.b.1) Manual B.14.b.1) M3 86,802.00 90,631.00 93,822.00 90,631.00 90,631.00 93,822.00 98,290.00
B.14.b.2) Menggunakan pompa beton B.14.b.2) M3 175,502.00 178,395.00 186,114.00 178,843.00 178,395.00 186,114.00 183,258.00
B.15 1 m3 Pemadatan beton pada saat mengecor
B.15.a Vibrator B.15.a M3 53,175.00 55,159.00 57,253.00 55,182.00 55,159.00 57,253.00 59,283.00
B.15.b Manual (menggunakan penusuk besi beton) B.15.b M3 86,802.00 90,631.00 93,822.00 90,631.00 90,631.00 93,822.00 98,290.00
B.16 1 m3 beton dicorkan pada tapak setiap kenaikan 4 m (vertikal)
B.16.a Manual B.16.a M3 43,401.00 45,315.00 46,911.00 45,315.00 45,315.00 46,911.00 49,145.00
B.16.b Menggunakan pompa beton B.16.b M3 175,502.00 178,395.00 186,114.00 178,843.00 178,395.00 186,114.00 183,258.00

B.3 - 96
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

A.3.3 Koefisien untuk analisa harga satuan pekerjaan pembesian beton


B.17 Pembesian 100 kg dengan besi polos atau ulir
B.17.a Untuk pembesian pelat B.17.a Kg 2,592,826.00 2,737,581.00 3,684,744.00 2,737,581.00 2,737,581.00 3,684,744.00 2,892,166.00
B.17.b Untuk pembesian kolom, balok, ring balk dan sloof B.17.b Kg 2,998,753.00 3,159,592.00 4,120,159.00 3,159,592.00 3,159,592.00 4,120,159.00 3,345,451.00
B.18 Pembesian 100 kg jaring kawat (Wiremesh) untuk pelat atau dinding B.18 Kg 141,002.00 146,133.00 158,439.00 146,133.00 146,133.00 158,439.00 154,775.00
B.20 Mengangkut/menaikkan 100 kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal setiap 25 m ke tapak pemasangan B.20
B.20.a Manual (kenaikan 4 m) B.20.a Kg 70,590.00 73,526.00 76,079.00 73,526.00 73,526.00 76,079.00 79,398.00
B.20.b Mekanis (penambahan jarak horizontal 10 m s.d 25 m) B.20.b Kg 73,905.00 76,058.00 79,326.00 76,179.00 76,058.00 79,326.00 80,198.00
B.20.c Mekanis (setiap penambahan jarak horizontal 25 m) B.20.c Kg 102,371.00 105,673.00 109,962.00 105,794.00 105,673.00 109,962.00 112,110.00
B.20.d Mekanis (setiap kenaikan 4 m) B.20.d Kg 86,402.00 89,971.00 92,524.00 90,129.00 90,920.00 94,263.00 97,108.00
A.3.4 Koefisien untuk analisa harga satuan pekerjaan pembuatan/penyediaan bekisting beton
B.21 Bekisting lantai
B.21.a 1 m² bekisting lantai beton expose dengan multiflex 18 mm (TP) B.21.a M2 208,426.00 216,747.00 231,671.00 217,701.00 217,104.00 232,315.00 232,721.00
B.21.b 1 m² bekisting lantai beton biasa dengan multiflex 12 mm atau 18 mm (TP) B.21.b M2 143,312.00 149,074.00 161,223.00 149,975.00 149,355.00 161,728.00 160,244.00
B.21.c 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) B.21.c M2 162,243.00 168,666.00 179,133.00 169,374.00 169,623.00 180,876.00 181,104.00
B.21.d 1 m2 perancah bekisting lantai menggunakan kaso 5/7 cm, tinggi 4 m**, JAT < 60 cm B.21.d M2 174,625.00 180,816.00 183,688.00 181,518.00 184,964.00 191,283.00 193,038.00
B.21.e 1 m2 perancah bekisting lantai menggunakan dolken ø 8-10 cm, tinggi 4 m, JAT < 80 cm B.21.e M2 165,236.00 171,239.00 181,965.00 173,184.00 171,622.00 182,654.00 184,935.00
B.22 Floordeck
B.23 Bekisting balok
B.23.a 1m2 Bekisting balok beton expose menggunakan multiflex 18 mm, JAT < 1,0m B.23.a M2 258,274.00 268,598.00 287,193.00 269,831.00 269,007.00 287,928.00 288,509.00
B.23.b 1 m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT < 1,0m B.23.b M2 177,548.00 184,696.00 199,717.00 185,835.00 185,015.00 200,291.00 198,617.00
B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP) B.23.c M2 200,487.00 208,237.00 219,279.00 209,106.00 210,152.00 222,777.00 223,293.00
B.23.d 1 m2 perancah bekisting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT < 1,0 m B.23.d M2 151,903.00 157,627.00 161,073.00 158,039.00 160,039.00 165,486.00 168,875.00
B.23.e 1 m2 Perancah bekisting balok menggunakan dolken ø 8-10 cm, tinggi 4 m**, JAT < 1,2 m B.23.e M2 152,331.00 158,178.00 166,159.00 159,288.00 158,536.00 166,802.00 170,692.00
B.24 Bekisting kolom
B.24.a 1 m2 Bekisting kolom beton expose menggunakan multiflex 18 mm (TP) B.24.a M2 221,000.00 229,844.00 245,119.00 230,829.00 230,163.00 245,694.00 246,886.00
B.24.b 1 m2 Bekisting kolom beton biasa menggunakan multiflex 12mm atau 18 mm, (TP) B.24.b M2 153,205.00 159,371.00 172,125.00 160,318.00 159,690.00 172,700.00 171,338.00
B.24.c 1 m2 Bekisting kolom beton biasa menggunakan kayu papan 3/20 cm (TP) B.24.c M2 186,292.00 193,558.00 204,408.00 194,362.00 195,090.00 207,204.00 207,655.00
B.24.d 1 m2 Perancah bekisting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m, JAT < 1,0m B.24.d M2 146,389.00 151,883.00 155,138.00 152,295.00 154,295.00 159,551.00 162,684.00
B.24.e 1 m2 Perancah bekisting kolom beton dengan kayu dolken ø 8 -10 cm, tinggi 4 m, JAT < 1,2 m B.24.e M2 143,095.00 148,599.00 156,057.00 149,616.00 148,906.00 156,608.00 160,351.00
B.25 Bekisting Dinding
B.25.a 1 m2 Bekisting dinding beton expose dengan multiflex 18 mm B.25.a M2 233,356.00 242,698.00 258,357.00 243,696.00 243,081.00 259,046.00 260,704.00
B.25.b 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP) B.25.b M2 154,750.00 160,987.00 173,518.00 161,893.00 161,293.00 174,069.00 173,083.00
B.25.c 1 m2 Bekisting dinding beton biasa menggunakan kayu papan 3/20 cm B.25.c M2 187,466.00 194,834.00 205,876.00 195,607.00 196,175.00 208,320.00 209,123.00
B.25.d 1 m2 Perancah/penyokong bekisting dinding beton menggunakan kayu 5/7, tinggi maksimum 2,5 m B.25.d M2 147,563.00 153,159.00 156,606.00 153,539.00 155,380.00 160,667.00 164,152.00
B.25.e 1 m2 Perancah/penyokong bekisting dinding beton menggunakan kayu 8/12, tinggi maksimum 4,5 m B.25.e M2 116,084.00 120,889.00 124,821.00 120,976.00 121,196.00 125,372.00 130,300.00
B.26 Bekisting fondasi dan sloof
B.26.a 1 m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm atau 18 mm (TP) B.26.a M2 158,988.00 165,375.00 179,183.00 166,437.00 165,694.00 179,758.00 177,799.00
B.26.b 1 m2 Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm B.26.b M2 136,649.00 142,186.00 151,276.00 142,679.00 142,569.00 151,966.00 152,853.00
B.26.c 1 m2 Perancah/penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7, tinggi maksimum 2,0 m B.26.c M2 60,876.00 63,383.00 65,369.00 63,465.00 63,702.00 65,943.00 68,319.00
B.27 Bongkar Bekisting
B.27.a Bongkar 1m2 Bekisting secara biasa (membersihkan dan membereskan puing-puing) B.27.a M2 6,944.00 7,250.00 7,505.00 7,250.00 7,250.00 7,505.00 7,863.00
B.27.b Bongkar 1 m² bekisting secara hati-hati (dan membereskan puing) *) B.27.b M2 10,416.00 10,875.00 11,258.00 10,875.00 10,875.00 11,258.00 11,794.00
A.3.5 Koefisien untuk AHSP pelaksanaan curing
B.28 Pelaksanaan Curring Beton
B.28.a Menggenangi 100 m² permukaan beton dengan air B.28.a M2 131,127.00 136,755.00 141,907.00 136,761.00 136,755.00 141,907.00 148,023.00
B.28.b Menyirami 100 m² permukaan beton menggunakan media terpal selama 4 hari B.28.b M2 5,338,833.00 5,604,856.00 6,130,774.00 5,604,856.00 5,604,856.00 6,130,774.00 6,006,698.00
B.28.c Menyirami 100 m² permukaan beton menggunakan media karung goni selama 4 hari B.28.c M2 328,440.00 342,527.00 355,476.00 342,550.00 342,527.00 355,476.00 370,748.00
B.28.d Curing dengan steam (uap) B.28.d - - - - - - -
A.3.6 Pembongkaran konstruksi beton
B.29 Pembongkaran konstruksi beton
B.29.a Bongkar 1 m3 beton secara konvensional B.29.a M3 772,080.00 800,006.00 822,983.00 800,563.00 800,193.00 823,540.00 855,880.00
B.29.b Bongkar 1 m3 beton dengan jack hammer B.29.b M3 326,458.00 336,925.00 349,052.00 337,564.00 336,925.00 349,052.00 358,498.00
B.30 Pemasangan waterstop
B.30.a 1 m’ pasangan water stop PVC lebar 150 mm B.30.a M' 244,730.00 254,802.00 280,842.00 257,482.00 254,802.00 280,842.00 273,566.00
B.30.b 1 m’ pasangan water stop PVC lebar 200 mm B.30.b M' 321,205.00 334,072.00 368,251.00 336,753.00 334,072.00 368,251.00 359,762.00
B.30.c 1 m’ pasangan water stop PVC lebar 230 mm - 320 mm B.30.c M' 397,680.00 413,343.00 455,659.00 417,364.00 413,343.00 455,659.00 445,958.00
B.30.d 1 m’ pasangan water stop rubber lebar 150 mm - 200 mm B.30.d M' 328,239.00 341,106.00 376,624.00 345,127.00 341,106.00 376,624.00 368,136.00
A.4 Pekerjaan pemancangan manual (Normatif)
A.4.1 AHSP pemancangan secara manual (tanpa mesin) menggunakan tripod dan Hammer
F.01 Per-m' penetrasi tiang pancang kayu gelondongan ø 15 - 20 cm F.01 M' 145,909.00 151,991.00 155,342.00 152,526.00 155,225.00 161,267.00 164,154.00
F.02 Per-m' penetrasi tiang pancang kayu atau dolken ø 8-10 cm F.02 M' 35,718.00 37,177.00 37,815.00 37,355.00 38,255.00 39,790.00 40,095.00
F.03 Per-m’ penetrasi tiang pancang baja pipa ø 30 cm atau kotak 30 x 30 cm F.03 M' 84,360.00 87,659.00 89,751.00 87,984.00 89,453.00 93,040.00 94,347.00
F.04 Tiang pancang beton bertulang F.04
F.04.a Per-m’ penetrasi tiang pancang beton kotak 20 cm x 20 cm F.04.a M' 96,149.00 100,096.00 103,329.00 100,167.00 100,510.00 104,088.00 108,046.00
F.04.b Per-m' penetrasi tiang pancang beton kotak 25 x 25 cm F.04.b M' 108,416.00 112,886.00 116,566.00 112,958.00 113,300.00 117,325.00 121,883.00
F.04.c Per-m' penetrasi tiang pancang beton kotak 30 x 30 cm F.04.c M' 120,683.00 125,677.00 129,803.00 125,748.00 126,091.00 130,562.00 135,720.00
F.04.d Per-m' penetrasi tiang pancang beton ø 40 atau kotak 40 x 40 cm F.04.d M' 163,206.00 169,743.00 174,947.00 169,939.00 170,881.00 177,034.00 182,969.00
F.04.e Per-m' penetrasi tiang pancang (hollow) beton ø 40 cm F.04.e M' 148,369.00 154,312.00 159,042.00 154,490.00 155,347.00 160,940.00 166,335.00
F.05 Turap Kayu
F.05.a Per m' penetrasi untuk 1 m’ lebar turap (10-12,5 buah) dolken ø8-10 F.05.a M' 194,444.00 202,503.00 208,886.00 202,681.00 203,581.00 210,861.00 218,620.00
F.05.b Per-m' penetrasi untuk 1 m' lebar turap kayu (10 buah) papan (2-3)/10 cm F.05.b M' 159,149.00 165,740.00 170,846.00 165,918.00 166,818.00 172,821.00 178,921.00
F.05.c Per-m' penetrasi untuk 1 m' lebar turap (5 buah) kayu papan (2-3)/20 cm F.05.c M' 259,260.00 269,900.00 276,028.00 270,792.00 275,291.00 285,903.00 291,180.00
F.05.d Per-m' penetrasi untuk 1 m' lebar turap (4 buah) kayu papan (2-3)/25 cm F.05.d M' 255,410.00 265,918.00 272,556.00 266,631.00 270,231.00 280,456.00 286,935.00
F.05.e Per-m' penetrasi untuk 1 m' lebar turap (3,33 buah) kayu papan (2-3)/30 cm F.05.e M' 257,309.00 267,916.00 275,064.00 268,508.00 271,495.00 281,622.00 289,130.00
F.05.f Per-m' penetrasi untuk 1 m' lebar turap (14 buah) kayu kaso 5/7 tebal 5 cm F.05.f M' 273,746.00 284,846.00 288,248.00 286,628.00 295,627.00 307,999.00 307,046.00
F.05.g Per-m' penetrasi untuk 1 m' lebar turap (20 buah) kayu kaso 5/7 tebal 7 cm F.05.g M' 212,138.00 220,819.00 225,242.00 221,710.00 226,210.00 235,118.00 238,180.00
F.05.h Per-m' penetrasi untuk 1 m' lebar turap (8 buah) kayu balok 8/12 tebal 8 cm F.05.h M' 320,868.00 333,927.00 339,033.00 335,710.00 344,709.00 358,785.00 360,046.00
F.05.i Per-m' penetrasi untuk 1 m' lebar (12,5 buah) turap kayu balok 8/12 tebal 12 cm F.05.i M' 259,260.00 269,900.00 276,028.00 270,792.00 275,291.00 285,903.00 291,180.00
F.06 Turap Baja
F.06.a Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm F.06.a M' 101,445.00 104,945.00 109,072.00 105,112.00 105,462.00 110,021.00 111,830.00
F.06.b Per-m' penetrasi untuk 1 m' lebar turap (7 buah) baja profil INP-8 + UNP-8 F.06.b M' 180,965.00 187,947.00 192,666.00 188,726.00 192,259.00 200,567.00 201,947.00

B.3 - 97
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

F.06.c Per-m' penetrasi untuk 1 m' lebar turap (5,56 buah) baja profil INP-10 + UNP-10 F.06.c M' 163,634.00 169,956.00 174,280.00 170,658.00 173,838.00 181,391.00 182,614.00
F.07 Turap Beton Pre-cast
F.07.a Per-m' penetrasi 1 buah turap beton pre-cast 12 x 30 cm F.07.a M' 94,309.00 98,086.00 100,451.00 98,376.00 99,811.00 103,613.00 105,707.00
F.07.b Per-m' penetrasi 1 buah turap beton pre-cast 15 x 40 cm F.07.b M' 150,895.00 156,937.00 160,722.00 157,402.00 159,697.00 165,782.00 169,132.00
F.07.c Per-m' penetrasi 1 buah turap beton pre-cast 22 x 50 cm F.07.c M' 188,619.00 196,172.00 200,902.00 196,753.00 199,622.00 207,227.00 211,415.00
A.4.2 AHSP pemancangan secara mekanis
TM.05 Pemancangan secara mekanis
TM.05.1 Tiang pancang Kayu Gelondongan ø 15 - 20 cm TM.05.1 M' 186,934.00 191,025.00 199,747.00 191,458.00 191,025.00 199,747.00 198,650.00
TM.05.2.a Tiang Pancang Beton kotak 20 x 20 cm TM.05.2.a M' 114,812.00 118,066.00 122,462.00 118,297.00 118,066.00 122,462.00 124,277.00
TM.05.2.b Per-m' penetrasi tiang pancang baja ø 20 cm atau kotak 20 x 20 TM.05.2.b M' 107,934.00 110,296.00 115,332.00 110,546.00 110,296.00 115,332.00 114,700.00
TM.05.2.c Per-m' penetrasi tiang pancang Baja ø 30 cm atau kotak 30 x 30 TM.05.2.c M' 110,704.00 113,127.00 118,292.00 113,383.00 113,127.00 118,292.00 117,645.00
TM.05.3.a Per-m' penetrasi tiang pancang beton ø 20 cm /kotak 20 x 20 TM.05.3.a M' 140,321.00 143,392.00 149,939.00 143,717.00 143,392.00 149,939.00 149,115.00
TM.05.3.b Per-m' penetrasi tiang pancang beton ø 25 cm atau kotak 25 x 25 TM.05.3.b M' 153,804.00 157,170.00 164,346.00 157,526.00 157,170.00 164,346.00 163,445.00
TM.05.3.c Per-m' penetrasi tiang pancang beton ø 30 cm / kotak 30 x 30 TM.05.3.c M' 158,773.00 162,248.00 169,656.00 162,616.00 162,248.00 169,656.00 168,725.00
TM.05.3.d Per-m' penetrasi pancang beton ø 40 cm atau kotak 40 x 40 TM.05.3.d M' 215,589.00 221,245.00 230,804.00 221,634.00 221,245.00 230,804.00 232,057.00
TM.05.3.e Per-m' penetrasi tiang pancang beton hollow ø 40 cm TM.05.3.e M' 201,725.00 207,370.00 216,165.00 207,699.00 207,370.00 216,165.00 218,238.00
A.5 Pekerjaan Dewatering (Normatif)
A.5.1 AHSP Pekerjaan Dewatering (Normatif)
D.01 Kistdam pasir/tanah
D.01.a 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm D.01.a bh 17,540.00 18,622.00 19,311.00 18,524.00 18,622.00 19,311.00 19,536.00
D.01.b 1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni atau terpal ukuran 45 x 120 cm D.01.b bh 38,423.00 40,466.00 42,112.00 40,401.00 40,466.00 42,112.00 42,916.00
D.01.c 1 Buah geobag pasir/tanah ukuran 145 x 240 cm D.01.c bh 1,483,578.00 1,541,391.00 1,683,402.00 1,552,011.00 1,541,391.00 1,683,402.00 1,647,443.00
D.02 Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65 cm D.02 M2 170,897.00 177,650.00 193,709.00 179,127.00 178,065.00 194,455.00 191,198.00
D.03 Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi berlubang untuk 1 m3 kistdam pasir/tanah dengan karung ukuran 43 cm x 65 cm. D.03 M2 1,323,272.00 1,354,141.00 1,564,038.00 1,354,141.00 1,354,141.00 1,564,038.00 1,386,032.00
D.04 Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3 m dan discharge head maks. 20 m (kapasitas 0,5 m3/s pada suction head 1 m dan discharge head 10 m). Jam 133,858.00 136,738.00 143,791.00 137,664.00 136,932.00 144,147.00 143,392.00
D.05 Pengoperasian per-jam pompa air diesel daya 10 kW dengan suction head maksimal 3 m dan discharge head maksimal 20 m (kapasitas 1,0 m3/s pada suction head 1 m dan discharge head 10 m) Jam 230,417.00 235,907.00 247,830.00 237,809.00 237,977.00 251,625.00 248,413.00
D.06 Pengoperasian per-jam pompa air diesel daya 20 kW dengan suction head maksimal 3 m dan discharge head maksimal 20 m (kapasitas 2,0 m3/s pada suction head 1 m dan discharge head 10 m). Jam 710,700.00 718,743.00 739,601.00 721,922.00 720,813.00 743,396.00 737,632.00
A.6 Pekerjaan pintu air (Normatif)
A.6.1 Biaya pemasangan (jika harga pintu air belum termasuk harga pemasangan)
H.01 Pintu angkat
H.01.a Pintu angkat Lebar B=200 mm; H=250 mm; H1=500 mm dan TR=1050 mm. H.01.a bh 23,253,468.00 24,183,679.00 24,208,720.00 24,413,592.00 25,563,101.00 26,737,655.00 26,040,967.00
H.02 Pintu sorong kayu
H.02.a Pintu sorong kayu Lebar B = 1500 mm; H = 1500 mm; H1 = 3000 mm dan TR = 3800 mm H.02.a bh 10,445,518.00 10,869,655.00 11,095,502.00 10,924,263.00 11,195,938.00 11,693,556.00 11,696,714.00
H.03 Pintu sorong baja
H.03.a Pintu sorong baja Lebar B = 500 mm; H = 500 mm; H1 = 1000 mm dan TR = 1900 mm bh 6,634,041.00 6,899,740.00 7,018,492.00 6,953,665.00 7,222,936.00 7,611,007.00 7,416,247.00
A.6.2 Biaya OP untuk pelumasan pintu air
H.04 AHSP pelumasan pintu air (pelaksanaan pelumasan dilakukan setiap 2 minggu sekali atau 26 kali/tahun)
H.04.a Pintu angkat H.04.a Lot 21,115.00 21,955.00 22,972.00 21,978.00 21,957.00 22,976.00 23,612.00
H.04.b Pintu sorong kayu dengan roda gigi
H.04.b.1) Stang tunggal < 1 m H.04.b.1) Lot 39,923.00 41,555.00 43,390.00 41,582.00 41,559.00 43,397.00 44,773.00
H.04.b.2) Stang Double < 1 m H.04.b.2) Lot 60,949.00 63,419.00 66,306.00 63,460.00 63,425.00 66,317.00 68,268.00
H.04.b.3) Stang tunggal 1 - 2 m H.04.b.3) Lot 59,246.00 61,689.00 64,397.00 61,728.00 61,694.00 64,406.00 66,509.00
H.04.b.4) Stang Double 1 - 2 m H.04.b.4) Lot 98,139.00 102,196.00 106,631.00 102,257.00 102,205.00 106,646.00 110,207.00
H.04.b.5) Stang tunggal > 2 m H.04.b.5) Lot 96,057.00 100,076.00 104,295.00 100,128.00 100,083.00 104,308.00 108,031.00
H.04.b.6) Stang Double > 2 m H.04.b.6) Lot 152,980.00 159,398.00 166,091.00 159,477.00 159,409.00 166,110.00 172,104.00
H.04.c Pintu sorong baja dengan roda gigi
H.04.c.1) Stang tunggal < 1 m H.04.c.1) Lot 60,298.00 62,760.00 65,576.00 62,804.00 62,766.00 65,587.00 67,609.00
H.04.c.2) Stang Double < 1 m H.04.c.2) Lot 99,957.00 104,046.00 108,679.00 104,112.00 104,055.00 108,695.00 112,098.00
H.04.c.3) Stang tunggal 1 - 2 m H.04.c.3) Lot 98,382.00 102,443.00 106,897.00 102,508.00 102,452.00 106,911.00 110,467.00
H.04.c.4) Stang Double 1 - 2 m H.04.c.4) Lot 156,598.00 163,084.00 170,137.00 163,183.00 163,098.00 170,161.00 175,901.00
H.04.c.5) Stang tunggal > 2 m H.04.c.5) Lot 154,274.00 160,716.00 167,536.00 160,804.00 160,729.00 167,557.00 173,464.00
H.04.c.6) Stang Double > 2 m H.04.c.6) Lot 249,825.00 260,275.00 271,277.00 260,409.00 260,294.00 271,310.00 280,950.00
A.7 Pekerjaan air tanah (Informatif)
A.7.1 AHSP Pekerjaan Air Tanah (Informatif)
AT.02 1 m' pengeboran ø 8 3/4" AT.02 M' 67,902.00 70,760.00 73,223.00 70,760.00 70,760.00 73,223.00 76,476.00
AT.03 1 m' reaming ø 8 3/4" - 12" AT.03 M' 62,485.00 65,116.00 67,382.00 65,116.00 65,116.00 67,382.00 70,378.00
AT.04 1 m' reaming ø 8 3/4" - 14 3/4" AT.04 M' 63,345.00 66,011.00 68,309.00 66,011.00 66,011.00 68,309.00 71,344.00
AT.05 Bongkar pasang temporary cassing (ID) 12" AT.05 M' 71,301.00 74,303.00 76,888.00 74,303.00 74,303.00 76,888.00 80,308.00
AT.06 Bongkar pasang temporary cassing (ID) 17" AT.06 M' 72,119.00 75,155.00 77,772.00 75,155.00 75,155.00 77,772.00 81,226.00
AT.15 1 lokasi pasang dan bongkar peralatan uji pemompaan AT.15 Lokasi 1,573,924.00 1,641,579.00 1,699,021.00 1,641,579.00 1,641,579.00 1,699,021.00 1,776,888.00
AT.16 Sampling 1 sampel analisa kualitas air AT.16 Sampel 95,737.00 95,737.00 95,737.00 95,737.00 95,737.00 95,737.00 95,737.00
A.8 Pekerjaan lain-lain (Normatif/Informatif)
A.8.1 AHSP Pekerjaan lain-lain (Normatif/Informatif)
LA.01 Pemagaran daerah kerja
LA.01.b Rangka kayu LA.01.b M2 331,660.00 343,786.00 360,560.00 344,903.00 350,488.00 372,846.00 365,972.00
LA.02 Pembuatan direksi keet, los kerja dan gudang LA.02 M2 1,795,652.00 1,868,093.00 2,043,165.00 1,883,603.00 1,869,051.00 2,044,889.00 2,012,689.00
LA.03 Pembuatan papan nama pekerjaan LA.03
LA.03.a 1 Buah papan nama pekerjaan menggunakan multiflex 18 mm, frame besi siku dan tiang kayu 8/12 LA.03.a bh 1,323,028.00 1,370,983.00 1,467,957.00 1,376,310.00 1,372,579.00 1,470,829.00 1,462,586.00
LA.04 Mobilisasi
LA.05 Foto dokumentasi
LA.06 Test bahan dan pengujian mutu pekerjaan - - - - - - -
LA.07 Penggambaran
LA.08 Copy atau penggandaan buku/kontrak/laporan
LA.09 1 m2 Pengangkatan gulma dan/atau sampah apung
LA.09.a Secara manual LA.09.a M2 5,208.00 5,437.00 5,629.00 5,437.00 5,437.00 5,629.00 5,897.00
LA.10 1 m3 Pengangkatan gulma padat, ketebalan 25 cm
LA.10.a Secara manual LA.10.a M3 86,802.00 90,631.00 93,822.00 90,631.00 90,631.00 93,822.00 98,290.00
LA.10.b Secara mekanis LA.10.b M3 432,547.00 433,664.00 435,968.00 433,779.00 433,664.00 435,968.00 435,748.00
LA.11 Pekerjaan Kayu
LA.11.a Secara Manual
LA.11.a.1) 1 m2 Pekerjaan serutan papan atau balok kayu (Manual) LA.11.a.1) M2 41,996.00 43,643.00 45,226.00 43,681.00 43,643.00 45,226.00 46,707.00
LA.11.a.2) 1 m2 Membuat pasangan/konstruksi kayu dari bahan baku papan kayu LA.11.a.2) M2 466,611.00 484,540.00 500,726.00 484,910.00 484,808.00 501,204.00 518,482.00

B.3 - 98
NO URAIAN KODE ANALISA SATUAN KABUPATEN BULUNGAN
Zona 1 Zona 2 Zona 3 Zona 4 Zona 5 Zona 6 Zona 7
Tanjung Selor dan Tj Palas Tengah dan Sekatak Tj Palas Timur Tj Palas Barat dan Peso Bunyu
Tanjung Palas Tj Palas Utara Peso Hilir

LA.11.a.3) 1 m' Pembuatan Profil pada sudut kayu dengan alat serutan profil, takikan/sambungan dengan pahat dan lain-lain. LA.11.a.3) M' 7,620.00 7,925.00 8,211.00 7,929.00 7,925.00 8,211.00 8,506.00
LA.11.b Secara Semi Mekanis
LA.12 Pekerjaan logam besi atau baja
LA.12.d Pengerjaan 10 cm pengelasan dengan las listrik LA.12.d Cm 55,021.00 56,786.00 60,794.00 56,890.00 56,786.00 60,794.00 60,109.00

B.3 - 99
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
biaya pembangunan bangunan gedung negara
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
standar harga satuan tertinggi (shst) pembangunan bangunan gedung negara
STANDAR HARGA SATUAN TERTINGGI (SHST)
PEMBANGUNAN BANGUNAN GEDUNG NEGARA
KABUPATEN BULUNGAN
TAHUN 2023

GEDUNG NEGARA
HARGA
NO. BANGUNAN KLAS
(Dalam Rupiah)

1. Gedung Negara Sederhana 9,020,000.00

2. Gedung Negara Tidak Sederhana 10,880,000.00

RUMAH NEGARA
HARGA
NO. BANGUNAN TIPE
(Dalam Rupiah)

1. Rumah Negara TIPE A 10,270,000.00

2. Rumah Negara TIPE B 10,080,000.00

3. Rumah Negara TIPE C, D, E 7,730,000.00

PAGAR GEDUNG NEGARA


HARGA
NO. BANGUNAN URAIAN UKURAN
(Dalam Rupiah)

1. Pagar Gedung Negara Depan BT; T. 1,50 M 4,990,000.00

2. Pagar Gedung Negara Belakang T. 3 M 4,060,000.00

3. Pagar Gedung Negara Samping T. 2 M 3,870,000.00

PAGAR RUMAH NEGARA


HARGA
NO. BANGUNAN URAIAN UKURAN
(Dalam Rupiah)

1. Pagar Rumah Negara Depan BT; T. 1,50 M 4,620,000.00

2. Pagar Rumah Negara Belakang T. 3 M 2,640,000.00

3. Pagar Rumah Negara Samping T. 2 M 2,490,000.00

D-1
STANDAR HARGA SATUAN TERTINGGI (SHST)
PEMBANGUNAN BANGUNAN GEDUNG NEGARA
KABUPATEN BULUNGAN
TAHUN 2023

PERHITUNGAN STANDAR HARGA SATUAN TERTINGGI (SHST) BANGUNAN NEGARA PER M 2


KLAS KLAS TIPE C, D, E TIPE B TIPE A
NO. BANGUNAN
SEDERHANA TIDAK SEDERHANA (Luas 70 M2) (Luas 120 M2) (Luas 250 M2)

1. Gedung Negara 9,020,000.00 10,880,000.00

2. Rumah Negara 7,730,000.00 10,080,000.00 10,270,000.00

PERHITUNGAN STANDAR HARGA SATUAN TERTINGGI (SHST)PAGAR BANGUNAN PER M 2

NO. BANGUNAN GEDUNG NEGARA RUMAH NEGARA

1. Pagar Depan 4,990,000.00 4,620,000.00

2. Pagar Belakang 4,060,000.00 2,640,000.00

3. Pagar Samping 3,870,000.00 2,490,000.00

Keterangan : (Berdasar Permen PU 22/PRT/M/2018


1. - Untuk Luasan Bangunan Rumah Negara Tipe A = 250 m²
- Untuk Luasan Bangunan Rumah Negara Tipe B = 120 m²
- Untuk Luasan Bangunan Rumah Negara Tipe C = 70 m²
2 - Untuk Pagar Rumah Negara Menggunakan Material Utama Pagar BRC
- Untuk Pagar Gedung Menggunakan Material Utama Batu Bata

D-2
harga satuan pokok kegiatan
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN BULUNGAN PROVINSI KALIMANTAN UTARA 2023
remunerasi tenaga ahli untuk layanan jasa konsultansi konstruksi
Remunerasi / Biaya Personil (Billing Rate)
UNTUK TENAGA AHLI NASIONAL BERPENDIDIKAN S1/S2/S3 Dengan SKK/SKA
Dalam rangka undangan Pelelangan Nasional (NCB)
Beerdasarkan Pengalaman Profesi yang setara (comparable experinces)
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BULUNGAN
(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

KUALIFIKASI TENAGA AHLI REMUNERASI / BIAYA PERSONIL (RUPIAH PER BULAN)


DENGAN SKK / SKA DAN TAHUN
S1 / Setara S2 / Setara S3 / Setara
1 21,467,100 29,731,200 37,653,000
Ahli Muda
2 22,983,000 31,589,400 39,560,100
1 3 24,498,900 33,447,600 41,516,100
Ahli Madya 2 4 26,014,800 35,305,800 43,472,100
3 5 27,530,700 37,164,000 45,428,100
1 4 6 28,997,700 39,022,200 47,384,100
2 5 7 30,513,600 40,880,400 49,340,100
3 6 8 32,029,500 42,689,700 51,296,100
4 7 9 33,545,400 44,547,900 53,252,100
5 8 10 35,061,300 46,406,100 55,208,100
6 9 11 36,528,300 48,264,300 57,164,100
7 10 12 38,044,200 50,122,500 59,120,100
8 11 13 39,560,100 51,980,700 61,076,100
9 12 14 41,076,000 53,838,900 62,983,200
10 13 15 42,591,900 55,697,100 64,939,200
Ahli Utama
11 14 16 44,058,900 57,555,300 66,895,200
12 15 17 45,574,800 59,413,500 68,851,200
13 16 18 47,090,700 61,271,700 70,807,200
14 17 19 48,606,600 63,129,900 72,763,200
15 18 20 50,122,500 64,988,100 74,719,200
16 19 21 51,589,500 66,797,400 76,675,200
17 20 22 53,105,400 68,655,600 78,631,200
18 21 23 54,621,300 70,513,800 80,587,200
19 22 24 56,137,200 72,372,000 82,543,200
20 23 25 57,653,100 74,230,200 84,499,200

- Bagi Tenaga Ahli yang tidak disyaratkan memiliki SKA Perhitungan pengalamannya
berdasarkan akumulasi pengalaman profesi yang setara (compare experiences) dihitung
sejak tamat pendidikan S1 bukan dihitung sejak kepemilikan SKK/SKA

E.1 - 105
Remunerasi / Biaya Personil (Billing Rate)
UNTUK TENAGA AHLI NASIONAL BERPENDIDIKAN S1/S2/S3 Tanpa SKK/SKA
Dalam rangka undangan Pelelangan Nasional (NCB)
Beerdasarkan Pengalaman Profesi yang setara (comparable experinces)
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BULUNGAN
(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

TENAGA AHLI TANPA SKK / SKA REMUNERASI / BIAYA PERSONIL (RUPIAH PER BULAN)
DAN TAHUN PENGALAMAN
S1 / Setara S2 / Setara S3 / Setara
1 **) 26,014,800 33,741,000
2 **) 27,873,000 35,697,000
3 21,467,100 29,731,200 37,653,000
4 22,983,000 31,589,400 39,560,100
5 24,498,900 33,447,600 41,516,100
6 26,014,800 35,305,800 43,472,100
7 27,530,700 37,164,000 45,428,100
8 28,997,700 39,022,200 47,384,100
9 30,513,600 40,880,400 49,340,100
10 32,029,500 42,689,700 51,296,100
11 33,545,400 44,547,900 53,252,100
12 35,061,300 46,406,100 55,208,100
13 36,528,300 48,264,300 57,164,100
14 38,044,200 50,122,500 59,120,100
15 39,560,100 51,980,700 61,076,100
16 41,076,000 53,838,900 62,983,200
17 42,591,900 55,697,100 64,939,200
18 44,058,900 57,555,300 66,895,200
19 45,574,800 59,413,500 68,851,200
20 47,090,700 61,271,700 70,807,200
21 48,606,600 63,129,900 72,763,200
22 50,122,500 64,988,100 74,719,200
23 51,589,500 66,797,400 76,675,200
24 53,105,400 68,655,600 78,631,200
25 54,621,300 70,513,800 80,587,200

**) S1 dengan pengalaman kurang dari 3 tahun dianggap Sub Professional


Catatan:

1. NCB (National Competitive Bidding) adalah pelelangan yang diselenggarakan di wilayah


Republik Indonesia dan terbatas hanya bisa diikuti oleh Badan Usaha Jasa Konsultansi yang
terdaftar di Republik Indonesia.

E.1 - 106
Remunerasi / Biaya Personil (Billing Rate)
Untuk Tenaga Sub Profesional
(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

No PERSONIL REMUNERASI /
BIAYA PERSONIL
(RUPIAH PER
BULAN)

1 ASISTEN AHLI (Sub Professional Staff) 13,643,100


2 OPERATOR CAD / CAM 11,393,700
3 OPERATOR SIG 11,393,700
4 PEMROGRAM PERANGKAT LUNAK 13,643,100
5 PEMROGRAM BASIS DATA 13,643,100
6 OPERATOR BASIS DATA 13,203,000
7 PEMELIHARA SISTEM 13,203,000
8 TEKNISI JARINGAN TEKNOLOGI INFORMASI 13,203,000
9 ADMINISTRATOR WEB 13,203,000
10 DESAIN GRAFIS 13,643,100
11 TEKNISI PERANGKAT KERAS 11,393,700
12 FASILITATOR 11,393,700
13 TEKNISI KHUSUS / INSPEKTUR KHUSUS 13,203,000
14 TEKNISI 11,393,700
15 INSPEKTUR 11,393,700
16 SURVEYOR 10,758,000

catatan
1. Personil dalam kategori sub profesional staff ini adalah Tenaga ahli berpendidikan S1
dengan pengalaman kerja kurang dari 3 tahun
2.
Semua personil yang terlibat dalam pelaksanaan substansi teknis pekerjaan Jasa
Konsultansi yang berpendidikan dibawah S1 dengan pengalaman kerja berapapun
dikategorikan sebagai Tenaga Sub Profesional
3 Fasiltator dalam tabel ini adalah fasilitator yang berpendidikan dibawah S1
Fasiltator dengan pendidikan minimal S1 dengan pengalaman 3 tahun keatas
dikateorikan sebagai tenaga ahli
4
Teknisi Khusus / Inspektur Khusus adalah personil yang memiliki sertifikat ketrampilan
(SKT) untuk bidang ketrampilan tertentu seperti : inspector pre-post tension grouting
inspector inspektur pengeboran pondasi dalam dan sejenisnya
5
Teknisi / inspektur adalah personil yang memiliki sertifikat ketrampilan (SKT) untuk
bidang ketrampilan tertentu seperti : inspektur pengawasan gedung inspektur
pengawasan jalan dan jembatan

E.1 - 107
Remunerasi / Biaya Personil (Billing Rate) Tenaga Pendukung (Supporting
Staffs)
(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

No PERSONIL REMUNERASI /
BIAYA PERSONIL
(RUPIAH PER
BULAN)
1 MANAJER KANTOR 11,393,700
2 MANAJER KANTOR LAPANGAN / ADMINSTRA 10,366,800
3 SEKRETARIS DWIBAHASA 11,295,900
4 SEKRETARIS 7,237,200
5 OPERATOR KOMPUTER 6,503,700
6 PENGEMUDI 5,085,600
7 KURIR 4,547,700
8 SATPAM 4,547,700
9 PESURUH KANTOR 4,352,100

E.1 - 108
BIAYA LANGSUNG DENGAN CARA PEMBAYARAN REIMBURSABLE AT COST

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BULUNGAN


(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

NO. JENIS PENGELUARAN SATUAN HARGA KETERANGAN

1 sewa Kendaraan dan O&M


Roda 4 Bulan 10,176,400 Tidak termasuk O&M,
Driver, 1500 CC
Minibus
Roda 4 hari 815,100 Termasuk O&M
Roda 2 Bulan 1,778,400 Tidak termasuk O&M
Roda 2 hari 296,400 Termasuk O&M
O&M Roda -4 Bulan 4,594,200
O&M Roda -2 Bulan 839,800

2 Sewa Kantor Proyek


Kabupaten / Kota per m2 per bulan 153,140
Kantor Lapangan per m2 per bulan 153,140

3 Biaya Komunikasi
Kantor Lapangan Bulan 3,211,000

4 Sewa Peralatan Penunjang Disesuaikan dengan


type dan merk alat
serta spesifikasi, untuk
alat berdimensi besar
diperhitungkan biaya
mobilisasi demolisasi
alat

A. Peralatan Pemetaan
• Meter Laser Unit-Bulan 247,000
• Total Station Unit-Bulan 14,820,000 ►Untuk tingkat
ketelitian tinggi
• Total Station Unit-Bulan 8,892,000 ►Untuk tingkat
ketelitian rata-rata
• Theodolite Digital Unit-Bulan 1,729,000
• Waterpass Digital Unit-Bulan 4,940,000 ►Untuk tingkat
ketelitian tinggi
• Waterpass Digital Unit-Bulan 2,964,000 ►Untuk tingkat
ketelitian rata-rata
• Hand GPS (Static) Unit-Bulan 988,000 ►Untuk tingkat
ketelitian tinggi
• GPS RTK Unit-Bulan 1,482,000 ►Termasuk Operator

• GPS Static Unit-Bulan 741,000 ►Termasuk operator


• Echo Sounder Unit-Bulan 1,976,000
• Drone Unit-Hari 1,729,000 ► Spesifikasi paling
sederhana, termasuk
operator

• dll.

E.2 - 109
NO. JENIS PENGELUARAN SATUAN HARGA KETERANGAN

B. Peralatan Soil Meckabinc


• DCP Unit-Hari 148,200
• Benkleman Beam Unit-Hari 247,000
• Sondir Unit-Hari 247,000
• CBR Lapangan Unit-Hari 494,000

C. Non Destructive Test


• Hammer Test Mekanik Unit-hari 148,200
• Hammer Test Digital Unit-hari 988,000
• Concrete Crack Detector (Ultrasonic)Unit-hari 1,235,000

***) Bila Lokasi Tujuan dan Sarana Transportasi ke Lokasi Tujuan sudah diketahui, maka Harga Satuan
bisa diisi dengan mengikuti aturan yang ada pada Perpres No. 16 Tahun 2018 Tentang Pengadaan
Barang / Jasa Pemerintah, yaitu pada Pasal 26 ayat (8) huruf a dan b disebutkan bahwa HPS ditetapkan
paling lama 28 (dua puluh delapan) hari kerja sebelum batas akhir untuk:

a. pemasukan penawaran untuk pemilihan dengan pascakualifikasi; atau b. pemasukan dokumen


kualifikasi untuk pemilihan dengan prakualifikasi.

Catatan:
Sewa peralatan survey terkait lainnya dapat dilihat pada standar sewa peralatan oleh agen resmi alat
atau yang diterbitkan oleh instansi terkait.

E.2 - 110
BIAYA LANGSUNG DENGAN CARA PEMBAYARAN FIXED RATE

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BULUNGAN


(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

NO. JENIS PENGELUARAN SATUAN HARGA KETERANGAN

1 Biaya Operasional Kantor Proyek


Kantor Lapangan per m2 per bulan 49,400

2 Biaya ATK
Kantor Utama Proyek Bulan 7,904,000
Kantor Lapangan Bulan 3,458,000

3 Biaya Komputer dan printer


Kantor Utama Proyek Unit-Bulan 4,940,000
Kantor sub proyek Unit-Bulan 3,458,000
Kantor Lapangan Unit-Bulan 2,470,000

4 Biaya Pelaporan ● Untuk biaya


• Laporan Pendahuluan Buku 148,200 Pelaporan Standar
• Laporan Antara Buku 197,600
• Konsep Lap. Akhir Buku 247,000 ● Untuk biaya
• Laporan Akhir Buku 395,200 Pelaporan yang tidak
Standar (ditentukan
• Ringkasan Eksekutif Buku 98,800 jenis kertas, cetakan,
• Laporan Bulanan Buku 98,800 cover dan penjilidan),
• Laporan Triwulan Buku 247,000 maka dihitung sesuai
pengeluaran
• Laporan Teknis / Khusus Buku 741,000
• Dokumen Tender Buku 2,568,800
• Manual O&M Buku 395,200
• Peta / Gambar A3 Lembar 4,940► Untuk biaya
pencetakan Peta /
• Peta / Gambar A2 Lembar 7,904 Gambar dengan
ukuran A1 atau lebih
besar, maka dihitung
sesuai pengeluaran

• SSD (1 TB) Buah 1,235,000


• dll.

E.2 - 111
BIAYA LANGSUNG DENGAN CARA PEMBAYARAN LUMP SUM
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN BULUNGAN
(berdasarkan Pedoman Standar Minimal Inkindo tahun 2021)

NO. JENIS PENGELUARAN SATUAN HARGA KETERANGAN

Biaya Lumsum (Lump Sum), antara


lain:
• Pengumpulan Data Sekunder LS ***)
• Seminar, Webinar, Workshop, LS ***)
Sosialisasi, Pelatihan, Diseminasi, Loka
Karya, Diskusi, Koordinasi Antar
Instansi, Focus Group Discussion
(FGD), dll

• Survey LS ***)
• Test Laboratorium LS ***)
• Hak Cipta LS ***)
• Lisensi Perangkat Lunak LS ***)
• dll.

***) Penentuan harga ini bisa mengikuti aturan yang ada pada Perpres No. 16 Tahun 2018 Tentang
Pengadaan Barang/Jasa Pemerintah, yaitu pada Pasal 26 ayat (8) huruf a dan b disebutkan bahwa HPS
ditetapkan paling lama 28 (dua puluh delapan) hari kerja sebelum batas akhir untuk:

a. pemasukan penawaran untuk pemilihan dengan pascakualifikasi; atau b. pemasukan dokumen


kualifikasi untuk pemilihan dengan prakualifikasi.

E.2 - 112