Anda di halaman 1dari 62

PEMERINTAH PROVINSI KALIMANTAN UTARA

DINAS PEKERJAAN UMUM, PENATAAN RUANG,


PERUMAHAN DAN KAWASAN PERMUKIMAN

PENYUSUNAN HARGA SATUAN POKOK KEGIATAN (HSPK) DAN


ANALISIS STANDAR BELANJA (ASB) BIDANG KE PU AN
PROVINSI KALIMANTAN UTARA TAHUN 2023

HARGA SATUAN DASAR POKOK KEGIATAN


(HSPK) BIDANG KE PU AN 2023
DAFTAR ISI
HARGA SATUAN POKOK KEGIATAN (HSPK) BIDANG KE PU AN 2023

NO URAIAN HALAMAN NO URAIAN HALAMAN

BIDANG UMUM M PEKERJAAN KUNCI DAN KACA CK - 11


A PEKERJAAN TANAH U-1 N PEKERJAAN PENGECATAN CK - 12
B PEKERJAAN PASANGAN U-1 O PEKERJAAN SANITASI DALAM GEDUNG CK - 13
C PEKERJAAN BETON BERTULANG U-1 P PEKERJAAN PEMASANGAN PIPA LUAR GEDUNG CK - 14
D BETON PRACETAK U-2 Q PEKERJAAN PEMOTONGAN PIPA CK - 14
E PEKERJAAN BAJA U-2 R PEKERJAAN AKSESORIS PIPA CK - 15
F PEKERJAAN PEMANCANGAN U-2 S PEKERJAAN PENYAMBUNGAN PIPA CK - 15
G PEKERJAAN PENGERINGAN AIR (DEWATERING) U-2 T PEKERJAAN PENGETESAN PIPA CK - 15
H PENGGUNAAN PERALATAN KERJA U-3 U PEKERJAAN MEKANIKAL DAN ELEKTRIKAL CK - 16
I ALAT LAINNYA U-5 V PEKERJAAN LANSEKAP CK - 18
W PEKERJAAN SALURAN U-DITCH CK - 19
BIDANG BINA MARGA
A DIVISI 1. UMUM BM - 1 BIDANG SUMBER DAYA AIR
B DIVISI 2. DRAINASE BM - 1 A PEKERJAAN TANAH (MANUAL & SEMI MEKANIS) (NORMATIF) SDA - 1
C DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK BM - 3 B PEKERJAAN PASANGAN SDA - 4
D DIVISI 4. PEKERJAAN PREVENTIF BM - 3 C PEKERJAAN PENGAMAN PANTAI SDA - 7
E DIVISI 5. PERKERASAN BERBUTIR BM - 5 D PEKERJAAN BETON (NORMATIF) SDA - 8
F DIVISI 6. PERKERASAN ASPAL BM - 5 E PEKERJAAN PEMBESIAN SDA - 10
G DIVISI 7. STRUKTUR BM - 6 F PEKERJAAN BEKISTING SDA - 10
H DIVISI 8. REHABILITASI JEMBATAN BM - 9 G PEKERJAAN CURING SDA - 11
I DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN BM - 11 H PEKERJAAN PEMBONGKARAN KONTRUKSI BETON SDA - 11
J DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA BM - 12 I PEKERJAAN PEMASANGAN WATERSTOP SDA - 11
J PEKERJAAN PEMANCANGAN SDA - 11
BIDANG CIPTA KARYA K PEKERJAAN DEWATERING (Normatif) SDA - 12
A PEKERJAAN PERSIAPAN CK - 1 L PEKERJAAN PINTU AIR SDA - 13
B PEKERJAAN TANAH CK - 1 M PEKERJAAN AIR TANAH (Normatif) SDA - 14
C PEKERJAAN PONDASI CK - 2 N PEKERJAAN LAIN LAIN SDA - 14
D PEKERJAAN BETON CK - 2 O PEKERJAAN KAYU SDA - 15
E BETON PRACETAK CK - 4 P PEKERJAAN BESI SDA - 15
F PEKERJAAN BESI DAN ALUMUNIUM CK - 4 Q PEKERJAAN SALURAN U-DITCH SDA - 15
G PEKERJAAN DINDING CK - 5
H PEKERJAAN PLESTERAN CK - 6 BIDANG TATA RUANG
I PEKERJAAN PELAPIS LANTAI DAN DINDING CK - 7 A PENGADAAN PETA TR - 1
J PEKERJAAN LANGIT-LANGIT DAN LIS CK - 9 B PRODUK PENGINDERAAN JAUH TR - 1
JASA PENGUMPULAN DAN PENGOLAHAN DATA INFORMASI
K PEKERJAAN PENUTUP ATAP CK - 9 C TR - 1
GEOSPASIAL
L PEKERJAAN KAYU CK - 10 D JASA PENGUKURAN TOPOGRAFI TR - 2
harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2023
bidang umum
HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A PEKERJAAN TANAH
1 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 1 KP : 2 PP m3 1.160.453,50 1.198.273,55 1.191.365,50 1.294.014,50 1.270.823,60 1.196.785,45 1.253.017,00 1.307.796,10 1.299.723,10 2.361.410,00 1.297.242,55 1.859.423,50 2.074.439,00 1.272.632,55 1.404.059,15
2 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 3 KP : 10 PP m3 1.318.647,50 1.364.464,65 1.350.290,90 1.524.993,15 1.445.202,70 1.347.522,85 1.412.604,80 1.482.593,80 1.474.224,10 4.363.298,95 1.464.286,95 2.520.856,35 2.950.150,20 1.439.581,50 1.587.802,70
3 Pemasangan 1 m3 Pondasi Batu Belah Camp 1/4 SP : 1 KP : 4 PP m3 1.272.475,00 1.316.001,35 1.304.111,50 1.455.812,60 1.394.409,50 1.303.673,35 1.366.456,45 1.431.833,95 1.423.429,75 3.718.985,00 1.415.815,60 2.313.574,60 2.673.845,45 1.391.129,70 1.534.724,45
4 Pemasangan 1 m3 Pondasi Siklop, 60% Beton Camp 1 SP : 2 PB : 3 Kr dan 40% Batu Belah m3 4.200.317,50 4.394.313,30 4.367.463,10 5.706.493,20 4.631.109,80 4.064.219,60 4.539.314,50 4.618.848,50 4.614.294,50 14.528.996,50 4.614.471,60 7.589.859,70 8.874.667,30 4.579.628,90 4.860.493,40
5 Pemasangan batu kosong ( aanstamping ) m3 914.836,50 950.054,10 943.540,50 1.031.239,50 1.009.932,30 943.416,30 1.004.902,20 1.055.796,60 1.048.399,80 1.998.812,70 1.036.925,10 1.540.735,50 1.730.602,80 1.021.489,80 1.140.273,30
6 Pemasangan pondasi sumuran , diameter 100 cm m3 1.489.100,50 1.535.332,80 1.508.620,60 1.810.132,20 1.617.051,80 1.492.486,10 1.533.697,50 1.612.058,50 1.607.677,00 8.086.064,00 1.599.689,10 3.520.193,70 4.345.392,30 1.571.366,90 1.702.031,05
7 Pengadaan Tiang Pancang spun pile d=50 cm m 2.093.000,00 2.197.339,50 2.178.824,50 2.405.294,00 2.336.786,20 2.042.055,00 2.233.438,00 2.363.848,00 2.345.448,00 4.729.892,50 2.290.719,50 3.545.622,50 4.019.365,00 2.270.019,50 2.565.259,00
8 Pengadaan Tiang Pancang spun pile d=45 cm m 1.787.100,00 1.876.489,50 1.860.274,50 2.053.394,00 1.994.086,20 1.745.355,00 1.906.838,00 2.016.548,00 2.001.598,00 4.014.592,50 1.956.069,50 3.015.472,50 3.416.765,00 1.937.669,50 2.185.759,00
9 Pengadaan Tiang Pancang spun pile d=40 cm m 1.453.600,00 1.526.889,50 1.514.124,50 1.670.444,00 1.621.486,20 1.422.205,00 1.551.488,00 1.639.348,00 1.626.698,00 3.237.192,50 1.590.369,50 2.435.872,50 2.758.965,00 1.576.569,50 1.774.059,00
10 Pengadaan Tiang Pancang spun pile d=30 cm m 928.050,00 974.889,50 966.724,50 1.065.544,00 1.032.686,20 911.605,00 990.288,00 1.041.348,00 1.034.448,00 2.007.842,50 1.014.219,50 1.523.922,50 1.721.665,00 1.003.869,50 1.122.009,00
11 Tiang Pancang square pile 35 x 35 cm m 1.181.510,00 1.236.629,50 1.225.129,50 1.347.524,00 1.314.896,20 1.048.570,00 1.298.833,00 1.320.913,00 1.358.863,00 2.622.517,50 1.332.769,50 2.144.117,50 2.432.365,00 1.320.349,50 1.490.699,00
12 Pengadaan Tiang Pancang square pile 30 x 30 cm m 923.910,00 965.229,50 957.179,50 1.050.824,00 1.026.246,20 815.120,00 1.022.833,00 1.040.313,00 1.069.063,00 2.042.917,50 1.049.869,50 1.674.917,50 1.899.915,00 1.039.749,50 1.170.999,00
13 Pengadaan Tiang Pancang square pile 25 x 25 cm m 724.960,00 757.079,50 750.179,50 821.974,00 803.146,20 638.020,00 798.583,00 811.463,00 833.313,00 1.572.567,50 819.869,50 1.294.267,50 1.467.515,00 810.899,50 909.949,00
14 Pengadaan Tiang Pancang square pile 20 x 20 cm m 543.260,00 566.179,50 561.579,50 613.824,00 599.596,20 478.170,00 591.583,00 601.013,00 615.963,00 1.137.867,50 605.969,50 941.217,50 1.066.165,00 600.449,50 670.749,00
15 Upah Potong dan buang tiang pancang bh 244.087,50 244.087,50 244.087,50 255.731,25 255.731,25 255.731,25 243.081,25 243.081,25 243.081,25 293.537,50 255.731,25 287.787,50 305.756,25 244.231,25 252.856,25

B PEKERJAAN PASANGAN
1 Pemasangan pondasi batu belah campuran 1 Semen : 3 PP m3 1.585.850,00 1.645.006,00 1.615.209,50 1.945.759,75 1.737.983,50 1.600.202,00 1.675.958,25 1.774.570,75 1.766.624,25 8.769.974,75 1.742.163,75 3.881.025,75 4.783.235,25 1.718.008,00 1.889.904,25
2 Pemasangan pondasi batu belah campuran 1 Semen : 4 PP m3 1.507.362,50 1.562.631,50 1.537.170,50 1.824.141,50 1.651.871,50 1.525.900,50 1.598.293,00 1.688.683,00 1.680.587,00 7.540.561,50 1.660.312,50 3.496.885,50 4.267.236,00 1.636.082,00 1.800.727,50
3 Pemasangan pondasi batu belah campuran 1 Semen : 5 PP m3 1.449.471,50 1.501.859,98 1.479.447,86 1.735.845,88 1.588.275,58 1.471.002,26 1.540.710,66 1.625.171,26 1.617.019,14 6.681.066,68 1.599.737,40 3.224.759,16 3.902.969,82 1.575.478,84 1.734.559,72
4 Pemasangan batu kosong ( aanstamping ) m3 914.836,50 950.054,10 943.540,50 1.031.239,50 1.009.932,30 943.416,30 1.004.902,20 1.055.796,60 1.048.399,80 1.998.812,70 1.036.925,10 1.540.735,50 1.730.602,80 1.021.489,80 1.140.273,30
5 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 2 PP m2 223.744,00 226.276,30 224.006,20 284.238,60 238.958,50 217.649,00 223.707,20 235.409,60 235.322,20 917.992,10 229.744,70 495.808,70 567.635,40 226.711,00 247.146,50
6 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 3 PP m2 213.486,00 215.506,55 213.762,00 268.732,00 227.681,60 207.911,95 213.474,50 224.139,60 224.047,60 770.362,00 218.991,05 448.695,50 504.700,50 215.955,05 235.383,15
7 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 4 PP m2 207.402,50 209.120,60 207.699,20 259.427,35 221.000,10 202.144,70 207.428,95 217.468,45 217.369,55 679.165,85 212.629,25 419.891,45 466.119,15 209.589,80 228.437,15
8 Plesteran 1 PC : 2 PP, tebal 20 mm m2 143.779,90 145.478,22 143.986,90 163.948,60 152.397,54 147.371,58 143.319,90 146.509,54 146.440,54 543.667,10 150.871,72 265.307,30 315.831,40 145.834,72 152.002,86
9 Plesteran 1 PC : 3 PP, tebal 20 mm m2 112.959,90 114.437,42 113.173,80 129.877,55 120.160,74 115.799,48 112.903,55 115.644,69 115.573,39 448.393,05 118.861,47 215.582,45 257.292,95 114.800,82 120.535,41
10 Plesteran 1 PC : 4 PP, tebal 20 mm m2 132.020,00 133.271,20 132.240,80 147.517,40 139.679,00 135.999,00 131.757,80 134.039,40 133.965,80 410.890,40 138.611,80 221.112,80 257.926,60 133.745,00 139.035,00
11 Plesteran Ciprat ,1 PC : 2 PP m2 80.960,00 81.509,70 81.001,40 89.226,20 85.235,70 83.600,40 80.518,40 81.576,40 81.562,60 225.305,70 84.720,50 127.265,90 147.121,80 81.723,60 84.136,30
12 Siar pasangan dinding Bata merah m2 47.455,90 47.813,32 47.455,90 52.939,10 50.079,74 49.007,48 47.202,90 47.917,74 47.917,74 148.883,60 49.722,32 79.248,80 92.524,40 47.905,32 49.574,66
13 Siar pasangan dinding conblock ekspose m2 22.597,50 22.781,50 22.597,50 25.334,50 23.862,50 23.310,50 22.482,50 22.850,50 22.850,50 74.428,00 23.678,50 38.663,00 45.402,00 22.827,50 23.644,00
14 Siar pasangan batu kali adukan 1 PC : 2 PP m2 96.864,50 97.704,00 96.947,30 108.267,90 102.366,10 99.875,20 96.498,80 98.095,00 98.067,40 306.136,90 101.595,60 162.888,30 190.260,60 97.959,30 101.632,40
15 Benangan sudut m 23.264,50 23.407,10 23.354,20 24.988,35 24.729,60 24.331,70 23.451,95 23.647,45 23.617,55 37.051,85 24.661,75 30.961,45 33.316,65 23.588,80 24.864,15

C PEKERJAAN BETON BERTULANG


1 Bekisting untuk kolom (pemakaian 1 x) m2 569.181,00 593.469,00 592.503,00 650.683,80 666.912,60 654.133,80 663.379,80 699.811,80 626.395,80 972.955,20 627.982,80 880.495,20 943.726,80 606.413,40 671.590,80
2 Bekisting untuk kolom (pemakaian 2 x) m2 284.590,50 296.734,50 296.251,50 325.341,90 333.456,30 327.066,90 331.689,90 349.905,90 313.197,90 486.477,60 313.991,40 440.247,60 471.863,40 303.206,70 335.795,40
3 Bekisting untuk balok/dinding (pemakaian 1x) m2 578.289,00 602.991,00 602.025,00 661.033,80 677.113,56 665.725,80 677.869,80 716.371,80 636.745,80 988.273,20 637.504,80 897.055,20 960.286,80 619.247,40 682.354,80
4 Bekisting untuk balok/dinding (pemakaian 2x) m2 289.144,50 301.495,50 301.012,50 330.516,90 338.556,78 332.862,90 338.934,90 358.185,90 318.372,90 494.136,60 318.752,40 448.527,60 480.143,40 309.623,70 341.177,40
5 Bekisting untuk plat lantai (pemakaian 1x) m2 789.981,00 825.309,00 824.343,00 904.603,80 915.312,60 863.893,80 895.219,80 942.691,80 869.275,80 1.480.795,20 865.342,80 1.255.855,20 1.368.766,80 843.773,40 942.070,80
6 Bekisting untuk plat lantai (pemakaian 2x) m2 394.990,50 412.654,50 412.171,50 452.301,90 457.656,30 431.946,90 447.609,90 471.345,90 434.637,90 740.397,60 432.671,40 627.927,60 684.383,40 421.886,70 471.035,40
7 Bekisting untuk tangga (pemakaian 1x) m2 601.611,00 625.830,00 624.864,00 683.941,80 692.304,60 665.932,80 684.631,80 720.373,80 657.307,80 1.061.620,20 657.514,80 930.244,20 1.005.688,80 642.845,40 706.573,80
8 Bekisting untuk tangga (pemakaian 2x) m2 300.805,50 312.915,00 312.432,00 341.970,90 346.152,30 332.966,40 342.315,90 360.186,90 328.653,90 530.810,10 328.757,40 465.122,10 502.844,40 321.422,70 353.286,90
9 Kolom praktis beton bertulang (11 x 11) cm m 119.663,25 124.327,65 123.822,80 156.117,10 132.366,15 120.436,05 128.989,75 130.795,25 129.035,75 344.246,75 130.642,30 196.913,35 225.217,15 127.653,45 135.166,40
10 Pemasangan 1 m2 Jembatan Untuk Pengecoran Beton m 142.163,00 147.039,00 147.039,00 152.720,00 156.020,04 160.126,00 183.908,00 200.238,00 154.698,00 242.063,50 149.891,00 224.606,50 234.266,50 172.684,00 162.276,50
11 Membuat 1 m' Kolom Praktis Beton Bertulang (11x11) cm m 140.748,50 145.878,65 145.373,80 181.618,35 153.150,10 139.215,55 152.156,50 154.537,00 151.052,50 383.875,75 152.199,05 224.950,35 255.341,40 152.200,20 157.648,90
12 Membuat 1 m' Ring Balok Beton Bertulang (10x15) cm m 176.536,50 182.337,10 181.632,15 222.727,40 191.647,50 176.429,55 189.912,15 193.402,40 188.172,20 481.699,35 190.266,35 283.423,25 322.261,05 189.992,65 196.382,05

BIDANG UMUM U - 1 dari 5


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

13 Beton Ready-mix K175 m3 2.132.732,50 2.231.517,50 2.212.197,50 2.433.558,13 2.371.343,13 2.089.932,38 2.260.914,38 3.032.909,38 2.369.014,38 4.691.655,00 2.326.895,63 3.546.485,00 4.006.211,88 2.360.446,88 2.655.105,63
14 Beton Ready-mix K225 m3 2.229.332,50 2.332.947,50 2.313.627,50 2.544.648,13 2.480.018,13 2.183.634,38 2.363.551,88 3.119.849,38 2.477.689,38 4.916.250,00 2.433.155,63 3.714.327,50 4.196.996,88 2.464.291,88 2.773.440,63
15 Beton Ready-mix K300 m3 2.428.570,00 2.541.845,00 2.520.110,00 2.774.073,13 2.703.405,63 2.376.955,13 2.576.071,88 3.210.411,88 2.702.284,38 5.382.345,00 2.651.713,13 4.060.880,00 4.590.641,88 2.693.716,88 3.034.260,63
16 Beton Ready-mix K400 m3 2.802.895,00 2.935.490,00 2.910.132,50 3.205.150,63 3.122.408,13 2.740.050,38 2.975.754,38 3.322.709,38 3.123.701,88 6.257.782,50 3.062.263,13 4.710.515,00 5.329.631,88 3.112.719,38 3.512.430,63
17 Lantai Kerja Plastic Sheet m2 34.027,35 35.177,35 35.177,35 38.070,75 36.920,75 33.470,75 35.103,52 36.253,52 36.253,52 58.478,65 35.770,75 49.973,25 55.689,90 35.194,60 38.993,05

D BETON PRACETAK
1 Pembuatan lahan produksi beton K175 tebal 8 cm m2 123.949,76 128.787,58 125.423,88 160.525,79 135.422,57 119.915,10 124.984,07 133.408,10 133.043,59 954.910,55 130.384,15 362.507,32 462.818,88 128.968,54 140.595,03
2 Pembuatan lahan produksi beton K175 tebal 10 cm m2 168.213,38 174.922,48 170.635,28 215.535,88 184.156,98 162.798,03 170.447,83 181.861,58 181.268,18 1.211.718,78 177.596,23 473.143,93 600.253,43 175.649,28 192.264,71
3 Pembuatan lahan produksi beton K175 tebal 12 cm m2 187.837,55 195.195,25 190.780,40 237.363,45 205.591,25 182.020,85 190.560,75 202.840,45 202.119,40 1.249.084,00 198.412,95 502.632,80 633.204,95 196.080,75 214.661,76
4 Pembuatan lahan produksi beton K175 tebal 15 cm m2 254.636,26 264.815,96 258.295,79 326.544,12 278.793,26 246.390,38 258.022,96 275.353,26 274.456,59 1.842.249,93 268.834,47 718.267,92 911.607,59 265.921,46 291.090,15
5 Pembuatan bekisting untuk plat beton pra cetak (5x pemakaian) m2 468.741,61 490.346,71 482.593,96 548.561,64 519.461,58 493.828,31 556.132,64 608.630,55 517.026,25 1.450.878,00 498.837,25 915.350,83 1.043.609,04 541.912,89 554.291,73
6 Pembuatan bekisting untuk balok beton pra cetak (10x pemakaian) m2 190.164,00 198.839,60 197.590,70 216.708,30 211.861,05 223.554,25 268.220,25 300.914,75 213.465,30 337.958,55 201.083,25 332.316,65 344.373,25 246.527,80 225.427,60
7 Pembuatan bekisting untuk kolom beton pra cetak (10x pemakaian) m2 165.784,00 173.355,60 172.095,20 189.016,30 184.554,30 192.245,50 228.953,50 255.955,50 185.750,30 297.357,80 175.639,50 287.909,40 300.184,50 211.878,30 196.666,10
8 Pemasangan dan membuka bekisting plat beton pra cetak bh 12.575,25 12.575,25 12.575,25 13.144,50 13.144,50 13.144,50 12.510,85 12.510,85 12.510,85 15.157,00 13.144,50 14.547,50 15.444,50 12.632,75 12.839,75
9 Pemasangan dan membuka bekisting balok beton pra cetak bh 20.372,25 20.372,25 20.372,25 21.286,50 21.286,50 21.286,50 20.225,05 20.225,05 20.225,05 24.541,00 21.286,50 23.517,50 24.828,50 20.429,75 20.774,75
10 Pemasangan dan membuka bekisting kolom beton pra cetak bh 16.473,75 16.473,75 16.473,75 17.215,50 17.215,50 17.215,50 16.367,95 16.367,95 16.367,95 19.849,00 17.215,50 19.032,50 20.136,50 16.531,25 16.807,25
11 Menuang beton plat pra cetak bh 100.142,00 100.142,00 100.142,00 106.018,50 106.018,50 106.018,50 100.834,30 100.834,30 100.834,30 124.016,00 106.018,50 123.280,00 129.777,50 100.981,50 105.650,50
12 Menuang beton balok pra cetak bh 102.976,75 102.976,75 102.976,75 109.008,50 109.008,50 109.008,50 103.657,55 103.657,55 103.657,55 127.500,50 109.008,50 126.707,00 133.400,00 103.816,25 108.611,75
13 Menuang beton kolom pra cetak bh 92.672,75 92.672,75 92.672,75 98.095,00 98.095,00 98.095,00 93.371,95 93.371,95 93.371,95 114.712,50 98.095,00 114.011,00 120.428,00 93.512,25 97.744,25
14 Mendirikan komponen plat pracetak bh 269.769,30 282.998,90 282.860,21 350.410,75 297.045,23 269.068,03 292.453,05 293.500,93 293.685,85 526.464,25 297.800,32 384.443,85 419.278,50 292.961,58 305.852,16
15 Mendirikan komponen balok pracetak bh 316.417,90 332.009,60 331.180,45 400.640,45 349.750,65 313.638,35 344.163,95 346.523,75 348.800,75 621.224,25 351.141,00 491.403,05 523.215,50 346.032,70 359.207,10
16 Mendirikan komponen kolom pracetak bh 520.211,70 546.344,30 544.224,85 648.817,35 576.831,95 512.942,55 567.799,85 572.993,25 579.065,25 1.030.900,25 579.715,00 854.876,65 898.046,50 572.325,10 591.642,80
17 Melangsir komponen plat pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40
18 Melangsir komponen balok pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40
19 Melangsir komponen kolom pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40
20 Bahan grouting campuran m3 8.794.912,50 9.168.662,50 9.168.662,50 17.563.662,50 9.996.662,50 8.145.162,50 12.561.162,50 12.561.162,50 12.561.162,50 45.796.162,50 12.561.162,50 23.716.162,50 27.856.162,50 12.561.162,50 14.090.662,50

E PEKERJAAN BAJA
1 Pemasangan besi profil kg 57.856,50 59.179,00 59.179,00 69.575,00 61.640,00 57.672,50 60.398,00 60.398,00 60.398,00 95.818,00 61.640,00 73.968,00 79.074,00 60.536,00 62.617,50
2 Pemasangan rangka baja WF kg 59.179,00 60.501,50 60.501,50 70.897,50 62.962,50 58.995,00 61.720,50 61.720,50 61.720,50 97.140,50 62.962,50 75.290,50 80.396,50 61.858,50 63.940,00
3 Pekerjaan perakitan (erection) 100 kg 29.635,50 29.865,50 29.865,50 32.234,50 30.854,50 30.164,50 29.923,00 29.923,00 29.923,00 38.996,50 30.854,50 34.166,50 36.340,00 30.153,00 30.509,50
4 Pengelasan dengan las listrik 10 cm 123.395,00 132.066,00 130.456,00 142.209,00 135.493,00 128.800,00 132.848,00 135.378,00 135.378,00 180.274,00 136.183,00 159.528,00 165.048,00 133.400,00 140.024,00

F PEKERJAAN PEMANCANGAN
1 Pemancangan Dolken Kayu Galam 3 m bh 112.010,00 114.310,00 113.160,00 120.520,00 119.370,00 112.470,00 112.240,00 115.690,00 114.540,00 175.950,00 117.070,00 148.350,00 162.150,00 114.310,00 120.520,00
2 Pemancangan tiang pancang dengan pile driver dan hammer m 206.853,54 208.233,54 208.233,54 213.063,54 212.511,54 210.303,54 209.038,54 209.038,54 209.038,54 230.428,54 211.683,54 224.678,54 240.203,54 208.808,54 210.188,54
3 Pemancangan tiang pancang dengan jack-in hydraulic (kap 380 ton) m 414.575,00 429.755,00 426.995,00 462.185,00 453.353,00 409.745,00 444.360,00 449.880,00 458.160,00 714.150,00 455.285,00 708.400,00 723.925,00 449.650,00 456.550,00
4 Upah Potong dan buang tiang pancang bh 244.087,50 244.087,50 244.087,50 255.731,25 255.731,25 255.731,25 243.081,25 243.081,25 243.081,25 293.537,50 255.731,25 287.787,50 305.756,25 244.231,25 252.856,25

G PEKERJAAN PENGERINGAN AIR (DEWATERING)


1 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm bh 15.847,00 15.806,33 15.893,73 17.595,00 17.516,80 16.067,80 17.064,41 17.174,81 17.184,01 30.047,20 17.428,48 23.874,00 27.084,80 17.185,98 18.666,80
1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni atau terpal ukuran 45 cm x
2 bh 35.017,50 35.048,07 35.105,57 38.111,00 37.973,00 35.880,00 36.629,27 36.859,27 36.853,52 58.075,00 37.809,69 48.650,75 53.705,00 36.921,69 39.347,25
120 cm
3 1 buah geobag pasir/tanah ukuran 145 x 240 cm bh 530.449,00 550.481,40 549.722,40 596.992,60 586.444,80 516.603,00 551.090,60 572.112,60 571.677,90 1.085.784,00 567.120,16 834.598,70 933.777,00 562.068,16 624.604,10
4 Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65 cm m3 143.040,17 148.079,66 148.079,66 161.991,99 157.822,59 172.216,00 204.305,27 227.579,43 157.756,95 230.222,36 150.174,60 236.897,70 238.783,93 185.816,56 164.249,07
Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi berlubang untuk 1 m³ kistdam
5 m3 706.530,10 733.392,71 733.392,71 923.148,70 761.806,00 681.134,65 760.240,01 760.240,01 760.240,01 1.385.058,85 761.793,35 954.236,65 1.035.483,00 760.357,47 788.408,95
pasir / tanah dengan karung ukuran 43 cm x 65 cm.

BIDANG UMUM U - 2 dari 5


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3 m dan
6 discharge head maks. 20 m (kapasitas 0,5 m³/s pada suction head 1 m dan discharge head 10 jam 126.643,75 130.599,15 130.599,15 161.143,75 135.556,25 123.481,25 138.828,77 138.828,77 138.828,77 238.625,00 136.962,12 172.787,50 192.050,00 134.809,93 140.300,00
m)

Pengoperasian per-jam pompa air diesel daya 10 kW dengan suction head maks. 3 m dan
7 discharge head maksimal 20 m (kapasitas 1,0 m³/s pada suction head 1 m dan discharge head jam 371.133,75 378.107,90 378.107,90 430.071,25 386.083,75 364.952,50 390.218,77 390.218,77 390.218,77 560.021,25 387.777,12 445.883,75 475.352,50 385.337,43 394.133,75
10 m)

Pengoperasian per-jam pompa air diesel daya 20 kW dengan suction head maks. 3 m dan
8 discharge head maksimal 20 m (kapasitas 2,0 m³/s pada suction head 1 m dan discharge head jam 874.833,75 887.586,65 887.586,65 1.001.276,25 901.341,25 862.873,75 969.301,27 969.301,27 969.301,27 1.314.565,00 924.309,62 1.107.967,50 1.239.872,50 900.594,93 936.445,00
10 m)

H PENGGUNAAN PERALATAN KERJA


1 AGGREGAT (CHIP) SPREADER Rp/jam 472.000,00 487.000,00 487.000,00 590.000,00 501.000,00 458.000,00 500.000,00 502.000,00 502.000,00 867.000,00 505.000,00 634.000,00 681.000,00 501.000,00 517.000,00
2 Asphalt Tanker Rp/jam 485.000,00 508.000,00 508.000,00 675.000,00 533.000,00 461.000,00 531.000,00 533.000,00 533.000,00 1.091.000,00 534.000,00 712.000,00 785.000,00 532.000,00 557.000,00
3 ASPHALT DISTRIBUTOR Rp/jam 1.260.000,00 1.278.000,00 1.277.000,00 1.389.000,00 1.285.000,00 1.233.000,00 1.289.000,00 1.293.000,00 1.293.000,00 1.724.000,00 1.295.000,00 1.463.000,00 1.535.000,00 1.291.000,00 1.310.000,00
4 ASPHALT FINISHER Rp/jam 974.000,00 986.000,00 986.000,00 1.059.000,00 990.000,00 954.000,00 993.000,00 997.000,00 997.000,00 1.280.000,00 997.000,00 1.109.000,00 1.160.000,00 995.000,00 1.008.000,00
5 ASPHALT LIQUID MIXER (kap 20000 ) Rp/jam 75.000,00 76.000,00 76.000,00 81.000,00 77.000,00 75.000,00 76.000,00 77.000,00 77.000,00 102.000,00 78.000,00 93.000,00 95.000,00 76.000,00 78.000,00
6 ASPHALT LIQUID MIXER Rp/jam 137.000,00 141.000,00 141.000,00 172.000,00 147.000,00 133.000,00 145.000,00 147.000,00 147.000,00 255.000,00 148.000,00 188.000,00 201.000,00 146.000,00 151.000,00
7 ASPHALT MIXING PLANT Rp/jam 9.205.000,00 9.780.000,00 9.779.000,00 13.785.000,00 10.342.000,00 8.621.000,00 10.347.000,00 10.351.000,00 10.352.000,00 23.583.000,00 10.353.000,00 14.421.000,00 16.164.000,00 10.350.000,00 10.925.000,00
8 ASPHALT MIXING PLANT (MODIFIKASI, ASBUTON) Rp/jam 9.110.000,00 9.680.000,00 9.680.000,00 13.674.000,00 10.252.000,00 8.542.000,00 10.250.000,00 10.251.000,00 10.251.000,00 23.393.000,00 10.254.000,00 14.268.000,00 15.979.000,00 10.251.000,00 10.822.000,00
9 ASPHALT MIXING PLANT (WARM MIX) Rp/jam 9.205.000,00 9.780.000,00 9.779.000,00 13.785.000,00 10.342.000,00 8.621.000,00 10.347.000,00 10.351.000,00 10.352.000,00 23.583.000,00 10.353.000,00 14.421.000,00 16.164.000,00 10.350.000,00 10.925.000,00
10 BABY VIBRATORY ROLLER 1-2 T. Rp/jam 84.000,00 84.000,00 84.000,00 86.000,00 86.000,00 85.000,00 84.000,00 85.000,00 85.000,00 96.000,00 86.000,00 96.000,00 96.000,00 84.000,00 86.000,00
11 BAR BENDER Rp/jam 84.000,00 85.000,00 85.000,00 89.000,00 86.000,00 84.000,00 85.000,00 86.000,00 86.000,00 109.000,00 87.000,00 102.000,00 104.000,00 85.000,00 87.000,00
12 BAR CUTTER Rp/jam 63.000,00 64.000,00 64.000,00 68.000,00 65.000,00 63.000,00 64.000,00 65.000,00 65.000,00 86.000,00 66.000,00 79.000,00 81.000,00 64.000,00 66.000,00
13 BLENDING EQUIPMENT Rp/jam 238.000,00 244.000,00 244.000,00 290.000,00 251.000,00 231.000,00 250.000,00 252.000,00 252.000,00 413.000,00 252.000,00 311.000,00 332.000,00 250.000,00 258.000,00
14 BORE PILE MACHINE Rp/jam 653.000,00 670.000,00 670.000,00 783.000,00 684.000,00 633.000,00 685.000,00 687.000,00 687.000,00 1.083.000,00 688.000,00 824.000,00 881.000,00 685.000,00 703.000,00
15 BORE PILE MACHINE Rp/jam 653.000,00 670.000,00 670.000,00 783.000,00 684.000,00 633.000,00 685.000,00 687.000,00 687.000,00 1.083.000,00 688.000,00 824.000,00 881.000,00 685.000,00 703.000,00
16 BREAKER Rp/jam 614.000,00 633.000,00 633.000,00 760.000,00 649.000,00 593.000,00 649.000,00 652.000,00 652.000,00 1.089.000,00 652.000,00 799.000,00 861.000,00 650.000,00 670.000,00
17 BULLDOZER 100-150 HP Rp/jam 745.000,00 763.000,00 762.000,00 880.000,00 776.000,00 723.000,00 777.000,00 780.000,00 780.000,00 1.195.000,00 780.000,00 924.000,00 986.000,00 778.000,00 797.000,00
18 CEMENT TANKER Rp/jam 429.000,00 448.000,00 448.000,00 587.000,00 469.000,00 409.000,00 467.000,00 469.000,00 469.000,00 935.000,00 470.000,00 620.000,00 681.000,00 468.000,00 489.000,00
19 COLD MILLING Rp/jam 1.429.000,00 1.457.000,00 1.456.000,00 1.641.000,00 1.475.000,00 1.392.000,00 1.479.000,00 1.483.000,00 1.483.000,00 2.154.000,00 1.485.000,00 1.727.000,00 1.830.000,00 1.481.000,00 1.510.000,00
20 Cold Paint Spray Machine Rp/jam 61.000,00 61.000,00 61.000,00 63.000,00 63.000,00 62.000,00 61.000,00 63.000,00 63.000,00 74.000,00 64.000,00 74.000,00 74.000,00 61.000,00 63.000,00
21 COLD RECYCLER Rp/jam 5.113.000,00 5.220.000,00 5.216.000,00 5.907.000,00 5.282.000,00 4.970.000,00 5.304.000,00 5.314.000,00 5.315.000,00 7.763.000,00 5.314.000,00 6.161.000,00 6.546.000,00 5.309.000,00 5.415.000,00
22 COMPRESSOR 4000-6500 L\M Rp/jam 209.000,00 216.000,00 216.000,00 272.000,00 225.000,00 201.000,00 224.000,00 225.000,00 225.000,00 417.000,00 226.000,00 292.000,00 317.000,00 224.000,00 233.000,00
23 CONCRETE BREAKER Rp/jam 730.000,00 761.000,00 761.000,00 972.000,00 790.000,00 700.000,00 789.000,00 791.000,00 791.000,00 1.515.000,00 794.000,00 1.033.000,00 1.127.000,00 790.000,00 822.000,00
24 CONCRETE CUTTER 130 feet/mnt Rp/jam 55.000,00 55.000,00 55.000,00 57.000,00 57.000,00 56.000,00 55.000,00 57.000,00 57.000,00 68.000,00 58.000,00 68.000,00 68.000,00 55.000,00 57.000,00
25 CONCRETE MIXER 0.3-0.6 M3 Rp/jam 98.000,00 100.000,00 100.000,00 119.000,00 104.000,00 96.000,00 102.000,00 104.000,00 104.000,00 173.000,00 105.000,00 133.000,00 141.000,00 103.000,00 107.000,00
26 CONCRETE PAN MIXER Rp/jam 306.000,00 309.000,00 308.000,00 325.000,00 310.000,00 303.000,00 309.000,00 311.000,00 311.000,00 396.000,00 314.000,00 358.000,00 370.000,00 310.000,00 314.000,00
27 CONCRETE PUMP Rp/jam 670.000,00 687.000,00 687.000,00 800.000,00 700.000,00 650.000,00 701.000,00 704.000,00 704.000,00 1.101.000,00 704.000,00 841.000,00 899.000,00 702.000,00 720.000,00
28 CONCRETE VIBRATOR Rp/jam 64.000,00 65.000,00 65.000,00 71.000,00 67.000,00 64.000,00 65.000,00 66.000,00 67.000,00 94.000,00 67.000,00 83.000,00 85.000,00 65.000,00 67.000,00
29 Concrete Mixer (350) Rp/jam 86.000,00 88.000,00 88.000,00 104.000,00 91.000,00 84.000,00 90.000,00 91.000,00 91.000,00 150.000,00 92.000,00 117.000,00 124.000,00 90.000,00 94.000,00
30 CRANE 10-15 TON Rp/jam 618.000,00 634.000,00 633.000,00 738.000,00 646.000,00 599.000,00 647.000,00 649.000,00 649.000,00 1.015.000,00 650.000,00 777.000,00 830.000,00 648.000,00 664.000,00
31 CRANE ON TRACK 35 TON Rp/jam 1.227.000,00 1.244.000,00 1.243.000,00 1.346.000,00 1.250.000,00 1.201.000,00 1.255.000,00 1.258.000,00 1.259.000,00 1.647.000,00 1.259.000,00 1.408.000,00 1.476.000,00 1.256.000,00 1.274.000,00
32 CRANE ON TRACK 75-100 TON Rp/jam 2.279.000,00 2.308.000,00 2.306.000,00 2.474.000,00 2.312.000,00 2.231.000,00 2.324.000,00 2.330.000,00 2.330.000,00 2.974.000,00 2.329.000,00 2.579.000,00 2.698.000,00 2.327.000,00 2.355.000,00
33 Drum Mixer (Untuk Asphaltic Plug) Rp/jam 349.000,00 349.000,00 349.000,00 350.000,00 350.000,00 349.000,00 348.000,00 350.000,00 350.000,00 361.000,00 351.000,00 361.000,00 361.000,00 349.000,00 350.000,00
34 DUMP TRUCK 3 - 4 M3 Rp/jam 303.000,00 313.000,00 313.000,00 388.000,00 325.000,00 292.000,00 324.000,00 325.000,00 325.000,00 580.000,00 326.000,00 413.000,00 447.000,00 324.000,00 336.000,00
35 DUMP TRUCK 6-8 M3 Rp/jam 449.000,00 469.000,00 469.000,00 608.000,00 490.000,00 430.000,00 489.000,00 491.000,00 491.000,00 958.000,00 492.000,00 643.000,00 705.000,00 489.000,00 511.000,00
36 EXCAVATOR 80-140 HP Rp/jam 544.000,00 559.000,00 559.000,00 659.000,00 572.000,00 527.000,00 572.000,00 574.000,00 574.000,00 923.000,00 575.000,00 695.000,00 744.000,00 572.000,00 588.000,00
37 EXCAVATOR Long Arm 155 HP Rp/jam 615.000,00 632.000,00 632.000,00 748.000,00 647.000,00 595.000,00 647.000,00 649.000,00 649.000,00 1.053.000,00 650.000,00 788.000,00 845.000,00 648.000,00 666.000,00

BIDANG UMUM U - 3 dari 5


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

38 FLAT BED TRUCK 3-4 TON Rp/jam 300.000,00 311.000,00 311.000,00 385.000,00 322.000,00 290.000,00 321.000,00 323.000,00 323.000,00 578.000,00 324.000,00 411.000,00 444.000,00 322.000,00 334.000,00
39 FULVI MIXER Rp/jam 1.111.000,00 1.156.000,00 1.155.000,00 1.460.000,00 1.196.000,00 1.064.000,00 1.197.000,00 1.200.000,00 1.200.000,00 2.224.000,00 1.200.000,00 1.528.000,00 1.668.000,00 1.198.000,00 1.243.000,00
40 GENERATOR SET Rp/jam 368.000,00 386.000,00 386.000,00 517.000,00 406.000,00 350.000,00 404.000,00 406.000,00 406.000,00 845.000,00 407.000,00 548.000,00 604.000,00 405.000,00 425.000,00
41 GROUTING PUMP Rp/jam 207.000,00 217.000,00 217.000,00 290.000,00 228.000,00 197.000,00 227.000,00 228.000,00 228.000,00 475.000,00 229.000,00 311.000,00 342.000,00 227.000,00 239.000,00
42 HOT RECYCLER Rp/jam 3.631.000,00 3.684.000,00 3.681.000,00 4.004.000,00 3.700.000,00 3.549.000,00 3.718.000,00 3.726.000,00 3.727.000,00 4.939.000,00 3.727.000,00 4.181.000,00 4.392.000,00 3.723.000,00 3.774.000,00
43 HYDROLIC PUMP Rp/jam 47.000,00 47.000,00 47.000,00 48.000,00 48.000,00 47.000,00 46.000,00 48.000,00 48.000,00 59.000,00 49.000,00 59.000,00 59.000,00 47.000,00 48.000,00
44 JACK HAMMER Rp/jam 69.000,00 50.000,00 50.000,00 51.000,00 51.000,00 50.000,00 49.000,00 51.000,00 51.000,00 62.000,00 52.000,00 62.000,00 62.000,00 50.000,00 51.000,00
45 JACK HIDROLIC Rp/jam 129.000,00 130.000,00 130.000,00 140.000,00 132.000,00 127.000,00 131.000,00 132.000,00 132.000,00 173.000,00 133.000,00 154.000,00 159.000,00 131.000,00 134.000,00
46 JACK HIDROLIK JEMBATAN Rp/jam 63.000,00 63.000,00 63.000,00 64.000,00 64.000,00 64.000,00 63.000,00 64.000,00 64.000,00 75.000,00 65.000,00 75.000,00 75.000,00 63.000,00 64.000,00
47 KUNCI TORSI 200-1000N.M Rp/jam 50.000,00 50.000,00 50.000,00 51.000,00 51.000,00 51.000,00 50.000,00 51.000,00 51.000,00 62.000,00 52.000,00 62.000,00 62.000,00 50.000,00 51.000,00
48 MANIFOLD Rp/jam 45.000,00 45.000,00 45.000,00 46.000,00 46.000,00 45.000,00 44.000,00 46.000,00 46.000,00 57.000,00 47.000,00 57.000,00 57.000,00 45.000,00 46.000,00
49 Mesin Amplas kayu Rp/jam 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00 20.000,00
50 MESIN LAS Rp/jam 75.000,00 76.000,00 75.000,00 80.000,00 77.000,00 75.000,00 76.000,00 77.000,00 77.000,00 99.000,00 78.000,00 92.000,00 94.000,00 76.000,00 78.000,00
51 MESIN POTONG RUMPUT Rp/jam 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00 24.000,00
52 MINI EXCAVATOR 40-60 HP Rp/jam 350.000,00 351.000,00 351.000,00 355.000,00 350.000,00 347.000,00 350.000,00 352.000,00 352.000,00 384.000,00 353.000,00 376.000,00 383.000,00 351.000,00 353.000,00
53 MOBILE CRANE 1 TON Rp/jam 191.000,00 191.000,00 191.000,00 193.000,00 193.000,00 192.000,00 191.000,00 192.000,00 192.000,00 203.000,00 193.000,00 203.000,00 203.000,00 191.000,00 193.000,00
54 MOTOR GRADER >100 HP Rp/jam 705.000,00 721.000,00 720.000,00 824.000,00 732.000,00 685.000,00 733.000,00 736.000,00 736.000,00 1.103.000,00 736.000,00 866.000,00 921.000,00 734.000,00 751.000,00
55 PEDESTRIAN ROLLER Rp/jam 223.000,00 225.000,00 224.000,00 234.000,00 225.000,00 220.000,00 225.000,00 227.000,00 227.000,00 273.000,00 228.000,00 252.000,00 260.000,00 225.000,00 228.000,00
56 PILE DRIVER + HAMMER Rp/jam 189.000,00 192.000,00 191.000,00 212.000,00 195.000,00 185.000,00 194.000,00 195.000,00 195.000,00 274.000,00 196.000,00 229.000,00 240.000,00 194.000,00 198.000,00
57 PILE DRIVER LEADER, 75 kw Rp/jam 169.000,00 177.000,00 177.000,00 228.000,00 185.000,00 163.000,00 183.000,00 185.000,00 185.000,00 362.000,00 186.000,00 247.000,00 269.000,00 184.000,00 192.000,00
58 PILE HAMMER Rp/jam 417.000,00 420.000,00 419.000,00 434.000,00 430.000,00 422.000,00 431.000,00 433.000,00 433.000,00 503.000,00 434.000,00 471.000,00 485.000,00 432.000,00 435.000,00
59 PILE HAMMER, 2,5 Ton Rp/jam 62.000,00 62.000,00 62.000,00 64.000,00 63.000,00 62.000,00 62.000,00 63.000,00 63.000,00 78.000,00 64.000,00 76.000,00 77.000,00 62.000,00 64.000,00
60 POMPA + MIXER EPOXY, 810 Watt Rp/jam 46.000,00 46.000,00 46.000,00 47.000,00 47.000,00 46.000,00 45.000,00 47.000,00 47.000,00 58.000,00 48.000,00 58.000,00 58.000,00 46.000,00 47.000,00
61 POWER BROOM Rp/jam 77.000,00 78.000,00 78.000,00 90.000,00 81.000,00 76.000,00 80.000,00 81.000,00 81.000,00 127.000,00 82.000,00 103.000,00 108.000,00 80.000,00 83.000,00
62 ROCK DRILL BREAKER Rp/jam 599.000,00 615.000,00 615.000,00 725.000,00 629.000,00 580.000,00 629.000,00 631.000,00 631.000,00 1.015.000,00 632.000,00 764.000,00 819.000,00 630.000,00 647.000,00
63 SAND BLASTING Rp/jam 46.000,00 46.000,00 46.000,00 47.000,00 47.000,00 47.000,00 46.000,00 47.000,00 47.000,00 58.000,00 48.000,00 58.000,00 58.000,00 46.000,00 47.000,00
64 SLIP FORM PAVER Rp/jam 2.638.000,00 2.665.000,00 2.663.000,00 2.816.000,00 2.664.000,00 2.589.000,00 2.677.000,00 2.684.000,00 2.685.000,00 3.311.000,00 2.685.000,00 2.946.000,00 3.068.000,00 2.681.000,00 2.708.000,00
65 STAMPER Rp/jam 57.000,00 57.000,00 57.000,00 59.000,00 59.000,00 58.000,00 57.000,00 59.000,00 59.000,00 70.000,00 60.000,00 70.000,00 70.000,00 57.000,00 59.000,00
66 STONE CRUSHER Rp/jam 1.050.000,00 1.075.000,00 1.075.000,00 1.241.000,00 1.093.000,00 1.020.000,00 1.096.000,00 1.099.000,00 1.099.000,00 1.689.000,00 1.100.000,00 1.306.000,00 1.393.000,00 1.097.000,00 1.123.000,00
67 STRESSING JACK Rp/jam 245.000,00 255.000,00 254.000,00 320.000,00 265.000,00 236.000,00 263.000,00 265.000,00 265.000,00 491.000,00 266.000,00 343.000,00 372.000,00 264.000,00 274.000,00
68 TAMPER Rp/jam 90.000,00 91.000,00 91.000,00 94.000,00 92.000,00 90.000,00 91.000,00 92.000,00 92.000,00 111.000,00 93.000,00 107.000,00 109.000,00 91.000,00 93.000,00
69 TANDEM ROLLER 6-8 T. Rp/jam 470.000,00 479.000,00 479.000,00 537.000,00 485.000,00 459.000,00 486.000,00 488.000,00 488.000,00 700.000,00 489.000,00 567.000,00 599.000,00 486.000,00 496.000,00
70 TANDEM ROLLER 8-10 T. Rp/jam 459.000,00 469.000,00 469.000,00 542.000,00 481.000,00 449.000,00 479.000,00 481.000,00 481.000,00 727.000,00 482.000,00 563.000,00 594.000,00 479.000,00 491.000,00
71 THERMOPLASTIC ROAD MARKING MACHINE Rp/jam 75.000,00 75.000,00 75.000,00 77.000,00 77.000,00 76.000,00 75.000,00 76.000,00 76.000,00 87.000,00 77.000,00 87.000,00 87.000,00 75.000,00 77.000,00
72 THREE WHEEL ROLLER 6-8 T Rp/jam 257.000,00 264.000,00 263.000,00 306.000,00 270.000,00 251.000,00 269.000,00 270.000,00 270.000,00 422.000,00 271.000,00 327.000,00 348.000,00 269.000,00 277.000,00
73 TIRE ROLLER 8-10 T. Rp/jam 518.000,00 533.000,00 533.000,00 634.000,00 546.000,00 501.000,00 546.000,00 548.000,00 548.000,00 899.000,00 549.000,00 669.000,00 718.000,00 547.000,00 563.000,00
74 TRACK LOADER 75-100 HP Rp/jam 354.000,00 362.000,00 362.000,00 416.000,00 369.000,00 345.000,00 369.000,00 371.000,00 371.000,00 564.000,00 371.000,00 442.000,00 469.000,00 369.000,00 378.000,00
75 TRAILER 20 TON Rp/jam 462.000,00 481.000,00 481.000,00 609.000,00 499.000,00 443.000,00 498.000,00 500.000,00 500.000,00 935.000,00 501.000,00 644.000,00 702.000,00 499.000,00 519.000,00
76 TRONTON 15 TON Rp/jam 531.000,00 550.000,00 550.000,00 683.000,00 568.000,00 512.000,00 567.000,00 569.000,00 569.000,00 1.033.000,00 572.000,00 731.000,00 791.000,00 568.000,00 589.000,00
77 Truk Mixer Rp/jam 653.000,00 677.000,00 677.000,00 839.000,00 699.000,00 628.000,00 699.000,00 701.000,00 701.000,00 1.252.000,00 701.000,00 882.000,00 958.000,00 699.000,00 724.000,00
78 VIBRATING RAMMER Rp/jam 54.000,00 54.000,00 54.000,00 59.000,00 56.000,00 54.000,00 55.000,00 56.000,00 56.000,00 79.000,00 57.000,00 71.000,00 72.000,00 55.000,00 57.000,00
79 VIBRATORY ROLLER 5-8 T. Rp/jam 291.000,00 299.000,00 299.000,00 361.000,00 308.000,00 281.000,00 307.000,00 309.000,00 309.000,00 523.000,00 310.000,00 385.000,00 413.000,00 308.000,00 318.000,00
80 WATER JET BLASTING Rp/jam 56.000,00 56.000,00 56.000,00 57.000,00 57.000,00 57.000,00 56.000,00 57.000,00 57.000,00 68.000,00 58.000,00 68.000,00 68.000,00 56.000,00 57.000,00
81 WATER PUMP 70-100 mm Rp/jam 54.000,00 54.000,00 54.000,00 60.000,00 56.000,00 54.000,00 55.000,00 56.000,00 56.000,00 81.000,00 57.000,00 71.000,00 73.000,00 55.000,00 57.000,00
82 WATER TANKER 3000-4500 L. Rp/jam 378.000,00 393.000,00 392.000,00 492.000,00 407.000,00 363.000,00 406.000,00 408.000,00 408.000,00 747.000,00 408.000,00 521.000,00 566.000,00 406.000,00 422.000,00
83 WELDING MACHINE, 300 A Rp/jam 52.000,00 52.000,00 52.000,00 58.000,00 54.000,00 52.000,00 53.000,00 54.000,00 54.000,00 77.000,00 55.000,00 69.000,00 70.000,00 53.000,00 55.000,00
84 WELDING SET Rp/jam 68.000,00 70.000,00 70.000,00 79.000,00 72.000,00 68.000,00 70.000,00 72.000,00 72.000,00 110.000,00 73.000,00 91.000,00 95.000,00 71.000,00 73.000,00

BIDANG UMUM U - 4 dari 5


HARGA SATUAN POKOK KEGIATAN BIDANG UMUM
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

85 WHEEL LOADER 1.0-1.6 M3 Rp/jam 551.000,00 562.000,00 562.000,00 636.000,00 570.000,00 537.000,00 571.000,00 573.000,00 573.000,00 841.000,00 574.000,00 671.000,00 711.000,00 572.000,00 584.000,00

I ALAT LAINNYA
1 Alat pancang hammer 2 ton Rp/hari 500.000,00 525.000,00 520.000,00 575.000,00 560.000,00 485.000,00 550.000,00 560.000,00 575.000,00 1.000.000,00 565.000,00 1.000.000,00 1.000.000,00 560.000,00 570.000,00
2 Alat pancang dengan tripod tinggi 5 - 7m beban tumbuk 1-2 ton Rp/hari 500.000,00 525.000,00 520.000,00 575.000,00 560.000,00 485.000,00 550.000,00 560.000,00 575.000,00 1.000.000,00 565.000,00 1.000.000,00 1.000.000,00 560.000,00 570.000,00
3 Alat pancang hammer 0,5 ton Rp/hari 350.000,00 367.500,00 364.000,00 402.500,00 392.000,00 339.500,00 385.000,00 392.000,00 402.500,00 700.000,00 395.500,00 700.000,00 700.000,00 392.000,00 399.000,00
4 Bor Listrik Rp/hari 100.000,00 105.000,00 104.000,00 115.000,00 112.000,00 97.000,00 110.000,00 112.000,00 115.000,00 200.000,00 113.000,00 200.000,00 200.000,00 112.000,00 114.000,00
5 Bore Pile Machine portable Rp/jam 250.000,00 262.500,00 260.000,00 287.500,00 280.000,00 242.500,00 275.000,00 280.000,00 287.500,00 500.000,00 282.500,00 500.000,00 500.000,00 280.000,00 285.000,00
6 Chain Saw Rp/jam 30.000,00 31.500,00 31.200,00 34.500,00 33.600,00 29.100,00 33.000,00 33.600,00 34.500,00 60.000,00 33.900,00 60.000,00 60.000,00 33.600,00 34.200,00
7 Drone Rp/hari 163.622,40 171.800,00 170.100,00 188.100,00 183.200,00 158.700,00 179.900,00 183.200,00 188.100,00 327.200,00 184.800,00 327.200,00 327.200,00 183.200,00 186.500,00
8 Generator Set 1500 watt Rp/jam 50.000,00 52.500,00 52.000,00 57.500,00 56.000,00 48.500,00 55.000,00 56.000,00 57.500,00 100.000,00 56.500,00 100.000,00 100.000,00 56.000,00 57.000,00
9 Hose Rp/hari 20.000,00 21.000,00 20.800,00 23.000,00 22.400,00 19.400,00 22.000,00 22.400,00 23.000,00 40.000,00 22.600,00 40.000,00 40.000,00 22.400,00 22.800,00
10 Jack Tension Rp/jam 2.500.000,00 2.625.000,00 2.600.000,00 2.875.000,00 2.800.000,00 2.425.000,00 2.750.000,00 2.800.000,00 2.875.000,00 5.000.000,00 2.825.000,00 5.000.000,00 5.000.000,00 2.800.000,00 2.850.000,00
11 Jack-in hydraulics kap 380 ton Rp/hari 2.000.000,00 2.100.000,00 2.080.000,00 2.300.000,00 2.240.000,00 1.940.000,00 2.200.000,00 2.240.000,00 2.300.000,00 4.000.000,00 2.260.000,00 4.000.000,00 4.000.000,00 2.240.000,00 2.280.000,00
12 Kendaraan roda 4 pick up L300 Rp/hari 300.000,00 315.000,00 312.000,00 345.000,00 336.000,00 291.000,00 330.000,00 336.000,00 345.000,00 600.000,00 339.000,00 600.000,00 600.000,00 336.000,00 342.000,00
13 Kertas HVS atau Kalkir Rim 50.000,00 52.500,00 52.000,00 57.500,00 56.000,00 48.500,00 55.000,00 56.000,00 57.500,00 100.000,00 56.500,00 100.000,00 100.000,00 56.000,00 57.000,00
14 Lift Kerja Rp/hari 550.000,00 577.500,00 572.000,00 632.500,00 616.000,00 533.500,00 605.000,00 616.000,00 632.500,00 1.100.000,00 621.500,00 1.100.000,00 1.100.000,00 616.000,00 627.000,00
15 Mesin Las listrik 250 A diesel Rp/hari 250.000,00 262.500,00 260.000,00 287.500,00 280.000,00 242.500,00 275.000,00 280.000,00 287.500,00 500.000,00 282.500,00 500.000,00 500.000,00 280.000,00 285.000,00
16 Mesin potong besi Rp/hari 100.000,00 105.000,00 104.000,00 115.000,00 112.000,00 97.000,00 110.000,00 112.000,00 115.000,00 200.000,00 113.000,00 200.000,00 200.000,00 112.000,00 114.000,00
17 Molen/Beton Mixer Rp/hari 110.000,00 115.500,00 114.400,00 126.500,00 123.200,00 106.700,00 121.000,00 123.200,00 126.500,00 220.000,00 124.300,00 220.000,00 220.000,00 123.200,00 125.400,00
18 Motor 2 Kw 1350 rpm + pengkabelan Rp/hari 200.000,00 210.000,00 208.000,00 230.000,00 224.000,00 194.000,00 220.000,00 224.000,00 230.000,00 400.000,00 226.000,00 400.000,00 400.000,00 224.000,00 228.000,00
19 Perahu Rp/hari 100.000,00 105.000,00 104.000,00 115.000,00 112.000,00 97.000,00 110.000,00 112.000,00 115.000,00 200.000,00 113.000,00 200.000,00 200.000,00 112.000,00 114.000,00
20 Peralatan potong pipa T1/manual (gergaji) / saw Rp/hari 75.000,00 78.700,00 78.000,00 86.200,00 84.000,00 72.700,00 82.500,00 84.000,00 86.200,00 150.000,00 84.700,00 150.000,00 150.000,00 84.000,00 85.500,00
21 Peralatan potong pipa T2/mekanik / cilinder saw Rp/hari 150.000,00 157.500,00 156.000,00 172.500,00 168.000,00 145.500,00 165.000,00 168.000,00 172.500,00 300.000,00 169.500,00 300.000,00 300.000,00 168.000,00 171.000,00
22 Pompa air diesel 10 KW Rp/hari 150.000,00 157.500,00 156.000,00 172.500,00 168.000,00 145.500,00 165.000,00 168.000,00 172.500,00 300.000,00 169.500,00 300.000,00 300.000,00 168.000,00 171.000,00
23 Pompa air diesel 20 KW Rp/hari 200.000,00 210.000,00 208.000,00 230.000,00 224.000,00 194.000,00 220.000,00 224.000,00 230.000,00 400.000,00 226.000,00 400.000,00 400.000,00 224.000,00 228.000,00
24 Pompa air diesel 5 KW Rp/hari 100.000,00 105.000,00 104.000,00 115.000,00 112.000,00 97.000,00 110.000,00 112.000,00 115.000,00 200.000,00 113.000,00 200.000,00 200.000,00 112.000,00 114.000,00
25 Pompa Submersible 3m³/h Rp/hari 120.000,00 126.000,00 124.800,00 138.000,00 134.400,00 116.400,00 132.000,00 134.400,00 138.000,00 240.000,00 135.600,00 240.000,00 240.000,00 134.400,00 136.800,00
26 Ponton Rp/hari 600.000,00 630.000,00 624.000,00 690.000,00 672.000,00 582.000,00 660.000,00 672.000,00 690.000,00 1.200.000,00 678.000,00 1.200.000,00 1.200.000,00 672.000,00 684.000,00
27 Scaffolding Rp/bln 60.000,00 63.000,00 62.400,00 69.000,00 67.200,00 58.200,00 66.000,00 67.200,00 69.000,00 120.000,00 67.800,00 120.000,00 120.000,00 67.200,00 68.400,00
28 Sewa Komputer Rp/hari 50.000,00 52.500,00 52.000,00 57.500,00 56.000,00 48.500,00 55.000,00 56.000,00 57.500,00 100.000,00 56.500,00 100.000,00 100.000,00 56.000,00 57.000,00
29 Sewa scanner ukuran A4 Rp/hari 15.000,00 15.700,00 15.600,00 17.200,00 16.800,00 14.500,00 16.500,00 16.800,00 17.200,00 30.000,00 16.900,00 30.000,00 30.000,00 16.800,00 17.100,00
30 Stamper Rp/hari 200.000,00 210.000,00 208.000,00 230.000,00 224.000,00 194.000,00 220.000,00 224.000,00 230.000,00 400.000,00 226.000,00 400.000,00 400.000,00 224.000,00 228.000,00
31 Stamper Kodok Rp/hari 150.000,00 157.500,00 156.000,00 172.500,00 168.000,00 145.500,00 165.000,00 168.000,00 172.500,00 300.000,00 169.500,00 300.000,00 300.000,00 168.000,00 171.000,00
32 Support pipa Rp/jam 80.000,00 84.000,00 83.200,00 92.000,00 89.600,00 77.600,00 88.000,00 89.600,00 92.000,00 160.000,00 90.400,00 160.000,00 160.000,00 89.600,00 91.200,00
33 Tamper Rp/hari 35.000,00 36.700,00 36.400,00 40.200,00 39.200,00 33.900,00 38.500,00 39.200,00 40.200,00 70.000,00 39.500,00 70.000,00 70.000,00 39.200,00 39.900,00
34 Theodolith Rp/hari 350.000,00 367.500,00 364.000,00 402.500,00 392.000,00 339.500,00 385.000,00 392.000,00 402.500,00 700.000,00 395.500,00 700.000,00 700.000,00 392.000,00 399.000,00
35 Tinta hitam Rp/hari 150.000,00 157.500,00 156.000,00 172.500,00 168.000,00 145.500,00 165.000,00 168.000,00 172.500,00 300.000,00 169.500,00 300.000,00 300.000,00 168.000,00 171.000,00
36 Tongkang Rp/hari 500.000,00 525.000,00 520.000,00 575.000,00 560.000,00 485.000,00 550.000,00 560.000,00 575.000,00 1.000.000,00 565.000,00 1.000.000,00 1.000.000,00 560.000,00 570.000,00
37 Total Station Rp/jam 481.225,60 505.200,00 500.400,00 553.400,00 538.900,00 466.700,00 529.300,00 538.900,00 553.400,00 962.400,00 543.700,00 962.400,00 962.400,00 538.900,00 548.500,00
38 Tripod tinggi 5 m Rp/hari 125.000,00 131.200,00 130.000,00 143.700,00 140.000,00 121.200,00 137.500,00 140.000,00 143.700,00 250.000,00 141.200,00 250.000,00 250.000,00 140.000,00 142.500,00
39 Tripod tinggi 7 m Rp/hari 150.000,00 157.500,00 156.000,00 172.500,00 168.000,00 145.500,00 165.000,00 168.000,00 172.500,00 300.000,00 169.500,00 300.000,00 300.000,00 168.000,00 171.000,00
40 Tripot/tackel dan handle crane 2 T Rp/hari 250.000,00 262.500,00 260.000,00 287.500,00 280.000,00 242.500,00 275.000,00 280.000,00 287.500,00 500.000,00 282.500,00 500.000,00 500.000,00 280.000,00 285.000,00
41 Waterpass Rp/hari 300.000,00 315.000,00 312.000,00 345.000,00 336.000,00 291.000,00 330.000,00 336.000,00 345.000,00 600.000,00 339.000,00 600.000,00 600.000,00 336.000,00 342.000,00

BIDANG UMUM U - 5 dari 5


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2023
bidang bina marga
HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A DIVISI 1. UMUM
1 1.2 Mobilisasi 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00 1.364.590.000,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.8 Manajemen dan Keselamatan Lalu Lintas 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
2 1.8.(1) Manajemen dan Keselamatan Lalu Lintas Jalan LS 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00 285.000.000,00
3 1.8.(2) Jembatan Sementara LS 586.270.117,63 599.974.935,84 597.298.687,63 633.214.562,98 618.203.057,61 562.826.684,60 588.738.967,53 604.419.104,29 602.198.788,35 909.885.937,30 566.735.642,26 706.329.509,30 758.389.812,30 593.231.144,10 629.439.612,51
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.17 Pengamanan Lingkungan Hidup 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
4 1.17.(1a) Pengujian pH Buah
5 1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah
6 1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah
7 1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah
8 1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah
9 1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah
10 1.17.(1g) Pengujian Coliform Buah
11 1.17.(1h) Pengujian E. Coli Buah
12 1.17.(1i) Pengujian Destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Buah
13 1.17.(1j) Pengujian Temperatur (Suhu) Buah
14 1.17.(1k) Pengujian Parameter Kualitas Air Lainnya Buah
15 1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah
16 1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah
17 1.17.(2c) Pengujian Parameter Kebisingan dan/atau Getaran Lainnya ……… Buah
18 1.17.(3a) Pengujian NoX Buah
19 1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah
20 1.17.(3c) Pengujian Karbondioksida (CO2) Buah
21 1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah
22 1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah
23 1.17.(3g) Pengujian Timah Hitam (Pb) Buah
24 1.17.(3h) Pengujian Parameter Udara Emisi dan Ambien lainnya : ………….. Buah
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.19 Keselamatan dan Kesehatan Kerja 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
25 1.19 Keselamatan dan Kesehatan Kerja ( K3 ) LS 604.450.000,00 612.671.000,00 611.682.000,00 631.161.000,00 625.496.000,00 600.005.000,00 616.200.000,00 623.395.200,00 622.638.000,00 734.461.000,00 621.097.800,00 694.631.640,00 726.043.600,00 619.709.200,00 622.406.400,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.20 Pengujian Tanah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
26 1.20.(1) Pengeboran, termasuk SPT dan Laporan M1 639.912,71 640.861,46 640.631,46 643.506,46 638.820,21 636.462,71 640.487,71 641.033,96 641.120,21 661.331,46 640.832,71 652.907,71 660.152,71 640.803,96 641.580,21
27 1.20.(2) Sondir termasuk Laporan M1 495.950,28 496.716,94 496.525,28 498.786,94 495.145,28 493.266,94 496.448,61 496.870,28 496.946,94 512.855,28 496.716,94 506.223,61 511.935,28 496.678,61 497.291,94
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
1.21 Manajemen Mutu 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
28 1.21 Manajemen Mut u LS 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00 1.076.750.000,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
B DIVISI 2. DRAINASE 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
29 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 54.856,75 56.042,64 56.024,02 64.402,68 57.417,19 53.799,56 57.121,99 57.363,06 57.370,35 86.876,56 57.672,37 68.175,16 72.554,15 57.238,36 58.608,68
30 2.2.(1) Pasangan Batu dengan Mortar M3 1.310.040,63 1.362.461,54 1.330.529,74 1.672.435,44 1.437.381,43 1.430.775,50 1.509.470,59 1.606.571,68 1.600.502,66 9.348.287,79 1.568.962,43 3.866.729,58 4.834.377,74 1.550.021,76 1.710.708,32
31 2.3.(1) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cm M1 155.984,84 161.063,56 160.113,74 175.760,81 169.421,01 152.009,23 160.630,92 166.762,87 166.109,89 294.237,29 162.941,12 227.827,68 251.897,92 163.921,39 178.776,23
32 2.3.(2) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cm M1 223.288,26 229.517,07 228.350,74 249.033,22 241.352,51 220.262,06 229.092,63 236.650,50 235.836,71 400.471,23 233.982,48 317.991,18 349.504,04 233.575,14 252.695,58
33 2.3.(3) Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M1 251.600,46 260.230,78 258.599,11 284.213,09 274.126,53 245.536,82 260.549,43 271.161,09 269.969,52 487.079,30 265.173,58 376.020,33 417.035,40 266.838,55 292.438,94
34 2.3.(4) Gorong-gorong Pipa Beton Bertulang, diameter dalam 40 cm M1 655.314,20 680.539,49 677.391,35 783.426,38 714.720,01 634.421,17 690.591,02 711.956,43 709.788,31 1.323.526,24 699.650,30 976.191,60 1.080.672,19 702.339,64 760.796,68
35 2.3.(5) Gorong-gorong Pipa Beton Bertulang, diameter dalam 60 cm M1 1.014.419,10 1.056.162,40 1.051.186,43 1.229.962,12 1.111.101,02 980.218,11 1.075.683,19 1.109.603,98 1.105.966,43 2.115.244,99 1.090.404,21 1.539.108,84 1.709.428,48 1.095.425,33 1.189.911,47
36 2.3.(6) Gorong-gorong Pipa Beton Bertulang, diameter dalam 80 cm M1 1.583.404,89 1.647.943,85 1.640.176,16 1.913.856,42 1.732.104,10 1.529.588,03 1.677.754,40 1.730.630,90 1.724.945,98 3.281.171,52 1.699.455,05 2.392.370,66 2.655.091,49 1.708.366,87 1.854.702,95
37 2.3.(7) Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 cm M1 2.161.155,48 2.253.063,30 2.242.478,41 2.641.838,07 2.370.706,97 2.082.718,07 2.297.375,21 2.369.175,13 2.361.176,07 4.565.714,31 2.324.919,41 3.291.199,91 3.659.767,30 2.339.482,85 2.542.227,39
38 2.3.(8) Gorong-gorong Pipa Beton Bertulang, diameter dalam 120 cm M1 2.830.815,82 2.957.133,59 2.942.803,08 3.495.452,88 3.117.663,51 2.722.504,61 3.019.260,81 3.116.283,04 3.105.104,14 6.127.776,16 3.055.399,54 4.372.453,23 4.876.514,83 3.077.246,71 3.353.411,34

BIDANG BINA MARGA BM - 1 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

39 2.3.(9) Gorong-gorong Pipa Beton Bertulang, diameter dalam 150 cm M1 4.197.020,45 4.388.921,99 4.367.582,55 5.215.337,68 4.631.098,88 4.032.263,56 4.485.991,67 4.630.235,24 4.612.985,46 9.194.736,31 4.538.708,76 6.520.893,66 7.282.557,67 4.574.259,12 4.989.287,82
40 2.3.(10) Gorong-gorong Pipa Baja Bergelombang Ton 50.364.927,19 51.772.224,37 51.724.515,41 60.551.121,43 53.289.123,87 48.789.132,38 52.712.766,07 52.983.585,42 52.944.103,13 85.290.878,56 52.532.147,61 63.309.605,58 67.840.672,29 52.799.792,13 54.598.922,40
41 2.3.(11) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 40 cm x 40 cm M1 700.061,21 731.659,36 728.287,61 870.601,60 770.864,97 671.903,41 747.477,84 769.903,54 766.818,62 1.514.671,78 753.825,40 1.070.524,33 1.194.064,78 762.037,10 828.414,81
42 2.3.(12) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 50 cm x 50 cm M1 935.380,74 979.492,92 974.868,32 1.174.672,00 1.033.655,58 896.484,62 1.002.945,06 1.033.842,25 1.029.575,93 2.072.302,54 1.012.217,14 1.452.311,16 1.623.996,97 1.023.363,84 1.115.374,52
43 2.3.(13) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 60 cm x 60 cm M1 1.182.276,00 1.238.636,06 1.232.713,34 1.487.544,29 1.307.822,51 1.133.005,82 1.269.113,19 1.308.840,23 1.303.473,36 2.637.105,16 1.281.761,25 1.846.150,02 2.065.769,88 1.295.227,55 1.413.133,39
44 2.3.(14) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 80 cm x 80 cm M1 1.810.129,09 1.894.579,03 1.885.360,60 2.260.179,79 1.999.408,04 1.737.642,81 1.939.785,84 2.002.239,80 1.994.621,41 4.004.083,91 1.962.522,80 2.827.265,58 3.159.983,42 1.978.864,97 2.159.698,75
45 2.3.(15) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 100 cm x 100 cm M1 3.036.154,29 3.173.154,79 3.157.596,56 3.753.407,58 3.345.431,60 2.921.809,86 3.246.571,50 3.353.279,84 3.341.805,65 6.624.448,15 3.291.589,26 4.731.224,98 5.277.920,47 3.309.898,38 3.611.011,87
46 2.3.(16) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 120 cm x 120 cm M1 4.473.639,44 4.662.040,63 4.639.015,29 5.425.950,70 4.904.753,62 4.320.558,30 4.757.756,98 4.917.613,23 4.903.450,95 9.464.851,13 4.833.804,00 6.896.108,91 7.664.431,10 4.844.445,92 5.277.218,66
47 2.3.(17) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 140 cm x 140 cm M1 7.192.398,97 7.483.370,52 7.446.388,43 8.633.197,62 7.863.472,30 6.962.402,26 7.629.837,97 7.889.020,97 7.869.022,53 14.963.782,98 7.764.344,41 11.031.632,56 12.234.062,77 7.763.490,47 8.449.539,21
48 2.3.(18) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 150 cm x 150 cm M1 8.509.075,24 8.840.058,58 8.796.276,67 10.112.282,86 9.278.548,06 8.251.493,16 9.000.710,68 9.309.213,91 9.288.107,62 17.407.118,22 9.168.004,54 12.970.176,95 14.355.187,90 9.152.303,87 9.952.182,42
49 2.3.(19) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 160 cm x 160 cm M1 10.748.283,39 11.162.145,47 11.106.921,70 12.742.699,13 11.712.289,76 10.429.677,12 11.364.076,40 11.754.377,48 11.728.835,28 21.901.875,66 11.581.224,38 16.367.964,47 18.105.773,22 11.553.604,51 12.560.367,17
50 2.3.(20) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 180 cm x 180 cm M1 14.563.937,56 15.779.749,18 15.701.564,29 17.805.374,86 16.531.391,85 14.811.347,99 16.036.919,70 16.593.912,23 16.564.110,72 30.304.307,26 16.366.020,79 22.991.557,18 25.360.990,81 16.289.504,64 17.686.262,73
51 2.3.(21) Gorong-gorong Kotak Beton Bertulang, ukuran dalam 200 cm x 200 cm M1 21.079.508,51 21.806.129,02 21.697.973,54 24.347.614,84 22.812.438,63 20.550.608,91 22.126.245,75 22.902.088,29 22.868.638,56 41.060.709,67 22.607.711,70 31.585.976,09 34.751.828,59 22.456.282,85 24.353.187,72
52 2.3.(22) Saluran berbentuk U Tipe DS 1 M1 548.385,00 574.917,00 570.084,00 747.076,00 606.076,00 520.702,00 584.413,00 598.348,00 597.341,00 2.090.374,00 587.993,00 1.034.347,00 1.223.216,00 590.313,00 630.901,00
53 2.3.(23) Saluran berbentuk U Tipe DS 1a (dengan tutup) M1 696.258,00 730.112,00 720.838,00 942.937,00 770.029,00 657.135,00 731.016,00 756.863,00 755.228,00 3.288.012,00 733.961,00 1.475.604,00 1.790.332,00 741.889,00 799.986,00
54 2.3.(24) Saluran berbentuk U Tipe DS 2 M1 569.509,00 597.088,00 591.620,00 775.056,00 629.498,00 540.192,00 605.356,00 620.993,00 619.896,00 2.261.465,00 608.846,00 1.097.384,00 1.304.233,00 611.967,00 655.056,00
55 2.3.(25) Saluran berbentuk U Tipe DS 2a (dengan tutup) M1 738.507,00 774.454,00 763.910,00 998.897,00 816.873,00 696.116,00 772.903,00 802.153,00 800.339,00 3.630.194,00 775.666,00 1.601.677,00 1.952.366,00 785.197,00 848.296,00
56 2.3.(26) Saluran berbentuk U Tipe DS 3 M1 590.634,00 619.259,00 613.157,00 803.036,00 652.920,00 559.683,00 626.299,00 643.638,00 642.451,00 2.432.556,00 629.698,00 1.160.421,00 1.385.249,00 633.621,00 679.211,00
57 2.3.(27) Saluran berbentuk U Tipe DS 3a (dengan tutup) M1 780.756,00 818.795,00 806.983,00 1.054.858,00 863.717,00 735.096,00 814.789,00 847.442,00 845.450,00 3.972.377,00 817.371,00 1.727.750,00 2.114.399,00 828.504,00 896.606,00
58 2.3.(28) Saluran berbentuk U Tipe DS 4 M1 632.883,00 663.600,00 656.229,00 858.997,00 699.764,00 598.664,00 668.186,00 688.928,00 687.562,00 2.774.739,00 671.403,00 1.286.494,00 1.547.283,00 676.928,00 727.521,00
59 2.3.(29) Saluran berbentuk U Tipe DS 4a (dengan tutup) M1 865.255,00 907.479,00 893.128,00 1.166.778,00 957.404,00 813.058,00 898.563,00 938.022,00 935.671,00 4.656.741,00 900.781,00 1.979.897,00 2.438.465,00 915.119,00 993.226,00
60 2.3.(30) Saluran berbentuk U Tipe DS 5 M1 675.133,00 707.942,00 699.302,00 914.957,00 746.607,00 637.644,00 710.073,00 734.218,00 732.673,00 3.116.921,00 713.108,00 1.412.567,00 1.709.316,00 720.235,00 775.831,00
61 2.3.(31) Saluran berbentuk U Tipe DS 5a (dengan tutup) M1 949.754,00 996.162,00 979.273,00 1.278.699,00 1.051.092,00 891.019,00 982.336,00 1.028.602,00 1.025.893,00 5.341.106,00 984.192,00 2.232.043,00 2.762.532,00 1.001.734,00 1.089.847,00
62 2.3.(32) Saluran berbentuk U Tipe DS 6 M1 675.133,00 707.942,00 699.302,00 914.957,00 746.607,00 637.644,00 710.073,00 734.218,00 732.673,00 3.116.921,00 713.108,00 1.412.567,00 1.709.316,00 720.235,00 775.831,00
63 2.3.(33) Saluran berbentuk U Tipe DS 6a (dengan tutup) M1 949.754,00 996.162,00 979.273,00 1.223.103,00 1.051.092,00 891.019,00 982.336,00 1.028.602,00 1.025.893,00 5.341.106,00 984.192,00 2.232.043,00 2.762.532,00 1.001.734,00 1.089.847,00
64 2.3.(34) Pasangan Batu tanpa Adukan (Aanstamping) M3 911.437,66 947.912,48 939.768,10 983.669,69 1.006.297,19 962.527,40 982.502,17 1.080.024,88 1.072.330,19 2.054.836,66 1.059.560,43 1.579.988,17 1.774.674,05 1.044.344,74 1.166.933,23
65 2.4.(1) Bahan Drainase Porous atau Penyaring (Filter) M3 578.629,69 604.017,38 598.462,88 656.733,38 641.579,25 531.032,63 572.641,06 603.583,25 598.662,69 1.171.824,13 547.665,94 824.867,69 935.198,69 582.526,75 652.362,51

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


66 2.4.(2) M1 153.218,33 157.956,33 156.771,83 170.307,33 167.938,33 153.724,33 160.900,33 166.822,83 165.638,33 273.466,17 165.569,33 233.645,50 262.859,33 162.468,17 177.640,50
Permukaan, diameter 4 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


67 2.4.(3) M1 188.753,33 195.860,33 193.491,33 211.764,83 207.026,83 188.074,83 198.804,33 207.095,83 205.911,33 348.089,67 204.657,83 296.424,00 333.929,33 201.556,67 222.651,50
Permukaan, diameter 5 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


68 2.4.(4) M1 236.133,33 245.609,33 243.240,33 266.251,83 260.329,33 234.270,33 249.737,83 261.582,83 259.213,83 449.956,67 256.775,83 378.154,50 427.504,83 253.674,67 281.876,50
Permukaan, diameter 6 inch

Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah


69 2.4.(5) M1 354.583,33 369.981,83 366.428,33 402.469,33 392.993,33 349.166,83 375.294,83 395.431,33 393.062,33 701.070,67 387.070,83 585.442,00 662.035,83 381.600,67 427.570,00
Permukaan, diameter 8 inch

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
C DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

70 3.1.(1) Galian Biasa M3 14.292,30 14.766,10 14.760,95 18.069,00 15.266,28 13.825,20 15.219,64 15.292,39 15.294,42 26.675,37 15.339,92 19.230,25 20.789,28 15.240,97 15.771,87

71 3.1.(2) Galian Batu Lunak M3 36.295,87 37.374,69 37.358,00 44.773,43 38.388,79 35.127,74 38.352,18 38.510,60 38.517,20 64.170,66 38.589,09 47.382,05 50.958,70 38.399,83 39.586,07

72 3.1.(3) Galian Batu M3 87.544,81 90.238,19 90.200,28 108.788,11 92.850,49 84.693,72 92.705,12 93.106,09 93.121,08 157.325,37 93.325,94 115.285,42 124.122,99 92.825,19 95.803,82

73 3.1.(4) Galian Struktur dengan kedalaman 0 - 2 meter M3 163.842,79 171.858,24 170.415,52 192.020,01 182.784,86 158.718,91 175.542,72 184.240,73 184.242,76 377.741,40 179.984,46 278.369,41 315.505,79 178.441,71 200.889,19

74 3.1.(5) Galian Struktur dengan kedalaman 2 - 4 meter M3 710.606,46 745.934,41 739.029,20 820.740,10 942.317,45 939.814,01 942.236,33 1.034.309,34 942.311,37 1.421.974,67 942.392,06 1.408.814,84 1.871.489,06 942.267,88 1.071.952,86

75 3.1.(6) Galian Struktur dengan kedalaman 4 - 6 meter M3 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21 836.114,21

76 3.1.(7) Galian Perkerasan Beraspal dengan Cold Milling Machine M3 156.159,74 160.719,67 160.645,18 191.847,23 164.868,58 151.284,57 164.866,26 165.335,62 165.364,82 273.518,06 165.730,24 202.538,29 218.179,74 165.091,41 169.893,07

77 3.1.(8) Galian Perkerasan Beraspal tanpa Cold Milling Machine M3 653.527,38 647.888,51 647.798,35 770.211,09 673.753,53 623.374,99 662.584,85 666.892,00 666.927,21 1.101.206,73 676.563,44 835.226,01 903.388,75 665.484,66 685.688,15

78 3.1.(9) Galian Perkerasan berbutir M3 25.175,85 26.163,97 26.157,15 33.084,75 27.210,90 24.223,92 27.121,09 27.210,62 27.213,29 50.679,93 27.305,47 34.997,51 38.214,20 27.158,55 28.215,30

79 3.1.(10). Galian Perkerasan Beton M3 642.518,27 636.334,59 636.247,24 754.904,99 661.687,86 612.957,47 650.491,17 654.752,74 654.786,86 1.076.507,81 664.454,36 819.084,08 885.705,34 653.395,33 673.017,05

80 3.2.(1a) Timbunan Biasa dari sumber galian M3 192.937,42 201.175,38 199.765,73 231.172,18 212.287,98 187.522,33 206.505,62 213.702,43 212.334,08 412.573,47 209.892,03 302.047,81 337.581,84 208.024,59 227.508,68

81 3.2.(1b) Timbunan Biasa dari hasil galian M3 84.121,93 87.614,71 87.592,07 111.963,28 91.185,85 80.617,91 91.004,57 91.330,58 91.339,36 173.659,84 91.513,70 118.414,64 129.336,44 91.091,15 94.840,71

82 3.2.(2a) Timbunan Pilihan dari sumber galian M3 240.831,96 251.813,77 250.402,90 294.007,20 265.602,60 232.559,06 258.506,67 267.183,55 267.195,57 530.425,98 263.265,76 383.181,63 429.169,99 261.376,87 286.461,13

83 3.2.(2b) Timbunan Pilihan dari galian M3 94.693,22 98.414,91 98.385,89 124.293,34 102.170,65 90.916,53 101.992,77 102.359,52 102.370,82 190.152,95 102.565,13 131.416,96 143.170,66 102.095,40 106.095,11

84 3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M3 438.584,83 459.944,89 456.303,19 518.837,27 488.661,05 424.501,84 469.172,57 493.604,79 491.197,25 1.006.003,82 480.489,99 737.222,78 833.132,46 476.494,63 535.510,61

BIDANG BINA MARGA BM - 2 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

85 3.2.(3b) Timbunan Pilihan (diukur dengan rod & plate) M3 511.238,02 536.021,18 532.008,91 609.792,90 568.942,99 494.473,89 547.441,72 574.423,80 571.777,98 1.168.319,97 560.055,08 852.253,92 961.725,94 555.522,18 621.813,86
86 3.2.(4) Penimbunan Kembali Berbutir (Granular Backfill) M3 209.368,06 218.315,50 216.965,20 255.011,77 230.744,76 203.813,42 224.575,37 231.537,38 230.217,70 449.274,46 228.409,76 325.695,36 364.444,22 226.181,98 246.008,65
87 3.3.(1) Penyiapan Badan Jalan M2 14.724,98 15.004,48 14.994,94 16.847,08 15.208,80 14.369,32 15.219,26 15.283,85 15.287,64 21.994,70 15.310,33 17.793,74 18.825,44 15.241,23 15.556,15
88 3.4.(1) Pembersihan dan Pengupasan Lahan M2 20.152,32 20.864,92 20.858,37 25.845,63 21.614,62 19.462,30 21.536,89 21.608,55 21.611,11 38.623,46 21.698,08 27.332,25 29.707,48 21.572,38 22.336,61
89 3.4.(2) Pemotongan Pohon Pilihan diameter 15 – 30 cm buah 41.967,48 42.373,15 42.369,41 45.275,62 42.867,01 41.638,93 42.744,19 42.790,67 42.792,13 52.828,21 42.917,42 46.298,04 47.804,28 42.786,06 43.226,78

90 3.4.(3) Pemotongan Pohon Pilihan diameter > 30 – 50 cm buah 142.642,57 144.304,29 144.290,18 156.142,56 146.273,19 141.243,29 145.845,42 146.026,58 146.032,11 186.777,28 146.466,38 160.101,40 166.087,11 145.992,42 147.792,17

91 3.4.(4) Pemotongan Pohon Pilihan diameter > 50 – 75 cm buah 374.639,44 380.047,95 380.008,33 418.313,17 386.174,51 369.806,68 385.174,62 385.716,27 385.731,75 516.446,26 386.734,04 430.004,55 448.527,25 385.525,45 391.354,39

92 3.4.(5) Pemotongan Pohon Pilihan diameter > 75 cm buah 474.593,12 490.816,25 490.732,44 605.529,35 509.038,12 459.960,44 506.574,59 507.931,88 507.964,33 896.527,64 510.330,46 637.012,71 690.763,78 507.387,35 524.710,94

93 3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2) M2 285.021,81 295.875,30 294.654,39 332.707,72 312.152,57 279.473,69 301.671,92 314.037,65 312.848,11 553.829,26 308.914,61 444.083,37 496.940,94 305.891,70 335.033,14

94 3.5.(2a) Geotekstil Separator Kelas 1 M2 241.563,31 251.135,70 248.744,09 283.023,12 263.721,47 237.254,89 255.706,42 264.380,65 263.204,91 460.727,56 261.709,41 369.535,77 412.448,14 258.700,30 281.615,64

95 3.5.(2b) Geotekstil Separator Kelas 2 M2 229.718,31 238.106,20 236.899,09 268.809,12 250.691,97 225.409,89 242.676,92 250.166,65 250.175,41 434.668,56 248.679,91 348.214,77 388.758,14 245.670,80 266.217,14

96 3.5.(2c) Geotekstil Separator Kelas 3 M2 211.950,81 219.154,20 217.947,09 248.672,62 230.555,47 207.642,39 222.540,42 230.030,15 228.854,41 396.764,56 228.543,41 316.233,27 352.038,64 225.534,30 243.711,64

97 3.5.(3) Geotekstil Stabilisator (Kelas 1) M2 243.081,31 252.736,50 250.317,29 284.775,72 265.418,87 238.731,49 257.334,82 266.105,65 264.916,11 463.956,76 263.379,21 372.185,37 415.456,54 260.356,30 283.506,24

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
D DIVISI 4. PEKERJAAN PREVENTIF 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

4.1 Pengabutan Aspal Emulsi (Fog Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lambat (CSS-1h atau SS-
98 4.1.(1) Liter 25.543,20 26.743,82 26.506,62 29.343,77 28.537,55 24.697,92 27.112,69 28.775,34 28.538,55 53.698,95 27.831,47 42.313,95 49.714,47 27.588,00 31.279,52
1h)

Pengabutan (Fog Seal) dengan Aspal Emulsi yang Mengikat Lebih Cepat (CQS-1h
99 4.1.(2) Liter 32.650,20 34.206,17 33.850,52 37.516,82 36.473,70 31.568,02 34.693,49 36.829,94 36.474,70 68.742,10 35.530,72 54.158,95 63.573,12 35.287,25 40.044,82
atau QS-1h)

Pengabutan (Fog Seal) dengan Aspal Emulsi Modifikasi Polymer yang Mengikat Lebih
100 4.1.(3) Liter 36.203,70 37.996,57 37.640,92 41.662,57 40.501,00 35.121,52 38.602,34 40.975,69 40.620,45 76.559,80 39.558,02 61.265,95 70.798,57 39.196,10 44.545,92
Cepat (PMCQS-1h atau PMQS-1h)

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.2 Laburan Aspal (Buras) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
101 4.2.(1) Aspal di Labur M2 23.289,86 24.434,63 24.165,27 26.828,74 26.006,05 21.764,83 23.867,57 25.353,30 25.098,04 48.077,57 23.980,75 36.859,41 42.726,61 24.276,17 27.552,14
102 4.3 Pemeliharaan Dengan Laburan Aspal Satu Lapis (Single Chip Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
103 4.4 Lapis Penutup Bubur Aspal Emulsi (Emulsified Asphalt Slurry Seal) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
104 4.4.(1) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CSS-1h SS-1h M2 42.804,20 44.814,20 44.393,81 49.288,28 47.793,38 41.389,05 45.390,38 48.193,12 47.800,15 96.365,74 46.605,39 72.415,57 85.378,41 46.205,85 52.366,38
105 4.4.(2) Penghamparan lapis penutup bubur aspal emulsi, tipe 1, CQS-1h QS-1h M2 32.926,21 34.412,55 34.111,81 38.060,97 36.414,92 31.240,77 34.095,41 35.890,73 35.747,61 72.113,74 34.443,45 52.968,06 61.043,39 34.653,88 38.781,70
106 4.4.(3) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CSS-1h SS-1h M2 34.005,50 35.523,49 35.175,52 39.297,38 37.607,46 32.816,64 35.759,13 37.811,59 37.513,56 78.429,18 35.946,16 55.518,04 64.645,56 36.402,86 40.826,86
107 4.4.(4) Penghamparan lapis penutup bubur aspal emulsi, tipe 2, CQS-1h QS-1h M2 34.005,50 35.523,49 35.175,52 39.297,38 37.607,46 32.816,64 35.759,13 37.811,59 37.513,56 78.429,18 35.946,16 55.518,04 64.645,56 36.402,86 40.826,86
108 4.4.(5) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CSS-1h SS-1h M2 36.225,09 37.828,68 37.511,67 42.916,76 39.942,72 34.905,68 38.259,44 40.123,18 39.857,54 83.167,52 38.384,04 57.969,42 66.957,65 38.843,97 43.065,62
109 4.4.(6) Penghamparan lapis penutup bubur aspal emulsi, tipe 3, CQS-1h QS-1h M2 36.673,78 38.299,01 37.977,23 43.430,53 40.444,71 35.341,96 38.736,77 40.632,34 40.361,76 84.106,29 38.890,95 58.743,78 67.868,37 39.331,17 43.621,03
110 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
111 4.5 Lapis Permukaan Mikro Aspal Emulsi Modifikasi Polimer (Micro Surfacing) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h atau
112 4.5.(1) M2 13.571,25 14.093,49 13.977,37 15.786,98 14.755,25 13.071,30 14.174,70 14.773,67 14.689,91 31.348,87 13.857,59 20.695,10 23.742,17 14.356,60 15.703,51
PMCQS-1h untuk Tipe 1

Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer PMCQS-1h
113 4.5.(2) Ton 109.749,74 113.812,49 113.423,97 134.348,75 118.455,92 105.982,12 116.617,33 119.064,61 118.722,36 210.221,86 117.907,85 156.477,68 174.017,82 117.301,55 124.776,11
atau PMCQS-1h untuk Tipe 1

Lapis Permukaan Mikro dengan aspal emulsi modifikasi polymer PMCQS-1h atau
114 4.5.(3) M2 18.501,04 19.077,94 18.911,62 21.345,87 20.056,78 17.763,09 19.310,35 19.905,83 20.060,49 44.123,85 19.725,82 32.512,52 36.919,92 19.592,27 20.710,03
PMCQS-1h untuk Tipe 2

Lapis Permukaan Mikro Perata dengan aspal emulsi modifikasi polymer PMCQS-1h
115 4.5.(4) Ton 78.798,83 82.278,82 81.910,59 98.987,48 86.508,80 75.786,70 84.642,77 86.949,95 86.599,62 164.133,02 85.743,38 119.124,21 134.547,15 85.282,10 92.095,86
atau PMCQS-1h untuk Tipe 2

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.6 Lapis Tipis Aspal Pasir 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

116 4.6.(1) Latasir Kelas A (SS-A) Ton 2.304.099,33 2.421.148,50 2.395.788,51 2.749.430,45 2.574.764,19 2.224.114,73 2.462.314,39 2.599.867,05 2.575.661,99 5.260.384,69 2.525.639,62 3.902.038,49 4.534.980,80 2.500.689,60 2.816.200,84

117 4.6.(2) Latasir Kelas B (SS-B) Ton 2.738.629,51 2.875.788,79 2.844.653,98 3.252.983,42 3.056.103,50 2.645.200,11 2.920.685,24 3.086.171,85 3.057.290,21 6.394.254,96 2.996.930,21 4.671.179,36 5.442.678,81 2.967.179,80 3.341.226,85

118 4.6.(3) Latasir Kelas A Modifikasi (SS-A Mod) Ton 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

119 4.6.(4) Latasir Kelas B Modifikasi (SS-B Mod) Ton 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4.7 Lapis Tipis Beton Aspal (LTBA) dan Stone Matrix Asphalt Tipis (SMA TIPIS) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

120 4.7.(1) Lapis Tipis Beton Aspal - A (LTBA-A) Ton 2.309.834,19 2.424.778,55 2.400.982,46 2.752.660,54 2.575.665,88 2.144.626,39 2.372.604,62 2.500.307,71 2.479.204,52 5.107.173,08 2.368.417,72 3.645.250,60 4.215.571,77 2.408.331,21 2.703.367,85

BIDANG BINA MARGA BM - 3 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

121 4.7.(2) Lapis Tipis Beton Aspal - B Halus (LTBA-B Halus) Ton 2.103.909,01 2.209.397,73 2.187.872,87 2.516.663,32 2.347.502,93 1.953.029,43 2.163.488,96 2.279.214,91 2.260.198,26 4.709.182,75 2.153.886,66 3.325.030,44 3.845.004,80 2.195.950,66 2.464.474,08

122 4.7.(3) Lapis Tipis Beton Aspal - B Halus (LTBA-B Kasar) Ton 1.888.316,28 1.983.086,91 1.964.226,66 2.268.877,75 2.106.324,19 1.754.372,34 1.945.618,61 2.047.330,97 2.030.773,33 4.279.086,42 1.929.809,33 2.980.325,98 3.442.658,16 1.974.269,09 2.212.041,38

123 4.7.(4) Lapis Tipis Beton Aspal - B Halus Modifikasi Kasar (LTBA-B Mod Kasar) Ton 1.948.318,40 2.045.763,23 2.026.271,60 2.337.773,69 2.172.547,64 1.812.765,59 2.009.266,71 2.114.455,69 2.097.273,24 4.399.765,47 1.995.261,09 3.077.142,90 3.554.294,56 2.038.866,80 2.284.334,35
124 4.7.(5) Stone Matrix Asphalt Tipis (SMA Tipis) Ton 3.026.572,03 3.178.540,19 3.106.234,31 3.932.790,95 3.361.140,01 2.870.916,96 3.125.852,66 3.342.408,98 3.323.258,18 18.988.068,30 3.176.982,80 7.876.123,64 9.932.128,75 3.209.182,23 3.574.107,43
125 4.7.(6) Stone Matrix Asphalt Modifikasi Tipis (SMA Mod Tipis) Ton 3.062.661,62 3.216.433,70 3.143.734,83 3.973.729,92 3.401.544,03 2.905.980,31 3.164.374,04 3.383.366,60 3.363.741,53 19.045.374,03 3.216.719,15 7.932.760,27 9.997.037,08 3.248.330,90 3.618.759,53
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.8 Penambalan Dangkal Perkerasan Beton Semen Bersambung Tanpa Tulangan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
126 4.8.(1) M3 1.541.789,83 1.588.210,85 1.571.320,29 1.776.585,02 1.677.676,14 1.478.488,17 1.612.204,18 1.690.884,26 1.682.685,27 3.213.556,04 1.652.987,34 2.500.277,06 2.816.085,68 1.638.706,99 1.825.736,74
Lintas Umur Beton < 24 jam

Tambalan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
127 4.8.(2) M3 654.998,50 656.730,00 652.503,80 755.491,24 688.749,95 618.287,38 667.824,92 689.802,41 687.861,13 1.297.265,60 683.680,70 972.028,93 1.078.665,04 675.375,83 729.856,98
Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari

Tambahan Dangkal dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
128 4.8.(3) M3 655.631,41 657.188,77 652.962,57 755.963,17 689.221,88 618.752,72 668.281,05 690.271,71 688.330,43 1.297.836,30 684.159,22 972.599,63 1.079.235,74 675.834,59 730.328,91
Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.9 Penambalan Penuh Perkerasan Beton Semen Bersambung Tanpa Tulangan 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
129 4.9.(1) M3 37.209.548,88 39.127.614,76 38.445.494,60 43.370.938,20 41.465.803,22 35.965.626,57 39.392.228,10 41.982.093,46 41.536.421,87 91.724.108,99 40.112.831,39 63.172.217,40 72.152.341,46 40.015.271,28 44.357.447,39
Lintas Umur Beton < 24 jam

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
130 4.9.(2) M3 15.727.306,19 16.516.228,53 16.157.202,95 18.615.375,25 17.402.052,12 15.156.533,68 16.462.091,23 17.595.367,81 17.311.195,89 45.486.618,74 16.531.803,85 25.621.662,93 29.410.658,06 16.599.947,72 17.534.410,91
Lintas Umur Beton lebih dari 1 hari dan kurang dari 3 hari

Tambalan Penuh dengan Beton Semen Cepat Mengeras untuk Pembukaan Lalu
131 4.9.(3) M3 15.722.027,94 16.510.950,28 16.151.924,69 18.609.803,76 17.396.480,62 15.150.962,19 16.456.519,74 17.589.796,32 17.305.624,40 45.480.167,54 16.526.232,36 25.615.211,73 29.402.740,68 16.594.376,23 17.528.839,41
Lintas Umur Beton lebih dari 3 hari dan kurang dari 7 hari

132 4.9.(4) Pemasangan Ruji (Dowel) Buah 138.990,39 144.446,62 143.609,01 169.670,78 148.369,74 135.471,50 147.391,00 150.889,90 150.052,28 283.141,90 150.877,32 204.288,92 227.122,18 148.703,66 158.405,16

133 4.9.(5) Pemasangan Sealant M1 1.098,98 960,59 960,57 1.014,37 995,88 981,08 967,97 978,77 978,76 1.223,28 1.001,20 1.152,10 1.236,60 974,43 988,43

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.10 Penambahan Penyalurab Beban Pada Perkerasan Beton Semen (Dowel Retrofit) 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Penambahan dan/atau Penggantian Ruji (Dowel) pada Perkerasan Beton Semen


134 4.10.(1) Buah 417.122,42 409.319,10 409.265,53 496.583,61 422.555,66 387.172,76 420.803,78 424.225,14 424.246,18 740.868,39 427.925,71 542.403,21 585.099,91 421.941,99 437.571,87
dengan Epoksi

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

4.11 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

135 4.11.(1) Penjahitan Melintang Tipe 1 (tabel pelat beton = 150 - 175 mm) Buah 26.694,60 27.122,43 27.122,38 29.393,13 27.613,75 26.960,29 27.361,50 27.368,03 27.368,05 36.456,16 27.864,21 30.949,42 32.940,82 27.501,22 27.830,53

136 4.11.(2) Penjahitan Melintang Tipe 2 (tabel pelat beton = > 175 mm - 200 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

137 4.11.(3) Penjahitan Melintang Tipe 3 (tabel pelat beton = > 200 mm - 225 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

138 4.11.(4) Penjahitan Melintang Tipe 4 (tabel pelat beton = > 225 mm - 250 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

139 4.11.(5) Penjahitan Melintang Tipe 5 (tabel pelat beton = > 250 mm - 275 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

140 4.11.(6) Penjahitan Melintang Tipe 6 (tabel pelat beton = > 275 mm -300 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

141 4.11.(7) Penjahitan Melintang Tipe 7 (tabel pelat beton = > 300 mm - 325 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

142 4.11.(8) Penjahitan Melintang Tipe 8 (tabel pelat beton = > 325 mm - 350 mm) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.12 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

143 4.12.(1) Penutupan Sambungan Melintang (Termoplastik) M1 262.555,83 268.685,70 266.428,70 286.965,26 274.840,04 258.731,74 270.125,32 274.729,23 274.739,07 382.126,11 272.895,92 328.971,58 350.705,35 270.276,83 280.934,38

144 4.12.(2) Penutupan Sambungan Melintang (Termoseting) M1 320.463,22 330.791,06 328.515,54 355.435,84 341.252,38 314.796,30 334.308,80 345.733,37 343.458,04 531.673,30 339.001,89 450.533,08 493.203,97 336.611,44 362.914,19

145 4.12.(3) Penutupan Sambungan Melintang (Preformed) M1 786.872,62 790.373,68 790.373,58 815.014,56 794.008,60 783.482,00 793.891,02 793.938,55 793.938,59 875.195,77 794.033,14 819.093,89 829.906,92 793.918,21 797.466,47

146 4.12.(4) Penutupan Sambungan Memanjang (Termoplastik) M1 262.555,83 268.685,70 266.428,70 286.965,26 274.840,04 258.731,74 270.125,32 274.729,23 274.739,07 382.126,11 272.895,92 328.971,58 350.705,35 270.276,83 280.934,38

147 4.12.(5) Penutupan Sambungan Memanjang (Termoseting) M1 320.463,22 330.791,06 328.515,54 355.435,84 341.252,38 314.796,30 334.308,80 345.733,37 343.458,04 531.673,30 339.001,89 450.533,08 493.203,97 336.611,44 362.914,19

148 4.12.(6) Penutupan Sambungan Memanjang (Preformed) M1 786.872,62 790.373,68 790.373,58 815.014,56 794.008,60 783.482,00 793.891,02 793.938,55 793.938,59 875.195,77 794.033,14 819.093,89 829.906,92 793.918,21 797.466,47
149 4.12.(7) Penutupan Retak (Termoplastik) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
150 4.12.(8) Penutupan Retak (Termoseting) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
4.13 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
151 4.13.(1) Pengeboran Lubang Buah 5.692,63 5.703,54 5.703,47 5.790,68 5.725,48 5.691,90 5.714,31 5.716,44 5.716,46 6.027,61 5.727,01 5.841,75 5.905,32 5.717,43 5.730,27
152 4.13.(2) Material Injeksi Berbahan Dasar Semen Kg 471.726,33 495.970,07 490.582,57 543.122,93 528.307,32 20.534,37 23.216,67 24.566,27 23.219,40 60.997,85 23.230,85 36.740,49 42.155,25 23.219,94 26.320,48
153 4.13.(3) Material Injeksi Berbahan Dasar Cellular Kg 562.792,17 590.910,30 585.286,67 647.162,47 630.291,59 211.328,38 232.403,54 247.874,52 245.062,70 253.589,85 239.452,51 378.702,36 430.750,60 236.625,10 270.372,86

BIDANG BINA MARGA BM - 4 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
E DIVISI 5. PERKERASAN BERBUTIR 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
154 5.1.(1) Lapis Pondasi Agregat Kelas A M3 913.436,77 959.002,93 950.083,91 1.068.918,83 1.019.572,63 835.339,33 921.457,21 973.702,68 966.300,92 1.988.729,27 847.990,69 1.312.148,66 1.485.092,63 936.399,73 1.056.961,91
155 5.1.(2) Lapis Pondasi Agregat Kelas B M3 842.483,31 884.501,41 875.703,75 987.047,52 939.857,60 794.695,99 876.705,31 926.777,65 919.476,59 1.889.894,88 763.299,29 1.178.714,52 1.333.213,23 891.444,83 1.005.830,10
156 5.1.(3) Lapis Pondasi Agregat Kelas S M3 794.851,94 834.488,86 827.052,15 932.546,28 886.164,70 761.223,82 839.930,14 887.728,68 880.326,92 1.809.369,72 699.759,65 1.077.943,62 1.218.276,77 853.390,35 962.242,28
157 5.1.(4) Lapis Drainase M3 1.117.405,36 1.172.543,00 1.162.283,72 1.302.533,33 1.248.269,07 908.763,78 1.002.429,12 1.059.804,60 1.052.503,33 2.167.863,75 906.481,02 1.406.237,92 1.592.634,24 1.018.607,09 1.151.077,20
158 5.2,(1) Lapis Permukaan Agregat Tanpa Penutup Aspal M3 919.482,06 965.164,79 956.243,96 1.075.963,54 1.025.925,19 841.337,28 927.711,56 979.978,68 972.577,63 1.998.201,46 854.367,14 1.319.680,03 1.493.214,37 942.685,48 1.063.380,38
159 5.2,(2) Lapis Pondasi Agregat Tanpa Penutup Aspal M3 913.222,09 958.788,24 949.869,23 1.068.695,63 1.019.349,43 835.116,13 921.243,55 973.489,02 966.087,26 1.988.473,69 847.767,49 1.311.906,71 1.484.828,54 936.183,34 1.056.745,52
160 5.3.(1.a) Perkerasan Beton Semen (PPC) M3 2.255.950,28 2.363.742,37 2.317.259,81 2.991.745,77 2.487.114,29 2.101.868,20 2.298.380,95 2.426.632,98 2.418.920,26 13.908.696,71 2.289.276,44 5.588.905,40 6.993.155,27 2.351.682,66 2.570.396,42
161 5.3.(1.a) Perkerasan Beton Semen (OPC Tipe I + Fly ash) M3 2.305.827,25 2.415.717,74 2.368.585,57 3.049.173,00 2.542.413,42 2.150.608,30 2.351.086,89 2.482.436,41 2.474.065,62 14.009.960,86 2.344.107,20 5.673.456,80 7.087.166,65 2.405.131,97 2.630.370,85
162 5.3.(1.b) Perkerasan Beton Semen Fast Track 8 Jam M3 4.365.881,70 4.580.404,88 4.512.349,35 5.480.848,52 4.842.334,49 4.133.231,87 4.532.228,70 4.773.446,82 4.782.836,67 20.359.592,86 4.576.501,73 9.776.253,62 11.887.944,62 4.624.065,11 5.157.737,31
163 5.3.(1.c) Perkerasan Beton Semen Fast Track 24 Jam M3 3.905.218,02 4.093.547,80 4.025.479,98 4.947.039,86 4.329.192,44 3.698.662,64 4.046.398,78 4.287.712,18 4.269.798,24 19.435.688,77 4.090.804,73 8.944.095,32 10.950.119,51 4.138.264,37 4.591.183,70
164 5.3.(2.a) Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3 2.781.061,26 2.904.432,46 2.857.311,58 3.632.526,53 3.044.836,57 2.612.523,94 2.853.448,89 2.984.690,50 2.976.315,20 14.821.638,99 2.846.312,39 6.268.952,60 7.723.477,93 2.907.463,12 3.146.109,17
165 5.3.(2.b) Perkerasan Beton Semen Fast Track 8 Jam dengan Anyaman Tulangan Tunggal M3 5.410.041,40 5.641.008,37 5.572.419,47 6.647.637,45 5.912.636,61 5.155.273,41 5.606.146,45 5.848.559,33 5.858.159,27 21.808.680,13 5.651.182,94 10.977.522,78 13.148.794,88 5.698.663,67 6.248.343,38
166 5.3.(2.c) Perkerasan Beton Semen Fast Track 24 Jam dengan Anyaman Tulangan Tunggal M3 4.918.485,75 5.122.144,07 5.053.555,17 6.074.155,85 5.366.463,66 4.691.026,40 5.087.282,15 5.329.695,03 5.311.986,32 20.825.568,82 5.132.318,64 10.103.646,06 12.165.683,57 5.179.799,36 5.647.553,13
167 5.3.(3) Lapis Pondasi bawah Beton Kurus (Concrete Vibrator) M3 1.624.846,04 1.700.347,23 1.665.390,33 2.078.722,97 1.792.312,30 1.504.214,70 1.627.030,45 1.732.833,77 1.725.147,95 9.751.703,50 1.608.364,96 3.968.302,38 4.963.535,61 1.668.776,90 1.844.990,82
168 5.4.(1) Stabilisasi Tanah Dasar dengan Semen Ton 872.973,33 887.637,58 881.139,85 1.003.123,54 902.455,01 858.331,64 889.230,63 902.623,28 902.635,03 2.762.655,52 896.437,88 1.403.530,74 1.622.771,86 895.824,54 917.321,20
169 5.4.(2) Lapis Fondasi Tanah Semen M3 881.071,18 909.807,53 893.549,09 1.102.618,65 941.640,63 855.313,32 904.422,38 943.346,15 943.359,25 5.075.329,43 924.384,39 2.085.285,32 2.583.166,36 922.280,61 981.136,45
170 5.5.(1) Lapis Fondasi Agregat Semen Kelas A (Cement Treated Base = CTB) M3 1.019.242,65 1.069.879,45 1.049.958,69 1.279.273,27 1.132.706,58 942.052,82 1.027.498,77 1.095.432,66 1.089.404,98 5.206.240,57 980.356,10 2.237.844,85 2.760.789,71 1.052.323,01 1.176.761,28
171 5.5.(2) Lapis Fondasi Agregat Semen Kelas B (Cement Treated Sub-Base = CTSB) M3 916.856,77 962.383,99 945.099,08 1.142.816,17 1.018.892,38 866.511,34 946.730,88 1.008.181,12 1.002.153,31 4.406.242,01 863.134,82 1.903.304,03 2.333.717,41 968.918,29 1.084.279,15
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
F DIVISI 6. PERKERASAN ASPAL 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
172 6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 41.978,17 43.963,13 43.568,04 48.183,95 46.935,75 40.586,17 44.564,89 47.330,84 46.936,11 88.467,35 45.754,52 69.742,62 82.027,95 45.355,80 51.487,84
173 6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 40.156,07 42.145,27 41.750,15 46.199,98 44.926,45 38.958,12 42.750,79 45.321,24 45.123,93 84.793,55 43.943,79 67.975,70 78.695,80 43.542,17 49.482,85
174 6.1 (2b) Lapis Perekat - Aspal Emulsi Modifikasi Polimer Liter 56.780,63 59.497,15 58.873,44 65.214,32 63.462,84 54.896,92 60.341,66 64.086,21 63.462,90 119.746,69 61.804,80 94.367,19 110.843,55 61.382,40 69.712,86
175 6.2 (1) Agregat Penutup BURTU M2 12.833,54 13.445,78 13.323,13 14.858,72 14.297,24 12.459,83 13.669,54 14.459,40 14.337,25 29.219,62 14.022,10 21.700,91 24.572,36 13.902,02 15.692,65
176 6.2 (2) Agregat Penutup BURDA M2 17.413,41 18.226,87 18.067,11 20.190,71 19.359,92 16.918,31 18.532,21 19.561,76 19.402,90 39.209,58 19.004,23 29.147,18 32.960,08 18.838,26 21.186,20
177 6.2 (3a) Bahan Aspal Keras untuk Pekerjaan Pelaburan Liter 19.267,56 20.220,15 19.983,03 22.147,05 21.525,75 18.668,49 20.460,44 21.764,46 21.527,65 40.600,18 21.054,44 32.353,73 37.703,05 20.816,32 23.664,50
178 6.2 (3b) Bahan Aspal Emulsi Modifikasi untuk Pekerjaan Pelaburan Liter 49.517,86 51.891,86 51.344,94 56.843,79 55.356,89 47.870,97 52.624,17 55.905,40 55.358,80 104.499,39 53.901,54 82.376,08 96.791,38 53.535,86 60.830,47
179 6.2 (4a) Aspal Cair untuk Precoated Liter 19.589,49 20.592,75 20.410,33 23.969,81 21.872,18 18.862,09 21.048,74 22.052,69 21.870,28 42.770,38 21.507,75 32.097,01 37.028,20 21.323,03 23.786,24
180 6.2 (4b) Aspal Emulsi untuk Precoated Liter 22.005,87 23.073,09 22.836,19 25.215,90 24.616,67 21.296,24 23.311,13 24.851,66 24.614,76 46.569,07 24.024,81 36.835,01 43.122,45 23.785,60 27.104,03
181 6.2 (4c) Aspal Emulsi Modifikasi Polimer untuk Precoated Liter 32.074,12 33.615,14 33.259,79 36.824,00 35.869,42 31.009,14 34.090,08 36.222,86 35.867,51 67.771,62 34.922,21 53.418,01 62.785,15 34.683,00 39.422,83
182 6.3 (1a) Stone Matrix Asphalt Halus (SMA Halus) Ton 2.051.140,15 2.153.261,14 2.133.562,84 2.439.633,34 2.290.918,77 1.950.845,66 2.163.190,60 2.278.246,81 2.260.002,91 4.448.577,61 2.155.882,96 3.293.200,19 3.789.020,46 2.194.433,29 2.467.228,58
183 6.3 (1b) Stone Matrix Asphalt Modifikasi Halus (SMA Mod Halus) Ton 2.893.129,41 3.033.598,07 3.006.174,42 3.404.250,77 3.232.656,17 2.762.725,47 3.058.825,66 3.227.558,15 3.201.552,21 6.223.693,02 3.067.259,09 4.671.752,72 5.426.516,66 3.105.362,28 3.500.737,88
184 6.3 (2a) Stone Matrix Asphalt Kasar (SMA Kasar) Ton 2.024.505,28 2.125.465,27 2.106.033,58 2.409.138,34 2.261.538,83 1.928.146,20 2.138.502,18 2.252.273,63 2.234.229,26 4.402.288,29 2.130.899,70 3.256.624,62 3.746.956,29 2.169.394,67 2.439.286,82
185 6.3 (2b) Stone Matrix Asphalt Modifikasi Kasar (SMA Mod Kasar) Ton 2.841.874,95 2.979.952,38 2.952.913,89 3.342.132,63 3.175.828,05 2.716.508,79 3.007.406,78 3.174.017,95 3.148.329,99 6.122.315,62 3.015.296,37 4.596.452,57 5.339.782,89 3.053.354,69 3.443.287,09
186 6.3(3) Lataston Lapis Aus (HRS-WC) Ton 2.202.419,71 2.313.769,66 2.289.148,75 2.629.184,59 2.459.826,42 2.094.679,71 2.316.705,04 2.447.095,16 2.425.152,13 5.258.308,30 2.337.478,43 3.682.776,04 4.287.899,77 2.353.685,29 2.649.545,29
187 6.3.(4) Lataston Lapis Fondasi (HRS-Base) Ton 1.913.293,58 2.010.405,07 1.989.327,32 2.296.978,19 2.136.933,61 1.815.741,46 2.010.992,33 2.122.082,14 2.103.677,63 4.667.916,95 2.019.608,52 3.198.458,95 3.723.510,15 2.042.730,98 2.296.226,48
188 6.3(5a) Laston Lapis Aus (AC-WC) Ton 2.007.799,58 2.109.681,01 2.088.599,69 2.397.979,56 2.243.701,31 1.872.961,91 2.075.152,18 2.189.720,48 2.170.784,21 4.554.129,33 2.060.721,41 3.203.286,51 3.708.297,24 2.107.308,66 2.371.275,24
189 6.3(5b) Laston Lapis Aus Modifikasi (AC-WC Mod) Ton 2.831.605,78 2.970.895,91 2.942.149,28 3.338.345,17 3.165.186,32 2.667.589,22 2.950.971,58 3.118.791,54 3.092.153,67 6.287.856,00 2.952.164,70 4.553.783,77 5.313.805,75 2.998.301,86 3.383.248,28
190 6.3(6a) Laston Lapis Antara (AC-BC) Ton 1.901.148,78 1.998.000,65 1.978.135,54 2.275.460,32 2.125.142,82 1.774.738,37 1.967.764,30 2.075.967,28 2.058.131,72 4.345.507,38 1.950.682,23 3.037.126,65 3.515.477,91 1.998.184,72 2.248.078,80
191 6.3(6b) Laston Lapis Antara Modifikasi (AC-BC Mod) Ton 2.668.696,24 2.800.570,63 2.773.632,40 3.154.687,67 2.983.828,12 2.514.891,33 2.784.318,28 2.941.625,74 2.916.680,92 5.965.059,27 2.781.671,22 4.295.051,87 5.009.999,79 2.828.727,65 3.190.698,77
192 6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 1.740.092,10 1.829.048,12 1.811.121,82 2.090.425,14 1.945.257,33 1.627.890,77 1.806.834,47 1.904.908,31 1.888.826,90 4.030.051,69 1.785.680,98 2.784.739,23 3.221.453,65 1.834.499,68 2.062.088,27
193 6.3(7b) Laston Lapis Fondasi Modifikasi (AC-Base Mod) Ton 2.394.635,57 2.513.290,97 2.489.236,41 2.836.760,34 2.677.409,54 2.259.371,46 2.502.546,86 2.643.099,13 2.620.857,24 5.406.315,67 2.493.938,27 3.858.095,59 4.497.477,85 2.542.309,42 2.866.227,22
194 6.3.(8) Bahan anti pengelupasan Kg 47.380,00 48.564,50 48.564,50 56.856,00 49.749,00 46.195,50 49.749,00 49.749,00 49.749,00 76.992,50 49.749,00 58.040,50 61.594,00 49.749,00 50.933,50
195 6.4.(1a) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Zeolit Ton 2.115.584,55 2.217.074,93 2.196.071,82 2.519.042,15 2.364.998,54 1.982.318,47 2.198.334,57 2.312.467,62 2.293.587,07 4.799.188,19 2.184.641,38 3.395.878,56 3.928.463,02 2.230.368,29 2.507.806,88
196 6.4.(1b) Laston Hangat Pen.60-70, WMAC Lapis Aus (WMAC-WC) dengan Wax Ton 2.052.086,85 2.156.182,65 2.135.101,33 2.448.909,92 2.293.524,49 1.916.142,00 2.122.761,00 2.240.650,84 2.220.607,39 4.648.239,78 2.109.437,41 3.280.789,24 3.795.764,60 2.156.024,66 2.426.634,32
197 6.4.(2a) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Zeolit Ton 2.010.074,35 2.106.544,71 2.086.746,42 2.397.893,73 2.247.717,48 1.885.218,18 2.092.195,30 2.199.983,16 2.182.203,95 4.595.895,92 2.075.866,69 3.232.363,37 3.738.869,72 2.122.503,80 2.386.004,28
198 6.4.(2b) Laston Hangat Pen.60-70, WMAC Lapis Antara (WMAC-BC) dengan Wax Ton 1.941.721,97 2.040.602,46 2.020.737,89 2.322.119,45 2.170.787,92 1.814.299,54 2.011.383,15 2.122.629,60 2.103.778,92 4.431.718,90 1.995.321,80 3.108.144,51 3.595.626,00 2.042.818,25 2.298.798,52
199 6.4.(3a) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Zeolit Ton 1.849.492,51 1.938.047,91 1.920.201,01 2.213.292,91 2.068.384,99 1.738.882,59 1.931.868,39 2.029.499,34 2.013.474,64 4.278.873,79 1.911.462,69 2.980.289,97 3.445.019,32 1.959.408,72 2.200.686,20
200 6.4.(3b) Laston Hangat Pen.60-70, WMAC Lapis Fondasi (WMAC-Base) dengan Wax Ton 1.786.291,67 1.877.562,14 1.859.635,84 2.143.549,51 1.997.244,34 1.672.934,66 1.856.504,02 1.958.054,45 1.940.814,00 4.128.313,17 1.836.508,70 2.865.673,01 3.312.807,89 1.885.328,16 2.119.866,84

BIDANG BINA MARGA BM - 5 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

201 6.5.(1) Laston Lapis Aus Asbuton (AC-WC Asb) Ton 2.412.296,12 2.532.934,58 2.507.978,89 2.853.836,84 2.696.468,40 2.265.122,12 2.506.322,37 2.646.189,43 2.625.163,36 5.145.504,75 2.504.241,72 3.836.731,04 4.414.953,48 2.544.851,98 2.869.617,97
202 6.5.(2) Laston Lapis Antara Asbuton (AC-BC Asb) Ton 2.305.605,07 2.421.212,14 2.397.473,02 2.731.271,50 2.577.864,91 2.166.894,92 2.398.930,46 2.532.432,21 2.512.506,47 4.936.874,01 2.394.202,54 3.670.571,18 4.222.134,15 2.435.724,01 2.746.416,96
203 6.5.(3) Laston Lapis Fondasi Asbuton (AC-Base Asb) Ton 2.144.103,07 2.251.797,01 2.230.008,92 2.545.636,65 2.397.497,28 2.019.705,03 2.237.640,14 2.360.992,11 2.342.819,06 4.617.944,63 2.228.833,11 3.416.998,83 3.926.569,66 2.271.667,54 2.560.033,70
204 6.6.(1) CPHMA Kemasa Kantong Ton 1.152.006,42 1.208.653,89 1.197.976,14 1.338.815,03 1.286.928,91 1.116.894,08 1.229.676,77 1.302.227,56 1.292.758,25 2.437.300,96 1.261.144,28 1.969.405,73 2.232.503,19 1.251.130,89 1.416.995,80
205 6.7.(1) Lapis Penetrasi Macadam M3 2.888.458,73 3.030.219,75 2.999.309,99 3.344.544,57 3.222.967,83 2.755.971,35 3.025.446,03 3.207.645,56 3.176.827,64 6.212.287,07 2.965.905,82 4.555.096,46 5.240.361,65 3.076.181,52 3.481.410,00
206 6.7.(2) Lapis Penetrasi Macadam Asbuton M3 8.979.633,39 9.394.236,55 9.337.808,22 10.338.517,87 10.048.632,85 8.637.216,93 9.460.957,44 10.062.551,48 10.006.194,18 19.086.992,02 9.584.844,61 14.635.423,88 17.166.051,46 9.657.653,93 10.969.300,34
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
G DIVISI 7. STRUKTUR 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
207 7.1 (1) Beton struktur, fc’50 MPa M3 3.589.412,32 3.740.358,97 3.667.394,21 4.578.470,09 4.082.881,70 3.680.264,31 3.851.092,39 4.110.847,96 4.011.495,36 21.144.688,26 3.891.496,27 9.054.959,64 11.514.031,39 3.925.330,62 4.309.615,51
208 7.1 (2) Beton struktur, fc’45 MPa M3 3.506.797,49 3.653.615,08 3.584.992,71 4.452.210,68 3.992.112,05 3.600.906,63 3.767.805,53 4.018.976,11 3.919.652,40 19.909.044,06 3.802.825,81 8.661.177,24 10.987.481,30 3.837.655,55 4.213.882,25
209 7.1 (3) Beton struktur, fc’40 MPa M3 3.402.042,15 3.543.972,40 3.480.270,14 4.297.439,04 3.877.214,25 3.500.426,71 3.662.517,88 3.903.785,55 3.804.538,27 18.507.227,50 3.692.363,93 8.205.841,37 10.380.748,89 3.727.367,56 4.093.924,14
210 7.1 (4) Beton struktur, fc’35 MPa M3 3.302.238,14 3.439.172,19 3.380.490,33 4.146.992,11 3.767.441,95 3.405.412,75 3.562.579,97 3.793.733,29 3.694.565,96 17.085.889,84 3.587.163,90 7.749.989,39 9.772.459,46 3.622.325,72 3.978.987,58
211 7.1 (5a) Beton struktur, fc’30 MPa M3 2.689.194,82 2.814.137,02 2.760.361,00 3.415.461,32 3.117.737,72 2.792.480,41 2.936.574,27 3.155.561,53 3.056.440,13 14.958.511,16 2.940.182,11 6.665.813,75 8.513.986,86 2.990.105,88 3.318.471,18
212 7.1 (5b) Beton strukutr bervolome besar, fc'30 MPa M3 2.814.754,63 2.946.596,84 2.892.820,81 3.563.439,20 3.258.815,61 2.912.858,29 3.072.467,59 3.301.804,84 3.202.683,44 15.252.928,32 3.081.260,00 6.901.910,80 8.787.291,65 3.129.383,22 3.480.414,01
213 7.1 (5c) Beton strukutr memadat sendiri, fc'30 MPa M3 2.599.922,78 2.720.367,76 2.668.149,27 3.305.572,25 3.018.212,43 2.711.116,08 2.852.612,38 3.064.848,56 2.967.946,78 14.516.312,80 2.862.169,17 6.499.844,82 8.306.295,88 2.904.387,23 3.217.633,45
214 7.1 (6a) Beton struktur, fc’25 Mpa M3 2.568.841,25 2.689.228,71 2.639.922,61 3.249.103,45 2.986.395,88 2.675.716,04 2.817.052,48 3.026.911,54 2.927.918,27 13.669.914,71 2.815.656,32 6.228.309,94 7.941.580,37 2.865.992,79 3.183.628,61
215 7.1 (6b) Beton struktur bervolume besar, fc’25 Mpa M3 2.724.091,25 2.851.378,71 2.802.072,61 3.428.503,45 3.158.895,88 2.827.516,04 2.982.652,48 3.202.861,54 3.103.868,27 14.001.114,71 2.988.156,32 6.500.859,94 8.252.080,37 3.035.042,79 3.376.828,61
216 7.1 (6c) Beton struktur memadat sendiri, fc’25 Mpa M3 2.554.390,68 2.672.632,71 2.622.671,66 3.238.204,39 2.968.060,66 2.668.149,58 2.807.416,40 3.015.152,90 2.918.211,96 13.887.940,35 2.815.220,94 6.297.449,77 8.036.408,98 2.856.910,67 3.165.793,77
217 7.1 (7a) Beton strukur, fc’20 MPa M3 2.638.998,61 2.750.335,55 2.705.078,45 3.253.364,36 3.052.652,96 2.767.230,32 2.876.654,02 3.081.869,40 2.982.928,01 12.640.981,60 2.887.450,21 6.037.405,13 7.621.298,20 2.923.063,14 3.238.207,82
218 7.1 (7b) Beton strukut bervolume besar, fc’20 MPa M3 2.794.248,61 2.912.485,55 2.867.228,45 3.432.764,36 3.225.152,96 2.919.030,32 3.042.254,02 3.257.819,40 3.158.878,01 12.972.181,60 3.059.950,21 6.309.955,13 7.931.798,20 3.092.113,14 3.431.407,82
219 7.1 (7c) Beton strukut memadat sendiri, fc’20 MPa M3 2.670.317,85 2.781.291,55 2.733.820,01 3.304.837,17 3.084.297,34 2.803.734,83 2.912.863,75 3.119.347,37 3.022.292,93 13.310.342,18 2.933.550,53 6.261.609,47 7.921.074,36 2.961.423,84 3.271.634,93
220 7.1 (7d) Beton strukut, fc’20 MPa yang dilaksanakan di air M3 3.565.985,05 3.682.790,01 3.637.289,57 4.256.778,61 4.029.629,32 3.727.187,36 3.836.619,18 4.043.740,39 3.944.582,14 13.875.124,37 3.863.576,85 7.162.522,10 8.935.636,46 3.888.897,50 4.208.346,95
221 7.1 (8) Beton , fc’15 Mpa M3 2.631.136,99 2.742.072,73 2.696.995,71 3.243.502,47 3.043.894,62 2.760.560,80 2.869.427,13 3.074.090,99 2.975.198,96 12.597.208,17 2.880.992,37 6.020.460,05 7.599.941,55 2.915.622,64 3.229.834,91
222 7.1 (9) Beton Siklop, fc’15 Mpa M3 1.239.463,66 1.288.937,81 1.261.773,21 1.553.504,28 1.354.194,58 1.164.858,10 1.232.064,45 1.308.939,19 1.304.379,80 7.594.199,83 1.228.241,20 3.046.482,58 3.818.472,72 1.264.094,07 1.385.032,64
223 7.1 (10) Beton, fc’10 Mpa M3 2.623.320,53 2.734.008,53 2.692.017,59 3.207.362,66 3.036.892,77 2.745.391,64 2.856.412,22 3.057.503,41 2.958.063,27 11.648.672,12 2.855.717,02 5.759.629,48 7.234.566,40 2.899.912,36 3.215.875,91
224 7.2 (1a) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 98.397.626,87 102.800.264,28 102.188.154,42 118.285.608,23 108.426.123,67 95.220.135,97 105.302.359,41 109.106.484,85 108.956.653,53 213.230.559,43 107.155.237,13 155.856.487,62 174.593.972,31 107.009.244,46 117.727.619,06
225 7.2 (1b) Penyediaan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 167.496.154,50 175.376.812,04 174.335.353,03 204.398.671,20 185.346.979,56 161.705.413,52 180.008.162,37 186.540.176,41 186.223.372,05 372.673.308,63 183.141.497,87 268.731.091,01 301.736.419,77 183.105.023,60 201.783.060,69
226 7.2 (1c) Penyediaan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
227 7.2 (2a) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 16 meter Buah 8.343.499,02 8.443.430,40 8.436.628,83 9.046.328,16 8.474.439,94 8.186.720,19 8.510.956,23 8.531.437,95 8.534.118,60 10.864.806,90 8.533.931,96 9.460.275,43 9.936.552,07 8.521.188,74 8.623.348,99
228 7.2 (2b) Pemasangan Unit Pracetak Gelagar Tipe I Bentang 25 meter Buah 10.515.931,63 10.641.882,58 10.633.310,05 11.401.759,41 10.680.966,20 10.318.331,63 10.726.990,40 10.752.805,03 10.756.183,66 13.693.723,26 10.755.948,42 11.923.487,91 12.523.774,74 10.739.887,19 10.868.647,34
229 7.2 (2c) Pemasangan Unit Pracetak Gelagar Tipe I Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
230 7.2 (3a) Penyediaan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 379.006.248,94 398.477.090,92 396.487.735,78 484.501.976,14 421.976.321,31 363.555.584,72 411.510.247,81 424.591.362,35 423.326.661,87 882.296.734,38 417.444.185,49 612.171.091,58 688.305.694,02 419.518.934,41 460.084.754,75
231 7.2 (3b) Penyediaan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
232 7.2 (4a) Pemasangan Unit Pracetak Gelagar Tipe U Bentang 16 meter Buah 10.515.931,63 10.641.882,58 10.633.310,05 11.401.759,41 10.680.966,20 10.318.331,63 10.726.990,40 10.752.805,03 10.756.183,66 13.693.723,26 10.755.948,42 11.923.487,91 12.523.774,74 10.739.887,19 10.868.647,34
233 7.2 (4b) Pemasangan Unit Pracetak Gelagar Tipe U Bentang … meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
234 7.2.(5) Penyediaan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
235 7.2.(6) Pemasangan Unit Pracetak Gelagar Box bentang ... meter lebar ……meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
236 7.2.(7) Baja Prategang Kg 450.527,81 463.117,30 461.786,62 528.172,23 478.218,67 442.719,29 470.725,89 477.804,31 476.677,78 697.049,87 478.671,44 558.861,86 596.045,94 473.252,13 495.337,69
237 7.2.(8) Penyediaan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
238 7.2.(9) Pemasangan Pelat Berongga (Voided Slab) Pracetak bentang ….. Meter Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Beton Pratekan untuk Diafragma fc' 45 MPa termasuk Pekerjaan pasca-tarik (post-
239 7.2.(10) M3 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
tension)

240 7.2.(11a) Penyediaan Balok T Beton Pratekan bentang 40m Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
241 7.2.(11b) Pemasangan Balok T Beton Pratekan bentang 60 m Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
242 7.2.(12a) Penyediaan Panel Full Depth slab Buah 1.664.069,07 1.718.365,58 1.713.099,40 1.975.477,45 1.781.034,48 1.619.124,07 1.752.469,79 1.786.610,90 1.782.147,12 3.086.342,90 1.774.555,45 2.323.133,17 2.546.393,82 1.778.885,31 1.886.257,48
243 7.2.(12b) Penmasangan Panel Full Depth slab Buah 767.163,66 776.270,51 775.650,68 831.559,57 779.442,83 753.222,64 782.378,02 784.244,54 784.488,83 998.433,98 784.864,39 870.206,70 913.841,19 783.356,71 792.897,60
244 7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 25.041,25 26.248,75 26.248,75 34.810,50 27.680,50 24.035,00 27.479,25 27.502,25 27.502,25 56.120,00 27.657,50 36.627,50 40.710,00 27.513,75 28.847,75
245 7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 25.633,50 27.433,25 27.433,25 34.810,50 27.680,50 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25
246 7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 25.633,50 27.433,25 27.433,25 34.810,50 27.680,50 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25
247 7.3 (4) Baja Tulangan Sirip BjTS 420B Kg 25.633,50 27.433,25 27.433,25 34.810,50 27.680,50 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25
248 7.3 (5) Baja Tulangan Sirip BjTS 520 Kg 26.225,75 27.433,25 27.433,25 35.995,00 28.865,00 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25

BIDANG BINA MARGA BM - 6 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

249 7.3 (6) Baja Tulangan Sirip BjTS 550 Kg 26.225,75 27.433,25 27.433,25 35.995,00 28.865,00 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25
250 7.3 (7) Baja Tulangan Sirip BjTS 700 Kg 26.225,75 27.433,25 27.433,25 35.995,00 28.865,00 25.219,50 28.663,75 28.686,75 28.686,75 57.304,50 28.842,00 37.812,00 41.894,50 28.698,25 30.032,25
251 7.3 (8) Anyaman Kawat Yang Dilas (Welded Wire Mesh) Kg 28.290,00 29.497,50 29.497,50 38.203,00 31.073,00 27.427,50 30.693,50 30.716,50 30.716,50 60.030,00 31.050,00 40.365,00 44.620,00 30.762,50 32.154,00
252 7.4 (1a) Penyediaan Baja Struktur Grade 250 (Kuat Leleh 250 MPa) Kg 33.845,97 34.999,23 34.999,00 43.069,90 36.151,28 32.691,92 36.150,90 36.151,56 36.151,65 62.683,25 36.153,22 44.235,48 47.702,46 36.151,64 37.305,10
253 7.4 (1b) Penyediaan Baja Struktur Grade 345 (Kuat Leleh 345 MPa) Kg 38.445,97 39.599,23 39.599,00 47.669,90 40.751,28 37.291,92 40.750,90 40.751,56 40.751,65 67.283,25 40.753,22 48.835,48 52.302,46 40.751,64 41.905,10
254 7.4 (1c) Penyediaan Baja Struktur Grade 485 (Kuat Leleh 485 MPa) Kg 46.495,97 47.649,23 47.649,00 55.719,90 48.801,28 45.341,92 48.800,90 48.801,56 48.801,65 75.333,25 48.803,22 56.885,48 60.352,46 48.801,64 49.955,10
255 7.4 (1d) Penyediaan Baja Struktur Grade 690 (Kuat Leleh 690 Mpa Untuk Tebal Pelat < 2,5) Kg 38.445,97 39.599,23 39.599,00 47.669,90 40.751,28 37.291,92 40.750,90 40.751,56 40.751,65 67.283,25 40.753,22 48.835,48 52.302,46 40.751,64 41.905,10

Penyediaan Baja Struktur Grade 690 (Kuat Leleh 620 Mpa Untuk Tebal Pelat < 2,5-4,0
256 7.4 (1e) Kg 40.745,97 41.899,23 41.899,00 49.969,90 43.051,28 39.591,92 43.050,90 43.051,56 43.051,65 69.583,25 43.053,22 51.135,48 54.602,46 43.051,64 44.205,10
inch)

257 7.4 (2) Pemasangan Baja Struktur Kg 3.604,27 3.636,79 3.634,58 3.883,16 3.697,03 3.603,38 3.698,09 3.704,76 3.705,63 4.626,11 3.716,39 4.167,66 4.521,92 3.701,69 3.744,83
258 7.4 (3) Penyediaan Struktur Jembatan Rangka Baja Standar …… m Kg 31.545,97 32.699,23 32.699,00 40.769,90 33.851,28 30.391,92 33.850,90 33.851,56 33.851,65 60.383,25 33.853,22 41.935,48 45.402,46 33.851,64 35.005,10
259 7.4 (4) Pemasangan Jembatan Rangka Baja Standar Panjang ….. M Kg 3.604,27 3.636,79 3.634,58 3.883,16 3.697,03 3.603,38 3.698,09 3.704,76 3.705,63 4.626,11 3.716,39 4.167,66 4.521,92 3.701,69 3.744,83
260 7.4 (5a) Pemasangan Jembatan Rangka Baja yang disediakan Pengguna Jasa Kg 3.604,27 3.636,79 3.634,58 3.883,16 3.697,03 3.603,38 3.698,09 3.704,76 3.705,63 4.626,11 3.716,39 4.167,66 4.521,92 3.701,69 3.744,83
261 7.4 (5b) Pengangkutan Bahan Jembatan yang disediakan Pengguna Jasa Kg 31.545,97 32.699,23 32.699,00 40.769,90 33.851,28 30.391,92 33.850,90 33.851,56 33.851,65 60.383,25 33.853,22 41.935,48 45.402,46 33.851,64 35.005,10
262 7.5.(1) Tiang bor sekan primer diameter 80 cm (fc' > 15 MPa) M1 2.160.573,68 2.239.419,54 2.212.292,61 2.625.562,90 2.431.117,45 2.224.082,60 2.325.998,98 2.449.652,47 2.390.887,16 8.428.884,76 2.337.114,93 4.314.605,77 5.302.568,62 2.354.530,36 2.555.680,32
263 7.5.(2) Tiang bor sekan sekunder diameter 80 cm (fc' > 30 MPa) M1 3.179.970,08 3.310.140,59 3.277.579,33 4.053.344,61 3.543.605,48 3.182.688,10 3.435.030,95 3.568.815,66 3.510.015,06 11.900.079,53 3.443.528,63 6.083.756,42 7.365.281,44 3.468.461,73 3.721.847,53
264 7.5.(3) Tiang bor sekan primer diameter 100 cm (fc' > 15MPa) M1 3.041.766,42 3.157.765,70 3.115.542,05 3.711.842,64 3.450.546,63 3.148.620,60 3.286.997,34 3.479.194,70 3.387.309,51 12.647.809,26 3.301.986,60 6.330.914,95 7.847.861,13 3.331.000,04 3.637.382,67
265 7.5.(4) Tiang bor sekan sekunder diameter 100 cm (fc' > 30 MPa) M1 4.108.578,79 4.291.520,35 4.241.107,28 5.314.656,10 4.639.003,41 4.136.353,43 4.469.427,49 4.675.556,71 4.583.496,54 17.207.339,53 4.477.815,71 8.434.299,90 10.364.702,20 4.520.456,32 4.894.228,83
266 7.5.(5) Tiang bor sekan primer diameter 120 cm (fc' > 15 MPa) M1 4.118.779,76 4.280.188,80 4.219.513,59 5.039.517,88 4.696.515,63 4.278.611,48 4.461.550,90 4.737.524,09 4.605.159,05 17.804.272,54 4.481.274,20 8.795.292,83 10.958.774,20 4.524.462,98 4.959.463,31
267 7.5.(6) Tiang bor sekan sekunder diameter 120 cm (fc' > 30 MPa) M1 5.430.880,28 5.683.037,39 5.610.697,96 7.079.939,38 6.173.634,34 5.483.616,89 5.929.723,91 6.224.950,76 6.092.282,70 24.001.728,66 5.938.873,11 11.542.556,83 14.282.135,33 6.002.485,66 6.528.463,19
268 7.5.(7) Tiang bor sekan primer diameter 150 cm (fc' > 15 MPa) M1 6.101.463,42 6.346.467,67 6.251.824,84 7.483.647,29 6.990.231,29 6.358.821,97 6.623.797,21 7.053.994,11 6.847.109,35 27.296.852,66 6.652.235,46 13.331.988,47 16.685.682,34 6.721.519,75 7.393.293,59
269 7.5.(8) Tiang bor sekan sekunder diameter 150 cm (fc' > 15 MPa) M1 8.018.391,45 8.401.827,93 8.289.036,12 10.512.676,62 9.158.959,58 8.112.447,58 8.778.388,29 9.238.189,34 9.030.800,77 36.761.367,02 8.789.670,50 17.457.151,06 21.699.525,39 8.891.341,84 9.701.659,62
270 7.5.(9) Tiang bor sekan primer diameter …… cm (fc' > 15 MPa) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
271 7.5.(10) Tiang bor sekan sekunder diameter ….. cm (fc' > 15 MPa) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
272 7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 63.463,57 63.463,57 63.463,57 67.135,36 67.135,36 65.927,86 64.588,93 64.588,93 64.588,93 89.042,86 67.135,36 79.333,57 86.266,43 65.081,79 67.110,71
273 7.6 (2) Dinding Turap Kayu Tanpa Pengawetan, Penyediaan dan Pemancangan M2 184.668,64 185.646,72 185.451,10 194.995,73 194.408,88 191.083,43 184.731,10 186.027,96 185.839,59 243.559,81 193.496,01 223.825,98 240.682,78 186.743,46 192.120,23
274 7.6.(3) Dinding Turap Kayu Dengan Pengawetan, Penyediaan dan Pemancangan M2 244.006,67 245.179,33 244.944,80 256.971,07 256.267,47 252.280,45 243.422,76 244.979,19 244.758,87 318.179,17 255.180,10 292.063,06 313.928,48 246.327,68 252.288,61
275 7.6.(4) Dinding Turap Baja, Penyediaan dan Pemancangan M2 5.172.681,27 5.356.631,77 5.355.807,88 6.631.970,54 5.540.537,66 4.990.064,55 5.538.479,39 5.541.456,08 5.541.486,41 9.739.730,85 5.540.711,41 6.824.460,22 7.373.929,12 5.539.524,82 5.727.823,58
276 7.6.(5) Dinding Turap Beton, Penyediaan dan Pemancangan M2 1.121.588,22 1.159.053,92 1.146.317,85 1.371.923,77 1.243.383,86 1.139.256,82 1.191.775,60 1.247.021,10 1.225.786,54 4.329.277,34 1.208.143,86 2.200.491,67 2.663.292,61 1.206.191,99 1.296.871,24
277 7.6.(6) Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Ukuran…… mm M1 213.100,23 222.579,10 220.683,33 242.582,31 236.894,98 208.458,36 226.115,56 239.006,83 237.148,97 430.965,71 232.383,04 356.364,19 404.915,23 230.002,45 258.818,23
278 7.6.(7) Penyediaan Tiang Pancang Kayu Dengan Pengawetan Ukuran…… mm M1 219.687,77 229.361,91 227.466,14 250.781,75 243.922,84 214.900,42 233.108,57 245.999,84 244.141,98 442.658,91 239.410,90 364.883,36 414.194,44 237.005,42 266.016,46
279 7.6 (8a) Penyediaan Tiang Pancang Baja Diameter 500 mm tebal 10 mm M1 5.218.388,96 5.403.274,54 5.403.233,56 6.697.512,65 5.588.366,36 5.033.754,69 5.587.803,48 5.587.982,17 5.587.998,30 9.843.701,81 5.588.752,33 6.886.099,90 7.442.271,95 5.587.996,79 5.773.245,20
280 7.6 (8b) Penyediaan Tiang Pancang Baja Diameter …. mm tebal …... mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
281 7.6.(8c) Penyediaan Tiang Pancang Baja Diameter …... mm tebal …… mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
282 7.6.(9a) Penyediaan Tiang Pancang Baja H Beam Ukuran 300 mm x 300 mm x 10 mm x 15 mm M1 2.545.060,60 2.632.632,79 2.632.592,82 3.248.065,38 2.722.795,40 2.460.126,90 2.719.516,30 2.719.682,39 2.719.698,12 4.748.121,88 2.723.167,73 3.345.237,08 3.612.285,59 2.720.159,85 2.809.219,36

Penyediaan Tiang Pancang Baja H Beam Ukuran …..mm x …….. mm x …….mm x


283 7.6.(9b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
……... mm

284 7.6.(10a) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 861.013,87 913.089,33 909.762,00 1.094.034,69 940.442,62 841.180,72 942.162,98 965.052,94 961.784,14 1.932.986,61 955.559,13 1.347.107,17 1.503.223,16 959.837,24 1.037.719,28

285 7.6.(10b) Penyediaan Tiang Pancang Beton Bertulang Pracetak ukuran ……..mm x ……... mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
286 7.6.(11a) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 1.304.463,92 1.356.599,26 1.352.248,85 1.535.421,31 1.419.428,14 1.300.218,35 1.388.039,43 1.424.704,79 1.420.412,90 2.546.105,29 1.417.423,05 1.966.660,59 2.193.988,55 1.410.437,83 1.531.844,88
287 7.6.(11b) Penyediaan Tiang Pancang Beton Pratekan Pracetak ukuran ……. mm x ………. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
288 7.6.(12a) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 900.641,91 952.816,72 948.432,34 1.107.041,54 991.478,76 871.927,81 976.012,31 1.012.912,36 1.008.586,51 2.047.106,51 989.301,32 1.466.796,27 1.654.028,97 998.629,20 1.104.145,62
289 7.6.(12b) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter ……...mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
290 7.6.(13) Pemancangan Tiang Pancang Kayu Ukuran ….. Mm M1 331.782,49 333.335,19 333.280,08 354.396,80 345.306,22 340.395,83 337.522,84 338.389,93 338.411,46 423.040,79 346.139,70 389.408,44 431.439,19 339.820,20 342.071,24
291 7.6.(14a) Pemancangan Tiang Pancang Baja Diameter 500 mm M1 490.026,56 494.658,75 494.408,50 530.276,73 503.505,41 489.742,49 498.064,38 499.439,09 499.537,45 640.845,00 506.004,21 565.123,55 603.470,49 500.316,48 505.559,11
292 7.6.(14b) Pemancangan Tiang Pancang Baja Diameter …….. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pemancangan Tiang Pancang Baja H beam Ukuran 300 mm x 300 mm x 10 mm x 15


293 7.6.(15a) M1 289.147,34 290.170,69 290.089,31 303.394,55 297.586,58 294.287,88 290.981,95 291.974,56 292.006,26 351.651,56 298.672,37 328.788,43 353.250,95 293.018,00 294.785,19
mm

Pemancangan Tiang Pancang Baja H beam Ukuran…….. mm x …….. mm x …….. mm


294 7.6.(15b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
x ……... mm

295 7.6.(16a) Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran 350 mm x 350 mm M1 289.147,34 290.170,69 290.089,31 303.394,55 297.586,58 294.287,88 290.981,95 291.974,56 292.006,26 351.651,56 298.672,37 328.788,43 353.250,95 293.018,00 294.785,19

BIDANG BINA MARGA BM - 7 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Pemancangan Tiang Pancang Beton Bertulang Pracetak ukuran………. mm x


296 7.6.(16b) M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
………... mm

297 7.6.(17a) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran 400 mm x 400 mm M1 289.147,34 290.170,69 290.089,31 303.394,55 297.586,58 294.287,88 290.981,95 291.974,56 292.006,26 351.651,56 298.672,37 328.788,43 353.250,95 293.018,00 294.785,19

298 7.6.(17b) Pemancangan Tiang Pancang Beton Pratekan Pracetak ukuran ………. mm x ….. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

299 7.6.(18a) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 450 mm M1 550.283,55 551.306,90 551.225,52 577.808,87 572.000,90 568.702,21 550.347,74 551.340,35 551.372,05 670.326,26 573.086,70 638.611,06 671.925,65 554.154,22 564.773,48

300 7.6.(18b) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter ….. mm 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

301 7.6.(19a) Tiang Bor Beton, diameter 800 mm M1 2.506.366,06 2.630.716,84 2.620.595,13 3.238.292,03 2.776.352,50 2.405.587,54 2.718.771,46 2.791.831,59 2.782.305,27 5.629.061,68 2.752.536,71 3.932.458,63 4.399.940,75 2.770.866,76 3.007.339,60

302 7.6.(19b) Tiang Bor Beton, diameter ….. mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(13)s/d 7.6.(18) bila Tiang
303 7.6.(20) M1 89.133,75 89.133,75 89.133,75 89.265,17 89.265,17 89.265,17 89.129,37 89.129,37 89.129,37 89.725,17 89.265,17 89.593,75 89.834,70 89.155,65 89.199,46
Pancang dikerjakan di tempat Yang Berair

Tambahan Biaya untuk Nomor Mata Pembayaran 7.6.(19) Bila Tiang Bor Beton
304 7.6.(21) M1 134.413,42 134.774,81 134.750,21 137.228,98 135.160,85 134.120,37 134.973,37 135.047,44 135.057,13 144.784,45 135.375,99 139.390,08 141.514,57 135.073,40 135.541,78
dikerjakan ditempat Yang Berair

305 7.6.(22) Pengujian Pembebanan Pada Tiang Dengan Diameter sampai 600 mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

306 7.6.(23) Pengujian Pembebanan Pada Tiang Dengan Diameter di atas 600 mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

307 7.6.(24) Tiang Uji jenis …. Ukuran …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban hidrolik
308 7.6.(25a) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Cara Beban Siklik

Pengujian Pembebanan Statis pada Tiang ukuran / diameter .... Dengan beban hidrolik
309 7.6 (25b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Cara Beban Bertahap

Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban statis
310 7.6 (26a) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Cara beban Siklik

Pengujian Pembebanan Statis pada Tiang ukuran / diameter ……. meja beban statis
311 7.6 (26b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Cara beban Bertahap

312 7.6 (27a) Pengujian Crosshole sonic logging (CSL) pada Tiang bor beton diameter .... Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pengujian Pembebanan Dinamis Jenis PDLT (Pile Dynamic Load Testing) pada
313 7.6 (27b) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Tiangukuran / diameter ....

314 7.6 (28) Pengujian Keutuhan Tiang dengan Pile Integrated Test (PIT) Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

315 7.7.(1) Dinding Sumuran Silinder terpasang, Diameter ……………. M1 8.721.816,28 9.331.233,85 9.296.495,03 11.443.202,28 9.577.654,41 8.469.821,43 9.682.184,80 9.915.679,17 9.883.033,86 20.801.685,07 9.784.712,98 14.045.430,39 15.742.828,98 9.865.453,34 10.696.839,63

316 7.9.(1) Pasangan Batu M3 1.019.112,19 1.063.631,29 1.039.148,98 1.303.581,50 1.123.032,94 1.116.961,19 1.193.631,39 1.274.935,94 1.269.181,42 7.187.984,21 1.236.953,95 3.020.449,37 3.772.782,28 1.226.241,59 1.360.855,78

317 7.10.(1) Pasangan Batu Kosong yang Diisi Adukan M3 784.826,10 812.211,40 800.043,56 943.212,93 857.757,25 759.143,76 793.071,97 832.784,82 829.096,83 3.494.950,19 804.759,43 1.630.692,98 1.976.122,78 809.149,42 883.355,29

318 7.10.(2) Pasangan Batu Kosong M3 891.642,92 925.803,09 918.376,97 1.003.179,88 982.386,73 946.741,33 1.006.532,13 1.057.029,78 1.049.603,66 1.987.170,10 1.038.825,28 1.536.474,94 1.724.621,27 1.023.301,05 1.139.930,16

319 7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 987.562,50 1.023.787,50 1.019.992,50 1.106.300,00 1.094.915,00 1.106.875,00 1.181.625,00 1.251.545,00 1.246.485,00 2.303.335,00 1.224.405,00 1.704.990,00 1.896.522,50 1.210.720,00 1.363.348,00

320 7.10.(3b) Bronjong dengan kawat yang dilapisi PVC M3 1.166.004,17 1.205.647,54 1.201.191,87 1.300.267,63 1.286.900,60 1.312.495,00 1.389.575,67 1.465.891,97 1.459.951,07 2.654.360,23 1.441.821,70 1.994.767,77 2.210.623,15 1.421.505,80 1.591.756,07

321 7.10.(4) Tambahan Biaya untuk Anyaman Penulangan Tanah dengan Kawat yang Dilapisi PVC M2 296.535,17 297.719,67 297.719,67 313.505,33 313.505,33 308.767,33 296.761,33 299.130,33 299.130,33 384.606,00 312.320,83 356.070,67 373.999,17 299.862,50 312.267,17

322 7.11.(1a) Sambungan Siar Muai Tipe Asphaltic Plug, Fixed M1 3.173.937,44 3.323.149,12 3.296.866,10 3.667.337,17 3.538.788,60 3.080.245,67 3.377.801,95 3.572.842,95 3.546.586,68 6.618.488,11 3.465.737,89 5.253.022,66 6.084.486,70 3.430.943,39 3.876.087,20

323 7.11.(1b) Sabungan siar Muai Tipe Asphaltic Plug, Movable M1 5.774.121,94 6.023.423,87 5.990.249,48 6.969.565,04 6.337.920,23 5.589.767,04 6.164.177,20 6.380.935,95 6.347.788,31 11.647.659,49 6.260.988,26 8.815.912,41 9.989.840,70 6.230.592,51 6.809.179,45

324 7.11.(2) Sambungan Siar Muai Tipe Silicone Seal M1 809.716,82 836.348,06 825.846,81 891.732,46 877.241,81 805.854,64 839.353,54 869.339,29 867.519,89 1.400.726,03 864.125,19 1.175.094,99 1.296.322,58 844.773,74 912.268,98

325 7.11.(3) Sambungan Siar Muai Tipe Strip seal M1 1.450.413,68 1.521.720,58 1.507.506,58 1.666.013,71 1.621.950,31 1.408.029,61 1.545.746,44 1.642.875,44 1.628.661,44 3.056.370,97 1.587.599,81 2.500.273,68 2.838.536,99 1.574.240,42 1.791.405,77

326 7.11.(4) Sambungan Siar Muai Tipe Compression Seal M1 1.453.938,49 1.525.245,39 1.511.031,39 1.670.198,31 1.626.134,91 1.412.214,21 1.549.139,30 1.646.268,30 1.632.054,30 3.062.864,80 1.591.784,41 2.506.107,73 2.845.030,83 1.577.765,23 1.795.260,47

327 7.11.(5) Sambungan Siar Muai Expansion Joint Tipe Modular, lebar …….. M1 302.862,45 317.425,17 313.555,38 374.939,77 336.216,67 288.158,30 316.064,37 333.367,50 332.717,04 1.271.223,66 319.938,47 648.348,08 779.871,16 322.496,65 360.233,47

328 7.11.(6) Sambungan Siar Muai Expansion Joint Tipe Finger Plate, lebar …….. M1 670.057,45 703.572,17 694.964,38 797.806,27 747.238,17 644.692,80 708.133,87 750.311,50 746.107,54 2.052.993,66 722.668,47 1.285.609,08 1.504.785,16 721.673,15 815.081,47

329 7.11.(7) Sambungan Siar Muai Expansion Tipe Karet dengan Lebar Celah …….. Cm M3 2.428.556,29 2.555.826,79 2.513.403,29 2.775.657,70 2.690.810,70 2.393.846,20 2.598.250,29 2.725.520,79 2.725.520,79 4.881.055,54 2.648.387,20 4.025.573,35 4.548.679,74 2.642.076,23 2.984.269,11

330 7.11.(8) Joint Filler untuk Sambungan Konstruksi M3 3.421.086,00 3.570.879,92 3.544.569,92 3.924.276,97 3.792.350,28 3.331.748,56 3.625.683,73 3.821.534,93 3.795.287,43 6.907.932,14 3.719.889,82 5.529.220,53 6.371.731,56 3.679.951,52 4.128.064,67

331 7.11.(9) Sambungan Siar Muai Tipe Modular, Lebar …….. M3 277.944,62 281.385,66 281.377,53 302.942,37 294.978,68 283.972,24 283.340,90 288.211,23 287.064,49 404.396,93 294.599,85 362.125,41 390.077,45 286.183,59 298.425,44

332 7.12.(1a) Landasan Logam Tipe Fixed Buah 2.307.399,77 2.394.405,10 2.377.113,96 2.595.413,06 2.539.299,45 2.277.960,07 2.425.803,29 2.542.870,81 2.526.787,07 4.375.637,23 2.498.653,34 3.672.346,79 4.135.559,14 2.463.989,32 2.733.509,94

333 7.12.(1b) Landasan Logam Tipe Moveable Buah 2.384.333,33 2.499.333,33 2.476.333,33 2.733.166,67 2.664.166,67 2.319.166,67 2.538.625,00 2.695.025,00 2.672.025,00 4.987.933,33 2.608.966,67 4.090.550,00 4.644.275,00 2.584.241,67 2.934.800,00

334 7.12.(1c) Landasan Logam Tipe ……. Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

335 7.12.(2) Landasan Elastomerik Karet Alam Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm Buah 1.320.583,33 1.382.683,33 1.370.033,33 1.509.566,67 1.472.766,67 1.287.616,67 1.403.575,00 1.487.525,00 1.476.025,00 2.728.183,33 1.444.016,67 2.244.800,00 2.546.675,00 1.428.491,67 1.618.050,00

336 7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran ….. Mm x ….. Mm x…….. Mm Buah 1.142.333,33 1.195.233,33 1.184.883,33 1.304.866,67 1.272.666,67 1.113.966,67 1.212.675,00 1.285.125,00 1.274.775,00 2.347.533,33 1.247.366,67 1.933.150,00 2.192.475,00 1.234.141,67 1.396.100,00

337 7.12.(4) Landasan karet Strip M1 408.250,00 425.500,00 422.050,00 462.875,00 452.525,00 400.775,00 431.393,75 454.393,75 452.093,75 808.737,50 444.475,00 672.462,50 760.581,25 438.868,75 492.487,50

338 7.12.(5) Landasan Tipe Logam Berongga (Pot Bearing) Buah 15.356.698,86 15.832.695,23 15.790.935,95 18.349.779,34 16.586.839,77 15.093.097,89 16.203.031,73 16.577.537,60 16.539.032,16 28.162.811,55 16.532.319,90 22.129.182,79 24.367.561,69 16.266.231,20 17.289.588,44

339 7.12.(6) Landasan Tipe Logam Jenis Spherical Buah 16.581.414,03 17.114.910,40 17.061.651,13 19.727.280,22 17.929.840,66 16.283.313,06 17.445.654,04 17.898.359,91 17.848.354,47 30.542.126,73 17.867.435,07 24.063.447,96 26.435.226,86 17.590.996,37 18.769.439,33

BIDANG BINA MARGA BM - 8 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

340 7.13.(1) Sandaran (Railing) M1 1.431.318,75 1.477.810,38 1.469.815,00 1.535.945,75 1.497.449,50 1.396.470,88 1.499.927,75 1.521.544,88 1.525.098,38 2.382.751,13 1.519.066,63 1.789.221,75 1.888.153,38 1.509.659,63 1.554.406,13

341 7.14.(1) Papan Nama Jembatan M1 708.211,90 732.362,07 727.186,90 791.301,12 776.637,24 705.911,72 742.424,40 775.199,74 770.024,74 1.291.977,58 765.424,57 1.099.703,14 1.238.666,65 753.445,40 829.729,08

342 7.15.(1) Pembongkaran Pasangan Batu M3 458.316,58 436.053,19 436.013,19 475.148,89 452.024,71 439.125,55 438.212,44 440.805,76 440.821,51 598.422,08 453.610,60 521.167,12 559.356,30 441.931,10 448.313,66

343 7.15.(2) Pembongkaran Beton M3 674.862,27 641.070,59 641.015,81 696.973,73 664.630,32 646.486,66 643.939,26 647.764,75 647.786,33 874.700,33 666.939,21 765.013,18 821.012,70 649.500,06 658.628,65

344 7.15.(3) Pembongkaran Beton Pratekan M3 614.492,65 635.858,69 635.649,07 784.772,11 658.396,41 593.319,11 656.353,40 659.667,29 659.749,81 1.171.758,86 661.569,34 835.813,42 903.877,17 657.212,16 681.255,93

345 7.15.(4) Pembongkaran Bangunan Gedung M2 372.478,88 361.368,88 361.300,71 438.370,98 375.026,16 341.580,23 370.866,47 374.516,92 374.543,71 646.890,08 377.345,29 478.404,90 512.364,93 371.777,42 385.833,69

346 7.15.(5) Pembongkaran Rangka Baja M2 1.457.174,56 1.507.031,24 1.506.539,04 1.855.266,20 1.560.394,15 1.408.477,43 1.554.902,63 1.562.778,32 1.562.972,09 2.761.744,46 1.567.891,03 1.977.087,24 2.138.053,98 1.557.103,51 1.613.342,38

347 7.15.(6) Pembongkaran Balok Baja (Steel Stingers) M1 546.250,09 564.524,36 564.349,37 692.881,72 584.797,55 529.050,80 581.945,17 584.923,57 584.992,43 1.027.952,64 587.551,94 739.221,97 799.274,14 582.959,25 603.681,13

348 7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 193.449,06 193.878,15 193.874,08 204.063,08 201.525,21 200.217,72 193.428,25 193.495,01 193.496,61 239.166,09 201.588,02 220.909,16 240.971,59 195.746,66 196.230,16

349 7.15.(8) Pembongkaran Jembatan Kayu M2 160.572,96 160.958,49 160.951,42 163.695,58 161.417,18 160.255,30 161.285,04 161.341,89 161.344,69 171.050,04 161.496,85 164.897,69 166.488,96 161.339,96 161.760,75

350 7.15.(9) Pengangkutan Hasil Bongkaran yang melebihi 5 km M3/ km 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

351 7.16.(1) Dreck drain Buah 1.196.862,50 1.256.087,50 1.244.012,50 1.374.825,00 1.339.175,00 1.162.650,00 1.276.672,50 1.356.597,50 1.345.097,50 2.507.575,00 1.311.000,00 2.053.325,00 2.331.050,00 1.299.212,50 1.478.612,50

352 7.16.(2a) Pipa Drainase Baja diameter 150 mm M1 272.487,94 294.912,94 290.887,94 329.987,94 305.837,94 256.579,61 305.952,94 315.727,94 317.261,28 732.679,61 315.229,61 444.987,94 493.671,28 310.054,61 332.479,61

353 7.16.(2b) Pipa Drainase Baja diameter ……. Mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

354 7.16.(3a) Pipa Drainase PVC diameter 150 mm M1 144.708,33 151.570,00 150.688,33 171.905,83 157.396,67 131.828,33 147.832,50 150.305,00 150.573,33 231.763,33 150.669,17 182.735,00 199.314,17 148.925,00 156.285,00

355 7.16.(3b) Pipa Drainase PVC diameter …… mm M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

356 7.16.(4) Pipa Penyalur PVC M1 222.812,50 230.632,50 229.559,17 252.214,17 236.842,50 218.557,50 236.957,50 239.813,33 240.177,50 409.342,50 240.081,67 296.585,00 321.885,00 238.145,83 246.272,50
Buah
357 7.17.(1) Pengujian Pembebanan Jembatan Jembata 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
n
#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
H DIVISI 8. REHABILITASI JEMBATAN 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

358 8.1 (1) Cairan Perekat (Epoksi resin) Kg 176.346,02 182.684,96 182.674,39 228.265,35 190.277,19 171.084,94 189.042,91 189.462,20 189.466,33 342.620,20 190.562,37 240.312,20 262.685,15 189.372,92 196.099,46

359 8.1 (2) Bahan Penutup (Sealant) Kg 178.743,51 187.203,95 184.556,36 212.081,02 197.715,10 173.458,99 190.303,93 199.837,33 197.194,76 352.451,35 193.983,35 273.332,56 303.903,87 191.945,47 208.109,46

360 8.1 (3a) Tabung Penyuntik, penyediaan Buah 112.407,06 117.927,06 116.547,06 128.606,95 125.156,95 109.976,95 119.865,10 126.765,10 125.385,10 231.356,51 123.086,95 189.986,73 215.486,51 122.067,06 137.937,06

361 8.1 (3b) Tabung Penyuntik, penggunan Buah 140.680,62 144.360,62 143.440,62 154.394,59 152.094,59 141.974,59 145.608,67 150.208,67 149.288,67 232.571,10 150.714,59 203.121,86 223.640,56 147.450,52 159.679,97

362 8.2.(1) Penambahan (Patching) M3 3.850.317,96 4.006.882,10 3.980.816,82 4.440.041,75 4.217.305,12 3.747.229,98 4.075.713,35 4.256.089,96 4.230.033,42 7.998.336,84 4.153.553,67 6.022.538,42 6.723.092,37 4.210.902,96 4.650.876,13

363 8.2.(2) Perbaikan Dengan Cara Graut M3 7.783.780,90 8.129.212,70 8.094.118,01 9.771.670,63 8.584.483,02 7.539.943,64 8.366.902,66 8.605.307,83 8.582.987,81 16.316.701,67 8.514.683,35 12.076.258,63 13.474.639,65 8.447.314,69 9.147.433,00

364 8.3.(1a) Pengecetan protektif pada elemen struktur beton, tebal 200µm M2 54.924,45 56.144,31 56.141,09 65.123,62 57.817,00 54.065,30 57.324,53 57.529,81 57.531,07 88.452,54 57.942,95 68.631,79 73.240,32 57.447,42 58.862,71

365 8.3.(1b) Pengecetan protektif pada elemen struktur beton, tebal : ……µm M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

366 8.3.(2a) Pengecetan dekoratif pada elemen struktur beton, tebal : 100 µm M2 54.924,45 56.144,31 56.141,09 65.123,62 57.817,00 54.065,30 57.324,53 57.529,81 57.531,07 88.452,54 57.942,95 68.631,79 73.240,32 57.447,42 58.862,71

367 8.3.(2b) Pengecetan dekoratif pada elemen struktur beton, tebal : ….. µm M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

368 8.4.(1) Perkuatan struktur dengan bahan FRP jenis e- glass per lapis pada daerah kering M2 1.611.724,43 1.690.803,96 1.670.972,10 1.863.662,83 1.797.632,12 1.562.676,06 1.719.476,71 1.821.497,35 1.801.673,64 3.385.040,32 1.767.293,38 2.763.929,22 3.129.919,96 1.746.575,52 1.978.267,30

369 8.4.(2) Perkuatan Struktur dengan bahan FRP jenis e- glass-per lapis pada daerah basah M2 1.670.949,43 1.752.397,96 1.732.566,10 1.931.179,33 1.863.964,12 1.619.532,06 1.782.255,21 1.887.829,35 1.868.005,64 3.509.412,82 1.831.256,38 2.866.980,72 3.246.000,96 1.810.538,52 2.051.706,30

370 8.4.(3) Perkuatan Struktur dengan bahan FRP Laminasi jenis glass pada daerah kering M2 1.611.724,43 1.690.803,96 1.670.972,10 1.863.662,83 1.797.632,12 1.562.676,06 1.719.476,71 1.821.497,35 1.801.673,64 3.385.040,32 1.767.293,38 2.763.929,22 3.129.919,96 1.746.575,52 1.978.267,30

371 8.4.(4) Perkuatan Struktur dengan bahan FRP Jenis carbon per lapis pada daerah kering M2 1.611.724,43 1.690.803,96 1.670.972,10 1.863.662,83 1.797.632,12 1.562.676,06 1.719.476,71 1.821.497,35 1.801.673,64 3.385.040,32 1.767.293,38 2.763.929,22 3.129.919,96 1.746.575,52 1.978.267,30

372 8.4.(5) Perkuatan struktur dengan bahan FRP jenis carbon per lapis pada daerah basah M2 1.008.491,93 1.057.705,96 1.048.224,10 1.166.095,83 1.126.687,62 978.959,06 1.076.028,71 1.140.202,85 1.130.729,14 2.123.892,82 1.104.329,88 1.728.112,72 1.958.679,46 1.093.962,02 1.240.795,30

373 8.4.(6) Perkuatan struktur dengan bahan FRP lainasi jenis carbon pada daerah kering;ll M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

374 8.4.(7) Pemasangan Perkuatan Pelat Lantai dengan Steel Plate Bonding Kg 1.346.703,85 1.396.568,38 1.384.334,89 1.515.635,28 1.475.422,15 1.338.770,60 1.414.881,93 1.474.631,79 1.463.132,18 2.461.879,72 1.457.473,11 2.071.534,14 2.309.008,04 1.435.861,52 1.584.009,50

375 8.4.(8) Perkuatan external stressing jembatan beton bentang …… m Buah 76.295.239,68 80.052.960,66 78.187.330,53 88.427.374,17 83.026.739,08 74.770.209,17 81.230.904,41 84.881.485,94 84.881.576,92 149.021.221,86 82.321.919,58 119.019.556,07 133.504.345,29 81.944.795,54 90.780.371,34

376 8.5.(1a) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M25 Buah 138.988,16 140.138,16 140.138,16 149.689,17 142.789,17 139.223,70 140.895,59 141.126,51 141.126,51 175.935,95 142.904,63 155.226,72 161.563,26 141.403,62 142.784,55

377 8.5.(1b) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter M20 Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

378 8.5.(1c) Penggantian Baut Mutu Tinggi A325 Tipe 1 diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

379 8.5.(2a) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M25 Buah 196.488,16 197.638,16 197.638,16 207.189,17 200.289,17 196.723,70 198.395,59 198.626,51 198.626,51 233.435,95 200.404,63 212.726,72 219.063,26 198.903,62 200.284,55

380 8.5.(2b) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter M20 Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

381 8.5.(2c) Penggantian Baut Mutu Tinggi A490 Tipe 1 diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

382 8.5.(3a) Penggantian Baut Biasa Grade A diameter M25 Buah 138.988,16 143.588,16 142.438,16 153.139,17 150.839,17 138.073,70 144.345,59 150.326,51 150.326,51 244.935,95 148.654,63 208.126,72 231.713,26 147.153,62 160.034,55

383 8.5.(3b) Penggantian Baut Biasa Grade A diameter ……. mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

384 8.5.(4a) Penggantian Baut Biasa Grade B diameter M25 Buah 121.738,16 125.188,16 124.038,16 133.589,17 131.289,17 120.823,70 125.945,59 130.776,51 129.626,51 206.985,95 130.254,63 179.376,72 198.363,26 127.603,62 138.184,55

385 8.5.(4b) Penggantian Baut Biasa Grade B diameter …….. Mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

BIDANG BINA MARGA BM - 9 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

386 8.5.(5a) Penggantian Baut Biasa Grade C untuk anchor bolts diameter M25 Buah 110.238,16 111.388,16 111.388,16 120.939,17 114.039,17 110.473,70 112.145,59 112.376,51 112.376,51 147.185,95 114.154,63 126.476,72 132.813,26 112.653,62 114.034,55

387 8.5.(5b) Penggantian Baut Biasa Grade C untuk anchor bolts diameter ……. Mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

388 8.5.(6a) Pengencangan Baut Biasa Grade A diameter M25 Buah 37.670,12 37.670,12 37.670,12 38.742,26 38.742,26 38.659,79 37.389,71 37.554,65 37.554,65 43.525,68 38.824,73 41.876,23 43.938,04 37.752,59 37.917,53

389 8.5.(6b) Pengencangan Baut Biasa Grade A diameter …… mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

390 8.5.(7a) Pengencangan Baut Biasa Grade B diameter M25 Buah 37.670,12 37.670,12 37.670,12 38.742,26 38.742,26 38.659,79 37.389,71 37.554,65 37.554,65 43.525,68 38.824,73 41.876,23 43.938,04 37.752,59 37.917,53
391 8.5.(7b) Pengencangan Baut Biasa Grade B diameter ……. mm Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
392 8.6.(1a) Pengelasan SMAW pada baja Grade 30 M1 100.614,25 103.603,75 103.513,58 123.476,67 106.906,93 97.921,75 106.308,70 106.970,06 106.972,58 174.456,34 106.823,37 129.490,41 138.072,84 106.228,42 109.441,24

393 8.6.(1b) Pengelasan SMAW pada baja Grade ….. M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

394 8.6.(2a) Pengelasan SAW pada baja Grade 30 M1 93.191,82 96.097,58 96.091,15 117.272,29 100.786,30 91.884,87 98.762,95 99.424,30 99.343,07 173.169,90 100.786,49 127.016,35 137.776,06 99.003,93 102.810,56

395 8.6.(2b) Pengelasan SAW pada baja Grade …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

396 8.6.(3a) Pengelasan GMAW pada baja Grade 30 M1 95.704,29 98.777,55 98.687,37 120.203,50 103.550,02 94.313,59 101.442,91 102.271,76 102.190,54 175.598,61 103.215,21 129.445,07 140.204,78 101.432,65 105.239,28

397 8.6.(3b) Pengelasan GMAW pada baja Grade ….. M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

398 8.6.(4a) Pengelasan FCAW pada baja Grade 30 M1 94.866,80 97.856,31 97.766,13 119.198,52 102.628,78 93.476,10 100.521,67 101.266,77 101.185,55 174.761,12 102.377,72 128.607,58 139.367,29 100.595,16 104.401,79

399 8.6.(4b) Pengelasan FCAW pada baja Grade …… M1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

400 8.7.(1a) Pengecatan struktur baja pada daerah kering tebal 80 mikron M2 127.318,05 130.569,72 130.564,44 155.320,85 135.833,58 125.891,89 133.712,14 134.119,72 134.121,78 219.140,93 136.075,13 166.275,88 178.104,82 133.995,90 138.628,98

401 8.7.(1b) Pengecatan struktur baja pada daerah kering tebal 240 mikron M2 217.405,06 223.233,94 223.223,38 268.015,07 233.087,21 215.227,18 228.844,33 229.659,48 229.663,62 384.189,58 233.570,32 289.250,66 310.885,20 229.411,86 238.003,57

402 8.7.(1c) Pengecatan struktur baja pada daerah kering tebal …… mikron M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

403 8.7.(2a) Pengecatan struktur baja pada daerah basah/pasang surut 360 mikron M2 217.405,06 223.233,94 223.223,38 268.015,07 233.087,21 215.227,18 228.844,33 229.659,48 229.663,62 384.189,58 233.570,32 289.250,66 310.885,20 229.411,86 238.003,57

404 8.7.(2b) Pengecatan struktur baja pada daerah basah/pasang surut 500 mikron M2 217.405,06 223.233,94 223.223,38 268.015,07 233.087,21 215.227,18 228.844,33 229.659,48 229.663,62 384.189,58 233.570,32 289.250,66 310.885,20 229.411,86 238.003,57

405 8.7.(2c) Pengecatan struktur baja pada daerah basah/pasang surut ….. mikron M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) 80


406 8.7.(3a) M2 217.405,06 223.233,94 223.223,38 268.015,07 233.087,21 215.227,18 228.844,33 229.659,48 229.663,62 384.189,58 233.570,32 289.250,66 310.885,20 229.411,86 238.003,57
mikron
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail)
407 8.7.(3b) M2 216.565,10 222.347,32 222.336,76 266.801,80 232.153,93 214.433,89 227.911,05 228.726,20 228.730,34 382.183,02 232.637,04 287.990,73 309.485,28 228.478,58 237.023,62
160 mikron
Pengecatan pada elemen sandaran dan/atau pagar pengaman (gruard rail) …..
408 8.7.(3c) M2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
mikron
409 8.8.(1) Perbaikan Elemen Struktur Baja dengan Cara Pelurusan LS 7.452.247,20 7.582.566,85 7.579.704,24 8.602.670,42 7.838.162,24 7.445.512,65 7.685.966,26 7.706.878,59 7.707.340,19 11.407.260,47 7.864.406,89 9.314.872,93 9.884.519,97 7.709.961,14 7.943.632,08

410 8.8.(2) Penggantian Elemen Struktur Baja Grade 250 (Kuat Leleh 250 Mpa) Kg 1.599.305,87 1.672.008,91 1.648.956,02 1.835.259,89 1.767.256,44 1.549.146,01 1.698.346,30 1.790.695,64 1.767.716,65 3.234.233,46 1.744.814,52 2.670.517,01 3.004.586,20 1.721.459,91 1.932.350,67

411 8.8.(3) Penggantian Elemen Struktur Baja Grade 345 (Kuat Leleh 345 Mpa) Kg 1.611.403,87 1.684.106,91 1.661.054,02 1.847.357,89 1.779.354,44 1.561.244,01 1.710.444,30 1.802.793,64 1.779.814,65 3.246.331,46 1.756.912,52 2.682.615,01 3.016.684,20 1.733.557,91 1.944.448,67

412 8.8.(4) Penggantian Elemen Struktur Baja Grade 485 (Kuat Leleh 485 Mpa) Kg 1.606.129,29 1.678.832,33 1.655.779,44 1.845.484,84 1.777.481,39 1.559.370,96 1.704.957,13 1.797.306,46 1.774.327,47 3.255.726,00 1.755.039,47 2.689.883,59 3.027.141,72 1.728.495,93 1.941.512,65

413 8.8.(5) Penggantian Elemen Struktur Baja Grade …….. Kg 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Pekuatan dengan external stressing untuk jembatan baja dengan bentang


414 8.9.(1) Buah 60.616.734,97 64.021.444,50 62.155.814,37 69.930.715,93 66.648.149,51 59.447.684,92 64.845.189,19 68.501.708,76 68.501.799,75 123.155.858,52 65.946.299,03 100.214.421,66 113.640.176,53 65.560.267,94 74.048.770,32
……….m
415 8.10.(1) Penggantian Lantai Kayu M3 8.808.186,49 11.909.736,49 11.909.736,49 10.696.979,35 13.822.679,35 13.453.529,35 15.010.629,35 15.010.629,35 11.388.129,35 16.997.007,92 11.105.804,35 13.245.707,92 20.758.822,20 11.994.179,35 13.899.729,35

416 8.10.(2) Perbaikan Lantai Kayu M3 12.144.110,18 15.360.660,18 15.360.660,18 14.952.903,04 17.388.603,04 16.674.453,04 18.576.553,04 18.576.553,04 14.954.053,04 23.207.931,61 14.671.728,04 17.616.631,61 25.474.745,90 15.560.103,04 17.580.653,04

417 8.10.(3) Penggantian Gelegar Kayu M3 6.860.538,09 9.904.560,67 9.904.546,59 8.278.077,33 11.749.002,45 11.552.200,79 12.948.984,69 12.949.543,74 9.327.049,25 13.567.093,59 9.032.507,69 10.742.857,49 18.077.420,03 9.931.413,66 11.771.738,76

418 8.10.(4) Perbaikan Gelegar Kayu M3 6.767.926,19 9.808.789,70 9.808.777,37 8.159.826,60 11.649.698,57 11.462.403,37 12.850.209,82 12.850.698,99 9.228.203,81 13.393.314,04 8.933.156,28 10.620.232,44 17.944.626,45 9.832.491,42 11.669.592,85

419 8.10.(5) Penggantian Balok Kepala Tiang M3 6.351.172,62 9.377.820,30 9.377.815,90 7.627.698,27 11.202.831,12 11.058.314,98 12.405.722,89 12.405.897,60 8.783.399,32 12.611.306,03 8.486.074,95 10.068.419,75 17.347.055,37 9.387.341,32 11.209.936,22

420 8.10.(6) Perbaikan Papan Lajur Kendaraan M3 7.184.679,75 10.239.759,09 10.239.738,85 8.691.954,92 12.096.566,02 11.866.491,76 13.294.696,74 13.295.500,38 9.673.008,30 14.175.322,04 9.380.237,62 11.172.045,14 18.542.197,54 10.277.641,52 12.129.249,47

421 8.10.(7) Pengantian Papan Lajur Kendaraan M3 11.375.932,52 14.587.744,76 14.587.562,63 14.145.919,24 16.612.396,38 15.911.804,36 17.797.945,31 17.800.505,92 14.178.024,77 22.331.516,62 13.896.409,58 16.821.690,99 24.665.652,18 14.781.698,27 16.799.256,74

422 8.10.(8) Perbaikan dan/atau Penggantian kerb kayu M3 15.674.519,05 19.045.505,67 19.045.309,41 19.717.109,07 21.227.034,12 20.046.314,10 22.412.260,26 22.420.052,03 18.797.628,83 30.639.083,74 18.515.458,74 22.577.492,65 30.907.361,12 19.398.514,75 21.572.490,06

423 8.10.(9) Perbaikan dan/atau Penggantian sandaran Kayu M3 8.308.492,48 11.401.480,70 11.401.439,33 10.123.895,50 13.301.144,28 12.956.992,53 14.492.280,35 14.493.922,56 10.871.438,75 16.275.455,83 10.585.386,24 12.657.401,08 20.150.499,56 11.477.178,32 13.367.470,36

424 8.10.(10) Pengecatan/Perlindungan Gelegar M2 86.216,98 88.370,27 88.367,63 104.289,61 91.381,21 84.877,47 90.389,77 90.494,59 90.495,62 144.523,19 91.452,51 109.156,46 117.148,15 90.610,82 93.058,95

425 8.10.(11) Pengecatan/Perlindungan Lantai Kayu M2 86.216,98 88.370,27 88.367,63 104.289,61 91.381,21 84.877,47 90.389,77 90.494,59 90.495,62 144.523,19 91.452,51 109.156,46 117.148,15 90.610,82 93.058,95

426 8.10.(12) Pengecatan/Perlindungan Tiang Pancang Kayu M2 86.216,98 88.370,27 88.367,63 104.289,61 91.381,21 84.877,47 90.389,77 90.494,59 90.495,62 144.523,19 91.452,51 109.156,46 117.148,15 90.610,82 93.058,95

427 8.10.(13) Pengecatan/Perlindungan Balok Kepala Kayu M2 86.216,98 88.370,27 88.367,63 104.289,61 91.381,21 84.877,47 90.389,77 90.494,59 90.495,62 144.523,19 91.452,51 109.156,46 117.148,15 90.610,82 93.058,95

428 8.10.(14) Pengecatan/Perlindungan Sandaran M1 86.216,98 88.370,27 88.367,63 104.289,61 91.381,21 84.877,47 90.389,77 90.494,59 90.495,62 144.523,19 91.452,51 109.156,46 117.148,15 90.610,82 93.058,95

429 8.11.(1) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Asphaltic Plug M1 5.865.656,44 5.990.079,31 5.966.995,20 6.401.573,77 6.327.071,25 5.942.799,83 6.025.757,47 6.196.439,80 6.173.356,49 9.413.268,25 6.257.171,28 8.173.037,64 9.122.783,01 6.098.815,00 6.548.808,35

430 8.11.(2) Penggantian dan Perbaikan Sambungan Siar Muai Tipe Silicone Seal M1 961.061,09 988.754,70 978.252,94 1.052.711,38 1.030.829,05 955.729,13 992.903,53 1.022.924,45 1.021.105,26 1.582.990,63 1.017.733,74 1.337.618,45 1.462.552,20 998.331,18 1.067.131,79

431 8.11.(3) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Strip Seal M1 1.431.461,68 1.502.531,68 1.488.317,68 1.645.166,51 1.602.524,51 1.389.314,51 1.526.320,64 1.623.449,64 1.609.235,64 3.031.496,47 1.568.174,01 2.479.189,58 2.816.742,19 1.554.814,62 1.771.743,07

BIDANG BINA MARGA BM - 10 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

432 8.11.(4) Penggantian Karet Pengisi Sambungan Siar Muai Tipe Compression Seal M1 1.453.938,49 1.525.245,39 1.511.031,39 1.670.198,31 1.626.134,91 1.412.214,21 1.549.139,30 1.646.268,30 1.632.054,30 3.062.864,80 1.591.784,41 2.506.107,73 2.845.030,83 1.577.765,23 1.795.260,47

433 8.11.(5) Penggantian Sambungan Siar Muai Tipe Modular, lebar …….. M1 244.572,56 256.406,85 254.529,67 282.106,28 273.536,20 237.382,23 261.050,01 277.391,21 274.387,68 556.697,55 267.892,80 421.535,18 477.671,62 265.903,46 301.942,22

434 8.11.(6) Penggantian Sambungan Siar Muai Tipe Finger Plate, lebar …….. M1 611.767,56 642.553,85 635.938,67 704.972,78 684.557,70 593.916,73 653.119,51 694.335,21 687.778,18 1.338.467,55 670.622,80 1.058.796,18 1.202.585,62 665.079,96 756.790,22

Penggantian Sambungan Siar Muai Tipe Dobel Siku dengan Penutup Karet
435 8.11.(7) M1 472.001,86 494.832,86 489.398,42 548.270,74 525.566,33 458.560,51 504.130,30 532.514,95 528.328,40 1.031.749,31 516.495,66 801.726,40 908.343,93 512.656,03 579.858,17
Neoprene
436 8.12.(1) Penggantian Landasan Logam Tipe …… Buah 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

Penggantian Landasan Elastomer Karet Alam Berlapis Baja Ukuruan …. mm x


437 8.12.(2) Buah #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A
…… mm x ……. mm
Penggantian Landasan Elastomer Sintetis Berlapis Baja Ukuran ….. mm x …..
438 8.12.(3) Buah 13.379.657,84 13.659.348,81 13.654.222,85 15.670.764,34 14.119.082,42 13.221.987,17 13.960.522,67 14.071.596,07 14.067.201,88 20.990.080,85 14.077.591,59 16.761.409,48 17.899.211,08 13.900.071,55 14.256.072,33
mm x …….. mm
439 8.12.(4) Penggantian Landasan Karet Strip tebal …. mm M1 8.189.129,46 8.206.379,46 8.202.929,46 8.398.593,74 8.388.243,74 8.287.208,03 8.255.500,89 8.337.643,74 8.335.343,74 9.591.965,17 8.390.050,89 9.340.279,46 9.776.786,60 8.238.743,74 8.370.500,89

440 8.12.(5) Penggantian Landasan Logam Berongga (Pot Bearing) Buah 16.944.657,84 17.402.598,81 17.361.822,85 19.770.514,34 18.111.882,42 16.680.037,17 17.764.722,67 18.117.296,07 18.078.401,88 29.064.230,85 18.039.341,59 23.291.109,48 25.378.811,08 17.822.721,55 18.789.372,33

441 8.12.(6) Penggantian Landasan Logam Jenis Spherical Buah 13.019.129,46 13.277.879,46 13.226.129,46 13.953.093,74 13.797.843,74 12.972.308,03 13.409.800,89 13.819.693,74 13.769.093,74 19.852.265,17 13.683.500,89 17.726.079,46 19.305.686,60 13.486.193,74 14.351.650,89

442 8.12.(7) Penggantian Stopper Lateral dan Horisontal Buah 13.494.657,84 13.780.098,81 13.773.822,85 15.803.014,34 14.247.882,42 13.333.537,17 14.083.572,67 14.201.546,07 14.197.151,88 21.735.280,85 14.258.141,59 17.301.909,48 18.571.961,08 14.074.871,55 14.517.122,33

443 8.13.(1) Perbaikan Sandaran Baja M1 321.840,95 323.847,96 323.847,96 339.480,52 327.438,45 321.417,41 326.092,49 326.092,49 326.092,49 378.746,01 327.438,45 345.842,09 354.634,21 326.250,84 329.049,59

444 8.13.(2) Penggantian Sandaran Baja M1 643.034,00 664.947,25 660.801,50 711.533,75 679.552,25 628.026,50 671.370,00 685.584,00 683.807,25 1.028.571,50 680.144,50 836.883,75 897.023,00 673.698,75 702.454,50

445 8.13.(3) Perbaikan Tembok Sandaran Beton M1 610.061,66 635.749,20 630.956,24 693.276,45 677.174,83 595.523,93 642.067,94 676.659,14 671.866,17 1.318.911,06 660.186,26 1.003.533,50 1.134.204,83 662.177,38 745.138,99

446 8.13.(4) Perbaikan Sandaran Beton-Baja M1 3.036.775,85 3.190.850,73 3.154.447,95 3.509.870,58 3.383.706,70 2.956.898,13 3.250.298,07 3.434.891,53 3.398.971,82 6.370.515,14 3.326.738,70 5.141.982,40 5.826.381,51 3.308.030,15 3.738.414,35

447 8.13.(5) Penggantian Sandaran Beton-Baja M1 3.491.019,08 3.658.655,55 3.619.271,21 4.017.052,21 3.872.867,83 3.394.586,64 3.721.894,58 3.925.578,42 3.887.386,44 7.248.955,30 3.808.115,10 5.812.635,42 6.569.602,88 3.788.949,06 4.262.381,02

448 8.14.(1) Penggantian Deck Drain Buah 1.189.217,65 1.248.252,59 1.236.442,02 1.367.830,89 1.331.211,64 1.153.450,24 1.268.527,26 1.348.865,39 1.337.064,94 2.528.554,33 1.302.889,98 2.060.548,30 2.341.154,47 1.290.992,18 1.470.771,52

449 8.14.(2) Penggantian Pipa Penyalur, Pipa Cucuran PVC diamter …… mm M1 1.109.838,06 1.184.459,73 1.170.507,31 1.283.672,03 1.224.809,27 940.645,70 1.106.666,94 1.150.960,59 1.153.589,21 1.752.007,05 1.135.601,96 1.435.860,66 1.545.832,82 1.121.567,64 1.213.956,51

450 8.14.(3) Penggantian Pipa Penyalur, Pipa Cucuran Baja diamter …… mm M1 877.285,06 957.691,23 942.554,31 1.066.103,53 1.001.456,27 815.951,20 993.541,44 1.044.735,09 1.045.063,71 2.603.720,05 1.024.776,46 1.619.366,16 1.835.253,32 1.009.557,64 1.118.046,51

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

I DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

451 9.1.(1) Mandor Jam 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80 32.724,80

452 9.1.(2) Pekerja Biasa Jam 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97 24.578,97

453 9.1.(3) Tukang Kayu, Tukang Batu, dsb Jam 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37 29.028,37

454 9.1.(4) a Dump Truck, kapasitas 3 - 4 m³ Jam 348.042,08 360.292,65 360.176,41 445.719,08 373.261,84 335.932,61 372.090,79 373.996,62 374.042,36 667.565,61 375.055,15 474.895,13 513.756,41 372.568,00 386.371,86

455 9.1.(4) b Dump Truck, kapasitas 6 - 8 m³ Jam 516.881,69 539.752,44 539.634,29 699.476,33 563.446,63 494.258,76 562.300,35 564.213,81 564.259,54 1.102.069,89 565.268,52 739.539,36 810.329,79 562.781,37 587.203,51

456 9.1.(5) a Truk Bak Datar 3 - 4 ton Jam 354.196,07 366.469,72 366.348,67 451.964,42 379.546,69 342.156,19 378.420,65 380.340,75 380.387,61 674.443,13 381.393,13 481.549,82 520.602,34 378.905,42 392.728,20

457 9.1.(5) b Truk Bak Datar 6 - 8 ton Jam 358.989,70 371.282,49 371.156,68 456.829,94 384.345,55 346.907,53 383.252,80 385.183,82 385.232,52 679.693,37 386.232,35 486.630,99 525.828,82 383.743,71 397.581,96

458 9.1.(6) Truk Tangki 3000 - 4500 Liter Jam 371.919,90 384.265,75 384.126,64 469.955,16 396.453,62 358.895,72 395.444,55 397.403,75 397.457,10 692.941,27 398.443,22 499.453,27 539.015,83 395.950,35 409.828,53

459 9.1.(7) Bulldozer 100 - 150 PK Jam 808.168,07 828.531,10 828.007,04 962.176,73 842.144,31 782.179,55 845.749,80 846.935,12 847.140,93 1.311.317,26 846.523,50 1.000.656,80 1.071.222,70 846.420,59 866.370,10

460 9.1.(8) Motor Grader min 100 PK Jam 407.371,76 416.543,44 416.312,86 478.475,75 424.392,78 396.549,88 424.006,86 426.171,86 426.263,33 648.030,64 427.140,83 507.945,92 539.630,53 424.630,80 435.264,30

461 9.1.(9) Loader Roda Karet 1.0 - 1.6 M3 Jam 296.094,58 303.162,74 303.017,91 351.799,66 309.992,88 288.279,50 309.031,45 311.005,89 311.063,06 485.133,54 312.041,55 376.271,62 400.130,67 309.546,77 318.143,45

462 9.1.(10) Loader Roda Berantai 75 - 100 PK Jam 407.371,76 416.543,44 416.312,86 478.475,75 424.392,78 396.549,88 424.006,86 426.171,86 426.263,33 648.030,64 427.140,83 507.945,92 539.630,53 424.630,80 435.264,30

463 9.1.(11) Alat Penggali (Excavator) 80 - 140 PK Jam 625.892,06 642.899,58 642.568,00 757.944,82 657.250,81 606.119,53 657.573,78 659.971,28 660.102,77 1.061.292,12 660.858,30 798.793,44 855.847,39 658.329,22 676.718,53

464 9.1.(12) Crane 10 - 15 Ton Jam 772.230,26 789.814,78 789.485,72 908.950,67 804.779,78 751.910,58 805.081,00 807.469,62 807.600,32 1.222.080,22 808.359,76 950.261,38 1.008.988,71 805.830,89 824.798,40

465 9.1.(13) Penggilas Roda Besi 6 - 9 Ton Jam 540.581,03 550.759,58 550.405,13 617.611,37 557.980,75 527.385,93 558.459,99 560.907,03 561.048,05 804.976,71 561.776,90 652.406,62 689.385,28 559.244,01 570.785,29

466 9.1.(14) Penggilas Bervibrasi 5 - 8 Ton Jam 334.131,05 344.336,10 344.200,80 415.121,80 354.432,71 323.285,79 353.391,24 355.339,00 355.392,36 601.679,90 356.382,29 442.303,79 475.361,98 353.891,32 365.632,51

467 9.1.(15) Pemadat Bervibrasi 1.5 - 3.0 PK Jam 104.013,09 104.436,62 104.381,71 108.142,76 105.816,60 103.843,54 104.206,69 105.968,52 105.986,83 127.920,62 107.077,34 122.686,14 124.894,87 104.603,90 106.629,11

468 9.1.(16) Penggilas Roda Karet 8 - 10 Ton Jam 595.708,63 612.816,60 612.517,41 729.138,58 627.700,85 576.195,82 627.791,34 630.110,70 630.228,85 1.033.995,32 631.024,40 768.909,95 825.651,62 628.501,04 647.015,57

469 9.1.(17) Kompresor 4000 - 6500 Ltr/mnt Jam 239.857,03 248.910,90 248.857,54 313.025,07 258.910,35 231.041,08 257.306,71 259.071,53 259.092,49 479.562,77 260.179,60 336.243,33 364.371,67 257.703,88 268.358,87

470 9.1.(18) Mesin Pengaduk beton (Molen) 0.3 - 0.6 M3 Jam 112.343,83 115.257,76 115.243,08 136.994,64 119.608,94 110.079,97 117.764,80 119.451,72 119.461,51 199.024,32 120.587,03 152.915,40 162.004,80 118.117,85 122.659,95

471 9.1.(19) Pompa Air 70 - 100 mm Jam 61.680,08 62.395,20 62.392,58 69.012,40 64.705,98 61.741,83 62.750,28 64.398,38 64.398,38 93.496,01 65.545,76 82.103,99 84.291,28 63.081,48 65.439,45

472 9.1.(20) Jack Hammer Jam 78.954,72 57.230,28 57.230,28 58.873,14 58.873,14 58.051,71 56.901,71 58.544,57 58.544,57 71.194,57 59.694,57 71.194,57 71.194,57 57.230,28 58.873,14

473 9.2.(1) Marka Jalan Termoplastik M2 282.165,64 286.115,48 285.580,38 308.100,48 290.283,41 278.941,95 288.967,73 290.097,12 290.097,94 374.756,21 289.797,05 321.511,29 334.845,71 289.562,06 295.197,34

474 9.2.(2) Marka Jalan Bukan Termoplastik M2 77.816,70 79.640,89 79.107,50 86.581,55 81.502,94 76.559,07 80.393,55 81.470,60 81.470,74 116.185,96 80.978,02 97.096,04 103.707,38 80.937,22 84.375,48

475 9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah 779.491,31 808.356,70 802.285,65 873.919,53 840.236,66 758.234,45 818.676,28 847.340,80 845.899,64 1.399.888,50 832.727,99 1.131.385,65 1.243.795,66 826.318,89 894.434,65

476 9.2.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineering Grade Buah 1.155.294,37 1.201.793,61 1.192.268,91 1.306.223,63 1.259.920,44 1.123.848,57 1.219.279,91 1.271.004,14 1.267.264,42 2.183.851,37 1.244.417,95 1.772.839,37 1.971.446,55 1.233.991,90 1.356.693,14

BIDANG BINA MARGA BM - 11 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

477 9.2.(4a) Rambu Jalan Tunggal dengan Pemantul High Intensity Grade Buah 771.617,92 800.483,31 794.412,25 865.754,53 832.071,66 750.069,45 810.919,53 839.584,05 838.142,89 1.390.557,07 824.562,99 1.122.637,44 1.234.464,23 818.445,50 886.561,26

478 9.2.(4b) Rambu Jalan Ganda dengan Pemantul High Intensity Grade Buah 1.143.946,33 1.190.445,57 1.180.920,88 1.294.455,30 1.248.152,10 1.112.080,24 1.208.100,00 1.259.824,23 1.256.084,51 2.170.401,84 1.232.649,62 1.760.230,44 1.957.997,03 1.222.643,87 1.345.345,10

479 9.2.(5) Patok Pengarah Buah 140.063,09 146.124,10 145.438,76 172.555,46 154.350,53 136.214,98 149.762,04 154.373,42 153.736,05 301.569,68 152.839,89 217.135,02 242.759,20 153.306,75 166.682,31

480 9.2.(6a) Patok Kilometer Buah 493.137,46 517.426,89 514.513,63 616.662,62 548.315,75 475.703,98 532.111,58 551.608,74 548.885,01 1.129.319,31 541.702,85 798.111,12 897.539,59 546.346,20 601.392,33

481 9.2.(6b) Patok Hektometer Buah 166.411,51 173.523,09 173.047,62 212.885,00 182.645,34 161.294,63 179.060,29 182.353,35 181.924,00 354.075,17 181.768,40 248.956,73 276.345,58 181.536,18 194.022,80

482 9.2.(7) Rel Pengaman M1 639.499,32 668.182,66 662.235,26 739.879,96 708.959,50 623.970,26 678.790,42 713.549,19 708.820,99 1.291.323,82 696.314,17 1.049.422,54 1.183.141,66 688.931,75 769.585,22

483 9.2.(8) Paku Jalan Tidak Memantul Buah 287.166,50 298.721,70 296.195,15 323.844,60 316.192,50 283.855,88 302.262,55 317.431,05 314.904,50 578.083,15 311.782,25 460.623,30 518.888,05 311.015,20 346.550,20

484 9.2.(9a) Paku Jalan Memantul Bujur Sangkar Buah 294.066,50 305.621,70 303.095,15 330.744,60 324.242,50 290.755,88 309.162,55 325.481,05 322.954,50 593.033,15 319.832,25 473.273,30 532.688,05 319.065,20 355.750,20

485 9.2.(9b) Paku Jalan Memantul Persegi panjang Buah 307.866,50 319.421,70 318.045,15 346.844,60 340.342,50 303.405,88 324.112,55 339.281,05 337.904,50 620.633,15 333.632,25 495.123,30 557.988,05 332.865,20 370.700,20

486 9.2.(9c) Paku Jalan Memantul Bulat Buah 321.666,50 334.371,70 331.845,15 362.944,60 355.292,50 317.205,88 339.062,55 355.381,05 354.004,50 675.833,15 349.732,25 520.423,30 586.738,05 348.965,20 389.330,20

487 9.2(10a) Kerb Pracetak Jenis 1 (Peninggi/Mountable) M1 162.789,65 169.892,47 168.565,16 187.606,74 180.424,13 159.063,67 172.568,15 181.556,63 180.299,78 355.652,72 177.343,87 267.590,74 301.449,29 179.114,27 200.478,04

488 9.2.(10b) Kereb Pracetak Jenis 2 (Penghalang/Barrier) M1 198.393,47 207.231,82 205.560,16 228.568,29 220.221,09 193.649,23 210.507,18 221.826,82 220.234,98 437.777,17 216.320,17 328.758,21 370.846,02 218.274,18 244.957,52

489 9.2.(10c) Kereb Pracetak Jenis 3 (Kereb Berparit/Gutter) M1 199.341,36 208.227,10 206.545,18 229.658,36 221.284,29 194.568,68 211.517,55 222.901,50 221.303,31 439.992,02 217.359,53 330.407,35 372.716,43 219.539,64 246.400,18

490 9.2.(10d) Kereb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cm M1 222.422,05 232.406,02 230.507,08 256.222,63 247.037,16 217.019,29 236.080,79 248.921,70 247.122,27 492.590,36 242.599,61 369.678,25 417.192,90 245.456,91 275.744,87

491 9.2.(10e) Kereb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cm M1 271.036,00 283.450,67 281.061,48 312.128,67 301.492,99 264.174,82 287.946,54 304.092,37 301.823,23 606.177,47 295.882,96 454.090,95 513.109,46 299.508,23 337.358,77

492 9.2.(10f) Kereb Pracetak Jenis 6 (Kereb dengan Bukaan) Buah 128.196,40 132.966,78 132.174,58 148.056,27 140.545,97 127.418,24 136.380,34 141.895,48 141.131,36 263.443,63 140.194,81 200.956,94 224.238,12 139.895,98 153.622,51

493 9.2.(10g) Kereb Pracetak Jenis 7 (Kereb pada Pelandaian Trotoar) Buah 796.818,03 835.019,50 827.470,46 916.971,16 889.543,45 774.744,34 848.347,23 899.228,28 892.071,79 1.822.703,69 871.648,48 1.359.793,92 1.540.929,50 886.166,28 1.004.309,61

494 9.2.(10h) Kereb Pracetak Jenis 8 (Kereb pada Pelandaian Trotoar) Buah 796.818,03 835.019,50 827.470,46 916.971,16 889.543,45 774.744,34 848.347,23 899.228,28 892.071,79 1.822.703,69 871.648,48 1.359.793,92 1.540.929,50 886.166,28 1.004.309,61

495 9.2.(10i) Kereb Pracetak Jenis 9 (Kereb pada Pelandaian Trotoar) Buah 796.818,03 835.019,50 827.470,46 916.971,16 889.543,45 774.744,34 848.347,23 899.228,28 892.071,79 1.822.703,69 871.648,48 1.359.793,92 1.540.929,50 886.166,28 1.004.309,61

496 9.2.(11) Kereb yang digunakan kembali M1 83.451,86 85.463,67 85.061,31 91.466,63 90.259,55 85.054,76 86.995,40 89.789,38 89.379,40 148.139,10 90.232,72 121.480,90 134.850,65 88.192,26 95.098,25

497 9.2.(12a) Perkerasan Blok Beton pada Trotoar dan Median M2 162.050,11 162.892,48 162.754,87 172.250,12 171.198,03 168.445,40 166.309,03 167.778,89 167.540,48 216.583,40 171.253,08 205.017,51 226.749,13 166.785,45 172.911,75

Pembengkokan Ubin Eksisting atau Perkerasan Blok Beton Eksisting pada


498 9.2.(12b) M3 17.677,45 17.686,07 17.683,13 20.303,84 18.475,43 17.522,09 18.276,19 18.347,01 18.348,17 27.405,69 18.532,05 22.513,49 25.039,51 18.298,84 18.791,10
Trotoar atau Median
499 9.2.(13) Beton Pemisah Jalur (Concrete Barrier) M1 878.585,13 931.031,83 925.409,30 1.087.217,02 972.245,55 853.774,22 957.016,21 995.560,32 989.947,99 2.057.244,91 974.578,16 1.454.763,55 1.639.719,52 985.886,40 1.091.181,78

500 9.2.(14) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe LED Buah 3.934.376,71 4.110.722,22 4.076.705,53 4.425.163,52 4.303.640,50 3.820.413,66 4.177.363,98 4.368.227,46 4.347.698,97 8.084.863,89 4.266.228,26 6.171.914,69 6.874.556,76 4.275.746,55 4.705.723,61

501 9.2.(15) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe LED Buah 5.084.376,71 5.318.222,22 5.272.705,53 5.747.663,52 5.591.640,50 4.935.913,66 5.404.413,98 5.673.477,46 5.641.448,97 10.527.463,89 5.526.628,26 8.168.314,69 9.143.506,76 5.524.646,55 6.129.423,61

502 9.2.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 Watt Buah 3.646.876,71 3.809.422,22 3.777.705,53 4.095.113,52 3.981.640,50 3.542.113,66 3.871.463,98 4.042.777,46 4.024.548,97 7.475.363,89 3.952.278,26 5.673.964,69 6.308.756,76 3.964.096,55 4.350.373,61

503 9.2.(17) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 Watt Buah 4.509.376,71 4.715.622,22 4.674.705,53 5.087.563,52 4.947.640,50 4.379.313,66 4.792.613,98 5.022.577,46 4.995.148,97 9.308.463,89 4.898.728,26 7.172.414,69 8.011.906,76 4.901.346,55 5.418.723,61

504 9.2.(18) Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 Watt Buah 3.872.517,37 4.045.761,03 4.011.751,70 4.348.857,17 4.233.220,84 3.761.638,04 4.110.472,12 4.297.761,12 4.278.379,78 7.938.827,47 4.197.992,51 6.061.496,03 6.747.797,00 4.208.823,67 4.629.846,95

505 9.2.(19) Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 Watt Buah 4.969.376,71 5.198.622,22 5.153.105,53 5.616.563,52 5.462.840,50 4.825.513,66 5.282.513,98 5.544.677,46 5.514.948,97 10.285.963,89 5.402.428,26 7.972.814,69 8.920.406,76 5.402.746,55 5.991.423,61

506 9.2.(20) Pagar Pemisah Pedestrian Carbon Steel M' 856.863,27 907.448,08 901.825,55 1.056.185,78 948.661,81 832.672,97 932.191,22 970.735,33 965.123,00 2.003.871,18 949.753,17 1.421.249,81 1.602.482,03 961.061,41 1.065.115,54

507 9.2.(21) Pagar Pemisah Pedestrian Galvanised M' 856.863,27 907.448,08 901.825,55 1.056.185,78 948.661,81 832.672,97 932.191,22 970.735,33 965.123,00 2.003.871,18 949.753,17 1.421.249,81 1.602.482,03 961.061,41 1.065.115,54

508 9.2.(22a) Stabilisasi dengan Tanaman M2 84.410,00 88.032,50 86.825,00 95.852,50 93.437,50 81.362,50 88.055,50 92.885,50 91.678,00 181.125,00 89.815,00 135.987,50 153.927,50 89.355,00 100.452,50

509 9.2.(22b) Stabilisasi dengan Tanaman VS M2 247.104,68 259.093,40 255.250,41 285.637,54 275.038,95 235.614,11 259.662,46 274.935,01 271.241,70 557.227,00 263.943,79 409.284,99 464.760,37 263.478,23 298.188,80

510 9.2.(23) Semak / Perdu…………………. M2 131.330,00 137.471,00 135.665,50 149.925,50 146.096,00 126.695,50 138.207,00 146.119,00 144.601,00 281.934,00 141.254,50 217.327,00 246.663,50 140.116,00 157.964,00

511 9.2.(24) Pohon Jenis ……………………. Buah 104.305,00 107.226,00 106.398,00 118.703,00 113.666,00 103.178,00 109.112,00 114.839,00 113.436,00 183.264,00 111.182,00 156.262,00 175.651,00 108.606,00 117.369,00

#N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A

J DIVISI 10. PEKERJAAN PEMELIHARAAN KINERJA 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

512 10.1.(1) Galian pada Saluran Air atau Lereng untuk Pemeliharaan M3 708.110,09 720.818,13 720.517,05 811.381,89 736.919,89 698.097,68 730.872,87 734.236,03 734.353,64 1.065.435,05 740.778,86 863.799,38 917.075,18 733.194,86 748.348,68

513 10.1.(2) Timbunan Pilihan pada Lereng Tepi Saluran untuk Pemeliharaan M3 359.837,70 370.940,05 369.452,42 416.068,15 388.891,77 355.326,43 376.672,55 386.133,22 386.148,40 673.551,46 386.656,31 519.683,07 575.310,64 381.020,07 407.261,83

514 10.1.(3) Pebaikan Pasangan Batu dengan Mortar M3 1.675.805,10 1.736.200,26 1.704.192,79 2.106.399,12 1.824.180,63 1.793.276,05 1.888.513,83 1.986.855,49 1.980.816,24 9.946.451,13 1.956.928,95 4.327.602,17 5.332.422,31 1.931.750,85 2.100.103,17

515 10.1.(4) Perbaikan Lapis Fondasi Agregat Kelas A M3 1.347.751,43 1.383.341,35 1.374.144,70 1.574.464,76 1.459.758,62 1.238.085,16 1.355.636,51 1.413.269,21 1.405.710,43 2.730.725,64 1.290.252,62 1.872.391,86 2.086.958,13 1.372.079,94 1.510.270,23

516 10.1.(5) Perbaikan Lapis Fondasi Agregat Kelas B M3 1.142.675,48 1.170.138,91 1.161.289,45 1.326.157,36 1.235.606,00 1.067.080,23 1.168.529,97 1.222.128,00 1.214.847,41 2.378.757,72 1.061.184,25 1.552.690,41 1.730.200,89 1.184.071,59 1.309.081,23

517 10.1.(6) Perbaikan Lapis Fondasi Agregat Kelas S M3 1.208.455,24 1.239.439,61 1.230.468,81 1.402.512,49 1.309.967,16 1.102.473,26 1.208.083,05 1.263.809,74 1.256.428,45 2.470.964,56 1.140.499,47 1.680.076,12 1.875.762,03 1.223.789,65 1.354.904,68

518 10.1.(7) Perbaikan dan Perataan Permukaan JalanTanah M2 12.646,59 12.921,72 12.914,14 14.763,47 13.143,44 12.321,10 13.142,71 13.186,34 13.189,32 19.751,89 13.220,15 15.538,87 16.547,19 13.163,77 13.459,38

519 10.1.(8) Perbaikan dan Perataan Permukan Perkerasan Berbutir Tanpa Penutup Aspal M3 13.334,76 13.616,97 13.609,29 15.525,11 13.862,97 13.019,03 13.838,92 13.883,91 13.886,93 20.710,95 13.941,04 16.355,07 17.424,31 13.866,79 14.170,55

520 10.1.(9) Perbaikan Campuran Aspal Panas M3 4.663.064,30 4.866.787,85 4.818.498,76 5.476.022,71 5.169.521,63 4.341.874,21 4.779.248,56 5.045.554,27 5.002.195,30 10.309.642,27 4.752.519,43 7.341.374,12 8.474.120,24 4.853.584,26 5.454.199,75

521 10.1.(10) Perbaikan Campuran Aspal Panas dengan Asbuton M3 5.388.715,00 5.668.055,46 5.639.343,33 6.271.811,06 6.016.708,90 5.122.160,70 5.720.760,13 6.033.770,38 5.855.282,22 12.053.724,59 5.648.464,37 8.849.836,89 10.161.104,12 5.765.663,09 6.439.844,30

522 10.1.(11) Perbaikan Asbuton Campuran Panas Hampar Dingin M3 2.738.277,99 2.842.717,66 2.819.719,72 3.157.738,60 3.019.500,51 2.638.943,88 2.891.150,11 3.050.610,26 3.030.267,47 5.625.643,49 2.966.094,21 4.547.389,67 5.130.318,62 2.938.427,01 3.302.847,39

BIDANG BINA MARGA BM - 12 dari 13


HARGA SATUAN POKOK KEGIATAN BIDANG BINA MARGA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NO MATA KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
PEMBAYARAN Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

523 10.1.(12) Perbaikan Lapis Penetrasi Macadam tanpa atau dengan Asbuton Liter 9.770.157,07 10.182.454,40 10.123.868,79 11.221.527,23 10.862.102,78 9.390.132,04 10.258.773,58 10.877.235,96 10.819.086,82 20.366.965,03 10.398.072,24 15.666.552,19 18.287.389,73 10.461.133,85 11.814.039,84

524 10.1.(13) Residu Bitumen untuk Pemeliharaan M3 900.800,59 920.243,70 919.143,01 1.038.369,05 937.825,40 879.860,74 934.806,80 941.492,31 941.100,43 1.405.324,20 942.152,93 1.124.796,93 1.204.857,60 937.368,95 963.721,77

525 10.1.(14) Perbaikan Perkerasan Beton Semen M3 2.106.582,46 2.208.982,13 2.162.559,05 2.799.920,55 2.327.404,47 1.958.371,23 2.138.654,28 2.266.445,61 2.258.709,40 13.622.420,05 2.128.907,05 5.387.189,98 6.774.189,01 2.191.814,90 2.404.856,64

526 10.1.(15) Perbaikan Lapis Fondasi Bawah Beton Kurus M3 1.998.684,20 2.062.114,97 2.027.097,04 2.512.065,36 2.167.446,11 1.848.391,09 1.997.187,62 2.106.857,78 2.099.195,89 10.381.685,32 1.985.874,08 4.442.866,25 5.469.911,82 2.040.021,90 2.229.656,91

527 10.1.(16) Perbaikan Pasangan Batu M2 1.522.081,95 1.575.084,77 1.549.562,62 1.882.102,42 1.655.491,50 1.643.066,80 1.728.954,28 1.813.604,97 1.807.669,03 8.083.801,93 1.790.452,26 3.704.949,77 4.512.092,88 1.765.514,01 1.918.723,49

528 10.1.(17) Pengecatan Kereb pada Trotoar atau Median M1 40.330,66 41.005,11 41.005,11 46.171,61 42.124,91 40.052,08 41.659,77 41.758,73 41.758,73 59.666,07 42.174,40 48.380,05 51.393,07 41.778,53 42.551,94

529 10.1.(18) Perbaikan Rel Pengaman Buah 540.924,76 567.308,36 561.382,78 621.332,29 604.013,91 525.963,85 575.770,09 610.307,99 605.571,21 1.126.003,31 591.100,37 921.936,65 1.045.510,35 585.516,12 663.011,28

530 10.1.(19) Pembersihan Patok Buah 21.783,48 21.852,36 21.851,78 23.136,59 22.725,66 22.516,82 21.916,39 21.924,58 21.924,80 27.352,39 22.733,93 25.117,02 27.634,13 22.148,50 22.223,81

531 10.1.(20) Pembersihan Rambu M1 21.783,48 21.852,36 21.851,78 23.136,59 22.725,66 22.516,82 21.916,39 21.924,58 21.924,80 27.352,39 22.733,93 25.117,02 27.634,13 22.148,50 22.223,81

532 10.1.(21) Pembersihan Drainase Buah 377.004,54 385.391,14 385.256,08 445.713,93 396.326,02 370.740,42 392.531,65 394.262,47 394.315,34 609.744,54 398.168,09 475.147,11 508.717,39 393.850,59 403.557,08

533 10.1.(22) Pengendalian Tanaman M2 3.203,39 3.203,39 3.203,39 3.280,06 3.280,06 3.280,06 3.199,56 3.199,56 3.199,56 3.567,56 3.280,06 3.452,56 3.663,39 3.222,56 3.222,56

534 10.2.(1) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

535 10.2.(2) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

536 10.2.(3) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

537 10.2.(4) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

538 10.2. (…..) Pemeliharaan Kinerja Jembatan …… bentang ….. m LS 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00

BIDANG BINA MARGA BM - 13 dari 13


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2023
bidang cipta karya
HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A PEKERJAAN PERSIAPAN

1 A.1 Pagar sementara dari Seng Gelombang BJLS 20 KI tinggi 2 meter m 441.686,25 457.786,25 455.788,70 500.629,50 484.925,10 497.891,35 568.962,50 623.305,75 483.893,55 881.289,85 467.775,15 745.750,85 795.929,95 535.122,60 509.240,70

2 A.2 Pagar sementara dari kawat duri tinggi 1,8 meter m 614.473,75 642.878,75 633.406,20 701.534,50 680.643,60 606.451,35 654.982,50 689.373,25 680.428,55 1.276.257,35 670.635,15 1.033.020,85 1.166.287,45 664.037,60 744.530,70

3 A.3 Pengukuran dan pemasangan bouwplank m 85.560,00 87.768,00 87.768,00 91.781,50 93.271,90 100.544,50 113.838,50 124.763,50 91.988,50 127.075,00 89.688,50 132.112,00 134.078,50 105.328,50 95.691,50

4 A.4 Pembuatan gudang semen dan peralatan m2 1.180.072,50 1.209.259,50 1.206.085,50 1.250.820,50 1.283.064,20 1.322.891,00 1.442.732,50 1.552.902,50 1.258.606,00 2.097.002,00 1.247.554,50 1.847.417,50 1.943.488,50 1.370.478,00 1.323.868,50

5 A.5 Pembuatan rumah jaga (konstruksi kayu) m2 1.095.030,00 1.124.700,00 1.122.975,00 1.150.920,00 1.193.727,60 1.247.865,00 1.389.085,00 1.507.535,00 1.176.335,00 1.687.855,00 1.155.980,00 1.682.795,00 1.735.810,00 1.305.250,00 1.234.180,00

6 A.6 Pembuatan kantor lapangan , dengan lantai plesteran m2 1.687.452,50 1.720.457,50 1.715.052,50 1.824.360,00 1.822.729,30 1.855.122,50 1.974.952,50 2.102.890,00 1.777.382,50 3.507.557,50 1.777.095,00 2.698.705,00 2.891.502,50 1.899.397,50 1.864.150,00

7 A.7 Pembuatan bedeng pekerja m2 1.656.230,00 1.700.608,50 1.691.282,00 1.859.193,50 1.807.448,10 1.826.177,00 1.921.857,00 2.040.939,50 1.717.950,50 3.631.861,00 1.718.847,50 2.680.167,00 2.898.874,00 1.829.730,50 1.848.636,50

8 A.8 Membersihkan lapangan dan perataan m2 25.875,00 25.875,00 25.875,00 27.025,00 27.025,00 27.025,00 26.220,00 26.220,00 26.220,00 31.050,00 27.025,00 29.900,00 33.925,00 26.450,00 26.450,00

9 A.9 Pembongkaran beton bertulang m3 2.213.715,50 2.213.715,50 2.213.715,50 2.298.045,00 2.298.045,00 2.298.045,00 2.190.706,30 2.190.706,30 2.190.706,30 2.627.704,00 2.298.045,00 2.474.363,00 2.665.999,00 2.221.374,50 2.221.374,50

10 A.10 Bongkaran dinding tembok Bata merah m3 1.047.632,75 1.047.632,75 1.047.632,75 1.086.347,50 1.086.347,50 1.086.347,50 1.032.678,15 1.032.678,15 1.032.678,15 1.240.827,00 1.086.347,50 1.164.156,50 1.242.724,50 1.048.012,25 1.048.012,25

11 A.11 Membongkar dinding bata/ pas. batu kali (bongkaran dipakai kembali) m2 484.380,00 484.380,00 484.380,00 502.665,00 502.665,00 502.665,00 478.515,00 478.515,00 478.515,00 574.770,00 502.665,00 540.270,00 579.945,00 485.415,00 485.415,00

12 A.12 Mengupas plesteran m2 21.993,75 21.993,75 21.993,75 22.856,25 22.856,25 22.856,25 21.850,00 21.850,00 21.850,00 26.162,50 22.856,25 24.725,00 26.881,25 22.137,50 22.137,50

13 A.13 Membongkar jembatan kayu (bongkaran dipakai kembali) m3 1.883.700,00 1.883.700,00 1.883.700,00 1.984.900,00 1.984.900,00 1.984.900,00 1.876.800,00 1.876.800,00 1.876.800,00 2.311.500,00 1.984.900,00 2.265.500,00 2.350.600,00 1.886.000,00 1.961.900,00

14 A.14 Membongkar genteng/ sirap ( bongkaran dipakai kembali) m2 87.975,00 87.975,00 87.975,00 91.425,00 91.425,00 91.425,00 87.400,00 87.400,00 87.400,00 104.650,00 91.425,00 98.900,00 107.525,00 88.550,00 88.550,00

15 A.15 Membongkar genteng/ sirap (bongkaran tidak dipakai kembali) m2 17.595,00 17.595,00 17.595,00 18.285,00 18.285,00 18.285,00 17.480,00 17.480,00 17.480,00 20.930,00 18.285,00 19.780,00 21.505,00 17.710,00 17.710,00

16 A.16 Membongkar rangka atap/ reng/ kaso (bongkaran dipakai kembali) m2 55.545,00 55.545,00 55.545,00 58.190,00 58.190,00 58.190,00 55.315,00 55.315,00 55.315,00 67.275,00 58.190,00 64.975,00 68.885,00 55.775,00 57.040,00

17 A.17 Membongkar rangka atap/ reng/ kaso (bongkaran tidak dipakai kembali) m2 41.658,75 41.658,75 41.658,75 43.642,50 43.642,50 43.642,50 41.486,25 41.486,25 41.486,25 50.456,25 43.642,50 48.731,25 51.663,75 41.831,25 42.780,00

18 A.18 Membongkar kuda-kuda/ gording/ balok (bongkaran dipakai kembali) m3 1.925.100,00 1.925.100,00 1.925.100,00 2.028.600,00 2.028.600,00 2.028.600,00 1.920.500,00 1.920.500,00 1.920.500,00 2.362.100,00 2.028.600,00 2.316.100,00 2.412.700,00 1.929.700,00 2.005.600,00

19 A.19 Membongkar kuda-kuda/ gording/ balok (bongkaran tidak dipakai kembali) m3 1.214.400,00 1.214.400,00 1.214.400,00 1.274.200,00 1.274.200,00 1.274.200,00 1.207.500,00 1.207.500,00 1.207.500,00 1.476.600,00 1.274.200,00 1.430.600,00 1.488.100,00 1.216.700,00 1.251.200,00

20 A.20 Membongkar plafond (bongkaran dipakai kembali) m2 78.660,00 78.660,00 78.660,00 83.145,00 83.145,00 83.145,00 78.545,00 78.545,00 78.545,00 97.175,00 83.145,00 96.025,00 99.130,00 78.775,00 82.570,00

21 A.21 Membongkar plafond (bongkaran tidak dipakai kembali) m2 26.392,50 26.392,50 26.392,50 27.427,50 27.427,50 27.427,50 26.220,00 26.220,00 26.220,00 31.395,00 27.427,50 29.670,00 32.257,50 26.565,00 26.565,00

22 A.22 Pengukuran kembali (site) m2 12.995,00 13.110,00 13.110,00 13.455,00 13.409,00 13.225,00 13.179,00 13.179,00 13.179,00 14.605,00 13.340,00 14.375,00 15.180,00 13.110,00 13.340,00

23 A.23 Pembuatan 1 m2 Pagar Sementara dari Kayu Tinggi 2 m m 371.593,75 384.071,25 383.453,70 420.762,00 408.436,30 422.221,35 482.770,00 528.488,25 404.256,05 761.689,85 391.300,15 627.070,85 666.554,95 452.667,60 424.773,20

24 A.24 Pembuatan 1 m2 Steger / Perancah dari Bambu m2 624.381,00 627.683,80 626.160,74 664.476,90 662.782,72 654.311,82 626.087,14 629.539,67 629.475,50 823.756,50 661.131,32 782.745,20 818.735,60 628.558,26 660.891,66

25 A.25 Pembuatan 1 Buah Kotak Adukan Uk. 40 x 50 x 25 cm bh 189.865,00 195.707,00 195.707,00 199.226,00 209.024,00 228.068,00 264.799,00 293.549,00 207.299,00 293.595,00 199.594,00 309.373,00 311.029,00 241.799,00 216.936,00

26 A.26 Pembuatan 1 m2 Jalan Sementara m2 299.287,50 306.452,00 305.118,00 326.646,00 322.310,50 303.496,50 309.591,50 319.608,00 318.101,50 525.872,00 321.862,00 426.995,00 473.248,00 314.789,50 336.964,95

27 A.27 Pemasangan 1 m2 Pagar Kawat Jaring Galvanis m2 46.241,50 47.736,50 47.736,50 51.520,00 50.025,00 45.540,00 48.122,90 49.617,90 49.617,90 82.547,00 48.530,00 68.609,00 79.074,00 48.219,50 52.773,50

28 A.28 Pemasangan 1 m2 Panel Beton Pracetak 5x50x240 cm Untuk Pagar m2 3.354.971,33 3.488.880,84 3.406.077,38 4.276.565,56 3.675.387,49 3.236.986,13 3.392.303,21 3.616.428,35 3.603.944,38 23.364.097,50 3.532.113,44 9.233.850,19 11.681.455,14 3.493.356,92 3.827.142,18

B PEKERJAAN TANAH

1 B.1 Galian tanah biasa sedalam 1 meter m3 121.612,50 121.612,50 121.612,50 126.212,50 126.212,50 126.212,50 120.175,00 120.175,00 120.175,00 144.325,00 126.212,50 135.700,00 145.762,50 121.900,00 121.900,00

2 B.2 Galian tanah biasa sedalam 2 meter m3 149.040,00 149.040,00 149.040,00 154.732,50 154.732,50 154.732,50 147.487,50 147.487,50 147.487,50 176.985,00 154.732,50 166.635,00 179.572,50 149.557,50 149.557,50

3 B.3 Galian tanah biasa sedalam 3 meter m3 176.881,50 176.881,50 176.881,50 183.689,50 183.689,50 183.689,50 175.237,00 175.237,00 175.237,00 210.151,00 183.689,50 198.076,00 214.003,50 177.652,00 177.652,00

4 B.4 Galian tanah keras sedalam 1 M m3 161.874,00 161.874,00 161.874,00 167.992,00 167.992,00 167.992,00 159.942,00 159.942,00 159.942,00 192.096,00 167.992,00 180.596,00 193.936,00 162.242,00 162.242,00

5 B.5 Galian tanah cadas sedalam 1 Meter m3 245.295,00 245.295,00 245.295,00 254.610,00 254.610,00 254.610,00 242.535,00 242.535,00 242.535,00 291.180,00 254.610,00 273.930,00 294.630,00 245.985,00 245.985,00

6 B.6 Galian tanah lumpur sedalam 1 Meter m3 195.615,00 195.615,00 195.615,00 203.032,50 203.032,50 203.032,50 193.372,50 193.372,50 193.372,50 232.185,00 203.032,50 218.385,00 234.772,50 196.132,50 196.132,50

7 B.7 Stripping tebing setinggi 1 m m2 8.797,50 8.797,50 8.797,50 9.142,50 9.142,50 9.142,50 8.740,00 8.740,00 8.740,00 10.465,00 9.142,50 9.890,00 10.752,50 8.855,00 8.855,00

BIDANG CIPTA KARYA CK - 1 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

8 B.8 Pembuangan tanah sejauh 30 meter m3 53.302,50 53.302,50 53.302,50 55.315,00 55.315,00 55.315,00 52.658,50 52.658,50 52.658,50 63.250,00 55.315,00 59.455,00 63.825,00 53.417,50 53.417,50

9 B.9 Urugan kembali m3 40.537,50 40.537,50 40.537,50 42.070,83 42.070,83 42.070,83 40.058,33 40.058,33 40.058,33 48.108,33 42.070,83 45.233,33 48.587,50 40.633,33 40.633,33

10 B.10 Pemadatan tanah m3 87.975,00 87.975,00 87.975,00 91.425,00 91.425,00 91.425,00 87.400,00 87.400,00 87.400,00 104.650,00 91.425,00 98.900,00 107.525,00 88.550,00 88.550,00

11 B.11 Urugan pasir m3 228.045,00 237.705,00 234.945,00 257.485,00 251.965,00 224.365,00 239.890,00 250.930,00 249.550,00 477.250,00 246.445,00 364.780,00 411.585,00 243.340,00 270.940,00

12 B.12 Lapisan pudel m3 517.155,00 532.975,55 529.409,40 573.013,95 563.865,70 518.414,25 536.849,90 557.637,30 554.226,40 973.377,25 557.038,15 778.351,05 864.199,70 544.272,00 596.488,90

13 B.13 Urugan tanah tanah dari luar lokasi pekerjaan (manual) m3 154.387,50 159.907,50 158.527,50 172.672,50 169.912,50 153.352,50 162.380,00 169.280,00 167.900,00 311.765,00 167.152,50 241.270,00 271.802,50 164.335,00 180.895,00

14 B.14 Urugan S i r t u m3 457.987,50 478.687,50 474.547,50 521.812,50 509.392,50 447.292,50 485.300,00 512.900,00 510.140,00 1.019.705,00 499.732,50 768.430,00 870.722,50 494.155,00 557.635,00

15 B.15 Lapisan ijuk 10 cm m2 302.392,50 316.192,50 313.432,50 344.827,50 336.547,50 295.147,50 320.160,00 338.790,00 336.720,00 617.895,00 329.647,50 498.870,00 577.357,50 326.025,00 367.425,00

C PEKERJAAN PONDASI

1 C.1 Pemasangan pondasi batu belah campuran 1 Semen : 3 PP m3 1.585.850,00 1.645.006,00 1.615.209,50 1.945.759,75 1.737.983,50 1.600.202,00 1.675.958,25 1.774.570,75 1.766.624,25 8.769.974,75 1.742.163,75 3.881.025,75 4.783.235,25 1.718.008,00 1.889.904,25

2 C.2 Pemasangan pondasi batu belah campuran 1 Semen : 4 PP m3 1.507.362,50 1.562.631,50 1.537.170,50 1.824.141,50 1.651.871,50 1.525.900,50 1.598.293,00 1.688.683,00 1.680.587,00 7.540.561,50 1.660.312,50 3.496.885,50 4.267.236,00 1.636.082,00 1.800.727,50

3 C.3 Pemasangan pondasi batu belah campuran 1 Semen : 5 PP m3 1.449.471,50 1.501.859,98 1.479.447,86 1.735.845,88 1.588.275,58 1.471.002,26 1.540.710,66 1.625.171,26 1.617.019,14 6.681.066,68 1.599.737,40 3.224.759,16 3.902.969,82 1.575.478,84 1.734.559,72

4 C.4 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 6 PP m3 1.408.635,00 1.458.991,20 1.438.725,90 1.673.598,45 1.543.412,70 1.432.274,40 1.500.084,15 1.580.365,65 1.572.175,35 6.076.005,45 1.557.002,25 3.033.091,65 3.646.439,55 1.532.724,60 1.687.874,55

5 C.5 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 8 PP m3 1.352.802,50 1.400.380,30 1.383.052,10 1.588.474,30 1.482.076,30 1.379.326,10 1.444.542,60 1.519.108,60 1.510.865,40 5.248.142,30 1.498.576,50 2.770.895,10 3.295.495,20 1.474.272,40 1.624.050,70

6 C.6 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 1 KP : 2 PP m3 1.160.453,50 1.198.273,55 1.191.365,50 1.294.014,50 1.270.823,60 1.196.785,45 1.253.017,00 1.307.796,10 1.299.723,10 2.361.410,00 1.297.242,55 1.859.423,50 2.074.439,00 1.272.632,55 1.404.059,15

7 C.7 Pemasangan 1 m3 Pondasi Batu Belah Camp 1 SP : 3 KP : 10 PP m3 1.318.647,50 1.364.464,65 1.350.290,90 1.524.993,15 1.445.202,70 1.347.522,85 1.412.604,80 1.482.593,80 1.474.224,10 4.363.298,95 1.464.286,95 2.520.856,35 2.950.150,20 1.439.581,50 1.587.802,70

8 C.8 Pemasangan 1 m3 Pondasi Batu Belah Camp 1/4 SP : 1 KP : 4 PP m3 1.272.475,00 1.316.001,35 1.304.111,50 1.455.812,60 1.394.409,50 1.303.673,35 1.366.456,45 1.431.833,95 1.423.429,75 3.718.985,00 1.415.815,60 2.313.574,60 2.673.845,45 1.391.129,70 1.534.724,45

9 C.9 Pemasangan 1 m3 Pondasi Siklop, 60% Beton Camp 1 SP : 2 PB : 3 Kr dan 40% Batu Belah m3 4.200.317,50 4.394.313,30 4.367.463,10 5.706.493,20 4.631.109,80 4.064.219,60 4.539.314,50 4.618.848,50 4.614.294,50 14.528.996,50 4.614.471,60 7.589.859,70 8.874.667,30 4.579.628,90 4.860.493,40

10 C.10 Pemasangan batu kosong ( aanstamping ) m3 914.836,50 950.054,10 943.540,50 1.031.239,50 1.009.932,30 943.416,30 1.004.902,20 1.055.796,60 1.048.399,80 1.998.812,70 1.036.925,10 1.540.735,50 1.730.602,80 1.021.489,80 1.140.273,30

11 C.11 Pemasangan pondasi sumuran , diameter 100 cm m3 1.489.100,50 1.535.332,80 1.508.620,60 1.810.132,20 1.617.051,80 1.492.486,10 1.533.697,50 1.612.058,50 1.607.677,00 8.086.064,00 1.599.689,10 3.520.193,70 4.345.392,30 1.571.366,90 1.702.031,05

12 C.12 Pengadaan Tiang Pancang spun pile d=50 cm m 2.093.000,00 2.197.339,50 2.178.824,50 2.405.294,00 2.336.786,20 2.042.055,00 2.233.438,00 2.363.848,00 2.345.448,00 4.729.892,50 2.290.719,50 3.545.622,50 4.019.365,00 2.270.019,50 2.565.259,00

13 C.13 Pengadaan Tiang Pancang spun pile d=45 cm m 1.787.100,00 1.876.489,50 1.860.274,50 2.053.394,00 1.994.086,20 1.745.355,00 1.906.838,00 2.016.548,00 2.001.598,00 4.014.592,50 1.956.069,50 3.015.472,50 3.416.765,00 1.937.669,50 2.185.759,00

14 C.14 Pengadaan Tiang Pancang spun pile d=40 cm m 1.453.600,00 1.526.889,50 1.514.124,50 1.670.444,00 1.621.486,20 1.422.205,00 1.551.488,00 1.639.348,00 1.626.698,00 3.237.192,50 1.590.369,50 2.435.872,50 2.758.965,00 1.576.569,50 1.774.059,00

15 C.15 Pengadaan Tiang Pancang spun pile d=30 cm m 928.050,00 974.889,50 966.724,50 1.065.544,00 1.032.686,20 911.605,00 990.288,00 1.041.348,00 1.034.448,00 2.007.842,50 1.014.219,50 1.523.922,50 1.721.665,00 1.003.869,50 1.122.009,00

16 C.16 Tiang Pancang square pile 35 x 35 cm m 1.181.510,00 1.236.629,50 1.225.129,50 1.347.524,00 1.314.896,20 1.048.570,00 1.298.833,00 1.320.913,00 1.358.863,00 2.622.517,50 1.332.769,50 2.144.117,50 2.432.365,00 1.320.349,50 1.490.699,00

17 C.17 Pengadaan Tiang Pancang square pile 30 x 30 cm m 923.910,00 965.229,50 957.179,50 1.050.824,00 1.026.246,20 815.120,00 1.022.833,00 1.040.313,00 1.069.063,00 2.042.917,50 1.049.869,50 1.674.917,50 1.899.915,00 1.039.749,50 1.170.999,00

18 C.18 Pengadaan Tiang Pancang square pile 25 x 25 cm m 724.960,00 757.079,50 750.179,50 821.974,00 803.146,20 638.020,00 798.583,00 811.463,00 833.313,00 1.572.567,50 819.869,50 1.294.267,50 1.467.515,00 810.899,50 909.949,00

19 C.19 Pengadaan Tiang Pancang square pile 20 x 20 cm m 543.260,00 566.179,50 561.579,50 613.824,00 599.596,20 478.170,00 591.583,00 601.013,00 615.963,00 1.137.867,50 605.969,50 941.217,50 1.066.165,00 600.449,50 670.749,00

20 C.20 Upah Potong dan buang tiang pancang bh 244.087,50 244.087,50 244.087,50 255.731,25 255.731,25 255.731,25 243.081,25 243.081,25 243.081,25 293.537,50 255.731,25 287.787,50 305.756,25 244.231,25 252.856,25

21 C.21 Pemancangan Dolken Kayu Galam 3 m bh 112.010,00 114.310,00 113.160,00 120.520,00 119.370,00 112.470,00 112.240,00 115.690,00 114.540,00 175.950,00 117.070,00 148.350,00 162.150,00 114.310,00 120.520,00

22 C.22 Pemancangan tiang pancang dengan pile driver dan hammer m 206.853,54 208.233,54 208.233,54 213.063,54 212.511,54 210.303,54 209.038,54 209.038,54 209.038,54 230.428,54 211.683,54 224.678,54 240.203,54 208.808,54 210.188,54

23 C.23 Pemancangan tiang pancang dengan jack-in hydraulic (kap 380 ton) m 414.575,00 429.755,00 426.995,00 462.185,00 453.353,00 409.745,00 444.360,00 449.880,00 458.160,00 714.150,00 455.285,00 708.400,00 723.925,00 449.650,00 456.550,00

D PEKERJAAN BETON

1 D.1 Membuat 1 m3 Beton Mutu f'c = 7,4 Mpa (K-100) m3 1.576.362,50 1.638.153,15 1.603.213,85 1.974.359,10 1.726.802,05 1.522.844,95 1.596.999,25 1.697.710,50 1.691.176,20 9.867.300,15 1.660.923,15 4.065.761,75 5.094.831,20 1.641.416,85 1.799.348,65

2 D.2 Membuat 1 m3 Beton Mutu f'c = 9,8 Mpa (K-125) m3 1.641.406,50 1.706.463,15 1.668.195,75 2.072.501,25 1.798.319,40 1.584.381,45 1.661.681,00 1.768.948,40 1.762.421,00 10.796.666,90 1.728.908,85 4.362.661,85 5.491.339,70 1.709.409,45 1.873.730,42

3 D.3 Membuat 1 m3 Beton Mutu f'c = 12,2 Mpa (K-150) m3 1.691.845,50 1.759.432,15 1.718.538,15 2.149.017,65 1.853.754,00 1.632.152,45 1.711.844,00 1.824.235,80 1.817.726,80 11.531.263,90 1.781.657,05 4.596.277,45 5.803.702,70 1.762.176,05 1.931.401,54

BIDANG CIPTA KARYA CK - 2 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

4 D.4 Membuat 1 m3 Lantai Kerja Beton Mutu f'c = 7,4 Mpa (K-100), Slump (3-6) cm, w/c = 0,87 m3 1.464.801,00 1.525.576,20 1.492.407,90 1.842.255,15 1.609.766,55 1.408.329,10 1.486.863,75 1.584.900,10 1.578.181,80 9.253.259,95 1.544.783,50 3.817.500,90 4.785.327,10 1.528.635,20 1.684.448,93

5 D.5 Membuat 1 m3 Beton Mutu f'c = 14,5 Mpa (K-175), Slump (120 ± 20) mm m3 1.752.807,00 1.823.454,95 1.779.458,25 2.240.855,50 1.920.790,95 1.689.820,35 1.772.477,75 1.891.000,20 1.884.493,50 12.397.440,45 1.845.378,55 4.873.374,55 6.173.630,10 1.825.899,85 2.001.132,71

6 D.6 Membuat 1 m3 Beton Mutu f'c = 16,9 Mpa (K-200) m3 1.808.530,25 1.881.971,55 1.835.019,35 2.325.862,35 1.982.005,45 1.742.630,65 1.827.873,25 1.952.103,15 1.945.630,95 13.224.985,05 1.903.658,25 5.135.323,85 6.524.307,65 1.884.214,05 2.064.804,07

7 D.7 Membuat 1 m3 Beton Mutu f'c = 19,3 Mpa (K-225) m3 1.853.483,75 1.929.185,95 1.880.028,05 2.392.853,30 2.031.481,90 1.785.086,35 1.872.602,50 2.001.281,75 1.994.788,85 13.839.028,70 1.950.621,95 5.333.682,75 6.788.448,85 1.931.157,05 2.116.269,10

8 D.8 Membuat 1 m3 Beton Mutu f'c = 21,7 Mpa (K-250) m3 1.878.277,75 1.955.217,35 1.904.615,05 2.431.826,80 2.058.651,80 1.808.693,55 1.897.224,00 2.028.555,15 2.022.112,85 14.246.066,60 1.976.593,55 5.459.635,35 6.958.083,05 1.957.179,25 2.144.530,12

9 D.9 Membuat 1 m3 Beton Mutu f'c = 24,0 Mpa (K-275) m3 1.921.218,75 2.000.301,95 1.947.245,55 2.498.912,05 2.105.731,65 1.849.566,85 1.939.906,25 2.075.790,25 2.069.423,85 14.937.123,45 2.021.588,45 5.674.439,25 7.247.034,35 2.002.250,05 2.193.534,15

10 D.10 Membuat 1 m3 Beton Mutu f'c = 26,4 Mpa (K-300) m3 1.934.087,25 2.013.812,15 1.959.982,95 2.519.342,95 2.119.821,45 1.861.830,45 1.952.671,25 2.089.951,35 2.083.617,15 15.155.218,65 2.035.066,45 5.741.456,65 7.337.463,45 2.015.760,25 2.208.179,63

11 D.11 Membuat 1 m3 Beton Mutu f'c = 28,8 Mpa (K-325) m3 2.073.938,75 2.156.172,95 2.099.448,05 2.691.439,30 2.268.289,90 2.003.045,85 2.091.413,00 2.234.041,75 2.227.801,85 16.078.124,70 2.181.093,45 6.096.627,25 7.786.913,35 2.158.351,05 2.356.290,20

12 D.12 Membuat 1 m3 Beton Mutu f'c = 31,2 Mpa (K-350), Slump (120 ± 20) mm m3 2.091.407,25 2.174.513,15 2.116.785,45 2.718.770,20 2.287.439,70 2.019.679,45 2.108.778,00 2.253.262,85 2.247.055,15 16.360.619,90 2.199.401,45 6.184.344,65 7.904.942,45 2.176.691,25 2.376.225,68

13 D.13 Beton kedap air dengan storox-100 m3 2.006.002,50 2.085.674,50 2.033.050,50 2.584.360,50 2.195.936,50 1.937.048,50 2.024.460,00 2.160.620,00 2.153.996,00 14.891.269,50 2.110.744,50 5.740.167,50 7.304.501,00 2.087.618,00 2.282.117,50

14 D.14 Beton tumbuk/rabat 1 Pc : 3 Ps : 5 Kr utk bawah lantai/pondasi m3 1.549.855,00 1.611.518,00 1.579.249,00 1.923.501,50 1.700.746,50 1.494.149,00 1.570.957,50 1.669.087,00 1.661.888,00 9.047.188,00 1.633.069,00 3.844.415,50 4.787.001,50 1.613.220,00 1.773.097,60

15 D.15 Pemasangan PVC Waterstop lebar 150 mm per M m 209.242,50 218.902,50 216.487,50 238.981,50 232.944,00 203.964,00 222.421,50 226.044,00 232.081,50 452.916,00 228.114,00 368.908,50 417.001,50 226.182,00 255.541,50

16 D.16 Pemasangan PVC Waterstop lebar 200 mm m 320.792,50 336.490,00 332.867,50 367.574,50 357.914,50 313.237,00 341.205,00 361.732,50 359.317,50 729.295,50 351.877,00 548.573,00 621.034,50 347.403,50 393.737,00

17 D.17 Pemasangan PVC Waterstop lebar 230 mm-320 mm m 383.640,00 401.752,50 398.130,00 438.989,50 428.122,00 373.784,50 407.652,00 431.802,00 429.387,00 872.355,50 419.669,50 654.085,50 741.152,00 415.081,00 471.132,00

18 D.18 Pembesian dengan besi polos kg 23.579,60 24.798,60 24.798,60 33.438,55 26.124,55 22.467,55 26.004,95 26.004,95 26.004,95 54.522,65 26.124,55 34.938,15 38.715,90 26.021,05 27.303,30

19 D.19 Pembesian dengan besi ulir kg 24.758,35 26.581,10 26.581,10 34.013,55 26.699,55 24.250,05 27.787,45 27.787,45 27.787,45 56.305,15 27.907,05 36.720,65 40.498,40 27.803,55 29.085,80

20 D.20 Pemasangan 1 m2 jaring kawat baja/wire mesh m2 112.917,35 118.605,25 117.432,25 128.857,50 126.166,50 110.745,00 120.962,75 126.827,75 126.827,75 232.254,00 123.820,50 191.164,50 216.407,00 122.193,25 137.810,25

21 D.21 Bekisting untuk pondasi m2 220.110,00 229.770,00 229.770,00 253.368,00 273.608,00 286.028,00 266.133,00 277.633,00 243.133,00 306.912,00 250.608,00 316.572,00 326.623,00 221.329,00 257.278,00

22 D.22 Bekisting batako untuk pondasi m2 161.172,50 165.749,50 162.909,00 186.880,75 173.569,50 159.919,00 162.592,75 170.010,25 169.929,75 572.418,25 169.193,75 309.965,25 369.086,75 166.163,50 178.359,25

23 D.23 Bekisting untuk sloof m2 220.110,00 229.770,00 229.770,00 253.368,00 273.608,00 286.028,00 266.133,00 277.633,00 243.133,00 306.912,00 250.608,00 316.572,00 326.623,00 221.329,00 257.278,00

24 D.24 Bekisting untuk kolom (pemakaian 1 x) m2 569.181,00 593.469,00 592.503,00 650.683,80 666.912,60 654.133,80 663.379,80 699.811,80 626.395,80 972.955,20 627.982,80 880.495,20 943.726,80 606.413,40 671.590,80

25 D.25 Bekisting untuk kolom (pemakaian 2 x) m2 284.590,50 296.734,50 296.251,50 325.341,90 333.456,30 327.066,90 331.689,90 349.905,90 313.197,90 486.477,60 313.991,40 440.247,60 471.863,40 303.206,70 335.795,40

26 D.26 Bekisting untuk balok/dinding (pemakaian 1x) m2 578.289,00 602.991,00 602.025,00 661.033,80 677.113,56 665.725,80 677.869,80 716.371,80 636.745,80 988.273,20 637.504,80 897.055,20 960.286,80 619.247,40 682.354,80

27 D.27 Bekisting untuk balok/dinding (pemakaian 2x) m2 289.144,50 301.495,50 301.012,50 330.516,90 338.556,78 332.862,90 338.934,90 358.185,90 318.372,90 494.136,60 318.752,40 448.527,60 480.143,40 309.623,70 341.177,40

28 D.28 Bekisting untuk plat lantai (pemakaian 1x) m2 789.981,00 825.309,00 824.343,00 904.603,80 915.312,60 863.893,80 895.219,80 942.691,80 869.275,80 1.480.795,20 865.342,80 1.255.855,20 1.368.766,80 843.773,40 942.070,80

29 D.29 Bekisting untuk plat lantai (pemakaian 2x) m2 394.990,50 412.654,50 412.171,50 452.301,90 457.656,30 431.946,90 447.609,90 471.345,90 434.637,90 740.397,60 432.671,40 627.927,60 684.383,40 421.886,70 471.035,40

30 D.30 Bekisting untuk tangga (pemakaian 1x) m2 601.611,00 625.830,00 624.864,00 683.941,80 692.304,60 665.932,80 684.631,80 720.373,80 657.307,80 1.061.620,20 657.514,80 930.244,20 1.005.688,80 642.845,40 706.573,80

31 D.31 Bekisting untuk tangga (pemakaian 2x) m2 300.805,50 312.915,00 312.432,00 341.970,90 346.152,30 332.966,40 342.315,90 360.186,90 328.653,90 530.810,10 328.757,40 465.122,10 502.844,40 321.422,70 353.286,90

32 D.32 Kolom praktis beton bertulang (11 x 11) cm m 119.663,25 124.327,65 123.822,80 156.117,10 132.366,15 120.436,05 128.989,75 130.795,25 129.035,75 344.246,75 130.642,30 196.913,35 225.217,15 127.653,45 135.166,40

33 D.33 Pemasangan 1 m2 Jembatan Untuk Pengecoran Beton m 142.163,00 147.039,00 147.039,00 152.720,00 156.020,04 160.126,00 183.908,00 200.238,00 154.698,00 242.063,50 149.891,00 224.606,50 234.266,50 172.684,00 162.276,50

34 D.34 Membuat 1 m' Kolom Praktis Beton Bertulang (11x11) cm m 140.748,50 145.878,65 145.373,80 181.618,35 153.150,10 139.215,55 152.156,50 154.537,00 151.052,50 383.875,75 152.199,05 224.950,35 255.341,40 152.200,20 157.648,90

35 D.35 Membuat 1 m' Ring Balok Beton Bertulang (10x15) cm m 176.536,50 182.337,10 181.632,15 222.727,40 191.647,50 176.429,55 189.912,15 193.402,40 188.172,20 481.699,35 190.266,35 283.423,25 322.261,05 189.992,65 196.382,05

36 D.36 Beton Ready-mix K175 m3 2.132.732,50 2.231.517,50 2.212.197,50 2.433.558,13 2.371.343,13 2.089.932,38 2.260.914,38 3.032.909,38 2.369.014,38 4.691.655,00 2.326.895,63 3.546.485,00 4.006.211,88 2.360.446,88 2.655.105,63

37 D.37 Beton Ready-mix K225 m3 2.229.332,50 2.332.947,50 2.313.627,50 2.544.648,13 2.480.018,13 2.183.634,38 2.363.551,88 3.119.849,38 2.477.689,38 4.916.250,00 2.433.155,63 3.714.327,50 4.196.996,88 2.464.291,88 2.773.440,63

38 D.38 Beton Ready-mix K250 m3 2.295.745,00 2.402.982,50 2.382.455,00 2.621.928,13 2.553.675,63 2.248.114,88 2.434.794,38 3.150.036,88 2.552.554,38 5.073.225,00 2.505.605,63 3.829.040,00 4.327.406,88 2.536.741,88 2.855.550,63

39 D.39 Beton Ready-mix K300 m3 2.428.570,00 2.541.845,00 2.520.110,00 2.774.073,13 2.703.405,63 2.376.955,13 2.576.071,88 3.210.411,88 2.702.284,38 5.382.345,00 2.651.713,13 4.060.880,00 4.590.641,88 2.693.716,88 3.034.260,63

40 D.40 Beton Ready-mix K400 m3 2.802.895,00 2.935.490,00 2.910.132,50 3.205.150,63 3.122.408,13 2.740.050,38 2.975.754,38 3.322.709,38 3.123.701,88 6.257.782,50 3.062.263,13 4.710.515,00 5.329.631,88 3.112.719,38 3.512.430,63

41 D.41 Lantai Kerja Plastic Sheet m2 34.027,35 35.177,35 35.177,35 38.070,75 36.920,75 33.470,75 35.103,52 36.253,52 36.253,52 58.478,65 35.770,75 49.973,25 55.689,90 35.194,60 38.993,05

BIDANG CIPTA KARYA CK - 3 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

E BETON PRACETAK

1 E.1 Pembuatan lahan produksi beton K175 tebal 8 cm m2 123.949,76 128.787,58 125.423,88 160.525,79 135.422,57 119.915,10 124.984,07 133.408,10 133.043,59 954.910,55 130.384,15 362.507,32 462.818,88 128.968,54 140.595,03

2 E.2 Pembuatan lahan produksi beton K175 tebal 10 cm m2 168.213,38 174.922,48 170.635,28 215.535,88 184.156,98 162.798,03 170.447,83 181.861,58 181.268,18 1.211.718,78 177.596,23 473.143,93 600.253,43 175.649,28 192.264,71

3 E.3 Pembuatan lahan produksi beton K175 tebal 12 cm m2 187.837,55 195.195,25 190.780,40 237.363,45 205.591,25 182.020,85 190.560,75 202.840,45 202.119,40 1.249.084,00 198.412,95 502.632,80 633.204,95 196.080,75 214.661,76

4 E.4 Pembuatan lahan produksi beton K175 tebal 15 cm m2 254.636,26 264.815,96 258.295,79 326.544,12 278.793,26 246.390,38 258.022,96 275.353,26 274.456,59 1.842.249,93 268.834,47 718.267,92 911.607,59 265.921,46 291.090,15

5 E.5 Pembuatan bekisting untuk plat beton pra cetak (5x pemakaian) m2 468.741,61 490.346,71 482.593,96 548.561,64 519.461,58 493.828,31 556.132,64 608.630,55 517.026,25 1.450.878,00 498.837,25 915.350,83 1.043.609,04 541.912,89 554.291,73

6 E.6 Pembuatan bekisting untuk balok beton pra cetak (10x pemakaian) m2 190.164,00 198.839,60 197.590,70 216.708,30 211.861,05 223.554,25 268.220,25 300.914,75 213.465,30 337.958,55 201.083,25 332.316,65 344.373,25 246.527,80 225.427,60

7 E.7 Pembuatan bekisting untuk kolom beton pra cetak (10x pemakaian) m2 165.784,00 173.355,60 172.095,20 189.016,30 184.554,30 192.245,50 228.953,50 255.955,50 185.750,30 297.357,80 175.639,50 287.909,40 300.184,50 211.878,30 196.666,10

8 E.8 Pemasangan dan membuka bekisting plat beton pra cetak bh 12.575,25 12.575,25 12.575,25 13.144,50 13.144,50 13.144,50 12.510,85 12.510,85 12.510,85 15.157,00 13.144,50 14.547,50 15.444,50 12.632,75 12.839,75

9 E.9 Pemasangan dan membuka bekisting balok beton pra cetak bh 20.372,25 20.372,25 20.372,25 21.286,50 21.286,50 21.286,50 20.225,05 20.225,05 20.225,05 24.541,00 21.286,50 23.517,50 24.828,50 20.429,75 20.774,75

10 E.10 Pemasangan dan membuka bekisting kolom beton pra cetak bh 16.473,75 16.473,75 16.473,75 17.215,50 17.215,50 17.215,50 16.367,95 16.367,95 16.367,95 19.849,00 17.215,50 19.032,50 20.136,50 16.531,25 16.807,25

11 E.11 Menuang beton plat pra cetak bh 100.142,00 100.142,00 100.142,00 106.018,50 106.018,50 106.018,50 100.834,30 100.834,30 100.834,30 124.016,00 106.018,50 123.280,00 129.777,50 100.981,50 105.650,50

12 E.12 Menuang beton balok pra cetak bh 102.976,75 102.976,75 102.976,75 109.008,50 109.008,50 109.008,50 103.657,55 103.657,55 103.657,55 127.500,50 109.008,50 126.707,00 133.400,00 103.816,25 108.611,75

13 E.13 Menuang beton kolom pra cetak bh 92.672,75 92.672,75 92.672,75 98.095,00 98.095,00 98.095,00 93.371,95 93.371,95 93.371,95 114.712,50 98.095,00 114.011,00 120.428,00 93.512,25 97.744,25

14 E.14 Mendirikan komponen plat pracetak bh 269.769,30 282.998,90 282.860,21 350.410,75 297.045,23 269.068,03 292.453,05 293.500,93 293.685,85 526.464,25 297.800,32 384.443,85 419.278,50 292.961,58 305.852,16

15 E.15 Mendirikan komponen balok pracetak bh 316.417,90 332.009,60 331.180,45 400.640,45 349.750,65 313.638,35 344.163,95 346.523,75 348.800,75 621.224,25 351.141,00 491.403,05 523.215,50 346.032,70 359.207,10

16 E.16 Mendirikan komponen kolom pracetak bh 520.211,70 546.344,30 544.224,85 648.817,35 576.831,95 512.942,55 567.799,85 572.993,25 579.065,25 1.030.900,25 579.715,00 854.876,65 898.046,50 572.325,10 591.642,80

17 E.17 Melangsir komponen plat pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40

18 E.18 Melangsir komponen balok pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40

19 E.19 Melangsir komponen kolom pracetak (sejauh + 20 m) bh 63.714,60 67.385,40 67.363,55 85.717,55 70.597,35 62.906,15 69.767,05 70.029,25 70.029,25 132.301,75 70.794,00 91.922,95 99.854,50 69.876,30 73.066,40

20 E.20 Bahan grouting campuran m3 8.794.912,50 9.168.662,50 9.168.662,50 17.563.662,50 9.996.662,50 8.145.162,50 12.561.162,50 12.561.162,50 12.561.162,50 45.796.162,50 12.561.162,50 23.716.162,50 27.856.162,50 12.561.162,50 14.090.662,50

21 E.21 Bahan grouting tidak campuran m3 10.667.400,00 10.667.400,00 10.667.400,00 21.304.900,00 11.943.900,00 10.241.900,00 17.049.900,00 17.049.900,00 17.049.900,00 65.982.400,00 17.049.900,00 31.942.400,00 38.324.900,00 17.049.900,00 19.177.400,00

22 E.22 Upah grouting pada join pracetak titik 89.654,00 89.654,00 89.654,00 95.151,00 95.151,00 95.151,00 90.079,50 90.079,50 90.079,50 111.642,00 95.151,00 111.642,00 117.173,50 90.079,50 95.151,00

23 E.23 Pemasangan bekisting join pra cetak titik 98.687,25 101.290,85 101.290,85 110.321,80 110.303,40 115.409,40 121.553,85 129.603,85 105.453,85 143.485,50 105.740,20 143.377,40 146.956,20 111.771,95 110.258,55

24 E.24 Upah join dengan sling titik 117.392,00 117.392,00 117.392,00 123.843,50 123.843,50 123.843,50 117.012,50 117.012,50 117.012,50 144.463,00 123.843,50 141.933,00 145.095,50 117.518,50 122.578,50

F PEKERJAAN BESI DAN ALUMUNIUM

1 F.1 Pemasangan besi profil kg 57.856,50 59.179,00 59.179,00 69.575,00 61.640,00 57.672,50 60.398,00 60.398,00 60.398,00 95.818,00 61.640,00 73.968,00 79.074,00 60.536,00 62.617,50

2 F.2 Pemasangan rangka baja WF kg 59.179,00 60.501,50 60.501,50 70.897,50 62.962,50 58.995,00 61.720,50 61.720,50 61.720,50 97.140,50 62.962,50 75.290,50 80.396,50 61.858,50 63.940,00

3 F.3 Pekerjaan perakitan (erection) kg 29.635,50 29.865,50 29.865,50 32.234,50 30.854,50 30.164,50 29.923,00 29.923,00 29.923,00 38.996,50 30.854,50 34.166,50 36.340,00 30.153,00 30.509,50

4 F.4 Pembuatan pintu besi plat baja 2 mm rangkap rangka baja siku m2 1.838.154,25 1.893.296,75 1.893.239,25 2.297.205,50 1.967.270,50 1.801.958,00 1.946.507,25 1.946.679,75 1.946.679,75 3.295.204,25 1.967.213,00 2.402.861,75 2.583.492,25 1.948.979,75 2.016.605,50

5 F.5 Pengelasan dengan las listrik 10 cm 123.395,00 132.066,00 130.456,00 142.209,00 135.493,00 128.800,00 132.848,00 135.378,00 135.378,00 180.274,00 136.183,00 159.528,00 165.048,00 133.400,00 140.024,00

6 F.6 Pemasangan pintu rolling door besi m2 834.302,00 855.002,00 850.402,00 917.401,00 904.751,00 844.951,00 859.211,00 886.811,00 882.211,00 1.384.048,00 895.551,00 1.212.698,00 1.327.813,00 870.021,00 946.151,00

7 F.7 Pemasangan pintu lipat (folding door) plastik/PVC m2 679.926,00 706.376,00 700.626,00 766.475,00 750.375,00 673.325,00 714.817,00 749.317,00 744.717,00 1.298.902,00 738.875,00 1.092.592,00 1.223.991,00 725.029,00 808.795,00

8 F.8 Pemasangan sunscreen alumunium m2 448.040,00 461.840,00 458.390,00 499.330,00 491.280,00 451.030,00 465.566,00 483.966,00 481.666,00 789.360,00 484.380,00 687.240,00 756.240,00 471.500,00 521.870,00

9 F.9 Pemasangan pintu rolling door alumunium m2 2.094.150,00 2.180.400,00 2.163.150,00 2.371.875,00 2.320.125,00 2.061.375,00 2.208.575,00 2.324.725,00 2.308.625,00 4.114.700,00 2.278.725,00 3.433.900,00 3.861.125,00 2.244.225,00 2.519.075,00

10 F.10 Pemasangan kusen pintu alumunium m 114.395,10 120.444,10 119.179,10 130.597,45 127.653,45 113.531,45 121.703,35 128.028,35 128.028,35 230.373,75 125.123,45 190.825,25 214.615,30 124.332,25 138.860,20

BIDANG CIPTA KARYA CK - 4 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

11 F.11 Pemasangan pintu alumunium strip lebar 8 cm m 6.169.837,40 6.475.507,40 6.420.077,40 7.083.399,70 6.905.379,70 5.993.429,70 6.581.160,20 7.009.420,20 6.942.260,20 13.087.815,35 6.760.939,70 10.701.967,85 12.154.647,85 6.709.005,70 7.638.820,95

12 F.12 Pemasangan pintu kaca rangka alumunium m2 503.913,90 529.639,40 524.579,40 574.020,20 562.037,20 495.095,70 540.037,70 570.512,70 570.512,70 1.047.039,35 551.917,20 853.068,85 967.390,35 550.353,20 622.923,95

13 F.13 Pemasangan venetioins blinds dan vertical blinds m2 324.806,00 335.156,00 332.856,00 361.353,00 354.453,00 325.703,00 338.008,00 350.658,00 348.358,00 573.056,50 349.853,00 493.131,50 545.801,50 342.263,00 376.590,50

14 F.14 Pemasangan terali besi strip (2x3) mm m2 1.199.649,71 1.233.759,94 1.228.746,08 1.346.778,77 1.283.221,80 1.241.057,46 1.240.415,74 1.248.294,67 1.248.294,67 1.690.789,79 1.285.370,60 1.493.265,60 1.563.436,48 1.245.975,78 1.294.836,74

15 F.15 Pemasangan jendela nako dan teralis m2 1.955.667,00 2.048.759,50 2.031.049,50 2.301.828,50 2.165.783,50 1.898.006,00 2.082.063,50 2.192.118,50 2.178.203,50 4.048.080,50 2.135.538,50 3.221.920,50 3.623.270,50 2.115.413,50 2.364.101,00

16 F.16 Pemasangan talang datar/jurai seng BJLS 20 lebar 90 cm m 148.240,75 151.650,50 151.650,50 155.692,75 161.357,65 163.817,50 177.439,25 190.779,25 158.004,25 227.550,50 156.566,75 221.869,50 231.236,25 170.366,75 166.819,00

17 F.17 Pemasangan talang 1/2 lingkaran seng BJLS 30 lebar 45 cm m 162.771,00 166.980,00 165.772,50 181.872,50 175.938,50 165.726,50 168.521,00 172.143,50 172.143,50 266.121,50 174.731,00 230.862,50 250.677,00 170.073,50 184.115,00

18 F.18 Pemasangan rangka besi hollow 1 x 40.40.2, modul 60 x 120 cm dinding partisi m2 308.706,00 320.666,00 314.686,00 345.253,00 339.273,00 309.373,00 320.068,00 332.028,00 332.028,00 540.626,50 333.293,00 464.841,50 513.371,50 320.873,00 349.220,50

19 F.19 Pemasangan rangka besi hollow 1 x 40.40.2, modul 60 x 60 cm plafond m2 249.366,00 259.831,00 254.598,50 280.278,00 275.045,50 248.883,00 259.405,50 269.870,50 269.870,50 447.706,50 269.813,00 382.041,50 423.441,50 259.980,50 284.073,00

20 F.20 Pemasangan 1 m2 Atap Pelana Rangka Atap Baja Canal Dingin Profil C75 m2 746.781,25 771.454,50 764.405,00 831.202,75 817.103,75 746.608,75 777.241,30 808.964,05 805.439,30 1.342.469,75 806.529,50 1.147.217,00 1.273.935,50 789.503,75 872.804,00

21 F.21 Pemasangan 1 m2 Atap Jurai Rangka Atap Baja Canal Dingin Profil C75 m2 909.452,20 942.054,70 932.739,70 1.017.030,10 998.400,10 905.250,10 950.057,78 991.975,28 987.317,78 1.679.476,10 984.427,60 1.423.884,00 1.587.349,60 965.779,20 1.073.205,30

22 F.22 Dinding Alumunium Composite Panel + Rangka m2 838.453,50 873.816,00 865.651,00 953.545,50 922.265,50 828.425,50 883.453,00 923.300,50 910.535,50 1.593.681,50 906.798,00 1.315.266,50 1.469.999,00 892.883,00 983.963,00

23 F.23 Langit - langit Spandrel Aluminium m2 801.193,50 837.993,50 827.643,50 911.225,50 888.225,50 784.150,50 845.043,00 891.043,00 886.443,00 1.599.834,00 870.400,50 1.325.559,00 1.494.436,50 857.118,00 964.413,00

24 F.24 Pagar BRC 1,20 x 2,40 m Hot Dip bh 1.425.448,00 1.468.601,75 1.461.398,15 1.704.214,90 1.485.948,35 1.393.064,00 1.487.145,50 1.506.495,40 1.508.721,80 2.383.093,25 1.504.830,20 1.778.790,10 1.881.888,75 1.496.424,85 1.535.198,02

25 F.25 Pagar BRC 1,20 x 2,40 m Electro Plating bh 1.223.048,00 1.266.201,75 1.258.998,15 1.501.814,90 1.283.548,35 1.190.664,00 1.284.745,50 1.304.095,40 1.306.321,80 2.180.693,25 1.302.430,20 1.576.390,10 1.679.488,75 1.294.024,85 1.332.798,02

26 F.26 Pagar BRC 0,9 x 2,40 m Hot Dip bh 1.278.248,00 1.309.901,75 1.304.998,15 1.490.314,90 1.327.248,35 1.255.064,00 1.324.995,50 1.340.895,40 1.343.121,80 2.026.593,25 1.340.380,20 1.555.690,10 1.635.788,75 1.333.124,85 1.362.698,02

27 F.27 Pagar BRC 0,90 x 2,40 m Electro Plating bh 1.087.348,00 1.119.001,75 1.114.098,15 1.299.414,90 1.136.348,35 1.064.164,00 1.134.095,50 1.149.995,40 1.152.221,80 1.835.693,25 1.149.480,20 1.364.790,10 1.444.888,75 1.142.224,85 1.171.798,02

28 F.28 Pemasangan atap spandek zincalume m2 153.962,00 160.287,00 159.022,00 174.386,00 170.591,00 150.466,00 161.920,00 169.740,00 169.740,00 305.463,00 167.141,00 255.093,00 287.638,00 164.726,00 184.966,00

29 F.29 Pemasangan nok zincalume m 65.872,00 68.402,00 67.137,00 74.106,00 72.841,00 65.136,00 67.735,00 70.955,00 70.955,00 120.083,00 70.886,00 102.603,00 113.873,00 68.471,00 75.256,00

30 F.30 Pemasangan kuda-kuda baja ringan dan reng utk atap spandek m2 378.093,55 391.500,25 389.056,50 425.213,65 414.106,95 369.890,60 388.953,00 407.879,70 405.579,70 518.326,85 400.067,75 593.493,15 657.268,70 394.519,00 440.949,10

31 F.31 Pemasangan kuda-kuda baja ringan dan reng utk atap genteng m2 417.423,55 432.900,25 430.456,50 470.753,65 457.576,95 407.150,60 430.353,00 451.349,70 449.049,70 555.586,85 441.467,75 659.733,15 731.788,70 435.919,00 488.559,10

G PEKERJAAN DINDING

1 G.1 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 2 PP m2 468.682,50 474.421,00 469.234,50 596.436,00 500.756,00 456.124,50 468.544,50 493.269,50 493.085,50 2.025.196,00 481.677,50 1.058.782,00 1.222.289,00 475.318,00 517.569,00

2 G.2 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 3 PP m2 438.552,50 443.178,95 439.180,40 554.176,95 468.139,70 426.869,65 438.668,65 461.093,65 460.884,35 1.680.751,45 450.236,50 944.266,15 1.071.256,05 444.151,85 484.267,30

3 G.3 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 4 PP m2 424.177,50 428.086,35 424.819,20 532.494,85 452.334,10 413.221,45 424.318,95 445.294,95 445.081,05 1.475.483,35 435.160,00 878.626,45 983.619,15 429.073,05 467.769,40

4 G.4 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 5 PP m2 415.265,00 418.733,40 415.968,80 518.587,90 442.561,40 404.790,80 415.520,30 435.553,30 435.318,70 1.332.626,90 425.879,50 834.235,30 923.903,10 419.782,20 457.670,10

5 G.5 Ps.dinding Bata merah (8x8x16), tebal 1 bata, camp. spesi 1 Semen : 6 PP m2 410.665,00 413.914,90 411.506,80 510.491,90 437.570,40 400.501,30 411.173,30 430.631,30 430.350,70 1.228.045,90 421.222,00 804.013,30 882.434,10 415.101,70 452.713,60

6 G.6 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 2 PP m2 223.744,00 226.276,30 224.006,20 284.238,60 238.958,50 217.649,00 223.707,20 235.409,60 235.322,20 917.992,10 229.744,70 495.808,70 567.635,40 226.711,00 247.146,50

7 G.7 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 3 PP m2 213.486,00 215.506,55 213.762,00 268.732,00 227.681,60 207.911,95 213.474,50 224.139,60 224.047,60 770.362,00 218.991,05 448.695,50 504.700,50 215.955,05 235.383,15

8 G.8 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 4 PP m2 207.402,50 209.120,60 207.699,20 259.427,35 221.000,10 202.144,70 207.428,95 217.468,45 217.369,55 679.165,85 212.629,25 419.891,45 466.119,15 209.589,80 228.437,15

9 G.9 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 5 PP m2 203.561,50 205.088,70 203.872,00 253.546,25 216.781,90 198.503,80 203.613,25 213.257,15 213.153,65 621.373,75 208.613,45 401.654,75 441.686,25 205.571,70 224.053,35

10 G.10 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 6 PP m2 201.123,50 202.531,10 201.461,60 249.650,05 214.113,90 196.203,80 201.225,85 210.602,95 210.490,25 579.205,55 206.088,05 388.779,35 424.284,45 203.041,70 221.316,35

11 G.11 Ps. dinding Bata merah (8x8x16) tebal ½ bata, spesi 1 Semen : 8 PP m2 197.110,00 198.317,50 197.455,00 243.570,00 209.702,50 192.395,00 197.225,00 206.195,00 206.080,00 521.007,50 201.882,50 370.242,50 399.510,00 198.835,00 216.717,50

12 G.12 Ps. dinding Hollow/Concrete Block HB20, spesi 1 Semen : 3 PP m2 404.386,00 420.642,40 414.043,70 482.452,60 444.127,70 397.032,90 419.391,20 443.361,80 440.249,90 1.636.811,10 435.254,30 844.994,70 1.015.203,90 429.069,60 474.768,30

13 G.13 Ps. dinding Hollow/Concrete Block HB20, spesi 1 Semen : 4 PP m2 398.038,00 414.002,30 407.999,30 470.299,40 437.296,70 391.179,40 413.599,80 436.682,60 433.469,50 1.459.540,90 428.968,40 795.480,30 946.604,10 422.733,10 468.201,80

14 G.14 Ps.dinding terawang ( roster), spesi 1 Semen : 3 PP m2 1.142.755,00 1.196.409,40 1.184.375,80 1.318.113,90 1.273.999,90 1.113.110,30 1.211.642,30 1.284.230,30 1.273.806,70 2.756.200,40 1.244.679,50 1.994.964,80 2.325.362,10 1.231.302,70 1.391.884,10

15 G.15 Ps. dinding terawang ( roster), spesi 1 Semen : 4 PP m2 1.136.372,50 1.189.709,50 1.178.014,00 1.308.360,75 1.266.989,50 1.107.059,00 1.205.297,75 1.277.230,25 1.266.799,75 2.660.818,25 1.238.003,75 1.964.815,25 2.284.986,75 1.224.623,50 1.384.594,25

BIDANG CIPTA KARYA CK - 5 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

16 G.16 Ps dinding bata berongga, spesi 1 Semen : 3 PP m2 439.932,50 457.936,90 448.203,30 508.973,90 479.809,90 425.870,30 447.869,80 475.607,80 475.534,20 1.204.907,90 461.989,50 811.672,30 946.799,60 458.330,20 504.544,10

17 G.17 Pemasangan Grass block m2 456.252,73 477.355,23 473.100,23 521.101,80 508.451,80 445.201,80 483.395,72 511.800,72 508.638,22 939.172,80 497.871,80 757.142,75 874.887,80 492.098,23 556.155,53

18 G.18 Paving block m2 345.852,73 357.295,23 357.180,23 392.761,80 381.491,80 336.181,80 362.645,72 385.185,72 379.608,22 721.822,80 370.221,80 550.142,75 664.437,80 368.588,23 414.705,53

19 G.19 Kanstein m 191.889,00 200.111,50 198.444,00 217.902,00 212.888,00 188.243,50 202.469,00 213.716,00 212.083,00 386.308,00 208.874,50 312.156,00 358.639,00 205.976,50 231.529,50

20 G.20 Ps dinding bataco, spesi camp 1 semen : 4 PP m2 161.172,50 165.749,50 162.909,00 186.880,75 173.569,50 159.919,00 162.592,75 170.010,25 169.929,75 572.418,25 169.193,75 309.965,25 369.086,75 166.163,50 178.359,25

21 G.21 Pemasangan 1 m2 Dinding Conblock HB20 Camp 1 SP : 3 PP m2 404.386,00 420.642,40 414.043,70 482.452,60 444.127,70 397.032,90 419.391,20 443.361,80 440.249,90 1.636.811,10 435.254,30 844.994,70 1.015.203,90 429.069,60 474.768,30

22 G.22 Pemasangan 1 m2 Dinding Conblock HB20 Camp 1 SP : 4 PP m2 398.038,00 414.002,30 407.999,30 470.299,40 437.296,70 391.179,40 413.599,80 436.682,60 433.469,50 1.459.540,90 428.968,40 795.480,30 946.604,10 422.733,10 468.201,80

23 G.23 Pemasangan 1 m2 Dinding Conblock HB15 Camp 1 SP : 3 PP m2 345.069,00 358.816,10 353.498,50 409.135,50 378.807,70 338.831,40 357.868,50 378.048,70 375.346,20 1.306.825,50 371.420,10 699.809,50 835.900,50 365.992,10 404.859,80

24 G.24 Pemasangan 1 m2 Dinding Conblock HB15 Camp 1 SP : 4 PP m2 340.147,00 353.666,40 348.797,30 399.838,90 373.503,90 334.284,30 353.351,30 372.855,30 370.079,20 1.173.627,90 366.528,00 662.425,30 784.178,10 361.063,20 399.733,10

25 G.25 Pemasangan 1 m2 Dinding Conblock HB10 Camp 1 SP : 3 PP m2 288.167,00 299.331,20 295.313,10 338.217,30 315.932,60 283.277,20 298.648,10 314.945,90 312.671,20 978.226,80 310.058,40 556.742,60 658.602,70 305.212,30 337.163,90

26 G.26 Pemasangan 1 m2 Dinding Conblock HB10 Camp 1 SP : 4 PP m2 285.338,00 296.374,55 292.649,70 332.538,60 312.903,50 280.686,25 296.122,70 311.999,60 309.669,70 890.403,60 307.294,95 532.585,70 624.985,90 302.421,25 334.310,75

27 G.27 Pemasangan 1 m2 Dinding Bata Ringan Tebal 7,5 cm (instant mortar) m2 731.043,50 748.075,00 745.055,10 803.436,00 793.410,30 740.383,80 752.064,35 776.101,65 772.115,75 1.231.394,70 783.928,55 1.052.699,65 1.159.742,80 760.611,15 829.116,65

28 G.28 Pemasangan 1 m2 Dinding Bata Ringan Tebal 10 cm (instant mortar) m2 767.308,75 786.145,75 782.764,75 845.123,50 834.014,50 775.571,50 790.674,45 817.239,45 812.892,45 1.315.715,00 823.630,00 1.115.523,00 1.231.063,50 799.945,75 873.867,75

29 G.29 Pasang kaca glass block m2 2.103.016,50 2.206.516,50 2.185.816,50 2.415.508,88 2.353.408,88 2.042.908,88 2.239.610,63 2.380.370,63 2.359.670,63 4.429.472,25 2.303.728,88 3.559.899,75 4.140.405,38 2.281.045,13 2.597.582,63

H PEKERJAAN PLESTERAN

1 H.1 Plesteran 1 PC : 2 PP, tebal 20 mm m2 143.779,90 145.478,22 143.986,90 163.948,60 152.397,54 147.371,58 143.319,90 146.509,54 146.440,54 543.667,10 150.871,72 265.307,30 315.831,40 145.834,72 152.002,86

2 H.2 Plesteran 1 PC : 3 PP, tebal 20 mm m2 112.959,90 114.437,42 113.173,80 129.877,55 120.160,74 115.799,48 112.903,55 115.644,69 115.573,39 448.393,05 118.861,47 215.582,45 257.292,95 114.800,82 120.535,41

3 H.3 Plesteran 1 PC : 4 PP, tebal 20 mm m2 132.020,00 133.271,20 132.240,80 147.517,40 139.679,00 135.999,00 131.757,80 134.039,40 133.965,80 410.890,40 138.611,80 221.112,80 257.926,60 133.745,00 139.035,00

4 H.4 Plesteran 1 PC : 5 PP, tebal 20 mm m2 129.299,10 130.415,98 129.540,60 143.256,65 136.696,36 133.426,22 129.074,85 131.067,11 130.986,61 366.770,65 135.780,73 207.440,45 239.520,85 130.910,48 135.955,99

5 H.5 Plesteran 1 PC : 6 PP, tebal 20 mm m2 127.116,40 128.124,72 127.364,80 139.922,80 134.298,84 131.356,68 126.904,80 128.673,04 128.590,24 334.203,80 133.497,52 197.142,20 225.731,20 128.626,12 133.462,56

6 H.6 Plesteran 1 PC : 2PP, tebal 15 mm m2 107.177,70 108.537,46 107.315,70 123.259,30 113.738,22 109.704,94 106.913,20 109.494,72 109.448,72 434.449,30 112.493,46 205.488,90 246.592,20 108.847,96 113.625,98

7 H.7 Plesteran 1 PC : 3PP, tebal 15 mm m2 102.064,80 103.170,64 102.223,50 115.410,55 108.124,38 104.859,76 101.838,25 103.891,23 103.838,33 356.841,55 107.150,79 181.052,55 213.834,45 103.501,84 107.796,17

8 H.8 Plesteran 1 PC : 4 PP, tebal 15 mm m2 98.704,50 99.642,90 98.870,10 110.310,30 104.431,50 101.671,50 98.490,60 100.201,80 100.146,60 307.788,30 103.631,10 165.455,10 192.979,20 99.981,00 103.948,50

9 H.9 Plesteran 1 PC : 5 PP, tebal 15 mm m2 96.620,70 97.456,06 96.800,10 107.065,00 102.146,22 99.699,94 96.432,10 97.923,42 97.863,62 274.597,00 101.460,36 155.125,80 179.089,50 97.807,96 101.585,48

10 H.10 Plesteran 1 PC :6 PP, tebal 15 mm m2 95.026,80 95.783,04 95.213,10 104.614,35 100.396,38 98.189,76 94.850,85 96.177,03 96.114,93 250.273,35 99.795,39 147.477,15 168.832,65 96.141,84 99.769,17

11 H.11 Plesteran 1 PC : 2 PP, tebal 10 mm m2 98.060,50 98.237,60 98.150,20 104.545,35 104.010,60 103.509,20 98.086,95 98.351,45 98.321,55 138.769,35 103.908,25 125.548,95 130.802,15 98.373,30 103.892,15

12 H.12 Berapen 1 PC : 5 PP tebal 15 mm m2 56.715,70 57.551,06 56.895,10 65.274,00 60.355,22 57.908,94 56.791,60 58.282,92 58.223,12 226.285,50 59.669,36 108.539,30 130.053,50 57.822,46 60.656,98

13 H.13 Plesteran skoning 1 PC : 3 PP, lebar 10 cm m 98.060,50 98.237,60 98.150,20 104.545,35 104.010,60 103.509,20 98.086,95 98.351,45 98.321,55 138.769,35 103.908,25 125.548,95 130.802,15 98.373,30 103.892,15

14 H.14 Plesteran granit 1 PC : 2 granit, tebal 10 mm m2 747.270,00 777.745,00 771.420,00 854.174,00 827.724,00 732.849,00 784.449,50 828.149,50 822.974,50 1.744.423,50 811.049,00 1.261.998,50 1.476.554,00 798.709,50 895.286,50

15 H.15 Plesteran Teraso ,1 PC : 2 Batu Teraso, tebal 10 mm m2 523.020,00 543.145,00 536.820,00 597.149,00 575.874,00 515.499,00 546.399,50 574.574,50 571.124,50 1.278.673,50 564.374,00 882.498,50 1.028.054,00 555.484,50 617.561,50

16 H.16 Plesteran Ciprat ,1 PC : 2 PP m2 80.960,00 81.509,70 81.001,40 89.226,20 85.235,70 83.600,40 80.518,40 81.576,40 81.562,60 225.305,70 84.720,50 127.265,90 147.121,80 81.723,60 84.136,30

17 H.17 Siar pasangan dinding Bata merah m2 47.455,90 47.813,32 47.455,90 52.939,10 50.079,74 49.007,48 47.202,90 47.917,74 47.917,74 148.883,60 49.722,32 79.248,80 92.524,40 47.905,32 49.574,66

18 H.18 Siar pasangan dinding conblock ekspose m2 22.597,50 22.781,50 22.597,50 25.334,50 23.862,50 23.310,50 22.482,50 22.850,50 22.850,50 74.428,00 23.678,50 38.663,00 45.402,00 22.827,50 23.644,00

19 H.19 Siar pasangan batu kali adukan 1 PC : 2 PP m2 96.864,50 97.704,00 96.947,30 108.267,90 102.366,10 99.875,20 96.498,80 98.095,00 98.067,40 306.136,90 101.595,60 162.888,30 190.260,60 97.959,30 101.632,40

20 H.20 Plesteran Acian m2 60.950,00 61.323,75 60.950,00 67.217,50 64.227,50 63.106,25 60.605,00 61.352,50 61.352,50 169.395,00 63.853,75 96.082,50 110.630,00 61.438,75 63.451,25

21 H.21 Benangan sudut m 23.264,50 23.407,10 23.354,20 24.988,35 24.729,60 24.331,70 23.451,95 23.647,45 23.617,55 37.051,85 24.661,75 30.961,45 33.316,65 23.588,80 24.864,15

22 H.22 Pemasangan 1 m2 Plesteran 1 SP : 1 PP Tebal 15 mm m2 407.827,95 409.758,11 407.938,35 446.418,50 432.062,82 426.309,14 406.521,55 410.271,47 410.234,67 960.342,00 430.224,66 612.170,30 680.190,50 409.903,01 430.337,13

BIDANG CIPTA KARYA CK - 6 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

23 H.23 Pemasangan 1 m2 Plesteran 1 SP : 7 PP tebal 15 mm m2 94.095,30 94.805,54 94.288,50 103.157,30 99.375,18 97.308,86 93.932,00 95.159,28 95.094,88 235.223,30 98.825,94 142.809,30 162.550,20 95.171,24 98.714,62

24 H.24 Pemasangan 1 m2 Plesteran 1 SP : 8 PP Tebal 15 mm m2 93.163,80 93.828,04 93.363,90 101.700,25 98.353,98 96.427,96 93.013,15 94.141,53 94.074,83 220.173,25 97.856,49 138.141,45 156.267,75 94.200,64 97.660,07

25 H.25 Pemasangan 1 m2 Plesteran 1 SP : 1/2 KP : 3 PP Tebal 15 mm m2 99.603,23 100.326,66 99.645,16 110.314,94 104.915,40 102.745,10 99.044,05 100.455,97 100.448,98 292.941,82 104.219,92 160.626,80 186.806,72 100.574,79 103.615,31

26 H.26 Pemasangan 1 m2 Plesteran 1 SP : 2 KP : 8 PP Tebal 15 mm m2 94.520,34 94.960,22 94.590,72 102.174,17 99.306,18 97.986,56 94.004,22 94.825,32 94.813,59 205.961,21 98.913,23 133.821,71 150.636,66 95.235,87 97.757,82

27 H.27 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 1 PP Tebal 15 mm m2 91.064,27 91.377,56 91.314,90 95.833,31 95.645,33 94.705,45 90.855,41 91.273,13 91.231,36 116.844,92 95.499,13 108.908,13 116.169,60 91.816,17 94.308,61

28 H.28 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 2 PP Tebal 15 mm m2 90.205,08 90.450,20 90.401,18 94.792,37 94.645,30 93.909,93 89.901,60 90.228,43 90.195,74 114.266,77 94.530,91 107.123,20 114.096,35 90.840,06 93.132,54

29 H.29 Pemasangan 1 m2 Plesteran 1 SM : 1 KP : 2 PP Tebal 20 mm m2 126.084,39 126.400,48 126.337,26 132.698,85 132.509,19 131.560,92 125.733,18 126.154,63 126.112,49 159.774,79 132.361,68 150.830,65 159.795,87 126.889,83 130.692,27

30 H.30 Pemasangan 1 m2 Plesteran Dengan Mortar Siap Pakai (MSP) m2 209.645,00 214.245,00 213.325,00 229.011,00 226.251,00 212.451,00 214.866,00 221.306,00 220.386,00 356.799,00 223.951,00 296.999,00 325.956,00 217.718,00 234.301,00

I PEKERJAAN PELAPIS LANTAI DAN DINDING (SNI 7395-2008)

1 I.1 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 40 x 40 ) cm m2 262.036,70 274.252,00 265.397,00 303.594,25 286.695,00 259.302,00 272.854,75 290.875,25 283.147,25 765.733,25 285.412,75 482.971,25 560.987,25 282.336,50 310.241,25

2 I.2 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 30 x30 ) cm m2 268.181,15 279.300,50 278.047,00 307.366,25 297.907,50 266.018,00 277.857,25 294.325,25 294.221,75 779.349,25 296.602,25 498.496,25 580.146,25 279.760,50 312.196,25

3 I.3 Pemasangan 1 m2 Lantai ubin PC abu - abu ukuran ( 20 x20 ) cm m2 268.640,00 276.345,00 275.045,50 309.597,25 293.675,50 264.569,00 277.891,75 289.943,75 289.840,25 785.168,25 286.229,25 479.969,75 564.931,75 282.911,50 312.587,25

4 I.4 Pemasangan 1 m2 Lantai ubin warna ukuran ( 40 x40 ) cm m2 365.251,50 383.536,50 374.681,50 432.463,25 404.949,50 359.467,00 385.129,25 403.149,75 403.046,25 996.262,25 397.687,25 651.457,75 756.832,25 394.611,00 439.259,75

5 I.5 Pemasangan 1 m2 Lantai ubin warna ukuran ( 30 x30 ) cm m2 373.589,00 390.528,50 389.275,00 446.044,75 410.688,00 361.870,50 392.535,25 409.003,25 408.899,75 1.001.954,75 397.629,75 652.550,25 753.025,75 394.438,50 442.249,75

6 I.6 Pemasangan 1 m2 Lantai ubin warna ukuran (20 x20 ) cm m2 375.843,00 391.391,00 387.044,00 444.722,25 413.342,20 368.724,50 393.386,25 414.580,75 411.429,75 1.026.196,75 407.818,75 677.792,75 774.093,75 401.453,50 445.067,25

7 I.7 Pemasangan 1 m2 Lantai ubin teraso ukuran (40 x40 ) cm m2 263.900,85 272.274,00 271.043,50 313.691,25 286.177,50 263.568,50 281.445,25 291.841,25 291.737,75 778.831,75 286.539,75 479.544,25 554.650,75 283.348,50 312.748,25

8 I.8 Pemasangan 1 m2 Lantai ubin teraso ukuran (30 x30 ) cm m2 373.589,00 390.528,50 389.275,00 446.044,75 410.688,00 361.870,50 392.535,25 409.003,25 408.899,75 1.001.954,75 397.629,75 652.550,25 753.025,75 394.438,50 442.249,75

9 I.9 Pemasangan 1 m2 Lantai ubin granit ukuran (40 x40 ) cm m2 593.986,50 619.896,00 611.041,00 691.696,25 656.558,00 580.577,50 629.113,25 662.382,75 662.279,25 1.476.605,75 649.295,75 1.047.931,75 1.206.677,75 638.595,00 713.741,75

10 I.10 Pemasangan 1 m2 Lantai ubin granit ukuran (30 x30 ) cm m2 605.647,50 636.237,50 621.333,50 705.404,25 670.047,50 593.929,00 638.244,25 682.013,25 668.259,25 1.507.023,25 656.989,25 1.062.065,25 1.217.142,75 653.798,00 728.910,25

11 I.11 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (40 x40 ) cm m2 593.986,50 619.896,00 611.041,00 691.696,25 656.558,00 580.577,50 629.113,25 662.382,75 662.279,25 1.476.605,75 649.295,75 1.047.931,75 1.206.677,75 638.595,00 713.741,75

12 I.12 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (30 x30 ) cm m2 605.647,50 636.237,50 621.333,50 705.404,25 670.047,50 593.929,00 638.244,25 682.013,25 668.259,25 1.507.023,25 656.989,25 1.062.065,25 1.217.142,75 653.798,00 728.910,25

13 I.13 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (60 x60 ) cm m2 620.712,50 648.910,50 644.138,00 726.368,75 690.770,50 608.177,50 661.692,75 696.503,25 692.834,75 1.539.901,75 680.713,75 1.102.510,75 1.264.315,75 670.634,00 752.140,25

14 I.14 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (40 x40 ) cm m2 593.986,50 619.896,00 611.041,00 691.696,25 656.558,00 580.577,50 629.113,25 662.382,75 662.279,25 1.476.605,75 649.295,75 1.047.931,75 1.206.677,75 638.595,00 713.741,75

15 I.15 Pemasangan 1 m2 Lantai ubin teralux marmer ukuran (30 x30 ) cm m2 605.647,50 636.237,50 621.333,50 705.404,25 670.047,50 593.929,00 638.244,25 682.013,25 668.259,25 1.507.023,25 656.989,25 1.062.065,25 1.217.142,75 653.798,00 728.910,25

16 I.16 Pemasangan 1 m plin ubin Pc abu - abu ukuran (15 x20 ) cm m 70.725,00 72.170,55 71.971,60 79.317,80 76.557,80 71.011,35 72.454,60 74.708,60 74.699,40 164.325,80 75.135,25 112.796,60 128.924,20 73.474,65 79.974,45

17 I.17 Pemasangan 1 m plin ubin Pc abu - abu ukuran (10 x30 ) cm m 58.431,50 59.406,70 59.257,20 64.870,35 62.907,30 59.183,60 59.527,45 61.054,65 61.047,75 127.326,85 61.949,35 89.622,95 101.396,65 60.289,90 65.012,95

18 I.18 Pemasangan 1 m plin ubin PC abu - abu ukuran (10 x40 ) cm m 58.638,50 59.722,95 59.268,70 64.904,85 63.137,30 59.281,35 59.441,20 61.284,65 61.277,75 127.861,60 62.070,10 89.967,95 101.592,15 60.410,65 64.961,20

19 I.19 Pemasangan 1 m plin ubin Pc warna ukuran (10 x20 ) cm m 62.399,00 63.776,70 63.029,20 69.217,35 66.932,30 62.806,10 62.873,95 64.999,15 64.992,25 131.052,85 65.571,85 96.752,95 105.709,15 63.854,90 68.382,45

20 I.20 Pemasangan 1 m plin ubin Pc warna ukuran (10 x30 ) cm m 62.663,50 64.155,05 63.611,10 70.455,90 67.761,45 63.420,20 64.114,80 66.035,30 66.028,40 135.010,00 66.934,60 95.947,95 108.987,80 64.869,20 69.711,85

21 I.21 Pemasangan 1 m plin ubin PC warna ukuran (10 x40 ) cm m 61.772,25 62.960,20 62.822,20 69.263,35 66.771,30 62.426,60 63.224,70 65.045,15 64.733,50 132.823,85 65.842,10 94.970,45 106.899,40 63.877,90 68.825,20

22 I.22 Pemasangan 1 m plin ubin teraso ukuran (10 x30 ) cm m2 58.604,00 59.689,60 59.551,60 65.584,50 63.296,00 59.360,70 59.649,35 61.569,85 61.157,00 126.079,10 62.469,15 91.888,45 100.868,80 60.403,75 64.840,45

23 I.23 Pemasangan 1 m plin ubin teraso ukuran (10 x40 ) cm m2 58.724,75 59.912,70 59.469,95 65.911,10 63.419,05 59.379,10 59.872,45 61.388,15 61.381,25 126.119,35 62.489,85 88.875,45 100.804,40 60.525,65 64.863,45

24 I.24 Pemasangan 1 m plin ubin granit ukuran (10 x40 ) cm m2 93.161,50 96.482,70 96.344,70 106.442,85 101.512,80 91.682,60 96.442,45 99.786,65 99.779,75 196.211,85 98.450,35 146.777,95 165.106,65 96.790,90 107.528,45

25 I.25 Pemasangan 1 m plin ubin granit ukuran (10 x30 ) cm m2 91.080,00 95.413,20 95.275,20 103.337,85 101.455,30 92.648,60 95.372,95 99.729,15 99.722,25 197.120,35 101.440,35 152.780,95 171.098,15 99.780,90 109.494,95

26 I.26 Pemasangan 1 m plin ubin teralux kerang ukuran (10 x40 ) cm m2 93.161,50 96.482,70 96.344,70 106.442,85 101.512,80 91.682,60 96.442,45 99.786,65 99.779,75 196.211,85 98.450,35 146.777,95 165.106,65 96.790,90 107.528,45

27 I.27 Pemasangan 1 m plin ubin teralux kerang ukuran (10 x30 ) cm m2 91.080,00 95.413,20 95.275,20 103.337,85 101.455,30 92.648,60 95.372,95 99.729,15 99.722,25 197.120,35 101.440,35 152.780,95 171.098,15 99.780,90 109.494,95

28 I.28 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x60 ) cm m2 96.956,50 101.140,20 99.047,20 110.870,35 107.032,80 96.570,10 101.099,95 105.306,65 105.299,75 208.574,35 105.062,85 157.012,95 176.836,65 101.448,40 110.863,45

BIDANG CIPTA KARYA CK - 7 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

29 I.29 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x40 ) cm m2 99.256,50 102.577,70 102.439,70 112.537,85 107.607,80 97.777,60 102.537,45 105.881,65 105.874,75 211.449,35 104.545,35 155.920,45 177.296,65 102.885,90 113.623,45

30 I.30 Pemasangan 1 m plin ubin teralux marmer ukuran (10 x30 ) cm m2 99.199,00 103.532,20 103.394,20 111.456,85 109.574,30 100.767,60 107.551,45 111.907,65 107.841,25 217.417,85 109.559,35 164.959,45 187.336,15 107.899,90 117.613,95

31 I.31 Keramik 50 x 50 cm m2 404.374,50 430.259,85 425.592,00 479.314,25 450.613,70 391.173,65 441.927,75 453.988,95 455.092,95 1.221.880,75 460.384,10 699.228,75 794.080,75 448.257,35 476.665,80

32 I.32 Keramik 40 x 40 cm m2 374.187,00 400.072,35 395.404,50 449.126,75 420.426,20 360.986,15 411.740,25 423.801,45 424.905,45 1.191.693,25 430.196,60 669.041,25 763.893,25 418.069,85 446.478,30

33 I.33 Keramik 30 x 30 cm m2 363.687,50 388.711,50 383.835,50 437.500,25 408.204,00 351.348,00 399.101,75 411.579,25 412.683,25 1.208.575,25 417.766,25 663.486,75 762.582,25 405.639,50 433.394,75

34 I.34 Keramik 20 x 20 cm m2 368.057,50 393.265,50 388.343,50 442.744,25 412.942,00 355.534,00 403.747,75 416.317,25 417.421,25 1.228.355,25 422.458,25 672.318,75 773.208,25 410.331,50 438.316,75

35 I.35 Plin Keramik 10 x 40 cm m 74.876,50 78.197,70 75.012,20 85.110,35 80.180,30 76.445,10 78.157,45 81.501,65 81.494,75 162.689,35 83.212,85 122.397,95 137.679,15 78.505,90 86.195,95

36 I.36 Plin Keramik 10 x 30 cm m 65.734,00 67.226,70 66.783,95 73.834,60 71.037,80 66.388,35 67.491,20 69.616,40 69.304,75 141.356,85 70.413,35 101.065,45 115.127,65 68.449,15 74.005,95

37 I.37 Plin Keramik 10 x 20 cm m 74.876,50 76.978,70 76.231,20 84.500,85 81.399,30 75.226,10 76.938,45 79.673,15 79.666,25 160.860,85 80.165,35 116.302,95 132.803,15 77.896,40 84.367,45

38 I.38 Plin Keramik 10 x 10 cm m 74.876,50 76.369,20 76.231,20 83.891,35 80.789,80 75.226,10 76.328,95 79.063,65 79.056,75 160.251,35 79.555,85 116.302,95 130.974,65 77.896,40 84.367,45

39 I.39 Plin Keramik 5 x 20 cm m 53.420,95 54.124,75 54.055,75 58.402,18 57.153,51 54.452,50 53.944,78 55.312,13 55.308,68 98.687,83 56.489,73 76.876,93 84.953,38 54.832,00 58.594,23

40 I.40 Plin internal cove 5 x 5 x 20 cm m 464.795,50 471.164,20 471.026,20 499.742,85 491.765,30 472.792,60 476.080,45 476.377,15 476.370,25 716.207,35 491.750,35 582.995,95 619.943,15 477.946,90 493.985,95

41 I.41 Lantai Marmer 1 x 1 m m2 3.273.222,00 3.311.895,35 3.304.755,00 3.378.648,25 3.335.072,45 3.250.453,15 3.329.681,25 3.347.929,45 3.350.263,95 4.349.363,25 3.353.082,60 3.664.135,75 3.784.966,25 3.338.483,35 3.377.207,30

42 I.42 Homogenous tile 30 x 60 cm m2 378.689,83 403.557,43 398.529,63 447.371,85 417.110,75 360.717,05 413.876,84 426.637,24 427.748,14 1.231.935,20 426.524,65 665.437,15 760.474,30 419.797,73 444.020,18

43 I.43 Homogenous tile 60 x 60 cm m2 479.602,33 504.642,43 499.614,63 548.801,85 518.368,25 461.457,05 515.134,34 527.894,74 529.005,64 1.337.160,20 527.782,15 767.902,15 863.456,80 521.055,23 545.450,18

44 I.44 Homogenous tile 50 x 50 cm m2 470.402,33 495.557,43 490.529,63 539.946,85 509.398,25 452.142,05 506.164,34 518.924,74 520.035,64 1.330.835,20 518.812,15 759.737,15 855.636,80 512.085,23 536.595,18

45 I.45 Homogenous tile 40 x 40 cm m2 410.027,33 435.182,43 430.154,63 479.571,85 449.023,25 391.767,05 445.789,34 458.549,74 459.660,64 1.270.460,20 458.437,15 699.362,15 795.261,80 451.710,23 476.220,18

46 I.46 Granit Alam m2 2.509.880,75 2.537.876,35 2.532.001,00 2.586.321,25 2.556.717,95 2.495.777,15 2.548.032,00 2.561.300,70 2.563.612,20 3.349.955,75 2.568.903,35 2.814.067,25 2.910.420,00 2.555.569,10 2.584.880,30

47 I.47 Steptread tangga 10 x 30 cm m 60.127,75 61.522,70 61.384,70 66.940,35 64.638,05 60.460,10 61.281,20 62.785,40 62.778,50 127.154,35 63.289,10 91.980,45 102.690,40 61.629,65 66.760,95

48 I.48 Lantai Karpet m2 266.121,50 273.769,00 272.561,50 286.258,00 279.818,00 262.913,00 277.506,50 281.129,00 281.129,00 441.025,00 283.440,50 337.237,50 357.397,00 279.105,00 287.695,50

49 I.49 Under-layer m2 124.706,00 126.316,00 126.316,00 133.699,00 132.089,00 127.259,00 127.362,50 128.570,00 128.570,00 176.548,00 130.881,50 159.700,50 173.650,00 127.753,50 133.929,00

50 I.50 Lantai parquet kayu m2 768.487,50 777.630,00 776.422,50 798.732,50 790.797,50 769.407,50 781.942,50 785.565,00 785.565,00 1.006.307,50 794.420,00 872.505,00 904.360,00 784.760,00 797.122,50

51 I.51 Lantai kayu gymfloor m2 768.487,50 777.630,00 776.422,50 798.732,50 790.797,50 769.407,50 781.942,50 785.565,00 785.565,00 1.006.307,50 794.420,00 872.505,00 904.360,00 784.760,00 797.122,50

52 I.52 Dinding poselen 11 x 11 cm m2 566.720,00 579.570,10 578.459,20 635.736,10 614.829,10 568.327,70 580.287,70 602.413,70 592.482,30 1.217.222,10 605.705,00 854.332,70 988.132,90 583.719,30 624.054,40

53 I.53 Dinding poselen 10 x 20 cm m2 559.532,50 576.120,10 568.914,20 647.121,10 603.817,85 557.575,20 573.790,20 594.421,20 594.379,80 1.236.829,60 593.975,00 891.535,20 979.335,40 583.086,80 625.031,90

54 I.54 Dinding poselen 20 x 20 cm m2 544.628,50 560.284,60 556.126,20 623.833,60 590.191,50 545.718,70 562.186,70 582.817,70 579.728,80 1.203.801,60 585.419,00 867.316,20 970.606,90 571.483,30 618.591,90

55 I.55 Dinding keramik 10 x 20 cm m2 772.857,50 886.965,10 867.569,20 1.061.581,10 939.042,85 691.665,20 945.585,20 996.691,20 1.002.744,80 3.473.694,60 996.245,00 1.763.120,20 2.052.055,40 967.071,80 1.069.966,90

56 I.56 Dinding Keramik 30 x 30 cm m2 349.255,00 375.261,10 370.562,20 425.240,10 395.673,60 335.809,20 387.018,70 398.955,70 400.121,80 1.191.577,10 405.444,00 649.667,20 747.023,90 393.348,30 421.504,90

57 I.57 Dinding marmer 1 x 1 m m2 3.440.173,25 3.479.157,10 3.471.574,00 3.557.594,00 3.510.188,70 3.424.591,90 3.495.356,00 3.514.351,70 3.516.732,20 4.672.674,25 3.527.779,10 3.889.708,25 4.034.395,50 3.505.957,85 3.548.931,05

58 I.58 Dinding batu paras m2 454.250,00 467.561,25 463.852,50 512.583,75 494.615,00 454.508,75 469.044,75 487.962,25 485.731,25 1.116.310,75 487.450,50 747.885,25 866.059,25 476.680,75 520.283,00

59 I.59 Dinding batu tempel hitam m2 473.225,00 487.548,25 483.586,50 534.468,25 515.867,00 472.977,75 489.411,25 509.593,75 507.109,75 1.156.790,75 508.323,00 780.775,25 904.009,25 497.300,25 543.812,00

60 I.60 Dinding Keramik 20 x 25 cm m2 355.292,50 381.298,60 376.599,70 431.277,60 401.711,10 341.846,70 393.056,20 404.993,20 406.159,30 1.197.614,60 411.481,50 655.704,70 753.061,40 399.385,80 427.542,40

61 I.61 Dinding Keramik 20 x 20 cm m2 361.330,00 387.336,10 382.637,20 437.315,10 407.748,60 347.884,20 399.093,70 411.030,70 412.196,80 1.203.652,10 417.519,00 661.742,20 759.098,90 405.423,30 433.579,90

62 I.62 Border Dinding Keramik 5 x 20 m 190.537,75 192.105,20 191.507,20 202.525,35 200.510,55 195.815,10 190.000,70 192.137,40 192.130,50 287.521,85 199.449,10 239.065,45 262.080,40 192.672,15 197.860,95

63 I.63 Lantai vynil 30 x 30 cm m2 319.113,50 331.591,00 329.176,00 359.398,00 351.750,50 314.318,00 335.363,00 352.268,00 349.853,00 613.134,00 345.713,00 510.784,00 571.619,00 340.538,00 379.063,00

64 I.64 Plint vynil 15 x 30 cm m2 276.092,00 288.259,00 285.844,00 314.111,00 306.774,00 270.273,00 291.835,50 308.740,50 306.325,50 556.611,50 300.736,50 460.034,50 518.581,00 296.849,50 334.178,50

65 I.65 Plint kayu tebal 2 cm lebar 10 cm m2 53.325,50 53.728,00 53.728,00 56.062,50 56.628,30 57.615,00 57.718,50 59.443,50 54.268,50 69.736,00 56.062,50 68.471,00 70.920,50 56.614,50 56.465,00

66 I.66 Wallpaper lebar 50 cm m2 115.747,50 118.450,00 117.242,50 125.079,75 123.584,75 116.684,75 117.955,50 120.370,50 120.370,50 178.146,50 122.377,25 153.824,00 169.268,50 119.968,00 126.689,75

BIDANG CIPTA KARYA CK - 8 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

67 I.67 Floor hardener m2 188.048,00 193.798,00 193.798,00 207.575,00 201.825,00 184.575,00 199.341,00 199.341,00 199.341,00 341.596,00 201.825,00 248.216,00 267.743,00 199.617,00 206.885,00

68 I.68 Pemasangan 1 m2 Lantai Teraso Cor di tempat, Tebal 3 cm m2 124.913,00 126.368,90 126.003,20 134.524,70 132.854,90 128.613,70 126.343,60 128.172,10 127.928,30 178.664,00 132.250,00 160.494,00 174.156,00 127.659,20 134.073,90

69 I.69 Pemasangan 1 m2 Lantai Keramik Artistik Uk. 10 x 20 cm m2 361.882,00 389.561,35 384.859,00 461.006,25 411.254,95 350.084,15 406.082,25 418.235,45 419.350,95 1.226.538,25 424.607,60 675.768,75 775.807,25 412.446,35 442.614,30

70 I.70 Pemasangan 1 m2 Lantai Keramik Artistik Uk. 10 x 10 cm / Uk. 5 x 20 cm m2 370.162,00 398.358,85 393.656,50 473.943,75 420.518,20 358.364,15 415.914,75 428.067,95 429.183,45 1.248.273,25 434.440,10 689.223,75 790.814,75 422.278,85 452.964,30

71 I.71 Pemasangan 1 m2 Lantai Keramik Uk. 33 x 33 cm m2 237.814,25 240.590,35 239.545,00 264.505,75 252.629,70 245.158,15 239.746,25 243.354,95 243.251,45 564.138,25 252.165,10 358.345,75 405.484,25 242.453,35 252.944,80

72 I.72 Pemasangan 1 m2 Lantai Keramik Mozaik Uk. 30 x 30 cm m2 415.897,50 446.748,55 440.539,70 523.624,90 472.383,20 401.680,05 462.141,30 479.706,40 480.037,60 1.520.553,00 482.994,25 814.528,90 947.192,90 470.408,65 510.357,35

73 I.73 Pemasangan 1 m2 Dinding Bata Pelapis 3 x 7 x 24 cm m2 785.599,50 812.157,60 803.424,50 906.884,25 858.351,95 782.213,90 815.413,25 847.541,95 847.484,45 1.809.116,75 845.823,85 1.255.207,75 1.470.223,25 826.475,10 897.445,05

74 I.74 Pemasangan 1 m2 Paving Block Natural Tebal 6 cm m2 162.580,10 163.651,90 163.379,35 173.630,45 172.871,45 169.598,55 163.412,70 164.706,45 164.715,65 221.220,90 172.335,55 209.364,40 218.823,15 164.416,65 173.360,20

75 I.75 Pemasangan 1 m2 Paving Block Natural Tebal 8 cm m2 202.554,10 203.625,90 203.469,50 215.158,10 214.515,25 211.010,05 202.927,85 204.337,75 204.230,80 270.705,40 213.979,35 254.812,40 267.146,15 204.506,80 213.682,65

76 I.76 Pemasangan 1 m2 Paving Block Berwarna Tebal 6 cm m2 162.580,10 163.651,90 163.379,35 173.630,45 172.871,45 169.598,55 163.412,70 164.706,45 164.715,65 221.220,90 172.335,55 209.364,40 218.823,15 164.416,65 173.360,20

77 I.77 Pemasangan 1 m2 Paving Block Berwarna Tebal 8 cm m2 202.554,10 203.625,90 203.469,50 215.158,10 214.515,25 211.010,05 202.927,85 204.337,75 204.230,80 270.705,40 213.979,35 254.812,40 267.146,15 204.506,80 213.682,65

j J PEKERJAAN LANGIT-LANGIT DAN LIS

1 J.1 Plafond Gypsumboard 120x240 cm, tebal 9 mm m2 63.439,75 65.532,75 65.114,15 70.507,65 69.251,85 63.378,80 68.220,30 67.801,70 66.545,90 111.161,30 67.983,40 94.916,40 105.099,65 66.357,30 72.850,20

2 J.2 Plafond Kalsiboard 120x240 cm, tebal 4,5 cm m2 60.288,75 61.963,15 61.544,55 66.576,95 65.739,75 60.703,90 64.708,20 64.289,60 63.452,40 104.054,30 64.889,90 89.483,80 99.117,35 63.263,80 68.919,50

3 J.3 Lis profil gypsum m 65.331,50 67.792,50 66.573,50 72.645,50 71.415,00 65.239,50 71.392,00 70.173,00 68.942,50 118.369,50 70.184,50 100.406,50 111.423,50 69.069,00 76.003,50

4 J.4 Langit-langit asbes semen, tebal 4 mm m 58.086,50 60.628,00 59.363,00 65.607,50 64.273,50 57.914,00 63.146,50 63.146,50 61.881,50 105.972,50 63.008,50 90.263,50 100.050,00 60.685,50 66.642,50

5 J.5 Langit-langit akustik 30 x 30 cm m2 458.068,00 478.653,00 475.030,50 522.387,50 509.967,50 448.212,50 513.521,00 509.898,50 497.823,50 932.983,50 500.307,50 770.086,00 870.343,00 494.477,00 558.842,50

6 J.6 Langit-langit akustik 30 x 60 cm m2 438.748,00 458.125,50 454.503,00 500.652,50 488.232,50 428.892,50 491.786,00 486.956,00 476.088,50 890.721,00 478.572,50 736.276,00 831.703,00 472.742,00 533.485,00

7 J.7 Langit-langit akustik 60 x 120 cm m2 404.800,00 422.970,00 419.347,50 461.495,00 450.282,50 395.772,50 454.250,00 450.627,50 439.760,00 826.160,00 441.830,00 681.605,00 770.615,00 436.367,50 493.235,00

8 J.8 Langit-langit tripleks 120 x 240, 3 mm m2 79.522,50 81.713,25 81.282,00 87.733,50 87.526,50 82.679,25 72.519,00 68.206,50 70.362,75 140.731,25 74.589,00 100.216,75 109.549,00 68.436,50 82.673,50

9 J.9 Langit-langit tripleks 120 x 240, 4 mm m2 85.560,00 88.182,00 87.319,50 95.064,75 93.995,25 89.579,25 78.987,75 76.831,50 76.831,50 155.825,00 81.057,75 110.135,50 121.192,75 74.905,25 91.298,50

10 J.10 Langit-langit tripleks 120 x 240, 5 mm m2 92.833,75 95.478,75 95.047,50 103.385,00 103.471,25 96.830,00 86.307,50 81.995,00 81.995,00 171.436,25 92.690,00 128.397,50 141.680,00 84.381,25 96.485,00

11 J.11 Langit-langit lambrisering tebal 9 mm m2 327.255,50 329.038,00 329.038,00 342.481,50 346.690,50 352.314,00 348.001,50 356.626,50 330.751,50 418.232,00 343.861,50 413.287,00 426.569,50 342.941,50 344.494,00

12 J.12 Langit-langit akustik 60 x 120 cm, rangka alumunium m2 820.927,50 855.255,00 846.285,00 928.653,75 906.056,25 813.768,75 891.048,75 903.468,75 892.601,25 1.581.595,00 892.256,25 1.323.650,00 1.483.471,25 879.433,75 984.256,25

13 J.13 Lis profil kayu m 46.017,25 47.236,25 47.236,25 51.290,00 50.315,38 46.054,63 47.771,00 49.582,25 49.280,38 86.635,25 49.409,75 69.273,13 76.624,50 48.187,88 53.058,13

14 J.14 Pemasangan 1 m2 Langit - Langit Besi Hollow 40x40 m2 217.649,00 226.849,00 222.249,00 241.787,50 237.187,50 214.187,50 226.745,50 235.945,50 235.945,50 378.948,00 232.587,50 323.058,00 356.396,50 226.883,50 246.042,50

K K PEKERJAAN PENUTUP ATAP

1 K.1 Atap genteng palentong kecil m2 117.834,75 120.709,75 120.709,75 131.238,00 128.363,00 116.863,00 120.456,75 126.206,75 126.206,75 209.685,25 125.488,00 190.710,25 198.990,25 123.676,75 136.125,50

2 K.2 Atap genteng palentong besar m2 129.909,75 134.049,75 132.669,75 144.233,00 141.473,00 129.053,00 135.176,75 140.696,75 140.696,75 237.745,25 140.093,00 198.760,25 224.750,25 136.901,75 150.270,50

3 K.3 Atap genteng kodok glazuur m2 284.584,75 296.084,75 293.209,75 320.988,00 315.238,00 277.863,00 298.706,75 313.081,75 313.081,75 563.310,25 306.613,00 478.210,25 523.865,25 301.926,75 337.375,50

4 K.4 Atap asbes gelombang 92 x 250 x 5 mm m2 82.455,00 84.893,00 84.318,00 91.735,50 89.182,50 83.018,50 85.376,00 88.251,00 87.676,00 139.541,00 88.607,50 120.198,00 132.825,00 86.273,00 93.690,50

5 K.5 Atap asbes gelombang 92 x 225 x 5 mm m2 86.365,00 88.573,00 88.573,00 96.220,50 94.012,50 86.698,50 89.171,00 92.621,00 91.931,00 147.706,00 92.632,50 126.638,00 139.840,00 90.183,00 98.175,50

6 K.6 Atap asbes gelombang 92 x 180 x 5 mm m2 89.642,50 92.368,00 91.505,50 99.498,00 97.807,50 89.631,00 92.276,00 95.726,00 94.863,50 153.916,00 96.082,50 131.985,50 146.050,00 93.460,50 101.453,00

7 K.7 Atap asbes gelombang 105 x 300 x 4 mm m2 76.820,00 78.568,00 78.165,50 85.008,00 82.972,50 77.326,00 78.878,50 81.293,50 80.891,00 127.121,00 82.167,50 110.020,50 120.922,50 80.005,50 86.330,50

8 K.8 Atap asbes gelombang 105 x 270 x 4 mm m2 81.811,00 83.881,00 83.398,00 90.562,50 88.768,50 82.558,50 84.755,00 87.653,00 87.170,00 138.391,00 87.802,50 119.117,00 131.146,00 86.043,00 93.414,50

9 K.9 Atap asbes gelombang 105 x 240 x 4 mm m2 79.649,00 81.811,00 81.305,00 88.170,50 86.330,50 80.350,50 82.225,00 84.755,00 84.755,00 133.814,00 85.318,50 114.816,00 126.776,00 83.559,00 90.217,50

BIDANG CIPTA KARYA CK - 9 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

10 K.10 Atap asbes gelombang 105 x 210 x 4 mm m2 78.568,00 80.465,50 79.879,00 86.802,00 84.801,00 79.108,50 80.960,00 83.306,00 83.306,00 130.697,50 84.214,50 112.803,50 124.453,00 81.868,50 88.239,50

11 K.11 Atap asbes gelombang 105 x 150 x 4 mm m2 83.605,00 85.583,00 85.583,00 93.000,50 90.332,50 84.398,50 86.411,00 89.171,00 89.171,00 142.186,00 90.332,50 122.728,00 135.700,00 87.653,00 95.185,50

12 K.12 Atap asbes gelombang 105 x 300 x 6 mm m2 83.478,50 85.744,00 85.318,50 92.816,50 90.712,00 83.915,50 86.077,50 89.056,00 88.630,50 141.519,00 89.435,50 121.532,00 134.170,50 87.250,50 94.725,50

13 K.13 Atap asbes gelombang 105 x 270 x 6 mm m2 80.224,00 82.110,00 81.673,00 88.860,50 86.721,50 80.626,50 82.455,00 85.077,00 84.640,00 134.274,00 85.847,50 115.598,00 127.627,00 83.651,00 90.424,50

14 K.14 Atap asbes gelombang 105 x 240 x 6 mm m2 83.467,00 85.721,00 85.192,00 92.770,50 90.355,50 84.122,50 86.687,00 89.332,00 88.803,00 141.680,00 89.826,50 121.992,00 134.895,00 87.538,00 94.978,50

15 K.15 Atap asbes gelombang 105 x 210 x 6 mm m2 80.523,00 82.351,50 82.351,50 89.113,50 87.158,50 81.109,50 83.386,50 85.640,50 85.640,50 135.573,50 86.595,00 117.104,50 128.972,50 84.272,00 90.999,50

16 K.16 Atap asbes gelombang 105 x 180 x 6 mm m2 81.535,00 83.639,50 82.984,00 90.390,00 88.251,00 81.937,50 84.203,00 86.825,00 86.169,50 137.114,50 87.595,50 118.875,50 130.904,50 85.180,50 92.172,50

17 K.17 Atap asbes gelombang 105 x 300 x 6 mm m2 83.478,50 85.744,00 85.318,50 92.816,50 90.712,00 83.915,50 86.077,50 89.056,00 88.630,50 141.519,00 89.435,50 121.532,00 134.170,50 87.250,50 94.725,50

18 K.18 Atap genteng beton m2 180.262,50 185.357,00 184.092,00 199.398,50 196.661,50 180.113,00 186.311,50 192.636,50 192.636,50 315.905,00 192.866,50 276.368,00 298.781,50 188.036,50 205.666,00

19 K.19 Atap genteng aspal m2 235.221,00 242.224,50 240.626,00 261.843,50 253.046,00 230.839,50 225.296,50 224.595,00 223.801,50 411.412,50 236.796,50 329.785,50 367.563,00 242.236,00 252.965,50

20 K.20 Atap genteng metal m2 86.687,00 88.090,00 88.090,00 95.645,50 93.092,50 87.710,50 87.871,50 90.217,50 90.217,50 136.137,00 91.919,50 118.427,00 128.972,50 89.504,50 95.691,50

21 K.21 Atap sirap kayu m2 143.865,00 147.085,00 147.085,00 158.884,00 156.009,00 146.349,00 148.520,20 153.005,20 151.510,20 234.680,50 154.514,00 206.666,50 224.330,50 150.397,00 162.759,50

22 K.22 Atap genteng metal m2 86.687,00 88.090,00 88.090,00 95.645,50 93.092,50 87.710,50 87.871,50 90.217,50 90.217,50 136.137,00 91.919,50 118.427,00 128.972,50 89.504,50 95.691,50

23 K.23 Atap seng gelombang 90 x 180 cm m2 89.125,00 92.368,00 91.563,00 99.682,00 97.129,00 89.010,00 92.989,00 97.014,00 96.209,00 160.057,00 96.324,00 136.574,00 152.329,00 94.070,00 103.707,00

24 K.24 Atap alumunium m2 251.194,50 254.840,00 253.632,50 272.722,50 270.169,50 259.233,00 255.794,50 260.624,50 259.417,00 375.440,50 268.962,00 346.782,50 369.506,50 257.347,00 277.782,50

25 K.25 Atap roof light fiberglass 90 x 180 cm m2 123.993,00 128.167,50 127.477,50 139.115,50 136.148,50 122.935,00 129.340,50 135.550,50 134.170,50 229.206,50 134.078,50 193.924,50 217.062,50 131.732,50 145.728,00

26 K.26 Bubung genteng palentong besar m 158.769,00 161.133,40 160.139,80 178.268,40 169.574,40 161.404,80 160.001,80 164.509,80 163.861,20 462.226,40 167.394,00 264.490,80 308.250,60 162.527,20 172.343,60

27 K.27 Bubung genteng kodok glazur m 176.019,00 179.533,40 177.964,80 197.818,40 189.124,40 178.079,80 178.401,80 183.484,80 183.411,20 498.451,40 186.369,00 298.990,80 342.175,60 180.927,20 193.043,60

28 K.28 Bubung stel gelombang 92 cm m 74.600,50 75.980,50 75.980,50 80.856,50 80.856,50 74.646,50 75.143,30 77.903,30 77.903,30 120.117,50 78.786,50 106.731,50 116.115,50 76.716,50 83.823,50

29 K.29 Bubung stel gelombang 105 cm m 73.048,00 74.255,50 74.255,50 79.994,00 78.786,50 73.266,50 73.418,30 75.833,30 75.833,30 117.875,00 76.889,00 103.454,00 113.183,00 74.819,00 81.236,00

30 K.30 Bubung stel gelombang 108 cm m 79.085,50 81.500,50 80.293,00 87.239,00 86.031,50 79.304,00 80.663,30 83.078,30 83.078,30 131.157,50 84.134,00 114.321,50 125.258,00 80.856,50 87.273,50

31 K.31 Nok paten 92 cm m 58.040,50 59.420,50 58.040,50 62.916,50 61.536,50 59.466,50 58.583,30 59.963,30 59.963,30 86.997,50 60.846,50 77.751,50 84.375,50 58.776,50 63.123,50

32 K.32 Nok paten 105 cm m 60.800,50 62.180,50 62.180,50 65.676,50 65.676,50 62.226,50 61.343,30 62.723,30 62.723,30 92.517,50 64.986,50 84.651,50 91.275,50 62.916,50 67.263,50

33 K.33 Nok paten 108 cm m 60.800,50 62.180,50 62.180,50 65.676,50 65.676,50 62.226,50 61.343,30 62.723,30 62.723,30 92.517,50 64.986,50 84.651,50 91.275,50 62.916,50 67.263,50

34 K.34 Nok stel rata 92 cm m 63.859,50 65.124,50 63.859,50 68.885,00 67.620,00 65.665,00 64.250,50 65.515,50 65.515,50 92.931,50 66.930,00 84.076,50 90.539,50 64.480,50 68.885,00

35 K.35 Nok stel rata 105 cm m 59.305,50 60.570,50 60.570,50 63.951,50 63.951,50 60.731,50 59.733,30 60.998,30 60.998,30 89.297,50 63.261,50 81.891,50 88.170,50 61.191,50 65.308,50

36 K.36 Nok genteng beton m 257.772,50 264.541,40 263.225,80 303.008,90 280.353,90 257.360,80 265.077,30 275.979,30 275.905,70 754.740,40 276.241,50 451.204,80 524.232,10 271.374,70 294.542,60

37 K.37 Nok genteng aspal m 104.828,25 106.438,25 106.208,25 113.896,00 112.716,10 110.446,00 111.337,25 114.959,75 108.692,25 154.583,00 111.366,00 143.773,00 152.858,00 110.474,75 115.132,25

38 K.38 Nok genteng metal m 88.653,50 89.976,00 88.711,00 95.128,00 93.518,00 92.080,50 89.608,00 90.873,00 90.873,00 123.176,50 94.783,00 114.321,50 122.601,50 90.183,00 94.668,00

39 K.39 Nok sirap m 90.510,75 91.545,75 91.085,75 97.681,00 96.531,00 93.886,00 91.442,25 92.822,25 92.362,25 127.845,50 96.071,00 118.128,00 125.085,50 92.189,75 97.767,25

40 K.40 Nok atap seng m 52.003,00 52.739,00 52.394,00 55.913,00 55.292,00 53.429,00 52.509,00 53.544,00 53.199,00 74.738,50 54.947,00 67.447,50 72.737,50 53.199,00 55.855,50

41 K.41 Nok atap alumunium m 247.135,00 248.561,00 247.181,00 264.063,00 262.407,00 260.889,00 248.952,00 250.332,00 250.332,00 323.380,00 263.787,00 315.974,00 328.877,00 249.182,00 264.638,00

42 K.42 Alumunium foil/sisalation m 65.481,00 67.896,00 66.688,50 72.588,00 71.380,50 65.343,00 67.643,00 70.058,00 70.058,00 114.091,50 70.173,00 96.669,00 108.744,00 69.195,50 75.348,00

L L PEKERJAAN KAYU

1 L.1 Membuat dan Pemasangan 1 m³ kusen pintu dan kusen jendela, kayu bengkirai m3 9.178.437,50 9.055.675,00 9.054.525,00 10.580.862,50 11.266.837,50 11.509.775,00 11.195.537,50 11.831.487,50 10.565.337,50 13.077.225,00 10.886.187,50 13.076.075,00 15.816.812,50 11.212.787,50 9.461.625,00

2 L.2 Miembuat dan Pemasangan 1 m2 Pintu klamp standar, kayu bengkirai m2 520.076,00 509.783,50 509.783,50 580.543,00 608.660,50 618.838,00 597.218,00 623.093,00 571.343,00 706.629,00 593.135,50 706.859,00 822.491,50 598.023,00 534.255,50

Membuat dan Pemasangan 1 m2 Pintu klamp sederhana, kayu meranti untuk gudang
3 L.3 m2 466.026,00 470.683,50 470.683,50 487.680,50 499.479,50 514.763,00 525.343,00 548.343,00 479.343,00 623.254,00 491.935,50 632.109,00 644.241,50 507.748,00 503.780,50
sementara

BIDANG CIPTA KARYA CK - 10 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

4 L.4 Membuat dan Pemasangan 1 m2 daun pintu panel , kayu meranti m2 891.825,00 897.000,00 897.000,00 940.700,00 949.394,00 963.125,00 951.050,00 974.050,00 905.050,00 1.158.050,00 941.850,00 1.151.150,00 1.181.050,00 934.950,00 950.475,00

5 L.5 Membuat dan Pemasangan 1 m2 Pintu dan jendela kaca , kayu meranti m2 693.795,00 697.245,00 696.900,00 730.940,00 737.881,40 745.430,00 728.985,00 743.820,00 702.075,00 897.345,00 733.010,00 889.180,00 914.480,00 720.130,00 738.415,00

6 L.6 Membuat dan Pemasangan 1 m2 Pintu dan jendela jalusi kayu , kayu meranti m2 958.295,00 966.805,00 966.230,00 1.005.445,00 1.024.300,40 1.046.155,00 1.053.400,00 1.091.925,00 980.950,00 1.277.995,00 1.011.655,00 1.276.500,00 1.309.275,00 1.026.835,00 1.030.860,00

Membuat 1 m2 daun Pintu kayu plywood rangkap , rangka tertutup meranti ( lebar sampai 90
7 L.7 m2 1.552.163,63 1.582.479,35 1.576.899,55 1.691.436,68 1.677.929,93 1.607.119,25 1.622.759,83 1.671.878,63 1.623.173,83 2.430.137,45 1.660.100,33 2.197.871,95 2.354.243,78 1.624.126,03 1.736.250,45
cm )

8 L.8 Pemasangan 1 m2 Jalusi kusen , kayu meranti m2 736.575,00 743.647,50 743.647,50 770.960,00 788.141,00 810.807,50 828.931,50 863.431,50 759.931,50 980.260,00 776.825,00 990.495,00 1.027.180,00 802.872,50 793.845,00

9 L.9 Pemasangan 1 m2 plywood rangkap , rangka ekspose kayu meranti m2 1.134.187,50 1.160.787,00 1.155.842,00 1.238.308,50 1.231.546,50 1.172.678,00 1.198.541,50 1.243.851,50 1.195.781,50 1.830.225,00 1.214.986,50 1.651.653,00 1.780.556,50 1.198.426,50 1.282.871,00

10 L.10 Pemasangan 1 m³ Taekwood rangkap lapis formika , rangka ekspose kayu kelas II m2 1.193.228,50 1.220.978,00 1.215.458,00 1.302.444,00 1.295.107,00 1.233.363,50 1.258.652,00 1.305.687,00 1.257.042,00 1.924.881,50 1.277.972,00 1.733.659,50 1.868.600,50 1.259.227,00 1.348.444,00

11 L.11 Pemasangan 1 m3 Kuda-kuda konvensional, bentang 6 m kayu bengkirai m2 7.365.750,00 7.262.940,00 7.262.940,00 8.807.620,00 9.361.230,00 9.543.160,00 9.430.230,00 10.062.730,00 8.797.730,00 11.219.400,00 8.981.730,00 10.920.860,00 13.634.630,00 9.439.430,00 7.590.920,00

12 L.12 Pemasangan 1 m2 rangka atap genteng keramik, kayu meranti m2 170.602,50 176.640,00 176.640,00 192.050,00 188.255,00 206.712,50 245.755,00 274.505,00 188.255,00 272.205,00 178.825,00 283.705,00 286.465,00 222.985,00 195.787,50

13 L.13 Pemasangan 1 m2 rangka atap genteng beton, kayu meranti m2 223.732,50 232.185,00 232.185,00 252.425,00 247.760,60 274.332,50 330.280,00 371.105,00 248.630,00 361.560,00 234.370,00 380.305,00 383.065,00 297.850,00 258.577,50

14 L.14 Pemasangan 1 m2 rangka atap sirap, kayu meranti m2 81.356,75 83.032,30 83.032,30 88.988,15 88.015,25 93.228,20 102.210,85 110.260,85 86.110,85 116.943,50 85.374,85 119.344,70 121.818,35 96.046,85 89.580,40

15 L.15 Pemasangan 1 m2 rangka plafon 50 x 100 cm, kayu meranti m2 144.589,50 146.590,50 146.590,50 157.262,50 155.244,94 160.505,50 168.590,00 177.445,00 150.880,00 199.847,00 152.340,50 199.755,00 207.862,50 161.851,00 157.021,00

16 L.16 Pemasangan 1 m2 rangka plafon 60 x 60 cm, kayu meranti m2 142.611,50 144.773,50 144.773,50 155.595,00 153.195,18 158.631,00 167.210,00 176.582,50 148.465,00 199.306,50 150.121,00 198.030,00 203.147,50 160.172,00 154.882,00

17 L.17 Pemasangan 1 m lisplank ukuran ( 3 x 20 ) cm , kayu bengkirai m 97.405,00 95.036,00 95.036,00 110.802,50 116.943,50 119.082,50 116.092,50 122.302,50 109.882,50 137.103,00 113.217,50 135.355,00 162.897,50 116.322,50 99.095,50

18 L.18 Pemasangan 1 m lisplank ukuran ( 3 x 30 ) cm , kayu bengkirai m 96.657,50 94.185,00 94.185,00 109.767,50 116.380,00 118.737,50 115.575,00 121.900,00 109.250,00 135.355,00 112.585,00 134.550,00 162.380,00 115.805,00 98.152,50

19 L.19 Pemasangan 1 m2 rangka dinding pemisah ( 60 x 120 ) cm , kayu meranti m2 191.693,50 195.086,00 195.086,00 199.720,50 207.186,30 217.488,00 233.645,50 249.745,50 201.445,50 271.756,50 201.905,50 276.931,50 281.704,00 221.110,50 210.875,50

20 L.20 Pemasangan 1 m2 dinding pemisah Taekwood rangkap, rangka kayu meranti m2 402.143,50 419.934,00 417.312,00 451.731,50 442.959,30 421.360,00 457.251,50 488.140,50 437.218,50 722.487,50 432.089,50 640.952,50 695.382,00 449.316,50 470.982,50

21 L.21 Pemasangan 1 m2 dinding pemisah plywood rangkap, rangka kayu meranti m2 402.143,50 419.934,00 417.312,00 451.731,50 442.959,30 421.360,00 457.251,50 488.140,50 437.218,50 722.487,50 432.089,50 640.952,50 695.382,00 449.316,50 470.982,50

22 L.22 Pemasangan 1 m2 dinding bilik , rangka kayu meranti m2 114.563,00 119.650,60 117.925,60 129.441,70 127.043,95 123.738,85 138.818,80 150.339,50 126.186,05 214.107,00 122.668,20 186.326,45 200.182,80 132.612,25 132.156,85

23 L.23 Pemasangan 1 m2 dinding lambrisering dari plywood 120 x 240 cm m2 71.489,75 74.307,25 73.387,25 80.879,50 79.614,50 74.842,00 64.658,75 62.358,75 62.358,75 142.830,00 65.814,50 94.702,50 105.248,00 60.116,25 77.228,25

24 L.24 Kusen Pintu/Jendela Alumunium m 297.820,10 312.724,10 310.194,10 341.852,45 332.583,45 290.631,45 316.513,35 335.488,35 332.958,35 617.463,75 326.258,45 509.605,25 576.405,30 322.937,25 365.295,20

25 L.25 Pintu/jendela kaca rangka alumunium m2 1.237.877,25 1.299.022,75 1.288.902,75 1.419.318,50 1.382.035,50 1.203.774,00 1.319.550,25 1.400.625,25 1.390.505,25 2.595.722,50 1.356.735,50 2.128.512,00 2.414.942,50 1.345.045,75 1.528.942,25

26 L.26 Pemancangan Tiang Pancang Ulin 10/10 4 m (dg sunduk dan kalang) bh 759.805,00 822.718,63 822.215,50 831.792,13 1.026.363,50 1.012.710,13 1.064.169,75 1.065.176,00 885.560,38 1.197.092,50 888.004,13 1.058.724,50 1.446.056,00 917.688,50 958.392,75

27 L.27 Pemancangan Tiang Pancang Ulin 10/10 4 m bh 553.437,50 601.953,13 601.450,00 608.134,38 756.125,00 743.978,13 786.743,75 787.750,00 651.259,38 890.100,00 650.828,13 786.600,00 1.079.275,00 675.050,00 705.381,25

28 L.28 Pemancangan Tiang Pancang Ulin 10/10 4 m bh 553.437,50 601.953,13 601.450,00 608.134,38 756.125,00 743.978,13 786.743,75 787.750,00 651.259,38 890.100,00 650.828,13 786.600,00 1.079.275,00 675.050,00 705.381,25

M M PEKERJAAN KUNCI DAN KACA

1 M.1 Pemasangan 1 Buah Kunci Tanam Antik bh 201.066,00 202.216,00 202.216,00 218.235,50 211.335,50 207.885,50 203.262,50 203.262,50 203.262,50 262.039,00 211.335,50 242.949,00 250.021,50 203.400,50 212.140,50

2 M.2 Pemasangan kunci tanam biasa bh 173.362,50 174.512,50 174.512,50 189.002,50 182.102,50 178.652,50 175.697,00 175.697,00 175.697,00 227.930,00 182.102,50 209.415,00 215.567,50 175.720,00 183.195,00

3 M.3 Pemasangan kunci kamar mandi bh 200.922,25 202.072,25 202.072,25 216.510,50 209.610,50 206.160,50 203.245,25 203.245,25 203.245,25 255.254,00 209.610,50 236.796,50 242.776,50 203.256,75 210.731,75

4 M.4 Pemasangan kunci silinder bh 183.672,25 185.972,25 185.972,25 203.860,50 192.360,50 188.910,50 187.145,25 188.295,25 188.295,25 252.954,00 194.660,50 226.446,50 232.426,50 188.306,75 196.931,75

5 M.5 Pemasangan engsel pintu bh 113.568,25 115.868,25 115.868,25 129.363,50 117.863,50 114.413,50 116.995,25 118.145,25 118.145,25 165.335,50 120.163,50 138.713,00 143.083,00 118.179,75 122.377,25

6 M.6 Pemasangan engsel jendela kupu-kupu bh 68.011,00 70.311,00 70.311,00 83.139,25 71.639,25 68.189,25 71.443,75 72.593,75 72.593,75 117.081,50 73.939,25 90.516,50 94.570,25 72.616,75 76.181,75

7 M.7 Pemasangan engsel angin bh 102.338,50 104.638,50 104.638,50 119.249,25 107.749,25 104.299,25 105.564,25 106.714,25 106.714,25 159.056,50 110.049,25 131.456,50 137.005,25 106.944,25 111.774,25

8 M.8 Pemasangan spring knip bh 103.517,25 104.667,25 104.667,25 114.793,00 107.893,00 104.443,00 105.874,75 105.874,75 105.874,75 140.656,50 107.893,00 122.084,00 126.856,50 105.909,25 108.956,75

9 M.9 Pemasangan kait angin bh 50.318,25 51.468,25 51.468,25 61.513,50 54.613,50 51.163,50 52.595,25 52.595,25 52.595,25 87.135,50 54.613,50 68.563,00 72.933,00 52.629,75 55.677,25

10 M.10 Pemasangan door closer bh 225.158,50 226.308,50 226.308,50 241.005,50 234.105,50 230.655,50 227.378,00 227.378,00 227.378,00 280.784,00 234.105,50 261.809,00 268.306,50 227.493,00 234.968,00

11 M.11 Pemasangan kunci slot bh 72.772,00 75.072,00 75.072,00 89.228,50 77.728,50 74.278,50 76.187,50 77.337,50 77.337,50 127.213,00 80.028,50 100.533,00 105.190,50 77.383,50 82.213,50

BIDANG CIPTA KARYA CK - 11 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

12 M.12 Pemasangan door holder bh 173.408,50 174.558,50 174.558,50 189.255,50 182.355,50 178.905,50 175.628,00 175.628,00 175.628,00 229.034,00 182.355,50 210.059,00 216.556,50 175.743,00 183.218,00

13 M.13 Pemasangan door stop bh 68.942,50 70.092,50 70.092,50 79.522,50 72.622,50 69.172,50 71.277,00 71.277,00 71.277,00 103.270,00 72.622,50 84.755,00 89.067,50 71.300,00 73.715,00

14 M.14 Pemasangan rel pintu sorong bh 304.566,00 306.866,00 306.866,00 326.335,50 314.835,50 311.385,50 307.912,50 309.062,50 309.062,50 380.489,00 317.135,50 353.349,00 360.421,50 309.200,50 319.090,50

15 M.15 Pemasangan kunci lemari bh 101.037,85 103.337,85 103.337,85 118.159,05 106.659,05 103.209,05 104.445,30 105.595,30 105.595,30 158.166,40 108.959,05 131.428,90 136.391,15 105.652,80 111.115,30

16 M.16 Pemasangan kaca tebal 3 mm m2 233.529,35 243.706,85 242.441,85 305.557,30 249.552,30 226.609,80 250.064,05 253.859,05 255.124,05 464.399,90 254.612,30 322.892,40 346.743,40 251.363,55 262.173,55

17 M.17 Pemasangan kaca tebal 5 mm m2 338.524,35 353.761,85 351.231,85 439.647,30 360.872,30 327.809,80 361.384,05 367.709,05 368.974,05 664.269,90 368.462,30 463.307,40 496.013,40 363.948,55 378.553,55

18 M.18 Pemasangan kaca tebal 8 mm m2 404.384,85 419.645,35 417.115,35 505.956,30 427.043,30 393.911,80 427.285,95 433.610,95 434.875,95 731.774,90 434.633,30 530.421,40 563.311,40 429.855,05 444.736,05

19 M.19 Pemasangan kaca buram 10 mm m2 512.852,16 530.642,66 528.112,66 635.713,91 540.355,91 500.899,41 540.787,16 548.377,16 549.642,16 907.739,39 549.210,91 665.813,89 705.450,37 543.374,66 561.797,66

20 M.20 Pemasangan cermin tebal 5 mm m2 336.626,85 351.806,85 349.276,85 437.289,80 358.859,80 325.969,80 359.371,55 365.696,55 366.961,55 660.934,90 366.449,80 460.892,40 493.425,90 361.936,05 376.483,55

21 M.21 Pemasangan cermin tebal 8 mm m2 401.728,35 416.908,35 414.378,35 502.655,80 424.225,80 391.335,80 424.468,45 430.793,45 432.058,45 727.105,90 431.815,80 527.040,40 559.688,90 427.037,55 441.838,05

22 M.22 Pemasangan kaca wireglassed tebal 5 mm m2 412.526,85 421.381,85 420.116,85 473.974,80 427.169,80 406.929,80 426.416,55 430.211,55 430.211,55 610.334,90 430.964,80 489.987,40 509.870,90 427.716,05 437.203,55

23 M.23 Pemasangan kaca patri tebal 5 mm m2 3.106.201,75 3.118.909,25 3.116.379,25 3.187.466,50 3.125.136,50 3.098.399,00 3.123.900,25 3.128.960,25 3.130.225,25 3.370.569,50 3.131.461,50 3.209.397,00 3.236.652,00 3.126.602,75 3.138.677,75

N N PEKERJAAN PENGECATAN

1 N.1 Pengikisan / Pengerokan 1 m2 Permukaan Cat Lama m2 25.058,50 25.116,00 25.116,00 26.415,50 26.070,50 25.898,00 24.863,00 24.863,00 24.863,00 30.946,50 26.070,50 28.301,50 30.371,50 25.208,00 25.265,50

2 N.2 Pencucian 1 m2 Bidang Permukaan Tembok yang Pernah di Cat m2 25.346,00 25.403,50 25.403,50 26.703,00 26.358,00 26.185,50 25.150,50 25.150,50 25.150,50 31.234,00 26.358,00 28.589,00 30.659,00 25.495,50 25.553,00

3 N.3 Pengerokan 1 m2 Karat Pada Permukaan Baja Cara Manual m2 26.381,00 26.438,50 26.438,50 27.795,50 27.450,50 27.278,00 26.243,00 26.243,00 26.243,00 32.499,00 27.450,50 29.854,00 32.211,50 26.588,00 26.645,50

4 N.4 Pengecatan 1 m2 Bidang Kayu Baru (1 Lps Plamir, 1 Lps Cat Dasr, 2 Lps Cat Penutup) m2 55.993,50 56.959,50 56.948,00 64.342,50 58.742,00 55.660,00 57.994,50 58.006,00 58.006,00 84.249,00 58.730,50 67.677,50 72.220,00 58.155,50 59.501,00

5 N.5 Pengecatan 1 m2 Bidang Kayu Baru (1 Lps Plamuur, 1 Lps Cat Dasar, 3 Lps Cat Penutup) m2 78.752,00 79.821,50 79.810,00 89.010,00 82.788,50 79.396,00 80.960,00 80.971,50 80.971,50 113.919,00 82.777,00 95.691,50 100.452,50 81.121,00 83.651,00

6 N.6 Pelaburan 1 m2 Bidang Kayu Dengan teak Oil m2 46.471,50 46.885,50 46.885,50 51.497,00 49.013,00 47.771,00 47.242,00 47.242,00 47.242,00 63.905,50 49.013,00 56.821,50 61.594,00 47.334,00 49.197,00

7 N.7 Pelaburan 1 m2 Bidang Kayu Dengan Politur m2 74.842,00 75.442,30 75.442,30 83.082,90 79.481,10 75.380,20 78.285,10 78.285,10 78.285,10 113.033,50 79.481,10 96.068,70 103.838,10 78.377,10 82.151,40

8 N.8 Pelaburan 1 m2 Bidang Kayu Dengan Cat Residu dan TER m2 23.207,00 23.609,50 23.609,50 27.071,00 24.656,00 23.448,50 23.851,00 23.851,00 23.851,00 36.420,50 24.656,00 28.830,50 31.533,00 24.081,00 24.483,50

9 N.9 Pelaburan 1 m2 Bidang Kayu Dengan Vernis m2 69.184,00 69.414,00 69.414,00 74.117,50 72.737,50 71.932,50 69.425,50 69.425,50 69.425,50 88.688,00 72.737,50 82.823,00 86.491,50 69.793,50 72.162,50

10 N.10 Pengecatan 1 m2 Tembok Baru (1 Lps Plamir, 1 Lps Cat Dasar, 2 Cat Lapis Cat Penutup) m2 64.849,65 65.493,65 65.493,65 70.948,10 67.084,10 65.152,10 66.126,15 66.126,15 66.126,15 84.850,45 67.084,10 74.316,45 76.940,75 66.172,15 67.613,10

11 N.11 Pengecatan 1 m2 Tembok Lama (1 Lps Plamuur, 2 Lps Cat Penutup) m2 54.917,10 55.492,10 55.492,10 60.243,90 56.793,90 55.068,90 56.037,20 56.037,20 56.037,20 72.360,30 56.793,90 62.838,30 65.251,00 56.101,60 57.207,90

12 N.12 Pelaburan 1 m2 Tembok Dengan Kalkarium m2 18.117,10 18.232,10 18.232,10 19.763,90 19.073,90 18.728,90 18.317,20 18.317,20 18.317,20 24.060,30 19.073,90 21.898,30 22.931,00 18.381,60 19.027,90

13 N.13 Pelaburan 1 m2 Tembok Dengan Kapur Sirih m2 77.569,80 80.588,55 80.071,05 88.507,45 85.229,95 76.777,45 81.537,30 84.987,30 84.642,30 159.471,65 84.309,95 121.751,65 136.965,00 82.917,30 91.267,45

14 N.14 Pelaburan 1 m2 Tembok Lama Dengan Kapur Sirih (Pemeliharaan) m2 169.751,50 175.357,75 174.322,75 190.054,75 185.224,75 168.894,75 176.709,00 183.609,00 182.919,00 329.135,75 183.097,25 257.145,75 287.730,00 179.699,00 196.149,75

15 N.15 Pemasangan 1 m2 Wallpaper m2 101.142,50 104.132,50 102.752,50 111.406,25 109.796,25 102.206,25 104.345,25 107.105,25 107.105,25 167.382,50 108.416,25 145.532,50 158.556,25 105.771,25 115.431,25

16 N.16 Pengecatan 1 m2 Permukaan Baja Dengan Menie Besi m2 48.645,00 48.794,50 48.783,00 52.296,25 51.594,75 51.192,25 48.892,25 48.903,75 48.903,75 62.617,50 51.583,25 60.375,00 62.048,25 48.938,25 51.594,75

17 N.17 Pengecatan 1 m2 Permukaan Baja Dengan Menie Besi Dengan Perancah m2 90.959,25 91.127,15 91.114,27 96.419,45 95.644,81 95.187,11 90.771,80 90.786,06 90.790,20 113.464,75 95.634,69 108.393,25 113.148,50 91.349,56 94.336,57

18 N.18 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual 4 Lapis m2 100.549,10 100.813,60 100.802,10 107.061,55 105.670,05 104.922,55 100.483,55 100.495,05 100.495,05 126.483,90 105.658,55 119.756,40 124.580,65 101.058,55 104.462,55

19 N.19 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual Sistem 1 Lapis Cat Mutakhir m2 44.654,50 45.045,50 45.034,00 48.771,50 46.621,00 45.494,00 45.298,50 45.310,00 45.310,00 59.029,50 46.609,50 52.463,00 54.981,50 45.436,50 46.632,50

20 N.20 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Manual Sistem 3 Lapis m2 246.502,50 246.962,50 246.951,00 262.614,00 260.049,50 258.715,50 246.698,00 246.709,50 246.709,50 310.327,50 260.038,00 298.747,00 309.488,00 247.618,00 258.175,00

21 N.21 Pengecatan 1 m2 Permukaan Baja Galvanis Secara Semprot Sistem 3 Lapis Cat Mutakhir m2 221.145,00 221.501,50 221.501,50 235.382,00 233.243,00 232.173,50 221.168,00 221.168,00 221.168,00 277.897,50 233.243,00 267.593,50 277.633,00 222.088,00 231.299,50

22 N.22 Plituran 1 m2 Dengan Plitur Melamic m2 363.457,50 366.689,00 366.137,00 394.024,50 388.159,50 377.775,00 368.885,50 372.197,50 371.645,50 521.663,00 387.055,50 474.973,00 498.858,50 370.173,50 394.243,00

23 N.23 Pengecatan 1 m2 Dinding Dalam m2 103.271,15 104.076,15 104.076,15 110.651,85 105.821,85 103.406,85 104.863,90 104.863,90 104.863,90 127.273,95 105.821,85 114.163,95 117.242,50 104.909,90 106.511,85

24 N.24 Pengecatan 1 m2 Dinding Luar m2 123.971,15 124.776,15 124.776,15 131.351,85 126.521,85 124.106,85 125.563,90 125.563,90 125.563,90 147.973,95 126.521,85 134.863,95 137.942,50 125.609,90 127.211,85

BIDANG CIPTA KARYA CK - 12 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

25 N.25 Pengecatan 1 m2 Plafond m2 103.271,15 104.076,15 104.076,15 110.651,85 105.821,85 103.406,85 104.863,90 104.863,90 104.863,90 127.273,95 105.821,85 114.163,95 117.242,50 104.909,90 106.511,85

26 N.26 Pengecatan 1 m2 Kayu m2 88.941,00 89.941,50 89.941,50 98.629,75 92.626,75 89.625,25 90.809,75 90.809,75 90.809,75 121.095,00 92.626,75 104.282,00 108.416,25 90.970,75 93.224,75

27 N.27 Pengecatan 1 m2 Lapisan Waterproofing Membrane Sheet + Screed m2 219.454,50 226.297,00 223.366,80 267.427,90 232.442,60 216.841,70 226.113,00 232.263,20 232.166,60 754.073,40 233.086,60 383.619,30 445.767,60 229.151,30 239.666,90

28 N.28 Pekerjaan 1 m2 TER Rangka Atap m2 34.707,00 35.109,50 35.109,50 38.571,00 36.156,00 34.948,50 35.351,00 35.351,00 35.351,00 47.920,50 36.156,00 40.330,50 43.033,00 35.581,00 35.983,50

29 N.29 Pengecatan 1 m2 Cat Meni m2 61.410,00 61.525,00 61.525,00 65.090,00 64.400,00 64.055,00 61.709,00 61.709,00 61.709,00 75.440,00 64.400,00 73.370,00 75.440,00 61.755,00 64.400,00

30 N.30 Pengecatan 1 m2 Cat Besi m2 172.500,00 172.810,50 172.810,50 182.574,00 180.711,00 179.779,50 172.431,00 172.431,00 172.431,00 212.922,50 180.711,00 203.354,50 211.876,00 173.351,00 178.721,50

31 N.31 Pengecatan 1 m2 Plafond Tekstur m2 116.806,65 117.726,65 117.726,65 125.233,85 119.713,85 116.953,85 118.629,40 118.629,40 118.629,40 144.190,45 119.713,85 129.240,45 132.710,00 118.675,40 120.518,85

O O. PEKERJAAN SANITASI DALAM GEDUNG

1 O.1 Pemasangan 1 Buah Closet Duduk / Monoblock bh 4.315.835,00 4.494.085,00 4.458.435,00 4.884.165,00 4.777.215,00 4.242.465,00 4.549.285,00 4.790.785,00 4.756.285,00 8.476.880,00 4.692.115,00 7.055.480,00 7.947.190,00 4.625.875,00 5.181.440,00

2 O.2 Pemasangan 1 Buah Closet Jongkok Porselen bh 831.220,00 848.102,00 843.939,00 913.249,50 898.472,00 847.849,00 852.736,50 876.081,50 873.758,50 1.488.364,50 889.697,50 1.219.356,50 1.343.970,50 862.661,00 932.730,50

3 O.3 Pemasangan 1 Buah Closet Jongkok teraso bh 717.025,00 729.307,00 726.294,00 786.864,50 771.167,00 733.884,00 729.226,50 746.476,50 744.153,50 1.262.734,50 763.887,50 1.033.976,50 1.128.115,50 736.851,00 792.430,50

4 O.4 Pemasangan 1 Buah Urinoir bh 2.138.425,00 2.225.457,00 2.207.494,00 2.423.314,50 2.365.987,00 2.104.914,00 2.252.976,50 2.370.621,50 2.354.498,50 4.340.709,50 2.323.862,50 3.527.751,50 3.976.090,50 2.289.351,00 2.565.845,50

5 O.5 Pemasangan 1 Buah Wastafel bh 2.885.120,00 3.003.202,00 2.979.029,00 3.270.174,50 3.194.217,00 2.839.994,00 3.040.496,50 3.200.691,50 3.178.588,50 5.814.894,50 3.136.912,50 4.758.136,50 5.358.160,50 3.089.521,00 3.466.985,50

6 O.6 Pemasangan 1 Buah Bathcuip Porselen bh 7.662.927,25 8.036.677,25 7.961.927,25 8.794.130,50 8.569.880,50 7.448.630,50 8.164.189,25 8.671.339,25 8.598.889,25 16.107.371,50 8.391.630,50 13.206.209,00 14.980.544,00 8.309.261,75 9.456.099,25

7 O.7 Pemasangan 1 Buah Bak Fiberglass Volume 1 m3 bh 3.686.325,00 3.795.575,00 3.773.725,00 4.094.000,00 4.028.450,00 3.700.700,00 3.835.825,00 3.984.175,00 3.963.475,00 6.479.675,00 3.976.700,00 5.597.625,00 6.203.675,00 3.885.275,00 4.269.950,00

8 O.8 Pemasangan 1 Buah Bak Mandi Batu Bata Volume 0,30 m3 bh 3.280.260,00 3.345.120,00 3.330.630,00 3.771.540,00 3.541.425,00 3.279.225,00 3.332.700,00 3.463.800,00 3.421.710,00 8.819.925,00 3.475.530,00 5.489.985,00 6.352.830,00 3.361.335,00 3.600.420,00

9 O.9 Pemasangan 1 Buah Bak Mandi Teraso Volume 0,30 m3 bh 3.692.075,00 3.801.325,00 3.779.475,00 4.099.750,00 4.034.200,00 3.706.450,00 3.841.575,00 3.989.925,00 3.969.225,00 6.485.425,00 3.982.450,00 5.603.375,00 6.209.425,00 3.891.025,00 4.275.700,00

10 O.10 Pemasangan 1 Buah Bak Air Fiberglass Volume 1 m3 bh 3.692.075,00 3.801.325,00 3.779.475,00 4.099.750,00 4.034.200,00 3.706.450,00 3.841.575,00 3.989.925,00 3.969.225,00 6.485.425,00 3.982.450,00 5.603.375,00 6.209.425,00 3.891.025,00 4.275.700,00

11 O.11 Pemasangan 1 Buah Bak Beton Volume 1 m3 bh 12.194.887,85 12.691.470,67 12.641.490,49 15.366.603,77 13.595.305,86 12.316.868,59 13.225.023,20 13.639.803,14 13.209.289,10 33.366.475,14 13.277.553,73 20.375.222,63 23.297.431,73 13.022.034,73 13.983.945,53

12 O.12 Pemasangan 1 Buah Bak Cuci Piring Stainlessteel bh 1.874.327,50 1.965.177,50 1.946.777,50 2.149.867,50 2.094.667,50 1.824.417,50 1.996.331,00 2.118.231,00 2.100.981,00 3.920.810,00 2.052.117,50 3.220.115,00 3.650.502,50 2.030.900,00 2.309.545,00

13 O.13 Pemasangan 1 Buah Bak Cuci Piring Teraso bh 939.837,50 981.697,50 971.232,50 1.087.210,00 1.044.372,50 921.207,50 992.392,50 1.050.467,50 1.042.302,50 2.444.497,50 1.024.650,00 1.702.632,50 1.960.865,00 1.009.930,00 1.139.477,50

14 O.14 Pemasangan 1 Buah Floor Drain bh 109.192,50 113.792,50 112.642,50 123.222,50 120.922,50 108.272,50 114.977,00 120.727,00 120.727,00 212.520,00 118.622,50 177.905,00 199.467,50 117.300,00 131.215,00

15 O.15 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30x30x35 cm bh 737.403,00 746.913,50 741.313,00 855.197,50 783.667,50 746.028,00 739.772,00 757.942,00 757.482,00 2.336.432,00 772.788,50 1.289.472,00 1.487.847,00 750.800,50 788.969,00

16 O.16 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 45x45x50 cm bh 1.115.155,00 1.129.679,50 1.120.249,50 1.307.803,00 1.185.144,00 1.125.666,00 1.117.616,00 1.146.883,50 1.146.331,50 3.829.822,00 1.167.008,50 2.030.762,00 2.356.108,50 1.134.831,50 1.192.998,50

17 O.17 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60x60x65 cm bh 1.360.680,00 1.383.147,55 1.369.224,50 1.651.477,05 1.453.266,50 1.357.399,05 1.369.815,60 1.415.355,60 1.414.580,50 5.370.195,25 1.424.053,05 2.708.189,05 3.174.073,60 1.391.700,10 1.476.903,60

18 O.18 Pemasangan 1 m' Pipa Galvanis Ø 1/2" m 71.507,00 71.507,00 71.507,00 76.831,50 75.049,00 71.484,00 73.475,80 73.475,80 73.475,80 100.245,50 75.049,00 85.364,50 91.517,00 73.600,00 74.738,50

19 O.19 Pemasangan 1 Buah Kran Ø 1/2" bh 170.545,00 175.173,75 173.995,00 188.427,50 186.098,75 173.420,00 176.358,25 182.137,00 182.137,00 289.368,75 183.798,75 254.667,50 277.696,25 178.681,25 196.448,75

20 O.20 Pemasangan 1 m' Pipa Galvanis Ø 3/4" m 87.549,50 89.332,00 89.332,00 94.656,50 91.091,50 87.526,50 89.518,30 89.518,30 91.300,80 123.418,00 91.091,50 104.972,00 109.342,00 89.642,50 92.563,50

21 O.21 Pemasangan 1 m' Pipa Galvanis Ø 1" m 98.244,50 100.027,00 100.027,00 105.351,50 101.786,50 98.221,50 100.213,30 101.995,80 101.995,80 141.243,00 101.786,50 117.449,50 123.602,00 100.337,50 103.258,50

22 O.22 Pemasangan 1 m' Pipa Galvanis Ø 1 1/2" m 148.913,50 150.696,00 150.696,00 160.781,50 155.434,00 148.304,00 152.287,60 154.070,10 154.070,10 214.831,50 155.434,00 179.722,00 187.427,00 152.536,00 156.595,50

23 O.23 Pemasangan 1 m' Pipa Galvanis Ø 3" m 426.586,75 439.064,25 437.281,75 467.728,00 446.338,00 419.600,50 442.399,25 447.746,75 447.746,75 640.055,50 448.120,50 513.728,00 538.131,00 442.709,75 454.474,25

24 O.24 Pemasangan 1 m' Pipa Galvanis Ø 4" m 599.489,25 613.749,25 610.184,25 647.760,50 621.023,00 587.155,50 617.084,25 622.431,75 624.214,25 855.738,00 622.805,50 700.890,50 728.858,50 615.612,25 630.941,75

25 O.25 Pemasangan 1 m' Pipa PVC type AW Ø 1/2" m 33.812,88 34.704,13 34.704,13 39.258,13 36.138,75 30.345,63 29.296,83 31.970,58 31.970,58 40.649,63 33.019,38 37.561,88 39.258,13 32.053,38 33.703,63

26 O.26 Pemasangan 1 m' Pipa PVC type AW Ø 3/4" m 35.753,50 36.788,50 36.788,50 47.092,50 38.122,50 33.292,50 32.243,70 35.348,70 35.348,70 44.056,50 36.052,50 40.882,50 42.377,50 35.086,50 36.880,50

27 O.27 Pemasangan 1 m' Pipa PVC type AW Ø 1" m 40.209,75 41.589,75 41.589,75 56.723,75 43.268,75 38.783,75 40.149,95 41.874,95 41.874,95 52.652,75 42.578,75 48.098,75 49.938,75 41.612,75 43.751,75

28 O.28 Pemasangan 1 m' Pipa PVC type AW Ø 1 1/2" m 71.886,50 75.005,88 74.560,25 82.282,50 77.826,25 64.457,50 65.112,43 71.796,80 72.242,43 92.836,63 73.370,00 83.748,75 87.184,38 71.029,75 74.842,00

29 O.29 Pemasangan 1 m' Pipa PVC type AW Ø 2" m 89.711,50 93.722,13 93.276,50 86.738,75 96.542,50 75.598,13 76.253,05 85.611,18 85.611,18 110.216,00 86.738,75 98.900,00 103.226,88 84.398,50 89.102,00

BIDANG CIPTA KARYA CK - 13 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

30 O.30 Pemasangan 1 m' Pipa PVC type AW Ø 2 1/2" m 127.779,38 134.018,13 132.681,25 114.402,00 138.020,13 109.945,75 115.607,20 124.074,08 124.519,70 160.741,25 125.988,25 143.767,25 150.006,00 122.923,50 129.533,13

31 O.31 Pemasangan 1 m' Pipa PVC type AW Ø 3" m 161.201,25 169.668,13 167.885,63 154.508,25 174.561,38 136.683,25 134.323,45 157.050,33 157.941,58 203.521,25 158.518,88 180.754,13 188.329,75 155.008,50 163.400,63

32 O.32 Pemasangan 1 m' Pipa PVC type AW Ø 4" m 232.501,25 246.315,63 244.087,50 265.023,25 253.437,00 199.070,75 229.241,58 235.034,70 235.925,95 306.460,63 236.057,63 269.433,50 280.574,13 231.656,00 244.950,00

33 O.33 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa PVC AW diameter 200 mm Ø 20 cm m 796.553,25 828.419,75 819.730,35 898.773,30 843.428,40 772.717,20 840.894,95 860.734,75 862.986,45 2.434.639,70 855.390,70 1.300.505,10 1.481.639,30 849.786,75 882.035,05

34 O.34 Pemasangan 1 m' Pipa Air Limbah Jenis Pipa PVC AW diameter 160 mm Ø 15 cm m 458.493,50 490.979,85 485.326,45 530.091,35 502.660,40 378.563,90 452.688,30 466.435,40 469.152,85 637.862,45 464.306,75 536.219,70 563.036,55 458.494,65 486.307,40

35 O.35 Pemasangan 1 m' Pipa Beton Ø 15 - 20 cm m 394.968,08 412.572,28 409.407,48 453.895,80 439.724,58 385.797,17 418.453,38 442.992,88 439.041,48 987.062,25 430.112,08 688.030,05 786.757,55 425.799,58 480.226,09

36 O.36 Pemasangan 1 m' Pipa Beton Ø 30 - 100 cm m 779.579,25 813.505,40 805.696,90 894.622,95 865.250,80 763.565,50 823.419,55 868.933,10 863.653,45 1.984.243,35 848.295,20 1.361.330,90 1.557.457,65 837.232,20 941.471,65

P P PEKERJAAN PEMASANGAN PIPA LUAR GEDUNG

1 P.1 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 2 1/2" m 79.562,75 83.674,00 82.794,25 70.788,25 85.974,00 67.602,75 71.878,45 77.375,45 77.714,70 101.108,00 78.228,75 89.826,50 94.093,00 76.699,25 80.367,75

2 P.2 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 3" m 105.029,50 110.607,00 109.434,00 100.809,00 113.677,50 88.895,00 87.896,80 102.605,30 103.249,30 133.883,00 103.350,50 118.714,50 124.050,50 101.384,00 106.283,00

3 P.3 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 4" m 154.830,25 163.886,50 162.420,25 176.151,25 168.590,00 133.083,75 152.990,25 156.785,25 157.446,50 205.355,50 157.406,25 180.860,50 188.738,00 154.726,75 162.868,75

4 P.4 Pengadaan dan Pemasangan 1 m' PIPA PVC AW diameter 6" m 308.234,50 328.532,00 325.047,50 353.659,50 336.881,00 259.313,50 304.708,60 313.115,10 314.943,60 412.355,50 313.053,00 358.673,50 374.808,00 308.499,00 325.921,50

5 P.5 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 63 mm m 110.095,25 114.968,38 113.763,75 120.545,88 116.932,00 109.212,63 119.795,50 122.204,75 122.368,63 148.534,00 121.586,63 135.481,50 139.506,50 121.135,25 124.890,00

6 P.6 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 110 mm m 302.530,50 316.603,63 314.249,00 332.605,88 320.942,00 299.422,63 330.630,75 336.490,00 337.803,88 402.247,00 335.946,63 367.287,00 377.177,00 333.132,00 344.971,25

7 P.7 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 125 mm m 389.165,75 406.688,88 403.184,25 427.365,88 413.402,00 384.982,63 425.316,00 432.325,25 433.639,13 516.810,00 431.856,63 471.442,50 483.747,50 427.828,75 442.002,50

8 P.8 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 150 mm m 501.584,00 523.707,13 520.202,50 549.185,38 531.771,50 496.452,13 545.756,65 555.065,90 557.529,78 658.881,00 554.826,13 602.968,00 618.976,00 550.608,50 569.474,25

9 P.9 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 200 mm m 981.502,00 996.725,13 994.370,50 1.015.809,38 1.002.995,50 969.976,13 1.003.778,65 1.009.637,90 1.010.951,78 1.296.303,00 1.009.950,13 1.103.080,00 1.135.878,00 1.006.422,50 1.019.768,25

10 P.10 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 250 mm m 1.526.642,25 1.550.246,00 1.545.525,25 1.579.588,25 1.559.676,00 1.509.564,75 1.562.193,35 1.571.634,85 1.574.297,10 2.020.021,00 1.572.446,75 1.719.491,50 1.768.918,50 1.566.190,75 1.585.602,75

11 P.11 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 315 mm m 2.411.389,00 2.447.973,38 2.442.036,50 2.494.542,63 2.464.082,00 2.383.078,88 2.467.112,25 2.482.436,00 2.486.446,63 3.190.606,00 2.482.668,88 2.714.851,00 2.792.533,50 2.473.627,00 2.504.878,25

12 P.12 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 400 mm m 3.900.305,50 3.961.140,50 3.950.353,50 4.035.879,00 3.986.268,00 3.854.363,00 3.991.742,00 4.016.766,00 4.022.677,00 5.171.297,00 4.016.605,00 4.403.212,00 4.528.964,50 4.002.483,00 4.053.324,50

13 P.13 Pengadaan dan Pemasangan 1 m' Pipa HDPE diameter 450 mm m 4.940.106,75 5.016.581,75 5.003.356,75 5.113.130,00 5.049.305,00 4.881.980,00 5.055.845,05 5.088.045,05 5.095.520,05 6.550.814,00 5.087.830,00 5.578.385,50 5.738.684,00 5.070.470,75 5.134.640,75

14 P.14 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 63 mm m 130.293,08 131.907,88 131.661,58 138.340,21 137.026,33 133.523,63 132.353,50 133.037,75 133.393,29 181.792,00 137.655,96 160.957,83 169.563,67 133.447,92 136.685,17

15 P.15 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 110 mm m 188.925,83 191.882,29 191.252,67 200.555,21 198.091,33 191.521,96 193.037,08 194.296,33 194.651,88 273.470,00 199.679,29 233.028,33 245.678,33 194.449,67 199.158,92

16 P.16 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 125 mm m 227.895,50 231.235,29 230.797,33 241.284,38 238.437,17 230.717,79 232.720,52 234.171,43 234.526,98 325.695,33 240.025,13 278.185,00 292.632,83 234.435,17 239.803,75

17 P.17 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 160 mm m 264.944,67 269.626,13 268.804,83 281.561,21 277.755,67 267.736,29 271.430,28 273.264,53 273.811,74 388.447,00 279.918,63 326.086,33 343.846,17 273.470,00 279.938,75

18 P.18 Pengadaan dan Pemasangan 1 m' Pipa GIP diameter 200 mm m 433.500,17 440.864,96 439.660,33 459.726,88 453.621,33 437.468,63 443.677,28 446.853,20 447.592,08 632.185,67 457.317,63 529.306,67 557.819,00 446.959,00 457.586,92

Q Q PEKERJAAN PEMOTONGAN PIPA

1 Q.1 Pemotongan 1 Buah PIPA PVC AW diameter 2 1/2" bh 4.163,00 4.372,30 4.327,45 3.697,25 4.489,60 3.547,75 3.753,60 4.037,65 4.052,60 5.214,10 4.085,95 4.618,40 4.854,15 4.004,30 4.191,75

2 Q.2 Pemotongan 1 Buah PIPA PVC AW diameter 3" bh 4.910,50 4.997,90 4.979,50 4.991,00 5.198,00 4.807,00 4.613,80 4.848,40 4.857,60 6.021,40 5.032,40 5.635,00 5.913,30 4.857,60 5.007,10

3 Q.3 Pemotongan 1 Buah PIPA PVC AW diameter 4" bh 7.831,50 7.974,10 7.951,10 8.420,30 8.300,70 7.739,50 7.771,70 7.831,50 7.840,70 9.729,00 8.121,30 9.103,40 9.568,00 7.845,30 8.091,40

4 Q.4 Pemotongan 1 Buah PIPA PVC AW diameter 6" bh 12.563,75 12.885,75 12.830,55 13.643,60 13.376,80 12.144,00 12.467,15 12.600,55 12.628,15 15.787,20 12.995,00 14.593,50 15.347,90 12.593,65 13.032,95

5 Q.5 Pemotongan 1 Buah Pipa HDPE diameter 63 mm bh 16.718,70 17.197,10 17.077,50 18.091,80 17.733,00 16.624,40 17.673,20 18.303,40 18.303,40 21.624,60 18.211,40 20.286,00 20.679,30 17.797,40 18.558,70

6 Q.6 Pemotongan 1 Buah Pipa HDPE diameter 110 mm bh 44.821,25 46.270,25 46.028,75 48.737,00 47.529,50 44.539,50 47.716,95 49.137,20 49.257,95 58.103,75 49.099,25 54.412,25 55.504,75 47.972,25 50.030,75

7 Q.7 Pemotongan 1 Buah Pipa HDPE diameter 125 mm bh 59.561,95 61.390,45 61.024,75 64.687,50 63.224,70 59.195,10 63.331,65 65.167,05 65.288,95 77.190,30 65.175,10 72.332,70 73.712,70 63.596,15 66.220,45

8 Q.8 Pemotongan 1 Buah Pipa HDPE diameter 160 mm bh 92.944,15 93.946,95 93.821,60 96.798,95 95.921,50 92.273,70 94.434,55 96.202,10 96.327,45 120.739,65 96.422,90 107.143,20 109.573,15 94.596,70 96.957,65

9 Q.9 Pemotongan 1 Buah Pipa HDPE diameter 200 mm bh 154.174,75 155.923,90 155.654,80 160.460,65 158.980,60 153.246,70 156.676,00 159.315,25 159.449,80 200.022,95 159.787,90 177.047,10 181.415,95 157.046,30 160.745,85

BIDANG CIPTA KARYA CK - 14 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

10 Q.10 Pemotongan 1 Buah Pipa HDPE diameter 250 mm bh 240.491,45 243.320,45 242.754,65 249.960,55 247.555,90 239.073,50 244.661,35 248.334,45 248.617,35 312.701,10 249.111,85 275.153,60 282.126,05 245.239,80 250.424,00

11 Q.11 Pemotongan 1 Buah Pipa GIP diameter 63 mm bh 24.753,75 25.558,75 25.443,75 26.726,00 26.036,00 24.426,00 25.883,05 26.228,05 26.343,05 41.837,00 26.381,00 31.498,50 33.442,00 26.041,75 26.846,75

12 Q.12 Pemotongan 1 Buah Pipa GIP diameter 110 mm bh 61.352,50 62.962,50 62.617,50 65.538,50 64.158,50 60.708,50 63.703,10 64.393,10 64.508,10 98.555,00 65.078,50 76.383,00 80.845,00 64.066,50 65.780,00

13 Q.13 Pemotongan 1 Buah Pipa GIP diameter 125 mm bh 86.020,00 87.860,00 87.630,00 91.321,50 89.711,50 85.571,50 88.786,90 89.591,90 89.706,90 131.445,00 90.631,50 104.972,00 110.572,50 89.343,50 91.482,50

14 Q.14 Pemotongan 1 Buah Pipa GIP diameter 160 mm bh 109.462,75 112.107,75 111.647,75 116.759,50 114.574,50 109.054,50 113.220,95 114.255,95 114.485,95 170.568,00 115.839,50 135.136,50 142.795,50 113.982,25 116.811,25

15 Q.15 Pemotongan 1 Buah Pipa GIP diameter 200 mm bh 219.903,00 224.158,00 223.468,00 233.404,00 229.839,00 220.639,00 225.837,00 227.677,00 228.022,00 328.072,00 232.024,00 267.927,00 282.647,00 227.424,00 232.944,00

R R PEKERJAAN AKSESORIS PIPA

#REF! R.1 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 150 mm bh 8.673.823,25 8.688.600,75 8.686.013,25 8.724.509,50 8.713.297,00 8.687.134,50 8.702.196,05 8.708.521,05 8.710.533,55 8.889.615,00 8.727.384,50 8.820.281,50 8.857.587,50 8.708.357,75 8.728.655,25

#REF! R.2 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 200 mm bh 10.962.823,50 10.983.696,00 10.980.533,50 11.034.698,50 11.017.161,00 10.977.773,50 11.004.432,80 11.014.207,80 11.017.945,30 11.282.949,00 11.036.423,50 11.195.388,00 11.241.031,50 11.013.550,00 11.038.930,50

#REF! R.3 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 250 mm bh 12.967.388,50 12.995.333,50 12.990.733,50 13.054.961,00 13.033.111,00 12.979.061,00 13.022.107,80 13.033.607,80 13.039.357,80 13.358.699,00 13.057.261,00 13.249.288,00 13.300.681,50 13.032.950,00 13.063.505,50

#REF! R.4 Pengadaan dan Pemasangan 1 Buah Valve HDPE Ø 300 mm bh 15.228.185,00 15.264.237,50 15.258.200,00 15.337.262,50 15.308.800,00 15.241.237,50 15.299.025,00 15.313.400,00 15.320.012,50 15.714.750,00 15.340.137,50 15.576.750,00 15.638.850,00 15.311.100,00 15.349.625,00

#REF! R.5 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 160 mm bh 1.868.485,50 1.886.138,00 1.882.607,50 1.907.838,50 1.893.797,00 1.864.989,50 1.903.673,20 1.911.884,20 1.913.275,70 2.019.377,00 1.911.127,50 1.950.308,00 1.968.259,50 1.907.528,00 1.922.098,50

#REF! R.6 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 200 mm bh 2.041.997,50 2.064.264,38 2.060.731,00 2.094.285,13 2.075.635,00 2.038.734,38 2.088.587,45 2.097.954,20 2.100.504,33 2.243.075,00 2.099.868,38 2.150.891,00 2.176.490,00 2.093.851,00 2.113.659,75

#REF! R.7 Pengadaan dan Pemasangan 1 Buah Tee HDPE Ø 250 mm bh 3.331.642,00 3.360.607,63 3.355.895,50 3.399.207,38 3.374.721,00 3.327.039,13 3.390.697,95 3.402.422,20 3.405.058,58 3.590.898,00 3.404.733,13 3.472.149,00 3.505.395,50 3.396.272,00 3.422.520,75

S S PEKERJAAN PENYAMBUNGAN PIPA

1 S.1 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 63 mm bh 979.466,50 1.008.622,45 1.002.561,26 1.080.883,85 1.062.700,28 982.132,43 1.036.097,10 1.048.219,48 1.062.953,05 1.584.263,00 1.072.211,47 1.554.754,00 1.583.515,50 1.050.441,28 1.072.143,16

2 S.2 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 110 mm bh 1.259.422,50 1.299.819,70 1.292.200,26 1.388.790,60 1.361.332,28 1.260.840,68 1.338.328,60 1.354.717,48 1.371.825,80 1.976.137,00 1.381.601,72 1.922.708,00 1.960.324,50 1.355.053,28 1.386.656,66

3 S.3 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 160 mm bh 1.804.062,50 1.844.962,83 1.837.472,76 1.946.382,48 1.919.312,28 1.803.511,31 1.878.857,35 1.894.987,48 1.915.157,68 2.751.697,00 1.930.252,35 2.604.543,00 2.660.272,00 1.897.508,28 1.930.290,41

4 S.4 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 200 mm bh 2.367.102,50 2.418.855,95 2.409.195,26 2.541.924,35 2.507.192,28 2.364.581,93 2.459.636,10 2.480.107,48 2.503.339,55 3.550.257,00 2.521.452,97 3.328.928,00 3.403.919,50 2.482.513,28 2.524.524,16

5 S.5 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 250 mm bh 3.119.892,50 3.184.799,08 3.171.817,76 3.332.966,23 3.288.272,28 3.114.252,56 3.234.764,85 3.260.727,48 3.288.171,43 4.600.667,00 3.309.303,60 4.267.213,00 4.366.067,00 3.261.868,28 3.314.257,91

6 S.6 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 315 mm bh 4.210.782,50 4.293.442,20 4.278.290,26 4.473.608,10 4.415.502,28 4.196.273,18 4.354.893,60 4.388.647,48 4.420.303,30 6.096.127,00 4.443.304,22 5.582.698,00 5.716.914,50 4.387.373,28 4.455.891,66

7 S.7 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 400 mm bh 6.087.812,50 6.203.678,45 6.181.885,26 6.439.791,85 6.357.162,28 6.060.164,43 6.284.651,10 6.331.687,48 6.370.617,05 8.687.997,00 6.398.505,47 7.873.268,00 8.069.009,50 6.326.733,28 6.422.909,16

8 S.8 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 450 mm bh 7.317.852,50 7.453.771,58 7.428.657,76 7.725.333,73 7.625.842,28 7.280.185,06 7.547.379,85 7.603.357,48 7.646.498,93 10.367.457,00 7.676.256,10 9.344.003,00 9.580.857,00 7.595.988,28 7.709.442,91

9 S.9 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 500 mm bh 8.658.292,50 8.816.564,70 8.788.130,26 9.123.575,60 9.007.222,28 8.608.305,68 8.922.808,60 8.987.727,48 9.036.230,80 12.194.117,00 9.066.706,72 10.938.938,00 11.218.054,50 8.976.793,28 9.109.826,66

10 S.10 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 630 mm bh 12.323.572,50 12.544.950,95 12.505.275,26 12.947.009,35 12.779.682,28 12.235.146,93 12.687.966,10 12.779.967,48 12.838.044,55 17.225.137,00 12.867.657,97 15.256.958,00 15.663.149,50 12.757.303,28 12.943.294,16

11 S.11 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 710 mm bh 16.415.502,50 16.688.487,20 16.639.870,26 17.170.643,10 16.962.692,28 16.297.838,18 16.861.373,60 16.974.707,48 17.042.358,30 22.434.407,00 17.073.409,22 19.910.778,00 20.418.744,50 16.943.763,28 17.173.511,66

12 S.12 Penyambungan 1 Buah Pipa HDPE Baru ke Pipa HDPE yang Ada Ø 800 mm bh 21.306.682,50 21.651.973,45 21.590.965,26 22.238.376,85 21.972.552,28 21.142.529,43 21.865.081,10 22.007.797,48 22.087.322,05 28.874.177,00 22.116.360,47 25.522.548,00 26.175.989,50 21.963.973,28 22.254.729,16

T T PEKERJAAN PENGETESAN PIPA

1 T.1 Penngetesan 1 Meter Pipa Ø 50 mm m 2.626,75 2.698,05 2.698,05 3.252,35 2.824,55 2.610,65 2.760,15 2.760,15 2.760,15 4.676,05 2.824,55 3.443,25 3.795,15 2.778,55 2.849,85

2 T.2 Penngetesan 1 Meter Pipa Ø 75 mm m 2.626,90 2.698,20 2.698,20 3.252,50 2.824,70 2.610,80 2.760,30 2.760,30 2.760,30 4.676,20 2.824,70 3.443,40 3.795,30 2.778,70 2.850,00

3 T.3 Penngetesan 1 Meter Pipa Ø 100 mm m 2.627,20 2.698,50 2.698,50 3.252,80 2.825,00 2.611,10 2.760,60 2.760,60 2.760,60 4.676,50 2.825,00 3.443,70 3.795,60 2.779,00 2.850,30

4 T.4 Penngetesan 1 Meter Pipa Ø 150 mm m 2.627,95 2.699,25 2.699,25 3.253,55 2.825,75 2.611,85 2.761,35 2.761,35 2.761,35 4.677,25 2.825,75 3.444,45 3.796,35 2.779,75 2.851,05

5 T.5 Penngetesan 1 Meter Pipa Ø 200 mm m 2.628,92 2.700,22 2.700,22 3.254,52 2.826,72 2.612,82 2.762,32 2.762,32 2.762,32 4.678,22 2.826,72 3.445,42 3.797,32 2.780,72 2.852,02

6 T.6 Penngetesan 1 Meter Pipa Ø 250 mm m 2.630,26 2.701,56 2.701,56 3.255,86 2.828,06 2.614,16 2.763,66 2.763,66 2.763,66 4.679,56 2.828,06 3.446,76 3.798,66 2.782,06 2.853,36

7 T.7 Penngetesan 1 Meter Pipa Ø 300 mm m 2.631,91 2.703,21 2.703,21 3.257,51 2.829,71 2.615,81 2.765,31 2.765,31 2.765,31 4.681,21 2.829,71 3.448,41 3.800,31 2.783,71 2.855,01

BIDANG CIPTA KARYA CK - 15 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

8 T.8 Penngetesan 1 Meter Pipa Ø 400 mm m 2.636,02 2.707,32 2.707,32 3.261,62 2.833,82 2.619,92 2.769,42 2.769,42 2.769,42 4.685,32 2.833,82 3.452,52 3.804,42 2.787,82 2.859,12

9 T.9 Penngetesan 1 Meter Pipa Ø 500 mm m 2.638,41 2.709,71 2.709,71 3.264,01 2.836,21 2.622,31 2.771,81 2.771,81 2.771,81 4.687,71 2.836,21 3.454,91 3.806,81 2.790,21 2.861,51

10 T.10 Penngetesan 1 Meter Pipa Ø 600 mm m 2.647,75 2.719,05 2.719,05 3.273,35 2.845,55 2.631,65 2.781,15 2.781,15 2.781,15 4.697,05 2.845,55 3.464,25 3.816,15 2.799,55 2.870,85

U U PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

1 U.1 Pemasangan 1 buah instalasi titik Lampu bh 648.427,50 674.992,50 674.992,50 734.505,00 707.940,00 628.245,00 676.372,50 702.937,50 702.937,50 1.259.250,00 681.375,00 1.018.440,00 1.169.895,00 676.717,50 760.207,50

2 U.2 Pemasangan 1 buah instalasi titik Lampu Luar bh 1.539.467,05 1.611.917,05 1.611.917,05 1.757.772,70 1.733.622,70 1.492.122,70 1.636.147,55 1.732.747,55 1.732.747,55 3.258.140,90 1.685.322,70 2.653.988,40 3.018.209,50 1.660.378,05 1.902.471,45

3 U.3 Pemasangan 1 buah instalasi titik Lampu Sorot bh 974.243,20 1.012.883,20 1.012.883,20 1.112.917,10 1.074.277,10 939.037,10 1.032.012,30 1.070.652,30 1.070.652,30 1.993.573,30 1.035.637,10 1.605.264,30 1.822.165,80 1.032.394,10 1.169.922,60

4 U.4 Pemasangan 1 buah Instalasi titik Stop Kontak bh 769.177,50 801.780,00 801.780,00 873.367,50 840.765,00 742.957,50 803.160,00 835.762,50 835.762,50 1.512.825,00 808.162,50 1.217.677,50 1.399.320,00 803.505,00 905.107,50

5 U.5 Pemasangan 1 buah Instalasi titik Detector bh 533.715,00 548.205,00 548.205,00 601.680,00 587.190,00 525.607,50 567.697,50 582.187,50 582.187,50 1.023.787,50 572.700,00 837.315,00 964.620,00 568.042,50 633.420,00

6 U.6 Pemasangan 1 buah Instalasi titik TV bh 696.727,50 732.952,50 714.840,00 793.672,50 757.447,50 684.997,50 734.332,50 770.557,50 770.557,50 1.375.170,00 757.447,50 1.137.982,50 1.301.512,50 734.677,50 829.035,00

7 U.7 Pemasangan 1 buah Insalasi titik Telepon bh 464.887,50 479.377,50 479.377,50 529.230,00 500.250,00 456.780,00 480.757,50 509.737,50 509.737,50 882.510,00 500.250,00 735.885,00 841.455,00 481.102,50 542.857,50

8 U.8 Pemasangan 1 M Kabel Power ( NYM 3x2,5 mm ) m 62.924,55 65.339,55 65.339,55 70.952,70 68.537,70 61.292,70 65.443,05 67.858,05 67.858,05 119.330,90 66.122,70 97.308,40 111.239,50 65.500,55 73.223,95

9 U.9 Pemasangan 1 M Kabel Power ( NYY 4x2,5 mm + NYA 2,5 mm ) m 69.450,80 71.865,80 71.865,80 78.772,70 77.565,20 69.112,70 74.372,80 76.787,80 76.787,80 133.475,90 76.357,70 113.810,90 129.007,00 74.441,80 83.430,20

10 U.10 Pemasangan 1 M Kabel Power ( NYY 4x4 mm + NYA 4 mm ) m 88.770,80 92.393,30 91.185,80 100.507,70 98.092,70 87.225,20 93.692,80 98.522,80 97.315,30 173.323,40 95.677,70 143.998,40 162.817,00 94.969,30 106.372,70

11 U.11 Pemasangan 1 M Kabel Power ( NYY 4x6 mm + NYA 6 mm ) m 119.806,43 125.843,93 124.636,43 136.416,45 134.001,45 118.303,95 127.137,68 134.382,68 133.175,18 239.563,40 131.586,45 200.549,65 226.642,00 129.627,43 145.889,58

12 U.12 Pemasangan 1 M Kabel Power ( NYY 4x16 mm + NYA 16 mm ) m 249.008,93 261.083,93 258.668,93 284.938,95 277.693,95 242.676,45 264.792,68 280.490,18 276.867,68 512.458,40 271.656,45 422.729,65 479.009,50 269.697,43 305.279,58

13 U.13 Pemasangan 1 M Kabel Power ( NYY 4x185 mm + NYA 95 mm ) m 2.200.328,93 2.309.003,93 2.287.268,93 2.528.473,95 2.463.268,95 2.134.828,95 2.345.315,18 2.493.837,68 2.472.102,68 4.656.598,40 2.410.138,95 3.809.767,15 4.328.519,50 2.388.859,93 2.721.487,08

14 U.14 Pemasangan 1 M Kabel Power ( NYM 3x4 mm ) m 73.792,05 76.207,05 76.207,05 83.027,70 80.612,70 72.160,20 77.518,05 81.140,55 79.933,05 142.273,40 79.405,20 119.043,40 135.389,50 77.575,55 86.506,45

15 U.15 Pemasangan 1 M Kabel Power ( NYFGBY 4x240 mm + NYA 95 mm ) m 96.082,50 99.705,00 99.705,00 108.215,00 107.007,50 94.932,50 101.108,00 105.938,00 104.730,50 182.275,00 104.592,50 155.250,00 175.202,50 102.407,50 114.022,50

16 U.16 Pemasangan 1 M Kabel Power ( NYY 4x240 mm + NYA 95 mm ) m 138.653,20 142.275,70 142.275,70 152.954,60 151.747,10 139.672,10 143.292,30 148.122,30 146.914,80 234.245,80 149.332,10 205.771,80 227.058,30 144.881,60 158.037,60

17 U.17 Pemasangan 1 M Kabel Power ( NYY 3x2,5 mm ) m 122.955,70 125.370,70 125.370,70 134.842,10 132.427,10 123.974,60 126.387,30 128.802,30 128.802,30 200.435,80 130.012,10 174.376,80 192.040,80 126.769,10 137.510,10

18 U.18 Pemasangan 1 M Kabel Power ( FRC 4x4 mm + NYA 4 mm ) m 282.345,70 293.213,20 290.798,20 318.382,10 311.137,10 279.742,10 297.852,30 312.342,30 308.719,80 540.950,80 306.307,10 454.516,80 509.613,30 301.856,60 336.747,60

19 U.19 Pemasangan 1 M Kabel Power ( FRC 3x2.5 mm ) m 180.915,70 186.953,20 185.745,70 201.254,60 197.632,10 180.727,10 187.969,80 196.422,30 195.214,80 323.600,80 195.217,10 278.221,80 309.168,30 190.766,60 209.960,10

20 U.20 Pemasangan 1 M Kabel Power ( FRC 4x6 mm + NYA 6 mm ) m 347.550,70 362.040,70 359.625,70 393.247,10 384.794,60 342.532,10 365.472,30 384.792,30 382.377,30 677.398,30 378.757,10 569.229,30 640.023,30 373.099,10 417.650,10

21 U.21 Pemasangan Kabel Tray ( W=200 mm ) m 564.037,05 591.809,55 585.772,05 646.930,20 631.232,70 547.915,20 600.365,55 637.798,05 632.968,05 1.184.345,90 616.742,70 969.123,40 1.101.389,50 611.290,55 695.086,45

22 U.22 Pemasangan Tee Kabel Tray ( W=200 mm ) bh 219.899,55 230.767,05 228.352,05 252.077,70 244.832,70 214.645,20 234.493,05 247.775,55 245.360,55 453.808,40 240.002,70 373.825,90 423.982,00 238.173,05 270.046,45

23 U.23 Pemasangan Kabel Tray ( W=900 mm ) m 1.456.035,70 1.526.070,70 1.511.580,70 1.668.367,10 1.626.104,60 1.417.207,10 1.548.822,30 1.643.007,30 1.629.724,80 3.032.023,30 1.592.294,60 2.491.569,30 2.824.390,80 1.575.769,10 1.789.370,10

24 U.24 Pemasangan Kabel Tray ( W=600 mm ) m 1.136.048,20 1.189.178,20 1.178.310,70 1.300.079,60 1.267.477,10 1.106.879,60 1.207.099,80 1.279.549,80 1.268.682,30 2.352.200,80 1.242.119,60 1.936.119,30 2.194.075,80 1.228.009,10 1.393.310,10

25 U.25 Pemasangan Reduser Kabel Tray ( W=400 mm ) m 295.628,20 307.703,20 305.288,20 334.079,60 326.834,60 291.817,10 309.927,30 325.624,80 323.209,80 567.515,80 320.797,10 476.251,80 534.970,80 315.139,10 352.445,10

26 U.26 Pemasangan Kabel Tray ( W=400 mm ) m 875.228,20 916.283,20 907.830,70 1.000.619,60 975.262,10 854.512,10 929.374,80 984.919,80 976.467,30 1.800.373,30 957.149,60 1.484.514,30 1.680.888,30 945.454,10 1.070.907,60

27 U.27 Pemasangan Tee Kabel Tray ( W=400 mm ) bh 404.303,20 421.208,20 417.585,70 458.452,10 448.792,10 398.077,10 427.054,80 449.997,30 447.582,30 800.563,30 440.339,60 667.036,80 751.113,30 434.681,60 488.892,60

28 U.28 Pemasangan Elbow Kabel Tray ( W=400 mm ) m 380.153,20 395.850,70 392.228,20 430.679,60 421.019,60 373.927,10 400.489,80 422.224,80 418.602,30 747.433,30 413.774,60 623.566,80 702.813,30 406.909,10 456.290,10

29 U.29 Pemasangan Kabel Ladder ( W=200 mm ) m 615.615,70 643.388,20 637.350,70 701.159,60 685.462,10 602.144,60 651.649,80 689.082,30 684.252,30 1.247.338,30 670.972,10 1.030.494,30 1.165.285,80 662.899,10 748.505,10

30 U.30 Pemasangan Tee Kabel Ladder ( W=200 mm ) bh 271.478,20 282.345,70 279.930,70 306.307,10 299.062,10 268.874,60 285.777,30 299.059,80 296.644,80 516.800,80 294.232,10 435.196,80 487.878,30 289.781,60 323.465,10

31 U.31 Pemasangan Lampu sorot bh 1.515.203,20 1.587.653,20 1.573.163,20 1.735.987,10 1.692.517,10 1.475.167,10 1.611.612,30 1.710.627,30 1.696.137,30 3.158.810,80 1.657.499,60 2.594.206,80 2.941.518,30 1.640.974,10 1.864.235,10

32 U.32 Pemasangan Lampu T-Bulk-18 watt + batt bh 259.403,20 269.063,20 266.648,20 291.817,10 285.779,60 256.799,60 272.494,80 284.569,80 283.362,30 490.235,80 280.949,60 413.461,80 463.728,30 276.499,10 307.767,60

33 U.33 Pemasangan Lampu Baret-32 watt bh 307.366,25 323.063,75 319.441,25 353.533,00 343.873,00 299.195,50 327.870,75 348.398,25 345.983,25 649.094,50 337.835,50 533.002,00 604.520,50 333.942,75 380.011,75

BIDANG CIPTA KARYA CK - 16 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

34 U.34 Pemasangan Splitter TV bh 177.637,05 186.089,55 183.674,55 202.570,20 197.740,20 173.590,20 188.608,05 199.475,55 198.268,05 364.453,40 194.117,70 300.168,40 340.664,50 192.288,05 218.123,95

35 U.35 Pemasangan Penangkal Petir bh 229.215,70 237.668,20 235.253,20 256.799,60 251.969,60 227.819,60 239.892,30 250.759,80 249.552,30 427.445,80 248.347,10 361.539,30 404.560,80 243.896,60 271.542,60

36 U.36 Pemasangan Stop Kontak daya bh 56.887,05 59.302,05 58.094,55 63.707,70 62.500,20 56.462,70 59.405,55 63.028,05 61.820,55 107.255,90 61.292,70 90.063,40 101.579,50 60.670,55 67.186,45

37 U.37 Pemasangan Stop Kontak-TV bh 81.037,05 84.659,55 83.452,05 91.480,20 90.272,70 79.405,20 84.763,05 89.593,05 88.385,55 157.970,90 87.857,70 132.325,90 149.879,50 86.028,05 96.166,45

38 U.38 Pemasangan Stop Kontak-TELEPON bh 93.112,05 96.734,55 96.734,55 105.970,20 103.555,20 91.480,20 98.045,55 104.083,05 102.875,55 184.535,90 101.140,20 154.060,90 174.029,50 100.518,05 113.071,45

39 U.39 Pemasangan Saklar tunggal bh 38.774,55 39.982,05 39.982,05 43.180,20 41.972,70 38.350,20 40.085,55 41.293,05 41.293,05 68.615,90 40.765,20 57.460,90 65.354,50 40.143,05 44.243,95

40 U.40 Pemasangan Sakalr Ganda bh 44.812,05 46.019,55 46.019,55 50.425,20 49.217,70 44.387,70 46.123,05 48.538,05 48.538,05 81.898,40 48.010,20 69.535,90 78.637,00 47.388,05 52.696,45

41 U.41 Pemasangan Manual push button bh 316.499,55 332.197,05 328.574,55 363.167,70 353.507,70 308.830,20 337.130,55 357.658,05 355.243,05 660.290,90 347.470,20 544.083,40 617.182,00 343.225,55 389.588,95

42 U.42 Pemasangan 1 buah instalasi titik Manual PUSH BUTTON bh 714.974,55 739.124,55 739.124,55 812.357,70 788.207,70 691.607,70 763.378,05 811.678,05 787.528,05 1.515.200,90 764.057,70 1.200.963,40 1.371.869,50 763.435,55 860.513,95

43 U.43 Pemasangan Bell Alarm bh 316.499,55 332.197,05 328.574,55 363.167,70 353.507,70 308.830,20 337.130,55 357.658,05 355.243,05 660.290,90 347.470,20 544.083,40 617.182,00 343.225,55 389.588,95

44 U.44 Pemasangan 1 buah instalasi titik Bell Alarm bh 714.974,55 739.124,55 739.124,55 812.357,70 788.207,70 691.607,70 763.378,05 811.678,05 787.528,05 1.515.200,90 764.057,70 1.200.963,40 1.371.869,50 763.435,55 860.513,95

45 U.45 Pemasangan Lampu indikator bh 105.187,05 110.017,05 108.809,55 119.252,70 116.837,70 103.555,20 111.328,05 117.365,55 117.365,55 211.100,90 114.422,70 174.588,40 198.179,50 113.800,55 127.561,45

46 U.46 Pemasangan 1 buah instalasi titik Lampu indikator bh 714.974,55 739.124,55 739.124,55 812.357,70 788.207,70 691.607,70 763.378,05 811.678,05 787.528,05 1.515.200,90 764.057,70 1.200.963,40 1.371.869,50 763.435,55 860.513,95

47 U.47 Pemasangan MCFA bh 14.556.203,20 15.280.703,20 15.135.803,20 16.733.137,10 16.298.437,10 14.124.937,10 15.526.842,30 16.510.954,80 16.369.677,30 30.862.483,30 15.951.884,60 25.236.039,30 28.670.928,30 15.808.571,60 18.014.547,60

48 U.48 Pemasangan Lampu Taman (t=1,5 m) bh 694.103,20 726.705,70 719.460,70 792.929,60 772.402,10 679.424,60 737.382,30 779.644,80 772.399,80 1.416.388,30 757.912,10 1.169.356,80 1.322.260,80 749.839,10 847.520,10

49 U.49 Pemasangan Lampu Taman (t=2,5 m) bh 826.928,20 865.568,20 857.115,70 945.074,60 922.132,10 808.627,10 878.659,80 930.582,30 923.337,30 1.700.150,80 904.019,60 1.401.196,80 1.585.495,80 894.739,10 1.012.947,60

50 U.50 Pemasangan Lampu SL-13 watt bh 27.945,00 29.152,50 29.152,50 31.763,00 30.555,50 26.933,00 29.141,00 30.348,50 30.348,50 55.349,50 29.348,00 44.367,00 50.623,00 29.164,00 32.913,00

51 U.51 Pemasangan Lampu Pijar-40 watt bh 77.070,70 77.070,70 77.070,70 81.712,10 81.712,10 80.504,60 78.087,30 79.294,80 78.087,30 105.043,30 81.712,10 98.304,30 105.100,80 78.469,10 81.965,10

52 U.52 Pemasangan Lampu T-Bulk-18 watt bh 198.691,25 208.351,25 205.936,25 227.953,00 221.915,50 192.935,50 211.950,75 224.025,75 222.818,25 416.047,00 217.085,50 341.009,50 387.170,50 215.607,75 244.771,75

53 U.53 Pemasangan Lampu T-Bulk-36 watt bh 198.691,25 208.351,25 205.936,25 227.953,00 221.915,50 192.935,50 211.950,75 224.025,75 222.818,25 416.047,00 217.085,50 341.009,50 387.170,50 215.607,75 244.771,75

54 U.54 Pemasangan Lampu Baret-32 watt C/W BATTERY CHARGER bh 307.366,25 323.063,75 319.441,25 353.533,00 343.873,00 299.195,50 327.870,75 348.398,25 345.983,25 649.094,50 337.835,50 533.002,00 604.520,50 333.942,75 380.011,75

55 U.55 Pemasangan Lampu V-Shafe 2x36 W bh 307.366,25 323.063,75 319.441,25 353.533,00 343.873,00 299.195,50 327.870,75 348.398,25 345.983,25 649.094,50 337.835,50 533.002,00 604.520,50 333.942,75 380.011,75

56 U.56 Pemasangan Lampu PL 7 Watt Fitting E27 bh 76.245,00 81.075,00 78.660,00 88.515,50 86.100,50 74.025,50 81.063,50 85.893,50 85.893,50 159.194,50 83.685,50 130.099,50 147.223,00 81.086,50 90.873,00

57 U.57 Pemasangan Panel Unit bh 292.349,55 305.632,05 304.424,55 335.395,20 326.942,70 284.680,20 310.565,55 329.885,55 327.470,55 607.160,90 319.697,70 500.613,40 567.674,50 317.868,05 360.608,95

58 U.58 Pemasangan GENSET 25 kVA bh 144.966.203,20 152.211.203,20 150.762.203,20 166.704.637,10 162.357.637,10 140.622.637,10 154.674.312,30 164.513.022,30 163.107.492,30 307.891.963,30 158.894.527,10 251.657.986,80 285.968.650,80 157.485.754,10 179.527.332,60

59 U.59 Pemasangan 1 buah Grounding box bh 657.878,20 688.065,70 682.028,20 750.667,10 732.554,60 643.199,60 697.534,80 737.382,30 731.344,80 1.336.693,30 718.064,60 1.106.566,80 1.251.018,30 708.784,10 800.427,60

60 U.60 Pemasangan 1 buah Grounding Rod Gip 1" bh 500.903,20 522.638,20 517.808,20 569.542,10 556.259,60 491.054,60 529.692,30 558.672,30 555.049,80 1.003.423,30 545.392,10 832.464,30 939.483,30 538.526,60 607.227,60

61 U.61 Pemasangan 1 M Kabel pentanahan ( BC 50 mm ) m 149.993,93 157.238,93 154.823,93 171.433,95 166.603,95 147.283,95 159.740,18 168.192,68 166.985,18 303.560,90 164.188,95 252.472,15 285.809,50 162.229,93 183.322,08

62 U.62 Pemasangan 1 M Kabel pentanahan ( NYY 70 mm ) m 263.025,70 272.685,70 271.478,20 295.439,60 290.609,60 260.422,10 276.117,30 289.399,80 286.984,80 498.688,30 285.779,60 420.706,80 472.180,80 280.121,60 312.597,60

63 U.63 Pemasangan 1 buah Terminal Box Telepon m 96.390,70 97.598,20 97.598,20 104.654,60 103.447,10 98.617,10 97.407,30 99.822,30 99.822,30 144.890,80 102.239,60 130.906,80 142.533,30 98.996,60 106.115,10

64 U.64 Pemasangan 1 buah Terminal Box TV bh 47.356,43 48.563,93 48.563,93 53.098,95 51.891,45 47.061,45 48.650,18 51.065,18 51.065,18 85.003,40 50.683,95 72.554,65 81.742,00 49.932,43 55.327,08

65 U.65 Pemasangan 1 buah Terminal Fire Alarm bh 560.543,93 588.316,43 582.278,93 643.566,45 626.661,45 545.758,95 598.062,68 634.287,68 629.457,68 1.176.583,40 614.586,45 964.897,15 1.096.042,00 607.797,43 690.472,08

66 U.66 Pemasangan 1 buah Antena UHF bh 892.606,43 936.076,43 927.623,93 1.025.136,45 998.571,45 866.953,95 950.652,68 1.011.027,68 1.001.367,68 1.880.555,90 976.836,45 1.539.667,15 1.748.092,00 967.632,43 1.101.022,08

67 U.67 Pemasangan 1 buah Antena VHF bh 892.606,43 936.076,43 927.623,93 1.025.136,45 998.571,45 866.953,95 950.652,68 1.011.027,68 1.001.367,68 1.880.555,90 976.836,45 1.539.667,15 1.748.092,00 967.632,43 1.101.022,08

68 U.68 Pemasangan Master Amplifier ( MIXER ) bh 1.152.953,20 1.207.290,70 1.196.423,20 1.319.399,60 1.286.797,10 1.123.784,60 1.225.212,30 1.298.869,80 1.289.209,80 2.389.633,30 1.260.232,10 1.965.099,30 2.226.678,30 1.247.329,10 1.415.045,10

69 U.69 Pemasangan 1 M Kabel Coaxial ( 7c-2v mm ) m 36.359,55 37.567,05 37.567,05 40.765,20 39.557,70 35.935,20 37.670,55 38.878,05 38.878,05 62.578,40 38.350,20 53.838,40 60.524,50 37.728,05 41.828,95

70 U.70 Pemasangan MDF-FA ( 5 zone ) bh 549.203,20 573.353,20 568.523,20 625.087,10 610.597,10 538.147,10 581.614,80 614.217,30 609.387,30 1.107.268,30 598.522,10 915.781,80 1.034.875,80 591.656,60 667.602,60

71 U.71 Pemasangan 1 M Kabel Power fire alarm ( NYA 5x2x2,5 mm ) m 123.299,55 125.714,55 124.507,05 142.195,20 140.987,70 122.875,20 137.893,05 140.308,05 140.308,05 252.155,90 139.780,20 213.228,40 247.687,00 137.950,55 155.333,95

BIDANG CIPTA KARYA CK - 17 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

72 U.72 Pemasangan 1 M Kabel Power fire alarm ( NYA 3x2x2,5 mm ) m 94.319,55 96.734,55 95.527,05 108.385,20 107.177,70 93.895,20 104.083,05 106.498,05 106.498,05 189.365,90 105.970,20 160.098,40 184.897,00 104.140,55 116.693,95

73 U.73 Pemasangan 1 M Kabel Power fire alarm ( NYA 20x1,5 mm ) m 83.452,05 87.074,55 85.867,05 95.102,70 92.687,70 83.027,70 89.593,05 93.215,55 93.215,55 165.215,90 91.480,20 137.155,90 155.917,00 90.858,05 102.203,95

74 U.74 Pemasangan 1 M jelly armoured ( kabel telepo ) m 92.768,20 93.975,70 93.975,70 99.824,60 99.824,60 94.994,60 93.784,80 96.199,80 94.992,30 136.438,30 98.617,10 124.869,30 135.288,30 95.374,10 101.285,10

75 U.75 Pemasangan Heat Detector bh 102.772,05 107.602,05 106.394,55 116.837,70 114.422,70 101.140,20 108.913,05 114.950,55 113.743,05 205.063,40 112.007,70 170.965,90 193.349,50 111.385,55 125.146,45

76 U.76 Pemasangan Smoke Detector bh 1.101.374,55 1.155.712,05 1.144.844,55 1.265.170,20 1.232.567,70 1.069.555,20 1.173.928,05 1.247.585,55 1.237.925,55 2.326.640,90 1.206.002,70 1.903.728,40 2.162.782,00 1.195.720,55 1.361.626,45

77 U.77 Pemasangan Panel MDP bh 7.541.412,50 7.915.737,50 7.840.872,50 8.667.205,00 8.442.610,00 7.319.635,00 8.042.295,00 8.550.652,50 8.478.202,50 15.971.027,50 8.263.900,00 13.064.057,50 14.839.427,50 8.188.747,50 9.329.260,00

78 U.78 Pemasangan Panel DB bh 12.975.162,50 13.621.175,00 13.491.972,50 14.916.017,50 14.528.410,00 12.590.372,50 13.840.710,00 14.717.355,00 14.592.982,50 27.513.520,00 14.219.290,00 22.497.047,50 25.558.405,00 14.091.007,50 16.057.450,00

79 U.79 Pemasangan Panel Kebakaran bh 7.541.412,50 7.915.737,50 7.840.872,50 8.667.205,00 8.442.610,00 7.319.635,00 8.042.295,00 8.550.652,50 8.478.202,50 15.971.027,50 8.263.900,00 13.064.057,50 14.839.427,50 8.188.747,50 9.329.260,00

80 U.80 Pemasangan Panel Pompa Air Bersih bh 13.337.412,50 14.001.537,50 13.868.712,50 15.332.605,00 14.934.130,00 12.941.755,00 14.227.110,00 15.129.112,50 14.999.910,00 28.282.697,50 14.616.557,50 23.127.362,50 26.274.452,50 14.484.652,50 16.506.640,00

81 U.81 Pemasangan Panel Unit bh 292.349,55 305.632,05 304.424,55 335.395,20 326.942,70 284.680,20 310.565,55 329.885,55 327.470,55 607.160,90 319.697,70 500.613,40 567.674,50 317.868,05 360.608,95

82 U.82 Pemasangan P-PLN bh 7.262.903,20 7.622.738,20 7.550.288,20 8.345.842,10 8.129.699,60 7.050.194,60 7.744.504,80 8.232.334,80 8.163.507,30 15.367.843,30 7.958.234,60 12.572.986,80 14.282.358,30 7.884.956,60 8.981.240,10

V V PEKERJAAN LANSEKAP

1 V.1 Pengadaan dan penanaman Ara Rea Polyback 60.409,50 63.859,50 62.709,50 69.678,50 67.378,50 59.328,50 64.998,00 68.448,00 68.448,00 121.693,00 66.228,50 107.778,00 121.750,50 66.171,00 75.371,00

2 V.2 Pengadaan dan penanaman Asoka Polyback 37.530,00 39.530,00 38.530,00 42.590,00 41.590,00 36.590,00 39.520,00 42.520,00 41.520,00 73.820,00 40.590,00 64.720,00 73.870,00 40.540,00 45.540,00

3 V.3 Pengadaan dan penanaman Bakung Polyback 15.559,50 16.709,50 15.559,50 17.928,50 16.778,50 15.628,50 16.698,00 17.848,00 17.848,00 29.693,00 16.778,50 26.128,00 29.750,50 16.721,00 19.021,00

4 V.4 Pengadaan dan penanaman Brokoli Polyback 60.409,50 63.859,50 62.709,50 69.678,50 67.378,50 59.328,50 64.998,00 68.448,00 68.448,00 121.693,00 66.228,50 107.778,00 121.750,50 66.171,00 75.371,00

5 V.5 Pengadaan dan penanaman Brokoli Kuning Polyback 66.159,50 69.609,50 68.459,50 75.428,50 74.278,50 63.928,50 69.598,00 74.198,00 73.048,00 130.893,00 71.978,50 116.978,00 133.250,50 70.771,00 79.971,00

6 V.6 Pengadaan dan penanaman Bugenvil Parigata t = 0,75 m pohon 451.409,50 474.409,50 469.809,50 519.328,50 505.528,50 437.678,50 481.298,00 511.198,00 506.598,00 916.343,00 494.028,50 816.178,00 926.750,50 489.371,00 557.221,00

7 V.7 Pengadaan dan penanaman Bunga Krisan Polyback 129.409,50 136.309,50 134.009,50 149.028,50 144.428,50 126.028,50 138.598,00 146.648,00 145.498,00 261.993,00 142.128,50 233.128,00 264.350,50 140.921,00 160.471,00

8 V.8 Pengadaan dan penanaman Dolar t= 1 m pohon 3.682.909,50 3.866.909,50 3.830.109,50 4.234.978,50 4.124.578,50 3.572.578,50 3.928.998,00 4.179.698,00 4.144.048,00 7.498.943,00 4.037.178,50 6.677.728,00 7.587.550,50 4.000.321,00 4.560.371,00

9 V.9 Pengadaan dan penanaman Kalatea kodok Polyback 129.409,50 136.309,50 134.009,50 149.028,50 144.428,50 126.028,50 138.598,00 146.648,00 145.498,00 261.993,00 142.128,50 233.128,00 264.350,50 140.921,00 160.471,00

10 V.10 Pengadaan dan penanaman Kalatea Merah Polyback 106.409,50 112.159,50 111.009,50 122.578,50 119.128,50 103.028,50 113.298,00 120.198,00 119.048,00 213.693,00 115.678,50 189.428,00 214.900,50 114.471,00 130.571,00

11 V.11 Pengadaan dan penanaman Bunga Krisan Polyback 129.409,50 136.309,50 134.009,50 149.028,50 144.428,50 126.028,50 138.598,00 146.648,00 145.498,00 261.993,00 142.128,50 233.128,00 264.350,50 140.921,00 160.471,00

12 V.12 Pengadaan dan penanaman Kucai Polyback 37.409,50 39.709,50 38.559,50 43.228,50 42.078,50 36.328,50 39.698,00 41.998,00 41.998,00 73.393,00 40.928,50 66.378,00 74.600,50 39.721,00 44.321,00

13 V.13 Pengadaan dan penanaman Lili Brasil Polyback 25.909,50 27.059,50 27.059,50 29.428,50 28.278,50 24.828,50 27.048,00 28.198,00 28.198,00 49.243,00 27.128,50 42.228,00 48.150,50 27.071,00 30.521,00

14 V.14 Pengadaan dan penanaman Lili Paris Polyback 25.909,50 27.059,50 27.059,50 29.428,50 28.278,50 24.828,50 27.048,00 28.198,00 28.198,00 49.243,00 27.128,50 42.228,00 48.150,50 27.071,00 30.521,00

15 V.15 Pengadaan dan penanaman Nanas nanasan Polyback 117.909,50 123.659,50 122.509,50 135.228,50 131.778,50 114.528,50 125.948,00 132.848,00 132.848,00 237.843,00 129.478,50 212.428,00 241.350,50 128.271,00 145.521,00

16 V.16 Pengadaan dan penanaman Palem Putri t = 2 m pohon 669.909,50 703.259,50 696.359,50 770.028,50 750.478,50 650.428,50 714.748,00 760.748,00 753.848,00 1.362.543,00 734.378,50 1.212.928,00 1.378.700,50 728.571,00 829.771,00

17 V.17 Pengadaan dan penanaman Palem Kuning pohon 370.909,50 389.309,50 385.859,50 426.178,50 414.678,50 359.478,50 395.048,00 420.348,00 416.898,00 751.893,00 405.478,50 668.978,00 760.000,50 401.971,00 458.321,00

18 V.18 Pengadaan dan penanaman Palem Phonik t= 1 m pohon 520.409,50 546.859,50 541.109,50 598.678,50 582.578,50 505.528,50 556.048,00 590.548,00 585.948,00 1.058.943,00 571.078,50 943.828,00 1.071.650,50 565.271,00 643.471,00

19 V.19 Pengadaan dan penanaman Palem Regu pohon 301.909,50 316.859,50 313.409,50 346.828,50 337.628,50 292.778,50 321.448,00 342.148,00 338.698,00 611.593,00 330.728,50 545.928,00 619.700,50 327.221,00 372.071,00

20 V.20 Pengadaan dan penanaman Pucuk Merah t = 0,75 m pohon 232.909,50 244.409,50 242.109,50 267.478,50 260.578,50 226.078,50 247.848,00 263.948,00 261.648,00 471.293,00 254.828,50 420.578,00 477.100,50 252.471,00 286.971,00

21 V.21 Pengadaan dan penanaman Rembusa Hijau Polyback 60.409,50 63.859,50 62.709,50 69.678,50 67.378,50 59.328,50 64.998,00 68.448,00 68.448,00 121.693,00 66.228,50 107.778,00 121.750,50 66.171,00 75.371,00

22 V.22 Pengadaan dan penanaman Rembusa Putih Polyback 60.409,50 63.859,50 62.709,50 69.678,50 67.378,50 59.328,50 64.998,00 68.448,00 68.448,00 121.693,00 66.228,50 107.778,00 121.750,50 66.171,00 75.371,00

23 V.23 Pengadaan dan penanaman Rumput Jepang m2 117.909,50 123.659,50 122.509,50 135.228,50 131.778,50 114.528,50 125.948,00 132.848,00 132.848,00 237.843,00 129.478,50 212.428,00 241.350,50 128.271,00 145.521,00

24 V.24 Pengadaan dan penanaman Sambang dara Polyback 60.409,50 63.859,50 62.709,50 69.678,50 67.378,50 59.328,50 64.998,00 68.448,00 68.448,00 121.693,00 66.228,50 107.778,00 121.750,50 66.171,00 75.371,00

25 V.25 Pengadaan dan penanaman Tabib Buya t = 3-4 m pohon 738.909,50 775.709,50 768.809,50 849.378,50 827.528,50 717.128,50 788.348,00 838.948,00 830.898,00 1.502.843,00 810.278,50 1.339.428,00 1.521.300,50 803.321,00 914.871,00

BIDANG CIPTA KARYA CK - 18 dari 19


HARGA SATUAN POKOK KEGIATAN BIDANG CIPTA KARYA
PROVINSI KALIMANTAN UTARA
TAHUN 2023

NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

26 V.26 Pengadaan dan penanaman Taiwan Beuty Polyback 25.909,50 27.059,50 27.059,50 29.428,50 28.278,50 24.828,50 27.048,00 28.198,00 28.198,00 49.243,00 27.128,50 42.228,00 48.150,50 27.071,00 30.521,00

27 V.27 Pengadaan dan penanaman Terang Bulan Polyback 25.909,50 27.059,50 27.059,50 29.428,50 28.278,50 24.828,50 27.048,00 28.198,00 28.198,00 49.243,00 27.128,50 42.228,00 48.150,50 27.071,00 30.521,00

28 V.28 Urugan dengan top soil m3 470.120,00 488.060,00 483.920,00 528.080,00 517.040,00 463.220,00 492.890,00 517.730,00 513.590,00 861.350,00 508.760,00 775.790,00 874.460,00 501.170,00 554.990,00

29 V.29 Pemupukan dengan kompos kg 6.359,50 6.359,50 6.359,50 6.428,50 6.428,50 6.428,50 6.348,00 6.348,00 6.348,00 8.993,00 6.428,50 8.878,00 9.050,50 6.371,00 6.371,00

30 V.30 Pengadaan dan penanaman Rumput Gajah Mini m2 105.259,50 109.859,50 108.709,50 120.278,50 116.828,50 101.878,50 110.998,00 117.898,00 116.748,00 205.643,00 114.528,50 184.828,00 209.150,50 113.321,00 128.271,00

31 V.31 Pengadaan dan penanaman Melati putih Polyback 37.409,50 39.709,50 38.559,50 43.228,50 42.078,50 36.328,50 39.698,00 41.998,00 41.998,00 73.393,00 40.928,50 66.378,00 74.600,50 39.721,00 44.321,00

32 V.32 Pengadaan dan penanaman Bulu domba Polyback 43.159,50 45.459,50 44.309,50 48.978,50 47.828,50 42.078,50 45.448,00 48.898,00 47.748,00 84.893,00 46.678,50 74.428,00 84.950,50 46.621,00 52.371,00

33 V.33 Pengadaan dan penanaman Adam hawa Polyback 39.709,50 42.009,50 40.859,50 45.528,50 44.378,50 38.628,50 41.998,00 44.298,00 44.298,00 77.993,00 43.228,50 69.828,00 79.200,50 43.171,00 48.921,00

34 V.34 Perawatan Tanaman hari 477.250,00 477.250,00 477.250,00 497.950,00 497.950,00 497.950,00 481.850,00 481.850,00 481.850,00 571.550,00 497.950,00 548.550,00 617.550,00 486.450,00 486.450,00

W W PEKERJAAN SALURAN U-DITCH

1 W.1 Saluran U-ditch : 30 x 50 x 8 cm ; L = 60 cm bh 1.150.911,79 1.195.518,11 1.190.015,13 1.476.650,23 1.261.907,21 1.145.094,57 1.245.408,47 1.264.360,23 1.253.434,83 3.199.403,11 1.264.837,20 1.942.727,91 2.190.705,14 1.249.942,24 1.311.999,20

2 W.2 Saluran U-ditch : 40 x 60 x 8 cm ; L = 60 cm bh 1.251.923,12 1.301.117,13 1.294.688,26 1.617.188,30 1.373.490,51 1.242.910,30 1.357.654,86 1.379.782,35 1.366.338,45 3.624.267,69 1.376.921,46 2.148.188,98 2.435.101,41 1.362.680,31 1.431.453,49

3 W.3 Saluran U-ditch : 50 x 80 x 10 cm ; L = 60 cm bh 1.608.523,78 1.674.381,59 1.664.567,25 2.110.067,28 1.767.246,27 1.586.479,50 1.746.893,67 1.779.365,45 1.760.463,13 5.128.840,42 1.768.505,96 2.867.702,89 3.293.085,50 1.754.705,34 1.847.485,70

4 W.4 Saluran U-ditch : 80 x 120 x 10 cm ; L = 80 cm bh 2.515.931,78 2.624.207,86 2.605.816,94 3.358.562,51 2.769.217,47 2.464.107,10 2.740.880,46 2.801.876,44 2.762.286,91 8.910.592,74 2.763.060,97 4.690.770,64 5.462.525,97 2.753.942,95 2.904.700,23

5 W.5 Saluran U-ditch : 100 x 150 x 10 cm ; L = 100 cm bh 3.512.633,80 3.667.795,05 3.639.926,43 4.725.754,18 3.869.692,66 3.428.310,08 3.829.715,52 3.922.348,29 3.859.555,96 13.049.566,35 3.852.255,97 6.686.697,33 7.837.260,85 3.848.490,39 4.061.928,86

6 W.6 Saluran U-ditch : 120 x 160 x 12 cm ; L = 100 cm bh 4.390.122,69 4.587.031,21 4.550.630,99 5.935.472,97 4.838.335,11 4.269.680,53 4.774.973,60 4.890.857,61 4.822.643,85 16.776.693,20 4.809.955,36 8.450.785,84 9.945.926,83 4.802.966,28 5.077.107,80

BIDANG CIPTA KARYA CK - 19 dari 19


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2023
bidang sumber daya air
HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

A. PEKERJAAN TANAH (MANUAL & SEMI MEKANIS) (NORMATIF)


1 A.1 1 m2 pembersihan dan striping/kosrekan m2 10.557,00 10.523,59 10.523,59 10.971,00 10.971,00 10.971,00 10.471,81 10.471,81 10.471,81 12.558,00 10.955,82 11.868,00 12.558,00 10.612,77 10.626,00

1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan ø
2 A.2 m2 13.403,25 13.372,99 13.372,99 14.012,75 13.943,75 13.909,25 13.319,76 13.319,76 13.319,76 16.192,00 13.924,77 15.145,50 16.042,50 13.495,96 13.524,00
< 15 cm

Cabut 1 tunggul pohon tanaman keras ø > 15 cm dan membuang sisa tunggul kayu dan
3 A.3 bh 38.640,00 38.528,63 38.528,63 40.020,00 40.020,00 40.020,00 38.356,03 38.356,03 38.356,03 45.310,00 39.969,39 43.010,00 45.310,00 38.825,89 38.870,00
akarnya

4 A.4 1 m' uitset trase saluran m 6.394,00 6.431,09 6.431,09 6.522,80 6.536,60 6.463,00 6.444,88 6.444,88 6.444,88 7.038,00 6.481,95 6.900,00 7.038,00 6.436,47 6.486,00
5 A.5 Pasang 1 m' profil melintang galian tanah m 46.023,00 47.208,95 47.208,95 49.668,50 49.529,12 51.060,00 56.822,91 60.675,41 49.117,91 67.746,50 47.992,25 65.688,00 67.068,00 53.698,85 50.554,00
6 A.6 Pasang 1 m' bouwplank m 73.945,00 76.212,32 76.212,32 79.534,00 80.868,00 88.527,00 103.749,02 115.249,02 80.749,02 113.275,00 77.185,69 118.657,00 119.876,00 94.783,94 83.559,00
7 A.7 Patok Kayu (Ukuran 5/7) bh 13.453,85 13.236,38 13.227,18 15.557,66 16.643,72 16.642,80 16.823,50 17.922,90 15.843,70 19.360,25 15.826,87 18.893,35 23.408,25 16.795,99 13.626,35
8 A.8 Patok Tetap Bantu (PTB) bh 314.518,91 319.934,62 319.406,70 360.032,47 333.107,00 310.972,55 324.921,14 330.175,34 329.099,88 642.854,32 329.604,62 442.727,22 487.178,35 327.128,13 342.645,21
9 A.9 Patok Tetap Utama (PTU) bh 512.806,95 522.672,24 521.395,16 609.457,02 549.373,81 500.498,05 530.657,82 544.758,72 541.375,70 1.440.046,10 540.607,27 842.025,03 963.822,73 536.225,16 573.570,09
10 A.10 1 m³ galian tanah biasa sedalam ≤ 1 m (Cara Manual) m3 203.946,75 203.633,25 203.633,25 213.658,50 213.658,50 213.658,50 208.974,43 208.974,43 208.974,43 246.031,00 213.516,02 239.556,50 246.031,00 210.297,07 210.421,25
11 A.11 1 m³ galian tanah biasa sedalam > 1 m s.d. 2 m (Cara Manual) m3 118.766,25 118.390,39 118.390,39 123.423,75 123.423,75 123.423,75 117.807,86 117.807,86 117.807,86 141.277,50 123.252,93 133.515,00 141.277,50 119.393,62 119.542,50
12 A.12 1 m³ galian tanah biasa sedalam > 2 m s.d. 3 m (Cara Manual) m3 133.722,00 133.298,81 133.298,81 138.966,00 138.966,00 138.966,00 132.642,92 132.642,92 132.642,92 159.068,00 138.773,67 150.328,00 159.068,00 134.428,37 134.596,00
13 A.13 1 m3 galian tanah biasa > 3 m, untuk setiap penambahan kedalaman 1 m m3 13.196,25 13.154,49 13.154,49 13.713,75 13.713,75 13.713,75 13.089,76 13.089,76 13.089,76 15.697,50 13.694,77 14.835,00 15.697,50 13.265,96 13.282,50
14 A.14 1 m³ galian tanah biasa sedalam ≤ 1 m (Cara Semi Mekanis) m3 50.554,00 51.006,50 51.006,50 56.672,00 53.222,00 51.497,00 51.391,64 51.391,64 51.391,64 72.266,00 53.166,33 60.536,00 64.791,00 51.908,47 52.532,00
15 A.15 1 m³ galian tanah biasa sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 57.592,00 58.022,22 58.022,22 63.986,00 60.536,00 58.811,00 58.372,84 58.372,84 58.372,84 80.638,00 60.470,20 68.448,00 73.163,00 58.983,65 59.616,00
16 A.16 1 m³ galian tanah biasa sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 64.630,00 65.037,95 65.037,95 71.300,00 67.850,00 66.125,00 65.354,05 65.354,05 65.354,05 89.010,00 67.774,08 76.360,00 81.535,00 66.058,83 66.700,00

Kedalaman yang > 3 m menggunakan AHSP A.16) + {AHSP A.13) untuk setiap kedalaman
17 A.17 m3 65.981,25 65.772,44 65.772,44 68.568,75 68.568,75 68.568,75 65.448,81 65.448,81 65.448,81 78.487,50 68.473,85 74.175,00 78.487,50 66.329,79 66.412,50
1m

18 A.18 1 m³ galian tanah berbatu sedalam ≤ 1 m (Cara Manual) m3 237.708,45 236.956,17 236.956,17 247.030,35 247.030,35 247.030,35 235.790,25 235.790,25 235.790,25 282.764,30 246.688,46 267.227,80 282.764,30 238.964,11 239.262,10
19 A.19 1 m³ galian tanah berbatu sedalam > 1 m s.d. 2 m (Cara Manual) m3 263.925,00 263.089,76 263.089,76 274.275,00 274.275,00 274.275,00 261.795,25 261.795,25 261.795,25 313.950,00 273.895,40 296.700,00 313.950,00 265.319,15 265.650,00
20 A.20 1 m³ galian tanah berbatu sedalam > 2 m s.d. 3 m (Cara Manual) m3 290.317,50 289.398,73 289.398,73 301.702,50 301.702,50 301.702,50 287.974,77 287.974,77 287.974,77 345.345,00 301.284,94 326.370,00 345.345,00 291.851,06 292.215,00

21 A.21 1 m³ galian tanah berbatu > 3 m, untuk setiap penambahan kedalaman 1 m (Cara Manual) m3 24.633,00 24.555,04 24.555,04 25.599,00 25.599,00 25.599,00 24.434,22 24.434,22 24.434,22 29.302,00 25.563,57 27.692,00 29.302,00 24.763,12 24.794,00

22 A.22 1 m³ galian tanah berbatu sedalam ≤ 1 m (Cara Semi Mekanis) m3 105.271,00 106.469,06 106.469,06 119.738,00 111.113,00 106.800,50 107.535,47 107.535,47 107.535,47 155.549,00 111.004,18 127.604,00 136.861,50 108.545,65 110.078,00
23 A.23 1 m³ galian tanah berbatu sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 117.587,50 118.746,59 118.746,59 132.537,50 123.912,50 119.600,00 119.752,58 119.752,58 119.752,58 170.200,00 123.785,97 141.450,00 151.512,50 120.927,22 122.475,00
24 A.24 1 m³ galian tanah berbatu sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 117.587,50 118.746,59 118.746,59 132.537,50 123.912,50 119.600,00 119.752,58 119.752,58 119.752,58 170.200,00 123.785,97 141.450,00 151.512,50 120.927,22 122.475,00

Kedalaman yang > 3 m menggunakan AHSP A.24) + {AHSP A.21) untuk setiap kedalaman
25 A.25 m3 112.608,00 112.251,63 112.251,63 117.024,00 117.024,00 117.024,00 111.699,30 111.699,30 111.699,30 133.952,00 116.862,04 126.592,00 133.952,00 113.202,84 113.344,00
1m

26 A.26 1 m³ Galian batu sedalam ≤ 1 m (Cara Manual) m3 594.359,10 592.478,13 592.478,13 617.667,30 617.667,30 617.667,30 589.562,89 589.562,89 589.562,89 707.015,40 616.812,44 668.168,40 707.015,40 597.498,71 598.243,80
27 A.27 1 m³ Galian batu sedalam > 1 m s.d. 2 m (Cara Manual) m3 659.812,50 657.724,39 657.724,39 685.687,50 685.687,50 685.687,50 654.488,12 654.488,12 654.488,12 784.875,00 684.738,50 741.750,00 784.875,00 663.297,86 664.125,00
28 A.28 1 m³ Galian batu sedalam > 2 m s.d. 3 m (Cara Manual) m3 725.793,75 723.496,83 723.496,83 754.256,25 754.256,25 754.256,25 719.936,93 719.936,93 719.936,93 863.362,50 753.212,35 815.925,00 863.362,50 729.627,65 730.537,50

29 A.29 1 m³ Galian batu sedalam > 3 m untuk setiap penambahan kedalaman 1 m (Cara Manual) m3 65.981,25 65.772,44 65.772,44 68.568,75 68.568,75 68.568,75 65.448,81 65.448,81 65.448,81 78.487,50 68.473,85 74.175,00 78.487,50 66.329,79 66.412,50

30 A.30 1 m³ Galian batu sedalam ≤ 1 m (Cara Semi Mekanis) m3 235.175,00 237.493,17 237.493,17 265.075,00 247.825,00 239.200,00 239.505,16 239.505,16 239.505,16 340.400,00 247.571,93 282.900,00 303.025,00 241.854,43 244.950,00
31 A.31 1 m³ Galian batu sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 270.365,00 272.571,80 272.571,80 301.645,00 284.395,00 275.770,00 274.411,20 274.411,20 274.411,20 382.260,00 284.091,32 322.460,00 344.885,00 277.230,32 280.370,00
32 A.32 1 m³ Galian batu sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 291.479,00 293.618,98 293.618,98 323.587,00 306.337,00 297.712,00 295.354,82 295.354,82 295.354,82 407.376,00 306.002,95 346.196,00 370.001,00 298.455,85 301.622,00

BIDANG SUMBER DAYA AIR SDA - 1 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Kedalaman yang > 3 m menggunakan AHSP A.32) + {AHSP A.29) untuk setiap kedalaman
33 A.33 m3 298.235,25 297.291,42 297.291,42 309.930,75 309.930,75 309.930,75 295.828,63 295.828,63 295.828,63 354.763,50 309.501,80 335.271,00 354.763,50 299.810,63 300.184,50
1m

34 A.34 1 m³ Galian tanah cadas atau tanah keras sedalam ≤ 1 m (Cara Manual) m3 219.937,50 219.241,46 219.241,46 228.562,50 228.562,50 228.562,50 218.162,71 218.162,71 218.162,71 261.625,00 228.246,17 247.250,00 261.625,00 221.099,29 221.375,00
35 A.35 1 m³ Galian tanah cadas atau tanah keras sedalam > 1 m s.d. 2 m (Cara Manual) m3 244.922,40 244.147,29 244.147,29 254.527,20 254.527,20 254.527,20 242.945,99 242.945,99 242.945,99 291.345,60 254.174,93 275.337,60 291.345,60 246.216,17 246.523,20
36 A.36 1 m³ Galian tanah cadas / tanah keras sedalam > 2 m s.d. 3 m (Cara Manual) m3 263.925,00 263.089,76 263.089,76 274.275,00 274.275,00 274.275,00 261.795,25 261.795,25 261.795,25 313.950,00 273.895,40 296.700,00 313.950,00 265.319,15 265.650,00

1 m³ Galian tanah cadas / tanah keras sedalam > 3 m untuk setiap penambahan
37 A.37 m3 17.595,00 17.539,32 17.539,32 18.285,00 18.285,00 18.285,00 17.453,02 17.453,02 17.453,02 20.930,00 18.259,69 19.780,00 20.930,00 17.687,94 17.710,00
kedalaman 1 m (Cara Manual)

38 A.38 1 m³ Galian tanah cadas / tanah keras sedalam ≤ 1 m (Cara Semi Mekanis) m3 85.916,50 87.175,81 87.175,81 99.624,50 90.999,50 86.687,00 88.337,15 88.337,15 88.337,15 132.526,00 90.918,52 105.846,00 113.838,50 89.088,92 90.597,00
39 A.39 1 m³ Galian tanah cadas / tanah keras sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 103.511,50 104.715,13 104.715,13 117.909,50 109.284,50 104.972,00 105.790,17 105.790,17 105.790,17 153.456,00 109.178,21 125.626,00 134.768,50 106.776,86 108.307,00
40 A.40 1 m³ Galian tanah cadas / tanah keras sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 117.587,50 118.746,59 118.746,59 132.537,50 123.912,50 119.600,00 119.752,58 119.752,58 119.752,58 170.200,00 123.785,97 141.450,00 151.512,50 120.927,22 122.475,00

Kedalaman yang > 3 m menggunakan AHSP A.40) + {AHSP A.37) untuk setiap kedalaman
41 A.41 m3 105.570,00 105.235,90 105.235,90 109.710,00 109.710,00 109.710,00 104.718,10 104.718,10 104.718,10 125.580,00 109.558,16 118.680,00 125.580,00 106.127,66 106.260,00
1m

42 A.42 1 m³ Galian lumpur sedalam ≤ 1 m (Cara Manual) m3 146.038,50 145.576,33 145.576,33 151.765,50 151.765,50 151.765,50 144.860,04 144.860,04 144.860,04 173.719,00 151.555,45 164.174,00 173.719,00 146.809,93 146.993,00
43 A.43 1 m³ Galian lumpur sedalam > 1 m s.d. 2 m (Cara Manual) m3 175.950,00 175.393,17 175.393,17 182.850,00 182.850,00 182.850,00 174.530,16 174.530,16 174.530,16 209.300,00 182.596,93 197.800,00 209.300,00 176.879,43 177.100,00
44 A.44 1 m³ Galian lumpur sedalam > 2 m s.d. 3 m (Cara Manual) m3 202.342,50 201.702,15 201.702,15 210.277,50 210.277,50 210.277,50 200.709,69 200.709,69 200.709,69 240.695,00 209.986,47 227.470,00 240.695,00 203.411,34 203.665,00

1 m³ Galian lumpur sedalam > 3 m s.d. 3 m untuk setiap penambahan kedalaman 1 m


45 A.45 m3 26.392,50 26.308,98 26.308,98 27.427,50 27.427,50 27.427,50 26.179,52 26.179,52 26.179,52 31.395,00 27.389,54 29.670,00 31.395,00 26.531,91 26.565,00
(Cara Manual)

46 A.46 1 m³ Galian lumpur sedalam ≤ 1 m (Cara Semi Mekanis) m3 79.488,00 80.389,36 80.389,36 89.424,00 83.214,00 80.109,00 81.217,24 81.217,24 81.217,24 113.367,00 83.153,26 94.047,00 99.912,00 81.781,06 82.869,00
47 A.47 1 m³ Galian lumpur sedalam > 1 m s.d. 2 m (Cara Semi Mekanis) m3 92.218,50 93.310,16 93.310,16 104.017,50 96.565,50 92.839,50 94.319,14 94.319,14 94.319,14 132.273,00 96.497,17 109.296,00 116.127,00 94.953,45 96.255,00
48 A.48 1 m³ Galian lumpur sedalam > 2 m s.d. 3 m (Cara Semi Mekanis) m3 106.553,25 107.906,99 107.906,99 120.732,75 111.624,75 107.070,75 109.170,40 109.170,40 109.170,40 154.341,50 111.550,10 126.661,00 134.607,50 109.863,43 111.446,50

49 A.49 1 m³ Galian lumpur > 3 m untuk setiap penambahan kedalaman 1 m (Cara Semi Mekanis) m3 13.455,00 13.719,86 13.719,86 15.801,00 14.145,00 13.317,00 13.978,60 13.978,60 13.978,60 21.022,00 14.139,94 16.376,00 17.434,00 14.025,59 14.306,00

50 A.50 1 m³ Galian pasir sedalam ≤ 1 m' (Cara Manual) m3 116.127,00 115.759,49 115.759,49 120.681,00 120.681,00 120.681,00 115.189,91 115.189,91 115.189,91 138.138,00 120.513,98 130.548,00 138.138,00 116.740,42 116.886,00
51 A.51 1 m³ Galian pasir sedalam > 1 m s.d. 2 m' (Cara Manual) m3 140.760,00 140.314,54 140.314,54 146.280,00 146.280,00 146.280,00 139.624,13 139.624,13 139.624,13 167.440,00 146.077,55 158.240,00 167.440,00 141.503,54 141.680,00
52 A.52 1 m³ Galian pasir untuk pondasi sedalam > 2 m s.d. 3 m' (Cara Manual) m3 161.874,00 161.361,72 161.361,72 168.222,00 168.222,00 168.222,00 160.567,75 160.567,75 160.567,75 192.556,00 167.989,18 181.976,00 192.556,00 162.729,08 162.932,00

1 m³ Galian pasir kedalaman > 3 m untuk setiap penambahan kedalaman 1 m (Cara


53 A.53 m3 17.595,00 17.539,32 17.539,32 18.285,00 18.285,00 18.285,00 17.453,02 17.453,02 17.453,02 20.930,00 18.259,69 19.780,00 20.930,00 17.687,94 17.710,00
Manual)

54 A.54 1 m³ Galian pasir sedalam ≤ 1 m' (Cara Semi Menaknis) m3 79.407,50 80.533,29 80.533,29 91.252,50 83.662,50 79.867,50 81.582,54 81.582,54 81.582,54 119.370,00 83.599,23 96.255,00 102.925,00 82.169,86 83.490,00
55 A.55 1 m³ Galian pasir sedalam > 1 m s.d. 2 m' (Cara Semi Menaknis) m3 94.926,75 96.504,19 96.504,19 110.555,25 100.205,25 95.030,25 98.000,49 98.000,49 98.000,49 146.889,50 100.138,19 116.242,00 124.464,50 98.623,05 100.406,50
56 A.55b 1 m³ Galian pasir sedalam > 2 m s.d. 3 m' (Cara Semi Menaknis) m3 107.226,00 109.140,09 109.140,09 125.718,00 113.298,00 107.088,00 110.968,45 110.968,45 110.968,45 168.314,00 113.227,14 131.974,00 141.404,00 111.626,24 113.758,00

1 m³ Galian pasir sedalam > 3 m' untuk setiap penambahan kedalaman 1 m (Cara Semi
56 A.56 m3 10.367,25 10.634,90 10.634,90 12.678,75 11.022,75 10.194,75 10.897,95 10.897,95 10.897,95 17.767,50 11.018,95 13.179,00 14.179,50 10.933,19 11.212,50
Menaknis)

57 A.57 (K3) 1 m² Pasangan papan 3/20, JAT ≥ 1,5 m' m2 360.496,25 338.505,83 338.505,83 445.970,00 505.844,75 527.476,25 526.923,25 582.295,75 471.550,75 579.508,00 472.614,92 587.535,00 809.830,00 526.981,99 350.830,50
58 A.58 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m, tebal 8 cm, JAT 4,0 m' m2 268.272,00 278.679,11 278.679,11 361.410,50 310.166,50 276.874,00 311.036,07 317.706,07 304.366,07 548.044,00 306.153,87 392.679,00 449.132,50 311.134,74 301.012,50
59 A.59 Kayu Bengkirai Ukuran 10 cm x 10 cm x 4 m, tebal 12 cm, JAT ≤ 6,0 m' m2 397.722,90 413.236,38 413.236,38 536.679,70 460.400,20 410.754,70 461.747,37 471.752,37 451.742,37 815.055,60 454.381,51 583.583,60 667.959,10 461.893,02 446.577,20
60 A.60 1 m³ Timbunan tanah atau urugan tanah kembali m3 58.063,50 57.879,75 57.879,75 60.340,50 60.340,50 60.340,50 57.594,95 57.594,95 57.594,95 69.069,00 60.256,99 65.274,00 69.069,00 58.370,21 58.443,00
61 A.61 1 m³ Pemadatan Tanah m3 99.475,00 99.196,59 99.196,59 102.925,00 102.925,00 102.925,00 98.765,08 98.765,08 98.765,08 116.150,00 102.798,47 110.400,00 116.150,00 99.939,72 100.050,00
62 A.62 1 m³ Timbunan pasir sebagai bahan pengisi m3 288.880,00 299.697,27 296.937,27 323.380,00 316.480,00 286.120,00 303.492,07 317.292,07 314.532,07 582.360,00 312.238,77 450.800,00 505.080,00 308.571,77 340.400,00
63 A.63 1 m³ Pemadatan pasir sebagai bahan pengisi m3 40.595,00 40.539,32 40.539,32 41.285,00 41.285,00 41.285,00 40.453,02 40.453,02 40.453,02 43.930,00 41.259,69 42.780,00 43.930,00 40.687,94 40.710,00
64 A.64 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 5 m m3 64.068,80 63.930,71 63.930,71 65.637,40 65.637,40 65.637,40 63.574,08 63.574,08 63.574,08 71.769,20 65.574,64 68.917,20 71.769,20 64.156,70 64.211,40

BIDANG SUMBER DAYA AIR SDA - 2 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

65 A.65 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 10 m m3 45.043,20 44.891,74 44.891,74 46.763,60 46.763,60 46.763,60 44.500,60 44.500,60 44.500,60 53.488,80 46.694,77 50.360,80 53.488,80 45.139,60 45.199,60
66 A.66 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 20 m m3 52.164,00 51.988,60 51.988,60 54.156,38 54.156,38 54.156,38 51.535,63 51.535,63 51.535,63 61.944,75 54.076,66 58.322,25 61.944,75 52.275,65 52.345,13
67 A.67 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 30 m m3 58.953,60 58.755,37 58.755,37 61.205,30 61.205,30 61.205,30 58.243,44 58.243,44 58.243,44 70.007,40 61.115,21 65.913,40 70.007,40 59.079,78 59.158,30
68 A.68 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 50 m m3 69.883,20 69.648,22 69.648,22 72.552,35 72.552,35 72.552,35 69.041,38 69.041,38 69.041,38 82.986,30 72.445,56 78.133,30 82.986,30 70.032,77 70.125,85
69 A.69 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 100 m m3 99.360,00 99.025,90 99.025,90 103.155,00 103.155,00 103.155,00 98.163,10 98.163,10 98.163,10 117.990,00 103.003,16 111.090,00 117.990,00 99.572,66 99.705,00
70 A.70 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 200 m m3 157.320,00 156.791,01 156.791,01 163.328,75 163.328,75 163.328,75 155.424,91 155.424,91 155.424,91 186.817,50 163.088,34 175.892,50 186.817,50 157.656,71 157.866,25
71 A.71 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 300 m m3 215.280,00 214.556,12 214.556,12 223.502,50 223.502,50 223.502,50 212.686,71 212.686,71 212.686,71 255.645,00 223.173,51 240.695,00 255.645,00 215.740,76 216.027,50
72 A.72 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 400 m m3 273.240,00 272.321,23 272.321,23 283.676,25 283.676,25 283.676,25 269.948,52 269.948,52 269.948,52 324.472,50 283.258,69 305.497,50 324.472,50 273.824,81 274.188,75
73 A.73 Mengangkut 1 m³ material atau hasil galian dengan jarak angkut 500 m m3 322.920,00 321.834,18 321.834,18 335.253,75 335.253,75 335.253,75 319.030,07 319.030,07 319.030,07 383.467,50 334.760,27 361.042,50 383.467,50 323.611,14 324.041,25

Mengangkut 1 m³ material atau hasil galian dengan jarak angkut > 500 m untuk setiap
74 A.74 m3 58.291,20 58.095,20 58.095,20 60.517,60 60.517,60 60.517,60 57.589,02 57.589,02 57.589,02 69.220,80 60.428,52 65.172,80 69.220,80 58.415,96 58.493,60
penambahan jarak angkut 100 m

75 A.75 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi 1 m m3 248.400,00 247.564,76 247.564,76 257.887,50 257.887,50 257.887,50 245.407,75 245.407,75 245.407,75 294.975,00 257.507,90 277.725,00 294.975,00 248.931,65 249.262,50

76 A.76 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 1 m s.d. 2 m m3 34.776,00 34.659,07 34.659,07 36.104,25 36.104,25 36.104,25 34.357,08 34.357,08 34.357,08 41.296,50 36.051,11 38.881,50 41.296,50 34.850,43 34.896,75

77 A.77 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 2 m s.d. 3 m m3 45.904,32 45.749,97 45.749,97 47.657,61 47.657,61 47.657,61 45.351,35 45.351,35 45.351,35 54.511,38 47.587,46 51.323,58 54.511,38 46.002,57 46.063,71

78 A.78 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 3 m s.d. 4 m m3 57.380,40 57.187,46 57.187,46 59.572,01 59.572,01 59.572,01 56.689,19 56.689,19 56.689,19 68.139,23 59.484,32 64.154,48 68.139,23 57.503,21 57.579,64

79 A.79 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 4 m s.d. 5 m m3 68.276,88 68.047,30 68.047,30 70.884,68 70.884,68 70.884,68 67.454,41 67.454,41 67.454,41 81.078,80 70.780,34 76.337,35 81.078,80 68.423,01 68.513,95

80 A.80 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 5 m s.d. 6 m m3 77.848,56 77.586,79 77.586,79 80.821,94 80.821,94 80.821,94 76.910,79 76.910,79 76.910,79 92.445,17 80.702,98 87.039,02 92.445,17 78.015,18 78.118,87

81 A.81 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 6 m s.d. 7 m m3 85.631,76 85.343,82 85.343,82 88.902,42 88.902,42 88.902,42 84.600,23 84.600,23 84.600,23 101.687,72 88.771,56 95.741,07 101.687,72 85.815,04 85.929,09

82 A.82 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 7 m s.d. 8 m m3 91.626,48 91.318,39 91.318,39 95.126,10 95.126,10 95.126,10 90.522,74 90.522,74 90.522,74 108.806,45 94.986,08 102.443,50 108.806,45 91.822,59 91.944,63

83 A.83 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 8 m s.d. 9 m m3 96.197,04 95.873,58 95.873,58 99.871,23 99.871,23 99.871,23 95.038,24 95.038,24 95.038,24 114.233,99 99.724,23 107.553,64 114.233,99 96.402,93 96.531,06

84 A.84 Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 9 m s.d. 10 m m3 100.055,52 99.719,08 99.719,08 103.877,09 103.877,09 103.877,09 98.850,24 98.850,24 98.850,24 118.815,93 103.724,18 111.867,63 118.815,93 100.269,67 100.402,94

Menurunkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 10 m untuk setiap
85 A.85 m3 2.484,00 2.475,65 2.475,65 2.578,88 2.578,88 2.578,88 2.454,08 2.454,08 2.454,08 2.949,75 2.575,08 2.777,25 2.949,75 2.489,32 2.492,63
penambahan 1 m

86 A.86 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi 1 m m3 49.680,00 49.512,95 49.512,95 51.577,50 51.577,50 51.577,50 49.081,55 49.081,55 49.081,55 58.995,00 51.501,58 55.545,00 58.995,00 49.786,33 49.852,50

87 A.87 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 1 m s.d. 2 m m3 72.681,84 72.437,45 72.437,45 75.457,88 75.457,88 75.457,88 71.806,31 71.806,31 71.806,31 86.309,69 75.346,81 81.262,34 86.309,69 72.837,40 72.934,21

88 A.88 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 2 m s.d. 3 m m3 100.022,40 99.686,07 99.686,07 103.842,70 103.842,70 103.842,70 98.817,52 98.817,52 98.817,52 118.776,60 103.689,85 111.830,60 118.776,60 100.236,48 100.369,70

89 A.89 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 3 m s.d. 4 m m3 130.824,00 130.384,10 130.384,10 135.820,75 135.820,75 135.820,75 129.248,08 129.248,08 129.248,08 155.353,50 135.620,83 146.268,50 155.353,50 131.104,00 131.278,25

90 A.90 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 4 m s.d. 5 m m3 162.453,60 161.907,35 161.907,35 168.658,43 168.658,43 168.658,43 160.496,67 160.496,67 160.496,67 192.913,65 168.410,17 181.632,15 192.913,65 162.801,30 163.017,68

BIDANG SUMBER DAYA AIR SDA - 3 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

91 A.91 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 5 m s.d. 6 m m3 193.752,00 193.100,51 193.100,51 201.152,25 201.152,25 201.152,25 191.418,04 191.418,04 191.418,04 230.080,50 200.856,16 216.625,50 230.080,50 194.166,68 194.424,75

92 A.92 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 6 m s.d. 7 m m3 222.566,40 221.818,02 221.818,02 231.067,20 231.067,20 231.067,20 219.885,34 219.885,34 219.885,34 264.297,60 230.727,08 248.841,60 264.297,60 223.042,75 223.339,20

93 A.93 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 7 m s.d. 8 m m3 249.228,00 248.389,97 248.389,97 258.747,13 258.747,13 258.747,13 246.225,77 246.225,77 246.225,77 295.958,25 258.366,26 278.650,75 295.958,25 249.761,42 250.093,38

94 A.94 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 8 m s.d. 9 m m3 273.240,00 272.321,23 272.321,23 283.676,25 283.676,25 283.676,25 269.948,52 269.948,52 269.948,52 324.472,50 283.258,69 305.497,50 324.472,50 273.824,81 274.188,75

95 A.95 Menaikkan 1 m³ material atau hasil galian tanah sampai beda tinggi > 9 m s.d. 10 m m3 297.086,40 296.087,45 296.087,45 308.433,45 308.433,45 308.433,45 293.507,66 293.507,66 293.507,66 352.790,10 307.979,45 332.159,10 352.790,10 297.722,25 298.117,95

Menaikkan 1 m³ material atau hasil galian tanah dengan beda tinggi > 10 m untuk setiap
96 A.96 m3 8.280,00 8.252,16 8.252,16 8.596,25 8.596,25 8.596,25 8.180,26 8.180,26 8.180,26 9.832,50 8.583,60 9.257,50 9.832,50 8.297,72 8.308,75
penambahan 1 m

97 A.97 Pekerjaan 1 m3 Galian Tanah di Situ / Waduk m3 207.333,66 207.176,92 207.176,92 209.275,87 209.275,87 209.275,87 206.934,00 206.934,00 206.934,00 216.721,03 209.204,64 213.484,01 216.721,03 207.595,27 207.657,36
98 A.98 Pekerjaan 1 m3 Galian Tanah Sungai Menggunakan Excavator 80-140 Hp m3 47.049,31 46.958,98 46.958,98 48.168,64 48.168,64 48.168,64 46.818,98 46.818,98 46.818,98 52.459,42 48.127,59 50.593,87 52.459,42 47.200,09 47.235,87

Pekerjaan 1 m3 Pengangkutan Galian Tanah Sungai Dari Excavator 80-140 Hp Sejauh 3


99 A.99 m3 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63 42.912,63
Km

Pekerjaan 1 m3 Perataan dan Perapihan Lokasi Buangan Tanah Sungai Menggunakan


100 A.100 m3 39.678,64 39.598,13 39.598,13 40.676,33 40.676,33 40.676,33 39.473,35 39.473,35 39.473,35 44.500,77 40.639,73 42.837,97 44.500,77 39.813,03 39.844,92
Bulldozer 100-150 Hp

Pekerjaan Pengangkutan 1 m3 Hasil Galian dari Borrow Area (A) Menggunakan Dump
101 A.101 m3 39.568,43 39.487,14 39.487,14 40.575,83 40.575,83 40.575,83 39.361,14 39.361,14 39.361,14 44.437,53 40.538,89 42.758,53 44.437,53 39.704,13 39.736,33
Truck

Pekerjaan Pengangkutan 1 m3 Hasil Galian Menuju Stockpile (B) Menggunakan Dump


102 A.102 m3 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24 7.804,24
Truck Sejauh 3 Km

103 A.103 Pekerjaan Muat 1 m3 Hasil Galian Di Stockpile (B) Ke Dalam Tongkang m3 43.964,93 43.874,60 43.874,60 45.084,26 45.084,26 45.084,26 43.734,60 43.734,60 43.734,60 49.375,04 45.043,21 47.509,48 49.375,04 44.115,70 44.151,48

Pekerjaan Pengangkutan Dengan Tongkang 1 m3 Hasil Galian Dari Stockpile (B) Ke Stock
104 A.104 m3 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10 11.448,10
Pile (C), Jarak angkut 20 Km

105 A.105 Pekerjaan Muat 1 m3 Hasil Galian Di Stockpile (C) Ke Dalam Perahu m3 68.257,29 68.177,63 68.177,63 69.244,38 69.244,38 69.244,38 68.054,18 68.054,18 68.054,18 73.028,19 69.208,17 71.383,06 73.028,19 68.390,25 68.421,81

Pekerjaan Pengangkutan Dengan Tongkang 1 m3 Hasil Galian Dari Stockpile (C) Ke Stock
106 A.106 m3 372.699,67 371.656,54 371.656,54 385.625,67 385.625,67 385.625,67 370.039,84 370.039,84 370.039,84 435.175,33 385.151,59 413.632,00 435.175,33 374.440,80 374.854,00
Pile (D) Lokasi Pekerjaan, Jarak angkut 2 Km

107 A.107 Galian Tanah Kedalaman 0 - 2 meter m3 44.241,31 44.150,37 44.150,37 45.367,73 45.367,73 45.367,73 44.009,10 44.009,10 44.009,10 49.685,98 45.326,40 47.808,03 49.685,98 44.392,74 44.428,76
108 A.108 Galian Tanah Kedalaman 2 - 4 meter m3 44.868,75 44.777,81 44.777,81 45.995,17 45.995,17 45.995,17 44.636,54 44.636,54 44.636,54 50.313,42 45.953,84 48.435,47 50.313,42 45.020,18 45.056,20
109 A.109 Galian Tanah Kedalaman > 4 meter m3 51.143,15 51.052,21 51.052,21 52.269,57 52.269,57 52.269,57 50.910,94 50.910,94 50.910,94 56.587,82 52.228,24 54.709,87 56.587,82 51.294,58 51.330,60
110 A.110 Pemadatan Tanah di Lokasi Pekerjaan m3 52.820,08 52.729,14 52.729,14 53.946,50 53.946,50 53.946,50 52.587,87 52.587,87 52.587,87 58.264,75 53.905,17 56.386,80 58.264,75 52.971,51 53.007,53

B. PEKERJAAN PASANGAN

1 B.1 Mortar tipe M (setara campuran 1 PC : 2 PP) Secara Manual m3 1.937.865,00 1.943.169,56 1.936.637,56 2.364.883,00 2.082.213,00 1.927.561,00 1.997.557,44 2.107.497,44 2.070.605,44 10.660.408,00 2.080.011,72 4.666.746,00 5.746.872,00 2.048.198,46 2.261.636,00
2 B.2 Mortar tipe M (setara campuran 1 PC : 2 PP) Menggunakan Molen/Beton Mixer m3 1.789.124,00 1.794.929,71 1.788.397,71 2.209.932,00 1.927.262,00 1.772.610,00 1.850.094,30 1.960.034,30 1.923.142,30 10.481.652,00 1.925.288,48 4.498.340,00 5.568.116,00 1.898.620,97 2.111.860,00
3 B.3 Mortar tipe S (setara campuran 1 PC : 3 PP) Secara Manual m3 1.830.627,50 1.842.096,06 1.835.460,56 2.201.335,75 1.970.157,00 1.831.616,50 1.896.639,19 1.995.596,69 1.964.351,19 9.068.675,75 1.973.550,47 4.162.752,75 5.072.241,75 1.941.685,46 2.139.063,25
4 B.4 Mortar tipe S (setara campuran 1 PC : 3 PP) Menggunakan Molen/Beton Mixer m3 1.681.886,50 1.693.856,21 1.687.220,71 2.046.384,75 1.815.206,00 1.676.665,50 1.749.176,05 1.848.133,55 1.816.888,05 8.889.919,75 1.818.827,23 3.994.346,75 4.893.485,75 1.792.107,97 1.989.287,25
5 B.5 Mortar Tipe N (setara campuran 1 PC : 4 PP) Secara Manual m3 1.746.965,00 1.763.240,56 1.756.524,56 2.073.749,00 1.882.734,00 1.756.763,00 1.817.904,44 1.908.294,44 1.881.453,44 7.827.084,00 1.890.491,72 3.769.608,00 4.545.996,00 1.858.586,46 2.043.435,00
6 B.6 Mortar Tipe N (setara campuran 1 PC : 4 PP) Menggunakan Molen/Beton Mixer m3 1.598.224,00 1.615.000,71 1.608.284,71 1.918.798,00 1.727.783,00 1.601.812,00 1.670.441,30 1.760.831,30 1.733.990,30 7.648.328,00 1.735.768,48 3.601.202,00 4.367.240,00 1.709.008,97 1.893.659,00
7 B.7 Mortar Tipe O (setara campuran 1 PC:5 PP) Secara Manual m3 1.686.705,00 1.706.421,36 1.699.650,16 1.981.923,80 1.819.750,80 1.702.832,60 1.761.168,04 1.845.394,04 1.821.717,84 6.935.226,80 1.830.645,72 3.487.011,60 4.167.793,20 1.798.712,86 1.974.536,20

BIDANG SUMBER DAYA AIR SDA - 4 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

8 B.8 Mortar Tipe O (setara campuran 1 PC:5 PP) Menggunakan Molen/Beton Mixer m3 1.537.964,00 1.558.181,51 1.551.410,31 1.826.972,80 1.664.799,80 1.547.881,60 1.613.704,90 1.697.930,90 1.674.254,70 6.756.470,80 1.675.922,48 3.318.605,60 3.989.037,20 1.649.135,37 1.824.760,20
9 B.9 Bongkar 1 m³ pasangan batu dan pembersihan batu (manual) m3 250.608,00 250.260,84 250.214,84 261.201,80 261.031,60 260.051,80 249.089,43 249.337,83 249.305,63 300.669,80 260.461,11 282.711,40 299.179,40 252.410,60 252.811,40
10 B.10 Bongkar 1 m³ pasangan batu (manual) m3 214.923,50 214.637,10 214.596,85 224.030,35 223.879,70 223.012,60 213.634,85 213.855,65 213.825,75 258.191,10 223.385,12 242.554,55 256.705,30 216.483,87 216.829,05
11 B.11 Bongkar 1 m³ pasangan batu dengan jack hammer m3 108.215,00 107.880,90 107.880,90 112.355,00 112.355,00 112.355,00 107.363,10 107.363,10 107.363,10 128.225,00 112.203,16 121.325,00 128.225,00 108.772,66 108.905,00
12 B.12 Pembersihan 1 m³ bongkaran pasangan batu untuk pemanfaatan kembali material batu m3 35.684,50 35.623,73 35.617,98 37.171,45 37.151,90 37.039,20 35.454,58 35.482,18 35.479,88 42.478,70 37.075,99 40.156,85 42.474,10 35.926,74 35.982,35
13 B.13 Mortar tipe M (setara campuran 1 PC: 2 PP) Secara Manual m3 1.965.005,00 1.946.579,61 1.945.820,61 2.492.843,50 2.079.821,00 1.896.097,00 1.945.646,89 2.047.191,89 2.026.307,89 8.272.283,50 2.000.450,14 4.386.019,50 5.031.031,50 1.972.548,63 2.170.981,50
14 B.14 Mortar tipe M (setara campuran 1 PC: 2 PP) Menggunakan Molen/Beton Mixer m3 1.819.300,00 1.801.375,76 1.800.616,76 2.340.928,50 1.927.906,00 1.744.182,00 1.801.219,75 1.902.764,75 1.881.880,75 8.096.563,50 1.848.762,90 4.220.649,50 4.855.311,50 1.826.007,15 2.024.241,50
15 B.15 Mortar tipe S (setara campuran 1 PC : 3 PP) Secara Manual m3 1.868.692,50 1.855.350,11 1.854.556,61 2.347.477,75 1.978.874,00 1.809.605,50 1.854.469,14 1.946.296,64 1.930.323,14 6.893.772,75 1.904.396,39 3.945.471,75 4.442.754,75 1.876.477,63 2.060.472,25
16 B.16 Mortar tipe S (setara campuran 1 PC : 3 PP) Menggunakan Molen/Beton Mixer m3 1.723.850,00 1.711.054,76 1.710.249,76 2.196.557,50 1.827.925,00 1.658.530,00 1.710.967,75 1.802.852,75 1.786.867,75 6.720.082,50 1.753.657,90 3.781.602,50 4.268.742,50 1.730.879,15 1.914.807,50
17 B.17 Mortar tipe N (setara campuran 1 PC : 4 PP) Secara Manual m3 1.814.355,00 1.804.175,11 1.803.324,11 2.264.476,50 1.922.121,50 1.761.018,00 1.803.380,39 1.889.630,39 1.876.531,89 6.082.821,50 1.850.490,14 3.689.050,50 4.099.393,50 1.822.542,63 1.998.401,00
18 B.18 Mortar tipe N (setara campuran 1 PC : 4 PP) Menggunakan Molen/Beton Mixer m3 1.668.650,00 1.658.971,26 1.658.120,26 2.112.561,50 1.770.206,50 1.609.103,00 1.658.953,25 1.745.203,25 1.732.104,75 5.907.101,50 1.698.802,90 3.523.680,50 3.923.673,50 1.676.001,15 1.851.661,00
19 B.19 Mortar tipe O (setara campuran 1 PC : 5 PP) Secara Manual m3 1.781.005,00 1.773.205,61 1.772.262,61 2.212.059,50 1.887.587,00 1.731.509,00 1.772.548,89 1.855.233,89 1.844.055,89 5.535.559,50 1.817.830,14 3.519.931,50 3.871.555,50 1.789.836,63 1.960.715,50
20 B.20 Mortar tipe O (setara campuran 1 PC : 5 PP) Menggunakan Molen/Beton Mixer m3 1.635.300,00 1.628.001,76 1.627.058,76 2.060.144,50 1.735.672,00 1.579.594,00 1.628.121,75 1.710.806,75 1.699.628,75 5.359.839,50 1.666.142,90 3.354.561,50 3.695.835,50 1.643.295,15 1.813.975,50
21 B.21 Mortar Campuran (setara campuran 1 PC : 6 PP) Secara Manual m3 1.762.605,00 1.757.151,61 1.756.024,61 2.179.675,50 1.869.233,00 1.715.961,00 1.756.770,89 1.837.155,89 1.827.403,89 5.117.235,50 1.800.810,14 3.399.043,50 3.705.679,50 1.772.724,63 1.940.889,50
22 B.22 Mortar Campuran (setara campuran 1 PC : 6 PP) Menggunakan Molen/Beton Mixer m3 1.616.900,00 1.611.947,76 1.610.820,76 2.027.760,50 1.717.318,00 1.564.046,00 1.612.343,75 1.692.728,75 1.682.976,75 4.941.515,50 1.649.122,90 3.233.673,50 3.529.959,50 1.626.183,15 1.794.149,50
23 B.23 Bongkar 1 m³ pasangan Batu Bata 8 x 8 x 16 Sacara Manual m3 106.869,50 106.666,50 106.652,70 111.293,55 111.241,80 110.943,95 106.160,20 106.236,10 106.225,75 128.009,95 111.024,41 120.468,25 127.490,15 107.580,11 107.740,05
24 B.24 Bongkar 1 m³ pasangan Batu Bata 8 x 8 x 16 dengan jack hammer m3 36.248,00 36.136,63 36.136,63 37.628,00 37.628,00 37.628,00 35.964,03 35.964,03 35.964,03 42.918,00 37.577,39 40.618,00 42.918,00 36.433,89 36.478,00
25 B.25 Siaran dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 99.969,50 99.183,75 99.156,15 111.545,40 104.742,00 102.251,10 98.966,25 100.562,45 99.805,75 309.931,90 104.068,08 166.683,30 192.503,10 100.441,53 104.909,90
26 B.26 Siaran dengan Mortar tipe S (setara campuran 1 PC : 3 PP) m2 97.554,50 96.996,45 96.955,05 107.564,10 102.278,70 100.153,50 96.799,65 98.119,85 97.521,85 264.067,60 101.756,58 152.959,20 173.852,40 98.123,13 102.232,70
27 B.27 Trasraam Tebal 1 cm, dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 102.384,50 101.513,65 101.481,45 115.048,30 107.301,90 104.449,90 101.303,05 103.129,25 102.264,45 339.723,80 106.517,58 176.598,60 205.606,20 102.888,73 107.720,50
28 B.28 Plesteran tebal 1 cm, dengan Mortar tipe N (setara campuran 1 PC : 4 PP) m2 96.657,50 96.144,30 96.102,90 106.218,60 101.336,85 99.346,20 95.947,50 97.178,00 96.624,85 251.509,60 100.859,58 148.922,70 168.470,40 97.226,13 101.201,15
29 B.29 Trasraam tebal 1,5 cm, dengan Mortar tipe M (setara campuran 1 PC : 2 PP) m2 129.556,70 128.351,12 128.305,12 146.696,30 135.780,96 131.747,68 127.865,62 130.447,14 129.225,38 461.543,30 134.657,52 231.616,90 272.133,70 130.012,50 136.579,98
30 B.30 Plesteran tebal 1,5 cm, dengan Mortar tipe S (setara campuran 1 PC : 3 PP) m2 125.651,30 124.819,24 124.750,24 140.240,20 131.801,04 128.359,32 124.368,24 126.501,72 125.538,48 386.777,20 130.924,62 209.281,60 241.766,80 126.268,10 132.255,52
31 B.31 Plesteran tebal 1,5 cm, dengan Mortar tipe N (setara campuran 1 PC : 4 PP) m2 121.175,50 120.460,28 120.405,08 133.885,30 127.029,00 124.255,20 119.988,58 121.708,98 120.931,58 336.170,30 126.345,32 191.997,10 219.072,70 121.695,70 127.008,30
32 B.32 1 m² Pekerjaan Acian m2 61.260,50 60.775,38 60.775,38 67.539,50 64.164,25 63.043,00 60.602,78 61.350,28 60.976,53 169.751,50 63.751,39 96.439,00 109.951,50 61.446,39 63.773,25
33 B.33 1 m³ Pasangan Batu Kosong m3 984.009,00 1.018.669,77 1.012.156,17 1.103.770,00 1.081.887,80 1.015.371,80 1.074.000,36 1.124.894,76 1.117.497,96 2.082.682,20 1.109.202,53 1.622.075,00 1.810.435,80 1.091.143,23 1.211.538,80
Bentuk I, Tipe A bronjong kawat ukuran L=2,0 m x B=1,0 m x T=1,0 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
34 B.34 bh 2.467.008,75 2.559.472,89 2.547.512,89 2.773.248,00 2.731.388,00 2.508.932,00 2.677.106,67 2.828.699,67 2.813.749,67 5.258.559,00 2.768.633,24 3.944.787,50 4.395.794,50 2.737.341,25 3.069.125,75
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
35 B.35 bh 2.494.643,25 2.587.824,09 2.575.864,09 2.803.585,00 2.761.725,00 2.536.302,00 2.705.413,28 2.858.489,78 2.843.539,78 5.306.905,00 2.798.217,10 3.980.748,00 4.434.497,75 2.766.495,32 3.101.429,25
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, dan kawat pengikat ø 2,0 mm, lubang kotak 100 x
36 B.36 bh 3.355.556,25 3.466.241,49 3.454.281,49 3.955.195,00 3.650.100,00 3.395.892,50 3.630.803,28 3.732.463,28 3.717.513,28 6.696.105,00 3.712.000,47 5.065.692,50 5.587.562,50 3.668.960,95 3.949.738,25
100 mm;

Bentuk I, Tipe B bronjong kawat ukuran L=3,0 m x B=1,0 m x T=1,0 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
37 B.37 bh 4.569.587,10 4.712.930,08 4.693.610,08 5.081.238,20 5.013.618,20 4.671.341,40 4.900.227,12 5.136.570,52 5.112.420,52 9.109.453,60 5.077.255,52 7.019.296,40 7.771.251,50 5.000.657,80 5.528.282,30
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
38 B.38 bh 3.688.007,45 3.826.406,84 3.808.466,84 4.146.193,90 4.083.403,90 3.750.957,30 4.002.874,06 4.229.644,86 4.207.219,86 7.866.492,20 4.139.586,81 5.901.043,30 6.576.367,00 4.092.863,71 4.589.211,85
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100
39 B.39 bh 4.819.995,00 4.983.675,17 4.965.735,17 5.691.867,50 5.248.887,50 4.874.907,50 5.222.038,84 5.374.528,84 5.352.103,84 9.736.590,00 5.341.781,86 7.332.055,00 8.105.545,00 5.278.870,09 5.696.893,00
mm;

BIDANG SUMBER DAYA AIR SDA - 5 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Bentuk I, Tipe C bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 1,0 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
40 B.40 bh 4.915.586,45 5.102.500,30 5.078.580,30 5.530.920,40 5.447.200,40 4.994.969,80 5.337.998,00 5.644.843,30 5.614.943,30 10.532.284,20 5.519.932,09 7.878.686,80 8.782.969,75 5.459.639,00 6.129.774,85
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
41 B.41 bh 4.863.569,65 5.047.243,28 5.023.323,28 5.470.299,30 5.386.579,30 4.947.109,10 5.282.663,32 5.583.128,42 5.553.228,42 10.404.896,40 5.462.478,32 7.801.305,60 8.697.053,25 5.401.325,65 6.059.065,95
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100
42 B.42 bh 6.363.640,00 6.580.364,24 6.556.444,24 7.512.490,00 6.931.280,00 6.437.355,00 6.896.697,10 7.100.017,10 7.070.117,10 12.874.940,00 7.055.164,45 9.695.190,00 10.720.645,00 6.972.237,18 7.527.624,00
mm;

Bentuk I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x T= 0,5 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
43 B.43 bh 1.453.617,25 1.504.551,49 1.498.571,49 1.626.583,00 1.605.653,00 1.474.898,00 1.564.829,44 1.650.389,44 1.642.914,44 2.994.094,00 1.619.312,26 2.255.391,50 2.499.249,00 1.600.586,11 1.787.312,75
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
44 B.44 bh 1.473.285,70 1.524.721,89 1.518.741,89 1.648.163,90 1.627.233,90 1.494.404,30 1.585.008,45 1.671.605,75 1.664.130,75 3.028.327,20 1.640.366,92 2.280.981,30 2.526.739,75 1.621.354,25 1.810.277,10
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100
45 B.45 bh 1.985.020,75 2.048.631,76 2.042.651,76 2.357.247,00 2.153.260,00 2.000.436,50 2.136.957,78 2.187.787,78 2.180.312,78 3.888.058,00 2.184.071,68 2.929.383,50 3.222.334,50 2.157.322,84 2.308.504,25
mm;

Bentuk I, Tipe E bronjong kawat ukuran L=3,0 m x B=1,0 m x T=0,5 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
46 B.46 bh 2.105.196,90 2.180.860,60 2.171.890,60 2.359.261,80 2.327.866,80 2.134.784,10 2.268.699,09 2.395.514,19 2.384.301,69 4.384.209,40 2.349.129,40 3.288.866,60 3.651.853,75 2.321.467,11 2.598.324,95
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
47 B.47 bh 2.630.006,30 2.705.152,07 2.696.182,07 2.908.688,10 2.877.293,10 2.681.188,20 2.790.974,33 2.919.300,53 2.908.088,03 5.030.458,80 2.897.221,38 3.896.726,70 4.288.281,00 2.849.870,67 3.136.867,65
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100
48 B.48 bh 3.583.572,50 3.676.054,97 3.667.084,97 4.159.446,50 3.861.573,50 3.636.392,00 3.804.731,03 3.880.976,03 3.869.763,53 6.534.070,00 3.907.071,68 5.084.989,50 5.553.051,00 3.841.956,41 4.076.744,25
mm;

Bentuk I, Tipe F Bronjong kawat ukuran L = 4,0 m x B = 1,0 m x T = 0,5 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan
49 B.49 bh 2.784.620,35 2.885.004,01 2.873.044,01 3.121.339,20 3.079.479,20 2.824.142,40 3.002.194,76 3.170.228,16 3.155.278,16 5.808.056,60 3.108.367,59 4.356.551,90 4.838.429,50 3.071.918,14 3.438.772,55
kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 3,0 mm, kawat sisi ø 4,0 mm dan kawat
50 B.50 bh 2.820.493,45 2.921.838,93 2.909.878,93 3.160.781,90 3.118.921,90 2.859.615,30 3.038.964,97 3.208.983,27 3.194.033,27 5.871.426,20 3.146.803,92 4.403.409,80 4.888.897,25 3.109.810,01 3.480.876,35
pengikat ø 2,0 mm, lubang heksagonal 100 x 120 mm;

Kawat bronjong wire mesh ø 5 mm ulir, kawat pengikat ø 2,0 mm, lubang kotak 100 x 100
51 B.51 bh 3.771.798,75 3.896.638,80 3.884.678,80 4.488.806,50 4.096.978,50 3.799.404,50 4.071.119,07 4.172.779,07 4.157.829,07 7.483.740,00 4.158.742,31 5.615.829,50 6.187.276,00 4.110.545,34 4.407.967,25
mm;

52 B.52 Pasangan Bronjong Pabrikasi (tenaga kerja untuk 1 m³ batu bronjong) m3 1.176.162,50 1.232.258,29 1.221.678,29 1.348.087,50 1.314.507,50 1.187.662,50 1.299.892,54 1.380.622,54 1.368.547,54 2.709.745,00 1.335.489,23 2.093.805,00 2.375.095,00 1.323.479,86 1.502.808,50
53 Bentuk II, Tipe G bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,17 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan
53 B.53 bh 4.581.034,20 4.694.445,40 4.681.307,80 5.031.682,40 4.985.700,80 4.679.340,80 4.817.989,33 5.015.508,73 4.999.086,73 8.343.737,60 5.009.450,96 6.577.075,40 7.194.521,90 4.915.084,87 5.365.427,12
kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat
54 B.54 bh 3.623.101,45 3.749.424,06 3.737.224,86 4.049.869,90 4.007.172,70 3.648.929,30 3.868.121,97 4.088.415,97 4.073.166,97 7.363.473,00 4.011.953,16 5.481.026,50 6.056.603,80 3.965.878,12 4.441.645,69
pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Bentuk II, Tipe H bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,23 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan
55 B.55 bh 4.069.010,50 4.206.329,92 4.189.825,12 4.542.649,50 4.484.882,70 4.135.089,50 4.367.137,97 4.597.738,27 4.577.107,27 8.274.719,20 4.525.133,82 6.270.216,30 6.944.991,45 4.465.106,06 4.972.922,46
kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat
56 B.56 bh 4.341.344,30 4.495.071,19 4.478.566,39 4.858.996,10 4.801.229,30 4.386.741,70 4.656.241,70 4.919.189,20 4.898.558,20 8.930.946,00 4.825.413,11 6.672.495,50 7.390.961,45 4.769.396,70 5.340.204,86
pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

Bentuk II, Tipe I bronjong kawat ukuran L = 6,0 m x B = 2,0 m x T = 0,30 m

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,00 mm, kawat sisi ø 3,40 mm dan
57 B.57 bh 4.817.522,50 4.986.032,91 4.964.504,91 5.391.303,50 5.315.955,50 4.904.301,50 5.196.626,79 5.475.110,79 5.448.200,79 9.976.595,00 5.379.855,35 7.551.728,00 8.387.111,00 5.310.951,30 5.924.735,60
kawat pengikat ø 2,0 mm, lubang heksagonal 60 x 80 mm;

BIDANG SUMBER DAYA AIR SDA - 6 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

Kawat bronjong galvanis kawat anyaman 3 lilitan ø 2,7 mm, kawat sisi ø 4,0 mm dan kawat
58 B.58 bh 5.694.944,90 5.879.422,18 5.857.894,18 6.341.930,30 6.266.582,30 5.786.517,10 6.088.255,53 6.400.945,13 6.374.035,13 11.380.901,40 6.312.863,09 8.658.929,60 9.569.081,00 6.224.475,34 6.914.940,80
pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;

59 B.59 Pasangan Bronjong Pabrikasi (tenaga kerja untuk 1 m³ batu bronjong) m3 1.184.960,00 1.241.027,95 1.230.447,95 1.357.230,00 1.323.650,00 1.196.805,00 1.308.619,05 1.389.349,05 1.377.274,05 2.720.210,00 1.344.619,08 2.103.695,00 2.385.560,00 1.332.323,83 1.511.663,50
60 B.60 1 m panjang Tiang pancang spun pile d = 30 cm m 1.086.094,50 1.124.347,76 1.116.056,26 1.213.100,50 1.190.020,00 1.072.754,50 1.137.807,75 1.189.925,75 1.182.818,75 2.177.801,00 1.171.263,40 1.693.858,00 1.897.005,50 1.153.820,65 1.273.176,50
61 B.61 1 m³ Pemasangan modul bronjong kawat menjadi struktur krib sungai m3 305.670,00 304.834,76 304.834,76 316.595,00 316.020,00 316.020,00 305.265,25 305.265,25 305.265,25 358.570,00 316.215,40 341.320,00 360.870,00 307.064,15 307.970,00
62 B.62 1 m² Pasangan batu muka m2 104.029,00 104.556,61 104.355,36 116.776,75 110.745,00 105.081,25 104.723,24 107.598,24 106.821,99 297.878,75 109.442,26 173.161,25 199.956,25 106.379,56 113.499,25
63 B.63 1 m² Pasangan batu candi m2 103.166,50 103.653,86 103.458,36 115.787,75 109.779,00 104.247,50 103.808,99 106.626,49 105.855,99 296.038,75 108.505,01 171.723,75 198.288,75 105.448,06 112.441,25
64 B.64 1 m² Pemasangan Geotextile, Tipe-A, Tipis m2 82.857,50 86.424,32 85.216,82 93.437,50 91.022,50 81.362,50 86.338,02 89.960,52 89.960,52 154.732,50 88.582,19 129.432,50 145.072,50 87.780,44 97.692,50
65 B.65 1 m² Pemasangan Geotextile, Tipe-B, Tebal Sedang m2 152.030,00 158.150,91 156.908,91 170.890,00 167.164,00 149.776,00 159.254,83 167.948,83 166.706,83 290.490,00 164.639,51 243.938,00 273.102,00 162.114,71 179.906,00
66 B.66 1 m² Pemasangan Geotextile, Tipe-C, Tebal m2 224.365,00 233.086,36 230.556,36 253.138,00 246.813,00 221.513,00 235.409,24 248.059,24 245.529,24 429.387,00 242.957,26 359.582,00 402.822,00 239.768,06 266.938,00

Pasangan bar screen (saringan kasar) bangunan intake, pengukur dan pengatur 1 buah
67 B.67 m2 907.925,00 946.607,38 946.607,38 1.229.062,50 994.175,00 876.875,00 985.060,12 985.060,12 985.060,12 1.923.087,50 994.272,70 1.288.862,50 1.414.787,50 986.822,07 1.029.250,00
pasangan bar screen/saringan kasar.

68 B.68 Pasangan ambang ukur pada bangunan pengukur dan/atau pengatur bh 1.049.904,00 1.102.664,79 1.078.514,79 1.210.766,00 1.158.866,50 1.024.316,50 1.107.049,04 1.179.499,04 1.155.349,04 2.121.439,50 1.134.802,73 1.706.864,50 1.916.739,50 1.131.786,36 1.258.778,50
69 B.69 1 m² pasangan lempengan rumput m2 32.130,00 32.028,32 32.028,32 33.390,00 33.390,00 33.390,00 31.870,73 31.870,73 31.870,73 38.220,00 33.343,79 36.120,00 38.220,00 32.299,72 32.340,00

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
70 B.70 m2 2.570,40 2.562,27 2.562,27 2.671,20 2.671,20 2.671,20 2.549,66 2.549,66 2.549,66 3.057,60 2.667,50 2.889,60 3.057,60 2.583,98 2.587,20
Kemiringan 1v : 10h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
71 B.71 m2 2.189,03 2.182,06 2.182,06 2.274,70 2.274,70 2.274,70 2.170,70 2.170,70 2.170,70 2.603,60 2.271,54 2.459,85 2.603,60 2.200,07 2.202,83
Kemiringan 1v : 10h s/d 1v : 2,5h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
72 B.72 m2 2.944,58 2.935,28 2.935,28 3.060,15 3.060,15 3.060,15 2.921,21 2.921,21 2.921,21 3.502,90 3.055,92 3.310,85 3.502,90 2.960,44 2.964,13
Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
73 B.73 m2 4.398,75 4.384,83 4.384,83 4.571,25 4.571,25 4.571,25 4.363,25 4.363,25 4.363,25 5.232,50 4.564,92 4.945,00 5.232,50 4.421,99 4.427,50
Kemiringan 1v : 1h s/d 1h : 2,5v

Penebasan Secara Manual 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
74 B.74 m2 8.797,50 8.769,66 8.769,66 9.142,50 9.142,50 9.142,50 8.726,51 8.726,51 8.726,51 10.465,00 9.129,85 9.890,00 10.465,00 8.843,97 8.855,00
Kemiringan 2,5v : 1h sampai dengan tegak

Penebasan Semi Mekanis 1 m2 Rumput. Perhitungan secara umum (jika tidak diketahui
75 B.75 m2 745,20 752,50 752,50 837,66 783,84 756,93 758,88 758,88 758,88 1.069,50 783,08 891,48 952,89 765,93 775,56
kondisi medan secara detail)

Penebasan Semi Meknis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
76 B.76 m2 616,69 622,48 622,48 691,44 648,31 626,75 627,51 627,51 627,51 879,75 647,68 736,00 786,31 633,39 641,13
Kemiringan 1v : 10h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
77 B.77 m2 764,69 771,88 771,88 857,38 803,91 777,17 778,12 778,12 778,12 1.090,89 803,12 912,64 975,03 785,40 795,00
Kemiringan 1v : 10h s/d 1v : 2,5h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
78 B.78 m2 2.107,95 2.118,37 2.118,37 2.236,75 2.160,85 2.122,90 2.127,57 2.127,57 2.127,57 2.557,60 2.159,84 2.309,20 2.393,15 2.136,97 2.150,50
Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
79 B.79 m2 2.107,95 2.118,37 2.118,37 2.236,75 2.160,85 2.122,90 2.127,57 2.127,57 2.127,57 2.557,60 2.159,84 2.309,20 2.393,15 2.136,97 2.150,50
Kemiringan 1v : 2,5h s/d 1v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
80 B.80 m2 1.657,04 1.672,85 1.672,85 1.859,67 1.742,37 1.683,72 1.686,62 1.686,62 1.686,62 2.369,23 1.740,67 1.979,38 2.115,08 1.702,36 1.723,39
Kemiringan 1v : 1h s/d 2,5v : 1h

Penebasan Semi Mekanis 1 m2 Rumput Didaerah Datar Sampai Pelandaian Naik Dengan
81 B.81 m2 2.960,10 2.987,92 2.987,92 3.318,90 3.111,90 3.008,40 3.012,06 3.012,06 3.012,06 4.222,80 3.108,86 3.532,80 3.774,30 3.040,25 3.077,40
Kemiringan 2,5v : 1h sampai dengan tegak

C. PEKERJAAN PENGAMAN PANTAI

1 C.1 Penanaman 1 Pohon Bakau bh 46.372,60 48.668,15 48.668,15 53.327,80 52.177,80 44.127,80 47.511,24 50.961,24 50.961,24 100.689,40 49.875,78 77.597,40 88.039,40 48.680,04 55.581,80

BIDANG SUMBER DAYA AIR SDA - 7 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

2 C.2 Matras bambu m 254.725,00 264.796,59 260.196,59 285.200,00 284.050,00 259.900,00 272.990,08 288.515,08 295.415,08 533.600,00 283.348,47 401.350,00 450.800,00 275.889,72 300.150,00
3 C.3 Pembuatan 1 buah kubus beton ukuran 30 cm x 30 cm x 30 cm bh 222.736,26 226.388,54 225.906,69 264.959,66 238.447,56 219.778,00 230.494,94 252.499,04 233.358,44 399.262,41 237.103,17 304.981,96 333.300,71 234.167,37 249.551,96
4 C.4 Pembuatan 1 buah kubus beton ukuran 40 cm x 40 cm x 40 cm bh 298.489,40 307.555,52 306.435,42 388.177,90 325.413,20 281.588,08 318.219,42 370.263,82 324.912,42 670.022,20 322.595,69 459.287,00 513.854,50 324.356,14 358.050,20
5 C.5 Pembuatan 1 buah 3B (Blok Beton Bergigi) bh 457.901,25 472.007,03 470.265,93 597.536,55 499.499,05 431.198,25 488.698,07 569.970,87 499.117,07 1.036.581,25 495.144,68 707.833,05 792.645,55 498.193,78 550.733,85
6 C.6 Pembuatan 1 buah blok beton berat 0,5 ton quadripod, tetrapod, dolos, tribar bh 1.020.173,97 1.052.058,87 1.048.127,02 1.336.005,37 1.113.533,27 958.887,71 1.090.012,80 1.274.396,90 1.113.576,30 2.329.599,62 1.103.757,34 1.584.534,17 1.776.037,92 1.111.356,96 1.230.380,17
7 C.7 Pembuatan 1 buah blok beton berat 0,75 ton quadripod, tetrapod, dolos, tribar bh 1.526.320,25 1.574.008,94 1.568.127,84 1.999.179,55 1.665.990,05 1.434.518,05 1.630.857,90 1.906.986,70 1.666.116,90 3.487.116,25 1.651.383,19 2.371.308,05 2.658.060,55 1.662.809,49 1.841.056,85
8 C.8 Pembuatan blok beton berat 1,0 ton quadripod, tetrapod, dolos, tribar dan lain-lain bh 2.043.180,28 2.106.796,34 2.098.948,74 2.674.725,78 2.229.839,08 1.920.860,76 2.182.682,34 2.551.367,74 2.229.740,34 4.662.353,58 2.210.351,15 3.172.185,88 3.555.365,88 2.225.403,85 2.463.473,08
9 C.9 Pembuatan 1 buah blok beton berat 1,5 ton quadripod, tetrapod, dolos, tribar bh 1.065.437,97 1.097.240,44 1.093.308,59 1.383.477,37 1.160.798,27 1.006.049,21 1.135.047,64 1.319.431,74 1.158.611,14 2.384.661,62 1.150.969,19 1.636.629,17 1.830.651,42 1.156.885,14 1.276.472,17
10 C.10 Pembuatan 1 buah blok beton berat 2,0 ton quadripod, tetrapod, dolos, tribar bh 1.065.437,97 1.097.240,44 1.093.308,59 1.383.477,37 1.160.798,27 1.006.049,21 1.135.047,64 1.319.431,74 1.158.611,14 2.384.661,62 1.150.969,19 1.636.629,17 1.830.651,42 1.156.885,14 1.276.472,17
11 C.11 Pembuatan 1 buah blok beton berat 2,5 ton quadripod, tetrapod, dolos, tribar bh 1.065.437,97 1.097.240,44 1.093.308,59 1.383.477,37 1.160.798,27 1.006.049,21 1.135.047,64 1.319.431,74 1.158.611,14 2.384.661,62 1.150.969,19 1.636.629,17 1.830.651,42 1.156.885,14 1.276.472,17
12 C.12 Pemasangan 1 m³ berbagai jenis armor m3 481.505,00 518.935,45 514.588,45 566.478,50 551.126,00 468.027,00 519.924,19 542.257,19 538.508,19 657.512,50 532.812,91 593.894,50 617.722,50 524.975,30 535.313,50
13 C.13 1 m3 pasangan batu 1 kg - 3 kg, void maksimum 15% m3 821.215,00 849.753,17 844.693,17 916.665,00 898.955,00 847.090,00 899.490,16 942.500,16 936.175,16 1.728.680,00 925.266,93 1.341.475,00 1.500.980,00 914.489,43 1.009.964,50
14 C.14 1 m3 pasangan batu 3 kg - 5 kg, void maksimum 15% m3 884.752,50 914.613,17 909.323,17 986.527,50 968.012,50 913.790,00 966.650,16 1.011.615,16 1.005.002,66 1.841.150,00 995.531,93 1.436.867,50 1.603.100,00 982.224,43 1.084.329,25
15 C.15 1 m³ Pasangan batu 5 kg - 10 kg, void maksimum 20% m3 938.469,00 969.596,49 964.076,49 1.045.189,00 1.025.869,00 969.289,00 1.023.847,18 1.070.767,18 1.063.867,18 1.938.854,00 1.054.570,63 1.516.344,00 1.690.454,00 1.040.231,37 1.146.918,00
16 C.16 1 m3 pasangan batu 10 kg - 30 kg, void maksimum 20% m3 965.206,50 997.656,49 991.906,49 1.075.951,50 1.055.826,50 996.889,00 1.054.207,18 1.103.082,18 1.095.894,68 2.005.324,00 1.085.735,63 1.565.736,50 1.746.574,00 1.071.166,37 1.182.182,75
17 C.17 1 m3 pasangan batu 30 kg - 50 kg, void maksimum 25% m3 1.008.228,00 1.041.415,80 1.035.527,80 1.122.308,00 1.101.700,00 1.041.348,00 1.099.260,20 1.149.308,20 1.141.948,20 2.076.440,00 1.132.308,32 1.625.456,00 1.811.480,00 1.116.799,32 1.230.665,60
18 C.18 1 m³ Pasangan batu 50 kg - 100 kg, void maksimum 25% m3 1.008.228,00 1.041.415,80 1.035.527,80 1.122.308,00 1.101.700,00 1.041.348,00 1.099.260,20 1.149.308,20 1.141.948,20 2.076.440,00 1.132.308,32 1.625.456,00 1.811.480,00 1.116.799,32 1.230.665,60
19 C.19 1 m3 pasangan batu 100 kg - 200 kg, void maksimum 30% m3 1.029.618,00 1.063.863,80 1.057.791,80 1.146.918,00 1.125.666,00 1.063.428,00 1.123.548,20 1.175.160,20 1.167.570,20 2.129.616,00 1.157.240,32 1.664.970,00 1.856.376,00 1.141.547,32 1.258.877,40
20 C.20 1 m3 pasangan batu 200 kg - 300 kg, void maksimum 30% m3 1.029.618,00 1.063.863,80 1.057.791,80 1.146.918,00 1.125.666,00 1.063.428,00 1.123.548,20 1.175.160,20 1.167.570,20 2.129.616,00 1.157.240,32 1.664.970,00 1.856.376,00 1.141.547,32 1.258.877,40
21 C.21 1 m3 pasangan batu 300 kg - 400 kg, void maksimum 30% m3 1.088.682,00 1.124.459,12 1.118.111,12 1.211.732,00 1.189.514,00 1.124.447,00 1.186.817,21 1.240.775,21 1.232.840,21 2.240.614,00 1.222.512,01 1.754.325,00 1.954.954,00 1.205.741,26 1.328.519,10
22 C.22 1 m³ Pasangan batu 400 kg - 500 kg, void maksimum 35% m3 1.099.377,00 1.135.683,12 1.129.243,12 1.224.037,00 1.201.497,00 1.135.487,00 1.198.961,21 1.253.701,21 1.245.651,21 2.267.202,00 1.234.978,01 1.774.082,00 1.977.402,00 1.218.115,26 1.342.625,00
23 C.23 1 m3 pasangan batu 200 kg - 500 kg, void maksimum 32% m3 1.082.299,50 1.118.093,33 1.111.745,33 1.205.073,50 1.182.855,50 1.117.788,50 1.180.477,31 1.234.435,31 1.226.500,31 2.232.955,00 1.215.861,11 1.747.011,00 1.947.295,00 1.199.330,88 1.322.033,10
24 C.24 1 m3 pasangan batu 500 kg - 650 kg, void maksimum 35% m3 1.120.709,50 1.157.516,78 1.150.984,78 1.247.439,50 1.224.577,50 1.157.624,50 1.221.671,72 1.277.193,72 1.269.028,72 2.306.555,00 1.258.528,86 1.806.029,00 2.012.615,00 1.241.173,23 1.367.540,90
25 C.25 1 m3 pasangan batu 650 kg - 800 kg, void maksimum 35% m3 1.136.752,00 1.174.352,78 1.167.682,78 1.265.897,00 1.242.552,00 1.174.184,50 1.239.887,72 1.296.582,72 1.288.245,22 2.346.437,00 1.277.227,86 1.835.664,50 2.046.287,00 1.259.734,23 1.388.699,75
26 C.26 1 Buah buis beton diangkut < 30 m dan dipasang untuk konstruksi pengaman pantai bh 351.900,00 350.786,34 350.786,34 365.700,00 365.700,00 365.700,00 349.060,33 349.060,33 349.060,33 418.600,00 365.193,87 395.600,00 418.600,00 353.758,86 354.200,00

Pengecoran 1 buah buis beton diameter 1 m' dengan campuran beton fc = 7,4 MPa (K-
27 C.27 bh 1.164.892,50 1.134.471,57 1.131.637,90 1.504.478,24 1.223.475,80 1.093.535,06 1.138.528,86 1.215.155,28 1.184.491,04 8.981.719,20 1.187.644,98 3.392.066,26 4.328.225,74 1.175.420,31 1.324.801,41
100)

28 C.28 1 m' Pasangan Pipa Suling-suling m 198.145,00 281.981,82 278.244,32 188.485,00 288.362,50 210.565,00 232.572,02 256.285,02 257.412,02 346.288,00 255.458,69 295.573,00 311.696,00 252.356,94 196.167,00
29 C.29 1 m' Peilskaal / mistar duga muka air (diambil dari AHSP Hidrologi) m 611.139,87 629.138,63 627.966,49 719.525,72 660.289,26 595.291,10 638.066,78 659.787,80 657.149,65 1.190.587,53 650.406,57 914.337,84 1.010.605,82 647.199,21 698.739,13

D. PEKERJAAN BETON (NORMATIF)

Lantai Kerja Beton Tipe-1 : menggunakan campuran beton tumbuk fc' = 1,8 s.d 3,7 (B0 : K-
1 D.1 m3 1.169.492,50 1.167.230,28 1.163.055,78 1.476.402,20 1.256.025,40 1.122.006,70 1.173.448,82 1.248.279,32 1.222.096,12 7.782.848,10 1.222.403,45 3.137.593,30 3.944.971,50 1.207.898,85 1.345.983,00
40 s.d. K-60) atau setara 1 PC : 3 PB : 5 Kr

Lantai Kerja Beton Tipe-2 : menggunakan campuran beton fc' = 5,6 s.d 7,4 MPa (K-80 s.d.
2 D.2 m3 1.195.655,00 1.190.081,93 1.186.124,78 1.522.608,05 1.282.107,40 1.144.145,35 1.195.988,82 1.274.096,82 1.245.707,92 8.380.513,45 1.246.591,40 3.310.085,25 4.181.749,60 1.232.304,15 1.374.208,60
K-100) atau setara 1 PC : 2 PB : 3 Kr

Lantai Kerja Beton Tipe-2 : menggunakan campuran beton fc' = 7,4 MPa atau setara 1 PC
3 D.3 m3 1.215.205,00 1.208.991,38 1.205.007,78 1.550.733,60 1.302.876,40 1.161.973,80 1.214.963,82 1.294.911,82 1.265.678,82 8.613.983,00 1.266.450,75 3.388.502,60 4.285.125,40 1.252.137,05 1.396.969,40
: 2 PB : 3 Kr

4 D.4 1 m³ beton mutu, f'c = 7,4 MPa (K100), slump (12_2) cm, w/c = 0,87 (Manual) m3 1.346.546,50 1.321.772,13 1.317.790,83 1.708.042,10 1.423.345,80 1.275.554,70 1.327.459,77 1.412.002,02 1.380.466,72 9.340.950,90 1.384.603,34 3.674.721,50 4.644.117,45 1.367.703,66 1.536.265,45

1 m³ beton mutu, f'c = 7,4 MPa (K100), slump (12_2) cm, w/c = 0,87 (Menggunakan
5 D.5 m3 1.303.052,35 1.278.460,06 1.274.478,76 1.661.199,15 1.376.606,35 1.228.815,25 1.284.429,91 1.368.972,16 1.337.436,86 9.282.181,30 1.337.843,14 3.619.712,40 4.585.347,85 1.323.905,59 1.491.302,75
Molen/Beton Mixer)

BIDANG SUMBER DAYA AIR SDA - 8 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

6 D.6 1 m³ Beton mutu, f’c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 m3 1.413.246,50 1.385.137,13 1.381.155,83 1.808.092,10 1.493.380,80 1.335.584,70 1.390.824,77 1.482.037,02 1.447.166,72 10.274.750,90 1.451.303,34 3.974.871,50 5.044.317,45 1.434.403,66 1.612.970,45

1 m³ beton mutu, f'c = 9,8 MPa (K125), slump (12±2) cm, w/c = 0,78 (Menggunakan
7 D.7 m3 1.369.673,69 1.341.742,47 1.337.761,96 1.761.158,69 1.446.553,25 1.288.768,95 1.347.711,00 1.438.918,01 1.404.048,23 10.215.797,50 1.404.456,88 3.919.725,79 4.985.392,63 1.390.520,11 1.567.910,21
Molen/Beton Mixer)

8 D.8 1 m³ Beton mutu, f'c = 12,2 Mpa (K150), slump (12±12) cm, w/c = 0,72 (Manual) m3 1.461.701,00 1.430.730,61 1.426.787,51 1.882.323,52 1.543.946,84 1.378.888,82 1.436.337,91 1.532.543,79 1.495.070,63 11.004.957,00 1.499.346,87 4.205.219,91 5.352.970,01 1.482.485,39 1.668.318,05

1 m³ Beton mutu, f'c = 12,2 Mpa (K150), slump (12±12) cm, w/c = 0,72 (Menggunakan
9 D.9 m3 1.418.206,85 1.387.418,54 1.383.475,45 1.835.480,57 1.497.207,39 1.332.149,37 1.393.308,04 1.489.513,93 1.452.040,77 10.946.187,40 1.452.586,67 4.150.210,81 5.294.200,41 1.438.687,32 1.623.355,35
Molen/Beton Mixer)

10 D.10 1 m³ Beton mutu, f'c = 14,5 MPa (K175), slump (12±12) cm, w/c = 0,66 (Manual) m3 1.519.258,91 1.484.964,82 1.481.058,73 1.970.241,70 1.604.064,69 1.430.381,40 1.490.488,00 1.592.601,08 1.552.070,02 11.863.735,22 1.556.490,93 4.476.807,03 5.716.640,58 1.539.666,46 1.734.134,48

1 m³ Beton mutu, f'c = 14,5 MPa (K175), slump (12±12) cm, w/c = 0,66 (Menggunakan
11 D.11 m3 1.475.764,76 1.441.652,75 1.437.746,67 1.923.398,75 1.557.325,24 1.383.641,95 1.447.458,14 1.549.571,22 1.509.040,16 11.804.965,62 1.509.730,73 4.421.797,93 5.657.870,98 1.495.868,39 1.689.171,78
Molen/Beton Mixer)

12 D.12 1 m³ Beton mutu, f'c = 16,9 MPa (K200), slump (12±12) cm, w/c = 0,61 (Manual) m3 1.573.935,48 1.536.401,48 1.532.540,37 2.054.043,51 1.661.116,46 1.479.237,93 1.541.833,02 1.649.584,53 1.606.110,14 12.688.957,24 1.610.691,00 4.737.028,11 6.065.355,37 1.593.911,52 1.796.576,45

1 m³ Beton mutu, f'c = 16,9 MPa (K200), slump (12±12) cm, w/c = 0,61 (Menggunakan
13 D.13 m3 1.530.441,33 1.493.089,41 1.489.228,31 2.007.200,56 1.614.377,01 1.432.498,48 1.498.803,15 1.606.554,67 1.563.080,28 12.630.187,64 1.563.930,81 4.682.019,01 6.006.585,77 1.550.113,44 1.751.613,75
Molen/Beton Mixer)

14 D.14 1 m³ Beton mutu, f'c = 19,3 MPa (K225), slump (12±12) cm, w/c = 0,58 (Manual) m3 1.615.266,54 1.575.436,20 1.571.591,67 2.116.862,11 1.704.348,24 1.516.277,17 1.580.821,15 1.692.784,73 1.647.155,36 13.295.214,70 1.651.814,41 4.929.585,40 6.322.909,12 1.635.051,50 1.843.922,42

1 m³ Beton mutu, f'c = 19,3 MPa (K225), slump (12±12) cm, w/c = 0,58 (Menggunakan
15 D.15 m3 1.307.976,46 1.255.138,41 1.253.931,83 1.766.653,84 1.362.157,35 1.213.655,66 1.256.408,95 1.350.786,14 1.306.915,41 12.620.041,93 1.315.758,01 4.416.450,69 5.743.582,21 1.304.595,18 1.471.852,77
Molen/Beton Mixer)

16 D.16 1 m³ Beton mutu, f'c = 21,7 MPa (K250) kedap air, slump (12±12) cm, w/c = 0,56 (Manual) m3 1.641.984,61 1.600.501,47 1.596.687,46 2.158.051,60 1.732.179,48 1.540.101,99 1.605.832,08 1.720.573,54 1.673.472,97 13.706.378,28 1.678.228,77 5.058.613,32 6.496.035,28 1.661.496,38 1.874.367,00

1 m³ Beton mutu, f'c = 21,7 MPa (K250) kedap air, slump (12±12) cm, w/c = 0,56
17 D.17 m3 1.336.712,08 1.282.322,11 1.281.125,88 1.810.163,52 1.392.248,25 1.239.437,51 1.283.571,95 1.380.861,52 1.335.506,14 13.035.919,88 1.344.384,96 4.548.982,44 5.920.689,69 1.333.232,48 1.504.799,12
(Menggunakan Molen/Beton Mixer)

18 D.18 1 m³ Beton mutu, f'c = 24,0 MPa (K275) kedap air, slump (12±12) cm, w/c = 0,53 (Manual) m3 1.687.753,57 1.643.500,60 1.639.733,18 2.228.394,18 1.779.898,72 1.580.957,61 1.648.748,98 1.768.228,37 1.718.633,45 14.403.488,04 1.723.535,91 5.277.928,59 6.790.108,93 1.706.850,11 1.926.573,42

1 m³ Beton mutu, f'c = 24,0 MPa (K275) kedap air, slump (12±12) cm, w/c = 0,53
19 D.19 m3 1.644.259,42 1.600.188,54 1.596.421,12 2.181.551,23 1.733.159,27 1.534.218,16 1.605.719,11 1.725.198,50 1.675.603,59 14.344.718,44 1.676.775,71 5.222.919,49 6.731.339,33 1.663.052,04 1.881.610,72
(Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 26,4 MPa (K300) kedap air, slump (12±12) cm, w/c = 0,52 (kedap
20 D.20 m3 1.702.010,41 1.656.860,93 1.653.111,29 2.250.423,90 1.794.739,38 1.593.660,39 1.662.077,94 1.783.044,45 1.732.658,12 14.624.580,53 1.737.616,52 5.347.179,58 6.883.074,35 1.720.948,50 1.942.805,48
air) (Manual)

1 m³ Beton mutu, f'c = 26,4 MPa (K300) kedap air, slump (12±12) cm, w/c = 0,52 (kedap
21 D.21 m3 1.658.516,26 1.613.548,86 1.609.799,23 2.203.580,95 1.747.999,93 1.546.920,94 1.619.048,07 1.740.014,59 1.689.628,25 14.565.810,93 1.690.856,32 5.292.170,48 6.824.304,75 1.677.150,43 1.897.842,78
air) (Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 28,8 MPa (K325) kedap air, slump (12±12) cm, w/c = 0,49 (kedap
22 D.22 m3 1.850.238,80 1.801.555,24 1.797.862,40 2.431.710,27 1.949.215,15 1.740.056,17 1.806.282,89 1.932.834,90 1.879.502,76 15.561.076,17 1.889.214,10 5.713.960,27 7.343.331,91 1.869.087,01 2.100.053,63
air) (Manual)

1 m³ Beton mutu, f'c = 28,8 MPa (K325) kedap air, slump (12±12) cm, w/c = 0,49 (kedap
23 D.23 m3 1.785.574,30 1.737.124,60 1.733.431,77 2.362.756,27 1.880.387,65 1.671.228,67 1.742.214,72 1.868.766,73 1.815.434,59 15.476.838,67 1.820.366,39 5.634.552,77 7.259.094,41 1.804.032,15 2.033.514,63
air) (Menggunakan Molen/Beton Mixer)

1 m³ Beton mutu, f'c = 31,2 MPa (K350) kedap air, slump (12±12) cm, w/c = 0,48 (kedap
24 D.24 m3 1.868.843,44 1.819.020,76 1.815.348,23 2.460.349,96 1.968.603,35 1.756.654,33 1.823.712,84 1.952.195,16 1.897.843,28 15.845.979,38 1.907.618,13 5.803.473,28 7.463.399,66 1.887.511,35 2.121.262,98
air) (Manual)

1 m³ Beton mutu, f'c = 31,2 MPa (K350) kedap air, slump (12±12) cm, w/c = 0,48 (kedap
25 D.25 m3 1.804.178,94 1.754.590,13 1.750.917,60 2.391.395,96 1.899.775,85 1.687.826,83 1.759.644,68 1.888.126,99 1.833.775,11 15.761.741,88 1.838.770,42 5.724.065,78 7.379.162,16 1.822.456,49 2.054.723,98
air) (Menggunakan Molen/Beton Mixer)

26 D.26 1 m³ Beton menggunakan Ready Mixed dan pompa beton m3 2.205.964,50 2.207.753,67 2.190.158,67 2.499.893,00 2.344.769,50 2.073.571,90 2.237.388,66 3.065.526,66 2.342.958,66 4.578.023,50 2.301.402,93 3.481.498,50 3.921.143,50 2.333.577,93 2.728.743,00
27 D.27 1 m³ beton menggunakan bahan aditif m3 34.500,00 35.880,00 35.880,00 45.540,00 37.260,00 33.120,00 37.260,00 37.260,00 37.260,00 69.000,00 37.260,00 46.920,00 51.060,00 37.260,00 38.640,00

Mengangkut / Menaikkan 1 m³ Beton dicorkan pada tapak berjarak < 25 m dengan beda
28 D.28 m3 72.139,50 71.911,20 71.911,20 74.968,50 74.968,50 74.968,50 71.557,37 71.557,37 71.557,37 85.813,00 74.864,74 81.098,00 85.813,00 72.520,57 72.611,00
tinggi < 1 m (Manual)

Mengangkut / Menaikkan 1 m³ Beton dicorkan pada tapak berjarak setiap tambahan jarak
29 D.29 m3 87.975,00 87.696,59 87.696,59 91.425,00 91.425,00 91.425,00 87.265,08 87.265,08 87.265,08 104.650,00 91.298,47 98.900,00 104.650,00 88.439,72 88.550,00
25 m (Manual)

BIDANG SUMBER DAYA AIR SDA - 9 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

30 D.30 Mengangkut / Menaikkan 1 m3 Beton Menggunakan pompa beton m3 39.412,80 39.288,07 39.288,07 40.958,40 40.958,40 40.958,40 39.094,76 39.094,76 39.094,76 46.883,20 40.901,71 44.307,20 46.883,20 39.620,99 39.670,40
31 D.31 Pemadatan 1 m³ Beton Pada Saat Mengecor Menggunakan Concrete Vibrator m3 50.657,50 50.518,29 50.518,29 52.382,50 52.382,50 52.382,50 50.302,54 50.302,54 50.302,54 58.995,00 52.319,23 56.120,00 58.995,00 50.889,86 50.945,00
32 D.32 Pemadatan 1 m³ Beton Pada Saat Mengecor (Manual) m3 87.975,00 87.696,59 87.696,59 91.425,00 91.425,00 91.425,00 87.265,08 87.265,08 87.265,08 104.650,00 91.298,47 98.900,00 104.650,00 88.439,72 88.550,00

Mengangkut / Menaikkan 1 m³ beton dicorkan pada tapak setiap kenaikan 4 m (vertikal)


33 D.33 m3 43.987,50 43.848,29 43.848,29 45.712,50 45.712,50 45.712,50 43.632,54 43.632,54 43.632,54 52.325,00 45.649,23 49.450,00 52.325,00 44.219,86 44.275,00
(Manual)

Mengangkut / Menaikkan 1 m³ beton dicorkan pada tapak setiap kenaikan 4 m (vertikal)


34 D.34 m3 39.412,80 39.288,07 39.288,07 40.958,40 40.958,40 40.958,40 39.094,76 39.094,76 39.094,76 46.883,20 40.901,71 44.307,20 46.883,20 39.620,99 39.670,40
(Menggunakan Pompa)

E. PEKERJAAN PEMBESIAN

1 E.1 Pembesian 100 Kg Dengan Besi Polos atau Ulir Untuk Plat 100 kg 2.364.975,00 2.487.060,22 2.487.060,22 3.358.460,00 2.622.805,00 2.255.380,00 2.608.931,11 2.608.931,11 2.608.931,11 5.485.615,00 2.623.432,85 3.517.965,00 3.893.440,00 2.610.575,60 2.742.060,00

2 E.2 Pembesian 100 Kg Dengan Besi Polos atau Ulir Untuk Kolom, Balok, Ring Balk, dan Sloof 100 kg 2.772.420,00 2.894.415,66 2.894.415,66 3.789.940,00 3.049.340,00 2.679.845,00 3.015.768,34 3.015.768,34 3.015.768,34 5.992.420,00 3.050.418,56 3.997.630,00 4.391.275,00 3.020.701,80 3.162.040,00

Pembesian 100 kg jaring kawat (Kawat Wiremesh Ukuran 8 mm x 2,25 m 50 m) untuk pelat
3 E.3 100 kg 10.338.960,00 10.902.435,79 10.785.135,79 11.849.887,50 11.611.550,00 10.084.925,00 11.137.395,04 11.723.895,04 11.723.895,04 21.963.562,50 11.377.174,23 17.963.287,50 20.431.187,50 11.255.282,36 12.783.975,00
atau dinding

4 E.4 Pembesian 100 kg kabel prestressed / strand 100 kg 9.486.925,00 9.631.546,59 9.631.546,59 10.655.900,00 9.785.925,00 9.351.225,00 9.776.015,08 9.776.015,08 9.776.015,08 13.151.400,00 9.786.373,47 10.827.250,00 11.267.700,00 9.777.189,72 9.928.525,00

Mengangkut/menaikkan 100 kg tulangan setiap kenaikan vertikal 4 m atau jarak horizontal


5 E.5 100 kg 66.924,25 66.752,19 66.752,19 69.885,50 69.885,50 69.885,50 66.130,17 66.130,17 66.130,17 80.546,00 69.807,30 76.992,50 80.546,00 66.856,09 68.108,75
setiap 25 m ke tapak pemasangan (Manual)

Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (penambahan jarak horizontal 10


6 E.6 100 kg 58.822,50 58.711,13 58.711,13 60.662,50 60.662,50 60.662,50 58.538,53 58.538,53 58.538,53 67.332,50 60.611,89 65.032,50 67.332,50 59.008,39 59.512,50
m sd. 25 m)

Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (setiap penambahan jarak


7 E.7 100 kg 87.457,50 87.290,45 87.290,45 90.677,50 90.677,50 90.677,50 87.031,55 87.031,55 87.031,55 102.062,50 90.601,58 98.612,50 102.062,50 87.736,33 88.952,50
horizontal 25 m)

8 E.8 Mengangkut/menaikkan 100 kg tulangan Secara Mekanis (setiap kenaikan 4 m) 100 kg 86.997,50 86.830,45 86.830,45 90.217,50 90.217,50 90.217,50 86.571,55 86.571,55 86.571,55 101.602,50 90.141,58 98.152,50 101.602,50 87.276,33 88.492,50

F. PEKERJAAN BEKISTING

1 F.1 1 m² bekisting lantai beton expose dengan Multipleks 18 mm m2 207.529,00 211.752,65 211.163,85 229.613,60 223.449,60 214.665,90 221.413,65 228.985,25 218.046,45 327.632,70 221.115,08 292.654,30 312.505,60 220.536,03 230.977,50
2 F.2 1 m² bekisting lantai beton biasa dengan Multipleks 18 mm (TP) m2 143.244,00 147.281,83 146.693,03 160.751,60 155.618,00 146.827,40 155.522,63 162.519,23 153.305,43 245.005,20 153.267,39 212.855,80 231.177,60 154.870,09 163.208,00
3 F.3 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP) m2 154.732,50 152.265,45 152.265,45 176.410,00 181.518,30 184.172,50 184.091,55 193.866,55 172.591,55 222.467,50 176.219,08 212.462,50 249.837,50 183.416,33 158.470,00

1 m² perancah bekisting lantai menggunakan Kayu Meranti Ukuran 5 cm x 7 cm x 4 m,


4 F.4 m2 141.105,00 143.525,45 143.525,45 154.272,50 151.547,00 158.412,50 171.154,05 182.654,05 148.154,05 200.387,50 147.871,58 199.237,50 203.550,00 162.658,83 153.410,00
tinggi 4 m**, JAT ≤ 60 cm

5 F.5 1 m² perancah bekisting lantai menggunakan dolken Ø 8 - 10 cm, tinggi 4 m, JAT ≤ 80 cm m2 170.349,50 173.870,08 173.870,08 187.700,70 183.752,75 170.940,60 173.921,66 177.286,56 177.286,56 286.402,90 180.497,31 236.594,10 256.681,15 176.402,86 189.068,05

6 F.6 1 m2 perancah bekisting lantai menggunakan bambu ø 8-10 cm, tinggi 4 m, JAT < 80 cm m2 176.157,00 180.762,81 180.555,81 196.259,00 189.773,00 175.628,00 180.831,65 185.270,65 185.270,65 288.305,00 185.644,02 247.204,00 269.468,00 181.583,42 196.926,00
7 F.7 1 m² Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,6 m) m2 370.047,00 387.574,82 383.848,82 425.212,50 412.074,44 363.641,50 400.863,02 426.370,02 406.981,02 803.769,50 397.472,19 617.216,50 691.334,00 402.799,94 444.084,00
8 F.8 1 m² Bekisting lantai Floordeck tipe pelat (JAP ≤ 0,8 m) m2 364.366,00 381.916,45 378.190,45 419.313,00 406.171,26 358.340,00 396.107,41 421.901,91 401.650,41 796.869,50 391.738,75 611.455,00 685.204,50 397.767,35 438.587,00
9 F.9 1 m² Bekisting lantai Floordeck tipe balok T (JAP ≤ 1,2 m) m2 353.913,65 371.329,08 367.603,08 407.826,80 395.025,23 346.696,25 383.874,98 409.036,98 390.682,98 782.293,25 380.650,13 597.166,25 670.547,75 385.979,84 427.238,80
10 F.10 1 m² Bekisting lantai dengan Floordeck tipe balok T (JAP ≤ 2,0 m) m2 349.281,45 366.646,06 362.920,06 402.805,90 390.096,79 341.647,75 378.638,82 403.570,82 385.906,82 775.979,75 375.793,27 591.036,75 664.245,75 380.899,49 422.298,40
11 F.11 1 m² Bekisting balok beton expose menggunakan Multipleks 18 mm, JAT ≤ 1,0 m m2 249.159,00 254.200,24 253.611,44 275.199,60 268.400,80 262.183,90 273.515,46 285.112,06 262.098,26 387.524,70 264.799,90 353.535,30 374.214,60 269.558,79 276.793,50
12 F.12 1 m2 Bekisting balok beton biasa menggunakan multiflex 12 mm atau 18 mm, JAT < 1,0m m2 170.395,50 175.135,56 174.546,76 190.778,10 185.166,10 178.590,40 191.656,34 202.102,94 182.539,14 285.715,20 181.696,76 254.623,80 273.509,10 188.337,76 193.522,00
13 F.13 1 m² Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP) m2 171.166,00 174.070,54 174.070,54 183.287,00 183.549,20 190.325,00 204.694,86 217.344,86 179.394,86 244.605,00 179.515,90 238.855,00 244.720,00 195.420,59 185.702,00
14 F.14 1 m² Perancah Bekisting balok menggunakan Kaso 5/7, tinggi 4 m dan JAT ≤ 1,0 m m2 134.711,00 136.051,54 136.051,54 145.475,00 143.156,60 146.579,00 151.196,86 157.521,86 138.546,86 181.700,00 141.197,90 176.939,00 181.907,00 146.982,59 143.290,00

BIDANG SUMBER DAYA AIR SDA - 10 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

15 F.15 1 m² Perancah Bekisting balok menggunakan dolken Ø 8-10 cm, tinggi 4 m**, JAT ≤ 1,2 m m2 156.538,00 158.507,17 158.507,17 170.013,70 166.916,75 159.406,10 158.483,97 160.353,87 160.353,87 236.665,40 165.175,62 204.474,60 218.455,15 160.358,62 168.908,55
16 F.16 1 m² Bekisting kolom beton expose menggunakan 18 mm (TP) m2 218.856,50 223.086,45 222.497,65 241.136,60 235.448,70 227.327,40 234.009,55 242.156,15 229.492,35 340.903,70 232.952,49 307.397,30 327.317,60 232.742,41 242.903,00
17 F.17 1 m2 Bekisting kolom beton biasa menggunakan multiflex 12mm atau 18 mm, (TP) m2 152.191,00 156.367,20 155.778,40 170.584,10 165.190,60 156.682,90 166.005,24 173.576,84 162.638,04 257.712,70 162.657,83 225.126,30 243.781,60 164.939,67 172.868,00
18 F.18 1 m² Bekisting kolom beton biasa menggunakan kayu papan 3/20, (TP) m2 160.551,50 163.237,18 163.237,18 171.718,00 172.074,50 178.077,50 191.118,76 202.618,76 168.118,76 229.367,50 168.411,96 223.157,50 228.792,50 182.717,51 174.018,00
19 F.19 1 m² Perancah bekisting kolom beton menggunakan kayu 5/7 cm, tinggi 4 m, JAT ≤ 1,0 m2 129.156,50 130.508,18 130.508,18 139.656,00 137.349,10 140.771,50 145.670,76 151.995,76 133.020,76 174.972,50 135.383,96 170.441,50 175.179,50 141.409,51 137.586,00
20 F.20 1 m² Perancah bekisting kolom beton dengan kayu dolken Ø 8-10 cm, tinggi 4 m, JAT ≤ 1,2 m2 129.156,50 130.508,18 130.508,18 139.656,00 137.349,10 140.771,50 145.670,76 151.995,76 133.020,76 174.972,50 135.383,96 170.441,50 175.179,50 141.409,51 137.586,00
21 F.21 1 m² Bekisting Dinding beton expose dengan Multipleks 18 mm m2 231.679,00 235.949,74 235.360,94 255.005,60 248.938,20 240.644,40 246.904,46 255.051,06 242.387,26 357.682,20 246.468,90 322.910,80 343.348,60 245.707,79 256.312,00
22 F.22 1 m2 Bekisting dinding beton biasa dengan multiflex 12 mm atau 18 mm (TP) m2 154.928,00 158.966,56 158.377,76 173.148,60 167.854,00 158.994,40 167.195,84 174.192,44 164.978,64 259.610,20 165.516,26 226.632,80 245.483,60 166.637,26 175.260,00
23 F.23 1 m² Bekisting dinding beton biasa menggunakan kayu papan 3/20 cm m2 163.576,00 166.135,54 166.135,54 174.662,00 175.048,40 180.665,00 192.619,86 203.544,86 170.769,86 231.840,00 171.580,90 225.055,00 230.920,00 184.725,59 176.732,00

1 m² Perancah / penyokong bekisting dinding beton menggunakan kayu 5/7, tinggi


24 F.24 m2 132.181,00 133.406,54 133.406,54 142.600,00 140.323,00 143.359,00 147.171,86 152.921,86 135.671,86 177.445,00 138.552,90 172.339,00 177.307,00 143.417,59 140.300,00
maksimum 2,5 m

1 m² Perancah/penyokong bekisting dinding beton menggunakan Balok 8/12, tinggi


25 F.25 m2 166.290,00 168.643,27 168.643,27 182.988,00 177.698,00 187.174,00 198.474,07 209.974,07 175.474,07 233.450,00 176.630,77 231.334,00 236.762,00 190.213,77 181.608,00
maksimum 4,5 m

1 m2 Bekisting fondasi dan sloof beton biasa menggunakan multiflex 12 mm atau 18 mm


26 F.26 m2 154.226,50 158.758,83 158.170,03 173.390,10 167.883,90 160.535,40 172.554,13 181.850,73 165.736,93 263.750,20 164.778,89 232.428,80 250.854,10 170.061,59 176.134,00
(TP)

27 F.27 1 m² Bekisting fondasi dan sloof beton biasa menggunakan papan 3/20 cm m2 157.032,50 160.085,45 160.085,45 168.705,00 168.960,30 176.122,50 192.141,55 205.366,55 165.691,55 228.677,50 164.719,08 223.962,50 229.137,50 182.266,33 171.580,00

1 m² Perancah /penyokong bekisting sloof dan fondasi beton menggunakan Kaso 5/7, tinggi
28 F.28 m2 98.152,50 99.938,63 99.938,63 107.927,50 105.507,90 110.055,00 119.373,53 127.423,53 103.273,53 141.220,00 102.931,89 139.150,00 142.312,50 113.403,39 106.950,00
maksimum 2,0 m

29 F.29 Bongkar 1 m² bekisting secara biasa (membersihkan dan membereskan puing-puing) m2 7.038,00 7.015,73 7.015,73 7.314,00 7.314,00 7.314,00 6.981,21 6.981,21 6.981,21 8.372,00 7.303,88 7.912,00 8.372,00 7.075,18 7.084,00
30 F.30 Bongkar 1 m² bekisting secara hati-hati (dan membereskan puing-puing) *) m2 10.557,00 10.523,59 10.523,59 10.971,00 10.971,00 10.971,00 10.471,81 10.471,81 10.471,81 12.558,00 10.955,82 11.868,00 12.558,00 10.612,77 10.626,00

G. PEKERJAAN CURING

1 G.1 Menggenangi 100 m² permukaan beton dengan air 100 m2 132.853,75 132.034,54 132.034,54 137.913,75 137.540,00 137.540,00 130.884,13 130.884,13 130.884,13 157.320,00 137.337,55 148.120,00 157.320,00 132.763,54 133.313,75
2 G.2 Menyirami 100 m² permukaan beton menggunakan media terpal selama 4 hari 100 m2 4.832.760,00 5.066.914,54 5.066.914,54 5.542.080,00 5.424.780,00 4.603.680,00 5.066.224,13 5.300.824,13 5.300.824,13 10.959.040,00 5.189.977,55 8.134.640,00 9.199.540,00 5.185.403,54 5.889.380,00
3 G.3 Menyirami 100 m² permukaan beton menggunakan media karung goni selama 4 hari 100 m2 332.695,00 330.086,34 330.086,34 345.345,00 343.850,00 343.850,00 327.210,33 327.210,33 327.210,33 393.300,00 343.343,87 370.300,00 393.300,00 331.908,86 333.845,00

H. PEKERJAAN PEMBONGKARAN KONTRUKSI BETON


1 H.1 Bongkar 1 m³ beton secara konvensional m3 688.390,00 689.191,41 688.961,41 727.179,50 718.359,00 711.194,50 687.556,59 688.292,59 688.212,09 854.254,50 716.792,46 784.403,50 831.208,50 696.094,45 698.613,50
2 H.2 Bongkar 1 m³ beton dengan jack hammer m3 270.365,00 272.571,80 272.571,80 301.645,00 284.395,00 275.770,00 274.411,20 274.411,20 274.411,20 382.260,00 284.091,32 322.460,00 344.885,00 277.230,32 280.370,00

I. PEKERJAAN PEMASANGAN WATERSTOP

1 I.1 1 m' Pasangan Water Stop PVC lebar 150 mm m 209.885,06 219.512,45 217.097,45 239.664,95 233.588,16 204.605,76 223.083,97 226.706,47 232.743,97 453.716,53 228.777,48 369.696,25 417.481,15 226.847,43 256.220,96
2 I.2 1 m' Pasangan Water Stop PVC lebar 200 mm m 212.951,25 222.583,77 220.168,77 242.949,00 236.802,25 207.787,75 226.157,36 229.779,86 250.307,36 457.636,75 231.994,79 373.330,25 421.262,25 229.944,31 259.394,00
3 I.3 1 m' Pasangan Water Stop PVC lebar 230 mm - 320 mm m 384.778,50 402.857,95 399.235,45 440.266,00 429.283,50 374.911,50 408.837,91 432.987,91 404.007,91 873.965,50 420.856,75 655.511,50 742.198,50 416.270,85 472.351,00
4 I.4 1 m' Pasangan Water Stop PVC lebar 150 mm - 200 mm m 309.861,75 324.335,77 321.920,77 354.441,50 345.810,75 302.271,75 329.128,36 349.655,86 332.750,86 702.149,75 338.588,29 525.889,25 595.590,75 335.330,31 380.489,00

J. PEKERJAAN PEMANCANGAN

1 J.1 Per-m' Penetrasi tiang pancang kayu gelondong Ø 15 - 20 cm m 146.883,75 146.633,18 146.633,18 150.851,25 150.851,25 150.851,25 146.244,82 146.244,82 146.244,82 165.341,25 150.737,37 160.166,25 165.341,25 147.301,99 148.263,75
2 J.2 Per-m' Penetrasi tiang pancang kayu atau dolken Ø 8 - 10 cm m 35.765,00 35.723,24 35.723,24 36.570,00 36.570,00 36.570,00 35.658,51 35.658,51 35.658,51 39.416,25 36.551,02 38.553,75 39.416,25 35.834,71 36.138,75
3 J.3 Per-m' Penetrasi tiang pancang baja pipa Ø 30 cm atau kotak 30 x 30 cm m 112.815,00 114.014,63 113.980,13 124.786,50 117.783,00 113.873,00 115.038,03 115.256,53 115.222,03 155.411,00 117.663,39 133.503,50 139.989,50 115.565,39 118.151,00

BIDANG SUMBER DAYA AIR SDA - 11 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

4 J.4 Per-m' penetrasi tiang pancang beton kotak 20 cm x 20 cm m 161.529,00 161.295,13 161.295,13 165.232,00 165.232,00 165.232,00 160.932,67 160.932,67 160.932,67 178.756,00 165.125,71 173.926,00 178.756,00 161.919,36 162.817,00
5 J.5 Per-m' penetrasi tiang pancang beton kotak 25 cm x 25 cm m 153.088,00 152.820,72 152.820,72 156.952,00 156.952,00 156.952,00 152.406,48 152.406,48 152.406,48 171.304,00 156.830,53 165.784,00 171.304,00 153.534,13 154.192,00
6 J.6 Per-m' penetrasi tiang pancang beton kotak 30 cm x 30 cm m 178.848,00 178.547,31 178.547,31 183.609,00 183.609,00 183.609,00 178.081,29 178.081,29 178.081,29 200.997,00 183.472,34 194.787,00 200.997,00 179.349,89 180.504,00
7 J.7 Per-m' penetrasi tiang pancang beton Ø 40 atau kotak 40 cm x 40 cm m 218.592,00 218.224,49 218.224,49 224.411,00 224.411,00 224.411,00 217.654,91 217.654,91 217.654,91 245.663,00 224.243,98 238.073,00 245.663,00 219.205,42 220.616,00
8 J.8 Per-m' penetrasi tiang pancang (hollow) beton Ø 40 cm m 198.720,00 198.385,90 198.385,90 204.010,00 204.010,00 204.010,00 197.868,10 197.868,10 197.868,10 223.330,00 203.858,16 216.430,00 223.330,00 199.277,66 200.560,00
9 J.9 Per m' penetrasi untuk 1 m' lebar turap (10 - 12,5 buah) dolken Ø 8 - 10 cm m 314.525,00 314.107,38 314.107,38 322.575,00 322.575,00 322.575,00 313.460,12 313.460,12 313.460,12 351.037,50 322.385,20 342.412,50 351.037,50 315.222,07 318.262,50
10 J.10 Per m' penetrasi untuk 1 m' lebar turap (10 buah) kayu papan (2 - 3) / 10 cm m 278.932,50 278.598,40 278.598,40 285.372,50 285.372,50 285.372,50 278.080,60 278.080,60 278.080,60 308.142,50 285.220,66 301.242,50 308.142,50 279.490,16 281.922,50
11 J.11 Per m' penetrasi untuk 1 m' lebar turap (5 buah) kayu papan (2 - 3) / 20 cm m 239.125,25 238.724,33 238.724,33 246.853,25 246.853,25 246.853,25 238.102,97 238.102,97 238.102,97 274.177,25 246.671,04 265.897,25 274.177,25 239.794,44 242.713,25
12 J.12 Per m' penetrasi untuk 1 m' lebar turap (4 buah) kayu papan (2 - 3) / 25 cm m 239.706,00 239.271,67 239.271,67 248.078,00 248.078,00 248.078,00 238.598,53 238.598,53 238.598,53 277.679,00 247.880,61 268.709,00 277.679,00 240.430,96 243.593,00
13 J.13 Per m' penetrasi untuk 1 m' lebar turap (3,33 buah) kayu papan (2 - 3) / 30 cm m 244.656,75 244.189,01 244.189,01 253.672,75 253.672,75 253.672,75 243.464,09 243.464,09 243.464,09 285.550,75 253.460,17 275.890,75 285.550,75 245.437,47 248.842,75
14 J.14 Per m' penetrasi untuk 1 m' lebar turap (14 buah) kayu kaso 5/7 tebal 5 cm m 231.414,50 231.191,77 231.191,77 235.704,00 235.704,00 235.704,00 230.846,57 230.846,57 230.846,57 250.872,50 235.602,77 246.272,50 250.872,50 231.786,27 233.404,00
15 J.15 Per m' penetrasi untuk 1 m' lebar turap (20 buah) kayu kaso 5/7 tebal 7 cm m 191.607,25 191.317,70 191.317,70 197.184,75 197.184,75 197.184,75 190.868,94 190.868,94 190.868,94 216.907,25 197.053,16 210.927,25 216.907,25 192.090,55 194.194,75
16 J.16 Per m' penetrasi untuk 1 m' lebar turap (8 buah) kayu balok 8/12 tebal 8 cm m 278.932,50 278.598,40 278.598,40 285.372,50 285.372,50 285.372,50 278.080,60 278.080,60 278.080,60 308.142,50 285.220,66 301.242,50 308.142,50 279.490,16 281.922,50
17 J.17 Per m' penetrasi untuk 1 m' lebar (12,5 buah) turap kayu balok 8/12 tebal 12 cm m 239.125,25 238.724,33 238.724,33 246.853,25 246.853,25 246.853,25 238.102,97 238.102,97 238.102,97 274.177,25 246.671,04 265.897,25 274.177,25 239.794,44 242.713,25
18 J.18 Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm m 328.152,50 330.543,29 330.025,79 349.370,00 347.127,50 339.882,50 331.132,54 334.410,04 333.892,54 437.805,00 346.029,23 414.977,50 429.237,50 332.582,36 351.325,00
19 J.19 Per-m' penetrasi (1 buah) turap baja profil Larsen lebar 350 mm m 328.152,50 330.543,29 330.025,79 349.370,00 347.127,50 339.882,50 331.132,54 334.410,04 333.892,54 437.805,00 346.029,23 414.977,50 429.237,50 332.582,36 351.325,00
20 J.20 Per-m' penetrasi untuk 1 m' lebar turap (7 buah) baja profil INP-8 + UNP-8 m 243.340,00 245.817,95 245.300,45 256.622,50 253.690,00 246.100,00 246.479,05 249.756,55 249.239,05 320.735,00 252.579,08 295.492,50 310.672,50 248.046,33 257.715,00
21 J.21 Per-m' penetrasi untuk 1 m' lebar turap (5,56 buah) baja profil INP-10 + UNP-10 m 223.663,50 226.135,16 225.617,66 236.325,00 233.530,50 226.009,50 226.799,14 230.076,64 229.559,14 298.563,00 232.427,17 274.033,50 288.799,50 228.295,95 237.705,00
22 J.22 Per-m' penetrasi untuk 1 buah turap beton pre-cast 12 x 30 cm m' 97.922,50 97.755,45 97.755,45 100.567,50 100.567,50 100.567,50 97.496,55 97.496,55 97.496,55 110.227,50 100.491,58 106.777,50 110.227,50 98.201,33 98.842,50
23 J.23 Per-m' penetrasi 1 buah turap beton pre-cast 15 x 40 cm m' 156.676,00 156.408,72 156.408,72 160.908,00 160.908,00 160.908,00 155.994,48 155.994,48 155.994,48 176.364,00 160.786,53 170.844,00 176.364,00 157.122,13 158.148,00
24 J.24 Per-m' penetrasi 1 buah turap beton pre-cast 22 x 50 cm m' 195.845,00 195.510,90 195.510,90 201.135,00 201.135,00 201.135,00 194.993,10 194.993,10 194.993,10 220.455,00 200.983,16 213.555,00 220.455,00 196.402,66 197.685,00

K. PEKERJAAN DEWATERING (Normatif)


1 K.1 1 buah kistdam pasir/tanah dibungkus karung plastik bagor 43 cm x 65 cm bh 15.847,00 15.806,33 15.893,73 17.595,00 17.516,80 16.067,80 17.064,41 17.174,81 17.184,01 30.047,20 17.428,48 23.874,00 27.084,80 17.185,98 18.666,80

1 buah kistdam pasir/tanah dibungkus karung plastik/bagor/goni atau terpal ukuran 45 cm x


2 K.2 bh 35.017,50 35.048,07 35.105,57 38.111,00 37.973,00 35.880,00 36.629,27 36.859,27 36.853,52 58.075,00 37.809,69 48.650,75 53.705,00 36.921,69 39.347,25
120 cm

3 K.3 1 buah geobag pasir/tanah ukuran 145 x 240 cm bh 530.449,00 550.481,40 549.722,40 596.992,60 586.444,80 516.603,00 551.090,60 572.112,60 571.677,90 1.085.784,00 567.120,16 834.598,70 933.777,00 562.068,16 624.604,10
4 K.4 Kerangka kayu untuk 1 m3 kistdam pasir/tanah ukuran 43 cm x 65 cm m3 143.040,17 148.079,66 148.079,66 161.991,99 157.822,59 172.216,00 204.305,27 227.579,43 157.756,95 230.222,36 150.174,60 236.897,70 238.783,93 185.816,56 164.249,07

Kerangka baja profil L.50.50.5 atau L.60.60.6 atau profil besi berlubang untuk 1 m³ kistdam
5 K.5 m3 706.530,10 733.392,71 733.392,71 923.148,70 761.806,00 681.134,65 760.240,01 760.240,01 760.240,01 1.385.058,85 761.793,35 954.236,65 1.035.483,00 760.357,47 788.408,95
pasir / tanah dengan karung ukuran 43 cm x 65 cm.

Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3 m dan
6 K.6 discharge head maks. 20 m (kapasitas 0,5 m³/s pada suction head 1 m dan discharge head jam 126.643,75 130.599,15 130.599,15 161.143,75 135.556,25 123.481,25 138.828,77 138.828,77 138.828,77 238.625,00 136.962,12 172.787,50 192.050,00 134.809,93 140.300,00
10 m)

Pengoperasian per-jam pompa air diesel daya 10 kW dengan suction head maks. 3 m dan
7 K.7 discharge head maksimal 20 m (kapasitas 1,0 m³/s pada suction head 1 m dan discharge jam 371.133,75 378.107,90 378.107,90 430.071,25 386.083,75 364.952,50 390.218,77 390.218,77 390.218,77 560.021,25 387.777,12 445.883,75 475.352,50 385.337,43 394.133,75
head 10 m)

Pengoperasian per-jam pompa air diesel daya 20 kW dengan suction head maks. 3 m dan
8 K.8 discharge head maksimal 20 m (kapasitas 2,0 m³/s pada suction head 1 m dan discharge jam 874.833,75 887.586,65 887.586,65 1.001.276,25 901.341,25 862.873,75 969.301,27 969.301,27 969.301,27 1.314.565,00 924.309,62 1.107.967,50 1.239.872,50 900.594,93 936.445,00
head 10 m)

1 L. PEKERJAAN PINTU AIR

BIDANG SUMBER DAYA AIR SDA - 12 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

2 L.1 Pintu Angkat Lebar B = 200 mm; H = 250 mm; H1 = 500 mm dan TR = 1050 mm. bh 14.175.202,82 14.178.079,61 14.177.584,90 14.219.955,16 14.194.836,01 14.178.948,42 14.181.674,95 14.187.380,88 14.185.718,82 14.623.964,77 14.194.054,94 14.343.072,39 14.403.036,75 14.185.380,24 14.203.088,92

3 L.2 Pintu Sorong Kayu Lebar B = 1500 mm; H = 1500 mm; H1 = 3000 mm dan TR = 3800 mm. bh 62.208.837,82 62.360.825,36 62.320.185,56 63.305.791,62 62.897.442,47 62.275.985,30 62.436.884,36 62.759.311,85 62.689.113,15 75.101.341,51 62.820.710,23 67.840.096,15 69.798.571,83 62.576.775,45 63.355.088,08

4 L.3 Pintu Sorong Baja Lebar B = 500 mm; H = 500 mm; H1 = 1000 mm dan TR = 1900 mm. bh 25.417.943,25 25.456.053,57 25.447.810,15 25.741.685,08 25.579.254,10 25.418.140,20 25.484.025,09 25.554.696,99 25.538.062,66 28.898.487,33 25.563.597,23 26.816.377,59 27.314.224,40 25.514.884,47 25.690.985,08

5 L.4 Pintu Skot Balk Lebar B = 500 mm; H = 1000 mm. bh 273.355,00 278.366,59 278.366,59 316.480,00 290.701,60 279.220,00 290.815,08 294.265,08 283.915,08 445.280,00 289.443,47 349.600,00 369.150,00 289.229,72 293.365,00

6 L.5 Pelumasan pintu air (Pintu Angkat) (Pelumasan setiap 2 minggu sekali atau 26 kali/tahun) m2 20.911,60 20.962,18 20.962,18 22.435,81 21.813,43 21.496,72 20.979,38 20.981,45 20.980,76 26.850,66 21.786,74 24.036,38 25.498,95 21.214,99 21.340,55

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Tunggal < 1 m) (Pelumasan
7 L.6 m2 40.572,00 40.623,93 40.623,93 43.046,80 42.269,40 41.807,10 40.577,83 40.605,43 40.596,23 50.625,30 42.200,39 46.190,90 48.898,00 41.056,89 41.227,50
setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Double < 1 m) (Pelumasan setiap
8 L.7 m2 61.985,00 62.089,35 62.089,35 65.855,90 64.581,70 63.815,80 62.037,45 62.085,75 62.069,65 77.551,40 64.473,58 70.596,20 74.715,50 62.758,33 63.031,50
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Tunggal 1 - 2 m) (Pelumasan
9 L.8 m2 60.168,00 60.240,15 60.240,15 63.834,20 62.702,60 62.026,40 60.165,25 60.206,65 60.192,85 75.104,20 62.599,08 68.544,60 72.588,00 60.883,83 61.134,00
setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Kayu dengan Roda Gigi (Stang Double 1 - 2 m) (Pelumasan
10 L.9 m2 99.590,00 99.686,49 99.686,49 105.536,65 103.767,95 102.708,80 99.542,48 99.608,03 99.586,18 123.976,90 103.597,72 113.364,70 120.042,75 100.738,97 101.136,75
setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 m) (Pelumasan setiap
11 L.10 m2 61.364,00 61.468,35 61.468,35 65.234,90 63.960,70 63.194,80 61.416,45 61.464,75 61.448,65 76.930,40 63.852,58 69.975,20 74.094,50 62.137,33 62.410,50
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 m) (Pelumasan setiap
12 L.11 m2 101.706,00 101.846,19 101.846,19 107.949,35 105.969,05 104.785,70 101.736,68 101.809,13 101.784,98 127.010,60 105.794,22 115.818,80 122.607,25 102.935,47 103.367,75
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 m) (Pelumasan setiap
13 L.12 m2 61.364,00 61.468,35 61.468,35 65.234,90 63.960,70 63.194,80 61.416,45 61.464,75 61.448,65 76.930,40 63.852,58 69.975,20 74.094,50 62.137,33 62.410,50
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 m) (Pelumasan setiap
14 L.13 m2 101.706,00 101.846,19 101.846,19 107.949,35 105.969,05 104.785,70 101.736,68 101.809,13 101.784,98 127.010,60 105.794,22 115.818,80 122.607,25 102.935,47 103.367,75
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal < 1 - 2 m) (Pelumasan
15 L.14 m2 99.774,00 99.881,99 99.881,99 105.812,65 103.974,95 102.881,30 99.749,48 99.815,03 99.793,18 124.448,40 103.804,72 113.652,20 120.364,75 100.945,97 101.355,25
setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double < 1 - 2 m) (Pelumasan
16 L.15 m2 158.792,00 158.944,54 158.944,54 168.302,50 165.473,50 163.783,00 158.714,13 158.817,63 158.783,13 197.800,00 165.202,05 180.826,00 191.509,50 160.628,04 161.264,50
setiap 2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Tunggal > 2 m) (Pelumasan setiap
17 L.16 m2 156.262,00 156.343,24 156.343,24 165.281,45 162.804,35 161.317,40 156.055,33 156.148,48 156.117,43 193.749,70 162.539,80 177.737,10 188.237,75 157.965,79 158.544,75
2 minggu sekali atau 26 kali/tahun)

Pelumasan Pintu Sorong Baja dengan Roda Gigi (Stang Double > 2 m) (Pelumasan setiap
18 L.17 m2 253.092,00 253.182,32 253.182,32 267.464,70 263.642,10 261.344,40 252.681,41 252.826,31 252.778,01 313.131,20 263.216,51 287.665,60 304.623,50 255.783,76 256.691,50
2 minggu sekali atau 26 kali/tahun)

19 L.18 Pintu Besi uk. lebar 0,3 m dan tinggi 0,6 m, ulir tunggal bh 1.225.399,75 1.266.728,04 1.259.624,49 1.398.340,20 1.337.044,05 1.212.282,85 1.282.431,51 1.328.502,81 1.322.549,26 2.265.899,05 1.319.723,24 1.850.240,75 2.048.589,30 1.297.130,37 1.418.481,30
20 L.19 Pintu besi uk. lebar 0,4 m dan tinggi 0,6 m, ulir tunggal bh 1.441.973,50 1.487.492,64 1.479.938,29 1.643.793,90 1.567.816,85 1.430.223,95 1.504.976,38 1.553.752,48 1.547.348,13 2.613.787,85 1.549.323,59 2.133.957,25 2.353.180,60 1.521.124,48 1.653.779,35
21 L.20 Pintu besi uk. lebar 0,5 m dan tinggi 0,8 m, ulir tunggal bh 2.048.927,40 2.106.183,21 2.097.366,16 2.331.648,00 2.214.563,05 2.041.034,95 2.128.665,97 2.185.018,27 2.177.351,22 3.588.589,95 2.192.785,54 2.929.060,35 3.206.742,80 2.148.872,40 2.313.200,85
22 L.21 Pintu besi uk. lebar 0,8 m dan tinggi 1 m, ulir tunggal bh 3.522.751,30 3.608.518,67 3.596.633,42 4.001.947,10 3.785.023,75 3.524.201,45 3.643.123,85 3.717.885,35 3.707.150,10 5.955.846,55 3.755.265,27 4.859.845,95 5.279.535,00 3.673.187,86 3.914.460,85
23 L.22 Pintu kayu rangka besi uk. lebar 1,2 m dan tinggi 1,4 m, ulir double bh 3.370.305,00 3.434.761,75 3.417.814,20 3.955.597,50 4.001.338,75 3.786.541,75 3.933.088,07 4.177.373,37 3.883.275,82 6.079.517,55 3.871.328,30 5.301.777,15 6.289.672,00 3.961.378,01 3.785.787,35
24 L.23 Pintu kayu rangka besi uk. lebar 1 m dan tinggi 2 m, ulir double bh 3.947.064,50 4.044.888,10 4.025.042,55 4.563.289,70 4.484.893,05 4.180.605,35 4.358.786,12 4.564.109,42 4.379.813,87 7.018.895,05 4.380.161,07 5.960.375,25 6.834.601,80 4.394.978,00 4.453.348,55
25 L.24 Pintu kayu rangka besi uk. lebar 1,4 m dan tinggi 2,5 m ulir double bh 5.657.195,00 5.747.367,19 5.724.137,19 6.610.545,00 6.647.230,00 6.338.340,00 6.534.711,15 6.898.341,15 6.434.661,15 9.825.945,00 6.450.763,53 8.583.945,00 10.116.665,00 6.578.986,01 6.257.495,00
26 L.25 Pintukayu rangka besi uk. lebar 1,6 m dan tinggi 2,5 m ulir double bh 6.776.513,00 6.911.006,19 6.877.945,99 7.923.375,80 7.956.790,20 7.519.247,40 7.802.710,35 8.252.921,55 7.724.211,35 12.079.563,20 7.714.273,13 10.478.156,00 12.329.780,20 7.856.815,41 7.588.767,20
27 L.26 Pintu kayu rangka besi uk. lebar 1,8 m dan tinggi 2,5 m ulir double bh 7.482.199,00 7.598.062,19 7.565.001,99 8.805.701,80 8.941.236,20 8.540.263,40 8.818.896,35 9.365.707,55 8.643.797,35 13.216.499,20 8.640.759,13 11.623.372,00 13.863.466,20 8.873.001,41 8.303.423,20

BIDANG SUMBER DAYA AIR SDA - 13 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

28 L.27 Pintu kayu rangka besi uk. lebar 2 m dan tinggi 2,5 m ulir double bh 7.713.763,00 7.823.646,19 7.790.585,99 9.103.275,80 9.271.240,20 8.881.307,40 9.162.700,35 9.744.011,55 8.953.101,35 13.609.063,20 8.950.063,13 12.008.116,00 14.388.970,20 9.216.805,41 8.537.747,20
29 L.28 Pintu air elektromekanik uk. lebar 2 m dan tinggi 2,5 m ulir double pakai motor bh 18.325.870,00 19.335.860,60 19.177.735,60 21.808.627,50 21.539.010,00 19.060.645,00 20.806.130,02 22.045.255,02 21.133.880,02 28.593.615,00 20.838.557,09 26.405.947,50 29.725.387,50 21.023.117,40 21.045.102,50
30 L.29 Pintu air elektromekanik uk. lebar 2,5 m dan tinggi 3,5 m ulir double pakai motor bh 19.551.175,00 20.535.472,20 20.377.347,20 23.267.090,00 23.132.310,00 20.703.395,00 22.422.910,74 23.785.660,74 22.627.035,74 30.415.400,00 22.358.391,98 28.232.457,50 32.066.397,50 22.643.983,80 22.283.402,50
31 L.30 Pintu air elektromekanik uk. lebar 3 m dan tinggi 3,5 m ulir double pakai motor bh 22.590.400,00 23.654.900,64 23.474.350,64 26.847.880,00 26.697.690,00 24.027.850,00 25.926.680,89 27.502.180,89 26.119.880,89 36.142.210,00 25.830.398,37 33.115.855,00 37.808.445,00 26.185.068,56 25.783.605,00
32 L.31 Pintu air elektromekanik uk. lebar 3,5 m dan tinggi 4,5 m ulir double pakai motor bh 27.668.300,00 28.852.763,84 28.637.713,84 32.808.625,00 32.649.235,00 29.613.695,00 31.774.537,33 33.695.037,33 31.933.237,33 45.505.190,00 31.628.113,14 41.161.185,00 47.259.975,00 32.092.846,36 31.580.600,00
33 L.32 Pemasangan Pintu Klep Fiber ukuran 60 x 60 cm bh 29.998.612,50 30.140.607,26 30.116.802,26 30.327.052,50 30.207.165,00 29.897.700,00 30.209.865,25 30.269.377,75 30.281.280,25 33.058.762,50 30.279.062,90 31.160.917,50 31.475.730,00 30.237.194,15 30.366.037,50
34 L.33 Pemasangan Pintu Klep Fiber ukuran 80 x 80 cm bh 43.051.687,50 43.233.357,26 43.202.939,76 43.466.090,00 43.313.140,00 42.917.712,50 43.322.452,75 43.399.157,75 43.413.705,25 46.938.400,00 43.404.875,40 44.518.167,50 44.916.297,50 43.356.394,15 43.518.300,00
35 L.34 Pemasangan Pintu Klep Fiber ukuran 100 x 100 cm bh 52.077.750,00 52.362.574,76 52.314.964,76 52.715.655,00 52.476.742,50 51.857.812,50 52.503.247,75 52.622.272,75 52.646.077,75 58.113.525,00 52.620.055,40 54.335.085,00 54.947.460,00 52.554.381,65 52.802.250,00
36 L.35 Pemasangan Pintu Klep Fiber ukuran 120 x 120 cm bh 66.023.512,50 66.355.947,26 66.300.402,26 66.764.572,50 66.485.985,00 65.763.900,00 66.520.425,25 66.659.287,75 66.687.060,25 73.051.162,50 66.653.102,90 68.645.857,50 69.357.420,00 66.579.494,15 66.867.037,50

1 M. AHSP Pekerjaan Air Tanah (Informatif)


2 M.1 1 m' pengambilan dan deskripsi sampel batuan (dalam laporan) m' 521.525,00 520.132,93 520.132,93 538.775,00 538.775,00 538.775,00 517.975,41 517.975,41 517.975,41 604.900,00 538.142,33 576.150,00 604.900,00 523.848,58 524.400,00
3 M.2 1 m' pengeboran Ø 8 3/4" - 12" m' 223.931,91 231.840,44 229.975,71 250.570,28 245.597,68 222.599,41 234.060,24 244.627,01 243.383,86 399.391,09 242.411,66 361.653,27 403.742,12 237.893,57 262.469,33
4 M.3 1 m' reaming Ø 8 3/4" - 12" m' 293.075,20 304.417,06 302.117,06 330.353,60 323.453,60 288.953,60 308.199,27 323.724,27 321.424,27 544.446,80 317.631,73 488.855,80 549.046,80 313.466,46 349.420,60
5 M.4 1 m' reaming Ø 8 3/4" - 14 3/4" m' 412.461,30 429.726,88 426.241,69 467.555,50 457.099,93 404.822,08 435.288,14 459.103,60 455.618,41 786.680,73 448.894,94 706.113,69 795.393,71 442.935,11 496.685,35
6 M.5 Bongkar pasang temporary cassing (ID) 12" m 170.540,40 175.616,87 174.302,65 188.824,48 185.538,93 171.082,51 177.312,03 183.883,13 182.568,91 288.251,87 183.485,61 262.184,13 290.223,20 180.044,53 196.161,02
7 M.6 Bongkar pasang temporary cassing (ID) 17" m 204.221,60 210.610,06 209.295,84 227.141,10 223.198,44 203.485,14 212.298,32 221.497,86 220.183,64 354.954,17 219.829,88 322.269,33 358.239,72 215.697,32 236.425,97
8 M.7 1 m' Pengadaan dan pemasangan cassing pipa black steel 6" m' 757.767,20 840.124,61 826.497,11 939.134,85 870.594,85 690.044,85 881.576,32 917.341,32 923.148,82 2.481.391,80 909.849,13 1.405.601,30 1.582.609,30 895.602,97 967.815,85
9 M.8 1 m' pengadaan dan pemasangan LC Screen 6" m' 570.834,70 594.944,61 590.114,61 643.987,35 629.497,35 557.047,35 603.333,82 635.936,32 631.106,32 1.075.171,80 617.404,13 964.461,30 1.084.831,80 613.162,97 687.043,35
10 M.9 1 m' pengadaan dan pemasangan cassing pipa black steel 8" m' 1.109.204,90 1.245.895,35 1.222.607,85 1.406.574,20 1.293.356,70 996.886,70 1.312.701,11 1.371.408,61 1.382.046,11 3.948.932,10 1.359.173,95 2.167.869,60 2.456.059,60 1.336.406,55 1.453.321,70
11 M.10 1 m' pengadaan dan pemasangan LC screen 8" m' 1.065.981,00 1.114.236,45 1.104.576,45 1.211.663,00 1.182.683,00 1.037.783,00 1.131.072,41 1.196.277,41 1.186.617,41 2.071.794,00 1.159.720,25 1.854.731,50 2.094.736,50 1.149.372,85 1.296.935,50
12 M.11 1 m' pengadaan dan pemasangan pipa sounding PVC 1" m' 81.514,30 82.938,44 82.938,44 86.061,40 83.186,40 80.311,40 82.917,72 84.355,22 84.355,22 111.340,70 83.180,33 92.377,20 95.528,20 82.974,11 84.485,90
13 M.12 1 m³ pengadaan dan pemasangan gravel pack m' 1.816.678,00 1.823.573,90 1.820.123,90 1.976.344,00 1.878.019,00 1.796.944,00 1.828.426,37 1.870.976,37 1.858.901,37 4.865.972,00 1.859.930,81 2.789.762,00 3.176.622,00 1.847.544,61 1.932.989,00
14 M.13 1 jam pencucian sumur jam 701.955,40 701.636,89 701.636,89 707.546,70 707.546,70 707.546,70 701.143,25 701.143,25 701.143,25 727.609,60 707.401,95 721.031,60 727.609,60 702.487,03 704.257,70
15 M.14 1 jam uji pemompaan jam 701.955,40 701.636,89 701.636,89 707.546,70 707.546,70 707.546,70 701.143,25 701.143,25 701.143,25 727.609,60 707.401,95 721.031,60 727.609,60 702.487,03 704.257,70
16 M.15 1 lokasi pasang dan bongkar peralatan uji pemompaan lokasi 2.339.100,00 2.334.645,36 2.334.645,36 2.405.800,00 2.405.800,00 2.405.800,00 2.327.741,31 2.327.741,31 2.327.741,31 2.651.900,00 2.403.775,47 2.559.900,00 2.651.900,00 2.346.535,44 2.359.800,00
17 M.16 Sampling 1 sampel analisa kualitas air bh 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00 345.000,00
18 M.17 1 Buah Patok Sumur bh 423.200,00 423.218,17 423.218,17 434.700,00 431.250,00 429.525,00 422.930,16 422.930,16 422.930,16 470.925,00 430.996,93 450.225,00 463.450,00 425.279,43 426.075,00
19 M.18 1 Titik Electric Logging titik 903.325,00 903.343,17 903.343,17 913.675,00 910.225,00 908.500,00 901.905,16 901.905,16 901.905,16 946.450,00 909.971,93 925.750,00 938.975,00 904.254,43 905.050,00

N. PEKERJAAN LAIN LAIN

1 N.1 Pemagaran Dengan Rangka Baja L.40.40.4 m 842.892,50 863.136,13 861.756,13 985.262,50 889.007,50 827.942,50 880.213,53 886.768,53 885.043,53 1.411.452,50 887.231,89 1.062.082,50 1.132.692,50 882.408,39 914.767,50
2 N.2 Pemagaran Dengan Rangka Kayu m 505.068,50 513.616,27 512.236,27 536.739,50 529.632,50 529.287,50 563.623,93 589.268,93 527.513,93 685.641,50 521.605,95 656.178,50 680.397,50 549.326,80 544.214,50
3 N.3 1 m² Pembuatan Direksi Keet atap abses gelombang, dinding triplek, kaca nako. m' 3.609.850,86 3.657.273,32 3.653.941,15 3.832.294,55 3.766.194,18 3.859.590,98 4.117.440,46 4.328.111,49 3.718.973,79 5.761.002,57 3.658.752,07 4.826.027,20 5.026.407,13 3.954.516,96 3.827.907,72

1 Buah papan nama pekerjaan menggunakan Multipleks 18 mm, frame besi siku dan tiang
4 N.4 bh 1.436.465,00 1.459.770,67 1.458.160,67 1.675.032,50 1.651.457,50 1.566.587,50 1.623.242,66 1.678.787,66 1.588.627,66 2.270.617,50 1.621.764,43 2.000.367,50 2.261.762,50 1.628.811,93 1.553.995,00
kayu 8/12

1 Buah papan nama pekerjaan menggunakan multiflex 10 mm, frame allumunium siku dan
5 N.5 bh 607.487,50 613.509,88 613.095,88 678.097,50 670.013,00 647.070,50 657.701,12 672.674,12 648.110,12 849.160,00 662.693,20 776.204,00 852.345,50 660.291,07 640.964,00
tiang kayu 5/7, printing banner plastik

6 N.6 Investigasi Lapangan ls 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00 2.587.500,00

BIDANG SUMBER DAYA AIR SDA - 14 dari 15


HARGA SATUAN POKOK KEGIATAN BIDANG SUMBER DAYA AIR
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB NUNUKAN KAB MALINAU KAB TANA TIDUNG
NO URAIAN SATUAN
ANALISA Tanjung Selor Tj Palas Timur Tj Palas Utara Long Peso Bunyu Tarakan Nunukan Sebatik Sebuku Krayan Malinau Sungai Boh Long Nawang Tideng Pale Tanah Merah

7 N.7 Sewa Lahan ha 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00 11.500.000,00
8 N.8 Fasilitas ls 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00 391.920.000,00

9 N.9 Kebutuhan Lain-lain ls 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00 526.700.000,00

1 Set foto dokumentasi menggunakan kamera digital tanpa film (jika menggunakan kamera
10 N.10 set 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00 5.307.250,00
digital, untuk dokumentasinya dengan CD dan album foto)

Penggambaran dengan CAD untuk 1 buah gambar (file AutoCAD) layout, tampak potongan
11 N.11 bh 399.567,50 405.317,50 405.317,50 407.617,50 407.617,50 399.567,50 411.067,50 411.067,50 411.067,50 411.067,50 411.067,50 411.067,50 462.817,50 411.067,50 411.067,50
dan detail untuk kondisi tidak rumit dan banyak bentuk duplikasi ukuran A1

Pencetakan 1 lembar gambar layout, tampak, potongan dan detail untuk kondisi tidak rumit
12 N.12 lembar 41.400,00 41.355,45 41.355,45 41.860,00 41.860,00 41.400,00 41.194,41 41.194,41 41.194,41 41.860,00 41.839,75 41.860,00 41.860,00 41.382,35 41.400,00
ukuran A1 :

13 N.13 Foto copy dan jilid Exemplar 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00 161.000,00
14 N.14 1 Set as built drawing (reduce dan copy kalkir serta blue/black print) Set 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00 4.755.250,00
15 N.15 1 m2 Pengangkatan gulma dan/atau sampah apung Secara manual m2 5.278,50 5.261,80 5.261,80 5.485,50 5.485,50 5.485,50 5.235,90 5.235,90 5.235,90 6.279,00 5.477,91 5.934,00 6.279,00 5.306,38 5.313,00
16 N.16 1 m2 Pengangkatan gulma dan/atau sampah apung Secara Mekanis m2 5.126,70 5.158,97 5.158,97 5.437,20 5.223,30 5.119,80 5.210,72 5.210,72 5.210,72 6.157,10 5.229,19 5.559,10 5.736,20 5.199,42 5.241,70
17 N.17 1 m3 Pengangkutan gulma padat, ketebalan 25 cm (Secara Manual) m3 87.975,00 87.696,59 87.696,59 91.425,00 91.425,00 91.425,00 87.265,08 87.265,08 87.265,08 104.650,00 91.298,47 98.900,00 104.650,00 88.439,72 88.550,00
18 N.18 1 m3 Pengangkutan gulma padat, ketebalan 25 cm (Secara Mekanisl) m3 49.105,00 49.049,32 49.049,32 49.795,00 49.795,00 49.795,00 48.963,02 48.963,02 48.963,02 52.440,00 49.769,69 51.290,00 52.440,00 49.197,94 49.220,00

O. PEKERJAAN KAYU

1 O.1 1 m2 Pekerjaan serutan papan atau balok kayu (Manual) m2 41.745,00 41.717,16 41.717,16 44.332,50 44.160,00 43.815,00 42.019,01 42.019,01 42.019,01 53.762,50 44.319,85 52.152,50 53.417,50 42.136,47 44.390,00
2 O.2 1 m2 Membuat pasangan/konstruksi kayu dari bahan baku papan kayu m2 465.405,00 465.829,54 465.542,04 494.017,00 490.693,50 488.623,50 465.283,00 466.145,50 465.858,00 589.915,50 492.260,22 574.103,00 583.820,50 466.933,07 490.797,00

1 m' Pembuatan Profil pada sudut kayu dengan alat serutan profil, takikan/sambungan
3 O.3 m' 7.624,50 7.613,36 7.613,36 8.038,50 8.015,50 7.981,00 7.619,10 7.619,10 7.619,10 9.533,50 8.033,44 9.200,00 9.499,00 7.666,09 7.958,00
dengan pahat dan lain-lain

4 O.4 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas I m3 2.429.570,50 2.516.758,11 2.516.470,61 3.124.377,50 2.604.324,50 2.343.015,75 2.603.353,10 2.604.215,60 2.603.928,10 4.610.022,25 2.604.054,94 3.217.774,75 3.480.176,00 2.603.687,59 2.692.006,25

5 O.5 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas II dan/atau III m3 2.272.687,50 2.275.785,88 2.274.635,88 2.421.267,50 2.396.312,50 2.383.490,00 2.274.116,96 2.277.566,96 2.276.416,96 2.896.505,00 2.404.113,91 2.802.435,00 2.850.907,50 2.281.844,90 2.396.830,00

6 O.6 1 m2 Pekerjaan serutan papan atau balok kayu (Semi Mekanis) m2 38.571,00 38.554,30 38.554,30 39.864,75 39.795,75 39.450,75 38.856,15 38.856,15 38.856,15 45.298,50 39.857,16 43.918,50 44.953,50 38.926,63 40.037,25

7 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku papan atau balok kayu 961.630,00 964.487,47 964.199,97 1.032.872,50 1.009.010,00 997.050,00 964.831,36 965.693,86 965.406,36 1.242.172,50 1.010.695,75 1.154.715,00 1.192.837,50 970.287,25 1.003.547,50
O.7 (semi mekanis) m3
P Pekerjaan logam besi atau baja 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
1 P.1 Pemasangan 1 Kg Besi Profil Siku, IWF, INP, UNP kg 57.856,50 59.145,59 59.145,59 69.575,00 61.571,00 57.603,50 60.381,81 60.381,81 60.381,81 95.818,00 61.624,82 73.968,00 78.625,50 60.522,77 62.617,50
2 P.2 Pengerjaan 100 Kg pekerjaan perakitan konstruksi besi/baja /100 kg 454.365,00 454.424,32 454.424,32 457.182,50 456.377,50 456.032,50 454.395,52 454.395,52 454.395,52 465.405,00 456.467,19 462.415,00 463.910,00 454.630,44 456.032,50
3 P.3 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 1.870.130,00 1.911.520,33 1.911.520,33 2.226.457,50 1.973.400,00 1.847.475,00 1.952.589,17 1.952.589,17 1.952.589,17 3.007.652,50 1.974.341,78 2.323.977,50 2.461.977,50 1.955.055,90 2.010.545,00
4 P.4 Pengerjaan 10 cm pengelasan dengan las listrik 10 cm 94.024,00 95.680,73 95.404,73 101.453,00 98.256,00 93.403,00 96.405,21 98.153,21 97.877,21 134.113,00 97.716,88 117.737,00 125.258,00 96.959,18 101.384,00

Q PEKERJAAN SALURAN U-DITCH


1 Q.1 Saluran U-ditch : 30 x 50 x 8 cm ; L = 60 cm bh 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06 1.059.537,06

2 Q.2 Saluran U-ditch : 40 x 60 x 8 cm ; L = 60 cm bh 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80 1.155.102,80

3 Q.3 Saluran U-ditch : 50 x 80 x 10 cm ; L = 60 cm bh 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36 1.490.437,36

4 Q.4 Saluran U-ditch : 80 x 120 x 10 cm ; L = 80 cm bh 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34 2.347.987,34

5 Q.5 Saluran U-ditch : 100 x 150 x 10 cm ; L = 100 cm bh 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39 3.290.291,39

6 Q.6 Saluran U-ditch : 120 x 160 x 12 cm ; L = 100 cm bh 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64 4.102.017,64

BIDANG SUMBER DAYA AIR SDA - 15 dari 15


harga satuan pokok kegiatan
PROVINSI KALIMANTAN UTARA 2023
bidang tata ruang
HARGA SATUAN POKOK KEGIATAN BIDANG TATA RUANG
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB TANA TIDUNG KAB MALINAU KAB NUNUKAN
NO URAIAN SATUAN
ANALISA Tanjung Selor Tarakan Tideng pale Malinau Nunukan

A PENGADAAN PETA

1 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 1.000 NLP 100.000,00 100.000,00 100.000,00 100.000,00 100.000,00
2 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 2.500 NLP 80.000,00 80.000,00 80.000,00 80.000,00 80.000,00
3 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 5.000 NLP 70.000,00 70.000,00 70.000,00 70.000,00 70.000,00
4 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 10.000 NLP 40.000,00 40.000,00 40.000,00 40.000,00 40.000,00
5 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 1.000 m2 1,00 1,00 1,00 1,00 1,00
6 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 2.500 km2 60.000,00 60.000,00 60.000,00 60.000,00 60.000,00
7 Peta Rupa Bumi Digital jenis vektor hipsografi skala 1 : 10.000 km2 1.900,00 1.900,00 1.900,00 1.900,00 1.900,00
8 Cetakan Peta Rupa Bumi skala 1 :50.000 NLP 50.000,00 50.000,00 50.000,00 50.000,00 50.000,00
9 Peta Lingkungan Pantai Indonesia jenis vektor hipsografi skala 1 : 10.000 NLP 50.000,00 50.000,00 50.000,00 50.000,00 50.000,00
10 Cetakan Peta Lingkungan Pantai Indonesia NLP 50.000,00 50.000,00 50.000,00 50.000,00 50.000,00
11 Cetakan Peta Lingkungan Laut Indonesia NLP 50.000,00 50.000,00 50.000,00 50.000,00 50.000,00

B PRODUK PENGINDERAAN JAUH

12 Mozaik Citra Radar hasil scan dan plot lembar 400.000,00 400.000,00 400.000,00 400.000,00 400.000,00
13 Foto Udara Hitam Putih lembar 150.000,00 150.000,00 150.000,00 150.000,00 150.000,00
14 Diapositif Film lembar 150.000,00 150.000,00 150.000,00 150.000,00 150.000,00

C JASA PENGUMPULAN DAN PENGOLAHAN DATA INFORMASI GEOSPASIAL

15 Pengumpulan data geospasial GPS Geodetic titik 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00
16 Pengumpulan data geospasial Gaya Berat titik 1.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00
17 Pengumpulan data geospasial Sipat datar teliti km 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00

BIDANG TATA RUANG TR -1 dari 3


HARGA SATUAN POKOK KEGIATAN BIDANG TATA RUANG
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB TANA TIDUNG KAB MALINAU KAB NUNUKAN
NO URAIAN SATUAN
ANALISA Tanjung Selor Tarakan Tideng pale Malinau Nunukan

18 Pengumpulan data geospasial Sipat datar km 2.500.000,00 2.500.000,00 2.500.000,00 2.500.000,00 2.500.000,00
19 Survey pasang surut per bulan titik 20.000.000,00 20.000.000,00 20.000.000,00 20.000.000,00 20.000.000,00
20 Survey Bathimetri single beam (minimum 10 hari) m3 12.000.000,00 12.000.000,00 12.000.000,00 12.000.000,00 12.000.000,00
21 Survey Bathimetri multi beam (minimum 10 hari) m3 20.000.000,00 20.000.000,00 20.000.000,00 20.000.000,00 20.000.000,00
22 Pengolahan Data Geospasial dari hasil survey GPS titik 500.000,00 500.000,00 500.000,00 500.000,00 500.000,00
23 Pengolahan Data Geospasial dari hasil survey pasang surut m3 1.000.000,00 1.000.000,00 1.000.000,00 1.000.000,00 1.000.000,00
24 Pengolahan citra resolusi tinggi ha 1.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00 1.500.000,00
25 Pengolahan citra resolusi menengah scene 7.000.000,00 7.000.000,00 7.000.000,00 7.000.000,00 7.000.000,00
26 Pengolahan citra resolusi rendah scene 5.000.000,00 5.000.000,00 5.000.000,00 5.000.000,00 5.000.000,00

D JASA SURVEY TOPOGRAFI

D.1 Jasa Survey Pengukuran Jalan

Lebar data Jalan 8 - 10 m km 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00


Lebar data Jalan 10 - 15 m km 3.750.000,00 3.750.000,00 3.750.000,00 3.750.000,00 3.750.000,00
Lebar data Jalan 15 - 20 m km 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00

D.2 Jasa Survey Pemetaan Topografi

Pengukuran Batas m2 500,00 500,00 500,00 500,00 500,00


Pengukuran Situasi Detail m2 500,00 500,00 500,00 500,00 500,00
Processing dan Drawing 1 : 1000 m2 500,00 -1000,00 500,00 -1000,00 500,00 -1000,00 500,00 -1000,00 500,00 -1000,00

BIDANG TATA RUANG TR -2 dari 3


HARGA SATUAN POKOK KEGIATAN BIDANG TATA RUANG
PROVINSI KALIMANTAN UTARA
TAHUN 2023
NOMOR KAB BULUNGAN KOTA TARAKAN KAB TANA TIDUNG KAB MALINAU KAB NUNUKAN
NO URAIAN SATUAN
ANALISA Tanjung Selor Tarakan Tideng pale Malinau Nunukan

D.3 Survey Pengukuran Topografi Lahan Terbuka

Kondisi Lahan Terbuka 1 ha - 3 ha ha 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00 4.500.000,00


Kondisi Lahan Terbuka 4 ha - 6 ha ha 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00
Kondisi Lahan Terbuka ≥ 7 ha 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00

D.3 Survey Pengukuran Topografi Lahan Tertutup

Kondisi Lahan Tertutup 1 ha - 3 ha ha 7.500.000,00 7.500.000,00 7.500.000,00 7.500.000,00 7.500.000,00


Kondisi Lahan Tertutup 4 ha - 6 ha ha 6.500.000,00 6.500.000,00 6.500.000,00 6.500.000,00 6.500.000,00
Kondisi Lahan Tertutup ≥ 7 ha ha 5.500.000,00 5.500.000,00 5.500.000,00 5.500.000,00 5.500.000,00

D.4 Survey Pengukuran Cut and Fill

1 ha - 3 ha ha 5.000.000,00 5.000.000,00 5.000.000,00 5.000.000,00 5.000.000,00


4 ha - 6 ha ha 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00 4.000.000,00
≥7 ha ha 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00 3.000.000,00

BIDANG TATA RUANG TR -3 dari 3

Anda mungkin juga menyukai