I PEKERJAAN PERSIAPAN -
II PEKERJAAN AREAL DARAT -
III PEKERJAAN ABUTMENT -
IV PEKERJAAN FLOATING PONTON TRESTLE -
V PEKERJAAN FLOATING PONTON PLATFORM -
VI ACCESS BRIDGE / ALLUMUNIUM GANGWAY -
VII PEKERJAAN GERBANG PELABUHAN -
VIII PEKERJAAN POS JAGA -
IX PEKERJAAN PAGAR PELABUHAN DAN LPJU -
X PEKERJAAN TOILET UMUM -
XI BIAYA KESEHATAN DAN KESELAMATAN KERJA
SUB TOTAL I -
PPN 10 % -
SUB TOTAL II -
TOTAL -
PEMBULATAN -
Terbilang :
# Sembilan Milyar Tujuh Ratus Tujuh Puluh Tujuh Juta Delapan
Ratus Ribu Rupiah #
R IN C IAN
D-04 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K100), slump (3-6)cm w/c = 0,87 -
Semen Portland kg 230.000 - -
Pasir Beton m3 0.638 - -
Kerikil m3 0.761 - -
Pekerja Oh 1.200 - -
Tukang Batu Oh 0.200 - -
Kepala Tukang Oh 0.020 - -
Mandor Oh 0.060 - -
Jumlah -
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Bukling factor pasir = 20 %
D-05 Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (12±2)cm w/c = 0,66 -
Semen Portland kg 326.000 - -
Pasir Beton m3 0.543 - -
Kerikil m3 0.762 - -
Pekerja Oh 1.650 - -
Tukang Batu Oh 0.275 - -
Kepala Tukang Oh 0.028 - -
Mandor Oh 0.083 - -
Jumlah -
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Bukling factor pasir = 20 %
K-04 Membuat 1 m2 Pintu besi plat tebal 2 mm rangkap rangka baja siku -
Besi siku kg 15.000 - -
Plat Besi 2 mm s/d 5 mm kg 32.800 - -
Kawat las kg 0.050 - -
Pekerja Oh 1.050 - -
Tukang Besi Oh 1.050 - -
Kepala Tukang Oh 0.105 - -
Mandor Oh 0.052 - -
Jumlah -
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-27 1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu ) 0.000
Profil aluminium 4" natural m' 8.900 - 0.00
Kaca polos 5 mm m2 0.650 - 0.00
Multiplek 9 mm m2 2.730 - 0.00
Engsel Pintu Union Standard ps 1.500 - 0.00
Espangolet ps 1.000 - 0.00
Kunci 2 Slaag ROYAL bh 1.000 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-29 1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu ) 0.000
Profil aluminium 4" natural m' 10.750 - 0.00
Kaca polos 5 mm m2 1.070 - 0.00
Multiplek 9 mm m2 1.680 - 0.00
Engsel Pintu Union Standard ps 1.500 - 0.00
Espangolet ps 1.000 - 0.00
Kunci 2 Slaag ROYAL bh 1.000 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-31 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m 0.000
Profil aluminium 4" natural m' 4.000 - 0.00
Kaca polos 5 mm m2 0.240 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-32 1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m 0.000
Profil aluminium 4" natural m' 4.500 - 0.00
Kaca polos 5 mm m2 0.480 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-35 1 UNIT Pek. Kusen Jendela Alm.uk. 1,44 X 1,20 M' ( 2 lubang ) dgn 1 Daun Jendela tampa BV 0.00
Profil aluminium 4" natural m' 5.280 - 0.00
Profil daun jendela aluminium m' 3.800 - 0.00
Kaca polos 5 mm m2 2.550 - 0.00
Engsel Jendela Unilon ps 2.000 - 0.00
Sloot Handle jendela bh 2.000 - 0.00
Hak Angin Kait Jendela Biasa bh 2.000 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
K-37 1 UNIT Pek. Kusen Jendela Alm.uk. 2,00 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela tampa BV 0.00
Profil aluminium 4" natural m' 10.250 - 0.00
Profil daun jendela aluminium m' 5.400 - 0.00
Kaca polos 5 mm m2 1.650 - 0.00
Engsel Pintu Union Standard ps 2.000 - 0.00
Sloot Handle jendela bh 2.000 - 0.00
Hak Angin Kait Jendela Biasa bh 2.000 - 0.00
Acesories ( 5 % ) ls 0.000 - 0.00
Jumlah 0.000
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
M-27 Pekerjaan Septictank Komunal (Bio Fill 5000 kap 3,6 m3) 18,565,171.93
1 m3 Galian tanah biasa sedalam 1 m m3 3.7000 118,575.00 438,727.50
Pek. Buangan tanah m3 2.5000 51,960.00 129,900.00
Pek. Pasangan bata merah 1/2 (bata) 1
m3 22.4900 195,252.83 4,391,236.19
PC : 4 PS
Pek. Plat Beton K-225
- Beton K-225 m3 0.2500 1,466,222.14 366,555.54
- Besi U-24 kg 22.0700 12,616.82 278,453.27
- Bekisting m3 2.1600 3,368,895.00 7,276,813.20
Pek. Pas. Pipa PVC dia 2" + Accesoris m' 0.5000 689,347.22 344,673.61
Pek. Pas. Pipa PVC dia 4" + Accesoris m' 2.0000 1,095,532.81 2,191,065.62
Sambungan Pipa PVC Jenis AW 4" TY buah 8.0000 60,761.55 486,092.40
Pek. Pas Bio Fill 5000 kap 3.6 m3 buah 1.0000 973,911.71 973,911.71
Jumlah 16,877,429.03
Overhead & Profit 10% 1,687,742.90
Harga Satuan Pekerjaan 18,565,171.93
N-17 Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar, 2 lps cat penutup) -
Plamir kg 0.100 - -
Cat dasar kg 0.100 - -
Cat Tembok Vinilex kg 0.260 - -
Pekerja Oh 0.020 - -
Tukang cat Oh 0.063 - -
Kepala Tukang Oh 0.006 - -
Mandor Oh 0.003 - -
Jumlah -
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
N-20 Mengecat 1 m2 Tembok Baru (1 lps plamir, 1 lps cat dasar,3 lps cat penutup) -
Plamir kg 0.100 - -
Cat dasar kg 0.100 - -
Cat Tembok Vinilex kg 0.390 - -
Pekerja Oh 0.030 - -
Tukang cat Oh 0.095 - -
Kepala Tukang Oh 0.010 - -
Mandor Oh 0.004 - -
Jumlah -
Overhead & Profit 10% -
Harga Satuan Pekerjaan -
1 Mandor OH -
2 Kepala Tukang Listrik OH -
3 Kepala Tukang OH -
4 Tukang Batu OH -
5 Tukang Kayu OH -
6 Tukang Besi OH -
7 Tukang Listrik OH -
8 Tukang Cat OH -
9 Tukang Las OH -
10 Tukang Pipa OH -
11 Tukang Kaca OH -
12 Tukang OH -
13 Pembantu Tukang OH -
14 Pekerja OH -
15 Operator OH -
16 Pembantu Operator OH -
17 Surveyor OH -
18 Pembantu Surveyor OH -
19 Sopir OH -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XXIII PEKERJAAN LANDSCAPE
1 Tanam pohon pelindung tinggi 2m Ttk 45.00 O-01 - -
2 Tanam bambu krisik/jepang Ttk 35.00 O-02 - -
3 Tanam pohon perdu Ttk 20.00 O-03 - -
4 Tanam Rumput Gajah (silang papan catur) M2 150.00 O-04 - -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XXII PEKERJAAN TOILET UMUM
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 22.00 A-04 - -
2 Galian tanah pondasi M3 12.32 B-01 - -
3 Pasir urug dasar pondasi M3 0.66 B-11 - -
4 Urugan sirtu (levelling lantai) M3 0.40 B-15 - -
5 Urugan kembali galian M3 4.11 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 4.68 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 2.64 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.66 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 115.08 D-17 - -
c. Pasang bekisting untuk sloof M2 8.80 D-21 - -
2 Balok B-15x30
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.99 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 117.43 D-17 - -
c. Pasang bekisting untuk balok M2 16.50 D-23 - -
3 Kolom Praktis 13x13
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.35 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 102.92 D-17 - -
c. Pasang bekisting untuk kolom M2 10.92 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 77.00 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 154.00 F-15 - -
3 Acian M2 154.00 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 27.30 I-39 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P2 Unit 2.00 K-24 - -
2 Bouvenlight alumunium tipe J3 Unit 2.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 20.00 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 8.00 I-37 - -
3 Pas. Plint Keramik 10x40 M' 44.00 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 23.09 K-42 - -
2 Atap Genteng Metal M2 23.09 G-13 - -
3 Pas. Nok Genteng Metal M' 34.64 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 20.00 H-08 - -
2 List plafond gypsum 10 cm M' 44.00 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 154.00 N-20 - -
2 Pengecatan plafon (3 lapis) M2 20.00 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 2.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 2.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 2.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 2.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 10.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 10.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 15.00 M-16 - -
4 Wastafel BH 1.00 M-04 - -
5 Kran BH 1.00 M-19 - -
6 Closet Jongkok BH 1.00 M-02 - -
7 Floor Drain BH 1.00 M-20 - -
8 Septictank Komunal (BioFill 5000 kap 3,6 m3) Unit 1.00 M-27 - -
SUB TOTAL K -
TOTAL XXII -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XXI PEKERJAAN GANGWAY
A PEKERJAAN PONDASI & STRUKTUR
1 Stake out dan pemasangan bouwplank M' 65.00 A-04 - -
2 Galian tanah pondasi M3 31.20 B-01 - -
3 Pasir urug dasar pondasi M3 1.95 B-11 - -
4 Urugan kembali galian M3 10.40 B-09 - -
5 Pas. Batu kosong/Aanstamping 20 cm M3 7.80 C-09 - -
6 Pas. batu belah 1pc : 4ps M3 13.00 C-02 - -
7 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 1.95 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 340.00 D-17 - -
c. Pasang bekisting untuk sloof M2 26.00 D-21 - -
8 Tiang Kolom Pipa Besi Ø 4" Kg 43.56 K-01 - -
9 Rabat Beton Lantai K-175 t = 20 cm M3 19.50 D-05 - -
SUB TOTAL A -
B PEKERJAAN ATAP
1 Rangka Atap Pipa Besi Ø 4" Kg 96.80 K-01 - -
2 Penutup Zincalum 4 mm M2 130.00 G-22 - -
SUB TOTAL B -
TOTAL XXI -
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
JUMLAH HARGA
7
-
-
-
-
-
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
7
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XVI PEKERJAAN KIOS KANTIN
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 74.00 A-04 - -
2 Galian tanah pondasi M3 41.44 B-01 - -
3 Pasir urug dasar pondasi M3 2.22 B-11 - -
4 Urugan sirtu (levelling lantai) M3 5.60 B-15 - -
5 Urugan kembali galian M3 13.81 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 15.73 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 8.88 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 2.22 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 387.07 D-17 - -
c. Pasang bekisting untuk sloof M2 29.60 D-21 - -
2 Balok B-15x30
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 3.33 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 395.01 D-17 - -
c. Pasang bekisting untuk balok M2 3.30 D-23 - -
3 Kolom Praktis 13x13
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 1.12 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 329.36 D-17 - -
c. Pasang bekisting untuk kolom M2 34.58 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 259.00 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 518.00 F-15 - -
3 Acian M2 518.00 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 19.95 I-39 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P1 Unit 2.00 K-27 - -
2 Pintu kusen alumunium tipe P2 Unit 5.00 K-24 - -
3 Jendela kusen alumunium tipe J1 Unit 4.00 K-37 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
4 Jendela kusen alumunium tipe J2 Unit 4.00 K-35 - -
5 Bouvenlight alumunium tipe J3 Unit 1.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 5.50 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 112.00 I-37 - -
3 Pas. Plint Keramik 10x40 M' 148.00 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 129.33 K-42 - -
2 Atap Genteng Metal M2 129.33 G-13 - -
3 Pas. Nok Genteng Metal M' 30.31 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 112.00 H-08 - -
2 List plafond gypsum 10 cm M' 148.00 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 518.00 N-20 - -
2 Pengecatan plafon (3 lapis) M2 112.00 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 6.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 10.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 5.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 2.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 10.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 10.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 15.00 M-16 - -
4 Wastafel BH 1.00 M-04 - -
5 Kran BH 1.00 M-19 - -
6 Closet Jongkok BH 1.00 M-02 - -
7 Floor Drain BH 1.00 M-20 - -
SUB TOTAL K -
TOTAL XVI -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XV PEKERJAAN POS JAGA
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 15.00 A-04 - -
2 Galian tanah pondasi M3 8.40 B-01 - -
3 Pasir urug dasar pondasi M3 0.45 B-11 - -
4 Urugan sirtu (levelling lantai) M3 0.45 B-15 - -
5 Urugan kembali galian M3 2.80 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 3.19 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 1.80 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.45 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 78.46 D-17 - -
c. Pasang bekisting untuk sloof M2 6.00 D-21 - -
2 Balok B-15x30
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.68 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 80.66 D-17 - -
c. Pasang bekisting untuk balok M2 1.80 D-23 - -
3 Kolom Praktis 13x13
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.41 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 120.57 D-17 - -
c. Pasang bekisting untuk kolom M2 12.74 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 52.50 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 105.00 F-15 - -
3 Acian M2 105.00 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 12.60 I-39 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P1 Unit 1.00 K-27 - -
2 Pintu kusen alumunium tipe P2 Unit 1.00 K-24 - -
3 Jendela kusen alumunium tipe J1 Unit 1.00 K-37 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
4 Jendela kusen alumunium tipe J2 Unit 1.00 K-35 - -
5 Bouvenlight alumunium tipe J3 Unit 1.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 2.25 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 9.00 I-37 - -
3 Pas. Plint Keramik 10x40 M' 30.00 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 10.39 K-42 - -
2 Atap Genteng Metal M2 10.39 G-13 - -
3 Pas. Nok Genteng Metal M' 10.39 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 9.00 H-08 - -
2 List plafond gypsum 10 cm M' 30.00 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 105.00 N-20 - -
2 Pengecatan plafon (3 lapis) M2 9.00 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 2.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 1.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 1.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 1.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 10.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 10.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 15.00 M-16 - -
4 Wastafel BH 1.00 M-04 - -
5 Kran BH 1.00 M-19 - -
6 Closet Jongkok BH 1.00 M-02 - -
7 Floor Drain BH 1.00 M-20 - -
SUB TOTAL K -
TOTAL XV -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XIV PEKERJAAN MUSHOLA
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 45.00 A-04 - -
2 Galian tanah pondasi M3 25.20 B-01 - -
3 Pasir urug dasar pondasi M3 1.35 B-11 - -
4 Urugan sirtu (levelling lantai) M3 3.20 B-15 - -
5 Urugan kembali galian M3 8.40 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 9.56 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 5.40 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 1.35 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 235.38 D-17 - -
c. Pasang bekisting untuk sloof M2 18.00 D-21 - -
2 Balok B-15x30
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 2.03 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 240.80 D-17 - -
c. Pasang bekisting untuk balok M2 12.00 D-23 - -
3 Kolom Praktis 13x13
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.53 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 155.85 D-17 - -
c. Pasang bekisting untuk kolom M2 16.38 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 157.50 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 315.00 F-15 - -
3 Acian M2 315.00 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 54.60 I-39 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P1 Unit 2.00 K-27 - -
2 Pintu kusen alumunium tipe P2 Unit 2.00 K-24 - -
3 Jendela kusen alumunium tipe J1 Unit 6.00 K-37 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
4 Jendela kusen alumunium tipe J2 Unit 2.00 K-35 - -
5 Bouvenlight alumunium tipe J3 Unit 4.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 20.00 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 64.00 I-37 - -
3 Pas. Plint Keramik 10x40 M' 90.00 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 73.90 K-42 - -
2 Atap Genteng Metal M2 73.90 G-13 - -
3 Pas. Nok Genteng Metal M' 27.71 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 64.00 H-08 - -
2 List plafond gypsum 10 cm M' 90.00 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 315.00 N-20 - -
2 Pengecatan plafon (3 lapis) M2 64.00 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 4.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 4.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 4.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 1.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 15.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 15.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 20.00 M-16 - -
4 Wastafel BH 2.00 M-04 - -
5 Kran BH 8.00 M-19 - -
6 Closet Jongkok BH 4.00 M-02 - -
7 Floor Drain BH 4.00 M-20 - -
SUB TOTAL K -
TOTAL XIV -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
XII PEKERJAAN RUMAH DINAS (2 UNIT)
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 36.00 A-04 - -
2 Galian tanah pondasi M3 20.44 B-01 - -
3 Pasir urug dasar pondasi M3 1.10 B-11 - -
4 Urugan sirtu (levelling lantai) M3 1.80 B-15 - -
5 Urugan kembali galian M3 6.81 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 7.76 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 4.38 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 1.13 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 197.03 D-17 - -
c. Pasang bekisting untuk sloof M2 15.00 D-21 - -
2 Balok B-15x30
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 1.62 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 192.17 D-17 - -
c. Pasang bekisting untuk balok M2 13.50 D-23 - -
3 Kolom Praktis 13x13
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.71 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 208.79 D-17 - -
c. Pasang bekisting untuk kolom M2 21.84 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 127.75 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 255.50 F-15 - -
3 Acian M2 255.50 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 14.70 I-39 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P1 Unit 2.00 K-27 - -
2 Pintu kusen alumunium tipe P2 Unit 1.00 K-24 - -
3 Jendela kusen alumunium tipe J1 Unit 1.00 K-37 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
4 Jendela kusen alumunium tipe J2 Unit 3.00 K-35 - -
5 Bouvenlight alumunium tipe J3 Unit 1.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 3.00 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 36.00 I-37 - -
3 Pas. Plint Keramik 10x40 M' 73.00 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 41.57 K-42 - -
2 Atap Genteng Metal M2 41.57 G-13 - -
3 Pas. Nok Genteng Metal M' 20.78 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 36.00 H-08 - -
2 List plafond gypsum 10 cm M' 73.00 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 255.50 N-20 - -
2 Pengecatan plafon (3 lapis) M2 36.00 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 4.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 3.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 3.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 1.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 12.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 12.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 15.00 M-16 - -
4 Wastafel BH 1.00 M-04 - -
5 Kran BH 1.00 M-19 - -
6 Closet Jongkok BH 1.00 M-02 - -
7 Floor Drain BH 1.00 M-20 - -
8 Septictank Komunal (BioFill 5000 kap 3,6 m3) Unit 1.00 M-27 - -
SUB TOTAL K -
HARGA 1 UNIT -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
7
-
-
-
-
-
-
-
-
-
-
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
X PEKERJAAN GEDUNG TERMINAL DAN OPERASIONAL
A PEKERJAAN TANAH
1 Stake out dan pemasangan bouwplank M' 121.50 A-04 - -
2 Galian tanah pondasi M3 71.18 B-01 - -
3 Pasir urug dasar pondasi M3 3.81 B-11 - -
4 Urugan sirtu (levelling lantai) M3 12.08 B-15 - -
5 Urugan kembali galian M3 23.73 B-09 - -
SUB TOTAL A -
B PEKERJAAN PONDASI
1 Pas. batu belah 1pc : 3ps M3 27.01 C-01 - -
2 Pas. Batu kosong/Aanstamping 20 cm M3 15.25 C-09 - -
SUB TOTAL B -
C PEKERJAAN STRUKTUR
1 Sloof SL-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 3.81 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 664.30 D-17 - -
c. Pasang bekisting untuk sloof M2 25.42 D-21 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
2 Kolom K1-20x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 3.22 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 726.99 D-17 - -
c. Pasang bekisting untuk kolom M2 32.20 D-22 - -
3 Balok B-15x20
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 3.81 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 611.17 D-17 - -
c. Pasang bekisting untuk balok 2x pakai M2 34.95 D-23 - -
4 Kolom Praktis 15x15
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 0.89 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 261.72 D-17 - -
c. Pasang bekisting untuk kolom M2 13.65 D-22 - -
SUB TOTAL C -
D PEKERJAAN DINDING
1 Pasangan Batu 1/2 bata 1pc : 4ps M2 444.85 E-05 - -
2 Plesteran 1pc : 4ps tebal 20 mm M2 889.70 F-15 - -
3 Acian M2 889.70 F-27 - -
4 Dinding keramik 20x20 kamar mandi M2 69.09 I-39 - -
SUB TOTAL D -
E PEKERJAAN PINTU DAN JENDELA
1 Pintu kusen alumunium tipe P1 Unit 2.00 K-27 - -
2 Pintu kusen alumunium tipe P2 Unit 6.00 K-24 - -
3 Pintu kusen alumunium tipe P3 Unit 4.00 K-24 - -
4 Jendela kusen alumunium tipe J1 Unit 8.00 K-37 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
5 Jendela kusen alumunium tipe J2 Unit 4.00 K-35 - -
6 Bouvenlight alumunium tipe J3 Unit 4.00 K-32 - -
SUB TOTAL E -
F PEKERJAAN LANTAI
1 Pas. Lantai Keramik 20x20 Kamar Mandi M2 36.20 I-07 - -
2 Pas. Lantai Keramik 40x40 M2 241.50 I-37 - -
3 Pas. Plint Keramik 10x40 M' 254.20 I-21 - -
SUB TOTAL F -
G PEKERJAAN ATAP
1 Rangka atap baja ringan M2 378.35 K-42 - -
2 Atap Genteng Metal M2 378.35 G-13 - -
3 Pas. Nok Genteng Metal M' 53.75 G-15 - -
SUB TOTAL G -
H PEKERJAAN PLAFOND
1 Plafond Gypsum 9 mm Rangka besi hollow M2 327.66 H-08 - -
2 List plafond gypsum 10 cm M' 254.20 H-13 - -
SUB TOTAL H -
I PEKERJAAN PENGECATAN
1 Pengecatan dinding (3 lapis) M2 889.70 N-20 - -
2 Pengecatan plafon (3 lapis) M2 327.66 N-11 - -
SUB TOTAL I -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
J PEKERJAAN INSTALASI LISTRIK
1 Panel MCB BH 1.00 P-38 - -
2 Stop kontak TTK 12.00 P-39 - -
3 Pemasangan Lampu TL 20 Watt (komplit) + saklar TTK 10.00 P-41 - -
4 Pemasangan Lampu pijar 25 watt + saklar TTK 8.00 P-40 - -
5 Pemasangan Penangkal Petir Unit 2.00 P-42 - -
SUB TOTAL J -
K PEKERJAAN SANITARY
1 Instalasi air bersih Pipa PVC A/W 1" M' 40.00 M-13 - -
2 Instalasi air kotor Pipa PVC A/W 3" M' 24.00 M-15 - -
3 Instalasi air kotor Pipa PVC A/W 4" M' 45.00 M-16 - -
4 Wastafel BH 2.00 M-04 - -
5 Kran BH 6.00 M-19 - -
6 Closet Jongkok BH 6.00 M-02 - -
7 Floor Drain BH 6.00 M-20 - -
8 Urinoir BH 4.00 M-03 - -
9 Septictank Komunal (BioFill 5000 kap 3,6 m3) Unit 1.00 M-27 - -
SUB TOTAL K -
TOTAL X -
BILL OF QUANTITY (BOQ)
LOKASI YABASO - DISTRIK SENTANI KOTA
RINCIAN
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilsasi Peralatan Ls 1.00 P-37 - -
2 Pengukuran dan Positioning Ls 1.00 P-35 - -
3 Direksi Keet dan Gudang M2 60.00 A-05 - -
4 Penerangan dan Keselamatan Kerja Ls 1.00 P-28 - -
5 Pelaporan dan dokumentasi Ls 1.00 P-36 - -
TOTAL I -
II PEKERJAAN AREAL DARAT
1 Pembersihan Lahan M2 12,000.00 A-08 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
3 Jalan Lingkungan Pelabuhan
a. Urugan dan Pemadatan Tanah untuk Sub Grade M3 387.50 P-27 - -
4 Causeway
a. Geotextile Non Woven M3 165.00 B-16 - -
b. Urugan dan Pemadatan Tanah untuk Sub Grade M3 11.25 P-27 - -
c. Urugan dan Pemadatan Sirtu untuk Sub Base t=30 cm M3 13.50 P-29 - -
d. Urugan dan Pemadatan Batu Pecah untuk Base Course t=15 cm M3 6.75 P-30 - -
e. Lapis timbunan batu 20 kg M3 79.05 C-09 - -
TOTAL II -
III PEKERJAAN ABUTMENT
1 L-SHAPE BETON
a. Membuat beton dengan mutu fc=19,3 Mpa (K225) M3 14.40 D-07 - -
b. Pembesian dengan besi polos atau besi ulir Kg 1,242.53 D-17 - -
c. Pasang bekisting untuk balok 2x pakai M2 15.60 D-23 - -
TOTAL III 61,356,372.90
IV PEKERJAAN FLOATING PONTON TRESTLE
1 Plat Lantai
a. Membuat Dek Plat Lantai m2 280.00 D-07 - -
b. Pembesian dan pembautan plat Kg 13,502.83 D-17 - -
2 Balok Alumunium -
a. Pembesian Frame dengan Rangka Alumunium Kg 9,363.24 D-17 - -
b. Pasang baut pengunci M2 216.00 D-23 - -
3 FLOATING PONTON -
a. Membuat Rangkaian Floating Ponton M3 210.00 D-07 - -
b. Pembesian Frame dengan Rangka Alumunium Kg 3,224.15 D-17 - -
c. Pasang baut pengunci M2 20.90 D-23 - -
4 Tiang Railling -
a. Membuat Pedestal M3 0.97 D-07 - -
b. Pembesian Dudukan Kg 156.96 D-17 - -
c. Pasang Base Plate untuk kolom M2 11.34 D-22 - -
5 Kansteen -
a. Membuat kansteen GRC/HDPE M3 6.48 D-07 - -
b. Pembautan kansteen Kg 885.11 D-17 - -
6 Pile Stabilizer Ponton/Tiang Lampu -
Pengadaan Tiang Pancang (Dia 40cm) Bh 28.00 - - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
Pemancangan Tiang Tegak (m') Bh 28.00 - - -
Penyambungan Tiang Pancang (bh) Bh 14.00 - -
Pengecatan Tiang Pancang Baja (m2) m2 35.17 - -
7 Railling GSP 2.5", t= 3mm M' 54.00 - - -
8 PVC buangan air @ 6m M' 8.10 M-15 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
9 Angkur Untuk Dudukan Jangkar Bh 7.00 - - -
TOTAL IV -
V PEKERJAAN FLOATING PONTON PLATFORM
1 Plat Lantai
a. Membuat Dek Plat Lantai m2 112.00 D-07 - -
b. Pembesian dan pembautan plat Kg 13,502.83 D-17 - -
2 Balok Alumunium -
a. Pembesian Frame dengan Rangka Alumunium Kg 9,363.24 D-17 - -
b. Pasang baut pengunci M2 216.00 D-23 - -
3 FLOATING PONTON -
a. Membuat Rangkaian Floating Ponton M3 112.00 D-07 - -
b. Pembesian Frame dengan Rangka Alumunium Kg 3,224.15 D-17 - -
c. Pasang baut pengunci M2 20.90 D-23 - -
4 Tiang Railling -
a. Membuat Pedestal M3 0.97 D-07 - -
b. Pembesian Dudukan Kg 156.96 D-17 - -
c. Pasang Base Plate untuk kolom M2 11.34 D-22 - -
5 Kansteen - - -
a. Membuat kansteen GRC/HDPE M3 6.48 D-07 - -
b. Pembautan kansteen Kg 885.11 D-17 - -
6 Pile Stabilizer Ponton/Tiang Lampu -
Pengadaan Tiang Pancang (Dia 40cm) Bh 16.00 - - -
Pemancangan Tiang Tegak (m') Bh 16.00 - - -
Penyambungan Tiang Pancang (bh) Bh 8.00 - -
Pengecatan Tiang Pancang Baja (m2) m2 20.10 - -
9 Railling GSP 2.5", t= 3mm M' 54.00 - - -
10 PVC buangan air @ 6m M' 8.10 M-15 - -
11 Angkur Untuk Dudukan Jangkar Bh 4.00 - - -
TOTAL V -
IX ACCESS BRIDGE
1 Abutment
a. Ram door M3 2.40 D-07 - -
b. Pembesian Angkur & Roller Kg 621.43 D-17 - -
No. URAIAN PEKERJAAN SATUAN VOLUME KODE HARGA SATUAN JUMLAH HARGA
1 2 3 4 5 6 7
2 Pek. Profil Baja Alumunium
a. Profil 200.200.6.9 Kg 369.00 K-01 - -
b. Profil 100.50.5.7 Kg 246.58 K-01 - -
c. Base Plate Railing Post, t = 12 mm Kg 14.40 K-01 - -
d. Plat Baja Stiffener t = 8 mm Kg 3.60 K-01 - -
e. Plat Grating untuk Lantai Kg 57.60 K-01 - -
TOTAL IX -