(B.O.Q)
SUB KEGIATAN : URUSAN PENYELENGGARAAN PSU PERUMAHAN
PEKERJAAN : PEMBANGUNAN MASJID AL- MUKMININ RT 012 RW 05 DUSUN SRI LESTARI
LOKASI : KECAMATAN SIAK KECIL
TAHUN ANGGARAN : 2022
REKAPITULASI HARGA
NO. DIVISI URAIAN PEKERJAAN JUMLAH SUB TOTAL JUMLAH TOTAL
1 2 3 4
(A) JUMLAH Rp -
(B) DIBULATKAN Rp -
TERBILANG : -
Bengkalis, 2022
Dibuat Oleh :
Penawar
PT./CV./Koperasi
a b c d e f=(dxe)
a b c d e f=(dxe)
HARGA JUMLAH
PERKIRAAN SATUAN HARGA
NO. AHSP URAIAN PEKERJAAN SAT.
KUANTITAS
( Rp. ) ( Rp. )
a b c d e f=(dxe)
Analisa El - 18
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B JUMLAH -
C KEUNTUNGAN 15.0 % x B -
D TOTAL BIAYA PENYELENGGARA K3 DAN KESELAMATAN -
ANALISA HARGA SATUAN PEKERJAAN ( AHSP )
BIDANG CIPTA KARYA
A. TENAGA
1. Pekerja L.01 OH 0.100 - - PERMEN PUPR NO.28/PRT/M/2016
2. Tukang L.02 OH 0.100 - - PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.001 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Mandor L.04 OH 0.005 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA -
B. BAHAN
1. Balok 5/7 Kayu Kelas III M3 0.012 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 10 cm Kg 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Papan Kayu Kelas II M3 0.007 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN -
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.071 - - PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.006 - - PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
C. PERALATAN
Alat Bantu Ls 1 -
JUMLAH HARGA PERALATAN -
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.750 - - PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.025 - - PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.500 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.050 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.300 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.010 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.250 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.025 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
A.4.1.1.4. 1 M3 Membuat Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.00
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 1.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Mandor L.04 OH 0.060 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 1.650 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.275 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.028 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.083 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Semen Portland Kg 299.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Pasir Beton /Kg Kg 799.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kerikil (Maks. 30 mm) /Kg Kg 1,017.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Air Liter 215.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 1.650 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.275 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.028 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.083 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Semen Portland Kg 371.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Pasir Beton /Kg Kg 698.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kerikil (Maks. 30 mm) /Kg Kg 1,047.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Air Liter 215.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 1.650 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.275 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.028 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.083 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Semen Portland Kg 384.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Pasir Beton /Kg Kg 692.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kerikil (Maks. 30 mm) /Kg Kg 1,039.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Air Liter 215.00 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.070 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Besi L.02 OH 0.070 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.007 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.004 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Besi Beton polos / Ulir Kg 10.50 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Kawat Beton Kg 0.15 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.520 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.260 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.026 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.026 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
1. Kayu Kelas III M3 0.040 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 10 cm Kg 0.300 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.100 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.520 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.260 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.026 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.026 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.045 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 10 cm Kg 0.300 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.100 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.660 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.330 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.040 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.400 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Balok Kayu Kelas II M3 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Plywood tbl. 6 mm M3 0.350 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Dolken Kayu Ǿ 8- 10 Pjg. 4 m Btg 2.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.660 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.330 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.040 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.400 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Balok Kayu Kelas II M3 0.018 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Plywood tbl. 9 mm M3 0.350 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Dolken Kayu Ǿ 8- 10 Pjg. 4 m Btg 2.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.660 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.330 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.040 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.400 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Balok Kayu Kelas II M3 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Plywood tbl. 9 mm M3 0.350 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Dolken Kayu Ǿ 8- 10 Pjg. 4 m Btg 6.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.660 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Kayu L.02 OH 0.330 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.030 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.400 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.150 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Balok Kayu Kelas II M3 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Plywood tbl. 9 mm M3 0.350 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Dolken Kayu Ǿ 8- 10 Pjg. 4 m Btg 2.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
A.4.1.1.35. 1 M' Membuat kolom praktis beton bertulang (11 x 11) cm 0.00
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.180 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Tukang Batu L.02 OH 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Tukang Batu L.02 OH 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Kepala Tukang L.03 OH 0.006 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Mandor L.04 OH 0.009 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA TENAGA 0.00
B. BAHAN
1. Kayu Kelas III M3 0.002 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.010 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Kg 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Besi Beton polos / Ulir Kg 3.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Kawat Beton Kg 0.450 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Semen Portland Kg 4.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
7. Pasir Beton M3 0.006 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
8. Kerikil (Maks. 30 mm) M3 0.009 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
JUMLAH HARGA BAHAN 0.00
C. PERALATAN
A.4.1.1.36. 1 M' Membuat ring balok beton bertulang (10 x 15) cm 0.00
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.297 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Tukang Batu L.02 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Tukang Batu L.02 OH 0.033 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Kepala Tukang L.03 OH 0.010 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Mandor L.04 OH 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
1. Kayu Kelas III M3 0.003 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Paku 5 - 12 cm Kg 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Minyak Bekisting Liter 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
4. Besi Beton polos / Ulir Kg 3.600 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
5. Kawat Beton Kg 0.050 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
6. Semen Portland Kg 5.500 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
7. Pasir Beton Kg 0.009 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
8. Kerikil (Maks. 30 mm) Kg 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.300 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.100 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.010 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.015 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
1. Bata Merah M' 70.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Semen Portland Kg 11.500 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Pasir Pasang M3 0.043 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
A.4.4.1.3. 1 M2 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP 0.00
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA REFERENSI AHSP
(Rupiah) (Rupiah)
A. TENAGA
1. Pekerja L.01 OH 0.600 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Tukang Batu L.02 OH 0.200 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Kepala Tukang L.03 OH 0.020 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Mandor L.04 OH 0.030 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
B. BAHAN
1. Bata Merah M' 140.000 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
2. Semen Portland Kg 26.550 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
3. Pasir Pasang M3 0.093 0.00 0.00 PERMEN PUPR NO.28/PRT/M/2016
C. PERALATAN
Bengkalis, 2022
Dibuat Oleh :
Penawar
PT./CV./Koperasi