REKAPITULASI

RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN


PEKERJAAN : PERENCANAAN TEKNIS
LOKASI : DC WARU - BANGAH - PASMAR - GIANT ( CLUSTER 2 )
KABUPATEN : KABUPATEN SIDOARJO

No Uraian Pekerjaan Sub Total (Rp)


1 2 3
A. BIAYA UMUM

I PEKERAAN PERSIAPAN -

B. BIAYA KONSTRUKSI

I PEKERJAAN TANAH -

II PEMASANGAN PIPA DAN ACCESSORIES -

IV PEKERJAAN K3 -

JUMLAH BIAYA KONSTRUKSI FISIK (BKF) -


PPN 11% -
JUMLAH -
DIBULATKAN -

##############################################################################################################################
RENCANA ANGGARAN BIAYA (RAB)
ENGINEERING ESTIMATE (EE)
KEGIATAN : PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN
PEKERJAAN : PERENCANAAN TEKNIS
LOKASI : DC WARU - BANGAH - PASMAR - GIANT ( CLUSTER 2 )
KABUPATEN : KABUPATEN SIDOARJO

HARGA SATUAN JUMLAH HARGA SUB TOTAL


NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

1 2 3 4 5 6=3*5 7
A BIAYA UMUM
I PEKERAAN PERSIAPAN
1 Mobilisasi/ demobilisasi alat dan pekeja 1.00 Ls
2 Papan nama proyek 1.00 Bh
3 Uitzet/ pengukuran 1.00 Ls
4 Direksi keet 1.00 Ls
Sub Jumlah -
B BIAYA KONSTRUKSI
I PEKERJAAN TANAH
1 Galian tanah 1,386.70 M3 -
2 Urug Pasir 534.80 M3
3 Bongkar Paving 402.50 M2
4 Pemasangan kembali Paving 402.50 M2
5 Urugan tanah sirtu, dipadatkan 1,069.95 M3
6 Galian Perkerasan Aspal 353.50 M2
7 Rekondisi Aspal 353.50 M2
8 Pembuangan tanah 1,355.20 M3 - -
Sub Jumlah -
II PEKERJAAN PIPA DAN ACCESSORIES
IIA PIPA DAN ACCESSORIES
1 Pipa GI dia8" GIP 4.00 Btg - -
2 Pipa PVC dia8" PVC RRJ 12.5 168.00 Btg - -
3 Pipa PVC dia16" PVC RRJ 12.5 180.00 Btg - -
4 Flange Socket dia3" PVC RRJ 12.5 1.00 Bh - -
5 Flange Socket dia6" PVC RRJ 12.5 2.00 Bh - -
6 Flange Socket dia8" PVC RRJ 12.5 7.00 Bh - -
7 Flange Socket dia10" PVC RRJ 12.5 1.00 Bh - -
8 Flange Socket dia12" PVC RRJ 12.5 1.00 Bh - -
9 Flange Socket dia16" PVC RRJ 12.5 4.00 Bh - -
10 Bend PVC dia3x 90' PVC RRJ 12.5 1.00 Bh - -
11 Bend PVC dia16x 90' PVC RRJ 12.5 3.00 Bh - -
12 Bend All flange GI dia8x 45' DCI 5.00 Bh - -
13 Band All flange GI dia16x 45' DCI 1.00 Bh - -
14 Tee All flange dia8"xdia3" DCI 3.00 Bh - -
15 Tee All flange dia8"xdia8" DCI 1.00 Bh - -
16 Tee All flange GI dia12"xdia10" DCI 1.00 Bh - -
17 Air Valve dia3" DCI 1.00 Bh - -
18 Water meter DCI 1.00 Bh
19 Gibboult Joint dia3" DCI PN16 1.00 Bh - -
20 Gibboult Joint dia6" DCI PN16 2.00 Bh - -
21 Gibboult Joint dia8" DCI PN16 4.00 Bh - -
22 Gibboult Joint dia12" DCI PN16 1.00 Bh - -
23 Gibboult Joint dia16" DCI PN16 2.00 Bh - -
24 Resilient gate valve dia3" DCI 2.00 Bh - -
25 Resilient gate valve dia6" DCI 3.00 Bh - -
26 Resilient gate valve dia8" DCI 4.00 Bh - -
27 Resilient gate valve dia10" DCI 1.00 Bh - -
28 Resilient gate valve dia12" DCI 2.00 Bh - -
29 Resilient gate valve dia16" DCI 2.00 Bh - -
30 Reducing Socket PVC dia8"xdia6" 3.00 Bh - -
HARGA SATUAN JUMLAH HARGA SUB TOTAL
NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

31 Reducing Socket PVC dia16"xdia12" 1.00 Bh - -


32 Tee Y All flange dia8"xdia8" 1.00 Bh - -
33 Tee Y All flange dia16"xdia16" 1.00 Bh - -
34 Blind Flange dia8" 1.00 Bh - -
35 Rubber packing dia3" Karet 14.00 Bh - -
36 Rubber packing dia6" Karet 4.00 Bh - -
37 Rubber packing dia8" Karet 14.00 Bh - -
38 Rubber packing dia10" Karet 2.00 Bh - -
39 Rubber packing dia12" Karet 4.00 Bh - -
40 Rubber packing dia16" Karet 6.00 Bh - -
41 Bolt & Nut 3/4" x 3 Besi 392.00 Bh - -
42 Strat pot 10" Besi 5.00 Bh -
43 Strat pot 8" Besi 7.00 Bh -
44 Strat pot 3" Besi 4.00 Bh

II B PEMASANGAN PIPA DAN ACCESSORIES


1 Pipa PVC dia8" 1,010.00 M
2 Pipa PVC dia16" 1,075.00 M
3 Pemasangan Accessories 1.00 Paket
4 Pekerjaan bak meter dan strainer 1.00 Ls
5 Pengelasan pipa 50.00 Cm
6 Turap bambu pengaman galian tanah 25.00 M1
II C PENGETESAN
1 Tes tekan pipa PVC dia8" 1,010.00 M -
2 Test tekan pipa PVC dia16" 1,075.00 M - -
II D JEMBATAN PERLINTASAN PIPA
JP 16M
1 Galian tanah abutment 2.50 M3 - -
2 Urugan Pasir bawah 0.31 M3 - -
3 Strous dia 20cm 0.85 M3 - -
4 Pembuatan lubang Strous dia 20cm 4.00 Ttk - -
5 Beton K250 1.66 M3 - -
6 Pas.batu kali 1 : 3 1.40 M3 - -
7 Besi beton U39 501.56 Kg - -
8 Wf 350.150.6.9 1,248.48 Kg - -
9 UNP 120.55.70 240.30 Kg - -
10 Anchor bolt M20x600 8.00 Bh - -
11 Besi klemp pipa dia10mm 12.00 Bh - -
12 Railing pengaman 2.00 Bh - -
13 Plesteran abutmen 4.56 M2 - -
14 Acian 4.56 M2 - -
15 Pengecatan pipa dan beam 34.95 M2 - -
Sub Jumlah -
III PEKERJAAN K3
1 Biaya penyiapan RK3K
a. Pembuatan Manual, prosedur, instruksi kerja dan 1.00 Ls
formulir biaya alat pelindung kerja dan alat pelindung diri
2 Biaya alat pelindung diri
a. Helm 38.00 Bh
b. Rompi 38.00 Bh
c. Sepatu safety 38.00 Bh
3 Biaya personil tenaga kerja program keselamatan kerja
a. Petugas pengatur lalu lintas ( flagman) 4.00 Org/bln
4 Biaya fasilitas kesehatan
a. Peralatan P3K ( Kotak P3K, tandu, tabung oksigen, 1.00 Ls
obat luka dan lain - lain
b. Hand sanityzer 38.00 Bh
c. Masker kesehatan 38.00 Box
HARGA SATUAN JUMLAH HARGA SUB TOTAL
NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

5 Biaya Rambu - rambu


a. Cone kerucut 4.00 Bh
b. Police line 2.00 Roll
c. Rambu tanda hati - hati 6.00 Bh
6 Biaya lain - lain terkait pengendalian resiko K3
a. Alat pemadam api ringan ( APAR ) 2.00 Bh
b. Lampu darurat ( Emergency Lamp ) 2.00 Ls
7 Biaya Asuransi dan Perizinan 1.00 Paket
SUB JUMLAH -
JUMLAH TOTAL A + B -
PPN 11% -
JUMLAH -
DIBULATKAN -
KEGIATAN : PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN
PEKERJAAN : PERENCANAAN TEKNIS
LOKASI : DC WARU - BANGAH - PASMAR - GIANT ( CLUSTER 2 )
KABUPATEN : KABUPATEN SIDOARJO
No. URAIAN PEKERJAAN SAT KOEF HARGA HARGA

1 Menggali 1 m3 Tanah biasa sedalam 2 meter M3 Analisa SNI 2.3.1.2:2016


Upah
Pekerja OH 0.400 - -
Mandor OH 0.045 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
2 Pembuatan Lubang Strous Pile diameter 20 cm kedalaman 3 m ( Titik )
Sewa Alat:
Sewa Alat bantu Strouss Pile Jam 1.200 - -
Sub Jumlah: -
Upah
Pekerja OH 1.200 - -
Mandor OH 0.060 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
3 Pengangkutan Tanah keluar Proyek
Upah
Pekerja OH 0.250 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.250 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
4 Pengurugan tanah kembali Analisa SNI 2835:2008
Upah
Mandor OH 0.015 - -
Pekerja OH 0.133 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
3
5 Mengurug kembali 1 m pasir urug
Bahan
Pasir Urug M3 1.200 - -
Sub Jumlah: -
Upah
Pekerja OH 0.300 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
6 Pengurugan Sirtu dengan Pemadatan
Bahan
Sirtu M3 1.200 - -
Sub Jumlah: -
Alat
Sewa Stamper Jam 0.009 - -
Sub Jumlah: -
Upah
Pekerja OH 0.250 - -
Mandor OH 0.025 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
7 Pengurugan tanah dengan pemadatan
Bahan
Sirtu M3 1.200 - -
Sub Jumlah: -
Alat
Sewa Alat Bantu (1 set @ 3 Alat) Jam 8.000 -
Biaya Pemadatan dengan Stamper (1 hari = 5 jam) Jam 0.333 - -
Sub Jumlah: -
Upah
Mandor OH 0.010 - -
Pekerja OH 0.300 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
8 Memadatkan 1 m3 tanah (per 20 cm) Analisa SNI 2835:2008
Bahan
Upah
Mandor OH 0.050 - -
Pekerja OH 0.500 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
9 Pemasangan Turap Bambu tinggi 1,5 m
Bahan
Bambu Bongkotan D. 10 - 12 CM, P 3.00 Mtr Batang 3.000 - -
Gedeg Guling M2 1.650 - -
Kawat Ikat Beton Kg 0.109 -
Sub Jumlah: -
Upah
Kepala Tukang Kayu OH 0.002 - -
Mandor OH 0.007 - -
Pekerja OH 0.273 - -
Tukang Kayu OH 0.022 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
10 Pemasangan Trucuk Kayu Gelam Ø 8 s/d 12
Bahan
Dolken kayu Gelam 8-10/400 cm Batang 1.000 - -
Sub Jumlah: -
Upah
Mandor OH 0.003 - -
Pekerja OH 0.050 - -
Tukang OH 0.013 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
11 Pemasangan Pipa PVC dia. 200 mm
Upah
Pekerja OH 0.189 - -
Tukang Pipa OH 0.095 - -
Mandor OH 0.019 - -
Sub Jumlah: -
Bahan
Pipa PVC 200" M 1.000 -
Sub Jumlah: -
Peralatan -
Sewa Tripot/Tackel & handle crane 2 T hari 0.024 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
12 Pemasangan Pipa PVC dia. 400 mm
Upah
Pekerja OH 0.544 - -
Tukang Pipa OH 0.272 - -
Mandor OH 0.054 - -
Sub Jumlah: -
Bahan
Pipa PVC 400" M 1.000 -
Sub Jumlah: -
Peralatan -
Sewa Tripot/Tackel & handle crane 2 T hari 0.080 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
13 Pemasangan 1 m pipa GIP Ø 200 mm M'
Upah
Pekerja OH 0.796 - -
Tukang Pipa OH 0.398 - -
Mandor OH 0.080 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 200 mm M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hr - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
14 Angkutan Pipa menggunakan Truck Rit
Upah
Mandor OH 0.563 - -
Sopir OH 0.562 - -
Pembantu Sopir OH 0.562 - -
Sub Jumlah: -
Peralatan
Sewa Truk Kelas 3 Dalam Kota Hari 0.562 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pengangkutan Pipa PVC per diameter per Rit
3/4" - 2" Btg 40.000
3"-4" Btg 30.000
6"-8" Btg 10.000
10"-12" Btg 5.000
14"-16" Btg 3.000
15 Tes Tekan Pipa dia. 200 mm M'
Upah
Pekerja OH 2.000 - -
Operator Alat Mekanik OH 0.667 - -
Tukang Pipa OH 0.250 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material
Solar Liter 0.100 - -
Air dalam m3 Liter 0.031 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
16 Tes Tekan Pipa dia. 400 mm M'
Upah
Pekerja OH 3.500 - -
Operator Alat Mekanik OH 1.165 - -
Tukang Pipa OH 0.439 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material:
Solar Liter 0.100 - -
Air dalam m3 Liter 0.050 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
17 Memasang 1 Kg besi profil kg Analisa SNI 7393:2008
Bahan
Besi Profil Kg 1.150 - -
Sub Jumlah: -
Upah
Pekerja OH 0.060 - -
Tukang Las OH 0.060 - -
Kepala Tukang Las OH 0.006 - -
Mandor OH 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
18 Memasang 1 Kg rangka kuda-kuda baja IWF kg Analisa SNI 7393:2008
Bahan
Besi baja IWF Kg 1.150 - -
Sub Jumlah: -
Upah
Tenaga Kerja
Pekerja OH 0.060 - -
Tukang Las OH 0.060 - -
Kepala Tukang Las OH 0.006 - -
Mandor OH 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
19 Pembuatan Tee Y All Flange dia 400x400
Upah
Pengelasan Pipa GI dia 400 cm 502.400 - -

Bahan
Pipa GI dia 400 m' 2.000 - -
Flange las dia 400 buah 3.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
20 Pembuatan Tee All Flange dia 200x75
Upah
Pengelasan Pipa GI dia 200 cm 125.600 - -
Pengelasan Pipa GI dia 75 cm 47.100 - -

Bahan
Pipa GI dia 200 m' 1.000 - -
Pipa GI dia 75 m' 1.000 - -
Flange las dia 200 buah 2.000 - -
Flange las dia 75 buah 1.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
21 Pembuatan Y Tee All Flange dia 400x400
Upah
Pengelasan Pipa GI dia 400 cm 502.400 - -

Bahan
Pipa GI dia 400 m' 2.000 - -
Flange las dia 400 buah 3.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
22 Pembuatan Tee All Flange dia 300x300
Upah
Pengelasan Pipa GI dia 300 cm 376.800 - -

Bahan
Pipa GI dia 300 m' 2.000 - -
Flange las dia 300 buah 3.000 - -
Jumlah:
Overhead %:
Nilai HSP: -
23 Pembuatan Tee Y All Flange dia 200x200
Upah
Pengelasan Pipa GI dia 200 cm 251.200 - -

Bahan
Pipa GI dia 200 m' 2.000 - -
Flange las dia 200 buah 3.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
24 1 m2 Pengecatan permukaan baja galvanis ( 1x cat meni , 1x cat dasar, 2x cat penutup )
Bahan
Cat meni Kg 0.200 - -
Cat dasar Kg 0.170 - -
Cat penutup 2x Kg 0.260 - -
Sub Jumlah: -
Upah
An. SNI ( Revisi ) 6.8.2
Pekerja Oh 0.070 - -
Tukang cat Oh 0.009 - -
Kepala tukang Oh 0.006 - -
Mandor Oh 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
2
25 Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang (m )
Abu-abu Mutu K300
Bahan
Paving Stone Abu-2 Tb 8 Cm (4 Persg.Panj. m2 1.010 - -
Pasir Cor/Beton m3 0.050 - -
Sub Jumlah: -
Upah
Pekerja OH 0.250 - -
Tukang Batu OH 0.500 - -
Kepala Tukang Batu OH 0.050 - -
Mandor OH 0.001 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
26 Pemasangan Paving Stone (Blok) Tbl.8 cm Abu-2 Empat Persegi Panjang (m 2)
Abu-abu Mutu K300
Bahan
2
Paving Stone Abu-2 Tb 8 Cm (4 Persg.Panj. m 1.010 - -
Pasir Cor/Beton m3 0.050 - -
Sub Jumlah: -
Upah
Pekerja OH 0.250 - -
Tukang Batu OH 0.500 - -
Kepala Tukang Batu OH 0.050 - -
Mandor OH 0.001 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
27 Kanstin 40cm Abu-abu M
Bahan
Semen PC 50 Kg zak 0.045 - -
Pasir Pasang m3 0.005 - -
Kanstin 40 cm m' 1.100 - -
Sub Jumlah: -
Upah
Mandor OH 0.001 - -
Kepala Tukang Batu OH 0.025 - -
Tukang Batu OH 0.050 - -
Pekerja OH 0.050 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
28 Stopper Uskup tebal 6 Cm (m) Abu-abu M
Bahan
Pasir Pasang m3 0.001 - -
Stopper/Uskup Tb 6 cm bh 3.340 - -
Sub Jumlah: -
Upah
Mandor OH 0.001 - -
Kepala Tukang Batu OH 0.025 - -
Tukang Batu OH 0.050 - -
Pekerja OH 0.050 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
29 Pengembalian Paving M2
Bahan
Pasir Pasang M3 0.050 - -
Sub Jumlah: -
Upah
Mandor OH 0.050 - -
Kepala Tukang Batu OH 0.050 - -
Tukang Batu OH 0.030 - -
Pekerja OH 0.080 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
30 Pembongkaran Paving Dipakai Kembali M2
Upah
Pekerja OH 0.040 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
31 Produksi Lapis Tipis Aspal Beton AC ( Lataston ) Ton
Mandor Hr 0.010 - -
Operator Alat Konstruksi Hr 0.025 - -
Pembantu Operator Alat Kontruksi Hr 0.025 - -
Sopir Hr 0.040 - -
Pembantu Sopir Hr 0.040 - -
Pekerja Hr 0.030 - -
Pekerja Hr 0.060 - -
Pasir Pasang M3 0.270 - -
Semen PC 50 Kg Sak 0.800 - -
Aspal AC 60/70 (termasuk Angkutan) Kg 70.000 - -
Kerikil/batu pecah mesin 1/2 M3 0.200 - -
Batu Pecah Mesin 2/3 cm M3 0.075 - -
Sewa AMP 10 T ( min. 5 jam ) Jam 0.050 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.240 - -
Sewa Wheel Loader 1,7 - 2 m3 ( min. 5 jam ) Jam 0.050 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
32 Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas ) Ton
Mandor Hr 0.010 - -
Operator Alat Konstruksi Hr 0.025 - -
Pembantu Operator Alat Kontruksi Hr 0.025 - -
Sopir Hr 0.040 - -
Pembantu Sopir Hr 0.040 - -
Pekerja Hr 0.030 - -
Pekerja Hr 0.060 - -
Pasir Pasang M3 0.240 - -
Kapur Pasang M3 0.020 - -
Semen PC 50 Kg Sak 0.296 - -
Aspal AC 60/70 (termasuk Angkutan) Kg 60.000 - -
Kerikil/batu pecah mesin 1/2 M3 0.140 - -
Batu Pecah Mesin 2/3 cm M3 0.170 - -
Sewa AMP 10 T ( min. 5 jam ) Jam 0.050 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.240 - -
Sewa Wheel Loader 1,7 - 2 m3 ( min. 5 jam ) Jam 0.050 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
33 Agregat Lapis Pondasi Atas (LPA) Klas A M3
Mandor Hr 0.009 - -
Pekerja Hr 0.030 - -
Agregat Klas A M3 1.259 - -
Sewa Motor Grader 125 - 140 Pk (min 5 jam) jam 0.009 - -
Sewa Truck Tangki Air jam 0.014 - -
Sewa Tandem Roller jam 0.012 - -
Sewa Dump Truck 5 T (min 5 jam) jam 0.504 - -
Sewa Wheel Loader 1,7-2 M3 (min 5 jam) jam 0.009 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
34 Agregat Lapis Pondasi Bawah (LPB) Klas B M3
Mandor Hr 0.009 - -
Pekerja Hr 0.060 - -
Agregat Klas B M3 1.259 - -
Sewa Truck Tangki Air jam 0.014 - -
Sewa Dump Truck 5 T (min 5 jam) jam 0.504 - -
Sewa Tandem Roller jam 0.011 - -
Sewa Wheel Loader 1,7-2 M3 (min 5 jam) jam 0.009 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
35 M2 Penghamparan Lapis Permukaan Aspal Beton Laston ( AC ) tb. 4 cm ( MANUAL )
Mandor Hr 0.015 - -
Pekerja Hr 0.150 - -
Produksi Lapis Tipis Aspal Beton AC Ton 0.090 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 -
Jumlah: -
Overhead %: -
Nilai HSP: -
36 M2 Penghamparan ATB tb. 6 cm ( MANUAL )
Mandor Hr 0.015 - -
Pekerja Hr 0.150 - -
Produksi ATB / ATBL / Lapis Beton Ton 0.090 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
37 M2 Galian Perkerasan Aspal
Cutting aspal m' 1.100 - -
Jackham Hr 0.239 -
solar Ltr 0.160 - -
Pekerja Hr 0.990 - -
alat bantu Set 0.840 -
Jumlah: -
Overhead %: -
Nilai HSP: -
38 M' Pekerjaan Cutting Aspal
Mandor Hr 0.010 - -
Pekerja Hr 0.020 - -
Sewa Alat Cutter Jam 0.084 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
39 M2 Rekondisi Aspal jalan Kabupaten
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.050 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.050 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 -
Jumlah: -
Overhead %: -
Nilai HSP: -
40 M2 Rekondisi Aspal jalan Kabupaten untuk perbaikan/kebocoran pipa
Cutting aspal m2 1.000 - -
Galian tanah m3 - - -
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.000 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.000 - -
Pengurugan sirtu dengan pemadatan m3 - - -
Urugan tanah kembali m3 - - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
41 M2 Rekondisi Aspal jalan Propinsi/Nasional M2
Cutting Aspal m1 1.000 - -
Galian tanah m3 - -
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.050 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.050 - -
Pengurugan sirtu dengan pemadatan m3 - -
Urugan tanah kembali m3 - -
Agregat A m3 0.300 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
42 M2 Rekondisi Rigid pavement jalan Propinsi/Nasional M2
Bongkar beton asumsi t=30 cm m3 0.240 - -
Galian tanah m3 - - -
Beton K350 m3 0.240 - -
Urugan tanah kembali m3 - - -
Agregat A m3 0.300 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
43 M2 Rekondisi bahu jalan kabupaten
Galian tanah m3 1.500 - -
Urugan tanah kembali m3 1.500 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
44 M2 Rekondisi bahu jalan Propinsi
Galian tanah m3 0.900 - -
Urugan sirtu m3 0.900 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
45 M2 Rekondisi bahu jalan Nasional
Galian tanah m3 1.500 - -
Urugan agregat B m3 0.300 - -
Urugan sirtu m3 1.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
2
45 Memasang 1 m Plesteran 1 PC : 3 PP, tebal 20 mm Analisa SNI 2837:2008
Bahan
Portland cement Kg 10.368 - -
Pasir pasang M3 0.031 - -
Sub Jumlah: -
Upah
Pekerja OH 0.260 - -
Tukang Batu OH 0.200 - -
Kepala Tukang Batu OH 0.020 - -
Mandor OH 0.013 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
2
46 Memasang 1 m acian Analisa SNI 2837:2008
Bahan
Portland cement Kg 3.250 - -
Sub Jumlah: -
Upah
Pekerja OH 0.200 - -
Tukang Batu OH 0.100 - -
Kepala Tukang Batu OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
47 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6) cm, w/c = 0,87Analisa SNI 7394:2008
Bahan
Portland cement Kg 230.000 - -
Pasir Cor/Beton Kg 893.000 - -
Kerikil Kg 1,027.000 - -
Air Liter 200.000 - -
Sub Jumlah: -
Upah
Pekerja OH 1.200 - -
Tukang Batu OH 0.200 - -
Kepala Tukang Batu OH 0.020 - -
Mandor OH 0.060 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
48 Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 Analisa SNI 7394:2008
Bahan
Portland cement Kg 413.000 - -
Pasir Cor/Beton Kg 681.000 - -
Kerikil Kg 1,021.000 - -
Air Liter 215.000 - -
Sub Jumlah: -
Upah
Pekerja OH 1.650 - -
Tukang Batu OH 0.275 - -
Kepala Tukang Batu OH 0.028 - -
Mandor OH 0.083 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
49 Pembesian 10 Kg dengan besi polos atau besi ulir Analisa SNI 7394:2008
Bahan
Besi beton Kg 10.500 - -
Kawat beton Kg 0.150 - -
Sub Jumlah: -
Upah
Pekerja OH 0.070 - -
Tukang Batu OH 0.070 - -
Kepala Tukang Batu OH 0.007 - -
Mandor OH 0.004 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
50 Pemasangan 1 m2 bekisting pondasi M2
Upah
Pekerja OH 0.520 - -
Tukang Kayu OH 0.260 - -
Kepala Tukang Kayu OH 0.026 - -
Mandor OH 0.026 - -
Sub Jumlah: -
Bahan
Usuk Kayu kelas III M3 0.040 - -
Paku biasa 2” – 5” Kg 0.300 - -
Minyak bekisting Liter 0.100 - -
Sub Jumlah: -
Peralatan
- -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
51 Pembongkaran Beton M3
Bahan
Mandor OH 0.400 - -
Pekerja OH 4.000 - -
Jumlah: -
Overhead %: -
3
Nilai HSP: -
52 Membuat 1 m beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 Analisa SNI 7394:2008
Bahan
Portland cement Kg 448.000 - -
Pasir Cor/Beton Kg 667.000 - -
Kerikil Kg 1,000.000 - -
Air Liter 215.000 - -
Sub Jumlah: -
Upah
Pekerja OH 2.100 - -
Tukang Batu OH 0.350 - -
Kepala Tukang Batu OH 0.035 - -
Mandor OH 0.105 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
53 Mengerjakan 10 cm pengelasan dengan las listrik cm Analisa SNI 7393:2008
Bahan
Kawat listrik Kg 0.400 - -
Solar Liter 0.300 - -
Minyak pelumas Liter 0.040 - -
Sub Jumlah: -
Upah
Pekerja OH 0.040 - -
Tukang las OH 0.020 - -
Kepala Tukang Las OH 0.002 - -
Mandor OH 0.002 - -
Sub Jumlah: -
Alat
Sewa Welding set Jam 0.170 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
54 Memasang 1 m3 Pondasi batu kali, campuran 1 PC : 3 PP M3 Analisa SNI 2836:2008
Bahan
3
Batu Kali 15/20 M 1.200 - -
Portland Cement Kg 202.000 - -
Pasir pasang M3 0.485 - -
Sub Jumlah: -
Upah
Pekerja OH 1.500 - -
Tukang Batu OH 0.750 - -
Kepala Tukang Batu OH 0.075 - -
Mandor OH 0.075 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN : PERENCANAAN PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN


PEKERJAAN : PERENCANAAN TEKNIS
SUMBER DANA :
LOKASI : DESA KEBONANOM - KEBON SIKEP - REL KA GEDANGAN ( CLUSTER 3 )
KABUPATEN : KABUPATEN SIDOARJO

No Uraian Pekerjaan Sub Total (Rp)


1 2 3
A. BIAYA UMUM

I PEKERAAN PERSIAPAN -

B. BIAYA KONSTRUKSI

I PEKERJAAN TANAH -

II PEMASANGAN PIPA DAN ACCESSORIES -

III PEKERJAAN K3 -

JUMLAH BIAYA KONSTRUKSI FISIK (BKF) -


PPN 11% -
JUMLAH -
DIBULATKAN -

################################################################################################################################
RENCANA ANGGARAN BIAYA (RAB)
ENGINEERING ESTIMATE (EE)
KEGIATAN : PERENCANAAN PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN
PEKERJAAN : PERENCANAAN TEKNIS
SUMBER DANA :
LOKASI : DESA KEBONANOM - KEBON SIKEP - REL KA GEDANGAN ( CLUSTER 3 )
KABUPATEN : KABUPATEN SIDOARJO

HARGA SATUAN JUMLAH HARGA SUB TOTAL


NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

1 2 3 4 5 6=3*5 7
A BIAYA UMUM
I PEKERAAN PERSIAPAN
1 Mobilisasi/ demobilisasi alat dan pekeja 1.00 Ls -
2 Papan nama proyek 1.00 Bh -
3 Uitzet/ pengukuran 1.00 Ls -
4 Direksi keet 1.00 Ls -
S Sub Jumlah -
B BIAYA KONSTRUKSI
I PEKERJAAN TANAH
1 Galian Tanah 5,102.26 M3 - -
2 Urug Pasir 495.37 M3 - -
3 Urug sirtu dipadatkan 4,513.74 M3 - -
4 Cutting Aspal 7,985.00 M2 - -
5 Rekondisi Aspal 2,807.25 M2 - -
6 Bongkar Paving 2,146.40 M2 - -
7 Rekondisi Paving 2,146.40 M3 - -
8 Pembuangan Tanah 5,102.26 M3 - -
Sub Jumlah -
II PEKERJAAN PIPA DAN ACCESSORIES -
IIA PENGADAAN PIPA DAN ACCESSORIES
1 Pipa PVC dia3" PVC RRJ 12.5 955.00 Btg - -
2 Pipa PVC dia4" PVC RRJ 12.5 1,298.00 Btg - -
3 Pipa PVC dia8" PVC RRJ 12.5 225.00 Btg - -
4 Pipa GI dia3" GI 3.00 Btg - -
5 Pipa GI dia4" GI 3.00 Btg - -
6 Pipa GI dia8" GI 6.00 Btg - -
7 Pipa GI dia12" GI 9.00 Btg - -
8 Pipa HDPE dia8" HDPE 53.10 M - -
9 Bend All Flange dia8" x45' DCI 16.00 Bh - -
10 Bend All Flange dia4" x45' DCI 5.00 Bh - -
11 Bend All Flange dia3" x45' DCI 20.00 Bh - -
12 Bend All Flange dia10" x45' DCI 1.00 Bh - -
13 Bend Las dia3" x90' CI 3.00 Bh - -
14 Bend All RR dia4" x90' PVC 9.00 Bh - -
15 Bend All RR dia2" x90' PVC 4.00 Bh - -
16 Bend All RR dia4" x45' PVC 9.00 Bh - -
17 Bend All RR dia3" x45' PVC 1.00 Bh - -
18 Bend All RR dia3" x90' PVC 9.00 Bh - -
19 Flange Socket dia10" PVC 10.00 Bh - -
20 Flange Socket dia4" PVC 9.00 Bh - -
21 Flange Socket dia8" PVC 21.00 Bh - -
22 Flange Socket dia2" PVC 8.00 Bh - -
23 Flange Socket dia3" PVC 11.00 Bh - -
24 Giboult Joint dia10" DCI 10.00 Bh - -
25 Giboult Joint dia8" DCI 6.00 Bh - -
26 End cap/ dop dia4" PVC 2.00 Bh - -
27 End cap/ dop dia3" PVC 6.00 Bh - -
28 Resillient Seat Gate Valve dia4" DCI 7.00 Bh - -
29 Resillient Seat Gate Valve dia10" DCI 7.00 Bh - -
30 Resillient Seat Gate Valve dia2" DCI 6.00 Bh - -
31 Resillient Seat Gate Valve dia8" DCI 11.00 Bh - -
32 Resillient Seat Gate Valve dia3" DCI 12.00 Bh - -
33 Reducer All Flange dia4"xdia2" DCI 4.00 Bh - -
34 Reducer All RR dia4"xdia3" PVC 1.00 Bh - -
35 Reducer All RR dia4"xdia2" PVC 1.00 Bh - -
36 Reducer All RR dia3"xdia2" PVC 1.00 Bh - -
HARGA SATUAN JUMLAH HARGA SUB TOTAL
NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

37 Tee All Flange dia10"xdia4" DCI 1.00 Bh - -


38 Tee All Flange dia4"xdia4" DCI 8.00 Bh - -
39 Tee All Flange dia4"xdia3" DCI 1.00 Bh - -
40 Tee All Flange dia4"xdia2" DCI 1.00 Bh - -
41 Tee All Flange dia8"xdia2" DCI 1.00 Bh - -
42 Tee All Flange dia8"xdia3" DCI 4.00 Bh - -
43 Tee All RR dia4"xdia3" PVC 21.00 Bh - -
44 Tee All RR dia4"xdia4" PVC 8.00 Bh - -
45 Tee All RR dia3"xdia3" PVC 4.00 Bh - -
46 Tee Y Flange dia10"xdia4" DCI 3.00 Bh - -
47 Tee Y Flange dia4"xdia4" DCI 1.00 Bh - -
48 Stratport dia8" Besi 11.00 Bh - -
49 Stratport dia10" Besi 5.00 Bh - -
50 Stratport dia4" Besi 10.00 Bh -
51 Stratport dia2" Besi 1.00 Bh -
52 Stratport dia3" Besi 8.00 Bh -
53 Water Presser/Meter Gauge dia3/4" Besi 7.00 Bh -
54 Air Valve dia3" Besi 3.00 Bh -
55 Air Valve dia2" Besi 3.00 Bh -
56 Mur baut 3/4" joint Besi 970.00 Bh -
57 Rubber Packing dia10" Karet 18.00 Bh -
58 Rubber Packing dia4" Karet 27.00 Bh -
59 Rubber Packing dia2" Karet 16.00 Bh -
60 Rubber Packing dia8" Karet 39.00 Bh -
61 Rubber Packing dia3" Karet 37.00 Bh -
II B PEMASANGAN PIPA DAN ACCESSORIES
1 Pipa PVC dia3" 5,326.00 M -
2 Pipa PVC dia4" 7,788.00 M -
3 Pipa PVC dia8" 1,100.00 M -
4 Pipa GI dia3" 16.00 M -
5 Pipa GI dia4" 18.20 M -
6 Pipa GI dia8" 36.40 M -
7 Pipa HDPE dia8" 53.10 M -
8 Pemasangan Accessories 1.00 Paket -
9 Boring/ Jacking pipa pelintas jalan dia12" 53.10 M -
10 Pekerjaan bak meter dan strainer 1.00 Ls -
11 Pengelasan pipa GI 2,417.80 Cm -
12 Pengecatan pipa GI 78.59 M2 -

II C PENGETESAN PIPA
1 Pipa PVC dia3" 5,326.00 M -
2 Pipa PVC dia4" 7,788.00 M -
3 Pipa PVC dia8" 1,100.00 M -
II D JEMBATAN PERLINTASAN PIPA
Pelintas Pipa P5,P6,P29 dan P30
1 Galian tanah abutment 8.83 M3 -
2 Urugan Pasir bawah 1.10 M3 -
3 Cerucuk Dolken 72.00 Ttk -
4 Beton K300 4.22 M3 -
5 Pas.batu kali 1 : 3 18.04 M3 -
6 Besi beton U39 842.40 Kg -
7 Plesteran 11.04 M2 -
8 Acian 11.04 M2 -
9 Pengecatan pipa 25.37 M2 -
10 Railing pengaman 8.00 Bh -
Pelintas Pipa P1b
1 Galian tanah abutment 2.40 M3 -
2 Urugan Pasir bawah 0.30 M3 -
3 Strous dia 20cm 0.85 M3 -
4 Strous dia 20cm 4.00 Ttk -
5 Beton K300 0.85 M3 -
6 Pas.batu kali 1 : 3 5.13 M3 -
7 Besi beton U39 169.00 Kg -
8 Wf 200.100.7.10 402.23 Kg -
9 UNP 50.38.5.7 13.37 Kg -
10 Anchor bolt M20x8 8.00 Bh -
11 Besi klemp pipa dia10mm 8.00 Bh -
12 Railing pengaman 2.00 Bh -
13 Plesteran abutmen 7.30 M2 -
14 Acian 7.30 M2 -
HARGA SATUAN JUMLAH HARGA SUB TOTAL
NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

15 Pengecatan pipa dan beam 12.03 M2 -


Sub Jumlah -
HARGA SATUAN JUMLAH HARGA SUB TOTAL
NO. URAIAN PEKERJAAN Volume SAT.
(Rp) (Rp) (Rp)

IV PEKERJAAN K3
1 Biaya penyiapan RK3K
a. Pembuatan Manual, prosedur, instruksi kerja dan 1.00 Ls -
formulir biaya alat pelindung kerja dan alat pelindung diri -
2 Biaya alat pelindung diri -
a. Helm 119.00 Bh -
b. Rompi 119.00 Bh -
3 Biaya personil tenaga kerja program keselamatan kerja -
a. Petugas pengatur lalu lintas ( flagman) 4.00 Org/bln -
4 Biaya fasilitas kesehatan -
a. Peralatan P3K ( Kotak P3K, tandu, tabung oksigen, 2.00 Ls -
obat luka dan lain - lain -
b. Hand sanityzer 119.00 Bh -
c. Masker kesehatan 119.00 Box -
5 Biaya Rambu - rambu -
a. Cone kerucut 4.00 Bh -
b. Police line 3.00 Roll -
c. Rambu tanda hati - hati 6.00 Bh -
6 Biaya lain - lain terkait pengendalian resiko K3 -
a. Alat pemadam api ringan ( APAR ) 2.00 Bh -
b. Lampu darurat ( Emergency Lamp ) 2.00 Ls -
7 Biaya Asuransi dan Perizinan 1.00 Paket -
SUB JUMLAH -
TOTAL SUB JUMLAH -
PPN 11% -
JUMLAH -
DIBULATKAN -
KEGIATAN : PENAMBAHAN JARINGAN PIPA DISTRIBUSI CLUSTER SPAM UMBULAN
PEKERJAAN : PERENCANAAN TEKNIS
SUMBER DANA :
LOKASI : DESA KEBONANOM - KEBON SIKEP - REL KA GEDANGAN ( CLUSTER 3 )
KABUPATEN : KABUPATEN SIDOARJO
No. URAIAN PEKERJAAN SAT KOEF HARGA HARGA

1 Menggali 1 m3 Tanah biasa sedalam 2 meter M3 Analisa SNI 2.3.1.2:2016


Upah
Pekerja OH 0.400 - -
Mandor OH 0.045 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pembuatan Lubang Strous Pile dia 30 cm kedalaman 3 m Titik
Sewa Alat:
Sewa Alat bantu Strouss Pile Jam 1.200 - -
Sub Jumlah: -
Upah
Pekerja OH 1.440 - -
Mandor OH 0.072 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
3 Pengangkutan Tanah keluar Proyek
Upah
Pekerja OH 0.250 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.250 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
4 Mengurug kembali 1 m 3 pasir urug
Bahan
Pasir Urug M3 1.200 - -
Sub Jumlah: -
Upah
Pekerja OH 0.300 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
5 Pengurugan Sirtu dengan Pemadatan
Bahan
Sirtu M3 1.200 - -
Sub Jumlah: -
Alat
Sewa Stamper Jam 0.009 - -
Sub Jumlah: -
Upah
Pekerja OH 0.250 - -
Mandor OH 0.025 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan Trucuk Kayu Gelam φ 8 s/d 12
Bahan
Dolken kayu Gelam 8-10/400 cm Batang 1.000 - -
Sub Jumlah: -
Upah
Mandor OH 0.003 - -
Pekerja OH 0.050 - -
Tukang OH 0.013 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Mengurug kembali 1 m 3 pasir pasang
Bahan
Pasir pasang M3 1.200 -
Sub Jumlah: -
Upah
Pekerja OH 0.300 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m' pipa PVC dia. 75 mm
Upah
Pekerja OH 0.017 - -
Tukang Pipa OH 0.004 - -
Mandor OH 0.001 - -
Sub Jumlah: -
Bahan
Pipa PVC 90" M 1.000 -
Sub Jumlah: -
Peralatan
Alat bantu set 1.600 -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan Pipa PVC dia. 100 mm
Upah
Pekerja OH 0.017 - -
Tukang Pipa OH 0.006 - -
Mandor OH 0.001 - -
Sub Jumlah: -
Bahan
Pipa PVC 110" M 1.000 -
Sub Jumlah: -
Peralatan
Alat bantu set 2.000 -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
6 Pemasangan Pipa PVC dia. 200 mm
Upah
Pekerja OH 0.189 - -
Tukang Pipa OH 0.095 - -
Mandor OH 0.019 - -
Sub Jumlah: -
Bahan
Pipa PVC 200" M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hari 0.024 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan Pipa PVC dia. 250 mm
Upah
Pekerja OH 0.256 - -
Tukang Pipa OH 0.128 - -
Mandor OH 0.026 - -
Sub Jumlah: -
Bahan
Pipa PVC 250" M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hari 0.034 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m pipa GIP Ø 75 mm
Upah
Pekerja OH 0.345 - -
Tukang Pipa OH 0.172 - -
Mandor OH 0.034 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 100 mm
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m pipa GIP Ø 100 mm M'
Upah
Pekerja OH 0.400 - -
Tukang Pipa OH 0.200 - -
Mandor OH 0.040 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 100 mm M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hr - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
8 Pemasangan 1 m pipa GIP Ø 200 mm M'
Upah
Pekerja OH 0.796 - -
Tukang Pipa OH 0.398 - -
Mandor OH 0.080 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 200 mm M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hr - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m pipa GIP Ø 250 mm M'
Upah
Pekerja OH 0.949 - -
Tukang Pipa OH 0.475 - -
Mandor OH 0.095 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 250 mm M 1.000 -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hr - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
8.16 Pemasangan Pipa HDPE dia. 200 mm M'
Upah
Pekerja OH 0.102 - -
Tukang Pipa OH 0.051 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Bahan
Pipa HDPE 200 mm M 1.000 -
Solar Liter 1.500 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hr 0.024 - -
Sewa Butt Welding Machine hr 0.024 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m pipa GIP Ø 300 mm M'
Upah
Pekerja OH 0.958 - -
Tukang Pipa OH 0.479 - -
Mandor OH 0.096 - -
Sub Jumlah: -
Bahan
Pipa GIP Ø 300 mm M - -
Sub Jumlah: -
Peralatan
Sewa Tripot/Tackel & handle crane 2 T hr - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan Pipa DN-300 dengan Metode Jacking
Upah
Pekerja OH 4.000 - -
Tukang Pipa OH 1.200 - -
Operator Alat Konstruksi OH 0.400 - -
Pembantu Operator Alat Kontruksi OH 0.400 - -
Sub Jumlah: -
Peralatan
Sewa Mesin Jacking hari 0.133 - -
Sewa Power pack hari 0.133 - -
Compressor breaker hari 0.133 - -
Sewa Stamper (termasuk BBM) jam 3.200 - -
Electric Generator hari 0.133 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 3.200 - -
Utility Detector hari 0.133 - -
Sewa Dump Truck 5 T (min 5 jam) Hari 0.133 - -
Sub Jumlah: -
Bahan/Material
Solar Liter 20.000 - -
Minyak Pelumas Liter 0.120 - -
Minyak Hidrolik Liter 1.200 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Angkutan Pipa menggunakan Truck Rit
Upah
Mandor OH 0.563 - -
Sopir OH 0.562 - -
Pembantu Sopir OH 0.562 - -
Sub Jumlah: -
Peralatan
Sewa Truk Kelas 3 Dalam Kota Hari 0.562 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pengangkutan Pipa PVC per diameter per Rit
3/4" - 2" Btg 40.000
3"-4" Btg 30.000
6"-8" Btg 10.000
10"-12" Btg 5.000
14"-16" Btg 3.000
Tes Tekan Pipa dia. 75 mm per 50 m'
Upah
Pekerja OH 1.000 - -
Operator Alat Mekanik OH 0.330 - -
Tukang Pipa OH 0.125 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material
Solar Liter 0.100 - -
Air dalam m3 m3 0.008 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
Tes Tekan Pipa dia. 100 mm per 50 m'
Upah
Pekerja OH 1.500 - -
Operator Alat Mekanik OH 0.500 - -
Tukang Pipa OH 0.188 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material
Solar Liter 0.100 - -
Air dalam m3 m3 0.018 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
9 Tes Tekan Pipa dia. 200 mm M'
Upah
Pekerja OH 2.000 - -
Operator Alat Mekanik OH 0.667 - -
Tukang Pipa OH 0.250 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material
Solar Liter 0.100 - -
Air dalam m3 Liter 0.031 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
Tes Tekan Pipa dia. 250 mm M'
Upah
Pekerja OH 2.500 - -
Operator Alat Mekanik OH 0.833 - -
Tukang Pipa OH 0.313 - -
Sub Jumlah: -
Peralatan
Sewa Genset 20 KVA hari 0.010 - -
Sewa Pompa Air Φ 6” (termasuk BBM) jam 0.100 - -
Sewa alat ukur tekanan hari 0.020 - -
Sub Jumlah: -
Bahan/Material:
Solar Liter 0.100 - -
Air dalam m3 Liter 0.050 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Harga per m' -
Memasang 1 Kg besi kg Analisa SNI 7393:2008
Bahan
Besi Profil Kg 1.150 - -
Sub Jumlah: -
Upah
Pekerja OH 0.060 - -
Tukang Las OH 0.060 - -
Kepala Tukang Las OH 0.006 - -
Mandor OH 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
11 Memasang 1 Kg kg Analisa SNI 7393:2008
Bahan
Besi baja IWF Kg 1.150 - -
Sub Jumlah: -
Upah
Tenaga Kerja
Pekerja OH 0.060 - -
Tukang Las OH 0.060 - -
Kepala Tukang Las OH 0.006 - -
Mandor OH 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pembuatan Tee Y All Flange dia 100x100
Upah
Pengelasan Pipa GI dia 100 cm 31.400 - -

Bahan
Pipa GI dia 100 m' 2.000 - -
Flange las dia 100 buah 3.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pembuatan Tee Y All Flange dia 250x100
Upah
Pengelasan Pipa GI dia 250 cm 235.500 - -
Pengelasan Pipa GI dia 100 cm 31.400 - -

Bahan
Pipa GI dia 250 m' 1.000 - -
Pipa GI dia 100 m' 1.000 - -
Flange las dia 250 buah 1.000 - -
Flange las dia 100 buah 2.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
13 1 m2 Pengecatan permukaan baja galvanis ( 1x cat meni , 1x cat dasar, 2x cat penutup )
Bahan
Cat meni Kg 0.200 - -
Cat dasar Kg 0.170 - -
Cat penutup 2x Kg 0.260 - -
Sub Jumlah: -
Upah
An. SNI ( Revisi ) 6.8.2
Pekerja Oh 0.070 - -
Tukang cat Oh 0.009 - -
Kepala tukang Oh 0.006 - -
Mandor Oh 0.003 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
16 Pengembalian Paving m2
Bahan
Pasir Pasang m3 0.050 - -
Sub Jumlah: -
Upah
Mandor OH 0.050 - -
Kepala Tukang Batu OH 0.050 - -
Tukang Batu OH 0.030 - -
Pekerja OH 0.080 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
17 Pembongkaran Paving Dipakai Kembali m2
Upah
Pekerja OH 0.040 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
URAIAN PEKERJAAN KOEF. SAT HARGA SAT HARGA (Rp.)
18 Produksi Lapis Tipis Aspal Beton AC ( LatastonTon
)
Mandor Hr 0.010 - -
Operator Alat Konstruksi Hr 0.025 - -
Pembantu Operator Alat Kontruksi Hr 0.025 - -
Sopir Hr 0.040 - -
Pembantu Sopir Hr 0.040 - -
Pekerja Hr 0.030 - -
Pekerja Hr 0.060 - -
Pasir Pasang M3 0.270 - -
Semen PC 50 Kg Sak 0.800 - -
Aspal AC 60/70 (termasuk Angkutan) Kg 70.000 - -
Kerikil/batu pecah mesin 1/2 M3 0.200 - -
Batu Pecah Mesin 2/3 cm M3 0.075 - -
Sewa AMP 10 T ( min. 5 jam ) Jam 0.050 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.240 - -
Sewa Wheel Loader 1,7 - 2 m3 ( min. 5 jam ) Jam 0.050 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
19 Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas )Ton
Mandor Hr 0.010 - -
Operator Alat Konstruksi Hr 0.025 - -
Pembantu Operator Alat Kontruksi Hr 0.025 - -
Sopir Hr 0.040 - -
Pembantu Sopir Hr 0.040 - -
Pekerja Hr 0.030 - -
Pekerja Hr 0.060 - -
Pasir Pasang M3 0.240 - -
Kapur Pasang M3 0.020 - -
Semen PC 50 Kg Sak 0.296 - -
Aspal AC 60/70 (termasuk Angkutan) Kg 60.000 - -
Kerikil/batu pecah mesin 1/2 M3 0.140 - -
Batu Pecah Mesin 2/3 cm M3 0.170 - -
Sewa AMP 10 T ( min. 5 jam ) Jam 0.050 - -
Sewa Dump Truck 5 T (min 5 jam) Jam 0.240 - -
Sewa Wheel Loader 1,7 - 2 m3 ( min. 5 jam ) Jam 0.050 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
20 Agregat Lapis Pondasi Atas (LPA) Klas A M3
Mandor Hr 0.009 - -
Pekerja Hr 0.030 - -
Agregat Klas A M3 1.259 - -
Sewa Motor Grader 125 - 140 Pk (min 5 jam) jam 0.009 - -
Sewa Truck Tangki Air jam 0.014 - -
Sewa Tandem Roller jam 0.012 - -
Sewa Dump Truck 5 T (min 5 jam) jam 0.504 - -
Sewa Wheel Loader 1,7-2 M3 (min 5 jam) jam 0.009 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
21 Agregat Lapis Pondasi Bawah (LPB) Klas B M3
Mandor Hr 0.009 - -
Pekerja Hr 0.060 - -
Agregat Klas B M3 1.259 - -
Sewa Truck Tangki Air jam 0.014 - -
Sewa Dump Truck 5 T (min 5 jam) jam 0.504 - -
Sewa Tandem Roller jam 0.011 - -
Sewa Wheel Loader 1,7-2 M3 (min 5 jam) jam 0.009 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
22 M2 Penghamparan Lapis Permukaan Aspal Beton Laston ( AC ) tb. 4 cm ( MANUAL )
Mandor Hr 0.015 - -
Pekerja Hr 0.150 - -
Produksi Lapis Tipis Aspal Beton AC Ton 0.090 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
23 M2 Penghamparan ATB tb. 6 cm ( MANUAL )
Mandor Hr 0.015 - -
Pekerja Hr 0.150 - -
Produksi ATB / ATBL / Lapis Beton Ton 0.090 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
24 M2 Galian Perkerasan Aspal
Cutting aspal m' 1.100 - -
Jackham Hr 0.239 -
solar Ltr 0.160 - -
Pekerja Hr 0.990 - -
alat bantu Set 0.840 -
Jumlah: -
Overhead %: -
Nilai HSP: -
25 M' Pekerjaan Cutting Aspal
Mandor Hr 0.010 - -
Pekerja Hr 0.020 - -
Sewa Alat Cutter Jam 0.084 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
26 M2 Rekondisi Aspal jalan Kabupaten
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.050 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.050 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
27 M2 Rekondisi Aspal jalan Kabupaten untuk perbaikan/kebocoran pipa
Cutting aspal m2 1.000 - -
Galian tanah m3 - - -
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.000 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.000 - -
Pengurugan sirtu dengan pemadatan m3 - - -
Urugan tanah kembali m3 - - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
28 M2 Rekondisi Aspal jalan Propinsi/Nasional M2
Cutting Aspal m' - - -
Galian tanah m3 - - -
Penghamparan ATB tb. 6 cm ( MANUAL ) m2 1.050 - -
Lapis Perm. Aspal Beton Laston ( AC ) tb. 4 cm m2 1.050 - -
Pengurugan sirtu dengan pemadatan m3 - -
Urugan tanah kembali m3 - -
Agregat A m3 0.300 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
29 M2 Rekondisi Rigid pavement jalan Propinsi/Nasional M2
Bongkar beton asumsi t=30 cm m3 0.240 - -
Galian tanah m3 - - -
Beton K350 m3 0.240 - -
Urugan tanah kembali m3 - - -
Agregat A m3 0.300 - -
Biaya Menggilas dengan Mesin Gilas Walles Jam 0.004 - -
Jumlah: -
Overhead %: -
Nilai HSP: -

M2 Rekondisi bahu jalan kabupaten


Galian tanah m3 1.500 - -
Urugan tanah kembali m3 1.500 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
M2 Rekondisi bahu jalan Propinsi
Galian tanah m3 0.900 - -
Urugan sirtu m3 0.900 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
M2 Rekondisi bahu jalan Nasional
Galian tanah m3 1.500 - -
Urugan agregat B m3 0.300 - -
Urugan sirtu m3 1.000 - -
Jumlah: -
Overhead %: -
Nilai HSP: -
30 Memasang 1 m 2 Plesteran 1 PC : 3 PP, tebal 20 mm Analisa SNI 2837:2008
Bahan
Portland cement Kg 10.368 - -
Pasir pasang M3 0.031 - -
Sub Jumlah: -
Upah
Pekerja OH 0.260 - -
Tukang Batu OH 0.200 - -
Kepala Tukang Batu OH 0.020 - -
Mandor OH 0.013 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
31 Memasang 1 m 2 acian Analisa SNI 2837:2008
Bahan
Portland cement Kg 3.250 - -
Sub Jumlah: -
Upah
Pekerja OH 0.200 - -
Tukang Batu OH 0.100 - -
Kepala Tukang Batu OH 0.010 - -
Mandor OH 0.010 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Membuat 1 m 3 lantai kerja beton mutu f'c = 7,4 Mpa (K 100), slump (3-6)
Analisa
cm, w/cSNI
= 0,87
7394:2008
Bahan
Portland cement Kg 230.000 - -
Pasir Cor/Beton Kg 893.000 - -
Kerikil Kg 1,027.000 - -
Air Liter 200.000 - -
Sub Jumlah: -
Upah
Pekerja OH 1.200 - -
Tukang Batu OH 0.200 - -
Kepala Tukang Batu OH 0.020 - -
Mandor OH 0.060 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
32 Membuat 1 m 3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm,Analisa
w/c = 0,52
SNI 7394:2008
Bahan
Portland cement Kg 413.000 - -
Pasir Cor/Beton Kg 681.000 - -
Kerikil Kg 1,021.000 - -
Air Liter 215.000 - -
Sub Jumlah: -
Upah
Pekerja OH 1.650 - -
Tukang Batu OH 0.275 - -
Kepala Tukang Batu OH 0.028 - -
Mandor OH 0.083 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
33 Pembesian 10 Kg dengan besi polos atau besi ulir Analisa SNI 7394:2008
Bahan
Besi beton Kg 10.500 - -
Kawat beton Kg 0.150 - -
Sub Jumlah: -
Upah
Pekerja OH 0.070 - -
Tukang Batu OH 0.070 - -
Kepala Tukang Batu OH 0.007 - -
Mandor OH 0.004 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pemasangan 1 m2 bekisting pondasi M2
Upah
Pekerja OH 0.520 - -
Tukang Kayu OH 0.260 - -
Kepala Tukang Kayu OH 0.026 - -
Mandor OH 0.026 - -
Sub Jumlah: -
Bahan
Usuk Kayu kelas III M3 0.040 - -
Paku biasa 2” – 5” Kg 0.300 - -
Minyak bekisting Liter 0.100 - -
Sub Jumlah: -
Peralatan
- -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
Pembongkaran Beton M3
Bahan
Mandor 0.4000 OH - -
Pekerja 4.0000 OH - -
Jumlah: -
Overhead %: -
Nilai HSP: -
3
34 Membuat 1 m beton mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm,Analisa
w/c = 0,48
SNI 7394:2008
Bahan
Portland cement Kg 448.000 - -
Pasir Cor/Beton Kg 667.000 - -
Kerikil Kg 1,000.000 - -
Air Liter 215.000 - -
Sub Jumlah: -
Upah
Pekerja OH 2.100 - -
Tukang Batu OH 0.350 - -
Kepala Tukang Batu OH 0.035 - -
Mandor OH 0.105 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
35 Mengerjakan 10 cm cm Analisa SNI 7393:2008
Bahan
Kawat LAS Kg 0.400 - -
Solar Liter 0.300 - -
Minyak pelumas Liter 0.040 - -
Sub Jumlah: -
Upah
Pekerja OH 0.040 - -
Tukang las OH 0.020 - -
Kepala Tukang Las OH 0.002 - -
Mandor OH 0.002 - -
Sub Jumlah: -
Alat
Sewa Welding set Jam 0.170 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -
36 Memasang 1 m 3 M3 Analisa SNI 2836:2008
Bahan
3
Batu belah 15cm/20 cm M 1.200 - -
Portland Cement Kg 202.000 - -
Pasir pasang M3 0.485 - -
Sub Jumlah: -
Upah
Pekerja OH 1.500 - -
Tukang Batu OH 0.750 - -
Kepala Tukang Batu OH 0.075 - -
Mandor OH 0.075 - -
Sub Jumlah: -
Jumlah: -
Overhead %: -
Nilai HSP: -