REKAPITULASI
TOTAL HARGA
NO JENIS PEKERJAAN
Rp.
1 2 3
1. PEKERJAAN PERSIAPAN Rp -
2. PEKERJAAN GALIAN TANAH PONDASI Rp -
3. PEKERJAAN PONDASI/STRUKTUR BAWAH Rp -
4. PEKERJAAN STRUKTUR ATAS Rp -
5. PEKERJAAN PASANGAN DAN PLESTERAN Rp -
6. PEKERJAAN BAJA DAN PENUTUP ATAP Rp -
7. PEKERJAAN PLAFOND Rp -
8. PEKERJAAN KUSEN, AMBANG PINTU, JENDELA DAN VENTILASI Rp -
9. PEKERJAAN PELAPIS LANTAI & DINDING Rp -
10. PEKERJAAN PENGECATAN Rp -
11. PEKERJAAN INTERIOR dan EXTERIOR Rp -
12. PEKERJAAN SANITASI Rp -
13. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp -
14. PEKERJAAN PENGADAAN LIFT Rp -
15. PEKERJAAN LAIN-LAIN Rp -
JUMLAH Rp -
PPN 11 % Rp -
JUMLAH TOTAL Rp -
DIBULATKAN Rp -
Terbilang : #VALUE!
….....................................
…...........................
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG LABORATORIUM TERPADU JURUSAN FARMASI TAHAP II
POLTEKKES KEMENKES ACEH TAHUN 2023
1. PEKERJAAN PERSIAPAN
Persiapan Awal
Jumlah 1 -
Jumlah 2 -
Pas. Pondasi Batu Gunung Mortal Type S 12,5 Mpa 19.18 M3 2.1.1.a.(a) - -
Angkur Pasangan Batu dia. 12 mm Panjang 1,2 M Jarak 50 cm 52.38 Kg 2.2.6.1.d. (a) - -
Jumlah 3 -
Kolom 30 x 30 cm (K4)
Kolom 13 x 13 cm (KP)
Jumlah 4.1 -
Kolom 25 x 25 cm (K4)
Kolom 13 x 13 cm (KP)
Jumlah 4.2 -
Kolom 25 x 25 cm (K4)
Kolom 13 x 13 cm (KP)
Jumlah 4.3 -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Kolom 13 x 13 cm (KP)
Jumlah 4.4 -
Jumlah 4 -
LANTAI . 1
LANTAI . 2
LANTAI . 3
LANTAI ATAP
Jumlah 5 -
a. Kaca Tempered 12 mm Warna Clear (Penutup Sky Light) + Accesories terpasang sesuai
65.81 M2 Taksir - -
Gambar
Jumlah 6 -
7. PEKERJAAN PLAFOND
LANTAI. 1
b. Plafond Panel Gypsum Board t=9 mm Cat Terpasang (sesuai Gambar) 1,149.13 M2 A.4.5.1.7. - -
c. Rangka Hollow 400 x 400 mm Fin. Cat Terpasang (sesuai Gambar) 67.54 M2 A.4.2.1.21. - -
d. Plafond GRC Panel Cetak t = 5 cm Fin. Cat Terpasang (sesuai Gambar) 67.54 M2 A.4.5.1.7A. - -
LANTAI. 2
b. Plafond Panel Gypsum Board t=9 mm Cat Terpasang (sesuai Gambar) 1,128.64 M2 A.4.5.1.7. - -
c. Rangka Hollow 400 x 400 mm Fin. Cat Terpasang (sesuai Gambar) 123.66 M2 A.4.2.1.21. - -
d. Plafond GRC Panel Cetak t = 5 cm Fin. Cat Terpasang (sesuai Gambar) 123.66 M2 A.4.5.1.7A. - -
LANTAI. 3
b. Plafond Panel Gypsum Board t=9 mm Cat Terpasang (sesuai Gambar) 768.74 M2 A.4.5.1.7. - -
d. Plafond GRC Akustik t=4 mm Fin. Cat Terpasang (sesuai Gambar) 391.11 M2 A.4.5.1.4. - -
f. Gantungan Pengaku Plafond CNP 125 x 50 x 20 x 2,3 mm (terpasang sesuai Gambar) 5,673.27 M A.4.2.1.1.D - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
LANTAI. ATAP
a. Rangka Hollow 400 x 400 mm Fin. Cat Terpasang (sesuai Gambar) 29.17 M2 A.4.2.1.21. - -
b. Plafond GRC Panel Cetak t = 5 cm Fin. Cat Terpasang (sesuai Gambar) 29.17 M2 A.4.5.1.7A. - -
Jumlah 7 -
LANTAI. 1
Pintu
Jendela
a. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J1) 1.00 Bh Dihitung - -
b. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J2) 1.00 Bh Dihitung - -
c. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J3) 3.00 Bh Dihitung - -
d. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J4) 4.00 Bh Dihitung - -
e. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J5) 15.00 Bh Dihitung - -
f. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J6) 10.00 Bh Dihitung - -
g. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J7) 1.00 Bh Dihitung - -
h. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
1.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J8)
i. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
2.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J17)
j. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
11.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J23)
k. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
2.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J24)
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Ventilasi
a. Kusen UPVC + Ambang Kaca 5 mm Warna Biru + Aksesoris lengkap Terpasang (V1) 8.00 Bh Dihitung - -
Dinding
a. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
1.00 Bh Dihitung - -
Gambar)(PJ1)
b. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
2.00 Bh Dihitung - -
Gambar)(PJ2)
c. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Swing 1 Kaca 5 mm Warna Biru (sesuai
3.00 Bh Dihitung - -
Gambar)(PJ3)
LANTAI. 2
Pintu
Jendela
a. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J5) 5.00 Bh Dihitung - -
b. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J6) 6.00 Bh Dihitung - -
c. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J7) 2.00 Bh Dihitung - -
d. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
1.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J8)
e. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J10) 1.00 Bh Dihitung - -
f. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J11) 4.00 Bh Dihitung - -
g. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J12) 4.00 Bh Dihitung - -
h. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J13) 2.00 Bh Dihitung - -
i. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J14) 2.00 Bh Dihitung - -
j. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J15) 2.00 Bh Dihitung - -
k. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J16) 2.00 Bh Dihitung - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
l. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J17) 2.00 Bh Dihitung - -
m. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J19) 8.00 Bh Dihitung - -
n. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
10.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J20)
o. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J22) 2.00 Bh Dihitung - -
p. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J24) 11.00 Bh Dihitung - -
q. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J26) 3.00 Bh Dihitung - -
Ventilasi
a. Kusen UPVC + Ambang Kaca 5 mm Warna Biru + Aksesoris lengkap Terpasang (V1) 8.00 Bh Dihitung - -
Dinding
a. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
2.00 Bh Dihitung - -
Gambar) (PJ2)
b. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Swing 1 Kaca 5 mm Warna Biru (sesuai
3.00 Bh Dihitung - -
Gambar) (PJ3)
c. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Swing 1 Kaca 5 mm Warna Biru (sesuai
3.00 Bh Dihitung - -
Gambar) (PJ6)
d. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pas Box Steril (sesuai Gambar) (PB1) 1.00 Bh Dihitung - -
e. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pas Box Steril (sesuai Gambar) (PB2) 5.00 Bh Dihitung - -
f. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pas Box Steril (sesuai Gambar) (PB3) 2.00 Bh Dihitung - -
LANTAI. 3
Pintu
Jendela
a. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J5) 5.00 Bh Dihitung - -
c. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J7) 2.00 Bh Dihitung - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
d. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
1.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J8)
e. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J11) 3.00 Bh Dihitung - -
f. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J12) 4.00 Bh Dihitung - -
g. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J13) 2.00 Bh Dihitung - -
h. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J15) 1.00 Bh Dihitung - -
i. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J16) 1.00 Bh Dihitung - -
j. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J17) 2.00 Bh Dihitung - -
k. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J18) 1.00 Bh Dihitung - -
l. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J19) 8.00 Bh Dihitung - -
m. Kusen UPVC + Daun Jendela Kaca warna biru 5 mm Ambang UPVC + Aksesoris lengkap
10.00 Bh Dihitung - -
Terpasang Sesuai Gambar (J20)
n. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J24) 2.00 Bh Dihitung - -
o. Kusen UPVC + Kaca warna biru 5 mm + Aksesoris lengkap Terpasang Sesuai Gambar (J25) 3.00 Bh Dihitung - -
Ventilasi
a. Kusen UPVC + Ambang Kaca 5 mm Warna Biru + Aksesoris lengkap Terpasang (V1) 8.00 Bh Dihitung - -
Dinding
a. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
2.00 Bh Dihitung - -
Gambar) (PJ2)
b. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
1.00 Bh Dihitung - -
Gambar) (PJ4)
c. Dinding Partisi Kaca 5 mm + Kusen UPVC + Pintu Geser Kaca 5 mm Warna Biru (sesuai
1.00 Bh Dihitung - -
Gambar) (PJ5)
LANTAI. ATAP
Pintu
a. Kusen UPVC + Daun Pintu Panel UPVC T= 1,7 m + Aksesoris lengkap Terpasang Sesuai
3.00 Bh Dihitung - -
Gambar (P7)
Ventilasi
a. Kusen UPVC + Ambang Kaca 5 mm Warna Biru + Aksesoris lengkap Terpasang (V1) 4.00 Bh Dihitung - -
Jumlah 8 -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
LANTAI. 1
LANTAI. 2
LANTAI. 3
LANTAI. ATAP
Jumlah 9 -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Pengecatan Baja
Jumlah 10 -
a. Panel GRC Ketebalan 2 cm Rangka Hollow 40 x 40 mm terpasang sesuai Gambar 76.50 M2 Taksir - -
- Panel GRC 6 mm
a. Panel GRC Ketebalan 6 mm Rangka Hollow 40 x 40 mm terpasang sesuai Gambar 313.95 M2 Taksir - -
- Pekerjaan Logam
a. Pekerjaan Ralling Pengaman Tangga + Conwood T = 1,6 cm Warna Akasia (sesuai Gambar) 85.92 M' Taksir - -
b. Pekerjaan Ralling Pengaman Tangga Darurat (sesuai Gambar) 89.00 M' Taksir - -
c. Pekerjaan Ralling Pengaman Balkon Dalam (sesuai Gambar) 32.40 M' Taksir - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Plat Meja
c Pekerjaan Sanitari
a. Pekerjaan Pintu Block Board Fin. HPL Lengkap Accesories 54.40 M2 Taksir - -
b. Pekerjaan Sekat Meja Block Board Fin. HPL Sesuai Gambar 72.96 M2 Taksir - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Plat Meja
c Pekerjaan Sanitari
a. Pekerjaan Pintu Block Board Fin. HPL Lengkap Accesories 108.80 M2 Taksir - -
Plat Meja
c Pekerjaan Sanitari
a. Pekerjaan Pintu Block Board Fin. HPL Lengkap Accesories 87.01 M2 Taksir - -
Plat Meja
c Pekerjaan Sanitari
a. Pekerjaan Pintu Block Board Fin. HPL Lengkap Accesories 15.40 M2 Taksir - -
a Panel GRC Ketebalan 2 cm Rangka Hollow 40 x 40 mm terpasang sesuai Gambar 428.13 M2 Taksir - -
b Kerawang GRC Ketebalan 5 cm Rangka Hollow 40 x 40 mm terpasang sesuai Gambar 64.68 M2 Taksir - -
c Cover Kolom Panel GRC Ketebalan 2 cm Rangka Hollow 40 x 40 mm terpasang sesuai Gambar 27.00 M2 Taksir - -
d Cover Kolom Plesteran Fin. Stuco Kasar sesuai Gambar 6.00 unit Taksir - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
a Pekerjaan Rangka Besi Hollow 60 x 60 cm Fin. Cat Warna Putih. 10.16 M2 A.4.2.1.1.C - -
b Pekerjaan Sign Name "LABORATORIUM FARMASI" Cutting PVC sesuai Gambar. 2.00 Unit Taksir - -
c Pekerjaan MOTIF PINTO ACEH TEMBAGA KETOK sesuai Gambar. 4.00 Unit Taksir - -
d Pekerjaan Ralling Stainless Steel Pengaman Balkon + Kaca 8 mm + Accesories(sesuai Gambar) 14.00 M' Taksir - -
e Pekerjaan Pagar Ralling Pengaman Tangga Teras & Ram Lt. Dasar (sesuai Gambar) 37.59 M' Taksir - -
f Pekerjaan Sign Name "POLTEKKES KEMENKES ACEH" Acrylic Timbul LED. 1.00 Unit Taksir - -
b Pekerjaan Saluran Precast + Penutup Beton mutu Beton K-250 48.32 M' Taksir - -
Jumlah 11 -
A Lantai I
5 Kaca Cermin Washtafel, T = 8 mm Ukuran Besar bevel Stainlessteel 2.00 Buah A.4.6.2.22.a - -
6 Kaca Cermin Washtafel, T = 8 mm Ukuran Kecil bevel Stainlessteel 1.00 Buah A.4.6.2.22.b - -
9 Kran tembok Stainless Merk TOTO dia 3/4 " 18.00 Buah A.5.1.1.19. - -
10 Jet Washer Pada Closet Duduk Merk TOTO Lengkap 11.00 Buah A.5.1.1.19B. - -
B Lantai II (dua)
5 Kaca Cermin Washtafel, T = 8 mm Ukuran Besar bevel Stainlessteel 2.00 Buah A.4.6.2.22.a - -
6 Kaca Cermin Washtafel, T = 8 mm Ukuran Kecil bevel Stainlessteel 1.00 Buah A.4.6.2.22.b - -
9 Kran tembok Stainless Merk TOTO dia 3/4 " 10.00 Buah A.5.1.1.19. - -
10 Jet Washer Pada Closet Duduk Merk TOTO Lengkap 9.00 Buah A.5.1.1.19B. - -
5 Kaca Cermin Washtafel, T = 8 mm Ukuran Besar bevel Stainlessteel 2.00 Buah A.4.6.2.22.a - -
6 Kaca Cermin Washtafel, T = 8 mm Ukuran Kecil bevel Stainlessteel 1.00 Buah A.4.6.2.22.b - -
9 Kran tembok Stainless Merk TOTO dia 3/4 " 10.00 Buah A.5.1.1.19. - -
10 Jet Washer Pada Closet Duduk Merk TOTO Lengkap 9.00 Buah A.5.1.1.19B. - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
D Lantai Atap
1 Kran tembok Stainless Merk TOTO dia 3/4 " 2.00 Buah A.5.1.1.19. - -
Jumlah 12 -
1. SITE PLAN
dia. 1 1/2 Inch ( pipa dari Sumber Air ke Tangki Atas ) 60.82 m Dihitung - -
Kapasitas : 8 M3
Type : Module
Bahan : FRP
a. LANTAI-1
b. LANTAI-2
c. LANTAI-3
1. SITEPLAN
Pengadaan dan Pemasangan Bio Fill termasuk Galian dan Urugan Kembali, Plat Beton Bertulang
Ø10 mm sebagai Penutup lengkap dengan accessories
Kap : 8 m3 (maks.)
1. LANTAI-1
2. LANTAI-2
3. LANTAI-2
1. SITEPLAN
Pekerjaan Bak Kontrol + Penutup Beton Bertulang (Sesuai Gambar) 4.00 Unit Dihitung - -
c. PERALATAN BIOFIL
Pengadaan dan Pemasangan Bio Fill termasuk Galian dan Urugan Kembali, Plat Beton Bertulang
Ø10 mm sebagai Penutup lengkap dengan accessories
Kap : 8 m3 (maks.)
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
1. LANTAI-1
2. LANTAI-2
3. LANTAI-3
INDOOR UNIT
LANTAI I
A. Indoor Unit
1 AC Cassete FXFQ 25 SVM4,9600 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 3.00 unit AC.IN.02 - -
2 AC Cassete FXFQ 50 SVM4,19100 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 2.00 unit AC.IN.04 - -
3 AC Cassete FXFQ 63 SVM4,24200 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 3.00 unit AC.IN.05 - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
4 AC Cassete FXFQ 80 SVM4,30700 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 8.00 unit AC.IN.06 - -
LANTAI II
A. Indoor Unit
1 AC Cassete FXFQ 25 SVM4,9600 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 4.00 unit AC.IN.02 - -
2 AC Cassete FXFQ 32 SVM4,12300 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 1.00 unit AC.IN.03 - -
3 AC Cassete FXFQ 50 SVM4,19100 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 5.00 unit AC.IN.04 - -
4 AC Cassete FXFQ 63 SVM4,24200 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 7.00 unit AC.IN.05 - -
5 AC Cassete FXFQ 80 SVM4,30700 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 8.00 unit AC.IN.06 - -
LANTAI III
A. Indoor Unit
1 AC Cassete FXFQ 25 SVM4,9600 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 3.00 unit AC.IN.02 - -
2 AC Cassete FXFQ 50 SVM4,19100 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 1.00 unit AC.IN.04 - -
3 AC Cassete FXFQ 63 SVM4,24200 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 2.00 unit AC.IN.05 - -
4 AC Cassete FXFQ 80 SVM4,30700 BTU/h /Terpasang + Pipa Drain (armaflex) uk.disesuaikan 14.00 unit AC.IN.06 - -
LANTAI I
2 UNIT Outdoor AC RXQ 8 AY14 + RXQ 12 AY14 + BHFP22P100 20PK 191.000 BTU/h 1.00 unit AC.O.20PK - -
3 REFNET Joint, Pipa Utama Drain 2,5" Bracket, Kabel Power, etc 1.00 Ls Taksir - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
LANTAI II
1 UNIT Outdoor AC VRV A RXQ10AY14 10PK 95.500 BTU/h 1.00 unit AC.O.10PK - -
2 UNIT Outdoor AC VRV A RXQ14AY14 14PK 136.000 BTU/h 2.00 unit AC.O.14PK - -
3 UNIT Outdoor AC VRV A RXQ 8 AY14 + RXQ 12 AY14 + BHFP22P100 20PK 191.000 BTU/h 1.00 unit AC.O.20PK - -
4 REFNET Joint, Pipa Utama Drain 2,5" Bracket, Kabel Power, etc 1.00 Ls Taksir - -
LANTAI III
1 UNIT Outdoor VRV A RXQ14AY14 14PK 136.000 BTU/h 2.00 unit AC.O.14PK - -
2 UNIT Outdoor VRV A RXQ 12 AY14 + RXQ 14 AY14 + BHFP22P100 26PK 251,000 BTU/H 1.00 unit AC.O.26PK - -
3 REFNET Joint, Pipa Utama Drain 2,5" Bracket, Kabel Power, etc 1.00 Ls Taksir - -
a LANTAI 1
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
10.00 unit Taksir - -
(CMM) 8"
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
4.00 unit Taksir - -
(CMM) 10"
b LANTAI 2
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
8.00 unit Taksir - -
(CMM) 8"
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
4.00 unit Taksir - -
(CMM) 10"
c LANTAI 3
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
8.00 unit Taksir - -
(CMM) 8"
Exhaust Fan 16,72-21,72 Watt, 806-954 Rpm 220 V, 50 Hz, hembusan udara keluar : 180
4.00 unit Taksir - -
(CMM) 10"
INSTALASI VENT
1. SITEPLAN
a. Pemipaan BSP-SCH-40
b Peralatan Utama
Hydrant Pilar dan Hydrant Box Outdoor + selang 30 Meter Lengkap Accesories 2.00 bh Dihitung - -
2. LANTAI-1
a Pemipaan BSP-SCH-40
b Peralatan Utama
3. LANTAI- 2
a Pemipaan BSP-SCH-40
b Peralatan Utama
4. LANTAI- 3
a. Pemipaan BSP-SCH-40
b. Peralatan Utama
Pengadaan material, pembuatan dudukan / pondasi pompa, dan pemasangan unit sampai
berfungsi dengan baik.
1 Pekerjaan Pompa
Pompa Bawah
- Mesin Pompa Grundfos CMBE 3 - 30 - Booster Pump Stainless Steel Variable Speed 1.00 unit Taksir - -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
Spesifikasi :
2. Voltage : 1 x 220
3. Kapasitas : 62 Liter/Menit
8. Suhu Cairan : 0 – 60 C
Pompa Atas
- Pengadaan dan Pemasangan Boster Pump termasuk Dudukan lengkap dengan accessories
Spesifikasi :
Merk : EBARA
Include :
- Pressure Switch
- Pressure Gauge
- Gate Valve
- Check Valve
- Pipa Header
Tanki air atas ( TAA ) Penguin TBSK 2000 Tangki Air Stainless 2 m3 8.00 Unit Taksir - -
1 SITE PLAN
Kabel Power dari Panel di ruang power house ke Panel MDP Gedung ( NYFGbY 4 x 120 mm) x
200.00 meter Taksir - -
2 cr
Biaya penarikan Kabel Tanah termasuk Galian dan Lainnya. 200.00 meter Taksir - -
Lantai 1
Kabel Power dari MDP ke PP-LP (LT 1) (NYY 4 X 25 mm) 4.00 meter Taksir - -
Kabel Power dari PP-LP (LT 1) ke PP-LAB 1 (LT 1) (NYY 4 X 10 mm) 18.00 meter Taksir - -
Kabel Power dari PP-LP (LT1) ke PP-LAB 2 (LT 1) (NYY 4 X 10 mm) 25.00 meter Taksir - -
Kabel Power dari MDP ke PP-POMPA (LT 1) (NYY 4 X 6 mm) 10.00 meter Taksir - -
Kabel Power dari MDP ke PP-AC (LT1) (NYY 4 X 25 mm) 4.00 meter Taksir - -
Kabel Power dari MDP ke PP-LIEF (LT ATAP) (NYY 4 X 16 mm) 25.00 meter Taksir - -
Biaya Penarikan Kabel dalam gedung termasuk alat bantu 86.00 meter Taksir - -
Lantai 2
Kabel Power dari MDP ke PP-LP (LT 2) (NYY 4 X 25 mm) 8.00 meter Taksir - -
Kabel Power dari PP-LP (LT 2) ke PP-LAB 3 (LT 2) (NYY 4 X 10 mm) 18.00 meter Taksir - -
Kabel Power dari PP-LP (LT 2) ke PP-LAB 4 (LT 2) (NYY 4 X 10 mm) 25.00 meter Taksir - -
Kabel Power dari MDP ke PP-AC (LT2) (NYY 4 X 35 mm) 9.00 meter Taksir - -
Biaya Penarikan Kabel dalam gedung + alat Bantu 60.00 meter Taksir - -
Lantai 3
Kabel Power dari MDP ke PP-LP (LT 3) (NYY 4 X 25 mm) 15.00 meter Taksir - -
Kabel Power dari PP-LP (LT 3) ke PP-LAB 5 (LT 3) (NYY 4 X 10 mm) 18.00 meter Taksir - -
Kabel Power dari PP-LP (LT 3) ke PP-LAB 6 (LT 3) (NYY 4 X 10 mm) 25.00 meter Taksir - -
Kabel Power dari MDP ke PP-AC (LT2) (NYY 4 X 35 mm) 16.00 meter Taksir - -
Biaya Penarikan Kabel dalam gedung + alat Bantu 74.00 meter Taksir - -
LANTAI 1
PANEL MDP
PANEL PP-LP ( LT 1)
PANEL PP LAB 1 ( LT 1)
LANTAI 2
LANTAI 3
1 Lantai-1
- Stop Kontak 3 phasa ( Plug & Socket 5 PIN 32 A) Mounting Surface 4.00 Buah Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak ( 30 cm dari lantai) 32.00 Titik Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak Meja Praktikum + Meja Kantor 111.00 Titik Taksir - -
Kabel Instalasi penerangan ( NYM 2 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 1,000.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Penerangan (NYM 3 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 180.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi stop kontak (NYM 3 x 2,5 mm) + pipa instalasi + Kotak Sambung + socket +
- 700.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Stop Kontak 1 phasa meja praktikum + meja Kantor ( NYY 3 x 2,5 mm) + Pipa
- 250.00 m Taksir - -
Instalasi + Socket + Klam Pipa (20 mm)
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
- Kabel Instalasi Stop Kontak 3 phasa (NYY 4 x 4 mm+ PE 1 x 4 mm) 100.00 m Taksir - -
2 Lantai-2
- Stop Kontak 3 phasa ( Plug & Socket 5 PIN 32 A) Mounting Surface 4.00 Buah Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak ( 30 cm dari lantai) 41.00 Titik Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak Meja Praktikum + Meja Kantor 104.00 Titik Taksir - -
Kabel Instalasi penerangan ( NYM 2 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 800.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Penerangan (NYM 3 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 180.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi stop kontak (NYM 3 x 2,5 mm) + pipa instalasi + Kotak Sambung + socket +
- 700.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Stop Kontak 1 phasa meja praktikum + meja Kantor ( NYY 3 x 2,5 mm) + Pipa
- 500.00 m Taksir - -
Instalasi + Socket + Klam Pipa (20 mm)
- Kabel Instalasi Stop Kontak 3 phasa (NYY 4 x 4 mm+ PE 1 x 4 mm) 100.00 m Taksir - -
3 Lantai-3
- Stop Kontak 3 phasa ( Plug & Socket 5 PIN 32 A) Mounting Surface 4.00 Buah Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak ( 30 cm dari lantai) 39.00 Titik Taksir - -
- Biaya Pemasangan Instalasi Power Stop Kontak Meja Praktikum 97.00 Titik Taksir - -
Kabel Instalasi penerangan ( NYM 2 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 800.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Penerangan (NYM 3 x 2,5 mm) + Pipa instalasi + Kotak Sambung + socket +
- 180.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi stop kontak (NYM 3 x 2,5 mm) + pipa instalasi + Kotak Sambung + socket +
- 700.00 m Taksir - -
Klam Pipa (20 mm)
Kabel Instalasi Stop Kontak 1 phasa meja praktikum + meja Kantor ( NYY 3 x 2,5 mm) + Pipa
- 400.00 m Taksir - -
Instalasi + Socket + Klam Pipa (20 mm)
- Kabel Instalasi Stop Kontak 3 phasa (NYY 4 x 4 mm+ PE 1 x 4 mm) 100.00 m Taksir - -
Lantai 1
Lantai 2
Lantai 3
System Penangkal Petir Electrostatic dgn tinggi 7m radius 97 meter 1.00 Unit Dihitung - -
NYY 1 x 70 mm2 menuju ke Bak Kontrol dalam Pipa PVC dia 50 52.00 Dihitung - -
Bak Kontrol 400 x 400 x 400 mm, dari Beton Bertulang, lengkap dengan terminal dari plat
tembaga electrode pentanahan batang tembaga
Jumlah 13 -
KONSTRUKSI FISIK GEDUNG FARMASI TAHAP-II
NO JENIS PEKERJAAN HARGA
JUMLAH
VOLUME SAT ANALISA SATUAN
(Rp) (Rp.)
1 2 3 4 5 6 7 = (3 x 6)
A PEKERJAAN LIFT
Pengadaan dan Pemasangan Freight Elevator kap. 1000 kg, Kecepatan 60 mpm, Lengkap
1 1.00 Unit Taksir - -
terpasang dengan Instalasi luar/dalam + Panel dan Test Commingsioning
Jumlah 14 -
Jumlah 15 -
….....................................
…...........................
RINCIAN MATA PEMBAYARAN PENYELENGGARAAN
MOBILISASI DAN DEMOBILISASI PERALATAN PEMADATAN LAHAN
MOB.DEMOB
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
(RP.) (RP.)
1 Stampler 250 Kg Unit 2 - -
JUMLAH TOTAL -
….....................................
…...........................
RINCIAN MATA PEMBAYARAN PENYELENGGARAAN
SISTEM MANAJEMN KESELAMATAN DAN KESELAMATAN KERJA (SMK-3) KONSTRUKSI GEDUNG
ANALISA SMK-3
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME WAKTU
(RP.) (RP.)
1 2 3 4 5 6 7 = (4 x 5 x 6)
A. Penyiapan RK3K Terdiri Atas :
1 Pembuatan Manual, Prosedur, Intruksi Kerja, Izin Kerja Set 2.00 1.00 - -
2 Pembuatan Kartu Indentitas Pekerja (KIP) Org 30.00 1.00 - -
Sub Total. A -
B. Sosialisasi Dan Promosi K3 Terdiri dari :
1 Induksi K3 (Safety Induction); khusus Untuk pekerja baru Org 30.00 1.00 - -
Pengarahan K3 (safety briefing): Pertemuan Keselamatan
2 Org 30.00 1.00 - -
(Safety Talk dan/atau Tool Box Meeting); setiap Hari
3 Pelatihan K3;
4 Bekerja diketinggian Org 30.00 1.00 - -
5 K3 Peralatan konstruksi & Penggunaan Bahan Kimia (MSDS) Org 30.00 1.00 - -
….....................................
…...........................
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
A.4.1.1.3. Membuat 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150), slump (12 ± 2) cm, w/c = 0,72
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 - 0.00
Tukang Batu L.02 OH 0.275 - 0.00
Kepala Tukang L.03 OH 0.028 - 0.00
Mandor L.04 OH 0.083 - 0.00
JUMLAH TENAGA KERJA 0.00
B BAHAN
Semen Portland Kg 299.000 0.00 0.00
Pasir Beton Kg 799.000 0.00 0.00
Kerikil Beton Uk. ≥ 4 cm Kg 1,017.000 0.00 0.00
Air Liter 215.000 0.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
B BAHAN
Kayu Kelas III M3 0.040 - -
Paku 5 - 12 cm Kg 0.400 - -
Minyak Bekisting Liter 0.200 - -
Balok Kayu Kelas II M3 0.018 - -
Polywood 120x240 cm tebal 9 mm Lembar 0.350 - -
Dolken Kayu Ø 8 - 10 cm - 4 m Batang 2.000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
B BAHAN
Furing channel Batang 3.500 - -
Assesoris (Perkuatan, Paku Ramset, Skrup Gipsum dll) Ls 100% xRangka -
JUMLAH HARGA BAHAN -
C PERALATAN
A.4.2.1.21. Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x 60 cm, untuk Plafon
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.350 - -
Tukang Besi L.02 OH 0.350 - -
Kepala Tukang L.03 OH 0.035 - -
Mandor L.04 OH 0.018 - -
JUMLAH TENAGA KERJA -
B BAHAN
Rangka metal hollow 40.40 Batang 4.000 - -
Assesoris (Perkuatan, Paku Ramset, Skrup Gipsum dll) Ls 100% x Rangka -
JUMLAH HARGA BAHAN -
C PERALATAN
A.4.4.1.3. Pemasangan 1 M2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Campuran 1 SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 - -
Tukang Batu L.02 OH 0.200 - -
Kepala Tukang L.03 OH 0.020 - -
Mandor L.04 OH 0.030 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Buah 140.000 - -
Semen Portland Kg 26.550 - -
Pasir Pasang Kg 130.200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
2
A.4.4.1.9. Pemasangan 1 M Dinding Bata Merah (5x11x22) cm Tebal ½ Batu Campuran 1 SP:4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 - -
Tukang Batu L.02 OH 0.100 - -
Kepala Tukang L.03 OH 0.010 - -
Mandor L.04 OH 0.015 - -
JUMLAH TENAGA KERJA -
B BAHAN
Bata Merah Buah 70.000 - -
Semen Portland Kg 11.500 - -
Pasir Pasang Kg 60.200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
2
A.4.4.2.27 Pemasangan 1 M Plesteran 1 SP : 4 PP Tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 - -
Mandor L.02 OH 0.010 - -
Tukang L.03 OH 0.100 - -
Kepala Tukang L.04 OH 0.010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 3.500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
2
A.4.4.3.44. Pemasangan 1 M Lantai Vinyl
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.170 - -
Tukang Batu L.02 OH 0.170 - -
Kepala Tukang L.03 OH 0.017 - -
Mandor L.04 OH 0.009 - -
JUMLAH TENAGA KERJA -
B BAHAN
Vinyl Sheet M2 1.060 - -
Lem Kg 0.350 - -
JUMLAH HARGA BAHAN -
C PERALATAN
A.4.5.2.36B. Pemasangan 1 M' Rabung Jurai Dalam Type Seng Plat Alumunium, T = 0,35
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.250 - -
Tukang Batu L.02 OH 0.150 - -
Kepala Tukang L.03 OH 0.015 - -
Mandor L.04 OH 0.013 - -
JUMLAH TENAGA KERJA -
B BAHAN
A.4.7.1.10B. Pengecatan 1 M2 Tembok Baru Bagian Luar (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 - -
Tukang Cat L.02 OH 0.063 - -
Kepala Tukang L.03 OH 0.006 - -
Mandor L.04 OH 0.003 - -
JUMLAH TENAGA KERJA -
B BAHAN
Plamur Kg 0.100 - -
Cat Dasar Alkali Kg 0.100 - -
Cat Tembok Wethershield (Luar) Kg 0.260 - -
Kuas 2 Inci - 4 Inci Buah 0.010 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A + B + C ) -
E Overhead & Profit (10%) 10.000 % x D -
F Harga Satuan Pekerjaan (D+E) -
….....................................
…...........................
DAFTAR ANALISA HARGA SATUAN
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
ANALISA AC
ANALISA PLAMBING
Memasang 1M PIPA AIR BERSIH KLAS WAVIN -Dia.50
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
Pipa Air Bersih Klas Wavin dia 50 Set 1.000 - -
Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Memasang 1 BH TANGKI AIR ATAS (TAA) Penguin TBSK 2000 Tangki Air Stainless 2 m3
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
Tanki air atas ( TAA ) Penguin TBSK 2000 Tangki Air Stainless 2 m3 Buah 1.000 - -
Dudukan dan Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
ANALISA PEMADAM
Memasang 1m PIPA HYDRAN BSP-SCH-40 DIA.150
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
BSP 150 Set 1.000 - -
Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Memasang 1 BH IHB
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
IHB Set 1.000 - -
Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Memasang 1 BH OHB
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
OHB Buah 1.000 - -
Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
ANALISA ELEKTRONIK
Memasang TRAY= 600
A TENAGA
Pekerja OH 0.150 - -
Tukang OH 0.100 - -
Kepala Tukang OH 0.015 - -
Mandor OH 0.050 - -
JUMLAH ONGKOS KERJA KERJA -
B BAHAN
Tray = 600 M1 1.000 - -
Perlengkapan (10% harga barang) Set 0.100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
….....................................
…...........................
DAFTAR ANALISA HARGA SATUAN
PEKERJAAN PASANGAN KUSEN PINTU, JENDELA, VENTILASI DAN DINDING PARTISI
PINTU
1 Unit Pintu, Type P1
2.00 Unit Daun Pintu Kaca Tempered 9 mm Lengkap @Rp - Rp. -
9.68 M2 CONWOOD T=1.1CM, L=30.5 CM, P=3.05 CM @Rp - Rp. -
1.00 Ls Pekerjaan Beton Gawang @Rp - Rp. -
2.96 M2 Kaca Mati 9 mm Warna Biru @Rp - Rp. -
1.00 Ls Pelengkap dan Aksesories Merk Dekkson (15% dari bahan) @Rp - Rp. -
Harga Satuan Pekerjaan Rp. -
VENTILASI
1 Unit Ventilasi, Type V1
0.500 M2 Kusen UPVC + Jendela kaca 5 mm warna Biru Ambg UPVC @Rp - Rp. -
1.000 Ls Pelengkap dan Aksesories Merk Dekkson (15% dari bahan) @Rp - Rp. -
Harga Satuan Pekerjaan Rp. -
DINDING PARTISI
1 Unit Dinding Partisi, Type PJ1
13.790 M2 Kusen UPVC + kaca 5 mm warna Biru @Rp - Rp. -
1.000 Unit Daun Pintu kaca Geser L = 90 Cm + Ambang UPVC @Rp - Rp. -
1.000 Ls Pelengkap dan Aksesories Merk Dekkson (15% dari bahan) @Rp - Rp. -
Harga Satuan Pekerjaan Rp. -
….....................................
…...........................
DAFTAR HARGA BAHAN DAN UPAH
….....................................
…...........................
DAFTAR HARGA BAHAN DAN UPAH ME
II OUTDOOR UNIT
1 OU DAIKIN VRV A RXQ10AY14 10PK 95.500 BTU/H Unit Rp. -
2 OU DAIKIN VRV A RXQ14AY14 14PK 136.000 BTU/H Unit Rp. -
3 OU DAIKIN VRV A RXQ 8AY14 + RXQ 12 AY14 + BHFP22P100 20PK 191.000 BTU/H Unit Rp. -
4 OU DAIKIN VRV A RXQ12 AY14 + RXQ 14 AY14 + BHFP22P100 26PK 251,000 BTU/H Unit Rp. -
IV PIPA WAVIN
1 PVC-100 M1 Rp. -
2 PVC-80 M1 Rp. -
3 PVC-50 M1 Rp. -
V PIPA AZ
1 PVC-50 M1 Rp. -
2 Vent Cap dia.50 M1 Rp. -
VI PIPA HYDRANT
1 BSP-150 M1 Rp. -
2 BSP-100 M1 Rp. -
1
3 BSP-65 M Rp. -
4 Indoor hydrant box Set Rp. -
5 Outdoor hydrant box Set Rp. -
6 Co2-3 ~3,5 kg Set Rp. -
NO URAIAN HARGA SATUAN HARGA SATUAN
….....................................
…...........................