No URAIAN PEKERJAAN TOTAL BIAYA

I BIAYA PENYELENGGARAAN SM K3 KONSTRUKSI Rp. -

II PEKERJAAN PERSIAPAN Rp. -

III PEKERJAAN STRUKTUR Rp. -

III PEKERJAAN ARSITEKTUR Rp. -

IV PEKERJAAN ELEKTRIKAL DAN PLUMBING Rp. -

V PEKERJAAN IPAL NON-PABRIKASI

A . PEKERJAAN PERSIAPAN Rp. -

B . PEKERJAAN TANAH DAN LANDASAN Rp. -

C . PEKERJAAN BAK INLET Rp. -

D . PEKERJAAN BAK SETLLER & AF Rp. -

E . PEKERJAAN BAK DESINFEKTAN Rp. -

F . PEKERJAAN LAIN LAIN Rp. -

G. COMISSIONING TEST Rp. -

Total Rp. -

PPN (11%) Rp. -

Grand Total Rp. -

Pembulatan Rp. -

Penawar,

PT/CV. ……………………
Jabatan
BIIL OF QUANTITY

Penyediaan Sarana & Prasarana Sanitasi di Lembaga


PEKERJAAN :
Pendidikan Keagamaan (LPK) Lokasi 30
LOKASI : Pondok Pesantren Daarul Qur'an Darussalam
: Desa Bukit Intan Makmur, Kecamatan Kunto Darussalam
: Kabupaten Rokan Hulu
TAHUN ANGGARAN : 2023

No Uraian Pekerjaan Volume Harga satuan Total

I BIAYA PENYELENGGARAAN SM K3 KONSTRUKSI


1 Papan informasi K.3 1,00 bh Rp. - Rp. -
2 Helm proyek 8,00 Bh Rp. - Rp. -
3 Sarung tangan (Safety gloves) 12,00 Psg Rp. - Rp. -
4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) 6,00 Psg Rp. - Rp. -
5 Rompi keselamatan (Safety vest) 8,00 Bh Rp. - Rp. -
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1,00 set Rp. - Rp. -
7 Rambu Petunjuk/police line 1,00 roll Rp. - Rp. -
Sub Total SM K3 Konstruksi : Rp. -

II PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan area 54,74 m2 Rp. - Rp. -
2 Pembongkaran Rabat Beton 1,58 m3 Rp. - Rp. -
3 Pekerjaan Bouwplank 29,70 m Rp. - Rp. -
Sub Total Pekerjaan Persiapan : Rp. -

III PEKERJAAN STRUKTUR


1 Pekerjaan Tanah
- Pekerjaan Galian Pondasi 5,78 m3 Rp. - Rp. -
- Pekerjaan Urugan Pasir 0,83 m3 Rp. - Rp. -
- Pekerjaan Lantai Kerja K-100 0,83 m3 Rp. - Rp. -
2 Pekerjaan Pondasi Setempat
- Bekisting 1,20 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 43,66 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 5,69 Kg Rp. - Rp. -
- Pengecoran Beton K-175 0,42 m3 Rp. - Rp. -
3 Pekerjaan Pasangan Pondasi Lajur 1 Bata 3,43 m3 Rp. - Rp. -
4 Pekerjaan Urugan Tanah Bawah Lantai 7,67 m3 Rp. - Rp. -
5 Pekerjaan Urugan Kembali 4,67 m3 Rp. - Rp. -
6 Pekerjaan Cor Lantai Beton
- Pengecoran Beton K-175 2,56 m3 Rp. - Rp. -
7 Pekerjaan Sloof 15X20
- Bekisting 15,46 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 95,34 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 50,76 Kg Rp. - Rp. -
- Pengecoran Beton K-175 1,16 m3 Rp. - Rp. -
8 Pekerjaan Kolom beton 12 x 12
- Bekisting 23,71 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 121,85 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 16,64 Kg Rp. - Rp. -
- Pengecoran Beton K-175 0,71 m3 Rp. - Rp. -
9 Pekerjaan Balok 12x15 Elv. + 1,85
- Bekisting 3,35 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 27,50 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 9,94 Kg Rp. - Rp. -
- Pengecoran Beton K-175 0,20 m3 Rp. - Rp. -
10 Pekerjaan Balok 12x20 Elv. + 2,25
- Bekisting 9,12 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 56,24 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 26,42 Kg Rp. - Rp. -
- Pengecoran Beton K-175 0,55 m3 Rp. - Rp. -
11 Pekerjaan Balok 12 x 20 Elv. + 2,75
- Bekisting 7,10 m2 Rp. - Rp. -
- Pembesian Ø 10 mm 43,78 Kg Rp. - Rp. -
- Pembesian Ø 8 mm 20,51 Kg Rp. - Rp. -
- Pengecoran Beton K-175 0,43 m3 Rp. - Rp. -
Sub Total Pekerjaan Struktur : Rp. -
No Uraian Pekerjaan Volume Harga satuan Total

III PEKERJAAN ARSITEKTUR


1 Pekerjaan Dinding
- Pekerjaan pasangan Dinding bata merah 44,54 m2 Rp. - Rp. -
- Pekerjaan pasangan Batu Kerawang/Roster 12,19 m2 Rp. - Rp. -
- Pekerjaan Plesteran 62,66 m2 Rp. - Rp. -
- Pekerjaan Acian 62,66 m2 Rp. - Rp. -
2 Pekerjaan Penutup Lantai dan dinding
2.1 Pekerjaan Penutup Lantai dan dinding Kamar Mandi 1
- Pasangan Keramik lantai 25x25 1,32 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 3,98 m2 Rp. - Rp. -
2.2 Pekerjaan Penutup Lantai dan dinding Kamar Mandi 2
- Pasangan Keramik lantai 25x25 1,32 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 3,98 m2 Rp. - Rp. -
2.3 Pekerjaan Penutup Lantai dan dinding Kakus 1
- Pasangan Keramik lantai 25x25 1,32 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 3,98 m2 Rp. - Rp. -
2.4 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 1
- Pasangan Keramik lantai 25x25 1,74 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 4,82 m2 Rp. - Rp. -
2.5 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 2
- Pasangan Keramik lantai 25x25 1,74 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 4,82 m2 Rp. - Rp. -
2.6 Pekerjaan Penutup Lantai dan dinding Kakus + Mandi 3
- Pasangan Keramik lantai 25x25 1,74 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 4,82 m2 Rp. - Rp. -
Pekerjaan Penutup Lantai selasar depan Kakus, lantai area bak cuci
2,7
tangan, Lantai Area Cuci bersama, dan lantai area tempat wudhu
- Pasangan Keramik lantai 25x25 27,34 m2 Rp. - Rp. -
2,8 Pekerjaan Bak Cuci Tangan
- Pekerjaan Beton
* Bekisting 14,20 m2 Rp. - Rp. -
* Pembesian Ø 10 mm 37,20 kg Rp. - Rp. -
* Pengecoran Beton K-175 0,22 m3 Rp. - Rp. -
- Pasangan Keramik lantai 25x25 0,72 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 0,88 m2 Rp. - Rp. -
- Waterproofing 1,60 m2 Rp. - Rp. -
2,9 Pekerjaan Tempat Wudhu
- Pasangan Keramik lantai 25x25 1,20 m2 Rp. - Rp. -
- Pasangan Keramik dinding 25x40 8,04 m2 Rp. - Rp. -
- Grill Besi 1,22 m2 Rp. - Rp. -
2,10 Pekerjaan Tempat Cuci Bersama
- Pasangan Keramik dinding 25x40 2,16 m2 Rp. - Rp. -
3 Pekerjaan Penutup Atap
- Pekerjaan rangka atap baja Ringan 47,94 m2 Rp. - Rp. -
- Penutup Atap 47,94 m2 Rp. - Rp. -
- Listplank GRC tebal 10 mm lebar 30 cm cat waethershield 27,70 m Rp. - Rp. -
4 Pekerjaan Pintu dan Ventilasi
- Pintu Aluminium Komplit terpasang 6,00 bh Rp. - Rp. -
- Bouvenlicht kisi-kisi Besi hollow 2 x2 cm finish cat 2,16 m2 Rp. - Rp. -
5 Pekerjaan Pengecatan
- Pengecatan Tembok 62,66 m2 Rp. - Rp. -
6 Pekerjaan Sanitary
- Pemasangan Closet Jongkok 4,00 bh Rp. - Rp. -
- Pemasangan Kran air stainless 11,00 bh Rp. - Rp. -
- Pemasangan head shower tanam lengkap dengan stop Kran 5,00 unit Rp. - Rp. -
- Pemasangan Floordrain stainless 9,00 bh Rp. - Rp. -
- Tempat Sabun Cair 1,00 bh Rp. - Rp. -
7 Pekerjaan Logo dan tulisan
- Loggo PU Akrilik 1,00 bh Rp. - Rp. -
- Tulisan "Indonesia Maju" Akrilik 1,00 Set Rp. - Rp. -
Sub Total Pekerjaan Arsitektur : Rp. -
IV PEKERJAAN ELEKTRIKAL DAN PLUMBING
1 Pekerjaan Elektrikal dan Plambing
- Pek. MCB 1,00 bh Rp. - Rp. -
- Pek. Box MCB 1,00 unit Rp. - Rp. -
- Pek. Instalasi titik lampu dan listrik 12,00 titik Rp. - Rp. -
- Pekerjaan Pemasangan lampu SL 18 Watt + Fitting 12,00 bh Rp. - Rp. -
- Pekerjaan Pemasangan Sakelar 10,00 bh Rp. - Rp. -
2 Pekerjaan pipa air bersih
- Pipa PVC Type AW dia 3/4 inch 42,00 m Rp. - Rp. -
No Uraian Pekerjaan Volume Harga satuan Total

3 Pekerjaan pipa air bekas


- Pipa PVC Type AW dia 3 inch 18,00 m Rp. - Rp. -
- Fitting dia 3 inch 10,00 bh Rp. - Rp. -
4 Pekerjaan pipa air Kotor/Tinja
- Pipa PVC Type AW dia 4 inch 9,80 m Rp. - Rp. -
- Fitting dia 4 inch 5,00 bh Rp. - Rp. -
5 Pekerjaan Bak Kontrol/Grease Trap beton
- Bak Kontrol beton 1,00 bh Rp. - Rp. -
- Grease Trap beton 1,00 bh Rp. - Rp. -
- Elbow PVC 3" 1,00 bh Rp. - Rp. -
- Tee PVC 3" 1,00 bh Rp. - Rp. -
Sub Total Pekerjaan Elektrikal dan plumbing: Rp. -
V PEKERJAAN IPAL NON-PABRIKASI
A . PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 20,99 m2 Rp. - Rp. -
Sub Total Pekerjaan Persiapan: Rp. -
B. PEKERJAAN TANAH DAN LANDASAN
1 Galian tanah manual 30,55 m3 Rp. - Rp. -
2 Urugan tanah kembali 11,74 m3 Rp. - Rp. -
3 Buang tanah keluar proyek 23,83 m3 Rp. - Rp. -
4 Pasir urug, tebal 10 cm 1,06 m3 Rp. - Rp. -
5 Rabat beton K-100 tebal 5 cm 0,53 m3 Rp. - Rp. -
Sub Total Pekerjaan tanah dan landasan: Rp. -
C . PEKERJAAN BAK INLET
1 Pelat Lantai dasar
- Pek. Beton K-225 0,16 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 10,31 kg Rp. - Rp. -
- Pemasangan bekisting pelat lantai dasar 0,44 m2 Rp. - Rp. -
2 Dinding
- Pek. Beton K-225 0,12 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 17,66 kg Rp. - Rp. -
- Pemasangan bekisting dinding 2,90 m2 Rp. - Rp. -
3 Lantai Atas
- Pek. Beton K-225 0,11 m3 Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 8,57 kg Rp. - Rp. -
- Pemasangan bekisting lantai Atas 0,65 m2 Rp. - Rp. -
4 Tutup Manhole
- Pek. Beton K-225 0,02 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 2,84 kg Rp. - Rp. -
- Pemasangan bekisting Mainhole 0,14 m2 Rp. - Rp. -
Sub Total Pekerjaan bak inlet: Rp. -
D . PEKERJAAN BAK SETLLER & AF
1 Pelat Lantai dasar
- Pek. Beton K-225 1,26 m3 Rp. - Rp. -
- Tulangan besi polos Ø 12 mm 81,46 kg Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 56,98 kg Rp. - Rp. -
- Pemasangan bekisting lantai dasar 2,33 m2 Rp. - Rp. -
2 Dinding
- Pek. Beton K-225 6,18 m3 Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 323,87 kg Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 183,91 kg Rp. - Rp. -
- Pemasangan bekisting dinding 82,34 m2 Rp. - Rp. -
3 Balok konsol dudukan media sarang tawon
- Pek. Beton K-225 0,15 m3 Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 24,05 kg Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 8,06 kg Rp. - Rp. -
- Pemasangan bekisting balok 2,55 m2 Rp. - Rp. -
4 Lantai Atas
- Pek. Beton K-225 1,03 m3 Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 88,92 kg Rp. - Rp. -
- Pemasangan bekisting Lantai Atas 5,70 m2 Rp. - Rp. -
5 Waterstop lebar 200 mm 14,90 m1 Rp. - Rp. -
6 Ring balok praktis 10/15 1,00 m1 Rp. - Rp. -
7 Tutup Manhole
- Pek. Beton K-225 0,11 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 14,22 kg Rp. - Rp. -
- Pemasangan bekisting lantai 0,72 m2 Rp. - Rp. -
8 Pasangan batu bata (1/2 bata) 1Pc : 3 Ps 0,45 m2 Rp. - Rp. -
9 Plesteran 1Pc : 3 Ps 0,90 m2 Rp. - Rp. -
10 Acian 0,90 m2 Rp. - Rp. -
Sub Total Pekerjaan bak setller & af: Rp. -
No Uraian Pekerjaan Volume Harga satuan Total

E . PEKERJAAN BAK DESINFEKTAN


1 Pelat Lantai dasar
- Pek. Beton K-225 0,17 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 10,17 kg Rp. - Rp. -
- Pemasangan bekisting lantai dasar 0,46 m2 Rp. - Rp. -
2 Dinding
- Pek. Beton K-225 0,31 m3 Rp. - Rp. -
- Pasangan batu bata (1/2 bata) 1Pc : 5 Ps Dinding dalam 0,60 m2 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 23,74 kg Rp. - Rp. -
- Pemasangan bekisting dinding 4,58 m2 Rp. - Rp. -
3 Lantai Atas
- Pek. Beton K-225 0,13 m3 Rp. - Rp. -
- Tulangan besi polos Ø 10 mm 8,94 kg Rp. - Rp. -
- Pemasangan bekisting pelat Lantai Atas 1,14 m2 Rp. - Rp. -
4 Tutup Manhole
- Pek. Beton K-225 0,02 m3 Rp. - Rp. -
- Tulangan besi polos Ø 8 mm 2,84 kg Rp. - Rp. -
- Pemasangan bekisting pelat lantai 0,14 m2 Rp. - Rp. -
Sub Total Pekerjaan bak desinfektan: Rp. -
F. PEKERJAAN LAIN LAIN
1 Pemasangan dudukan media sarang tawon (bahan pipa PVC AW dia. 1") 2,70 m2 Rp. - Rp. -
2 Pemasangan media sarang tawon, bahan rigid PVC tebal 0,2 mm 2,43 m3 Rp. - Rp. -
3 Pemasangan pipa buangan PVC tipe AW dia. 4" 2,00 m1 Rp. - Rp. -
4 Pemasangan pipa penguras PVC tipe AW dia. 4" 6,00 m1 Rp. - Rp. -
5 Pemasangan penghubung antar bak pipa PVC tipe AW dia.4" 6,00 m1 Rp. - Rp. -
6 Pemasangan Tee PVC tipe AW dia.4" 7,00 bh Rp. - Rp. -
Pemasangan penghubung antar bak inlet dengan bak settler pipa PVC tipe AW
7 1,20 m1 Rp. - Rp. -
dia.3"
8 Pemasangan sirkulasi antar bak pipa PVC tipe AW dia. 2" 1,50 m1 Rp. - Rp. -
9 Pemasangan vent pipa Galvanish dia. 2" p = 2 m 1,00 bh Rp. - Rp. -
10 Floating Clorin feeder (pengumpan klorin apung) 1,00 unit Rp. - Rp. -
11 Khlorin Tablet 10,00 kg Rp. - Rp. -
Pemasangan Fine Screen Stainliststeel 304, diameter lubang 1,5 cm, Tebal Plat
12 1,00 unit Rp. - Rp. -
2 mm
Sub Total Pekerjaan lain-lain: Rp. -
G. COMISSIONING TEST
1 Uji Aliran dan Kebcoran Bak IPL 1,00 ls Rp. - Rp. -
2 Uji Analisa Laboratrium, Air Limbah Domestik 1,00 spl Rp. - Rp. -
Sub Total Pekerjaan comissioning test: Rp. -
DAFTAR HARGA SATUAN PEKERJAAN
PROYEK :
Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan Keagamaan (LPK) Lokasi 30
PEKERJAAN : Pembangunan Bilik MCK Wanita
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA SATU


NO URAIAN
Upah (Rp.) Bahan (Rp.) (Rp) AN
A ANALISA PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan - - - / M2
2 Pembongkaran Rabat Beton - - - / M3
3 Pemasangan Bowplank - - - / M1
B ANALISA PEKERJAAN STRUKTUR
1 Galian Tanah Biasa Sedalam 1 m - - - / M3
2 Galian Tanah Biasa Sedalam 2 s/d 3 m - - - / M3
3 Buang Tanah Ke luar Lokasi / M3 - - - / M3
4 Pengurugan Tanah Kembali - - - / M3
5 Pengurugan Tanah Bawah Lantai - - - / M3
6 Urugan Pasir - - - / M3
7 Pekerjaan Pasangan Pondasi Rolag 30x30 - - - / M3
8 Pek. Rabat Beton Fc 7.4 Mpa / Lantai Kerja - - - / M3
9 Pekerjaan Beton Fc. 14.5 Mpa atau K. 175 Kg/Cm2 - - - / M3
Pekerjaan Beton Fc. 18,86 Mpa atau K. 225 Kg/Cm2 /
10 - - - / M3
M3
11 Pemasangan Waterstop Lebar 200 mm per m' - - - /M
12 Penulangan 1 kg dengan Besi Polos Ø 12 mm - - - / Kg
13 Penulangan 1 kg dengan Besi Polos Ø 10 mm - - - / Kg
14 Penulangan 1 kg dengan Besi Polos Ø 8 mm - - - / Kg
15 Penulangan 1 kg dengan Besi Polos Ø 6 mm - - - / Kg
16 Bekisting Sloof - - - / M2
17 Bekisting Kolom - - - / M2
18 Bekisting Balok - - - / M2
19 Bekisting Dinding - - - / M2
20 Bekisting lantai Beton / M2 - - - / M2
21 1 m' ring balk beton bertulang (10x15) cm - - - /M
22 Pemasangan 1 m2 rangka atap baja ringan - - - / M2
C ANALISA PEKERJAAN ARSITEKTUR
1 Pasangan 1/2 Bata Spesi 1 : 5 - - - / M2
2 Pas. Roster ul. 20x20 cm - - - / M2
3 Plesteran Tebal 2 cm Spesi 1 : 4 - - - / M2
4 Acian Dinding - - - / M2
5 Memasang Pintu Kamar Mandi Aluminium - - - / BH
6 Mencat Tembok dan plafond - - - / M2
7 Pasang Kloset Jongkok - - - / Unit
8 Pasangan Floor Drain - - - / BH
9 Pasangan Kran Air 3/4" - - - / BH
10 Pekerjaan Pasang Keramik lantai 25 x 25 cm - - - / M2
11 Pekerjaan Pasang Keramik dinding 25 x 40 cm - - - / M2
12 Penutup Atap - - - / M2
13 Listplank GRC tebal 10 mm lebar 30 cm cat waethershield - - - /M
14 Bouvenlicht kisi-kisi Besi hollo 2 x2 cm finish cat - - - / M2
15 Waterproofing - - - / M2
HARGA SATUAN JUMLAH HARGA SATU
NO URAIAN
Upah (Rp.) Bahan (Rp.) (Rp) AN
16 Grill Besi - - - / M2
17 Pemasangan head shower tanam lengkap dengan stop Kran - - - / Unit
18 Tempat Sabun - - - / BH
19 Loggo PU Akrilik - / BH
20 Tulisan "Indonesia Maju" Akrilik - /Set
D ANALISA PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Titik Lampu & Listrik - - - / Titik
2 Pek. MCB - - - / BH
3 Pek. Box MCB - - - / Unit

4 Pekerjaan Pemasangan lampu SL 18 Watt + Fitting - - - / BH

5 Pekerjaan Pemasangan Sakelar - - - / BH


E ANALISA PEKERJAAN PLAMBING
1 Pasangan Pipa PVC AW diameter 4" / M1 - - - / M'
2 Pemasangan Pipa PVC Dia 3/4" - - - / M'
3 Pemasangan 1 bh Tee pipa PVC diameter 4” - - - / BH
Pemasangan 1 bh Fitting pipa PVC diameter 4” - - - / BH
Pemasangan 1 bh Fitting pipa PVC diameter 3” - - - / BH
4 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 3” - - - / M'
5 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 2” - - - / M'
6 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1” - - - / M'
Pasangan Pipa PVC AW 1/2 Inch dari instalasi utama ke
7 - - - / M'
fixture
8 Pemasangan Bak Kontrol Beton Ø40 cm t=45 cm - / BH
9 Pemasangan Grease Trap Beton Ø40 cm t=45 cm - / BH
F ANALISA PEKERJAAN IPAL
Pemasangan 1 m2 dudukan media sarang tawon dengan
1 - - -
bahan pipa PVC AW dia.1” / M2
Pemasangan media sarang tawon, bahan rigid PVC tebal
2 - /M3
0,2 mm
3 Pemasangan vent pipa Galvanish dia. 2" - / BH
4 Floating Clorin feeder (pengumpan klorin apung) - /Unit
5 Khlorin Tablet - /Kg
Pemasangan Fine Screen Stainliststeel 304, diameter
6 - /Unit
lubang 1,5 cm, Tebal Plat 2 mm
G COMISSIONING TEST
1 Uji Aliran dan Kebocoran Bak IPL - / ls
2 Uji Analisa Laboratorium, Air Limbah Domestik - /spl
DAFTAR ANALISA HARGA SATUAN

Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan Keagamaan


PROYEK : (LPK) Lokasi 30

PEKERJAAN : Pembangunan Bilik MCK Wanita


TAHUN ANGGARAN : 2023

A ANALISA PEKERJAAN PERSIAPAN


1 Pembersihan Lapangan / M2
0,060 OH Pekerja @ - = -
0,005 OH Mandor @ - = -
= -
Profit & Overhead (10%) = - -
Total = - - = -

2 Pembongkaran Rabat Beton / M3


6,667 OH Pekerja @ - = -
0,333 OH Mandor @ - = -
= -
Profit & Overhead (10%) = - -
Total = - - = -

3 Pemasangan Bowplank / M1
0,100 OH Pekerja @ - = -
0,005 OH Mandor @ - = -
0,100 OH Tukang Kayu @ - = -
0,010 OH Kepala Tukang @ - = -
0,007 M3 Kayu Klas III/papan @ - = -
0,250 Btg Kayu balok 5/7 @ - = -
0,020 KG Paku @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

B ANALISA PEKERJAAN STRUKTUR


1 Galian Tanah Biasa sedalam 1 m / M3
0,450 OH Pekerja @ - = -
0,025 OH Mandor @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

2 Galian Tanah Biasa sedalam 2 m / M3


0,450 OH Pekerja @ - = -
0,025 OH Mandor @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

3 Buang Tanah Ke luar Lokasi / M3


0,300 OH Pekerja @ - = -
0,011 OH Mandor @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

4 Pengurugan Tanah Kembali / M3


0,450 OH Pekerja @ - = -
0,045 OH Mandor @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
5 Urugan Tanah Urug / M3
0,450 OH Pekerja @ - = -
0,045 OH Mandor @ - = -
1,200 m3 Tanah Urug @ - -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

6 Urugan Pasir Urug / M3


0,300 OH Pekerja @ - = -
0,010 OH Mandor @ - = -
1,200 m3 Pasir Urug @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

7 Pekerjaan Pasangan Pondasi Rolag 30x30 / M3


0,513 OH Pekerja @ - = -
0,030 OH Mandor @ - = -
0,513 OH Tukang batu @ - = -
0,020 OH Kepala Tukang @ - = -
50,473 Kg Semen (50 Kg) @ - = -
1,393 M3 Pasir Pasang @ - = -
490,000 Bh Batu Bata - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

8 Pekerjaan Beton Fc. 7.4 Mpa atau K. 100 Kg/Cm2 / M3


1,200 OH Pekerja @ - = -
0,120 OH Mandor @ - = -
0,275 OH Tukang Batu @ - = -
0,020 OH Kepala Tukang @ - = -
0,740 M3 Kerikil @ - = -
0,621 M3 Pasir Beton @ - = -
225,000 Kg Semen @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

9 Pekerjaan Beton Fc. 14.5 Mpa atau K. 175 Kg/Cm2 / M3


1,450 OH Pekerja @ - = -
0,083 OH Mandor @ - = -
0,275 OH Tukang Batu @ - = -
0,028 OH Kepala Tukang @ - = -
0,762 M3 Kerikil @ - = -
0,543 M3 Pasir Beton @ - = -
300,000 Kg Semen @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

10 Pekerjaan Beton Fc. 18,86 Mpa atau K. 225 Kg/Cm2 / M3


1,450 OH Pekerja @ - = -
0,083 OH Mandor @ - = -
0,275 OH Tukang Batu @ - = -
0,028 OH Kepala Tukang @ - = -
0,776 M3 Kerikil @ - = -
0,411 M3 Pasir Beton @ - = -
371,000 Kg Semen @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
11 Pemasangan 1 m' PVC Waterstop Lebar 200 mm
0,070 OH Pekerja @ - = -
0,035 OH Tukang Batu @ - = -
0,004 OH Kepala Tukang @ - = -
0,007 OH Mandor @ - = -
1,050 M' Water stop @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -

12 Pekerjaan Besi 10 kg Besi Polos Ø 12 mm


0,070 OH Pekerja @ - = -
0,070 OH Tukang Besi @ - = -
0,007 OH Kepala Tukang @ - = -
0,004 OH Mandor @ - = -
10,500 Kg Besi Beton panjang 12 meter dia
@ 12 - = -
0,150 Kg Kawat Beton @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk /Kg - - -

13 Pekerjaan Besi 10 kg Besi Polos Ø 10 mm


0,070 OH Pekerja @ - = -
0,070 OH Tukang Besi @ - = -
0,007 OH Kepala Tukang @ - = -
0,004 OH Mandor @ - = -
10,500 Kg Besi Beton panjang 12 meter dia
@ 10 - = -
0,150 Kg Kawat Beton @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk /Kg - - -

14 Pekerjaan Besi 10 kg Besi Polos Ø 8 mm


0,070 OH Pekerja @ - = -
0,070 OH Tukang Besi @ - = -
0,007 OH Kepala Tukang @ - = -
0,004 OH Mandor @ - = -
10,500 Kg Besi Beton panjang 12 meter dia
@ 8 - = -
0,150 Kg Kawat Beton @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk /Kg - - -

15 Pekerjaan Besi 10 kg Besi Polos Ø 8 mm


0,070 OH Pekerja @ - = -
0,070 OH Tukang Besi @ - = -
0,007 OH Kepala Tukang @ - = -
0,004 OH Mandor @ - = -
10,500 Kg Besi Beton panjang 12 meter dia
@ 6 - = -
0,150 Kg Kawat Beton @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk /Kg - - -
16 Bekisting Sloof, Kolom dan Ring Balk Beton / M2
0,660 OH Pekerja @ - = -
0,026 OH Mandor @ - = -
0,330 OH Tukang Kayu @ - = -
0,026 OH Kepala Tukang @ - = -
0,048 M3 Papan Kayu Kelas III @ - = -
0,300 Kg Paku @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk 2 x pakai = - - -

17 Bekisting balok Beton / M2


0,660 OH Pekerja @ - = -
0,033 OH Mandor @ - = -
0,330 OH Tukang Kayu @ - = -
0,033 OH Kepala Tukang @ - = -
0,400 Kg Paku @ - = -
0,200 Ltr Minyak Bekisting @ - = -
0,018 M3 Balok Kayu Kelas III @ - = -
0,675 Lbr Multiplek tebal 0,9 cm @ - = -
2,000 Btg Kayu Dolken @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk 2 x pakai = - - -

18 Bekisting Dinding Beton/ M2


0,660 OH Pekerja @ - = -
0,033 OH Mandor @ - = -
0,330 OH Tukang Kayu @ - = -
0,033 OH Kepala Tukang @ - = -
0,400 Kg Paku @ - = -
0,200 liter Minyak bekisting @ - = -
0,020 m³ Balok Kayu Kelas III @ - = -
0,671 lembar Multiplek tebal 0,9 cm @ - = -
2,000 batang Kayu Dolken @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk 2 x pakai = - - -

19 Bekisting lantai Beton / M2


0,660 OH Pekerja @ - = -
0,033 OH Mandor @ - = -
0,330 OH Tukang Kayu @ - = -
0,033 OH Kepala Tukang @ - = -
0,400 Kg Paku @ - = -
0,200 liter Minyak bekisting @ - = -
0,016 m³ Kayu Kelas III @ - = -
0,671 lembar Multiplek tebal 0,9 cm @ - = -
= - = -
Profit & Overhead (10%) = - -
Total = - - = -
Untuk 2 x pakai = - - -
20 1 m' ring balk beton bertulang (10x15) cm
0,297 OH Pekerja @ - = -
0,015 OH Mandor @ - = -
0,033 OH Tukang Batu @ - = -
0,033 OH Tukang Kayu @ - = -
0,033 OH Tukang Besi @ - = -
0,010 OH Kepala Tukang @ - = -
0,003 M3 Papan @ - = -
0,020 Kg Paku @ - = -
3,600 Kg Besi Beton panjang 12 meter dia
@ 10 - = -
0,050 Kg Kawat Beton @ - = -
0,015 M3 Kerikil @ - = -
0,009 M3 Pasir Beton @ - = -
5,500 Kg Semen @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

21 Pemasangan 1 m2 rangka atap baja ringan


0,200 OH Pekerja @ - = -
0,050 OH Mandor @ - = -
0,450 OH Tukang @ - = -
0,010 OH Kepala Tukang @ - = -
3,200 M C.75.75 @ - ` = -
- buah Sekrup kait / roofing @ - = -
3,000 M Reng R.34 @ - = -
- buah Dynabolt dia 12mm (10-15cm)
@ - = -
5,000 % Peralatan - -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

C ANALISA PEKERJAAN ARSITEKTUR


1 Pasangan 1/2 Bata Spesi 1 semen : 6 pasir /M2
0,075 OH Pekerja @ - = -
- OH Mandor @ - = -
0,075 OH Tukang Batu @ - = -
- OH Kepala Tukang @ - = -
70,000 Bh Batu Bata @ - = -
0,050 M3 Pasir Pasang @ - = -
6,500 Kg Semen @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

2 Pemasangan 1 m2 Dinding Terawang (Roster) uk. 20x20 cm camp. 1SP : 4PP


0,300 OH Pekerja @ - = -
0,015 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,010 OH Kepala Tukang @ - = -
25,000 Bh Roster uk. 20x20 cm @ - = -
0,035 M3 Pasir Pasang @ - = -
11,000 Kg Semen @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
3 Plesteran Tebal 1.5 cm Spesi 1 : 6 /M2
0,050 OH Pekerja @ - = -
0,015 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,015 OH Kepala Tukang @ - = -
3,456 Kg Semen @ - = -
0,029 M3 Pasir Pasang @ - = -
= - - =
Profit & Overhead (10%) = - -
Total = - - = -

4 Pemasangan Acian / M2
0,050 OH Pekerja @ - = -
0,010 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,010 OH Kepala Tukang @ - = -
3,250 Kg Semen @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

5 Pemasangan 1 buah Pintu Pintu aluminium Lengkap


0,131 OH Pekerja @ - = -
0,013 OH Mandor @ - = -
0,131 OH Tukang Besi @ - = -
0,013 OH Kepala Tukang @ - = -
1,000 set Pintu Alumunium @ - -
- -
Profit & Overhead (10%) - -
Total = - - = -

6 Mencat Tembok (1 plamuur, 1 cat dasar, 2 cat penutup) /M2


0,020 OH Pekerja @ - = -
0,003 OH Mandor @ - = -
0,063 OH Tukang Cat @ - = -
0,006 OH Kepala Tukang @ - = -
0,100 Kg Plamuur @ - = -
0,100 Kg Cat dasar @ - = -
0,260 Kg Cat Penutup @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

7 Pasangan closet Jongkok / BH


0,054 OH Pekerja @ - = -
OH Mandor @ - = -
0,350 OH Tukang Batu @ - = -
OH Kepala Tukang @ - = -
1,000 Bh Closet Jongkok @ - ` = -
0,120 kg Semen @ - -
0,010 m3 Pasangan bata @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

8 Pasangan Floor Drain/ BH


0,010 OH Pekerja @ - = -
0,005 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,010 OH Kepala Tukang @ - = -
1,000 Bh Floor Drain @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
9 Pasangan Kran Air /Bh
0,010 OH Pekerja @ - = -
0,005 OH Mandor @ - = -
0,005 OH Tukang Batu @ - = -
- OH Kepala Tukang @ - = -
1,000 Bh Kran 3/4" @ - = -
0,025 Bh Sealtape @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

10 Pasang Lantai Keramik UK. 25 x 25 cm /M2


0,050 OH Pekerja @ - = -
0,014 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,014 OH Kepala Tukang @ - = -
1,050 Doos Keramik Ukuran 25 x 25 @ - ` = -
10,400 Kg Semen 50 Kg @ - = -
0,045 M3 Pasir Pasang @ - = -
0,500 Kg Semen Warna @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

11 Pasang dinding Keramik UK. 25 x 40 cm /M2


0,075 OH Pekerja @ - = -
0,045 OH Mandor @ - = -
0,100 OH Tukang Batu @ - = -
0,045 OH Kepala Tukang @ - = -
1,050 Doos Keramik Ukuran 25 x 40 @ - ` = -
10,400 Kg Semen 50 Kg @ - = -
0,045 M3 Pasir Pasang @ - = -
0,500 Kg Semen Warna @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

12 Penutup Atap
0,020 OH Pekerja @ - = -
- OH Mandor @ - = -
0,080 OH Tukang Besi @ - = -
- OH Kepala Tukang @ - = -
1,050 M2 Atap Spandek berpasir @ - = -
6,000 bh Screw Cteks 12-4 x 50 @ - = -
2,000 bh Screw Cteks 10 x 16 -16 @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

13 Listplank GRC tebal 10 mm lebar 30 cm cat waethershield


0,200 OH Pekerja @ - = -
- OH Mandor @ - = -
0,200 OH Tukang Kayu @ - = -
- OH Kepala Tukang @ - = -
0,458 btg GRC plank tebal 10 mm lebar@30 cm panjang 2,4
- m = -
0,300 Kg Cat Penutup (Tembok dan Plafond)
@ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
14 Pemasangan 1 M2 Bouvenlicht kisi-kisi Besi hollo 2 x2 cm finish cat
0,932 OH Pekerja @ - = -
- OH Mandor @ - = -
0,826 OH Tukang Las @ - = -
0,133 OH Tukang Cat @ - = -
- OH Kepala Tukang @ - = -
21,167 Kg Profil besi hollow @ - = -
0,213 Kg Cat Menie (Minyak) @ - = -
0,507 Kg Cat Penutup (Minyak) @ - = -
0,373 Kg Pengencer/Minyak Cat biasa @ - = -
1,000 ls Peralatan @ - -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

15 Waterproofing
0,100 OH Pekerja @ - = -
- OH Mandor @ - = -
0,100 OH Tukang batu @ - = -
- OH Kepala Tukang @ - = -
3,400 Kg Waterproofing cementitious @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

16 Grill Besi
1,641 OH Pekerja @ - = -
- OH Mandor @ - = -
1,373 OH Tukang Las @ - = -
0,335 OH Tukang Cat @ - = -
- OH Kepala Tukang @ - = -
14,170 Kg Profil besi siku @ - = -
21,043 Kg Profil besi Beton panjang 12 meter
@ dia 13 - = -
0,535 Kg Cat Menie (Minyak) @ - = -
1,271 Kg Cat Penutup (Minyak) @ - = -
0,937 Kg Pengencer/Minyak Cat biasa @ - = -
1,000 ls Peralatan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

17 Pemasangan head shower tanam lengkap dengan stop Kran


0,200 OH Pekerja @ - = -
- OH Mandor @ - = -
0,200 OH Tukang Pipa @ - = -
- OH Kepala Tukang @ - = -
1,000 bh Head shower tanam Lengkap dengan
@ kran tanam
- = -
1,000 ls Peralatan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

18 Tempat Sabun
0,125 OH Pekerja @ - = -
- OH Mandor @ - = -
0,125 OH Tukang Pipa @ - = -
- OH Kepala Tukang @ - = -
1,000 bh Tempat sabun @ - = -
1,000 ls Peralatan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
D ANALISA PEKERJAAN ELEKTRIKAL
1 Pemasangan 1 BH titik Lampu
0,350 % Tukang Listrik @ - = -
1,000 Btg Pipa Listrik 5/8" @ - = -
6,000 m Kabel NYM 3x2,5 mm2 @ - ` = -
1,000 Bh Tee Doos @ - = -
2,000 Bh Elbow @ - = -
3,000 Bh Las Dop @ - = -
12,000 Bh Klem Pipa Listrik @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

2 Pek. MCB
0,125 OH Pekerja @ - = -
- OH Mandor @ - = -
0,125 OH Tukang Listrik @ - = -
OH Kepala Tukang @ - = -
1,000 bh MCB 1phase 10A @ - = -
1,000 ls Material pendukung @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

3 Pek. Box MCB


0,125 OH Pekerja @ - = -
- OH Mandor @ - = -
0,125 OH Tukang Listrik @ - = -
- OH Kepala Tukang @ - = -
1,000 bh Box MCB @ - = -
1,000 ls Material pendukung @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

4 Pekerjaan Pemasangan lampu SL 18 Watt + Fitting


0,028 OH Pekerja @ - = -
- OH Mandor @ - = -
0,056 OH Tukang Listrik @ - = -
- OH Kepala Tukang @ - = -
1,000 bh Lampu SL 18 Watt + Fitting @ - = -
1,000 ls Material pendukung @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

5 Pekerjaan Pemasangan Sakelar


0,028 OH Pekerja @ - = -
- OH Mandor @ - = -
0,056 OH Tukang Listrik @ - = -
- OH Kepala Tukang @ - = -
1,000 bh Saklar (standar) - Gracio Broco
@ - = -
1,000 ls Material pendukung @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
E ANALISA PEKERJAAN PLAMBING
1 Pasangan Pipa PVC AW diameter 4" / M1
0,081 OH Pekerja @ - = -
0,004 OH Mandor @ - = -
0,135 OH Tukang Pipa @ - = -
0,014 OH Kepala Tukang @ - = -
0,350 Bh Lem Pipa PVC @ - -
1,100 M Pipa PVC tipe AW Ø 4 Inchi @
panjang 4 m - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

2 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"


0,036 OH Pekerja @ - = -
0,002 OH Mandor @ - = -
0,060 OH Tukang Batu @ - = -
0,006 OH Kepala Tukang @ - = -
0,350 Bh Lem Pipa PVC @ - -
1,200 M' Pipa PVC AW 3/4" @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

3 Pemasangan 1 bh Tee pipa PVC diameter 4”


0,027 OH Pekerja @ - = -
0,004 OH Mandor @ - = -
0,045 OH Tukang Pipa @ - = -
0,014 OH Kepala Tukang @ - = -
1,000 bh Tee pipa PVC diameter 4 Inchi
@ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

4 Pemasangan 1 bh Fitting pipa PVC diameter 4”


0,027 OH Pekerja @ - = -
0,004 OH Mandor @ - = -
0,045 OH Tukang Pipa @ - = -
0,014 OH Kepala Tukang @ - = -
1,000 bh Socket Pipa PVC 4" @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

5 Pemasangan 1 bh Fitting pipa PVC diameter 3”


0,027 OH Pekerja @ - = -
0,004 OH Mandor @ - = -
0,045 OH Tukang Pipa @ - = -
0,014 OH Kepala Tukang @ - = -
1,000 bh Socket Pipa PVC 3" @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

6 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 3”


0,081 OH Pekerja @ - = -
0,004 OH Mandor @ - = -
0,135 OH Tukang Pipa @ - = -
0,014 OH Kepala Tukang @ - = -
0,350 Bh Lem Pipa PVC @ - -
1,200 M Pipa PVC tipe AW Ø 3" panjang
@ 4m - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -
7 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 2”
0,054 OH Pekerja @ - = -
0,003 OH Mandor @ - = -
0,090 OH Tukang Pipa @ - = -
0,009 OH Kepala Tukang @ - = -
1,200 M Pipa PVC tipe AW Ø 2" panjang
@ 4m - = -
1,000 LS Perlengkapan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

8 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1”


0,036 OH Pekerja @ - = -
0,002 OH Mandor @ - = -
0,060 OH Tukang Pipa @ - = -
0,006 OH Kepala Tukang @ - = -
1,200 M Pipa PVC tipe AW Ø 1" panjang
@ 4m - = -
1,000 LS Perlengkapan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

9 Pemasangan 1 m’ Pipa PVC Tipe AW Diameter 1/2”


0,034 OH Pekerja @ - = -
0,002 OH Mandor @ - = -
0,059 OH Tukang Pipa @ - = -
0,006 OH Kepala Tukang @ - = -
1,200 M Pipa PVC Dia 1/2" ( AW ) @ - = -
1,000 LS Perlengkapan @ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

F ANALISA PEKERJAAN IPAL


1 Pemasangan 1 m2 dudukan media sarang tawon dengan bahan pipa PVC AW dia.1”
0,200 OH Pekerja @ - = -
0,010 OH Mandor @ - = -
0,400 OH Tukang Pipa @ - = -
0,040 OH Kepala Tukang @ - = -
14,700 m Pipa PVC diameter 1” @ - = -
1,000 ls Perlengkapan (tali pengikat, dll)
@ - = -
= - -
Profit & Overhead (10%) = - -
Total = - - = -

2 Pemasangan media sarang tawon, bahan rigid PVC tebal 0,2 mm


Total = -

3 Pemasangan vent pipa Galvanish dia. 1"


Total = -

4 Floating Clorin Feeder (Pengumpan klorin apung)


Total = -

5 Khlorin Tablet
Total = -

6 Pemasangan Fine Screen Stainliststeel 304, diameter lubang 1,5 cm, Tebal Plat 2 mm
Total = -

G COMMISSIONING TEST

1 Uji Aliran dan Kebocoran Bak IPL


Total = -
2 Uji Analisa Laboratorium, Air Limbah Domestik
Total = -
DAFTAR HARGA SATUAN UPAH DAN BAHAN
PROYEK : Penyediaan Sarana & Prasarana Sanitasi di Lembaga Pendidikan
Keagamaan (LPK) Lokasi 30
PEKERJAAN : Pembangunan Bilik MCK Wanita
TAHUN ANGGARAN : 2023

NO UPAH SATUAN HARGA SATUAN


1 2 3 4
I UPAH
1 Kepala Tukang Org / Hari
2 Tukang Batu Org / Hari
3 Tukang Kayu Org / Hari
4 Tukang Besi Org / Hari
5 Tukang Pipa Org / Hari
6 Tukang Las Org / Hari
7 Tukang Cat Org / Hari
8 Tukang Listrik Org / Hari
9 Pekerja Org / Hari
10 Mandor Org / Hari
II. BAHAN
A BAHAN BATU-BATUAN
1 Kerikil M3
2 Pasir Pasang M3
3 Pasir Beton M3
4 Pasir Urug M3
5 Tanah Urug M3
6 Batu Bata Bh
7 Roster uk. 20x20 cm Bh
8 Keramik Ukuran 25 x 25 Doos
9 Keramik Ukuran 25 x 40 Doos
10 Logo PU Akrilik Bh
B BAHAN KAYU
1 Papan Bekisting (terentang) M3
2 Kayu Kelas III M3
3 Kayu Kelas II M3
4 Kaso 5/7 Btg
5 Minyak bekisting Liter
6 Kayu Dolken Batang
7 Multiplek tebal 0,9 cm lembar
8 Formtie/penjaga jarak bekesting/spacer buah
C SEMEN
1 Semen (50 Kg) kg
2 Semen Warna ( 40 Kg ) kg
3 Waterproofing cementitious Kg
D BAHAN BESI DAN KAWAT
1 Besi Beton panjang 12 meter dia 12 Kg
2 Besi Beton panjang 12 meter dia 10 Kg
3 Besi Beton panjang 12 meter dia 8 Kg
4 Besi Beton panjang 12 meter dia 6 Kg
5 Profil besi Beton panjang 12 meter dia 13 Kg
6 Kawat Beton Kg
NO UPAH SATUAN HARGA SATUAN
1 2 3 4
7 Profil besi siku Kg
8 Profil besi siku tebal 5mm Kg
9 Profil besi hollow Kg
10 Paku Kg
11 Plat embaded (konekting rangka) bh
12 Kawat las bh
13 Akrilik Sign Indonesia Maju set
E BAHAN ATAP
1 Lem Kayu Kg
2 Profil C.75.75 M'
3 Reng R.34 M'
4 Atap Spandek berpasir M2
5 Screw Cteks 12-4 x 50 bh
6 Screw Cteks 10 x 16 -16 bh
7 GRC plank tebal 10 mm lebar 30 cm panjang 2,4 m btg
F BAHAN CAT
1 Plamuur Kg
2 Cat Menie (Minyak) Kg
3 Cat Dasar (Tembok) Kg
4 Cat Penutup (Minyak) Kg
5 Cat Penutup (Tembok dan Plafond) Kg
6 Pengencer/Minyak Cat biasa Kg
G SANITER
1 Kloset Jongkok Bh
2 Kran Air dia 3/4" tipe tuas steinless Bh
3 Head shower tanam Lengkap dengan kran tanam bh
4 Tempat sabun bh
5 Saringan Floordrain 10x10 cm steinless Bh
H BAHAN PINTU
1 Pintu Alumunium Kamar Mandi Bh
I BAHAN LISTRIK
1 Pipa Listrik 5/8" btg
2 Tee Doos bh
3 L.Bow bh
4 Las Dop bh
5 Klem Pipa Listrik bh
6 Mangkok (Listrik) bh
7 Pipa PVC Dia 1/2" ( AW ) Btg
8 MCB 1phase 10A bh
9 Box MCB bh
10 Lampu SL 18 Watt + Fitting bh
11 Isolasi bh
12 Saklar (standar) - bh
13 Kabel NYM 3x2,5 mm2 @100 mtr supreme m
J BAHAN PLAMBING
1 Pipa PVC tipe AW Ø 4 Inchi panjang 4 m m
2 Elbow PVC L 90 Derajat Diameter 4" Bh
3 Tee pipa PVC diameter 4 Inchi Bh
4 Socket Pipa PVC 4" Bh
5 Socket Pipa PVC 3" Bh
6 Pipa PVC tipe AW Ø 3 Inchi panjang 4 m m
NO UPAH SATUAN HARGA SATUAN
1 2 3 4
7 Pipa PVC tipe AW Ø 2 Inchi panjang 4 m m
8 Pipa PVC tipe AW Ø 1 Inchi panjang 4 m m
9 Pipa PVC AW 3/4" m
10 Lem Pipa PVC Bh
11 Sealtape Bh
12 Water Stop lebar 200 m'
K IPAL
1 Media Sarang Tawon M3
2 Pemasangan vent pipa Galvanish dia. 2" bh
3 Floating Clorin feeder Unit
4 Khlorin Tablet kg
5 Fine Screen Stainliststeel 304 Unit
6 Uji Aliran dan Kebocoran Bak IPL ls
7 Uji Analisa Laboratorium, Air Limbah Domestik spl
L SM K3
1 Papan informasi K.3 bh
2 Helm proyek Bh
3 Sarung tangan (Safety gloves) Psg
4 Sepatu keselamatan untuk pekerja (Rubber safety shoes) Psg
5 Rompi keselamatan (Safety vest) Bh
6 Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) set
7 Rambu Petunjuk/police line roll