Anda di halaman 1dari 31

PEMERINTAH KOTA AMBON

DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


Jl. Yan Paays No. 30 Telp. 0911-311190- Ambon

BILL OF QUANTITY (BOQ)

PEKERJAAN :
PENGADAAN DAN PEMASANGAN LAMPU
JALAN DESA EMA

TAHUN ANGGARAN
2020
BILL OF QUANTITY (BOQ)
REKAPITULASI
PEKERJAAN : PENGADAAN DAN PEMASANGAN LAMPU JALAN DESA EMA
LOKASI : KOTA AMBON
TAHUN ANGGARAN: 2020

No. URAIAN PEKERJAAN JUMLAH


HARGA
(Rp)

A. PEKERJAAN PERSIAPAN Rp -
B. PEKERJAAN PENGADAAN MATERIAL UTAMA Rp -
C. PEKERJAAN KONSTRUKSI Rp -
D. PEKERJAAN PEMASANGAN Rp -
E. PEKERJAAN PENYAMBUNGAN DAYA BARU Rp -

JUMLAH TOTAL PEKERJAAN Rp -


PPN 10% Rp -
JUMLAH Rp -
DIBULATKAN Rp -
Terbilang : .........................................................................................................................
.........................................................................................................................

Ambon, …........................... 2020

Penawar
PT./CV. …...................................

Nama Jelas
Jabatan
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PENGADAAN DAN PEMASANGAN LAMPU JALAN DESA EMA


LOKASI : KOTA AMBON
TAHUN ANGGARA : 2020

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pengukuran Kembali (Steak Out) Ls 1.00 - -
2 Dokumentasi dan Pelaporan Ls 1.00 - -
3 Pembersihan Awal dan Akhir Ls 1.00 - -
4 Penyelenggaraan K3 Ls 1.00 - -
5 Papan Nama Proyek Ls 1.00 - -
Jumlah -
B. PEKERJAAN PENGADAAN MATERIAL UTAMA
1 Tiang Listrik Standard H 07 (baru) Bh 24.00 - -
2 Himawari 100 W ( 1 LED) Lengkap Bh 24.00 - -
3 Stang Lampu Uk. P: 1,5 M' dia 1.5" Bh 24.00 - -
4 Klem Beugel 5 x 1,5 " Bh 48.00 - -
5 Kabel NYM 2 x 2,5 mm M 72.00 - -
6 Kabel Pilin (twisted) 2 x 16 mm2 in foor M 1,335.00 - -
7 Pengadaan Panel Kontrol + armature
- Box Panel Outdoor uk. 40 x 60 cm Bh 1.00 - -
- Magnetic Contactor 50 A Bh 1.00 - -
- Timer Switch (Panasonic) TB 388 24H 100-250V AC/50 Bh 1.00 - -
- MCB 16 A (1 P) Bh 1.00 - -
- MCB 10 A (1 P) Bh 2.00 - -
- Pipa Subduct PVC 1.5." Staff 1.00 - -
- Pipa PVC 1,0" Staff 2.00 - -
- Knee PVC 1,0" Bh 2.00 - -
- Stainless Steel Strip M 24.00 - -
- Yokes/Stoping Buckle Bh 48.00 - -
- Schoon Kabel 6 mm Bh 6.00 - -
- Batang Arde BC 12 mm Bh 1.00 - -
- CCS / CCO 1P1 Bh 48.00 - -
- Service Wedge Clam 16 mm Bh 48.00 - -
- Tension Bracket Bh 24.00 - -
- Suspension Bracket Bh 24.00 - -
- Strain Klem LV TC Bh 4.00 - -
- Connector Alumunium Bh 4.00 - -
8 Mobilisasi (Mantage) Ls 1.00 - -
Jumlah -
C. PEKERJAAN KONSTRUKSI
1 Pek. Pembongkaran Trotoar M3 0.22 - -
2 Pek. Galian Tanah (Pondasi Tiang) M3 1.30 - -
3 Pek. Pondasi Tiang 30 x 30 cm (f’c = 19,3 Mpa) M3 1.30 - -
4 Perbaikan Bekas Bongkaran Trotoar (Rabat Beton) M3 0.32 - -
5 Material Bantu Ls 1.00 - -
Jumlah -
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)

D. PEKERJAAN PEMASANGAN
1 Pemasangan Tiang Listrik Standard H 07 Unit 24.00 - -
2 Pemasangan armatur Himawari 80 W Bh 24.00 - -
3 Pemasangan Jaringan Kabel Udara M 1,335.00 - -
4 Pasang Box Panel + Armateru Unit 1.00 - -
5 Pemasangan Arde Titik 1.00 - -
Jumlah -
E. PEKERJAAN PENYAMBUNGAN DAYA BARU
1 Biaya Penyambungan Unit 3,500.00 - -
2 SLO (Sertifikat Layak Operasi ) Unit 3,500.00 - -
3 Uang Jaminan Listrik (UJL) Unit 3,500.00 - -
Jumlah -
ANALISA HARGA SATUAN PEKERJAAN

A.2.2.1.14. Pembongkaran 1 m3 trotoar

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.6670 - -
Mandor L.04 OH 0.3330 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.21 Pembongkaran 10 M2 Aspal Jalan

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Batu L.03 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Aspal M3 0.0450 - -
Batu Pecah Mesin (Kg) Kg 0.3000 - -
Minyak Tanah Liter 0.1000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Alat Bantu Ls 1.0000 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
G Untuk 1 M2 Pembongkaran Aspal F / 10 -
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7500 - -
Mandor L.04 OH 0.0250 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000 - -
Mandor L.04 OH 0.0500 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.9. (K3) Pemasangan 1 m3 batu kosong (anstamping)

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800 - -
Tukang Batu L.02 OH 0.3900 - -
Kepala Tukang L.03 OH 0.0390 - -
Mandor L.04 OH 0.0390 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 - -
Pasir Urug m3 0.4320 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.3.2.1.3. Pemasangan 1 m3 pondasi batu kali campuran 1SP : 5PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 - -
Porland Cemend Tonasa (Kg) Kg 136.0000 - -
Pasir Pasang/Beton (M3) m3 0.5440 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000 - -
Tukang Batu L.02 OH 0.7500 - -
Kepala Tukang L.03 OH 0.0750 - -
Mandor L.04 OH 0.0750 - -
JUMLAH TENAGA KERJA -
B BAHAN
Batu Kali m3 1.2000 - -
Porland Cemend Tonasa (Kg) Kg 163.0000 - -
Pasir Pasang/Beton (M3) m3 0.5200 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 - -
Tukang Batu L.02 OH 0.2000 - -
Kepala Tukang L.03 OH 0.0200 - -
Mandor L.04 OH 0.0600 - -
JUMLAH TENAGA KERJA -
B BAHAN
Porland Cemend Tonasa (Kg) kg 230.0000 - -
Pasir Pasang/Beton (Kg) kg 893.0000 - -
Batu Pecah Mesin (Kg) kg 1,027.0000 - -
Air Liter 200.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 Mpa

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 - -
Tukang Batu L.02 OH 0.2750 - -
Kepala Tukang L.03 OH 0.0280 - -
Mandor L.04 OH 0.0830 - -
JUMLAH TENAGA KERJA -
B BAHAN
Porland Cemend Tonasa (Kg) kg 371.0000 - -
Pasir Pasang/Beton (Kg) kg 698.0000 - -
Batu Pecah Mesin (Kg) kg 1,047.0000 - -
Air Liter 215.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 - -
Tukang Besi L.02 OH 0.0700 - -
Kepala Tukang L.03 OH 0.0070 - -
Mandor L.04 OH 0.0040 - -
JUMLAH TENAGA KERJA -
B BAHAN
Besi Beton Polos kg 10.5000 - -
Ikat Beton (bendrat) kg 0.1500 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
G Untuk 1 Kg Pembesian -
A.4.1.1.20 (K3) Pemasangan 1 m2 bekisting untuk pondasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200 - -
Tukang Kayu L.02 OH 0.2600 - -
Kepala Tukang L.03 OH 0.0260 - -
Mandor L.04 OH 0.0260 - -
JUMLAH TENAGA KERJA -
B BAHAN
Kayu Klas II kg 0.0400 - -
Paku Campur kg 0.3000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15.0% x D -
F Harga Satuan Pekerjaan (D+E) -

1 M3 BETON Pondasi Tiang 30 x 30 cm Fc' = 19,3 Mpa


Spesi beton K.225 m3 1.0000 - -
Cetakan papan begesting m2 13.3333 - -
Jumlah -

Pemasangan 1 buah Tiang Lampu Decorative

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3750 - -
Tukang Batu L.03 OH 0.2500 - -
Mandor L.04 OH 0.0667 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Dump Truck Hr 0.1250 - -
Scaffolding Hr 0.1250 - -
Alat Bantu Ls 0.1250 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
Pemasangan Kabel Twisted

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0080 - -
Tukang Listrik L.03 OH 0.0040 - -
Supir L.03 OH 0.0030 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0300 - -
Mobil Pick Up Hr 0.0200 - -
Alat Bantu Ls 0.0030 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

Pemasangan Kawat Baja

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0080 - -
Tukang Listrik L.03 OH 0.0040 - -
Supir L.03 OH 0.0030 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0030 - -
Scaffolding Hr 0.0030 - -
Mobil Pick Up Hr 0.0030 - -
Alat Bantu Ls 0.0030 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
Pemasangan Kabel Seling Baja

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0080 - -
Tukang Listrik L.03 OH 0.0040 - -
Supir L.03 OH 0.0030 - -
Mandor L.04 OH 0.0010 - -
JUMLAH TENAGA KERJA -
B BAHAN
Klem Kabbel Seling baja Bh 1.0000 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.0030 - -
Scaffolding Hr 0.0030 - -
Mobil Pick Up Hr 0.0030 - -
Alat Bantu Ls 0.0030 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

Pemasangan Lampu / Armatur

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0796 - -
Tukang Listrik L.03 OH 0.0398 - -
Kepala Tukang L.03 OH 0.0199 - -
Mandor L.04 OH 0.0100 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.1990 - -
Alat Bantu Ls 0.1990 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
Gelar Kabel Tanah, Perapihan dan Instalasi

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 - -
Tukang Listrik L.03 OH 0.0100 - -
Supir L.03 OH 0.0200 - -
Mandor L.04 OH 0.0050 - -
JUMLAH TENAGA KERJA -
B BAHAN
Pasir Urug M3 0.0300 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Mobil Pick Up Hr 0.0200 - -
Alat Bantu Ls 0.0200 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -

Pemasangan Grounding Panel Kontrol PJU

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 - -
Tukang Listrik L.03 OH 0.2000 - -
Mandor L.04 OH 0.1000 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
Pemasangan Panel Kontrol PJU

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7326 - -
Tukang Listrik L.03 OH 0.7326 - -
Supir L.03 OH 0.0500 - -
Mandor L.04 OH 0.1832 - -
JUMLAH TENAGA KERJA -
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
Tangga 7 Meter Hr 0.3663 - -
Mobil Pick Up Hr 0.0500 - -
Alat Bantu Ls 0.3663 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) -
E Overhead & Profit (Contoh 0 %) 15% x D -
F Harga Satuan Pekerjaan (D+E) -
DAFTAR HARGA UPAH DAN BAHAN

HARGA UPAH
1 Mandor Org./Hr. Rp -
2 Kepala Tukang Org./Hr. Rp -
3 Tukang Kayu Org./Hr. Rp -
4 Tukang Batu Org./Hr. Rp -
5 Tukang Besi Org./Hr. Rp -
6 Tukang Cat Org./Hr. Rp -
7 Tukang Listrik Org./Hr. Rp -
8 Supir Org./Hr. Rp -
9 Pekerja Org./Hr. Rp -
HARGA SEWA PERALATAN
1 Sewa Dump Truck /Hr. Rp -
2 Tripod /Hr. Rp -
3 Tangga 7 Meter /Hr. Rp -
4 Scaffolding /Hr. Rp -
4 Katrol Pengangkat Tiang /Hr. Rp -
5 Mobil Pick Up /Hr. Rp -
HARGA BAHAN
BATU
1 Batu Karang M³ Rp -
2 Batu Kali M³ Rp -
KERIKIL
1 Batu Kerikil Sungai / Pantai (Kerikil Cor) M³ Rp -
2 Batu Pecah Mesin (M3) M³ Rp -
3 Batu Pecah Mesin (Kg) Kg Rp -
PASIR & TANAH
1 Pasir Pasang/Beton (M3) M³ Rp -
2 Pasir Pasang/Beton (Kg) Kg Rp -
3 Pasir Urug M³ Rp -
4 Sirtu M³ Rp -
5 Tanah Timbunan M³ Rp -
BATU BATA
1 Bata Merah 6x11x22 cm Bh Rp -
BAHAN KAYU
1 Kayu Klas I M³ Rp -
2 Kayu Klas II M³ Rp -
3 Papan Kayu Kls I M³ Rp -
4 Papan Kayu Kls II M³ Rp -
5 Dolken Kayu Btg Rp -
SEMEN
1 Porland Cemend Tonasa (Zak) Zak Rp -
2 Porland Cemend Tonasa (Kg) Kg Rp -
3 Sement Warna Kg Rp -
BAHAN AIR
1 Air Ltr Rp -
BAHAN BESI
1 Besi Beton Polos Kg Rp -
2 Angkur Ø 22 mm Kg Rp -
3 Angkur Ø 16 mm Kg Rp -
4 Besi Polos Standard Ø 6 mm Staf Rp -
HARGA BAHAN
5 Besi Polos Standard Ø 16 mm Staf Rp -
KAWAT
1 Ikat Beton (bendrat) Kg Rp -
2 Kawat Baja Kg Rp -
3 Kawat Baja M' Rp -
BAHAN PAKU
1 Paku Campur Kg Rp -
BAHAN PIPA
1 Pipa GIP Mediun A dia. 3" Staf Rp -
2 Pipa GIP Mediun A dia. 2." Staf Rp -
3 Pipa GIP Mediun A dia. 1.5." Staf Rp -
4 Pipa GIP Mediun A dia. 1." Staf Rp -
5 Pipa PVC dia 2" Staf Rp -
6 Pipa PVC dia 1.5" Staf Rp -
7 Pipa PVC dia 1" Staf Rp -
LAMPU JALAN DAN ARMATURE
1 Kap Lampu Jalan Zetalux Bh Rp -
2 Kap Lampu Jalan Osiwa Bh Rp -
3 Stang Lampu Uk. P= 3 M' Dia. 1,5" Bh Rp -
4 Kap Lampu Jalan Zetalux Bh Rp -
5 Stang Lampu Uk. P= 1,5 M' Dia. 1,5" Bh Rp -
6 Balon Mercury Scn-T 250 Watt Bh Rp -
7 Balon Mercury Scn-T 220 Watt (Non Ignitor) Bh Rp -
8 Balon MercuryHPL -N 250 Watt Bh Rp -
9 Balon Mercury ML 250 Watt Bh Rp -
10 LED SETA 100 W lengkap Bh Rp -
11 LED SETA 80 W lengkap Bh Rp -
12 Fatro Lengkap Bh Rp -
13 Lampu Philips (19 W) untuk Fatro Bh Rp -
14 Himawari 100 W ( 1 LED) Lengkap Bh Rp -
15 LED SETA LUX 95 W Bh Rp -
16 Balon Visicon 95 Watt Bh Rp -
17 Balon Visicon 75 Watt Bh Rp -
18 LED CL RL-2 100 Watt (bridgelux Chip) Bh Rp -
19 LED CL RL-2 80 Watt (bridgelux Chip) Bh Rp -
20 LED CL RL-2 60 Watt (bridgelux Chip) Bh Rp -
21 LED MINI 20 W Bh Rp -
22 LED MINI 30 W Bh Rp -
23 LED MINI 40 W Bh Rp -
24 LED MINI 50 W Bh Rp -
25 LED JETA 20 W Bh Rp -
26 LED JETA 30 W Bh Rp -
27 LED JETA 40 W Bh Rp -
28 LED JETA 50 W Bh Rp -
29 LED SETA 60 W Bh Rp -
30 LED SETA 80 W Bh Rp -
31 LED SETA 100 W Bh Rp -
32 LED META 130 W Bh Rp -
HARGA BAHAN
33 LED META 150 W Bh Rp -
34 Lampu LED Flexibel 12 V-DC IP65 Bh Rp -
35 Lampu Shade Mika Bh Rp -
36 LAMPU KESSIL A. 160 TUNA BLUE 40 WATT Bh Rp -
37 Lampu LED 30 Watt Philips Bh Rp -
38 Bola Politin Bh Rp -
39 LAMPU LED 50 WATT PHILIPS Bh Rp -
40 LED SETA 170 W Bh Rp -
41 Adaptor LED/Flasher IC Bh Rp -
42 Ballast BSN 250 Watt Bh Rp -
43 Ballast BHL 250 Watt Bh Rp -
44 Ballast BHL 400 Watt Bh Rp -
45 Lampu Selang Bh Rp -
46 Lampu Meteor Bh Rp -
47 Tiang Lampu Decorative DG-Alfino-H7000 Bh Rp -
48 Tiang Decorative H 06 Doubel Arm Bh Rp -
49 Tiang Decorative H 06 Single Arm Bh Rp -
MATERIAL PANNEL
1 Box Pannel Outdoor Uk. 40 x 60 cm Bh Rp -
2 Box Pannel Uk. 40 x 60 cm Bh Rp -
3 Box Pannel Uk.30 x 40 cm Bh Rp -
4 Box Out Door KWH Meter 3 Phase Bh Rp -
5 Magnetic Contactor SN 65-220 V Bh Rp -
6 Magnetic Contactor 80 A Bh Rp -
7 Magnetic Contactor 50 A Bh Rp -
8 Magnetic Contactor 35 A Bh Rp -
9 Timer Switch Panasonic Bh Rp -
10 Timer Switch Theben Bh Rp -
11 MCB 2 A Bh Rp -
12 MCB 4 A Bh Rp -
13 MCB 10 A Bh Rp -
14 MCB 16 A Bh Rp -
15 MCB 25 A Bh Rp -
16 MCB 32 A Bh Rp -
17 MCB 35 A Bh Rp -
18 MCB 35 A (3 Phase) Bh Rp -
19 MCB 50 A Bh Rp -
20 MCB 50 A (3 Phase) Bh Rp -
21 MCB 63 A Bh Rp -
22 MCB 63 A (3 Phase) Bh Rp -
23 MCB 80 A Bh Rp -
24 MCB 80 A (3 Phase) Bh Rp -
25 KWH Meter 60/80 Bh Rp -
26 KWH Meter 3 Phase Bh Rp -
BAHAN KABEL JARINGAN
1 NYM 2 x 1.5 mm (Eterna) Meter Rp -
2 NYM 2 x 2.5 mm (Eterna) Meter Rp -
3 NYM 2 x 4 mm (Eterna) Meter Rp -
HARGA BAHAN
4 NYM 2 x 6 mm (Eterna) Meter Rp -
5 NYM 2 x 10 mm (Eterna) Meter Rp -
6 NYM 3 x 2,5 mm (Eterna) Meter Rp -
7 NYM 3 x 4 mm (Eterna) Meter Rp -
8 NYM 3 x 6 mm (Eterna) Meter Rp -
9 NYM 2 x 10 mm (Eterna) Meter Rp -
10 NYM 4 x 2.5 mm (Eterna) Meter Rp -
11 NYM 4 x 4 mm (Eterna) Meter Rp -
12 NYM 4 x 6 mm (Eterna) Meter Rp -
13 NYM 4 x 10 mm (Eterna) Meter Rp -
14 NGA 1,5 mm Meter Rp -
15 NGA 2,5 mm Meter Rp -
16 Tuistek 2 x 10 mm Meter Rp -
17 Tuistek 2 x 16 mm Meter Rp -
18 Tuistek 4 x 16 mm Meter Rp -
19 NYFGBY 2 x 6 mm Meter Rp -
20 NYFGBY 4 x 6 mm Meter Rp -
21 NYFGBY 2 x 4 mm Meter Rp -
22 NYFGBY 4 x 4 mm Meter Rp -
TIANG LAMPU / LISTRIK
1 Tiang PJU Type ISP Lengan Tunggal Oct. 9 M Buah Rp -
2 Tiang PJU Type ISP Lengan Ganda Oct. 9 M Buah Rp -
3 Tiang Galvanis 12 Meter Buah Rp -
4 Tiang PJU Type ISP Lengan Tunggal Oct. 7 M Buah Rp -
5 Tiang PJU Type ISP Lengan Ganda Oct. 7 M Buah Rp -
6 Tiang PJU Solar Cell Type ISP 9 M Oct Single Buah Rp -
7 Tiang Decorative, h = 7 M (ORLANDO) Buah Rp -
8 Tiang Lampu Decorative DG-Alfino-H7000 Bh Rp -
9 Tiang Decorative H 06 Doubel Arm Bh Rp -
10 Tiang Decorative H 06 Single Arm Bh Rp -
11 Tiang Decorative, h = 6 M, 2 Lengan (AB 106) Buah Rp -
12 Tiang Telepon (Telkom) H07 Buah Rp -
13 Tiang Telepon (Telkom) H09 Buah Rp -
14 Tiang Listrik Standard H09 Buah Rp -
15 Tiang Listrik Standard H07 Buah Rp -
16 Tiang Listrik Besi 9 meter da N Buah Rp -
17 Tiang Listrik Besi 11 meter Buah Rp -
18 Tiang Listrik Besi 13 meter Buah Rp -
KLEM BEUGEL
1 Klem Beugel 2 x 1,5 " Buah Rp -
2 Klem Beugel 3 x 1,5 " Buah Rp -
3 Klem Beugel 4 x 1,5 " Buah Rp -
4 Klem Beugel 5 x 1,5 " Buah Rp -
5 Klem Beugel 6 x 1,5 " Buah Rp -
6 Klem Beugel 10 x 1,5 " Buah Rp -
7 Beugel 1.5" Buah Rp -
8 Beugel 2" Buah Rp -
9 Beugel 3" Buah Rp -
HARGA BAHAN
10 Beugel 5" Buah Rp -
11 Beugel 6" Buah Rp -
12 Beugel 10" Buah Rp -
13 Klem Kabbel Seling baja Buah Rp -
LAIN-LAIN
1 Fotocell Buah Rp -
2 Isolasi Listrik 3 M Roll Rp -
3 Service Wedge Clam 16 mm Buah Rp -
4 Tension Bracket Buah Rp -
5 Suspension Bracket Buah Rp -
6 Isolasi Listrik Schot 23 Roll Rp -
7 Cocector Aluminium Buah Rp -
8 Schoon 6 mm Buah Rp -
9 Kabel BC 6 mm2 Meter Rp -
10 Strain Klem LV TC Buah Rp -
11 Klem Kabel N0 10 Dos Rp -
12 Klem Kabel N0 12 Dos Rp -
13 Klem Kabel N0 14 Dos Rp -
14 Afta Klem 10 mm Buah Rp -
15 Afta Klem 16 mm Buah Rp -
16 Socket Automat Lampu Selang Buah Rp -
17 CCS/CCO 1P1 Buah Rp -
18 Veteng Porselin E-40 Buah Rp -
19 T Dos Buah Rp -
20 Dora Dos 3/4 Buah Rp -
21 Dora Dos 5/8 Buah Rp -
22 Automatic Timer Solenoid 1 " Buah Rp -
23 Automatic Timer Solenoid 11/2 " Buah Rp -
24 Automatic Timer Solenoid 2 " Buah Rp -
25 Automatic Timer Hunter 9 Sim Buah Rp -
26 Yokes /Stoping Buckle Buah Rp -
27 Stainless Steel Strip M Rp -
28 Knee PVC dia 2" Buah Rp -
29 Knee PVC dia 1,5" Buah Rp -
30 Knee PVC dia. 1" Buah Rp -
31 Gembok Buah Rp -
32 Skun Kabel (Ties) `15 cm Bh Rp -
33 Kabel Power M' Rp -
34 Kabel NYAF 2x2,5 mm M' Rp -
35 Kabel Seling M10 Baja M' Rp -
36 Klem Sekling Stanlees Steel Bh Rp -
37 Jarum Keras / Spand Skrup Stanlees Steel Bh Rp -
38 Kaussen Stainlees Steel Bh Rp -
39 Cat Primer Nebel 1000 Kg Rp -
40 Cat Finish Clear Coating Kg Rp -
41 Box Panel Out Door 25x30x20 cm Bh Rp -
42 Asessoris Ls Rp -
43 Grounding Rod 12 mm2 staff Rp -
HARGA BAHAN
44 Kabel schoon 6 mm2 Buah Rp -
45 Biaya Penyambungan VA Rp -
46 SLO ( sertifikat Layak Operasi ) VA Rp -
47 Uang jaminan Listrik (UJL) VA Rp -
BAHAN BAKAR MINYAK
1 Solar Ltr Rp -
2 Minyak Pelumas Ltr Rp -
3 Minyak Tanah Ltr Rp -
BAHAN JALAN
1 Aspal Unit Rp -
2 Cat Marka (Non Thermoplas) Kg Rp -
3 Cat Marka (Thermoplastic) Kg Rp -
Lembar 21 dari 31

RINCIAN HARGA SATUAN UPAH DAN BAHAN TAHUN 2014


LOKASI : DESA TAWIRI - AMBON

HARGA DI
LOKASI JASA +
HARGA BELI DI ONGKOS PROYEK (REAL OVERHEAD 10%
JUMLAH QUARRY ANGKUT COST)
NO. JENIS URAIAN STN (Rp.) (Rp.)
HARGA (Rp.) (Rp.)
(Rp.) (1) (2) (3) (4)
(1) + (2) 10% x (3)
I SATUAN UPAH
1. Pekerja OH 82,000.00 74,750.00 - 74,750.00 7,475.00
2. Tukang OH 95,000.00 86,250.00 - 86,250.00 8,625.00
3. Kepala Tukang OH 122,000.00 110,650.00 - 110,650.00 11,065.00
4. Mandor OH 134,000.00 122,100.00 - 122,100.00 12,210.00
II. SATUAN BAHAN
1 Tanah Urug M3 127,000.00 90,000.00 25,000.00 115,000.00 11,500.00
2 Pasir Beton / Pasang M3 193,000.00
### 150,000.00 25,000.00 175,000.00 17,500.00
3 Pasir Beton / Pasang Kg 227.00
### 107.14 100.00 207.14 20.71
4 Pasir Urug M3 154,000.00
### 115,000.00 25,000.00 140,000.00 14,000.00
5 Batu Kali M3 160,000.00
### 120,000.00 25,000.00 145,000.00 14,500.00
6 Kerikil M3 193,000.00
### 150,000.00 25,000.00 175,000.00 17,500.00
7 Kerikil Kg 232.00
### 111.11 100.00 211.11 21.11
8 Semen PC (50 Kg) Sak 74,000.00 66,000.00 1,000.00 67,000.00 6,700.00
9 Semen PC Kg 2,000.00 1,320.00 100.00 1,420.00 142.00
10 Air Ltr 246.00 24.00 200.00 224.00 22.40
11 Kayu Klas II M3 3,108,000.00 2,800,000.00 25,000.00 2,825,000.00 282,500.00
12 Papan Kayu Klas II M3 3,218,000.00 2,900,000.00 25,000.00 2,925,000.00 292,500.00
13 Plywood tebal 9 mm Lbr 112,000.00 100,000.00 2,000.00 102,000.00 10,200.00
14 Dolken Kayu Galam, Ø 8-10 cm, Panjang 4 M' Btg 45,000.00 40,000.00 1,000.00 41,000.00 4,100.00
15 Minyak Bekisting Liter 28,000.00
### 25,000.00 200.00 25,200.00 2,520.00
16 Besi Beton Kg 11,000.00
### 10,000.00 100.00 10,100.00 1,010.00
17 Kawat Las Kg 36,000.00
### 33,000.00 100.00 33,100.00 3,310.00
18 Kawat Ikat Kg 27,000.00
### 24,000.00 100.00 24,100.00 2,410.00
19 Paku Campur Kg 27,000.00
### 24,000.00 100.00 24,100.00 2,410.00
20 Soda Api Kg 12,000.00
### 11,000.00 100.00 11,100.00 1,110.00
21 Semen Putih Sak 157,000.00
### 140,000.00 3,000.00 143,000.00 14,300.00
22 Plamir Tembok Kg 25,000.00
### 23,000.00 100.00 23,100.00 2,310.00
23 Cat Tembok Metrolite Kg 24,000.00 22,000.00 100.00 22,100.00 2,210.00
24 Cat Tembok Anti Bocor Aquaproof Kg 94,000.00 85,000.00 100.00 85,100.00 8,510.00
25 Menie Besi Kg 50,000.00 45,000.00 100.00 45,100.00 4,510.00
26 Cat Besi Kg 77,000.00 70,000.00 100.00 70,100.00 7,010.00
27 Street box Bh 488,000.00 443,500.00 100.00 443,600.00 44,360.00
28 Minyak Cat (Thineer) Ltr 31,000.00 28,000.00 200.00 28,200.00 2,820.00
29 Kertas Amplas, semua ukuran Lbr 7,000.00 6,000.00 100.00 6,100.00 610.00
30 Kuas Bh 10,000.00 9,000.00 100.00 9,100.00 910.00
31 Pipa GIP Ø 100 mm Medium A Spindo M' 249,000.00 226,333.33 300.00 226,633.33 22,663.33
32 Pipa GIP Ø 75 mm Medium A Spindo M' 172,000.00 155,833.33 300.00 156,133.33 15,613.33
33 Pipa GIP Ø 50 mm Medium A spindo M' 106,000.00 96,250.00 300.00 96,550.00 9,655.00
34 Pipa GIP Ø 40 mm Medium A Spindo M' 78,000.00 70,583.33 300.00 70,883.33 7,088.33
35 Pipa GIP Ø 20 mm Medium A spindo M' 34,000.00 30,166.67 300.00 30,466.67 3,046.67
36 Elbow GIP Ø 100 mm Bh 363,000.00 330,000.00 150.00 330,150.00 33,015.00
Lembar 22 dari 31

HARGA DI
LOKASI JASA +
HARGA BELI DI ONGKOS PROYEK (REAL OVERHEAD 10%
JUMLAH QUARRY ANGKUT COST)
NO. JENIS URAIAN STN (Rp.) (Rp.)
HARGA (Rp.) (Rp.)
(Rp.) (1) (2) (3) (4)
(1) + (2) 10% x (3)
37 Elbow GIP Ø 75 mm Bh 176,000.00 160,000.00 150.00 160,150.00 16,015.00
38 Elbow GIP Ø 50 mm Bh 52,000.00 47,000.00 150.00 47,150.00 4,715.00
39 Socket GIP Ø 100 mm Bh 98,000.00 89,000.00 150.00 89,150.00 8,915.00
40 Socket GIP Ø 75 mm Bh 58,000.00 52,500.00 150.00 52,650.00 5,265.00
41 Socket GIP Ø 50 mm Bh 28,000.00 25,000.00 150.00 25,150.00 2,515.00
42 Socket GIP Ø 40 mm Bh 24,000.00 22,000.00 150.00 22,150.00 2,215.00
43 Socket GIP Ø 20 mm Bh 10,000.00 8,500.00 150.00 8,650.00 865.00
44 Knee GIP Ø 100 mm Bh 151,000.00 137,000.00 150.00 137,150.00 13,715.00
45 Knee GIP Ø 75 mm Bh 105,000.00 95,000.00 150.00 95,150.00 9,515.00
46 Knee GIP Ø 50 mm Bh 41,000.00 37,500.00 150.00 37,650.00 3,765.00
47 Knee GIP Ø 20 mm Bh 10,000.00 9,000.00 150.00 9,150.00 915.00
48 Nepel GIP Ø 100 mm Bh 94,000.00 85,000.00 150.00 85,150.00 8,515.00
49 Nepel GIP Ø 75 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
50 Nepel GIP Ø 50 mm Bh 50,000.00 45,000.00 150.00 45,150.00 4,515.00
51 Gilboult Joint GIP Ø 50 mm Bh 99,000.00 90,000.00 150.00 90,150.00 9,015.00
52 Water Mur GIP Ø 100 mm Bh 314,000.00 285,000.00 150.00 285,150.00 28,515.00
53 Water Mur GIP Ø 75 mm Bh 164,000.00 148,500.00 150.00 148,650.00 14,865.00
54 Water Mur GIP Ø 50 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
55 Gate Valve GIP Ø 100 mm Bh 1,980,000.00 1,800,000.00 150.00 1,800,150.00 180,015.00
56 Gate Valve GIP Ø 75 mm Bh 1,100,000.00 1,000,000.00 150.00 1,000,150.00 100,015.00
57 Gate Valve GIP Ø 50 mm Bh 935,000.00 850,000.00 150.00 850,150.00 85,015.00
58 Check Valve GIP Ø 50 mm Bh 220,000.00 200,000.00 150.00 200,150.00 20,015.00
59 Air Valve Ø 100 mm Bh 1,100,000.00 1,000,000.00 150.00 1,000,150.00 100,015.00
60 Air Valve Ø 75 mm Bh 825,000.00 750,000.00 150.00 750,150.00 75,015.00
61 Air Valve Ø 50 mm Bh 594,000.00 540,000.00 150.00 540,150.00 54,015.00
62 Flange GIP Ø 100 mm Bh 66,000.00 60,000.00 150.00 60,150.00 6,015.00
63 Flange GIP Ø 75 mm Bh 55,000.00 50,000.00 150.00 50,150.00 5,015.00
64 Flange GIP Ø 50 mm Bh 47,000.00 42,500.00 150.00 42,650.00 4,265.00
65 Over Sock GIP Ø 100 mm x 75 mm Bh 110,000.00 100,000.00 150.00 100,150.00 10,015.00
66 Over Sock GIP Ø 75 mm x 50 mm Bh 55,000.00 50,000.00 150.00 50,150.00 5,015.00
67 Over Sock GIP Ø 50 mm x 20 mm Bh 28,000.00 25,000.00 150.00 25,150.00 2,515.00
68 Tee GIP Ø 75 mm x 75 mm Bh 134,000.00 122,000.00 150.00 122,150.00 12,215.00
69 Tee GIP Ø 50 mm x 50 mm Bh 45,000.00 41,000.00 150.00 41,150.00 4,115.00
70 Tee GIP Ø 20 mm x 20 mm Bh 15,000.00 13,500.00 150.00 13,650.00 1,365.00
71 Doop GIP Ø 50 mm Bh 30,000.00 27,500.00 150.00 27,650.00 2,765.00
72 Atap Kran Ø 20 mm Bh 31,000.00 28,000.00 150.00 28,150.00 2,815.00
73 Pipa Hawa GIP Ø 50 mm Bh 44,000.00 40,000.00 150.00 40,150.00 4,015.00
74 Karet Packing 3 mm M' 30,000.00 27,150.00 200.00 27,350.00 2,735.00
75 Floor Drain Bh 42,000.00 38,000.00 200.00 38,200.00 3,820.00
76 Ijuk Kg 66,000.00 60,000.00 100.00 60,100.00 6,010.00
77 Sock Drat Luar Buah 9,000.00 8,100.00 100.00 8,200.00 820.00
78 Seal tape Rol 3,000.00 3,000.00 50.00 3,050.00 305.00
79 Pompa Submersible Unit 15,411,000.00 14,000,000.00 10,000.00 14,010,000.00 1,401,000.00
80 Panel Kontrol Pompa Submersible Unit 3,746,000.00 3,400,000.00 5,000.00 3,405,000.00 340,500.00
81 Kabel Power M' 16,000.00 14,000.00 200.00 14,200.00 1,420.00
82 Kabel Sensor M' 8,000.00 7,000.00 200.00 7,200.00 720.00
83 Probe Sensor Set 166,000.00 150,000.00 500.00 150,500.00 15,050.00
Lembar 23 dari 31

ONGKOS PIKUL TOTAL JUMLAH DIBULATKAN


(Rp.) (Rp.) (Rp.)

(5) (6) (7)


(3) + (4) + (5)

- 82,225.00 82,000.00
- 94,875.00 95,000.00
- 121,715.00 122,000.00
- 134,310.00 134,000.00

- 126,500.00 127,000.00
- 192,500.00 193,000.00
- 227.85 227.00
- 154,000.00 154,000.00
- 159,500.00 160,000.00
- 192,500.00 193,000.00
- 232.22 232.00
- 73,700.00 74,000.00
- 1,562.00 2,000.00
- 246.40 246.00
- 3,107,500.00 3,108,000.00
- 3,217,500.00 3,218,000.00
- 112,200.00 112,000.00
- 45,100.00 45,000.00
- 27,720.00 28,000.00
- 11,110.00 11,000.00
- 36,410.00 36,000.00
- 26,510.00 27,000.00
- 26,510.00 27,000.00
- 12,210.00 12,000.00
- 157,300.00 157,000.00
- 25,410.00 25,000.00
- 24,310.00 24,000.00
- 93,610.00 94,000.00
- 49,610.00 50,000.00
- 77,110.00 77,000.00
- 487,960.00 488,000.00
- 31,020.00 31,000.00
- 6,710.00 7,000.00
1.00 10,011.00 10,000.00
- 249,296.67 249,000.00
- 171,746.67 172,000.00
- 106,205.00 106,000.00
- 77,971.67 78,000.00
- 33,513.33 34,000.00
- 363,165.00 363,000.00
Lembar 24 dari 31

ONGKOS PIKUL TOTAL JUMLAH DIBULATKAN


(Rp.) (Rp.) (Rp.)

(5) (6) (7)


(3) + (4) + (5)
- 176,165.00 176,000.00
- 51,865.00 52,000.00
- 98,065.00 98,000.00
- 57,915.00 58,000.00
- 27,665.00 28,000.00
- 24,365.00 24,000.00
- 9,515.00 10,000.00
- 150,865.00 151,000.00
- 104,665.00 105,000.00
- 41,415.00 41,000.00
- 10,065.00 10,000.00
- 93,665.00 94,000.00
- 66,165.00 66,000.00
- 49,665.00 50,000.00
- 99,165.00 99,000.00
- 313,665.00 314,000.00
- 163,515.00 164,000.00
- 66,165.00 66,000.00
- 1,980,165.00 1,980,000.00
- 1,100,165.00 1,100,000.00
- 935,165.00 935,000.00
- 220,165.00 220,000.00
- 1,100,165.00 1,100,000.00
- 825,165.00 825,000.00
- 594,165.00 594,000.00
- 66,165.00 66,000.00
- 55,165.00 55,000.00
- 46,915.00 47,000.00
- 110,165.00 110,000.00
- 55,165.00 55,000.00
- 27,665.00 28,000.00
- 134,365.00 134,000.00
- 45,265.00 45,000.00
- 15,015.00 15,000.00
- 30,415.00 30,000.00
- 30,965.00 31,000.00
- 44,165.00 44,000.00
- 30,085.00 30,000.00
- 42,020.00 42,000.00
- 66,110.00 66,000.00
- 9,020.00 9,000.00
- 3,355.00 3,000.00
- 15,411,000.00 15,411,000.00
- 3,745,500.00 3,746,000.00
- 15,620.00 16,000.00
- 7,920.00 8,000.00
- 165,550.00 166,000.00
ANALISA HARGA SATUAN UPAH DAN BAHAN

ANALISA HARGA SATUAN UPAH


HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO TENAGA KERJA DASAR SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
QUARRY ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6 7 8 9
1 Mandor - OH - -
2 Kepala Tukang - OH - -
3 Tukang Kayu - OH - -
4 Tukang Batu - OH - -
5 Tukang Besi - OH - -
6 Tukang Cat - OH - -
7 Tukang Listrik - OH - -
8 Supir - OH - -
9 Pekerja - OH - -
ANALISA HARGA SEWA PERALATAN
HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO TENAGA KERJA DASAR SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
QUARRY ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6 7 8 9
1 Sewa Dump Truck - OH - -
2 Tripod - OH - -
3 Tangga 7 Meter - OH - -
4 Scaffolding - OH - -
5 Katrol Pengangkat Tiang - OH - -
6 Mobil Pick Up - OH - -
ANALISA HARGA SATUAN BAHAN/MATERIAL
HARGA ONGKOS HARGA DI OVERHEAD & ONGKOS
NO BAHAN/MATERIAL DI QUARY SAT ANGKUT LOKASI PROYEK LABA 15 % PIKUL JUMLAH
( Rp) ( Rp) ( Rp) ( Rp) ( Rp)
1 2 3 4 5 6=(3+5) 7 = (6 x 15% ) 8 9 = ( 6+7+8)
BATU
1 Batu Karang - M³ - - - -
2 Batu Kali - M³ - - - -
KERIKIL
1 Batu Kerikil Sungai / Pantai (Kerikil Cor) - M³ - - - -
2 Batu Pecah Mesin (M3) - M³ - - - -
3 Batu Pecah Mesin (Kg) - Kg - - - -
PASIR & TANAH
1 Pasir Pasang/Beton (M3) - M³ - - - -
2 Pasir Pasang/Beton (Kg) - Kg - - - -
3 Pasir Urug - M³ - - - -
4 Sirtu - M³ - - - -
5 Tanah Timbunan - M³ - - - -
BATU BATA
1 Bata Merah 6x11x22 cm - Bh - - - -
BAHAN KAYU
1 Kayu Klas I - M³ - - - -
2 Kayu Klas II - M³ - - - -
3 Papan Kayu Kls I - M³ - - - -
4 Papan Kayu Kls II - M³ - - - -
5 Dolken Kayu - Btg - - - -
SEMEN
1 Porland Cemend Tonasa (Zak) - Zak - - - -
2 Porland Cemend Tonasa (Kg) - Kg - - - -
3 Sement Warna - Kg - - - -
BAHAN AIR
1 Air - Ltr - - -
BAHAN BESI
1 Besi Beton Polos - Kg - - - -
2 Angkur Ø 22 mm - Kg - - - -
3 Angkur Ø 16 mm - Kg - - - -
4 Besi Polos Standard Ø 6 mm - Staf - - - -
5 Besi Polos Standard Ø 16 mm - Staf - - - -
KAWAT
1 Ikat Beton (bendrat) - Kg - - - -
2 Kawat Baja - Kg - - - -
3 Kawat Baja - M' - - - -
BAHAN PAKU
1 Paku Campur - Kg - - - -
BAHAN PIPA
1 Pipa GIP Mediun A dia. 3" - Staf - - - -
2 Pipa GIP Mediun A dia. 2." - Staf - - - -
3 Pipa GIP Mediun A dia. 1.5." - Staf - - - -
4 Pipa GIP Mediun A dia. 1." - Staf - - - -
5 Pipa PVC dia 2" - Staf - - - -
6 Pipa PVC dia 1.5" - Staf - - - -
7 Pipa PVC dia 1" - Staf - - - -
LAMPU JALAN DAN ARMATURE
1 Kap Lampu Jalan Zetalux - Bh - - - -
2 Kap Lampu Jalan Osiwa - Bh - - - -
3 Stang Lampu Uk. P= 3 M' Dia. 1,5" - Bh - - - -
4 Kap Lampu Jalan Zetalux - Bh - - - -
5 Stang Lampu Uk. P= 1,5 M' Dia. 1,5" - Bh - - - -
6 Balon Mercury Scn-T 250 Watt - Bh - - - -
7 Balon Mercury Scn-T 220 Watt (Non Ignitor) - Bh - - - -
8 Balon MercuryHPL -N 250 Watt - Bh - - - -
9 Balon Mercury ML 250 Watt - Bh - - - -
10 LED SETA 100 W lengkap - Bh - - - -
11 LED SETA 80 W lengkap - Bh - - - -
12 Fatro Lengkap - Bh - - - -
13 Lampu Philips (19 W) untuk Fatro - Bh - - - -
14 Himawari 100 W ( 1 LED) Lengkap - Bh - - - -
15 LED SETA LUX 95 W - Bh - - - -
16 Balon Visicon 95 Watt - Bh - - - -
17 Balon Visicon 75 Watt - Bh - - - -
18 LED CL RL-2 100 Watt (bridgelux Chip) - Bh - - - -
19 LED CL RL-2 80 Watt (bridgelux Chip) - Bh - - - -
20 LED CL RL-2 60 Watt (bridgelux Chip) - Bh - - - -
21 LED MINI 20 W - Bh - - - -
22 LED MINI 30 W - Bh - - - -
23 LED MINI 40 W - Bh - - - -
24 LED MINI 50 W - Bh - - - -
25 LED JETA 20 W - Bh - - - -
26 LED JETA 30 W - Bh - - - -
27 LED JETA 40 W - Bh - - - -
28 LED JETA 50 W - Bh - - - -
29 LED SETA 60 W - Bh - - - -
30 LED SETA 80 W - Bh - - - -
31 LED SETA 100 W - Bh - - - -
32 LED META 130 W - Bh - - - -
33 LED META 150 W - Bh - - - -
34 Lampu LED Flexibel 12 V-DC IP65 - Bh - - - -
35 Lampu Shade Mika - Bh - - - -
36 LAMPU KESSIL A. 160 TUNA BLUE 40 WATT - Bh - - - -
37 Lampu LED 30 Watt Philips - Bh - - - -
38 Bola Politin - Bh - - - -
39 LAMPU LED 50 WATT PHILIPS - Bh - - - -
40 LED SETA 170 W - Bh - - - -
41 Adaptor LED/Flasher IC - Bh - - - -
42 Ballast BSN 250 Watt - Bh - - - -
43 Ballast BHL 250 Watt - Bh - - - -
44 Ballast BHL 400 Watt - Bh - - - -
45 Lampu Selang - Bh - - - -
46 Lampu Meteor - Bh - - - -
47 Tiang Lampu Decorative DG-Alfino-H7000 - Bh - - - -
48 Tiang Decorative H 06 Doubel Arm - Bh - - - -
49 Tiang Decorative H 06 Single Arm - Bh - - - -
MATERIAL PANNEL
1 Box Pannel Outdoor Uk. 40 x 60 cm - Bh - - - -
2 Box Pannel Uk. 40 x 60 cm - Bh - - - -
3 Box Pannel Uk.30 x 40 cm - Bh - - - -
4 Box Out Door KWH Meter 3 Phase - Bh - - - -
5 Magnetic Contactor SN 65-220 V - Bh - - - -
6 Magnetic Contactor 80 A - Bh - - - -
7 Magnetic Contactor 50 A - Bh - - - -
8 Magnetic Contactor 35 A - Bh - - - -
9 Timer Switch Panasonic - Bh - - - -
10 Timer Switch Theben - Bh - - - -
11 MCB 2 A - Bh - - - -
12 MCB 4 A - Bh - - - -
13 MCB 10 A - Bh - - - -
14 MCB 16 A - Bh - - - -
15 MCB 25 A - Bh - - - -
16 MCB 32 A - Bh - - - -
17 MCB 35 A - Bh - - - -
18 MCB 35 A (3 Phase) - Bh - - - -
19 MCB 50 A - Bh - - - -
20 MCB 50 A (3 Phase) - Bh - - - -
21 MCB 63 A - Bh - - - -
22 MCB 63 A (3 Phase) - Bh - - - -
23 MCB 80 A - Bh - - - -
24 MCB 80 A (3 Phase) - Bh - - - -
25 KWH Meter 60/80 - Bh - - - -
26 KWH Meter 3 Phase - Bh - - - -
BAHAN KABEL JARINGAN
1 NYM 2 x 1.5 mm (Eterna) - Meter - - - -
2 NYM 2 x 2.5 mm (Eterna) - Meter - - - -
3 NYM 2 x 4 mm (Eterna) - Meter - - - -
4 NYM 2 x 6 mm (Eterna) - Meter - - - -
5 NYM 2 x 10 mm (Eterna) - Meter - - - -
6 NYM 3 x 2,5 mm (Eterna) - Meter - - - -
7 NYM 3 x 4 mm (Eterna) - Meter - - - -
8 NYM 3 x 6 mm (Eterna) - Meter - - - -
9 NYM 2 x 10 mm (Eterna) - Meter - - - -
10 NYM 4 x 2.5 mm (Eterna) - Meter - - - -
11 NYM 4 x 4 mm (Eterna) - Meter - - - -
12 NYM 4 x 6 mm (Eterna) - Meter - - - -
13 NYM 4 x 10 mm (Eterna) - Meter - - - -
14 NGA 1,5 mm - Meter - - - -
15 NGA 2,5 mm - Meter - - - -
16 Tuistek 2 x 10 mm - Meter - - - -
17 Tuistek 2 x 16 mm - Meter - - - -
18 Tuistek 4 x 16 mm - Meter - - - -
19 NYFGBY 2 x 6 mm - Meter - - - -
20 NYFGBY 4 x 6 mm - Meter - - - -
21 NYFGBY 2 x 4 mm - Meter - - - -
22 NYFGBY 4 x 4 mm - Meter - - - -
TIANG LAMPU / LISTRIK
1 Tiang PJU Type ISP Lengan Tunggal Oct. 9 M - Buah - - - -
2 Tiang PJU Type ISP Lengan Ganda Oct. 9 M - Buah - - - -
3 Tiang Galvanis 12 Meter - Buah - - - -
4 Tiang PJU Type ISP Lengan Tunggal Oct. 7 M - Buah - - - -
5 Tiang PJU Type ISP Lengan Ganda Oct. 7 M - Buah - - - -
6 Tiang PJU Solar Cell Type ISP 9 M Oct Single - Buah - - - -
7 Tiang Decorative, h = 7 M (ORLANDO) - Buah - - - -
8 Tiang Lampu Decorative DG-Alfino-H7000 - Bh - - - -
9 Tiang Decorative H 06 Doubel Arm - Bh - - - -
10 Tiang Decorative H 06 Single Arm - Bh - - - -
11 Tiang Decorative, h = 6 M, 2 Lengan (AB 106) - Buah - - - -
12 Tiang Telepon (Telkom) H07 - Buah - - - -
13 Tiang Telepon (Telkom) H09 - Buah - - - -
14 Tiang Listrik Standard H09 - Buah - - - -
15 Tiang Listrik Standard H07 - Buah - - - -
16 Tiang Listrik Besi 9 meter da N - Buah - - - -
17 Tiang Listrik Besi 11 meter - Buah - - - -
18 Tiang Listrik Besi 13 meter - Buah - - - -
KLEM BEUGEL
1 Klem Beugel 2 x 1,5 " - Buah - - - -
2 Klem Beugel 3 x 1,5 " - Buah - - - -
3 Klem Beugel 4 x 1,5 " - Buah - - - -
4 Klem Beugel 5 x 1,5 " - Buah - - - -
5 Klem Beugel 6 x 1,5 " - Buah - - - -
6 Klem Beugel 10 x 1,5 " - Buah - - - -
7 Beugel 1.5" - Buah - - - -
8 Beugel 2" - Buah - - - -
9 Beugel 3" - Buah - - - -
10 Beugel 5" - Buah - - - -
11 Beugel 6" - Buah - - - -
12 Beugel 10" - Buah - - - -
13 Klem Kabbel Seling baja - Buah - - - -
LAIN-LAIN
1 Fotocell - Buah - - - -
2 Isolasi Listrik 3 M - Roll - - - -
3 Service Wedge Clam 16 mm - Buah - - - -
4 Tension Bracket - Buah - - - -
5 Suspension Bracket - Buah - - - -
6 Isolasi Listrik Schot 23 - Roll - - - -
7 Cocector Aluminium - Buah - - - -
8 Schoon 6 mm - Buah - - - -
9 Kabel BC 6 mm2 - Meter - - - -
10 Strain Klem LV TC - Buah - - - -
11 Klem Kabel N0 10 - Dos - - - -
12 Klem Kabel N0 12 - Dos - - - -
13 Klem Kabel N0 14 - Dos - - - -
14 Afta Klem 10 mm - Buah - - - -
15 Afta Klem 16 mm - Buah - - - -
16 Socket Automat Lampu Selang - Buah - - - -
17 CCS/CCO 1P1 - Buah - - - -
18 Veteng Porselin E-40 - Buah - - - -
19 T Dos - Buah - - - -
20 Dora Dos 3/4 - Buah - - - -
21 Dora Dos 5/8 - Buah - - - -
22 Automatic Timer Solenoid 1 " - Buah - - - -
23 Automatic Timer Solenoid 11/2 " - Buah - - - -
24 Automatic Timer Solenoid 2 " - Buah - - - -
25 Automatic Timer Hunter 9 Sim - Buah - - - -
26 Yokes /Stoping Buckle - Buah - - - -
27 Stainless Steel Strip - M - - - -
28 Knee PVC dia 2" - Buah - - - -
29 Knee PVC dia 1,5" - Buah - - - -
30 Knee PVC dia. 1" - Buah - - - -
31 Gembok - Buah - - - -
32 Skun Kabel (Ties) `15 cm - Bh - - - -
33 Kabel Power - M' - - - -
34 Kabel NYAF 2x2,5 mm - M' - - - -
35 Kabel Seling M10 Baja - M' - - - -
36 Klem Sekling Stanlees Steel - Bh - - - -
37 Jarum Keras / Spand Skrup Stanlees Steel - Bh - - - -
38 Kaussen Stainlees Steel - Bh - - - -
39 Cat Primer Nebel 1000 - Kg - - - -
40 Cat Finish Clear Coating - Kg - - - -
41 Box Panel Out Door 25x30x20 cm - Bh - - - -
42 Asessoris - Ls - -
43 Grounding Rod 12 mm2 - staff - - - -
44 Kabel schoon 6 mm2 - Buah - - - -
45 Biaya Penyambungan - VA - -
46 SLO ( sertifikat Layak Operasi ) - VA - -
47 Uang jaminan Listrik (UJL) - VA - -
BAHAN BAKAR MINYAK -
1 Solar - Ltr - - - - -
2 Minyak Pelumas - Ltr - - - - -
3 Minyak Tanah - Ltr - - - - -
BAHAN JALAN
1 Aspal - Unit - - - -
2 Cat Marka (Non Thermoplas) - Kg - - - -
3 Cat Marka (Thermoplastic) - Kg - - - -

Anda mungkin juga menyukai