Anda di halaman 1dari 1

55 20

DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG

3.2

80
KOTA AMBON

90
Puncak Ø 63 mm
Pipa Ø 50 mm
150

3.2
KETERANGAN

20

10
63
LED SETA
100 Watt
65 10
Segmen C 150
plat 3,2 mm
200

DET. PUNCAK TIANG DET. DASARTIANG DET. RIB PLAT PEKERJAAN


Skala 1 : 5 Skala 1 : 5 Skala 1 : 5 PENGADAAN DAN PEMASANGAN
LAMPU JALAN RUAS GALALA -
3 HALONG
30

LOKASI

GALALA - HALONG
Segmen B
200

plat 3,2 mm
MENGETAHUI

Tiang, t = 3,2 mm KEPALA DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG
3 Baut Ø 16 mm
1.6 Ring Ø 16 mm KOTA AMBON
30

50
900

...............................................

30
NIP. .......................................

10 MENYETUJUI

PEJABAT PEMBUAT KOMITMEN


Segmen A (PPK)
plat 3,2 mm
DET. 2 HAND HOLE DET. ANCHOR BOLT
Skala 1 : 30 Skala 1 : 30
J.S. TATIPIKALAWAN
500

NIP. 19720310 199703 1 008

DIPERIKSA PARAF
2 ........................................
30

DIGAMBAR PARAF
Segmen A
plat 3,2 mm
152

Dasar Ø 150 mm ........................................


30
1 Dasar Ø 150 mm

7.5 15 7.5
Dasar Ø 150 mm NO NAMA GAMBAR SKALA
Rib Plat, t = 6 mm

30
Rib Plat, t = 6 mm
10

Base Plat, 300 x 300 x 16 mm


5 20 5
1.6

30 7.5 15 7.5 Base Plat, 300 x 300 x 16 mm Base Plat, 300 x 300 x 16 mm
30

DETAIL TIANG PJU DET. 1 BASE PLAT DENAH BASE PLAT


Skala 1 : 50 Skala 1 : 30 Skala 1 : 30 KODE LBR NO. LBR JLH LBR

KONSULTAN PERENCANA

CVP
.ESONACONSULTAN

Anda mungkin juga menyukai