Anda di halaman 1dari 4

SJ

ID DINAS PEKERJAAN UMUM DAN


ME PENATAAN RUANG
KOTA AMBON
KETERANGAN

8
PEMUKIMAN 6
9 2
PEKERJAAN
1
11 10 3
PENGADAAN DAN PEMASANGAN
LAMPU JALAN LINGKUNGAN
4 ASRAMA HAJI DESA WAIHERU
PE
JI MU
HA KIM LOKASI
5 A AN
AM
RU ASR
HE S
AI EK DESA WAIHERU
N 2W MP
L
S N KO
SD
MENGETAHUI

KEPALA DINAS PEKERJAAN UMUM DAN


W PENATAAN RUANG
E
KOTA AMBON

MAN
UKI
PEM
...............................................
NIP. .......................................

MENYETUJUI
SITE PLAN LAMPU JALAN LINGKUNGAN ASRAMA HAJI DESA WAIHERU PEJABAT PEMBUAT KOMITMEN
Skala 1 : 3000 (PPK)

J.S. TATIPIKALAWAN
NIP. 19720310 199703 1 008

DIPERIKSA PARAF

........................................

DIGAMBAR PARAF

........................................
Lampu tipe Himawari 100 W

NO NAMA GAMBAR SKALA


450

4000 4000 4000

DENAH PENEMPATAN LAMPU JALAN KODE LBR NO. LBR JLH LBR
Skala 1 : 1000

KONSULTAN PERENCANA

CVP
.ESONACONSULTAN
10.16 7.62
6.35

DINAS PEKERJAAN UMUM DAN


PENATAAN RUANG
0.3 0.3 0.
2 2 32 KOTA AMBON
KETERANGAN

150 DET. DASAR TIANG DET. TENGAH TIANG DET. PUNCAK TIANG
Skala 1 : 5 Skala 1 : 5
Skala 1 : 5
Lampu tipe Himawari 100 W
PEKERJAAN
Lengan Lampu Pipa Ø 1.5"
140

Klem Parabole PENGADAAN DAN PEMASANGAN


LAMPU JALAN LINGKUNGAN
Pipa Gip Medium A, Ø 2.5" ASRAMA HAJI DESA WAIHERU

30 LOKASI

16 10 DESA WAIHERU
150

Pipa Gip Medium A, Ø 3"


MENGETAHUI

30
10
KEPALA DINAS PEKERJAAN UMUM DAN
PENATAAN RUANG
10 8 10 KOTA AMBON

...............................................
NIP. .......................................

16 10 MENYETUJUI
330

Pipa Gip Medium A, Ø 4"


PEJABAT PEMBUAT KOMITMEN
(PPK)
Tiang PJU/Listrik
20

10 8 10 J.S. TATIPIKALAWAN
NIP. 19720310 199703 1 008

DIPERIKSA PARAF
20
60

........................................
Pondasi beton fc' 19.3

DIGAMBAR PARAF
60

30
Pondasi beton fc' 19.3 ........................................

NO NAMA GAMBAR SKALA

DETAIL TIANG PJU


Skala 1 : 50

30
KODE LBR NO. LBR JLH LBR

DET. PONDASI TIANG DET. KLEM PARABOLA


Skala 1 : 10 KONSULTAN PERENCANA
Skala 1 : 10
CVP
.ESONACONSULTAN
DINAS PEKERJAAN UMUM DAN
PENATAAN RUANG
Twisted 2 x 16 mm2
KOTA AMBON
Panel Kontrol
PLN 2.200 W, 220 V
KETERANGAN

Twisted 2 x 16 mm2
Lampu Himawari/Visicom 100 W

PEKERJAAN

PENGADAAN DAN PEMASANGAN


LAMPU JALAN LINGKUNGAN
ASRAMA HAJI DESA WAIHERU
1 2 3 4 5 6 7 8 9 10 11
LOKASI
Twisted 2 x 16 mm2

DESA WAIHERU

SUSUNAN LAMPU PJU MENGETAHUI


Non Skala
KEPALA DINAS PEKERJAAN UMUM DAN
PENATAAN RUANG
KOTA AMBON

...............................................
NIP. .......................................

MENYETUJUI

PEJABAT PEMBUAT KOMITMEN


(PPK)

J.S. TATIPIKALAWAN
LED Himawari/Visicom Daya (VA) NIP. 19720310 199703 1 008
100 Watt (11 Bh)
NYM 2 x 2.5 mm²
1 DIPERIKSA PARAF
NYM 2 x 2.5 mm²
2
NYM 2 x 2.5 mm²
3
NYM 2 x 2.5 mm² ........................................
4
MCB 10 A MCB 4 A NYM 2 x 2.5 mm²
5
Twisted 2 x 16 mm2 Twisted 2 x 16 mm2 Twisted 2 x 16 mm2
NYM 2 x 2.5 mm² DIGAMBAR PARAF
6 1.100 1.100
NYM 2 x 2.5 mm²
7
NYM 2 x 2.5 mm² ........................................
PLN 2.200 W 8
220 V NYM 2 x 2.5 mm²
9
NYM 2 x 2.5 mm² NO NAMA GAMBAR SKALA
10
NYM 2 x 2.5 mm²
11
TOTAL 1.100

REKAPITULASI DAYA
Non Skala

KODE LBR NO. LBR JLH LBR

KONSULTAN PERENCANA

CVP
.ESONACONSULTAN

Anda mungkin juga menyukai