Anda di halaman 1dari 22

DAFTAR GAMBAR STRUKTUR

KETERANGAN UMUM
STANDARD DRAWING (1)
STANDARD DRAWING (2)
STANDARD DRAWING (3)
STANDARD DRAWING (4)
STANDARD DRAWING (5)

PUSKESMAS
DENAH PONDASI DAN TIE BEAM KEC. CILANDAK

DENAH KOLOM LT.1 DAN LT.2


DENAH BALOK LT.2 DAN ATAP
DENAH LANTAI BONGKARAN DAN BARU
DETAIL PONDASI
DETAIL PONDASI STROUSS PILE

DENAH PONDASI DAN TIE BEAM


DENAH KOLOM LT.1 DAN LT.2
DENAH PLAT LT. 1 DAN LT.2
DENAH BALOK LT.2 DAN BALOK LT. ATAP
DENAH ATAP

DENAH KOLOM
DENAH BALOK ATAP DAN DENAH ATAP

STRUKTUR
PENUTUPAN VOID

DAFTAR GAMBAR NTS

STR 00 21
KETERANGAN UMUM
1. SPESIFIKASI BAHAN
6.
A. MUTU BETON STRUKTURAL

7.

B. MUTU BETON NON STRUKTURAL

C. MUTU BAJA TULANGAN

PUSKESMAS
KEC. CILANDAK

D. MUTU BAJA PROFIL

E. MUTU LAS : AWS E-70xx


F. MUTU BAUT ANGKUR : ASTM A-307
G. MUTU SAMBUNGAN BAUT

2.

8.
3.

4.

STRUKTUR

KETERANGAN GBR NTS

STR 01 21
I. UMUM

KETERANGAN

PUSKESMAS
KEC. CILANDAK

STRUKTUR

STANDART DWG (1) NTS

STR 02 21
II. KOLOM

KASUS
KASUS KASUS

(A) (B)
(J) (H) (I) (I)

KASUS

PUSKESMAS
KEC. CILANDAK

(C) (D)

TAMPAK ATAS TAMPAK ATAS

KASUS

SENGKANG 1xD SENGKANG 1,5xD SENGKANG 2xD SENGKANG 2,5xD

(E) (F)

STRUKTUR

STANDART DWG (2) NTS

STR 03 21
III. BALOK

DETAIL SENGKANG BALOK

PUSKESMAS
KEC. CILANDAK

SENGKANG 1xD SENGKANG 1,5xD SENGKANG 2xD SENGKANG 2,5xD

STRUKTUR

STANDART DWG (3) NTS

STR 04 21
IV. PELAT

PUSKESMAS
KEC. CILANDAK

STRUKTUR

STANDART DWG (4) NTS

STR 05 21
a
b
c

PUSKESMAS
KEC. CILANDAK

STIFFENER

LINTEL (L)

STRUKTUR

STANDART DWG (5) NTS

STR 06 21
PUSKESMAS
KEC. CILANDAK

IPAL EXISTING IPAL EXISTING


KORIDOR KORIDOR

KORIDOR KORIDOR

STRUKTUR

CSSD
DENAH PONDASI 1 : 100 (A3)

DAN TIE BEAM

STR 07 21
PUSKESMAS
KEC. CILANDAK

IPAL EXISTING
KORIDOR

KORIDOR KORIDOR

STRUKTUR

CSSD
DENAH KOLOM LT.1 DAN 2 1 : 100 (A3)

STR 08 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

CSSD
DENAH BALOK ATAP 1 : 100 (A3)

DAN ATAP

STR 09 21
COMBIDEX t=0.75mm
WF.250.125.6.9

PUSKESMAS
KEC. CILANDAK

KORIDOR KORIDOR

STRUKTUR

CSSD
DENAH LANTAI 1 : 100 (A3)

STR 10 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

CSSD
DETAIL PONDASI 1 : 25 (A3)

STR 11 21
L=4M
PUSKESMAS
KEC. CILANDAK
1/3 L 2/3 L

STEK 40 d

VARIABLE TEBAL PILE CAP

STRUKTUR

CSSD
DETAIL PONDASI 1 : 25 (A3)

STR 12 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

IGD
DENAH PONDASI 1 : 100 (A3)

DAN TIE BEAM

STR 13 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

IGD
DENAH KOLOM LT. 1 DAN 2 1 : 100 (A3)

STR 14 21
COMBIDEX t=0.75mm
WF.250.125.6.9

PUSKESMAS
KEC. CILANDAK

STRUKTUR

IGD
DENAH LANTAI LT. 1 DAN 2 1 : 100 (A3)

STR 15 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

IGD
DENAH BALOK LT. 2 1 : 100 (A3)

DAN BALOK ATAP

STR 16 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

IGD
DENAH ATAP 1 : 100 (A3)

STR 17 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

LAUNDRY
DENAH KOLOM 1 : 100 (A3)

STR 18 21
PUSKESMAS
KEC. CILANDAK

STRUKTUR

LAUNDRY
DENAH BALOK DAN ATAP 1 : 100 (A3)

STR 19 21
COMBIDEX t=0.75mm
WF.200.100.5,5.8

PUSKESMAS
KEC. CILANDAK
4

P
L14

Grouting t=8

2x3M16

STRUKTUR

PENUTUPAN VOID 1 : 100 (A3)

STR 20 21

Anda mungkin juga menyukai