Anda di halaman 1dari 52

Pemerintah Provinsi Sulawesi Barat

Dinas Pekerjaan Umum & Penataan Ruang

BIDANG CIPTA KARYA

PERENCANAAN
PEMBANGUNAN GEDUNG
DETAIL ENGINEERING DESIGN (DED) TAMBAHAN DINAS PUPR
PROVINSI SULAWESI BARAT
KEC. SIMBORO
KAB. MAMUJU
DETAIL ENGINEERING DESIGN (DED)
LEMBAR PENGESAHAN

DISETUJUI OLEH : DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIK KEGIATAN KONSULTASI PERENCANA
DINAS PEKERJAAN UMUM & PENATAAN RUANG DINAS PEKERJAAN UMUM & PENATAAN RUANG CV. ALIAH CONSULINDA
PROVINSI SULAWESI BARAT PROVINSI SULAWESI BARAT

ASRUL.,ST.,MT. ANDI HABIBIE AKBAR SAP,ST. CAHYANI,ST.


NIP.19761202 200604 1 010 NIP. 19810904 201001 1 013 TEAM LEADER

TIM ASISTENSI : TIM ASISTENSI : TIM ASISTENSI :


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIK KEGIATAN PEJABAT PELAKSANA TEKNIK KEGIATAN
DINAS PEKERJAAN UMUM & PENATAAN RUANG DINAS PEKERJAAN UMUM & PENATAAN RUANG DINAS PEKERJAAN UMUM & PENATAAN RUANG
PROVINSI SULAWESI BARAT PROVINSI SULAWESI BARAT PROVINSI SULAWESI BARAT

JOHNDICK, ST. ADIWIJAYA, A.Md. MUHTAR, A.Md.


NIP.19800310 201403 1 001 NIP. 19800604 201101 1 009 NIP. 19830314 201001 1 010

TIM ASISTENSI : TIM ASISTENSI :


PEJABAT PEMBUAT KOMITMEN PEJABAT PEMBUAT KOMITMEN
DINAS PEKERJAAN UMUM & PENATAAN RUANG DINAS PEKERJAAN UMUM & PENATAAN RUANG
PROVINSI SULAWESI BARAT PROVINSI SULAWESI BARAT

HASRIAWAN SUGISMAN TIKA


NIP.19810101 201101 1 016 NIP.19851223 201001 1 012

TAHUN
TAHUNANGGARAN
ANGGARAN 2002
2022
Drawing A.11 R. Sloof
Subset ID and Name Layout A.11.1 Denah Rencana Sloof S3.1 R. Denah Sloof
ID Name
A.11.1 Denah Rencana Sloof S3.2 R. Detail Sloof

A.01 Drawing Lists Drawing List A.12 Rencana Kolom-Balok


A.01 Drawing Lists Drawing List A.12.1 Rencana Kolom S4.1 R. Kolom Lt. 1 PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
A.12.1 Rencana Kolom S4.2 R. Kolom Lt.2 BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

A.02 Floor Plans A.12.2 Rencana Balok S5.1 Balok Elv. +365 PAKET KEGIATAN

A.02.1 Siteplan A1.0 Siteplan A.12.2 Rencana Balok S5.2 Balok Elv. +765
A.02.2 Denah A1.1 Denah Lt. 1 A.12.3 Rencana Kolom Balok Lv. Atap S4.3 Kolom Lv. Atap PENAMBAHAN GEDUNG
A.12.3 Rencana Kolom Balok Lv. Atap S5.3 Ringbalk Elv. +835 KANTOR DINAS PUPR
A.02.2 Denah A1.2 Denah Lt. 2
A.12.4 Rencana Detail Pembesian Kolo… DB-B1 Detail Prov. Sulawesi Barat

A.03 Elevations A.12.4 Rencana Detail Pembesian Kolo… DB-K1 Detail


A.03.1 Tampak Depan & Samping A2.1 Tampak Depan A.12.4 Rencana Detail Pembesian Kolo… DB-K1 Detail LOCATION

A.03.1 Tampak Depan & Samping A2.2 Tampak Samping A.12.4 Rencana Detail Pembesian Kolo… DB-KP Detail
Kompleks Perkantoran
A.03.2 Tampak Belakang dan Samping A2.3 Tampak Samping A.12.5 Rencana Detail Pembesian Kolom DB-K1 Detail Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
A.03.2 Tampak Belakang dan Samping A2.4 Tampak Belakang A.12.6 Rencana Detail Pembesian Kolom DB-K1 Detail Sulawesi Barat

A.04 Sections A.13 Rencana Plat Lantai KETERANGAN

A.04.1 Potongan A-A A3.1 Section A-A A.13.1 Rencana Plat Lantai Elv. S6.1 R. Plat Lantai dan Cor Bet…
A.04.2 Potongan B-B A3.2 Section B-B A.13.1 Rencana Plat Lantai Elv. S6.2 R. Plat Lantai dan Cor Bet…
Detail Engineering Drawing
A.04.3 Potongan C-C A3.3 … Building Section A.13.2 Detail Plat Lantai S6.3 Detail Plat Lantai (DED)

A.13.2 Detail Plat Lantai S6.3 Detail Plat Lantai


A.05 Detail Jembatan DRAWING TITLE

A.05.1 Denah Jembatan A1.3 Denah Fokus Jembatan A.14 Rencana Tangga
A.05.1 Denah Jembatan A1.4 Detail Denah Jembatan A.14.1 Rencana Denah Tangga S7.1 Denah Tangga Drawing Lists

A.05.2 Section JA-JA A3.4 Section JA-JA A.14.2 Potongan Tangga DB-T.B Detail
A.05.2 Section JA-JA A3.5 Section JB-JB A.14.2 Potongan Tangga DB-T.C Detail
A.05.2 Section JA-JA D-AJ1 Detail A.14.2 Potongan Tangga DB-T.D Detail DIBUAT OLEH

A.05.2 Section JA-JA D-AJ2 Detail A.14.2 Potongan Tangga S7.2 Potongan Tangga SS1
A.05.2 Section JA-JA D-AJ3 Detail A.14.2 Potongan Tangga S7.3 Potongan Tangga SS2
A.14.3 Potongan dan Detail R. Tangga DB-T.A Detail
A.06 R. Pintu Jendela A.14.3 Potongan dan Detail R. Tangga S7.4 Potongan Tangga SS3
A.06.1 Denah Pintu Jendela A1.D.1 Denah Pintu Jendela Lt. 1 A.14.4 Denah Tangga Darurat S7A.1 Denah Tangga Darurat Cahyani, ST.
A.14.5 Potongan Tangga Darurat S7A.2 Potongan S-TD1 Tim Leader
A.06.1 Denah Pintu Jendela A1.D.2 Denah Pintu Jendela Lt. 2
A.06.2 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.14.5 Potongan Tangga Darurat S7A.3 Potongan S-TD2 STATUS
.

A.06.3 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela


A.06.3 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15 Rencana Rangka Kuda-Kuda SCALE 1:1 FILE NO : 1-DED

A.06.4 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap DA-1 Detail
NAME SIGN
A.06.5 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap DA-2 Detail
DRAWING BY Ar. Chairunnisa, S.Ars
A.06.5 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap DA-2 Detail
Reviewed &
A.06.6 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap DA-4 Detail approved by

A.06.6 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap DA-5 Detail

N
A.06.7 Detail Pintu Jendela A1.D.3 Detail Pintu Jendela A.15.1 Rencana Kuda-Kuda Atap S8.1 R. Potongan Detail Atap 82VP2+CCV

A.15.1 Rencana Kuda-Kuda Atap S8.1 R. Potongan Detail Atap


DESCRIPTION
A.07 R. Pola Lantai
A.07.1 R. Denah Pola Lantai A6.1 Denah Pola Lantai Lt.1 A.16 Rencana Elektrikal
A.07.1 R. Denah Pola Lantai A6.2 Denah Pola Lantai Lt.2 A.16.1 Rencana Titik Lampu A7.1 Denah Titik Lampu Lt. 1
A.07.2 Detail R. Pola Lantai DL Potongan LA2-LA2 A.16.1 Rencana Titik Lampu A7.2 Denah Titik Lampu Lt. 2
A.07.2 Detail R. Pola Lantai DL- Potongan LA1-LA1 A.16.1 Rencana Titik Lampu A7.3 Ket. Titik Lampu
ps :
Semua dalam satuan ukuran MM, kecuali apabila
A.08 R. Plafon A.17 Rencana Plumbing ditampilkan berbeda

A.08.1 Denah R. Plafon A5.1 R. Denah Plafon Lt.1 A.17.1 Rencana Air Bersih & Air Kotor P1.1 Rencana Air bersih Lt.1 APPROVAL

A.08.1 Denah R. Plafon A5.2 R. Denah Plafon Lt.2 A.17.1 Rencana Air Bersih & Air Kotor P2.1 Rencana Air Kotor Lt.1
A.08.2 Detail Plafon DP1- Detail Plafon A.17.2 Detail Menara Tandon D-P1 Detail Menara Tandon

A.09 Rencana Atap


A.09.1 Denah Atap A4.1 Denah Atap
REV
A.09.1 Denah Atap A4.2 Denah Atap
NOTES

A.10 Denah Rencana Pondasi


A.10.1 Rencana Pondasi S1.1 R. Pondasi Tapak
A.10.1 Rencana Pondasi S2.1 R. Pondasi Menerus
A.10.2 Detail Pondasi S1.2 Detail Pondasi Footplate
A.10.2 Detail Pondasi S2.2 Detail Pondasi Menerus
01
PAGE TOTAL
A.10.3 Detail Pondasi S1.2 Detail Pondasi Footplate
A.10.3 Detail Pondasi S1.2 Detail Pondasi Footplate INSTITUTION

Drawing Lists 49
1:1

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran

B
Gubernur, Rangas, Simboro,
1 2 3 Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
8.000

4.000 4.000
KETERANGAN

2.605 1.395 4.000

Detail Engineering Drawing


A A (DED)
-0.450 -0.450
FFL FFL
1.200
C Toilet Toilet C
DRAWING TITLE

16
17
18
19
20
15
14 +0.510 +0.510 +0.510 Siteplan
FFL FFL FFL
13
Pantry 4.000
12 Staff
11
Area Area
2.800
DIBUAT OLEH

10
9
8
7
6
5
4
3
A A
20R x 175
19G x 251

B B

+0.160

+0.320
+0.510
FFL

Cahyani, ST.
Tim Leader
Ramp
11.000
+0.480 +0.510 .
FFL STATUS
FFL FFL Rg.
+0.000 4.000 4.000
Teras Lobby Meeting
+0.510
FFL
SCALE 1:100 FILE NO : 1-DED
UP

NAME SIGN
+0.510 1
FFL
DRAWING BY Ar. Chairunnisa, S.Ars
2

19G x 250
20R x 188
3
Reviewed &
C C4
5 approved by
6

N
82VP2+CCV
7
8

+0.510 +0.510
FFL FFL 3.000 3.000 Septictank DESCRIPTION
Rg. Kabid Rg. Kasi Existing
9
10
11
12

D D13
14
15
4.000 4.000 16 ps :

20
19
18
17
Semua dalam satuan ukuran MM, kecuali apabila
8.000 ditampilkan berbeda

DOWN
APPROVAL

1 2 3
B

REV

NOTES

02
PAGE TOTAL

INSTITUTION

Siteplan 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR

B
1 2 3 1 2 3 Prov. Sulawesi Barat

8.000 8.000
4.000 4.000 675
2.605 1.395 4.000 2.530 1.470 4.000 LOCATION

Kompleks Perkantoran
1.075 Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
A A A A Sulawesi Barat
-0.450 -0.450
FFL FFL
1.202
C Toilet Toilet C C C KETERANGAN
Lobby
16
17
18
19
20

Rg. Arsip
15
3.000 FFL
14 +0.510 +0.510 +0.510
+4.010 Detail Engineering Drawing
FFL FFL FFL
13
4.000 VOID 4.000 (DED)
12
Pantry Staff
11
Area Area
2.798
DRAWING TITLE
10
9
8
7
6
5
4
3

A A A A
20R x 175
19G x 251
275 275
1.000 Denah

B B B B
+0.160

+0.320

+0.510
FFL
1.224 DIBUAT OLEH

Lobby
Rg. Arsip Rg. Arsip
11.000 11.000 11.000 FFL FFL 11.000
+0.480 +0.510 +4.010 +4.010
FFL FFL Rg.
4.000 Teras Lobby Meeting
1.550 4.000
+0.510
FFL
UP
Cahyani, ST.

+0.510 1 Tim Leader


FFL 1.226 2
7.000 .
STATUS
19G x 250
3 20R x 188
2.000
C C
4
5
C C
6 SCALE 1:100 FILE NO : 1-DED
7

NAME SIGN
8
Rg. Arsip Rg. Arsip
+0.510 +0.510
3.000 FFL FFL 3.000 FFL
+4.010
FFL
+4.010
3.000 1.015 DRAWING BY Ar. Chairunnisa, S.Ars

Rg. Kabid Rg. Kasi Reviewed &


9
approved by
10

N
11
12 82VP2+CCV
1.735
D D
13
14
D D
15 1.800 DESCRIPTION
775 1.275 2.725 1.356 2.644 16
20
19
18
17

4.000 4.000
DOWN

4.000 1.925 1.200


8.000
1 2 3 1 2 FFL 3
+4.010
1.350 750 1.374
B

B
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Entrance
to Existing
Building

Denah Lt. 1 Denah Lt. 2 REV

NOTES

03
PAGE TOTAL

INSTITUTION

Denah 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
RH RH Kec.Mamuju, Kab. Mamuju,
+11.387 RH +11.387 Sulawesi Barat
+11.387

KETERANGAN

Detail Engineering Drawing


(DED)
3.387 3.387
3.737

DRAWING TITLE

RBH
+8.000 RL
RBH
+8.000 Tampak Depan & Samping
+7.650

DIBUAT OLEH

4.350 4.350
4.000

Cahyani, ST.
Tim Leader
Lv.2
+4.000 BLH .
STATUS
BLH +3.650
+3.650 +3.650
BLH WH
400 SCALE 1:100 FILE NO : 1-DED
+3.250

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

3.150 2.300 3.150


Reviewed &
approved by

WH

N
Lv.1 +950 Lv.1 82VP2+CCV
+500 Lv.1
450 +500
+500
±0 GL
500 GL 500 500 ±0 DESCRIPTION
±0 GL

4.000 4.000
4.000 4.000 3.000

11.000 8.000 ps :
A B C D 3 2 1 Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Tampak Depan Tampak Samping

REV

NOTES

04
PAGE TOTAL

INSTITUTION

Tampak Depan & Samping 49


1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

1 2 3 Kompleks Perkantoran
Gubernur, Rangas, Simboro,
RH
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
RH RH +11.387
+11.387 +11.387
KETERANGAN

Detail Engineering Drawing


(DED)
3.387
3.852

DRAWING TITLE

RL
RBH RBH +8.000 Tampak Belakang dan Samping
+8.000 +8.000 RBH
+7.535
+7.650

DIBUAT OLEH

4.000
3.535 4.350

Cahyani, ST.
Tim Leader
Lv.2
Lv.2 +4.000 BLH STATUS
.
+4.000 BLH +3.650
+3.650
750 1:100
450 +3.200
SCALE FILE NO : 1-DED
WH
WH
+2.900 NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars


3.500
2.300 2.250 Reviewed &
approved by
WH
+1.300

N
WH
+829 82VP2+CCV
Lv.1
Lv.1 +500 450
+500 +500 Lv.1
950 DESCRIPTION
+250 FH ±0 500 500 ±0
±0 GL ±0 GL GL GL

4.000 4.000
3.000 4.000 4.000
11.000 8.000
ps :
D C B A 1 2 3
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Tampak Belakang Tampak Samping

REV

NOTES

05
PAGE TOTAL

INSTITUTION

Tampak Belakang dan 49


Samping 1:100

GSEducationalVersion
RH
+11.387 Rangka Atap Baja Ringan Kanal C.75
Reng Alumunium

PEMERINTAH PROVINSI SULAWESI BARAT


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Penutup Atap Spandek BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022
Rangka Atap Baja Ringan
PAKET KEGIATAN
Kanal C.75
PENAMBAHAN GEDUNG
3.387 KANTOR DINAS PUPR
Lisplang
Prov. Sulawesi Barat
Talang Air Hujan
RH LOCATION
+8.800
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
800 Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
RBH
+8.000 Balok Utama Balok Utama Balok Utama +8.000
20/35 cm 20/35 cm 20/35 cm KETERANGAN
350
CH
800 Detail Engineering Drawing
(DED)
+7.200

C. +7.200 C. +7.200
DRAWING TITLE

Potongan A-A

DIBUAT OLEH

3.650
3.190

Balok Utama Cahyani, ST.


20/35 cm Pas. 1/2 Bata Merah
Tim Leader
1:3 Plester 2 Sisi
Plat Lantai t=12cm .

FFL
Rg. Staff STATUS

Keramik 60x60 +4.010 LV.2


SCALE 1:50 FILE NO : 1-DED
+4.010 Balok Utama +4.000
Balok Anak 20/35 cm
CH 15/20 cm 350 NAME SIGN

+3.610
810 DRAWING BY Ar. Chairunnisa, S.Ars

WH C. +3.610 Reviewed &


approved by
+3.200

N
Jendela J2 Bordes 1.435 82VP2+CCV

2200x3550
Sliding Door P2 Tangga DESCRIPTION
+2.250 BRH
Balok Tangga +2.215
15/20 cm
2.200

ps :

1.715
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
WH
Sloof 25x20cm
+1.000 APPROVAL

Rg. Staff Pantry Pas. Batu Kali


FFL 490 +0.510 +0.510 SH
+510 +500
+0.320

+250FH 250
510 +0.160

±0 GL 250 GL ±0
REV

Keramik 60x60cm Urugan Tanah Aanstampang NOTES

Spesi Pasir Urug

Beton Tumbuk t=5cm


Pasir Urug t=10cm

4.375 3.625
4.000 4.000 06
PAGE TOTAL

8.000 INSTITUTION

Potongan A-A 49
3 2 1 1:50

GSEducationalVersion
Bumbungan Atap
Rangka Atap Baja Ringan Kanal C.75
RH
Reng Alumunium
+8.387

Penutup Atap Spandek


Rangka Atap Baja Ringan PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Kanal C.75 BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

2.587
PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat
Lisplang
Talang Air Hujan
LOCATION
RH RH
+8.800 Kompleks Perkantoran
RingBalk Gubernur, Rangas, Simboro,
15/20 cm Kec.Mamuju, Kab. Mamuju,
800 800 RBH
Sulawesi Barat

+8.000 +8.000 KETERANGAN

Balok Utama Balok Anak Balok Anak


Balok Utama 20/35 cm
+7.650 20/35 cm 15/20 cm 15/20 cm
Detail Engineering Drawing
CH (DED)

+7.200
DRAWING TITLE
C. +7.200 C. +7.200 C. +7.200

Potongan B-B

DIBUAT OLEH

3.990 4.000

Cahyani, ST.
Tim Leader

Keramik 60x60 STATUS


.

FFL
Plat Lantai t=12cm Rg. Arsip Rg. Arsip Rg. Staff
Balok Utama LV.2 SCALE 1:50 FILE NO : 1-DED
+4.010 +4.010 +4.010
+4.010 20/35 cm +4.000
NAME SIGN
CH
Balok Utama 20/35 cm +3.650 DRAWING BY Ar. Chairunnisa, S.Ars
+3.610
810 Pas. 1/2 Bata Merah Reviewed &
WH C. +3.610 C. +3.610 C. +3.610 approved by
1:3 Plester 2 Sisi
+3.200

N
82VP2+CCV

Jendela J2 Jendela J2
2200x3550 2200x3550 DESCRIPTION

3.500
2.200
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

WH
Pantry & Sloof 25x20cm APPROVAL

+1.000
Rg. Kasi Rg. Lobby Rg. Staff Pas. Batu Kali
FFL 490 +0.510 +0.510 +0.510
SH
+510 +500
+250 FH 250
510 GL
±0 GL 250 ±0 REV

NOTES
Keramik 60x60cm Aanstampang
Urugan Tanah
Spesi Pasir Urug

Beton Tumbuk t=5cm FPH


Pasir Urug t=10cm -1.000

3.000 4.000 4.000 PAGE


07
TOTAL

INSTITUTION
11.000 1.000
Potongan B-B 49
D C B A 1:50

GSEducationalVersion
RH
+11.387 Bumbungan Atap

PEMERINTAH PROVINSI SULAWESI BARAT


Penutup Atap Spandek DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
Rangka Atap Baja Ringan TAHUN ANGGARAN 2022

2.587 Kanal C.75 PAKET KEGIATAN

Reng Alumunium
PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Lisplang
Prov. Sulawesi Barat
Talang Air Hujan
RH RH LOCATION
+8.800 +8.800
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
800 800 Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
RBH
+8.000 Balok Utama Balok Utama Balok Utama +8.000
20/35 cm 20/35 cm 20/35 cm KETERANGAN

CH
800 Detail Engineering Drawing
(DED)
+7.200

C. +7.200 C. +7.200
DRAWING TITLE

Potongan C-C

4.000 DIBUAT OLEH

3.190

Balok Utama Cahyani, ST.


20/35 cm Pas. 1/2 Bata Merah
Tim Leader
1:3 Plester 2 Sisi
Plat Lantai t=12cm .

FFL
Rg. Staff Balok Anak
STATUS

Keramik 60x60 +4.010 LV.2


15/20 cm SCALE 1:50 FILE NO : 1-DED
+4.010 Balok Utama +4.000
CH 20/35 cm
400 Bordes NAME SIGN
+3.610
WH
Tangga 910 DRAWING BY Ar. Chairunnisa, S.Ars

410 C. +3.610 +2.250 BRH


Reviewed &
approved by
+3.200
+3.090

N
82VP2+CCV
Jendela J2
3550x2200
DESCRIPTION

Balok Tangga
15/20 cm
2.200
2.640
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
WH
Sloof 25x20cm
+1.000 APPROVAL

Rg. Staff Toilet Toilet Pas. Batu Kali


FFL 490 +0.510 +0.450 +0.450
TLH
+510 +450
+0.320

+250 FH
510 +0.160 200
±0 GL 250 ±0 GL
REV

Keramik 60x60cm Urugan Tanah Aanstampang NOTES

Spesi Pasir Urug

Beton Tumbuk t=5cm FPH


Pasir Urug t=10cm -1.000

4.000 1.395 2.605


08
PAGE TOTAL

4.000 4.000
INSTITUTION
8.000
3 2 1 Potongan C-C 49
1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG

B
KANTOR DINAS PUPR
1 2 3
Prov. Sulawesi Barat
8.000
4.000 4.000 675
2.530 1.470 4.000
LOCATION

1.075 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
A A Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

C C
Lobby KETERANGAN
Rg. Arsip
3.000 FFL
+4.010
Detail Engineering Drawing
VOID 4.000 (DED)

JB-JB
SP17
A A DRAWING TITLE

1.000 523
Denah Jembatan
B B

DIBUAT OLEH
Lobby
Rg. Arsip Rg. Arsip
11.000 FFL FFL 11.000 1.350
+4.010 +4.010 FFL
4.000 +4.010
3.250

Cahyani, ST.
Tim Leader
7.000
.
2.000 STATUS
C C 1.377
SP17
JA-JA SP17
JA-JA
SCALE 1:100, FILE NO : 1-DED
1:51,28
Rg. Arsip Rg. Arsip NAME SIGN
FFL
+4.010
FFL
+4.010
3.000 1.015
DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &

JB-JB
SP17
approved by

Entrance

N
1.735 to Existing 82VP2+CCV
D D Building

1.800

Detail Denah Jembatan DESCRIPTION

4.000 1.925 1.200

1 2 FFL 3
+4.010
1.350 750 1.374
B

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

Entrance APPROVAL
to Existing
Building

D-J1

REV

NOTES

Denah Lt. 1

09
PAGE TOTAL

INSTITUTION

Denah Jembatan 49
1:100,
1:51,28
GSEducationalVersion
D- AJ1 PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
Penutup Atap Spandek TAHUN ANGGARAN 2022

PAKET KEGIATAN

Rangka Atap Top Chord


Baja Ringan Kanal PENAMBAHAN GEDUNG
C .75-0,75 TCT KANTOR DINAS PUPR
Prov. Sulawesi Barat
Reng Baja Ringan 0,45 CTC
Rangka Atap Batang Tarik
Sekrup 12x20mm Baja Ringan Kanal LOCATION

C .75-0,75 TCT
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


Reng Atap Hollow 4x4cm (DED)
D-AJ3
Rangka Atap Baja Ringan Kanal C.75 Nok Atap

D-AJ2 Rangka Atap Baja Ringan Kanal C.75


Reng Alumunium
DRAWING TITLE
D-AJ1 Penutup Atap Spandek

547
Lisplang
Section JA-JA
Talang Air Hujan
Balok Utama
15/20 cm
D- AJ2
C. +6.850 C. +6.850 C. +6.850

Penutup Atap Spandek DIBUAT OLEH

Pas. 1/2 Bata Merah


1:3 Plester 2 Sisi Pas. 1/2 Bata Merah
1:3 Plester 2 Sisi
Rangka Atap Top Chord
Baja Ringan Kanal
C .75-0,75 TCT
Jendela J2
2200x3550
Reng Baja Ringan 0,45 CTC Cahyani, ST.
3.200
Tim Leader
Sekrup 12x20mm
.
STATUS

SCALE 1:50, FILE NO : 1-DED


1:10
Rangka Atap Web
Balok Utama
Baja Ringan Kanal NAME SIGN
Balok Utama
20/35 cm
Plat Lantai t=12cm
Jembatan 20/35 cm
Jembatan C .75-0,75 TCT DRAWING BY Ar. Chairunnisa, S.Ars
Plat Lantai t=12cm
Rg. Arsip Rg. Arsip
Keramik 60x60 Keramik 60x60
+4.010 +4.010 Reviewed &
approved by

N
Balok Utama
Balok Utama 82VP2+CCV
20/35 cm
20/35 cm

1.650
D- AJ3 DESCRIPTION

Bumbungan Atap

Kolom Struktur
3.250 Penutup Atap Spandek
20x40 cm

Reng Baja Ringan 0,45 CTC


Kolom Struktur
20x40 cm
Sekrup 12x20mm ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

Rangka Atap Top Chord APPROVAL


Baja Ringan Kanal
C .75-0,75 TCT

REV
Rangka Atap Web
Baja Ringan Kanal NOTES

C .75-0,75 TCT

Section JA-JA Section JB-JB

10
PAGE TOTAL

INSTITUTION

Section JA-JA 49
1:50,
1:10
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat
1 2 3 1 2 3
8.000 8.000
4.000 4.000 675 LOCATION
2.605 1.395 4.000 2.530 1.470 4.000
Kompleks Perkantoran
1.075 Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
J5 J5 J5
Sulawesi Barat
A A A A

1.202 J3 J3 J3 KETERANGAN
J2 J5 J5 J5
16
17
18
19
20

P3
15
14
3.000 Detail Engineering Drawing
(DED)
13
12
P1 P1 J2 4.000 PI 4.000
11
2.798 DRAWING TITLE
10
9
8
7
6
5
4
3

20R x 175
19G x 251 Denah Pintu Jendela
275 275
1.000
B B B B
DIBUAT OLEH
1.224
PI J5

11.000 11.000 11.000 11.000


4.000 PJ1 PI J2 1.550 J6 J5 4.000

Cahyani, ST.
UP
Tim Leader
J5
P2

1
1.226 2
7.000 STATUS
.

19G x 250
20R x 188
3
2.000
C C
4
C C
5 SCALE 1:100 FILE NO : 1-DED
6
7
NAME SIGN
8
J4
DRAWING BY Ar. Chairunnisa, S.Ars

3.000 J1 PL1 J4 3.000 J4 3.000 1.015


Reviewed &
9 approved by

J2 10
P4

N
82VP2+CCV
11
12
1.735
D D
13
14
D D
DESCRIPTION
15 1.800

775 1.275 2.725 1.356 2.644 16


20
19
18
17

4.000 4.000
DOWN

4.000 1.925 P5 1.200


8.000
1 2 3 1 2 3
J7 1.350 750 1.374
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Entrance
to Existing
Building

Denah Pintu Jendela Lt. 1 Denah Pintu Jendela Lt. 2 REV

NOTES

11
PAGE TOTAL

INSTITUTION

Denah Pintu Jendela 49


1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Plywood t=18mm
Aluminium 3" Prov. Sulawesi Barat

B
B8

B8

B8
Potongan A Potongan A Potongan B
black powder
Tampak 1 coated

LOCATION

650 669 669 619 600 619 619


Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
146 Sulawesi Barat
D-PJ2

KETERANGAN
1.269 1.250 1.250 1.304

3.150 3.150 3.100 3.100 3.100 Detail Engineering Drawing


(DED)

2.481 2.219 2.481 2.481


232 233
354 DRAWING TITLE

1.250 Detail Pintu Jendela


999 999
823

116 DIBUAT OLEH

Tampak 1 D-PJ2
B8

B8

B8
A

B
981 1.888 981

3.850

Cahyani, ST.
Aluminium 3"
black powder Tim Leader
coated Partikel Laminasi t=8mm Aluminium 3"
50 Kaca Polos 5mm black powder STATUS
.
Aluminium 3" Aluminium 3" coated
120 Aluminium 4" black powder
Kaca Polos 5mm
Aluminium 4" coated Header Track
black powder Kaca Polos 6mm 38 Assembly SCALE 1:50 FILE NO : 1-DED
coated Aluminium 3"
684 black powder
coated NAME SIGN
Kaca Polos 5mm 959
D-PJ1

DRAWING BY Ar. Chairunnisa, S.Ars


120 Door
Panel Reviewed &
101 461 959
approved by
Door
981 1.888 981 2.031 519 Guides

N
82VP2+CCV

Tampak 1 Tampak 1

Detail Detail DESCRIPTION

Type Kusen : Aluminium 3" Finishing : Black Powder Coated Type Kusen : Aluminium 3" Finishing : Black Powder Coated
Daun Pintu : Rangka Aluminium + Kaca 5mm Finishing : Black Powder Coated Daun Pintu : Rangka Aluminium, Kaca 5mm, Plywood Finishing : Black Powder Coated, Melamic
ps :
Bovenlicht : Kaca Ryben 5mm Finishing : - Bouvenlicht : Kaca Ryben 5mm Finishing : - Semua dalam satuan ukuran MM, kecuali apabila

PJ1 PL1
ditampilkan berbeda

Aksesoris : Engsel Kupu-Kupu + Fix Handle Aksesoris : Rel Pintu, Engsel Roda, Fix Handle APPROVAL

Lokasi : Teras > Lobby Lokasi : Rg. Kabid


Jumlah : 1 Jumlah : 1
Skala : Skala :

REV

NOTES

12
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

Aluminium 4"
black powder
J3 PENAMBAHAN GEDUNG

B8
A
coated
B8
A

Kusen : Aluminium 4" Finishing : Black Powder Coated KANTOR DINAS PUPR
Tampak 1
Potongan A

B8
A
44 44 44

370
400 400 320 400 DJ : Rgk. Aluminium + Kaca 5mm Prov. Sulawesi Barat

Tampak 1
Potongan A Bouvenlicht : Kaca Ryben 5mm
Kaca Polos 5mm
Potongan A LOCATION
930 930

B8
Aksesoris : Engsel Friction Stay, Casement Handle

A
101 650

Lokasi : Toilet Kompleks Perkantoran


Gubernur, Rangas, Simboro,
60 2.104 602.104 Kec.Mamuju, Kab. Mamuju,
2.060 Tampak 1 Jumlah : 3
Sulawesi Barat
1.600 1.500 1.298 1.500 Skala :
1.070 1.070 Type KETERANGAN

B8
A
101 Detail Engineering Drawing
(DED)
B8

1.225
A

1.225

J5
B8
A
Aluminium 4" DRAWING TITLE
black powder
coated
P1 Aluminium 4"
J4
black powder
Kusen : Aluminium 4" Kusen : Aluminium 4" Detail Pintu Jendela
coated
2.500
Panel Aluminium
DP : Panel Aluminium Kaca Polos 5mm DJ : Rgk. Aluminium + Kaca 5mm
Tampak 1 Aluminium 4"
black powder
Bouvenlicht : - Bouvenlicht : Kaca Ryben 5mm coated 1.225 DIBUAT OLEH

Acs: Engsel,Handle Acs: Casement Handle 1.275 Kaca Polos 5mm


101 101
1.298 Kusen : Aluminium 4" Finishing : Black Powder Coated
712 Lokasi : Toilet 1.500 Lokasi : Rg. Staff & Rg. Arsip
44 44 DJ : Rgk. Aluminium + Kaca 5mm
800
Jumlah : 2 Jumlah : 3
Potongan A Bouvenlicht : Kaca Ryben 5mm
Aluminium 4" Aluminium 4"

B8
Aksesoris : Rel Guides, Casement Handle Cahyani, ST.

A
black powder black powder
B8
A

coated coated
Tampak 1 Tampak 2
Handle Tim Leader
650 Lokasi : Rg. Arsip (Lt.2)
.
Kaca Polos 5mm Kaca Polos 5mm STATUS
600 600
Jumlah : 9
Tampak 2
Skala : SCALE 1:50 FILE NO : 1-DED

1.400 1.400 2.800 Aluminium 4" Type NAME SIGN

B8
A
black powder
J7
B8

Potongan A coated
A

DRAWING BY Ar. Chairunnisa, S.Ars


Tampak 1
50
Kusen : Aluminium 4" Reviewed &
Kaca Polos 5mm approved by

600
DJ : Rgk. Aluminium + Kaca 5mm

N
J6
82VP2+CCV
Bouvenlicht : Kaca Ryben 5mm
1.378 1.378 1.400 1.500
44
Acs: Engsel Friction Stay,
DESCRIPTION
2.800 Casement Handle
Tampak 2 Lokasi : Jembatan Rg. Arsip
Jumlah : 1 50
Aluminium 4"
black powder
J3 Kusen : Aluminium 4" Finishing :

B8
B8
A

A
Tampak 1 coated
Kusen : Aluminium 4" Finishing : Black Powder Coated Tampak 1
Black Powder Coated
ps :
DJ : Rgk. Aluminium + Kaca 5mm,
370

400 400 320 400 DJ : Rgk. Aluminium + Kaca 5mm Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
Finishing : Black Powder Coated
Bouvenlicht : Kaca Ryben 5mm APPROVAL
Kaca Polos 5mm
Potongan A
Bouvenlicht : Kaca Ryben 6mm
B8

Aksesoris : Engsel Friction Stay, Casement Handle 1.777 1.777


A

650
Potongan A Acs: Rel Guides, Casement
Lokasi : Toilet 3.553
Handle
Tampak 1 Jumlah : 3 Tampak 2
Lokasi : Rg. Arsip
Skala : Jumlah : 1
REV

NOTES

13
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION
Aluminium 3"

B8

B8
A

A
black powder
coated
Kompleks Perkantoran
Kaca Polos 5mm Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
650 593 650

1.000 1.000 KETERANGAN

Detail Engineering Drawing


2.200 (DED)
1.250 1.250

1.10
3.150 3.150
DRAWING TITLE

3
1.200 1.143 1.200

Detail Pintu Jendela

1.250 1.250 DIBUAT OLEH

B8
A
Potongan A

850 850 850


2.550
B8

1.000
A

Cahyani, ST.
Type
850 850 850 Tim Leader
553

2.550 650 .
Type 2.200 STATUS

SCALE 1:50 FILE NO : 1-DED

J1
1.200
J2 NAME SIGN

1.250 DRAWING BY Ar. Chairunnisa, S.Ars

Aluminium 3" Reviewed &


black powder approved by
coated
3.150
Tampak 1

N
82VP2+CCV
Kaca Polos 5mm Tampak 1
Kusen : Aluminium 3" Finishing : Kusen : Aluminium 3" Finishing :
Black Powder Coated Black Powder Coated
DESCRIPTION
DJ : Rgk. Aluminium + Kaca 5mm, DJ : Rgk. Aluminium + Kaca 5mm,
1.250 Finishing : Black Powder Coated Finishing : Black Powder Coated
850 850 850 Bouvenlicht : Kaca Ryben 5mm 710 710 710 710 710 Bouvenlicht : Kaca Ryben 5mm
2.550 3.550
Acs: Engsel Friction Stay, Acs: Engsel Friction Stay,
Casement Handle Casement Handle
Tampak 2 Tampak 2 ps :
Potongan A Lokasi : Rg. Kabid Lokasi : Rg. Kasi, Rg. Meeting, Rg. Staff Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
Jumlah : 1 Jumlah : 4
APPROVAL

REV

NOTES

14
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
Detail

B8
A
B8
A
Tampak 1 Tampak 1

Ilustrasi Detail PEMERINTAH PROVINSI SULAWESI BARAT


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022
985 985 1.007 1.007
PAKET KEGIATAN

PENAMBAHAN GEDUNG
2.152 2.162 156 2.095 156
354 354 KANTOR DINAS PUPR
Prov. Sulawesi Barat

932 928
813 823 LOCATION

Type Type
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
968 968

B8
Sulawesi Barat

A
Ilustrasi Detail
1.936
P3 P2
B8

KETERANGAN
A

Aluminium 4"
black powder Detail Engineering Drawing
Aluminium 4"
black powder coated (DED)
Aluminium 3" coated
black powder Kusen : Aluminium 4" Finishing : Kaca Polos 5mm Kusen : Aluminium 3" Finishing :
Kaca Polos 5mm
coated Black Powder Coated Black Powder Coated
DRAWING TITLE
DP : Rgk. Aluminium + Kaca 5mm, DJ : Rgk. Aluminium + Kaca 5mm,
968 968
Finishing : Black Powder Coated 884 Finishing : Black Powder Coated
Detail Pintu Jendela
1.936 Bouvenlicht : Kaca Ryben 5mm Bouvenlicht : Kaca Ryben 5mm
Acs: Rel Pintu, Engsel Roda, Fix Acs: Rel Pintu, Engsel Roda,
Tampak 1 Handle Tampak 1 Fix Handle DIBUAT OLEH

Lokasi : Rg. Arsip Lokasi : Rg. Kasi/Rg. Meeting


Jumlah :1 Jumlah : 1

Cahyani, ST.
Tim Leader

.
STATUS
B8
A

SCALE 1:50 FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
2.100 2.100
82VP2+CCV

DESCRIPTION

Type
B8
A

Potongan A

1.200
P4 ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

m 3" Finishing : Aluminium 4" Aluminium 4" Kusen : Aluminium 4" Finishing :
black powder
ted black powder
coated coated Black Powder Coated
Kaca Polos 5mm DJ : Rgk. Aluminium + Kaca 5mm,
Finishing : Black Powder Coated
REV

Bouvenlicht : Kaca Ryben 5mm NOTES

Acs: Engsel Kupu-Kupu, Smart


1.200 Door Lock
Rg. Meeting Lokasi : Rg. Arsip
Jumlah : 1

15
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

Tampak 2 LOCATION

Kompleks Perkantoran
2.386 Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
989 1.397

KETERANGAN

Kaca Polos 5mm 1.000 1.000 1.000


Aluminium 4"
885 black powder Detail Engineering Drawing
coated (DED)
Aluminium Corner Joint
black powder
coated

DRAWING TITLE

1.000 1.000 1.000


3.100 3.100 3.100
Detail Pintu Jendela
Tampak 1

3.557 1.750 Partikel Laminasi t= 9mm

DIBUAT OLEH

1.100 1.100 1.100

Cahyani, ST.
922 Kaca Polos 5mm Tim Leader
Aluminium 4" 885 1.750 922 1.397 989 1.093
black powder
coated .
STATUS
3.557 2.386

SCALE 1:50 FILE NO : 1-DED


Tampak 1 Tampak 2 Tampak 3
1.093
NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars


Tampak 3
Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION
Type

PI
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Rangka : Aluminium 4" Finishing :


Black Powder Coated
DJ : Rgk. Aluminium + Kaca 5mm,
Finishing : Black Powder Coated

Bouvenlicht : Kaca Ryben 5mm


REV
Acs: Screw
NOTES

Lokasi : Rg. Arsip


Jumlah : Masing-masing 1

16
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

B8
A
PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat
1.083

LOCATION

2.100 2.143 2.100 Kompleks Perkantoran


190 Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
Type
870
KETERANGAN

Ilustrasi : P5 Detail Engineering Drawing


(DED)

B8
A
Daun Material
Besi/Aluminium
black powder
DRAWING TITLE
coated

Kusen : Aluminium 4" Finishing : Detail Pintu Jendela


Aluminium 4"
black powder
Black Powder Coated
coated
DP : Rgk. Aluminium + Besi/Almnm,
Finishing : Black Powder Coated DIBUAT OLEH

Bouvenlicht : Besi/Aluminium
Acs: Engsel Kupu-Kupu,
1.000 Handle
Lokasi : Evacuation Route
Jumlah : 1 Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:50 FILE NO : 1-DED

NAME SIGN
1.000
DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

3.190 DESCRIPTION

Type
2.190

PI ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Kusen : Aluminium 4" Finishing :


Aluminium 4" Black Powder Coated
black powder
Aluminium 3"
black powder
coated DP : Rgk. Aluminium + Kaca 5mm,
Kaca Polos 5mm
coated Finishing : Black Powder Coated
REV

Bouvenlicht : Kaca Ryben 5mm NOTES

1.993 919 862 Acs: Screw


3.774
Lokasi : Rg. Arsip
Jumlah :1

17
PAGE TOTAL

INSTITUTION

Detail Pintu Jendela 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
1 2 3 1 2 3 KANTOR DINAS PUPR

8.000 8.000 Prov. Sulawesi Barat


4.000 4.000 675
2.605 1.395 4.000 2.530 1.470 4.000
LOCATION

1.075
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
A A A A Kec.Mamuju, Kab. Mamuju,
-0.450 -0.450
LA1 LA1 LA1 LA1 Sulawesi Barat
CT-1 CT-1
1.202
Toilet Toilet
KETERANGAN
16
17
18
19
20

15
3.000
14 +0.510 +0.510 +0.510 Rg. Staff
GT-1 GT-1 GT-1
13
Pantry 4.000 GT-1
+4.010
4.000 Detail Engineering Drawing
12 Staff (DED)
11
Area Area
2.798
10
9
8
7
6
5
4
3

DRAWING TITLE
20R x 175
19G x 251
275 275
1.000
R. Denah Pola Lantai
B B B B
GT-1 +0.160

GT-1 +0.320

+0.510
GT-1
1.224
DIBUAT OLEH
Lobby
Rg. Arsip Rg. Arsip
11.000 11.000 11.000 GT-1 GT-1 11.000
+0.480 +0.510 +0.510 +4.010 +4.010
GT-1 GT-1 GT-1
4.000 Teras Lobby Rg. Meeting
1.550 4.000

UP

Cahyani, ST.
+0.510 1
LA2

LA2
GT-1 1.226 2
7.000
Tim Leader

19G x 250
20R x 188
3
2.000 .
C C
4
5
C C STATUS

6
1:100
LA2

LA2
7 SCALE FILE NO : 1-DED
8
Rg. Arsip Rg. Arsip
+0.510 +0.510 NAME SIGN
3.000 GT-1 GT-1 3.000 GT-1
+4.010
GT-1
+4.010
3.000 1.015

Rg. Kabid Rg. Kasi DRAWING BY Ar. Chairunnisa, S.Ars


9
10 Reviewed &
11
approved by

12

N
1.735
D D
13
14
D D 82VP2+CCV

15 1.800

775 1.275 2.725 1.356 2.644 16


DESCRIPTION
20
19
18
17

4.000 4.000
DOWN

4.000 1.925 1.200


8.000 GT-1
+4.010
1 2 3 1 2 3
1.350 750 1.374

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

Entrance APPROVAL
to Existing
Building

Denah Pola Lantai Lt. 1 Denah Pola Lantai Lt. 2 REV

NOTES

18
PAGE TOTAL

INSTITUTION

R. Denah Pola Lantai 49


1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)
150

150
DRAWING TITLE

Pas. 1/2 Bata Merah


1:3 Plester 2 Sisi Detail R. Pola Lantai

Pas. 1/2 Bata Merah Pas. 1/2 Bata Merah


1:3 Plester 2 Sisi 1:3 Plester 2 Sisi
Lantai Granite 60x60 Lantai 60x60 DIBUAT OLEH
Spesi Adukan Spesi Adukan
Beton Tumbuk t=5cm Beton Tumbuk t=5cm
Pas. 1/2 Bata Merah
Pasir Urug t=10cm Pasir Urug t=10cm
1:3 Plester 2 Sisi
Urugan Tanah Urugan Tanah
Lantai 60x60
Dipadatkan Dipadatkan
Spesi Adukan
Dinding Keramik 25x25 Rg. Kabid Lobby
Beton Tumbuk t=5cm Lantai 25x25
+0.510 +0.450

Pasir Urug t=10cm Spesi Adukan 20 Cahyani, ST.


Urugan Tanah Beton Tumbuk t=5cm
Dipadatkan 50 Tim Leader
Pasir Urug t=10cm
Rg. Staff
+0.510 Urugan Tanah
.
Dipadatkan STATUS
20 100 250
Toilet
+0.450
50
SCALE 1:10 FILE NO : 1-DED

100 250 NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

Detail LA1 Detail LA2


ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

19
PAGE TOTAL

INSTITUTION

Detail R. Pola Lantai 49


1:10

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
1 2 3 1 2 3
Prov. Sulawesi Barat
8.000 8.000
4.000 4.000 675
2.605 1.395 4.000 2.530 1.470 4.000
LOCATION

1.075 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
A A A A Kec.Mamuju, Kab. Mamuju,
+2.970 +3.000 Sulawesi Barat
EC-1 KSB-1 DP1 DP1 DP1 DP1
1.202
Toilet Toilet
KETERANGAN
16
17
18
19
20
15
3.000
14 +3.780 +3.610 +3.610 Rg. Staff
KSB-1 KSB-1 KSB-1
Detail Engineering Drawing
13
Pantry 4.000 VOID KSB-1
+7.200
4.000 (DED)
12 Staff
11
Area Area
2.798
10
9
8
7
6
5
4
3

DRAWING TITLE
20R x 175
19G x 251
275 275
1.000
Denah R. Plafon
B B B B
+0.160

+0.320

+3.610
KSB-1
1.224
DIBUAT OLEH
Lobby
Rg. Arsip Rg. Arsip
11.000 11.000 11.000 KSB-1 KSB-1 11.000
+0.480 +3.610 +3.610 +7.200 +7.200
KSB-1 KSB-1
4.000 Teras Lobby Rg. Meeting
1.550 4.000

UP

Cahyani, ST.
+3.610
Tim Leader
1
KSB-1 1.226 2
7.000

19G x 250
20R x 188
.
3
2.000 STATUS
C C
4
5
C C
1:100
6
SCALE FILE NO : 1-DED
7
8
Rg. Arsip Rg. Arsip NAME SIGN
+3.610 +3.610
3.000 KSB-1 KSB-1 3.000 KSB-1
+7.200
KSB-1
+7.200
3.000 1.015
DRAWING BY Ar. Chairunnisa, S.Ars
Rg. Kabid Rg. Kasi
9
Reviewed &
approved by
10
11

N
12
1.735
82VP2+CCV
D D
13
14
D D
15 1.800
DESCRIPTION
775 1.275 2.725 1.356 2.644 16
20
19
18
17

4.000 4.000
DOWN

4.000 1.925 1.200


8.000
1 2 3 1 2 3
KSB-1
1.350 750 1.374

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL
Entrance
to Existing
Building

Denah R. Plafon Lt. 1 Denah R. Plafon Lt. 2 REV

NOTES

20
PAGE TOTAL

INSTITUTION

Denah R. Plafon 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Detail Plafon

Begel Penggantung
DIBUAT OLEH

Rangka Hollow 40x40mm

Cahyani, ST.
KSB-1 KSB-1 Tim Leader

+3.610 +3.610 .
STATUS

1:20
Balok 20/35cm Plafon Kalsiboard
SCALE FILE NO : 1-DED

dengan Natural White NAME SIGN


Pas. 1/2 Bata Merah Ceiling Lamp Fluorescent
Coating 1200x2440,
1:3 Plester 2 Sisi 60x60mm DRAWING BY Ar. Chairunnisa, S.Ars

t= 4mm Reviewed &


approved by

N
82VP2+CCV

Detail DP Plafon
DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

21
PAGE TOTAL

INSTITUTION

Detail Plafon 49
1:20

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

B
1 2 3 1 2 3
8.000
10.400 LOCATION
4.000 4.675
1.125 4.075 4.075 1.125 4.000 4.000 675
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
1.125

Dak Beton Kec.Mamuju, Kab. Mamuju,


1.085
FFL Sulawesi Barat
+8.000

A A A A
KETERANGAN

C C C C

Canopy Beton
Detail Engineering Drawing
5.085 (DED)
4.075

4.000 4.000

DRAWING TITLE
FFL
+8.000

A A A A Denah Atap

B B B B
DIBUAT OLEH

TALANG AIR HUJAN


Nok Atap
3.015

13.400 Void 11.000

4.000 4.000

Cahyani, ST.

Canopy Beton
Tim Leader

.
STATUS

SCALE 1:100 FILE NO : 1-DED


C C C FFL C
+3.770

NAME SIGN
4.060

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
3.000 3.000
approved by

N
82VP2+CCV

D D D D DESCRIPTION

1.100
1.125

4.000 4.000

8.000

6.275 3.200 925


3.325
1 2 3 1 2 3
Bangunan Eksisting
Atap Jembatan ke

ps :
2.125 Semua dalam satuan ukuran MM, kecuali apabila
B

B
ditampilkan berbeda

APPROVAL
Bangunan Eksisting Bangunan Eksisting

Bangunan Eksisting Bangunan Eksisting Bangunan Eksisting Bangunan Eksisting

REV

Denah Rencana Atap Denah Rencana Atap NOTES

22
PAGE TOTAL

INSTITUTION

Denah Atap 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

1 2 3 1 2 3
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
8.000 8.000 Kec.Mamuju, Kab. Mamuju,
4.000 4.000 Sulawesi Barat
4.000 4.000
2.605 1.395 4.000
PFP1 PFP1 PFP1
KETERANGAN

A A A A
Detail Engineering Drawing
PBK1 PBK1 PBK1 (DED)

PBK1
DRAWING TITLE

PBK1
PBK1

PBK1
4.000 4.000 4.000 4.000
Rencana Pondasi

D-FP1

PFP1 PFP1 PFP1 DIBUAT OLEH

B B B B

PBK1

11.000 11.000 11.000 11.000 Cahyani, ST.

ROLLAG BATA
Tim Leader

PBK1

PBK1
4.000 4.000 4.000 4.000
.
STATUS
PF.A

PA
SCALE 1:100 FILE NO : 1-DED
PFP1 PFP1 PFP1 PBK1
NAME SIGN

C C C C DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
PBK1
approved by

N
PF.A

PA
82VP2+CCV

PBK1

PBK1
3.000 3.000 3.000 3.000

DESCRIPTION
PFP1 PFP1 PFP1 PBK1 PBK1

D D D D

4.000 4.000 4.000 4.000


2.073 2.073
D-FP2
8.000 ps :
8.000 PFP2 PFP2 Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
1 2 3 1 2 3
APPROVAL

Denah Rencana Pondasi Footplate Denah Rencana Pondasi Menerus


REV

NOTES

23
PAGE TOTAL

INSTITUTION

Rencana Pondasi 49
1:100

GSEducationalVersion
450
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

1.000 450 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
Sloof 25x20cm Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
Pas. Batu Kali
KETERANGAN

FFL SH
+510 +500
Detail Engineering Drawing
(DED)

FH
250
+250 DRAWING TITLE

1.000
Urugan Tanah Detail Pondasi

Tanah Asli DIBUAT OLEH


700

Aanstampang
4ø13 Pasir Urug
Cahyani, ST.
150 Tim Leader
-650
Sloof 25x20cm FFL 50 STATUS
.

+510 200 SCALE 1:20 FILE NO : 1-DED

250 NAME SIGN

700 DRAWING BY Ar. Chairunnisa, S.Ars


510 100 100 Reviewed &

GL 900 approved by

N
±0 82VP2+CCV

DESCRIPTION

ø8 -150
700
Detail PA
Urugan Tanah
ø8 -150 ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda
6ø13
APPROVAL

300
Selimut Beton
Lantai Kerja t=5cm FPL
50
Pasir Urug t=15cm 50 -1.100
REV

NOTES

450
275 275
1.000

Detail DFP 24
PAGE TOTAL

INSTITUTION

Detail Pondasi 49
1:20

GSEducationalVersion
1.000 800
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
300 300 KANTOR DINAS PUPR
Prov. Sulawesi Barat

800 200 LOCATION

1.000 400 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
300 Sulawesi Barat

KETERANGAN
300

300 400 300 Detail Engineering Drawing


(DED)

300 200 300


DRAWING TITLE

1.000 800
Detail Pondasi

DIBUAT OLEH

Cahyani, ST.
Tim Leader
3ø13 2ø13
.
STATUS

SCALE 1:20 FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV
ø8 -150 ø8 -150
DESCRIPTION

ø8 -150 ø8 -150
6ø13 6ø13
ps :
Semua dalam satuan ukuran MM, kecuali apabila
300 300 ditampilkan berbeda
Selimut Beton Selimut Beton
APPROVAL
Lantai Kerja t=5cm 50 Lantai Kerja t=5cm 50
Pasir Urug t=15cm 50 Pasir Urug t=15cm 50

300 400 300 300 200 300


REV

1.000 800 NOTES

Detail DFP-2 Detail DFP-2

25
PAGE TOTAL

INSTITUTION

Detail Pondasi 49
1:20

GSEducationalVersion
Elevasi Balok (B1) 20/35cm Elevasi
Jembatan Jembatan
+4.000 +4.000 Balok (B1) 20/35cm

Elevasi Elevasi PEMERINTAH PROVINSI SULAWESI BARAT


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Balok Balok BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

+3.650 +3.650 PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
ø8 -150 ø8 -150 Prov. Sulawesi Barat

LOCATION

3ø13 2ø13 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Sengkang (Besi ø8 - 150)

Sengkang (Besi ø8 - 150)


Detail Engineering Drawing
(DED)

DRAWING TITLE

Rencana Detail Pembesian Kolom

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:22 FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

3ø13 2ø13
DESCRIPTION

Elevasi Elevasi
Muka Muka
Tanah Tanah
+0 +0

ps :

Kolom pedestal
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Elevasi ø8 -150 Elevasi ø8 -150


Dasar 6ø13 Dasar 6ø13
Pondasi Pondasi
Telapak Telapak REV
300 300
Selimut Beton Selimut Beton NOTES

-1.000 -1.000
50 50
50 50
Lantai Kerja t=5cm Lantai Kerja t=5cm
Pasir Urug t=15cm
300 400 300 Pasir Urug t=15cm 300 200 300
32
PAGE TOTAL

1.000 800
INSTITUTION

Rencana Detail Pembesian 49


Kolom 1:22

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

1 2 3 LOCATION

Kompleks Perkantoran
4.000 4.000 Gubernur, Rangas, Simboro,
2.605 1.395 4.000 Kec.Mamuju, Kab. Mamuju,
3.625 4.375 Sulawesi Barat

A A KETERANGAN
Sloof 20/25 Sloof 20/25 Sloof 20/25
Sloof 20/25
1.200
Detail Engineering Drawing
Sloof 20/25
(DED)
Sloof 20/25

Sloof 20/25
4.000 DRAWING TITLE
Sloof 20/25

Sloof 20/25
2.800
Denah Rencana Sloof

DIBUAT OLEH
B B
Sloof 20/25

11.000 11.000
ROLLAG BATA

Sloof 20/25
200
Sloof 20/25

4.000 4.000 Cahyani, ST.


Tim Leader

Besi 4ø13 STATUS


.

SCALE 1:100, FILE NO : 1-DED


1:5
C
Sloof 20/25
C Besi ø8 - 150 NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
Sloof 20/25

Sloof 20/25

approved by

3.000 3.000
250

N
Beton K.250 82VP2+CCV

DESCRIPTION
Sloof 20/25 Sloof 20/25

D D

4.000 4.000

8.000

ps :
1 2 3 Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Denah Rencana Sloof Denah Pembesian Sloof

REV

NOTES

26
PAGE TOTAL

INSTITUTION

Denah Rencana Sloof 49


1:100,
1:5
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
1 2 3 1 2 3 KANTOR DINAS PUPR
8.000 8.000
Prov. Sulawesi Barat
4.000 4.000
4.000 4.000
KP2 KP2
LOCATION
2.605 1.395 4.000
1.000
Kompleks Perkantoran
A K1 KP1 K1 K1 A A K1 K1 K1 A Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
1.202 Sulawesi Barat

KP1 KP1 KP1 DB-KP


KETERANGAN

4.000 4.000 4.000 4.000


Detail Engineering Drawing
(DED)
2.798

DRAWING TITLE

B K1 K1 K1 B B K1 K1 K1 B Rencana Kolom
DB-K1

DIBUAT OLEH
11.000 11.000 11.000 11.000

4.000 4.000 4.000 4.000 4.000

Cahyani, ST.
Tim Leader

C K1 K1 K1 C C K1 K1 K1 C .
STATUS

SCALE 1:100 FILE NO : 1-DED

3.000 3.000 3.000 3.000 3.000 NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
K1 approved by

D K1 K1 K1 D D K1 K1 KP2 KP2 D

N
82VP2+CCV

4.000 4.000 4.000 1.850 1.650 500


2.073 DESCRIPTION
4.000 4.000
8.000
8.000
1 2 3 1 2 3
K2 K2

1.252

ps :
Bangunan Existingn
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

Bangunan Existingn Bangunan Existingn Entrance


to Existing APPROVAL
Building

Denah R. Kolom Lt. 1 Denah R. Kolom Lt. 2

REV

NOTES

27
PAGE TOTAL

INSTITUTION

Rencana Kolom 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat
1 2 3 1 2 3
4.000 4.000
8.000 LOCATION
2.605 1.395 4.000 675
4.000 4.000 675
1.275 1.330 Kompleks Perkantoran
B1 B1 BA BA Gubernur, Rangas, Simboro,
B1 B1 1.000 BA BA 1.000 Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
A A A A
B1 B1 B1 B1 B1
KETERANGAN
1.202 BA B1

Detail Engineering Drawing


BA
(DED)

4.000 B1 B1 4.000 4.000 B1 B1 4.000

BA B1 B1 DRAWING TITLE
2.798

Rencana Balok

BA BA
B B B B
B1 B1 B1 BA BA DIBUAT OLEH
450 450

11.000 11.000 11.000 11.000

4.000 B1 BA B1 B1 4.000 4.000 B1 B1 B1

Cahyani, ST.
Tim Leader

.
STATUS
7.000 7.000
B1 B1 B1 BA BA
C C C C SCALE 1:100 FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

3.000 B1 B1 B1 3.000 3.000 B1 B1 B1 Reviewed &


approved by

N
82VP2+CCV

B1 B1 B1 B1
D D D D DESCRIPTION

1.275 2.725 4.000 1.850 1.650 500


B1 B1 2.073
4.000 1.750 1.850 400 5.850

3.325 BA BA 3.325
1 2 3 1 2 3
ps :
Semua dalam satuan ukuran MM, kecuali apabila
B1 B1 1.252 ditampilkan berbeda

APPROVAL
Bangunan Eksisting Bangunan Eksisting

Bangunan Eksisting Entrance


Bangunan Eksisting
to Existing
Building

Denah R. Balok Elv. +365 Denah R. Balok Elv. +765 REV

NOTES

28
PAGE TOTAL

INSTITUTION

Rencana Balok 49
1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

1 2 3 1 2 3 Kompleks Perkantoran
Gubernur, Rangas, Simboro,
8.000 Kec.Mamuju, Kab. Mamuju,
8.000 Sulawesi Barat

4.000 4.000 4.000 4.000


KETERANGAN

A A A A
KP3 KP3 KP3 BA BA Detail Engineering Drawing
(DED)

DRAWING TITLE

4.000 4.000 4.000 4.000 4.000 BA BA 4.000


Rencana Kolom Balok Lv. Atap

DIBUAT OLEH

B KP3 KP3 8.000 B B 8.000 B

Cahyani, ST.
11.000 11.000
Tim Leader
4.000 4.000 4.000 BA BA 4.000
.
STATUS

SCALE 1:100 FILE NO : 1-DED

7.000 7.000 NAME SIGN

C KP3 KP3 C C C DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV
3.000 3.000 3.000 3.000 BA BA 3.000 3.000

DESCRIPTION

KP3 KP3 KP3 BA BA


D D D D

4.000 4.000 4.000 4.000

8.000 8.000 ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

1 2 3 1 2 3
APPROVAL

Denah R. Kolom Lv. Atap Denah R. Balok +835

REV

NOTES

29
PAGE TOTAL

INSTITUTION

Rencana Kolom Balok Lv. Atap 49


1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

Besi 12ø13 PENAMBAHAN GEDUNG


KANTOR DINAS PUPR
Besi ø8 - 150 Prov. Sulawesi Barat

Besi 4ø13 Besi 4ø13 LOCATION

Beton K.250 Besi ø8 - 150 Kompleks Perkantoran


450 Besi ø8 - 150 Gubernur, Rangas, Simboro,
400 Kec.Mamuju, Kab. Mamuju,
Beton K.250 Sulawesi Barat
Beton K.250
150
KETERANGAN

Detail Engineering Drawing


(DED)

450 150 200


DRAWING TITLE

Detail Pembesian Kolom K1 Detail Pembesian Kolom KP Detail Pembesian Kolom K2 Rencana Detail Pembesian Kolom Balok

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

25 SCALE 1:10, FILE NO : 1-DED


1:5
NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

Besi 4ø13 Besi 4ø13

N
82VP2+CCV

Besi ø8 - 150 Besi ø8 - 150


350 300 DESCRIPTION

Beton K.250 Beton K.250


200
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL
25

150
150
25 25
200 REV

Detail Pembesian Balok B1 Detail Pembesian Balok BA NOTES

30
PAGE TOTAL

INSTITUTION

Rencana Detail Pembesian 49


Kolom Balok 1:10,
1:5
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE
Balok (B1) 20/35cm

Balok (B1) 20/35cm


Rencana Detail Pembesian Kolom

Sloof 25x20cm
4ø13
DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:28 FILE NO : 1-DED

Sengkang (Besi ø8 - 150) Sengkang (Besi ø8 - 150) Kolom pedestal NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars


4.000

4.000
Reviewed &
approved by
Ketinggian

Ringbalk

N
Pondasi
Elevasi

Telapak
Elevasi

Elevasi

Elevasi

Elevasi
Kolom
+8.000

+7.650

+4.000

+3.650

Tanah

Dasar

-1.000
Balok

Muka
82VP2+CCV

Lv. 1
Lv.2

+500

+0
DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

31
PAGE TOTAL

INSTITUTION

Rencana Detail Pembesian 49


Kolom 1:28

GSEducationalVersion
Elevasi Balok (B1) 20/35cm Elevasi
Jembatan Jembatan
+4.000 +4.000 Balok (B1) 20/35cm

Elevasi Elevasi PEMERINTAH PROVINSI SULAWESI BARAT


DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Balok Balok BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

+3.650 +3.650 PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
ø8 -150 ø8 -150 Prov. Sulawesi Barat

LOCATION

3ø13 2ø13 Kompleks Perkantoran


Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Sengkang (Besi ø8 - 150)

Sengkang (Besi ø8 - 150)


Detail Engineering Drawing
(DED)

DRAWING TITLE

Rencana Detail Pembesian Kolom

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:22 FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

3ø13 2ø13
DESCRIPTION

Elevasi Elevasi
Muka Muka
Tanah Tanah
+0 +0

ps :

Kolom pedestal
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Elevasi ø8 -150 Elevasi ø8 -150


Dasar 6ø13 Dasar 6ø13
Pondasi Pondasi
Telapak Telapak REV
300 300
Selimut Beton Selimut Beton NOTES

-1.000 -1.000
50 50
50 50
Lantai Kerja t=5cm Lantai Kerja t=5cm
Pasir Urug t=15cm
400 Pasir Urug t=15cm 500
275 300 300
32
PAGE TOTAL

1.000 800
INSTITUTION

Rencana Detail Pembesian 49


Kolom 1:22

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION
1 2 3 1 2 3
8.000 8.000
Kompleks Perkantoran
4.000 4.000 675 4.000 4.000 675 Gubernur, Rangas, Simboro,
2.530 1.470 4.000 2.530 1.470 4.000 Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
1.075 CL 1.075
KETERANGAN
A A A A

Detail Engineering Drawing

Kanopi Dak Cor Beton/

Kanopi Dak Cor Beton/


(DED)

Sunshading Jendela

Sunshading Jendela
3.000 3.000 SK1 SK1

DRAWING TITLE
Void C A 4.000 Void Void 4.000

Rencana Plat Lantai Elv.

1.000 1.000
DIBUAT OLEH

B B B B

11.000 11.000 11.000 11.000


Cahyani, ST.
A A 4.000 Void Void 4.000 Tim Leader

.
STATUS
Kanopi Dak Cor Beton/
Sunshading Teras

SCALE 1:100 FILE NO : 1-DED


7.000 7.000
C C C C NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

B B 3.000 Void Void 3.000

N
82VP2+CCV

DESCRIPTION

D D D D
1.800 1.800

4.000 1.925 4.000 1.925


BG ps :
1 2 3 1 2 3 Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Entrance Entrance
to Existing to Existing
Building Building

REV

NOTES

Denah R. Plat Lantai & Cor Beton Denah Rencana Cor Beton

33
PAGE TOTAL

INSTITUTION

Rencana Plat Lantai Elv. 49


1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Bondek Prov. Sulawesi Barat

Besi M10 LOCATION

Besi M10 Kompleks Perkantoran


Gubernur, Rangas, Simboro,

Beton K.250 Kec.Mamuju, Kab. Mamuju,


Sulawesi Barat

KETERANGAN

35
Detail Engineering Drawing
(DED)
47 120
38
DRAWING TITLE

Detail Plat Lantai

DIBUAT OLEH

Detail Rencana Plat Lantai

Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:5 FILE NO : 1-DED

NAME SIGN
25
DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

Besi 4ø13 DESCRIPTION

Besi ø8 - 150 Besi ø8 - 150


350 300
Beton K.250 Besi ø8 - 150
Beton K.250 ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

25

25 150 25
REV

NOTES

200
Detail SK1

34
PAGE TOTAL

INSTITUTION

Detail Plat Lantai 49


1:5

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

4.000 4.000
KETERANGAN
2.605 1.395 1.200 251 251 251 251 251 1.470

SS-3

SS-3
Detail Engineering Drawing
(DED)

-0.450 -0.450
DRAWING TITLE
FFL FFL

Bordes
SS-2

SS-2

SS-2

SS-2
Turun
1.202
1.200
Toilet16 Toilet 1.451 Rencana Denah Tangga

17
18
19
20

16
17
18
19
20
251 DIBUAT OLEH
15
251 251 251 14
+0.510 +0.510
251 FFL 251 251 FFL
3.850 3.850
13
251 Pantry 251 251 12
Pantry
251 11
Area 251 251 11
Area Cahyani, ST.

195 195 Tim Leader

.
10
9
8
7
6
5
4
3
2
1

10
9
8
7
6
5
4
3
STATUS
Bordes

Bordes
SS-1

SS-1

SS-1

SS-1
1.395 20R x 175 1.395 20R x 175 SCALE 1:50 FILE NO : 1-DED

Naik

Naik
1.200 1.200
19G x 251 19G x 251
NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by
SS-3

SS-3

N
82VP2+CCV
1.200 241 251 251 251 251 251 251 251 251 251 1.200 241 251 251 251 251 251 251 251 251 251
1.441 1.441
DESCRIPTION
3.700 3.700

Denah Tangga Lt.1 Denah Tangga

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

35
PAGE TOTAL

INSTITUTION

Rencana Denah Tangga 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
1.617
1.653 DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN
Rg. Staff Rg. Staff Rg. Arsip
+4.010 +4.010 +4.000
Lv. 2 Lv. 2 Lv. 2 FFL Lv.2
+4.000 +4.000 +4.000 +4.010 PENAMBAHAN GEDUNG
175 175
KANTOR DINAS PUPR
175 175
+3.780 Prov. Sulawesi Barat
875 175 875 875 175
Bordes
175 Tangga 175
BRH BRH BRH DB-T.B +3.125 BRH
175 175 LOCATION
+3.125 +3.125 +3.125 +3.125
175
Kompleks Perkantoran
175 +3.000 +2.970
Gubernur, Rangas, Simboro,
875
Bordes 175 875 Kec.Mamuju, Kab. Mamuju,
3.142
Tangga 175 Sulawesi Barat
BRH +2.250 BRH
175
+2.250 3.500 +2.250
175 KETERANGAN

175

175 2.625 2.625


Detail Engineering Drawing
175 (DED)
175
1.750 1.750
175
DRAWING TITLE
175
694
175

Dapur Pantry DB-T.C 175 Toilet Toilet Teras Potongan Tangga


Lv. 1 +0.510 +0.510 Lv. 1 Lv. 1 +0.450 +0.450 +0.480
175 TLH
+500 +500 +500
+450

500 500 DIBUAT OLEH


GL GL
±0 DB-T.D ±0

1.117 309 251 251 251 251 251 251 251 251 251 Cahyani, ST.
1.395 75 236 251 251 251 251 1.215 155
3.685 Tim Leader
1.395 1.315 1.290
.
STATUS
Pot. Rencana Tangga SS1 Pot. Rencana Tangga SS2

SCALE 1:50, FILE NO : 1-DED


1:10
NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

120 Selimut

N
Beton K.250 82VP2+CCV

ø10 -20 DESCRIPTION

Selimut
Beton K.250
ø10
ø10 -20 Balok 15/20 ø10 -20
ø10 ø10
Beton K.250 ø10
ps :

ø10 -10
-20 175 Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL
Beton
ø10 -20
-15 140
200
ø10 -20
-15 K.250

ø10 Sloof 20/25 cm


Besi 4ø13
ø10 -10
-20 250 Besi ø8 - 150 REV

NOTES
ø10
251 251
ø10 -15
Lantai Kerja, t=5cm
Pas. 1/2 Bata Merah
Pasir Urug, t=5cm 1:3 Plester 2 Sisi ø10 -10
-20
DB-TC DB-TD DB-TB
36
PAGE TOTAL

200 150
INSTITUTION

Potongan Tangga 49
1:50,
1:10
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

Rg. Staff Rg. Arsip


+4.010 +4.000
Lv. 2 FFL Lv.2
+4.000 +4.010 DRAWING TITLE
175 1.855

175
727
Potongan dan Detail R. Tangga
875 175

175
BRH
175
+3.125 DIBUAT OLEH
175
+2.970

175 +2.970
J3 40X65CM

1.033
875 175
Bordes
175
DB-T.A Tangga
+2.250 BRH
175
+2.250

Pas. 1/2 Bata Merah Cahyani, ST.


+2.095
1:3 Plester 2 Sisi Tim Leader
+2.250 Selimut Balok 15/20 STATUS
.

Beton K.250
1.740 1.740 Beton K.250
SCALE 1:50, FILE NO : 1-DED
1:10
NAME SIGN

Toilet
+0.450
Pantry
+0.510
Teras
FFL Lv.1
120 DRAWING BY Ar. Chairunnisa, S.Ars

+0.480
TLH
+450
+510 200 Reviewed &
approved by

N
GL 82VP2+CCV
±0

+2.095 ø10 -15 Besi 4ø13 DESCRIPTION


Besi ø8 - 150
ø10 -10
-20

150 1.416 251 251 251 251 1.430 150


150
1.200 2.800

ps :
Semua dalam satuan ukuran MM, kecuali apabila
A B ditampilkan berbeda

APPROVAL

Pot. Rencana Tangga SS3 DB-TA

REV

NOTES

37
PAGE TOTAL

INSTITUTION

Potongan dan Detail R. 49


Tangga 1:50,
1:10
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat
1.200
LOCATION

S-TD2
S-TD1
Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat
UP

250 KETERANGAN
1
250
Detail Engineering Drawing
2
250 (DED)

19G x 250
20R x 188
3
250
4 2.000
250 DRAWING TITLE
5
250
6 Denah Tangga Darurat
250
7
250
8 DIBUAT OLEH

1.000 1.000

9 5.950
250 Cahyani, ST.
10 Tim Leader
250
.
STATUS
11
250
12
250 1.750 SCALE 1:50 FILE NO : 1-DED
13
250
NAME SIGN
14
250
DRAWING BY Ar. Chairunnisa, S.Ars
15
250 Reviewed &
16 approved by
20
19
18
17

N
82VP2+CCV
DOWN

1.200 1.200
DESCRIPTION
S-TD2 S-TD2
S-TD1
S-TD2

ps :
Semua dalam satuan ukuran MM, kecuali apabila
1.075 1.374 ditampilkan berbeda
250 250 250 250
APPROVAL
3.449

Denah Tangga Darurat REV

NOTES

38
PAGE TOTAL

INSTITUTION

Denah Tangga Darurat 49


1:50

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)
Besi Profil U-150x75x5

Besi Hollow Galvanis DRAWING TITLE

1.000 Potongan Tangga Darurat

+4.000
DIBUAT OLEH

2.384 754
750
+3.250 Besi Profil U-150x75x5

Besi Hollow Galvanis


Cahyani, ST.
Tim Leader

1.500 STATUS
.

SCALE 1:50 FILE NO : 1-DED


2.916
4.000 +1.750
NAME SIGN
3.250
DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV
1.750
DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
1.273 1.736 1.002 2.260 ditampilkan berbeda
1.315 909 1.300
APPROVAL

S-TD1 S-TD2

REV

NOTES

39
PAGE TOTAL

INSTITUTION

Potongan Tangga Darurat 49


1:50

GSEducationalVersion
DA-1
Rangka Atap Batang Tarik
Baja Ringan Kanal
C .75-0,75 TCT PEMERINTAH PROVINSI SULAWESI BARAT
Bumbungan Atap
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
Corner Plat Reng Baja Ringan 0,45 CTC TAHUN ANGGARAN 2022

Reng Baja Ringan 0,45 CTC PAKET KEGIATAN


Rangka Atap Top Chord Rangka Atap Web
Baja Ringan Kanal
C .75-0,75 TCT
1.569 Baja Ringan Kanal PENAMBAHAN GEDUNG
Penutup Atap Spandek
DA-5 C .75-0,75 TCT KANTOR DINAS PUPR
Rangka Atap Batang Tarik Prov. Sulawesi Barat
Baja Ringan Kanal
C.75 -0,75 TCT
Sekrup 12x20mm
1.463
Rangka Atap Web LOCATION
Baja Ringan Kanal
C.75 -0,75 TCT DA-4

Kompleks Perkantoran
Sekrup 12x20mm Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
1.417
Rangka Atap Top Chord Sulawesi Barat
Baja Ringan Kanal
C .75-0,75 TCT KETERANGAN
30°
1.148 Ringbalk 15/20
91
1.0
Detail Engineering Drawing
DA-2 DA-3 (DED)
DA-1
Pas. 1/2 Bata Merah
1:3 Plester 2 Sisi
DRAWING TITLE
Overhang Calsiplang t=20mm
Talang Air Hujan
Rencana Kuda-Kuda Atap

DA-2
Rangka Atap Web DIBUAT OLEH
1.628 1.513 1.718 1.513 1.628
Baja Ringan Kanal
8.000 C .75-0,75 TCT

Reng Baja Ringan 0,45 CTC


Pot. Rencana Kuda-Kuda
BENTUK Sekrup 12x20mm
KODE KETERANGAN Cahyani, ST.
PROFIL
Tim Leader
3,5
Rangka Atap Batang Tarik .
Baja Ringan Kanal STATUS
mm
CT.75
C TRUSS 75
C .75-0,75 TCT
7,5

tebal 0,75 mm SCALE 1:50, FILE NO : 1-DED


1:10
NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

RT.15 R TRUSS 15 mm Reviewed &


approved by

N
82VP2+CCV

DESCRIPTION

Bumbungan Atap
Bumbungan Atap DA-4 DA-3
Rangka Atap Web
Penutup Atap Spandek DA-5 Baja Ringan Kanal
Penutup Atap Spandek C .75-0,75 TCT
ps :
Semua dalam satuan ukuran MM, kecuali apabila
Sekrup 12x20mm Reng Baja Ringan 0,45 CTC ditampilkan berbeda
Reng Baja Ringan 0,45 CTC
APPROVAL
Corner Plat Sekrup 12x20mm

Reng Baja Ringan 0,45 CTC


Sekrup 12x20mm Rangka Atap Batang Tarik
Baja Ringan Kanal
C .75-0,75 TCT
Rangka Atap Top Chord REV
Baja Ringan Kanal
NOTES
Rangka Atap Top Chord C .75-0,75 TCT
Baja Ringan Kanal
C .75-0,75 TCT

40
PAGE TOTAL

INSTITUTION

Rencana Kuda-Kuda Atap 49


1:50,
1:10
GSEducationalVersion
1 2 3 1 2 3
8.000 8.000
4.000 4.000 675
2.605 1.395 4.000 2.530 1.470 4.000 PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022
1.075
PAKET KEGIATAN

A A A A
PENAMBAHAN GEDUNG
1.202 KANTOR DINAS PUPR
Prov. Sulawesi Barat

16
17
18
19
20
15
14
3.000
LOCATION
13
12
4.000 4.000
11
Kompleks Perkantoran
2.798 Gubernur, Rangas, Simboro,

10
9
8
7
6
5
4
3
Kec.Mamuju, Kab. Mamuju,
20R x 175 Sulawesi Barat
19G x 251
275 275
1.000
B B B B KETERANGAN

1.224
Detail Engineering Drawing
(DED)

11.000 11.000 11.000 11.000


4.000 1.550 4.000 DRAWING TITLE

UP
Rencana Titik Lampu
1
1.226 2
7.000

19G x 250
20R x 188
3
DIBUAT OLEH
C C
4
5
C C
6
7
8

3.000 3.000 3.000


9
Cahyani, ST.
Tim Leader
10
11

2
.
12
STATUS
D D
13
14
D D
1.800
1:100,
15
SCALE FILE NO : 1-DED
775 1.275 2.725 1.356 2.644 16
1:50
20
19
18
17
4.000 4.000
DOWN

NAME SIGN
4.000 1.925
8.000 DRAWING BY Ar. Chairunnisa, S.Ars

1 2 3 1 2 3
Reviewed &
1.350 750 1.374 approved by

N
82VP2+CCV

DESCRIPTION
Entrance
to Existing
Building

Denah R. Elektrikal & Titik Lampu Denah R. Elektrikal & Titik Lampu

Lt. 1 Lt. 2 ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

Fitting Downlight + Bohlam


Lampu 24 Watt : LED Ceiling Lamp Model 1

Downlight LED 13W ø 15cm


Surface Mounted

Saklar Tunggal : Ceiling Lamp Fluorescent


60x60 REV

NOTES
Saklar Ganda

Stop Kontak Type C


: Ceiling Lamp Fluorescent
2 Stop Kontak Type C 100x50
2 Gang

Stop Kontak AC

41
PAGE TOTAL

Lighting Panel/ : Suspended Lamp


Power Panel Fluorescent 150x30
INSTITUTION

Rencana Titik Lampu 49


1:100,
1:50
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
1 2 3 1 2 3 Prov. Sulawesi Barat
8.000 8.000
2.605 1.395 4.000 2.605 1.395 Sumur
4.000 LOCATION
Pipa ⌀3" disalurkan ke Resapan
Pipa Air Bersih ⌀3/4" sumur resapan Pipa ⌀3" disalurkan ke
Disalurkan Langsung septictank
Kompleks Perkantoran
BK BK BK BK BK
dari Toren ke Lt.1 Gubernur, Rangas, Simboro,
A A A A Kec.Mamuju, Kab. Mamuju,
KR
KR FD FD KR
Sulawesi Barat
WS KR FD FD WS
FT FT
1.202 FT 1.202 FT

JS JS JS JS
KETERANGAN
16
17
18
19
20

15
14
Detail Engineering Drawing
KS 13
12
4.000 KS
4.000 (DED)
11
2.798 2.798
10
9
8
7
6
5
4
3

DRAWING TITLE
20R x 175
275 275 19G x 251 Tower Tank 275 275
BK BK BK

Kap. 1200 Liter Rencana Air Bersih & Air Kotor


B B B B
Pipa Air Bersih ⌀3/4"
1.224 1.224

Dari Sumber Air


Disalurkan Langsung DIBUAT OLEH
dari Toren ke Lt.1

⌀3/4
11.000 11.000 11.000 11.000
4.000 1.550 4.000 1.550

Cahyani, ST.
Tim Leader
1.226 1.226
.
STATUS
C C C C
SCALE 1:100 FILE NO : 1-DED

NAME SIGN

3.000 3.000 3.000 3.000 Septictank DRAWING BY Ar. Chairunnisa, S.Ars


Existing
Reviewed &
approved by

N
82VP2+CCV
D D D D
DESCRIPTION
775 1.275 2.725 1.319 2.681 775 1.275 2.725 1.319 2.681
4.000 4.000 4.000 4.000
8.000 8.000
1 2 3 1 2 3

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV
Denah Rencana Air Bersih Denah Rencana Air Kotor
NOTES

42
PAGE TOTAL

INSTITUTION

Rencana Air Bersih & Air 49


Kotor 1:100

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

1.500
KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Detail Menara Tandon

2.155
DIBUAT OLEH

Rangka Besi
2.150 650 1.500
Cahyani, ST.
Tim Leader

.
STATUS

SCALE 1:25 FILE NO : 1-DED

4.500 NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION
2.150

Denah Tandon Air


2.345
ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

1.500
43
PAGE TOTAL

INSTITUTION
2.149
Detail Menara Tandon 49
1:25

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Detail Septictank & Sumur Resapan

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

44
PAGE TOTAL

INSTITUTION

Detail Septictank & Sumur 49


Resapan

GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Axonometry 3D

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

45
PAGE TOTAL

INSTITUTION

Axonometry 3D 49
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Axonometry 3D

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

46
PAGE TOTAL

INSTITUTION

Axonometry 3D 49
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Axonometry 3D

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

47
PAGE TOTAL

INSTITUTION

Axonometry 3D 49
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Axonometry 3D

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

48
PAGE TOTAL

INSTITUTION

Axonometry 3D 49
GSEducationalVersion
PEMERINTAH PROVINSI SULAWESI BARAT
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2022

PAKET KEGIATAN

PENAMBAHAN GEDUNG
KANTOR DINAS PUPR
Prov. Sulawesi Barat

LOCATION

Kompleks Perkantoran
Gubernur, Rangas, Simboro,
Kec.Mamuju, Kab. Mamuju,
Sulawesi Barat

KETERANGAN

Detail Engineering Drawing


(DED)

DRAWING TITLE

Axonometry 3D

DIBUAT OLEH

Cahyani, ST.
Tim Leader

.
STATUS

SCALE FILE NO : 1-DED

NAME SIGN

DRAWING BY Ar. Chairunnisa, S.Ars

Reviewed &
approved by

N
82VP2+CCV

DESCRIPTION

ps :
Semua dalam satuan ukuran MM, kecuali apabila
ditampilkan berbeda

APPROVAL

REV

NOTES

49
PAGE TOTAL

INSTITUTION

Axonometry 3D 49
GSEducationalVersion

Anda mungkin juga menyukai