Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
PEKERJAAN PERSIAPAN 0.00 0.00 0.00 0.00 0.00
Pekerjan Pembuatan Dirm2 30.00 300,000.00 11.00 990,000.00 9,990,000.00
Papan nama proyek unit 1.00 350,000.00 11.00 38,500.00 388,500.00
Mobilisasi, Demobilisasls 1.00 1,500,000.00 11.00 165,000.00 1,665,000.00
Pekerjaan Pengukuran sls 1.00 4,500,000.00 11.00 495,000.00 4,995,000.00
PEKERJAAN SMKK 0.00 0.00 0.00 0.00 0.00
Penyiapan RK3K terdiri Set 1.00 2,000,000.00 11.00 220,000.00 2,220,000.00
Pembuatan Kartu Identit Org 40.00 25,000.00 11.00 110,000.00 1,110,000.00
Papan Informasi K3. bh 1.00 500,000.00 11.00 55,000.00 555,000.00
Topi Pelindung (Safety bh 45.00 50,000.00 11.00 247,500.00 2,497,500.00
Sarung Tangan (Safety psg 40.00 35,000.00 11.00 154,000.00 1,554,000.00
Sepatu Keselamatan (Sapsg 5.00 250,000.00 11.00 137,500.00 1,387,500.00
Rompi Keselamatan (Safbh 40.00 50,000.00 11.00 220,000.00 2,220,000.00
Personil K3 terdiri atas OB 3.00 3,700,000.00 11.00 1,221,000.00 ###
Fasilitas sarana keseha ls 1.00 3,000,000.00 11.00 330,000.00 3,330,000.00
PEKERJAAN PEMBUATAN DRAINA 0.00 0.00 0.00 0.00 0.00
Pengukuran & bouwplam 1,520.00 64,755.04 11.00 ### ###
Galian tanah m3 1,398.40 114,380.00 11.00 ### ###
Pasangan batu 1 4 m3 1,398.40 1,093,344.00 11.00 ### ###
Pekerjaan Lean Concretm3 121.60 1,428,660.62 11.00 ### ###
Plesteran 1 Pc 3 Ps teb m2 927.20 93,023.56 11.00 9,487,658.93 ###