1,073,433,806.03
REKAPITULASI
Rehabilitasi Ruang Kelas Beserta Perabotnya SMP NEGERI 31 (DAK FISIK)
TH. ANGG 2021
B.6 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG Rp 18,365,351.64 1.882 0.941 0.941
C.6 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG Rp 10,876,431.52 1.115 0.557 0.557
D.4 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG Rp 16,662,406.80 1.707 0.854 0.854
JUMLAH Rp 975,848,914.57 100.000 0.582 1.525 0.943 6.366 6.366 8.071 8.787 8.752 10.670 7.376 8.180 5.102 7.857 9.941 8.828 0.653
0.582 2.106 3.049 9.416 15.782 23.853 32.640 41.392 52.062 59.438 67.618 72.720 80.577 90.518 99.347 100.000
..................................
Direktur
BILL OF QUANTITY
(BOQ)
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
A. PEKERJAAN PERSIAPAN
A.1 Papan nama proyek bh 1.00 200,000.00 200,000.00
A.2 Pengukuran lahan ls 1.00 500,000.00 500,000.00
A.3 Administrasi dan dokumentasi ls 1.00 1,000,000.00 1,000,000.00
A.4 Mobilisasi dan biaya angkut bahan material ls 1.00 1,000,000.00 1,000,000.00
A.5 Biaya SMK3 (Alat Pelindung Kerja, APD, Rambu-rambu)
Penyiapan RKK
Sosialisasi,Promosi dan
Alat Pelindung Kerja dan Pelindung Diri
Helm bh 35.00 52,000.00 1,820,000.00
Sarung Tangan psng 37.00 5,000.00 185,000.00
Rompi bh 35.00 22,000.00 770,000.00
Sepatu Psng 35.00 125,000.00 4,375,000.00
Garis Pengaman Ls 4.00 500,000.00 2,000,000.00
Asuransi dan Perizinan
Personil Keselamatan Kontruksi
Fasilitas Sarana, Prasarana dan alat Kesehatan
Peralatan P3K Ls 4.00 500,000.00 2,000,000.00
Masker Pcs 35.00 30,000.00 1,050,000.00
Thermogun bh 4.00 150,000.00 600,000.00
Sabun Cuci Tangan gln 4.00 50,000.00 200,000.00
Hand Sanitizer gln 4.00 95,000.00 380,000.00
Disinfektan gln 4.00 50,000.00 200,000.00
Rambu - Rambu Yang Diperlukan
Rambu Petunjuk bh 5.00 50,000.00 250,000.00
Rambu peringatan bh 5.00 50,000.00 250,000.00
Rambu Informasi bh 5.00 50,000.00 250,000.00
Konsultansi Dengan Ahli Terkait
Keselamatan Konstruksi
Kegiatan dan Peralatan Terkait Dengan Pengendalian Resiko Keselamatan Konstruksi
JUMLAH PEKERJAAN PERSIAPAN 17,030,000.00
B. PEKERJAAN REHABILITASI 4 RUANG KELAS LANTAI 2 (LOKASI 1)
B.1 PEKERJAAN BONGKARAN
Pekerjaan bongkaran tidak dipakai kembali
B.1.1 Bongkaran atap genteng dan bubung m2 598.50 4,620.00 2,765,070.00
B.1.2 Bongkaran rangka atap m2 598.50 20,762.00 12,426,057.00
B.1.3 Bongkaran kuda-kuda / gording / balok kayu m3 6.04 1,065,900.00 6,438,036.00
B.1.4 Bongkaran plafond m2 379.48 18,122.00 6,876,936.56
B.1.5 Bongkaran lantai keramik m2 335.64 8,745.00 2,935,171.80
B.1.6 Bongkaran plesteran rusak / cacat m2 10.00 11,550.00 115,500.00
B.1.7 Bongkaran daun pintu m2 13.58 291,830.00 3,963,051.40
B.1.8 Bongkaran daun jendela dan kaca rusak / cacat m2 3.78 291,830.00 1,103,117.40
B.1.9 Bongkaran kusen pintu dan jendela rusak / cacat m3 0.08 1,065,900.00 85,272.00
B.1.10 Bongkaran papan jalusi rusak / cacat ml 5.00 20,000.00 100,000.00
JUMLAH PEKERJAAN BONGKARAN 36,808,212.16
B.2 PEKERJAAN ATAP
B.2.1 Kuda-kuda baja ringan (SNI, Bergaransi, Perhitungan Struktur) m2 598.50 146,500.00 87,680,250.00
B.2.2 Genteng metalroof berpasir m2 598.50 152,900.00 91,510,650.00
B.2.3 Nok genteng metalroof berpasir ml 37.00 165,200.00 6,112,400.00
B.2.4 Listplank (Kalsiplank) ml 74.00 53,570.00 3,964,180.00
B.2.5 Talang jurai plat seng BJLS berikut rangka ml 8.00 184,930.00 1,479,440.00
JUMLAH PEKERJAAN ATAP 190,746,920.00
B.3 PEKERJAAN PLESTERAN DAN ACIAN
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
B.3.1 Plesteran dinding 1PC : 5PS m2 10.00 63,539.00 635,390.00
B.3.2 Acian dinding 1PC : 5PS m2 10.00 50,798.00 507,980.00
JUMLAH PEKERJAAN PLESTERAN DAN ACIAN 1,143,370.00
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
B.4 PEKERJAAN PLAFOND
B.4.1 Rangka plafond besi hollow m2 379.48 126,406.00 47,968,548.88
B.4.2 Penutup plafond gypsum m2 379.48 50,924.00 19,324,639.52
B.4.3 List plafond gypsum ml 280.10 25,418.00 7,119,581.80
JUMLAH PEKERJAAN PLAFOND 74,412,770.20
B.5 PEKERJAAN LANTAI
B.5.1 Keramik Lantai 40x40 cm, dalam m2 254.34 241,169.00 61,338,923.46
B.5.2 Keramik Lantai 40x40 cm, luar m2 70.30 241,169.00 16,954,180.70
B.5.3 Keramik Lantai 40x40 cm, tangga m2 11.00 241,169.00 2,652,859.00
JUMLAH PEKERJAAN LANTAI 80,945,963.16
B.6 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
B.6.1 Perbaikan dan penggantian kusen pintu dan jendela rusak / m3 9,250,000.00 740,000.00
cacat 5x14 cm kayu borneo super 0.08
B.6.2 Daun pintu panel solid kayu borneo super m2 13.58 825,000.00 11,203,500.00
B.6.3 Kunci pintu + handle bh 5.00 345,620.00 1,728,100.00
B.6.4 Engsel pintu 4 inch bh 18.00 59,017.00 1,062,306.00
B.6.5 Kunci slot tanam pintu (Espagnolet) bh 5.00 75,207.00 376,035.00
B.6.6 Plat baja tekuk tebal 5 mm pembungkus kunci pada pintu kg 19.50 31,720.00 618,540.00
B.6.7 Daun jendela, kayu borneo super m2 1.68 433,048.00 727,520.64
B.6.8 Engsel daun jendela bh 12.00 41,500.00 498,000.00
B.6.9 Kunci slot daun jendela bh 6.00 51,500.00 309,000.00
B.6.10 Hak kait angin daun jendela bh 6.00 35,000.00 210,000.00
B.6.11 Kaca polos 5 mm m2 2.10 128,500.00 269,850.00
B.6.12 Perbaikan dan penggantian papan jalusi kayu ml 5.00 124,500.00 622,500.00
JUMLAH PEKERJAAN KUSEN DAN ALAT PENGGANTUNG 18,365,351.64
B.7 PEKERJAAN ELEKTRIKAL
B.7.1 Instalasi titik lampu ttk 29.00 151,340.00 4,388,860.00
B.7.2 Instalasi titik daya / stop kontak ttk 40.00 160,707.00 6,428,280.00
B.7.3 Armamatur stop kontak bh 40.00 51,500.00 2,060,000.00
B.7.4 Armamatur sakelar tunggal bh 1.00 25,712.00 25,712.00
B.7.5 Armamatur sakelar ganda bh 8.00 31,762.00 254,096.00
B.7.6 Lampu TL 1x36 watt, Philips bh 24.00 196,515.00 4,716,360.00
B.7.7 Lampu SL 36 watt, Philips bh 5.00 90,007.00 450,035.00
B.7.8 Pekerjaan panel distribusi ls 1.00 925,000.00 925,000.00
JUMLAH PEKERJAAN ELEKTRIKAL 19,248,343.00
B.8 PEKERJAAN PENGECATAN
B.8.1 Pengecatan dinding dan kolom exposed, Vinilex m2 655.07 21,500.00 14,084,005.00
B.8.2 Pengecatan plafond, balok, dan plat exposed, Vinilex m2 379.48 32,500.00 12,333,100.00
B.8.3 Pengecatan kusen pintu, jendela, dan bouvenlight kayu Avian m2 146.13 43,087.00 6,296,303.31
JUMLAH PEKERJAAN PENGECATAN 32,713,408.31
B.9 PEKERJAAN MEBELER
B.9.1 Pekerjaan meja, kursi, dan perabot lainya (Mebeler) kebutuha kls 4.00 21,500,000.00 86,000,000.00
JUMLAH PEKERJAAN MEBELER 86,000,000.00
C. PEKERJAAN REHABILITASI 2 RUANG KELAS LANTAI 2 (LOKASI 2)
C.1 PEKERJAAN BONGKARAN
Pekerjaan bongkaran tidak dipakai kembali
C.1.1 Bongkaran atap genteng dan bubung m2 292.50 4,620.00 1,351,350.00
C.1.2 Bongkaran rangka atap m2 292.50 20,762.00 6,072,885.00
C.1.3 Bongkaran kuda-kuda / gording / balok kayu m3 3.91 1,065,900.00 4,167,669.00
C.1.4 Bongkaran plafond m2 222.17 18,122.00 4,026,164.74
C.1.5 Bongkaran lantai keramik m2 155.89 8,745.00 1,363,258.05
C.1.6 Bongkaran plesteran rusak / cacat m2 10.00 11,550.00 115,500.00
C.1.7 Bongkaran daun pintu m2 6.41 291,830.00 1,870,630.30
C.1.8 Bongkaran daun jendela dan kaca rusak / cacat m2 6.17 291,830.00 1,800,591.10
C.1.9 Bongkaran kusen pintu dan jendela rusak / cacat m3 0.08 1,065,900.00 85,272.00
C.1.10 Bongkaran papan jalusi rusak / cacat ml 5.00 20,000.00 100,000.00
JUMLAH PEKERJAAN BONGKARAN 20,953,320.19
C.2 PEKERJAAN ATAP
C.2.1 Kuda-kuda baja ringan (SNI, Bergaransi, Perhitungan Struktur) m2 292.50 146,500.00 42,851,250.00
C.2.2 Genteng metalroof berpasir m2 292.50 152,900.00 44,723,250.00
C.2.3 Nok genteng metalroof berpasir ml 23.00 165,200.00 3,799,600.00
C.2.4 Listplank (Kalsiplank) ml 70.22 53,570.00 3,761,685.40
JUMLAH PEKERJAAN ATAP 95,135,785.40
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
C.3 PEKERJAAN PLESTERAN DAN ACIAN
C.3.1 Plesteran dinding 1PC : 5PS m2 10.00 63,539.00 635,390.00
C.3.2 Acian dinding 1PC : 5PS m2 10.00 50,798.00 507,980.00
JUMLAH PEKERJAAN PLESTERAN DAN ACIAN 1,143,370.00
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
C.4 PEKERJAAN PLAFOND
C.4.1 Rangka plafond besi hollow m2 222.17 126,406.00 28,083,621.02
C.4.2 Penutup plafond gypsum m2 222.17 50,924.00 11,313,785.08
C.4.3 List plafond gypsum ml 188.10 25,418.00 4,781,125.80
JUMLAH PEKERJAAN PLAFOND 44,178,531.90
C.5 PEKERJAAN LANTAI
C.5.1 Keramik Lantai 40x40 cm, dalam m2 121.24 241,169.00 29,239,329.56
C.5.2 Keramik Lantai 40x40 cm, luar m2 34.65 241,169.00 8,356,505.85
JUMLAH PEKERJAAN LANTAI 37,595,835.41
C.6 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
C.6.1 Perbaikan dan penggantian kusen pintu dan jendela rusak / m3 9,250,000.00 740,000.00
cacat 5x14 cm kayu borneo super 0.08
C.6.2 Daun pintu panel solid kayu borneo super m2 6.41 825,000.00 5,288,250.00
C.6.3 Kunci pintu + handle bh 2.00 345,620.00 691,240.00
C.6.4 Engsel pintu 4 inch bh 8.00 59,017.00 472,136.00
C.6.5 Kunci slot tanam pintu (Espagnolet) bh 2.00 75,207.00 150,414.00
C.6.6 Plat baja tekuk tebal 5 mm pembungkus kunci pada pintu kg 9.75 31,720.00 309,270.00
C.6.7 Daun jendela, kayu borneo super m2 1.49 433,048.00 645,241.52
C.6.8 Engsel daun jendela bh 16.00 41,500.00 664,000.00
C.6.9 Kunci slot daun jendela bh 8.00 51,500.00 412,000.00
C.6.10 Hak kait angin daun jendela bh 8.00 35,000.00 280,000.00
C.6.11 Kaca polos 5 mm m2 4.68 128,500.00 601,380.00
C.6.12 Perbaikan dan penggantian papan jalusi kayu ml 5.00 124,500.00 622,500.00
JUMLAH PEKERJAAN KUSEN DAN ALAT PENGGANTUNG 10,876,431.52
C.7 PEKERJAAN ELEKTRIKAL
C.7.1 Instalasi titik lampu ttk 17.00 151,340.00 2,572,780.00
C.7.2 Instalasi titik daya / stop kontak ttk 20.00 160,707.00 3,214,140.00
C.7.3 Armamatur stop kontak bh 20.00 51,500.00 1,030,000.00
C.7.4 Armamatur sakelar tunggal bh 1.00 25,712.00 25,712.00
C.7.5 Armamatur sakelar ganda bh 5.00 31,762.00 158,810.00
C.7.6 Lampu TL 1x36 watt, Philips bh 12.00 196,515.00 2,358,180.00
C.7.7 Lampu SL 36 watt, Philips bh 5.00 90,007.00 450,035.00
C.7.8 Pekerjaan panel distribusi ls 1.00 925,000.00 925,000.00
JUMLAH PEKERJAAN ELEKTRIKAL 10,734,657.00
C.8 PEKERJAAN PENGECATAN
C.8.1 Pengecatan dinding dan kolom exposed, Vinilex m2 400.76 21,500.00 8,616,340.00
C.8.2 Pengecatan plafond, balok, dan plat exposed, Vinilex m2 222.17 32,500.00 7,220,525.00
C.8.3 Pengecatan kusen pintu, jendela, dan bouvenlight kayu Avian m2 95.88 43,087.00 4,131,181.56
C.8.4 Pengecatan besi Avian m2 2.76 47,500.00 131,100.00
JUMLAH PEKERJAAN PENGECATAN 20,099,146.56
C.9 PEKERJAAN MEBELER
C.9.1 Pekerjaan meja, kursi, dan perabot lainya (Mebeler) kebutuha kls 2.00 21,500,000.00 43,000,000.00
JUMLAH PEKERJAAN MEBELER 43,000,000.00
D. PEKERJAAN REHABILITASI 2 RUANG KELAS LANTAI 1 (LOKASI 3)
D.1 PEKERJAAN BONGKARAN
Pekerjaan bongkaran tidak dipakai kembali
D.1.1 Bongkaran lantai keramik m2 159.95 8,745.00 1,398,762.75
D.1.2 Bongkaran plesteran rusak / cacat m2 10.00 11,550.00 115,500.00
D.1.3 Bongkaran daun pintu m2 8.24 291,830.00 2,404,679.20
D.1.4 Bongkaran kusen pintu dan jendela rusak / cacat m3 0.08 1,065,900.00 85,272.00
D.1.5 Bongkaran papan jalusi rusak / cacat ml 5.00 20,000.00 100,000.00
JUMLAH PEKERJAAN BONGKARAN 4,104,213.95
D.2 PEKERJAAN PLESTERAN DAN ACIAN
D.2.1 Plesteran dinding 1PC : 5PS m2 10.00 63,539.00 635,390.00
D.2.2 Acian dinding 1PC : 5PS m2 10.00 50,798.00 507,980.00
JUMLAH PEKERJAAN PLESTERAN DAN ACIAN 1,143,370.00
D.3 PEKERJAAN LANTAI
D.3.1 Keramik lantai 40x40 cm, dalam m2 121.24 241,169.00 29,239,329.56
D.3.2 Keramik lantai 40x40 cm, luar m2 38.70 241,169.00 9,333,240.30
JUMLAH PEKERJAAN LANTAI 38,572,569.86
Harga Jumlah
No, Uraian Pekerjaan Satuan Volume Satuan Harga
(Rp.) (Rp.)
D.4 PEKERJAAN KUSEN DAN ALAT PENGGANTUNG
D.4.1 Perbaikan dan penggantian kusen pintu dan jendela rusak / m3 9,250,000.00 740,000.00
cacat 5x14 cm kayu borneo super 0.08
D.4.2 Daun pintu panel solid kayu borneo super m2 8.24 825,000.00 6,798,000.00
D.4.3 Kunci pintu + handle bh 3.00 345,620.00 1,036,860.00
D.4.4 Engsel pintu 4 inch bh 15.00 59,017.00 885,255.00
D.4.5 Kunci slot tanam pintu (Espagnolet) bh 3.00 75,207.00 225,621.00
D.4.6 Plat baja tekuk tebal 5 mm pembungkus kunci pada pintu kg 14.63 31,720.00 464,063.60
D.4.7 Daun jendela, kayu borneo super m2 6.40 433,048.00 2,771,507.20
D.4.8 Engsel daun jendela bh 20.00 41,500.00 830,000.00
D.4.9 Kunci slot daun jendela bh 10.00 52,000.00 520,000.00
D.4.10 Hak kait angin daun jendela bh 10.00 53,500.00 535,000.00
D.4.11 Kaca polos 5 mm m2 9.60 128,500.00 1,233,600.00
D.4.12 Perbaikan dan penggantian papan jalusi kayu ml 5.00 124,500.00 622,500.00
JUMLAH PEKERJAAN KUSEN DAN ALAT PENGGANTUNG 16,662,406.80
D.5 PEKERJAAN ELEKTRIKAL
D.5.1 Instalasi titik lampu ttk 14.00 151,340.00 2,118,760.00
D.5.2 Instalasi titik daya / stop kontak ttk 20.00 160,707.00 3,214,140.00
D.5.3 Armamatur stop kontak bh 20.00 51,500.00 1,030,000.00
D.5.4 Armamatur sakelar ganda bh 4.00 31,762.00 127,048.00
D.5.5 Lampu TL 1x36 watt, Philips bh 12.00 196,515.00 2,358,180.00
D.5.6 Lampu SL 36 watt, Philips bh 2.00 90,007.00 180,014.00
D.5.7 Pekerjaan panel distribusi ls 1.00 925,000.00 925,000.00
JUMLAH PEKERJAAN ELEKTRIKAL 9,953,142.00
D.6 PEKERJAAN PENGECATAN
D.6.1 Pengecatan dinding dan kolom exposed, Vinilex m2 446.95 21,500.00 9,609,425.00
D.6.2 Pengecatan plafond, balok, dan plat exposed, Vinilex m2 216.00 32,500.00 7,020,000.00
D.6.3 Pengecatan kusen pintu, jendela, dan bouvenlight kayu Avian m2 91.73 43,087.00 3,952,370.51
JUMLAH PEKERJAAN PENGECATAN 20,581,795.51
D.7 PEKERJAAN MEBELER
D.7.1 Pekerjaan meja, kursi, dan perabot lainya (Mebeler) kebutuha kls 2.00 21,500,000.00 43,000,000.00
JUMLAH PEKERJAAN MEBELER 43,000,000.00
E. PEKERJAAN LAIN-LAIN
E.1 Pembersihan sisa pekerjaan dan buangan berangkal ke luar lo ls 1.00 700,000.00 700,000.00
JUMLAH PEKERJAAN LAIN-LAIN 700,000.00
JUMLAH TOTAL 975,848,914.57
PPn 10% 97,584,891.46
JUMLAH TOTAL 1,073,433,806.03
DIBULATKAN 1,073,433,000.00
TERBILANG : SATU MILYAR TUJUH PULUH TIGA JUTA TIGA RATUS DELAPAN PULUH SATU RIBU RUPIAH
..................................
Direktur
ANALISA HARGA SATUAN PEKERJAAN
Harga Satuan
No. Jenis Bahan Bangunan Sat.
( Rp. )
1 2 3 4
A BAHAN AGREGAT KASAR & BAHAN PEREKAT.
1 Pasir pasang m3 110,000.00
2 Semen Tiga Roda Kg 1,040.00
3 Semen putih Kg 1,700.00
4 Air Ltr 15.00
5 Lem putih fox kg 20,500.00
B BAHAN PENUTUP DINDING
1 Bata merah bakar kelas I bh 650.00
C BAHAN LOGAM
1 Kuda-kuda rangka Baja Ringan (Zinkalum) m2 205,000.00
2 Kuda-kuda rangka Baja Ringan (Galvalum) m2 210,000.00
3 Baja WF, Plat, Siku, C Lips dan INP kg 14,000.00
4 Besi Hollow 4x4 tebal 0,8 mm Bt 105,000.00
5 Besi Hollow 2x4 tebal 0,8 mm Bt 55,000.00
6 Seng plat BJLS 25 uk. 90 x 180 cm lbr 51,500.00
7 Seng plat BJLS 30 uk. 90 x 180 cm m' 71,500.00
8 Kawat beton kg 18,500.00
9 Paku 1 s/d 3 cm kg 19,500.00
10 Paku 4 s/d 7 cm kg 17,800.00
11 Paku uk. 8 s/d 12 cm kg 17,800.00
12 Angker Mur Baut dia. 19 mm panjang 60 cm bh 51,500.00
13 Mur Baut HTB dia. 10 mm s/d 16 mm panjang 5 cm bh 16,500.00
14 Mur Baut biasa dia. 10 mm s/d 16 mm panjang 5 cm bh 10,500.00
15 Piser dia. 12 cm s/d 20 cm bh 8,500.00
16 Paku gipsum anti karat ( 20.00 m2 / kg ) kg 20,500.00
17 Paku sekrup dus 10,500.00
D BAHAN PENGUNCI / PENGGANTUNG DAN KACA
1 Engsel pintu nylon 4" psg 27,500.00
2 Engsel jendela biasa psg 41,500.00
3 Engsel jendela biasa Casement 75,000.00
4 Engsel angin psg 28,500.00
5 Grendel jendela ( spring knip ) bh 10,500.00
6 Grendel pintu biasa ( selot ) bh 14,500.00
7 Grendel tanam pintu ganda ( espagnolet ) bh 33,500.00
8 Hak angin stainless bh 35,000.00
9 Kunci Tanam dekson bh 238,000.00
10 Kaca polos 5 mm m2 128,500.00
Harga Satuan
No. Jenis Bahan Bangunan Sat.
( Rp. )
1 2 3 4
E BAHAN KAYU / KAYU LAPIS DAN PLAFOND
1 Kayu balok Albasia m3 1,650,000.00
2 Kayu papan Albasia m3 1,750,000.00
3 Kayu Terentang m3 1,800,000.00
4 Kayu balok Borneo super m3 4,500,000.00
5 Kayu papan Borneo super ( Meranti ) uk. 3/20 cm m3 5,200,000.00
6 Kayu papan Borneo super ( Meranti ) uk. 3/30 cm m3 5,200,000.00
7 Kayu kaso Borneo , uk. 5/7 - 4. 00 m' m3 5,200,000.00
8 Dolken dia 5 s/d 7 cm btg 22,500.00
9 Dolken dia 8 s/d 10 cm btg 25,500.00
10 Multiplek 9 mm, uk. 1,20 x 2,40 lbr 125,000.00
11 Multiplek 12 mm, uk. 1,20 x 2,40 lbr 148,000.00
12 Play Wood 9 mm, uk. 1,20 x 2,40 lbr 125,000.00
13 Teakwood 3 mm, uk. 1,20 x 2,40 lbr 95,000.00
14 Teakwood 4 mm, uk. 1,20 x 2,40 lbr 105,000.00
15 Teakwood 3 mm, ukuran pintu lbr 85,000.00
16 Teakwood 4 mm, ukuran pintu lbr 96,000.00
17 Melamin 4 mm, uk. 1,20 x 2,40 lbr 127,500.00
18 Formika putih polos, uk. 1,20 x 2,40 lbr 127,500.00
19 Formika motif, ukuran pintu lbr 125,000.00
20 Gipsum 120 x 240 cm ex DN lbr 62,500.00
21 List profil kayu kamper 1 cm m' 3,800.00
22 List profil kayu kamper 2 cm m' 3,800.00
23 List profil kayu kamper 4 cm m' 5,500.00
24 List profil kayu kamper 5 cm m' 7,500.00
25 List profil kayu kamper 10 cm m' 20,500.00
26 List Gipsump 7 cm m' 6,500.00
F BAHAN PENUTUP ATAP
1 Bubung genteng metal Rainbow bh 78,500.00
2 Bubung genteng metal Sakura bh 95,000.00
G BAHAN PENUTUP LANTAI.
1 Keramik Lantai 40 x40 DN warna /corak, anti slip m2 55,000.00
H BAHAN FINISHING.
1 Cat dasar tembok, Indo 9000 Sealer Water Base kg 21,500.00
2 Cat dasar Kayu ltr 15,500.00
3 Cat tembok Sanlex gln 115,500.00
4 Cat tembok Vinilex gln 145,000.00
5 Cat kayu / besi Seiv kg 47,500.00
6 Cat kayu / besi Avian kg 47,500.00
7 Dempul tembok ( plamuur ) kg 14,500.00
8 Dempul kayu kg 20,500.00
9 Thiner A ltr 17,500.00
10 Kuas 3" bh 8,000.00
11 Kuas 4" bh 15,500.00
12 Rol cat bh 23,500.00
13 Ampelas lbr 4,500.00
Harga Satuan
No. Jenis Bahan Bangunan Sat.
( Rp. )
1 2 3 4
14 Minyak Bekisting ltr 15,500.00
15 Plamir Kg 15,500.00
Harga Satuan
No. Jenis Bahan Bangunan Sat.
( Rp. )
1 2 3 4
I BAHAN ELEKTRIKAL
1 NYM 3x2,5 sekualitas supreme m' 6,000.00
2 Solatif Kabel roll 7,500.00
3 Pipa Kabel btg 18,700.00
4 T-Doos bh 2,700.00
5 Inbow-doos bh 3,500.00
6 Stop Kontak, sekualitas Brocco bh 28,000.00
7 Stop Kontak Broco Waterproofing bh 35,000.00
8 Saklar tunggal, sekualitas Brocco bh 18,500.00
9 Saklar Double, sekualitas Brocco bh 23,500.00
10 Fiting lampu, sekualitas Brocco bh 15,500.00
11 Lampu SL 18 watt, sekualitas Philips bh 32,500.00
12 Lampu TL 36 Watt + aksesoris bh 70,000.00
13 Trafo lampu TL, sekualitas Philips bh 60,000.00
14 M C B 10 A bh 32,500.00
15 M C B 16 A bh 32,500.00
DAFTAR HARGA SATUAN UPAH
TAHUN ANGGARAN 2021
Harga Satuan
No. Jenis Pekerjaan Sat.
( Rp. )
1 2 3 4
1Pekerja Oh 125,000.00
2 Tukang Batu Oh 145,000.00
3 Kepala Tukang batu Oh 160,000.00
4 Tukang Kayu Oh 145,000.00
5 Kepala Tukang Kayu Oh 160,000.00
6 Tukang Besi profil / Tukang Las Oh 145,000.00
7 Kepala Tukang Besi Profil / Tukang Las Oh 160,000.00
8 Tukang Besi Beton Oh 145,000.00
9 Kepala Tukang Besi Beton Oh 160,000.00
10 Tukang Cat Oh 145,000.00
11 Kepala Tukang Cat Oh 160,000.00
12 Tukang Gali Oh 145,000.00
13 Kepala Tukang Gali Oh 160,000.00
14 Tukang Pipa Oh 145,000.00
15 Kepala Tukang Pipa Oh 160,000.00
16 Tukang Listrik Oh 145,000.00
17 Kepala Tukang Listrik Oh 160,000.00
18 M a n d o r Oh 170,000.00
19 Operator hari 170,000.00
20 Pembantu Operator hari 160,000.00
21 Sopir hari 160,000.00
22 Pembantu Sopir hari 140,000.00
23 Alat bantu ls 120,000.00