Anda di halaman 1dari 28

RENCANA ANGGARAN BIAYA (RAB)

INSTANSI :
KEGIATAN : PEMBANGUNAN GEDUNG PEMERINTAH
PEKERJAAN : PEMBANGUNAN BALAI RW.15 TEGALPANGGUNG
LOKASI : KEL. TEGALPANGGUNG, KEC. DANUREJAN KOTA YOGYAKARTA
TAHUN : 2019

HARGA SAT. TOTAL HARGA


No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)

I BIAYA PENYELENGGARAAN SMK3

1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 set 250,000.00 250,000.00
2 Spanduk (banner) 1.00 bh 150,000.00 150,000.00
3 Papan Informasi K3 1.00 bh 350,000.00 350,000.00
5 Pagar Pengaman Sementara dari Seng Gelombang tinggi 2 m (sewa) 1.00 ls 2,500,000.00 2,500,000.00
6 Sewa Topi Pelindung (Safety Helmet) 15.00 bh 25,000.00 375,000.00
7 Sewa Pelindung Mata (Goggles, Spectacles) 1.00 bh 15,000.00 15,000.00
8 Sewa Tameng Muka (Face Shield) 1.00 bh 40,000.00 40,000.00
9 Pelindung Telinga (Ear Plug, Ear Muff) 1.00 psg 25,000.00 25,000.00
10 Pelindung Pernafasan Dan Mulut (Masker) 15.00 dus 20,000.00 300,000.00
11 Sarung Tangan (Safety Gloves) 15.00 psg 5,000.00 75,000.00
Sewa Sepatu Keselamatan (Rubber Safety Shoes_and
12 15.00 psg 50,000.00 750,000.00
toe cap)
13 Sewa Penunjang Seluruh Tubuh (Full Body Harness) 2.00 bh 200,000.00 400,000.00
16 Peralatan P3K (Kotak P3K, Obat Luka, Perban, Alkohol, Kapas) 1.00 ls 150,000.00 150,000.00
17 Rambu Petunjuk 1.00 bh 50,000.00 50,000.00
18 Rambu Larangan 1.00 bh 50,000.00 50,000.00
19 Rambu Peringatan 1.00 bh 50,000.00 50,000.00
20 Rambu Kewajiban 1.00 bh 50,000.00 50,000.00
21 Rambu Informasi 1.00 bh 50,000.00 50,000.00
22 Rambu Pekerjaan Sementara 1.00 bh 50,000.00 50,000.00
23 Alat Pemadam Api Ringan (APAR) 2.00 bh 1,000,000.00 2,000,000.00
24 Bendera K3 1.00 bh 50,000.00 50,000.00
SUB JUMLAH 7,730,000.00

II PEKERJAAN PERSIAPAN

A PEKERJAAN PERSIAPAN
1 Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 1.00 Unit 377,707.00 377,707.00
2 Pembersihan lokasi awal dan akhir 1.00 Ls 3,000,000.00 3,000,000.00
3 Uizet dan Bowplang 1.00 Ls 1,250,000.00 1,250,000.00
SUB JUMLAH 4,627,707.00

III PEKERJAAN PEMBANGUNAN LANTAI 1


A PEKERJAAN GALIAN
1 Galian tanah biasa footplat 46.51 m3 78,853.00 3,667,453.03
2 Galian tanah biasa sedalam 1 m 57.02 m3 64,432.00 3,673,912.64
3 Urug pasir bawah pondasi dan bawah lantai 13.67 m3 190,773.00 2,607,866.91
4 Urugan tanah kembali 23.25 m3 46,365.00 1,077,986.25
5 Urug Tanah Peninggian Lantai 44.38 m3 46,365.00 2,057,678.70
SUB JUMLAH 13,084,897.53
B PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali campuran 1 SP :8 PP 30.43 m3 771,182.00 23,467,068.26
2 Pasangan dinding 1/2 bata transram 1 SP : 3 PP (trasram) 22.19 m2 119,465.00 2,650,928.35
3 Pasangan dinding 1/2 bata 1 SP : 6 PP 196.48 m2 114,790.00 22,553,939.20
4 Plesteran dinding bata 1pc : 3ps (Trasram ) 44.38 m2 56,134.00 2,491,226.92
5 Plesteran dinding bata 1pc : 6ps 392.96 m2 53,318.00 20,951,841.28
6 Penebalan Dinding Teras pasangan 1/4 bata 1.86 m2 83,385.00 155,096.10
7 Plesteran beton 1pc: 3 ps 71.08 m2 56,134.00 3,990,004.72
8 Pekerjaan Acian MU 200 Skinwall 506.58 m2 37,147.00 18,817,927.26
9 Pasang Sponengan Sudut 296.75 m' 32,383.00 9,609,655.25
SUB JUMLAH 104,687,687.34
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
C PEKERJAAN BETON
1 Lantai Kerja bawah pondasi & Lantai fc 7,4 Mpa 13.67 m3 716,761.00 9,798,122.87

2 Pondasi Footplat F.1


* Beton mutu f’c = 19,3 Mpa 3.60 m3 893,160.00 3,215,376.00
* Besi Ulir 619.79 kg 13,742.00 8,517,154.18
* Begisting Pasangan Batako 1.32 m2 105,165.00 138,817.80

3 Pondasi Footplat F.2


* Beton mutu f’c = 19,3 Mpa 0.72 m3 893,160.00 643,075.20
* Besi Ulir 102.21 kg 13,742.00 1,404,569.82
* Begisting Pasangan Batako 1.92 m2 105,165.00 201,916.80

4 Pondasi Footplat F.3


* Beton mutu f’c = 19,3 Mpa 1.20 m3 893,160.00 1,071,792.00
* Besi Ulir 195.25 kg 13,742.00 2,683,125.50
* Begisting Pasangan Batako 1.92 m2 105,165.00 201,916.80

5 Pondasi Footplat F.4


* Beton mutu f’c = 19,3 Mpa 1.08 m3 893,160.00 964,612.80
* Besi Ulir 156.49 kg 13,742.00 2,150,485.58
* Begisting Pasangan Batako 1.92 m2 105,165.00 201,916.80

6 Sloof S.1 150/200 mm -


* Beton mutu f’c = 19,3 Mpa 5.33 m3 893,160.00 4,760,542.80
* Besi Ulir 413.62 kg 13,742.00 5,683,966.04
Besi polos 221.52 kg 13,164.00 2,916,089.28
* Begisting pemakaian 2x 53.38 m2 155,432.00 8,296,960.16
* Bongkaran begisting dengan hati hati 53.38 m2 8,771.00 468,195.98

7 Kolom K.1 200/300 mm -


* Beton mutu f’c = 19,3 Mpa 3.26 m3 893,160.00 2,911,701.60
* Besi Ulir 909.69 kg 13,742.00 12,500,959.98
* Besi polos 139.25 kg 13,164.00 1,833,087.00
* Begisting pemakaian 2x 54.45 m2 244,630.00 13,320,103.50
* Bongkaran begisting dengan hati hati 54.45 m2 8,771.00 477,580.95
-
8 Kolom K.2 150/400 mm -
* Beton mutu f’c = 19,3 Mpa 2.67 m3 893,160.00 2,384,737.20
* Besi Ulir 744.29 kg 13,742.00 10,228,033.18
* Besi polos 126.59 kg 13,164.00 1,666,430.76
* Begisting pemakaian 2x 49.00 m2 244,630.00 11,986,870.00
* Bongkaran begisting dengan hati hati 49.00 m2 8,771.00 429,779.00

9 Kolom Kp 110/110 6.82 m1 74,850.00 510,477.00

10 Balok B.1 200/400 -


* Beton mutu f’c = 19,3 Mpa 3.35 m3 893,160.00 2,992,086.00
* Besi Ulir 460.21 kg 13,742.00 6,324,205.82
* Besi polos 227.00 kg 13,164.00 2,988,228.00
* Begisting pemakaian 2x 41.97 m2 247,380.00 10,382,538.60
* Bongkaran begisting dengan hati hati 41.97 m2 8,771.00 368,118.87

11 Balok B.2 150/350 -


* Beton mutu f’c = 19,3 Mpa 1.96 m3 893,160.00 1,750,593.60
* Besi Ulir 321.96 kg 13,742.00 4,424,374.32
* Besi polos 156.35 kg 13,164.00 2,058,191.40
* Begisting pemakaian 2x 31.74 m2 247,380.00 7,851,841.20
* Bongkaran begisting dengan hati hati 31.74 m2 8,771.00 278,391.54

12 Balok B.3 150/500 -


* Beton mutu f’c = 19,3 Mpa 0.52 m3 893,160.00 464,443.20
* Besi Ulir 55.23 kg 13,742.00 758,970.66
* Besi polos 40.74 kg 13,164.00 536,301.36
* Begisting pemakaian 2x 8.05 m2 247,380.00 1,991,409.00
* Bongkaran begisting dengan hati hati 8.05 m2 8,771.00 70,606.55
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
13 Balok B.4 150/200 -
* Beton mutu f’c = 19,3 Mpa 0.32 m3 893,160.00 285,811.20
* Besi polos 40.20 kg 13,164.00 529,192.80
* Begisting pemakaian 2x 5.92 m2 247,380.00 1,464,489.60
* Bongkaran begisting dengan hati hati 5.92 m2 8,771.00 51,924.32

14 Balok Konsol BK.1 150/350 -


* Beton mutu f’c = 19,3 Mpa 0.17 m3 893,160.00 151,837.20
* Besi ulir 32.74 kg 13,742.00 449,913.08
* Besi polos 20.98 kg 13,164.00 276,180.72
* Begisting pemakaian 2x 2.89 m2 247,380.00 714,928.20
* Bongkaran begisting dengan hati hati 2.89 m2 8,771.00 25,348.19

15 Balok Konsol BK.2 150/350 -


* Beton mutu f’c = 19,3 Mpa 0.04 m3 893,160.00 35,726.40
* Besi ulir 7.49 kg 13,742.00 102,927.58
* Besi polos 5.07 kg 13,164.00 66,741.48
* Begisting pemakaian 2x 0.72 m2 247,380.00 178,113.60
* Bongkaran begisting dengan hati hati 0.72 m2 8,771.00 6,315.12

16 Balok Latiu BL 110/110 12.55 m3 177,644.00 2,229,432.20

17 Beton Plat lantai 2


* Beton mutu f’c = 19,3 Mpa 4.18 m3 893,160.00 3,733,408.80
* Besi 440.01 kg 13,164.00 5,792,291.64
* Begisting 34.85 m2 412,517.00 14,376,217.45
* Bongkaran begisting 34.85 m2 3,709.00 129,258.65

18 Beton Plat tangga


* Beton mutu f’c = 19,3 Mpa 0.66 m3 893,160.00 589,485.60
* Besi ulir 97.72 kg 13,742.00 1,342,868.24
Besi polos 52.46 kg 13,164.00 690,583.44
* Begisting 7.15 m2 378,940.00 2,709,421.00
* Bongkaran begisting 7.15 m2 3,709.00 26,519.35

19 Beton Plat Meja Daur


* Beton mutu f’c = 14.5 Mpa 0.06 m3 858,962.00 51,537.72
* Besi 5.52 kg 13,164.00 72,665.28
* Begisting 0.95 m2 164,195.00 155,985.25
* Bongkaran begisting 0.95 m2 3,709.00 3,523.55

SUB JUMLAH 191,051,344.36

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm polish 165.00 m2 208,708.00 34,436,820.00
2 Pekerjaan Pemasangan keramik tangga 40/40 cm polish 7.75 m2 208,708.00 1,617,487.00
3 Pekerjaan Pemasangan Plin keramik lantai dan tangga 9/40 cm 66.40 m 29,602.00 1,965,572.80
4 Pekerjaan Pemasangan Lantai keramik kamar mandi 25/25 cm 2.50 m2 213,214.00 533,035.00
5 Pekerjaan Pemasangan keramik dinding kamar mandi 25/40 cm 9.28 m2 239,948.00 2,226,717.44
6 Pekerjaan Pemasangan keramik dinding dan meja dapur 1.62 m2 239,948.00 388,715.76
7 Step Nousing Tangga 8x40 cm 17.00 m 59,994.00 1,019,898.00
SUB JUMLAH 42,188,246.00

E PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pembuatan pintu P.1 1.00 unit 13,695,723.00 13,695,723.00
2 Pembuatan pintu P.2 2.00 unit 6,455,983.00 12,911,966.00
3 Pembuatan pintu P.3 1.00 unit 1,796,570.00 1,796,570.00
4 Pembuatan pintu P.4 ( Pintu Panel UPVC) 1.00 unit 2,500,000.00 2,500,000.00
5 Pembuatan Teralis TR.1 termasuk cat 1.20 m2 400,000.00 480,000.00
6 Pembuatan Teralis TR.2 termasuk cat 1.24 m2 400,000.00 496,000.00
7 Penutup Rel pintu geser 3.68 m2 845,351.00 3,110,891.68
34,991,150.68
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 26.00 m2 124,023.00 3,224,598.00
2 Memasang langit-langit GRCboard tebal 6 mm + rangka hollow 11.30 m2 140,743.00 1,590,395.90
3 List Gypsum 5-10 cm 70.10 m 36,487.00 2,557,738.70
SUB JUMLAH 7,372,732.60
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 324.28 m2 26,108.00 8,466,302.24
2 Pengecatan tembok tidak terlindung dari panas dan hujan 182.30 m2 41,195.00 7,509,848.50
3 Pengecatan Plafond 37.30 m2 9,790.00 365,167.00
SUB JUMLAH 16,341,317.74
I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 16.00 titik 175,000.00 2,800,000.00
2 Instalasi Titik stop kontak 4.00 titik 200,000.00 800,000.00
3 fiting lampu downlight 5" 7.00 bh 75,000.00 525,000.00
4 Fiting lampu tempel 3.00 bh 20,000.00 60,000.00
5 Lampu TL LED 2x18 w TKO + Fiting 6.00 bh 150,000.00 900,000.00
6 Lampu LED 13 w Philips 10.00 bh 85,000.00 850,000.00
7 Saklar dobel 4.00 bh 35,000.00 140,000.00
8 Saklar tunggal 5.00 bh 25,000.00 125,000.00
9 Stop kontak 4.00 bh 30,000.00 120,000.00
10 Pemasangan Box Presto isi 4 + aksesoris 1.00 ls 55,000.00 55,000.00
11 MCB 6 A MG 6.00 bh 55,000.00 330,000.00
12 Kabel Tovoer NYY 3x4 1.00 m 17,000.00 17,000.00
13 Pasang daya Listrik Baru termasuk SLO 2200.00 Va 1,500.00 3,300,000.00
SUB JUMLAH 10,022,000.00

J PEKERJAAN PLUMBING
1 Pemasangan Closet Jongkok 1.00 bh 655,028.00 655,028.00
2 Pemasangan Kichenzink 1.00 bh 520,481.00 520,481.00
3 Keran 1/2 " 1.00 bh 160,000.00 160,000.00
4 Floor Drain 1.00 bh 95,000.00 95,000.00
5 Keran sink dapur 1.00 bh 280,000.00 280,000.00
6 Instalasi air bersih pipa 1" distribusi 12.00 m 27,266.00 327,192.00
7 Instalasi air bersih pipa 3/4" 12.00 m 22,588.00 271,056.00
8 Instalasi air bekas pipa 3" 15.00 m 91,647.00 1,374,705.00
9 Instalasi air bekas pipa 4" 15.00 m 137,016.00 2,055,240.00
10 Instalasi air hujan pipa 4" 84.00 m 137,016.00 11,509,344.00
11 Bak kontrol 4.00 unit 607,861.00 2,431,444.00
12 Pembuatan Septic Tank 1.00 Unit 4,500,000.00 4,500,000.00
13 Pembuatan Sumur Resapan dalam 3 m+ plat beton penutup 5.00 bh 1,356,241.00 6,781,205.00
14 Pompa Air Shimitsu 1.00 bh 750,000.00 750,000.00
SUB JUMLAH 31,710,695.00

IV PEKERJAAN PEMBANGUNAN LANTAI 2


A PEKERJAAN URUG PASIR
1 Urug pasir bawah lantai 1.85 m3 190,773.00 352,930.05
SUB JUMLAH 352,930.05
B PEKERJAAN PASANGAN
1 Pasangan dinding 1/2 bata 1 SP : 6 PP 293.77 m2 114,790.00 33,721,858.30
2 Plesteran dinding bata 1pc : 6ps 559.35 m2 53,318.00 29,823,423.30
3 Plesteran beton 1pc: 3 ps 84.68 m2 56,134.00 4,753,427.12
4 Pekerjaan Acian MU 200 Skinwall 644.03 m2 37,147.00 23,923,782.41
5 Pasang Sponengan Sudut 492.80 m' 32,383.00 15,958,342.40
6 Screeding dan leveling atap Beton dan talang beton t.3 cm 25.80 m2 69,747.00 1,799,472.60
SUB JUMLAH 109,980,306.13
C PEKERJAAN BETON

1 Kolom K.1 20x30 cm -


* Beton mutu f’c = 19,3 Mpa 3.10 m3 893,160.00 2,768,796.00
* Besi Ulir 874.97 kg 13,742.00 12,023,837.74
* Besi Polos 132.41 kg 13,164.00 1,743,045.24
* Begisting pemakaian 2x 51.70 m2 244,630.00 12,647,371.00
* Bongkaran begisting dengan hati hati 51.70 m2 8,771.00 453,460.70

2 Kolom K.2 15x40 cm -


* Beton mutu f’c = 19,3 Mpa 1.42 m3 893,160.00 1,268,287.20
* Besi Ulir 441.90 kg 13,742.00 6,072,589.80
* Besi Polos 68.49 kg 13,164.00 901,602.36
* Begisting pemakaian 2x 26.18 m2 244,630.00 6,404,413.40
* Bongkaran begisting dengan hati hati 26.18 m2 8,771.00 229,624.78

3 Kolom Kp 110/110 43.00 m 74,850.00 3,218,550.00


HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
4 Balok BR.1 200/300 -
* Beton mutu f’c = 19,3 Mpa 2.76 m3 893,160.00 2,465,121.60
* Besi Ulir 302.56 kg 13,742.00 4,157,779.52
Besi Polos 225.68 kg 13,164.00 2,970,851.52
* Begisting pemakaian 2x 36.80 m2 247,380.00 9,103,584.00
* Bongkaran begisting dengan hati hati 36.80 m2 8,771.00 322,772.80

5 Balok BR.2 150/300 -


* Beton mutu f’c = 19,3 Mpa 2.48 m3 893,160.00 2,215,036.80
* Besi Ulir 287.29 kg 13,742.00 3,947,939.18
Besi Polos 137.08 kg 13,164.00 1,804,521.12
* Begisting pemakaian 2x 41.36 m2 247,380.00 10,231,636.80
* Bongkaran begisting dengan hati hati 41.36 m2 8,771.00 362,768.56

6 Balok BR.3 150/400 -


* Beton mutu f’c = 19,3 Mpa 1.68 m3 893,160.00 1,500,508.80
Besi Ulir 116.69 kg 13,742.00 1,603,553.98
Besi Polos 138.68 kg 13,164.00 1,825,583.52
* Begisting pemakaian 2x 26.60 m2 247,380.00 6,580,308.00
* Bongkaran begisting dengan hati hati 26.60 m2 8,771.00 233,308.60

7 Balok B.4 150/200 -


* Beton mutu f’c = 19,3 Mpa 1.08 m3 893,160.00 964,612.80
* Besi polos 148.63 kg 13,164.00 1,956,565.32
* Begisting pemakaian 2x 19.82 m2 247,380.00 4,903,071.60
* Bongkaran begisting dengan hati hati 19.82 m2 8,771.00 173,841.22

8 Balok Konsol BK.3 200/300 -


* Beton mutu f’c = 19,3 Mpa 0.21 m3 893,160.00 187,563.60
* Besi ulir 34.32 kg 13,742.00 471,625.44
* Besi polos 16.00 kg 13,164.00 210,624.00
* Begisting pemakaian 2x 2.88 m2 247,380.00 712,454.40
* Bongkaran begisting dengan hati hati 2.88 m2 8,771.00 25,260.48

9 Balok Latiu BL 110/110 55.10 m3 177,644.00 9,788,184.40

10 Atap Dag Beton


* Beton mutu f’c = 19,3 Mpa 2.04 m3 893,160.00 1,822,046.40
* Besi 214.64 kg 13,164.00 2,825,520.96
* Begisting 17.00 m2 412,517.00 7,012,789.00
* Bongkaran begisting 17.00 m2 3,709.00 63,053.00

11 Talang beton
* Beton mutu f’c = 19,3 Mpa 3.02 m3 893,160.00 2,697,343.20
* Besi 318.17 kg 13,164.00 4,188,389.88
* Begisting 33.60 m2 412,517.00 13,860,571.20
* Bongkaran begisting 33.60 m2 3,709.00 124,622.40

12 Canopi beton
* Beton mutu f’c = 19,3 Mpa 0.27 m3 893,160.00 241,153.20
* Besi 24.85 kg 13,164.00 327,125.40
* Begisting 4.50 m2 247,380.00 1,113,210.00
* Bongkaran begisting 4.50 m2 3,709.00 16,690.50

SUB JUMLAH 150,743,171.42

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm unpolish Platinum 36.00 m2 208,708.00 7,513,488.00
2 Pekerjaan Pemasangan Plin keramik 9 X 40 cm 45.00 m 29,602.00 1,332,090.00
SUB JUMLAH 8,845,578.00
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
E PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pembuatan pintu P.3 2.00 unit 1,796,570.00 3,593,140.00
2 Pintu P.5 1.00 unit 2,500,000.00 2,500,000.00
3 Pembuatan Jendela j.1 3.00 bh 2,557,797.00 7,673,391.00
4 Pembuatan Jendela j.2 6.00 bh 2,635,827.00 15,814,962.00
5 Pembuatan Jendela j.2 2.00 bh 1,242,945.00 2,485,890.00
6 Glass box GB.1 12.51 m2 744,540.00 9,314,195.40
SUB JUMLAH 41,381,578.40
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 172.45 m2 124,023.00 21,387,766.35
2 List Gypsum 5-10 cm 126.65 m 36,487.00 4,621,078.55
SUB JUMLAH 26,008,844.90
G PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 163.20 m2 200,000.00 32,640,000.00
2 Pemasangan Penutup Atap Genteng Keramik Glasur 40.00 m2 196,883.00 7,875,320.00
3 Pemasangan Nok/Kerpus Genteng Keramik Glasur 5.00 m 88,092.00 440,460.00
4 Penutup Atap Galvalum 123.20 m2 96,011.00 11,828,555.20
5 Nok Atap Galvalum 13.85 m1 43,477.00 602,156.45
6 Memasang lisplank ukuran (0,9 x 20) cm, Kalsiplang 10.00 m 36,750.00 367,500.00
7 Memasang lisplank Kayu Jati Banyu tumetes ukuran 2x2x20 cm 8.00 m 385,803.00 3,086,424.00
SUB JUMLAH 56,840,415.65

H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 515.63 m2 26,108.00 13,462,068.04
2 Pengecatan tembok tidak terlindung dari panas dan hujan 121.98 m2 41,195.00 5,024,966.10
3 Cat Plafon 172.45 m2 26,108.00 4,502,324.60
4 Cat Kayu listplang 2.20 m2 44,704.00 98,348.80
5 Waterproofing dag beton dan talang 25.80 m2 21,230.00 547,734.00
SUB JUMLAH 23,635,441.54

I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 22.00 titik 175,000.00 3,850,000.00
2 Instalasi Titik stop kontak 4.00 titik 200,000.00 800,000.00
3 fiting lampu downlight 5" 22.00 bh 75,000.00 1,650,000.00
4 Saklar dobel 2.00 bh 35,000.00 70,000.00
5 Saklar tunggal 1.00 bh 25,000.00 25,000.00
6 Stop kontak 4.00 bh 30,000.00 120,000.00
7 Lampu LED 13 w Philips 22.00 bh 85,000.00 1,870,000.00
SUB JUMLAH 8,385,000.00
J PEKERJAAN PLUMBING
1 Instalasi air bersih pipa 1" distribusi 8.00 m 27,266.00 218,128.00
2 Instalasi air bersih pipa 3/4" 8.00 m 22,588.00 180,704.00
3 Instalasi air bekas pipa 3" 6.00 m 91,647.00 549,882.00
4 Instalasi air bekas pipa 4" 6.00 m 137,016.00 822,096.00
5 Instalasi air hujan pipa 4" 16.00 m 137,016.00 2,192,256.00
6 water toren 500 l 1.00 unit 950,000.00 950,000.00
SUB JUMLAH 4,913,066.00
V PEKERJAAN LANDSCAPE
1 Pemasangan Perkerasan Conblok 55.00 m2 179,465.00 9,870,575.00
2 Pembuatan Pagar Besi 6.75 m2 550,000.00 3,712,500.00
3 Pembuatan Reling Tangga stainless steel 5.50 m2 750,000.00 4,125,000.00
4 Pembuatan Reling Selasar stainless steel 7.50 m2 750,000.00 5,625,000.00
SUB JUMLAH 23,333,075.00
VI PEKERJAANLAIN LAIN
1 Ornamen Arsitektur, 2 bh Unpak Semen termasuk Finishing Cat 0.80 m2 550,000.00 440,000.00
2 Ornamen Arsitektur, 2 bh Ornamen kolom bawah termasuk Finishing Cat Gradasi 1.20 m2 550,000.00 660,000.00
3 Ornamen Arsitektur, 2 bh Ornamen Wajikan termasuk Finishing Cat Gradasi 0.04 m2 550,000.00 22,000.00
4 Ornamen Arsitektur, 2 bh Ornamen kolom atas termasuk Finishing Cat Gradasi 1.20 m2 550,000.00 660,000.00
5 Ornamen Arsitektur GRC Cetak Motif Kawung termasuk Finishing Cat 5.50 m2 550,000.00 3,025,000.00
6 Lis profil semen lebar 10 cm 10.50 m 40,000.00 420,000.00
7 Pembuatan Huruf dr plat galvanis tinggi hrf 20 cm tebal hrf 3 cm termasuk cat duco 22.00 hrf 150,000.00 3,300,000.00
8 Pembuatan Panggung knockdown 1.00 unit 14,228,320.00 14,228,320.00
SUB JUMLAH 22,755,320.00
RENCANA ANGGARAN BIAYA (RAB)

INSTANSI :
KEGIATAN : PEMBANGUNAN GEDUNG PEMERINTAH
PEKERJAAN : PEMBANGUNAN BALAI RW.15 TEGALPANGGUNG
LOKASI : KEL. TEGALPANGGUNG, KEC. DANUREJAN KOTA YOGYAKARTA
TAHUN : 2019

HARGA SAT. TOTAL HARGA


No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)

I BIAYA PENYELENGGARAAN SMK3

1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 set 150,000.00 150,000.00
2 Spanduk (banner) 1.00 bh 100,000.00 100,000.00
3 Papan Informasi K3 1.00 bh 50,000.00 50,000.00
5 Pagar Pengaman Sementara dari Seng Gelombang tinggi 2 m (sewa) 1.00 ls 1,000,000.00 1,000,000.00
6 Sewa Topi Pelindung (Safety Helmet) 15.00 bh 20,000.00 300,000.00
7 Sewa Pelindung Mata (Goggles, Spectacles) 1.00 bh 15,000.00 15,000.00
8 Sewa Tameng Muka (Face Shield) 1.00 bh 20,000.00 20,000.00
9 Pelindung Telinga (Ear Plug, Ear Muff) 1.00 psg 15,000.00 15,000.00
10 Pelindung Pernafasan Dan Mulut (Masker) 15.00 dus 8,000.00 120,000.00
11 Sarung Tangan (Safety Gloves) 15.00 psg 7,000.00 105,000.00
Sewa Sepatu Keselamatan (Rubber Safety Shoes_and
12 15.00 psg 50,000.00 750,000.00
toe cap)
13 Sewa Penunjang Seluruh Tubuh (Full Body Harness) 2.00 bh 100,000.00 200,000.00
16 Peralatan P3K (Kotak P3K, Obat Luka, Perban, Alkohol, Kapas) 1.00 ls 150,000.00 150,000.00
17 Rambu Petunjuk 1.00 bh 100,000.00 100,000.00
18 Rambu Larangan 1.00 bh 100,000.00 100,000.00
19 Rambu Peringatan 1.00 bh 100,000.00 100,000.00
20 Rambu Kewajiban 1.00 bh 100,000.00 100,000.00
21 Rambu Informasi 1.00 bh 100,000.00 100,000.00
22 Rambu Pekerjaan Sementara 1.00 bh 100,000.00 100,000.00
23 Alat Pemadam Api Ringan (APAR) 2.00 bh 250,000.00 500,000.00
24 Bendera K3 1.00 bh 100,000.00 100,000.00
SUB JUMLAH 4,175,000.00

II PEKERJAAN PERSIAPAN

A PEKERJAAN PERSIAPAN
1 Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 1.00 Unit 200,000.00 200,000.00
2 Pembersihan lokasi awal dan akhir 1.00 Ls 1,000,000.00 1,000,000.00
3 Uizet dan Bowplang 1.00 Ls 1,500,000.00 1,500,000.00
SUB JUMLAH 2,700,000.00

III PEKERJAAN PEMBANGUNAN LANTAI 1


A PEKERJAAN GALIAN
1 Galian tanah biasa footplat 60.00 m3 71,516.64 4,290,998.58
2 Galian tanah biasa sedalam 1 m 53.27 m3 58,626.90 3,123,054.79
3 Urug pasir bawah pondasi dan bawah lantai 12.31 m3 231,811.16 2,853,595.36
4 Urugan tanah kembali 30.00 m3 41,672.08 1,250,162.40
5 Urug Tanah Peninggian Lantai 44.38 m3 231,811.16 10,287,779.20
SUB JUMLAH 21,805,590.32
B PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali campuran 1 SP :8 PP 28.63 m3 601,620.23 17,224,387.07
2 Pasangan dinding 1/2 bata transram 1 SP : 3 PP (trasram) 21.85 m2 89,501.52 1,955,608.12
3 Pasangan dinding 1/2 bata 1 SP : 6 PP 186.09 m2 84,575.94 15,738,736.20
4 Plesteran dinding bata 1pc : 3ps (Trasram ) 43.70 m2 37,397.42 1,634,267.40
5 Plesteran dinding bata 1pc : 6ps 372.18 m2 34,488.55 12,835,948.06
6 Penebalan Dinding Teras pasangan 1/4 bata 1.86 m2 90,000.00 167,400.00
7 Plesteran beton 1pc: 3 ps 71.85 m2 37,397.42 2,687,004.86
8 Pekerjaan Acian MU 200 Skinwall 485.90 m2 16,416.04 7,976,554.69
9 Pasang Sponengan Sudut 298.95 m' 12,000.00 3,587,400.00
SUB JUMLAH 63,807,306.40
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
C PEKERJAAN BETON
1 Lantai Kerja bawah pondasi & Lantai fc 7,4 Mpa 12.31 m3 786,606.98 9,683,131.93

2 Pondasi Footplat F.1


* Beton mutu f’c = 19,3 Mpa 3.60 m3 898,723.26 3,235,403.74
* Besi Ulir 502.80 kg 16,021.79 8,055,756.62
* Begisting Pasangan Batako 1.32 m2 85,000.00 112,200.00

3 Pondasi Footplat F.2


* Beton mutu f’c = 19,3 Mpa 0.72 m3 898,723.26 647,080.75
* Besi Ulir 96.82 kg 16,021.79 1,551,229.82
* Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00

4 Pondasi Footplat F.3


* Beton mutu f’c = 19,3 Mpa 1.20 m3 898,723.26 1,078,467.91
* Besi Ulir 170.61 kg 16,021.79 2,733,477.80
* Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00

5 Pondasi Footplat F.4


* Beton mutu f’c = 19,3 Mpa 1.08 m3 898,723.26 970,621.12
* Besi Ulir 155.09 kg 16,021.79 2,484,819.60
* Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00

6 Sloof S.1 200/300 mm -


* Beton mutu f’c = 19,3 Mpa 5.28 m3 898,723.26 4,745,258.81
* Besi Ulir 415.50 kg 16,021.79 6,657,054.25
Besi polos 250.34 kg 16,021.79 4,010,895.21
* Begisting pemakaian 2x 52.86 m2 85,000.00 4,493,100.00
* Bongkaran begisting dengan hati hati 52.86 m2 25,000.00 1,321,500.00

7 Sloof S.2 200/400 mm


* Beton mutu f’c = 19,3 Mpa 0.96 m3 16,021.79 15,390.53
* Besi Ulir 113.70 kg 85,000.00 9,664,865.57
Besi polos 64.90 kg 85,000.00 5,516,264.45
* Begisting pemakaian 2x 12.81 m2 25,000.00 320,200.00
* Bongkaran begisting dengan hati hati 12.81 m2 25,000.00 320,200.00

8 Kolom K.1 200/300 mm -


* Beton mutu f’c = 19,3 Mpa 3.30 m3 898,723.26 2,965,786.76
* Besi Ulir 783.31 kg 16,021.79 12,550,029.27
* Besi polos 179.68 kg 16,021.79 2,878,795.44
* Begisting pemakaian 2x 55.00 m2 85,000.00 4,675,000.00
* Bongkaran begisting dengan hati hati 55.00 m2 25,000.00 1,375,000.00
-
9 Kolom K.2 150/400 mm -
* Beton mutu f’c = 19,3 Mpa 2.70 m3 898,723.26 2,426,552.80
* Besi Ulir 749.97 kg 16,021.79 12,015,862.75
* Besi polos 177.55 kg 16,021.79 2,844,669.03
* Begisting pemakaian 2x 49.50 m2 85,000.00 4,207,500.00
* Bongkaran begisting dengan hati hati 49.50 m2 25,000.00 1,237,500.00

10 Kolom Kp 110/110 33.00 m 80,000.00 2,640,000.00

11 Balok B.1 200/400 -


* Beton mutu f’c = 19,3 Mpa 3.33 m3 898,723.26 2,992,748.46
* Besi Ulir 403.39 kg 16,021.79 6,463,030.35
* Besi polos 220.59 kg 16,021.79 3,534,246.92
* Begisting pemakaian 2x 41.70 m2 85,000.00 3,544,500.00
* Bongkaran begisting dengan hati hati 41.70 m2 25,000.00 1,042,500.00

12 Balok B.2 150/350 -


* Beton mutu f’c = 19,3 Mpa 1.99 m3 898,723.26 1,788,459.29
* Besi Ulir 321.17 kg 16,021.79 5,145,718.68
* Besi polos 180.21 kg 16,021.79 2,887,286.99
* Begisting pemakaian 2x 32.28 m2 85,000.00 2,743,800.00
* Bongkaran begisting dengan hati hati 32.28 m2 25,000.00 807,000.00

13 Balok B.3 150/500 -


* Beton mutu f’c = 19,3 Mpa 0.52 m3 898,723.26 467,336.10
* Besi Ulir 55.23 kg 16,021.79 884,883.53
* Besi polos 39.41 kg 16,021.79 631,418.79
* Begisting pemakaian 2x 8.05 m2 85,000.00 684,250.00
* Bongkaran begisting dengan hati hati 8.05 m2 25,000.00 201,250.00
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
14 Balok B.4 150/200 -
* Beton mutu f’c = 19,3 Mpa 0.32 m3 898,723.26 287,591.44
* Besi polos 49.07 kg 16,021.79 786,189.29
* Begisting pemakaian 2x 5.92 m2 85,000.00 503,200.00
* Bongkaran begisting dengan hati hati 5.92 m2 25,000.00 148,000.00

15 Balok Konsol BR.2 150/350


- Beton mutu f’c = 19,3 Mpa 0.19 m3 898,723.26 167,836.57
- Besi Ulir 23.18 kg 16,021.79 371,416.22
- Besi polos 10.65 kg 16,021.79 170,682.06
- Begisting pemakaian 2x 3.11 m2 85,000.00 264,562.50
- Bongkaran begisting dengan hati hati 3.11 m2 25,000.00 77,812.50

16 Balok Konsol BK.1 150/300 -


* Beton mutu f’c = 19,3 Mpa 0.17 m3 898,723.26 152,782.95
* Besi ulir 32.74 kg 16,021.79 524,553.44
* Besi polos 17.31 kg 16,021.79 277,337.21
* Begisting pemakaian 2x 2.89 m2 85,000.00 245,650.00
* Bongkaran begisting dengan hati hati 2.89 m2 25,000.00 72,250.00

17 Balok Konsol BK.2 150/350 -


* Beton mutu f’c = 19,3 Mpa 0.05 m3 898,723.26 44,936.16
* Besi ulir 12.62 kg 16,021.79 202,195.00
* Besi polos 6.03 kg 16,021.79 96,611.40
* Begisting pemakaian 2x 0.85 m2 85,000.00 72,250.00
* Bongkaran begisting dengan hati hati 0.85 m2 25,000.00 21,250.00

18 Balok Latiu BL 110/110 12.55 m 800,000.00 10,040,000.00

19 Beton Plat lantai 2


* Beton mutu f’c = 19,3 Mpa 4.40 m3 898,723.26 3,954,382.34
* Besi 448.36 kg 16,021.79 7,183,565.58
* Begisting 36.71 m2 85,000.00 3,120,350.00
* Bongkaran begisting 36.71 m2 25,000.00 917,750.00

20 Beton Plat tangga


* Beton mutu f’c = 19,3 Mpa 0.65 m3 898,723.26 584,170.12
* Besi ulir 91.89 kg 16,021.79 1,472,242.39
Besi polos 52.46 kg 16,021.79 840,503.17
* Begisting 6.24 m2 85,000.00 530,400.00
* Bongkaran begisting 6.24 m2 25,000.00 156,000.00

21 Beton Plat Meja Daur


* Beton mutu f’c = 14.5 Mpa 0.06 m3 857,919.35 51,475.16
* Besi 5.42 kg 16,021.79 86,838.11
* Begisting 0.95 m2 85,000.00 80,750.00
* Bongkaran begisting 0.95 m2 25,000.00 23,750.00

SUB JUMLAH 185,270,926.89

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm polish 161.90 m2 91,250.11 14,773,392.67
2 Pekerjaan Pemasangan keramik tangga 40/40 cm polish 7.75 m2 91,250.11 707,188.35
3 Pekerjaan Pemasangan Plin keramik lantai dan tangga 9/40 cm 66.40 m 41,151.18 2,732,438.28
4 Pekerjaan Pemasangan Lantai keramik kamar mandi 25/25 cm 2.80 m2 107,969.50 302,314.60
5 Pekerjaan Pemasangan keramik dinding kamar mandi 25/40 cm 9.27 m2 114,756.53 1,063,793.06
6 Pekerjaan Pemasangan keramik dinding dan meja dapur 1.62 m2 114,756.53 185,905.58
7 Step Nousing Tangga 8x40 cm 17.00 m 23,000.00 391,000.00
SUB JUMLAH 20,156,032.53

E PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pembuatan pintu P.1 1.00 unit 2,100,000.00 2,100,000.00
2 Pembuatan pintu P.2 2.00 unit 2,100,000.00 4,200,000.00
3 Pembuatan pintu P.3 1.00 unit 2,100,000.00 2,100,000.00
4 Pembuatan pintu P.4 ( Pintu Panel UPVC) 1.00 unit 1,400,000.00 1,400,000.00
5 Pembuatan Teralis TR.1 termasuk cat 1.20 m2 550,000.00 660,000.00
6 Pembuatan Teralis TR.2 termasuk cat 1.24 m2 550,000.00 682,000.00
7 Penutup Rel pintu geser 3.68 m2 550,000.00 2,024,000.00
SUB JUMLAH 13,166,000.00
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 26.20 m2 129,019.01 3,380,297.97
2 Memasang langit-langit GRCboard tebal 6 mm + rangka hollow 11.30 m2 141,888.33 1,603,338.07
3 List Gypsum 5-10 cm 70.10 m 16,955.33 1,188,568.46
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
SUB JUMLAH 6,172,204.50
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 303.60 m2 20,809.48 6,317,759.40
2 Pengecatan tembok tidak terlindung dari panas dan hujan 182.30 m2 31,173.73 5,682,970.76
3 Pengecatan Plafond 37.50 m2 14,650.60 549,397.35
SUB JUMLAH 12,550,127.51
I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 16.00 titik 130,000.00 2,080,000.00
2 Instalasi Titik stop kontak 4.00 titik 130,000.00 520,000.00
3 fiting lampu downlight 5" 7.00 bh 65,000.00 455,000.00
4 Fiting lampu tempel 3.00 bh 65,000.00 195,000.00
5 Lampu TL LED 2x18 w TKO + Fiting 6.00 bh 120,000.00 720,000.00
6 Lampu LED 13 w Philips 10.00 bh 110,000.00 1,100,000.00
7 Saklar dobel 4.00 bh 35,000.00 140,000.00
8 Saklar tunggal 5.00 bh 35,000.00 175,000.00
9 Stop kontak 4.00 bh 35,000.00 140,000.00
10 Pemasangan Box Presto isi 4 + aksesoris 1.00 ls 160,000.00 160,000.00
11 MCB 6 A MG 6.00 bh 90,000.00 540,000.00
12 Kabel Tovoer NYY 3x4 1.00 m 15,000.00 15,000.00
13 Pasang daya Listrik Baru termasuk SLO 2200.00 Va 1,000.00 2,200,000.00
14 Pemasangan Lampu Led 50 Watt 2.00 bh 128,351.52
SUB JUMLAH 8,440,000.00

J PEKERJAAN PLUMBING
1 Pemasangan Closet Jongkok 1.00 bh 450,000.00 450,000.00
2 Pemasangan Kichenzink 1.00 bh 400,000.00 400,000.00
3 Keran 1/2 " 1.00 bh 45,000.00 45,000.00
4 Floor Drain 1.00 bh 75,000.00 75,000.00
5 Keran sink dapur 1.00 bh 45,000.00 45,000.00
6 Instalasi air bersih pipa 1" distribusi 12.00 m 31,000.00 372,000.00
7 Instalasi air bersih pipa 3/4" 12.00 m 34,000.00 408,000.00
8 Instalasi air bekas pipa 3" 15.00 m 130,000.00 1,950,000.00
9 Instalasi air bekas pipa 4" 15.00 m 154,000.00 2,310,000.00
10 Instalasi air hujan pipa 4" 84.00 m 90,000.00 7,560,000.00
11 Bak kontrol 4.00 unit 900,000.00 3,600,000.00
12 Pembuatan Septic Tank 1.00 Unit 3,500,000.00 3,500,000.00
13 Pembuatan Sumur Resapan dalam 3 m+ plat beton penutup 5.00 bh 1,500,000.00 7,500,000.00
14 Pompa Air Shimitsu 1.00 bh 750,000.00 750,000.00
15 Pengeboran Sumur Air Bersih 20 m 500,000.00
SUB JUMLAH 28,965,000.00

IV PEKERJAAN PEMBANGUNAN LANTAI 2


A PEKERJAAN URUG PASIR
1 Urug pasir bawah lantai 1.79 m3 231,811.16 414,941.97
SUB JUMLAH 414,941.97
B PEKERJAAN PASANGAN
1 Pasangan dinding 1/2 bata 1 SP : 6 PP 329.89 m2 84,575.94 27,900,756.00
2 Plesteran dinding bata 1pc : 6ps 587.99 m2 34,488.55 20,278,921.75
3 Plesteran beton 1pc: 3 ps 84.68 m2 37,397.42 3,166,813.80
4 Pekerjaan Acian MU 200 Skinwall 672.67 m2 16,416.04 11,042,578.81
5 Pasang Sponengan Sudut 492.80 m' 12,000.00 5,913,600.00
6 Screeding dan leveling atap Beton dan talang beton t.3 cm 57.53 m2 250,000.00 14,382,500.00
SUB JUMLAH 82,685,170.37
C PEKERJAAN BETON

1 Kolom K.1 20x30 cm -


* Beton mutu f’c = 19,3 Mpa 3.10 m3 898,723.26 2,786,042.11
* Besi Ulir 805.53 kg 16,021.79 12,906,033.47
* Besi Polos 148.43 kg 16,021.79 2,378,114.47
* Begisting pemakaian 2x 51.70 m2 85,000.00 4,394,500.00
* Bongkaran begisting dengan hati hati 51.70 m2 25,000.00 1,292,500.00

2 Kolom K.2 15x40 cm -


* Beton mutu f’c = 19,3 Mpa 1.42 m3 898,723.26 1,276,187.03
* Besi Ulir 397.71 kg 16,021.79 6,372,026.58
* Besi Polos 77.33 kg 16,021.79 1,238,965.11
* Begisting pemakaian 2x 26.18 m2 85,000.00 2,225,300.00
* Bongkaran begisting dengan hati hati 26.18 m2 25,000.00 654,500.00

3 Kolom Kp 110/110 44.60 m 80,000.00 3,568,000.00


HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
4 Balok BR.1 200/300 -
* Beton mutu f’c = 19,3 Mpa 2.76 m3 898,723.26 2,480,476.20
* Besi Ulir 290.06 kg 16,021.79 4,647,280.76
Besi Polos 243.83 kg 16,021.79 3,906,593.35
* Begisting pemakaian 2x 34.00 m2 85,000.00 2,890,000.00
* Bongkaran begisting dengan hati hati 34.00 m2 25,000.00 850,000.00

5 Balok BR.2 150/300 -


* Beton mutu f’c = 19,3 Mpa 2.16 m3 898,723.26 1,941,242.24
* Besi Ulir 250.57 kg 16,021.79 4,014,580.22
Besi Polos 136.71 kg 16,021.79 2,190,339.08
* Begisting pemakaian 2x 36.07 m2 85,000.00 3,065,950.00
* Bongkaran begisting dengan hati hati 36.07 m2 25,000.00 901,750.00

6 Balok BR.3 150/600 -


* Beton mutu f’c = 19,3 Mpa 2.52 m3 898,723.26 2,264,782.62
Besi Ulir 175.04 kg 16,021.79 2,804,401.14
Besi Polos 151.27 kg 16,021.79 2,423,685.31
* Begisting pemakaian 2x 37.80 m2 85,000.00 3,213,000.00
* Bongkaran begisting dengan hati hati 37.80 m2 25,000.00 945,000.00

6 Balok BR.4 150/500 -


* Beton mutu f’c = 19,3 Mpa 0.51 m3 898,723.26 454,978.65
Besi Ulir 42.20 kg 16,021.79 676,060.99
Besi Polos 73.94 kg 16,021.79 1,184,659.96
* Begisting pemakaian 2x 5.40 m2 85,000.00 459,000.00
* Bongkaran begisting dengan hati hati 7.76 m2 25,000.00 194,062.50

7 Balok B.4 150/200 -


* Beton mutu f’c = 19,3 Mpa 1.08 m3 898,723.26 970,621.12
* Besi polos 148.63 kg 16,021.79 2,381,318.83
* Begisting pemakaian 2x 19.82 m2 85,000.00 1,684,700.00
* Bongkaran begisting dengan hati hati 19.82 m2 25,000.00 495,500.00

8 Balok Konsol BK.3 200/300 -


* Beton mutu f’c = 19,3 Mpa 0.21 m3 898,723.26 188,731.88
* Besi ulir 41.19 kg 16,021.79 659,937.58
* Besi polos 20.00 kg 16,021.79 320,435.82
* Begisting pemakaian 2x 2.52 m2 85,000.00 214,200.00
* Bongkaran begisting dengan hati hati 2.52 m2 25,000.00 63,000.00

9 Balok Latiu BL 110/110 52.88 m 800,000.00 42,304,000.00

10 Atap Dag Beton


* Beton mutu f’c = 19,3 Mpa 2.72 m3 898,723.26 2,444,527.27
* Besi 271.55 kg 16,021.79 4,350,717.40
* Begisting 22.74 m2 85,000.00 1,932,900.00
* Bongkaran begisting 22.74 m2 25,000.00 568,500.00

11 Talang beton
* Beton mutu f’c = 19,3 Mpa 2.52 m3 898,723.26 2,264,782.62
* Besi 223.55 kg 16,021.79 3,581,671.42
* Begisting 33.60 m2 85,000.00 2,856,000.00
* Bongkaran begisting 33.60 m2 25,000.00 840,000.00

12 Canopi beton
* Beton mutu f’c = 19,3 Mpa 0.50 m3 898,723.26 449,361.63
* Besi 16.18 kg 16,021.79 259,183.88
* Begisting 3.58 m2 85,000.00 304,300.00
* Bongkaran begisting 3.58 m2 25,000.00 89,500.00

SUB JUMLAH 149,823,901.22

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm unpolish Platinum 35.86 m2 91,250.11 3,272,228.91
2 Pekerjaan Pemasangan Plin keramik 9 X 40 cm 45.00 m 41,151.18 1,851,803.05
SUB JUMLAH 5,124,031.96
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
E PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pembuatan pintu P.3 2.00 unit 2,100,000.00 4,200,000.00
2 Pintu P.5 2.00 unit 2,100,000.00 4,200,000.00
3 Pembuatan Jendela j.1 3.00 bh 1,800,000.00 5,400,000.00
4 Pembuatan Jendela j.2 8.00 bh 1,800,000.00 14,400,000.00
5 Pembuatan Jendela j.3 2.00 bh 1,800,000.00 3,600,000.00
6 Glass box GB.1 12.51 m2 400,000.00 5,004,000.00
SUB JUMLAH 36,804,000.00
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 176.63 m2 129,019.01 22,788,627.09
2 List Gypsum 5-10 cm 129.02 m 16,955.33 2,187,576.35
SUB JUMLAH 24,976,203.45
G PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 166.00 m2 195,062.10 32,380,309.16
2 Pemasangan Penutup Atap Genteng Keramik Glasur 40.00 m2 246,416.81 9,856,672.54
3 Pemasangan Nok/Kerpus Genteng Keramik Glasur 5.00 m 125,057.30 625,286.49
4 Penutup Atap Galvalum 126.00 m2 165,948.84 20,909,554.39
5 Nok Atap Galvalum 13.85 m1 111,981.46 1,550,943.20
6 Memasang lisplank ukuran (0,9 x 20) cm, Kalsiplang 10.00 m 40,000.00 400,000.00
7 Memasang lisplank Kayu Jati Banyu tumetes ukuran 2x2x20 cm 8.00 m 60,000.00 480,000.00
8 Canopi lantai 1 7.24 m2 200,000.00
9 Seng Krul
SUB JUMLAH 66,202,765.78
I PEKERJAAN PAGAR DEPAN GEDUNG

1 Pekerjaan galian dan Urugan


a. Galian Biasa < 1m 3.43 m3 58,626.90 201,377.53
b. Urugan Pasir 5cm 0.25 m3 231,811.16 56,874.87
c. Urugan Tanah Kembali 1.09 m3 41,672.08 45,391.31
-
2 Pekerjaan Pasangan -
a. Pekerjaan Pondasi Pasangan Batu Kali 1 : 4 1.89 m3 601,620.23 1,137,062.23
b. Pasangan Dinding Batu bata Merah 1Pc : 6Pp 2.78 m2 84,575.94 235,332.55
c. Plesteran 7.29 m2 37,397.42 272,496.32
d. Acian 7.29 m2 16,416.04 119,615.49
e. Cat Tembok exterior 7.29 m2 31,173.73 227,147.37
f. Pasangan Batu andhesit 10x20 cm 2.78 m2 260,000.00 723,450.00
g. Pengecatan Batu Andhesit 2.78 m2 31,173.73
-
3 Pelrerjaan Beton dan Pembesian -
a. Sloof 15 x 20 cm -
- Cor Beton Fc 7.4 Mpa 0.21 m3 786,600.00 165,421.98
- Pembesian Sloof 35.68 Kg 16,021.79 571,701.09
- Pemasangan Bekisting 2.84 m2 85,000.00 241,740.00
- Pelepasan bekisting 2.84 m2 25,000.00 71,100.00
-
b Kolom Praktis 15 x 15 cm -
- Cor Beton Fc 7,4 Mpa 0.18 m3 786,600.00 141,588.00
- Pembesian Kolom Praktis 71.87 Kg 16,021.79 1,151,513.90
- Pemasangan Bekisting 0.80 m2 85,000.00 68,000.00
- Pelepasan bekisting 0.80 m2 25,000.00 20,000.00
c Pekerjaan pagar dan Tralis Railing
a Tralis Besi Hollow 4.00 m2 260,000.00 1,040,000.00
b Pagar Dorong Pintu masuk 6.00 m2 190,000.00 1,140,000.00

SUB JUMLAH 7,629,812.64


H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 544.27 m2 20,809.48 11,325,977.97
2 Pengecatan tembok tidak terlindung dari panas dan hujan 121.98 m2 31,173.73 3,802,571.44
3 Cat Plafon 176.63 m2 14,650.60 2,587,734.76
4 Cat Kayu listplang 2.20 m2 14,650.60 32,231.31
5 Waterproofing dag beton dan talang 57.53 m2 70,307.34 4,044,781.01
SUB JUMLAH 21,793,296.49

I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 22.00 titik 130,000.00 2,860,000.00
2 Instalasi Titik stop kontak 4.00 titik 130,000.00 520,000.00
3 fiting lampu downlight 5" 22.00 bh 65,000.00 1,430,000.00
4 Saklar dobel 2.00 bh 35,000.00 70,000.00
5 Saklar tunggal 1.00 bh 35,000.00 35,000.00
6 Stop kontak 4.00 bh 35,000.00 140,000.00
7 Lampu LED 13 w Philips 22.00 bh 110,000.00 2,420,000.00
SUB JUMLAH 7,475,000.00
J PEKERJAAN PLUMBING
1 Instalasi air bersih pipa 1" distribusi 8.00 m 31,000.00 248,000.00
2 Instalasi air bersih pipa 3/4" 8.00 m 34,000.00 272,000.00
HARGA SAT. TOTAL HARGA
No. ITEM PEKERJAAN VOLUME SAT.
(Rp) (Rp)
3 Instalasi air bekas pipa 3" 6.00 m 130,000.00 780,000.00
4 Instalasi air bekas pipa 4" 6.00 m 154,000.00 924,000.00
5 Instalasi air hujan pipa 4" 16.00 m 90,000.00 1,440,000.00
6 water toren 500 l 1.00 unit 1,600,000.00 1,600,000.00
SUB JUMLAH 5,264,000.00
VI PEKERJAAN LANDSCAPE
1 Pemasangan Perkerasan Conblok 55.00 m2 140,000.00 7,700,000.00
2 Pembuatan Pagar Besi 6.75 m2 260,000.00 1,755,000.00
3 Pembuatan Reling Tangga stainless steel 5.50 m2 190,000.00 1,045,000.00
4 Pembuatan Reling Selasar stainless steel 7.50 m2 190,000.00 1,425,000.00
5 Pembuatan Tangga Stainless steel 2.03 m2 190,000.00 384,750.00
SUB JUMLAH 12,309,750.00
VII PEKERJAANLAIN LAIN
1 Ornamen Arsitektur, 2 bh Unpak Semen termasuk Finishing Cat 0.80 m2 700,000.00 560,000.00
2 Ornamen Arsitektur, 2 bh Ornamen kolom bawah termasuk Finishing Cat Gradasi 1.20 m2 760,000.00 912,000.00
3 Ornamen Arsitektur, 2 bh Ornamen Wajikan termasuk Finishing Cat Gradasi 0.04 m2 760,000.00 30,400.00
4 Ornamen Arsitektur, 2 bh Ornamen kolom atas termasuk Finishing Cat Gradasi 1.20 m2 760,000.00 912,000.00
5 Ornamen Arsitektur GRC Cetak Motif Kawung termasuk Finishing Cat 5.50 m2 760,000.00 4,180,000.00
6 Lis profil semen lebar 10 cm 10.50 m 29,000.00 304,500.00
7 Pembuatan Huruf dr plat galvanis tinggi hrf 20 cm tebal hrf 3 cm termasuk cat duco 22.00 hrf 30,000.00 660,000.00
8 Pembuatan Panggung knockdown 1.00 unit 3,000,000.00 3,000,000.00
9 Talang Seng Samping 12 m1 70,000.00 840,000.00

SUB JUMLAH 11,398,900.00

799,109,962.04
KETERANGAN PANJANG LEBAR LEBAR TINGGI JUMLAH Koef luas SUB. VOLUME SAT.
No. ITEM PEKERJAAN
atas bawah VOLUME TOTAL

II PEKERJAAN PERSIAPAN
1 Membuat Papan Nama Proyek 80x120 cm (bahan flexi)
2 Pembersihan lokasi awal dan akhir 1.00 1.00 unit
3 Uizet dan Bowplang 1.00 1.00 ls
45.00 45.00 45.00 m'

II PEKERJAAN PERSIAPAN
A PEKERJAAN GALIAN
1 Galian tanah biasa footplat Pondasi pb.1
Pondasi pb.1B-1C-1I 16.80 0.70 0.70 8.23
Pondasi pb.1b-2B-2C 1.70 0.70 0.70 0.83
Pondasi pb.1b-6A-6I 18.50 0.70 0.70 9.07
Pondasi pb.1b-C1-C2 2.15 0.70 0.70 1.05
Pondasi pb.1a-2C-2E 2.80 0.70 0.70 1.37
Pondasi pb.1a-B2-B6 6.85 0.70 0.70 3.36
Pondasi pb.1a-D1-D2 2.15 0.70 0.70 1.05
Pondasi pb.1a-E1-E6 9.00 0.70 0.70 4.41
Pondasi pb.1a-i1-i6 9.00 0.70 0.70 4.41
Pondasi pb.1c-F1-F6 9.00 0.50 0.50 2.25
Pondasi pb.1c-G1-G6 9.00 0.50 0.50 2.25
Pondasi pb.1c-H1-H6 9.00 0.50 0.50 2.25
Pondasi batu bata 11.00 0.20 0.20 0.44
pengurangan pager 25.10 0.70 0.70 12.30 53.27 m3
Galian
F.1 1.40 1.20 0.70 10.00 11.76
F.2 2.20 1.20 0.70 1.00 1.85
F.3A 1.20 1.20 0.70 2.00 2.02
F.3B 1.20 1.20 0.70 1.00 1.01
F.3C 1.20 1.20 0.70 1.00 1.01
F.4 1.20 2.00 0.70 2.00 3.36
(21.00) m3

F.1 1.40 1.20 2.00 10.00 33.60


F.2 2.20 1.20 2.00 1.00 5.28
F.3A 1.20 1.20 2.00 2.00 5.76
F.3B 1.20 1.20 2.00 1.00 2.88
F.3C 1.20 1.20 2.00 1.00 2.88
F.4 1.20 2.00 2.00 2.00 9.60
60.00 m3

92.27 m3 jumlah

3 Urug pasir bawah pondasi dan bawah lantai


Pondasi batu kali Menerus 85.65 0.70 0.05 3.00
27.00 0.50 0.05 0.68
11.00 0.20 0.05 0.11

footplat
F.1 1.40 1.20 0.05 10.00 0.84
F.2 2.20 1.20 0.05 1.00 0.13
F3 1.20 1.20 0.05 4.00 0.29
F.4 1.20 2.00 0.05 2.00 0.24
Bawah Lantai
Teras Utara 0.05 6.20 0.31
Lobby 0.05 29.00 1.45
pantri 0.05 2.50 0.13
wc 0.05 2.45 0.12
ruang serba guna 0.05 116.00 5.80
teras selatan 0.05 0.90 0.05
Penguranhgan 13.14
F.1 1.40 0.70 0.05 10.00 0.49
F.2 2.20 0.70 0.05 1.00 0.08
F.3A 1.20 0.70 0.05 2.00 0.08
F.3B 1.20 0.70 0.05 1.00 0.04
F.3C 1.20 0.70 0.05 1.00 0.04
F.4 1.20 0.70 0.05 2.00 0.08

(0.82)
12.32 m3

4 Urugan tanah kembali 30.00 30.00 m3


Urug Tanah Peninggian Lantai
Teras Utara 0.25 6.20 1.55
Lobby 0.25 29.00 7.25
pantri 0.25 2.50 0.63
wc 0.25 2.45 0.61
ruang serba guna 0.25 116.00 29.00
teras selatan 0.25 0.90 0.23
Area parkir 0.10 43.00 4.30
lahan terbuka belakang 0.10 8.20 0.82
44.38 m3

B PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali campuran 1 SP :8 PP
Pondasi pb.1B-1C-1I 16.80 0.30 0.60 0.60 4.54
Pondasi pb.1b-2B-2C 1.70 0.30 0.60 0.60 0.46
Pondasi pb.1b-6A-6I 18.50 0.30 0.60 0.60 5.00
Pondasi pb.1b-C1-C2 2.15 0.30 0.60 0.60 0.58
Pondasi pb.1a-2C-2E 2.80 0.30 0.60 0.60 0.76
Pondasi pb.1a-B2-B6 6.85 0.30 0.60 0.60 1.85
Pondasi pb.1a-D1-D2 2.15 0.30 0.60 0.60 0.58
Pondasi pb.1a-E1-E6 9.00 0.30 0.60 0.60 2.43
Pondasi pb.1a-i1-i6 9.00 0.30 0.60 0.60 2.43
Pondasi pb.1c-F1-F6 9.00 0.30 0.40 1.08
Pondasi pb.1c-G1-G6 9.00 0.30 0.40 1.08
Pondasi pb.1c-H1-H6 9.00 0.30 0.40 1.08
pondasi pagar 25.10 0.30 0.60 0.60 6.78 28.63 m3

Penguranhgan
F.1 0.30 0.20 0.60 10.00 0.36
F.2 0.30 0.20 0.60 1.00 0.04
0.40 0.15 0.60 1.00 0.04
F.3A 0.40 0.15 0.60 2.00 0.07
F.3B 0.40 0.15 0.60 1.00 0.04
F.3C 0.40 0.15 0.60 1.00 0.04
F.4 0.40 0.15 0.60 4.00 0.14
(0.72) (0.72)

27.91 m3

2 Pasangan dinding 1/2 bata transram 1 SP : 3 PP (trasram)


1C-1E 2.48 1.65 4.09
1E-1I 13.20 0.25 3.30
2B-2D 2.88 0.25 0.72
2D-2E 1.33 1.65 2.19
6B-6E 4.03 0.25 1.01
6E-6I 13.20 0.25 3.30
B2-B6 1.71 0.25 0.43
C1-C2 1.70 0.25 0.43
D1-D2 2.00 1.65 3.30
E1-E2 1.70 1.65 2.81
E2-E3 0.88 0.25 0.22
I1-I6 3.85 0.25 0.96

pengurang pintu jendela 0.90 0.90 21.85 m2

3 Pasangan dinding 1/2 bata 1 SP : 6 PP


1C-1E 2.48 1.45 3.60
1E-1I 13.20 2.85 37.62
2B-2D 2.88 2.85 8.21
2D-2E 1.33 1.45 1.93
6B-6E 4.03 2.85 11.49
6E-6I 13.20 2.85 37.62
B2-B6 1.71 2.85 4.87
C1-C2 1.70 2.85 4.85
D1-D2 2.00 1.45 2.90
E1-E2 1.70 1.45 2.47
E2-E3 0.88 2.85 2.51
I1-I6 3.85 2.85 10.97
Pager 17.90 3.10 55.49
7.00 0.60 4.20

pengurang pintu jendela 2.62 2.62 186.09 m2

4 Plesteran dinding bata 1pc : 3ps (Trasram ) pasangan bata 43.71 43.71 m2
5 Plesteran dinding bata 1pc : 6ps pasangan bata
372.18 372.18 m2
6 Penebalan Dinding Teras pasangan 1/4 bata 0.60 3.10 1.86 1.86 m2

7 Plesteran beton 1pc: 3 ps


balok 34.85 0.80 27.88
12.80 0.35 4.48
balok b2 7.20 0.55 3.96
kolom 11.65 3.05 35.53 71.85 m2

8 Pekerjaan Acian MU 200 Skinwall - 487.74 485.91 m2


kanopi 4.30 0.88 3.78
tangga 4.00 1.10 4.40
pengurang keramik dinding 10.02 10.02
9 Pasang Sponengan Sudut 3.05 32.00 97.60
balok 69.70 69.70
pj 52.24 2.00 104.48 298.96 m2

C PEKERJAAN BETON
1 Lantai Kerja bawah pondasi & Lantai fc 7,4 Mpa
12.32 12.32

2 Pondasi Footplat F.1


* Beton mutu f’c = 19,3 Mpa 1.20 1.00 0.30 10.00 3.60 3.60 m3
* Besi Ulir 13 1.20 8.00 1.00 10.00 1.042 100.02
1.00 7.00 1.00 10.00 1.042 72.93
16 1.50 7.00 1.00 10.00 1.578 165.72
1.30 8.00 1.00 10.00 1.578 164.14 502.81 kg
* Begisting Pasangan Batako 1.20 1.00 0.30 1.32 1.32 m2
- -
3 Pondasi Footplat F.2
* Beton mutu f’c = 19,3 Mpa 2.00 1.20 0.30 1.00 0.72 0.72 m3
* Besi Ulir 13 2.00 13.00 1.00 1.00 1.042 27.09
13 1.19 8.00 1.00 1.00 1.042 9.92
16 2.30 8.00 1.00 1.00 1.578 29.04
16 1.50 13.00 1.00 1.00 1.578 30.78 96.82 kg
* Begisting Pasangan Batako 2.00 1.20 0.30 1.92 1.92 m2

4 Pondasi Footplat F.3


* Beton mutu f’c = 19,3 Mpa 1.00 1.00 0.30 4.00 1.20 1.20 m3
* Besi Ulir 13 1.00 7.00 1.00 4.00 1.042 29.17
13 0.91 7.00 1.00 4.00 1.042 26.55
16 1.30 7.00 1.00 4.00 1.578 57.45
16 1.30 7.00 1.00 4.00 1.578 57.45 170.62 kg
2.00 1.20 0.30 1.92 1.92 m2
* Begisting Pasangan Batako
- -

5 Pondasi Footplat F.4


* Beton mutu f’c = 19,3 Mpa 1.80 1.00 0.30 2.00 1.08 1.08 m3
* Besi Ulir 13 1.80 12.00 1.00 2.00 1.042 45.01
13 0.99 7.00 1.00 2.00 1.042 14.44
16 2.10 7.00 1.00 2.00 1.578 46.40
16 1.30 12.00 1.00 2.00 1.578 49.24 155.09 kg
* Begisting Pasangan Batako 2.00 1.20 0.30 1.92 1.92 m2

6 Sloof S.1 200/300 mm


* Beton mutu f’c = 19,3 Mpa
S.1-1C-1i 15.53 0.20 0.30 0.93
S.1-2B-2E 3.95 0.20 0.30 0.24
S.1-6B-6I 16.83 0.20 0.30 1.01
S.1-B2-B6 5.80 0.20 0.30 0.35
S.1-C1-C2 1.50 0.20 0.30 0.09
S.1-D1-D2 2.30 0.20 0.30 0.14
S.1-E1-E6 7.90 0.20 0.30 0.47
S.1-F1-F6 8.65 0.20 0.30 0.52
S.1-G1-G6 8.65 0.20 0.30 0.52
S.1-H1-H6 8.65 0.20 0.30 0.52
S.1-I1-I6 8.35 0.20 0.30 0.50
88.11 - 5.29 m3
* Besi Ulir
0.52 S.1-1C-1i 17.18 0.52 4.00 1.041885 73.77
S.1-2B-2E 4.80 4.00 1.041885 20.00
S.1-6B-6I 18.88 0.52 4.00 1.041885 80.85
S.1-B2-B6 7.05 4.00 1.041885 29.38
S.1-C1-C2 2.45 4.00 1.041885 10.21
S.1-D1-D2 2.45 4.00 1.041885 10.21
S.1-E1-E6 9.20 4.00 1.041885 38.34
S.1-F1-F6 9.20 4.00 1.041885 38.34
S.1-G1-G6 9.20 4.00 1.041885 38.34
S.1-H1-H6 9.20 4.00 1.041885 38.34
S.1-I1-I6 9.05 4.00 1.041885 37.72 415.50 kg
* Besi polos Besi 8 0.90 705.00 0.39456 250.35 250.35 kg

* Begisting pemakaian 2x 88.11 0.60 52.87 52.87 m2


* Bongkaran begisting dengan hati hati 88.11 0.60 52.87 52.87 m2

12 Sloof S.2 150/200


* Beton mutu f’c = 19,3 Mpa
32.02 0.15 0.20 0.96
- 0.96 m3
* Besi Ulir
12 32.02 4.00 0.88776 113.70
113.70 kg
* Besi polos Besi 8 0.64 257.00 0.39456 64.90 64.90 kg

* Begisting pemakaian 2x 32.02 0.40 12.81 12.81 m2


* Bongkaran begisting dengan hati hati 32.02 0.40 12.81 12.81 m2

8 Kolom K.1 200/300 mm


* Beton mutu f’c = 19,3 Mpa 0.20 0.30 5.00 11.00 3.30 3.30 m3
* Besi Ulir 16.00 5.64 8.00 11.00 1.57824 783.31 783.31 kg
8.00 0.90 46.00 11.00 0.39456 179.68 179.68 kg
* Begisting pemakaian 2x 5.00 1.00 11.00 55.00 55.00 m2
pengurangan bekisting void sloof 0.20 0.30 (28.00) (1.68)
pengurangan bekisting void balok 0.20 0.40 (22.00) (1.76)
* Bongkaran begisting dengan hati hati 5.00 1.00 11.00 55.00 55.00 m2

10 Kolom K.2 150/400 mm


* Beton mutu f’c = 19,3 Mpa 0.15 0.40 5.00 9.00 2.70 2.70 m3
* Besi Ulir 16.00 52.80 9.00 1.57824 749.98 749.98 kg
* Besi polos 8.00 1.00 50.00 9.00 0.39456 177.55 177.55 kg
* Begisting pemakaian 2x 5.00 1.10 9.00 49.50 49.50 m2
pengurangan bekisting void sloof 0.20 0.30 (28.00) (1.68)
pengurangan bekisting void balok 0.20 0.40 (22.00) (1.76)
* Bongkaran begisting dengan hati hati 5.00 1.10 9.00 49.50 49.50 m2

10 Kolom Kp 110/110
3.30 10.00 33.00 33.00 m

11 Balok B.1 200/400


* Beton mutu f’c = 19,3 Mpa
B.1-1E-1I 12.80 0.20 0.40 1.02
B.1-6E-6I 12.80 0.20 0.40 1.02
B.1-E1-E6 7.70 0.20 0.40 0.62
B.1-I1-I6 8.40 0.20 0.40 0.67 3.34 M3
* Besi Ulir 41.70
B.1-1E-1I 14.45 6.00 1.57824 136.83
B.1-6E-6I 12.55 6.00 1.57824 118.84
B.1-E1-E6 7.45 6.00 1.57824 70.55
B.1-I1-I6 8.15 6.00 1.57824 77.18 403.40 kg
Besi polos 42.60 2.00 0.88776 75.64
1.10 334.00 0.39456 144.96 220.60 kg
* Begisting pemakaian 2x 41.70 1.00 41.70 41.70 m2
* Bongkaran begisting dengan hati hati 41.70 1.00 41.70 41.70 m2

Balok B.2 150/350


Beton mutu f’c = 19,3 Mpa
B.2-1C-1E 2.65 0.15 0.35 0.14
B.2-2B-2E 3.98 0.15 0.35 0.21
B.2-3B-3E 4.35 0.15 0.35 0.23
B.2-4B-4E 4.65 0.15 0.35 0.24
B.2-5B-5E 4.35 0.15 0.35 0.23
B.2-6B-6E 4.35 0.15 0.35 0.23
CANOPI 6.35 0.15 0.35 0.33
B.2-B2-B6 5.80 0.15 0.35 0.30
B.2-C1-C2 1.50 0.15 0.35 0.08 1.99 m2
37.98
* Besi Ulir
B.2-1C-1E 2.80 5.00 1.57824 22.10
B.2-2B-2E 4.50 5.00 1.57824 35.51
B.2-3B-3E 4.50 5.00 1.57824 35.51
B.2-4B-4E 4.50 5.00 1.57824 35.51
B.2-5B-5E 4.50 5.00 1.57824 35.51
B.2-6B-6E 4.50 5.00 1.57824 35.51
CANOPI 6.50 5.00 1.57824 51.29
B.2-B2-B6 6.75 5.00 1.57824 53.27
B.2-C1-C2 2.15 5.00 1.57824 16.97 321.17 kg
40.70
Besi polos 40.70 2.00 0.88776 72.26
0.90 304.00 0.39456 107.95 180.22 kg
* Begisting pemakaian 2x 37.98 0.85 32.28 32.28 m2
* Bongkaran begisting dengan hati hati 37.98 0.85 32.28 32.28 m2

-
Balok B.3 150/500
* Beton mutu f’c = 19,3 Mpa B.3-A1-A6 7.00 0.15 0.50 0.53 0.53 m2
* Besi Ulir B.3-A1-A6 7.00 5.00 1.57824 55.24 55.24
Besi polos 7.00 2.00 0.88776 12.43
1.20 57.00 0.39456 26.99 39.42 kg
* Begisting 7.00 1.15 8.05 8.05 m2
* Bongkaran begisting 7.00 1.15 8.05 8.05 m2

Balok B.4 150/200


* Beton mutu f’c = 19,3 Mpa B.3-A1-A6 10.78 0.15 0.20 0.32 0.32 m2
* Besi polos B.3-A1-A6 11.55 4.00 0.6165 28.48
0.60 87.00 0.39456 20.60 49.08 kg
* Begisting pemakaian 2x 10.78 0.55 5.93 5.93 m2
* Bongkaran begisting dengan hati hati 10.78 0.55 5.93 5.93 m2

0 Balok BR.2 150/300


Beton mutu f’c = 19,3 Mpa
B2-B5 4.15 0.15 0.30
0.19 0.19 m3
Besi Ulir
B2-B5 4.45 5.00 1.04 23.18 23.18 kg
Besi Polos

Begel Besi 8 0.90 30.00 0.39 10.65 10.65 kg

Begisting pemakaian 2x 4.15 0.75 3.11 3.11 m2


Bongkaran begisting 4.15 0.75 3.11 3.11 m2

Balok Konsol BK.1 150/300


* Beton mutu f’c = 19,3 Mpa 3.40 0.15 0.35 0.18 0.18 m3
* Besi ulir 10 4.15 5.00 1.57824 32.75 32.75
Besi polos 4.15 2.00 0.88776 7.37
* 0.90 28.00 0.39456 9.94 17.31 kg
* Begisting pemakaian 2x 3.40 0.85 2.89 2.89 m2
* Bongkaran begisting dengan hati hati 3.40 0.85 2.89 2.89 m2
- -
Balok Konsol BK.2 150/350
* Beton mutu f’c = 19,3 Mpa 1.00 0.15 0.35 0.05 0.05 m3
* Besi ulir 10 1.60 5.00 1.57824 12.63 12.63 kg
1.60 2.00 0.88776 2.84
* Besi polos 0.90 9.00 0.39456 3.20 6.04 kg
* Begisting pemakaian 2x 1.00 0.85 0.85 0.85 m2
* Bongkaran begisting dengan hati hati 1.00 0.85 0.85 0.85 m2

18 Balok Latiu BL 110/110 12.55 12.55 12.55 m'

0.11 0.11 0.15 0.15


polos 8 12.65 4.00 0.39456 19.96 30.70 kg
0.32 85.00 0.39456 10.73

19 Beton Plat lantai 2


* Beton mutu f’c = 19,3 Mpa 0.12 4.41 4.41 m3
2.07 5.17 0.12 1.28 4.41
5.02 3.13 0.12 1.89
2.00 2.63 0.12 0.63
0.85 0.90 0.12 0.09
0.85 5.03 0.12 0.51
* Besi
2.42 5.17 2.00 35.00 0.39456 66.84
5.62 2.42 2.00 17.00 0.39456 75.39
5.02 3.13 2.00 21.00 0.39456 83.19
3.58 5.02 2.00 34.00 0.39456 96.05
2.30 2.63 2.00 18.00 0.39456 32.67
2.93 2.00 2.00 14.00 0.39456 32.37
1.00 0.90 2.00 7.00 0.39456 5.52
1.05 0.85 2.00 6.00 0.39456 4.97
1.00 5.03 2.00 34.00 0.39456 26.83
5.18 0.85 2.00 6.00 0.39456 24.53
448.36 kg
* Begisting 36.72 m2
2.07 5.17 10.70
5.02 3.13 15.71
2.00 2.63 5.26
0.85 0.90 0.77
0.85 5.03 4.28
36.72
* Bongkaran begisting 36.72 m2

Beton Plat tangga


* Beton mutu f’c = 19,3 Mpa 5.49 1.00 0.12 0.66 0.66 m3
* Besi ulir D13 6.30 2.00 7.00 1.041885 91.89 91.89 kg
10 1.15 2.00 37.00 0.6165 52.46 52.46 kg
* Begisting 5.49 1.00 0.42 5.49 6.25 6.25 m2
6.30 0.12 1.00 0.76
* Bongkaran begisting 6.25 m2

21 Beton Plat Meja Daur


* Beton mutu f’c = 14.5 Mpa 1.25 0.60 0.08 0.06 0.06 0.06 m3
* Besi 1.35 0.60 1.00 5.00 0.39456 2.66 5.43 kg
0.70 1.35 1.00 10.00 0.39456 2.76
* Begisting 0.95 0.95 0.95 m2
* Bongkaran begisting 0.95 m2

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm polish
2 Pekerjaan Pemasangan keramik tangga 40/40 cm polish 161.90 161.90 161.90 161.90 m2
3 Pekerjaan Pemasangan keramik tangga 40/40 cm polish 7.75 1.00 7.75 7.75 7.75 m2
3 Pekerjaan Pemasangan Plin keramik lantai dan tangga 9/40 cm 66.4 66.4 66.40 m
4 Pekerjaan Pemasangan Lantai keramik kamar mandi 25/25 cm 2.50 2.50 2.50 2.80 m2
1.5 0.2 0.30 0.30
2.80
5 Pekerjaan Pemasangan keramik dinding kamar mandi 25/40 cm 5.8 1.65 9.57 9.27 9.27 9.27 m2
Dikurangi 1.5 0.2 -0.3
6 Pekerjaan Pemasangan keramik dinding dan meja dapur 1.25 1.3 1.63 1.63 1.63
-
E PEKERJAAN KUSEN, PINTU DAN JENDELA -
1 Pembuatan pintu P.1 1.00 1.00 1.00 unit
2 Pembuatan pintu P.2 2.00 2.00 2.00 unit
3 Pembuatan pintu P.3 1.00 1.00 1.00 unit
4 Pembuatan pintu P.4 ( Pintu Panel UPVC) 1.00 1.00 1.00 unit
5 Pembuatan Teralis TR.1 termasuk cat 2.00 - 2.00 2.00 unit
6 Pembuatan Teralis TR.2 termasuk cat 2.00 - 2.00 2.00 unit
-
F PEKERJAAN PLAFON -
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 26.20 26.20 26.20 m2
2 Memasang langit-langit GRCboard tebal 6 mm + rangka hollow 11.30 11.30 11.30 m2
3 List Gypsum 5-10 cm 70.10 70.10 70.10 70.10 m
-
-
H PEKERJAAN FINISHING -
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 485.91 303.61 303.61 m2
2 Pengecatan tembok tidak terlindung dari panas dan hujan 204.40 182.30 182.30 m2
pengurang 22.10
3 Pengecatan Plafond 37.50 37.50 37.50 m2

I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 16.00 16.00 16.00 titik
2 Instalasi Titik stop kontak 4.00 4.00 4.00 titik
3 fiting lampu downlight 5" 7.00 7.00 7.00 titik
4 Fiting lampu tempel 3.00 3.00 3.00 titik
5 Lampu TL LED 2x18 w TKO + Fiting 6.00 6.00 6.00 titik
6 Lampu LED 13 w Philips 10.00 10.00 10.00 titik
7 Saklar dobel 4.00 4.00 4.00 titik
8 Saklar tunggal 5.00 5.00 5.00 titik
9 Stop kontak 4.00 4.00 4.00 titik
10 Pemasangan Box Presto isi 4 + aksesoris 1.00 1.00 1.00 titik
11 MCB 6 A MG 6.00 6.00 6.00 titik
12 Kabel Tovoer NYY 3x4 1.00 1.00 1.00 titik
13 Pasang daya Listrik Baru termasuk SLO 1.00 1.00 1.00 titik
14 Pemasangan Lampu Led 50 watt 2.00 2.00 2.00 bh

J PEKERJAAN PLUMBING
2.00 2.00 2.00 bh
1 Pemasangan Closet Jongkok 1.00 1.00 1.00 bh
2 Pemasangan Kichenzink 3.00 3.00 3.00 bh
3 Keran 1/2 " 5.00 5.00 5.00 bh
4 Floor Drain 3.00 3.00 3.00 bh
5 Keran sink dapur 1.00 1.00 1.00 bh
6 Instalasi air bersih pipa 1" distribusi 4.00 4.00 4.00 m
7 Instalasi air bersih pipa 3/4" 35.00 35.00 35.00 m
8 Instalasi air bekas pipa 3" 4.00 4.00 4.00 m
9 Instalasi air bekas pipa 4" 3.00 3.00 3.00 m
10 Instalasi air hujan pipa 4" 41.80 41.80 41.80 m
11 Bak kontrol 35.95 35.95 35.95 unit
12 Pembuatan Septic Tank 1.00 1.00 1.00 unit
13 Pembuatan Sumur Resapan dalam 3 m+ plat beton penutup 5.00 5.00 5.00 bh
14 Pompa Air Shimitsu 1.00 1.00 1.00 bh
15 sumur Bor 20.00 20.00 20.00 m

IV PEKERJAAN PEMBANGUNAN LANTAI 2

A PEKERJAAN URUG PASIR


1 Urug pasir bawah lantai
Bawah Lantai
0.05 35.86 1.79 1.79 1.79 m3

1 Pasangan dinding 1/2 bata 1 SP : 6 PP


1C-1e 2.48 5.50 13.64
1E-1I 13.20 4.40 58.08
2A-2C 2.88 3.00 8.64
3B-3E 4.35 0.40 1.74
4A-4E 5.24 3.00 15.72
5A-5E 4.50 0.20 0.90
5B-5E 4.35 0.40 1.74
6A-6E 4.87 3.00 14.61
6E-61 12.80 4.40 56.32
A2-A6 6.55 3.00 19.65
C1-C2 1.70 5.50 9.35
C2-C4' 3.27 3.00 9.81
E1-E2 1.80 5.50 9.90
E2-E6 6.55 5.00 32.75
I1-I6 8.75 5.50 48.13
SHAF 1.87 3.00 5.61
GUNUNGAN DEPAN 3.21 3.21
GUNUNGAN BELAKANG 8.90 8.90
TALANG 14.00 0.20 4.00 11.20 329.90 m2
dinding pagar
pengurangan
denah pintu jendela
p3 2.40 0.88 2.00 4.22
p5 2.10 0.73 1.00 1.53
j1 1.60 0.90 3.00 4.32
j2 2.54 0.60 8.00 12.19
gb 2.60 0.60 8.00 12.48
j3 1.15 0.50 2.00 1.15
35.90 294.00 M2

2 Plesteran dinding bata 1pc : 6ps 587.99


587.99 m2
3 Plesteran beton 1pc: 3 ps kolom 29.08 29.08
balok 32.60 1.00 32.60
18.00 0.50 9.00
11.00 0.70 7.70
9.00 0.70 6.30 84.68 m2
4 Pekerjaan Acian MU 200 Skinwall 672.67
672.67 m2
5 Pasang Sponengan Sudut kolom+susdut 4.40 22.00 96.80
3.00 10.00 30.00
balok 59.60 2.00 119.20
kusen 123.40 2.00 246.80 492.80 m
Screeding dan leveling atap Beton dan talang beton t.3 cm 57.54 57.54 m2

C PEKERJAAN BETON

1 Kolom K.1 20x30 cm


* Beton mutu f’c = 19,3 Mpa 0.20 0.30 4.70 11.00 3.10 3.10 m3
* Besi Ulir 16.00 5.80 8.00 11.00 1.57824 805.53 805.53 kg
* Besi Polos 8.00 0.90 38.00 11.00 0.39456 148.43 148.43 kg
* Begisting pemakaian 2x 4.70 1.00 11.00 51.70 51.70 m2
* Bongkaran begisting dengan hati hati 4.70 1.00 11.00 51.70 51.70 m2

2 Kolom K.2 15x40 cm


* Beton mutu f’c = 19,3 Mpa 0.15 0.40 3.40 7.00 1.43 1.43 m3
* Besi Ulir 16.00 4.50 8.00 7.00 1.57824 397.72 397.72 kg
* Besi Polos 8.00 1.00 28.00 7.00 0.39456 77.33 77.33 kg
* Begisting pemakaian 2x 3.40 1.10 7.00 26.18 26.18 m2
* Bongkaran begisting dengan hati hati 3.40 1.10 7.00 26.18 26.18 m2

3 Kolom Kp 110/110 0.11 0.11 3.40 8.00 27.20 44.60 m


atap depan 0.60 4.00 2.40
gunungan 2.20 1.00 2.20
gunganbelakang 2.00 2.00 4.00
tangki air 2.20 4.00 8.80

4 Balok BR.1 200/300


Beton mutu f’c = 19,3 Mpa
1e-1i 14.00 0.20 0.30 0.84
6E-6I 14.00 0.20 0.30 0.84
E1-E6 9.00 0.20 0.30 0.54
I1-I6 9.00 0.20 0.30 0.54
46.00 2.76 m3
Besi Ulir
1e-1i 14.10 6.00 1.041885 88.14
6E-6I 14.10 6.00 1.041885 88.14
E1-E6 9.10 6.00 1.041885 56.89
I1-I6 9.10 6.00 1.041885 56.89 290.06 kg
46.40
Besi Polos 1e-1i 14.10 2.00 0.88776 25.03
6E-6I 14.10 2.00 0.88776 25.03
E1-E6 9.10 2.00 0.88776 16.16
I1-I6 9.10 2.00 0.88776 16.16

Begel Besi 8 1.10 372.00 0.39456 161.45 243.84 kg

Begisting pemakaian 2x 18.00 0.80 14.40 34.00 m2


28.00 0.70 19.60

Bongkaran begisting 18.00 0.80 14.40 34.00 m2

0 Balok BR.2 150/300


Beton mutu f’c = 19,3 Mpa
1C-1E 2.80 0.15 0.30 0.13
2A-2E 5.50 0.15 0.30 0.25
3A-3E 5.50 0.15 0.30 0.25
4A-4E 5.50 0.15 0.30 0.25
5A-5E 5.50 0.15 0.30 0.25
6A-6E 5.50 0.15 0.30 0.25
A2-A6 6.75 0.15 0.30 0.30
C1-C2 2.15 0.15 0.30 0.10
E1-E6 8.90 0.15 0.30 0.40
48.10 2.16 m3
Besi Ulir
1C-1E 2.80 5.00 1.041885 14.59
2A-2E 5.50 5.00 1.041885 28.65
3A-3E 5.50 5.00 1.041885 28.65
4A-4E 5.50 5.00 1.041885 28.65
5A-5E 5.50 5.00 1.041885 28.65
6A-6E 5.50 5.00 1.041885 28.65
A2-A6 6.75 5.00 1.041885 35.16
C1-C2 2.15 5.00 1.041885 11.20
E1-E6 8.90 5.00 1.041885 46.36 250.57 kg

Besi Polos

Begel Besi 8 0.90 385.00 0.39456 136.72 136.72 kg

Begisting pemakaian 2x 48.10 0.75 36.08 36.08 m2


Bongkaran begisting 48.10 0.75 36.08 36.08 m2

3 Balok BR.3 150/600


Beton mutu f’c = 19,3 Mpa
1E-1I 14.00 0.15 0.60 1.26
6E-6I 14.00 0.15 0.60 1.26
28.00 2.52 m3
Besi
1E-1I 14.00 6.00 1.041885 87.52
6E-6I 14.00 6.00 1.041885 87.52
175.04 kg
0 15.10 2.00 0.88776 26.81
1E-1I 15.10 2.00 0.88776 26.81

Begel Besi 8 1.10 225.00 0.39456 97.65 151.27 kg

Begisting pemakaian 2x 28.00 1.35 37.80 37.80 m2


Bongkaran begisting 28.00 1.35 37.80 37.80 m2
1 Balok BR.4 150/500
Beton mutu f’c = 19,3 Mpa
2B-6B 6.75 0.15 0.50 0.51
-
0.51 m3
Besi
6.75 6.00 1.041885 42.20
- 6.00 1.041885 -
42.20 kg
14.10 2.00 0.88776 25.03
14.10 2.00 0.88776 25.03

Begel Besi 8 1.10 55.00 0.39456 23.87 73.94 kg

Begisting pemakaian 2x 6.75 1.15 5.40 m2


6.75 0.80 5.40
Bongkaran begisting 6.75 1.15 7.76 7.76 m2

2 Balok B.4 150/200


Beton mutu f’c = 19,3 Mpa
36.05 0.15 0.20 1.08
1.08 m3
-
36.05 4.00 0.6165 88.90

Begel Besi 8 0.60 252.35 0.39456 59.74 148.64 kg

Begisting pemakaian 2x 36.05 0.55 19.83 19.83 m2


Bongkaran begisting 36.05 0.55 19.83 19.83 m2

Balok Konsol BK.3 200/300


* Beton mutu f’c = 19,3 Mpa 3.60 0.20 0.30 0.22 0.22 m3
* Besi ulir 10 4.35 6.00 1.57824 41.19 41.19
4.35 2.00 0.88776 7.72
* Besi polos 0.90 37.00 0.39456 13.14 20.86 kg
* Begisting pemakaian 2x 3.60 0.70 2.52 2.52 m2
* Bongkaran begisting dengan hati hati 3.60 0.70 2.52 2.52 m2

9 Balok Latiu BL 110/110 52.88 0.11 0.11 52.88 52.88 m'

10 Atap Dag Beton


* Beton mutu f’c = 19,3 Mpa 0.12 2.73 m3
5.17 0.95 0.12 0.59 4.91 2.73
5.20 0.85 0.12 0.53 4.42
4.18 0.95 0.12 0.48 3.97
2.63 2.00 0.12 0.63 5.26
1.37 1.23 0.12 0.20 1.69
2.00 1.25 0.12 0.30 2.50
22.75

* Besi 271.55 kg
5.47 0.95 2.00 7.00 0.39456 30.22
1.10 5.17 2.00 35.00 0.39456 30.38
5.20 0.85 2.00 6.00 0.39456 24.62
1.00 5.20 2.00 35.00 0.39456 27.62
4.63 0.95 2.00 7.00 0.39456 25.58
1.10 4.18 2.00 28.00 0.39456 24.30
2.78 2.00 2.00 14.00 0.39456 30.71
2.30 2.63 2.00 18.00 0.39456 32.67
1.52 1.23 2.00 9.00 0.39456 10.80
1.38 1.37 2.00 9.00 0.39456 9.80
2.15 1.25 2.00 14.00 0.39456 23.75
1.40 2.00 2.00 1.00 0.39456 1.10

* Begisting 22.75 22.75 m2


5.17 0.95 4.91
5.20 0.85 4.42
4.18 0.95 3.97
2.63 2.00 5.26
1.37 1.23 1.69
2.00 1.25 2.50
* Bongkaran begisting 22.75 m2

Talang beton
* Beton mutu f’c = 19,3 Mpa 28.00 0.90 0.10 25.20 2.52 2.52 m3
* Besi 8 14.00 1.45 1.00 94.00 0.39456 2.00 107.56 223.56 kg
14.70 14.00 1.00 10.00 0.39456 2.00 116.00
* Begisting 94.33 33.60 33.60 33.60 m2
* Bongkaran begisting 33.60 m2

Canopi beton
* Beton mutu f’c = 19,3 Mpa 4.18 0.60 0.10 2.00 2.51 0.50 0.50 m3
besi 8 4.28 0.60 1.00 5.00 0.39456 8.44 16.18 kg
0.70 4.18 1.00 28.00 0.39456 7.73
* Begisting 2.51 3.58 3.58 m2
4.18 0.60 0.10 5.38 2.00 1.08
* Bongkaran begisting 3.58 m2

D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm unpolish Platinum
35.86 35.86 35.86 m2

2 Pekerjaan Pemasangan Plin keramik 9 X 40 cm rumah 45 45 45.00 m2

E PEKERJAAN KUSEN, PINTU DAN JENDELA


1 Pembuatan pintu P.3 2.00 2.00 2.00 unit
2 Pintu P.5 2.00 2.00 2.00 unit
3 Pembuatan Jendela j.1 3.00 3.00 3.00 bh
4 Pembuatan Jendela j.2 8.00 8.00 8.00 bh
5 Pembuatan Jendela j.3 2.00 2.00 2.00 bh
6 Glass box GB.1 2.6 0.6 1.56 8 12.48 12.48 12.48 m2

F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 176.6389 176.6389 176.64 m2
13.83 8.83 122.1189
5.3 3.28 17.384
3.12 2.45 7.644
5.4 3.6 19.44
1.46 -0.8 -1.168
drop celling 37.4 0.3 11.22
176.6389

2 List Gypsum 5-10 cm dalam 13.83 2 27.66 129.02 129.02 129.02 m2


8.83 2 17.66
5.3 2 10.6
3.28 2 6.56
3.12 2 6.24
2.45 2 4.9
5.4 2 10.8
3.6 2 7.2
37.4 1 37.4

129.02

G PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 1 4 4 5 40 166.00 m2
4.5 4.5 14 126
2 Pemasangan Penutup Atap Genteng Keramik Glasur 40.00 m2
4 Penutup Atap Galvalum 126 126.00 m2
5 Nok Atap Galvalum 13.85 13.85 13.85 m2
6 Memasang lisplank ukuran (0,9 x 20) cm, Kalsiplang 10 10 10.00 m2
7 Memasang lisplank Kayu Jati Banyu tumetes ukuran 2x2x20 cm 8 8 8.00 m2
8 Canopi Lantai 1 9.05 0.8 <10 7.24 7.24 m2

H PEKERJAAN FINISHING

1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 544.27 544.274 544.27
2 Pengecatan tembok tidak terlindung dari panas dan hujan 128.40 121.98 121.98
3 Cat Plafon 176.6389 176.64 m2
4 Cat Kayu listplang 3.53 0.34 2 2.4004 2.4004 2.40 m2
5 Waterproofing dag beton dan talang 49.55 49.55 49.55 m2

I PEKERJAAN PAGAR DEPAN GEDUNG

1 Pekerjaan galian dan Urugan


a. Galian Biasa < 1m 7.01 0.7 0.49 3.43 m3
b. Urugan Pasir 5cm 7.01 0.7 0.7 0.035 0.25 m3
c. Urugan Tanah Kembali 0.05 1.09 m3

2 Pekerjaan Pasangan
a. Pekerjaan Pondasi Pasangan Batu Kali 1 : 4 7 0.3 0.6 0.27 1.89 m3
b. Pasangan Dinding Batu bata Merah 1Pc : 6Pp 3.71 0.6 2.78 m2
c. Plesteran dinding 4.16 0.75 3.12 0.75 1 7.29 m2
3.71 0.15 0.5565
kolom 5.75 0.6 3.45
Ban-banan 0.16 7.2865
d. Acian 7.29 m2
e. Cat Tembok exterior 7.29 m2
f. Pasangan Batu andhesit 10x20 cm 2.78 m2
g. Pengecatan Batu Andhesit 2.78 m2

3 Pelrerjaan Beton dan Pembesian


a. Sloof 15 x 20 cm
- Cor Beton Fc 7.4 Mpa 7.01 0.15 0.03 0.21 m3
- Pembesian Sloof 0.2 35.68 Kg
Pokok Dia 12 7.11 4 0.888 25.25472
Begel Dia 08 0.55 48 0.395 10.428
- Pemasangan Bekisting 7.11 2 1.422 2.84 m2
- Pelepasan bekisting 0.2 2.84 m2

b Kolom Praktis 15 x 15 cm
- Cor Beton Fc 7,4 Mpa 0.15 0.15 4 0.0225 0.045 0.18 m3
- Pembesian Kolom Praktis 2 71.87 71.87 Kg
Pokok Dia 12 2.4 4 0.888 8.525
Begel Dia 08 0.44 54 0.395 9.443
- Pemasangan Bekisting 0.1 0.1 4 0.2 0.80 m2
- Pelepasan bekisting 2 0.80 m2

c Pekerjaan pagar dan Tralis Railing


a Tralis Besi Hollow aiq 2 2 4.00 m2
b Pagar Dorong Pintu masuk 3 6 6.00 m2
2
MC 0%

INSTANSI :
KEGIATAN : PEMBANGUNAN GEDUNG PEMERINTAH
PEKERJAAN : PEMBANGUNAN BALAI RW.15 TEGALPANGGUNG
LOKASI : KEL. TEGALPANGGUNG, KEC. DANUREJAN KOTA YOGYAKARTA
TAHUN : 2019

KONTRAK NEGO PEKERJAAN TAMBAH PEKERJAAN KURANG MC0


No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA

I BIAYA PENYELENGGARAAN SMK3

1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja Dan Formulir 1.00 set 150,000.00 150,000.00 set set set 150,000.00
2 Spanduk (banner) 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
3 Papan Informasi K3 1.00 bh 50,000.00 50,000.00 bh bh bh 50,000.00
5 Pagar Pengaman Sementara dari Seng Gelombang tinggi 2 m (sewa) 1.00 ls 1,000,000.00 1,000,000.00 ls ls ls ###
6 Sewa Topi Pelindung (Safety Helmet) 15.00 bh 20,000.00 300,000.00 bh bh bh 300,000.00
7 Sewa Pelindung Mata (Goggles, Spectacles) 1.00 bh 15,000.00 15,000.00 bh bh bh 15,000.00
8 Sewa Tameng Muka (Face Shield) 1.00 bh 20,000.00 20,000.00 bh bh bh 20,000.00
9 Pelindung Telinga (Ear Plug, Ear Muff) 1.00 psg 15,000.00 15,000.00 psg psg psg 15,000.00
10 Pelindung Pernafasan Dan Mulut (Masker) 15.00 dus 8,000.00 120,000.00 dus dus dus 120,000.00
11 Sarung Tangan (Safety Gloves) 15.00 psg 7,000.00 105,000.00 psg psg psg 105,000.00
Sewa Sepatu Keselamatan (Rubber Safety Shoes_and
12 15.00 psg 50,000.00 750,000.00 psg psg psg 750,000.00
toe cap)
13 Sewa Penunjang Seluruh Tubuh (Full Body Harness) 2.00 bh 100,000.00 200,000.00 bh bh bh 200,000.00
16 Peralatan P3K (Kotak P3K, Obat Luka, Perban, Alkohol, Kapas) 1.00 ls 150,000.00 150,000.00 ls ls ls 150,000.00
17 Rambu Petunjuk 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
18 Rambu Larangan 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
19 Rambu Peringatan 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
20 Rambu Kewajiban 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
21 Rambu Informasi 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
22 Rambu Pekerjaan Sementara 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00
23 Alat Pemadam Api Ringan (APAR) 2.00 bh 250,000.00 500,000.00 bh bh bh 500,000.00
24 Bendera K3 1.00 bh 100,000.00 100,000.00 bh bh bh 100,000.00

SUB JUMLAH 4,175,000.00 ###


II PEKERJAAN PERSIAPAN

A PEKERJAAN PERSIAPAN
1 Membuat Papan Nama Proyek 80x120 cm (bahan flexi) 1.00 Unit 200,000.00 200,000.00 Unit Unit Unit 200,000.00
2 Pembersihan lokasi awal dan akhir 1.00 Ls 1,000,000.00 1,000,000.00 Ls Ls Ls ###
3 Uizet dan Bowplang 1.00 Ls 1,500,000.00 1,500,000.00 Ls Ls Ls ###

SUB JUMLAH 2,700,000.00 ###


III PEKERJAAN PEMBANGUNAN LANTAI 1
A PEKERJAAN GALIAN
1 Galian tanah biasa footplat 60.00 m3 71,516.64 4,290,998.58 m3 m3 m3 ###
2 Galian tanah biasa sedalam 1 m 53.27 m3 58,626.90 3,123,318.61 m3 m3 m3 ###
3 Urug pasir bawah pondasi dan bawah lantai 12.32 m3 231,811.16 2,855,044.18 m3 m3 m3 ###
4 Urugan tanah kembali 30.00 m3 41,672.08 1,250,162.40 m3 m3 m3 ###
5 Urug Tanah Peninggian Lantai 44.38 m3 231,811.16 10,288,358.72 m3 m3 m3 ###
SUB JUMLAH 21,807,882.48 ###
No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
B PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali campuran 1 SP :8 PP 28.63 m3 601,620.23 17,226,492.74 m3 m3 m3 ###
2 Pasangan dinding 1/2 bata transram 1 SP : 3 PP (trasram) 21.85 m2 89,501.52 1,955,966.13 m2 m2 m2 ###
3 Pasangan dinding 1/2 bata 1 SP : 6 PP 186.09 m2 84,575.94 15,738,905.35 m2 m2 m2 ###
4 Plesteran dinding bata 1pc : 3ps (Trasram ) 43.71 m2 37,397.42 1,634,566.58 m2 m2 m2 ###
5 Plesteran dinding bata 1pc : 6ps 372.18 m2 34,488.55 12,836,086.01 m2 m2 m2 ###
6 Penebalan Dinding Teras pasangan 1/4 bata 1.86 m2 90,000.00 167,400.00 m2 m2 m2 167,400.00
7 Plesteran beton 1pc: 3 ps 71.85 m2 37,397.42 2,687,098.36 m2 m2 m2 ###
8 Pekerjaan Acian MU 200 Skinwall 485.91 m2 16,416.04 7,976,694.23 m2 m2 m2 ###
9 Pasang Sponengan Sudut 298.96 m' 12,000.00 3,587,496.00 m' m' m' ###
SUB JUMLAH 63,810,705.39 ###
C PEKERJAAN BETON
1 Lantai Kerja bawah pondasi & Lantai fc 7,4 Mpa 12.32 m3 786,606.98 9,688,048.22 m3 m3 m3 ###

2 Pondasi Footplat F.1


- Beton mutu f’c = 19,3 Mpa 3.60 m3 898,723.26 3,235,403.74 m3 m3 m3 ###
- Besi Ulir 502.81 kg 16,021.79 8,055,837.85 kg kg kg ###
- Begisting Pasangan Batako 1.32 m2 85,000.00 112,200.00 m2 m2 m2 112,200.00

3 Pondasi Footplat F.2


- Beton mutu f’c = 19,3 Mpa 0.72 m3 898,723.26 647,080.75 m3 m3 m3 647,080.75
- Besi Ulir 96.82 kg 16,021.79 1,551,278.71 kg kg kg ###
- Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00 m2 m2 m2 163,200.00

4 Pondasi Footplat F.3


- Beton mutu f’c = 19,3 Mpa 1.20 m3 898,723.26 1,078,467.91 m3 m3 m3 ###
- Besi Ulir 170.62 kg 16,021.79 2,733,572.03 kg kg kg ###
- Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00 m2 m2 m2 163,200.00

5 Pondasi Footplat F.4


- Beton mutu f’c = 19,3 Mpa 1.08 m3 898,723.26 970,621.12 m3 m3 m3 970,621.12
- Besi Ulir 155.09 kg 16,021.79 2,484,840.46 kg kg kg ###
- Begisting Pasangan Batako 1.92 m2 85,000.00 163,200.00 m2 m2 m2 163,200.00

6 Sloof S.1 200/300 mm


- Beton mutu f’c = 19,3 Mpa 5.29 m3 898,723.26 4,751,190.39 m3 m3 m3 ###
- Besi Ulir 415.50 kg 16,021.79 6,657,114.13 kg kg kg ###
- Besi polos 250.35 kg 16,021.79 4,011,028.51 kg kg kg ###
- Begisting pemakaian 2x 52.87 m2 85,000.00 4,493,610.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 52.87 m2 25,000.00 1,321,650.00 m2 m2 m2 ###

7 Sloof S.2 150/200 mm


- Beton mutu f’c = 19,3 Mpa 0.96 m3 16,021.79 15,390.53
- Besi Ulir 113.70 kg 85,000.00 9,664,865.57
- Besi polos 64.90 kg 85,000.00 5,516,264.45
- Begisting pemakaian 2x 52.87 m2 25,000.00 1,321,650.00
- Bongkaran begisting dengan hati hati 52.87 m2 25,000.00 1,321,650.00

8 Kolom K.1 200/300 mm


- Beton mutu f’c = 19,3 Mpa 3.30 m3 898,723.26 2,965,786.76 m3 m3 m3 ###
- Besi Ulir 783.31 kg 16,021.79 12,550,062.54 kg kg kg ###
- Besi polos 179.68 kg 16,021.79 2,878,837.48 kg kg kg ###
- Begisting pemakaian 2x 55.00 m2 85,000.00 4,675,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 55.00 m2 25,000.00 1,375,000.00 m2 m2 m2 ###

9 Kolom K.2 150/400 mm


- Beton mutu f’c = 19,3 Mpa 2.70 m3 898,723.26 2,426,552.80 m3 m3 m3 ###
- Besi Ulir 749.98 kg 16,021.79 12,016,017.33 kg kg kg ###
- Besi polos 177.55 kg 16,021.79 2,844,701.07 kg kg kg ###
- Begisting pemakaian 2x 49.50 m2 85,000.00 4,207,500.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 49.50 m2 25,000.00 1,237,500.00 m2 m2 m2 ###

10 Kolom Kp 110/110 33.00 m1 80,000.00 2,640,000.00 m1 m1 m1 ###


No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
11 Balok B.1 200/400
- Beton mutu f’c = 19,3 Mpa 3.34 m3 898,723.26 2,998,140.80 m3 m3 m3 ###
- Besi Ulir 403.40 kg 16,021.79 6,463,160.84 kg kg kg ###
- Besi polos 220.60 kg 16,021.79 3,534,383.04 kg kg kg ###
- Begisting pemakaian 2x 41.70 m2 85,000.00 3,544,500.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 41.70 m2 25,000.00 1,042,500.00 m2 m2 m2 ###

12 Balok B.2 150/350


- Beton mutu f’c = 19,3 Mpa 1.99 m3 898,723.26 1,792,009.24 m3 m3 m3 ###
- Besi Ulir 321.17 kg 16,021.79 5,145,748.16 kg kg kg ###
- Besi polos 180.22 kg 16,021.79 2,887,371.59 kg kg kg ###
- Begisting pemakaian 2x 32.28 m2 85,000.00 2,744,055.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 32.28 m2 25,000.00 807,075.00 m2 m2 m2 807,075.00

13 Balok B.3 150/500


- Beton mutu f’c = 19,3 Mpa 0.53 m3 898,723.26 471,829.71 m3 m3 m3 471,829.71
- Besi Ulir 55.24 kg 16,021.79 885,018.11 kg kg kg 885,018.11
- Besi polos 39.42 kg 16,021.79 631,523.64 kg kg kg 631,523.64
- Begisting pemakaian 2x 8.05 m2 85,000.00 684,250.00 m2 m2 m2 684,250.00
- Bongkaran begisting dengan hati hati 8.05 m2 25,000.00 201,250.00 m2 m2 m2 201,250.00

14 Balok B.4 150/200


- Beton mutu f’c = 19,3 Mpa 0.32 m3 898,723.26 290,512.29 m3 m3 m3 290,512.29
- Besi polos 49.08 kg 16,021.79 786,322.79 kg kg kg 786,322.79
- Begisting pemakaian 2x 5.93 m2 85,000.00 503,731.25 m2 m2 m2 503,731.25
- Bongkaran begisting dengan hati hati 5.93 m2 25,000.00 148,156.25 m2 m2 m2 148,156.25

15 Balok Konsol BK.2 150/350


- Beton mutu f’c = 19,3 Mpa 0.19 m3 898,723.26 167,836.57
- Besi Ulir 23.18 kg 16,021.79 371,416.22
- Besi polos 10.65 kg 16,021.79 170,682.06
- Begisting pemakaian 2x 3.11 m2 85,000.00 264,562.50
- Bongkaran begisting dengan hati hati 3.11 m2 25,000.00 77,812.50

16 Balok Konsol BK.1 150/350


- Beton mutu f’c = 19,3 Mpa 0.18 m3 898,723.26 160,422.10 m3 m3 m3 160,422.10
- Besi ulir 32.75 kg 16,021.79 524,689.31 kg kg kg 524,689.31
- Besi polos 17.31 kg 16,021.79 277,358.35 kg kg kg 277,358.35
- Begisting pemakaian 2x 2.89 m2 85,000.00 245,650.00 m2 m2 m2 245,650.00
- Bongkaran begisting dengan hati hati 2.89 m2 25,000.00 72,250.00 m2 m2 m2 72,250.00

17 Balok Konsol BK.2 150/350


- Beton mutu f’c = 19,3 Mpa 0.05 m3 898,723.26 47,182.97 m3 m3 m3 47,182.97
- Besi ulir 12.63 kg 16,021.79 202,289.85 kg kg kg 202,289.85
- Besi polos 6.04 kg 16,021.79 96,719.84 kg kg kg 96,719.84
- Begisting pemakaian 2x 0.85 m2 85,000.00 72,250.00 m2 m2 m2 72,250.00
- Bongkaran begisting dengan hati hati 0.85 m2 25,000.00 21,250.00 m2 m2 m2 21,250.00

18 Balok Latiu BL 110/110 12.55 m3 800,000.00 10,040,000.00 m3 m3 m3 ###

19 Beton Plat lantai 2


- Beton mutu f’c = 19,3 Mpa 4.41 m3 898,723.26 3,959,594.94 m3 m3 m3 ###
- Besi polos 448.36 kg 16,021.79 7,183,565.58 kg kg kg ###
- Begisting 36.72 m2 85,000.00 3,120,775.00 m2 m2 m2 ###
- Bongkaran begisting 36.72 m2 25,000.00 917,875.00 m2 m2 m2 917,875.00

20 Beton Plat tangga


- Beton mutu f’c = 19,3 Mpa 0.66 m3 898,723.26 592,078.88 m3 m3 m3 592,078.88
- Besi ulir 91.89 kg 16,021.79 1,472,310.60 kg kg kg ###
- Besi polos 52.46 kg 16,021.79 840,569.66 kg kg kg 840,569.66
- Begisting 6.25 m2 85,000.00 530,910.00 m2 m2 m2 530,910.00
- Bongkaran begisting 6.25 m2 25,000.00 156,150.00 m2 m2 m2 156,150.00
No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
21 Beton Plat Meja Daur
- Beton mutu f’c = 14.5 Mpa 0.06 m3 857,919.35 51,475.16 m3 m3 m3 51,475.16
- Besi polos 5.43 kg 16,021.79 86,921.42 kg kg kg 86,921.42
- Begisting 0.95 m2 85,000.00 80,750.00 m2 m2 m2 80,750.00
- Bongkaran begisting 0.95 m2 25,000.00 23,750.00 m2 m2 m2 23,750.00

SUB JUMLAH 187,328,958.59 ###


D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm polish 161.90 m2 91,250.11 14,773,392.67 m2 m2 m2 ###
2 Pekerjaan Pemasangan keramik tangga 40/40 cm polish 7.80 m2 91,250.11 711,750.85 m2 m2 m2 711,750.85
3 Pekerjaan Pemasangan Plin keramik lantai dan tangga 9/40 cm 66.40 m 41,151.18 2,732,438.28 m m m ###
4 Pekerjaan Pemasangan Lantai keramik kamar mandi 25/25 cm 2.50 m2 107,969.50 269,923.75 m2 m2 m2 269,923.75
5 Pekerjaan Pemasangan keramik dinding kamar mandi 25/40 cm 9.30 m2 114,756.53 1,067,235.75 m2 m2 m2 ###
6 Pekerjaan Pemasangan keramik dinding dan meja dapur 1.60 m2 114,756.53 183,610.45 m2 m2 m2 183,610.45
7 Step Nousing Tangga 8x40 cm 17.00 m 23,000.00 391,000.00 m m m 391,000.00

SUB JUMLAH 20,129,351.75 ###


E PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pembuatan pintu P.1 1.00 unit 2,100,000.00 2,100,000.00 unit unit unit ###
2 Pembuatan pintu P.2 2.00 unit 2,100,000.00 4,200,000.00 unit unit unit ###
3 Pembuatan pintu P.3 1.00 unit 2,100,000.00 2,100,000.00 unit unit unit ###
4 Pembuatan pintu P.4 ( Pintu Panel UPVC) 1.00 unit 1,400,000.00 1,400,000.00 unit unit unit ###
5 Pembuatan Teralis TR.1 termasuk cat 1.20 m2 550,000.00 660,000.00 m2 m2 m2 660,000.00
6 Pembuatan Teralis TR.2 termasuk cat 1.20 m2 550,000.00 660,000.00 m2 m2 m2 660,000.00
7 Penutup Rel pintu geser 3.70 m2 550,000.00 2,035,000.00 m2 m2 m2 ###
SUB JUMLAH 13,155,000.00 ###
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 26.00 m2 129,019.01 3,354,494.17 m2 m2 m2 ###
2 Memasang langit-langit GRCboard tebal 6 mm + rangka hollow 11.30 m2 141,888.33 1,603,338.07 m2 m2 m2 ###
3 List Gypsum 5-10 cm 70.10 m 16,955.33 1,188,568.46 m m m ###
SUB JUMLAH 6,146,400.70 ###
H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 324.30 m2 20,809.48 6,748,515.73 m2 m2 m2 ###
2 Pengecatan tembok tidak terlindung dari panas dan hujan 182.30 m2 31,173.73 5,682,970.76 m2 m2 m2 ###
3 Pengecatan Plafond 37.30 m2 14,650.60 546,467.23 m2 m2 m2 546,467.23
SUB JUMLAH 12,977,953.72 ###
I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 16.00 titik 130,000.00 2,080,000.00 titik titik titik ###
2 Instalasi Titik stop kontak 4.00 titik 130,000.00 520,000.00 titik titik titik 520,000.00
3 fiting lampu downlight 5" 7.00 bh 65,000.00 455,000.00 bh bh bh 455,000.00
4 Fiting lampu tempel 3.00 bh 65,000.00 195,000.00 bh bh bh 195,000.00
5 Lampu TL LED 2x18 w TKO + Fiting 6.00 bh 120,000.00 720,000.00 bh bh bh 720,000.00
6 Lampu LED 13 w Philips 10.00 bh 110,000.00 1,100,000.00 bh bh bh ###
7 Saklar dobel 4.00 bh 35,000.00 140,000.00 bh bh bh 140,000.00
8 Saklar tunggal 5.00 bh 35,000.00 175,000.00 bh bh bh 175,000.00
9 Stop kontak 4.00 bh 35,000.00 140,000.00 bh bh bh 140,000.00
10 Pemasangan Box Presto isi 4 + aksesoris 1.00 ls 160,000.00 160,000.00 ls ls ls 160,000.00
11 MCB 6 A MG 6.00 bh 90,000.00 540,000.00 bh bh bh 540,000.00
12 Kabel Tovoer NYY 3x4 1.00 m 15,000.00 15,000.00 m m m 15,000.00
13 Pasang daya Listrik Baru termasuk SLO 2200.00 Va 1,000.00 2,200,000.00 Va Va Va ###
14 Pemasangan Lampu Led 50 Watt 2.00 bh 128,351.52 256,703.04

SUB JUMLAH 8,696,703.04 ###


No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
J PEKERJAAN PLUMBING
1 Pemasangan Closet Jongkok 1.00 bh 450,000.00 450,000.00 bh bh bh 450,000.00
2 Pemasangan Kichenzink 1.00 bh 400,000.00 400,000.00 bh bh bh 400,000.00
3 Keran 1/2 " 1.00 bh 45,000.00 45,000.00 bh bh bh 45,000.00
4 Floor Drain 1.00 bh 75,000.00 75,000.00 bh bh bh 75,000.00
5 Keran sink dapur 1.00 bh 45,000.00 45,000.00 bh bh bh 45,000.00
6 Instalasi air bersih pipa 1" distribusi 12.00 m 31,000.00 372,000.00 m m m 372,000.00
7 Instalasi air bersih pipa 3/4" 12.00 m 34,000.00 408,000.00 m m m 408,000.00
8 Instalasi air bekas pipa 3" 15.00 m 130,000.00 1,950,000.00 m m m ###
9 Instalasi air bekas pipa 4" 15.00 m 154,000.00 2,310,000.00 m m m ###
10 Instalasi air hujan pipa 4" 84.00 m 90,000.00 7,560,000.00 m m m ###
11 Bak kontrol 4.00 unit 900,000.00 3,600,000.00 unit unit unit ###
12 Pembuatan Septic Tank 1.00 Unit 3,500,000.00 3,500,000.00 Unit Unit Unit ###
13 Pembuatan Sumur Resapan dalam 3 m+ plat beton penutup 5.00 bh 1,500,000.00 7,500,000.00 bh bh bh ###
14 Pompa Air Shimitsu 1.00 bh 750,000.00 750,000.00 bh bh bh 750,000.00
15 Pengeboran Sumur Air Bersih 20.00 m 500,000.00 10,000,000.00

SUB JUMLAH 38,965,000.00 ###


IV PEKERJAAN PEMBANGUNAN LANTAI 2
A PEKERJAAN URUG PASIR
1 Urug pasir bawah lantai 1.90 m3 231,811.16 440,441.20 m3 m3 m3 440,441.20
SUB JUMLAH 440,441.20 440,441.20
B PEKERJAAN PASANGAN
1 Pasangan dinding 1/2 bata 1 SP : 6 PP 293.80 m2 84,575.94 24,848,410.42 m2 m2 m2 ###
2 Plesteran dinding bata 1pc : 6ps 559.40 m2 34,488.55 19,292,894.14 m2 m2 m2 ###
3 Plesteran beton 1pc: 3 ps 84.70 m2 37,397.42 3,167,561.75 m2 m2 m2 ###
4 Pekerjaan Acian MU 200 Skinwall 644.00 m2 16,416.04 10,571,930.90 m2 m2 m2 ###
5 Pasang Sponengan Sudut 492.80 m' 12,000.00 5,913,600.00 m' m' m' ###
6 Screeding dan leveling atap Beton dan talang beton t.3 cm 25.80 m2 250,000.00 6,450,000.00 m2 m2 m2 ###
SUB JUMLAH 70,244,397.21 ###
C PEKERJAAN BETON

1 Kolom K.1 20x30 cm


- Beton mutu f’c = 19,3 Mpa 3.10 m3 898,723.26 2,786,042.11 m3 m3 m3 ###
- Besi Ulir 875.00 kg 16,021.79 14,019,067.30 kg kg kg ###
- Besi Polos 132.40 kg 16,021.79 2,121,285.16 kg kg kg ###
- Begisting pemakaian 2x 51.70 m2 85,000.00 4,394,500.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 51.70 m2 25,000.00 1,292,500.00 m2 m2 m2 ###

2 Kolom K.2 15x40 cm -


- Beton mutu f’c = 19,3 Mpa 1.40 m3 898,723.26 1,258,212.56 m3 m3 m3 ###
- Besi Ulir 441.90 kg 16,021.79 7,080,029.53 kg kg kg ###
- Besi Polos 68.50 kg 16,021.79 1,097,492.70 kg kg kg ###
- Begisting pemakaian 2x 26.20 m2 85,000.00 2,227,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 26.20 m2 25,000.00 655,000.00 m2 m2 m2 655,000.00

3 Kolom Kp 110/110 m m m ###


43.00 m 80,000.00 3,440,000.00
4 Balok BR.1 200/300 -
- Beton mutu f’c = 19,3 Mpa 2.80 m3 898,723.26 2,516,425.13 m3 m3 m3 ###
- Besi Ulir 302.60 kg 16,021.79 4,848,194.02 kg kg kg ###
- Besi Polos 225.70 kg 16,021.79 3,616,118.27 kg kg kg ###
- Begisting pemakaian 2x 36.80 m2 85,000.00 3,128,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 36.80 m2 25,000.00 920,000.00 m2 m2 m2 920,000.00
No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
5 Balok BR.2 150/300 -
- Beton mutu f’c = 19,3 Mpa 2.50 m3 898,723.26 2,246,808.15 m3 m3 m3 ###
- Besi Ulir 287.30 kg 16,021.79 4,603,060.61 kg kg kg ###
- Besi Polos 137.10 kg 16,021.79 2,196,587.57 kg kg kg ###
- Begisting pemakaian 2x 41.40 m2 85,000.00 3,519,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 41.40 m2 25,000.00 1,035,000.00 m2 m2 m2 ###

6 Balok BR.3 150/400 -


- Beton mutu f’c = 19,3 Mpa 1.70 m3 898,723.26 1,527,829.54 m3 m3 m3 ###
- Besi Ulir 116.70 kg 16,021.79 1,869,743.03 kg kg kg ###
- Besi Polos 138.70 kg 16,021.79 2,222,222.44 kg kg kg ###
- Begisting pemakaian 2x 26.60 m2 85,000.00 2,261,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 26.60 m2 25,000.00 665,000.00 m2 m2 m2 665,000.00

7 Balok B.4 150/200 -


- Beton mutu f’c = 19,3 Mpa 1.10 m3 898,723.26 988,595.59 m3 m3 m3 988,595.59
- Besi polos 148.60 kg 16,021.79 2,380,838.17 kg kg kg ###
- Begisting pemakaian 2x 19.80 m2 85,000.00 1,683,000.00 m2 m2 m2 ###
- Bongkaran begisting dengan hati hati 19.80 m2 25,000.00 495,000.00 m2 m2 m2 495,000.00

8 Balok Konsol BK.3 200/300 -


- Beton mutu f’c = 19,3 Mpa 0.20 m3 898,723.26 179,744.65 m3 m3 m3 179,744.65
- Besi ulir 34.30 kg 16,021.79 549,547.44 kg kg kg 549,547.44
- Besi polos 16.00 kg 16,021.79 256,348.66 kg kg kg 256,348.66
- Begisting pemakaian 2x 2.90 m2 85,000.00 246,500.00 m2 m2 m2 246,500.00
- Bongkaran begisting dengan hati hati 2.90 m2 25,000.00 72,500.00 m2 m2 m2 72,500.00

9 Balok Latiu BL 110/110 55.10 m 800,000.00 44,080,000.00 m m m ###

10 Atap Dag Beton -


- Beton mutu f’c = 19,3 Mpa 2.00 m3 898,723.26 1,797,446.52 m3 m3 m3 ###
- Besi 214.60 kg 16,021.79 3,438,276.39 kg kg kg ###
- Begisting 17.00 m2 85,000.00 1,445,000.00 m2 m2 m2 ###
- Bongkaran begisting 17.00 m2 25,000.00 425,000.00 m2 m2 m2 425,000.00

11 Talang beton -
- Beton mutu f’c = 19,3 Mpa 3.00 m3 898,723.26 2,696,169.78 m3 m3 m3 ###
- Besi 318.20 kg 16,021.79 5,098,133.96 kg kg kg ###
- Begisting 33.60 m2 85,000.00 2,856,000.00 m2 m2 m2 ###
- Bongkaran begisting 33.60 m2 25,000.00 840,000.00 m2 m2 m2 840,000.00

12 Canopi beton -
- Beton mutu f’c = 19,3 Mpa 0.30 m3 898,723.26 269,616.98 m3 m3 m3 269,616.98
- Besi 24.90 kg 16,021.79 398,942.60 kg kg kg 398,942.60
- Begisting 4.50 m2 85,000.00 382,500.00 m2 m2 m2 382,500.00
- Bongkaran begisting 4.50 m2 25,000.00 112,500.00 m2 m2 m2 112,500.00

SUB JUMLAH 148,237,778.87 ###


D PEKERJAAN LANTAI
1 Pekerjaan Pemasangan Lantai keramik 40/40 cm unpolish Platinum 36.00 m2 91,250.11 3,285,003.93 m2 m2 m2 ###
2 Pekerjaan Pemasangan Plin keramik 9 X 40 cm 45.00 m 41,151.18 1,851,803.05 m m m ###

SUB JUMLAH 5,136,806.98 ###


No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
E PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pembuatan pintu P.3 2.00 unit 2,100,000.00 4,200,000.00 unit unit unit ###
2 Pintu P.5 1.00 unit 2,100,000.00 2,100,000.00 unit unit unit ###
3 Pembuatan Jendela j.1 3.00 bh 1,800,000.00 5,400,000.00 bh bh bh ###
4 Pembuatan Jendela j.2 6.00 bh 1,800,000.00 10,800,000.00 bh bh bh ###
5 Pembuatan Jendela j.2 2.00 bh 1,800,000.00 3,600,000.00 bh bh bh ###
6 Glass box GB.1 12.50 m2 400,000.00 5,000,000.00 m2 m2 m2 ###
SUB JUMLAH 31,100,000.00 ###
F PEKERJAAN PLAFON
1 Memasang langit-langit Gypsum tebal 9 mm + rangka hollow 172.50 m2 129,019.01 22,255,778.60 m2 m2 m2 ###
2 List Gypsum 5-10 cm 126.70 m 16,955.33 2,148,239.99 m m m ###
SUB JUMLAH 24,404,018.59 ###
G PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 163.20 m2 195,062.10 31,834,135.27 m2 m2 m2 ###
2 Pemasangan Penutup Atap Genteng Keramik Glasur 40.00 m2 246,416.81 9,856,672.54 m2 m2 m2 ###
3 Pemasangan Nok/Kerpus Genteng Keramik Glasur 5.00 m 125,057.30 625,286.49 m m m 625,286.49
4 Penutup Atap Galvalum 123.20 m2 165,948.84 20,444,897.63 m2 m2 m2 ###
5 Nok Atap Galvalum 13.90 m1 111,981.46 1,556,542.27 m1 m1 m1 ###
6 Memasang lisplank ukuran (0,9 x 20) cm, Kalsiplang 10.00 m 40,000.00 400,000.00 m m m 400,000.00
7 Memasang lisplank Kayu Jati Banyu tumetes ukuran 2x2x20 cm 8.00 m 60,000.00 480,000.00 m m m 480,000.00
8 Canopi lantai 1 7.24 m2 195,062.10 1,412,249.63
9 Seng Krul
SUB JUMLAH 66,609,783.83 ###
H PEKERJAAN FINISHING
1 Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 515.60 m2 20,809.48 10,729,370.06 m2 m2 m2 ###
2 Pengecatan tembok tidak terlindung dari panas dan hujan 122.00 m2 31,173.73 3,803,194.91 m2 m2 m2 ###
3 Cat Plafon 172.50 m2 14,650.60 2,527,227.80 m2 m2 m2 ###
4 Cat Kayu listplang 2.20 m2 14,650.60 32,231.31 m2 m2 m2 32,231.31
5 Waterproofing dag beton dan talang 25.80 m2 70,307.34 1,813,929.26 m2 m2 m2 ###

SUB JUMLAH 18,905,953.34 ###


I PEKERJAAN LISTRIK
1 Instalasi Titik Lampu 22.00 titik 130,000.00 2,860,000.00 titik titik titik ###
2 Instalasi Titik stop kontak 4.00 titik 130,000.00 520,000.00 titik titik titik 520,000.00
3 fiting lampu downlight 5" 22.00 bh 65,000.00 1,430,000.00 bh bh bh ###
4 Saklar dobel 2.00 bh 35,000.00 70,000.00 bh bh bh 70,000.00
5 Saklar tunggal 1.00 bh 35,000.00 35,000.00 bh bh bh 35,000.00
6 Stop kontak 4.00 bh 35,000.00 140,000.00 bh bh bh 140,000.00
7 Lampu LED 13 w Philips 22.00 bh 110,000.00 2,420,000.00 bh bh bh ###
SUB JUMLAH 7,475,000.00 ###
J PEKERJAAN PLUMBING
1 Instalasi air bersih pipa 1" distribusi 8.00 m 31,000.00 248,000.00 m m m 248,000.00
2 Instalasi air bersih pipa 3/4" 8.00 m 34,000.00 272,000.00 m m m 272,000.00
3 Instalasi air bekas pipa 3" 6.00 m 130,000.00 780,000.00 m m m 780,000.00
4 Instalasi air bekas pipa 4" 6.00 m 154,000.00 924,000.00 m m m 924,000.00
5 Instalasi air hujan pipa 4" 16.00 m 90,000.00 1,440,000.00 m m m ###
6 water toren 500 l 1.00 unit 1,600,000.00 1,600,000.00 unit unit unit ###
SUB JUMLAH 5,264,000.00 ###

V PEKERJAAN PAGAR DEPAN GEDUNG


1 Pekerjaan galian dan Urugan
a. Galian Biasa < 1m 3.43 m3 58,626.90 201,377.53
b. Urugan Pasir 5cm 0.25 m3 231,811.16 56,874.87
c. Urugan Tanah Kembali 1.09 m3 41,672.08 45,391.31

2 Pekerjaan Pasangan
a. Pekerjaan Pondasi Pasangan Batu Kali 1 : 4 1.89 m3 601,620.23 1,137,062.23
b. Pasangan Dinding Batu bata Merah 1Pc : 6Pp 2.78 m2 84,575.94 235,332.55
c. Plesteran 7.29 m2 37,397.42 272,496.32
d. Acian 7.29 m2 16,416.04 119,615.49
e. Cat Tembok exterior 7.29 m2 31,173.73 227,147.37
f. Pasangan Batu andhesit 10x20 cm 2.78 m2 260,000.00 723,450.00
g. Pengecatan Batu Andhesit 2.78 m2 31,173.73 86,740.90
No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
3 Pelrerjaan Beton dan Pembesian
Sloof 15 x 20 cm
Cor Beton Fc 7.4 Mpa 0.21 m3 786,600.00 165,421.98
Pembesian Sloof 35.68 Kg 16,021.79 571,701.09
Pemasangan Bekisting 2.84 m2 85,000.00 241,740.00
Pelepasan bekisting 2.84 m2 25,000.00 71,100.00

4 Kolom Praktis 15 x 15 cm
Cor Beton Fc 7,4 Mpa 0.18 m3 786,600.00 141,588.00
Pembesian Kolom Praktis 71.87 Kg 16,021.79 1,151,513.90
Pemasangan Bekisting 0.80 m2 85,000.00 68,000.00
Pelepasan bekisting 0.80 m2 25,000.00 20,000.00

5 Pekerjaan pagar dan Tralis Railing


Tralis Besi Hollow 4.00 m2 260,000.00 1,040,000.00
Pagar Dorong Pintu masuk 6.00 m2 190,000.00 1,140,000.00

SUB JUMLAH 7,716,553.54


No. ITEM PEKERJAAN HARGA SAT. JUMLAH HARGA JUMLAH JUMLAH JUMLAH
VOLUME SAT. VOLUME SAT. VOLUME SAT VOLUME SAT
(Rp) SEBELUM PPN HARGA HARGA HARGA
V PEKERJAAN LANDSCAPE
1 Pemasangan Perkerasan Conblok 55.00 m2 140,000.00 7,700,000.00 m2 m2 m2 ###
2 Pembuatan Pagar Besi 6.80 m2 260,000.00 1,768,000.00 m2 m2 m2 ###
3 Pembuatan Reling Tangga stainless steel 5.50 m2 190,000.00 1,045,000.00 m2 m2 m2 ###
4 Pembuatan Reling Selasar stainless steel 7.50 m2 190,000.00 1,425,000.00 m2 m2 m2 ###
5 Pembuatan Tangga Stainless steel m3 190,000.00 -
SUB JUMLAH 11,938,000.00 ###
VI PEKERJAANLAIN LAIN
1 Ornamen Arsitektur, 2 bh Unpak Semen termasuk Finishing Cat 0.80 m2 700,000.00 560,000.00 m2 m2 m2 560,000.00
2 Ornamen Arsitektur, 2 bh Ornamen kolom bawah termasuk Finishing Cat Gradasi 1.20 m2 760,000.00 912,000.00 m2 m2 m2 912,000.00
3 Ornamen Arsitektur, 2 bh Ornamen Wajikan termasuk Finishing Cat Gradasi 0.10 m2 760,000.00 76,000.00 m2 m2 m2 76,000.00
4 Ornamen Arsitektur, 2 bh Ornamen kolom atas termasuk Finishing Cat Gradasi 1.20 m2 760,000.00 912,000.00 m2 m2 m2 912,000.00
5 Ornamen Arsitektur GRC Cetak Motif Kawung termasuk Finishing Cat 5.50 m2 760,000.00 4,180,000.00 m2 m2 m2 ###
6 Lis profil semen lebar 10 cm 10.50 m 29,000.00 304,500.00 m m m 304,500.00
7 Pembuatan Huruf dr plat galvanis tinggi hrf 20 cm tebal hrf 3 cm termasuk cat duco 22.00 hrf 30,000.00 660,000.00 hrf hrf hrf 660,000.00
8 Pembuatan Panggung knockdown 1.00 unit 3,000,000.00 3,000,000.00 unit unit unit ###
9 Talang Seng Samping 12.00 m' 70,000.00 840,000.00
SUB JUMLAH 11,444,500.00 ###
788,810,189.24 ###

Yogyakarta, Agustus 2019

Menyetujui
Disetujui Pejabat Pembuat Komitmen Mengetahui DIPERIKSA
Diperiksa DIBUAT
DIBUATOLEH
OLEH
Ka. Bid.. Prasarana Pengairan dan Drainase (PPKom) DIPERIKSA Kepala Dinas Kimpraswil Konsultan Ka. Sie.Pengawas Kontraktor
Kontraktor
Kota CV CAHAYA
Pengairan BUMI MAYA CV.
CV.DINAR
DINARARSITEK
ARSITEK
Yogyakarta Selaku
Mengetahui
Disetujui 1. Mengetahui Diperiksa
Disetujui
Penawar
Pimpinan
Ka.
Kepala
Bid.. Prasarana
Dinas Kimpraswil
Pengairan dan Drainase
Disetujui Kepala Dinas Kimpraswil Ka.
Mengetahui Ka.Seksi.
Kegiatan
DiperiksaBid..
CV.
Kota Yogyakarta
Ka. Bid.. Prasarana Pengairan dan Drainase 2.. Kepala Dinas KimpraswilKota Drainase
Prasarana
MKB
Ka. 2006
ALAM
Sie.
Ir. Toto Suroto Yogyakarta
Kota Pengairan
Selaku
Drs. Supriyadi Pengairan
PERMAI
NIP. 490 029 728 Ir.Yogyakarta
Eko Suryo Pimpinan
dan
Selaku
Nip. 19651127 199203 1 006
Ir. Toto Suroto
Disetujui 3. NIP.
Mengetahui
490 027 943 Kegiatan
Drainase
Diperiksa
Pimpinan Triyono Widodo
NIP. 490
Ka. Bid.. Prasarana 029 728 dan Drainase
Pengairan Adian
KepalaHeri
Dinas Yuniawan,
KimpraswilST. Selaku
Ka. Sie.
Kegiatan
Ir. Eko Suryo Kota
Team Leader PPTK
Ir. Indiyah
Pengairan
4. MKB 2006 Pelaksana
Pelaksana
NIP. 490Ir. 027
Toto943
Suroto Ir. Eko Suryo
Yogyakarta NIP.Selaku
490 028
NIP. 490 029 728 Ir.NIP.
Eko490 027 943
Suryo SITI
Budi
Pimpinan
814
NIP. 490 027 943 NURMAI
Rahardjo,
Kegiatan BE
NIP.
MKBMUNAH,
Ir.
010Toto
088
2006
Ir. Toto Suroto DIPERIKSA
Suroto
127
AMd DIBUAT
Ir. Indiyah
NIP. 490 029 728 Ir. Eko Suryo CV CAHAYA
NIP.NIP.
BUMI
490490
PIMPINA028
MAYA CV. DINAR ARSITEK
NIP. 490 027 943 029
814N728

Ir. Indiyah
NIP. 490 028
814

Febri Lavanjaya S.Pd Bening Aprilia Solihayati, S.T.


Direktur Direktur