HARGA
NO JENIS PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.) TOTAL HARGA Rp.
SATUAN (Rp.)
Rumah
LANTAI 1
I PEKERJAAN PERSIAPAN
1 Uitzet dan pengukuran ls 1.00 450,000.00 450,000.00
2 Bongkaran ls 1.00 1,250,000.00 1,250,000.00
3 Pembersihan lokasi ls 1.00 1,250,000.00 1,250,000.00
2,950,000.00
LANTAI 2
I PEKERJAAN PASANGAN DAN PLESTERAN 57,651,541.69
II PEKERJAAN BETON BERTULANG 62,252,786.28
III PEKERJAAN KAYU 22,663,343.40
IV PEKERJAAN ATAP 30,489,841.26
V PEKERJAAN LANTAI 5,814,382.50
VI PEKERJAAN BESI & KACA 856,287.69
VII PEKERJAAN PENGGANTUNG & PENGUNCI 3,346,625.00
VIII PEKERJAAN SANITAIR 3,838,733.70
IX PEKERJAAN CAT-CATAN 8,780,675.25
X INSTALASI LISTRIK 1,660,000.00