No.
Uraian Pekerjaan
Volume
Sat.
Harga Sat.
(Rp.)
Jumlah
(Rp.)
1.
36.00
16,688
600,750
2.
2.072
595,845
1,234,591
TOTAL
(Rp.)
600,750
1,835,340.84
3.
36
m'
48,958.34
1,762,500
0.540
881,945
476,250
12
btg
60,000
720,000
4,794,091.29
4.
4236
pcs
3,750
15,885,000
5.
36
m2
100,778
3,627,990
6.
64.80 m2
156,173
10,120,000
7.
36
73,958
2,662,500
20,679,091.29
24,307,081.29
34,427,081.16
m2
37,089,581.31
8.
unit
422,875
422,875
4.50
m2
17,889
80,499
c. Septitank
1.000
unit
525,000
525,000
38,117,956
9.
m'
33,750
135,000
m'
33,750
135,000
m'
8,438
33,750
38,421,706
10.
pcs
84,375
421,875
38,843,581
11.
10
hr
625,000
6,250,000
45,093,581
12.
bh
937,500
3,750,000
bh
250,000
250,000
bh
250,000
1,000,000
JUMLAH
50,093,581
Per m 2
1,391,488.35
Pembulatan
1,400,000.00