Pekerjaan
Lokasi
NO
URAIAN PEKERJAAN
VOL
SAT
HARGA SATUAN
JUMLAH HARGA
1
I
PEKERJAAN PERSIAPAN
Pembongkaran Existing
Pembongkaran Rumah Lama
II
PEKERJAAN SIPIL
A.
PEKERJAAN TANAH
PEKERJAAN PONDASI
PEKERJAAN STRUKTUR
Pondasi Poer
Sloof Beton 20 x 30 cm
- Beton K.250
- Pembesian
- Bakesting (3 kali Pakai)
Ls
4.000.000,00
4.000.000,00
88,00
M3
67.650,00
5.953.200,00
4,50
M3
36.400,00
163.800,00
69,48
M3
36.400,00
2.529.072,00
0,75
M3
36.400,00
27.300,00
74,73
M3
16.220,00
1.212.120,60
4,34
M3
91.650,00
397.761,00
17,37
M3
238.410,00
4.141.181,70
58,12
M3
449.430,00
26.120.871,60
0,98
M3
1.800.000,00
1.764.000,00
5,21
M3
722.459,80
3.764.015,56
572,14
Kg
15.329,00
8.770.334,06
17,40
M2
161.334,90
2.807.227,26
Kolom 30 x 30 cm
- Beton K.250
- Pembesian
- Bakesting (3 kali Pakai)
1,00
1,57
M3
722.459,80
1.134.261,89
149,57
Kg
15.329,00
2.292.758,53
6,96
M2
270.308,20
1.881.345,07
Kolom 20 x 20 cm
- Beton K.250
1,97
M3
722.459,80
1.423.245,81
126,09
Kg
15.329,00
1.932.833,61
13,15
M2
270.308,20
3.554.552,83
Kolom Praktis 11 x 11 cm
81,80
M1
179.580,20
14.689.660,36
Balok Beton 15 x 25 cm
- Pembesian
- Beton K.250
3,26
M3
722.459,80
2.355.218,95
286,87
Kg
15.329,00
4.397.430,23
20,30
M2
256.048,20
5.197.778,46
Balok Beton 11 x 15 cm
36,50
M3
210.000,00
7.665.000,00
- Pembesian
- Beton K.250
10,58
M3
722.459,80
7.643.624,68
105,84
M2
57.000,00
6.032.880,00
- Bakesting Bondek
105,84
M2
75.000,00
7.938.000,00
III
PEKERJAAN ARSITEKTUR
PEKERJAAN PASANGAN
379,00
M2
58.650,00
22.228.350,00
563,00
M2
22.679,00
12.768.277,00
48,00
M2
26.601,40
1.276.867,20
Acian
611,00
M2
12.630,00
7.716.930,00
24,64
M2
124.170,00
3.059.548,80
Pasangan Roster
18,00
Bh
26.701,37
480.624,66
PEKERJAAN LANTAI
9,45
M2
91.650,00
866.092,50
Pasangan Keramik
10.344.825,70
- Keramik Lantai 40 x 40 cm
104,66
M2
98.842,21
- Keramik Lantai WC 20 x 20 cm
10,08
M2
89.684,50
904.019,76
- Keramik Dinding WC 20 x 20 cm
16,65
M2
85.369,50
1.421.402,18
529.626,20
PEKERJAAN ATAP
0,25
M3
2.118.504,80
0,09
M3
4.826.899,00
434.420,91
71,12
M2
56.175,00
3.995.166,00
24,00
M1
27.155,00
651.720,00
PEKERJAAN PLAFOND
1
2
101,47
M2
148.291,00
15.047.087,77
0,60
M3
8.337.191,25
5.002.314,75
2,94
M2
708.500,00
2.082.990,00
10,08
M2
708.500,00
7.141.680,00
6,00
Bh
350.000,00
2.100.000,00
1,00
Bh
1.000.000,00
1.000.000,00
1,24
M2
502.200,00
622.728,00
1,44
M2
502.200,00
723.168,00
0,29
M2
502.200,00
145.638,00
10
1,00
M2
502.200,00
502.200,00
11
0,40
M2
893.300,00
357.320,00
3,08
M2
93.830,00
288.996,40
10
24,00
Bh
35.000,00
840.000,00
11
28,00
Bh
30.000,00
840.000,00
12
7,00
Bh
240.000,00
1.680.000,00
13
7,00
Bh
30.000,00
210.000,00
14
14,00
Bh
30.000,00
420.000,00
15
28,00
Bh
25.000,00
700.000,00
PEKERJAAN PENGECETAN
Pengecetan Dinding
611,00
M2
25.360,00
15.494.960,00
57,95
M2
29.110,00
1.686.924,50
PEKERJAAN SANITARY
7,00
Btg
43.910,00
307.370,00
7,00
Set
38.110,00
266.770,00
7,00
Btg
53.910,00
377.370,00
7,00
Set
48.110,00
336.770,00
12,00
Btg
22.610,00
271.320,00
2,00
Set
50.000,00
100.000,00
1,00
Unit
1.500.000,00
1.500.000,00
IV
PEKERJAAN ELEKTRIKAL
48,00
Ttk
83.020,00
3.984.960,00
Pasangan Lampu
- Lampu 18 Watt
10,00
Ttk
42.820,00
428.200,00
- Lampu 5 Watt
7,00
Ttk
29.820,00
208.740,00
14,00
Ttk
44.110,00
617.540,00
2,00
Ttk
50.610,00
101.220,00
14,00
M2
50.610,00
708.540,00
Pasangan Saklar
- Saklar Tunggal
- Saklar Ganda
PEKERJAAN MEKANIKAL
1,00
Unit
1.500.000,00
1.500.000,00
1,00
Bh
2.500.000,00
2.500.000,00
PEKERJAAN AKHIR
1,00
Ls
1.000.000,00
1.000.000,00
263.562.152,53