II PEKERJAAN TANAH
1 Galian Tanah 10.425 m3 55,786 581,569
2 Urugan peninggian peil lantai 3.003 m3 192,390 577,747
3 Pasir urug bawah lantai 0.901 m 3
192,390 173,343
JUMLAH II 1,332,660