1 Pekerjaan Persiapan
1.1. Pembersihan Lapangan & Pematangan lahan 1.0 Ls 7,778,610.00 7,778,610.00
1.2. Pemasangan Bouplank/Pengukuran 1.0 Ls 6,667,380.00 6,667,380.00
1.3. Pengadaan Air Kerja 1.0 Ls 5,556,150.00 5,556,150.00
1.4. Pengadaan Listrik Kerja [3 phase] 1.0 Ls 15,000,000.00 15,000,000.00
1.5. Pembuatan Gedung Semen dan Alat 1.0 Ls 10,000,000.00 10,000,000.00
1.6. Pembuatan bedeng 1.0 Ls 15,000,000.00 15,000,000.00
60,002,140.00
106,090,821.06
4 Pekerjaan Tangga
4.1 Pek. Tangga Besi Finish cat 1.0 ls 6,178,700.0 6,178,700.0
4.2 Pek. Railling Besi Finish cat 14.7 M2 842,250.0 12,381,075.0
18,559,775.00
5 Pekerjaan RAILLING
5.1. Pek. Railling holo 2/4 tiang 4/4 5.5 M2 657,302.1 3,615,161.6
3,615,161.55
6 Pekerjaan Area R.Parkir
6.1 Pek. Paving Blok + Kanstin 392.5 M2 65,000.0 25,512,500.0
25,512,500.00
7 Pengadaan Kontainer [REKONDISI+INTERIOR]
7.1 Pek. Kontainer 8.0 bh 40,221,200.0 321,769,600.0
321,769,600.00
8 Pek. Atap
8.1 Pek. Rangka Atap Baja Ringan 0.75 295.0 M2 111,357.4 32,850,433.0
8.2. Pek. Penutup Atap Metal Pasir 295.0 M2 75,840.8 22,373,021.3
55,223,454.25